Exhibit 4.1
EXECUTION VERSION
LOAN GUARANTEE AGREEMENT
dated as of February 20, 2014
between
GEORGIA POWER COMPANY, as Borrower,
and
U.S. DEPARTMENT OF ENERGY, as Guarantor
Plant Vogtle Nuclear Units 3&4
Burke County, Georgia
Table of Contents
Page
|
|
|
|
|
|
ARTICLE 1
|
|
DEFINITIONS; RULES OF INTERPRETATION
|
1
|
|
1.1.
|
|
Definitions.
|
1
|
|
1.2.
|
|
Rules of Interpretation.
|
2
|
|
1.3.
|
|
Conflict with FFB Credit Facility Documents.
|
2
|
ARTICLE 2
|
|
FUNDING
|
2
|
|
2.1.
|
|
Summary of Key Terms; Financial Plan.
|
2
|
|
2.2.
|
|
Availability of Advances.
|
4
|
|
2.3.
|
|
Mechanics for Requesting Advances.
|
4
|
|
2.4.
|
|
Mechanics for Funding Advances.
|
5
|
|
2.5.
|
|
Advance Requirements under the FFB Credit Facility Documents.
|
6
|
|
2.6.
|
|
No Approval of Work.
|
6
|
|
2.7.
|
|
Borrower Funding Commitments.
|
6
|
|
2.8.
|
|
Approval of Maturity Extension Election Notices by DOE after Notice from FFB.
|
7
|
ARTICLE 3
|
|
PAYMENTS; PREPAYMENTS
|
7
|
|
3.1.
|
|
Place and Manner of Payments.
|
7
|
|
3.2.
|
|
Interest Provisions Relating to All Advances.
|
8
|
|
3.3.
|
|
Prepayments.
|
9
|
|
3.4.
|
|
Payment of Credit Subsidy Cost and Fees.
|
12
|
|
3.5.
|
|
Evidence of Debt.
|
13
|
|
3.6.
|
|
DOE Late Penalty Charge.
|
13
|
ARTICLE 4
|
|
CONDITIONS PRECEDENT TO ADVANCES
|
13
|
|
4.1.
|
|
Conditions Precedent to Guarantee Issuance Date and Initial Advance.
|
13
|
|
4.2.
|
|
Conditions Precedent to Each Advance.
|
24
|
ARTICLE 5
|
|
REPRESENTATIONS AND WARRANTIES
|
28
|
|
5.1.
|
|
Organization.
|
28
|
|
5.2.
|
|
Authorization; No Conflict.
|
28
|
|
5.3.
|
|
Legality; Validity; Enforceability.
|
29
|
|
5.4.
|
|
Capitalization.
|
29
|
|
5.5.
|
|
Title.
|
29
|
|
5.6.
|
|
Security Interests.
|
29
|
|
5.7.
|
|
Required Consents.
|
30
|
|
5.8.
|
|
Governmental Judgments.
|
30
|
|
5.9.
|
|
Tax.
|
31
|
|
5.10.
|
|
Compliance with Governmental Rules.
|
31
|
|
5.11
|
|
Environmental, Health and Safety Matters.
|
31
|
|
5.12.
|
|
Investment Company Act.
|
32
|
|
5.13.
|
|
Regulation of Secured Parties.
|
32
|
Table of Contents
Page
|
|
|
|
|
|
|
5.14.
|
|
ERISA.
|
33
|
|
5.15.
|
|
Intellectual Property.
|
34
|
|
5.16.
|
|
No Defaults or Mandatory Prepayment Events.
|
35
|
|
5.17.
|
|
No Judgment Liens; No Delinquent Indebtedness.
|
35
|
|
5.18.
|
|
Sufficiency of Project Documents.
|
35
|
|
5.19.
|
|
Financial Statements.
|
35
|
|
5.20.
|
|
Project Milestone Schedule; Construction Budget; and Borrower Base Case Projections.
|
36
|
|
5.21.
|
|
Sufficient Funds.
|
36
|
|
5.22.
|
|
Fees and Enforcement.
|
36
|
|
5.23.
|
|
No Additional Fees.
|
36
|
|
5.24.
|
|
U.S. Government Requirements.
|
36
|
|
5.25.
|
|
Insolvency Proceedings; Solvency.
|
38
|
|
5.26.
|
|
Use of Proceeds.
|
38
|
|
5.27.
|
|
No Material Adverse Effect.
|
38
|
|
5.28.
|
|
Certain Program Requirements.
|
39
|
|
5.29.
|
|
No Omissions.
|
39
|
|
5.30.
|
|
DOE Approval of EPC Contract Replacements.
|
39
|
ARTICLE 6
|
AFFIRMATIVE COVENANTS
|
39
|
|
6.1.
|
|
Information Covenants.
|
39
|
|
6.2.
|
|
Books, Records and Inspections; Accounting and Auditing Matters.
|
51
|
|
6.3.
|
|
Maintenance of Insurance.
|
53
|
|
6.4.
|
|
Maintenance of Existence.
|
53
|
|
6.5.
|
|
Construction and Operation of Project.
|
53
|
|
6.6.
|
|
Use of Proceeds.
|
53
|
|
6.7.
|
|
Maintenance of Liens and Collateral
|
53
|
|
6.8.
|
|
Creation and Perfection of Security Interests; Additional Documents; Filings and Recordings.
|
53
|
|
6.9.
|
|
Acceptance, Startup and Testing.
|
55
|
|
6.10.
|
|
Technology.
|
55
|
|
6.11.
|
|
Compliance with Certain U.S. Government Requirements.
|
56
|
|
6.12.
|
|
Suspension of EPC Contract.
|
59
|
ARTICLE 7
|
NEGATIVE COVENANTS
|
59
|
|
7.1.
|
|
Liens.
|
59
|
|
7.2.
|
|
Corporate Existence.
|
60
|
|
7.3.
|
|
Affiliate Transactions; Commissions.
|
60
|
|
7.4.
|
|
Amendment of Certain Project Documents.
|
60
|
|
7.5.
|
|
Use of Non-AP1000 Reactor Technology.
|
62
|
|
7.6.
|
|
Margin Regulations.
|
62
|
|
7.7.
|
|
ERISA.
|
62
|
|
7.8.
|
|
Investment Company Act.
|
62
|
|
7.9.
|
|
Replacement or Removal of the Operator or Owners’ Agent.
|
62
|
Table of Contents
Page
|
|
|
|
|
|
|
7.10.
|
|
Casualty Loss Proceeds.
|
63
|
|
7.11.
|
|
Fuel Supply Agreements.
|
63
|
ARTICLE 8
|
|
EVENTS OF DEFAULT; REMEDIES
|
63
|
|
8.1.
|
|
Events of Default.
|
63
|
|
8.2.
|
|
Remedies for Events of Default.
|
70
|
|
8.3.
|
|
Automatic Acceleration.
|
71
|
|
8.4.
|
|
Delivery of Remedies Instructions.
|
71
|
|
8.5.
|
|
Appointment of a Receiver.
|
72
|
|
8.6.
|
|
DOE Independent Rights.
|
72
|
ARTICLE 9
|
|
REIMBURSEMENT AGREEMENT
|
72
|
|
9.1.
|
|
Reimbursement Obligation.
|
72
|
|
9.2.
|
|
Payments and Computations.
|
72
|
|
9.3.
|
|
Obligations Absolute
|
73
|
|
9.4.
|
|
Security
|
75
|
|
9.5.
|
|
DOE Rights.
|
75
|
|
9.6.
|
|
Further Assurances.
|
75
|
ARTICLE 10
|
|
MISCELLANEOUS
|
75
|
|
10.1.
|
|
Addresses.
|
75
|
|
10.2.
|
|
Further Assurances.
|
76
|
|
10.3.
|
|
Delay and Waiver.
|
77
|
|
10.4.
|
|
Right of Set Off.
|
77
|
|
10.5.
|
|
Amendment or Waiver.
|
77
|
|
10.6.
|
|
Entire Agreement.
|
78
|
|
10.7.
|
|
Governing Law.
|
78
|
|
10.8.
|
|
Severability.
|
78
|
|
10.9.
|
|
Financial Statements.
|
78
|
|
10.10.
|
|
Limitation on Liability.
|
78
|
|
10.11.
|
|
Waiver of Jury Trial.
|
78
|
|
10.12.
|
|
Consent to Jurisdiction.
|
79
|
|
10.13.
|
|
Successors and Assigns.
|
80
|
|
10.14.
|
|
Participations
|
80
|
|
10.15.
|
|
Reinstatement
|
80
|
|
10.16.
|
|
No Partnership; Etc.
|
80
|
|
10.17.
|
|
Payment of Costs and Expenses; Indemnification.
|
81
|
|
10.18.
|
|
Counterparts.
|
84
|
|
10.19.
|
|
No Prejudice to IRS Determination of Tax Basis.
|
84
|
|
10.20.
|
|
Completion Costs Non-Recourse.
|
84
|
|
10.21.
|
|
Covenant Defeasance.
|
84
|
|
10.22.
|
|
Restoration.
|
87
|
|
10.23.
|
|
Collateral Agent.
|
88
|
Table of Contents
Page
|
|
|
|
Exhibits to the Loan Guarantee Agreement
|
|
|
|
|
Exhibit A
|
Definitions
|
|
Exhibit B
|
Rules of Interpretation
|
|
Exhibit C-1
|
Form of Borrower Guarantee Issuance Date Certificate
|
|
Exhibit C-2
|
Form of Borrower Advance Date Certificate
|
|
Exhibit C-3
|
Form of Borrower Financial Officer Certificate
|
|
Exhibit C-4
|
Form of Borrower Pre-Closing Certificate
|
|
Exhibit D-1
|
Form of Lender’s Engineer Guarantee Issuance Date Certificate
|
|
Exhibit D-2
|
Form of Lender’s Engineer Advance Date Certificate
|
|
Exhibit E
|
Form of Insurance Advisor Certificate
|
|
Exhibit F
|
Form of Advance Notice
|
|
Exhibit G
|
Davis-Bacon Act Required Provisions
|
|
Exhibit H
|
Form of Lien Waivers and Releases
|
|
Exhibit I
|
Form of Contractor Affidavit
|
|
Exhibit J
|
DOL Letter
|
|
Exhibit K
|
Form of Additional Project Document Consent to Assignment
|
|
Exhibit L-1
|
Form of Restricted Data Site Nondisclosure Agreement for Outside Legal Counsel
|
|
Exhibit L-2
|
Form of Nondisclosure Agreement for Lender’s Engineer
|
|
Exhibit L-3
|
Definitions of “competitor of Westinghouse” and “competitor of Stone &Webster”
|
|
Exhibit M
|
Form of Project Cost Spreadsheet
|
|
|
|
|
Schedules to the Loan Guarantee Agreement
|
|
|
|
Schedule 4.1.2
|
Principal Project Document Matters
|
|
Schedule 4.1.4(d)(i)
|
Unapproved Expenditures in Construction Monitoring Reports
|
|
Schedule 4.1.4(d)(iv)
|
Outstanding Rights to Appeal Certificate, Construction Monitoring Orders and NCCR Tariff Orders
|
|
Schedule 4.1.33
|
Form of Borrower Appropriations Act Certificate
|
|
Schedule 4.1.34
|
Form of MEAG Appropriations Act Certificate
|
|
Schedule 5.4
|
Equity Interests of the Borrower and Operator
|
|
Schedule 5.7
|
Required Consents
|
|
Schedule 5.8
|
Governmental Judgments
|
|
Schedule 5.11(a)
|
Compliance with Environmental Laws
|
|
Schedule 6.3
|
Required Insurances
|
|
Schedule 6.11(h)(i)
|
Davis-Bacon Act Wage Determinations
|
|
Schedule 7.4
|
Provisions of Certain Project Documents Not to Be Amended without DOE Consent
|
|
Schedule 10.1
|
Addresses
|
|
LOAN GUARANTEE AGREEMENT
This LOAN GUARANTEE AGREEMENT (this “
Agreement
”), dated as of February 20, 2014, is by and between (i) Georgia Power Company, a corporation organized and existing under the laws of the State of Georgia (the “
Borrower
”) and (ii) the U.S. DEPARTMENT OF ENERGY, acting by and through the Secretary of Energy (or appropriate authorized representative thereof) (“
DOE
” or the “
Guarantor
”).
RECITALS
WHEREAS, the Borrower, together with each of the other Owners, intends to expand the facilities at the existing nuclear power generating facility commonly known as the Alvin W. Vogtle Electric Generating Plant located in Burke County, Georgia, near Waynesboro, Georgia, on the west bank of the Savannah River, by developing, constructing, owning, operating and maintaining two additional nuclear generating units, consisting of two Westinghouse AP1000 nuclear reactors, each with a nominally rated generating capacity of approximately 1,100 megawatts, natural draft cooling towers, intake and discharge structures, associated transmission facilities, fuel and ancillary structures supporting the power generation process (together, the “
Project
”), located adjacent to such existing facility.
WHEREAS, the Borrower has requested, for the purpose of financing a portion of its ownership interest in the Project, that:
(i) FFB enter into the FFB Note Purchase Agreement to evidence its agreement to (A) make Advances in an aggregate principal amount not to exceed three billion four hundred sixty-two million four hundred nine thousand one hundred seventeen Dollars ($3,462,409,117) and (B) purchase from the Borrower the FFB Promissory Note evidencing the Borrower’s obligation to repay such Advances; and
(ii) the Guarantor guarantee all of the obligations of the Borrower under the FFB Promissory Note pursuant to the DOE Guarantee;
WHEREAS, the execution of this Agreement is a condition precedent to DOE’s issuance of the DOE Guarantee, and FFB’s receipt of the DOE Guarantee is a condition precedent to FFB’s execution of the FFB Credit Facility Documents.
NOW, THEREFORE, in consideration of the foregoing, DOE’s entering into this Agreement, and other good and valid consideration, the receipt and adequacy of which are hereby expressly acknowledged, the parties hereby agree as follows:
ARTICLE 1
DEFINITIONS; RULES OF INTERPRETATION
Except as otherwise expressly provided herein, capitalized terms used in this Agreement and its exhibits and schedules shall have the meanings given in
Exhibit A
hereto.
|
|
1.2
|
Rules of Interpretation
.
|
Except as otherwise expressly provided herein, the rules of interpretation set forth in
Exhibit B
hereto shall apply to this Agreement.
|
|
1.3
|
Conflict with FFB Credit Facility Documents
.
|
Except as otherwise expressly provided herein, in the case of any conflict between the terms of this Agreement and the terms of any FFB Credit Facility Document, the terms of this Agreement, as between the Borrower and the Secured Parties party thereto, shall control.
ARTICLE 2
FUNDING
|
|
2.1
|
Summary of Key Terms; Financial Plan
.
|
2.1.1.
Summary of Key Terms
.
The following is a summary of certain key terms, conditions and dates. To the extent of any inconsistency between the provisions of this
Section 2.1
and any other provision of this Agreement, the provisions of this Agreement other than this
Section 2.1
shall control:
|
|
|
|
Base Project Costs
|
|
U.S. Dollars ($)
|
Eligible Base Project Costs (including guaranteed loan contingency)
|
|
4,946,298,739
|
Ineligible Base Project Costs
|
|
169,472,487
|
Base Project Costs
|
|
5,115,771,226
|
|
|
|
Funding of Eligible Base Project Costs
|
|
|
FFB Credit Facility Commitment
|
|
3,462,409,117
|
Base Funding
|
|
1,483,889,622
|
|
|
|
Funding of Ineligible Base Project Costs
|
|
|
Base Funding
|
|
169,472,487
|
|
|
|
Funding of Overrun Project Costs
|
|
|
Overrun Funding
|
|
100% of all Overrun Project Costs in accordance with
Section 2.7
|
|
|
|
|
Completion of Project
|
|
|
Anticipated Completion Date
|
|
Fourth calendar quarter of 2018
|
|
|
|
Certain Key Terms
|
|
|
Last Day for an Advance
|
|
December 31, 2020
|
First Principal Payment Date
|
|
February 20, 2020
|
Maturity Date
|
|
February 20, 2044
|
2.1.2.
Financial Plan
.
The proposed sources and uses of financing with respect to the Borrower’s Undivided Interest are set forth in the Financial Plan below:
|
|
|
|
|
|
|
SOURCES
:
|
|
Debt
|
|
|
Maximum Amount of DOE Guaranteed Loan
|
|
$3,462,409,117
|
|
|
|
|
|
Borrower Funding
|
|
|
|
Base Funding
|
|
$1,653,362,109
|
|
Overrun Funding
|
100% of all Overrun Project Costs in accordance with
Section 2.7
|
|
|
Total Borrower Funding
|
|
$1,653,362,109
|
TOTAL SOURCES
|
|
|
$5,115,771,226
|
USES:
|
|
|
|
Plant in Service Costs:
|
|
$4,798,651,392
|
|
Loan Guarantee Support Costs
|
|
$10,779,067
|
|
Independent Evaluator and monitoring Costs:
|
|
$7,289,779
|
|
Financing Cost:
|
|
$26,828,405
|
|
Nuclear Fuel Costs
(1)
:
|
|
$174,713,904
|
|
Guaranteed Loan Contingency:
|
|
$97,508,676
|
|
|
|
|
|
|
|
|
TOTAL USES (BASE PROJECT COSTS):
|
|
|
|
$5,115,771,226
|
(1) Of the nuclear fuel costs, $169,472,487 represent Ineligible Project Costs.
|
|
2.2
|
Availability of Advances
.
|
2.2.1.
Availability
.
Subject to the satisfaction (or waiver by DOE) of each applicable condition precedent set forth in this Agreement and satisfaction (or waiver by FFB) of each applicable condition precedent in the FFB Credit Facility Documents, Advances shall be made during the Availability Period.
2.2.2.
FFB Credit Facility Commitment Reductions and Cancellations
.
The Borrower may, on not less than fifteen (15) days prior written notice to DOE and upon the satisfaction of any consent requirement or other applicable provisions of each FFB Credit Facility Document, permanently cancel or reduce the unutilized portions of the FFB Credit Facility Commitment, in whole or in part, but only if:
(a)
each partial reduction is in an amount permitted under the FFB Credit Facility Documents;
(b)
the Borrower certifies in writing that any such partial reduction could not reasonably be expected to impair the completion of the Project by the Anticipated Completion Date; provided that no such certification shall be required in connection with the prepayment in full of the DOE Guaranteed Loan pursuant to
Section 3.3.2(a)
; and
(c)
upon such cancellation or reduction, the Borrower pays all fees, Periodic Expenses, and other amounts then due with respect to such cancellation or reduction under the Loan Documents.
Once canceled, the FFB Credit Facility Commitment may not be reinstated, and once reduced, the FFB Credit Facility Commitment may not be increased.
2.2.3.
No Obligation to Make Advances
.
Nothing in this Agreement obligates the Secured Parties to make Advances to the Borrower. Any Advances will be made solely by FFB pursuant to the FFB Credit Facility Documents.
|
|
2.3
|
Mechanics for Requesting Advances
.
|
2.3.1.
Advance Notices
.
(a)
The Borrower may request an Advance by delivering to DOE, with a copy to the Lender’s Engineer, an appropriately completed Advance Notice with respect to such Advance at any time not less than (i) eighteen (18) Business Days prior to the Requested Advance Date in the case of an Advance in an amount less than $500,000,000, (ii) twenty (20) Business Days prior to the Requested Advance date in the case of an Advance in an amount equal to or greater
$500,000,000 and less than $2,000,000,000, and (iii) twenty-five (25) Business Days prior to the Requested Advance date in the case of an Advance in an amount equal to or greater than $2,000,000,000 (except that the eighteen (18) Business Day, twenty (20) Business Day and twenty-five (25) Business Day requirements shall not apply in the case of the initial Advance). Without DOE’s written consent, the Borrower may not request an Advance more frequently than once per calendar quarter.
(b)
Each Advance Notice shall be in the form set forth in
Exhibit F
or otherwise in form and substance acceptable to DOE.
|
|
2.4
|
Mechanics for Funding Advances
.
|
2.4.1.
Satisfaction of Conditions Precedent
. If DOE determines that (i) the Advance Notice has been satisfactorily completed, (ii) all conditions precedent set forth in
Article 4
applicable to the requested Advance have been satisfied (or waived) and (iii) the FFB Advance Request and all other certificates and documentation required under the FFB Credit Facility Documents in respect of the requested Advance have been provided and are satisfactory (or have been waived), then, no later than fifteen (15) Business Days from DOE’s receipt of the Advance Notice with respect to such Advance (except that such fifteen (15) Business Day requirement shall not apply in the case of the initial Advance), DOE shall sign the FFB Advance Request Approval Notice attached to the FFB Advance Request accompanying such Advance Notice, and forward it together with such FFB Advance Request to FFB with a copy to the Borrower and the Lender’s Engineer.
2.4.2.
Drawstop Notices
.
(a)
Issuance
. At any time after DOE forwards an Advance Notice to FFB and prior to the FFB’s making of the Advance requested therein, whether or not DOE has issued an FFB Advance Request Approval Notice, DOE may issue a notice (a “
Drawstop Notice
”) to FFB pursuant to Section 7.4(d) of the FFB Note Purchase Agreement or otherwise pursuant to the FFB Credit Facility Documents, if DOE has determined that:
i.
the conditions in
Article 4
with respect to such Advance are not met or, having been met, are no longer met; or
ii.
the conditions precedent to such Advance contained in the FFB Credit Facility Documents are not met or, having been met, are no longer met.
(b)
Consequences
. If a Drawstop Notice is issued, the requested Advance shall not be made, unless DOE shall have delivered a notice to FFB indicating that DOE has waived the conditions precedent referred to in
clauses (a)(i)
and
(ii)
of this
Section 2.4.2
that were not met or were no longer met or that such conditions precedent have been met to its satisfaction (such notice, a “
Drawstop Withdrawal Notice
”). The issuance of a Drawstop Notice shall not preclude the Borrower from resubmitting an Advance Notice within the same or subsequent calendar quarter (notwithstanding
Section 2.3.1
) with respect to all or any portion of the same Advance.
(c)
Costs
. The Borrower shall pay all expenses incurred by DOE, FFB and the Collateral Agent (including all fees and Periodic Expenses of the Independent Consultants) in respect of any Advance that is not made due to the issuance of a Drawstop Notice.
(d)
Copies to Borrower; No Effect on Validity
. DOE shall make commercially reasonable efforts to provide a copy of each Drawstop Notice and Drawstop Withdrawal Notice to the Borrower upon the issuance thereof, provided that the failure to deliver a copy of any such notice to the Borrower shall have no effect on its validity.
2.4.3.
No Liability
.
No Secured Party shall have any liability to the Borrower or any Affiliate thereof or to any other Person solely arising from the issuance of or failure to issue for any reason (including due to an Uncontrollable Cause as defined both hereunder and in the FFB Note Purchase Agreement) any FFB Advance Request Approval Notice, Drawstop Notice, or any other notice contemplated by this
Section 2.4
, except in each case to the extent of such Secured Party’s gross negligence or willful misconduct as determined by a court of competent jurisdiction in a final non-appealable Governmental Judgment.
|
|
2.5
|
Advance Requirements under the FFB Credit Facility Documents
.
|
Notwithstanding anything to the contrary contained in this
Article 2
, the Borrower also shall comply with all disbursement requirements set forth in the FFB Credit Facility Documents.
|
|
2.6
|
No Approval of Work
.
|
None of (x) the signing of any FFB Advance Request Approval Notice by DOE, (y) DOE’s forwarding any FFB Advance Request Approval Notice, FFB Advance Request or Advance Notice to FFB or (z) the making of any Advance under the Loan Documents shall be deemed an approval or acceptance by any Secured Party of any work, labor, supplies, materials or equipment furnished or supplied with respect to the Project.
|
|
2.7
|
Borrower Funding Commitments
.
|
Prior to or concurrently with each Advance, the Borrower agrees to pay from sources other than the DOE Guaranteed Loan, (i) at least 30% of the sum of the Eligible Base Project Costs being financed or reimbursed using the proceeds of such Advance plus all other Eligible Project Costs incurred to date and 100% of all Ineligible Base Project Costs previously incurred or then required to be paid (such obligation, the “
Base Funding Commitment
”) and (ii) 100% of all Overrun Project Costs previously incurred or then required to be paid (if any) (such obligation, the “
Overrun Funding Commitment
” and, together with the Base Funding Commitment, collectively, the “
Funding Commitments
”); provided that the Funding Commitments shall terminate (a) upon the occurrence of any Mandatory Prepayment Event described in
clause (iii)
or
(iv)
of the definition of Mandatory Prepayment Event or (b) in the event the FFB Credit Facility Commitment is cancelled or terminated for any reason.
|
|
2.8
|
Approval of Maturity Extension Election Notices by DOE after Notice from FFB
.
|
If DOE receives any notice from FFB pursuant to Section 14(a)(3)(B) of the FFB Promissory Note requiring DOE to approve each Maturity Extension Election Notice (as defined therein) delivered by the Borrower after the date of such notice, then DOE shall approve each such Maturity Extension Election Notice so long as no Potential Default, Event of Default, Potential Mandatory Prepayment Event or Mandatory Prepayment Event is continuing.
ARTICLE 3
PAYMENTS; PREPAYMENTS
|
|
3.1.
|
Place and Manner of Payments
.
|
3.1.1.
Generally
.
All payments due under the DOE Guaranteed Loan shall be made by the Borrower pursuant to the terms of the FFB Credit Facility Documents and as specified herein.
3.1.2.
Net of Tax, Etc
.
(a)
Tax
. Any and all payments to any Secured Party by the Borrower hereunder or under any other Loan Document shall be made free and clear of, and without deduction for, any and all Taxes excluding (i) taxes imposed on or measured by the net income (however denominated) of such Secured Party by any jurisdiction or any political subdivision or taxing authority thereof or therein solely as a result of a present or former connection between such Secured Party and such jurisdiction or political subdivision (other than any connection arising as a result of the transactions contemplated by the Loan Documents), and (ii) any withholding Taxes or other Tax based on gross income imposed by the United States of America (all such Taxes, other than those Taxes described in clauses (i) and (ii) of this
Section 3.1.2(a)
, the “
Covered Taxes
”). If the Borrower shall be required by law to withhold or deduct any Covered Taxes from or in respect of any sum payable hereunder or under any other Loan Document to any Secured Party, (A) the sum payable shall be increased as may be necessary so that after making all such required deductions (including deductions applicable to additional sums payable under this
Section 3.1.2
), such Secured Party receives an amount equal to the sum it would have received had no such deductions been made, (B) the Borrower shall make such deductions and (C) the Borrower shall pay the full amount deducted to the relevant taxation authority or other authority in accordance with all Governmental Rules. If the Borrower shall make any payment with respect to Covered Taxes under this
clause (a)
to or for the benefit of any Secured Party and if such Secured Party shall claim any credit or deduction for such Covered Taxes against any other Taxes payable by such Secured Party that are not Covered Taxes, then such Secured Party shall pay to the Borrower an amount equal to the amount such Secured Party determines, absent manifest error, is the amount by which such other Taxes are actually reduced;
provided
that the aggregate amount payable by such Secured Party pursuant to this sentence shall not exceed the aggregate amount previously paid by the Borrower with respect to such Covered Taxes.
(b)
Indemnity
. The Borrower hereby indemnifies each Secured Party for the full amount of Covered Taxes (including any Covered Taxes imposed by any jurisdiction on amounts payable under this
Section 3.1.2)
paid by any Secured Party, whether or not such Covered Taxes
were correctly or legally asserted. Each Secured Party shall give notice to the Borrower of the assertion of any claim against such Secured Party relating to such Secured Party’s Covered Taxes as promptly as is practicable after being notified of such assertion;
provided
that any failure to notify the Borrower promptly of such assertion shall not relieve the Borrower of its obligation under this
Section 3.1.2
, except, with respect to any such notice given by a Secured Party more than ninety (90) days after such Secured Party has notice or knowledge of such claim, to the extent that the Borrower is actually prejudiced by such failure. Payments by the Borrower pursuant to this indemnification shall be made within ten (10) days after the date such Secured Party makes written demand therefor (which may be submitted through DOE), which demand shall be accompanied by a certificate describing in reasonable detail the basis thereof. Each Secured Party agrees to repay to the Borrower any refund (including that portion of any interest that was included as part of such refund with respect to Covered Taxes paid by the Borrower pursuant to this
clause (b)
for the period following such Borrower payment) received by such Secured Party for Covered Taxes that were paid by the Borrower pursuant to this
clause (b)
, and to provide reasonable assistance to the Borrower (at the expense of the Borrower) to contest any such Covered Taxes that such Secured Party or the Borrower reasonably believes not to have been properly assessed.
(c)
Notice
. Within ten (10) days after the date of any payment of Covered Taxes by the Borrower, the Borrower shall furnish to each affected Secured Party the original or a certified copy of a receipt evidencing such payment or, if the relevant tax authority has not provided the Borrower with such a receipt, shall furnish such other evidence of such payment as may be available to the Borrower (in which case the Borrower shall promptly request a receipt from the relevant tax authority, and so furnish the original or a certified copy thereof promptly on receipt thereof). The Borrower shall compensate each Secured Party for all reasonable losses and expenses sustained by such Secured Party as a result of any failure by the Borrower to so furnish such copy of such evidence or, if available, such receipt.
(d)
Survival of Obligations
. The obligations of the Borrower under this
Section 3.1.2
shall survive the termination of this Agreement and the repayment of the Secured Obligations.
|
|
3.2.
|
Interest Provisions Relating to All Advances
.
|
3.2.1.
Interest Account and Interest Computations
.
(a)
Interest shall accrue on the unpaid principal amount of each Advance from the date such Advance is disbursed or deemed disbursed pursuant to the FFB Credit Facility Documents, to the date such Advance is paid in full, at a rate per annum relating thereto as specified in the FFB Promissory Note.
(b)
The Borrower hereby authorizes DOE to record in an account or accounts maintained by DOE (A) the interest rates applicable to all Advances, (B) the interest periods for each Advance outstanding, (C) the date and amount of each principal and interest payment on the DOE Guaranteed Loan, and (D) such other information as DOE may determine is necessary for the computation of interest payable by the Borrower hereunder.
(c)
All computations of interest (including with respect to the FFB Late Charge Rate on Overdue Amounts or any unpaid amounts under the Loan Documents, but excluding interest pursuant to
Section 9.2.1
) shall be made pursuant to the procedures set forth in the relevant FFB Credit Facility Documents.
(d)
The parties to this Agreement acknowledge that the amount of interest permitted to be capitalized in accordance with the FFB Promissory Note is zero (0). The Borrower shall not request, or use the proceeds of, any Advance to pay any interest that has accrued on the unpaid principal amount of any Advance.
3.2.2.
Interest Payment Dates
.
Subject to the terms of the FFB Credit Facility Documents, the Borrower shall pay accrued interest on the outstanding principal amount of each Advance on each Quarterly Payment Date, on prepayment (to the extent thereof), and at maturity (whether by acceleration or otherwise).
3.3.1.
Terms of all Prepayments
.
(a)
With respect to any prepayment of the DOE Guaranteed Loan, in whole or in part, and whether such prepayment is voluntary or mandatory, including a prepayment upon acceleration, the Borrower shall comply with all applicable terms and provisions of the FFB Credit Facility Documents and this Agreement.
(b)
All prepayments of the DOE Guaranteed Loan shall be applied in accordance with, and shall be subject to the terms and conditions (including conditions as to prepayment premiums or discounts) as set forth in, the FFB Credit Facility Documents.
(c)
The Borrower may not reborrow any amount of the DOE Guaranteed Loan that is prepaid; provided that the provisions of Section 14 of the FFB Promissory Note shall not constitute a prepayment of the DOE Guaranteed Loan for purposes of this
Section 3.3.1(c)
. Any “Maturity Extension” (as defined in the FFB Promissory Note) for any Advance as provided in the FFB Credit Facility Documents shall not be considered for purposes hereof prepayment of principal.
3.3.2.
Voluntary Prepayments
.
(a)
Prior to Commercial Operation of the Second Unit, without the consent of DOE, the Borrower may not prepay the DOE Guaranteed Loan (i) in part or (ii) in whole unless, in the case of this
subclause (ii)
, the Borrower simultaneously cancels the outstanding FFB Credit Facility Commitment.
(b)
After Commercial Operation of the Second Unit has occurred, or, if prior to the Commercial Operation of the Second Unit, upon satisfaction of the requirements of
Section 3.3.2(a)
, the Borrower may prepay the principal amount of any Advance in whole or in part upon no less than five (5) Business Days’ prior written notice submitted by the Borrower to FFB. Any prepayment in whole or in part shall be subject to satisfaction of the following conditions:
(i)
such prepayment (if in part) shall be in an amount no less than $100,000;
(ii)
compliance with any restrictions contained in the FFB Credit Facility Documents, including satisfaction of any minimum amount requirement of the FFB Credit Facility Documents; and
(iii)
payment of all accrued and unpaid interest on such principal amount, and any other fees and Periodic Expenses then payable, including any prepayment premiums, or other amounts as may be required under the Loan Documents.
(c)
Any prepayment pursuant to this
Section 3.3.2
shall be applied as directed by the Borrower in accordance with the FFB Promissory Note.
3.3.3.
Mandatory Prepayments
.
(a)
Mandatory Prepayments in Connection with Certain Events of Taking
. If, as a result of any Event of Taking, any Condemnation Proceeds in excess of ten million Dollars ($10,000,000) per Event of Taking are received by or on behalf of the Borrower for the account of the Borrower, the Borrower shall be required to make a mandatory prepayment of the DOE Guaranteed Loan in the amount of all such Condemnation Proceeds. Each mandatory prepayment under this
clause (a)
shall be made on the Payment Date immediately following the receipt of such Condemnation Proceeds.
(b)
Awards of Disputed Amounts under EPC Contract
. To the extent the proceeds of any Advances are used to fund any amounts in dispute with the EPC Contractor, and, following the resolution of the dispute, the Borrower receives any payments from the EPC Contractor reimbursing it for all or any portion of such amounts, the Borrower shall be required to make a mandatory prepayment of the DOE Guaranteed Loan in an amount equal to the difference between the aggregate amount of all Advances made pursuant to the FFB Credit Facility Documents as of the date of receipt of such payments
minus
seventy percent (70%) of the aggregate amount of Eligible Project Costs in respect of the Borrower’s Undivided Interest at the time of the determination of the amount to be prepaid. Each mandatory prepayment under this clause (b) shall be made upon receipt of such reimbursement payments. In the event any computation required in the first sentence of this clause (b) results in an amount of zero or less, no mandatory prepayment shall be required in connection with the applicable reimbursement payments.
(c)
Casualty Loss Proceeds
.
(i)
If as a result of an Event of Loss, other than an Event of Loss that constitutes a Mandatory Prepayment Event pursuant to
clause (vi)
of the definition thereof, any Casualty Loss Proceeds in excess of ten million Dollars ($10,000,000) per occurrence are received by or on behalf of the Borrower for the account of the Borrower and such proceeds are not applied towards the repair or restoration of the relevant portion of the Project, the Borrower’s Undivided Interest or the Collateral, then the Borrower shall be required to make a mandatory prepayment of the DOE Guaranteed Loan in the amount of all such Casualty Loss Proceeds. Each mandatory prepayment under this
clause (c)(i)
shall be made upon receipt of such Casualty Loss Proceeds.
(ii)
If as a result of an Event of Loss that constitutes a Mandatory Prepayment Event pursuant to
clause (vi)
of the definition thereof, any Casualty Loss Proceeds are received by or on behalf of the Borrower for the account of the Borrower, then the Borrower shall be required to make a mandatory prepayment of the DOE Guaranteed Loan in the full amount of all Casualty Loss Proceeds in respect of such loss. Each mandatory prepayment under this
clause (c)(ii)
shall be (A) made upon receipt of such Casualty Loss Proceeds or, in the case of any such Casualty Loss Proceeds received prior to the occurrence of such Mandatory Prepayment Event, immediately following the occurrence of such Mandatory Prepayment Event and (B) applied to each Level Principal Amount in order of maturity.
(d)
Mandatory Prepayment Events
. Upon the occurrence of a Mandatory Prepayment Event:
(i)
DOE may (A) suspend or terminate the commitment to guarantee any further Advances and (B) shall not be required to (1) review any Advance Notice or (2) forward to FFB any FFB Advance Request Approval Notice; and
(ii)
DOE may deliver a Mandatory Prepayment Notice to the Borrower.
(e)
Effect of Notice
. Upon delivery to the Borrower of a Mandatory Prepayment Notice, DOE may, in its discretion, suspend or terminate the FFB Credit Facility Commitment, and the Borrower shall be required to prepay the outstanding principal amount of the DOE Guaranteed Loan, commencing on the next Quarterly Payment Date immediately following the Borrower’s receipt of such notice, with equal payments of principal in twenty (20) consecutive quarterly installments on each Quarterly Payment Date. The level principal amount payable on each Quarterly Payment Date shall be equal to the aggregate outstanding principal amount of the DOE Guaranteed Loan immediately prior to the first such Quarterly Payment Date divided by 20 (the “
Level Principal Amount
”), and the amount of principal to be prepaid on any Quarterly Payment Date shall be equal to the positive difference, if any, of the Level Principal Amount to be made on such date (as such amount may be reduced pursuant to
Section 3.3.3(c)(ii)
)
minus
the regularly scheduled principal amount due on such Quarterly Payment Date (any such prepayment amount, a “
Quarterly Prepayment Amount
”). Subject to
Section 2.7 and Section 10.21
, from and after the delivery of a Mandatory Prepayment Notice, the Borrower shall continue to perform and observe all other obligations under the Loan Documents to which it is a party until the Debt
Termination Date, subject in all cases to the survival of any provisions of the Loan Documents that survive the Debt Termination Date.
(f)
In connection with any prepayments required pursuant to this
Section 3.3.3
, the Borrower shall provide notice of such prepayment to the FFB in accordance with the requirements of Section 15 of the FFB Promissory Note (which requires notice at least five (5) Business Days in advance of each Quarterly Payment Date on which a mandatory prepayment is required), which notice shall include the amount of principal to be prepaid (which shall not be less than the applicable Quarterly Prepayment Amount) and the Advance or Advances to which such prepayment shall be applied. As provided in the FFB Promissory Note, such prepayments shall be applied to the scheduled repayments of outstanding principal for each applicable Advance in inverse order of maturity. In the event the Borrower fails to provide such notice to DOE, the required Quarterly Prepayment Amount shall be applied pro rata amongst the principal of each outstanding Advance and, as to each Advance, to the scheduled repayments of outstanding principal of such Advance in inverse order of maturity.
|
|
3.4.
|
Payment of Credit Subsidy Cost and Fees
.
|
(a)
Prior to or concurrently with the issuance of the DOE Guarantee, the Borrower shall pay to DOE, (i) the remaining portion of the DOE Loan Facility Fee, (ii) the Credit Subsidy Cost in respect of the DOE Guarantee, as determined by DOE and approved by OMB (the “
DOE
Guaranteed Loan Credit Subsidy Cost
”), and (iii) in accordance with
clause (c)
of this
Section 3.4
, the initial installment of the DOE Maintenance Fee.
(b)
The Borrower shall pay to FFB the fees payable to FFB from time to time in accordance with the requirements of the FFB Credit Facility Documents.
(c)
The Borrower shall pay to DOE the DOE Maintenance Fee each year in advance until the Debt Termination Date, commencing on the Guarantee Issuance Date, and on January 1 of each calendar year thereafter; provided that (i) for the calendar year in which the Guarantee Issuance Date occurs, the DOE Maintenance Fee shall be pro-rated on a daily basis for the number of days starting with the Guarantee Issuance Date and ending on December 31 of such calendar year and (ii) for the calendar year in which the Maturity Date is scheduled to occur, the DOE Maintenance Fee shall be pro-rated on a daily basis for the number of days starting with January 1 of such calendar year and ending on the Maturity Date, provided that, in the case of this
subclause (ii)
, if the Debt Termination Date does not occur on or before the Maturity Date, then the Borrower shall promptly pay to DOE the balance of the DOE Maintenance Fee for such calendar year.
(d)
The Borrower shall pay to DOE the DOE Modification Reimbursement Payments, if any, in the amount(s) and at the time(s) reasonably determined by DOE.
(e)
All DOE Guaranteed Loan Fees shall be paid on the dates due, in immediately available funds in Dollars, to DOE or FFB, as applicable. Once paid, the DOE Guaranteed Loan Fees shall not be refundable under any circumstances; provided, however, that the amounts payable pursuant to
Section 3.4(a)
shall become non-refundable upon the execution and delivery of this Agreement.
(f)
All amounts payable to DOE under this
Section 3.4
shall be paid by wire transfer to the following account, or to such other account as may be specified by DOE from time to time.
|
|
U.S. Treasury Department
|
ABA No. TREASNYC/CTR/BNF =
|
OBI =
|
DOE shall maintain, in accordance with its usual practice, internal records evidencing the amounts from time to time (i) advanced by FFB under the FFB Note Purchase Agreement, (ii) paid by DOE with respect to the DOE Guarantee and, (iii) principal and interest amounts paid by the Borrower with respect to the foregoing. In the event of any conflict among the records of DOE and FFB, absent manifest error, the records of FFB shall prevail with regards to
subclauses (i)
and
(ii)
above and the records of DOE shall prevail with regards to
subclause (iii)
above.
|
|
3.6.
|
DOE Late Penalty Charge
.
|
If the Borrower fails to pay in accordance with the terms of the FFB Credit Facility Documents, this Agreement or any other Loan Document (whether at scheduled maturity, as a mandatory prepayment, by acceleration or otherwise) any principal of or interest on the DOE Guaranteed Loan when such principal or interest is due and payable, the Borrower shall pay to DOE the DOE Late Penalty Charge no later than three (3) Business Days after such amounts become due and payable. All amounts payable to DOE under this
Section 3.6
shall be paid in accordance with
Section 3.4(f)
.
ARTICLE 4
CONDITIONS PRECEDENT TO ADVANCES
|
|
4.1.
|
Conditions Precedent to Guarantee Issuance Date and Initial Advance
.
|
The obligation of the Guarantor to issue the DOE Guarantee and forward to FFB the FFB Advance Request Approval Notice with respect to the initial Advance is subject to the prior satisfaction (or waiver in writing), as determined in all cases by DOE, of each of the following conditions precedent (and of any deliverable, as to its form and substance) as of the Guarantee Issuance Date and to their continued satisfaction on the Advance Notice Date and the Advance Date for the initial Advance.
4.1.1.
Loan Documents
.
DOE shall have received fully executed originals, in sufficient counterparts for each Secured Party that is a party thereto (provided that there shall be only one original of the FFB Promissory Note), of each of the following documents:
(a)
Loan Guarantee Agreement
. This Agreement.
(b)
FFB Credit Facility Documents
. Each of the following FFB Credit Facility Documents:
(i)
the FFB Program Financing Agreement;
(ii)
the FFB Note Purchase Agreement;
(iii)
the FFB Promissory Note;
(iv)
the DOE Guarantee; and
(v)
all other documents, certificates and instruments required to be delivered on or before the Guarantee Issuance Date in connection with the foregoing.
(c)
Security Documents
. Each of the following Security Documents:
(i)
the Deed to Secure Debt;
(ii)
the Collateral Agency Agreement; and
(iii)
all other documents, certificates and instruments required under the Security Documents and this Agreement to be delivered on or before the Guarantee Issuance Date in connection with the foregoing.
(d)
Direct Agreements
. Each of the following Direct Agreements:
(i)
the Owners Direct Agreement;
(ii)
the Southern Nuclear Direct Agreement;
(iii)
the Consent to Assignment, dated as of the date hereof, among the Borrower, the EPC Contractor and the Collateral Agent;
(iv)
the Consent to Assignment, dated as of the date hereof, among the Borrower, the Operator, Westinghouse Electric Company LLC and the Collateral Agent, with respect to the Westinghouse Fuel Assembly Agreement and the Westinghouse License Agreement;
(v)
the Consent to Assignment, dated as of the date hereof, among Toshiba Corporation, the Borrower and the Collateral Agent; and
(vi)
the Consent to Assignment, dated as of the date hereof, among The Shaw Group, Inc., the Borrower and the Collateral Agent.
4.1.2.
Principal Project Documents
.
(a)
DOE shall have received complete copies of each of the following fully executed documents, each certified by the Borrower that (x) such copy is a true, correct and complete copy of such document (including all schedules, exhibits, attachments, supplements and amendments thereto and any related Protocols and Side Letters), (y) such document has been duly executed and delivered by the Borrower (as applicable) and is in full force and effect, and (z) neither the Borrower nor, to the Borrower’s Knowledge, any other party to such document is, or but for the passage of time or giving of notice or both will be, in breach of any obligation thereunder except for any such breach that (i) could not reasonably be expected to have a material adverse effect on the completion or operation of the Project, or (ii) is disclosed on
Schedule 4.1.2
hereto.
(i)
Land Documents
. Each of the title deed or deeds for the Project Site.
(ii)
Operating Documents
. Each of the following Operating Documents:
(1)
the Fuel Disposal Agreements (other than those to be entered into after the Guarantee Issuance Date); and
(2)
the Nuclear Operating Agreement.
(iii)
Owner Documents
. Each of the following Owner Documents:
(1)
the Development Agreement;
(2)
the Nuclear Managing Board Agreement;
(3)
the Ownership Agreement;
(4)
the Declaration of Covenants;
(5)
the Cost Allocation Procedures; and
(6)
the Operating Agreement.
(iv)
the Letter Agreement for Construction Services.
(b)
The Borrower shall have established a confidential password-protected electronic data site that allows employees of DOE and outside legal counsel to DOE, on a need to know basis, to review from time to time (but not download or print) (the “
Restricted Data Site
”) complete, unredacted electronic copies of each of the following executed documents (provided that any such outside legal counsel of DOE shall be entitled to review only such documents as are authorized for review by such outside legal counsel pursuant to
Section 6.1(p)
, and provided further that such documents shall be made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
), each certified by the Borrower that (x) such copy is a true, correct and complete copy of such document (including all schedules, exhibits, attachments, supplements and amendments thereto and any related Protocols and Side Letters), (y) such document has been duly executed and delivered by the Borrower (as applicable) and is
in full force and effect, and (z) neither the Borrower nor, to the Borrower’s Knowledge, any other party to such document is, or but for the passage of time or giving of notice or both will be, in breach of any obligation thereunder except for any such breach that (i) could not reasonably be expected to have a material adverse effect on the completion or operation of the Project, or (ii) is disclosed on
Schedule 4.1.2
hereto.
(i)
Construction Contracts
. The EPC Contract.
(ii)
Operating Documents
. Each of the following Operating Documents:
(1)
the Westinghouse Fuel Assembly Agreement;
(2)
the Westinghouse License Agreement; and
(3)
the Software License.
(iii)
the Toshiba Guarantee.
(iv)
the Shaw Guarantee.
4.1.3.
Pre-Closing Project Costs Report
.
DOE shall have received: (a) a detailed description, with supporting documents as reasonably requested by DOE, of expenditures for Project Costs incurred and paid by the Borrower or any Affiliate of the Borrower prior to the Guarantee Issuance Date, which description shall specify those expenditures for which the Borrower seeks credit to be applied toward Base Funding; and (b) a certificate from the Lender’s Engineer and the Borrower certifying that such Project Costs have been applied in accordance with the Construction Budget.
4.1.4.
Rate Recovery Authorization
(a)
DOE shall have received copies of the final amended certification order and all orders on remand entered by the Georgia PSC in Docket No. 27800-U (collectively, the “
Certificate
”) through the Guarantee Issuance Date, which orders relate to the Borrower’s right to recover certain Project Costs through regulated rates in accordance with and subject to the requirements of applicable Georgia law (Official Code of Georgia Annotated, 46-3A-1 through 46-3A-11);
(b)
DOE shall have received copies of each order entered by the Georgia PSC on the semi-annual construction monitoring reports filed by the Borrower pursuant to the Certificate (such orders collectively, the “
Construction Monitoring Orders
”; such reports collectively, the “
Construction Monitoring Reports
”) through the Guarantee Issuance Date, which orders relate to the Georgia PSC’s verification and approval of expenditures for Project Costs;
(c)
DOE shall have received copies of each order in Georgia PSC Dockets 31958 and 32539 (the “
NCCR Tariff Orders
”) through the Guarantee Issuance Date, which orders relate to the Borrower’s ability to recover financing costs associated with the Borrower’s Undivided Interest; and
(d)
DOE shall have received a Borrower Certificate certifying that:
(i)
the Georgia PSC has, subject to Official Code of Georgia Annotated Section 46-3A-7, verified and approved all expenditures incurred for Project Costs identified in all Construction Monitoring Reports for all periods through December 31, 2012 except (A) as set forth on
Schedule 4.1.4(d)(i)
and (B) that the Borrower’s inability to recover all of the expenditures set forth on
Schedule 4.1.4(d)(i)
through regulated rates could not reasonably be expected to have a material adverse effect on the ability of the Borrower to repay Advances when due or the ability of the Project to be completed,
(ii)
the NCCR Tariff Orders authorize the Borrower to recover financing costs associated with the Borrower’s Undivided Interest through the Nuclear Construction Cost Recovery Schedule tariff (the “
NCCR Tariff
”) as filed or, if modified, without any material adverse effect on the Borrower’s ability to recover financing costs associated with the Borrower’s Undivided Interest through the NCCR Tariff,
(iii)
except for the Certificate, the Construction Monitoring Orders and the NCCR Tariff Orders, there are no other orders relating to the Borrower’s right to recover Project Costs or financing costs associated with the Borrower’s Undivided Interest, and
(iv)
no appeals of the Certificate, the Construction Monitoring Orders or the NCCR Tariff Orders are pending and, except as set forth on
Schedule 4.1.4(d)(iv)
, all rights to appeal the Certificate, the Construction Monitoring Orders or the NCCR Tariff Orders have expired.
4.1.5.
Borrower Base Case Projections; Project Milestone Schedule; Construction Budget; Advance Schedule; Employment Projections
.
DOE shall have received (other than the Project Milestone Schedule, which shall be made available on the Restricted Data Site and made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
), at least thirty (30) days prior to the Guarantee Issuance Date (or such shorter period as may be satisfactory to DOE), the following items, certified by the Borrower in a Borrower Certificate substantially in the form of
Exhibit C-4
(
Form of Borrower Pre-Closing Certificate
) as prepared in good faith based upon assumptions believed by the Borrower to be reasonable, in each case as of the date of preparation and as of the Guarantee Issuance Date:
(a)
the Borrower Base Case Projections, including a summary of the underlying assumptions and explanations thereto;
(b)
the Summary Project Milestone Schedule;
(c)
the Project Milestone Schedule;
(d)
the Construction Budget;
(e)
the Advance Schedule; and
(f)
projections for jobs created and maintained in the U.S. as a result of the Project for each calendar year occurring during the term of the DOE Guaranteed Loan.
4.1.6.
Financial Statements
.
(a)
(i)
Delivery of Financial Statements
. DOE shall have received (i) the most recent audited and unaudited Financial Statements from each of the Borrower and Chicago Bridge & Iron Company N.V. and the most recent audited Financial Statements with respect to Toshiba Corporation, and (ii) a Financial Officer Certificate substantially in the form of
Exhibit C-3
(
Form of Borrower Financial Officer Certificate
) with respect to the Borrower’s Financial Statements that certifies that the Borrower has attached true, complete and correct copies of such Financial Statements of the Borrower and includes the certifications set forth in
Section 6.1(e)
with respect to the Financial Statements of the Borrower. DOE acknowledges and agrees that in connection with the Borrower’s delivery of Financial Statements of Chicago Bridge & Iron Company N.V. and Toshiba Corporation, the Borrower is making no representations or warranties with respect to such Financial Statements.
(ii)
Current Reports on Form 8-K
. DOE also shall have received any Current Reports on Form 8-K filed by the Borrower with the United States Securities and Exchange Commission subsequent to the date of the most recent unaudited Financial Statements delivered by the Borrower pursuant to this
Section 4.1.6(a)
.
(b)
No Material Adverse Effect
. DOE shall have determined that no event or condition shall have occurred since the date of the most recent audited and unaudited Financial Statements of the Borrower delivered to DOE that had or could reasonably be expected to have a material adverse effect on the business, properties or financial condition of the Borrower or a material adverse effect on the ability of the Project to be completed.
4.1.7.
Update of Conditional Commitment
.
Either (i) DOE shall have determined that there are not any material changes to the terms and conditions of the Conditional Commitment or (ii) at least thirty (30) days prior to the Guarantee Issuance Date (or such shorter period as may be satisfactory to DOE), DOE shall have received a written summary of any such changes, which shall be approved by the Secretary of Energy and reflected in this Agreement.
4.1.8.
Update of Credit Rating
.
DOE shall have received a credit rating of the Borrower from Moody’s, S&P or Fitch dated not less than thirty (30) days prior to the Guarantee Issuance Date, based on the updated commitment of DOE reflected in the FFB Credit Facility Documents and assuming that the FFB Credit Facility Commitment does not benefit from the DOE Guarantee.
4.1.9.
COL; Required Consents
.
DOE shall have received (i) certification from the Borrower, together with such other evidence as DOE may request, that all necessary consents and waivers under any other current Indebtedness or Other Obligations of the Borrower have been duly obtained and are not subject
to any conditions, except as disclosed to, and as are satisfactory to, DOE on
Schedule 5.7
, (ii) certification from the Borrower, together with such other evidence as DOE may request, that the COLs, Georgia PSC approval of the issuance of indebtedness under the Loan Documents, and all other Required Consents listed on
Schedule 5.7
(except those identified on
Schedule 5.7
as to be obtained at a later stage in the development of the Project) have been duly obtained and are not subject to any waiting period or appeal (except for the waiting periods and appeals that are disclosed to, and as are satisfactory to, DOE on
Schedule 5.7)
, and (iii) a copy of each COL, Georgia PSC approval of the issuance of indebtedness under the Loan Documents, and each other Required Consent listed on
Schedule 5.7
and requested by DOE (except those identified on
Schedule 5.7
as to be obtained at a later stage in the development of the Project), certified by the Borrower as being true, correct and complete.
4.1.10.
Insurance
.
DOE shall have received (i) certification from the Borrower and the Insurance Advisor that all Required Insurance is in place, and in full force and effect without default and all premiums due thereon (x) have been paid in full, (y) are to be paid with the proceeds of the initial Advance, or (z) are to be paid by other arrangements satisfactory to DOE and (ii) certificates or policies with respect to all Required Insurance, designating the Secured Parties as additional insureds to the extent required by
Schedule 6.3
, certified by the Borrower and the Insurance Advisor as being true, correct and complete.
4.1.11.
Notice to Proceed
.
DOE shall have received a copy of the “Full Notice to Proceed” (as defined in the EPC Contract), certified by the Borrower as a true, complete and correct copy.
4.1.12.
Security Interests
.
(a)
Security Interests
. DOE shall have received evidence that all Liens in the Collateral intended to be created by the Security Documents have been created and, where appropriate, have been (or, subject to arrangements satisfactory to DOE, will be) registered or otherwise perfected to create a first priority perfected Lien over the Collateral in favor of the Collateral Agent, subject only to Permitted Liens and the December 2013 Mechanic’s Lien Exception. To the extent each such Lien arises or attaches under the Uniform Commercial Code of any jurisdiction in the U.S., it shall be valid and enforceable and shall constitute a first priority perfected security interest, subject only to Permitted Liens. In all other cases, each such Lien shall be enforceable against the Borrower, any subsequent lienor (including a judgment lienor), any junior lienor, or any transferee for or not for value, in bulk, by operation of law, for the benefit of creditors, or otherwise.
(b)
Filings
. DOE shall have received evidence that (i) each of the Security Documents has been (or arrangements satisfactory to DOE have been made so that it will be) duly filed and registered or recorded in every jurisdiction in which such filing and registration or recording is necessary or advisable to make valid and effective the Liens intended to be created thereby and the rights of the Secured Parties thereunder, (ii) all fees and duties in connection with such filing, registration or recording (x) have been paid in full, (y) are to be paid with the
proceeds of the requested Advance, or (z) are to be paid by other arrangements satisfactory to DOE.
4.1.13.
Authority and Incumbency of Major Project Participants
.
DOE shall have received certified copies of each of the Borrower’s and the Operator’s Organizational Documents, good standing certificates, incumbency certificates and resolutions, and any other such documents as DOE may reasonably request, with respect to approval of (i) each such Major Project Participant’s participation in the Project, (ii) in the case of the Borrower, the financing therefor and the granting of Liens pursuant to the Security Documents, and (iii) the execution, delivery and performance by each such Major Project Participant of the Transaction Documents (including any Direct Agreements) to which it is party.
4.1.14.
Guarantee Issuance Date Certificates
.
DOE shall have received:
(a)
a Borrower Certificate, substantially in the form of
Exhibit C-1
(
Form of Borrower Guarantee Issuance Date Certificate
), regarding the matters required to be certified by it as set forth in this
Section 4.1
, and such other certifications as may be required to be made to the Secured Parties by the Borrower as of the Guarantee Issuance Date under the FFB Credit Facility Documents;
(b)
a Lender’s Engineer Certificate, substantially in the form of
Exhibit D-1
(
Form of Lender’s Engineer Guarantee Issuance Date Certificate)
, dated as of the Guarantee Issuance Date, regarding the matters required to be certified by it as set forth in this
Section 4.1
, including a certification as to the reasonableness and appropriateness of (A) the Construction Budget, (B) the Summary Project Milestone Schedule, (C) the Project Milestone Schedule, (D) the Advance Schedule and (E) the Pre-Closing Project Costs Report; and
(c)
an Insurance Advisor Certificate, substantially in the form of
Exhibit E
(
Form of Insurance Advisor Certificate
), regarding the matters required to be certified by it as set forth in this
Section 4.1
.
4.1.15.
Legal Opinions
.
DOE shall have received the following legal opinions, each dated the Guarantee Issuance Date and in form and substance satisfactory to DOE:
(a)
one or more opinions of special counsel to the Borrower and the Operator with respect to matters of New York, Georgia and Federal law and the General Corporation Law of the State of Delaware, including (i) due authorization, execution and delivery and enforceability of the Loan Documents, the Owner Documents, the Nuclear Operating Agreement and the Letter Agreement for Construction Services, in each case to which each such Major Project Participant is a party, (ii) creation and perfection of security interests, (iii) receipt of all Governmental Approvals necessary to (1) recover Project Costs up to the revised total certified cost of six billion one hundred thirteen million Dollars ($6,113,000,000) as set forth in paragraph 4 of the stipulation adopted by the Georgia PSC in the first Construction Monitoring Order
through electricity rates regulated by the Georgia PSC in accordance with and subject to the requirements of applicable Georgia law (Official Code of Georgia Annotated, 46-3A-1 through 46-3A-11), (2) construct and operate the Project (other than those Governmental Approvals not required to be obtained as of such date), (3) enter into such Loan Documents, and that such Governmental Approvals are in full force and effect and all applicable appeal periods have expired, except for any waiting periods and appeals that have been disclosed to DOE, (iv) DOE will not be regulated as an electric corporation or public utility under the federal law of United States of America or the law of the State of Georgia solely as a result of entering into the Transaction Documents to which it is a party, and (v) absence of conflicts with law, material agreements identified in such opinion letter or Organizational Documents of such Major Project Participant;
(b)
opinion of in-house counsel to Westinghouse Electric Company LLC with respect to, among other things, due authorization, execution and delivery of the Transaction Documents to which Westinghouse Electric Company LLC is a party;
(c)
opinion of in-house counsel to Stone & Webster, Inc. with respect to, among other things, due authorization, execution and delivery of the Transaction Documents to which Stone & Webster, Inc. is a party; and
(d)
opinion of Balch & Bingham LLP, special Georgia counsel to the Owners’ Agent, with respect to, among other things, the enforceability of the EPC Contract, the Software License, the Westinghouse Fuel Assembly Agreement and the Westinghouse License Agreement.
4.1.16.
Lender’s Engineer Report
.
DOE shall have received a Lender’s Engineer Report, dated on or before the Guarantee Issuance Date, addressing such matters as DOE may reasonably request.
4.1.17.
Receipt of Credit Subsidy Cost and Fees
.
(a)
DOE shall have received payment in full of the DOE Guaranteed Loan Credit Subsidy Cost.
(b)
Each of DOE and FFB shall have received all amounts then due and payable to it pursuant to
Section 3.4
.
4.1.18.
Lobbying Certification
.
DOE shall have received evidence that the Borrower has provided a Standard Form-LLL “Disclosure Form to Report Lobbying”.
4.1.19.
Title to Project Site
. DOE shall have received (i) evidence of the Borrower’s ownership of fee simple title, under the relevant laws of the State of Georgia, to the real estate comprising the Borrower’s Undivided Interest subject only to Permitted Liens and the December 2013 Mechanic’s Lien Exception, (ii) the Required Survey with respect to the Project Site, and (iii) an ALTA Form 2006 Mortgagee Policy of Title Insurance (or similar policy form) issued by the Title Company, with such coinsurers or reinsurers as may be reasonably acceptable to DOE,
in the aggregate amount of not less than one hundred million Dollars ($100,000,000) insuring as of the Guarantee Issuance Date that the Deed to Secure Debt creates a first and prior Lien and security title on Borrower’s Undivided Interest in and to the Project Site (subject only to Permitted Liens and the December 2013 Mechanic’s Lien Exception) and containing all endorsements requested by DOE and available in the State of Georgia.
4.1.20.
Intellectual Property
.
DOE shall have received evidence that the Borrower, the Owners’ Agent and the Operator own or hold (or have available to them on commercially reasonable terms) a valid and enforceable license or right to use all Technology and Intellectual Property Rights necessary for the construction and operation of the Project through the Maturity Date (including all Intellectual Property Rights granted or conferred under the IP Agreements).
4.1.21.
Environmental; Compliance with NEPA
.
(a)
Environmental
. DOE has received certification from the Borrower, together with such other evidence as DOE may reasonably request of satisfaction as of the Guarantee Issuance Date of all material environmental requirements applicable to the Project (including required mitigations and the receipt of any required environmental consultations and permits) pursuant to applicable Environmental Laws and Governmental Approvals to the extent such material environmental requirements are required to be satisfied as of the Guarantee Issuance Date (and, with respect to any such requirements that are required to be satisfied after the Guarantee Issuance Date, DOE is reasonably satisfied with the Borrower’s plan to comply with such requirements).
(b)
Compliance with NEPA
. DOE has (i) issued an Environmental Impact Statement for the Project pursuant to NEPA, (ii) issued a Record of Decision with respect to the Project and (iii) received evidence of satisfaction of and compliance with all material additional environmental requirements specified in the Environmental Impact Statement (or referenced therein) and required to be complied with as of the Guarantee Issuance Date, and (iv) with respect to any environmental requirements specified in the Environmental Impact Statement (or referenced therein) and required to be complied with after the Guarantee Issuance Date, DOE is satisfied with the Borrower’s plan to comply with such requirements.
4.1.22.
Fuel Supply and Disposal
.
DOE shall have received evidence, including a certification from the Lender’s Engineer, that the implementation plans for the Project are sufficient to provide supply and disposal of nuclear fuel required to operate the Project in accordance with the COLs, all applicable Governmental Rules and the terms of the Fuel Supply Agreements (other than those to be entered into after the Guarantee Issuance Date).
4.1.23.
Conditions Precedent to Each Advance
.
Each condition precedent to an Advance under
Section 4.2
shall have been satisfied (with any reference in
Section 4.2
to an Advance Date being deemed for purposes of this
Section 4.1.23
to refer to the Guarantee Issuance Date).
4.1.24.
Conditions Precedent in FFB Credit Facility Documents
.
Each condition precedent to the initial Advance under the FFB Credit Facility Documents shall have been satisfied as determined by FFB and DOE, as applicable.
4.1.25.
Conditions Precedent in Transaction Documents
.
DOE shall have received such evidence as it may request, that all conditions precedent to the obligations of any party to be performed as of the Guarantee Issuance Date under the EPC Contract or any other contract necessary for the construction of the Project have been satisfied.
4.1.26.
Program Requirements
.
(a)
All Program Requirements required to have been satisfied as of the Guarantee Issuance Date shall have been satisfied.
(b)
System for Awards Management
. The Borrower has registered in the SAM database.
(c)
Patriot Act
. Each of DOE and FFB have received all documentation and other information required by regulatory authorities under the applicable “know your customer” and anti-money laundering rules and regulations, including the Patriot Act, customarily delivered to financial institutions in connection with a transaction such as the issuance of the DOE Guaranteed Loan.
4.1.27.
Due Diligence Review
.
DOE shall have completed its due diligence review of the Project, the Borrower, the Operator and all other matters related thereto and the results thereof shall have been satisfactory to DOE.
4.1.28.
DOE Approvals
.
DOE has received each of the following: (i) evidence that OMB has reviewed and approved DOE’s calculation of the DOE Guaranteed Loan Credit Subsidy Cost as of the Guarantee Issuance Date, (ii) the action memorandum duly executed and delivered by the Secretary of Energy, authorizing the execution by DOE of the Loan Documents to which it is a party and the apportionment of the DOE Guaranteed Loan Credit Subsidy Cost and (iii) evidence that the Form SF132 Apportionment Request has been approved by OMB and the apportionment has occurred.
4.1.29.
Davis-Bacon Compliance
.
DOE shall have received a Borrower Certificate, dated as of the Guarantee Issuance Date, (a) certifying that the Borrower and, to the DBA Knowledge of the Borrower, all DBA Contract Parties are in material compliance with all Davis-Bacon Requirements, except to the extent that the Davis-Bacon Requirements have been waived by the Department of Labor, including pursuant to the DOL Letter, (b) identifying and describing the immaterial non-compliance with all Davis-Bacon Requirements of which the Borrower has DBA Knowledge, (c) certifying that
the Borrower has commenced the cure of such immaterial non-compliance and reasonably believes that such immaterial non-compliance will be cured prior to any Advances subsequent to the Advance for which the Borrower Certificate identified in this
Section 4.1.29
is being delivered and (d) attaching a copy of the Davis-Bacon and Related Acts Compliance Program and certifying that such copy is a true, correct and complete copy of the Davis-Bacon and Related Acts Compliance Program.
4.1.30.
OMB Certification
.
OMB shall have certified in writing that the FFB Credit Facility Commitment, the DOE Guaranteed Loan and the Project comply with the provisions of the Omnibus Appropriations Act, 2009, P.L. No. 111-8, Division C, Title III, as amended by Section 408 of the Supplemental Appropriations Act, 2009, P.L. No. 111-32 (the “
Appropriations Act
”).
4.1.31.
Westinghouse Letter Agreement
.
DOE shall have received a fully executed original counterpart of the Westinghouse Letter Agreement.
4.1.32.
Cargo Preference Act
.
DOE shall have received a fully executed copy of that letter agreement dated January 8, 2014, between the Borrower and the United States Maritime Administration (the “
CPA Agreement
”), certified by the Borrower to be true, correct and complete.
4.1.33.
Borrower Appropriations Act Certificate
.
DOE shall have received the Borrower Appropriations Act Certificate.
4.1.34.
MEAG Appropriations Act Certificate
.
DOE shall have received the MEAG Appropriations Act Certificate.
|
|
4.2.
|
Conditions Precedent to Each Advance
.
|
The obligation of the Guarantor to guarantee each Advance, including the initial Advance, is subject to the prior satisfaction (or waiver in writing), as determined in all cases by DOE, of each of the following conditions precedent (and of any deliverable, as to its form and substance) as of the Advance Notice Date and to their continued satisfaction on the Advance Date for such Advance:
4.2.1.
Updated Advance Schedule; Application of Advance Proceeds
.
DOE shall have received:
(a)
either (i) a proposed updated Advance Schedule, reflecting any changes to the estimated timing and amounts of proposed Advances and Base Funding to be provided, and certified by the Borrower as being consistent in all material respects with the most recent
Construction Monitoring Report, the Construction Budget and the Project Milestone Schedule,
provided
that such proposed updated Advance Schedule shall not accelerate the estimated date of disbursement of any Advance amounts reflected in the initial Advance Schedule delivered pursuant to
Section 4.1.5(e)
, or (ii) a certification from the Borrower that no changes to the then-current Advance Schedule are required; and
(b)
certification from the Borrower and the Lender’s Engineer that the proceeds of the requested Advance will be needed for Eligible Project Costs that have been incurred by the applicable Requested Advance Date, together with a description in reasonable detail of such Eligible Project Costs.
4.2.2.
Invoices and Lien Waivers
.
With respect to each Advance Notice, DOE shall have received copies of (a) each invoice of the EPC Contractor that is the subject of such Advance Notice (whether via direct payment to the EPC Contractor or via reimbursement to the Borrower), (b) lien waivers and releases, in the form attached as
Exhibit H
(which form may be modified by the Borrower from time to time as may be required by Governmental Rule), with respect to all work reflected in the invoices specified in
clause (a)
of this
Section 4.2.2
, (c) for all advances after the initial Advance, each invoice for Project Costs (other than invoices of the EPC Contractor, invoices previously delivered and invoices with respect to Project Costs incurred through September 30, 2013) that (i) is the subject of such Advance Notice and (ii) is in an amount that exceeds one hundred thousand Dollars ($100,000), (d) for all Advances after the initial Advance, a spreadsheet in substantially the form attached hereto as
Exhibit M
, (e) for all advances after the initial Advance, a sample of between thirty (30) and fifty (50) of any invoices for Project Costs that are the subject of such Advance Notice (other than the invoices specified in
clauses (a)
and
(c)
of this
Section 4.2.2
) and, if requested by DOE or the Lender’s Engineer, any additional invoices of the type described in this
clause (e)
that are not included in such sample to the extent the Lender’s Engineer reasonably determines that a review of additional invoices is necessary in light of matters identified in the Lender’s Engineer’s review of such sample, and (f) in the case of the invoice for the final payment from the Owners under the EPC Contract, the EPC Contractor’s affidavit in the form attached as
Exhibit I
(which form may be modified by the Borrower from time to time as may be required by Governmental Rule). To the extent any information delivered pursuant to this
Section 4.2.2
contains confidential trade secret or proprietary information of the EPC Contractor, such information shall be provided via the Restricted Data Site and made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
.
4.2.3.
Fees and Expenses
.
DOE shall have received certification from the Borrower, and such other evidence as DOE may reasonably request, that (a) all DOE Guaranteed Loan Fees and Periodic Expenses (other than Periodic Expenses subject to a fee agreement with the Borrower), in each case incurred and invoiced prior to the relevant date (x) have been paid in full, (y) are to be paid with the proceeds of any requested Advance (only in the event that such amounts are Eligible Project Costs), or (z) are to be paid by other arrangements satisfactory to DOE, and (b) with respect to any Periodic Expenses subject to a fee agreement with the Borrower, the Borrower is not in default of its payment obligations under such fee agreement.
4.2.4.
Consents and Approvals
.
DOE shall have received (i) an updated schedule reflecting the status of all Required Consents, certified by the Borrower as being true, correct and complete and (ii) copies of any such Required Consents requested by DOE.
4.2.5.
Representations and Warranties; No Default; No Mandatory Prepayment Event
.
DOE shall have received certification from the Borrower, and DOE shall not have determined that such certification is untrue, that, on both the Advance Notice Date and the Advance Date, the representations and warranties in the Loan Documents (other than those in
Sections 5.8
,
5.11(a)
,
5.14(b)
,
(e)
and
(i)
,
5.18(a)
,
(c)
and
(d)
,
5.24(g)
, and
5.27
, which are made only as of the Guarantee Issuance Date, and those that speak only as to an earlier date, which shall be true and correct as of such earlier date) are true and correct in all material respects, and no Event of Default, Potential Default, Mandatory Prepayment Event or Potential Mandatory Prepayment Event has occurred and is continuing.
4.2.6.
Advance Certificates
.
DOE shall have received:
(a)
a Borrower Certificate, substantially in the form of
Exhibit C-2
, confirming that all conditions to the requested Advance have been satisfied and regarding the other matters required to be certified by the Borrower as set forth in this
Section 4.2
; and
(b)
a Lender’s Engineer Certificate, substantially in the form of
Exhibit D-2
, dated as of the Advance Date, regarding the matters required to be certified by the Lender’s Engineer as set forth in this
Section 4.2
.
4.2.7.
Borrower Funding Commitments
.
DOE shall have received a certificate of an Authorized Official of the Borrower certifying that the amount of Base Funding and Overrun Funding provided by the Borrower prior to or concurrently with the requested Advance
has been, or, prior to or concurrently with the requested Advance will be, applied to pay (A) at least 30% of the sum of the Eligible Base Project Costs being financed or reimbursed using the proceeds of the requested Advance plus all other Eligible Project Costs incurred to date, (B) 100% of all Ineligible Base Project Costs previously incurred or then required to be paid, and (C) 100% of all Overrun Project Costs previously incurred or then required to be paid.
4.2.8.
Title Continuation
.
DOE shall have received a construction bringdown endorsement (dated as of a date not earlier than five (5) Business Days prior to the relevant Advance Date) insuring that the Deed to Secure Debt remains a first priority Lien on the Borrower’s unencumbered fee title, under the relevant laws of the State of Georgia, to the Borrower’s Undivided Interest in and to the Project Site (subject only to Permitted Liens and the December 2013 Mechanic’s Lien Exception) as is necessary for the development of the Project.
4.2.9.
Davis-Bacon Requirements
.
DOE shall have received a Borrower Certificate, dated as of the Advance Date, (a) certifying that the Borrower and, to the DBA Knowledge of Borrower, all DBA Contract Parties are in material compliance with all Davis-Bacon Requirements, except to the extent that the Davis-Bacon Requirements have been waived by the Department of Labor, including pursuant to the DOL Letter, (b) identifying and describing the immaterial non-compliance with all Davis-Bacon Requirements of which the Borrower has DBA Knowledge, (c) certifying that the Borrower has commenced the cure of such immaterial non-compliance and reasonably believes that such immaterial non-compliance will be cured prior to any Advances subsequent to the Advance for which the Borrower Certificate is being delivered, (d) certifying that all immaterial non-compliance identified on all prior Borrower Certificates in respect of compliance with Davis-Bacon Requirements has been cured, and (e) certifying that there have been no updates to the Davis-Bacon and Related Acts Compliance Program or, if there have been any updates to the Davis-Bacon and Related Acts Compliance Program since the most recent prior Advance Date, attaching a copy of such updates and certifying that such copies are true, correct and complete copies of such updates.
4.2.10.
Advance Notice; Advance Schedule
.
Pursuant to
Article 2
, DOE shall have received (i) an Advance Notice in accordance with
Section 2.3
and (ii) certification from the Borrower that the requested Advance conforms to the Advance Schedule.
4.2.11.
Issuance of FFB Advance Request Approval Notice
.
Pursuant to
Article 2
, FFB shall have received, in accordance with the FFB Credit Facility Documents, the FFB Advance Request signed by the Borrower, together with the FFB Advance Request Approval Notice signed by DOE.
4.2.12.
Absence of Drawstop Notice
.
Pursuant to
Article 2
, DOE shall not have delivered a Drawstop Notice in accordance with
Section 2.4.2(a)
of this Agreement with respect to the Advance unless DOE shall have delivered a Drawstop Withdrawal Notice with respect to such Drawstop Notice in accordance with
Section 2.4.2(b)
of this Agreement.
4.2.13.
Owners’ Agent
.
The Borrower is the Owners’ Agent.
4.2.14.
Cargo Preference Act
.
(a)
DOE shall have received a Borrower Certificate, certifying that as of the Advance Notice Date and the Advance Date, the Borrower is in compliance with all of its obligations under the CPA Agreement.
(b)
DOE shall not have received written notice from United States Maritime Administration that the Borrower is not in compliance with all of its obligations under the CPA Agreement.
ARTICLE 5
REPRESENTATIONS AND WARRANTIES
The Borrower makes all of the following representations and warranties to and in favor of DOE on (i) the Guarantee Issuance Date, (ii) each Advance Notice Date, and (iii) each Advance Date, except (x) as such representations and warranties relate to an earlier date and (y) with respect to the representations in
Sections 5.8
,
5.11(a)
,
5.14(b)
,
(e)
and
(i)
,
5.18(a)
,
(c)
and
(d)
,
5.24(g)
, and
5.27
, which are made only as of the Guarantee Issuance Date.
5.1.
Organization
.
The Borrower (a) is a corporation duly incorporated, validly existing and in good standing under the laws of the State of Georgia, (b) is duly qualified to do business in the State of Georgia and in each other jurisdiction where the failure to so qualify could reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed, and (c) has all requisite corporate power and authority to (i) own or hold under lease and operate the property it purports to own or hold under lease, (ii) carry on its business as now being conducted and as now proposed to be conducted in respect of the Project, (iii) incur Indebtedness and Other Obligations and create Liens on its properties, and (iv) execute, deliver, perform and observe the terms and conditions of each of the Transaction Documents to which it is a party.
5.2.
Authorization; No Conflict
.
The Borrower has duly authorized, executed and delivered the Transaction Documents to which it is a party. Neither the Borrower’s execution and delivery of the Transaction Documents to which it is a party, nor the consummation of the transactions contemplated thereby nor its compliance with the terms thereof (a) contravenes its Organizational Documents, (b) contravenes any Governmental Rules where such contravention could reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed, (c) contravenes or results in any breach or constitutes any default under any Governmental Judgment, where such contravention, breach or default could reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed, (d) contravenes or results in any breach or constitutes any default under any agreement or instrument to which it is a party or by which it or any of its revenues, properties or assets may be bound, except where such contravention, breach or default could not reasonably be expected to have a Material Adverse Effect, or a material adverse effect on the ability of the Project to be completed, (e) results in or requires the creation of any Lien upon any of its revenues, properties or assets, except for the Liens created by the Security Documents and Permitted Liens, or (f) requires the consent or approval of any Person other than the Required Consents and any other consents or approvals that have been obtained and are in full force and effect.
5.3.
Legality; Validity; Enforceability
.
Each Transaction Document is a legal, valid and binding obligation of the Borrower, enforceable against the Borrower in accordance with its terms, subject to Bankruptcy Laws and general principles of equity, regardless of whether enforcement is considered in a proceeding at law or in equity.
5.4.
Capitalization
.
As of the Guarantee Issuance Date, the Equity Interests of the Borrower and of the Operator are proportionately owned by Southern Company as provided on
Schedule 5.4
.
5.5.
Title
.
(a)
The Borrower owns (i) fee simple title to
the real estate comprising the Borrower’s Undivided Interest and (ii) valid legal and beneficial/equitable title to the personal property and other assets of the Borrower (tangible and intangible) on which it purports to grant security title and Liens pursuant to the Security Documents, in each case free and clear of any Liens of any kind except for the Liens created by the Security Documents and Permitted Liens. Except for the Liens created by the Security Documents and Permitted Liens, the Borrower is not under any obligation to create any Lien upon any of the Collateral.
(b)
The Borrower’s Undivided Interest is at least a 45.7% undivided ownership interest, as a tenant in common, in the Additional Unit Properties and the Related Facilities, subject, from and after the Guarantee Issuance Date, to any increase in such ownership interest pursuant to the Ownership Agreement.
(c)
The Project Site and the real property interests relating to the Transmission Facilities comprise all real estate necessary for the development of the Project.
|
|
5.6.
|
Security Interests
.
|
Pursuant to the Security Documents the Collateral Agent (for the benefit of the Secured Parties) has a perfected first priority Lien in the Collateral, subject only to the Permitted Liens. Such Lien in the Collateral is superior and prior to the Liens of all third Persons (other than Permitted Liens) now existing or hereafter arising whether by way of deed of trust, mortgage, Lien, security interests, encumbrance, assignment or otherwise. All documents and instruments, including the Deed to Secure Debt and UCC financing statements, have been recorded or filed for record in such manner and in such places as are required, and all other action as is necessary shall have been taken to establish and perfect the Collateral Agent’s Lien in and to the Collateral (for the benefit of the Secured Parties) to the extent contemplated by the Security Documents. All Taxes and Periodic Expenses that are due and payable in connection with the execution, delivery or recordation of the Deed to Secure Debt and UCC financing statements, or the execution, issuance and delivery of the FFB Promissory Note, or the granting of the security title and security interest on the property under the Deed to Secure Debt, have been paid or satisfactory arrangements have been made with the relevant Secured Parties to satisfy such obligations.
(a)
Schedule 5.7
sets forth all consents and approvals, including all Governmental Approvals, that are required to have been obtained or to be obtained by the Borrower for the ownership of the Borrower’s Undivided Interest or by the Borrower or the Operator for the construction, operation or routine maintenance of the Project (all such consents and approvals, whether or not identified on such Schedule, the “
Required Consents
”).
(b)
All Required Consents that are required to be obtained, and all applications for Required Consents that are required to be filed, on or as of the date this representation is made (including any Required Consents required on that date), have been filed or obtained, other than Required Consents that, if not obtained, could not reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated. Such Required Consents required to have been obtained as of the date this representation is made are in full force and effect and as of the date this representation is made are not under appeal or subject to other proceedings or unsatisfied conditions that could reasonably be expected to result in a material adverse modification or cancellation as of such date (except for the appeals, proceedings and conditions that are disclosed on
Schedule 5.7
).
(c)
To the Borrower’s Knowledge, any such Required Consent which has not been obtained as of the date this representation is made, but which will be required to be obtained in the future, is reasonably expected to (i) be obtained on or prior to the relevant date or stage of development of the Project for which such Required Consent will be required, and (ii) contain only conditions or requirements which the Borrower expects to be satisfied or complied with, in each case, in accordance with the terms of the Required Consent.
(d)
Each of the Project, the Borrower or the Operator is in compliance in all respects with all such Required Consents applicable to it, including all federal, state, and local Governmental Approvals, except (1) any such non-compliance that the Borrower (A) is diligently working to cure through appropriate regulatory procedures, including for the purpose of obtaining any necessary amendment to such Required Consent and (B) reasonably believes will be cured through such diligent efforts, or (2) where the failure to comply could not reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated.
|
|
5.8.
|
Governmental Judgments
.
|
(a)
Except as set forth on
Schedule 5.8
, there is no pending or threatened (in writing) action, suit, or proceeding, or investigation by a Governmental Authority, of any kind, including no action or proceeding of or before any Governmental Authority, in each case (x) involving the Borrower or the Operator or (y) to the Borrower’s Knowledge, involving any Project Participant other than the Borrower and the Operator, in each case that relates to the Project or any transactions contemplated by any of the Transaction Documents that has, or could reasonably be expected to have, a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated.
(b)
Neither the Borrower nor the Operator has failed to observe in any material respect, or is otherwise in default with respect to, any Governmental Judgment or any order of any court, arbitrator, administrative agency or other Governmental Authority except (1) any such failure to observe or default that the Borrower (A) is diligently working to cure through procedures approved by the applicable court, arbitrator, arbitral panel, administrative agency or Governmental Authority or appropriate regulatory procedures and (B) reasonably believes will be cured through such diligent efforts, or (2) that has not and could not reasonably be expected to have, a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated. There is no injunction, writ, or preliminary restraining order of any nature issued by a court, arbitrator, administrative agency or other Governmental Authority directing that any of the obligations provided for in any of the Transaction Documents to be performed by the Borrower, the Operator or, to the Borrower’s Knowledge, any other Project Participant, not be consummated as herein or therein provided. No Governmental Judgment or order of any court, arbitrator, administrative agency or other Governmental Authority has been entered against the Borrower, the Operator, or, to the Borrower’s Knowledge, any other Project Participant that has, or could reasonably be expected to have, a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated.
The Borrower has filed all material tax returns required by Governmental Rules to be filed by it and has paid (a) all income taxes payable by it that have become due pursuant to such tax returns and (b) all other material Taxes and assessments payable by it that have become due, in each case other than those Taxes that it is contesting in good faith and by appropriate proceedings for which reserves have been established to the extent required by applicable Governmental Rules.
|
|
5.10.
|
Compliance with Governmental Rules
.
|
Each of the Borrower and the Operator (with respect to the Project) is in compliance with, and has conducted its business, operations, assets, equipment, property, leaseholds, and other facilities in compliance with (a) Title XVII and the Applicable Regulations, in all respects, and (b) all other Governmental Rules and all other Program Requirements in all material respects, except, in the case of
subclause (b)
above, (x) for any such non-compliance asserted by any Governmental Authority where the Borrower is contesting such assertion in good faith by appropriate legal proceedings, and (y) for any such non-compliance that the Borrower is diligently working to cure pursuant to an applicable Remediation Plan.
|
|
5.11.
|
Environmental, Health and Safety Matters
.
|
(a)
Except as disclosed on
Schedule 5.11(a)
, with respect to the Project, neither the Borrower nor the Operator has Knowledge of any material non-compliance with Environmental Laws or has received any complaint, order, directive, claim, citation or notice by any Governmental Authority relating to any actual or potential material violation of its then-existing obligations under Environmental Laws.
(b)
The Borrower and the Operator have developed and implemented policies and procedures with respect to the Project that are reasonably designed to provide for compliance
with Governmental Rules concerning safety and the protection of human health, including the Occupational Safety and Health Act of 1970 and the rules and regulations promulgated thereunder and the rules and regulations of the NRC relating to safety matters.
|
|
5.12.
|
Investment Company Act
.
|
The Borrower is not required to register as an “investment company” and it is not “controlled” by a company required to register as an “investment company” under the Investment Company Act.
|
|
5.13.
|
Regulation of Secured Parties
.
|
(a)
No Secured Party shall be or become subject to regulation by the NRC under the Atomic Energy Act of 1954 and the NRC’s regulations thereunder solely as a result of the execution, performance or delivery of this Agreement or the other Loan Documents to which it is a party; provided, however, that in accordance with 42 U.S.C. §2234 and 10 CFR §50.81, (1) the rights of the Secured Party may be exercised only in compliance with and subject to the provisions of the COLs, the Atomic Energy Act of 1954 and regulations issued by the NRC pursuant to said Act; and (2) no Secured Party may take possession of the Project prior to the issuance or transfer of a license from the NRC to such Secured Party authorizing such possession.
(b)
No Secured Party shall be or become subject to regulation as a “public utility” under the Federal Power Act solely as a result of the execution, performance or delivery of this Agreement or the other Loan Documents to which it is a party; provided, however, that upon exercise by a Secured Party of certain remedies allowed under this Agreement or the Security Documents, such Secured Party may become subject to regulation as a “public utility” under the Federal Power Act.
(c)
No Secured Party shall be or become subject to regulation as under the Public Utility Holding Company Act, and FERC’s regulations thereunder, solely as a result of the execution, performance or delivery of this Agreement or the other Loan Documents to which it is a party; provided, however, that upon exercise by a Secured Party of certain remedies allowed under this Agreement or the Security Documents, such Secured Party may become subject to regulation under Public Utility Holding Company Act.
(d)
No Secured Party shall be or become subject to regulation by the Georgia PSC as an “electric light and power company”, a “person owning, leasing or operating public gas plants or electric light and power plants furnishing service to the public” or an “electric supplier” or similar term, under the laws of the State of Georgia, solely as a result of the execution, performance or delivery of this Agreement or the other Loan Documents to which it is a party; provided, however, that upon exercise by a Secured Party of certain remedies allowed under this Agreement or the Security Documents, such Secured Party may become subject to regulation by the Georgia PSC as an “electric light and power company”, a “person owning, leasing or operating public gas plants or electric light and power plants furnishing service to the public” or an “electric supplier” or similar term, under the laws of the State of Georgia.
(a)
The Borrower and its ERISA Affiliates have operated the Pension Plans in compliance with their terms and with all applicable provisions and requirements of the Internal Revenue Code, ERISA, and other applicable federal or state laws and have performed in all respects their respective obligations under each Pension Plan, except, in each case, where such failure to comply or perform could not reasonably be expected to have a Material Adverse Effect.
(b)
No ERISA Event has occurred or is reasonably expected to occur which could reasonably be expected to have a Material Adverse Effect.
(c)
No Pension Plan has failed to satisfy the minimum funding standards under Section 412 or Section 430 of the Internal Revenue Code other than any such failure that could not reasonably be expected to have a Material Adverse Effect.
(d)
Except to the extent required under Section 4980B of the Internal Revenue Code, Sections 601 through 609 of ERISA or comparable state law, no Pension Plan provides health or welfare benefits (through the purchase of insurance or otherwise) for any retired or former employee of the Borrower or any of its ERISA Affiliates which has or could result in liability to the Borrower that is reasonably expected to have a Material Adverse Effect.
(e)
As of the most recent valuation date for any Pension Plan, the outstanding benefit liabilities (as defined in Section 4001(a)(18) of ERISA) do not exceed the assets of such Pension Plan, except for any such excess of liabilities over assets that could not reasonably be expected to have a Material Adverse Effect.
(f)
All liabilities under each Pension Plan are (i) funded to at least the minimum level required by applicable law, (ii) funded to the level required by the terms governing the Pension Plans other than any failure to fund at such level that could not reasonably be expected to have a Material Adverse Effect, (iii) provided for or recognized as required by applicable accounting standards in the Financial Statements most recently delivered to DOE pursuant to
Section 6.1,
and (iv) estimated as required by applicable accounting standards in the formal notes to the Financial Statements most recently delivered to DOE pursuant to
Section 6.1
.
(g)
To the Borrower’s Knowledge, there are no circumstances that may give rise to a liability in relation to any Pension Plan that is not funded, insured, provided for, recognized or estimated in the manner described in
clause (f)
of this
Section 5.14
that could reasonably be expected to have a Material Adverse Effect.
(h)
(i) The Borrower is not a “plan” within the meaning of Section 4975(e) of the Internal Revenue Code; (ii) the assets of the Borrower do not constitute “plan assets” within the meaning of Section 3(42) of ERISA and the United States Department of Labor Regulations set forth in 29 C.F.R. § 2510.3-101; (iii) the Borrower is not a “governmental plan” within the meaning of Section 3(32) of ERISA; (iv) transactions by or with the Borrower are not subject to state statutes applicable to the Borrower regulating investments of fiduciaries with respect to governmental plans; and (v) the Borrower has not engaged in any transaction that would cause any obligation, or action taken or to be taken, hereunder (or the exercise by the Secured Parties
of any of their respective rights under this Agreement) to be a non-exempt (under a statutory or administrative class exemption) prohibited transaction under ERISA or Section 4975 of the Internal Revenue Code or any similar state law, other than any such transaction or prohibited transaction described in this
subclause (v)
that could not reasonably be expected to have a Material Adverse Effect.
(i)
Neither the Borrower, nor any ERISA Affiliate, nor to the Knowledge of the Borrower any duly-appointed administrator of a Multiemployer Plan has instituted or intends to institute proceedings to withdraw from any Multiemployer Plan.
Notwithstanding anything in this
Section 5.14
to the contrary, the specific representations and warranties made pursuant to this
Section 5.14
shall not be interpreted to limit the generality of, or otherwise limit in any way, the representations made by the Borrower in
Section 5.10
or the obligations (including the related exceptions and cure rights) of the Borrower in
Section 8.1(r)
, each of which shall be applied to the Borrower without regard to the provisions of this
Section 5.14
.
|
|
5.15.
|
Intellectual Property
.
|
(a)
Pursuant to the EPC Contract, the Software License, the Westinghouse Fuel Assembly Agreement, the Southern Nuclear Direct Agreement, the Westinghouse License Agreement, the BEACON Software Agreement (if any), any replacement agreement for any of the foregoing and any Additional Project Document for the supply of fuel assemblies and/or related required software for the Project (collectively, the “
IP Agreements
”), the Borrower possesses, or will possess in due course, in accordance with the terms of the IP Agreements, an IP Interest; except where the Borrower’s failure to own or hold all or any part of such IP Interest (x) results from termination of the relevant IP Agreement after the date hereof and prior to delivery of all of the Technology and Intellectual Property Rights thereunder, or (y) could not reasonably be expected to result in a material adverse effect on the ability of the Project to be completed or operated, or to be conveyed or disposed of. The Borrower does not have Knowledge of any Technology or Intellectual Property Rights necessary to construct, complete, operate, use and maintain the Project through the Maturity Date that have not been granted or conferred, or that will not be granted or conferred in due course, in accordance with the terms of the IP Agreements, except for Technology and Intellectual Property Rights (x) to the extent not granted or conferred as a result of a termination of the relevant IP Agreement after the date hereof and prior to delivery of such Technology and Intellectual Property Rights thereunder, or (y) which if not so granted or conferred could not reasonably be expected to result in a material adverse effect on the ability of the Project to be completed or operated, or to be conveyed or disposed of.
(b)
The Borrower does not have Knowledge that (i) all or any part of the IP Interest granted pursuant to the IP Agreements, or the Borrower’s or the Operator’s use of such IP Interest, infringes upon or misappropriates the Intellectual Property Rights or other rights of any Person, or (ii) any action by the Borrower or the Operator or any product, process, method, substance, part or other material employed by the Borrower or the Operator, in each case that is necessary to complete, operate, convey or dispose of the Project, infringes upon or misappropriates the Intellectual Property Rights of any Person, except, in each case, where such
infringement or misappropriation could not reasonably be expected to result in a material adverse effect on the ability of the Project to be completed or operated, or to be conveyed or disposed of.
|
|
5.16.
|
No Defaults or Mandatory Prepayment Events
.
|
No Event of Default, Potential Default, Mandatory Prepayment Event or Potential Mandatory Prepayment Event has occurred and is continuing.
|
|
5.17.
|
No Judgment Liens; No Delinquent Indebtedness
.
|
The Borrower (i) does not have a judgment lien against any of its property for a debt owed to the United States of America and (ii) does not have an outstanding debt owed to the United States of America or any agency thereof that is in delinquent status, as the term “delinquent status” is defined in 31 C.F.R. § 285.13(d), including any Tax liabilities, except to the extent such delinquency has been resolved with the appropriate Governmental Authority in accordance with Governmental Rule and, to the Knowledge of the Borrower, the standards of the Debt Collection Improvement Act of 1996.
|
|
5.18.
|
Sufficiency of Project Documents
.
|
(a)
All easements, leasehold and other property interests, and all utility and other services, means of transportation, facilities, other materials and other rights that can reasonably be expected to be necessary for the construction, completion and operation of the Project in accordance with Governmental Rules and the Transaction Documents (including gas, electrical, water and sewage services and facilities) have been procured under the Project Documents or are commercially available to the Project at the Project Site.
(b)
DOE has received a true, complete and correct copy of each of the Project Documents (including all exhibits, schedules, attachments, supplements and amendments thereto and any related Protocols and Side Letters).
(c)
Each Principal Project Document is in full force and effect.
(d)
The Project Documents are the only material contracts to be entered into by the Borrower or the Operator that are necessary for the construction of the Project.
|
|
5.19.
|
Financial Statements
.
|
Each of the Financial Statements of the Borrower included in the Borrower’s most recent Annual Report on Form 10-K and any subsequent Quarterly Report on Form 10-Q filed with the Securities and Exchange Commission under the Exchange Act has been delivered to DOE, has been prepared in accordance with GAAP and presents fairly in all material respects (a) the financial condition of the Borrower as of the respective dates of the balance sheets included therein and (b) the results of operations of the Borrower for the respective periods covered by the statements of income included therein.
5.20.
Project Milestone Schedule; Construction Budget; and Borrower Base Case Projections
.
(a)
The Project Milestone Schedule, the Summary Project Milestone Schedule, the Construction Budget and the Borrower Base Case Projections, in each case when delivered by the Borrower to DOE, were prepared in good faith by the Borrower and were based upon assumptions believed by the Borrower to be reasonable.
(b)
The Project Milestone Schedule and the Summary Project Milestone Schedule are consistent with the most recent Construction Monitoring Report filed by the Borrower with the Georgia PSC.
Based on conditions existing as of the date this representation is being made, the Borrower reasonably expects that the total funding available to the Borrower (through the FFB Credit Facility Commitment and other sources of funding for Base Funding and Overrun Funding) will be sufficient to fund (i) the Base Project Costs and (ii) all Overrun Project Costs that are reasonably expected to be incurred.
|
|
5.22.
|
Fees and Enforcement
.
|
Other than amounts that have been paid in full or with respect to which arrangements satisfactory to DOE have been made, no fees or Taxes including documentary, stamp, transaction, registration, or similar taxes are required to be paid to ensure the legality, validity, enforceability, priority or admissibility in evidence in applicable jurisdictions of any Transaction Documents.
|
|
5.23.
|
No Additional Fees
.
|
The Borrower has not paid or become obligated to pay any fee or commission to any broker, finder or intermediary for or on account of arranging the financing of the transactions contemplated by the Transaction Documents.
|
|
5.24.
|
U.S. Government Requirements
.
|
(a)
Davis-Bacon Requirements
. The Borrower and, to the DBA Knowledge of the Borrower, all DBA Contract Parties are in material compliance with all Davis-Bacon Requirements, except to the extent that the Davis-Bacon Requirements have been waived by the Department of Labor. The Borrower has established, implemented and enforced a program (such program, as updated in accordance with
Section 6.11(h)(iv)
, the “
Davis-Bacon and Related Acts Compliance Program
”) designed to (i) ensure material compliance with all Davis-Bacon Requirements and (ii) provide reasonable assurance that information relating to compliance with the Davis-Bacon Requirements is made known to the Vice President of Employee Relations and Associate General Counsel of Southern Company Services, Inc., and such other Person or Persons who have principal oversight responsibility with respect to the Borrower’s compliance with the Davis-Bacon Requirements (and each of the Persons referred to in this
subclause (ii)
are identified by name and position in the Davis-Bacon and Related Acts Compliance Program).
(b)
Foreign Asset Control Regulations
. Neither the making of any Advances nor the use of the proceeds thereof will violate any Foreign Asset Control Regulations.
(c)
Prohibited Persons
. None of the Borrower Entities, Borrower Entity Controlling Persons or Southern Company or any of their respective Principal Persons is a Prohibited Person. To the Borrower’s Knowledge, no event has occurred and no condition exists that is likely to result in any Borrower Entity, Borrower Entity Controlling Person or Southern Company or any of their respective Principal Persons becoming a Prohibited Person. The internal management and accounting practices and controls of all Borrower Entities have been designed and maintained to provide reasonable assurance of compliance with all Corrupt Practices Laws, the Patriot Act, the Anti-Terrorism Order and the rules and regulations of OFAC. The Borrower has designed and maintained disclosure controls and procedures to provide reasonable assurance that material information regarding the Borrower’s and the Operator’s compliance with laws (including Corrupt Practices Laws, the Patriot Act, the Anti-Terrorism Order and the rules and regulations of OFAC) is made known to Senior Management Persons of the Borrower.
(d)
Anti-Terrorism Order
. Each Borrower Entity, each Borrower Entity Controlling Person and Southern Company, and each of their respective Principal Persons is in compliance with the Anti-Terrorism Order and has not previously violated the Anti-Terrorism Order.
(e)
Use of Collateral
. None of the Collateral is traded or used, directly or indirectly, by a Prohibited Person or by a Person organized in a Prohibited Jurisdiction.
(f)
Corrupt Practices Laws; OFAC
. Each Borrower Entity, each Borrower Entity Controlling Person and Southern Company, and each of their respective Principal Persons, employees and agents acting in such capacities have complied with all Foreign Asset Control Regulations, all applicable orders, rules and regulations of the OFAC and all applicable Corrupt Practices Laws in obtaining any consents, licenses, approvals, authorizations, rights, or privileges with respect to the Project and, otherwise, have conducted the Project in compliance with all Foreign Asset Control Regulations, all applicable orders, rules and regulations of the OFAC and all applicable Corrupt Practices Laws. Each Borrower Entity, each Borrower Entity Controlling Person and Southern Company has designed controls, including internal management and accounting controls, to enable such Person’s compliance with all Corrupt Practices Laws, such controls are reasonable, and such Person has implemented such controls.
(g)
Federal Agency Funds
. No funds, personnel or property (tangible or intangible) of any federal agency, instrumentality, personnel or affiliated entity are expected to be used (directly or indirectly) through acquisitions, contracts, demonstrations, exchanges, grants, incentives, leases, procurements, sales, other transaction authority, or other arrangements, to support the Borrower’s Undivided Interest or to obtain goods or services from the Borrower’s Undivided Interest, except to the extent that the Borrower’s Undivided Interest benefits from any exemption set forth in the Appropriations Act.
(h)
Lobbying
. In accordance with 31 U.S.C. § 1352, no proceeds of the Advances have been expended by the Borrower or any of its Affiliates to pay any Person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress (as defined
for purposes of 31 U.S.C. § 1352), an officer or employee of Congress, or an employee of a Member of Congress.
(i)
EPC Contractor
.
(i)
None of the EPC Contractor, Chicago Bridge & Iron Company N.V., Toshiba Corporation, The Shaw Group, Inc. or any of their respective ultimate parent companies, or the successors or assigns of any such Person, is identified as a Prohibited Person on the lists set forth in clauses (i) and (ii) of the definition of Prohibited Person.
(ii)
In the EPC Contract, the EPC Contractor: (A) represented and warranted that neither it nor any of its “principals” (as defined in 7 C.F.R. Part 3017) was debarred, suspended, proposed for debarment, voluntarily excluded or declared ineligible by any Federal department or agency from participation in any “covered transaction” (as defined in 7 C.F.R. Part 3017), (B) agreed to comply with Subpart C (“Responsibilities of Participants Regarding Transactions”) of 7 C.F.R. Part 3017 in connection with the planning, design, licensing, acquisition, construction, completion, startup, renewal, addition, replacement, and modification of the Project and (C) agreed to cause each party performing services or providing goods (1) which relate to the planning, design, licensing, acquisition, construction, completion, startup, renewal, addition, replacement, and modification of the Project or future capital improvements related thereto and (2) the payments for which are expected to equal or exceed twenty-five thousand Dollars ($25,000) (or such other amount as is specified from time to time in 7 C.F.R. § 3017.220), to provide a representation and warranty and agreement substantially identical to the representation and warranty and agreement in clauses (A) and (B) above.
|
|
5.25.
|
Insolvency Proceedings; Solvency
.
|
(a)
The Borrower is not the subject of any pending or, to the Borrower’s Knowledge, threatened, Insolvency Proceedings.
(b)
The Borrower is and, after giving effect to the requested Advance, will be solvent. For purposes of the preceding sentence, “solvent” means (a) the fair saleable value (on a going concern basis) of the Borrower’s assets exceed its liabilities, contingent or otherwise, fairly valued, (b) the Borrower will be able to pay its debts as they become due and (c) upon paying its debts as they become due, the Borrower will not be left with unreasonably small capital as is necessary to satisfy all of its current and reasonably anticipated obligations.
The Borrower has used and shall continue to use the proceeds of all Advances in accordance with the terms and conditions of all applicable Loan Documents.
|
|
5.27.
|
No Material Adverse Effect
.
|
No event or condition has occurred since the date of the Financial Statements of the Borrower delivered pursuant to
Section 4.1.6
that has or could reasonably be expected to have a material adverse effect on the business, properties or financial condition of the Borrower.
|
|
5.28.
|
Certain Program Requirements
.
|
(a)
Eligibility
. The Project qualifies as an “Eligible Project” under Title XVII and is not a research, development, or demonstration project or a project that employs Commercial Technologies (as defined in the Applicable Regulations) in service in the United States.
(b)
U.S. Nexus
. The Project will be constructed and operated in the United States, employs new or significantly improved technology that has the potential to be replicated in other commercial projects in the United States, and such technology is or is likely to be available in the United States for further commercial application.
(c)
Useful Life
. The Maturity Date occurs prior to the end of 90% of the projected useful life of the Project’s major physical assets, as calculated in accordance with GAAP.
(d)
No Tax-Exempt Indebtedness
. The FFB Credit Facility Commitment and the DOE Guaranteed Loan will not finance, either directly or indirectly, tax-exempt indebtedness obligations, consistent with the requirements of Section 149(b) of the Internal Revenue Code.
The statements and information pertaining to the Project, the Borrower’s Undivided Interest or the Borrower contained in any Borrower Certificate, Loan Document or other document, report or written information that has been furnished by or on behalf of the Borrower to DOE, the Collateral Agent or any Independent Consultant (all such statements and information collectively, the “
Disclosure Package
”), taken together as a whole, are true and correct in all material respects and do not contain any material misstatement of fact or omit to state a material fact or any fact necessary to make the statements contained therein not materially misleading in light of the circumstances in which they were made (or, with respect to any forward-looking statements or information contained in the Disclosure Package, such statements or information were prepared in good faith based on assumptions believed by the Borrower to be reasonable at the time prepared).
|
|
5.30.
|
DOE Approval of EPC Contract Replacements
.
|
If the EPC Contract has been terminated, DOE has approved any documents, instruments or agreements (if any) issued or executed in replacement thereof.
ARTICLE 6
AFFIRMATIVE COVENANTS
The Borrower covenants and agrees that until the Debt Termination Date, unless DOE waives compliance in writing:
|
|
6.1.
|
Information Covenants
.
|
At its own expense the Borrower shall (except as otherwise provided in this
Section 6.1
with respect to information made available for review through the Restricted Data Site) furnish or cause to be furnished the following items to DOE (x) in unalterable electronic format with a
reproduction of the signatures where required, either (1) as an attachment via email or (2) through a confidential password-protected electronic data site that provides, each time a document is uploaded to the data site, prompt notification via email containing a link to such document, which email, in each of cases (1) and (2), shall provide a brief description of such document and a cross-reference to the provision(s) of this Agreement pursuant to which such document is required to be furnished, and (y) upon the reasonable request by DOE, in hard copy with sufficient copies for each Secured Party:
(a)
Monthly Construction Progress Reports
. Prior to Commercial Operation of the Second Unit, no later than thirty (30) days following the end of each month:
(i)
an unredacted copy of the Borrower’s monthly construction status report filed with the Georgia PSC (the “
Georgia PSC Monthly Status Report
”) with respect to such month;
provided
,
however
, that if the Borrower determines that such unredacted copy contains confidential trade secret and proprietary information of the EPC Contractor, then (A) such unredacted copy shall be provided via the Restricted Data Site, and (B) a copy that redacts only the confidential trade secret and proprietary information of the EPC Contractor shall be provided to DOE and shall also be provided to the Lender’s Engineer in hard copy format; provided further that the redacted copy delivered pursuant to clause (B) shall contain a level of substantive information with respect to the Project that is substantially consistent with the level of substantive information contained in such Georgia PSC Monthly Status Reports delivered to DOE prior to the Guarantee Issuance Date;
(ii)
an unredacted copy of the EPC Contractor’s monthly project status report delivered to the Borrower pursuant to Section 3.4(b) (
Monthly Status Report
) of the EPC Contract (the “
EPC Contractor Monthly Report
”) with respect to such month, which copy shall be provided via the Restricted Data Site;
(iii)
a copy of the Operator’s monthly project report in the form delivered to the Owners (the “
Southern Nuclear Monthly Report
”) with respect to such month;
provided
,
however
, that if the Borrower determines that such copy contains confidential trade secret and proprietary information of the EPC Contractor, then such copy shall be provided via the Restricted Data Site;
(iv)
a copy of the written materials delivered by the Owners’ Agent to the Owners (other than the Borrower) in connection with any monthly project management board meeting, including any reports provided to the Owners pursuant to Section 5.7(c) of the Ownership Agreement (such written materials, the “
Project Management Board Monthly Meeting Materials
” and, together with the EPC Contractor Monthly Report, the Southern Nuclear Monthly Report and the Georgia PSC Monthly Status Report, the “
Monthly Construction Reports
”), with respect to such month;
provided
,
however
, that if the Borrower determines that such copy contains confidential trade secret and proprietary information of the EPC Contractor, then such copy shall be provided via the Restricted Data Site.
(v)
The following shall be included in one or more of the Monthly Construction Reports furnished to DOE each month:
(1)
the status and progress of the development, planning, design, licensing, acquisition, construction, completion, startup and commissioning of each Unit, inclusive of the Owners’ scope of services, including an updated critical path schedule;
(2)
summary financial information regarding the construction of the Units, including an updated Construction Budget, Summary Project Milestone Schedule and Project Milestone Schedule, inclusive of both the Owners’ and the EPC Contractor’s scope of services, along with an explanation of reasons for any change to or deviations from the most recent prior Construction Budget and Project Milestone Schedule;
provided
,
however
, that if the Borrower determines that such Project Milestone Schedule contains confidential trade secret and proprietary information of the EPC Contractor, then such Project Milestone Schedule shall be provided via the Restricted Data Site;
(3)
a Transmission Facilities project report summarizing major activities, budget, schedule and issues specifically affecting design, construction and startup of Transmission Facilities;
(4)
a summary relating to completed Inspections, Tests, Analyses, and Acceptance Criteria (ITAACs), acceptance and startup tests, and performance tests with respect to the Project, except to the extent the Borrower is prohibited from providing such information under applicable requirements of the NRC; and
(5)
other matters regarding the Project, including (1) disputes or litigation, (2) legislation or governmental proceedings, (3) delinquent payments under any Project Document, or (4) strikes, slowdowns or work stoppages, in each case, to the extent such other matters are material to the Construction Budget, the Project Milestone Schedule or the ability of the Project to be completed or operated.
(vi)
The Borrower agrees that representatives of the Borrower shall, at DOE’s request, meet with the Lender’s Engineer (and, if DOE requests, with representatives of DOE) on a mutually acceptable date (in person or telephonically) each month to discuss the most recent EPC Contractor Monthly Report and any other reports and information required to be provided pursuant to this
Section 6.1(a)
. The Borrower shall use its commercially reasonable efforts to provide DOE and/or the Lender’s Engineer with such additional information reasonably requested by DOE and/or the Lender’s Engineer based on their review of the Monthly Construction Reports.
(b)
Operation Period Reporting
.
(i)
Plans and Budgets
. Promptly following approval by the Nuclear Managing Board, a copy of each of the following with respect to each Unit:
(1)
each Strategic Plan;
(2)
each Fuel Plan;
(3)
each Operation and Maintenance Budget (and the details of any deviations from the applicable Strategic Plan identified by the Operator to the Nuclear Managing Board);
(4)
each New Investment Budget (and the details of any deviations from the applicable Strategic Plan identified by the Operator to the Nuclear Managing Board); and
(5)
each Fuel Budget.
(ii)
Formal Routine Information; Reports
. Promptly following submission to the Owners, a copy of each of the following with respect to each Unit:
(1)
Annual Energy Estimates
. Each written energy estimate projecting the estimated generation for such Unit during the succeeding five calendar years in accordance with Section 5.1.1.1 of the Nuclear Managing Board Agreement;
(2)
Annual and Monthly Benchmark Performance Data
. (A) Annually, each comparison of the performance of such Unit relative to other similar units and plants in the United States and (B) monthly, each comparison of the performance of such Unit for the preceding month relative to the INPO performance index (both component and aggregate), in each case provided pursuant to Section 5.1.1.2 of the Nuclear Managing Board Agreement;
(3)
Monthly Plant Budget Reports
. Each report provided pursuant to Section 5.1.1.3 of the Nuclear Managing Board Agreement showing actual costs for operation and maintenance services, new investment services and fuel services at such Unit with comparisons to the respective budgets for such services; and
(4)
Bimonthly Strategic Plan Reports
. Each report provided pursuant to Section 5.1.1.4 of the Nuclear Managing Board Agreement showing actual performance for each Unit compared to goals and strategic objectives contained in the Strategic Plan for such Unit.
(iii)
Formal Routine Information: INPO Evaluations and Assessments
. To the extent permitted under applicable proprietary information agreements with INPO, the Borrower shall make available for review by DOE or any Independent Consultant during visits to the Project Facility the evaluations and assessments of each Unit by INPO, promptly after the Operator has made such evaluations and assessments available for review by the Owners pursuant to Section 5.1.1.5 of the Nuclear Managing Board Agreement.
(iv)
Formal Routine Information: Upon Request
. Upon request by DOE, a copy of any of the following:
(1)
Audit Reports
. Any financial or accounting reports concerning each Unit that are made available for review by the Owners pursuant to Section 5.1.1.7 of the Nuclear Managing Board Agreement, and that contain the results of audits by or for the Borrower, the Operator, Southern Company Services, Inc. or
any affiliate of Southern Company, for any Owner or its Affiliates, or by any regulatory agency;
(2)
Correspondence to and from NRC
. Any correspondence to or from the NRC concerning each Unit that is available to the Owners pursuant to Section 5.1.1.8 of the Nuclear Managing Board Agreement; and
(3)
Correspondence to and from Georgia Environmental Protection Division
. Any correspondence to or from the Georgia Environmental Protection Division concerning each Unit that is available to the Owners pursuant to Section 5.1.1.9 of the Nuclear Managing Board Agreement.
(v)
Formal Routine Information: Minutes of Meetings with the Nuclear Managing Board
. Promptly following approval by the Nuclear Managing Board in accordance with Section 2.7 of the Nuclear Managing Board Agreement, a copy of the minutes of each Nuclear Managing Board meeting that refer to matters concerning either or both Units.
(vi)
Formal Non-routine Information
.
(1)
Changes to Operator’s Organizational Structure
. Promptly following submission to the Owners or the Operator (as applicable) pursuant to Section 5.1.2.2 of the Nuclear Managing Board Agreement, a copy of any material information reported by the Operator to the Owners regarding any change to the organizational structure of the Operator to the extent that such change has a material effect on the Operator’s personnel who are dedicated to each Unit; and
(2)
Changes in Key Plant Personnel
. Promptly following submission to the Owners or the Operator (as applicable) pursuant to Section 5.1.2.3 of the Nuclear Managing Board Agreement, a copy of any material information reported by the Operator to the Owners regarding the replacement of (A) the individual occupying the position of General Manager of each Unit, and the successors of such replacement, and (B) any officer of the Operator having responsibility for each Unit, and the successors of such replacement.
(c)
Quarterly Financial Statements and Reports
. Not later than fifty (50) days after the end of each fiscal quarter of each Fiscal Year, (other than with respect to the fourth quarter of each Fiscal Year) unaudited Financial Statements and reports of the Borrower as at the end of such quarterly period.
(d)
Annual Financial Statements and Reports
. Not later than one hundred five (105) days after the end of each Fiscal Year:
(i)
audited Financial Statements of the Borrower as at the end of such Fiscal Year, including the related report or reports of the Borrower’s Accountant; and
(ii)
a discussion and analysis by the management of the Borrower of the Borrower’s business and operations at the end of such Fiscal Year (which, at any time the
Borrower is subject to the reporting requirements of the Exchange Act, may be satisfied by delivery of the Management’s Discussion and Analysis of Financial Condition and Results of Operation filed with the Securities and Exchange Commission).
(e)
Certification by Financial Officer
. Each time Financial Statements of the Borrower are delivered pursuant to
clauses (c)
and
(d)(i)
of this
Section 6.1
, such Financial Statements shall be certified by a Financial Officer of the Borrower as having been prepared in accordance with GAAP on a consistent basis and as fairly presenting in all material respects the financial condition of the Borrower as of the date thereof and the results of operations and cash flows of the Borrower for the periods presented. Such certification shall also include a certification that no Event of Default, Potential Default, Mandatory Prepayment Event or Potential Mandatory Prepayment Event exists, or if such certification cannot be made, the nature and period of existence of each such Event of Default, Potential Default, Mandatory Prepayment Event and Potential Mandatory Prepayment Event and what corrective action the Borrower has taken or proposes to take with respect thereto.
(f)
Borrower Base Case Projections
. So long as any amount of the DOE Guaranteed Loan remains outstanding, not later than one hundred twenty (120) days after the end of each Fiscal Year, updated Borrower Base Case Projections and a summary of the underlying assumptions and explanations thereto.
(g)
Reporting Obligations; 5 Business Day Notices
. Promptly, but in any event within five (5) Business Days (except as provided in
clause (vii)
of this
Section 6.1(g)
), in each case after the Borrower obtains Knowledge thereof:
(i)
notice of any event that constitutes an Event of Default, Potential Default, Mandatory Prepayment Event or Potential Mandatory Prepayment Event, specifying the nature thereof, together with a Borrower Certificate indicating any steps the Borrower has taken or proposes to take to remedy the same;
(ii)
notice of the occurrence of any event, condition, legislation or governmental proceedings and any developments with respect to the foregoing, with respect to the Borrower or the Operator or their participation in the Project, in each case that has had, or could reasonably be expected to have, a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated;
(iii)
notice of the occurrence of any event, condition, legislation or governmental proceedings and any developments with respect to the foregoing, with respect to the Borrower or the Operator or their participation in the Project, in each case that has resulted in, or the Borrower believes will result in, Public Inquiries;
(iv)
notice and a copy of any of the following communications received by the Borrower or the Operator from the NRC: (1) notice of a potential violation of severity level III or higher (or its equivalent level in subsequent versions of the NRC Enforcement Policy); (2) Red, Yellow or White NRC Inspection Finding (or its equivalent in subsequent versions of the Reactor Oversight Policy); (3) notice to stop work or shut down or show cause; (4) Demand for Information under 10 CFR § 50.54(f) or 10 CFR § 2.204; or (5) any other immediately effective,
unilateral docket-specific non-routine communication requiring action by any licensee with respect to the Project, except, in each case, to the extent the Borrower or the Operator is prohibited from doing so by Governmental Rule;
(v)
notice of:
(1)
any complaint, order, directive, claim, citation, designation or notice by any Governmental Authority with respect to the Project received by the Borrower or the Operator relating to any actual or potential material non-compliance with its then-existing obligations under Environmental Laws; and
(2)
within thirty (30) days after notice is provided pursuant to
clause
(1)
of this
Section 6.1(g)(v)
, the Borrower shall provide to DOE a written description of any steps the Borrower or the Operator is taking and proposes to take with respect to the matters described in such notice;
(vi)
notice and a copy of any stop work order issued by the Borrower or the Operator with respect to any work on the Project (other than any suspension of work for convenience for which advance notice has been provided under
Section 6.12
); and
(vii)
any item required to be delivered by the Borrower pursuant to
Section 6.11(h)(ii)
or
Section 6.11(h)(iv)
, in each case subject to the time for delivery provided therein;
provided
,
however
, that if the Borrower determines that any notice or other document required to be delivered pursuant to this
Section 6.1(g)
(other than any item required to be delivered pursuant to
Section 6.11(h)(iv)
) contains confidential trade secret or proprietary information of the EPC Contractor, then such notice or document shall be provided via the Restricted Data Site.
(h)
Governmental and Environmental Indemnity Claims and Reports
.
(i)
Simultaneously with or promptly following any notification or report to the NRC with respect to (A) any event or condition required to be reported to the NRC within seven days or less under 10 CFR Part 73 (each such event, a “
Safeguards Event
”) or (B) any accident related to the Project having a material and adverse impact on the environment or on human health (including any accident resulting in the loss of life), notice of such Safeguards Event accident, notification or report, and, within ten (10) days thereafter, a copy of such notification or report and, to the extent not included in the notification or report to the NRC, a report describing such Safeguards Event or accident, the impact of such Safeguards Event or accident and the remedial efforts required and (as and when taken) implemented with respect thereto, provided that the Borrower shall not be required to disclose any information pursuant to this
clause (i)
to the extent it is prohibited from doing so by Governmental Rule or to the extent such information otherwise is security-related sensitive information that is not ordinarily disclosed to the public under standard nuclear operating practices;
(ii)
within one hundred five (105) days after the close of each Fiscal Year, a report, satisfactory to DOE in its reasonable discretion, summarizing any notices received by the Borrower (or on behalf of the Borrower) or the Operator with respect to any material alleged or actual violations of Environmental Laws or Required Consents in connection with the Project
over the preceding year, with sufficient information (as determined by DOE) to allow DOE to monitor the Project’s performance with respect to the contest of such alleged violations and the cure of such actual violations and its compliance with Environmental Laws and Required Consents and including a narrative summary of (A) the results of environmental monitoring or sampling activity and (B) any violations of Environmental Laws or Required Consents identified by any Governmental Authority and any remedial action taken with respect thereto and a description of any steps the Borrower or the Operator is taking and proposes to take with respect thereto; provided that the Borrower shall not be required to disclose information in such report to the extent it is prohibited from doing so by Governmental Rule.
(i)
Safety Audit Reports
. Within ten (10) days after any such report is submitted, a copy of any safety audit report with respect to the Project submitted by the Borrower (or on behalf of the Borrower) or the Operator to any Governmental Authority; provided that the Borrower shall not be required to disclose information in any such report to the extent it is prohibited from doing so by Governmental Rule.
(j)
Exchange Reports and Filings
. Promptly following transmission thereof, copies of all financial information, statutory audits, proxy materials and other information and periodic reports, if any, which the Borrower has delivered to the Securities and Exchange Commission or any successor regulatory authority.
(k)
Insurance Certificates
. Certificates of insurance (and, if requested by DOE, certified copies of any insurance policies) evidencing the Required Insurance in accordance with, and at the times required by,
Schedule 6.3
.
(l)
Additional Monthly Reporting; Project Documents, Required Consents, Casualty Damages, Authorized Officials
. No later than thirty (30) days following the end of each month, the Borrower shall provide DOE with:
(i)
an up-to-date list of all Additional Project Documents, together with a copy of each Additional Project Document (which copy, in the case of any Fuel Supply Agreement or the BEACON Software Agreement (if any), shall be provided via the Restricted Data Site) entered into during such month (unless, in each case, there have been no changes since the end of the preceding month, in which case the Borrower shall state the same);
(ii)
an up-to-date list of all Required Consents including an updated schedule reflecting the status of such Required Consents (unless there have been no changes during such month, in which case the Borrower shall state the same) and promptly following DOE’s request, a copy of any Required Consent in such list that has been obtained;
(iii)
a list of (A) any termination, amendment or material waiver or breach of, or material notices and material correspondence with respect to, any Project Document (other than the EPC Contract, the Toshiba Guarantee, the Shaw Guarantee, the Software License, the Westinghouse License Agreement, the Westinghouse Fuel Assembly Agreement, any other Fuel Supply Agreement or the BEACON Software Agreement (if any)) or Required Consent during such month, and (B) promptly following DOE’s request, a copy of any of the foregoing or any agreement, instrument or other document giving effect to any of the foregoing;
(iv)
a list of (A) any termination, amendment or material waiver or breach of, or material notices and material correspondence with respect to, the EPC Contract, the Toshiba Guarantee, the Shaw Guarantee, the Software License, the Westinghouse License Agreement, the Westinghouse Fuel Assembly Agreement, any other Fuel Supply Agreement or the BEACON Software Agreement (if any) during such month, and (B) promptly following DOE’s request, a copy of any of the foregoing or any agreement, instrument or other document giving effect to any of the foregoing, which copy shall be provided via the Restricted Data Site;
(v)
notice of any material changes in any Required Insurance with respect to the Project, including any proposed material changes to the Required Insurance that have been accepted by the Borrower and the provider of such Required Insurance but that have yet to become effective;
(vi)
notice of any challenges to or appeals of any of the COLs filed with any Governmental Authority, and notice of any additional conditions to any of the COLs imposed since the last report under this
Section 6.1(l)(vi)
that could reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated.
(vii)
(A) notice of any correspondence to or from the NRC that identifies an event, condition or other matters that could reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated, and (B) promptly following DOE’s request, delivery of a copy of any of the foregoing notices or correspondence except to the extent that the Borrower is prohibited from doing so by Governmental Rule;
(viii)
notice of any report filed by the Borrower or the Operator (or, if the Borrower as Owners’ Agent receives a copy or notice thereof, by any Construction Contractor, Fuel Supply Contractor or Fuel Disposal Contractor) with any Governmental Authority other than the NRC that identifies an event, condition or other matters that could reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be completed or operated, and (B) promptly following DOE’s request, delivery of a copy of any such report except to the extent that the Borrower is prohibited from doing so by Governmental Rule;
(ix)
notice of any material casualty damages or losses with respect to the Project during such month; and
(x)
notice of any change in the Authorized Officials of the Borrower, together with an amended incumbency certificate of the Borrower reflecting such change and including certified specimen signatures of any new Person so appointed and satisfactory evidence of the authority of such Person.
(m)
Georgia PSC Filings and Orders
. Promptly following the transmission or filing thereof, copies of the following, in each case in unredacted nonpublic form:
(i)
each Construction Monitoring Report filed by the Borrower with the Georgia PSC (if the Borrower determines that any such Construction Monitoring Report contains
confidential trade secret and proprietary information of the EPC Contractor, then such copy shall be provided via the Restricted Data Site), each procedural and scheduling order of the Georgia PSC with respect thereto, and each order of the Georgia PSC approving, denying or modifying each such Construction Monitoring Report, or approving or modifying any proposed revisions to the certificate granted pursuant to Official Code of Georgia Annotated 46-3A-1 through 46-3A-11;
(ii)
each NCCR Tariff filed by the Borrower with the Georgia PSC, and each order of the Georgia PSC approving, denying or modifying each such NCCR Tariff;
(iii)
each application for financing authority filed by the Borrower pursuant to Official Code of Georgia Annotated, 46-2-28, and each order of the Georgia PSC approving, denying or modifying each such application and each subsequent filing of the Borrower with the Georgia PSC with respect to each such application showing schedules of outstanding securities and financings of the Borrower;
(iv)
any petition or proceeding seeking revocation, modification or disallowance of any expenditures that have been verified by the Georgia PSC under the semi-annual construction monitoring report proceedings;
(v)
any petition or proceeding seeking reexamination, modification or revocation of the certificate granted pursuant to Official Code of Georgia Annotated 46-3A-1 through 46-3A-11; and
(vi)
any petition or proceeding initiating a general rate case for the Borrower.
(n)
Other Information
. As soon as reasonably available through the use of commercially reasonable efforts by the Borrower or the Operator, as applicable, following such request, such other information or documents reasonably related to the Project or the Borrower’s obligations under the Loan Documents as DOE or any Independent Consultant may reasonably request.
(o)
Information Made Available
.
(i)
(A) The information that will be made available to DOE from and after the date hereof is as set forth in the Loan Documents, and (B) such information will be made publicly available to the extent required by applicable federal law; and
(ii)
The Borrower acknowledges that (A) prior to the date hereof it made available to DOE information (including correspondence, books, documents, papers and records) in connection with the pre-application, the Application, the negotiation and execution of the Conditional Commitment, and the negotiation and execution of this Agreement and the other Loan Documents, and (B) such information will be made publicly available to the extent required by applicable federal law.
(p)
Restricted Data Site
.
(i)
At all times, the Borrower shall maintain the Restricted Data Site and ensure that complete, unredacted electronic copies of the EPC Contract, the Toshiba Guarantee, the Shaw Guarantee, the Software License, the Westinghouse Fuel Assembly Agreement, any other Fuel Supply Agreement, the Westinghouse License Agreement, the BEACON Software Agreement (if any), all Georgia PSC Monthly Status Reports required to be made available on the Restricted Data Site pursuant to
Section 6.1(a)(i)
, all EPC Contractor Monthly Reports required to be made available on the Restricted Data Site pursuant to
Section 6.1(a)(ii)
, all Project Management Board Monthly Meeting Materials that are required to be made available via the Restricted Data Site pursuant to
Section 6.1(a)(iii)
, all Southern Nuclear Monthly Reports that are required to be made available via the Restricted Data Site pursuant to
Section 6.1(a)(iv)
, each Project Milestone Schedule that is required to be made available on the Restricted Data Site pursuant to
Section 6.1(a)(v)(2)
and all notices and other documents that are required to be made available via the Restricted Data Site pursuant to
Section 4.1.5
,
Section 4.2.2
,
Section 6.1(g)
,
Section 6.1(l)(i) or (iv)
or
Section 6.1(m)(i)
, are available on the Restricted Data Site for review (but not downloading or printing) from time to time by (A) employees of DOE, and (B) attorneys with DOE’s outside legal counsel, Chadbourne & Parke LLP, and nuclear regulatory specialist attorneys with DOE’s outside legal counsel for nuclear regulatory matters, Hunton & Williams LLP, in each case on a need to know and use basis solely for the purpose of monitoring the Project in connection with their work in relation to the DOE Guaranteed Loans of Borrower (and not with respect to any DOE guaranteed loans not related to the Project);
provided
, that access by attorneys described in
clause (B)
of this
Section 6.1(p)(i)
shall be limited to the EPC Contract, the Toshiba Guarantee, the Shaw Guarantee, the Software License, the Westinghouse Fuel Assembly Agreement, any other Fuel Supply Agreement, the Westinghouse License Agreement, the BEACON Software Agreement (if any) and any notices and other documents required to be provided via the Restricted Data Site pursuant to
Section 4.1.5
,
Section 4.2.2
,
Section 6.1(g)
or
Section 6.1(l)(i) or (iv)
, and provided further, that such access shall be subject to each such law firm and each such individual attorney being granted such access, executing and delivering to the Borrower a nondisclosure agreement in the form attached hereto as
Exhibit L-1
. In addition, access to the Restricted Data Site shall be further conditioned on each such firm acting as outside legal counsel to DOE, including each employee of such firm or company, not being a “competitor of Westinghouse” or a “competitor of Stone & Webster” (as each such term is defined in
Exhibit L-3
). Notwithstanding the foregoing, any such reports or other documents to be provided on the Restricted Data Site, to the extent such documents contain sensitive or protected information of the EPC Contractor’s employees or other personnel working on the Project, may have such sensitive or protected information redacted.
(ii)
With respect to any report or other document required to be made available on the Restricted Data Site, the Borrower shall also make such report or other document available in its offices for review by employees of the Lender’s Engineer, on a need to know and use basis solely for the purpose of monitoring the Project and the DOE Guaranteed Loans of Borrower (and not with respect to any DOE guaranteed loans not related to the Project);
provided
, that such access shall be subject to the Lender’s Engineer and each employee of the Lender’s Engineer being granted such access, executing and delivering to the Borrower a nondisclosure agreement in the form attached hereto as
Exhibit L-2
. In addition, access to the Restricted Data Site shall be further conditioned on such company acting as Lender’s Engineer,
including each employee of such company, not being a “competitor of Westinghouse” or a “competitor of Stone & Webster” (as each such term is defined in
Exhibit L-3
),
provided
that such condition shall not apply to MPR Associates, Inc. or any of its employees, notwithstanding that it may be a “competitor of Westinghouse” or a “competitor of Stone & Webster”. Notwithstanding the foregoing, to the extent any such reports or other documents to be made available in the Borrower’s office for review by the Lender’s Engineer contain:
(A) Protected Information, such reports or other documents may have such Protected Information redacted;
provided
that, notwithstanding any such redaction, the Monthly Construction Reports made available for review by the Lender’s Engineer shall contain a level of substantive information with respect to the Project that is substantially consistent with the level of substantive information contained in such Monthly Construction Reports delivered or made available to the Lender’s Engineer prior to the Guarantee Issuance Date;
provided further
, that in the event DOE notifies the Borrower that DOE requires the Lender’s Engineer to review any such redacted information on the grounds that disclosure of such information to Lender’s Engineer is necessary in connection with the administration, preservation, protection or enforcement of any of the Loan Documents, or of any Secured Party’s rights thereunder or in connection therewith, GPC agrees that it will seek disclosure of such redacted information from either or both EPC Contractors (as applicable), in the same manner and based on the same principles as would apply in connection with a request by the Owners to the EPC Contractor for disclosure of Contractor Non-Disclosable Information (as defined in the EPC Contract) pursuant to Section 19.3(e) of the EPC Contract. To the extent that the Borrower obtains permission from either or both EPC Contractors (as applicable) to disclose such redacted information through its exercise of the procedures set forth in Section 19.3(e) of the EPC Contract, the redacted information shall be made available by the Borrower to the Lender’s Engineer in the same manner and under the same conditions as the same redacted information has been made available by either or both EPC Contractors (as applicable) to the Borrower in accordance with the procedures set forth in Section 19.3(e) of the EPC Contract; and
(B) sensitive or protected information of the EPC Contractor’s employees or other personnel working on the Project, such reports or other documents may have such sensitive or protected information redacted.
(iii)
Notwithstanding anything in
Section 4.1.2(b)
,
4.1.5
,
4.2.2
,
6.1(a)(i)
,
(ii)
,
(iii)
,
(iv)
or
(v)(2)
,
6.1(g)
,
6.1(l)(i) or (iv)
or
6.1(m)(i)
to the contrary, at DOE’s request:
(1)
the Borrower shall grant access to the Restricted Data Site on a need to know basis to any of the following Persons identified by DOE to the Borrower in writing (other than any such Person, including the employees and advisors of such Person, that is a “competitor of Westinghouse” or a “competitor of Stone & Webster” (as each such term is defined in
Exhibit L-3
):
(A) following notice from DOE to the Borrower that an Event of Default has occurred and is continuing, any potential transferee of the Borrower's Undivided Interest;
(B) following receipt by DOE of a "Project Termination Notice" (as defined in the Owners Direct Agreement), any potential transferee of (x) the rights and obligations of any "Non-Continuing Owner" (as defined in the Owners Direct Agreement) under the EPC Contract or (y) the "Ownership Interest" (as defined in the Ownership Agreement) of any Non-Continuing Owner; or
(C) following any termination of the EPC Contract, any potential transferee of DOE’s rights under the Westinghouse Letter Agreement; and
provided, that, such access shall be conditioned upon: (i) DOE providing notice to the Borrower of the identity of any potential transferee(s) not less than five business days prior to providing access to such potential transferee(s) such that the Borrower may notify the EPC Contractor and object to providing information to such potential transferee(s) if provision of information to such potential transferee(s) would be in violation of this
Section 6.1(p)(ii)
; and (ii) the execution and delivery by such Person, including each employee or advisor of such Person granted such access on a need to know basis of a nondisclosure agreement in a form acceptable to the EPC Contractor, with such acceptance not to be unreasonably withheld;
(2)
the Borrower shall promptly provide to DOE complete, unredacted hard copies of the EPC Contract, the Westinghouse Fuel Assembly Agreement, the Westinghouse License Agreement, the Software License, the BEACON Software Agreement (if any), any of the EPC Contractor Monthly Reports, or any of the Project Management Board Monthly Meeting Materials and Southern Nuclear Monthly Reports described in
clause (i)
of this
Section 6.1(p)
, (i) following receipt of notice from DOE that it intends to exercise any of its rights and remedies in connection with an Event of Default that has occurred and is continuing, (ii) following delivery of a Project Termination Notice, (iii) as DOE may require in order to comply with any Governmental Rule or Governmental Judgment (including any subpoena), or (iv) as required to respond to, defend or evaluate any action, claim, suit, litigation, proceeding or governmental investigation or inquiry to which DOE is a party.
|
|
6.2.
|
Books, Records and Inspections; Accounting and Auditing Matters
.
|
(a)
The Borrower shall keep complete and accurate books and records of its transactions in accordance with accounting practices on the basis of GAAP (including the establishment and maintenance of appropriate reserves). The Borrower shall keep such books and records concerning the Project as are necessary to facilitate an effective and accurate audit
and performance evaluation of the Borrower, the Borrower’s Undivided Interest and the Project as required in Section 609.17 of the Applicable Regulations.
(b)
Each set of Financial Statements of the Borrower delivered hereunder shall be prepared in accordance with GAAP consistently applied except to the extent that there have been any changes to such accounting principles or the application thereof noted in such Financial Statements and all financial records of the Borrower shall be maintained at the principal executive office of the Borrower.
(c)
The Borrower shall consult with and cooperate with DOE with regards to DOE’s monitoring of the Borrower, the Borrower’s Undivided Interest and the Project and audit, examination and inspection of the books and records of the Borrower, the Borrower’s Undivided Interest and the Project as provided in the Applicable Regulations, and in furtherance thereof (i) shall permit officers and designated representatives of DOE, its agents, the Comptroller General and the Independent Consultants to visit and inspect the Project Facility and any ancillary facilities upon reasonable notice and at reasonable times during normal business hours, subject to the rules and regulations of the NRC and to the reasonable direction of senior plant management, (ii) shall provide to officers and designated representatives of DOE, its agents, the Comptroller General and the Independent Consultants access to any pertinent books, documents, papers and records of the Borrower including those with respect to the Project, to the extent in the possession of the Borrower or reasonably obtainable by the Borrower, for the purpose of audit, examination, inspection and monitoring upon reasonable notice and at reasonable times during normal business hours, to examine and discuss the Project and the affairs, finances and accounts of the Borrower with the representatives of the Borrower, (iii) shall afford proper facilities for such inspection and shall make copies (at the Borrower’s expense) of any records that are subject to such inspection, and (iv) shall require the Operator to make available to DOE, its agents, the Comptroller General and the Independent Consultants the same rights of inspection and access to its books and records that the Operator makes available to the Owners; provided that the Operator shall not be required to disclose the information in such books and records to the extent it is prohibited from doing so by Governmental Rule.
(d)
If at any time the Borrower is no longer subject to the periodic reporting requirements of the Exchange Act, the Borrower shall appoint and maintain a firm of independent public accountants of recognized standing in the U.S. as accountants for the Borrower.
(e)
The Borrower shall retain all records relating to expenditures with respect to which Advances were made until the later of (x) the date that is five (5) years after the Advance was made with respect to such expenditure and (y) Commercial Operation of the Second Unit.
(f)
The Borrower shall, upon the request of DOE, (i) exercise its right pursuant to Section 5.6 (
Management Audit; Access to Records
) of the Ownership Agreement to conduct management audits of Owners’ Agent’s performance in respect of the Project or (ii) exercise its right pursuant to Section 7.8 (
Cost Audits
) of the Ownership Agreement to conduct audits of costs charged to and paid by the Borrower pursuant to the Ownership Agreement, provided that the references to the Sections of the Ownership Agreement contained in this
Section 6.2(f)
refer to such sections without regard to any amendments thereto after the date of this Agreement.
|
|
6.3.
|
Maintenance of Insurance
.
|
The Borrower shall keep the Borrower’s Undivided Interest insured in accordance with normal nuclear industry practices (
provided
that such insurance coverage is available on commercially reasonable terms, conditions and price) in accordance with the terms and provisions described on
Schedule 6.3
. The Borrower shall obtain and maintain Required Insurance and shall pursue any contractual remedies to cause other Persons required to provide Required Insurance pursuant to their respective Project Documents, including any Construction Contractor and the Operator, to obtain and maintain such Required Insurance, or alternate coverage as provided for on
Schedule 6.3
as required pursuant to their respective Project Documents, as the case may be.
|
|
6.4.
|
Maintenance of Existence
.
|
The Borrower shall maintain and preserve its existence as a corporation organized and existing under the laws of the State of Georgia, subject to permitted mergers and sales of substantially all assets that do not constitute an Event of Default under
Section 8.1(f)
.
|
|
6.5.
|
Construction and Operation of Project
.
|
The Borrower shall construct and operate the Project, or cause the Project to be constructed and operated, in each case in accordance with the Required Consents (including the COLs) and any Governmental Rules and other directions or instructions issued or provided by the NRC with respect to the Project unless, with respect to any noncompliance with any such Required Consents, Governmental Rules and other directions or instructions, the Borrower is diligently working to cure the noncompliance through appropriate regulatory procedures or to obtain a necessary amendment to such Required Consent.
The Borrower shall use the proceeds of all Advances in accordance with the terms and conditions of all applicable Loan Documents.
|
|
6.7.
|
Maintenance of Liens and Collateral
.
|
The Borrower shall establish, maintain, preserve, protect and continue the validity, perfection and first priority of the Liens of the Security Documents subject to Permitted Liens and the provisions of the Deed to Secure Debt at all times until the Debt Termination Date.
|
|
6.8.
|
Creation and Perfection of Security Interests; Additional Documents; Filings and Recordings
.
|
(a)
The Borrower shall execute and deliver, from time to time as reasonably requested by DOE or the Collateral Agent at the Borrower’s expense, such other documents and instruments as shall be necessary or advisable or that DOE or the Collateral Agent may reasonably request in connection with the rights and remedies of DOE and the Collateral Agent granted or provided for by the Loan Documents, and to consummate the transactions contemplated therein.
(b)
The Borrower shall, at its own expense, take all actions that have been or shall be reasonably requested by DOE or the Collateral Agent or that the Borrower knows are necessary to establish, maintain, preserve, protect or continue the validity, perfection or priority of the first priority (subject to Permitted Liens) Liens of the Secured Parties created by the Security Documents and shall furnish to DOE timely notice of the necessity of any such action, together with such instruments, in execution form, and such other information as may be required or reasonably requested to enable any appropriate Secured Party to effect any such action. Without limiting the generality of the foregoing, the Borrower shall, at its own expense, (A) execute or cause to be executed and shall file or cause to be filed or register or cause to be registered and record or cause to be recorded all documents (including financing statements, continuation statements, fixture filings and mortgages or deeds of trust) and pay all fees, Taxes and Periodic Expenses in connection therewith, in all places necessary or advisable (in the reasonable opinion of counsel for DOE or the Collateral Agent) to establish, maintain, preserve, protect or continue the validity, perfection or priority of such Liens and in all other places that DOE or the Collateral Agent shall reasonably request, (B) discharge all other Liens (other than Permitted Liens), (C) deliver or publish all notices to third parties that may be required to establish, maintain, preserve, protect or continue the validity, perfection or priority (subject to Permitted Liens) of any Lien created pursuant to the Security Documents and (D) cause to be delivered to DOE such opinions of counsel and other related documents as may be reasonably requested by DOE or the Collateral Agent to assure compliance with this
Section 6.8
.
(c)
If the Borrower shall at any time acquire any interest in any Collateral that is not covered by the Security Documents or the Lien created thereby, the Borrower shall promptly notify DOE of such interest and, to the extent requested by DOE, shall promptly (i) execute, deliver and record a supplement to the Security Documents, satisfactory in form and substance to DOE and (ii) establish and perfect a first priority (subject to Permitted Liens) Lien of the Secured Parties in each such interest.
(d)
If at any time any Additional Project Document shall be entered into by the Borrower, the Owners’ Agent (if the Owners’ Agent is acting on behalf of and would bind the Borrower) or the Operator in connection with the Project, the Borrower shall promptly notify DOE of such Additional Project Document and (i) in the case of an Additional Project Document that (A) creates, terminates, replaces or otherwise modifies any IP Interest, or (B) is entered into in connection with any lease financing of nuclear fuel for the Project, the Borrower shall promptly deliver to the Secured Parties a Direct Agreement in substantially the form attached hereto as
Exhibit K
with respect to such Additional Project Document, unless, in the case of
subclause (A)
above, where the Borrower’s failure to own or hold all or any part of such IP Interest could not reasonably be expected to result in a material adverse effect on the ability of the Project to be completed or operated, or to be conveyed or disposed of; or (ii) in the case of any Additional Project Document other than an Additional Project Document described in
subclause (i)
above, the Borrower shall, to the extent requested by DOE, use its reasonable best efforts to promptly deliver to the Secured Parties a Direct Agreement in substantially the form attached hereto as
Exhibit K
with respect to such Additional Project Document.
(e)
Without limiting the generality of the foregoing, as soon as practicable after Commercial Operation with respect to each Unit, the Borrower shall (i) provide DOE with a copy of all descriptions provided to the Owners pursuant to Section 4.9(c) of the Ownership
Agreement of the Additional Unit Properties setting forth in reasonable detail the facilities, equipment and other property and rights then constituting such applicable Additional Unit Property, including all property (including a metes and bounds description of the Identified Sites (as defined in the Ownership Agreement)), real or personal, and rights therein jointly paid for under the Ownership Agreement and (ii) if requested by DOE, enter into an amendment to the Deed to Secure Debt to revise the description of the collateral in accordance with the updated description.
|
|
6.9.
|
Acceptance, Startup and Testing
.
|
(a)
As soon as available, the Borrower shall provide to DOE a schedule setting forth the anticipated dates of startup and testing of the Project Facility, or any part thereof, pursuant to the Project Documents, and, from time to time promptly following any changes to the information in such schedule, shall provide to DOE an updated schedule reflecting such changes.
(b)
The Borrower shall provide, or cause to be provided, prior notice to DOE and the Lender’s Engineer that is reasonable under the circumstances of startup and testing of the Project Facility pursuant to the Project Documents, and shall allow the Lender’s Engineer or DOE or both to attend and witness such startup and testing, in all cases subject to the requirements of the NRC and to the reasonable direction of senior plant management.
(c)
At the request of DOE, the Borrower shall provide DOE and the Lender’s Engineer with access to and copies of any data or reports received by the Borrower in connection with any of the startup and other testing of the Project Facility provided that the Borrower shall not be required to disclose the information in such data or reports to the extent it is prohibited from doing so by Governmental Rule.
(a)
The Borrower shall not take any action that would in any way prevent it or the Operator from exercising the IP Interests that have vested to the Borrower or the Operator under the IP Agreements, or that would otherwise materially conflict with or adversely affect the IP Interests that have vested to the Borrower or the Operator under the IP Agreements. With respect to all other IP Interests that have been granted, but have not yet vested to the Borrower or the Operator under the IP Agreements, the Borrower shall use reasonable best efforts to not take any action that would in any way prevent it or the Operator from exercising such IP Interests or that would otherwise materially conflict with or adversely affect such IP Interests.
(b)
The Borrower shall take all commercially reasonable actions necessary to maintain and protect the IP Interest granted to it under the IP Agreements, including (i) protecting the secrecy and confidentiality of all confidential information and trade secrets having material value by establishing and taking commercially reasonable actions to enforce a policy requiring all current and former employees, consultants, licensees, vendors and contractors who will be provided access to such Technology and Intellectual Property Rights to execute appropriate confidentiality agreements; and (ii) taking all other commercially reasonable actions necessary to maintain the secrecy of all Technology and Intellectual Property Rights that are trade secrets having a material value.
(c)
If the Borrower obtains Knowledge of any breach or violation of any of the terms or conditions of the IP Agreements by a third Person, and such breach or violation is reasonably likely to prevent Borrower or the Operator from exercising the IP Interest granted to any of them under the IP Agreements, or that would otherwise materially conflict with or adversely affect the IP Interest granted to any of them under the IP Agreements, then the Borrower shall promptly take or request the Owners’ Agent or the Operator to take, such commercially reasonable actions under the IP Agreements to protect the rights granted to the Borrower or the Operator, including, for example, suing for an injunction against such violation or breach and posting any bond in conjunction therewith.
(d)
None of the provisions of this
Section 6.10
shall in any way prohibit the Borrower from terminating the EPC Contract and the related IP Agreements in accordance with the requirements of Section 2.08 of the Owners Direct Agreement.
|
|
6.11.
|
Compliance with Certain U.S. Government Requirements
.
|
(a)
Lobbying Requirements
. The Borrower shall comply with all requirements of 31 U.S.C. §1352, including: (i) if any funds have been paid or will be paid to any Person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress (as defined for purposes of 31 U.S.C. §1352), an officer or employee of Congress, or an employee of a Member of Congress in connection with the DOE Guaranteed Loan, the Borrower shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions; and (ii) no proceeds of the Advances will be expended to pay any Person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress.
(b)
Use of U.S. Government Funds
. The Borrower shall not use funds obtained from the U.S. Government, or from a loan or other instrument guaranteed by the U.S. Government, for the payment of Credit Subsidy Costs, administrative fees, or other fees charged by or paid to DOE relating to the Applicable Regulations, except to the extent explicitly authorized by an act of Congress.
(c)
Program Requirements
. The Borrower shall comply with all Program Requirements.
(d)
Prohibited Persons
.
(i)
The Borrower shall provide prompt written notice (including a brief description) to DOE if, at any time, it obtains Knowledge that the representations made with respect to Prohibited Persons (including the Debarment Regulations) in any of the Loan Documents were erroneous when made or have become erroneous by reason of changed circumstances.
(ii)
If any Borrower Entity, Borrower Entity Controlling Person or Southern Company or any of their respective Principal Persons becomes a Prohibited Person, or, any Owner, the EPC Contractor, Chicago Bridge & Iron Company N.V., Toshiba Corporation, The Shaw Group, Inc. or any of their respective ultimate parent companies, or the successors or
assigns of any such Person becomes (whether through a transfer or otherwise) a Prohibited Person identified in
clause (i)
or
(ii)
of the definition of Prohibited Person, the Borrower shall, within thirty (30) days of obtaining Knowledge that such Person has become a Prohibited Person, engage and continue to engage in good faith discussions with DOE regarding (A) the removal or replacement of such Person or, (B) if such removal or replacement is not reasonably feasible, the implementation of other mitigation measures.
(e)
Foreign Ownership
. The Borrower shall, and shall cause the Operator to, comply at all times with the requirements of the NRC with respect to foreign ownership, control and domination of each of the Borrower and the Operator.
(f)
Foreign Asset Control Regulations
. The Borrower shall ensure that the making of any Advances and the use of the proceeds thereof will not violate any Foreign Asset Control Regulations.
(g)
Use of Collateral
. None of the Collateral shall be traded or used, directly or indirectly, by a Prohibited Person or by a Person organized in a Prohibited Jurisdiction.
(h)
Davis-Bacon Act
.
(i)
In accordance with Section 1702(k) of Title XVII, beginning on the Guarantee Issuance Date, all laborers and mechanics employed by contractors and subcontractors in the performance of construction work financed in whole or in part by the DOE Guaranteed Loan shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with the Davis-Bacon Act, including but not limited to those wages set forth in
Schedule 6.11(h)(i)
. The contract clauses set forth in
Exhibit G
shall be incorporated into all Davis-Bacon Act Covered Contracts.
(ii)
The Borrower shall systematically review (by itself or through its agent) the certified payrolls that are required, pursuant to
subparagraph (a)(3)(i)
of
Exhibit G
, to be maintained by all project contractors and subcontractors that employ laborers and mechanics in the performance of construction work financed in whole or in part by the DOE Guaranteed Loan. The Borrower shall notify DOE in writing within 10 Business Days after it obtains DBA Knowledge of: (a) receipt by the Borrower of any complaint alleging non-compliance with the Davis-Bacon Act or (b) any non-compliance with the Davis-Bacon Act. In such instances, the Borrower shall forward to DOE (A) a copy of all written complaints or a written summary of any oral complaint or non-compliant incident, (B) a summary of the investigation of the Borrower into such complaint or such incident, (C) a summary of the resolution (or proposed resolution) of the complaint or incident, (D) the relevant certified payrolls and (E) any other information reasonably requested by DOE regarding the complaint or incident. Certified payrolls maintained, or caused to be maintained, by the Borrower shall be considered federal government records for the purposes of the Freedom of Information Act, 42 U.S.C. § 552.
(iii)
If the Borrower or any Affiliate of the Borrower intends to: (A) enter into a Davis-Bacon Act Covered Contract after the Guarantee Issuance Date; (B) materially change the scope of work of any Davis-Bacon Act Covered Contract; or (C) exercise any option to extend the term of a Davis-Bacon Act Covered Contract to perform work for a period of time
for which it was not obligated under the terms of the original contract (
subclauses (A)
,
(B)
and
(C)
collectively, “
Davis-Bacon Actions
”), the Borrower shall provide DOE: (1) a statement of the work for any DBA Contract Party that will perform construction, alteration, or repair of a building or work financed in whole or in part by the DOE Guaranteed Loan; (2) notice of intent to exercise an
y
option described in
subclause (C)
above; and (3) any other information requested by DOE relating to such Davis-Bacon Action. This information shall be provided no less than ten (10) Business Days prior to the occurrence of such Davis-Bacon Action.
(iv)
The Borrower shall update the Davis-Bacon and Related Acts Compliance Program as necessary and appropriate so that such program (A) remains designed to (1) ensure material compliance with all Davis-Bacon Requirements and (2) provide reasonable assurance that information relating to compliance with the Davis-Bacon Requirements is made known to the Vice President of Employee Relations and Associate General Counsel of Southern Company Services, Inc., and such other Person or Persons who have principal oversight responsibility with respect to the Borrower’s compliance with the Davis-Bacon Requirements and (B) identifies all of the Persons referred to in
subclause (A)(2)
above by name and position. The Borrower shall provide notice to DOE of each update to the Davis-Bacon and Related Acts Compliance Program and a copy of such update not later than ten (10) Business Days after the effective date of such update.
(v)
The Borrower shall implement and enforce the Davis-Bacon and Related Acts Compliance Program.
(i)
Corrupt Practices Laws
.
(i)
All Borrower Entities and their respective officers, directors, employees and agents acting in such capacities shall comply with all applicable Corrupt Practices Laws.
(ii)
The internal management and accounting practices and controls of all Borrower Entities shall be designed and maintained to provide reasonable assurance of compliance with all Corrupt Practices Laws, the Patriot Act, the Anti-Terrorism Order and the rules and regulations of OFAC. The disclosure controls and procedures of all Borrower Entities shall be designed and maintained to provide reasonable assurance that material information regarding each Borrower Entity’s compliance with laws (including Corrupt Practices Laws, the Patriot Act, the Anti-Terrorism Order and the rules and regulations of OFAC) is made known to Senior Management Persons of the Borrower.
(iii)
If any Borrower Entity or its officers, directors, employees or agents acting in such capacities fails to comply with the requirements of
clause (i)
of this
Section 6.11(i)
, the Borrower shall, within thirty (30) days of obtaining Knowledge that such Person has so failed to comply, engage and continue to engage in good faith discussions with DOE regarding (A) the removal or replacement of such Person or, (B) if such removal or replacement is not reasonably feasible, the implementation of other mitigation measures.
(j)
OFAC
. If any Borrower Entity, Borrower Entity Controlling Person or Southern Company or any of their respective Principal Persons, employees or agents acting in such capacities, or, any other Owner, the EPC Contractor, Chicago Bridge & Iron Company N.V.,
Toshiba Corporation, The Shaw Group, Inc. or any of their respective ultimate parent companies, or the successors or assigns of any such Person, fails to comply with any or all applicable orders, rules and regulations of OFAC in obtaining any consents, licenses, approvals, authorizations, rights, or privileges with respect to the Project or, otherwise, in conducting activities in connection with the Project, the Borrower shall, within thirty (30) days of obtaining Knowledge that such Person has so failed to comply, engage and continue to engage in good faith discussions with DOE regarding (i) the removal or replacement of such Person or, (ii) if such removal or replacement is not reasonably feasible, the implementation of other mitigation measures.
(k)
Anti-Terrorism Order
. If any Borrower Entity, Borrower Entity Controlling Person or Southern Company or any of their respective Principal Persons, or, any other Owner, the EPC Contractor, Chicago Bridge & Iron Company N.V., Toshiba Corporation, The Shaw Group, Inc. or any of their respective ultimate parent companies, or the successors or assigns of any such Person, fails to comply with the Anti-Terrorism Order, the Borrower shall, within thirty (30) days of obtaining Knowledge that such Person has so failed to comply, engage and continue to engage in good faith discussions with DOE regarding (i) the removal or replacement of such Person or, (ii) if such removal or replacement is not reasonably feasible, the implementation of other mitigation measures.
(l)
Patriot Act
. The Borrower shall establish and maintain an anti-money laundering compliance program if and as required by the Patriot Act.
(m)
SAM Registration
. The Borrower shall maintain its SAM registration at all times.
|
|
6.12.
|
Suspension of EPC Contract
.
|
The Borrower shall provide forty-five (45) days’ (or such shorter period satisfactory to DOE) prior notice to DOE in advance of exercising the Owners’ right under the EPC Contract to suspend all work under the EPC Contract for the Owners’ convenience, provided, however, that only concurrent notice of any such action to suspend all work under the EPC Contract shall be required where such action is necessary due to an emergency or otherwise is necessary in order to comply with requirements of the NRC, the Georgia PSC or any other Governmental Authority.
ARTICLE 7
NEGATIVE COVENANTS
The Borrower covenants and agrees that until the Debt Termination Date, unless DOE waives compliance in writing:
The Borrower shall not, and shall not agree to, create, assume or otherwise permit to exist any Lien (i) upon the Collateral, other than Permitted Liens, or (ii) upon the Collateral in connection with any financing secured by the Securitization Property. There shall be no restrictions on the ability of the Borrower to grant Liens upon any other assets of the Borrower.
|
|
7.2.
|
Corporate Existence
.
|
The Borrower shall not fail to maintain its corporate existence and its right to carry on its business, subject to permitted mergers and sales of substantially all assets that do not constitute an Event of Default under
Section 8.1(f)
.
|
|
7.3.
|
Affiliate Transactions; Commissions
.
|
The Borrower shall not, directly or indirectly, enter into any transaction or series of related transactions with any Affiliate, except for at cost services provided or received from Affiliates in accordance with Federal Energy Regulatory Commission requirements or if not subject to such requirements, on terms equivalent to those that would be obtained on an arm’s-length basis.
|
|
7.4.
|
Amendment of Certain Project Documents
.
|
The Borrower shall not directly or indirectly agree to any amendment, modification, replacement, supplement, consent or waiver or waive any right to consent to any amendment, modification, replacement, supplement or waiver of any right with respect to, or assign or agree to the assignment of any party’s obligations under:
(a)
Any of the following Sections of the EPC Contract:
(i)
Section 3.5(t) (
Contractor Responsibilities - Royalties and Fees
);
(ii)
Section 15.3 (
Intellectual Property Indemnity
);
(iii)
Section 20.1(e) (
Representations and Warranties of Contractor - Intellectual Property Rights
);
(iv)
Article 29 (
Assignment
);
(v)
Section 3.5(u)(iv) (
Contractor Responsibilities - Subcontracting - Flow-Down Clauses
), but only to the extent that such amendment, modification, replacement, supplement, consent or waiver could reasonably be expected to adversely impact (A) any Intellectual Property Rights or rights in Technology provided or to be provided pursuant to the EPC Contract or any subcontract thereunder or (B) the assignability of (or obligation of the EPC Contractor, or any other party to any such subcontract, to assign, or procure or permit the assignability of) any such rights in whole or in part;
(vi)
Section 3.5(u)(viii) (
Contractor Responsibilities - Subcontracting - Assignment of Subcontracts
), but only to the extent that such amendment, modification, replacement, supplement, consent or waiver could reasonably be expected to adversely impact (A) any Intellectual Property Rights or rights in Technology provided or to be provided pursuant to the EPC Contract or any subcontract thereunder or (B) the assignability of (or obligation of the EPC Contractor, or any other party to any such subcontract, to assign, or procure or permit the assignability of) any such rights in whole or in part;
(vii)
Section 17.2(a) (
Maximum Total Liability
) to the extent that such amendment, modification, replacement, supplement, consent or waiver could reasonably be expected to limit the EPC Contractor’s liability in connection with its indemnification obligations under Section 15.3 (
Intellectual Property Indemnity
) of the EPC Contract;
(b)
the Software License;
(c)
the Shaw Guarantee;
(d)
the Toshiba Guarantee;
(e)
any provisions of the Owner Documents that are listed in
Schedule 7.4
;
(f)
any provisions of the Nuclear Operating Agreement and the Letter Agreement for Construction Services that are listed in
Schedule 7.4
;
(g)
any of the following provisions of the Westinghouse Fuel Assembly Agreement:
(i)
Article XV (
Patents, Copyright and Trade Secret Indemnity
);
(ii)
Article XIX (
Assignment and Transfer
); or
(h)
any of the following provisions of the Westinghouse License Agreement:
(i)
Article VII (
Intellectual Property Rights
);
(ii)
Article VIII (
Assignment, Transfer, Subletting or Sublicensing
);
(iii)
Sections 13.2 and 13.4 of Article XIII (
Limitation of Liability
).
For the avoidance of doubt, nothing in this
Section 7.4
shall prohibit the Borrower from terminating the EPC Contract and the related IP Agreements in accordance with the requirements of Section 2.08 of the Owners Direct Agreement.
Notwithstanding anything to the contrary herein, neither Borrower nor the Operator will be required to obtain DOE’s consent to (a) any amendment, supplement or other modification or waiver applicable to any such provisions of the Nuclear Operating Agreement, the Letter Agreement for Construction Services, the Westinghouse Fuel Assembly Agreement or the Westinghouse License Agreement that is necessary to comply with the requirements of any Governmental Rule, including any requirement of the NRC or (b) the agreements, consents, waivers and amendments, or the effectiveness of any or all of them, as set forth in the MEAG SPV Amendments.
The restrictions on amendments to the Nuclear Operating Agreement and Westinghouse License Agreement set forth in this
Section 7.4
shall not apply to any amendment that relates exclusively to Plant Vogtle Units 1 and 2 and/or Plant Hatch Units 1 and 2 and that does not relate to the Project.
|
|
7.5.
|
Use of Non-AP1000 Reactor Technology
.
|
The Borrower shall not construct, or permit to be constructed, any nuclear reactor for the Project other than Westinghouse AP1000 standard nuclear reactor plant design, certified at 76 Fed. Reg. 82,079 (Dec. 30, 2011) (codified at 10 C.F.R. Part 52 Appendix D), and any amendments thereto, as described in each COL, including any amendments to the COLs or exemptions issued by NRC approving modifications to such certified standard design.
|
|
7.6.
|
Margin Regulations
.
|
The Borrower shall not directly or indirectly apply any part of the proceeds of any Advance or other revenues to the purchasing or carrying of any margin stock within the meaning of Regulation T, U or X of the Board of Governors of the Federal Reserve of the United States, or any regulations, interpretations or rulings thereunder.
(a) The Borrower shall not be a “plan” within the meaning of Section 4975(e) of the Internal Revenue Code; (b) the assets of the Borrower shall not constitute “plan assets” within the meaning of Section 3(42) of ERISA and the United States Department of Labor Regulations set forth in 29 C.F.R. § 2510.3-101; (c) the Borrower shall not be a “governmental plan” within the meaning of Section 3(32) of ERISA; (d) transactions by or with the Borrower shall not be subject to state statutes applicable to the Borrower regulating investments of fiduciaries with respect to governmental plans; and (e) the Borrower shall not engage in any transaction that would cause any obligation, or action taken or to be taken, hereunder (or the exercise by the Secured Parties of any of their respective rights under this Agreement) to be a non-exempt (under a statutory or administrative class exemption) prohibited transaction under ERISA or Section 4975 of the Internal Revenue Code or any similar state law, other than any such transaction or prohibited transaction described in this
subclause (e)
that could not reasonably be expected to have a Material Adverse Effect.
Notwithstanding anything in
Section 7.7(e)
to the contrary,
Section 7.7(e)
shall not be interpreted to limit the generality of, or otherwise limit in any way, the obligations (including the related exceptions and cure rights) of the Borrower in
Section 8.1(r)
, which shall be applicable to the Borrower without regard to the provisions of
Section 7.7(e)
.
|
|
7.8.
|
Investment Company Act
.
|
The Borrower shall not take any action that would result in the Borrower being required to register as an “investment company” under the Investment Company Act.
|
|
7.9.
|
Replacement or Removal of the Operator or Owners’ Agent
.
|
The Borrower shall not vote or agree to replace or remove the Operator or the Owners’ Agent other than with the prior written consent of DOE and upon receipt of any necessary approvals from the NRC; provided that the foregoing shall not impair or restrict the Borrower’s ability to resign as Owners’ Agent in accordance with the Owner Documents.
|
|
7.10.
|
Casualty Loss Proceeds
.
|
The Borrower shall not accept any Casualty Loss Proceeds from the relevant insurers in connection with an Event of Loss until any amounts that are required to be applied to prepay the DOE Guaranteed Loan in connection with such Event of Loss pursuant to
Section 3.3.3(c)
have been so applied.
|
|
7.11.
|
Fuel Supply Agreements
.
|
(a)
After Substantial Completion of both Units (as each such term is defined in the EPC Contract), the Borrower shall not terminate and shall not cause the Westinghouse Fuel Assembly Agreement to be terminated prior to the time it is fully performed unless the Borrower at the time of such termination has a contract or contracts in place for an alternate supply of fuel assemblies for not less than the next two (2) reloads for each Unit, and has the right to use the BEACON Software or another core monitoring system that complies with the COLs with such alternate supply of fuel assemblies;
provided
,
however
, that this covenant shall not prevent the Borrower from amending or causing to be amended the Westinghouse Fuel Assembly Agreement, except as provided in
Section 7.4(g)
, and shall not prevent the Borrower from enforcing or causing to be enforced any remedy available to Borrower under the Westinghouse Fuel Assembly Agreement other than termination.
(b)
The Borrower shall not fail at any time (i) to ensure that a contractual obligation for the supply of not less than two (2) additional reloads of fuel assemblies and related fuel fabrication services for each Unit is in place or (ii) to have the right to use the BEACON Software or another core monitoring system that complies with the COLs with such reloads.
(c)
Notwithstanding the foregoing, the Borrower shall not be deemed to have failed to perform or observe the covenants set forth in
clauses (a)
and
(b)
of this
Section 7.11
, unless the Borrower shall fail to have remedied any non-compliance with the terms of such covenants by the date that is one (1) year in advance of the next scheduled delivery date for the last fuel assembly for the next reload for the Unit in question available under the then-effective Fuel Supply Agreement, provided that (1) the Borrower is diligently working to remedy such non-compliance pursuant to a plan of remediation with a timetable for curing such non-compliance that has been provided to DOE at the time of such non-compliance, (2) the Borrower reasonably believes such non-compliance will be remedied through such diligent efforts, and (3) such non-compliance could not reasonably be expected to have a Material Adverse Effect or a material adverse effect on the ability of the Project to be operated.
ARTICLE 8
EVENTS OF DEFAULT; REMEDIES
The occurrence of any of the following events shall constitute an Event of Default hereunder:
(a)
Failure to Make Payment Under Loan Documents
. The Borrower shall fail to pay, in accordance with the terms of the FFB Credit Facility Documents, this Agreement or any other Loan Document (whether at scheduled maturity, as a mandatory prepayment, by
acceleration or otherwise), (i) any principal of or interest on the DOE Guaranteed Loan or any DOE Maintenance Fee amount on or before the date such amount is due, or (ii) any scheduled fee, charge or other amount due under any Loan Document on or before the date such amount is due,
provided
, in the case of either
subclause (i)
or
(ii)
above, that such failure to pay shall continue for a period of three (3) Business Days (except that no grace period shall apply with respect to any failure to pay amounts due on the Maturity Date);
provided
further
,
however
, that the FFB Late Charge Rate shall apply in accordance with
Section 9.2.1
from the date of any such missed payment until the amount of the applicable missed payment has been paid in accordance with the requirements of
Section 9.2.1
and the DOE Late Penalty Charge shall be payable in accordance with
Section 3.6
.
(b)
Misstatements; Omissions
. Any representation, warranty or statement (other than the representations and warranties in
Section 5.15
, the exclusive remedy with respect to a breach of which shall be as provided in
Section 3.3.3
) made or deemed to be made by the Borrower in any Loan Document shall be found to have been untrue in any material respect when made or deemed to have been made, unless such materially untrue representation, warranty or statement is capable of being remedied, and such materially untrue representation, warranty or statement is remedied within ninety (90) days (or such longer period acceptable to DOE), in each case following the earlier of (i) the date of notice thereof from DOE to the Borrower or (ii) the date that the Borrower obtains Knowledge of such material untruth (for the avoidance of doubt, a Borrower misrepresentation as to the non-existence of a Potential Default under any certification provided or representation made pursuant to
Section 4.2.5
,
Section 5.16
or
Section 6.1(e)
shall be remedied under this
Section 8.1(b)
if such Potential Default is remedied within the cure period of this
Section 8.1(b)
).
(c)
Borrower Payment Default under EPC Contract, Owner Documents or Owners Direct Agreement
. A payment default by the Borrower occurs under any IP Agreement or any of the Owner Documents that is not cured by the Borrower or another Owner within 30 days. For the avoidance of doubt, a payment default by an Owner other than the Borrower with respect to amounts owed under the Owner Documents that causes a payment default by the Owners under any IP Agreement shall not constitute an Event of Default under this
Section 8.01(c)
.
(d)
Covenants and Other Agreements
. The Borrower shall fail to perform or observe any term, covenant or agreement (other than those set forth in
clauses (a)
and
(b)
of this
Section 8.1
and those set forth in
Section 6.1(g)(iii)
) contained in any Loan Document to which it is a party and, if such default is remediable, such default has not been remedied within ninety (90) days, in each case following the earlier of (i) the date of notice thereof from DOE to the Borrower or (ii) the date on which the Borrower obtains Knowledge of such breach.
(e)
Environmental and Safety Matters
. Any failure by the Borrower, the Operator or the Borrower’s Undivided Interest to comply in all material respects with any Environmental Law, Governmental Approvals or safety regulations applicable to the Project, including compliance in all material respects with all conditions and requirements required in connection with the Environmental Impact Statement, if such failure continues for ninety (90) days, in each case following the earlier of (i) the date of notice thereof from DOE to the Borrower or (ii) the date on which the Borrower obtains Knowledge of such failure (unless such default cannot reasonably be cured within such time period and the Borrower or the Operator is diligently
working to cure such default according to an applicable Remediation Plan or, in the case of any non-compliance with NRC-issued Governmental Approvals and other NRC directions and instructions, the Borrower (A) is diligently working to cure such noncompliance through appropriate NRC regulatory procedures, which cure may include obtaining a necessary amendment to such NRC-issued Governmental Approval and (B) reasonably believes will be cured through such diligent efforts);
provided
that no such failure shall be considered to have occurred under this
clause (e)
for so long as the Borrower or the Operator, as applicable, is contesting in good faith by appropriate legal proceedings each assertion by a Governmental Authority that the Borrower, the Operator or the Borrower’s Undivided Interest is not in compliance with such Environmental Law, Governmental Approvals or safety regulations.
(f)
Merger; Transfer of Assets
. The Borrower shall, or shall agree to, enter into any transaction of merger, consolidation or other similar actions (a “
Merger Transaction
”), or convey, sell, lease or otherwise transfer all or substantially all of the Borrower’s property or assets, unless, in the case of a Merger Transaction:
(i) if the Borrower shall consolidate with or merge into another Person, the Person formed by such consolidation or merger shall be a Person organized and existing under the laws of the United States of America, any State thereof or the District of Columbia and shall have expressly assumed pursuant to a written agreement, in form and substance satisfactory to DOE, the due and punctual payment of the principal of (and premium, if any) and interest on the DOE Guaranteed Loan and the performance of all obligations of the Borrower under the Transaction Documents;
(ii) immediately after giving effect to such Merger Transaction, no Event of Default, Potential Default or Mandatory Prepayment Event shall have occurred;
(iii) all required approvals from the NRC and the Georgia PSC in connection with the Merger Transaction shall have been obtained prior to the consummation of such transaction;
(iv) if the surviving Person resulting from the Merger Transaction is not subject to rate regulation by the Georgia PSC, then such Person satisfies the following two conditions at the time the Merger Transaction is consummated:
(A) such Person has a long-term, senior, unsecured, non-credit enhanced debt rating meeting at least two of the three following ratings (1) BBB- or better from S&P, (2) Baa3 or better from Moody’s and/or (3) BBB- or better from Fitch, and
(B) such Person has not been placed on a negative credit watch or its equivalent by any two or more of such rating agencies that states that such Person’s long-term senior, unsecured, non-credit enhanced debt rating could be downgraded to or below (1) in the case of S&P, BB+, (2) in the case of Moody’s, Ba1 or (3) in the case of Fitch, BB+; and
(v) the Borrower has delivered to DOE a Borrower Certificate and a legal opinion from counsel satisfactory to DOE, each stating that such consolidation or merger complies
with this
Section 8.1(f)
and that all conditions precedent herein provided for relating to such transaction have been complied with, and such legal opinion further opining as to the due authorization, execution, delivery and enforceability of the assumption agreement referred to in
clause (i)
of this
Section 8.1(f)
and covering such other matters as DOE may reasonably request.
(g)
Transfer of Collateral
. The Borrower shall, or shall agree to, convey, release, sell, lease or otherwise transfer any of the Collateral except (i) as provided for in
clause (f)
of this
Section 8.1
, (ii) in accordance with the Deed to Secure Debt, (iii) as may be approved by DOE or (iv) pursuant to DOE’s purchase of any of the Collateral pursuant to the Owners Direct Agreement;
provided
that effective upon any such transfer of all or any portion of the Borrower’s Undivided Interest, the owner of such transferred portion of the Borrower’s Undivided Interest shall have assumed the obligations of the Borrower to comply with Section 1702(k) of Title XVII with respect to such transferred portion of the Borrower’s Undivided Interest pursuant to an assumption agreement reasonably acceptable to DOE and the Department of Labor.
(h)
Unenforceability, Termination, Repudiation or Transfer of Certain Transaction Documents
. This Agreement or any of the other Loan Documents (other than the DOE Guarantee) or any material provision hereof or thereof at any time for any reason (i) (A) is or becomes invalid, illegal, void or unenforceable against the Borrower, or (B) the Borrower shall have repudiated or disavowed or taken any action to challenge the validity or enforceability of such agreement or material provision, (ii) ceases to be in full force and effect, except at the expiration of the stated term thereof, or shall otherwise be prematurely terminated, (iii) except as otherwise expressly permitted hereunder shall be assigned or otherwise transferred by the Borrower (other than with the prior written consent of DOE) or (iv) shall cease to give the Collateral Agent or DOE in any material respect the Liens, rights, powers and privileges purported to be created thereby or hereby, and in each case such event continues unremedied for thirty (30) days;
provided
, that such thirty (30) day cure period shall not apply to
subclause (i)(B)
above.
(i)
Security Interests
. (i) Any of the Security Documents shall fail in any material respect to provide the Liens, rights, titles, interests, remedies, powers or privileges intended to be created thereby (including the priority intended to be created thereby), (ii) any such Security Document or Lien created pursuant to the Security Documents shall cease to be in full force and effect, or (iii) the validity or applicability of any of the Security Documents or Liens created pursuant to any of the Security Documents to the Advances, the Secured Obligations or any other obligations purported to be secured or guaranteed thereby or any part thereof, shall be disaffirmed by or on behalf of the Borrower;
provided
such event, other than any disaffirmation by or on behalf of the Borrower described in
subclause (iii)
above, continues unremedied for thirty (30) days.
(j)
Change of Control
. A Change of Control shall occur with respect to the Borrower or the Operator without the prior written consent of DOE.
(k)
Default under Other Indebtedness or Other Obligations
.
(i)
Prior to Commercial Operation of the Second Unit, the Borrower shall fail to pay when due any principal, interest or other amount due under any agreement or instrument
evidencing, or under which the Borrower has outstanding at any time, any Indebtedness (other than the DOE Guaranteed Loan) or Other Obligations in an amount in excess of one hundred million Dollars ($100,000,000), and such failure shall continue after the applicable grace period, if any, specified in such agreement or instrument, or any other default under any such agreement or instrument shall occur and shall continue after the applicable grace period, if any, specified in such agreement or instrument, if the effect of such default is to accelerate or to permit the acceleration of the maturity of such Indebtedness or Other Obligations, in each case, where such default is not cured within ten (10) Business Days following such failure or default and right to accelerate.
(ii)
From and after Commercial Operation of the Second Unit, the Borrower shall fail to pay when due any principal, interest or other amount due under any agreement or instrument evidencing, or under which the Borrower has outstanding at any time, any Indebtedness (other than the DOE Guaranteed Loan) or Other Obligations in an amount in excess of five hundred million Dollars ($500,000,000), and such failure shall continue after the applicable grace period, if any, specified in such agreement or instrument, or any other default under any such agreement or instrument shall occur and shall continue after the applicable grace period, if any, specified in such agreement or instrument, if the effect of such default is to accelerate or to permit the acceleration of the maturity of such Indebtedness or Other Obligations, in each case, where such default is not cured within ten (10) Business Days following such failure or default and right to accelerate.
(l)
Judgments
.
(i)
Prior to Commercial Operation of the Second Unit, one or more Governmental Judgments shall be entered against the Borrower, and such Governmental Judgments shall not be vacated, satisfied, discharged or stayed for any period of ten (10) Business Days and the aggregate amount of all such unvacated, unsatisfied, undischarged or unstayed Governmental Judgments outstanding at any time (except to the extent any applicable insurer(s) shall have acknowledged liability therefor) exceeds one hundred million Dollars ($100,000,000).
(ii)
From and after Commercial Operation of the Second Unit, one or more Governmental Judgments shall be entered against the Borrower, and such Governmental Judgments shall not be vacated, satisfied, discharged or stayed for any period of ten (10) Business Days and the aggregate amount of all such unvacated, unsatisfied, undischarged or unstayed Governmental Judgments outstanding at any time (except to the extent any applicable insurer(s) shall have acknowledged liability therefor) exceeds five hundred million Dollars ($500,000,000).
(m)
Bankruptcy; Insolvency; Dissolution
.
(i)
Involuntary Bankruptcy, Etc
. An Insolvency Proceeding shall have been commenced against the Borrower, and such proceeding continues undismissed for sixty (60) days.
(ii)
Voluntary Bankruptcy, Etc
. The institution by the Borrower of any Insolvency Proceeding with respect to itself, or the admission by it in writing of its inability to pay its Indebtedness and Other Obligations generally as they become due, or any other event shall have occurred that under any Governmental Rule would have an effect analogous to any of those events listed above in this
clause (ii)
with respect to the Borrower, or any action is taken by the Borrower for the purpose of effecting any of the foregoing.
(iii)
Dissolution
. The dissolution of the Borrower.
(n)
Abandonment of Project
. The Borrower or Owners’ Agent shall abandon the Project or otherwise permanently cease to pursue the construction or operation of the Project;
provided
,
however
, that any abandonment or cessation of pursuing the construction or operation of the Project resulting from or constituting any Potential Mandatory Prepayment Event or Mandatory Prepayment Event shall not be an Event of Default under this
clause (n)
.
(o)
Application of Proceeds, Funding of Project Expenses
. The Borrower shall fail to apply the proceeds of the Advances exclusively to Eligible Project Costs, if such failure is not cured within ninety (90) days following the earlier of (i) the date of notice of such failure from DOE to the Borrower or (ii) the date on which the Borrower obtains Knowledge of such failure.
(p)
ERISA Events
.
(i)
Prior to Commercial Operation of the Second Unit, (A) the Borrower or any of its ERISA Affiliates shall fail to pay when due any Pension Plan or Multiemployer Plan contributions aggregating in excess of one hundred million Dollars ($100,000,000) or (B) any one or more ERISA Events shall occur with respect to any one or more Pension Plans or Multiemployer Plans which individually or in the aggregate results in liability to the Borrower in excess of one hundred million Dollars ($100,000,000), in each case where such failure to pay or ERISA Event shall continue for a period of ten (10) Business Days.
(ii)
From and after Commercial Operation of the Second Unit, (A) the Borrower or any of its ERISA Affiliates shall fail to pay when due any Pension Plan or Multiemployer Plan contributions aggregating in excess of five hundred million Dollars ($500,000,000) or (B) any one or more ERISA Events shall occur with respect to any one or more Pension Plans or Multiemployer Plans which individually or in the aggregate results in liability to the Borrower in excess of five hundred million Dollars ($500,000,000), in each case where such failure to pay or ERISA Event shall continue for a period of ten (10) Business Days.
(q)
Suspension and Debarment
. The failure of the Borrower to comply with the Debarment Regulations unless such breach is capable of being cured and such breach is cured, in each case, within ninety (90) days following the earlier of (i) the date of notice thereof from DOE to the Borrower or (ii) the date on which the Borrower obtains Knowledge of such breach.
(r)
Compliance with Governmental Rules; Program Requirements
.
(i)
The Borrower, the Operator (with respect to the Project), or the Borrower’s Undivided Interest shall fail to comply with the provisions of Title XVII and such failure continues unremedied for any period of at least thirty (30) days or, in the case of a failure to
comply with Section 1702(k) of Title XVII, such failure continues unremedied for ninety (90) days, in each case following the earlier of (A) the date of notice thereof from DOE to the Borrower or (B) the date on which the Borrower obtains Knowledge of such failure.
(ii)
The Borrower, the Operator (with respect to the Project) or the Borrower’s Undivided Interest shall fail to comply with the provisions of the Applicable Regulations and such failure continues unremedied for ninety (90) days, in each case following the earlier of (A) the date of notice thereof from DOE to the Borrower or (B) the date on which the Borrower obtains Knowledge of such failure.
(iii)
The Borrower, the Operator (with respect to the Project) or the Borrower’s Undivided Interest shall fail to comply in all material respects with (A) all other Governmental Rules and (B) all other Program Requirements (other than the provisions of Title XVII and the Applicable Regulations), and such failure continues unremedied for at least ninety (90) days, in each case following the earlier of (x) the date of notice thereof from DOE to the Borrower or (y) the date on which the Borrower obtains Knowledge of such failure (unless such failure cannot reasonably be cured within such period and the Borrower or the Operator, as applicable, is diligently working to cure such failure according to an applicable Remediation Plan);
provided
that no such failure shall be considered to have occurred under this
clause (iii)
at any time the Borrower or the Operator is contesting in good faith by appropriate legal proceedings each assertion by a Governmental Authority that the Borrower, the Operator or the Project is not in compliance with such Program Requirements or other Governmental Rules.
Each clause of this
Section 8.1
shall operate independently, and the occurrence of any event described in any such clause shall constitute an Event of Default (subject, in each case, to all applicable requirements of notice, knowledge, lapse of time and right of the Borrower to cure or remedy any such event).
Notwithstanding the provisions of Section 11.1.1 of the FFB Note Purchase Agreement and Sections 23 and 24 of the FFB Promissory Note, DOE acknowledges and agrees that the Secured Parties shall not be entitled to exercise any of the remedies set forth in the Loan Documents with respect to any failure by the Borrower to make payments of principal and interest under the FFB Promissory Note unless and until an Event of Default shall have occurred and be continuing pursuant to
Section 8.1(a)
.
DOE further acknowledges and agrees that (i) any payment made by the Borrower to the account specified in Section 10(a) of the FFB Promissory Note as the subaccount of the Secretary (U.S. Treasury Department, ABA No. , TREAS NYC/CTR/BNF= , OBI= ) (the “
Secretary Subaccount
”) on or before the applicable Payment Date (or, if such Payment Date shall fall on a day on which either the FFB or the Federal Reserve Bank of New York is not open for business, the first day thereafter on which FFB and the Federal Reserve Bank of New York are both open for business) specified in the FFB Promissory Note (the “
Required Payment Date
”) shall be deemed made on the later of the date such payment is received at the Secretary Subaccount or the Required Payment Date, (ii) DOE shall take all actions necessary to ensure that the amounts paid by the Borrower and received at the Secretary Subaccount are, no later than the Required Payment Date, credited to the subaccount of FFB (within the account of the United States Treasury maintained at the
Federal Reserve Bank of New York) as provided in Section 10(a) of the FFB Promissory Note (the “
FFB Subaccount
”), (iii) if the Borrower makes the payment to the Secretary Subaccount on or before the Required Payment Date and DOE fails to credit such payment to the FFB Subaccount on the Required Payment Date, DOE shall be responsible to the Borrower for any Late Charges that may be payable to FFB because of such DOE failure, (iv) DOE, and not FFB, has the sole authority, pursuant to Section 23 of the FFB Promissory Note, to exercise any and all remedies with respect to any “default” under the FFB Promissory Note or Event of Default under this Agreement, and (v) if the Borrower makes the payment to the Secretary Subaccount on or before the Required Payment Date and such amounts are not credited to the FFB Subaccount by the Required Payment Date, DOE shall not declare a default in payment under the FFB Promissory Note or a Potential Default or Event of Default under this Agreement as a result of such amounts not being credited to the FFB Subaccount by the Required Payment Date, and DOE shall not be entitled to exercise any rights or remedies against the Borrower in connection with such failure.
|
|
8.2.
|
Remedies for Events of Default
.
|
(a)
Upon the occurrence and during the continuance of an Event of Default, DOE may, in its discretion, without further notice of default, presentment or demand for payment, protest or notice of non-payment or dishonor, or other notices or demands of any kind, all such notices and demands being waived (to the extent not prohibited by Governmental Rules), exercise any or all rights and remedies at law or in equity (in any combination or order that DOE may elect), including, without prejudice to DOE’s other rights and remedies, the following:
(i)
suspend or terminate the FFB Credit Facility Commitment;
(ii)
refuse, and DOE shall not be obligated, to review any Advance Notices or forward to FFB any FFB Advance Request Approval Notices;
(iii)
take those actions necessary to perfect and maintain the Liens of the Security Documents;
(iv)
declare and make all sums of outstanding principal and accrued but unpaid interest under the FFB Credit Facility Documents, this Agreement and the other Loan Documents together with all unpaid fees, Periodic Expenses and other amounts due hereunder or under any other Loan Document, payable on demand or immediately due and payable, whereupon such amounts shall immediately mature and become due and payable;
(v)
enter into possession of the Collateral (or any portion thereof) and perform any and all work and labor necessary to complete the Borrower’s Undivided Interest (or any portion thereof) or to operate and maintain the Borrower’s Undivided Interest (or any portion thereof), or otherwise foreclose upon or take possession of any Collateral, in each case in accordance with the Security Documents and the Direct Agreements, and all sums expended by any such Person in taking any such action (other than any amount expended for Completion Costs), together with interest on such amount at the FFB Late Charge Rate, shall be repaid by the Borrower to such Person upon demand and shall be secured by the Security Documents, notwithstanding that such expenditures may, together with the aggregate amount of Advances
under the DOE Guaranteed Loan, exceed the amount of the total FFB Credit Facility Commitment;
(vi)
otherwise foreclose upon or take possession and cause the sale or disposition of any Collateral in accordance with the Security Documents and the Direct Agreements;
(vii)
set off and apply proceeds of any sale or disposition of Collateral to the satisfaction of the Secured Obligations under all of the Loan Documents in accordance with the Security Documents and the Direct Agreements;
(viii)
cure defaults in accordance with the Security Documents and the Direct Agreements;
(ix)
charge interest at the FFB Late Charge Rate on any amounts not paid when due;
(x)
proceed to protect and enforce its rights and remedies by appropriate proceedings, including to enforce the payment of any amount due and payable under the Loan Documents, for damages, or for the specific performance of any provision of this Agreement or any other Transaction Document;
(xi)
exercise any and all rights and remedies available to it under any of the Transaction Documents with respect to the Project, the Borrower, the Owners and any other Project Participant and under the Collateral or otherwise under Governmental Rules; and
(xii)
take such other actions as DOE may reasonably require to provide for the care, preservation, protection, and maintenance of all Collateral so as to enable the United States to achieve maximum recovery upon default by the Borrower on the DOE Guaranteed Loan.
|
|
8.3.
|
Automatic Acceleration
.
|
Upon the occurrence of an Event of Default referred to in
Section 8.1(m)
, (a) the FFB Credit Facility Commitment shall automatically be terminated, and (b) the DOE Guaranteed Loan and the Secured Obligations, together with interest accrued thereon and all other amounts due in respect of the DOE Guaranteed Loan and the Secured Obligations, shall immediately mature and become due and payable, without any presentment, demand, diligence, protest, notice of acceleration, or other notice of any kind, all of which the Borrower hereby expressly waives to the extent permitted by Governmental Rule.
|
|
8.4.
|
Delivery of Remedies Instructions
.
|
At any time when an Event of Default has occurred and is continuing, DOE shall be entitled, by delivery of Remedies Instructions to the Collateral Agent, to:
(a)
direct the Collateral Agent to exercise, or refrain from exercising any right, remedy, power or privilege available to or conferred upon it with respect to the Collateral or
otherwise under this Agreement, the Security Documents or any other Loan Document to which it is a party; and
(b)
direct the time, place and manner in which the Collateral Agent is to exercise any such right, remedy, power or privilege.
|
|
8.5.
|
Appointment of a Receiver
.
|
Notwithstanding any appointment of a receiver, subject to mandatory provisions of Governmental Rule, the Secured Parties shall be entitled to retain possession and control of all cash, cash equivalents and investments held by, or deposited with, them or their agents or nominees pursuant to any provision of this Agreement or any other Security Document or Loan Document.
|
|
8.6.
|
DOE Independent Rights
.
|
DOE may itself exercise any right given to the Collateral Agent in this
Article 8
or otherwise in the Loan Documents.
ARTICLE 9
REIMBURSEMENT AGREEMENT
|
|
9.1.
|
Reimbursement Obligation
.
|
If the Borrower defaults in any payment due to FFB under the DOE Guaranteed Loan or otherwise under any FFB Credit Facility Document, and as a result of such payment default by the Borrower, the Guarantor makes any payments to FFB pursuant to the DOE Guarantee (a “
DOE Guarantee Payment
”), the Borrower shall become immediately obligated to reimburse the Guarantor in an amount (the “
DOE Guarantee Payment Amount
”) equal to the sum of (i) all DOE Guarantee Payments paid by the Guarantor to FFB, and (ii) all fees, costs, expenses and other amounts incurred by the Guarantor in connection therewith, whether by payment to FFB or otherwise;
provided
,
however
, that (x) any DOE Guarantee Payment shall not operate to satisfy the Borrower’s obligations to FFB under the DOE Guaranteed Loan or otherwise under the FFB Credit Facility Documents and (y) to the extent of any DOE Guarantee Payment, DOE shall be deemed hereunder to have been granted a participation in any or all of FFB’s rights under the Loan Documents and, to the extent applicable, with respect to the Collateral. Any DOE Guarantee Payment Amount shall be due and payable to DOE by the Borrower on the same day as the date on which DOE made payment of the DOE Guarantee Payment to which it relates.
|
|
9.2.
|
Payments and Computations
.
|
9.2.1.
Interest
.
The Borrower shall pay to the Guarantor an amount (the “
Borrower Reimbursement Obligations
”) equal to the sum of (i) the DOE Guarantee Payment Amount, and (ii) interest on the DOE Guarantee Payment Amount from the date the DOE Guarantee Payment was paid by the Guarantor under the DOE Guarantee until payment in full by the Borrower to the Guarantor
of the DOE Guarantee Payment Amount, at the FFB Late Charge Rate at the time of the payment default by the Borrower.
9.2.2.
Method of Payment
.
The Borrower shall make each payment with respect to Borrower Reimbursement Obligations hereunder (a “
Borrower Reimbursement Payment
”), irrespective of any right of counterclaim or set off, in Dollars and in immediately available funds by wire transfer to the following account, or to such other account as may be specified by the Guarantor in writing to the Borrower from time to time:
|
|
U.S. Treasury Department
|
ABA No. TREASNYC/CTR/BNF =
|
OBI =
|
9.2.3.
Taxes
.
All Borrower Reimbursement Payments by the Borrower hereunder shall be made in accordance with
Section 3.1.2
.
9.2.4.
Determinations
.
The parties to this Agreement agree that each determination by DOE of an amount of interest or fees payable hereunder shall be conclusive and binding for all purposes, absent manifest error.
|
|
9.3.
|
Obligations Absolute
.
|
To the fullest extent permitted by law, the Borrower Reimbursement Obligations are absolute, irrevocable and unconditional, and shall be paid strictly in accordance with the terms of this Agreement under all circumstances whatsoever, including the following circumstances, whether or not with notice to or the consent of the Borrower:
(a)
the occurrence, or the failure by DOE or any other Secured Party or any other Person to give notice to the Borrower of the occurrence, of any Event of Default or Potential Default under this Agreement or any default under any of the other Loan Documents;
(b)
the extension of the time for performance of any obligations, covenants or agreements of any Person under or arising out of any of the Loan Documents;
(c)
the existence of any claim, set off, counterclaim, defense or other rights of any kind or nature that (A) the Borrower, DOE or any other Person may have at any time against FFB or any transferee, or (B) the Borrower or any other Person may have at any time against DOE, whether in connection with the Loan Documents, the transactions contemplated therein or any unrelated transactions;
(d)
any failure, omission or delay on the part of (i) DOE to assert a defense to a DOE Guarantee Payment Amount under the DOE Guarantee or to otherwise contest the DOE
Guarantee, or (ii) DOE or any other Secured Party or the Borrower to enforce, assert or exercise any other right, power or remedy conferred by this Agreement or any of the Loan Documents;
(e)
the taking or the omission on the part of DOE or any other Secured Party or the Borrower of any other actions or remedies referred to in any of the Loan Documents;
(f)
the compromise, settlement, release, modification, amendment (whether material or otherwise) or termination of any or all of the obligations, conditions, covenants or agreements of any Person in respect of any of the Loan Documents;
(g)
any amendment or waiver of the payment, performance or observance of any of the obligations, conditions, covenants or agreements of any Person contained in any of the Loan Documents;
(h)
the exchange, surrender, substitution or modification of any security for any of the Loan Documents;
(i)
any disability, incapacity or lack of powers, authority or legal personality of or dissolution or change in the status of the Borrower or any other Person;
(j)
any release, irregularity, invalidity, illegality, lack of genuineness, unenforceability or modification affecting this Agreement, the DOE Guarantee, the DOE Guaranteed Loan, or the other Loan Documents, or the transactions contemplated hereby or thereby;
(k)
the voluntary or involuntary liquidation, dissolution, sale or other disposition of all or substantially all the assets of, the marshaling of assets and liabilities, receivership, insolvency, bankruptcy, assignment for the benefit of creditors, reorganization, arrangement, composition with creditors or readjustment of, or other similar proceedings that affect the Borrower or any other Person party to any of the Loan Documents;
(l)
the release or discharge by operation of law of the Borrower from the performance or observance of any obligation, covenant or agreement contained in any of the Loan Documents;
(m)
any statement or any other document presented under the DOE Guarantee proving to be forged, fraudulent, invalid or insufficient in any respect or any statement therein being untrue or inaccurate in any respect whatsoever;
(n)
any determination by a court or arbitrator, or any settlement of a disputed claim by any party hereto or other Person, relating to this Agreement, the DOE Guarantee, or the other Loan Documents, or the transactions contemplated hereby or thereby;
(o)
any promptness, diligence, presentment, demand of payment, protest, notice of dishonor or nonpayment of any liabilities of the Borrower, suit or taking of other action by DOE or any other Secured Party against any party liable thereon; or
(p)
any other circumstance or happening whatsoever, whether or not similar to any of the foregoing.
9.4.1.
Borrower Reimbursement Obligations Secured
.
The parties expressly acknowledge that the Collateral pledged and assigned under the Security Documents is pledged and assigned to secure payment by the Borrower of the Borrower Reimbursement Obligations.
9.4.2.
Actions
.
The Borrower expressly acknowledges that DOE is free to litigate, settle or otherwise satisfy or discharge its obligation with respect to any DOE Guarantee Payment Amount, and take any action under the Security Documents or otherwise with respect to the Collateral, as it may from time to time deem appropriate, and any failure by DOE to advise, notify, or consult with the Borrower shall not be a defense to, or in any way diminish, discharge or derogate from the Borrower Reimbursement Obligations hereunder.
9.5.1.
Rights Cumulative
.
The Guarantor’s right to reimbursement provided for in this
Article 9
shall be in addition to, and not in limitation of, any other claims, rights or remedies of subrogation, reimbursement, contribution, exoneration or indemnification or similar claims, rights or remedies, whether arising under contract, by statute, or otherwise that DOE may have from time to time.
9.5.2.
Subrogation
.
Without limiting the generality of
Section 9.5.1
, upon any DOE Guarantee Payment DOE shall be subrogated to the rights of FFB or any subsequent holder of the DOE Guaranteed Loan, including, to the extent applicable, all related Liens and Collateral.
|
|
9.6.
|
Further Assurances
.
|
The Borrower shall cooperate with DOE in connection with the exercise of any of its rights under this
Article 9
and agrees, promptly upon request by DOE, to execute, acknowledge and deliver all further instruments and documents, and take all such further acts as DOE may reasonably request from time to time in order to carry out the purposes of this
Article 9
or to enable DOE to exercise and enforce its rights and remedies hereunder.
ARTICLE 10
MISCELLANEOUS
Any communications, including any notices, between or among the parties to the Loan Documents shall be given to the addresses listed in
Schedule 10.1
. All notices or other communications required or permitted to be given under the Loan Documents shall be in writing and shall be considered as properly given (a) if delivered in person, (b) if sent by overnight delivery service for delivery, (c) in the event overnight delivery service is not readily available, if mailed by first class mail, postage prepaid, registered or certified with return receipt requested, (d) if sent by facsimile or telecopy with transmission verified or (e) if transmitted by electronic mail (with such transmission verified). Notice so given shall be effective upon delivery to the addressee, except that (A) communication or notice so transmitted by facsimile or telecopy or other direct written electronic means shall be deemed to have been validly and effectively given on the day (if a Business Day and, if not, on the next following Business Day) on which it is validly transmitted if transmitted (with such transmission verified) before 2:00 p.m., recipient’s time, and if transmitted after that time, on the next following Business Day, (B) if any notice is tendered to an addressee and the delivery thereof is refused by such addressee, such notice shall be effective upon such tender, and (C) if such addressee requires delivery to a mail room or other central depository, delivery to such room or depository shall be effective. Any party shall have the right to change its address for notice under any of the Loan Documents to any other location by giving prior written notice to the other parties in the manner set forth above.
|
|
10.2.
|
Further Assurances
.
|
(a)
The Borrower shall fully cooperate with all Persons as may be necessary to ensure that each Secured Party receives any notices due to such Secured Party pursuant to the Loan Documents.
(b)
(i) Each of the Borrower and the Secured Parties shall cooperate with one another in furtherance of the express purposes of this Agreement and each of the other Loan Documents, and each one of them agrees, upon the reasonable request of another, to execute, acknowledge and deliver all further instruments and documents, and take all such further action as any one or more of them may reasonably request from time to time to carry out such purposes; and (ii) the Borrower agrees to use commercially reasonable efforts to provide such legal opinions, certificates and consents as reasonably requested by DOE from time to time.
(c)
The Borrower shall take all action to ensure that each of the Transaction Documents is in proper legal form under the respective governing laws selected in such Transaction Document, without any further action required with respect to such legal form for the enforcement of such Transaction Documents.
(d)
The Borrower (i) shall cooperate in all respects with each Independent Consultant, (ii) shall ensure that each Independent Consultant is provided with all information reasonably requested by such Independent Consultant in fulfilling its duties to DOE and ensure that any information that it may supply to such Independent Consultant, when taken together with all of
the statements, information, documents, reports and other information and updates then included in the Disclosure Package, is accurate in all material respects and not, by omission of information or otherwise, misleading in any material respect at the time such information is provided.
(e)
Each of the parties agrees that money damages would not be a sufficient remedy for any breach of this
Section 10.2
and
Section 6.8
and agrees that in addition to all other remedies, any court or arbitrator having proper jurisdiction may award specific performance or other equitable relief as a remedy for any such breach.
(f)
In the event the Borrower requests the Collateral Agent to take any action required to be taken by the Collateral Agent under the Deed to Secure Debt, and all of the conditions to such action have been satisfied, DOE shall instruct the Collateral Agent to take such action.
No delay or omission in exercising any right, power, privilege or remedy under this Agreement or any other Loan Document, including any rights and remedies in connection with the occurrence of an Event of Default or Potential Default shall impair any such right, power, privilege or remedy of the Secured Parties, nor shall it be construed to be a waiver of any right, power, privilege or remedy or of any breach or default, or an acquiescence therein, or in any similar breach or default thereafter occurring, nor shall any waiver of any single right, power, privilege or remedy, or of any breach or default be deemed a waiver of any other right, power, privilege or remedy or of any other breach or default theretofore or thereafter occurring. Any waiver, permit, consent or approval of any kind or character on the part of any of the Secured Parties of any right, power, privilege or remedy including any rights and remedies in connection with the occurrence of an Event of Default or Potential Default or of any other breach or default under this Agreement or any other Loan Document, or any waiver on the part of any of the Secured Parties of any provision or condition of this Agreement or any other Transaction Document, must be in writing and shall be effective only to the extent specifically set forth in such writing. All rights, powers, privileges and remedies, either under this Agreement or any other Loan Document or by law or otherwise afforded to any of the Secured Parties, shall be cumulative and not alternative and not exclusive of any other rights, powers, privileges and remedies that such Secured Parties may otherwise have.
In addition to any rights now or hereafter granted under Governmental Rules or otherwise, and not by way of limitation of any such rights, upon the occurrence and during the continuance of an Event of Default, each Secured Party is hereby authorized at any time or from time to time, without presentment, demand, protest or other notice of any kind to the Borrower or to any other Person, any such notice being hereby expressly waived, to set off and to appropriate and apply any and all deposits (general or special, time or demand, provisional or final) and any other Indebtedness or Other Obligations at any time held or owing by such Secured Party (including by any branches and agencies of such Secured Party wherever located) to or for the credit or the
account of the Borrower against and on account of the Secured Obligations and liabilities of the Borrower to such Secured Party under this Agreement or any other Loan Document.
|
|
10.5.
|
Amendment or Waiver
.
|
Except as otherwise provided herein, neither this Agreement nor any of the terms hereof may be changed, waived, discharged or terminated unless such change, waiver, discharge or termination is in writing and signed by the Borrower and DOE. Any amendment to or waiver of this Agreement or any of the terms hereof that constitutes a ‘modification’ within the meaning set forth in Section 502(9) of the Federal Credit Reform Act of 1990 and OMB Circular A-11 may be conditioned upon payment of any increase to the DOE Guaranteed Loan Credit Subsidy Cost by the Borrower.
This Agreement, including any agreement, document or instrument attached hereto or referred to herein (including the other Loan Documents), integrates all the terms and conditions mentioned herein or incidental hereto and supersedes all oral negotiations and prior agreements and understandings of the parties hereto in respect to the subject matter hereof.
This Agreement and the rights and obligations of the parties hereunder shall be governed by, and construed and interpreted in accordance with, the Federal law of the United States of America. To the extent that Federal law does not specify the appropriate rule of decision for a particular matter at issue, it is the intention and agreement of the parties hereto that the law of the State of New York (without giving effect to its conflict of laws principles (except Section 5-1401 of the New York General Obligations Law)) shall be adopted as the governing Federal rule of decision.
In case any one or more of the provisions contained in any Loan Document should be invalid, illegal or unenforceable in any respect, the validity, legality and enforceability of the remaining provisions shall not in any way be affected or impaired thereby, and the parties thereto shall enter into good faith negotiations to replace the invalid, illegal or unenforceable provision.
|
|
10.9.
|
Financial Statements
.
|
All financial statements of the Borrower submitted pursuant to this Agreement and the other Loan Documents shall be prepared in accordance with GAAP.
|
|
10.10.
|
Limitation on Liability
.
|
No claim shall be made by the Borrower or any of its Affiliates against any Secured Party or any of their Affiliates, directors, employees, attorneys or agents, including the Collateral Agent and the Independent Consultants, for any special, indirect, consequential or punitive damages (whether or not the claim therefor is based on contract, tort or duty imposed by law), in connection with, arising out of or in any way related to the transactions contemplated by this
Agreement or the other Transaction Documents or any act or omission or event occurring in connection therewith; and, to the extent not prohibited by Governmental Rule, the Borrower hereby waives, releases and agrees not to sue upon any such claim for any such damages, whether or not accrued and whether or not known or suspected to exist in its favor.
|
|
10.11.
|
Waiver of Jury Trial
.
|
EACH OF THE PARTIES HERETO HEREBY KNOWINGLY, VOLUNTARILY, AND INTENTIONALLY WAIVES ANY RIGHTS IT MAY HAVE TO A TRIAL BY JURY IN RESPECT OF ANY LITIGATION BASED HEREON, OR ARISING OUT OF, UNDER, OR IN CONNECTION WITH, THIS AGREEMENT OR ANY OTHER LOAN DOCUMENT, OR ANY COURSE OF CONDUCT, COURSE OF DEALING, STATEMENTS (WHETHER VERBAL OR WRITTEN), OR ACTIONS OF ANY OF THE PARTIES. THIS PROVISION IS A MATERIAL INDUCEMENT FOR EACH SECURED PARTY TO ENTER INTO THIS AGREEMENT AND THE OTHER LOAN DOCUMENTS. EACH OF THE PARTIES REPRESENTS THAT IT HAS DISCUSSED THIS WAIVER OF RIGHT TO JURY WITH ITS COUNSEL, UNDERSTANDS THE RAMIFICATIONS OF SUCH WAIVER, AND KNOWINGLY AND VOLUNTARILY AGREES TO THIS WAIVER.
|
|
10.12.
|
Consent to Jurisdiction
.
|
By execution and delivery of this Agreement, the Borrower irrevocably and unconditionally:
(a)
submits for itself and its property in any legal action or proceeding against it arising out of or in connection with this Agreement or any other Loan Document, or for recognition and enforcement of any judgment in respect thereof, to the non-exclusive general jurisdiction of (i) the courts of the United States of America for the District of Columbia, (ii) the courts of the United States of America in and for the Southern District of New York, (iii) any other federal court of competent jurisdiction in any other jurisdiction where it or any of its property may be found, and (iv) appellate courts from any of the foregoing;
(b)
consents that any such action or proceeding may be brought in or removed to such courts, and waives any objection, or right to stay or dismiss any action or proceeding, that it may now or hereafter have to the venue of any such action or proceeding in any such court or that such action or proceeding was brought in an inconvenient court and agrees not to plead or claim the same;
(c)
agrees that, to the extent not prohibited by Governmental Rule, service of process in any such action or proceeding may be effected by mailing a copy thereof by registered or certified mail (or any substantially similar form of mail), postage prepaid, to the Borrower at its address set forth in
Schedule 10.1
or at such other address of which DOE shall have been notified pursuant thereto;
(d)
agrees that nothing herein shall (i) affect the right of any Secured Party to effect service of process in any other manner permitted by law or (ii) limit the right of any Secured Party to commence proceedings against or otherwise sue the Borrower or any other Person in any other court of competent jurisdiction nor shall the commencement of proceedings in any one
or more jurisdictions preclude the commencement of proceedings in any other jurisdiction (whether concurrently or not) if, and to the extent, permitted by the Governmental Rules; and
(e)
agrees that judgment against it in any such action or proceeding shall be conclusive and may be enforced in any other jurisdiction within or without the U.S. by suit on the judgment or otherwise as provided by law, a certified or exemplified copy of which judgment shall be conclusive evidence of the fact and amount of the Borrower’s obligation.
|
|
10.13.
|
Successors and Assigns
.
|
(a)
The provisions of this Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permitted assigns.
(b)
The Borrower may not assign or otherwise transfer any of its rights or obligations under this Agreement or under any Transaction Document without the prior written consent of DOE.
(c)
FFB may assign any or all of its rights, benefits and obligations under the FFB Credit Facility Documents and, to the extent applicable, with respect to the Collateral, to any Person that acquires an interest in the DOE Guaranteed Loan in accordance with the provisions of the FFB Credit Facility Documents.
(d)
DOE, acting for this purpose as an agent of the Borrower, shall maintain a register for the recordation of the names and addresses of each Person that acquires an interest in the DOE Guaranteed Loan in accordance with the provisions of the FFB Credit Facility Documents and the outstanding principal amounts of the Advances owing to each such Person pursuant to the terms of the FFB Credit Facility Documents, and all accrued and unpaid interest thereon (the “
Register
”). The entries in the Register shall be conclusive, and the Borrower and the Secured Parties may treat each Person whose name is recorded in the Register as having the interest in the DOE Guaranteed Loan specified in the Register for all purposes of this Agreement, notwithstanding notice to the contrary. The Register shall be available for inspection by the Borrower and any Secured Party, at any reasonable time and from time to time upon reasonable prior notice.
If FFB sells or otherwise grants participations in any or all of its rights and obligations under the FFB Credit Facility Documents, then, except to the extent directed by DOE, the Borrower shall continue to deal exclusively with FFB and the provisions of this Agreement shall apply as if no such participation had been sold or granted.
This Agreement shall continue to be effective if at any time payment and performance of the Borrower’s obligations hereunder, or any part thereof, is, pursuant to Governmental Rules, reduced in amount. In the event of any such reduction, the Borrower’s obligations hereunder shall be deemed reduced only by such amount.
|
|
10.16.
|
No Partnership; Etc
.
|
The Secured Parties and the Borrower intend that the relationship between them shall be solely that of creditor and debtor. Nothing contained in this Agreement or in any other Loan Document shall be deemed or construed to create a partnership, tenancy-in-common, joint tenancy, joint venture or co-ownership by, between or among the Secured Parties and the Borrower or any other Person. The Secured Parties shall not be in any way responsible or liable for the indebtedness, losses, obligations or duties of the Borrower or any other Person with respect to the Project or otherwise. All obligations to pay real property or other Taxes, assessments, insurance premiums, and all other fees and Periodic Expenses arising from the ownership, operation or occupancy of the Project and to perform all obligations under the agreements and contracts relating to the Project shall be the sole responsibility of the Borrower and the other Owners (and, as between the Borrower and the other Owners, as provided in the Owner Documents).
|
|
10.17.
|
Payment of Costs and Expenses; Indemnification
.
|
(a)
(i) The Borrower shall, whether or not the transactions herein contemplated are consummated, pay or reimburse: all reasonable and documented out-of-pocket costs and expenses of each Secured Party (including all costs, charges and expenses, including all fees and Periodic Expenses of the Independent Consultants and other legal counsel, consultants and advisors for any of the foregoing) made, paid, suffered or incurred in connection with (A) the negotiation, preparation, execution and delivery and, where appropriate, authentication, registration and recordation of this Agreement, the other Loan Documents and any other documents and instruments related hereto or thereto (including legal opinions), and (B) the authentication, registration and recordation (where appropriate) of any of the Loan Documents and the delivery of the evidences of Indebtedness relating to the Advances and the disbursements thereof.
(ii)
The Borrower shall also pay or reimburse, without duplication, all reasonable and documented out-of-pocket costs and expenses of each Secured Party (including reasonable travel costs and all other costs, charges and expenses including the fees and Periodic Expenses of legal counsel and, to the extent DOE uses legal counsel at the Department of Justice, the value imputed to the Department of Justice’s work consistent with applicable law), consultants and advisors for any of the foregoing) made, paid, suffered or incurred in connection with (A) any amendment or modification to, or the protection or preservation of any right or claim under, or consent or waiver in connection with, this Agreement or any other Loan Document, any such other document or instrument related hereto or thereto or any Collateral, and (B) the administration, preservation in full force and effect and enforcement (including with respect to a work out) of this Agreement, the other Loan Documents and any other documents and instruments referred to herein or therein, and (C) the fees and expenses of the Lender’s Engineer and other Independent Consultants from time to time retained pursuant to the Loan Documents.
(iii)
The Borrower shall pay or arrange for the payment before they become overdue of all present and future material Taxes (including stamp taxes), fees, Periodic Expenses or other charges payable on or in connection with the execution, issue, delivery, registration, or
notarization, or for the legality, validity, or enforceability, of this Agreement, any other Transaction Documents and any other documents related to this Agreement (other than those Taxes that it is contesting in good faith).
(b)
(i) The Borrower shall, whether or not the transactions herein contemplated are consummated, indemnify and hold harmless each of the Secured Parties and FFB (each, an “
Indemnified Party
”) and each of its respective officials, advisors, servants, officers, directors, employees, representatives, attorneys and agents (each, an “
Indemnified Person
”) from and against, and reimburse such Indemnified Parties (and their respective Indemnified Persons) for: (A) any and all claims, damages, liabilities, obligations, judgments, penalties, disbursements, costs and expenses of any kind or nature whatsoever, to which an Indemnified Party or an Indemnified Person may become subject, in any way relating to or arising out of or in connection with the entering into and performance of any Loan Document or the disbursement of, or use of the proceeds of, any Advances or the consummation of any transactions contemplated herein or in any Loan Document (other than Section 2.08 of the Owners Direct Agreement) (collectively, “
Claims
”), but, if any such Indemnified Party has an ownership interest in the Project, is an obligor under the EPC Contract or is an obligor under the Westinghouse Letter Agreement (or any construction contract between DOE and Westinghouse pursuant to the Westinghouse Letter Agreement), the obligations of the Borrower under this
subsection (b)
shall not apply to an Indemnified Party and its respective Indemnified Persons to the extent relating to or arising out of or in connection with such Indemnified Party being a Project owner, EPC Contract obligor or obligor under the Westinghouse Letter Agreement (or any construction contract between DOE and Westinghouse pursuant to the Westinghouse Letter Agreement), and the obligations of the Borrower under this
subsection (b)
shall be further subject to the provisions of
Sections 2.7
,
3.1.2(b)
,
10.17(b)(ii)
,
10.17(c)(i)
,
10.17(c)(ii)
and
10.20
and any provisions of any other Loan Documents that expressly limit the liability of the Borrower; and (B) any and all actions, claims, suits, litigation, investigations, proceedings or inquiries (regardless of whether any Indemnified Party or Indemnified Person is a party thereto) relating to any Claim, and any and all reasonable and documented costs and expenses incurred by an Indemnified Party or by an Indemnified Person in defending, analyzing, settling, or resolving a Claim (the “
Costs of Defense
”).
(ii)
Without limitation to the provisions of
clause (b)(i)
of this
Section 10.17
, the Borrower shall, whether or not the transactions herein contemplated are consummated, indemnify and hold harmless each Indemnified Party and each Indemnified Person from and against any and all liabilities, obligations, damages (foreseeable and unforeseeable, including consequential and punitive damages), penalties, claims, actions, judgments, suits, costs, expenses (including reasonable fees and expenses of legal counsel, consultants and advisors for any such Indemnified Person) and disbursements incurred by any of them as a result of, or arising out of, or in any way related to, or by reason of, any Environmental Claims (whether or not such Indemnified Party or Indemnified Person is a party thereto) related to any actual or alleged presence, Release or threatened Release of Hazardous Substances on, in, under, about or from the Project Facility or any other property owned or operated by the Borrower or the Operator; provided that, with respect to any such other property, such Indemnified Party’s and Indemnified Person’s rights under this clause (b)(ii) shall only apply to the extent such Indemnified Party’s (and its respective Indemnified Persons’) liabilities, obligations, losses, damages, penalties, claims, actions, judgments, suits, costs and disbursements are incurred in such Indemnified Party’s capacity as a Secured Party under the Loan Documents and not in the capacity of a
Project owner, obligor under the EPC Contract or obligor under the Westinghouse Letter Agreement (or any construction contract between DOE and Westinghouse pursuant to the Westinghouse Letter Agreement).
(c)
(i) The indemnities provided for in
Section 10.17(b)
shall not apply to the extent that a court or arbitral tribunal of competent jurisdiction renders a final non-appealable determination that all or any portion of a Claim or Costs of Defense resulted from the gross negligence or willful misconduct of an Indemnified Party or an Indemnified Person. The indemnities provided for in
Section 10.17(b)
are independent of and in addition to any other rights of any Indemnified Person in connection with any Claim or Costs of Defense hereunder, under any other agreement, or at law. Each Indemnified Party and each Indemnified Person shall have the right to control its, his or her defense. Each Indemnified Party and each Indemnified Person agrees to (x) notify the Borrower promptly after its, his or her receipt of a notice of the commencement of any claim, investigation or proceeding for which indemnification will be sought from the Borrower pursuant to
Section 10.17(b)
and (y) keep the Borrower reasonably informed of material developments with respect thereto. The Borrower may, at any time and at its own expense, elect to participate in the defense of any claim for which indemnification will be sought from the Borrower. The Borrower shall have no liability with respect to any settlement or compromise of any claim or proceeding effected without its prior written consent, which shall not be unreasonably withheld, conditioned or delayed, nor shall the Borrower be responsible for the fees and expenses of more than one firm of attorneys retained in connection with the same matter in the same jurisdiction for all Indemnified Parties and all Indemnified Persons unless it would be necessary or desirable to retain multiple firms of attorneys as a result of the interests of such Indemnified Parties and Indemnified Persons not being fully aligned.
(ii)
In the event of a “nuclear incident” involving “public liability” to “persons indemnified” as such terms are defined in 42 U.S.C. §§ 2014(q), (t) and (w), then, to the extent the Indemnified Parties and Indemnified Persons (as defined in
Section 10.17(b)
) are “persons indemnified” pursuant to the Price-Anderson Act, 42 U.S.C. §2210 and to the extent of the indemnity provided thereby, the indemnities provided for in
Section 10.17(b)
shall not apply to, and the Borrower shall not have any liability to, any such Indemnified Persons.
(d)
All sums paid and costs incurred by any Indemnified Party or Indemnified Person with respect to any matter for which indemnification is required hereunder shall bear interest at the FFB Late Charge Rate applicable to the DOE Guaranteed Loan as provided in
clause (iii)
of this
Section 10.17(d)
below and shall be immediately due and payable on demand. Each such Indemnified Party and each such Indemnified Person shall promptly notify the Borrower of any such amounts payable by the Borrower hereunder;
provided
that any failure to provide such notice shall not affect the Borrower’s obligations under this
Section 10.17
except as provided in this
Section 10.17
. All such sums paid and costs incurred by any Secured Party or any of its respective officials, advisors, servants, officers, directors, employees, representatives, attorneys and agents that remain unpaid by the Borrower shall be added to the Secured Obligations and be secured by the Security Documents.
(i)
To the extent that the undertaking in the preceding clauses of this
Section 10.17
may be unenforceable because it is violative of any law or public policy, the
Borrower shall perform such undertakings to the maximum extent permitted by such law or public policy.
(ii)
The provisions of this
Section 10.17
shall survive foreclosure under the Security Documents and satisfaction or discharge of the Secured Obligations, and shall be in addition to any other rights and remedies of any Indemnified Party or Indemnified Person.
(iii)
Any amounts payable by the Borrower pursuant to this
Section 10.17
shall be payable prior to the later of (i) ten (10) Business Days after the Borrower receives an invoice for such amounts from any applicable Indemnified Party or Indemnified Person, and (ii) five (5) Business Days prior to the date on which such Indemnified Party or Indemnified Person expects to pay such costs on account of which the Borrower’s indemnity hereunder is payable, and if not paid by such applicable date shall bear interest at the FFB Late Charge Rate from and after such applicable date until paid in full.
(iv)
Upon payment of any Claim or Costs of Defense by the Borrower pursuant to this
Section 10.17
, the Borrower, without any further action, shall be subrogated to any and all claims that such Indemnified Party or Indemnified Person may have relating thereto, and such Indemnified Party or Indemnified Person shall, at the request and expense of the Borrower, cooperate with the Borrower and give, at the request and expense of the Borrower, such further assurances as are necessary or advisable to enable the Borrower vigorously to pursue such claims.
This Agreement may be executed in one or more duplicate counterparts and when signed by all of the parties shall constitute a single binding agreement. The delivery of an executed counterpart of this Agreement by electronic means, including by telecopy, facsimile or by portable document format (PDF) attachment to email, shall be as effective as delivery of an original executed counterpart of this Agreement.
|
|
10.19.
|
No Prejudice to IRS Determination of Tax Basis
.
|
Each Borrower Entity acknowledges and agrees that DOE’s issuance of the DOE Guarantee pursuant to this Agreement, including the determination by DOE as to whether Project Costs are Eligible Project Costs, shall not prejudice or otherwise have any binding effect with regard to any determination by the Internal Revenue Service, the U.S. Department of the Treasury, or a court of law as to the tax basis of the Borrower’s Undivided Interest or any part thereof under the Internal Revenue Code and under Section 1603 of the American Recovery and Reinvestment Tax Act of 2009.
|
|
10.20.
|
Completion Costs Non-Recourse
.
|
(a)
All Completion Costs incurred by the Secured Parties shall be repaid by the Borrower upon demand and shall be secured by the Security Documents, notwithstanding that such expenditures may, together with the aggregate amount of Advances under the DOE Guaranteed Loan, exceed the amount of the total FFB Credit Facility Commitment.
(b)
Notwithstanding anything in this Agreement or any other Loan Document to the contrary, there shall be no recourse against the Borrower for any liability to any Secured Party for any Completion Costs except to the extent the same is enforced against the proceeds from any sales of Collateral in accordance with Section 4.10 of the Deed to Secure Debt, and the Secured Parties shall look solely to such proceeds from a sale of the Collateral (but not to the Borrower) in enforcing rights and obligations under and in connection with the Loan Documents with respect to Completion Costs.
|
|
10.21.
|
Covenant Defeasance
.
|
(a)
Mandatory Prepayment Event and Discontinuation with Construction or Operation of Project
. Notwithstanding any provision of this Agreement to the contrary, in the event a Mandatory Prepayment Event has occurred and the Borrower has confirmed to DOE, in the relevant notice of Mandatory Prepayment Event delivered to DOE pursuant to
Section 6.1(g)(i)
, that it will not continue with the construction or operation of the Project, then, with effect from delivery of such notice to DOE:
(i)
the Borrower shall no longer be required to comply with
Section 6.1(a)
(
Monthly Construction Progress Reports
),
Section 6.1(b)
(
Operation Period Reporting
),
Section 6.1(g)(vi)
and
(vii)
(
Reporting Obligations; 5 Business Day Notices
);
Section 6.1(l)(ii)
(
Additional Monthly Reporting; Required Consents
),
Section 6.9
(
Acceptance, Startup and Testing
), or
Section 7.5
(
Use of Non-AP1000 Reactor Technology
);
(ii)
Section 6.1(n)
(
Other Information
) shall be amended automatically, without any further action on the part of the parties hereto, to read in its entirety as follows:
(n)
Other Information
. As soon as reasonably available through the use of commercially reasonable efforts by the Borrower following such request, such other information or documents reasonably related to the Borrower’s obligations under the Loan Documents as DOE or any Independent Consultant may reasonably request.
; and
(iii)
the occurrence of any event described in
Section 8.1(c)
(
Borrower Payment Default under EPC Contract, Owner Documents or Owners Direct Agreement
) shall no longer constitute an Event of Default hereunder.
(b)
EPC Assignment and Assumption
. Notwithstanding any provision of this Agreement to the contrary, if DOE has completed the EPC Assignment and Assumption (as defined in the Owners Direct Agreement), then, with effect from the effective date of the relevant assignment and assumption agreement:
(i)
Section 6.1(g)(ii)
(
Reporting Obligations; 5 Business Day Notices
) shall be amended automatically, without any further action on the part of the parties hereto, to read in its entirety as follows:
(ii) notice of the occurrence of any event, condition, legislation or governmental proceedings and any developments with respect to the foregoing, with respect to the Borrower, in each case that has had, or could reasonably be expected to have, a Material Adverse Effect;
(ii)
the Borrower shall no longer be required to comply with
Section 6.11(c)
(
Program Requirements
) solely as it relates to compliance with Section 1702(k) of Title XVII,
Section 6.11(h)
(
Davis-Bacon Act
) or
subsections (a)
,
(b)
,
(c)
and
(d)
of
Section 7.4
(
Amendment of Certain Project Documents
);
(iii)
the Borrower shall not be in breach of
Section 7.1
(
Liens
) to the extent any Lien is created, assumed, or permitted to exist on any Collateral (a) over which the Borrower does not have control or (b) as a result of any actions by DOE or its designee; and
(iv)
the occurrence of any event described in
Section 8.1(i)
(
Security Interests
) with respect to the security interest granted by the Borrower pursuant to the Deed to Secure Debt in the EPC Contract or any other Collateral assumed by DOE, shall no longer constitute an Event of Default hereunder.
(c)
Transfer of COLs
. Notwithstanding any provision of this Agreement to the contrary, if both of the COLs issued to the Borrower have been transferred to another Person, then, with effect from the date of such transfer, or NRC approval thereof, whichever is later, the Borrower shall no longer be required to comply with
Section 6.5
(
Construction and Operation of Project
) or
Section 6.11(e)
(
Foreign Ownership
).
(d)
Borrower No Longer an Owner
. Notwithstanding any provision of this Agreement to the contrary, if, in accordance with the Loan Documents, the Borrower’s Undivided Interest has been reduced to zero, then, with effect from the date of such reduction to zero:
(i)
the Borrower shall no longer be required to comply with
Section 6.1(h)
(
Governmental and Environmental Indemnity Claims and Reports
),
Section 6.1(i)
(Safety Audit Reports),
Section 6.1(k)
(
Insurance Certificates
) and
subsections (i)
and
(iii)
through
(x)
of
Section 6.1(l)
(
Additional Monthly Reporting;
Project Documents, Casualty Damages, Authorized Officials
),
Section 6.1(p)
(
Restricted Data Site
) (provided that, at DOE’s request, the Borrower shall reasonably cooperate with DOE to preserve DOE’s access to the Restricted Data Site and the documents available therein in accordance with the requirements of the EPC Contract),
Section 6.3
(
Maintenance of Insurance
),
Section 6.7
(
Maintenance of Liens and Collateral
),
Section 6.8
(
Creation and Perfection of Security Interests; Additional Documents; Filings and Recordings
),
Section 6.10
(
Technology
),
Section 6.11(c)
(
Program Requirements
) solely as it relates to compliance with Section 1702(k) of Title XVII,
Section 6.11(f)
(
Foreign Asset Control Regulations
),
Section 6.11(g)
(
Use of Collateral
),
Section 6.11(h)
(
Davis-Bacon Act
),
Section 7.1
(
Liens
),
subsections (e)
,
(f)
,
(g)
and
(h)
of
Section 7.4
(
Amendment of Certain Project Documents
),
Section 7.9
(
Replacement or Removal of the Operator or Owners’ Agent
) and
Section 7.10
(
Casualty Loss Proceeds
);
(ii)
Section 6.2(c)
(
Books, Records and Inspections; Accounting and Auditing Matters
) shall be amended automatically, without any further action on the part of the parties hereto, to read in its entirety as follows:
(c) The Borrower shall consult with and cooperate with DOE with regards to DOE’s monitoring of the Borrower and audit, examination and inspection of the books and records of the Borrower as provided in the Applicable Regulations, and in furtherance thereof (i)
shall provide to officers and designated representatives of DOE, its agents, the Comptroller General and the Independent Consultants access to any pertinent books, documents, papers and records of the Borrower to the extent in the possession of the Borrower or reasonably obtainable by the Borrower, for the purpose of audit, examination, inspection and monitoring upon reasonable notice and at reasonable times during normal business hours, to examine and discuss the affairs, finances and accounts of the Borrower with the representatives of the Borrower, and (ii) shall afford proper facilities for such inspection and shall make copies (at the Borrower’s expense) of any records that are subject to such inspection.
(iii)
the occurrence of any event described in
Section 8.1(e)
(
Environmental and Safety Matters
),
Section 8.1(g)
(
Transfer of Collateral
) and
Section 8.1(i)
(
Security Interests
) shall no longer constitute an Event of Default hereunder; and
(iv)
Section 8.1(r)
(
Compliance with Program Requirements and Applicable Regulations
) shall be amended automatically, without any further action on the part of the parties hereto, to read in its entirety as follows:
(r)
Compliance with Governmental Rules; Program Requirements
.
(i) The Borrower shall fail to comply with the provisions of Title XVII (other than Section 1702(k)) and such failure continues unremedied for any period of at least thirty (30) days following the earlier of (A) the date of notice thereof from DOE to the Borrower or (B) the date on which the Borrower obtains Knowledge of such failure.
(ii) The Borrower shall fail to comply with the provisions of the Applicable Regulations (other than those implementing the requirements of Section 1702(k) of Title XVII) and such failure continues unremedied for ninety (90) days following the earlier of (A) the date of notice thereof from DOE to the Borrower or (B) the date on which the Borrower obtains Knowledge of such failure.
(iii) The Borrower shall fail to comply in all material respects with (A) all other Governmental Rules (other than Section 1702(k) of Title XVII) and (B) all other Program Requirements (other than the provisions of Title XVII and the Applicable Regulations), and such failure continues unremedied for at least ninety (90) days, in each case following the earlier
of (x) the date of notice thereof from DOE to the Borrower or (y) the date on which the Borrower obtains Knowledge of such failure (unless such failure cannot reasonably be cured within such period and the Borrower is diligently working to cure such failure according to an applicable Remediation Plan); provided that the Borrower shall not be in default under this clause (iii) at any time the Borrower is contesting in good faith by appropriate legal proceedings each assertion by a Governmental Authority that the Borrower is not in compliance with such Program Requirements or other Governmental Rules.
If DOE is required by Governmental Rule to repay, restore, return, or disgorge in whole or in part, any payment or property previously paid or transferred to DOE by the Borrower in full or partial satisfaction of any Secured Obligation (other than amounts received with respect to Completion Costs) because the payment or transfer is avoided pursuant to Section 547 of the Bankruptcy Code (a “
Voidable Transfer
”), then the provisions of the Loan Guarantee Agreement will automatically and immediately be revived, reinstated and restored and will exist as though the Voidable Transfer had never been made. The provisions of this
Section 10.22
shall survive the termination of this Agreement.
|
|
10.23.
|
Collateral Agent
.
|
The Borrower shall enter into a separate written agreement with the Collateral Agent and, as provided in Section 2.08(a) of the Collateral Agency Agreement, shall be responsible thereunder for paying the fees and expenses of the Collateral Agent in connection with the Project, the Transaction Documents and the DOE Guaranteed Loan, under all circumstances, without recourse to DOE or any other Person. The DOE agrees that the party providing collateral agent services from time to time shall be retained through federal procurement procedures.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and delivered by their respective officers or representatives hereunto duly authorized as of the date first written above.
Georgia Power Company,
as Borrower
By:
/s/ W. Ron Hinson
______________________
Name: W. Ron Hinson
Title: Executive Vice President, Chief Financial Officer and Treasurer
[Signature Page to Loan Guarantee Agreement - GPC]
U.S. DEPARTMENT OF ENERGY,
as Guarantor
By:
/s/ April Stephenson
_____________________
|
|
Title:
|
Chief Operating Officer
|
Loan Programs Office
[Signature Page to Loan Guarantee Agreement - GPC]
Exhibit A
to Loan Guarantee Agreement
DEFINITIONS
“
Additional Project Document
” Any of the following: (a) any contract entered into after the Guarantee Issuance Date by the Borrower, the Owners’ Agent (if the Owners’ Agent is acting on behalf of and would bind the Borrower) or the Operator in connection with the Project (i) under which the Borrower, the Owners’ Agent or the Operator (as applicable) could reasonably be expected to have obligations or liabilities in the aggregate in excess of one hundred million Dollars ($100,000,000), (ii) that the Borrower reasonably determines is for the supply or installation of equipment for which limited sourcing is available, (iii) (A) in connection with any lease financing of nuclear fuel for the Project or (B) for the disposal of nuclear fuel for the Project or (C) the supply of fuel assemblies and/or related required software for the Project (including the BEACON Software Agreement (if any)), (iv) for the provision of nuclear operating services, or (v) for the construction of the Transmission Facilities under which the Borrower, the Owners’ Agent (if the Owners’ Agent is acting on behalf of and would bind the Borrower) or the Operator (as applicable) could reasonably be expected to have obligations or liabilities in the aggregate in excess of ten million Dollars ($10,000,000), or (b) any guarantee, letter of credit, surety bond or other performance security in favor of the Borrower, the Owners’ Agent or the Operator (as applicable) provided after the Guarantee Issuance Date pursuant to the EPC Contract or pursuant to any contract described in clause (a). Any agreement with respect to the purchase of fuel (excluding the fuel assemblies) for the Project shall not be considered an Additional Project Document.
“
Additional Unit Properties
” The “Additional Unit Properties” as defined in the Ownership Agreement.
“
Advance
” An advance or a borrowing of the DOE Guaranteed Loan made pursuant to the Agreement and the FFB Credit Facility Documents.
“
Advance Date
” A Business Day on which FFB makes an Advance in accordance with
Article 2
.
“
Advance Notice
” A request for an Advance delivered by the Borrower pursuant to
Section 4.2.10
in accordance with
Section 2.3.1
.
“
Advance Notice Date
” With respect to any Advance, the date of submission of the Advance Notice for such Advance.
“
Advance Schedule
” A schedule detailing the expected dates and amounts of proposed Advances and Base Funding contributions to fund Project Costs, prepared by the Borrower, as updated from time to time in accordance with
Section 4.2.1
.
“
Affiliate
” As to any Person, any other Person that directly or indirectly Controls, or is under common Control with, or is Controlled by, such Person.
“
Agreement
” As defined in the preamble. The Agreement constitutes the “Loan Guarantee Agreement” referred to in the Applicable Regulations.
“
Anti-Terrorism Order
” Executive Order No. 13,224, 66 Fed. Reg. 49,079 (2001), issued by the President of the United States of America (Executive Order Blocking Property and Prohibiting Transactions With Persons Who Commit, Threaten to Commit, or Support Terrorism).
“
Anticipated Completion Date
” The fourth calendar quarter of 2018.
“
Applicable Regulations
” The final regulations with respect to Title XVII, at 10 C.F.R. Part 609, and any other applicable regulations from time to time issued as final rules to implement Title XVII.
“
Application
” The Loan Guarantee Application of the Borrower, dated August 6, 2008, September 12, 2008 and September 29, 2008 (with respect to Part I) and December 23, 2008 (with respect to Part II), for a DOE Guarantee under Title XVII.
“
Appropriations Act
” As defined in
Section 4.1.30
.
“
Atomic Energy Act
” The Atomic Energy Act of 1954, as amended from time to time, and the regulations promulgated, and any publicly available rulings issued that have the force of law, thereunder.
“
Authorized Official
” (a) With respect to any Person (i) that is a corporation, the chairman, chief executive officer, president, vice president, assistant vice president, treasurer, assistant treasurer, or any other Financial Officer of such Person, (ii) that is a partnership, each general partner of such Person or the chairman, chief executive officer, president, vice president, assistant vice president, treasurer, assistant treasurer or any other Financial Officer of a general partner of such Person or (iii) with respect to any Person that is a limited liability company, the manager, managing partner or duly appointed officer of such Person, the individuals authorized to represent such Person pursuant to the Organizational Documents of such Person, or the chairman, chief executive officer, president, vice president, assistant vice president, treasurer, assistant treasurer or any other Financial Officer of the manager or managing member of such Person and (b) with respect to any Borrower Entity, only those individuals holding the positions of President, Vice President, Assistant Vice President, Treasurer, Assistant Treasurer, or other Financial Officer of such Borrower Entity and whose name appears on the certificate of incumbency delivered pursuant to
Section 4.1.13
, as such certificate shall be amended from time to time pursuant to
Section 6.1(l)(x)
to identify names of the individuals then holding such offices and the capacity in which they are acting.
“
Availability Period
” The period from the Initial Advance Date until the earliest to occur of (i) the Last Day for an Advance, (ii) the date on which the undrawn FFB Credit Facility Commitment is reduced to zero, or (iii) the date of termination of the FFB Credit Facility Commitment.
“
Bankruptcy Law
” Any insolvency, reorganization, moratorium or similar law for the general relief of debtors in any relevant jurisdiction.
“
Base Funding
” Funding to be provided by the Borrower for Base Project Costs pursuant to the Base Funding Commitment.
“
Base Funding Commitment
” As defined in
Section 2.7
.
“
Base Project Costs
” The Borrower’s estimate as of the Guarantee Issuance Date of total Project Costs, which is an aggregate amount of five billion one hundred fifteen million seven hundred seventy-one thousand two hundred twenty-six Dollars ($5,115,771,226).
“
Base Quarter
” The calendar quarter ending September 30 in any given calendar year.
“
BEACON Software
” The AP1000-compatible version of Best Estimate Analysis for Core Operation Nuclear - Direct Margin Monitor System and its related deliverables to be used in the operation of the Project.
“
BEACON Software Agreement
” The agreement, to be entered into after the date of this Agreement by Westinghouse Electric Company LLC and the Owners or the Owners’ Agent if the BEACON Software is not provided pursuant to the EPC Contract, pursuant to which the Owners will acquire the BEACON Software including a license for the use thereof.
“
Borrower
” As defined in the preamble to the Agreement.
“
Borrower Appropriations Act Certificate
” A certificate, in the form attached hereto as
Schedule 4.1.33
, executed by an Authorized Official of the Borrower.
“
Borrower Base Case Projections
” The Borrower’s projection of its operating results over a period commencing January 1, 2013 and ending no sooner than twelve (12) fiscal months after the Maturity Date, including projections of revenues, expenses, cash flow, sources and uses of revenues over the forecast period and other forecasts as may reasonably be requested by DOE.
“
Borrower Certificate
” A certificate executed by an Authorized Official of the Borrower, addressing such matters for which such Borrower Certificate is required, in form and substance reasonably acceptable to DOE.
“
Borrower Entity
” Each of the Borrower, the Owners’ Agent, the Operator, and each of their respective successors and assigns.
“
Borrower Entity Controlling Person
” Any Person that directly or indirectly Controls any Borrower Entity.
“
Borrower Reimbursement Obligations
” As defined in
Section 9.2.1
.
“
Borrower Reimbursement Payment
” As defined in
Section 9.2.2
.
“
Borrower’s Accountant
” The independent public accountants appointed by the Borrower (so long as the Borrower is subject to the periodic reporting requirements of the Exchange Act), or a firm of independent public accountants of recognized standing in the U.S. appointed or maintained by the Borrower pursuant to
Section 6.2(d)
(in the event the Borrower is no longer subject to the periodic reporting requirements of the Exchange Act).
“
Borrower’s Undivided Interest
” The undivided ownership interest of the Borrower as a tenant in common in the Additional Unit Properties and the Related Facilities.
“
Business Day
” Any day other than a Saturday, Sunday or any other day on which either FFB or the Federal Reserve Bank of New York are not open for business.
“
Capital Lease
” Any lease of (or other agreement conveying the right to use) property, real or personal, which would be required, in accordance with GAAP, to be capitalized and accounted for as a capital lease on a balance sheet of the lessee.
“
Casualty Loss Proceeds
” All proceeds of Required Insurance (other than any proceeds of business interruption insurance, advance loss of profit insurance, proceeds covering liability of the Borrower to third parties, proceeds dedicated to placing nuclear reactors in a safe and stable condition after an accident and proceeds applied toward the costs of decontamination and debris removal operations ordered by the NRC) resulting from an Event of Loss.
“
Certificate
” As defined in
Section 4.1.4(a)
.
“
Change of Control
” Any event or series of events that results in (i) a reduction in Southern Company’s proportionate ownership of the Equity Interests of the Borrower or the Operator (other than immaterial changes in ownership that do not require the approval of the NRC), (ii) a change in possession of the power to direct or cause the direction of the management of the Borrower or the Operator, or (iii) a change of the Operator (unless, in the case of clause (i), (ii) or (iii) above, such change or reduction is approved by the NRC).
“
Claims
” As defined in
Section 10.17(b)(i)
.
“
COLs
” Collectively, Combined Construction and Operating Licenses NPF-91 and NPF-92 issued by the NRC authorizing the construction and operation of the Project in accordance with all Governmental Rules.
“
Collateral
” All property, whether real, personal or mixed, whether now existing or hereinafter acquired, upon which a Lien is created or purported to be created by any Security Document then in effect or contemplated to be in effect, subject to Article V of the Deed to Secure Debt.
“
Collateral Agency Agreement
” The Collateral Agency Agreement, dated as of the Guarantee Issuance Date, among the Borrower, DOE and the Collateral Agent.
“
Collateral Agent
” Midland, as appointed pursuant to the Collateral Agency Agreement.
“
Commercial Operation
” With respect to a Unit, midnight following the achievement of all of the following with respect to such Unit: (i) successful completion of the requisite performance tests provided for in the EPC Contract; (ii) demonstration by the Owners’ Agent that the related transmission facilities have been completed and such Unit is capable of producing and delivering energy to the transmission system; and (iii) such Unit is declared available for dispatch.
“
Completion Costs
” All amounts expended by the Secured Parties after the expiration of the EPC Contract Termination Consultation Period or the occurrence of a No Replacement EPC Event to complete construction, furnishing and equipping of the Additional Unit Properties and Related Facilities (including payments under the Construction Contracts, costs incurred in connection with any suspension of work under the Construction Contracts, maintenance costs with respect to equipment delivered to the Project Site, costs related to the management of construction work, and costs related to providing security for the Project Site) prior to Commercial Operation of the Second Unit, so that the Additional Unit Properties and Related Facilities shall be operational and usable for their intended purposes.
“
Comptroller General
” The Comptroller General of the United States.
“
Condemnation Proceeds
” Any cash proceeds received by the Borrower in respect of any Event of Taking.
“
Conditional Commitment
” The Conditional Commitment, dated as of February 13, 2010, between DOE and the Borrower.
“
Construction Budget
” The Construction Budget for each Unit, as updated from time to time by delivery of an updated Construction Budget pursuant to
Section 6.1(a)
, setting forth all Project Costs with respect to such Unit and containing a reasonably detailed budget of the amounts attributable to the Borrower’s Undivided Interest (each by category on an aggregate basis) to design, develop, construct, and start up such Unit through the anticipated date of Commercial Operation of such Unit (inclusive of the cost of all punch list items for such Unit) under the Project Documents.
“
Construction Contractor
” Any of (i) the EPC Contractor, and (ii) the contractor, vendor or supplier under any other Construction Contract.
“
Construction Contracts
” The documents listed in
Section 4.1.2(b)(i)
and all Additional Project Documents entered into after the Guarantee Issuance Date that are for any one or more of the following purposes: construction, procurement, installation, or improvement of land, buildings, equipment, or manufacturing facilities for the Project.
“
Construction Monitoring Orders
” As defined in
Section 4.1.4(b)
.
“
Construction Monitoring Reports
” As defined in
Section 4.1.4(b)
.
“
Control
” (including, with its correlative meanings, “controlled by” and “under common control with”) as used with respect to any Person, means possession, directly or indirectly, of the power to direct or cause the direction of management or policies of such Person (whether through ownership of voting securities or partnership or other ownership interests, by contract, or otherwise).
“
Corrupt Practices Laws
” (i) the Foreign Corrupt Practices Act of 1977 (Pub. L. No. 95-213, §§ 101-104), as amended, and (ii) any equivalent U.S. or foreign Governmental Rule.
“
Cost Allocation Procedures
” The Plant Vogtle Cost Allocation Procedures, produced in accordance with the Development Agreement, among the Owners.
“
Costs of Defense
” As defined in
Section 10.17(b)(i)
.
“
Covered Taxes
” As defined in
Section 3.1.2(a)
.
“
CPA Agreement
” As defined in
Section 4.1.32
.
“
Credit Subsidy Cost
” The meaning given the term “cost” in Section 1701(2) of Title XVII.
“
Dalton
” The City of Dalton, Georgia, acting by and through its Board of Water, Light and Sinking Fund Commissioners, d/b/a Dalton Utilities, which, as of the Guarantee Issuance Date, owns a 1.6% undivided interest in the Project.
“
Davis-Bacon Act
” Subchapter IV of Chapter 31 of Part A of Subtitle II of Title 40 of the United States Code, including and as implemented by the regulations set forth in Parts 1, 3 and 5 of title 29 of the Code of Federal Regulations.
“
Davis-Bacon Actions
” As defined in
Section 6.11(h)(iii)
.
“
Davis-Bacon Act Covered Contract
” Any contract, agreement or other arrangement related to the Project that is subject to Davis-Bacon Act requirements under Title XVII.
“
Davis-Bacon and Related Acts Compliance Program
” As defined in
Section 5.24(a)
.
“
Davis-Bacon Requirements
” The requirement that all laborers and mechanics employed by contractors and subcontractors in the performance of construction work financed in whole or in part by the DOE Guaranteed Loan shall be paid wages at rates not less than those prevailing on projects similar in the locality as determined by the Secretary of Labor in accordance with the Davis-Bacon Act, and all regulations related thereto, including those set forth in 29 C.F.R. § 5.5(a) (1) to (10), and all notice, reporting and other obligations related thereto as required by DOE, including the obligations under
Section 6.11
and the inclusion of the provisions in
Exhibit G
and the appropriate wage determination(s) of the Secretary of Labor in each Davis-Bacon Act Covered Contract.
“
DBA Knowledge
” The actual knowledge of the Vice President of Employee Relations and Associate General Counsel of Southern Company Services, Inc., and such other Person or Persons who have principal oversight responsibility with respect to the Borrower’s compliance with the Davis-Bacon Requirements under the Davis-Bacon and Related Acts Compliance Program.
“
DBA Contract Party
” Any contractor, subcontractor (including any lower tier subcontractor) or other entity (other than the Borrower but including, if applicable, the Owners’ Agent and the Operator) that is party to a Davis-Bacon Act Covered Contract.
“
Debarment Regulations
” (i) The Government-wide Debarment and Suspension (Non-procurement) regulations (Common Rule), 53 Fed. Reg. 19204 (May 26, 1988), (ii) Subpart 9.4 (Debarment, Suspension, and Ineligibility) of the Federal Acquisition Regulations, 48 C.F.R. 9.400 - 9.409, and (iii) the revised Government-wide Debarment and Suspension (Non-procurement) regulations (Common Rule), 60 Fed. Reg. 33037 (June 26, 1995).
“
Debt Termination Date
” The first day on which the indebtedness evidenced by the FFB Promissory Note has been paid in cash in full (other than unasserted contingent indemnity obligations and other obligations that expressly survive termination of the applicable documents), all commitments of FFB to the Borrower under the FFB Note Purchase Agreement and the other FFB Credit Facility Documents have been terminated, and the Borrower has paid in cash all sums due from the Borrower under this Agreement, the FFB Credit Facility Documents and the other Loan Documents (other than unasserted contingent indemnity obligations and other obligations that expressly survive termination of the applicable documents).
“
December 2013 Mechanic’s Lien Exception
” An exception taken in the mortgagee policy of title insurance or in any construction bringdown endorsement thereto with respect to any lien, or right to a lien, for services, labor or material furnished or imposed by law and not shown by the public records arising from services, labor or material provided subsequent to services, labor or material covered under the (i) December 16, 2013 Pay Application of Westinghouse Electric Company and (ii) November 27, 2013 Pay Application of Stone & Webster, Inc.
“
Declaration of Covenants
” The Declaration of Covenants and Cross-Easements for Vogtle Additional Units, made as of April 21, 2006 and recorded in Deed Book 598 at pages 35-70
,
Burke County, Georgia Records, among the Owners, as amended by the Omnibus Amendment; as further amended by the Amendment to Declaration of Covenants and Cross-Easements for Vogtle Additional Units made as of December 18, 2013 among the Owners and to be recorded in the land records of Burke County, Georgia.
“
Deed to Secure Debt
” The Deed to Secure Debt, Security Agreement and Fixture Filing made by the Borrower as grantor in favor of the Collateral Agent as grantee.
“
Development Agreement
” The Plant Vogtle Owners’ Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units, dated as of May 13, 2005 and recorded in Deed Book 547 at pages 1-35, Burke County, Georgia Records, among the Owners, as amended by Amendment No. 1, dated as of April 21, 2006 and recorded in Deed Book 598 at pages 230-239, Burke County, Georgia Records, as further amended by a letter agreement, dated April 19, 2007, as supplemented by a First Addendum, dated as of April 8, 2008, as further amended by Amendment No. 2, dated as of April 8, 2008 and recorded in Deed Book 714 at pages 271-277, Burke County, Georgia Records, and as further amended by the Omnibus Amendment.
“
Direct Agreements
” The documents listed in
Section 4.1.1(d)
and all other agreements entered into prior to, on, or after the Initial Advance Date pursuant to which a Project Participant consents to an assignment for security to the Secured Parties (or any of them) of the Borrower’s interest in any Project Documents.
“
Disclosure Package
” As defined in
Section 5.29
.
“
DOE
” As defined in the preamble to the Agreement.
“
DOE Guarantee
” The guarantee of the repayment of the DOE Guaranteed Loan provided by DOE as Guarantor for the benefit of FFB pursuant to the FFB Credit Facility Documents.
“
DOE Guarantee Payment
” As defined in
Section 9.1
.
“
DOE Guarantee Payment Amount
” As defined in
Section 9.1
.
“
DOE Guaranteed Loan
” The loan (and Advances thereunder) made by FFB and guaranteed by DOE pursuant to the FFB Credit Facility Documents and, as the context requires, the principal amount of such loan outstanding from time to time and all accrued and unpaid interest thereon.
“
DOE Guaranteed Loan Credit Subsidy Cost
” As defined in
Section 3.4(a)(ii)
.
“
DOE Guaranteed Loan Fees
” All fees payable by the Borrower to DOE or FFB under the Agreement, the FFB Credit Facility Documents or related side letters, including the DOE Loan Facility Fee, the DOE Guaranteed Loan Credit Subsidy Cost, the DOE Maintenance Fee and the DOE Modification Reimbursement Payments and any other fees payable by Borrower pursuant to
Section 3.4
.
“
DOE Late Penalty Charge
” A penalty charge payable to DOE by the Borrower on the amount of any principal or interest on the DOE Guaranteed Loan that is not paid when such amount is due and payable, in an amount equal to 0.05% of the amount not paid when due and payable.
“
DOE Loan Facility Fee
” A fee payable to DOE by the Borrower equal to 0.5% of the FFB Credit Facility Commitment, 20% of which was paid by the Borrower prior to the Guarantee Issuance Date and 80% of which shall be payable prior to or concurrently with the issuance of the DOE Guarantee.
“
DOE Maintenance Fee
” A fee payable to DOE by the Borrower for DOE’s administrative expenses in servicing and monitoring the Project and the DOE Guaranteed Loan during the construction, startup, commissioning and operation of the Project in the amount of two hundred thousand Dollars ($200,000) for the first full calendar year after the Guarantee Issuance Date, subject to escalation on January 1 of each year thereafter as determined in the following sentence, until completion of the second refueling outage for both Units, at which time such fee shall be reset on January 1 of the following year at one hundred thousand Dollars ($100,000), subject to escalation on January 1 of each year thereafter as determined in the following sentence for each remaining calendar year over the scheduled term of the DOE Guaranteed Loan. The DOE Maintenance Fee shall be modified in an amount equal to the percentage determined by the sum of (i) the percentage (rounded to the nearest 1/10%) by which the ECI for the Base Quarter of the year before the preceding calendar year deviates from the ECI for the Base Quarter of the second year before the preceding calendar year, if at all,
plus
(ii) the percentage (rounded to the nearest 1/10%) by which the amount of the comparability payment for federal government employees in the Washington Metropolitan Area (as defined by the United States Office of Management and Budget) recommended by the President’s Pay Agent, if any, for the calendar year before the preceding calendar year deviates from the amount of such comparability payment, if any, recommended by the President’s Pay Agent for the second calendar year before the preceding calendar year.
“
DOE Modification Reimbursement Payments
” Amounts payable to DOE in the event that the Project experiences any technical, financial, legal or other events that require DOE to incur time or expenses (including third-party expenses) beyond standard monitoring of compliance with and administration of the Loan Documents, to reimburse DOE in full for (i) such amounts as DOE reasonably determines are its additional internal administrative costs, including in connection with any prospective or actual related amendment or waiver of the Agreement or any terms hereof, internal administrative costs associated with determining whether any such prospective amendment or waiver would constitute a “modification” for purposes of the Federal Credit Reform Act of 1990 and OMB Circular A-11 and (ii) amounts paid by DOE to Independent Consultants, to the extent that such third parties are not paid directly by or on behalf of the Borrower.
“
Dollars
” or “
$
” The lawful currency of the United States of America.
“
DOL Letter
” That letter dated June 18, 2010 from the United States Department of Labor to Scott Blake Harris, General Counsel, U.S. Department of Energy, attached hereto as
Exhibit J
.
“
Drawstop Notice
” As defined in
Section 2.4.2(a)
.
“
Drawstop Withdrawal Notice
” As defined in
Section 2.4.2(b)
.
“
ECI
” The Employment Cost Index, as published by the Bureau of Labor Statistics for the relevant period.
“
Eligible Base Project Costs
” Eligible Project Costs, in an aggregate amount equal to four billion nine hundred forty-six million two hundred ninety-eight thousand seven hundred thirty-nine Dollars $4,946,298,739.
“
Eligible Project Costs
” Those portions of Project Costs that are eligible for funding as “Project Costs” as defined in the Applicable Regulations.
“
Employee Benefit Plan
” (i) All “employee benefit plans” (as defined in Section 3(3) of ERISA) other than any Multiemployer Plans that are or at any time within the last six years have been maintained or sponsored by the Borrower or any ERISA Affiliate or to which the Borrower or any ERISA Affiliate has made, or been obligated to make, contributions within the last six years or with respect to which the Borrower or any ERISA Affiliate has incurred any material liability or obligation within the last six years, (ii) all Pension Plans and (iii) all Qualified Plans.
“
Environmental Claim
” Any and all administrative, regulatory or judicial actions, suits, demands, decrees, claims, liens, judgments, notices of noncompliance or violation, investigations
(excluding routine inspections), proceedings, clean-up, removal or remedial actions or orders relating in any way to any violation of Environmental Law or any violation of any Governmental Approval issued under any such Environmental Law including (a) any and all claims by any Governmental Authority for enforcement, cleanup, removal, response, remedial or other actions or damages pursuant to any applicable Environmental Law, and (b) any and all claims by any third party seeking damages, contribution, indemnification, cost recovery, compensation or injunctive relief resulting from Hazardous Substances, the violation or alleged violation of any Environmental Law or Governmental Approval issued thereunder, or arising from alleged injury or threat of injury to health, safety or the environment.
“
Environmental Impact Statement
” A detailed written statement as required by Section 102(2)(C) of NEPA.
“
Environmental Laws
” All Governmental Rules relating in any way to the environment, preservation or reclamation of natural resources, flora or fauna, the management, release or threatened release of any Hazardous Substance, or to health and safety matters.
“
EPC Contract
” The Engineering, Procurement and Construction Agreement, dated as of April 8, 2008, between the Borrower, acting for itself and as Owners’ Agent, and the EPC Contractor.
“
EPC Contract Termination Consultation Period
” As defined in the Owners Direct Agreement.
“
EPC Contractor
” As the context shall require, (a) Westinghouse Electric Company LLC and Stone & Webster, Inc., collectively or (b) either such Person, individually.
“
EPC Contractor Monthly Report
” As defined in
Section 6.1(a)(ii)
.
“
Equity Interests
” Any and all shares, interests, rights to purchase, warrants, options, participations or other equivalents of or interests in (however designated) the common or preferred equity or preference share capital of a Person, including partnership interests and limited liability company interests;
provided
that such common or preferred equity or preference share capital includes rights to vote in the election of the board of directors or similar governing body of such Person.
“
ERISA
” The Employee Retirement Income Security Act of 1974, as amended from time to time, and the regulations promulgated, and any publicly available rulings issued that have the force of law, thereunder.
“
ERISA Affiliate
” As applied to any person (as defined in Section 3(9) of ERISA), means (i) any corporation that is a member of a controlled group of corporations within the meaning of Section 414(b) of the Internal Revenue Code of which that person is a member, (ii) any trade or business (whether or not incorporated) that is a member of a group of trades or business under common control within the meaning of Section 414(c) of the Internal Revenue Code or Section 4001(b) of ERISA of which that person is a member, (iii) any member of an affiliated service group within the meaning of Section 414(m) and (o) of the Internal Revenue Code of which that person is a member.
“
ERISA Event
”:
|
|
(i)
|
a reportable event as defined in Section 4043 of ERISA and the regulations issued under such Section with respect to a Pension Plan, excluding, however, such events as to which the PBGC by regulation has waived the requirement of Section 4043(a) of ERISA that it be notified within thirty (30) days of the occurrence of such event;
|
|
|
(ii)
|
the applicability of the requirements of Section 4043(b) of ERISA with respect to a contributing sponsor, as defined in Section 4001(a)(13) of ERISA, to any Pension Plan where an event described in paragraph (9), (10), (11), (12) or (13) of Section 4043(c) of ERISA is reasonably expected to occur with respect to such plan within the following thirty (30) days;
|
|
|
(iii)
|
a withdrawal by the Borrower or an ERISA Affiliate from a Pension Plan or the termination of any Pension Plan resulting in either event in liability under Sections 4063 or 4064 of ERISA;
|
|
|
(iv)
|
the withdrawal of the Borrower or an ERISA Affiliate in a complete or partial withdrawal (within the meaning of Sections 4203 and 4205 of ERISA) from any Multiemployer Plan resulting in liability therefor, or the receipt by the Borrower or an ERISA Affiliate of notice from any Multiemployer Plan that it is in reorganization or insolvency pursuant to Sections 4241 or 4245 of ERISA,
|
|
|
(v)
|
the filing of a notice of intent to terminate, the treatment of a plan amendment as a termination under Sections 4041 of ERISA or the commencement of proceedings by the PBGC to terminate a Pension Plan, which in either case results in liability therefor or the receipt of notice of termination of a Multiemployer Plan under Section 4041A of ERISA or the institution of proceedings by the PBGC to terminate a Multiemployer Plan, if in either case liability therefor is asserted by the Multiemployer Plan;
|
|
|
(vi)
|
the imposition of liability on the Borrower or an ERISA Affiliate with respect to any Pension Plan pursuant to Sections 4062(e) or 4069 of ERISA or by reason of the application of Section 4212(c) of ERISA;
|
|
|
(vii)
|
the failure by the Borrower or an ERISA Affiliate to make by its due date any required contribution to any Pension Plan, or the failure to meet the minimum funding standard of Section 412 of the Internal Revenue Code with respect to any Pension Plan (whether or not waived in accordance with Section 412(c) of the Internal Revenue Code) or the failure to make by its due date a required installment under Section 430(j) of the Internal Revenue Code with respect to any Pension Plan or the failure by the Borrower or any ERISA Affiliate to make any required contribution to a Multiemployer Plan;
|
|
|
(viii)
|
the institution by the PBGC under Section 4042 of ERISA for the termination of, or the appointment of a trustee to administer, any Pension Plan or Multiemployer Plan;
|
|
|
(ix)
|
the imposition of any material liability under Title I or Title IV of ERISA with respect to any Pension Plan or Multiemployer Plan, other than PBGC premiums due but not delinquent under Section 4007 of ERISA, upon the Borrower or an ERISA Affiliate;
|
|
|
(x)
|
an application for a funding waiver under Section 302 of ERISA with respect to any Pension Plan;
|
|
|
(xi)
|
the imposition of any lien on any of the rights, properties or assets of the Borrower or an ERISA Affiliate, or the posting of a bond or other security by such entities, in either case pursuant to Title I or IV of ERISA or to Sections 412, 430 or 436 of the Internal Revenue Code;
|
|
|
(xii)
|
the making of any amendment to any Pension Plan that results in the imposition of a lien or the posting of a bond or other security by the Borrower or an ERISA Affiliate;
|
|
|
(xiii)
|
the occurrence of a non-exempt prohibited transaction (within the meaning of Section 4975 of the IRC or Section 406 of ERISA) involving the assets of an Employee Benefit Plan, if the Borrower has liability therefor;
|
|
|
(xiv)
|
the receipt by the Borrower of notice of the final determination by the Internal Revenue Service that a Qualified Plan’s qualification or tax exempt status should be revoked;
|
|
|
(xv)
|
a determination that any Employee Benefit Plan is, or is reasonably expected to be, in “at risk” status (as defined in Section 303(i)(4) of ERISA or Section 430(i)(4) of the Internal Revenue Code) if the Borrower has any liability (whether direct or contingent) therefor; or
|
|
|
(xvi)
|
the receipt by the Borrower or an ERISA Affiliate of any notice, of the imposition of withdrawal liability or of a determination that a Multiemployer Plan is, or is reasonably expected to be, in “endangered”, “seriously endangered” or “critical” status, within the meaning of Section 305 of ERISA if the Borrower has any liability (whether direct or contingent) therefor.
|
“
Event of Default
” Any of the events described in
Section 8.1
.
“
Event of Loss
” Any event that causes any portion of the Project, the Borrower’s Undivided Interest or the Collateral to be damaged, destroyed or rendered unfit for normal use for any reason whatsoever.
“
Event of Taking
” Any taking, exercise of rights of eminent domain, public improvement, inverse condemnation, condemnation or similar action of or proceeding by any Governmental Authority relating to any part of the Borrower’s Undivided Interest or the Collateral.
“
Exchange Act
” The Securities and Exchange Act of 1934.
“
FFB
” The Federal Financing Bank, a body corporate and instrumentality of the United States of America.
“
FFB Advance Request
” An “Advance Request” as defined in the FFB Note Purchase Agreement.
“
FFB Advance Request Approval Notice
” An “Advance Request Approval Notice” as defined in the FFB Note Purchase Agreement, signed by DOE.
“
FFB Credit Facility Commitment
” The commitment of FFB to make Advances pursuant to the terms of the FFB Note Purchase Agreement in an aggregate principal amount not to exceed three billion four hundred sixty-two million four hundred nine thousand one hundred seventeen Dollars ($3,462,409,117), as may be reduced pursuant to
Section 2.2.2
.
“
FFB Credit Facility Documents
” The documents listed in
Section 4.1.1(b)
, and all other agreements and documents necessary or appropriate in connection with the making by FFB of the DOE Guaranteed Loan that are agreed in writing by DOE and the Borrower from time to time to be FFB Credit Facility Documents.
“
FFB Late Charge Rate
” The interest rate applicable from time to time under the FFB Promissory Note with respect to Overdue Amounts.
“
FFB Note Purchase Agreement
” The Note Purchase Agreement, dated as of the Guarantee Issuance Date, among the Borrower, FFB, and DOE.
“
FFB Program Financing Agreement
” The Program Financing Agreement, dated as of September 2, 2009, between FFB and the Secretary of Energy.
“
FFB Promissory Note
” The promissory note issued by the Borrower in favor of FFB, purchased by FFB pursuant to the FFB Note Purchase Agreement and guaranteed by the Guarantor.
“
FFB Subaccount
” As defined in
Section 8.1
.
“
Financial Officer
” With respect to any Person, the Chief Financial Officer, the Controller or Comptroller and any Assistant Controller or Assistant Comptroller, or the Treasurer or any Assistant Treasurer.
“
Financial Officer Certificate
” A certificate executed by a Financial Officer of the Borrower, in form and substance reasonably acceptable to DOE, that (i) with respect to any certificate delivered pursuant to
Section 4.1
, is dated as of the Guarantee Issuance Date or (ii) with respect to any other certification to be made by a Financial Officer pursuant to any Loan Document, addresses such matters as are specified in such Loan Document.
“
Financial Plan
” The Financial Plan included in
Section 2.1
, setting forth all sources of funds needed to pay Project Costs to achieve completion of the Project, including the DOE Guaranteed Loan.
“
Financial Statements
” With respect to any Person, such Person’s quarterly or annual balance sheet and statements of income and cash flows for such fiscal period, together with all notes thereto and with comparable figures for the corresponding period of its previous fiscal period, each prepared in Dollars and in accordance with GAAP; provided that, in the case of unaudited Financial Statements, such statements may be subject to changes resulting from audits and normal year-end adjustments and, in the case of audited Financial Statements, such statements may include changes with which the Borrower’s Accountant shall concur.
“
First Principal Payment Date
” As defined in the FFB Promissory Note.
“
First Unit
” The first Unit to achieve Commercial Operation.
“
Fiscal Year
” The accounting year of the Borrower beginning on January 1 of each year and ending on December 31 of each year, or such other accounting year as shall be adopted by the Borrower.
“
Foreign Asset Control Regulations
” The United States Trading with the Enemy Act, as amended, or any of the foreign assets control regulations of the United States Treasury Department (31 C.F.R. Subtitle B, Chapter V, as amended), or any ruling issued thereunder or any enabling legislation or Presidential Executive Order granting authority therefor.
“
Fuel Budget
” As defined in the Nuclear Managing Board Agreement.
“
Fuel Disposal Agreements
” The Contract DE-CR01-09RW09005 (Vogtle Electric Generating Plant, Unit 3), dated November 5, 2008, as amended on November 5, 2008, between the Operator and the U.S. Department of Energy, and the Contract DE-CR01-09RW09006 (Vogtle Electric Generating Plant, Unit 4), dated November 5, 2008, as amended on November 5, 2008, between the Operator and the U.S. Department of Energy.
“
Fuel Disposal Contractor
” Any counterparty to a Fuel Disposal Agreement or any Additional Project Document for the disposal of fuel for the Project.
“
Fuel Plan
” The ten (10) year fuel plan for Plant Hatch, Plant Vogtle Units 1 and 2, and the Units, provided annually to the Nuclear Managing Board by the Operator pursuant to Section 4.2 of the Nuclear Managing Board Agreement.
“
Fuel Supply Agreements
” The Westinghouse Fuel Assembly Agreement and any Additional Project Documents for the supply of fuel assemblies for the Project.
“
Fuel Supply Contractor
” Any fuel supplier party to a Fuel Supply Agreement.
“
Funding Commitments
” As defined in
Section 2.7
.
“
GAAP
” Generally accepted accounting principles in the U.S. in effect from time to time including, where appropriate, generally accepted auditing standards, including the pronouncements and interpretations of appropriate accountancy administrative bodies (including the Financial Accounting Standards Board and any predecessor and successor thereto), applied on a consistent basis both as to classification of item and amounts.
“
Georgia PSC
” The Georgia Public Service Commission and any successor thereto.
“
Georgia PSC Monthly Status Report
” As defined in
Section 6.1(a)(i)
.
“
Governmental Approval
” Any approval, consent, authorization, license, permit, Environmental Impact Statement, Record of Decision, order, certificate, qualification, waiver, exemption, memorandum of agreement, memorandum of understanding or variance, or any other action of a similar nature, applicable to such Person or any of its properties, of or by a Governmental Authority, including any of the foregoing that are or may be deemed given or withheld by failure to act within a specified time period.
“
Governmental Authority
” Any federal, state, county, municipal, or regional authority, or any other entity of a similar nature, exercising any executive, legislative, judicial, regulatory, or administrative function of government.
“
Governmental Judgment
” With respect to any Person, any judgment, order, decision, injunction, arbitral award or any action of a similar nature of any federal, state or local court of competent jurisdiction, arbitrator or arbitral panel, in each case that is applicable to or binding upon such Person or any of its properties or to which such Person or any of its properties are subject.
“
Governmental Rule
” With respect to any Person, any applicable constitution, statute, law, rule, regulation, code, ordinance, treaty, or any published directive, guideline, requirement or other governmental rule, restriction, order, decision or decree, in each case which has the force of law, enacted, promulgated or issued by a Governmental Authority having jurisdiction over such Person or any of its properties, or any Governmental Judgment.
“
Guarantee Issuance Date
” The date the DOE Guarantee has been executed by Guarantor, delivered to FFB and FFB has purchased the FFB Promissory Note.
“
Guarantor
” As defined in the preamble to the Agreement.
“
Guaranty Obligations
” With respect to any Person, any legally enforceable non-contingent liquidated obligation of such Person which has become due and payable with respect to any guarantee of Indebtedness or Other Obligations of another Person.
“
Hazardous Substance
” Any waste, substance, or material that is regulated, classified, or otherwise characterized under or pursuant to any Governmental Rule as “hazardous,” “toxic,” “pollutant,” “contaminant,” “radioactive,” or words of similar meaning or effect.
“
Hedging Agreement
” Any agreement or instrument (including a cap, swap, collar, option, forward purchase agreement or other similar derivative instrument) relating to the hedging of any interest under any Indebtedness.
“
Improvements
” The buildings, fixtures and other improvements to be situated on the Project Site that constitute Additional Unit Properties under the Ownership Agreement, including the Additional Units and the Related Facilities.
“
Indebtedness
” As to any Person, and at any date, means, without duplication:
|
|
(i)
|
all Indebtedness for Borrowed Money of such Person;
|
|
|
(ii)
|
all obligations of such Person evidenced by bonds, debentures, notes, letters of credit, or other similar instruments;
|
|
|
(iii)
|
all non-contingent obligations of such Person to reimburse any bank or other Person in respect of amounts paid or advanced under a letter of credit or other instrument;
|
|
|
(iv)
|
all Guaranty Obligations of such Person; and
|
|
|
(v)
|
all Indebtedness described in clauses (i) through (iv) of this definition or Other Obligations of others secured by any Lien upon any property, assets or revenues of such Person, even though such Person has not assumed or become liable for the payment of such liabilities.
|
“
Indebtedness for Borrowed Money
” As to any Person, without duplication, (i) all indebtedness (including principal, interest, fees, and charges) of such Person for borrowed money or for the deferred purchase price of property or services (other than any deferral (x) in connection with the provision of credit in the ordinary course of business by any trade creditor or utility or (y) of any amounts payable under the Project Documents) or (ii) the aggregate amount required to be capitalized under any Capital Lease under which such Person is the lessee.
“
Indemnified Party
” As defined in
Section 10.17(b)(i)
.
“
Indemnified Person
” As defined in
Section 10.17(b)(i)
.
“
Independent Consultants
” Collectively, the Lender’s Engineer, the Insurance Advisor, Chadbourne & Parke LLP as legal counsel to DOE, any subcontractors of such consultants, and any other advisor or consultant retained by the Secured Parties after consultation with the Borrower (provided that no such consultation shall be required during the continuation of a Potential Default or Event of Default).
“
Ineligible Base Project Costs
” The portion of Base Project Costs that are Ineligible Project Costs.
“
Ineligible Project Costs
” Those portions of Project Costs that are not Eligible Project Costs, including Ineligible Base Project Costs and Overrun Project Costs.
“
Initial Advance Date
” The date on which the initial Advance is made.
“
INPO
” The Institute of Nuclear Power Operations.
“
Insolvency Proceedings
” Any bankruptcy, insolvency, liquidation, reorganization, restructuring, controlled management, suspension of payments, scheme of arrangement, appointment of provisional liquidator, receiver or administrative receiver, petition for winding up
or similar proceeding, under any applicable law, relating to debtor and creditor rights in any jurisdiction and whether voluntary or involuntary.
“
Insurance Advisor
” The insurance advisor or expert appointed by DOE.
“
Insurance Advisor Certificate
” A certificate executed by an Authorized Official of the Insurance Advisor that is (i) with respect to any certificate delivered pursuant to
Section 4.1
, dated as of the Guarantee Issuance Date and substantially in the form attached as
Exhibit E
to the Agreement, or (ii) with respect to any other certification to be made by the Insurance Advisor pursuant to any Loan Document, addressing such matters as are specified in such Loan Document.
“
Intellectual Property Rights
” Any and all rights in, arising out of, or associated with the following, whether now or hereafter existing, created, acquired or held: (i) all U.S., international and foreign patents and patent applications and all reissues, reexaminations, divisions, renewals, extensions, provisionals, continuations and continuations-in-part thereof; (ii) all trade secret rights; (iii) all copyrights or other rights associated with works of authorship, including all copyright registrations and applications for copyright registration, renewals and extensions thereof, and all other rights corresponding thereto throughout the world; (iv) all mask work rights, mask work registrations and applications therefor, and any equivalent or similar rights in semiconductor masks, layouts, architectures or topology; (v) all rights in industrial designs and any registrations and applications therefor throughout the world; (vi) all rights to trade names, logos, trademarks and service marks, including registered trademarks and service marks and all applications to register trademarks and service marks throughout the world; (vii) all rights to any databases and data collections throughout the world; (viii) all moral and economic rights of authors and inventors, however denominated, throughout the world; and (ix) any similar or equivalent rights to any of the foregoing anywhere in the world.
“
Internal Revenue Code
” The United States Internal Revenue Code of 1986, as amended from time to time, and the regulations promulgated and rulings issued thereunder. Section references to the Internal Revenue Code are to the Internal Revenue Code as in effect at the Guarantee Issuance Date and any subsequent provisions of the Internal Revenue Code, amendatory thereof, supplemental thereto or substituted therefor.
“
Investment Company Act
” The United States Investment Company Act of 1940.
“
IP Agreements
” As defined in
Section 5.15(a)
.
“
IP Interest
” An undivided irrevocable right, title or interest in and to, or a valid and enforceable license, permit, certificate, franchise, or other authorization or right to use, the Technology and Intellectual Property Rights necessary to construct, complete, operate, use and maintain the Project through the Maturity Date.
“
Knowledge
” With respect to the Borrower, the actual knowledge of any Senior Management Person.
“
Land Documents
” The documents listed in
Section 4.1.2(a)(i)
and all other contracts and documents entered into prior to, on, or after the Initial Advance Date required for the acquisition
of land and rights to land for the Project, all easements, licenses, and covenants, conditions and restrictions in connection with the Project Site, and any and all other documents (including estoppel certificates from landlords) affecting an interest in or right to use the Project Site.
“
Last Day for an Advance
” As defined in the FFB Promissory Note.
“
Lender’s Engineer
” MPR Associates, Inc., as engineering advisor to DOE, and any replacement engineering advisor to DOE designated by DOE as the Lender’s Engineer.
“
Lender’s Engineer Certificate
” A certificate executed by an Authorized Official of the Lender’s Engineer that is (i) with respect to any certificate delivered pursuant to
Section 4.1
, dated as of the Guarantee Issuance Date and substantially in the form attached as
Exhibit D-1
to the Agreement, (ii) with respect to any certificate delivered pursuant to
Section 4.2
, dated as of the Advance Notice Date and substantially in the form attached as
Exhibit D-2
to the Agreement, or (iii) with respect to any other certification to be made by the Lender’s Engineer pursuant to any Loan Document, addressing such matters as are specified in such Loan Document.
“
Lender’s Engineer Report
” A report or reports of the Lender’s Engineer delivered on or before the Initial Advance Date pursuant to
Section 4.1.16
.
“
Letter Agreement for Construction Services
” The Letter Agreement, dated July 28, 2006, and the Letter Agreement dated July 30, 2008, in each case between the Borrower, as Owners’ Agent, and the Operator.
“
Level Principal Amount
” As defined in
Section 3.3.3(e)
.
“
Lien
” Any lien (statutory or other), pledge, mortgage, charge, security interest, deed of trust, assignment, hypothecation, title retention, fiduciary transfer, deposit arrangement, easement, encumbrance or preference, priority or other security agreement or preferential arrangement of any kind or nature whatsoever that has the practical effect of constituting a security interest in respect of an asset, whether or not filed, recorded or otherwise perfected or effective under applicable law, as well as the interest of a vendor or lessor under any conditional sale agreement, Capital Lease or other title retention agreement relating to such asset, (including any conditional sale or other title retention agreement, any Capital Lease having substantially the same economic effect as any of the foregoing, or any preferential arrangement having the practical effect of constituting a security interest with respect to the payment of any obligation with, or from the proceeds of, any asset or revenue of any kind).
“
Loan Documents
” The Agreement, the FFB Credit Facility Documents, the Security Documents, the Direct Agreements and any other document, agreement, statement or certificate delivered hereunder or thereunder, or pursuant hereto or thereto, or in connection herewith or therewith, that are agreed in writing by DOE and the Borrower to be Loan Documents, but in all cases excluding any Project Documents.
“
Major Project Participant
” The Borrower and the Operator.
“
Mandatory Prepayment Event
” The occurrence of any of the following events, and, in the case of the events described in clauses (i) through (vii), the failure of the Borrower to remedy
such event within ninety (90) days after (A) the Borrower has Knowledge of such event or (B) receipt of notice from DOE or FFB, shall constitute a Mandatory Prepayment Event:
(i) both COLs shall be revoked, terminated, or determined to be invalid or shall cease to be in full force and effect (following the exhaustion of all regulatory and judicial rights of appeal by the Operator and the Borrower);
(ii) (A) any Required Consent (other than the COLs) necessary for the construction, completion or operation of the Project shall be revoked, terminated, or determined to be invalid or shall cease to be in full force and effect (following the exhaustion of all regulatory and judicial rights of appeal by the Operator and the Borrower) or (B) the Borrower or the Operator shall be required to suspend construction or operation of the Project as a result of the failure to receive any Required Consent; provided, that no Mandatory Prepayment Event under this clause (ii)(B) shall occur so long as the Borrower or the Operator (as applicable) is diligently pursuing receipt of such Required Consent (including pursuit of regulatory or judicial rights of appeal to the extent applicable) and believes in good faith that such Required Consent (or a functional equivalent thereto that will permit the Project to resume construction or operation, as applicable) is capable of being obtained;
(iii) (A) the Certificate and/or the certification orders issued by the Georgia PSC in GPSC Docket No. 27800 shall be revoked, terminated, cancelled or determined to be invalid, or the Georgia PSC shall otherwise issue an order directing the Borrower to cancel the Borrower’s participation in the Project (in either case following the exhaustion of all regulatory and judicial rights of appeal by the Borrower), or (B) the Georgia PSC shall issue an order authorizing the Borrower to cancel the Project and the Borrower elects to cancel the Borrower’s participation in the Project;
(iv) the Georgia PSC either shall not permit the Borrower to recover any amount of Base Project Costs or Overrun Project Costs through rates regulated by the Georgia PSC, or shall cease to regulate the conduct of the Borrower’s business, unless (A) the Borrower’s inability to recover such amount through regulated rates could not reasonably be expected to have a material adverse effect on (x) the ability of the Borrower to repay the Advances when due and (y) the ability to complete the Project, and (B) the Borrower is continuing to fund Base Project Costs and Overrun Project Costs notwithstanding the inability to recover such amount through rates regulated by the Georgia PSC;
(v) the Georgia PSC shall cease to regulate the conduct of the Borrower’s business, unless such deregulation could not reasonably be expected to have a material adverse effect on the ability of the Borrower to repay the DOE Guaranteed Loan when due;
(vi) all or substantially all of the Improvements are destroyed or become permanently inoperative as a result of a material Event of Loss, and the Borrower fails to work diligently to repair or restore the Improvements following such Event of Loss;
(vii) an Event of Taking occurs that results in the inability of the Project to be completed or operated;
(viii) any representation and warranty in
Section 5.15
made or deemed to be made by the Borrower shall be found to have been untrue in any material respect when made or deemed to have been made, unless such materially untrue representation and warranty is capable of being remedied, and such materially untrue representation and warranty is remedied to DOE’s satisfaction within ninety (90) days (or such longer period acceptable to DOE) following the earlier of (i) the date of notice thereof from DOE to the Borrower or (ii) the date that the Borrower obtains Knowledge of such material untruth;
provided
, that no Mandatory Prepayment Event under this clause (viii) shall occur so long as the Borrower or the Operator (as applicable) is diligently pursuing a cure for such materially untrue representation and warranty pursuant to its rights under the Project Documents or the Borrower acquires the applicable Technology and Intellectual Property Rights from the holder thereof; or
(ix) (A) the EPC Contractor terminates the EPC Contract; (B) DOE receives a Project Termination Notice and (1) the EPC Contract is terminated by the Owners for convenience or (2) the EPC Contract Termination Consultation Period expires; or (C) a No Replacement EPC Event occurs.
“
Mandatory Prepayment Notice
” A notice to the Borrower from DOE stating that a Mandatory Prepayment Event has occurred and is continuing and that a mandatory prepayment of the DOE Guaranteed Loan in accordance with
Section 3.3.3(d)
and
(e)
is required.
“
Material Adverse Effect
” As of any date of determination, a material and adverse effect upon (i) the business, properties or financial condition of the Borrower taken as a whole, (ii) the rights or remedies of FFB or DOE under the applicable Loan Documents, (iii) the ability of the Borrower to observe and perform its obligations under the Loan Documents or (iv) the security or Liens of the Secured Parties on any of the Collateral.
“
Maturity Date
” As set forth in the FFB Promissory Note.
“
MEAG
” Municipal Electric Authority of Georgia, a public body corporate and politic and an instrumentality of the State of Georgia, which, as of the Guarantee Issuance Date, owns a 22.7% undivided interest in the Project.
“
MEAG Appropriations Act Certificate
” A certificate, in the form attached hereto as
Schedule 4.1.34
, executed by an authorized representative of MEAG.
“
MEAG SPV Amendments
” The Agreement and Amendment No. 2 to the Ownership Agreement, the Agreement and Amendment No. 2 to the Operating Agreement, the Agreement and Amendment No. 3 to the Development Agreement and the Agreement and Amendment No. 2 to the Nuclear Managing Board Agreement, each dated as of even date with the Agreement, and each entered into by and among the Owners, and, other than with respect to Amendment No. 2 to the Nuclear Managing Board Agreement, to be recorded in the Burke County, Georgia Records.
“
Merger Transaction
” As defined in
Section 8.1(f)
.
“
Midland
” PNC Bank, National Association, doing business as Midland Loan Services, a division of PNC Bank, National Association.
“
Monthly Construction Reports
” As defined in
Section 6.1(a)(iv)
.
“
Multiemployer Plan
” A “multiemployer plan” (within the meaning of Section 3(37) of ERISA) that the Borrower or any ERISA Affiliate contributes to or participates in, or with respect to which the Borrower or any ERISA Affiliate has any material liability or other obligation (whether accrued, absolute, contingent or otherwise).
“
NCCR Tariff
” As defined in
Section 4.1.4(d)(ii)
.
“
NCCR Tariff Orders
” As defined in
Section 4.1.4(c)
.
“
NEPA
” The National Environmental Policy Act of 1969 of the United States.
“
New Investment Budget
” As defined in the Nuclear Managing Board Agreement.
“
No Replacement EPC Event
” As defined in the Owners Direct Agreement.
“
NRC
” The U.S. Nuclear Regulatory Commission, an agency of the United States of America.
“
Nuclear Managing Board
” As defined in the Nuclear Managing Board Agreement.
“
Nuclear Managing Board Agreement
” The Second Amended and Restated Nuclear Managing Board Agreement for Plant Hatch and Plant Vogtle, dated as of April 21, 2006, among the Owners, as amended by Amendment No. 1 dated as of April 8, 2008.
“
Nuclear Operating Agreement
” The Amended and Restated Nuclear Operating Agreement, dated as of April 21, 2006, as amended, between the Borrower, as Owners’ Agent, and the Operator.
“
OFAC
” Office of Foreign Assets Control, agency of the U.S. Department of the Treasury under the auspices of the Under Secretary of the Treasury for Terrorism and Financial Intelligence.
“
OMB
” The Office of Management and Budget of the Executive Office of the President of the United States of America.
“
Omnibus Amendment
” The Omnibus Amendment Regarding Plant Vogtle Additional Units Description made as of December 1, 2013, among the Owners and recorded or to be recorded in the Burke County, Georgia Records.
“
OPC
” Oglethorpe Power Corporation, an electric membership corporation organized and existing under the laws of the State of Georgia, which, as of the Guarantee Issuance Date, owns a 30% undivided ownership interest in the Project.
“
Operating Agreement
” The Plant Alvin W. Vogtle Nuclear Units Amended and Restated Operating Agreement, dated as of April 21, 2006 and recorded in Deed Book 598 at pages 240-290, Burke County, Georgia Records, among the Owners, as amended by Amendment No. 1,
dated as of April 8, 2008 and recorded in Deed Book 714 at pages 278-284, Burke County, Georgia Records, as further amended by the Omnibus Amendment.
“
Operating Documents
” The documents listed in
Section 4.1.2(a)(ii)
and
4.1.2(b)(ii)
.
“
Operation and Maintenance Budget
” The operation and maintenance budget for each Unit provided annually by the Operator to the Nuclear Managing Board pursuant to Section 4.3 of the Nuclear Managing Board Agreement, containing an estimate of the costs of operation and maintenance services for each Unit for the next calendar year, and a forecast of budget requirements for the succeeding four (4) calendar years.
“
Operator
” Southern Nuclear Operating Company, Inc., a corporation organized and existing under the laws of the State of Delaware, which will oversee construction of the Project on behalf of the Owners pursuant to the Letter Agreement for Construction Services, and operate the Project on behalf of the Owners pursuant to the Nuclear Operating Agreement.
“
Organizational Documents
” With respect to any Person, its charter, articles of incorporation and by-laws, memorandum and articles of association, statute, partnership agreement, limited liability company agreement or similar instruments that are required to be registered or lodged in the place of organization of such Person and that establish the legal personality of such Person.
“
Other Obligation
” As to any Person, and at any date, means, without duplication:
(i) all obligations of such Person to purchase securities (or other property) that arise out of or in connection with the sale or acquisition of the same or similar securities (or property);
(ii) all obligations in respect of any Hedging Agreement or similar arrangement between such Person and a financial institution providing for the transfer or mitigation of interest risks either generally or under specific contingencies (but without regard to any notional principal amount relating thereto);
(iii) all indebtedness created or arising under any conditional sale or other title retention agreement, or incurred as financing, in either case with respect to property acquired by such Person (even though the rights and remedies of the seller or bank under such agreement in the event of any default are limited to repossession or sale of such property); and
(iv) all obligations pursuant to any agreement to purchase materials, supplies or other property if such agreement provides that payment shall be made regardless of whether delivery of such materials, supplies or other property is ever made or tendered.
“
Overdue Amounts
” Any amounts owing under the FFB Promissory Note that are not paid when and as due.
“
Overrun Funding
” Funding to be provided by the Borrower pursuant to the Overrun Funding Commitment.
“
Overrun Funding Commitment
” As defined in
Section 2.7
.
“
Overrun Project Costs
” Project Costs incurred in excess of Base Project Costs.
“
Owner
” Each of the Borrower, MEAG, OPC and Dalton.
“
Owner Documents
” The documents listed in
Section 4.1.2(a)(iii)
and all other contracts related to the Project entered into by the Owners related to any adjustments of undivided ownership interests in the Project or any changes material to the role of the Borrower with respect to the Project as Owners’ Agent or otherwise.
“
Owners’ Agent
” The Borrower, as agent for the Owners under the Owner Documents.
“
Owners Direct Agreement
” The Owners Consent to Assignment and Direct Agreement and Amendment to Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement, dated as of the date hereof, among the Owners, the Owners’ Agent, the Borrower, DOE, the Collateral Agent, and each other DOE Collateral Agent (as defined therein) party thereto from time to time, and to be recorded in the Burke County, Georgia Records.
“
Ownership Agreement
” The Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement, dated as of April 21, 2006 and recorded in Deed Book 598 at pages 71-229, Burke County, Georgia Records, among the Owners, as amended by Amendment No. 1, dated as of April 8, 2008 and recorded in Deed Book 714 at pages 285-292
,
Burke County, Georgia Records, as further amended by the Omnibus Amendment and as further amended by the Owners Direct Agreement.
“
Patriot Act
” The Uniting and Strengthening America by Providing Appropriate Tools Required to Intercept and Obstruct Terrorism Act of 2001.
“
Payment Date
” Each Principal Payment Date and Quarterly Payment Date.
“
PBGC
” The Pension Benefit Guaranty Corporation or any entity succeeding to any or all of its functions under ERISA.
“
Pension Plan
” An employee benefit plan (as defined in Section 3(3) of ERISA) other than a Multiemployer Plan (i) that is or was at any time within the last six years maintained or sponsored by the Borrower or any ERISA Affiliate or to which the Borrower or any ERISA Affiliate has made, or was obligated to make, contributions within the last six years, and (ii) that is or was subject to Section 412 of the Internal Revenue Code, Section 302 of ERISA or Title IV of ERISA.
“
Periodic Expenses
” All of the following amounts from time to time due under or in connection with the Loan Documents: (i) all recordation and other costs, fees and charges in connection with the execution, delivery, filing, registration, or performance of the Transaction Documents or the perfection of the security interests in the Collateral, (ii) all fees, charges, and expenses of any Independent Consultants of or to the Secured Parties, and (iii) all other fees, charges, expenses and other amounts (other than interest and principal on the DOE Guaranteed Loan) from time to time due under or in connection with the Loan Documents.
“
Permitted Liens
” As defined in the Deed to Secure Debt.
“
Person
” Any individual, firm, corporation, company, voluntary association, partnership, limited liability company, joint venture, trust, unincorporated organization, Governmental Authority, committee, department, authority or any other body, incorporated or unincorporated, whether having distinct legal personality or not.
“
Potential Default
” An event that, with the giving of notice or passage of time or both, would become an Event of Default.
“
Potential Mandatory Prepayment Event
” An event that, with the giving of notice or passage of time or both, would become a Mandatory Prepayment Event.
“
Pre-Closing Project Costs Report
” The report required to be delivered pursuant to
Section 4.1.3(a)
.
“
President’s Pay Agent
” The Secretary of Labor and the Directors of the Office of Management and Budget and the Office of Personnel Management, or such other individuals designated as the President’s Pay Agent pursuant to Section 5304(d)(1) of Title 5, United States Code.
“
Principal Payment Date
” The First Principal Payment Date and each Quarterly Payment Date occurring after the First Principal Payment Date.
“
Principal Persons
” With respect to the Borrower or the Operator, (a) any officer or director of such Person, (b) any beneficial owner of ten percent (10%) or more of the Equity Interests of such Person that are not Publicly Traded Securities, or (c) any other natural person (whether or not an employee of such Person) with primary management or supervisory responsibilities over a Borrower Entity.
“
Principal Project Documents
” The Land Documents, the Construction Contracts, the Operating Documents, the Owner Documents, the Letter Agreement for Construction Services, the Shaw Guarantee and the Toshiba Guarantee.
“
Program Requirements
” (i) The provisions of Title XVII and the Applicable Regulations and (ii) the Federal Credit Reform Act of 1990, P.L. 101-508, 104 Stat. 1388-609 (1990), as amended by P.L. 105-33, 111 Stat. 692 (1997) and from time to time.
“
Prohibited Jurisdiction
” Any jurisdiction that:
(i) is subject to U.S. or multilateral economic or trade sanctions in which the U.S. participates, including the trade sanctions and economic embargoes administered by OFAC;
(ii) has been designated by the Secretary of the Treasury under Section 311 or 312 of the Patriot Act, as warranting special measures due to money laundering concerns; or
(iii) has been designated as non-cooperative with international anti-money laundering principles or procedures by an intergovernmental group or organization of which the U.S. is a member, such as the Financial Action Task Force on Money Laundering, and with which designation the U.S. representative to the group or organization continues to concur.
“
Prohibited Person
” Any person or entity that is:
(i) named, identified, or described on the list of "Specially Designated Nationals and Blocked Persons" (Appendix A to 31 C.F.R. chapter V) as published by OFAC at its official website, http://www.treas.gov/offices/enforcement/ofac/sdn/, or at any replacement website or other replacement official publication of such list;
(ii) named, identified or described on any other blocked persons list, designated nationals list, denied persons list, entity list, debarred party list, unverified list, sanctions list or other list of individuals or entities with whom United States persons may not conduct business published by OFAC, the U.S. Department of Commerce or the U.S. Department of State;
(iii) debarred, suspended, proposed for debarment with a final determination still pending, declared ineligible or voluntarily excluded (as such terms are defined in any of the Debarment Regulations) from contracting with any United States federal government department or any agency or instrumentality thereof or otherwise participating in procurement or nonprocurement transactions with any United States federal government department or agency pursuant to any of the Debarment Regulations;
(iv) indicted, convicted or had a Governmental Judgment rendered against it for any of the offenses listed in any of the Debarment Regulations;
(v) subject to United States or multilateral economic or trade sanctions in which the United States participates; or
(vi) owned or Controlled by, or acting on behalf of, any governments, corporations, entities or individuals that are subject to United States or multilateral economic or trade sanctions in which the United States participates.
“
Project
” As defined in the Recitals to the Agreement.
“
Project Costs
” All costs incurred by the Borrower attributable to the Borrower’s Undivided Interest or otherwise relating to the Borrower’s acquisition, development, financing and construction of the Project, including (i) amounts payable under the Construction Contracts; (ii) interest, fees and expenses payable in connection with the FFB Credit Facility Commitment and the DOE Guaranteed Loan prior to the end of the Availability Period; (iii) costs to acquire title or use rights to the Project Site, necessary easements and other real property interests; (iv) costs and expenses of legal, engineering, accounting, construction management and other advisors or Independent Consultants incurred in connection with the Project; (v) fees, commissions and expenses payable to the Secured Parties at or prior to the Initial Advance Date; (vi) development costs to the extent permitted to be paid under the Loan Documents; (vii) construction insurance premiums for coverage obtained prior to Commercial Operation of the Second Unit; and (viii) the Borrower’s and the Operator’s labor costs and general and administration costs.
“
Project Documents
” The Principal Project Documents and the Additional Project Documents.
“
Project Facility
” The Project Site and the Improvements.
“
Project Management Board Monthly Meeting Materials
” As defined in
Section 6.1(a)(iv)
.
“
Project Milestone Schedule
” (a) At any time prior to development by the Borrower of a level two schedule of significant development, construction and completion milestones for the completion of Unit 4, the level two
schedule of significant development, construction and completion milestones for the completion of Unit 3, and (b) at any time thereafter, the level two schedules of significant development, construction and completion milestones for the completion of the Project, in each case
prepared by the Borrower, as updated from time to time in accordance with the requirements of
Section 5.20
, by delivery of an updated Project Milestone Schedule pursuant to
Section 6.1(a)
.
“
Project Participant
” Any party to a Project Document and any party to a Loan Document, other than the Secured Parties.
“
Project Site
” The real property defined as the “Identified Sites” in the Ownership Agreement, together with all such additional real property rights that constitute Additional Unit Properties under the Ownership Agreement.
“
Project Termination Notice
” As defined in the Owners Direct Agreement.
“
Protected Information
” AP1000 engineering or design or related information of either EPC Contractor individually, not included in the public version of the AP1000 Design Control Document, including as a representative list of such information: calculations for safety-related systems and components; the Plant Design Model referred to in the EPC Contract; instrumentation and control functional, system, software and interface requirements and functional logic diagrams; designs, design specifications and qualification reports for safety-related and non-safety related equipment; systems design and design specification documents for safety-related and non-safety related systems; design change packages, including E&DCRs; instrumentation and control architecture diagrams, software verification and validation documentation; testing procedures and test results; component data packages; fabrication and construction drawings; and final plant as-built drawings.
“
Protocols and Side Letters
” With respect to any agreement, any related protocols or side letters that, individually or collectively, represent a binding agreement between or among the parties thereto.
“
Public Inquiries
” Inquiries to DOE by (i) members of Congress, (ii) members of (x) the media or (y) other parties that could reasonably be expected to result in a news release or other publication, or (iii) members of the public in response to the issuance of news releases or other reports.
“
Public Utility Holding Company Act
” or “
PUHCA
” The United States Public Utility Holding Company Act of 2005.
“
Publicly Traded Securities
” Equity securities that (i) are listed for trading on the New York Stock Exchange, the American Stock Exchange, the National Market System of the Nasdaq Stock Market or any other national securities exchange or (ii) were issued and sold to the public in an offering registered under the Securities Act of 1933, as amended.
“
Qualified Plan
” An employee benefit plan (as defined in Section 3(3) of ERISA) other than a Multiemployer Plan (i) that is or was at any time within the last six years maintained or sponsored by the Borrower or any ERISA Affiliate or to which the Borrower or any ERISA Affiliate has made, or was obligated to make, contributions within the last six years, and (ii) that is intended to be tax-qualified under Section 401(a) of the Internal Revenue Code.
“
Quarterly Payment Date
” Each date for payment of principal or interest or both specified in the FFB Promissory Note, which date is on a quarterly basis.
“
Quarterly Prepayment Amount
” As defined in
Section 3.3.3(e)
.
“
Record of Decision
” The public record of decision issued in accordance with 40 C.F.R. § 1505.2 describing a government agency’s NEPA decision-making process.
“
Register
” As defined in
Section 10.13(d)
.
“
Related Facilities
” The “Related Facilities” as defined in the Ownership Agreement.
“
Release
” Disposing, discharging, injecting, spilling, leaking, leaching, dumping, pumping, pouring, emitting, escaping, emptying, seeping, placing and the like, into or upon any land or water or air, or otherwise entering into the environment.
“
Remediation Plan
” With respect to any non-compliance with any Environmental Law, Government Approvals or safety regulations applicable to the project under
Section 8.1(e)
, any non-compliance with Governmental Rule or Program Requirement under
Section 8.1(r)(iii)
, or any non-compliance with any Governmental Rule or Program Requirement under
Section 5.10
, a plan of correction with a timetable for curing such non-compliance that has been approved by a court of competent jurisdiction, or the lead Governmental Authority with enforcement responsibility with respect to such matter, or DOE, as the case may be.
“
Remedies Instructions
” Written instructions to the Collateral Agent from DOE directing the Collateral Agent to exercise or refrain from exercising any rights, remedies, powers or privileges with respect to the Collateral or otherwise under this Agreement or any other Loan Document to which it is a party.
“
Requested Advance Date
” As defined in the FFB Note Purchase Agreement.
“
Required Consents
” As defined in
Section 5.7
.
“
Required Insurance
” Insurance coverage for the Project satisfying the requirements of
Section 6.3
.
“
Required Payment Date
” As defined in
Section 8.1
.
“
Required Survey
” The survey prepared by Lowe Engineers with respect to the Project Site.
“
Restricted Data Site
” As defined in
Section 4.1.2(b)
.
“
Safeguards Event
” As defined in
Section 6.1(h)(i)
.
“
SAM
” The System for Awards Management database, established in accordance with the Federal Acquisition Streamlining Act of 1994.
“
Second Unit
” The second Unit to achieve Commercial Operation.
“
Secretary Subaccount
” As defined in
Section 8.1
.
“
Secured Obligations
” All amounts owing to FFB or the Secured Parties under the Loan Documents, including (i) all loans, advances, debts, liabilities, and obligations, howsoever arising, owed by the Borrower under the FFB Credit Facility Documents or this Agreement or otherwise to the Secured Parties (whether or not evidenced by any note or instrument and whether or not for the payment of money), direct or indirect, absolute or contingent, due or to become due, now existing or hereafter arising, pursuant to any of the Transaction Documents, including all interest, fees and Periodic Expenses chargeable to the Borrower and payable by the Borrower hereunder or thereunder, (ii) any and all sums advanced by FFB, the Collateral Agent or any other Secured Party in order to preserve the Collateral or preserve the Secured Parties’ security interest in the Collateral, including amounts to cure defaults of the Borrower under the IP Agreements prior to the end of the EPC Contract Termination Consultation Period or the occurrence of a No Replacement EPC Event, and, subject to
Section 10.20(b)
of the Agreement, Completion Costs and (iii) in the event of any proceeding for the collection or enforcement of the obligations after an Event of Default shall have occurred and be continuing, the expenses of retaking, holding, preparing for sale or lease, selling or otherwise disposing of or realizing on the Collateral, or of any exercise by any Secured Party or FFB of its rights under the Security Documents and the Direct Agreements, together with any Periodic Expenses, including attorney’s fees and court costs.
“
Secured Parties
” DOE and the Collateral Agent.
“
Securitization Property
” As defined in the Deed to Secure Debt.
“
Security Documents
” The documents listed in
Section 4.1.1(c)
of the Agreement and all other contracts and documents entered into prior to, on, or after the Guarantee Issuance Date that provide any Lien, pledge, charge or security interest to the Collateral Agent for the benefit of the Secured Parties (or any of them) to secure the Secured Obligations.
“
Senior Management Person
” Any officer of the Borrower or the Operator.
“
Shaw Guarantee
” The Guaranty Agreement, dated as of April 8, 2008, by The Shaw Group, Inc. in favor of the Borrower, acting for itself and as Owners’ Agent.
“
Software License
” The Software License, dated as of April 8, 2008, between the Borrower, acting for itself and as Owners’ Agent, and the EPC Contractor.
“
Southern Company
” The Southern Company, a Delaware corporation, and its successors and assigns.
“
Southern Nuclear Direct Agreement
” The Consent to Assignment, dated as of the date hereof, among the Operator, the Borrower, DOE and the Collateral Agent.
“
Southern Nuclear Monthly Report
” As defined in
Section 6.1(a)(iii)
.
“
Strategic Plan
” The strategic plan for each Unit provided annually to the Nuclear Managing Board by the Operator pursuant to Section 4.1 of the Nuclear Managing Board Agreement, including a schedule of scheduled operating cycles and planned outages for refueling, maintenance and other work for the succeeding five (5) years, and including availability and performance goals and strategic objectives, planned mandatory projects, planned improvement projects (non-mandatory), authorized level of staffing, and low level radioactive waste disposal.
“
Summary Project Milestone Schedule
” The level one schedule of significant development, construction and completion milestones for the completion of the Project prepared by the Borrower, as updated from time to time and delivered pursuant to
Section 6.1(a)
, as updated from time to time in accordance with the requirements of
Section 5.20
, by delivery of an updated Project Milestone Schedule pursuant to Section 6.1(a).
“
Taxes
” All taxes, levies, imposts, duties, deductions, charges or withholdings imposed by any Governmental Authority, including any interest, penalties or additions thereto imposed in respect thereof.
“
Technology
” Regardless of form, any invention (whether or not patentable or reduced to practice), discovery, information, work of authorship, articles of manufacture, machines, methods, processes, models, procedures, protocols, designs, diagrams, drawings, documentation, flow charts, network configurations and architectures, schematics, specifications, concepts, data, databases and data collections, algorithms, formulas, know-how, and techniques, software code, including all source code, object code, firmware, development tools and application programming interfaces (APIs), tools, materials, marketing and development plans, and other forms of technology and all media on which any of the foregoing is recorded.
“
Title Company
” Chicago Title Insurance Company.
“
Title XVII
” Title XVII of the Energy Policy Act of 2005, Pub. L. 109-58, as amended by Section 406 of Div A of Title IV of Pub. L. 111-5 and Section 310 of Title III of Pub. L. 111-85, as may be amended from time to time.
“
Toshiba Guarantee
” The Guaranty Agreement, dated as of April 8, 2008, by Toshiba Corporation in favor of the Borrower, acting for itself and as Owners’ Agent.
“
Transaction Documents
” The Project Documents and the Loan Documents.
“
Transmission Facilities
” Those interconnection facilities, including the step-up substation and the switchyard, that are to be used for the evacuation of power from the Project and (a) that are or will be jointly owned by the Owners and located at the Project Site and (b) the costs of which have been included in Eligible Project Costs.
“
Uncontrollable Cause
” An unforeseeable cause beyond the control and without the fault of DOE, including an act of God, fire, flood, severe weather, epidemic, quarantine restriction, explosion, sabotage, act of war, act of terrorism, riot, civil commotion, disruption or failure of the DOE communications systems, closure of the U.S. Government, or an unforeseen or unscheduled closure or evacuation of DOE’s offices.
“
Uniform Commercial Code
” or “
UCC
” The Uniform Commercial Code of the State of Georgia.
“
Units
” The two additional nuclear generating units to be located at the Alvin W. Vogtle Nuclear Generating Plant as described in the Ownership Agreement and that comprise part of the Project.
“
U.S.
” The United States of America.
“
U.S. Government
” The federal government of the United States of America.
“
Voidable Transfer
” As defined in
Section 10.22
.
“
Westinghouse Fuel Assembly Agreement
” The Contract for AP1000 Fuel Fabrication, Design and Related Services, dated as of April 3, 2009, between the Operator, acting as agent for Georgia Power Company (acting for itself and as agent for the other Owners), collectively as owner, and Westinghouse Electric Company LLC, as amended by Amendment No. 1 dated as of June 21, 2012.
“
Westinghouse Letter Agreement
” The letter agreement, dated as of the date hereof, between Westinghouse Electric Company LLC and DOE, under which Westinghouse Electric Company LLC would, at DOE’s request following the termination of certain Project Document(s) prior to repayment in full of the DOE Guaranteed Loan, enter into replacement agreement(s) therefor.
“
Westinghouse License Agreement
” The Amended and Restated License Agreement, dated February 9, 2012, between Southern Nuclear Operating Company, Inc., for itself and as agent for Alabama Power Company and Georgia Power Company (acting for itself and as agent for the other Owners), collectively, as licensee, and Westinghouse Electric Company LLC.
Exhibit B
to Loan Guarantee Agreement
RULES OF INTERPRETATION
For all purposes of the Agreement, including Exhibits, Schedules, Annexes and Appendices hereto, unless otherwise indicated or required by the context:
|
|
1.
|
Plurals and Gender
. Defined terms in the singular shall include the plural and vice versa, and the masculine, feminine or neuter gender shall include all genders.
|
|
|
2.
|
Use of Or
. The
word
“or” is not exclusive.
|
|
|
3.
|
Change of Law
. Each reference to a Governmental Rule or Environmental Law includes any amendment, supplement or modification of such Governmental Rule or Environmental Law, as the case may be, and all regulations, rulings and other Governmental Rules or Environmental Laws promulgated thereunder.
|
|
|
4.
|
Successor and Assigns
. A reference to a Person includes its successors and permitted assigns.
|
|
|
5.
|
Including
. The words “include,” “includes” and “including” are not limiting and mean include, includes and including “without limitation” and “without limitation by specification”.
|
|
|
6.
|
Hereof, Herein, Hereunder
. The words “hereof,” “herein” and “hereunder” and words of similar import when used in any document shall refer to such document as a whole and not to any particular provision of such document.
|
|
|
7.
|
Articles, Sections, Exhibits
. A reference in a document to an Article, Section, Exhibit, Schedule, Annex or Appendix is to the Article, Section, Exhibit, Schedule, Annex or Appendix of such document unless otherwise indicated.
|
|
|
8.
|
Attachments, Replacements, Amendments
. References to any document, instrument or agreement (a) shall include all exhibits, schedules, annexes, attachments and appendices thereto, and all exhibits, schedules, annexes, attachments or appendices to any document shall be deemed incorporated by reference in such document, (b) shall include all Protocols and Side Letters related thereto, (c) shall include all documents, instruments or agreements issued or executed in replacement thereof, and (d) shall mean such document, instrument or agreement, or replacement thereto, as amended, modified and supplemented from time to time and in effect at any given time.
|
|
|
9.
|
Periods and Time
. References to “days,” “weeks,” “months” and “years” shall mean calendar days, weeks, months and years, respectively. References to a period of “days,” “weeks,” “months” and “years” shall mean consecutive days, weeks, months and years, respectively, and such period shall be deemed to begin on the day that the event to which the period relates first occurs. For purposes of computation of time periods, the word “from” means “from but not including” and the words “to” and “until” each mean “to and including.” References to a time of day shall mean such time in Washington, D.C.
|
|
|
10.
|
Ambiguities
. The Loan Documents are the result of negotiations among, and have been reviewed by each party to the Loan Documents and their respective counsel. Accordingly, the Loan Documents shall be deemed to be the product of all parties thereto, and no ambiguity shall be construed in favor of or against any Person.
|
|
|
11.
|
Continuing Definitions
. With respect to any term that is defined by reference to any document, for purposes hereof, such term shall continue to have the original definition notwithstanding any termination, expiration or modification of such document.
|
|
|
12.
|
Terms Defined Elsewhere
. Terms that are defined in the preamble, the recitals, or the Sections of the Agreement have the meanings ascribed to them therein.
|
|
|
13.
|
Headings
. The table of contents and article and section headings and other captions have been inserted as a matter of convenience for the purpose of reference only and do not limit or affect the meaning of the terms and provisions thereof.
|
|
|
14.
|
Accounting Terms
. All accounting terms not specifically defined shall be construed in accordance with GAAP.
|
|
|
15.
|
Forward-Looking Statements
. With respect to preparation or update by any Person of budgets, projections or other forward-looking plans and forecasts (including the Construction Budget, the Financial Plan, the Advance Schedule, the Borrower Base Case Projections, the Summary Project Milestone Schedule, the Project Milestone Schedule, the Anticipated Completion Date, reports under the Nuclear Managing Board Agreement, and all estimates with respect to Project Costs), such Person shall be deemed to represent only that such budgets, projections and forward-looking plans and forecasts were prepared in good faith based upon assumptions believed by such Person to be reasonable at the time of their preparation or update.
|
Exhibit C-1
to Loan Guarantee Agreement
[FORM OF] BORROWER GUARANTEE ISSUANCE DATE CERTIFICATE
(Delivered pursuant to
Section 4.1.14
of the Loan Guarantee Agreement)
Date: _______________, 20__
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: Director, Portfolio Management
Re: DOE Loan Guarantee, LGPO Loan #1021
Ladies and Gentlemen:
This Borrower Certificate is delivered to you pursuant to
Section 4.1.14
of the Loan Guarantee Agreement, dated as of February 20, 2014, (the “
Loan Guarantee Agreement
”), by and between (i) Georgia Power Company, a Georgia corporation, as Borrower, and (ii) the U.S. Department of Energy, as Guarantor.
All capitalized terms used in this Borrower Certificate not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
In connection with the satisfaction of the conditions precedent as of the Guarantee Issuance Date and those matters set forth under
Section 4.1
of the Loan Guarantee Agreement requiring the Borrower’s certification, the Borrower HEREBY CERTIFIES for the benefit of DOE, that as of the date hereof:
|
|
1.
|
the following documents were delivered (or, in the case of the EPC Contract, the Software License, the Westinghouse Fuel Assembly Agreement, the Westinghouse License Agreement, the Toshiba Guarantee and the Shaw Guarantee, were made available on the Restricted Data Site in accordance with
Section 4.1.2(b)
of the Loan Guarantee Agreement and made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
of the Loan Guarantee Agreement) on or before the Guarantee Issuance Date, each of which is (x) a true, correct and complete copy of such document (including all schedules, exhibits, attachments, supplements and amendments thereto and any related Protocols and Side Letters) and (y) duly executed and delivered by the Borrower (as applicable) and is in full force and effect:
|
|
|
a.
|
the title deed or deeds for the Project Site;
|
|
|
c.
|
the Fuel Supply Agreements (other than those to be entered into after the Guarantee Issuance Date);
|
|
|
d.
|
the Fuel Disposal Agreements (other than those to be entered into after the Guarantee Issuance Date);
|
|
|
e.
|
the Nuclear Operating Agreement;
|
|
|
g.
|
the Development Agreement;
|
|
|
h.
|
the Nuclear Managing Board Agreement;
|
|
|
i.
|
the Ownership Agreement;
|
|
|
j.
|
the Declaration of Covenants;
|
|
|
k.
|
the Cost Allocation Procedures;
|
|
|
l.
|
the Operating Agreement;
|
|
|
m.
|
the Letter Agreement for Construction Services;
|
|
|
n.
|
the Westinghouse Fuel Assembly Agreement;
|
|
|
o.
|
the Westinghouse License Agreement;
|
|
|
p.
|
the Toshiba Guarantee; and
|
|
|
2.
|
neither the Borrower nor, to the Borrower’s Knowledge, any other party to any of the documents listed above is, or but for the passage of time or giving notice or both will be, in breach of any obligation thereunder except for (1) any such breach identified on
Schedule 4.1.2
of the Agreement or (2) any such breach that could not reasonably be expected to have a material adverse effect on the completion or operation of the Project.
|
|
|
3.
|
Attached hereto as
Appendix A[-1]
is a detailed description[, with [insert description of other supporting documents reasonably requested by DOE,] of expenditures for Project Costs incurred and paid by the Borrower or any Affiliate of the Borrower prior to the Guarantee Issuance Date for which the Borrower seeks credit to be applied toward Base Funding, and the amounts of such Project Costs have been applied in accordance with the Construction Budget.
|
|
|
4.
|
attached hereto as
Appendix B-1
are true, correct and complete copies of the Borrower’s Organizational Documents, attached hereto as
Appendix B-2
are true, correct and complete copies of the Borrower’s good standing certificates, and attached hereto as
Appendix B-3
is a true, correct and complete copy of the Borrower’s incumbency certificate;
|
|
|
5.
|
attached hereto as
Appendix C
is a true, correct and complete copy of the Borrower’s resolutions duly adopted by the Borrower’s Board of Directors to authorize (a) the Borrower’s participation in the Project, (b) the financing therefor and the granting of Liens pursuant to the Security Documents and (c) the execution, delivery and performance by the Borrower of the Transaction Documents (including any Direct Agreements) to which the Borrower is party;
|
|
|
6.
|
the Borrower Base Case Projections, the Summary Project Milestone Schedule, the Project Milestone Schedule, the Construction Budget for each Unit, the Advance Schedule and the projection for jobs created and maintained in the U.S. as a result of the Project for each calendar year occurring during the term of the DOE Guaranteed Loan delivered (or, in the case of the Project Milestone Schedule, made available on the Restricted Data Site and made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
of the Loan Guarantee Agreement) under the Borrower’s Pre-Closing Certificate dated as of February 20, 2014 were prepared in good faith based on assumptions that the Borrower believes are reasonable, in each case as of the date of preparation and as of the date hereof;
|
|
|
7.
|
all necessary consents and waivers under any current Indebtedness or Other Obligations of the Borrower have been duly obtained and is not subject to any conditions, except as disclosed to DOE on
Schedule 5.7
to the Loan Guarantee Agreement;
|
|
|
8.
|
attached hereto are true, correct and complete copies of the following documents each of which has been duly obtained and are not subject to any waiting period or appeal (except for the waiting periods and appeals that are disclosed to DOE on
Schedule 5.7
to the Loan Guarantee Agreement): (a) each COL, attached hereto as
Appendix D-1
, (b) Georgia PSC approval of the issuance of indebtedness under the Loan Documents, attached hereto as
Appendix D-2
and (c) [insert description of any other Required Consents listed on
Schedule 5.7
to the Loan Guarantee Agreement and requested by DOE (except those identified on
Schedule 5.7
to the Loan Guarantee Agreement as to be obtained at a later stage in the development of the Project)], attached hereto as
Appendix D-3
;
|
|
|
9.
|
attached hereto are true, correct and complete copies of the following documents: (a) the final amended certification order and all orders on remand entered by the Georgia PSC in Docket No. 27800-U (collectively, the “
Certificate
”) through the Guarantee Issuance Date, which orders relate to the Borrower’s right to recover certain Project Costs through regulated rates in accordance with and subject to the requirements of applicable Georgia law (Official Code of Georgia Annotated, 46-3A-1 through 46-3A-11), attached hereto as
Appendix E-1
, (b) each order entered by the Georgia PSC on the semi-annual construction monitoring reports filed by the Borrower pursuant to the Certificate (such orders collectively, the “
Construction Monitoring Orders
”; such reports collectively, the “
Construction Monitoring Reports
”) through the Guarantee Issuance Date, which orders relate to the Georgia PSC’s verification and approval of expenditures for Project Costs, attached hereto as
Appendix E-2
, and (c) each order in Georgia PSC Dockets 31958 and 32539 through the Guarantee Issuance Date (the “
NCCR Tariff Orders
”), which orders relate to the Borrower’s ability to recover financing costs associated with the Borrower’s Undivided Interest, attached hereto as
Appendix E-3
;
|
|
|
10.
|
the Georgia PSC has, subject to Official Code of Georgia Annotated Section 46-3A-7, verified and approved all expenditures incurred for Project Costs identified in all Construction Monitoring Reports for all periods through December 31, 2012, except as set forth on
Schedule 4.1.4(d)(i)
to the Loan Guarantee Agreement, and the Borrower’s inability to recover all of the expenditures set forth on
Schedule 4.1.4(d)(i)
through regulated rates could not reasonably be expected to have a material adverse effect on the ability of the Borrower to repay Advances when due or the ability of the Project to be completed;
|
|
|
11.
|
the NCCR Tariff Orders authorize the Borrower to recover financing costs associated with the Borrower’s Undivided Interest through the Nuclear Construction Cost Recovery Schedule tariff (the “
NCCR Tariff
”) as filed or, if modified, without any material adverse effect on the Borrower’s ability to recover financing costs associated with the Borrower’s Undivided Interest through the NCCR Tariff;
|
|
|
12.
|
except for the Certificate, the Construction Monitoring Orders and the NCCR Tariff Orders, there are no other orders relating to the Borrower’s right to recover Project Costs or financing costs associated with the Borrower’s Undivided Interest;
|
|
|
13.
|
no appeals of the Certificate, the Construction Monitoring Orders or the NCCR Tariff Orders are pending and, except as set forth on
Schedule 4.1.4(d)(iv)
to the Loan Guarantee Agreement, all rights to appeal the Certificate, the Construction Monitoring Orders or the NCCR Tariff Orders have expired;
|
|
|
14.
|
all Required Insurance is in place, and in full force and effect without default and all premiums due thereon [have been paid in full] [are to be paid with the proceeds of the initial Advance] [are to be paid by other arrangements satisfactory to DOE];
|
|
|
15.
|
attached hereto as
Appendix F
are true, correct and complete copies of the certificates or policies with respect to all Required Insurance designating the Secured Parties as additional insureds;
|
|
|
16.
|
attached hereto as
Appendix G
is a true, correct and complete copy of the “Full Notice to Proceed” (as defined in the EPC Contract);
|
|
|
17.
|
all material environmental requirements applicable to the Project (including required mitigations and the receipt of any required environmental consultations and permits) pursuant to applicable Environmental Laws and Governmental Approvals have been satisfied as of the Guarantee Issuance Date (to the extent such material environmental requirements are required to be satisfied as of the Guarantee Issuance Date) [and attached hereto as
Appendix H
is a true, correct and complete copy of [such other evidence as DOE may request]];
|
|
|
18.
|
the Borrower and, to the DBA Knowledge of the Borrower, all DBA Contract Parties are in material compliance with all Davis-Bacon Requirements, except to the extent that the Davis-Bacon Requirements have been waived by the Department of Labor, including pursuant to the DOL Letter;
|
|
|
19.
|
Appendix I
identifies and describes all immaterial non-compliance with the Davis-Bacon Requirements of which the Borrower has DBA Knowledge;
|
|
|
20.
|
the Borrower has commenced the cure of the immaterial non-compliance identified in
Appendix I
and reasonably believes that such immaterial non-compliance will be cured prior to any Advances subsequent to the Advance for which this Borrower Certificate is being delivered;
|
|
|
21.
|
Attached hereto as
Appendix J
is a true, correct and complete copy of the Davis-Bacon and Related Acts Compliance Program;
|
|
|
22.
|
Attached hereto as
Appendix K
are the forms of “Builder’s Risk” policy, “Cargo” policy and “OCIP” policies referred to in
Schedule 6.3
(
Required Insurances
) to the Loan Guarantee Agreement;
|
|
|
23.
|
attached hereto as
Appendix L
is a true, correct and complete copy of the CPA Agreement;
|
|
|
24.
|
[such other certifications as may be required to be made to the Secured Parties by the Borrower as of the Guarantee Issuance Date under the FFB Credit Facility Documents].
|
This Borrower Certificate is a Loan Document.
(Signature page follows)
IN WITNESS WHEREOF, the undersigned has duly executed this Borrower Certificate on behalf of the Borrower as of the date first written above.
GEORGIA POWER COMPANY,
a Georgia corporation,
as Borrower
By:
Name:
Title:
[
Signature Page to Borrower Guarantee Issuance Date Certificate
]
Exhibit C-2
to Loan Guarantee Agreement
[FORM OF] BORROWER ADVANCE DATE CERTIFICATE
(Delivered pursuant to
Section 4.2.6
of the Loan Guarantee Agreement)
Date: _______________, 20__
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: Director, Portfolio Management
Re: DOE Loan Guarantee, LGPO Loan #1021
Ladies and Gentlemen:
This Borrower Certificate is delivered to you pursuant to
Section 4.2.6
of the Loan Guarantee Agreement, dated as of February 20, 2014, (the “
Loan Guarantee Agreement
”), by and between (i) Georgia Power Company, as Borrower, and (ii) the U.S. Department of Energy, as Guarantor.
All capitalized terms used in this Borrower Certificate not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
The Borrower HEREBY CERTIFIES for the benefit of DOE, that as of the date hereof:
|
|
1.
|
[attached hereto as
Appendix A
is a proposed updated Advance Schedule, reflecting any changes to the estimated timing and amounts of proposed Advances and Base Funding to be provided][no changes to the current Advance Schedule are required];
|
|
|
2.
|
[the Advance Schedule is consistent in all material respects with the most recent Construction Monitoring Report, the Construction Budget and the Project Milestone Schedule[ and does not accelerate the estimated date of disbursement of any Advance amounts reflected in the initial Advance Schedule delivered pursuant to
Section 4.1.5(e)
of the Loan Guarantee Agreement];
|
|
|
3.
|
the proceeds of the requested Advance will be needed for Eligible Project Costs that have been incurred by the Requested Advance Date and attached hereto as
Appendix B
is a description in reasonable detail of such Eligible Project Costs;
|
|
|
4.
|
[the invoices relating to Project Costs incurred through September 30, 2013 that were made available in the Borrower’s offices for review by the Lender’s Engineer were true, correct and complete copies of such invoices;]
1
|
|
|
5.
|
[attached hereto as
Appendix C]
[provided via the Restricted Data Site and made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
of the Loan Guarantee Agreement]
2
are true, correct and complete copies of each invoice of the EPC Contractor that is the subject of the requested Advance (whether via direct payment to the EPC Contractor or via reimbursement to the Borrower);
|
|
|
6.
|
[attached hereto as
Appendix D]
[provided via the Restricted Data Site and made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
of the Loan Guarantee Agreement]
3
are true, correct and complete copies of the lien waivers and releases with respect to all work reflected in each invoice of the EPC Contractor that is the subject of the requested Advance;
|
|
|
7.
|
[attached hereto as
Appendix E]
[provided via the Restricted Data Site and made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
of the Loan Guarantee Agreement]
4
are true, correct and complete copies of each invoice for Project Costs (other than invoices of the EPC Contractor, invoices previously delivered and invoices with respect to Project Costs incurred through September 30, 2013) that (i) is the subject of the requested Advance, and (ii) is in an amount that exceeds one hundred thousand Dollars ($100,000)
5
;
|
|
|
8.
|
[attached hereto as
Appendix F
is a true, correct and complete copy of a spreadsheet in the form attached as
Exhibit M
of the Loan Guarantee Agreement;]
6
|
|
|
9.
|
[attached hereto as
Appendix G]
[provided via the Restricted Data Site and made available for review by employees of the Lender’s Engineer in accordance with
Section
|
_________________
1
To be included only with respect to the initial Advance.
2
Borrower to choose between optional language depending on whether the invoices contain confidential trade secret or proprietary information of the EPC Contractor.
3
Borrower to choose between optional language depending on whether the lien waivers and releases contain confidential trade secret or proprietary information of the EPC Contractor.
4
Borrower to choose between optional language depending on whether the lien waivers and releases contain confidential trade secret or proprietary information of the EPC Contractor.
5
To be included for each Advance after the initial Advance.
6
To be included for each Advance after the initial Advance.
6.1(p)(ii)
of the Loan Guarantee Agreement]
7
is a true and correct sample of [
insert applicable number of invoices between 30 and 50
] invoices for Project Costs that are the subject of the requested Advance (other than the invoices specified in paragraphs 5 and 7)
8
[and additional invoices of the type described in this in paragraph 8 that are not included in such sample]
9
;
|
|
10.
|
[attached hereto as
Appendix H
, is a true, correct and complete copy of the EPC Contractor’s affidavit with respect to the invoice for the final payment by the Owners under the EPC Contract;]
10
|
|
|
11.
|
all DOE Guaranteed Loan Fees and Periodic Expenses (other than Periodic Expenses subject to a fee agreement with the Borrower) in each case incurred and invoiced prior to the date hereof
[
have been paid in full
][
are Eligible Project Costs and are to be paid with the proceeds of the requested Advance
][
are to be paid by other arrangements satisfactory to DOE, consisting of [
describe other arrangements
]
]
, and with respect to any Periodic Expenses subject to a fee agreement with the Borrower, the Borrower is not in default of its payment obligations under such fee agreement;
|
|
|
12.
|
attached hereto as
Appendix I-1
is a true, correct and complete copy of an updated schedule reflecting the status of all Required Consents;
|
|
|
13.
|
[attached hereto as
Appendix I-2
is a true, correct and complete copy of [any Required Consents on
Appendix I-1
that have been requested by DOE];]
|
|
|
14.
|
on both the Advance Notice Date and the Advance Date, the representations and warranties in the Loan Documents (other than those in
Sections 5.8
,
5.11(a)
,
5.14(b)
,
(e)
and
(i)
,
5.18(a)
,
(c)
and
(d)
,
5.24(g)
and
5.27
of the Loan Guarantee Agreement, which are made only as of the Guarantee Issuance Date, and those that speak only as to an earlier date, which were true and correct as of such earlier date) are true and correct in all material respects, and no Event of Default, Potential Default, Mandatory Prepayment Event or Potential Mandatory Prepayment Event has occurred and is continuing;
|
|
|
15.
|
all conditions to the requested Advance have been satisfied;
|
___________________________
|
|
7
|
Borrower to choose between optional language depending on whether the lien waivers and releases contain confidential trade secret or proprietary information of the EPC Contractor.
|
|
|
8
|
To be included for each Advance after the initial Advance.
|
|
|
9
|
To be included if requested by DOE or the Lender’s Engineer.
|
|
|
10
|
To be included in the case of the invoice for the final payment from the Owners under the EPC Contract.
|
|
|
16.
|
the Borrower and, to the DBA Knowledge of Borrower, all DBA Contract Parties are in material compliance with all Davis-Bacon Requirements, except to the extent that the Davis-Bacon Requirements have been waived by the Department of Labor, including pursuant to the DOL Letter;
|
|
|
17.
|
Appendix J
identifies and describes the immaterial non-compliance with all Davis-Bacon Requirements of which the Borrower has DBA Knowledge, and the Borrower has commenced the cure of such immaterial non-compliance and reasonably believes that such immaterial non-compliance will be cured prior to any Advances subsequent to the Advance for which the Borrower Certificate is being delivered;
|
|
|
18.
|
all immaterial non-compliance identified on all prior Borrower Certificates in respect of compliance with Davis-Bacon Requirements have been cured;
|
|
|
19.
|
[[there have been no updates to the Davis-Bacon and Related Acts Compliance Program][attached hereto as
Appendix K
is a true, correct and complete copy of all updates to the Davis-Bacon and Related Acts Compliance Program];]
|
|
|
20.
|
the requested Advance conforms to the Advance Schedule;
|
|
|
21.
|
as of the Advance Notice Date and the Advance Date, GPC is in compliance with all of its obligations under the CPA Agreement; and
|
|
|
22.
|
the amount of Base Funding and Overrun Funding provided by the Borrower prior to or concurrently with the requested Advance has been, or, prior to or concurrently with the requested Advance will be, applied to pay (A) at least 30% of the sum of the Eligible Base Project Costs being financed or reimbursed using the proceeds of the requested Advance plus all other Eligible Project Costs incurred to date, (B) 100% of all Ineligible Base Project Costs previously incurred or then required to be paid, and (C) 100% of all Overrun Project Costs previously incurred or then required to be paid.
|
This Borrower Certificate is a Loan Document.
(The remainder of this page is intentionally blank.)
IN WITNESS WHEREOF, the undersigned has duly executed this Borrower Certificate on behalf of the Borrower as of the date first written above.
GEORGIA POWER COMPANY,
a Georgia corporation,
as Borrower
By: ____________________________________
Name:
Title:
[
Signature Page to Borrower Advance Date Certificate
]
Exhibit C-3
to Loan Guarantee Agreement
FORM OF BORROWER FINANCIAL OFFICER CERTIFICATE
(Delivered pursuant to
Section 4.1.6(a)
of the Loan Guarantee Agreement)
Date: _______________, 20__
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: Director, Portfolio Management
Re: DOE Loan Guarantee, LGPO Loan #1021
Ladies and Gentlemen:
This Borrower Financial Officer Certificate is delivered to you pursuant to
Section 4.1.6(a)
of the Loan Guarantee Agreement, dated as of February 20, 2014, (the “
Loan Guarantee Agreement
”), by and between (i) Georgia Power Company, a Georgia corporation, as Borrower, and (ii) the U.S. Department of Energy, as Guarantor.
All capitalized terms used in this Borrower Financial Officer Certificate not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
In connection with the satisfaction of the conditions precedent as of the Guarantee Issuance Date and those matters set forth under
Sections 4.1.6(a)
and
6.1(e)
of the Loan Guarantee Agreement requiring the Borrower’s certification, the Borrower HEREBY CERTIFIES for the benefit of DOE, in its capacity as the Guarantor, that as of the date hereof:
|
|
1.
|
attached hereto as
Appendix A
are true, correct and complete copies of the Borrower’s most recent audited and unaudited Financial Statements;
|
|
|
2.
|
the attached Financial Statements were prepared in accordance with GAAP on a consistent basis and fairly present in all material respects the financial condition of the Borrower as of the date thereof and the results of operations and cash flows of the Borrower for the periods presented; and
|
|
|
3.
|
[no Event of Default, Potential Default, Mandatory Prepayment Event or Potential Mandatory Prepayment Event exists][
description of the nature and period of existence of any Event of Default, Potential Default, Mandatory Prepayment Event and Potential Mandatory Prepayment Event and the corrective action Borrower has taken or proposes to take with respect thereto
].
|
This Borrower Certificate is a Loan Document.
IN WITNESS WHEREOF, the undersigned has duly executed this Certificate on behalf of the Borrower as of the date first written above.
GEORGIA POWER COMPANY,
a Georgia corporation,
as Borrower
By: _________________________________
Name:
Title:
[
Signature Page to Borrower Financial Officer Certificate
]
Exhibit C-4
to Loan Guarantee Agreement
FORM OF BORROWER PRE-CLOSING CERTIFICATE
(Delivered pursuant to
Section 4.1.3
of the Loan Guarantee Agreement)
Date: _______________, 20__ [
at least 30 days before the Guarantee Issuance Date (or such shorter period as may be satisfactory to DOE)
]
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: Director, Portfolio Management
Re: DOE Loan Guarantee, LGPO Loan #1021
Ladies and Gentlemen:
This Borrower Pre-Closing Certificate is delivered to you pursuant to
Section 4.1.3
of the Loan Guarantee Agreement, dated as of February 20, 2014 (the “
Loan Guarantee Agreement
”), by and between (i) Georgia Power Company, a Georgia corporation, as Borrower, and (ii) the U.S. Department of Energy, as Guarantor.
All capitalized terms used in this Borrower Pre-Closing Certificate not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
In connection with the satisfaction of the conditions precedent as of the Guarantee Issuance Date and those matters set forth under
Section 4.1.3
of the Loan Guarantee Agreement requiring the Borrower’s certification, the Borrower HEREBY CERTIFIES for the benefit of DOE, in its capacity as the Guarantor, that as of the date hereof:
|
|
1.
|
attached hereto as
Appendix A
is a true, correct and complete copy of the Borrower’s Pre-Closing Project Costs Report describing expenditures for Project Costs incurred and paid by the Borrower or any Affiliate of the Borrower prior to the Guarantee Issuance Date and specifying those expenditures for which the Borrower seeks credit to be applied toward Base Funding;
|
|
|
2.
|
attached hereto are true, correct and complete copies the following documents, each of which was prepared in good faith based upon assumptions believed by the Borrower to be reasonable, in each case as of the date of preparation and as of the Guarantee Issuance Date: (a) the Borrower Base Case Projections, including a summary of the underlying assumptions and explanations thereto, attached hereto as
Appendix B
; (b) the Construction Budget for each Unit, attached hereto as
Appendix C
; (d) the Advance Schedule, attached hereto as
Appendix D
; (e) the projections for jobs created and maintained in the U.S. as a result of the Project for each calendar year occurring during the term of the DOE Guaranteed Loan, attached hereto as
Appendix E
; and (f) the Summary Project Milestone Schedule, attached hereto as
Appendix F
;
|
|
|
3.
|
a true, correct and complete copy of the Project Milestone Schedule, which was prepared in good faith based upon assumptions believed by the Borrower to be reasonable as of the date of preparation and as of the Guarantee Issuance Date has been made available to the Guarantor via the Restricted Data Site and has been and made available for review by employees of the Lender’s Engineer in accordance with
Section 6.1(p)(ii)
of the Loan Guarantee Agreement; and
|
|
|
4.
|
the Project Costs described in the Pre-Closing Project Costs Report have been applied in accordance with the Construction Budget attached hereto.
|
This Borrower Certificate is a Loan Document.
(Signature page follows)
IN WITNESS WHEREOF, the undersigned has duly executed this Certificate on behalf of the Borrower as of the date first written above.
GEORGIA POWER COMPANY,
a Georgia corporation,
as Borrower
By: ____________________________
Name:
Title:
[
Signature Page to Borrower Pre-Closing Certificate
]
Exhibit D-1
to Loan Guarantee Agreement
[FORM OF] LENDER’S ENGINEER
GUARANTEE ISSUANCE DATE CERTIFICATE
(Delivered pursuant to
Section 4.1.14(b)
of the Loan Guarantee Agreement)
Date: _______________, 20__
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: [_____________________]
Re: DOE Loan Guarantee, LGPO Loan #1021
Ladies and Gentlemen:
MPR Associates, Inc. (as “
Lender’s Engineer
”) hereby delivers to you this Lender’s Engineer Guarantee Issuance Date Certificate (the “
Certificate
”) pursuant to
Section 4.1.14(b)
of the Loan Guarantee Agreement, dated as of February 20, 2014 (the “
Loan Guarantee Agreement
”), by and among (i) Georgia Power Company, a Georgia corporation, as Borrower, and (ii) the U.S. Department of Energy, as Guarantor.
All capitalized terms used in this Certificate not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
We have read the provisions of the Loan Guarantee Agreement which identify the responsibilities of the Lender’s Engineer related to providing this Certificate as required by
Section 4.1.14(b)
of the Loan Guarantee Agreement.
We have reviewed the supporting material and data made available to us by the Borrower, including a copy of the Borrower Certificate dated February 20, 2014 (the “
Borrower’s Pre-Closing Certificate
”) and the Borrower Certificate dated February 20, 2014 (the “
Borrower’s Guarantee Issuance Date Certificate
”). The Lender’s Engineer’s review is based on the understanding and assumption that we have been provided true, complete and accurate information, which is satisfactory in form and scope to us, from other parties. Unless otherwise expressly noted, the certifications herein, where applicable, are consistent with our review documented in our Lender’s Engineer’s Report, including the United States Department of Energy Loan Guarantee Independent Engineer Report for Vogtle Units 3 & 4, dated November 6, 2009, the United States Department of Energy Loan Guarantee Independent Engineer Report for Vogtle Units 3 & 4 Revision 4, dated April 2013, and the Revision 2 of Supplement to DOE Loan Guarantee Independent Engineer Report for Vogtle Units 3 & 4, dated October 9, 2013.
Based on our review described above of the aforementioned information, and of data provided to us by others which we have not independently verified, the Lender’s Engineer HEREBY CERTIFIES for the benefit of DOE, that as of the date hereof and as of the Guarantee Issuance Date:
|
|
1.
|
the Construction Budget attached as
Appendix A
to the Borrower’s Pre-Closing Certificate is reasonable and appropriate and consistent with the Advance Schedule and Financial Plan for the Borrower’s Undivided Interest;
|
|
|
2.
|
the amounts reflected in the Pre-Closing Project Costs Report, submitted to the Lender’s Engineer and attached as
Appendix C
to the Borrower’s Guarantee Issuance Date Certificate, have been applied in accordance with the Construction Budget;
|
|
|
3.
|
the Advance Schedule attached as
Appendix [D]
to the Borrower’s Pre-Closing Certificate showing the timing and amount of proposed Advances and Base Funding for the Borrower’s Undivided Interest (showing the total number of Advances in each calendar quarter) is consistent with the Financial Plan and supports completion of the Project in accordance with the Project Milestone Schedule;
|
|
|
4.
|
the Summary Project Milestone Schedule attached as
Appendix [F]
to the Borrower’s Pre-Closing Certificate and the Project Milestone Schedule referred to in the Borrower’s Pre-Closing Certificate are achievable for the Project; and
|
|
|
5.
|
the implementation plans for the Project are sufficient to provide supply and disposal of nuclear fuel required to operate the Project in accordance with the COLs, all applicable Governmental Rules and the terms of the Fuel Supply Agreements (other than those to be entered into after the Guarantee Issuance Date).
|
(Signature page follows)
IN WITNESS WHEREOF, the undersigned has executed this Certificate as of the date first written above.
MPR ASSOCIATES, INC.
By: _________________________________
Name:
Title:
[
Signature Page to Lender’s Engineer Guarantee Issuance Date Certificate
]
Exhibit D-2
to Loan Guarantee Agreement
[FORM OF] LENDER’S ENGINEER ADVANCE DATE CERTIFICATE
(For each Advance)
(Delivered pursuant to
Section 4.2.6(b)
of the Loan Guarantee Agreement)
Date: _______________, 20__
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: [___________________]
Re: DOE Loan Guarantee, LGPO Loan #1021
Ladies and Gentlemen:
MPR Associates, Inc. (as “
Lender’s Engineer
”) hereby delivers to you this Lender’s Engineer Certificate (the “
Certificate
”) pursuant to
Section 4.2.6(b)
of the Loan Guarantee Agreement, dated as of February 20, 2014 (the “
Loan Guarantee Agreement
”), by and among (i) Georgia Power Company, a Georgia corporation, as Borrower, and (ii) the U.S. Department of Energy, as Guarantor.
All capitalized terms used in this Certificate not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
We have read the provisions of the Loan Guarantee Agreement which identify the responsibilities of the Lender’s Engineer related to providing this Certificate as required by
Section 4.2.6(b)
of the Loan Guarantee Agreement.
We have reviewed the supporting material and data made available to us by the Borrower, including the Borrower Certificate dated [•] (the “
Borrower’s Advance Date Certificate
”). The Lender’s Engineer’s review is based on the understanding and assumption that we have been provided true, complete and accurate information, which is satisfactory in form and scope to us, from other parties. Unless otherwise expressly noted, the certifications herein, where applicable, are consistent with our review documented in our Lender’s Engineer’s Report, including the United States Department of Energy Loan Guarantee Independent Engineer Report for Vogtle Units 3 & 4, dated November 6, 2009, the United States Department of Energy Loan Guarantee Independent Engineer Report for Vogtle Units 3 & 4 Revision 4, dated April 2013, and the Revision 2 of Supplement to DOE Loan Guarantee Independent Engineer Report for Vogtle Units 3 & 4, dated October 9, 2013.
Based on our review described above of the aforementioned information, and of data provided to us by others which we have not independently verified, the Lender’s Engineer HEREBY CERTIFIES for the benefit of DOE that, as of the date hereof, the Lender’s Engineer has reviewed the description of Eligible Project Costs attached as Appendix B to the Borrower’s Advance Date Certificate that have been incurred by the Requested Advance Date, and the proceeds of each requested Advance will be needed for such Eligible Project Costs.
(Signature page follows)
IN WITNESS WHEREOF, the undersigned has executed this Certificate as of the date first written above.
MPR ASSOCIATES, INC.
By: _________________________________
Name:
Title:
[
Signature Page to Lender’s Engineer Advance Date Certificate
]
Exhibit E
to Loan Guarantee Agreement
[FORM OF] INSURANCE ADVISOR GUARANTEE ISSUANCE DATE CERTIFICATE
(Delivered pursuant to
Section 4.1.14(c)
of the Loan Guarantee Agreement)
Date: _______________, 20__
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: Director, Portfolio Management
Re: DOE Loan Guarantee, LGPO Loan #1021
Ladies and Gentlemen:
This Insurance Advisor Certificate (the “
Certificate
”) is delivered to you pursuant to
Section 4.1.14(c)
of the Loan Guarantee Agreement, dated as of February 20, 2014 (the “
Loan Guarantee Agreement
”), by and between (i) Georgia Power Company, a Georgia corporation, as Borrower, and (ii) the U.S. Department of Energy, as Guarantor.
All capitalized terms used in this Certificate not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
This Certificate does not affirmatively or negatively amend, extend, or alter the coverage afforded by the insurance policies.
Pursuant to
Section 4.1.10
of the Loan Guarantee Agreement, the Insurance Advisor HEREBY CERTIFIES for the benefit of DOE, that as of the date hereof (a) all Required Insurance as set forth in
Schedule 6.3
(
Required Insurances
) to the Loan Guarantee Agreement (“
Schedule 6.3
”)) is in place, and in full force and effect without default and all premiums due thereon have been paid in full, and (b) attached hereto as
Schedule 1
are true, correct and complete copies of the insurance certificates or policies with respect to such Required Insurance, designating the Secured Parties as additional insureds to the extent required by Schedule 6.3.
We have reviewed the Borrower Certificate dated the date hereof (the “
Borrower Guarantee Issuance Date Certificate
”).
The forms of “Builder’s Risk” policy, “Cargo” policy and “OCIP” policies (as those terms are defined in Schedule 6.3) attached to the Borrower Guarantee Issuance Date Certificate are appropriate forms for purposes of Section I.a.1, I.a.2, and I.a.4 of Schedule 6.3.
(
Signature page follows
)
IN WITNESS WHEREOF, the undersigned has executed this Certificate as of the date first written above.
[ ]
By: _______________________________
Name:
Title:
Exhibit F
to Loan Guarantee Agreement
[FORM OF] ADVANCE NOTICE
(For Each Advance Date)
(Delivered pursuant to
Section 4.2.10
of the Loan Guarantee Agreement)
Date of this Notice: ___________, 20__
Requested Advance Date: ___________, 20__
To:
|
|
|
|
U.S. Department of Energy
Loan Programs Office, Loan Guarantee Program
1000 Independence Avenue, S.W.
Washington, D.C. 20585
Attention: Director, Portfolio Management
E-mail: lpo.portfolio@hq.doe.gov
Telephone: (202) 287-6738
Facsimile: (202) 287-6967
And a copy (which copy shall not constitute notice) to:
Chadbourne & Parke LLP
Attention: Peter Fitzgerald
E-mail: pfitzgerald@chadbourne.com
Telephone: (202) 974-5712
Facsimile: (202) 974-6912
|
|
With a copy to the same address (which copy shall not constitute notice):
Attention: Kenneth Cestari
E-mail: Kenneth.Cestari@hq.doe.gov
Telephone: (202) 287-5523
And a copy (which copy shall not constitute notice) to:
MPR Associates Inc., as Lender’s Engineer
320 King Street
Alexandria, VA 22314-3230
Attn: Thomas Lubnow
Re: DOE Loan Guarantee, LGPO Loan #1021
|
Ladies and Gentlemen:
This Advance Notice is delivered to you pursuant to the Loan Guarantee Agreement, dated as of February 20, 2014 (the “
Loan Guarantee Agreement
”), by and among (i) Georgia Power Company, a Georgia corporation, as Borrower, and (ii) the U.S. Department of Energy, as Guarantor.
All capitalized terms used in this Advance Notice not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
In connection with the satisfaction of the conditions precedent as of the Requested Advance Date listed above and those matters set forth under
Section 4.2
of the Loan Guarantee Agreement requiring the Borrower’s certification, the Borrower hereby notifies you that, as of the date hereof:
|
|
1.
|
This Advance Notice constitutes a request for an Advance of US$_______________ under the Loan Guarantee Agreement and the FFB Credit Facility Documents, such
|
amount being in accordance with the minimum amount and increments required by the FFB Credit Facility Documents;
|
|
2.
|
The Requested Advance Date for the Advance is the date noted as such on the first page of this Advance Notice;
|
3.
Schedule 1
attached hereto sets forth with respect to the requested Advance:
|
|
(a)
|
the aggregate amount of the Eligible Base Project Costs that have been paid by the Borrower prior to the Requested Advance Date;
|
|
|
(b)
|
the aggregate amount of the Project Costs (Eligible Project Costs and Ineligible Project Costs) that have been paid by the Borrower prior to the Requested Advance Date;
|
|
|
(c)
|
the aggregate amount of Advances made prior to the Requested Advance Date;
|
|
|
(d)
|
the maximum amount of the Advance that the Borrower may request;
|
|
|
(e)
|
the amount of the requested Advance; and
|
|
|
(f)
|
the payees to which the proceeds of the requested Advance is to be paid;
|
|
|
4.
|
Schedule 2
attached hereto includes a draft of the FFB Advance Request with respect to the requested Advance, together with any information necessary for FFB and DOE to process such request; and
|
|
|
5.
|
Schedule 3
attached hereto includes a Borrower Certificate delivered pursuant to
Section 4.2.6
of the Loan Guarantee Agreement regarding the matters required to be certified by the Borrower as set forth under
Section 4.2
of the Loan Guarantee Agreement in connection with the requested Advance.
|
(The remainder of this page is intentionally blank.)
IN WITNESS WHEREOF, the undersigned has duly executed this Advance Notice on behalf of the Borrower as of the date first written above.
GEORGIA POWER COMPANY,
a Georgia corporation,
as Borrower
By: ________________________
Name:
Title:
Attachments
Schedule 1 Advance Amounts
Schedule 2 FFB Advance Request
Schedule 3 Borrower Certificate[s]
Schedule 1 to Advance Notice
Advance Amounts
|
|
|
|
|
|
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
Advance Date/
Requested Advance Date
|
Aggregate amount of Eligible Base Project Costs paid by the Borrower prior to the Requested Advance Date
11
|
Aggregate amount of Project Costs (Eligible Project Costs and Ineligible Project Costs) paid by the Borrower prior to the Requested Advance Date
|
Aggregate amount of Advances made prior to the Requested Advance Date
|
Maximum amount of Advance (70% of the amount in column 2 less the amount in column 4)
|
Amount of Requested Advance
|
Payees
|
[Initial Advance Date]
|
|
|
|
|
|
|
[Second Advance Date]
|
|
|
|
|
|
|
[Third Advance Date]
|
|
|
|
|
|
|
[Etc.]
|
|
|
|
|
|
|
_______________________
11
Per LGA definition of “Eligible Base Project Costs” this amount may not exceed $4,946,298,739.
Schedule 2 to Advance Notice
FFB Advance Request
[
See attached
.]
ADVANCE REQUEST
***********************************************************************************
PLEASE REFER TO DEPARTMENT OF ENERGY (DOE) REGULATIONS AND INSTRUCTIONS FOR A DESCRIPTION OF (1) ANY OTHER FORMS AND MATERIALS THAT DOE REQUIRES TO BE SUBMITTED IN CONNECTION WITH EACH ADVANCE REQUEST, AND (2) THE TIME LIMITS FOR SUBMITTING THOSE FORMS AND MATERIALS AND THIS ADVANCE REQUEST TO DOE.
PLEASE DIRECT ALL
QUESTIONS
ON HOW TO COMPLETE THIS ADVANCE REQUEST FORM TO THE DOE CONTACT OFFICE INDICATED BELOW.
WHEN COMPLETED, PLEASE DELIVER THIS FORM (TOGETHER WITH ALL OTHER FORMS AND MATERIAL REQUIRED BY DOE)
TO
DOE AT THE ADDRESS OF THE DOE CONTACT OFFICE INDICATED BELOW:
United States Department of Energy
Loan Guarantee Program
1000 Independence Avenue, SW
Washington, DC 20585
Attention:
Director, Portfolio Management
Telephone No.
(202) 287-6738
Facsimile No.
(202) 287-5816
Email Address
lpo.portfolio@hq.doe.gov
***********************************************************************************
Chief Financial Officer
Federal Financing Bank
Reference is made to the following-described Future Advance Promissory Note (the “Note”) payable to the Federal Financing Bank (“FFB”), which is guaranteed by the Secretary of Energy (the “Secretary”):
NAME OF BORROWER
(the “Borrower”):
GEORGIA POWER COMPANY
12
FFB NOTE IDENTIFIER
: _____________________
13
The undersigned, as an authorized official of the Borrower, hereby requests FFB to make an advance of funds (“this Advance”) under, pursuant to, and in accordance with the applicable terms of the Note.
The undersigned further requests that this Advance be made as follows:
|
|
1.
|
REQUESTED ADVANCE AMOUNT
:
|
The principal amount of this Advance is requested to be
$____________________.
14
|
|
2.
|
REQUESTED ADVANCE DATE
:
|
This Advance is requested to be made on:
___________________.
15
Funds in an amount equal to the Requested Advance Amount are requested to be disbursed by electronic funds transfer to the following account(s):
______________________
12
Insert the corporate name of the Borrower. If the corporate name of the Borrower at the time of this Advance is different from the corporate name that appears on page 1 of the Note, add “(formerly _________________)”, and insert in this second blank the corporate name of the Borrower as it appears on page 1 of the Note.
13
Insert the “Note Identifier” that FFB assigned to the Note (as provided in the Note Purchase Agreement).
14
Insert the particular amount of funds that the Borrower requests to be advanced.
15
Insert the particular calendar date that the Borrower requests to be date on which this Advance is to be made, which must be a Business Day.
(IF MORE THAN ONE PAYEE IS TO BE PAID FROM
THE REQUESTED ADVANCE AMOUNT,
PROVIDE THE INFORMATION BELOW FOR EACH PAYEE).
$____________________
A.
Correspondent bank (if any) for payee’s bank
:
|
|
|
Name of financial institution
|
|
|
|
Address of financial institution
|
|
|
|
ABA number of financial institution
|
|
B.
Payee’s bank and account
:
|
|
|
Name of financial institution
|
|
|
|
Address of financial institution
|
|
|
|
ABA number of financial institution
|
|
|
|
Account name
|
|
|
|
Account number
|
|
|
|
Taxpayer ID number
|
|
4. MATURITY DATE ______________
16
The undersigned certifies that the undersigned has been authorized to execute this Advance Request on behalf of the Borrower and to deliver it to Secretary for review and approval before being forwarded to FFB, and that this authority is valid and in full force and effect on the date hereof.
____________________
16
Insert the particular calendar date that the Borrower requests to be date on which this Advance is to mature, which date must meet the criteria for Maturity Dates specified in section 7.3.1(a)(5) of the Note Purchase Agreement referred to in the Note.
IN WITNESS WHEREOF, the undersigned has executed this Advance Request and caused it to be delivered to the Secretary for review and approval before being forwarded to FFB.
|
|
|
|
|
GEORGIA POWER COMPANY
|
|
|
|
|
Signature:
|
|
|
|
|
|
Print Name:
|
|
|
|
|
|
Title:
|
|
|
|
|
|
Date:
|
|
ADVANCE REQUEST APPROVAL NOTICE
Notice is hereby given to FFB that the preceding Advance Request made by the Borrower identified therein has been approved by or on behalf of the Secretary of Energy for purposes of the Note identified therein.
|
|
|
|
|
|
|
SECRETARY OF ENERGY
acting through his or her
duly authorized designate
|
FOR ACCOUNTING
|
|
|
|
|
|
Signature:
|
|
USE ONLY:
|
|
|
|
|
|
Print Name:
|
|
DOE Budget
|
|
|
|
|
|
Title:
|
|
Account
|
|
|
|
|
|
Date:
|
|
Schedule 3 to Advance Notice
Borrower Certificate[s]
[
See attached.
]
Exhibit G
to Loan Guarantee Agreement
DAVIS-BACON ACT REQUIRED PROVISIONS
SECTION (a) MINIMUM WAGES, ETC.
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics.
Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (a)(1)(iv) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in Sec. 5.5(a)(4) [paragraph (a)(4) below]. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer’s payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph (a)(1)(ii) of this section) and the Davis-Bacon poster (WH-1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
(ii)(A) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met:
(1) The work to be performed by the classification requested is not performed by a classification in the wage determination; and
(2) The classification is utilized in the area by the construction industry; and
(3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(ii)(B) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
(ii)(C) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
(ii)(D) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs (a)(1)(ii) (B) or (C) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
(iii) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.
(iv) If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
(2) Withholding.
The Department of Energy (“DOE”) shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be
withheld from the contractor under this contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), all or part of the wages required by the contract, DOE may, after written notice to the contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
(3) Payrolls and basic records.
(i) Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work (or under the United States Housing Act of 1937, or under the Housing Act of 1949, in the construction or development of the project). Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.
(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the DOE) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to DOE. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits
of the employee’s social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to DOE if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit them to the applicant, sponsor, or owner, as the case may be, for transmission to DOE, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the sponsoring government agency (or the applicant, sponsor, or owner).
(ii)(B) Each payroll submitted shall be accompanied by a ``Statement of Compliance,’’ signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following:
(1) That the payroll for the payroll period contains the information required to be provided under Sec. 5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under Sec. 5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete;
(2) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3;
(3) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.
(ii)(C) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the ``Statement of Compliance’’ required by paragraph (a)(3)(ii)(B) of this section.
(ii)(D) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code.
(iii) The contractor or subcontractor shall make the records required under paragraph (a)(3)(i) of this section available for inspection, copying, or transcription by authorized representatives of DOE or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them
available, the Federal agency may, after written notice to the contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.
(4) Apprentices and trainees
(i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman’s hourly rate) specified in the contractor’s or subcontractor’s registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice’s level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(ii) Trainees. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed
pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee’s level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(iii) Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.
(5) Compliance with Copeland Act requirements.
The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.
(6) Subcontracts.
The contractor or subcontractor shall insert in any subcontracts the clauses contained in 29 CFR 5.5(a)(1) through (10) and such other clauses as DOE may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5.
(7) Contract termination: debarment.
A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the
contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.
(8) Compliance with Davis-Bacon and Related Acts requirements.
All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.
(9) Disputes concerning labor standards.
Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives.
(10) Certification of eligibility.
(i) By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor’s firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1).
(ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1).
(iii) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001.
Exhibit H
to Loan Guarantee Agreement
FORM OF LIEN WAIVERS AND RELEASES
INTERIM PAYMENT REPRESENTATIONS AND LIEN WAIVER AND RELEASE
By executing and submitting its interim payment application and the lien waiver below, in consideration for the payment described in the lien waiver below, and for the purpose of inducing Owners to make this interim payment, [NAME OF CONTRACTOR], for itself, its Vendors
17
and Subcontractors, and the Personnel of any of them, does hereby certify and warrant as follows effective upon receipt by [NAME OF CONTRACTOR] of payment in the amount of
$xxxxx:
1.
All Parties Paid
. [NAME OF CONTRACTOR] has been paid amounts owed pursuant to the terms of the Engineering, Procurement and Construction Agreement between Owners and Westinghouse and Stone & Webster, Inc. (as Contractor) for Units 3 and 4 at the Vogtle Electric Generating Plant in Georgia (the “Facility”), dated as of April 8, 2008 and as subsequently amended, (the “EPC Agreement”) for the materials, equipment, services and labor furnished to or for the benefit of the Facility (the “Work”) through the effective date of the preceding interim lien waiver and for the portion of the Work covered by the invoice dated
_______
, except for (a) retained funds withheld by Owners pursuant to Article 8 of the EPC Agreement, (b) disputed amounts specifically identified on the attached Exhibit B, or (c) amounts claimed for pending changes specifically identified on the attached Exhibit B, and that the parties supplying labor or materials under contract to [NAME OF CONTRACTOR] in connection with the Work and the Facility have been paid, or will be paid promptly from the proceeds of this progress payment pursuant to the terms of the respective agreements with [NAME OF CONTRACTOR] (except to the extent of payments that [NAME OF CONTRACTOR] has the right (or in good faith believes it has the right) to withhold or are in dispute under such agreements), for labor, services, equipment or materials furnished in relation to the Work and the Facility.
2.
Waiver of Lien Claims
. [NAME OF CONTRACTOR] waives any and all liens and releases and forever discharges Owners, any construction lender, and their respective directors, officers, principals, partners, employees, agents, subsidiaries, parent and related firms, successors and assigns from any and all actions, causes of action, liens, bond rights, stop notices, debts, dues, accounts, covenants, agreements, judgments, claims and demands of whatsoever nature or character for nonpayment for the Work for which payment is owed and is being made to the effective date of the interim lien waiver stated below, with the exception of (a) retained funds withheld by Owners pursuant to Article 8 of the EPC Agreement, (b) disputed amounts specifically identified on the attached Exhibit B, and (c) amounts claimed for pending changes specifically identified on the attached Exhibit B.
___________________
17
Unless otherwise provided herein, all capitalized terms used herein shall have the meanings assigned to them in the EPC Agreement.
3.
Representations
. [NAME OF CONTRACTOR] represents that (a) insurance coverages required by the EPC Agreement to be maintained by [NAME OF CONTRACTOR] remain in effect and unchanged; (b) [NAME OF CONTRACTOR] has not received notice nor does it have actual knowledge of any event or circumstance that would void or diminish the warranty provided by [NAME OF CONTRACTOR] under the EPC Agreement or by a Vendor or Subcontractor under a Subcontract; and (c) [NAME OF CONTRACTOR] has secured from its Major Vendors and Major Subcontractors with Subcontracts in excess of One Million Dollars ($1,000,000) written waivers of lien rights, on forms that conform to the State of Georgia’s statutory requirements, with respect to services, labor, materials or equipment supplied to or for the benefit of the Facility through the effective date of the preceding interim lien waiver from such Vendors and Subcontractors for which proper and acceptable invoices through the effective date of the preceding interim lien waiver have been received and processed. [NAME OF CONTRACTOR] will make available to Owners copies of such waivers of lien rights for Owners’ review.
4.
Authorization
. [NAME OF CONTRACTOR] warrants that it is the sole owner of the lien claims released herein, that it has not sold, assigned or conveyed such lien claims to any other party, and that the individual whose signature appears below has personal knowledge of these matters and is fully authorized and qualified to make these representations on behalf of [NAME OF CONTRACTOR].
5.
Scope of Lien Release
. The representations and lien release contained herein are independent covenants and operate, and are effective with respect to, labor, services, materials or equipment provided by or through [NAME OF CONTRACTOR], under any agreement, whether oral or written, whether extra or additional to any such agreement, and with respect to the Facility, the Property, or the EPC Agreement.
INTERIM LIEN WAIVER AND RELEASE UPON PAYMENT
STATE OF GEORGIA
COUNTY OF BURKE
THE UNDERSIGNED [NAME OF CONTRACTOR] HAS BEEN EMPLOYED BY GEORGIA POWERCOMPANY, ACTING FOR ITSELF AND AS AGENT FOR OGLETHORPE POWER CORPORATION; MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA; AND THE CITY OF DALTON, GEORGIA, ACTING BY AND THROUGH ITS BOARD OF WATER, LIGHT AND SINKING FUND COMMISSIONERS (“OWNERS”) TO FURNISH MATERIALS, EQUIPMENT, SERVICES, AND LABOR (THE “WORK”) FOR CONSTRUCTION OF IMPORVEMENTS KNOWN AS UNITS 3 AND 4 OF THE VOGTLE ELECTRIC GENERATIONG PLANT (THE “FACILITY”) WHICH IS LOCATED IN CITY OF WAYNESBORO, COUNTY OF BURKE, STATE OF GEORGIA, AND IS OWNED BY GEORGIA POWER COMPANY, OGLETHORPE POWER CORPORATION, MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA, AND THE BOARD OF WATER, LIGHT AND SINKING FUND COMMISSION OF THE CITY OF DALTON,
GEORGIA DBA/DALTON UTILITIES AND MORE PARTICULARLY DESCRIBED AS FOLLOWS (THE “PROPERTY”):
THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE IS MORE FULLY DESCRIBED IN EXHIBIT A.
UPON RECEIPT OF THE SUM OF
$XXXXX
[NAME OF CONTRACTOR] WAIVES AND RELEASES ANY LIENS OR CLAIMS OF LIENS IT HAS UPON THE FOREGOING DESCRIBED PROPERTY OR ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND THROUGH THE DATE OF
_______,
AND EXCEPTING THOSE RIGHTS AND LIENS THAT [NAME OF CONTRACTOR] MIGHT HAVE IN ANY RETAINED AMOUNTS, DISPUTED AMOUNTS SPECIFICALLY IDENTIFIED ON THE ATTACHED EXHIBIT B, AND AMOUNTS CLAIMED FOR PENDING CHANGES SPECIFICALLY IDENTIFIED ON THE ATTACHED EXHIBIT B, ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY [NAME OF CONTRACTOR] TO OR ON ACCOUNT OF SAID OWNERS FOR SAID FACILITY AND PROPERTY.
GIVEN UNDER HAND AND SEAL THIS _________ DAY OF _________________,
20XX.
[NAME OF CONTRACTOR]
BY: ____________________________________________________ (SEAL)
PRINTED NAME:
________________________
TITLE: ____________________
WITNESS: _______________________________________________
PRINTED NAME: _________________________________________
__________________________________________________________
(ADDRESS)
NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE BEEN PAID IN FULL THE AMOUNT STATED ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED SUCH PAYMENT, 60 DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE EITHER AN AFFIDAVIT OF NONPAYMENT OR A CLAIM OF LIEN PRIOR TO THE EXPIRATION OF SUCH 60 DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FACE OF THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER O.C.G.A. SECTION 44-14-366.
18
_________________________
18
This notice language may be moved to the face of the interim lien waiver.
FINAL PAYMENT REPRESENTATIONS AND LIEN WAIVER
By executing and submitting its payment application and the lien waiver below, in consideration for and effective upon receipt of the final payment described in the lien waiver below, and for the purpose of inducing Owners to make final payment, the Contractor, for itself, its Subcontractors and the Personnel of any of them does hereby represent and warrant as follows:
1.
All Parties Paid
. It has been paid in full amounts owed pursuant to the terms of the Engineering, Procurement and Construction Agreement between Owners and Contractor for Units 3 & 4 at the Vogtle Site in Georgia, dated as of April 8, 2008 (the “
Agreement
”) for the materials or labor furnished to the Facility except for disputed amounts specifically identified and detailed below, and that the parties supplying labor or materials under contract to the Contractor in connection with the Facility have been paid in full for all labor, services, equipment or materials ordered or supplied pursuant to the terms of agreements with the Contractor (except to the extent of payments that Contractor has the right (or in good faith believes it has the right) to withhold or are in dispute under such agreements).
Disputed Claim Amounts Specifically Excepted from the Representation and Lien Waiver:
________________________________________________________________________
________________________________________________________________________
2.
Waiver Of Lien Claims
. It waives and releases any lien claims for non-payment of Work performed, and for which payment is owed, against the Owners, any construction lender, and their respective directors, officers, principals, partners, employees, agents, subsidiaries, parent and related firms, successors and assigns, arising out of or pertaining in any manner to the Agreement, the property described below, or the Facility except to the extent disputed amounts are detailed and specifically identified above.
3.
Representations
. Contractor represents that Contractor has not received notice nor does it have actual knowledge of any event or circumstance that would void the warranty provided by Contractor under the Agreement or by a Vendor or Subcontractor under a Subcontract and that Contractor has secured from its Major Vendors and Major Subcontractors with Subcontracts in excess of One Million Dollars ($1,000,000) waivers of lien rights with respect to services, labor, materials or equipment supplied to or for the benefit of the Facility.
4.
Authorization
. It warrants that it is the sole owner of the lien claims released herein, that it has not sold, assigned or conveyed such lien claims to any other party, and that the individual whose signature appears below has personal knowledge of these matters and is fully authorized and qualified to make these representations on behalf of the Contractor.
5.
Scope Of Lien Release
. The representations and lien release contained herein are independent covenants and operate, and are effective with respect to, labor, services, materials or equipment provided by or through the Contractor, under any agreement, whether oral or written, whether extra or additional to any such agreement, and with respect to the Facility, the Property, or the Agreement.
LIEN WAIVER AND LIEN RELEASE UPON FINAL PAYMENT
STATE OF GEORGIA
COUNTY OF ______
THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLAYED BY __________ [NAME OF CONTRACTOR] TO FURNISH _________ [DESCRIBE MATERIALS AND/OR LABOR] FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS ________ [TITLE OF THE PROJECT OR BUILDING] WHICH IS LOCATED IN THE CITY OF ______, COUNTY OF ______, AND IS OWNED BY _______ [NAME OF OWNER] AND MORE PARTICUALARLY DESCRIBED AS FOLLOWS: __________________________________________________ [DESCRIBE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK NAND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.]
UPON RECEIPT OF THE SUM OF $_______, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS IT HAS UPO9N THE FOREGOING, DESCRIBED PROPERTY AND ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY THE UNDERSIGNED TO OR ON ACCOUNT OF SAID CONTRACTOR FOR SAID PROPERTY.
19
GIVEN UNDER HAND AND SEAL THIS _________ DAY OF _________________,
20XX.
_______________________
BY: ______________________________________ (SEAL)
PRINTED NAME:
_________________________
TITLE: ___________________________________
WITNESS: _______________________________________________
PRINTED NAME: _________________________________________
_________________________________________________________
(ADDRESS)
__________________________
19
The EPC Contractor may make reservations to this form of final lien waiver for disputed amounts.
NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE BEEN PAID IN FULL THE AMOUNT STATED ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED SUCH PAYMENT, 60 DAYS AFTER THE DATED STATED ABOV E UNLESS YOU FILE EITHER AN AFFIDAVIT OF NONPAYMENT OR A CLAIM OF LIEN PRIOR TO THE EXPIRATION OF SUCH 60 DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FACE OFTHE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A VAIVER AND RELEASE UNDER O.C.G.A. SECTION 44-14-366.
20
__________________________
20
This notice may be moved to the face on the final lien waiver.
Exhibit I
to Loan Guarantee Agreement
FORM OF CONTRACTOR AFFIDAVIT
(To Be Signed Contemporaneously With The Final Payment Or With The Subsequent Resolution Of Dispute Claim Amounts)
CONTRACTOR AFFIDAVIT WAIVING LIEN RIGHTS
2
1
Personally appeared before me, the undersigned officer duly authorized to administer oaths, (name of the Affiant) , who after being duly sworn, deposes and states as follows:
1. I am over 18 years of age and otherwise competent to make this Affidavit. The facts set forth herein are based upon my personal knowledge. I am a duly authorized representative of the ____________ (“
Contractor
”) who, was in charge of the property improvement described as follows:
(describe the construction project) ____________________________________________ ______________________________________________________________________________
The improvement describe above was made with respect to the property owned by ____________(“
Owners
”), and that property is more fully identified as follows:
(describe the improved property by, at least, reference to the street address, city and county. It is recommended that the property’s legal description be referenced here and attached as an exhibit to this affidavit.) _______________________________________________________
2. The construction improvement referenced herein now has been completed, and the agreed price or reasonable value of the labor, services, or materials furnished in connection with this improvement invoiced by Contractor to Owners have been fully paid.
3. I acknowledge that Contractor has received payment in full for the amounts due pursuant to the terms of the Engineering, Procurement and Construction Agreement between Owners and Contractor for Units 3 & 4 at the Vogtle Site in Georgia, dated as of April 8, 2008 (the “
Agreement
”) in connection with the materials, equipment, services and labor furnished by Contractor for the improvement of the property described herein, and hereby releases all rights to any lien on that improvement or the property so improved.
4. This Affidavit is given in compliance with the requirements of O.C.G.A. § 44-14-361.2, and as part of a transaction involving final disbursement of the Contract Price by the Owners to this Contractor.
________________
21
The EPC Contractor may make reservations to the form of affidavit for disputed amounts.
5. On behalf of Contractor, I further represent that to the best of my knowledge, as of the date of this Affidavit, there is no valid preliminary notice or claim of lien filed at the [______________] registry of deeds located at [_______________________] filed by Contractor or one of its Subcontractors or Vendors arising out of this Project Work as a result of nonpayment of amounts due from Owners which affects the improved property described herein and which has not been previously cancelled, dissolved, or expired.
__________________________________________
(Name of Affiant)
ON BEHALF OF CONTRACTOR
Sworn to and subscribed before me
this ______ day of ________,
20____.
____________________________________
Notary Public
My Commission Expires: ________
Exhibit J
to Loan Guarantee Agreement
DOL LETTER
[
See attached
.]
Exhibit J
Exhibit K
to Loan Guarantee Agreement
[FORM OF ADDITIONAL PROJECT DOCUMENT CONSENT TO ASSIGNMENT]
CONSENT TO ASSIGNMENT
This CONSENT TO ASSIGNMENT (this “
Agreement
”), dated as of [_____ __], 20[__], by and among GEORGIA POWER COMPANY, [___________] (“
Contracting Party
”), and [PNC BANK, NATIONAL ASSOCIATION, doing business as Midland Loan Services, a division of PNC Bank, National Association,] as collateral agent for the Secured Parties (as defined below) (together with its successors in such capacity, the “
Collateral Agent
”).
RECITALS
1. WHEREAS, the Borrower, together with each of the other Owners (as defined herein), intends to expand the facilities at the existing nuclear power generating facility commonly known as the Alvin W. Vogtle Electric Generating Plant located in Burke County, Georgia, near Waynesboro, Georgia, on the west bank of the Savannah River, by developing, constructing, owning, operating and maintaining two additional nuclear generating units, consisting of two (2) Westinghouse AP1000 nuclear reactors, each with a nominally rated generating capacity of approximately 1,100 megawatts, natural draft cooling towers, intake and discharge structures, associated transmission facilities, fuel and ancillary structures supporting the power generation process (together, the “
Project
”);
2. WHEREAS, (a) the Borrower and the Contracting Party have entered into that certain [DESCRIBE ASSIGNED AGREEMENT], pursuant to which the Contracting Party have agreed to [DESCRIBE OBLIGATIONS UNDER ASSIGNED AGREEMENT] (as amended, restated, modified or otherwise supplemented from time to time, the “
Assigned Agreement
”);
3. WHEREAS, as of [__________] the Borrower entered into a Note Purchase Agreement with the Federal Financing Bank, a body corporate and instrumentality of the United States of America (“
FFB
”), and the U.S. DEPARTMENT OF ENERGY, acting by and through the Secretary of Energy (or appropriate authorized representative thereof) (“
DOE
”) (the “
Note Purchase Agreement
”), pursuant to which a promissory note will be issued by the Borrower and purchased by FFB (the “
FFB Promissory Note
”);
4. WHEREAS, pursuant to that certain Secretary’s Guarantee, dated as of February 20, 2014 (the “
DOE Guarantee
”), by DOE (in such capacity, the “
Guarantor
”), to and for the benefit of FFB, the Guarantor is guaranteeing the obligations of the Borrower under the FFB Promissory Note (the FFB Promissory Note, together with the Note Purchase Agreement, DOE Guarantee, and certain other documents and instruments executed in connection therewith, the “
FFB Credit Facility Documents
”);
5. WHEREAS, pursuant to that certain Loan Guarantee Agreement, dated as of February 20, 2014, by and between the Borrower and DOE (the “
Loan Guarantee Agreement
”), the Borrower agreed to reimburse the Guarantor for any payments made by the Guarantor to FFB under the DOE Guarantee;
6. WHEREAS, as security for the Borrower’s reimbursement and other obligations under the Loan Guarantee Agreement, the Borrower is concurrently herewith making a collateral assignment of its right, title and interest in, to and under, and granted a security interest in such right, title and interest in, to and under, the Assigned Agreement (the “
Security Interest
”) to the Collateral Agent for the benefit of the Secured Parties pursuant to a Deed to Secure Debt and Security Agreement, dated as of February 20, 2014 (the “
Security Agreement
”) by the Borrower to the Collateral Agent;
7. WHEREAS, pursuant to
Section 6.8(d)
of the Loan Guarantee Agreement, the Borrower is required to [use reasonable best efforts to] promptly deliver to DOE this Agreement upon execution of the Assignment Agreement;
NOW, THEREFORE, in consideration of the foregoing, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, and intending to be legally bound, the Contracting Party hereby agrees as follows:
SECTION 1:
Definitions and Interpretation
.
1.01
Definitions
.
For purposes of this Agreement, the following terms shall have the following meanings:
Agreement
. “Agreement” shall have the meaning set forth in the preamble.
Assigned Agreement
. “Assigned Agreement” shall have the meaning set forth in recital 2.
Borrower
. “Borrower” shall have the meaning set forth in the preamble.
Business Day.
“Business Day” shall mean any day other than a Saturday, Sunday or any other day on which either FFB or the Federal Reserve Bank of New York are not open for business.
Collateral Agent
. “Collateral Agent” shall have the meaning set forth in the preamble.
Contracting Party
. “Contracting Party” shall have the meaning set forth in the preamble.
Dalton Utilities.
“Dalton Utilities” shall mean the City of Dalton, Georgia, acting by and through its Board of Water, Light and Sinking Fund Commissioners, d/b/a Dalton Utilities, which, as of the date of this Agreement, owns a 1.6% undivided ownership interest in the Project.
Debt Termination Date
. “Debt Termination Date” shall mean the first day on which the indebtedness evidenced by the FFB Promissory Note has been indefeasibly paid in cash in full (other than unasserted contingent indemnity obligations and other obligations that expressly survive termination of the applicable documents), all commitments of the FFB to the Borrower under the Note Purchase Agreement and the other FFB Credit Facility Documents have been terminated, and the Borrower has paid in cash all sums due from the Borrower under the Loan Guarantee Agreement, the FFB Credit Facility Documents and the other Loan Documents (other than unasserted contingent indemnity obligations and other obligations that expressly survive termination of the applicable documents).
DOE.
“DOE” shall have the meaning set forth in recital 3.
DOE Guaranteed Loans
. “DOE Guaranteed Loans” means the indebtedness evidenced by the FFB Promissory Note.
DOE Guarantee.
“DOE Guarantee” shall have the meaning set forth in recital 4.
FFB.
“FFB” shall have the meaning set forth in recital 3.
FFB Credit Facility Documents.
“FFB Credit Facility Documents shall have the meaning set forth in recital 4.
Guarantor.
“Guarantor” shall have the meaning set forth in recital 4.
Loan Documents.
“Loan Documents” shall have the meaning set forth in the Loan Guarantee Agreement.
Loan Guarantee Agreement
. “Loan Guarantee Agreement” shall have the meaning set forth in recital 5.
MEAG.
["MEAG" shall mean the Municipal Electric Authority of Georgia, a public body corporate and politic and an instrumentality of the State of Georgia, which, as of the date of this Agreement, owns a 22.7% undivided ownership interest in the Project.]
22
_____________________
22
To be revised to reference each of the three MEAG SPVs once MEAG's undivided interest in the Project transfers to the SPVs.
Note Purchase Agreement.
“Note Purchase Agreement” shall have the meaning set forth in recital 3.
OPC.
“OPC” shall mean Oglethorpe Power Corporation, an electric membership corporation organized and existing under the laws of the State of Georgia, which, as of the date of this Agreement, owns a 30.0% undivided ownership interest in the Project.
Owners.
“Owners” shall mean the Borrower, MEAG, OPC and Dalton Utilities.
Person
. “Person” shall mean any individual, corporation, company, partnership, firm, limited liability company, voluntary association, joint venture, trust, unincorporated organization, governmental authority, committee, department, authority or any other entity, incorporated or unincorporated, whether having distinct legal personality or not.
Project
. “Project” shall have the meaning set forth in recital 1.
Secured Parties.
“Secured Parties” shall mean DOE and the Collateral Agent.
Security Agreement
. “Security Agreement” shall have the meaning set forth in recital 6.
Security Interest
. “Security Interest” shall have the meaning set forth in recital 6.
Termination Date
. “Termination Date” shall have the meaning set forth in Section 4.09.
1.02
Interpretation
.
Except as otherwise expressly provided, the following rules of interpretation shall apply to this Agreement:
(a) the definitions of terms herein shall apply equally to the singular and plural forms of the terms defined;
(b) whenever the context may require, any pronoun shall include the corresponding masculine, feminine and neuter forms;
(c) the words “include”, “includes” and “including” shall be deemed to be followed by the phrase “without limitation”;
(d) the word “will” shall be construed to have the same meaning and effect as the word “shall”;
(e) unless the context requires otherwise, any definition of or reference to any agreement, instrument or other document herein shall be construed as referring to such agreement, instrument or other document as from time to time amended, supplemented or otherwise modified (subject to any restrictions on such amendments, supplements or modifications set forth herein or therein) and shall include any appendices, schedules, exhibits, clarification letters, side letters and disclosure letters executed in connection therewith;
(f) any reference herein to any Person shall be construed to include such Person’s successors and permitted assigns;
(g) any reference to any applicable law shall include all references to such applicable law as amended from time to time;
(h) the words “herein”, “hereof” and “hereunder”, and words of similar import, shall be construed to refer to this Agreement in its entirety and not to any particular provision hereof; and
(i) all references herein to Articles, Sections and Schedules shall be construed to refer to Articles and Sections of, and Schedules to, this Agreement.
SECTION 2:
Consent to Assignment; General Undertakings
.
2.01
Acknowledgement of Financing Arrangements
.
The Contracting Party acknowledges, on the basis of the Borrower’s representation, that (i) pursuant to the DOE Guarantee, the Guarantor has guaranteed the obligations of the Borrower under the FFB Promissory Note and pursuant to the FFB Credit Facility Documents, the DOE Guaranteed Loans are being made available to the Borrower for the purpose of financing a portion of the Borrower’s undivided ownership interest in the Project; and (ii) pursuant to the Security Agreement, the Borrower has granted the Security Interest to the Collateral Agent as first priority security for the payment of the obligations of the Borrower arising under or in connection with the Loan Documents.
2.02
Consent to Security
.
|
|
(a)
|
[In accordance with [____________] of the Assigned Agreement, the Contracting Party consents to the granting of the Security Interest to the Collateral Agent pursuant to the Security Agreement].
23
|
|
|
(b)
|
The Contracting Party agrees that the grant of the Security Interest to the Collateral Agent by the Borrower pursuant to the Security Agreement does not relieve the Contracting Party of its obligations to continue performance of the Assigned Agreement in accordance with its terms.
|
SECTION 3:
Representations and Warranties
.
The Contracting Party hereby represents and warrants to the Secured Parties as follows:
3.01
Due Organization
.
The Contracting Party is duly organized, validly existing and in good standing under the laws of the State of [_______]. The Contracting Party has the
__________________
23
Subject to revision based on review of the Assigned Agreement.
requisite power and authority to own and operate its business and properties and to carry on its business as such business is now being conducted and is duly qualified to do business in the State of Georgia and in any other jurisdiction in which the transaction of its business makes such qualification necessary.
3.02
Authorization
.
The Contracting Party has full power and authority to execute and deliver this Agreement and to perform its obligations hereunder, and the execution, delivery and performance of this Agreement by the Contracting Party has been duly authorized by the necessary action on the part of the Contracting Party; this Agreement has been duly executed and delivered by the Contracting Party and is the valid and binding obligation of the Contracting Party enforceable in accordance with its terms, except as such enforceability may be limited by applicable bankruptcy, insolvency, moratorium or other laws affecting the rights of creditors generally and by general principles of equity.
3.03
Non-Contravention
.
The execution, delivery and performance of this Agreement by the Contracting Party and the consummation of the transactions contemplated hereby do not and will not contravene the organizational documents of the Contracting Party and do not and will not conflict with or result in a breach of or default under any indenture, mortgage, lease, agreement, instrument, judgment, decree, order or ruling to which the Contracting Party is a party or by which it or any of its properties is bound or affected.
3.04
Approvals
.
There are no approvals or consents of governmental authorities or other Persons not yet obtained, the absence of which would materially impair such Contracting Party’s ability to execute, deliver and perform its obligations under this Agreement.
3.05
No Previous Assignments
.
The Contracting Party (a) has received no written notice of any previous assignment by the Borrower of all or any part of its rights under the Assigned Agreement and (b) has not consented to any previous assignment by the Borrower of all or any part of its rights under the Assigned Agreement.
SECTION 4:
Miscellaneous Provisions.
4.01
Governing Law; Submission to Jurisdiction
.
(a) The validity, construction, and performance of this Agreement shall be governed by and interpreted in accordance with the laws of the State of [_______].
(b) The parties hereto agree to the non-exclusive jurisdiction of the United States District Court for the District of Columbia for any legal proceedings that may be brought by a party hereto arising out of or in connection with this Agreement
or for recognition or enforcement of any judgment. Each party hereto accepts, generally and unconditionally, the jurisdiction of the aforesaid court for legal proceedings arising out of or in connection with this Agreement. Each party hereto hereby waives any right to stay or dismiss any action or proceeding under or in connection with this Agreement brought before the foregoing court on the basis of forum non-conveniens or improper venue. For the avoidance of doubt, the parties hereto do not, by this Section 4.01, waive any first-to-file challenges to venue.
4.02
Waiver of Jury Trial
.
EACH PARTY HEREBY IRREVOCABLY WAIVES ALL RIGHT TO TRIAL BY JURY IN ANY ACTION, PROCEEDING OR COUNTERCLAIM (WHETHER BASED ON CONTRACT, TORT OR OTHERWISE) ARISING OUT OF OR RELATING TO THIS AGREEMENT.
4.03
Counterparts
.
This Agreement may be executed in any number of counterparts and by different parties hereto in separate counterparts, each of which when so executed and delivered shall be deemed an original, but all such counterparts together shall constitute but one and the same instrument; signature pages may be detached from multiple separate counterparts and attached to a single counterpart so that all signature pages are physically attached to the same document. Delivery of an executed signature page of this Agreement by facsimile transmission, electronic transmission, or portable document format shall be effective as delivery of a manually executed counterpart of the Agreement by such party.
4.04
Headings Descriptive
.
Section and subsection headings in this Agreement are included herein for convenience of reference only and shall not affect the construction of or interpretation of and shall not constitute a part of this Agreement for any other purpose or be given any substantive effect.
4.05
Severability
.
Any provision of this Agreement that is prohibited or unenforceable in any jurisdiction shall not invalidate the remaining provisions hereof, and any such prohibition or unenforceability in any jurisdiction shall not invalidate or render unenforceable such provision in any other jurisdiction.
4.06
Amendments, Waivers.
No amendment, modification or waiver of any of the provisions of this Agreement will be effective unless in writing (including a writing evidenced by a facsimile transmission) and signed by each of the parties hereto, and any waiver shall be a waiver only with respect to the specific instance involved and shall in no way impair the rights of the parties making such waiver or the obligations of the other parties to such party in any other respect or at any other time.
4.07
Remedies Cumulative
.
The rights and remedies of the parties under this Agreement are cumulative, not alternative, and are not exclusive of any rights or remedies provided by law.
4.08
Termination
.
This Agreement shall terminate upon the earlier of (the “
Termination Date
”): (i) the first date on which the Assigned Agreement has expired or been validly terminated in accordance with its terms, and (ii) receipt by the other parties hereto of notice from the Collateral Agent that the Debt Termination Date has occurred (which notice shall only be given after DOE has notified the Collateral Agent of such occurrence). On the Termination Date, this Agreement shall be deemed terminated and each of the parties shall be released, relieved and discharged from any obligation or liability hereunder other than any obligations or liabilities accruing on or prior to the Termination Date.
4.09
Successors and Assigns
.
(a) This Agreement may be assigned by the Collateral Agent with the prior consent of the Contracting Party, which will not be unreasonably withheld, provided that no such consent shall be required in connection with any assignment of this Agreement by the Collateral Agent to any successor Collateral Agent. Upon an assignment of this Agreement by the Collateral Agent, such Collateral Agent will be released from its obligations hereunder, other than any obligations owed to any Party under this Agreement by the Collateral Agent prior to its assignment of this Agreement.
(b) This Agreement may not be assigned by the Borrower without the prior written consent of the Collateral Agent.
(c) This Agreement may be assigned by the Contracting Party only in connection with an assignment of the Assigned Agreement (without limiting any rights of the Borrower under the Assigned Agreement relating to assignment by the Contracting Party). The Contracting Party agrees that any assignment of the Assigned Agreement will not be effected without concurrently assigning this Agreement to the assignee of the Assigned Agreement and such assignee agreeing to be bound by the terms hereof.
4.10
Further Assurances
.
The parties hereto agree that each of them shall act in a commercially reasonable manner to take such further action and execute and deliver such additional documents and instruments (in recordable form, if requested) as the Collateral Agent may reasonably request to effectuate the purposes of this Agreement, including to perfect in the State of Georgia and elsewhere a Security Interest in favor of the Collateral Agent over the Assigned Agreement.
4.11
Entire Agreement
.
This Agreement constitutes the entire agreement and understanding of the parties with respect to its subject matter and supersedes all oral communication and prior writings with respect thereto.
4.12
Conflict of Documents
.
In the event of any ambiguity, conflict or inconsistency between the provisions of this Agreement and the Assigned Agreement with regard to the purposes of this Agreement, the provisions of this Agreement shall prevail and govern with respect to the purposes of this Agreement to the extent of such ambiguity, conflict or inconsistency.
4.13
No Impairment
. Each of the Borrower, acting for itself and as agent for the Owners, and the Contracting Party, hereby agrees that none of this Agreement, the acknowledgement by the Contractor Party of the financing arrangements as reflected in the Loan Documents, or the consent by the Contracting Party to the granting of the Security Interest pursuant to the Security Agreement, shall in any manner impair, invalidate or excuse the rights or obligations of the Borrower, acting for itself and as agent for the Owners, or the Contracting Party, under the Assigned Agreement in accordance with its terms.
4.14
Relationship of Parties
.
This Agreement is not intended to and does not create or establish between the parties any relationship as partners, joint venturers, employer and employee, master and servant, or of principal and agent
.
4.15
Notices
.
All notices, communications, and approvals required or permitted to be given hereunder shall be in writing and shall be valid and sufficient if (a) delivered in person or dispatched by certified mail (return receipt requested), postage prepaid, in any post office in the United States or by any national overnight express mail services (return receipt requested) to the Person(s) and at the address(es) identified below for such Person(s); (b) delivered by facsimile directed to the Person(s) as listed below provided that the sender has received electronic or voice confirmation of the recipient’s receipt of such transmission; or (c) delivered by electronic mail directed to the Person(s) as listed below provided that the tracking option on such electronic mail is enabled to provide both a delivery receipt and a read receipt from the addressee (i.e., the sender will receive a return acknowledgement that the electronic mail has been received and read by the addressee); provided, however, if such delivery receipt and read receipt are not received, the subject notice, communication, or required approval shall not be deemed delivered. A party may change its notice information set forth below by delivery of notice thereof to each other party in accordance with this Section 4.15.
If to the Borrower:
Georgia Power Company
241 Ralph McGill Boulevard
Atlanta, Georgia 30308-3374
Attention: Office of the General Counsel
Facsimile: [________]
Email: [_________]
If to Contracting Party:
[__________]
[__________]
Attention: [________]
Facsimile: [________]
Email: [_________]
With a copy to:
[__________]
[__________]
Attention: [________]
Facsimile: [________]
Email: [_________]
If to the Collateral Agent:
PNC Bank, National Association
doing business as Midland Loan Services, a division of PNC Bank, National Association
10851 Mastin Street, Suite 700
Overland Park, Kansas 66210
Attention: Government Services
Facsimile: (913) 253-9709
Email: mls.doe@midlandls.com
With a copy to:
PNC Bank, National Association
doing business as Midland Loan Services, a division of PNC Bank, National Association
10851 Mastin Street, Suite 700
Overland Park, Kansas 66210
Attention: General Counsel
Facsimile: (913) 253-9709
Email: governmentservices@midlandls.com
[THE REMAINDER OF THIS PAGE INTENTIONALLY BLANK]
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and delivered by their respective officers or representatives hereunto duly authorized as of the date first above written.
GEORGIA POWER COMPANY,
as Borrower
By:___________________________________
Name:
Title:
[___________________]
as Contracting Party
By:____________________________________
Name:
Title:
PNC BANK, NATIONAL ASSOCIATION,
Doing business as Midland Loan Services, a
Division of PNC Bank, National Association,
as Collateral Agent
By:____________________________________
Name:
Name:
Title:
Exhibit L-1
to Loan Guarantee Agreement
FORM OF RESTRICTED DATA SITE NONDISCLOSURE AGREEMENT FOR OUTSIDE LEGAL COUNSEL
[FORM OF] NONDISCLOSURE AGREEMENT
This Nondisclosure Agreement (this “
Agreement
”) is dated ____________, 2014 and is between _________________ (“
Recipient
”) and Georgia Power Company, a Georgia corporation (“
GPC
”).
Recipient is providing advisory and support services to the Department of Energy (“
DOE
”), Office of the General Counsel, Loan Guarantee Program, under Matching Order DEM001-09CF01015 (the “
Matching Order
”).
In order to allow the Recipient to review the following documents (the “
Confidential Information
”):
i. the Engineering, Procurement and Construction Agreement between GPC, acting for itself and as agent for the other Owners (as such term is defined therein, the “
Owners
”), and a consortium consisting of Westinghouse Electric Company LLC (“
Westinghouse
”) and Stone & Webster, Inc. (“
Stone & Webster
” and, together with Westinghouse, collectively, the “
Contractor
”), dated as of April 8, 2008, as it may be amended from time to time, for Units 3 & 4 at the Vogtle Electric Generating Plant in Waynesboro, Georgia (the “
Project
”; such agreement, the “
EPC Agreement
”);
ii. an executed copy of the Toshiba Guarantee (as it may be amended from time to time) in the form attached as Exhibit V-1 to the EPC Agreement;
iii. an executed copy of the Shaw Guarantee (as it may be amended from time to time) in the form attached as Exhibit V-2 to the EPC Agreement;
iv. an executed copy of the Software License (as it may be amended from time to time, the “
Software License
”) in the form attached as Exhibit M to the EPC Agreement;
v. the Contract for AP1000 Fuel Fabrication, Design and Related Services, dated as of April 3, 2009, between Southern Nuclear Operating Company, Inc. (the “
Operator
”), acting as the agent of Georgia Power Company, collectively as owner, and Westinghouse, as amended by Amendment No. 1 dated as of June 21, 2012, (as it may be further amended from time to time, the “
Fuel Fabrication Agreement
”); any other contract entered into after the date hereof by GPC or the Operator for the supply of fuel assemblies and/or related required software for the Project, as it may be amended from time to time (each, a “
Fuel Supply Agreement
”); the Amended and Restated License Agreement dated February 9, 2012, between the Operator, for itself and as agent for Alabama Power Company and Georgia Power Company, collectively, as licensee,
and Westinghouse (as it may be amended from time to time, the “
License Agreement
”); the agreement (if any), to be entered into after the date of this Agreement by Westinghouse and the Owners or GPC (acting for itself and as agent for the other Owners) if the AP1000-compatible version of Best Estimate Analysis for Core Operation Nuclear - Direct Margin Monitor
TM
System and its related deliverables to be used in the operation of the Project (the “
BEACON-DMM
TM
Software
”) is not otherwise provided for the Project, pursuant to which the Owners will acquire the
BEACON-DMM
TM
Software including a license for the use thereof (as such agreement may be amended from time to time, the “
BEACON Software Agreement
”);
vi. any notice of the occurrence of any event, condition, legislation or governmental proceedings and any developments with respect to the foregoing, with respect to GPC, Oglethorpe Power Corporation, or the Municipal Electric Authority of Georgia or any of its wholly owned subsidiaries (each a “
DOE Borrower
”) or the Operator or their participation in the Project, in each case that has, or could reasonably be expected to have, a Material Adverse Effect (as such term is defined in the Loan Guarantee Agreements by and between each DOE Borrower and DOE (the “
DOE Loan Guarantee Agreements
”)) or a material adverse effect on the ability of the Project to be completed or operated, only to the extent such items contain Confidential and Proprietary Information as defined in the EPC Agreement (“
Confidential and Proprietary Information
”);
vii. any notice and a copy of any of the following communications received by a DOE Borrower or the Operator from the NRC: (1) notice of a potential violation of severity level III or higher (or its equivalent in subsequent versions of the NRC Enforcement Policy); (2) Red, Yellow or White NRC Inspection Finding (or its equivalent in subsequent versions of the Reactor Oversight Policy); (3) notice to stop work or shut down or show cause; (4) Demand for Information under 10 CFR § 50.54(f) or 10 CFR § 2.204; or (5) any other immediately effective, unilateral, docket-specific, non-routine communication requiring action by any licensee with respect to the Project, only to the extent such items contain Confidential and Proprietary Information;
viii. any notice of any complaint, order, directive, claim, citation, designation or notice by any Governmental Authority (as such term is defined in the DOE Loan Guarantee Agreements) with respect to the Project received by a DOE Borrower or the Operator relating to any actual or potential material non-compliance with its then-existing obligations under Environmental Laws (as such term is defined in the DOE Loan Guarantee Agreements) and any written description of any steps that such DOE Borrower or the Operator is taking and proposes to take with respect to the matters described in such notice, only to the extent such items contain Confidential and Proprietary Information;
ix. notice and a copy of any stop work order issued by a DOE Borrower or the Operator with respect to any work on the Project, only to the extent such items contain Confidential and Proprietary Information under the EPC Agreement;
x. any notice of any termination, amendment or material waiver or breach of, or material notices and material correspondence with respect to, the EPC Agreement, the Toshiba Guarantee, the Shaw Guarantee, the Software License, the Fuel Fabrication Agreement, any other Fuel Supply Agreement, the BEACON Software Agreement (if any), or the License Agreement and any copy of any of the foregoing or any agreement, instrument or other document giving effect to any of the foregoing, only to the extent such items contain Confidential and Proprietary Information;
xi. any notice of any event that constitutes an Event of Default, Potential Default, Mandatory Prepayment Event or Potential Mandatory Prepayment Event (as such terms are defined in the DOE Loan Guarantee Agreements) and any written description of any steps any DOE Borrower has taken or proposes to take to remedy matters described in any such notice, only to the extent such items contain Confidential and Proprietary Information;
xii. any notice of the occurrence of any event, condition, legislation or governmental proceedings and any developments with respect to the foregoing, with respect to any DOE Borrower or the Operator or their participation in the Project, in each case that has resulted in, or any DOE Borrower believes will result in, Public Inquiries (as such term is defined in the DOE Loan Guarantee Agreements), only to the extent such items contain Confidential and Proprietary Information; and
xiii. any lien waivers and releases, with respect to all work reflected in any invoice of the Contractor and, in the case of the invoice for the final payment from the DOE Borrowers under the EPC Agreement, the Contractor’s affidavit, only to the extent such items contain Confidential and Proprietary Information;
the parties agree as follows.
For the purposes of this Agreement, “Confidential Information” includes the entirety of documents identified in i-xiii above, but excludes any terms, conditions or information that have been Publicly Disclosed (as defined herein) or which Recipient has been authorized in writing by GPC to publicly disclose (except pursuant to paragraph C below). For purposes of this Agreement, “Publicly Disclosed” means information which has become generally available to the public other than as a result of disclosure by Recipient in violation of the terms of this Agreement.
In connection with Recipient’s participation in providing the advisory and support services to the DOE, Office of the General Counsel, Loan Guarantee Program, under the Matching Order, Recipient acknowledges the following:
A. Recipient acknowledges that (1) pursuant to the terms of the EPC Agreement, the Fuel Fabrication Agreement and the License Agreement, respectively, GPC may not disclose the Confidential Information until and unless the persons to whom such Confidential Information is disclosed agrees to keep such Confidential Information confidential and (2) that Recipient and persons to whom such Confidential Information is disclosed are not obligated to keep confidential any terms, conditions or information that have been Publicly Disclosed.
B. Recipient hereby acknowledges, agrees and understands that the Confidential Information is confidential and proprietary business, technical and/or financial information of Westinghouse, Stone & Webster and/or GPC, and the disclosure of Confidential Information could cause substantial harm to the competitive and commercial interests of Westinghouse, Stone & Webster and/or GPC.
C. Recipient hereby agrees and confirms that Recipient will protect the confidentiality of such Confidential Information, including any information or analysis derived from it, and not disclose it to any third party, except to the individuals and entities under the circumstances described below in this paragraph. Specifically, Recipient will not disclose nor release any Confidential Information, to anyone either during or after the period of performance of the Matching Order other than:
|
|
(1)
|
Individuals within Recipient’s organization who are directly concerned with the performance of the Matching Order and who have executed an agreement in the same form as this Agreement or who are secretarial or word processing personnel who Recipient has provided with the Confidential Information solely for the purpose of Recipient’s performance of the Matching Order;
|
|
|
(2)
|
Other individuals who are employees of the United States’ government in connection with their work in relation to the DOE Borrowers’ DOE Loan Guarantees for the Project; and
|
|
|
(3)
|
As required by law, including without limitation pursuant to any direction or an order from a court or federal office (e.g., the Government Accountability Office) of competent jurisdiction, provided that Recipient shall provide written notice to GPC, by email, fax or overnight courier at the addresses below or such other addresses as GPC may notify to Recipient in writing from time to time, in advance of any such disclosure so as to allow GPC the opportunity to seek to limit the extent of disclosure of the Confidential Information and/or to seek a protective order or other appropriate remedy (and/or waive compliance with the provisions of this Agreement); and if such limitation or protective order or other appropriate remedy is not obtained before Recipient is legally required to produce such Confidential Information (or compliance with the provisions of this Agreement is waived), Recipient after consultation with GPC shall disclose only the minimum amount of Confidential Information that Recipient in good faith and in its sole discretion believes is legally required.
|
Georgia Power Company
241 Ralph McGill Blvd.
BIN 10240
Atlanta, GA 30308
Attention: Office of the General Counsel
Fax: 404-506-2725
Email: tpbishop@southernco.com
With copies to:
Balch & Bingham LLP
1710 Sixth Avenue North
Birmingham, AL 35203-2015
Attention: Stan Blanton, Partner
Fax: (205) 488-5879
Email: SBLANTON@balch.com
Westinghouse Electric Company LLC
1000 Westinghouse Drive
Cranberry Township, Pennsylvania 16066
Attention: Frank G. Gill
Commercial Director, Vogtle 3 & 4 Project
Facsimile: 1-724-940-8502
Email: gillfg@westinghouse.com
Westinghouse Electric Company LLC
1000 Westinghouse Drive
Cranberry Township, Pennsylvania 16066
Attention: Sr. Vice President & General Counsel
Facsimile: 1-724-940-8508
Email: sweenemt@westinghouse.com
Stone & Webster, Inc.
128 South Tryon Street
Charlotte, NC 28202
Attention: Senior Associate General Counsel
Facsimile: (704) 331-6001
Email: Mark McKain@cbi.com
Stone & Webster, Inc.
100 Technology Center Drive
Stoughton, Massachusetts 02072
Attention: Nuclear Division Counsel
Facsimile: 617-589-7575
Email: Ken.Jenkins@cbi.com
GPC’s agent, the Operator, will provide access to the Confidential Information on a secure confidential, password-protected electronic data site (i.e., read-only access) (the “Restricted Data Site”) that will allow Recipient to review the Confidential Information on a need to know and use basis solely for the purpose of monitoring the Project for the DOE Borrowers’ DOE Loan Guarantees (and no other guaranteed loans or related projects).
D. GPC acknowledges that Recipient may be required under the terms of the Matching Order to prepare written summaries of the Confidential Information (the “Summaries”) for review by DOE and such individuals as set forth in paragraph C.(2) above. In Recipient’s review of the Confidential Information, Recipient shall be entitled to prepare such written notes and analyses as Recipient shall deem appropriate for purposes of preparing the Summaries.
E. In the event that DOE, pursuant to its rights under the DOE Loan Guarantee Agreements, delivers a written notification to GPC directing GPC to deliver a copy of a document constituting Confidential Information to one or more attorneys at [Chadbourne & Parke LLP][Hunton & Williams LLP] (as outside counsel for DOE), GPC will, upon reasonable notice, deliver one copy of such Confidential Information (the “Chadbourne {or Hunton} Copy”) to Recipient. In the event of such delivery, Recipient agrees to hold the Chadbourne {or Hunton} Copy in the strictest confidence and to maintain the secrecy and/or nonpublic nature of the Chadbourne {or Hunton} Copy. Recipient shall number each additional copy of the Chadbourne {or Hunton} Copy, which shall be treated in the same manner as the Chadbourne {or Hunton} Copy, and shall allow only those individuals identified in clause (1) of paragraph A above to have access to the Chadbourne {or Hunton} Copy or any copy thereof; provided that Recipient shall be permitted to disclose the Chadbourne {or Hunton} Copy as required by law, including without limitation pursuant to any direction or an order from a court or federal office (e.g., the Government Accountability Office) of competent jurisdiction, provided that Recipient shall provide written notice to GPC in advance of any such disclosure in accordance with, and shall follow the further procedures set out in, clause (3) of paragraph C above. Recipient shall provide notice to GPC of the number of additional copies of the Chadbourne {or Hunton} Copy that have been made.
F. Consistent with subpart (g) of the Nondisclosure Acknowledgement executed at the request of DOE by [Recipient][individuals within Recipient’s organization who are directly concerned with the performance of the Matching Order] (“Nondisclosure Acknowledgement”), Recipient acknowledges that the Confidential Information is Loan Guarantee Information and will be utilized in accordance with the task or subtask assignment only and acknowledges that the disclosure of this Confidential Information is otherwise restricted by Westinghouse, Stone & Webster and/or GPC as submitters.
G. I hereby agree that the representations and commitments made in subparts (a) and (h) of the Nondisclosure Acknowledgement extend to Confidential Information supplied by Westinghouse, Stone & Webster and/or GPC with respect to the use and review of the Confidential Information.
H. This Agreement shall be governed in accordance with the laws of the State of New York without giving effect to any choice of law, provision, or rule (whether of New York or any other jurisdiction) that would cause the application of the laws of any jurisdiction other than New York.
[The remainder of this page is intentionally blank.]
|
|
|
|
|
|
|
|
ACCEPTED AND AGREED
|
|
|
|
|
|
|
|
|
By:
|
|
|
|
|
Name:
|
|
|
|
|
Title:
|
|
|
|
|
Date:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ACKNOWLEDGED AND AGREED
|
|
|
|
|
|
|
|
|
GEORGIA POWER COMPANY
|
|
|
|
|
|
|
|
|
By:
|
|
|
|
|
Name:
|
|
|
|
|
Title:
|
|
|
|
|
Date:
|
|
|
|
|
Exhibit L-2
to Loan Guarantee Agreement
FORM OF NONDISCLOSURE AGREEMENT FOR LENDER’S ENGINEER
[FORM OF] NONDISCLOSURE AGREEMENT
This Nondisclosure Agreement (this “Agreement”) is dated [ ] and is between [ , a ________ corporation] [[___________
]
, an employee of
]
24
(“Recipient”) and Georgia Power Company (“GPC”). Capitalized terms used but not otherwise defined in this Agreement have the meanings provided in the EPC Agreement, as defined in Article 2(b)(i) below.
1. Recipient is participating in providing technical advisory and support services to the Department of Energy, Loan Programs Office (“DOE”), under Contract No. DE-DT002463 (the “Contract”), in connection with (a) DOE’s negotiation of certain loan guarantee agreements and related financing documents between DOE and each of GPC, Oglethorpe Power Corporation and/or the Municipal Electric Authority of Georgia or any of its wholly owned subsidiaries (each, a “DOE Borrower”) pursuant to which DOE would guarantee the repayment of a loan to such DOE Borrower for the construction, operation and ownership of Vogtle Units 3 and 4 (the “Project”) and (b) the related due diligence (each such guarantee, a “DOE Loan Guarantee”; such loan guarantee agreements collectively, the “DOE Loan Guarantee Agreements”).
2. (a) In order to permit Recipient to review Confidential Information (as hereinafter defined) of GPC and/or its Contractor, a consortium composed of Westinghouse Electric Company, LLC (“Westinghouse”) and Stone & Webster, Inc. (“Stone & Webster”), that may be contained in the materials described in Article 2(b) hereof (the “Documents”), GPC and Recipient desire to enter into this Agreement which shall apply to any review of Confidential Information contained in the Documents after the date hereof by Recipient. For the purposes of this Agreement, “Confidential Information” means the entirety of Documents identified in Section 2(b) below, but excludes any Publicly Disclosed Information (as defined herein) or which Recipient has been authorized in writing by GPC to publicly disclose (excluding the disclosures permitted to be made by Recipient pursuant to Article 3.C below). For purposes of this Agreement, “Publicly Disclosed Information” means terms, conditions or other information that has become generally available to the public other than: (i) as a result of disclosure by Recipient, or (ii) any Confidential Information that Recipient knows has been disclosed by a third party (x) approved to receive such Confidential Information hereunder in violation of the terms of this Agreement or (y) in violation of any obligation of confidentiality of such third party similar to the terms of this Agreement.
(b) The Documents to which this Agreement shall apply are:
_______________
24
For Lender’s Engineer’s NDA, use first bracketed option; for each individual Lender’s Engineer employee’s NDA, use second bracketed option.
i.
the Engineering, Procurement and Construction Agreement between GPC, acting for itself and as agent for the other Owners (as such term is defined therein, the “
Owners
”), and a consortium consisting of Westinghouse and Stone & Webster (collectively, the “
Contractor
”), dated as of April 8, 2008, as it may be amended from time to time, for the Project (the “EPC Agreement”);
ii.
an executed copy of the Toshiba Guarantee, as it may be amended from time to time in the form attached as Exhibit V-1 to the EPC Agreement;
iii.
an executed copy of the Shaw Guarantee, as it may be amended from time to time in the form attached as Exhibit V-2 to the EPC Agreement;
iv.
an executed copy of the Software License (as it may be amended from time to time, the “
Software License
”) attached as Exhibit M to the EPC Agreement;
v.
the Contract for AP1000 Fuel Fabrication, Design and Related Services, dated as of April 3, 2009, between Southern Nuclear Operating Company, Inc. (the “
Operator
”), acting as the agent of Georgia Power Company, collectively as owner, and Westinghouse, as amended by Amendment No. 1 dated as of June 21, 2012, (as it may be further amended from time to time, the “
Fuel Fabrication Agreement
”); any other contract entered into after the date hereof by GPC or the Operator for the supply of fuel assemblies and/or related required software for the Project, as it may be amended from time to time (each, a “
Fuel Supply Agreement
”); the Amended and Restated License Agreement dated February 9, 2012, between the Operator, for itself and as agent for Alabama Power Company and Georgia Power Company, collectively, as licensee, and Westinghouse (as it may be amended from time to time, the “
License Agreement
”); the agreement (if any), to be entered into after the date of this Agreement by Westinghouse and the Owners or GPC (acting for itself and as agent for the other Owners) if the AP1000-compatible version of Best Estimate Analysis for Core Operation Nuclear - Direct Margin Monitor
TM
System and its related deliverables to be used in the operation of the Project (the “
BEACON-DMM
TM
Software
”) is not otherwise provided for the Project, pursuant to which the Owners will acquire the BEACON-DMM
TM
Software including a license for the use thereof (as such agreement may be amended from time to time, the “
BEACON Software Agreement
”);
vi.
each Monthly Status Report provided by Contractor to GPC pursuant to the EPC Agreement ;
vii.
each monthly construction status report filed by GPC with the Georgia Public Service Commission (“
Georgia PSC
”);
viii.
each monthly project report delivered by the Operator to the co-owners of Vogtle Units 3 & 4;
ix.
the level two schedule of significant development, construction and completion milestones for the completion of each Unit, in each case prepared by GPC, as updated from time to time;
x.
a copy of the written materials delivered by GPC, as agent for the co-owners of Vogtle Units 3 & 4, to the co-owners in connection with any monthly project management board meeting;
xi.
invoices submitted by Contractor to Owners pursuant to the EPC Agreement;
xii.
any semi-annual construction monitoring reports filed with the Georgia PSC by GPC pursuant to the final amended certification order and all orders on remand entered by the Georgia PSC in Docket No. 27800-U that contains any Confidential and Proprietary Information;
xiii.
any notice of the occurrence of any event, condition, legislation or governmental proceedings and any developments with respect to the foregoing, with respect to GPC, Oglethorpe Power Corporation or the Municipal Electric Authority of Georgia or any of its wholly owned subsidiaries (each, a “DOE Borrower”) or the Operator or their participation in the Project, in each case that has, or could reasonably be expected to have, a Material Adverse Effect (as such term is defined in the DOE Loan Guarantee Agreements) or a material adverse effect on the ability of the Project to be completed or operated, only to the extent such items contain Confidential and Proprietary Information;
xiv.
any notice and a copy of any of the following communications received by a DOE Borrower or the Operator from the NRC: (1) notice of a potential violation of severity level III or higher (or its equivalent in subsequent versions of the NRC Enforcement Policy); (2) Red, Yellow or White NRC Inspection Finding (or its equivalent in subsequent versions of the Reactor Oversight Policy); (3) notice to stop work or shut down or show cause; (4) Demand for Information under 10 CFR § 50.54(f) or 10 CFR § 2.204; or (5) any other immediately effective, unilateral, docket-specific, non-routine communication requiring action by any licensee with respect to the Project, only to the extent such items contain Confidential and Proprietary Information;
xv.
any notice of any complaint, order, directive, claim, citation, designation or notice by any Governmental Authority (as such term is defined in the DOE Loan Guarantee Agreements) with respect to the Project received by a DOE Borrower or the Operator relating to any actual or potential material non-compliance with its then-existing obligations under Environmental Laws (as such term is defined in the DOE Loan Guarantee Agreements) and any written description of any steps that DOE Borrower or the Operator is taking and proposes to take with respect to the matters described in such notice, only to the extent such items contain Confidential and Proprietary Information;
xvi.
notice and a copy of any stop work order issued by a DOE Borrower or the Operator with respect to any work on the Project, only to the extent such items contain Confidential and Proprietary Information;
xvii.
any notice of any termination, amendment or material waiver or breach of, or material notices and material correspondence with respect to, the EPC Agreement, the Toshiba Guarantee, the Shaw Guarantee, the Software License, the Fuel Fabrication Agreement, any other Fuel Supply Agreement, the BEACON Software Agreement (if any) or the License Agreement and any copy of any of the foregoing or any agreement, instrument or other document giving effect to any of the foregoing, only to the extent such items contain Confidential and Proprietary Information;
xviii.
any notice of any event that constitutes an Event of Default, Potential Default, Mandatory Prepayment Event or Potential Mandatory Prepayment Event (as such terms are defined in the DOE Loan Guarantee Agreements) and any written description of any steps any DOE Borrower has taken or proposes to take to remedy matters described in any such notice, only to the extent such items contain Confidential and Proprietary Information;
xix.
any notice of the occurrence of any event, condition, legislation or governmental proceedings and any developments with respect to the foregoing, with respect to any DOE Borrower or the Operator or their participation in the Project, in each case that has resulted in, or any DOE Borrower believes will result in, Public Inquiries (as such term is defined in the DOE Loan Guarantee Agreements), only to the extent such items contain Confidential and Proprietary Information; and
xx.
any lien waivers and releases, with respect to all work reflected in any invoice of the Contractor and, in the case of the invoice for the final payment from the DOE Borrowers under the EPC Agreement, the Contractor’s affidavit, only to the extent such items contain Confidential and Proprietary Information.
(c) Notwithstanding the foregoing, Confidential Information made available to Recipient pursuant to this Agreement
shall not include any such Confidential Information consisting of AP1000 engineering or design or related information of Contractor, or Westinghouse, or Stone & Webster individually,
not included in the public version of the AP1000 Design Control Document, including as a representative list of such information:
calculations for safety-related systems and components; the Plant Design Model; instrumentation and control functional, system, software and interface requirements and functional logic diagrams; designs, design specifications and qualification reports for safety-related and non-safety related equipment; systems design and design specification documents for safety-related and non-safety related systems; design change packages, including E&DCRs; instrumentation and control architecture diagrams, software verification and validation documentation, testing
procedures and test results; component data packages; fabrication and construction drawings; and final plant as-built drawings.
(d) To the extent, as a result of any request from Recipient (or a request from DOE on behalf of Recipient) to be allowed to see any Confidential Information that has been redacted under Section 2(c), GPC obtains from Contractor, or Westinghouse or Stone & Webster individually, permission to disclose such redacted Confidential Information, such Confidential Information will be disclosed by GPC to Recipient in the same manner and under the same conditions as such redacted Confidential Information has been made available by Contractor, or Westinghouse or Stone & Webster individually, to GPC.
3. In connection with Recipient’s participation in providing the technical advisory and support services to the DOE under the Contract in connection with the Project (the “Purpose”):
A. Recipient acknowledges GPC may not disclose Confidential Information included in the Documents until and unless the persons to whom such Confidential Information is disclosed agree to keep such information, terms and conditions confidential as provided herein and only to use such Confidential Information for the Purpose. Recipient by this Agreement agrees to keep the Confidential Information contained therein confidential, subject to the terms of this Agreement.
B. Recipient hereby acknowledges, agrees and understands that the Confidential Information is confidential and proprietary business, technical and financial information of GPC, Westinghouse and/or Stone & Webster, and the disclosure of Confidential Information could cause substantial harm to the competitive and commercial interests of GPC and Contractor, or Westinghouse, or Stone & Webster individually.
C. Recipient hereby agrees and confirms that, pursuant to Article 3.A. above, Recipient will protect the confidentiality of such Confidential Information, including any information or analysis derived from it, and not disclose it to any third party, except as provided in this Article 3.C.
(1) Specifically, Recipient will not disclose nor release any Confidential Information obtained in the course of review of the Documents to anyone, either during or after the period of performance of the Contract, other than:
(a) individuals within Recipient’s organization who are directly concerned with the performance of the Contract and the Purpose, and who have executed a nondisclosure and non-use agreement in substantially the same form of this Agreement, or who are secretarial or word processing personnel to whom Recipient has provided the Confidential Information solely for the purpose of Recipient’s performance of the Contract and the Purpose and who are under the same obligations of confidentiality and nonuse as the Recipient;
(b) individuals who are employees of the United States’ government in connection with their work in relation to the DOE Borrowers’ DOE Loan
Guarantees for the Project, designated in writing, including by e-mail, by an attorney in the DOE, provided (1) such individual employees of the United States’ government have confirmed to Recipient in writing, including by e-mail, that they have a need to know such Confidential Information in connection with their work in relation to the DOE Borrowers’ DOE Loan Guarantees for the Project;
(c) with respect to any such Confidential Information obtained in the course of review of the Documents listed in items (i) through (v) and (xiii) through (xx) of Article 2(b), to attorneys at Chadbourne & Parke LLP or Hunton & Williams LLP who have confirmed to Recipient in writing, including by email, that they have entered into a confidentiality agreement with GPC on terms similar to this Agreement with respect to such Documents; and
(d) as required by law, including without limitation pursuant to direction or an order from a court or federal office (e.g., the Government Accountability Office) of competent jurisdiction, provided that Recipient shall follow the procedure set out in Article 8 below.
(2) For any such disclosure described in this Article 3, Recipient shall minimize the amount of Confidential Information disclosed to only the Confidential Information that Recipient in good faith and in its discretion believes is required to be disclosed and shall reasonably cooperate with GPC or Contractor, or Westinghouse or Stone & Webster individually, in any efforts that GPC or Contractor, or Westinghouse or Stone & Webster individually, may take to limit disclosure of the Confidential Information.
(3) Recipient warrants that it is not included in any United States Government published list of persons or entities whose export or import privileges are in any way restricted. Recipient warrants that it shall not disclose any Confidential Information to any third parties if such third party is, at the time of the disclosure, included in any United States Government published list of persons or entities whose export or import privileges are in any way restricted. Recipient acknowledges that Confidential Information may be subject to one or more of the U.S. Government export control laws and regulations, including without limit the U.S. Export Administration Regulations (EAR), and the regulations of the U.S. Department of Energy at 10 CFR Part 810. Accordingly, Recipient shall not transfer or disclose, or permit the transfer or disclosure in any medium, Confidential Information received under this Agreement to: (i) any person that is not a citizen, national, permanent resident alien or “Protected Person” of the United States; (ii) any foreign country; or (iii) any legal entity organized under the laws of a country other than the United States, including without limit its employees, directors, owners, affiliated companies, or agents and representatives, without specific authorization from GPC and Westinghouse and only in accordance with applicable U.S. Government export control regulations.
4. GPC makes no representation whatsoever (and none is to be implied or relied upon by Recipient) as to the sufficiency or accuracy of the Confidential Information provided hereunder, the ability of Recipient to use the Confidential Information for its intended purpose, or the result
to be obtained therefrom. GPC covenants that the Documents that GPC shall make available to the Recipient for its review shall be a true, correct and complete copy of the Documents as of the time that GPC makes the Documents available to the Recipient.
5. Recipient hereby accepts responsibility for its own acts. To the extent that GPC, Westinghouse or Stone & Webster suffers any damage as a result of either (a) Recipient’s publication or disclosure of the Confidential Information in any way whatsoever to any unauthorized person or (b) the use of the Confidential Information by Recipient, Recipient shall be liable for any and all actual damages suffered by GPC, Westinghouse and/or Stone & Webster as a result of such unauthorized publication, disclosure or use, not to exceed $3,500,000. In addition, Recipient acknowledges that GPC, Westinghouse, and/or Stone &Webster may suffer irreparable harm as a result of Recipient’s actions under either (a) or (b) herein above, and Recipient hereby agrees that GPC, Westinghouse and/or Stone & Webster shall be entitled to seek an injunction or other equitable relief should such action be taken by Recipient. For purposes of this Article 5 and Article 8 below, Westinghouse and/or Stone & Webster shall be considered third party beneficiaries hereunder.
6. Recipient further agrees that Recipient will not have the right to receive electronic or hard copies of such Documents under this Agreement, but will be entitled to review the Documents from time to time during the term of Recipient’s services under the Contract in the offices of GPC in Atlanta, GA or at the Vogtle 3 & 4 Project site in Waynesboro, GA upon reasonable notice to GPC and Contractor.
7. GPC acknowledges that in the performance of the Contract, Recipient is required to undertake a review of the Documents and may be required to prepare written summaries of Documents or analyses of the information contained therein for review by DOE and such individuals as set forth in Article 3.C(1)(b) and/or Article 3.C(1)(c) above. In Recipient’s review of the Documents, Recipient shall be entitled to prepare such written notes and analyses as Recipient shall deem appropriate for purposes of preparing such summaries or analyses. All such written summaries, notes and analyses shall contain a prominent statement on the cover page stating the following: “This document contains Confidential Information of GPC, Westinghouse, Stone & Webster, and/or their partners and suppliers.” No such summary, note or analysis, nor any excerpt thereof, shall be disclosed by Recipient to any third party except as provided in Article 3.C above.
8. If Recipient is notified that it is required by law, including without limitation pursuant to direction or an order from a court or federal office (e.g., the Government Accountability Office) of competent jurisdiction (including by oral questions, interrogatories, subpoena, government investigative demand or similar process) to release Confidential Information, upon Recipient’s receipt of any such notice, Recipient shall provide prompt written notice thereof to GPC, Westinghouse and Stone & Webster, by email, fax or overnight courier at their respective addresses below or such other addresses as they may notify to Recipient in writing from time to time, so as to allow GPC or Contractor, or Westinghouse or Stone & Webster individually,
the opportunity to seek to limit the extent of disclosure of the Confidential Information and/or to seek a protective order or other appropriate remedy (and/or waive compliance with the provisions of this Agreement). If such limitation or protective order or other appropriate remedy
is not obtained before Recipient is legally required to produce such Confidential Information (or compliance with the provisions of this Agreement is waived), Recipient after consultation with GPC and Westinghouse, shall disclose only the minimum amount of Confidential Information that Recipient in good faith and in its discretion believes is legally required.
If to Westinghouse:
Westinghouse Electric Company LLC
1000 Westinghouse Drive
Cranberry Township, Pennsylvania 16066
Attention: Frank G. Gill
Commercial Director, Vogtle 3 & 4 Project
Facsimile: 1-724-940-8502
Email: gillfg@westinghouse.com
With a copy to:
Westinghouse Electric Company LLC
1000 Westinghouse Drive
Cranberry Township, Pennsylvania 16066
Attention: Sr. Vice President & General Counsel
Facsimile: 1-724-940-8508
Email: sweenemt@westinghouse.com
If to Stone & Webster:
Stone & Webster, Inc.
128 South Tryon Street
Charlotte, NC 28202
Attention: Senior Associate General Counsel
Facsimile: (704) 331-6001
Email: Mark McKain@cbi.com
With a copy to:
Stone & Webster, Inc.
100 Technology Center Drive
Stoughton, Massachusetts 02072
Attention: Nuclear Division Counsel
Facsimile: 617-589-7575
Email: Ken.Jenkins@cbi.com
9. Recipient acknowledges that the Confidential Information will only be utilized in accordance with the task or subtask assignment pursuant to the Contract for the Purpose and acknowledges that the disclosure of this Confidential Information is otherwise restricted by GPC as submitter.
10. This Agreement shall be governed in accordance with the laws of the State of New York without giving effect to any choice of law, provision, or rule (whether of New York or any other jurisdiction) that would cause the application of the laws of any jurisdiction other than New York.
ACCEPTED AND AGREED
By:__________________________
Name:
Title:
Date:
Address for Notices
:
___________________
___________________
___________________
E-mail: ___________________
Phone:
Fax:
ACKNOWLEDGED AND AGREED
GEORGIA POWER COMPANY
By:__________________________
Name:
Title:
Date:
Address for Notices
:
Georgia Power Company
241 Ralph McGill Blvd.
BIN 10240
Atlanta, GA 30308
Attention: Office of the General Counsel
Fax: 404-506-2725
Email: tpbishop@southernco.com
With a copy to:
Balch & Bingham LLP
1710 Sixth Avenue North
Birmingham, AL 35203-2015
Attention: Stan Blanton, Partner
Fax: (205) 488-5879
Email: SBLANTON@balch.com
Exhibit L-3
to Loan Guarantee Agreement
Definitions of “competitor of Westinghouse” and “competitor of Stone &Webster”
(A) The term “competitor of Westinghouse” means, except as provided in paragraph (B), a person or entity that, on a commercial basis for the purpose of making sales into the market, at the time of determination of whether such person or entity is a competitor of Westinghouse:
(1) maintains products and equipment as part of such person’s or entity’s on-going commercial nuclear power business that are substantially similar to the products and/or equipment that Westinghouse actively maintains, supplies or provides;
(2) provides nuclear power facility operations and maintenance services, operator training for nuclear power facility operations, or operations and maintenance, or nuclear power facility operator refresher or requalification training, as part of such person’s or entity’s on-going commercial nuclear power generation business;
(3) designs, develops, engineers, procures, constructs or supplies commercial nuclear power facilities, or nuclear technology-related products or components for such nuclear power facilities;
(4) provides nuclear technology-related services
(
including without limitation initial operator training services, simulator training services and other related operator training services) for nuclear power facilities, nuclear technology-related products or nuclear technology-related components with respect to such facilities, products, components or services;
exclusive, however
, of the activities identified in paragraph (A)(2);
(5) supplies fabricated nuclear fuel or non-fuel core components (and related fuel services and information) for commercial nuclear facilities; or
(6) indicates through its marketing channels that such person or entity will, on a going forward basis as part of its commercial nuclear power business, undertake any of the activities specified in paragraph (A)(1) - (A)(5) above.
The term “competitor of Westinghouse” shall also include any person or entity that partners with, controls, is controlled by, is under common control with, or participates in a joint venture with (an “Affiliate”) any person or entity described in the preceding paragraph (A).
(B) The term “competitor of Westinghouse” does not include a person or entity that is designated by DOE to hold either or both of the licenses (currently denominated NRC licenses NPF-91 and NPF-92) to own and/or operate the commercial nuclear power facility known as Vogtle Unit 3 and Unit 4 to be constructed pursuant to the New EPC Contract (“Substitute Owner”),
(1) even if such Substitute Owner or any of its Affiliates performs any of the activities specified in paragraphs (A)(1), (A) (2) or (A)(6) above, provided that such person or entity does so solely for its own account or the account of any of its Affiliates and only at (i) the commercial nuclear power facility to be constructed pursuant to the New EPC Contract, and/or (ii) any other commercial nuclear power facility as to which such Substitute Owner or any of its Affiliates has an ownership interest (or has a contractual right to purchase an ownership interest) or holds a license from the NRC (or has applied for such a license) to own, construct and/or operate such commercial nuclear power facility; and
(2) without in any way limiting the rights of the Substitute Owner under paragraph (B)(1) above, such Substitute Owner and its Affiliates do not perform any of the activities specified in paragraphs (A)(3), (A)(4) or (A)(5) above (or paragraph (A)(6) above as such paragraph specifically relates to paragraphs (A)(3), (A)(4) or (A)(5) above), and neither such Substitute Owner nor its Affiliates own nor are owned, in whole or in part, by a person or entity that does perform any of the activities specified in paragraphs (A)(3), (A)(4) or (A)(5) above (or paragraph (A)(6) above as such paragraph specifically relates to paragraphs (A)(3), (A)(4) or (A)(5) above).
(C) The term “competitor of Stone & Webster” means, except as provided in paragraph (D), a person or entity that, on a commercial basis for the purpose of making sales into the market, at the time of determination of whether such person or entity is a competitor of Stone & Webster:
(1) maintains products and equipment as part of such person’s or entity’s on-going commercial nuclear power business that are substantially similar to the products and/or equipment that Stone & Webster actively maintains, supplies or provides;
(2) provides nuclear power facility outage operations and maintenance services as part of such person’s or entity’s on-going commercial nuclear power business;
(3) indicates through its marketing channels that such person or entity will, on a going forward basis, undertake any of the activities specified in paragraph (C)(1) or (C)(2);
(4) designs, develops, engineers, procures, constructs and supplies commercial nuclear power facilities, or nuclear technology-related products or components for such nuclear power facilities; or
(5) provides nuclear technology-related services for nuclear power facilities, nuclear technology-related products or nuclear technology-related components, in each case that it designs, develops, engineers, procures, constructs or supplies with respect to such facilities, products, components or services;
exclusive, however
, of the activities identified in paragraph (C)(2).
The term “competitor of Stone & Webster” shall also include any person or entity that partners with, controls, is controlled by, is under common control with, or participates in a joint venture with (an “Affiliate”) any person or entity described in the preceding sentence.
(D) The term “competitor of Stone & Webster” does not include a person or entity that is designated by DOE to hold either or both of the licenses (currently denominated NRC licenses
NPF-91 and NPF-92) to own and/or operate the commercial nuclear power facility to be constructed pursuant to the New EPC Contract (“Substitute Owner”),
(1) even if such Substitute Owner or any of its Affiliates performs any of the activities specified in paragraphs (C)(1)-(3) above, provided that it does so solely for its own account or the account of any of its Affiliates and only at (i) the commercial nuclear power facility to be constructed pursuant to the New EPC Contract, and/or (ii) any other commercial nuclear power facility as to which such Substitute Owner or any of its Affiliates has an ownership interest (or has a contractual right to purchase an ownership interest) or holds a license from the NRC (or has applied for such a license) to own, construct and/or operate such commercial nuclear power facility.
Exhibit M
to Loan Guarantee Agreement
FORM OF PROJECT COST SPREADSHEET
Exhibit M
Schedule 4.1.2
to Loan Guarantee Agreement
PRINCIPAL PROJECT DOCUMENT MATTERS
None.
Schedule 4.1.2
Schedule 4.1.4(d)(i)
to Loan Guarantee Agreement
UNAPPROVED EXPENDITURES IN CONSTRUCTION MONITORING REPORTS
On July 30, 2013, the Borrower and the Georgia PSC staff entered into a stipulation to waive the requirement to amend the Certificate to increase the revised total certified cost of six billion one hundred and thirteen million Dollars ($6,113,000,000) as set forth in paragraph 4 of the stipulation adopted by the Georgia PSC in the first Construction Monitoring Order, which increase had been requested in the 8
th
Construction Monitoring Report, until the completion of Plant Vogtle Unit 3. In accordance with the Georgia Integrated Resource Planning Act, any costs incurred by Georgia Power in excess of the certified amount will not be included in rate base, unless shown to be reasonable and prudent, and any related financing costs during construction potentially would be subject to recovery through allowance for funds used during construction. The stipulation also provides that Georgia Power will combine the ninth and tenth Construction Monitoring Reports originally scheduled to be filed by August 31, 2013 and February 28, 2014, respectively, into a single report covering the period from January 1 through December 31, 2013 to be filed by February 28, 2014. Additionally, Georgia Power filed an abbreviated status update on September 3, 2013, which included the costs incurred from January 1 through June 30, 2013. Georgia Power expects to resume filing semi-annual Construction Monitoring Reports in August 2014. The stipulation was approved by the Georgia PSC in Administrative Session on September 13, 2013 and the written order of approval was issued on October 8, 2013.
On October 28, 2013 the Georgia PSC issued its final Order on the Eighth Semi-Annual Construction Monitoring Report. This order verifies and approves the expenditures incurred for Project Costs as identified in the Construction Monitoring Report for the period July 1, 2012 through December 31, 2012. Pursuant to the Order Adopting Stipulation entered October 8, 2013, the October 28, 2013 order makes no determination of prudence in regard to the approved expenditures.
Schedule 4.1.4(d)(i)
Schedule 4.1.4(d)(iv)
to Loan Guarantee Agreement
OUTSTANDING RIGHTS TO APPEAL CERTIFICATE, CONSTRUCTION MONITORING ORDERS AND NCCR TARIFF ORDERS
No appeals of the Certificate, the Construction Monitoring Orders or the NCCR Tariff Orders are pending.
The Georgia PSC issued an NCCR Tariff Order on December 23, 2013. Section 50-13-19(a) of the Official Code of Georgia Annotated provides that any person who has exhausted all administrative remedies available with the Georgia PSC and who is aggrieved by a final decision in such a contested case is entitled to judicial review. Under Section 50-13-19(b) of the Official Code of Georgia Annotated, proceedings for a review must be instituted by filing a petition within 30 days after the service of the final decision of the Georgia PSC or, if a rehearing of such final decision of the Georgia PSC is requested, within 30 days after the decision thereon.
With respect to any Construction Monitoring Order or NCCR Tariff Order issued after the Guarantee Issuance Date, or any amendments to the Certificate approved by the Georgia PSC after the Guarantee Issuance Date, Section 50-13-19(a) of the Official Code of Georgia Annotated provides that any person who has exhausted all administrative remedies available with the Georgia PSC and who is aggrieved by a final decision in such a contested case is entitled to judicial review. Under Section 50-13-19(b) of the Official Code of Georgia Annotated, proceedings for a review must be instituted by filing a petition within 30 days after the service of the final decision of the Georgia PSC or, if a rehearing of such final decision of the Georgia PSC is requested, within 30 days after the decision thereon.
Schedule 4.1.4(d)(iv)
Schedule 4.1.33
to Loan Guarantee Agreement
[FORM OF BORROWER APPROPRIATIONS ACT
CERTIFICATE]
(Delivered pursuant to
Section 4.1.33
of the Loan Guarantee Agreement)
Date: _______________, 20__
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: Director, Portfolio Management
Re: DOE Loan Guarantee, LGPO Loan #1021
Ladies and Gentlemen:
This Borrower Appropriations Act Certificate
is delivered to you pursuant to
Section 4.1.33
of the Loan Guarantee Agreement, dated as of February 20, 2014 (the “
Loan Guarantee Agreement
”), by and between (i) Georgia Power Company, a corporation organized and existing under the laws of Georgia (the “
Borrower
”), as Borrower, and (ii) the U.S. Department of Energy (“
DOE
”), as Guarantor. All capitalized terms used in this certificate not otherwise defined shall have their respective meanings specified in the Loan Guarantee Agreement.
For purposes of this Borrower Appropriations Act Certificate, the term “project” shall mean the Borrower’s 45.7% undivided ownership interest in two additional nuclear generating units, consisting of two Westinghouse AP1000 nuclear reactors, each with a nominally rated capacity of approximately 1,100 megawatts, natural draft cooling towers, intake and discharge structures, associated transmission facilities, fuel and ancillary structures supporting the power generation process, located at the Alvin W. Vogtle Electric Generating Plant located in Burke County, Georgia.
The Borrower hereby certifies, for the benefit of the Office of Management and Budget (“
OMB
”) and DOE, that:
(a) the source of funds for the payment of the DOE Guaranteed Loan Credit Subsidy Cost is not a federal loan or other debt obligation that is guaranteed by the federal government;
(b) to the Borrower’s Knowledge as of the date hereof, based on its review of the Omnibus Appropriations Act, 2009, P.L. No. 111-8, Division C, Title III, as amended by Section 408 of the Supplemental Appropriations Act, 2009, P.L. No. 111-32 (the “
Appropriations Act
”), except for the use of the proceeds of the DOE-guaranteed loans provided for in the Loan Guarantee Agreement by the Borrower to finance a portion of the Borrower’s costs of construction in connection with the project, the Borrower does not expect to use, directly or indirectly, funds, personnel, or property (tangible or intangible) of any Federal agency, instrumentality, personnel or affiliated entity through acquisitions, contracts, demonstrations,
exchanges, grants, incentives, leases, procurements, sales, other transaction authority, or other arrangements, to support the project or to obtain goods or services from the project (the “Federal Support Prohibition”), except as set forth below; and
(c) for the reasons stated below, Borrower believes that the following do not preclude the use of loan guarantee authority in the Appropriations Act for the loan guarantee contemplated to be issued pursuant opt the terms of the Loan Guarantee Agreement:
1. Borrower will obtain nuclear liability insurance under the Price-Anderson Act federal insurance program with respect to the project. Such insurance is a federal insurance program within the meaning of subparagraph (c) of the provisions of the Appropriations Act applicable to Section 1703 of the Title XVII.
2. The Energy Policy Act of 2005 provides production tax credits for companies that begin construction on new nuclear reactors by 2014 and bring such reactors into service by 2021. The Borrower expects to receive these production tax credits with respect to both of the above-referenced new nuclear generating units under construction. These production tax credits constitute otherwise allowable Federal income tax benefits within the meaning of subparagraph (a) of the provisions of the Appropriations Act applicable to Section 1703 of the Title XVII.
3. In the ordinary course of its business, the Borrower makes sales of electricity to federal government agencies located in its retail service territory at the Borrower’s standard rates of service as approved by the Georgia Public Service Commission. As required by law, these sales are made under an areawide public utility contract, dated August 25, 2006, between the United States of America and Southern Company Services, Inc., as agent for the Borrower (the “
GPC Areawide Agreement
”).
25
The GPC Areawide Agreement has a term of not more than 10 years, and can be terminated by either party with 90 days notice. The GPC Areawide Agreement does not require that electricity be delivered from any particular generating source, was not entered into in contemplation of the project, and requires the delivery by GPC of electricity regardless of whether the project is completed. The Borrower’s ordinary course sales of electricity to federal agencies within its retail service territory are not within the scope of the provisions of the Appropriations Act applicable to Section 1703 of Title XVII.
4. Based on existing law, the Borrower does not expect to issue any tax-exempt financing in connection with the project. However, the Borrower may in the future issue tax-exempt bonds to finance all or a portion of its undivided ownership interest in any
_____________________
|
|
25
|
The United States of America entered into the GPC Areawide Agreement under the requirements of 48 C.F.R. Section 41.204, which requires the federal government to enter into a bilateral contract for energy services for any federal facility that is expected to purchase in excess of $100,000 of electricity in any year. Based on the General Services Administration’s most recently published list of areawide public utility contracts (last updated August 20, 2013), the federal government has entered into such contracts with 99 utilities.
|
pollution control or other equipment that comprises a portion of the project if such equipment is eligible under then-current federal income tax law for tax-exempt financing. Any such tax-exempt financing would constitute otherwise allowable Federal income tax benefits within the meaning of subparagraph (a) of the provisions of the Appropriations Act applicable to Section 1703 of Title XVII.
5. NuStart Energy Development LLC, the consortium of nine nuclear power companies operating 58 percent of the nation’s nuclear power plants and two reactor vendors, executed a Cooperative Agreement with DOE in 2005 to demonstrate the Nuclear Regulatory Commission licensing process and to complete the designs for the first advanced nuclear power reactors in the U.S. in 30 years. The Cooperative Agreement was authorized pursuant to the Department of Energy NP 2010 program and committed DOE and NuStart to participate in a 50-50 cost sharing program to complete the detailed engineering work for two advanced reactor technologies -- the Westinghouse Advanced Passive 1000 Reactor and the General Electric Economic Simplified Boiling Water Reactor. The members of NuStart included DTE Energy, Duke Energy, EDF International, Entergy Nuclear, Exelon Corporation, FPL Group, Progress Energy, SCANA Corporation, Tennessee Valley Authority, Southern Nuclear, GE Energy and Westinghouse Electric Company, LLC. NuStart was dissolved in 2012.
The Borrower does not believe that DOE’s general involvement with the AP1000 reactor in connection with NuStart is within the scope of the provisions of the Appropriations Act applicable to Section 1703 of Title XVII. Further, the Cooperative Agreement would constitute a grant or cooperative agreement within the meaning of subparagraph (f) of the provisions of the Appropriations Act applicable to Section 1703 of Title XVII, provided that the obligations of DOE under the Cooperative Agreement were recorded in accordance with 31 U.S.C Section 1501(a)(5) on or before May 1, 2009.
(Signature page follows)
IN WITNESS WHEREOF, the undersigned has executed this Certificate on behalf of Borrower as of the date first written above.
GEORGIA POWER COMPANY
By:
Name:
Title:
Schedule 4.1.34
to Loan Guarantee Agreement
[FORM OF MEAG APPROPRIATIONS ACT CERTIFICATE]
Certificate
February 20, 2014
U.S. Department of Energy, as Guarantor
1000 Independence Ave. S.W.
Washington, D.C. 20585
Attn: Kenneth Cestari and Nicholas Whitcombe
Ladies and Gentlemen:
This Certificate
is delivered to you by Municipal Electric Authority of Georgia, a public body corporate and politic and instrumentality of the State of Georgia (“
MEAG Power
”), in connection with DOE’s issuance of loan guarantees to the Federal Financing Bank (“
FFB
”) pursuant to (a) that Loan Guarantee Agreement of even date herewith between Georgia Power Company (“
GPC
”), as Borrower, and the U.S. Department of Energy (“
DOE
”), as Guarantor, and (b) that Loan Guarantee Agreement of even date herewith between Oglethorpe Power Corporation (an Electric Membership Corporation)(“
OPC
”), as Borrower, and DOE, as Guarantor.
MEAG Power, GPC, OPC and the City of Dalton (“
Dalton
”) are the owners of undivided interests in two nuclear generating units, consisting of two Westinghouse AP1000 nuclear reactors, each with a nominally rated capacity of approximately 1,100 megawatts, natural draft cooling towers, intake and discharge structures, associated transmission facilities, fuel and ancillary structures supporting the power generation process, located at the Alvin W. Vogtle Electric Generating Plant located in Burke County, Georgia (“
Vogtle 3&4
”).
MEAG Power and DOE have been negotiating the terms and conditions of loan guarantee agreements (the “
LGAs
”) to be entered into by three wholly owned subsidiaries of MEAG Power (the “
SPV Borrowers
”) of which MEAG Power is the sole member. Under the LGAs, it is contemplated that (a) MEAG Power would transfer its undivided interests in Vogtle 3&4 to the SPV Borrowers (each SPV Borrower’s undivided interest in Vogtle 3&4, the “
project
”), and (b) the proceeds from the guaranteed loans contemplated by the LGAs would be used to finance a portion of such SPV Borrower’s costs of construction in connection with its project.
As used herein, “Knowledge” shall mean the actual knowledge of (a) any officer or director of MEAG Power or (b) any other natural person (whether or not an employee of MEAG Power) with primary management or supervisory responsibilities over MEAG Power and, in each case, any knowledge such person should have obtained in the diligent performance of their duties, functions and responsibilities.
MEAG Power hereby certifies in its capacity as the managing member of the SPV Borrowers, for the benefit of DOE and the Office of Management and Budget (“
OMB
”), that:
(a) to MEAG Power’s Knowledge (as defined above) as of the date hereof, based on its review of the Omnibus Appropriations Act, 2009, P.L. No. 111-8, Division C, Title III, as amended by Section 408 of the Supplemental Appropriations Act, 2009, P.L. No. 111-32 (the “
Appropriations Act
”), except for use of the proceeds of the guaranteed loans contemplated under each LGA to finance a portion of the applicable SPV Borrower’s costs of construction in connection with such SPV Borrower’s project, MEAG Power does not expect funds, personnel, or property (tangible or intangible) of any Federal agency, instrumentality, personnel or affiliated entity through acquisitions, contracts, demonstrations, exchanges, grants, incentives, leases, procurements, sales, other transaction authority, or other arrangements to be used (directly or indirectly), to support an SPV Borrower’s project or to obtain goods or services from an SPV Borrower’s project, except as set forth below; and
(b) for the reasons stated below, MEAG Power believes that the following do not preclude the use of loan guarantee authority in the Appropriations Act for the loan guarantees contemplated to be issued pursuant to the terms of the LGAs:
1. The SPV Borrowers will obtain nuclear liability insurance under the Price-Anderson Act federal insurance program with respect to the project. Such insurance is a federal insurance program within the meaning of subparagraph (c) of the provisions of the Appropriations Act applicable to Section 1703 of Title XVII.
2. Each SPV Borrower is a 100% owned subsidy of MEAG Power. MEAG Power has in the past issued both tax-exempt debt and Build America Bonds as permitted under the United States Internal Revenue Code to provide funds to aid in the development and construction of the SPV Borrowers’ projects. MEAG Power may in the future issue additional tax-exempt debt, but not Build America Bonds, to provide funds for the completion of the SPV Borrowers’ projects. MEAG Power believes that such prior and future tax-exempt financings and such prior Build America Bonds constitute otherwise allowable Federal income tax benefits within the meaning of subparagraph (a) of the provisions of the Appropriations Act applicable to Section 1703 of Title XVII.
3. The SPV Borrowers will sell all of the capacity and energy from the project to MEAG Power. MEAG Power will resell the capacity and energy to wholesale and/or retail electric suppliers which may have among their direct and/or indirect consumers federal agencies or others which use federal funds to purchase retail electric service. No service to such federal agencies or others which use federal funds is conditioned or dependent upon the construction, completion, operation or availability of the SPV Borrowers’ projects or the output thereof. MEAG Power believes the possibility of such purchases of retail electric service by federal agencies or with the use of federal funds does not prohibit Guarantor, under the provisions of the Appropriations Act applicable to Section 1703 of Title XVII, from providing the loan guarantees to be issued pursuant to the LGAs.
4. NuStart Energy Development LLC, the consortium of nine nuclear power companies operating 58 percent of the nation's nuclear power plants and two reactor vendors, executed a Cooperative Agreement with DOE in 2005 to demonstrate the Nuclear Regulatory Commission licensing process and to complete the designs for the
first advanced nuclear power reactors in the U.S. in 30 years. The Cooperative Agreement was authorized pursuant to the Department of Energy NP 2010 program and committed DOE and NuStart to participate in a 50-50 cost sharing program to complete the detailed engineering work for two advanced reactor technologies -- the Westinghouse Advanced Passive 1000 Reactor and the General Electric Economic Simplified Boiling Water Reactor. The members of NuStart included DTE Energy, Duke Energy, EDF International, Entergy Nuclear, Exelon Corporation, FPL Group, Progress Energy, SCANA Corporation, Tennessee Valley Authority, Southern Nuclear Operating Company, GE Energy and Westinghouse Electric Company, LLC. NuStart was dissolved in 2012. MEAG Power does not believe that DOE’s general involvement with the AP1000 reactor in connection with NuStart is within the scope of the provisions of the Appropriations Act applicable to Section 1703 of Title XVII. Further, the Cooperative Agreement would constitute a grant or cooperative agreement within the meaning of subparagraph (f) of the provisions of the Appropriations Act applicable to Section 1703 of Title XVII, provided that the obligations of DOE under the Cooperative Agreement were recorded in accordance with 31 U.S.C Section 1501(a)(5) on or before May 1, 2009.
(Signature page follows)
IN WITNESS WHEREOF, the undersigned has executed this Certificate on behalf of the MEAG Power as of the date first written above.
Municipal Electric Authority of Georgia,
By: ____________________________________
Name:
Title:
Schedule 5.4
to Loan Guarantee Agreement
EQUITY INTERESTS OF THE BORROWER AND OPERATOR
As shown in the table below, Southern Company owns 95.4% of the Equity Interests of the Borrower:
|
|
|
|
|
|
Class of Stock
|
Shares Outstanding
|
Votes in Election of Directors
|
Percentage
|
Common Stock(1)
|
Southern
|
9,261,500
|
9,261,500
|
95.4%
|
Preferred Stock(2)
|
0
|
0
|
0
|
0.0%
|
Class A Preferred Stock(3)
|
General Public (NYSE Listed)
|
1,800,000
|
450,000
|
4.6%
|
|
|
|
|
100.0%
|
________________________
|
|
(1)
|
The Borrower has 20,000,000 authorized shares of common stock, no par value per share (the “Common Stock”). As of the date of this Agreement, 9,261,500 shares of the Common Stock are issued and outstanding, all of which are owned by Southern Company. Each share of the Common Stock is entitled to one vote in the election of directors.
|
|
|
(2)
|
The Borrower has 5,000,000 authorized shares of preferred stock, par value $100 per share (the "Preferred Stock"). As of the date of this Agreement, no shares of the Preferred Stock are issued and outstanding.
|
|
|
(3)
|
The Borrower has 50,000,000 authorized shares of Class A preferred stock, par value $25 per share (the “Class A Preferred Stock”). As of the date of this Agreement, 1,800,000 shares ($45 million liquidation amount) of the Borrower’s 6.125% Series Class A Preferred Stock (the “Series 6.125% Stock”) are issued and outstanding, representing all of the outstanding shares of the Class A Preferred Stock. The Series 6.125% Stock is listed on the New York Stock Exchange and is held by the general public. Each share of the Class A Preferred Stock is entitled to one-fourth of one vote in the election of directors.
|
The Borrower’s authorized capital stock also consists of 15,000,000 authorized shares of preference stock, par value $100 per share (the “Preference Stock”). As of the date of this Agreement, 2,250,000 shares ($225 million liquidation amount) of the Borrower’s 6.50% Series 2007A Preference Stock (the “Series 2007A Preference Stock”) are issued and outstanding, representing all of the outstanding shares of the Preference Stock. As of the date of this Agreement, the holders of the Preference Stock are not entitled to vote generally in the election of directors. However, the Borrower’s charter provides that with the approval of the Borrower’s board of directors and the holders of a majority of the outstanding shares of the Common Stock, the Borrower’s charter may be amended to provide that the holders of the Preference Stock be entitled to vote in the election of directors, with each outstanding share of the Preference Stock entitled to such number of votes per share not to exceed one-tenth of a vote per share.
Southern Company owns 100% of the Equity Interests of the Operator. The Equity Interests of the Operator consist of 1,000 authorized shares of common stock, par value $10.00 per share, all of which are owned by Southern Company.
Schedule 5.4 - Page 1
Schedule 5.7
to Loan Guarantee Agreement
REQUIRED CONSENTS
Order of the Georgia PSC entitled “Order Approving Georgia Power Company’s Application For Financing Authority,” dated October 28, 2013.
|
|
|
|
|
|
|
|
|
Permit
|
Activity Covered
|
Agency
|
Jurisdiction
|
Permit/Reference No.
|
Date Received
|
Expiration Date
|
1.
|
Early Site Permit (ESP) and Limited Work Authorization (LWA)
|
ESP - Site approval for nuclear plant construction; LWA - approval for limited safety-related work
|
NRC
|
Federal
|
ESP-004
|
August 26, 2009
|
August 26, 2029
|
2.
|
Combined Operating Licenses (COLs)
|
Safety-related construction for a nuclear power facility
|
NRC
|
Federal
|
NPF-91,
NPF-92
|
February 10, 2012
|
N/A
|
3.
|
Limited Work Authorization (LWA-B)
|
Approval for nuclear island rebar and embeds and placement of NI base slab
|
NRC
|
Federal
|
LWA-001
LWA-002
|
February 10, 2012
|
N/A
|
4.
|
Certificate of Registration
|
Transportation of Hazardous Material
|
USDOT
|
Federal
|
060313 551 085V
|
June 3, 2013
|
June 30, 2014
|
5.
|
Migratory Bird Treaty Act Special Purpose - Utility (Avian Mortality Monitoring) F.K.A. Salvage Permit
|
Handling of migratory bird carcasses and relocation of certain nests
|
USFWS
|
Federal
|
MB745135-1
|
February 28, 2013
|
March 31, 2015
|
6.
|
Clean Water Act Section 404 and Rivers and Harbors Act Section 10 Permit
|
Disturbance of crossing wetland areas or navigable waters;
New intake/discharge infrastructure in Savannah River
|
USACE
|
Federal
|
SAS-2007-01837
|
September 30, 2010; modified March 2, 2011
|
September 30, 2015
|
7.
|
Private Aids to Navigation
|
Aids to navigation at discharge infrastructure
|
USCG
|
Federal
|
N/A
|
October 30, 2013
|
October 30, 2014
|
8.
|
Section 401 Certification
|
Compliance with water quality standards
|
GDNR
|
State
|
JPN 200701837
|
June 1, 2010
|
N/A
|
|
|
|
|
|
|
|
|
|
9.
|
Certificate of Public Convenience and Necessity
|
Present and future public convenience and necessity requiring the operation of such equipment or facility
|
GA PSC
|
State
|
Docket No. 27800-U
|
March 17, 2009
|
N/A
|
10.
|
Georgia SIP Synthetic Minor Air Permit
|
Construction air emission sources
|
GDNR
|
State
|
169-033-039-S-01-0
|
June 18, 2009
|
N/A
|
11.
|
Georgia PSD Construction and Part 70 Operating Air Permit
|
Construction of plant air emission sources
|
GDNR
|
State
|
4911-033-0030-V-02-3
|
April 9, 2010 (construction)
June 14, 2010 (operation)
|
N/A
|
12.
|
Title V Operating Permit
|
Operation of air emission sources
|
GDNR
|
State
|
4911-033-0030-V-03-0
|
July 11, 2012
|
July 10, 2017
|
13.
|
Permit to Operate a Public Water System
|
Operate a public, non-transient, non-community water system
|
GDNR
|
State
|
PG0330056
|
July 14, 2010
|
July 13, 2020
|
14.
|
Permit to Withdraw Groundwater - Make up Wells 3 and 4
|
Consumptive use of 100,000 gallons per day or more of groundwater
|
GDNR
|
State
|
017-0003
|
March 9, 2012
|
September 1, 2020
|
15.
|
Permit to Withdraw Groundwater - Dewatering Activities
|
Dewater for foundation if needed for more than 60 days
|
GDNR
|
State
|
017-0006
|
March 9, 2012
|
March 13, 2015
|
|
|
|
|
|
|
|
|
|
16.
|
Solid Waste Handling Permit
|
Collection and transportation of garbage and other putrescible waste for disposal in an off-site municipal solid waste landfill
|
GDNR
|
State
|
PBR-017-07COL
|
December 28, 2000
|
N/A
|
17.
|
Solid Waste Landfill Buffer Variance (Landfill #2)
|
Variance from buffer requirements for Landfill #2 to accommodate haul road and surface water intake pipe construction
|
GDNR
|
State
|
Permit No. 017-006D(LI)
|
February 5, 2010
|
N/A
|
18.
|
Private Industrial Landfill Certificate of Clean Closure
(Landfill #3)
|
Certificate of Clean Closure of Landfill #3 to construct Vogtle 3 & 4
|
GDNR
|
State
|
017-007D(LI)
|
August 13, 2010
|
N/A
|
19.
|
No Further Action Status for Removal of Underground Storage Tanks
|
Removal of USTs to construct Vogtle 3 & 4
|
GDNR
|
State
|
N/A
|
December 1, 2009
|
N/A
|
20.
|
Hazardous Waste Generation Facility Wide EPA I.D. Number
|
Necessary to generate hazardous waste
|
GDNR
|
State
|
GAD094066321
|
November 5, 2013
(amended notification recognized by GDNR)
|
N/A
|
21.
|
Scientific Collecting Permit
|
State permit for collection of specimens
|
GDNR
|
State
|
29-WJH-13-34
|
February 13, 2013
|
March 31, 2014
|
22.
|
State Waters Buffer Variance
|
Land disturbing activities within 25’ state waters buffer
|
GDNR
|
State
|
BV-017-10-01
|
April 29, 2010
|
N/A
|
23.
|
NPDES Wastewater Permit
|
Regulates limits of pollutants in liquid discharge to surface water (Ready-Mixed Concrete Batch Plant)
|
GDNR
|
State
|
GA0039276
|
April 16, 2010
|
March 31, 2015
|
|
|
|
|
|
|
|
|
|
24.
|
NPDES Wastewater Permit
|
Regulates limits of pollutants in liquid discharge to surface water
(Units 1 & 2)
|
GDNR
|
State
|
GA0026786
|
June 30, 1999
|
May 31, 2004 (administratively extended)
|
25.
|
Infrastructure Projects Construction Storm Water Permit
|
Discharge storm water from linear construction sites (e.g. Roadways, transmission line and rail corridor) (On-Site Switchyard)
|
GDNR
|
State
|
GAR100002
|
September 24, 2013
|
July 31, 2018
|
26.
|
Stand-Alone Construction Projects Storm Water Permit
|
Discharge storm water from site during construction (Construction Activities)
|
GDNR
|
State
|
GAR100001
|
September 24, 2013
|
July 31, 2018
|
27.
|
NPDES Wastewater Permit
|
Regulates limits of pollutants in liquid discharge to surface water
|
GDNR
|
State
|
|
Future Consent
|
|
28.
|
General Permit for Industrial Storm Water Discharges
|
Discharge storm water associated with industrial activity
|
GDNR
|
State
|
|
Future Consent
|
|
29.
|
Permit to Withdraw Surface Water
|
Surface water withdrawal
|
GDNR
|
State
|
|
Future Consent
|
|
30.
|
General Permit to Transport Radioactive Materials
|
Transportation of radioactive materials in the State of Georgia
|
GDNR/GDPS
|
State
|
|
Future Consent
|
|
31.
|
Tennessee Radioactive Waste License-for-Delivery
|
Transportation of radioactive materials into the State of Tennessee
|
TDEC
|
State
|
|
Future Consent
|
|
32.
|
Utah Radiation Control Rule
|
Transportation of radioactive materials into the State of Utah
|
UDEQ
|
State
|
|
Future Consent
|
|
|
|
|
|
|
|
|
|
|
33.
|
South Carolina Radioactive Waste Transport Permit
|
Transportation of radioactive materials into the State of South Carolina
|
SCDHEC
|
State
|
|
Future Consent
|
|
34.
|
Texas Radioactive Waste Transport
|
Transportation of radioactive materials into the State of Texas
|
TCEQ
|
State
|
|
Future Consent
|
|
35.
|
Scientific Collecting Permit
|
State permit for collection of specimens
|
SCDNR
|
State
|
F-13-17
|
January 6, 2014
|
December 31, 2014
|
36.
|
Building Permit (Security Training Facility) and Certificate of Occupancy (Training Center B)
|
Construction, alteration, repair, or demolition of any building or structure within the boundaries of Burke County
|
Burke County
|
County
|
Permit No. 751 (Security)
Permit Nos. 764 & 765 (Security)
Permit No. B-28-10 (Training Center B)
|
Sept. 24, 2013 (No. 751)
Oct. 3, 2013 (Nos. 746 & 765)
July 20, 2011 (Training Center B)
|
N/A
|
37.
|
Utility Encroachment Permit
|
Placement of utilities on County right of way
|
Burke County
|
County
|
6-26
|
November 12, 2013
|
N/A
|
As noted in the expiration date column of this
Schedule 5.7
, many of the Governmental Approvals identified on this
Schedule 5.7
expire. The Borrower or Operator must timely apply for a renewal or reissuance of such Governmental Approvals, and such Governmental Approvals must be renewed or reissued in connection with the construction and operation of the Project.
We note that Governmental Authorities retain the right to suspend, modify or revoke Governmental Approvals, including the Governmental Approvals identified on this
Schedule 5.7
and that Borrower or Operator may seek a modification of the Governmental Approvals identified on this
Schedule 5.7
.
Schedule 5.8
to Loan Guarantee Agreement
GOVERNMENTAL JUDGMENTS
None.
Schedule 5.8
Schedule 5.11(a)
to Loan Guarantee Agreement
COMPLIANCE WITH ENVIRONMENTAL LAWS
None
Schedule 5.11(a)
Schedule 6.3
to Loan Guarantee Agreement
REQUIRED INSURANCES
Capitalized terms used in this
Schedule 6.3
and not otherwise defined in this
Schedule 6.3
shall have the meanings assigned to them in the Loan Guarantee Agreement. All insurance requirements in this
Schedule 6.3
are subject to the qualification, contained in Section 6.3 of the Loan Guarantee Agreement, that such coverages, endorsements and/or waivers are available from time to time on commercially reasonable terms, conditions and price.
Section I.
Insurance during Construction
|
|
(a)
|
Required Insurance
. The Borrower, on its own behalf and as agent for the other Owners, shall maintain at the expense of the Owners, or shall cause the EPC Contractor to maintain, the following insurance policies, with not less than the limits and coverage provisions set forth in this Section I(a):
|
|
|
1.
|
NEIL Builder’s Risk Policy No. BR10-001 (“Builder’s Risk”), substantially in the form attached to the Borrower Certificate delivered pursuant to
Section 4.1.14(a)
of the Loan Guarantee Agreement.
|
|
|
2.
|
Global cargo transit insurance Layered Program Policy Number B0509JQ046809 (“Cargo”), substantially in the form attached to the Borrower Certificate delivered pursuant to
Section 4.1.14(a)
of the Loan Guarantee Agreement.
|
|
|
3.
|
Delay in startup insurance (“DSU”) provided under the Builder’s Risk and Cargo insurance policies described in subsections (a)(1) and (a)(2) above.
|
|
|
4.
|
Owner-Controlled Insurance Program (“OCIP”) Policy Numbers GLO5477145 and WC5477146 (Zurich), 7275653 (National Union), MNU754229/01/2010 (Axis), WCSINAT50011710 (Starr), US00012178LI10A (XL America), and IE00014117LI10A (XL Dublin), substantially in the forms attached to the Borrower Certificate delivered pursuant to
Section 4.1.14(a)
of the Loan Guarantee Agreement.
|
|
|
5.
|
Sudden and accidental pollution insurance policy with respect to the Project with a limit of not less than $2,000,000 per occurrence, $4,000,000 aggregate until the Final Completion Date (as defined in the EPC Contract). Such coverage may be included in the OCIP coverage.
|
|
|
(b)
|
Endorsements to Policies
. Borrower shall use commercially reasonable efforts to ensure that all insurance policies (except as indicated otherwise in items 1 and 3 below) described in Section I(a) above are endorsed as follows:
|
|
|
1.
|
to provide a severability of interests or cross liability clause (only for liability policies under the OCIP coverage);
|
|
|
2.
|
to provide that such policy shall be primary and not excess to or contributing with any insurance or self‑insurance maintained by the Secured Parties;
|
|
|
3.
|
with respect to the Builder’s Risk coverage maintained by the Borrower, on its own behalf and as agent for the other Owners, to name the Secured Parties as additional insureds;
|
|
|
4.
|
with respect to insurance policies maintained by the EPC Contractor, to waive any rights by the insurance carriers to subrogate against the Borrower or the Secured Parties, and with respect to insurance policies maintained by the Borrower, to waive any rights by all insurance carriers to subrogate against the Secured Parties; and
|
|
|
5.
|
The Borrower, on its own behalf and as agent for the other Owners, shall use commercially reasonable efforts to provide that no policy cancellations or material changes that reduce coverage on the Secured Parties’ interests (other than any such policy cancellations with respect to the Builder’s Risk, Cargo and DSU coverages) shall become effective except upon at least 30 days prior written notice to DOE.
|
|
|
6.
|
The Borrower, on its own behalf and as agent for the other Owners, shall use commercially reasonable efforts to provide that no policy cancellations of the Builder’s Risk, Cargo and DSU coverages can be made unless for non-payment of premium, for which the Borrower will use commercially reasonable efforts to require the insurer to give at least 10 days prior written notice to DOE.
|
Section II.
Insurance during Operation
|
|
(a)
|
Required Insurance
. The Borrower, on its own behalf and as agent for the other Owners, shall, or shall cause the Operator to, procure at the expense of the Owners and maintain in full force and effect the following insurance policies with respect to the Project with not less than the limits and coverage provisions set forth in this Section II(a). Coverage required by this Section II(a) shall be effective with no lapse of coverage between the expiration/cancellation of the NEIL Builder’s Risk policy and placing into effect the nuclear property damage insurance policy (Section II(a)(1) below) from (1) the Substantial Completion Date (as defined in the EPC Contract), (2) such other date that is consistent with the then-current generally accepted practices of owners and operators of U.S. commercial nuclear power plants, or (3) as otherwise mutually agreed upon by the Borrower and DOE (following consultation with the Insurance Advisor); provided, however, that nuclear-related insurance coverages shall be put into effect whenever required by the regulations of the NRC.
|
|
|
1.
|
Nuclear property damage insurance in accordance with the regulations of the NRC and otherwise consistent with the then-current generally accepted practices of owners and operators of U.S. commercial nuclear power plants.
|
|
|
2.
|
Nuclear accidental outage insurance related to any property damage that causes an interruption of operations, consistent with the then-current generally accepted practices of owners and operators of U.S. commercial nuclear power plants.
|
|
|
3.
|
Nuclear suppliers and transporters liability insurance not covered under the nuclear liability insurance (Section II(a)(5) below), consistent with the then-current generally accepted practices of owners and operators of U.S. commercial nuclear power plants.
|
|
|
4.
|
The following conventional (non-nuclear) liability insurance, consistent with the then-current generally accepted practices of owners and operators of U.S. commercial nuclear power plants: government-mandated workers’ compensation, employer’s liability, general liability, automobile liability and excess liability.
|
|
|
5.
|
Nuclear liability insurance coverage in accordance with the regulations of the NRC.
|
|
|
6.
|
Nuclear worker liability insurance, consistent with the then-current generally accepted practices of owners and operators of U.S. commercial nuclear power plants.
|
|
|
(b)
|
Endorsements to Policies
. The Borrower, on its own behalf and as agent for the other Owners, shall use commercially reasonable efforts to provide that all insurance policies (except as indicated otherwise in items 1 and 3 below) maintained by Borrower and Operator pursuant to Section II(a) are endorsed to:
|
|
|
1.
|
provide a severability of interest or cross liability clause (on general liability coverage only);
|
|
|
2.
|
provide that the insurance shall be primary and not excess to or contributing with any other insurance or self‑insurance maintained by the Secured Parties;
|
|
|
3.
|
except for any workers’ compensation and employer’s liability insurance, name the Secured Parties as additional insureds;
|
|
|
4.
|
contain provisions that no policy cancellations or material changes that reduce coverage on the Secured Parties’ interests (other than any such policy cancellations with respect to the nuclear property damage insurance coverage (Section II(a)(1) above)) shall become effective except upon at least 30 days prior written notice to DOE;
|
|
|
5.
|
contain provisions that no policy cancellations of the nuclear property damage insurance coverage (Section II(a)(1) above) can be made unless for non-payment of premium, for which the Borrower will use commercially reasonable efforts to require the insurer to give at least 10 days prior written notice to DOE; and
|
|
|
6.
|
waive any subrogation rights that the insurers may have against the Secured Parties.
|
|
|
(c)
|
Evidence of Insurance
. The Borrower, on its own behalf and as agent for the other Owners, shall, or shall cause the Operator, upon request from DOE from time to time, to deliver to DOE evidence of insurance required to be maintained by the Borrower or Operator under this Section II, including certificates of insurance and, when available, at DOE’s request, certified copies of any insurance policies.
|
Section III.
General Conditions applying to all Insurance Required under Sections I and II
|
|
(a)
|
Retrospective Rated Policies
. It is understood and agreed that certain policies are rated on a retrospective rated basis which is acceptable.
|
|
|
(b)
|
Non-renewal; Tail Coverage
. In the event that any policy required to be maintained by Borrower pursuant to this
Schedule 6.3
is written on a “claims-made” basis and such policy is not renewed or the retroactive date of such policy is to be changed, the Borrower shall use commercially reasonable efforts to obtain for each such policy or policies a ten-year extended reporting period coverage (“Tail Coverage”) dated back to the original effective date of such coverage. Borrower shall provide DOE with evidence of any such Tail Coverage.
|
Schedule 6.11(h)(i)
to Loan Guarantee Agreement
DAVIS-BACON ACT WAGE DETERMINATION(S)
26
|
|
1.
|
For all construction (as defined in DOL regulations at 29 CFR 5.2 to include installation where appropriate, hereinafter “construction”) under the Engineering, Procurement and Construction (EPC) contract and other prime contracts for construction in effect at the time of loan guarantee closing, and subcontracts thereunder, incorporate the following “Heavy” wage determination schedule: GA90 Modification 0 (1/03/14), found at: http://www.wdol.gov/wdol/scafiles/davisbacon/GA90.dvb, and attached hereto as
Exhibit 1
.
|
|
|
2.
|
For all construction under the EPC contract and other prime contracts for construction in effect at the time of loan guarantee closing, and subcontracts thereunder, on sheltered enclosures with walk-in access for the purpose of housing persons, machinery, equipment, incorporate the following “Building” wage determination schedule: GA126 Modification 1 (1/17/14) found at http://www.wdol.gov/wdol/scafiles/davisbacon/GA126.dvb, and attached hereto as
Exhibit 2
.
|
|
|
3.
|
For all construction under the EPC contract and other prime contracts for construction in effect at the time of loan guarantee closing, and subcontracts thereunder, on paved roads and other paved surfaces, please use GA7 Modification 0 (1/3/14) “Highway” schedule found at http://www.wdol.gov/wdol/scafiles/davisbacon/GA7.dvb, and attached hereto as
Exhibit 3
.
|
_______________
26
To be updated the week before the Loan Guarantee Agreement is signed.
Schedule 6.11(h)(i) - Page 1
Exhibit 1
General Decision Number: GA140090 01/03/2014 GA90
Superseded General Decision Number: GA20130090
State: Georgia
Construction Type: Heavy
Heavy Construction, Includes Water and Sewer Lines, and Heavy Construction on Treatment Plant Sites and Industrial Sites (Refineries, Power Plants, Chemical and Manufacturing Plants, Paper Mills, Etc.)
Counties: Burke, McDuffie and Richmond Counties in Georgia.
|
|
|
|
|
Modification Number
|
|
Publication Date
|
|
0
|
|
1/3/2014
|
|
* ELEC1579-002 10/01/2013
|
|
|
|
|
|
|
|
Rates
|
Fringes
|
|
|
|
|
|
|
ELECTRICIAN
|
$23.00
|
11.40
|
|
----------------------------------------------------------------
|
|
ENGI0474-029 07/01/2013
|
|
|
|
|
|
|
|
BURKE & RICHMOND COUNTIES
|
|
|
|
|
|
|
|
|
|
Rates
|
Fringes
|
|
|
|
|
|
|
POWER EQUIPMENT OPERATOR:
|
|
|
|
Crane: 119 Tons and Under.
|
$24.55
|
12.30
|
|
|
Crane: 120 to 249 Tons
|
$25.55
|
12.30
|
|
|
Crane: 250 to 499 Tons
|
$26.55
|
12.30
|
|
|
Crane: 500 Tons and Larger
|
$27.55
|
12.30
|
|
|
Mechanic
|
$24.55
|
12.30
|
|
----------------------------------------------------------------
|
|
ENGI0926-032 07/01/2013
|
|
|
|
MCDUFFIE COUNTY
|
|
|
|
|
|
Rates
|
Fringes
|
|
POWER EQUIPMENT OPERATOR:
|
|
|
|
Crane, Mechanic
|
$27.88
|
10.13
|
|
Schedule 6.11(h)(i) - Page 2
|
|
|
|
|
|
----------------------------------------------------------------
|
|
SUGA2012-108 08/11/2012
|
|
|
|
|
|
|
|
|
|
Rates
|
Fringes
|
|
CARPENTER (Form Work Only).
|
$ 15.44
|
0.00
|
|
CARPENTER, Excludes Form Work
|
$ 14.76
|
0.00
|
|
CEMENT MASON/CONCRETE FINISHER
|
$ 16.96
|
0.00
|
|
IRONWORKER, REINFORCING.
|
$ 13.30
|
1.66
|
|
LABORER: Common or General
|
$ 9.84
|
0.00
|
|
LABORER: Pipelayer.
|
$ 9.48
|
0.00
|
|
OPERATOR:
|
|
|
|
Backhoe/Excavator/Trackhoe
|
$ 12.80
|
0.00
|
|
OPERATOR: Bulldozer
|
$ 14.58
|
0.00
|
|
OPERATOR: Grader/Blade
|
$ 20.24
|
0.00
|
|
OPERATOR: Loader
|
$ 16.59
|
4.13
|
|
OPERATOR: Piledriver
|
$18.72
|
2.06
|
|
OPERATOR: Roller
|
$ 12.04
|
0.69
|
|
TRUCK DRIVER: Dump Truck.
|
$ 12.79
|
0.00
|
|
TRUCK DRIVER: Lowboy Truck
|
$ 17.28
|
1.84
|
|
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
================================================================
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
----------------------------------------------------------------
Schedule 6.11(h)(i) - Page 3
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of “identifiers” that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than “SU” denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an “SU” identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
Schedule 6.11(h)(i) - Page 4
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party’s position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
END OF GENERAL DECISION
Schedule 6.11(h)(i) - Page 5
Exhibit 2
General Decision Number: GA140126 01/17/2014 GA126
Superseded General Decision Number: GA20130126
State: Georgia
Construction Type: Building
County: Burke County in Georgia.
|
|
|
|
|
Modification Number
|
|
Publication Date
|
|
0
|
|
1/3/2014
|
|
1
|
|
1/17/2014
|
|
BOIL0026-001 01/01/2013
|
|
|
|
|
|
|
|
Rates
|
Fringes
|
|
|
|
|
|
|
BOILERMAKER
|
$ 24.91
|
19.69
|
|
----------------------------------------------------------------
|
|
* ELEV0032-001 01/01/2014
|
|
|
|
|
|
|
|
|
|
Rates
|
Fringes
|
|
|
|
|
|
ELEVATOR MECHANIC
|
$ 36.96
|
26.785+a+b
|
|
PAID HOLIDAYS:
a. New Year’s Day, Memorial Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years’ service.
----------------------------------------------------------------
ENGI0474-003 07/01/2013
|
|
|
|
|
|
|
|
Rates
|
Fringes
|
|
POWER EQUIPMENT OPERATOR:
|
|
|
|
Backhoe/Excavator,
Bobcat/Skid Steer/Skid
Loader, Bulldozer,
Forklift (under 15 tons), and Loader.
|
$ 22.72
|
12.30
|
|
Schedule 6.11(h)(i) - Page 6
|
|
|
|
|
|
SUGA2012-108 08/11/2012
|
|
|
|
Crane (over 10 tons) and
Forklift (15 tons and over)
|
$ 24.55
|
12.30
|
|
|
Crane (over 120 tons)
|
$ 25.55
|
12.30
|
|
|
Crane (over 250 tons)
|
$ 26.55
|
12.30
|
|
|
Oiler
|
$ 20.38
|
12.30
|
|
----------------------------------------------------------------
|
|
|
PLUM0150-006 10/01/2012
|
|
|
|
|
|
Rates
|
Fringes
|
|
PLUMBER/PIPEFITTER
|
$ 22.94
|
12.71
|
|
----------------------------------------------------------------
|
|
|
SHEE0085-003 08/01/2012
|
|
|
|
|
|
|
|
|
|
Rates
|
Fringes
|
|
SHEET METAL WORKER (Including
HVAC Duct Installation;
Excluding Metal Roof
Installation)
|
$ 28.34
|
11.55
|
|
----------------------------------------------------------------
|
|
|
SUGA2012-033 08/11/2012
|
|
|
|
|
|
Rates
|
Fringes
|
|
BRICKLAYER
|
$ 16.00
|
0.00
|
|
CARPENTER, Includes Drywall
Hanging and Metal Stud
Installation
|
$ 15.28
|
0.00
|
|
CEMENT MASON/CONCRETE FINISHER
|
$ 16.58
|
0.00
|
|
DRYWALL FINISHER/TAPER.
|
$ 17.00
|
0.00
|
|
ELECTRICIAN
|
$ 19.71
|
3.60
|
|
HVAC MECHANIC (Installation
of HVAC Unit Only, Excludes
Installation of HVAC Pipe and
Duct)
|
$ 18.00
|
3.89
|
|
IRONWORKER, REINFORCING
|
$ 17.94
|
0.00
|
|
IRONWORKER, STRUCTURAL
|
$ 20.00
|
0.35
|
|
Schedule 6.11(h)(i) - Page 7
|
|
|
|
|
|
LABORER: Common or General
|
$ 10.25
|
0.32
|
|
LABORER: Mason Tender - Brick
|
$ 9.00
|
0.00
|
|
LABORER: Pipelayer.
|
$ 12.00
|
0.23
|
|
OPERATOR: Grader/Blade
|
$ 17.52
|
0.00
|
|
PAINTER: Brush, Roller and Spray
|
$ 16.00
|
1.62
|
|
ROOFER (Installation of Metal Roofs Only)
|
$ 15.02
|
0.00
|
|
ROOFER, Excludes Installation
of Metal Roofs
|
$ 10.76
|
0.00
|
|
TILE FINISHER
|
$ 10.31
|
0.00
|
|
TILE SETTER
|
$ 19.50
|
0.00
|
|
TRUCK DRIVER: Dump Truck
|
$ 12.70
|
0.00
|
|
TRUCK DRIVER: Lowboy Truck
|
$ 17.41
|
0.00
|
|
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
================================================================
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
----------------------------------------------------------------
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of “identifiers” that indicate whether the particular rate is union or non-union.
Union Identifiers
Schedule 6.11(h)(i) - Page 8
An identifier enclosed in dotted lines beginning with characters other than “SU” denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an “SU” identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
Schedule 6.11(h)(i) - Page 9
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party’s position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
END OF GENERAL DECISION
Schedule 6.11(h)(i) - Page 10
Exhibit 3
General Decision Number: GA140007 01/03/2014 GA7
Superseded General Decision Number: GA20130007
State: Georgia
Construction Type: Highway
Counties: Burke, Columbia, Glascock, Hancock, Jefferson,
Jenkins, Lincoln, McDuffie, Richmond, Taliaferro, Warren,
Washington and Wilkes Counties in Georgia.
HIGHWAY CONSTRUCTION PROJECTS
|
|
|
|
|
Modification Number
|
|
Publication Date
|
|
0
|
|
1/3/2014
|
|
SUGA2011-007 03/07/2011
|
|
|
|
|
|
|
|
Rates
|
Fringes
|
|
CARPENTER
|
$ 11.45
|
|
|
CEMENT MASON/CONCRETE FINISHER
|
$ 11.36
|
|
|
LABORER
|
|
|
|
|
Asphalt Raker
|
$ 11.00
|
|
|
|
Asphalt Screed Person
|
$ 10.50
|
|
|
|
Common or General
|
$ 8.93
|
|
|
|
Form Setter
|
$ 10.35
|
|
|
|
Guardrail Erector
|
$ 13.50
|
|
|
|
Milling Machine Ground Person
|
$ 10.00
|
|
|
|
Pipe Layer
|
$ 10.20
|
|
|
POWER EQUIPMENT OPERATOR:
|
|
|
|
|
Asphalt Distributor
|
$ 14.10
|
|
|
|
Asphalt Paver/Spreader
|
$ 12.00
|
|
|
|
Backhoe/Excavator.
|
$ 10.80
|
|
|
|
Bulldozer
|
$ 11.60
|
|
|
|
Compactor
|
$10.00
|
|
|
|
Crane/Dragline.
|
$ 17.50
|
|
|
|
Front End Loader.
|
$ 10.70
|
|
|
|
Material Transfer Vehicle (Shuttle Buggy).
|
$ 11.30
|
|
|
Schedule 6.11(h)(i) - Page 11
|
|
|
|
|
|
|
Mechanic
|
$ 12.75
|
|
|
|
Milling Machine
|
$ 11.50
|
|
|
|
Motorgrader Fine Grade
|
$ 14.55
|
|
|
|
Motorgrader Fine Grade
|
$ 16.00
|
|
|
|
Roller
|
$ 10.00
|
|
|
|
Water Truck
|
$ 11.25
|
|
|
TRUCK DRIVER
|
|
|
|
|
26,000 GVW & Under
|
$ 10.79
|
|
|
|
26,001 GVW & Over.
|
$ 12.75
|
|
|
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
================================================================
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
----------------------------------------------------------------
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of “identifiers” that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than “SU” denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Schedule 6.11(h)(i) - Page 12
Non-Union Identifiers
Classifications listed under an “SU” identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Schedule 6.11(h)(i) - Page 13
The request should be accompanied by a full statement of the interested party’s position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
END OF GENERAL DECISION
Schedule 6.11(h)(i) - Page 14
Schedule 7.4
to Loan Guarantee Agreement
PROVISIONS OF CERTAIN PROJECT DOCUMENTS
NOT TO BE AMENDED WITHOUT DOE CONSENT
|
|
i.
|
Section 1.4 (
Ownership of Additional Units as Tenants in Common
);
|
|
|
ii.
|
Section 1.5 (
Authorization of Georgia Power as Agent for the Participating Parties
) (third sentence, which provides the standards of Agent conduct);
|
|
|
iii.
|
Section 2.1 (
Grant of Right to Use Existing Resources
);
|
|
|
iv.
|
Exhibit A (
Identified Sites
);
|
|
|
i.
|
Section 4.1 (Tenants
in Common
);
|
|
|
ii.
|
Section 4.2 (
Alienation and Assignment
);
|
|
|
iii.
|
Section 4.9(c) (
Property Rights
);
|
|
|
iv.
|
Section 7.7 (
Non-Payment
);
|
|
|
v.
|
Section 7.10 (
Right of Lenders to Make Payments
);
|
|
|
vi.
|
Definition of “Additional Unit Property”;
|
|
|
vii.
|
Definition of “Additional Unit Properties”;
|
|
|
viii.
|
Definition of “Additional Unit”;
|
|
|
ix.
|
Definition of “Additional Units”;
|
|
|
x.
|
Definition of “Agent”;
|
|
|
xii.
|
Definition of “Commercial Operation”;
|
|
|
xiii.
|
Definition of “Cost of Construction”;
|
|
|
xiv.
|
Definition of “Decommissioning”;
|
|
|
xvi.
|
Definition of “Existing Unit Ownership Agreement”;
|
|
|
xvii.
|
Definition of “Existing Units”;
|
|
|
xviii.
|
Definition of “Final Percentage Interest”;
|
|
|
xix.
|
Definition of “Identified Site”;
|
|
|
xx.
|
Definition of “Identified Sites”;
|
|
|
xxi.
|
Definition of “Initial Percentage Interest”;
|
|
|
xxii.
|
Definition of “Major Milestone”;
|
|
|
xxiii.
|
Definition of “Maximum Binding Percentage”;
|
|
|
xxiv.
|
Definition of “Minimum Binding Percentage”;
|
|
|
xxv.
|
Definition of “Ownership Interest”;
|
|
|
xxvi.
|
Definition of “Party”;
|
|
|
xxvii.
|
Definition of “Participating Party”;
|
|
|
xxviii.
|
Definition of “Participating Parties”;
|
|
|
xxix.
|
Definition of “Plant Vogtle”;
|
|
|
xxx.
|
Definition of “Related Facilities”;
|
|
|
xxxi.
|
Definition of “Supplemental Percentage Interest”;
|
|
|
xxxii.
|
Definition of “Uniform System of Accounts”;
|
|
|
xxxiii.
|
Definition of “Weighted Ownership Interest in Plant Vogtle”;
|
|
|
xxxiv.
|
Exhibit A-1 (
Description of Identified Sites
);
|
|
|
i.
|
Article II (Operating
Agent
);
|
|
|
ii.
|
Section 3.1 (
Operation
);
|
|
|
iii.
|
Section 3.3 (
Agreements to Recognize Successor Agent
);
|
|
|
iv.
|
Section 3.4 (
Agreements to Acknowledge Information Rights
);
|
|
|
d.
|
Nuclear Managing Board Agreement
|
|
|
i.
|
Section 5.1.1 (Information
to be Provided to the Participants
) (last sentence);
|
|
|
ii.
|
Section 5.6 (
Civil Penalties and Meetings
);
|
|
|
e.
|
Declaration of Covenants
|
|
|
i.
|
Section 9(e) (Notice) (last paragraph);
|
|
|
f.
|
Nuclear Operating Agreement:
|
|
|
i.
|
Sections 2.7.2 (initial paragraph) and 2.7.2.1 (
Contracts with Non-affiliated Third Parties
);
|
|
|
ii.
|
Section 3.6 (
Management Audit
);
|
|
|
iii.
|
Section 3.7 (
Civil Penalties and Meetings
);
|
|
|
iv.
|
Section 5.1.7 (
Right to Audit Costs and Inspect Records
);
|
|
|
v.
|
Section 6.3 (Safeguards
Information
) (with respect to the last sentence only);
|
|
|
vi.
|
Section 6.1(b) (
Confidentiality
);
|
|
|
vii.
|
Section 10.1 (
Termination
) (lead-in paragraph; clauses (i) and (ii));
|
|
|
viii.
|
Section 11.8 (
Sale or Disposal of Property
);
|
|
|
ix.
|
Section 11.13 (
Third-Party Beneficiaries
);
|
|
|
g.
|
Letter Agreement for Construction Services:
|
|
|
i.
|
Section 3(a) (Assignment
to Successor/Replacement of Co-owners’ Agent
);
|
|
|
ii.
|
Section 3(c) (
Vendor and Supplier Confidential Information
);
|
|
|
iii.
|
Section 6 (
Audit Obligations
);
|
|
|
iv.
|
Section 7 (
Third-Party Beneficiaries
);
|
|
|
v.
|
Section 8 (Term
and Termination
) (second paragraph and clauses (i) and (ii)); and
|
|
|
vi.
|
Section 9 (
Plant
Access
and Safety Conscious Work Environment
) (with respect to the last sentence only).
|
Schedule 10.1
to Loan Guarantee Agreement
ADDRESSES
If to the Guarantor:
United States Department of Energy
Loan Guarantee Program
1000 Independence Avenue, SW
Washington, D.C. 20585
Attn: Director, Portfolio Management
Fax: (202) 287-6967
Email: lpo.portfolio@hq.doe.gov
with copies to:
United States Department of Energy
Loan Guarantee Program
1000 Independence Ave., SW
Washington, D.C. 20585
Attn: Kenneth Cestari
Email: Kenneth.Cestari@hq.doe.gov
Telephone: (202) 287-5523
If to FFB:
The Federal Financing Bank
Main Treasury Building
1500 Pennsylvania Ave, NW
Washington, DC 20220
Attn: Chief Financial Officer
Telephone: (202) 622-2470
Facsimile: (202) 622-0707
If to the Collateral Agent:
PNC Bank, National Association, doing business as Midland Loan Services, a division of PNC Bank, National Association
10851 Mastin Street, Suite 700
Overland Park, KS 66210
Attention: Government Services
Telephone: (913) 253-9000
Facsimile: (913) 253-9709
Email address: mls.doe@midlandls.com
with a copy to (which copy shall not constitute notice):
PNC Bank, National Association, doing business as Midland Loan Services, a division of PNC Bank, National Association
10851 Mastin Street, Suite 700
Overland Park, KS 66210
Attention: General Counsel
Telephone: (913) 253-9000
Facsimile: (913) 253-9709
Email address: governmentservices@midlandls.com
If to the Borrower:
Georgia Power Company
241 Ralph McGill Blvd.
BIN 10240
Atlanta, GA 30308
Attention: Office of the General Counsel
Fax: 404-506-2725
Email: tpbishop@southernco.com
If to the Operator:
Southern Nuclear Operating Company, Inc.
c/o Balch & Bingham LLP
1710 Sixth Avenue North
Birmingham, AL 35203-2015
Attention: Stan Blanton, Partner
Fax: (205) 488-5879
Email: SBLANTON@balch.com
If to OPC:
Oglethorpe Power Corporation
2100 East Exchange Place
Tucker, Georgia 30034-5336
Attention: Chief Financial Officer
Fax: 770-270-7977
Email: betsy.higgins@opc.com
With a copy to:
Oglethorpe Power Corporation
2100 East Exchange Place
Tucker, GA 30084-5336
Attention: General Counsel
Fax: 770-270-7977
E-mail: chuck.whitney@opc.com
If to MEAG:
Municipal Electric Authority of Georgia
1470 Riveredge Pkwy, NW
Atlanta, Georgia 30328-4686
Attention: President and CEO
Facsimile: 866-422-2976
Email: bjohnston@meagpower.org
With a copy to:
Municipal Electric Authority of Georgia
1470 Riveredge Pkwy, NW
Atlanta, Georgia 303028-4686
Attention: Senior Vice President & General Counsel
Facsimile: 866-422-2976
Email: pdegnan@meagpower.org
DOE (Title XVII)
GEORGIA POWER COMPANY
Exhibit 4.2
NOTE PURCHASE AGREEMENT
made as of February 20, 2014, by and among the
FEDERAL FINANCING BANK
("
FFB
"), a body corporate and instrumentality of the United States of America,
GEORGIA POWER COMPANY
(the "
Borrower
"), a corporation duly organized and existing under the laws of the State of Georgia, and the
SECRETARY OF ENERGY, acting through the Department of Energy
(the "
Secretary
").
WHEREAS,
the Secretary is authorized, pursuant to the Guarantee Act (as hereinafter defined), to guarantee loans that meet the requirements of the Guarantee Act; and
WHEREAS,
FFB is authorized, under section 6(a) of the FFB Act (as hereinafter defined), to make commitments to purchase, and to purchase on terms and conditions determined by FFB, any obligation that is issued, sold, or guaranteed by an agency of the United States of America; and
WHEREAS,
pursuant to the FFB Act, FFB has entered into the Program Financing Agreement (as hereinafter defined) with the Secretary setting forth the commitment of FFB to enter into agreements to purchase notes issued by entities designated by the Secretary when those notes have been guaranteed by the Secretary, and the commitment of the Secretary to guarantee those notes; and
WHEREAS,
pursuant to the Program Financing Agreement, the Secretary has delivered to FFB and the Borrower a Designation Notice (as hereinafter defined) designating the Borrower to be a "Borrower" for purposes of the Program Financing Agreement; and
WHEREAS,
FFB is entering into this Note Purchase Agreement, as authorized by section 6(a) of the FFB Act and in fulfillment of its commitment under the Program Financing Agreement, setting
NOTE PURCHASE AGREEMENT - page 1
DOE (Title XVII)
GEORGIA POWER COMPANY
out, among other things, FFB's agreement to purchase, pursuant to the FFB Act, the Note (as hereinafter defined) to be issued by the Borrower, when the terms and conditions specified herein have been satisfied, as hereinafter provided.
NOW, THEREFORE,
for and in consideration of the mutual agreements herein contained and for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, FFB, the Secretary, and the Borrower agree as follows:
ARTICLE 1
DEFINITIONS AND RULES OF INTERPRETATION
Section 1.1
Definitions
.
As used in this Agreement, the following terms shall have the respective meanings specified in this section 1.1, unless the context clearly requires otherwise.
"
Advance
" shall mean an advance of funds made by FFB under the Note in accordance with the provisions of article 7 of this Agreement.
"
Advance Identifier
" shall mean, for each Advance, the particular sequence of letters and numbers constituting the Note Identifier plus the particular sequence of additional numbers assigned by FFB to the respective Advance in the interest rate confirmation notice relating to such Advance delivered by FFB in accordance with section 7.7 of this Agreement.
"
Advance Request
" shall mean a letter from a Borrower requesting an Advance under the Note, in the form of letter attached as
Exhibit A
to this Agreement.
"
Advance Request Approval Notice
" shall mean the written notice from the Department located at the end of an Advance Request advising FFB that such Advance Request has been approved on behalf of the Secretary.
NOTE PURCHASE AGREEMENT - page 2
DOE (Title XVII)
GEORGIA POWER COMPANY
"
Borrower Instruments
" shall have the meaning specified in section 3.2.1 of this Agreement.
"
Borrower State
" shall have the meaning specified in Schedule I to this Agreement.
"
Business Day
" shall mean any day on which FFB and the Federal Reserve Bank of New York are both open for business.
"
Certificate Specifying Authorized Borrower Signatories
" shall mean a certificate of the Borrower specifying the names and titles of those individuals who are authorized to execute and deliver from time to time Advance Requests on behalf of the Borrower, and containing the original signature of each of those individuals, substantially in the form of the Certificate Specifying Authorized Borrower Signatories attached as
Exhibit B
to this Agreement.
"
Certificate Specifying Authorized Department Officials
" shall mean a certificate specifying the names and titles of those officials of the Department who are authorized to execute and deliver Advance Request Approval Notices from time to time on behalf of the Secretary and setting out the original signature of each of those authorized officials, and specifying the name and title of those officials of the Department who are authorized to confirm telephonically the authenticity of the Advance Request Approval Notices from time to time on behalf of the Secretary and setting out the telephone number of each of those authorized officials, in the form of the Certificate Specifying Authorized Department Officials attached as Annex 1 to the Program Financing Agreement.
"
Department
" shall mean the Department of Energy.
"
Designation Notice
" shall mean, generally, a notice from the Secretary to FFB and the particular entity identified therein as the respective "Borrower," designating that entity to be a "Borrower" for purposes of the Program Financing Agreement, in the form of notice that is attached as Annex 2 to the Program Financing Agreement; and "
the
Designation Notice
" shall mean the particular Designation Notice completed and delivered by the Secretary to FFB and
NOTE PURCHASE AGREEMENT - page 3
DOE (Title XVII)
GEORGIA POWER COMPANY
the Borrower designating the Borrower to be a "Borrower" for purposes of the Program Financing Agreement.
"
FFB Act
" shall mean the Federal Financing Bank Act of 1973 (Pub. L. No. 93-224, 87 Stat. 937, codified at 12 U.S.C. § 2281
et
seq
.), as amended.
"
Governmental Approval
" shall mean any approval, consent, authorization, license, permit, order, certificate, qualification, waiver, exemption, or variance, or any other action of a similar nature, of or by a Governmental Authority having jurisdiction over the Borrower or any of its properties.
"
Governmental Authority
" shall mean any federal, state, county, municipal, or regional authority, or any other entity of a similar nature, exercising any executive, legislative, judicial, regulatory, or administrative function of government.
"
Governmental Judgment
" shall mean any judgment, order, decision, or decree, or any action of a similar nature, of or by a Governmental Authority having jurisdiction over the Borrower or any of its properties.
"
Governmental Registration
" shall mean any registration, filing, declaration, or notice, or any other action of a similar nature, with or to a Governmental Authority having jurisdiction over the Borrower or any of its properties.
"
Governmental Rule
" shall mean any statute, law, rule, regulation, code, or ordinance of a Governmental Authority having jurisdiction over the Borrower or any of its properties.
"
Guarantee Act
" shall mean Title XVII of the Energy Policy Act of 2005 (Pub. L. No. 109-58, 119 Stat. 594, 1117, codified at 42 U.S.C. § 16511
et
seq
.), as amended.
"
Holder
" shall mean FFB, for so long as it shall be the holder of the Note, and any successor or assignee of FFB, for so long as such successor or assignee shall be the holder of the Note.
NOTE PURCHASE AGREEMENT - page 4
DOE (Title XVII)
GEORGIA POWER COMPANY
"
Loan Commitment Amount
" shall have the meaning specified in Schedule I to this Agreement.
"
Loan Guarantee Agreement
" shall have the meaning specified in Schedule I to this Agreement.
"
Loan Servicer
" shall mean the Department, acting through the Loan Programs Office.
"
Material Adverse Effect on the Borrower
" shall mean any material adverse effect on the financial condition, operations, business or prospects of the Borrower or the ability of the Borrower to perform its obligations under this Agreement or any of the other Borrower Instruments.
"
Note
" shall mean a future advance promissory note payable to FFB, in the form of note that is attached as
Exhibit C
to this Agreement, as such Note may be amended, supplemented, and restated from time to time in accordance with its terms.
"
Note Identifier
" shall mean the particular sequence of letters and numbers assigned by FFB to the Note in the Principal Instruments acceptance notice relating to the Note delivered by FFB in accordance with section 5.1 of this Agreement.
"
Opinion of Borrower's Counsel re: Borrower Instruments
" shall mean an opinion of counsel from counsel to the Borrower, substantially in the form of opinion that is attached as
Exhibit D
to this Agreement.
"
Opinion of Secretary's Counsel re: Secretary's Guarantee
" shall mean an opinion of counsel from counsel to the Secretary, substantially in the form of opinion that is attached as
Exhibit E
to this Agreement.
"
Other Debt Obligation
" shall mean any note or any other evidence of an obligation for borrowed money of a similar nature, made or issued by the Borrower (other than the Note purchased by FFB under this Agreement), or any mortgage, indenture, deed of trust or loan agreement with respect thereto to which the Borrower is a party or by which
NOTE PURCHASE AGREEMENT - page 5
DOE (Title XVII)
GEORGIA POWER COMPANY
the Borrower or any of its properties is bound (other than this Agreement).
"
Person
" shall mean any individual, corporation, partnership, joint venture, association, joint-stock company, trust, trust company, unincorporated organization or Governmental Authority.
"
Principal Instruments
" shall have the meaning specified in section 4.2 of this Agreement.
"
Program Financing Commitment Amount
" shall have the meaning specified in section 1.1 of the Program Financing Agreement.
"
Program Financing Agreement
" shall mean the Program Financing Agreement dated as of September 2, 2009, between FFB and the Secretary, as such agreement may be amended, supplemented, and restated from time to time in accordance with its terms.
"
Project State
" shall have the meaning specified in Schedule I to this Agreement.
"
Requested Advance Amount
" shall have the meaning specified in section 7.3.1(a)(2) of this Agreement.
"
Requested Advance Date
" shall have the meaning specified in section 7.3.1(a)(3) of this Agreement.
"
Secretary's Certificate
" shall mean a certificate relating to the Secretary's Guarantee and other matters, in the form of certificate that is attached as
Exhibit F
to this Agreement.
"
Secretary's Guarantee
" shall mean a guarantee of the Note issued by the Secretary, in the form of guarantee that is attached as
Exhibit G
to this Agreement.
"
Secretary's Instruments
" shall have the meaning specified in section 3.3.1 this Agreement.
"
Security Instruments
" shall have the meaning specified in Schedule I to this Agreement.
NOTE PURCHASE AGREEMENT - page 6
DOE (Title XVII)
GEORGIA POWER COMPANY
"
this Agreement
" shall mean this Note Purchase Agreement between FFB, the Secretary, and the Borrower.
"
Uncontrollable Cause
" shall mean an unforeseeable cause beyond the control and without the fault of FFB, being: act of God, fire, flood, severe weather, epidemic, quarantine restriction, explosion, sabotage, act of war, act of terrorism, riot, civil commotion, lapse of the statutory authority of the United States Department of the Treasury to raise cash through the issuance of Treasury debt instruments, disruption or failure of the Treasury Financial Communications System, closure of the Federal Government, or an unforeseen or unscheduled closure or evacuation of the FFB offices.
Section 1.2
Rules of Interpretation
.
Unless the context shall otherwise indicate, the terms defined in section 1.1 of this Agreement shall include the plural as well as the singular and the singular as well as the plural. The words "herein," "hereof," and "hereto," and words of similar import, refer to this Agreement as a whole. All references to "the Secretary" herein shall mean the Secretary in his or her official, and not individual, capacity, and shall include designates thereof that may be duly authorized from time to time.
ARTICLE 2
FFB COMMITMENT TO PURCHASE THE NOTE
Subject to the terms and conditions of this Agreement, FFB agrees to purchase the Note that is offered by the Borrower to FFB for purchase under this Agreement.
NOTE PURCHASE AGREEMENT - page 7
DOE (Title XVII)
GEORGIA POWER COMPANY
ARTICLE 3
COMMITMENT CONDITIONS
FFB shall be under no obligation to purchase the Note under this Agreement, and the Secretary shall be under no obligation to issue the Secretary's Guarantee guaranteeing such Note, unless and until each of the conditions specified in this article 3 has been satisfied.
Section 3.1
Commitment Amount Limits
.
3.1.1
Loan Commitment Amount
. The maximum principal amount of the Note that is offered for purchase shall not exceed the Loan Commitment Amount.
3.1.2
Program Financing Commitment Amount
. At the time that the Note is offered to FFB for purchase under this Agreement, the maximum principal amount of the Note, when added to the aggregate maximum principal amount of all other notes that have been issued by entities that have been designated by the Secretary in Designation Notices to be "Borrowers" for purposes of the Program Financing Agreement and which notes have been guaranteed by the Secretary pursuant to the Guarantee Act, shall not exceed the Program Financing Commitment Amount.
Section 3.2
Borrower Instruments
.
3.2.1
Borrower Instruments
. FFB shall have received the following instruments (such instruments being, collectively, the "
Borrower Instruments
"):
(a) an original counterpart of this Agreement, duly executed by the Borrower; and
(b) the original Note, with all of the blanks on page 1 of the Note filled in with information consistent with the information set out in the Designation Notice, and duly executed by the Borrower.
NOTE PURCHASE AGREEMENT - page 8
DOE (Title XVII)
GEORGIA POWER COMPANY
3.2.2
Opinion of Borrower's Counsel re: Borrower Instruments
. FFB shall have received an Opinion of Borrower's Counsel re: Borrower Instruments.
3.2.3
Certificate Specifying Authorized Borrower Signatories
. FFB shall have received a completed and signed Certificate Specifying Authorized Borrower Signatories.
Section 3.3
Secretary's Instruments
.
3.3.1
Secretary's Instruments
. FFB shall have received the following instruments (such instruments being, collectively, the "
Secretary's Instruments
"):
(a) an original counterpart of this Agreement, duly executed by or on behalf of the Secretary;
(b) the original Secretary's Guarantee relating to the Note, duly executed by or on behalf of the Secretary; and
(c) an original Secretary's Certificate relating to the Secretary's Guarantee and other matters, duly executed by or on behalf of the Secretary.
3.3.2
Opinion of Secretary's Counsel re: Secretary's Guarantee
. FFB shall have received an Opinion of Secretary's Counsel re: Secretary's Guarantee.
Section
3.4
Conditions Specified in Other Agreements
.
Each of the conditions specified in the Program Financing Agreement as being conditions to purchasing the Note shall have been satisfied, or waived by FFB or the Secretary, as the case may be.
NOTE PURCHASE AGREEMENT - page 9
DOE (Title XVII)
GEORGIA POWER COMPANY
ARTICLE 4
OFFER OF THE NOTE FOR PURCHASE
The Note that is to be offered to FFB for purchase under this Agreement shall be offered in accordance with the procedures described in this article 4.
Section 4.1
Delivery of Borrower Instruments to the Secretary
.
The Borrower shall deliver to the Secretary, for redelivery to FFB, the following:
(a) all of the Borrower Instruments, each duly executed by the Borrower;
(b) an Opinion of Borrower's Counsel re: Borrower Instruments; and
(c) a completed and signed Certificate Specifying Authorized Borrower Signatories.
Section 4.2
Delivery of Principal Instruments by the Secretary to FFB
.
The Secretary shall deliver to FFB all of the following instruments (collectively being the "
Principal Instruments
":
(a) all of the instruments described in section 4.1;
(b) all of the Secretary's Instruments, each duly executed by the Secretary; and
(c) an Opinion of Secretary's Counsel re: Secretary's Guarantee.
NOTE PURCHASE AGREEMENT - page 10
DOE (Title XVII)
GEORGIA POWER COMPANY
ARTICLE 5
PURCHASE OF THE NOTE BY FFB
Section
5.1
Acceptance or Rejection of Principal Instruments
.
Within 5 Business Days after delivery to FFB of the Principal Instruments relating to the Note that is offered for purchase under this Agreement, FFB shall deliver by facsimile transmission (fax) to the Department one of the following:
(a) an acceptance notice, which notice shall:
(1) state that the Principal Instruments meet the terms and conditions detailed in article 3 of this Agreement, or are otherwise acceptable to FFB; and
(2) assign a Note Identifier to such Note for use by the Borrower and the Department in all communications to FFB making reference to such Note; or
(b) a rejection notice, which notice shall state that one or more of the Principal Instruments does not meet the terms and conditions of this Agreement and specify how such instrument or instruments does not meet the terms and conditions of this Agreement.
Section
5.2
Purchase
.
FFB shall not be deemed to have accepted the Note offered for purchase under this Agreement until such time as FFB shall have delivered an acceptance notice accepting the Principal Instruments relating to the Note;
provided
,
however
, that in the event that FFB shall make an Advance under the Note, then FFB shall be deemed to have accepted the Note offered for purchase.
NOTE PURCHASE AGREEMENT - page 11
DOE (Title XVII)
GEORGIA POWER COMPANY
ARTICLE 6
CUSTODY OF NOTE; LOSS OF NOTE, ETC.
Section 6.1
Custody
.
FFB shall have custody of the Note purchased under this Agreement until all amounts owed under the Note have been paid in full.
Section 6.2
Lost, Stolen, Destroyed, or Mutilated Note
.
In the event that the Note purchased under this Agreement shall become lost, stolen, destroyed, or mutilated, the Borrower shall, upon a written request made by FFB to the Borrower, with a copy to the Secretary, execute and deliver to FFB, in replacement thereof, a new Note of like tenor, dated and bearing interest from the date to which interest has been paid on such lost, stolen, destroyed, or mutilated Note or, if no interest has been paid thereon, dated the same date as such lost, stolen, destroyed, or mutilated Note. Upon delivery of such replacement Note to FFB, the Borrower shall be released and discharged from any further liability on account of the lost, stolen, or destroyed Note. If the Note being replaced has been mutilated, such mutilated Note shall be surrendered to the Borrower for cancellation. The Secretary shall deliver to FFB a confirmation that the Secretary's Guarantee related to the lost, stolen, destroyed, or mutilated Note remains in full force and effect with respect to the replacement Note.
ARTICLE 7
ADVANCES
Section
7.1
Commitment
.
Subject to the terms and conditions of this Agreement, FFB agrees to make Advances under the Note for the account of the Borrower.
NOTE PURCHASE AGREEMENT - page 12
DOE (Title XVII)
GEORGIA POWER COMPANY
Section 7.2
Treasury Policies Applicable to Advances
.
Each of the Borrower and the Secretary understands and consents to the following Treasury financial management policies generally applicable to all advances of funds:
(a) each Advance will be requested by the Borrower, and each Advance Request will be approved by the Secretary, only at such time and in such amount as shall be necessary to meet the immediate payment or disbursing need of the Borrower;
(b) except for Advances to reimburse the Borrower for expenditures that it has made from its own working capital, generally each Advance will be requested to be disbursed directly to the Person(s) to whom the Borrower is obligated to make payments;
(c) Advances for investment purposes will not be requested by the Borrower or approved by the Secretary; and
(d) all interest earned on any lawful and permitted investment of Advances in excess of the interest accrued on such Advances will be remitted to FFB.
Section 7.3
Conditions to Making Advances
.
FFB shall be under no obligation to make any Advance under the Note unless and until each of the conditions specified in this section 7.3 is satisfied.
7.3.1
Advance Requests
. For each Advance, the Borrower shall have delivered to the Secretary, for review and approval before being forwarded to FFB, an Advance Request, which Advance Request:
(a) shall specify, among other things:
(1) the particular "Note Identifier" that FFB assigned to this Note (as provided in section 5.1 of this Agreement;
(2) the particular amount of funds that the Borrower requests to be advanced (such amount
NOTE PURCHASE AGREEMENT - page 13
DOE (Title XVII)
GEORGIA POWER COMPANY
being the "
Requested Advance Amount
" for the respective Advance);
(3) the particular calendar date that the Borrower requests to be the date on which the respective Advance is to be made (such date being the "
Requested Advance Date
" for such Advance), which date:
(A) must be a Business Day; and
(B) shall not be earlier than the third Business Day to occur after the date on which FFB shall have received the respective Advance Request;
(4) the particular bank account or accounts to which the Borrower requests that the respective Advance be made;
(5) the particular calendar date that the Borrower selects to be the date on which the respective Advance is to mature (such date being the "
Maturity Date
" for such Advance), which date must meet all of the following criteria:
(A) the Maturity Date for the respective Advance must be a "Payment Date" (as that term is defined in paragraph 7 of the Note); and
(B) the Maturity Date for the respective Advance may not be a date that will occur after the particular date specified on page 1 of the Note as being the "Final Maturity Date"; and
(C) the period of time between the Requested Advance Date for the respective Advance and the Maturity Date for such Advance may not be less than 90 days; and
(b) shall have been duly executed by an individual whose name and signature appear on the
NOTE PURCHASE AGREEMENT - page 14
DOE (Title XVII)
GEORGIA POWER COMPANY
Certificate Specifying Authorized Borrower Signatories delivered by the Borrower to FFB pursuant to section 4.1(c) or section 11.4 of this Agreement; and
(c) shall have been received by FFB not later than the specified number of Business Days in section 7.4(b) hereof before the Requested Advance Date specified in such Advance Request.
7.3.2
Advance Request Approval Notice
. For each Advance, the Secretary shall have delivered to FFB the Borrower's executed Advance Request, together with the Department's executed Advance Request Approval Notice, which Advance Request Approval Notice:
(a) shall have been duly executed on behalf of the Secretary by an official of the Department whose name and signature appear on the Certificate Specifying Authorized Department Officials delivered to FFB pursuant to section 3.1.3 or section 6.1 of the Program Financing Agreement; and
(b) shall have been received by FFB not later than the third Business Day before the Requested Advance Date specified in such Advance Request.
7.3.3
Telephonic Confirmation of Authenticity of Advance Request Approval Notices
. For each Advance, FFB shall have obtained telephonic confirmation of the authenticity of the related Advance Request Approval Notice from an official of the Department:
(a) whose name, title, and telephone number appear on the Certificate Specifying Authorized Department Officials that has been delivered by the Secretary to FFB pursuant to section 3.1.3 or section 6.1 of the Program Financing Agreement; and
(b) who is not the same official of the Department who executed the Advance Request Approval Notice on behalf of the Secretary.
7.3.4
Note Maximum Principal Amount Limit
. At the time of making any Advance under the Note, the amount of
NOTE PURCHASE AGREEMENT - page 15
DOE (Title XVII)
GEORGIA POWER COMPANY
such Advance, when added to the aggregate amount of all Advances previously made under the Note, shall not exceed the maximum principal amount of the Note.
7.3.5
Conditions Specified in Other Agreements
. Each of the conditions specified in the Program Financing Agreement as being conditions to making Advances under the Note, shall have been satisfied, or waived by FFB or the Secretary, as the case may be.
Section 7.4
Amount and Timing of Advances
.
FFB shall make each Advance in the Requested Advance Amount specified in the respective Advance Request and on the Requested Advance Date specified in the respective Advance Request, subject to satisfaction of the conditions specified in section 7.3 of this Agreement and subject to the following additional limitations:
(a) in the event that the Requested Advance Date specified in the respective Advance Request is not a Business Day, FFB shall make the respective Advance on the first day thereafter that is a Business Day;
(b) in the event that FFB receives the respective Advance Request and the related Advance Request Approval Notice later than:
(i) the third Business Day before the Requested Advance Date specified in such Advance Request if the Requested Advance Amount specified in the respective Advance Request is less than $500,000,000, FFB shall make the respective Advance as soon as practicable thereafter, but in any event not later than the third Business Day after FFB receives such Advance Request, unless the Borrower delivers to FFB and the Secretary a written cancellation of such Advance Request or a replacement Advance Request specifying a later Requested Advance Date;
(ii) the fifth Business Day before the Requested Advance Date specified in such Advance Request if the Requested Advance Amount specified in the respective Advance Request is equal to or greater than
NOTE PURCHASE AGREEMENT - page 16
DOE (Title XVII)
GEORGIA POWER COMPANY
$500,000,000 but less than $2,000,000,000, FFB shall make the respective Advance as soon as practicable thereafter, but in any event not later than the fifth Business Day after FFB receives such Advance Request, unless the Borrower delivers to FFB and the Secretary a written cancellation of such Advance Request or a replacement Advance Request specifying a later Requested Advance Date;
(iii) the tenth Business Day before the Requested Advance Date specified in such Advance Request if the Requested Advance Amount specified in the respective Advance Request is equal to or greater than $2,000,000,000, FFB shall make the respective Advance as soon as practicable thereafter, but in any event not later than the tenth Business Day after FFB receives such Advance Request, unless the Borrower delivers to FFB and the Secretary a written cancellation of such Advance Request or a replacement Advance Request specifying a later Requested Advance Date;
(c) in the event that an Uncontrollable Cause prevents FFB from making the respective Advance on the Requested Advance Date specified in the respective Advance Request, FFB shall make such Advance as soon as such Uncontrollable Cause ceases to prevent FFB from making such Advance, unless the Borrower delivers to FFB and the Secretary a written cancellation of such Advance Request or a replacement Advance Request specifying a later Requested Advance Date; and
(d) in the event that FFB receives, not later than 3:30 p.m. (Washington, DC, time) on the Business Day immediately before the Requested Advance Date specified in an Advance Request, a written notice delivered by facsimile transmission of withdrawal or cancellation of the Advance Request Approval Notice, and telephonic confirmation of the withdrawal or cancellation, from an official of the Department whose name, title, and telephone number appear on the Certificate Specifying Authorized Department Officials that has been delivered by the Secretary to FFB pursuant to section 3.1.3 or section 6.1 of the Program Financing Agreement, FFB shall not make the respective Advance.
NOTE PURCHASE AGREEMENT - page 17
DOE (Title XVII)
GEORGIA POWER COMPANY
Section 7.5
Type of Funds and Means of Advance
.
Each Advance shall be made in immediately available funds by electronic funds transfer to such bank account(s) as shall have been specified in the respective Advance Request.
Section 7.6
Interest Rate Applicable to Advances
.
7.6.1
Initial Rate Determinations
. The rate of interest applicable to each Advance made under the Note shall be established as provided in paragraph 6 of the Note, subject to section 7.6.2 of this Agreement.
7.6.2
Rate Re-determinations
. In the event the Borrower elects to extend the maturity of all or any portion of the outstanding principal amount of any Advance, as provided in paragraph 14 of the Note, then the rate of interest applicable to the outstanding principal amount of such Advance shall be re-determined by FFB in accordance with the terms of paragraph 14 of the Note.
Section 7.7
Interest Rate Confirmation Notices
.
7.7.1
Initial Rates
. After making each Advance, FFB shall deliver, by facsimile transmission, to the Borrower and the Secretary written confirmation of the making of the respective Advance, which confirmation shall:
(a) state the date on which such Advance was made;
(b) state the interest rate applicable to such Advance; and
(c) assign an Advance Identifier to such Advance for use by the Borrower and the Secretary in all communications to FFB making reference to such Advance.
7.7.2
Re-determined Rates
. In the event that the rate of interest applicable to the outstanding principal amount of any Advance is re-determined as provided in section 7.6.2. of this Agreement, FFB shall deliver, by facsimile transmission, to the Borrower and the Secretary written confirmation of the re-determination of such interest rate, which confirmation shall state the date on
NOTE PURCHASE AGREEMENT - page 18
DOE (Title XVII)
GEORGIA POWER COMPANY
which the applicable interest rate was re-determined for such Advance and the re-determined interest rate.
ARTICLE
8
REPRESENTATIONS AND WARRANTIES BY THE BORROWER
The Borrower makes the representations and warranties provided in this article 8 to FFB.
Section
8.1
Organization
.
The Borrower is a corporation duly organized, validly existing and in good standing under the laws of the Borrower State and is qualified to do business in the Project State.
Section 8.2
Authority
.
The Borrower has all requisite corporate power and authority to carry on its business as presently conducted, to execute and deliver this Agreement and each of the other Borrower Instruments, to consummate the transactions contemplated hereby and thereby, and to perform its obligations hereunder and thereunder.
Section
8.3
Due Authorization
.
The execution and delivery by the Borrower of this Agreement and each of the other Borrower Instruments, the consummation by the Borrower of the transactions contemplated hereby and thereby, and the performance by the Borrower of its obligations hereunder and thereunder have been duly authorized by all necessary corporate action.
Section
8.4
Due Execution
.
This Agreement has been, and each of the other Borrower Instruments will have been at the respective time of delivery of each thereof, duly executed and delivered by individuals who are duly authorized to execute and deliver such documents on behalf of the Borrower.
NOTE PURCHASE AGREEMENT - page 19
DOE (Title XVII)
GEORGIA POWER COMPANY
Section 8.5
Validity and Enforceability
.
This Agreement constitutes, and each of the other Borrower Instruments will constitute at the respective time of delivery of each thereof, the legal, valid, and binding agreement of the Borrower, enforceable against the Borrower in accordance with their respective terms.
Section 8.6
No Governmental Actions Required
.
No Governmental Approvals or Governmental Registrations are now, or under existing Governmental Rules will in the future be, required to be obtained or made, as the case may be, by the Borrower to authorize the execution and delivery by the Borrower of this Agreement or any of the other Borrower Instruments, the consummation by the Borrower of the transactions contemplated hereby or thereby, or the performance by the Borrower of its obligations hereunder or thereunder.
Section 8.7
No Conflicts or Violations
.
The execution and delivery by the Borrower of this Agreement or any of the other Borrower Instruments, the consummation by the Borrower of the transactions contemplated hereby or thereby, and the performance by the Borrower of its obligations hereunder or thereunder do not and will not conflict with or violate, result in a breach of, or constitute a default under (a) any term or provision of the charter documents or bylaws of the Borrower; (b) any of the covenants, conditions or agreements contained in any Other Debt Obligation of the Borrower; (c) any Governmental Approval or Governmental Registration obtained or made, as the case may be, by the Borrower; or (d) any Governmental Judgment or Governmental Rule currently applicable to the Borrower.
Section
8.8
All Necessary Governmental Actions
.
The Borrower has not failed to obtain any material Governmental Approval or make any material Governmental Registration required or necessary to carry on the business of the Borrower as presently conducted, and the Borrower reasonably believes that it will not be prevented by any Governmental Authority having jurisdiction over the Borrower from so carrying on its business as presently conducted.
NOTE PURCHASE AGREEMENT - page 20
DOE (Title XVII)
GEORGIA POWER COMPANY
Section
8.9
No Material Litigation
.
(a) There are no lawsuits or judicial or administrative actions, proceedings or investigations pending or, to the best knowledge of the Borrower, threatened against the Borrower which, in the reasonable opinion of the Borrower, is likely to have a Material Adverse Effect on the Borrower.
(b)
Except as disclosed in writing to FFB and the Secretary in Schedule II to this Agreement, there is no litigation or other proceeding pending, or threatened in writing, against the Borrower in any court or before any Governmental Authority which challenges the validity as to the Borrower or the enforceability against the Borrower of any of the Borrower’s Instruments, or seeks to enjoin the performance by the Borrower of, the Borrower’s Instruments.
ARTICLE 9
BILLING BY FFB
Section 9.1
Billing Statements to the Borrower, the Department, and the Loan Servicer
.
FFB shall prepare a billing statement for the amounts owed to FFB on each Advance that is made under the Note purchased under this Agreement, and shall deliver each such billing statement to the Borrower, the Department, and the Loan Servicer.
Section 9.2
Failure to Deliver or Receive Billing Statements No Release
.
Failure on the part of FFB to deliver any billing statement or failure on the part of the Borrower to receive any billing statement shall not, however, relieve the Borrower of any of its payment obligations under the Note or this Agreement.
Section 9.3
FFB Billing Determinations Conclusive
.
9.3.1
Acknowledgment and Consent
. The Borrower acknowledges that FFB has described to it:
NOTE PURCHASE AGREEMENT - page 21
DOE (Title XVII)
GEORGIA POWER COMPANY
(a) the rounding methodology employed by FFB in calculating the amount of accrued interest owed at any time on the Note; and
(b) the methodology employed by FFB in calculating the payment schedule for the installments of principal due and payable on the Note;
and the Borrower consents to these methodologies.
9.3.2
Agreement
. The Borrower agrees that any and all determinations made by FFB shall be conclusive and binding upon the Borrower with respect to:
(a) the amount of accrued interest owed on the Note determined using this rounding methodology; and
(b) the amount of any scheduled installment payment of principal due and payable on the Note determined using this methodology.
ARTICLE
10
PAYMENTS TO FFB
Each amount that becomes due and owing on the Note purchased under this Agreement shall be paid when and as due, as provided in the Note.
ARTICLE 11
RIGHTS AND AGREEMENTS OF THE SECRETARY AND FFB
Section 11.1
Rights and Agreements related to Enforcement
.
11.1.1
Secretary's Authority
. In consideration of the Secretary's Guarantee relating to the Note that has been purchased by FFB under this Agreement, the Secretary shall have the sole authority (vis-à-vis FFB), in the case of a default by the Borrower under such Note or the occurrence of
NOTE PURCHASE AGREEMENT - page 22
DOE (Title XVII)
GEORGIA POWER COMPANY
an Event of Default under the Security Instruments, in respect of acceleration of such Note, the exercise of other available remedies, and the disposition of sums or property recovered.
11.1.2
Acknowledgment of Security Interest
. FFB acknowledges that the Borrower has, through the execution of the Security Instruments, pledged and granted a security interest to the "Collateral Agent," for the benefit of the "Secured Parties" (as those terms are defined in the Loan Guarantee Agreement) in certain property of the Borrower to secure the payment and performance of certain obligations owed to the Secretary under,
inter alia
, the Security Instruments.
11.1.3
FFB Cooperation
. FFB shall cooperate with the Secretary to enable the Secretary to exercise and enforce the Secretary's rights and remedies under this Agreement, the Program Financing Agreement, the Note, and the Security Instruments, including, when reasonably requested by the Secretary, executing and delivering to the Secretary instruments, agreements, and other documents prepared by or for the Department for FFB's execution.
Section 11.2
Secretary
'
s Right to Purchase Advances or the Note.
Notwithstanding the provisions of the Note, the Borrower acknowledges that, under the terms of the Program Financing Agreement, the Secretary may purchase from FFB all or any portion of any Advance that has been made under the Note, or may purchase from FFB the Note in its entirety, in the same manner, at the same price, and subject to the same limitations as shall be applicable, under the terms of the Note, to a prepayment by the Borrower of all or any portion of any Advance made under the Note, or a prepayment by the Borrower of the Note in its entirety, as the case may be.
Section 11.3
Secretary's Confirmation Relating to the Secretary's Guarantee
.
The Secretary confirms to FFB that the obligation of the United States of America to pay amounts due and payable under the Secretary's Guarantee when such amounts become due and payable in
NOTE PURCHASE AGREEMENT - page 23
DOE (Title XVII)
GEORGIA POWER COMPANY
accordance with its terms, constitutes the absolute obligation of the United States of America, against which no offset may be made by the United States of America in discharge of its obligation to make these payments and for which, in accordance with section 1702(j) of the Guarantee Act, the full faith and credit of the United States of America are pledged,
provided
,
however
, that the United States will be entitled to offset payments under the Secretary's Guarantee against any financial asset or obligation of any Holder of the Secretary's Guarantee other than FFB.
Section 11.4
Delivery of Replacement Certificates Specifying Authorized Borrower Signatories
.
The Borrower may, at any time and from time to time, deliver to FFB a revised Certificate Specifying Authorized Borrower Signatories, updated and completed as appropriate, in replacement of the original such certificate delivered pursuant to section 4.1(c) of this Agreement.
ARTICLE 12
EFFECTIVE DATE, TERM, SURVIVAL
Section 12.1
Effective Date
.
This Agreement shall be effective as of the date first above written.
Section 12.2
Term of Commitment to Make Advances
.
The obligation of FFB under this Agreement to make Advances under the Note issued by the Borrower shall expire on the "Last Day for an Advance" specified in the Note.
Section 12.3
Survival
.
12.3.1
Representations, Warranties, and Certifications
. All representations, warranties, and certifications made by the Borrower in this Agreement, or in any agreement, instrument, or certificate delivered pursuant hereto, shall survive the execution and delivery of this
NOTE PURCHASE AGREEMENT - page 24
DOE (Title XVII)
GEORGIA POWER COMPANY
Agreement, the purchasing of the Note hereunder, and the making of Advances thereunder.
12.3.2
Remainder of Agreement
. Notwithstanding the occurrence and passage of the Last Day for an Advance, the remainder of this Agreement shall remain in full force and effect until all amounts owed under this Agreement and the Note purchased by FFB under this Agreement have been paid in full.
ARTICLE 13
MISCELLANEOUS
Section
13.1
Notices
.
13.1.1
Addresses of the Parties
.
All notices and other communications hereunder and under the Note to be made to any party shall be in writing and shall be addressed as follows:
To FFB:
Federal Financing Bank
Main Treasury Building
1500 Pennsylvania Avenue, NW
Washington, DC 20220
Attention: Chief Financial Officer
Telephone No.
(202) 622-2470
Facsimile No.
(202) 622-0707
To the Borrower:
Georgia Power Company
241 Ralph McGill Boulevard, NE
Atlanta, Georgia 30308-3374
Attention: Earl Long, Assistant Treasurer
NOTE PURCHASE AGREEMENT - page 25
DOE (Title XVII)
GEORGIA POWER COMPANY
Telephone No. (404) 506-0783
Facsimile No. (404) 506-0717
Email Address
eclong@southernco.com
To the Secretary (or the Department):
United States Department of Energy
Loan Guarantee Program
1000 Independence Avenue, SW
Washington, DC 20585
Attention: Director, Portfolio Management
Telephone No. (202) 287-6738
Facsimile No. (202) 287-5816
Email Address lpo.portfolio@hq.doe.gov
To the Loan Servicer:
United States Department of Energy
Loan Guarantee Program
1000 Independence Avenue, SW
Washington, DC 20585
Attention: Director, Portfolio Management
Telephone No. (202) 287-6738
Facsimile No. (202) 287-5816
Email Address lpo.portfolio@hq.doe.gov
The address, telephone number, or facsimile number for any party or the Loan Servicer may be changed at any time and from time to time upon written notice given by such changing party to each other party hereto.
13.1.2
Permitted Means of Delivery
. Advance Requests, notices, and other communications to FFB under this Agreement may be delivered by facsimile (fax) transmission of the executed instrument.
NOTE PURCHASE AGREEMENT - page 26
DOE (Title XVII)
GEORGIA POWER COMPANY
13.1.3
Effective Date of Delivery
. A properly addressed notice or other communication shall be deemed to have been "delivered" for purposes of this Agreement:
(a) if made by personal delivery, on the date of such personal delivery;
(b) if mailed by first class mail, registered or certified mail, express mail, or by any commercial overnight courier service, on the date that such mailing is received;
(c) if sent by facsimile (fax) transmission:
(1) if the transmission is received and receipt confirmed before 4:00 p.m. (Washington, DC, time) on any Business Day, on the date of such transmission; and
(2) if the transmission is received and receipt confirmed after 4:00 p.m. (Washington, DC, time) on any Business Day or any day that is not a Business Day, on the next Business Day.
13.1.4
Notices to FFB to Contain FFB Identification References
. All notices to FFB making any reference to either the Note or any Advance made thereunder shall identify the Note or such Advance by the Note Identifier or the respective Advance Identifier, as the case may be, assigned by FFB to the Note or such Advance.
Section 13.2
Amendments
.
No provision of this Agreement may be amended, modified, supplemented, waived, discharged, or terminated orally but only by an instrument in writing duly executed by each of the parties hereto.
Section 13.3
Successors and Assigns
.
This Agreement shall be binding upon and inure to the benefit of each of FFB, the Borrower, and the Secretary, and each of their respective successors and assigns.
NOTE PURCHASE AGREEMENT - page 27
DOE (Title XVII)
GEORGIA POWER COMPANY
Section 13.4
Sale or Assignment of Note
.
13.4.1
Sale or Assignment Permitted
. Subject to the requirements of 10 C.F.R. § 609.10(g) (1) and Office of Management and Budget Circular A-129 revised (November 2000), FFB may sell, assign, or otherwise transfer all or any part of the Note or any participation share thereof.
13.4.2
Notice of Sale, Etc
. FFB will deliver to the Borrower, the Department, and the Loan Servicer written notice of any sale, assignment, or other transfer of any Note promptly after any such sale, assignment, or other transfer.
13.4.3
Manner of Payment after Sale
. Any sale, assignment, or other transfer of all or any part of any Note may provide that, following such sale, assignment, or other transfer, payments on such Note shall be made in the manner specified by the respective purchaser, assignee, or transferee, as the case may be.
13.4.4
Replacement Notes
. The Borrower agrees:
(a) to issue a replacement Note or Notes with the same aggregate principal amount, interest rate, maturity, and other terms as each respective Note or Notes sold, assigned, or transferred pursuant to subsection 13.4.1 of this Agreement;
provided
,
however
, that, when requested by the respective purchaser, assignee, or transferee, such replacement Note or Notes shall provide that payments thereunder shall be made in the manner specified by such purchaser, assignee, or transferee; and
(b) to effect the change in ownership on its records and on the face of each such replacement Note issued, upon receipt of each Note or Notes so sold, assigned, or transferred.
Section 13.5
Forbearance Not a Waiver
.
Any forbearance on the part of FFB from enforcing any term or condition of this Agreement shall not be construed to be a waiver of such term or condition or acquiescence by FFB in any
NOTE PURCHASE AGREEMENT - page 28
DOE (Title XVII)
GEORGIA POWER COMPANY
failure on the part of Borrower to comply with or satisfy such term or condition.
Section 13.6
Rights Confined to Parties
.
Nothing expressed or implied herein is intended or shall be construed to confer upon, or to give to, any Person other than FFB, the Borrower, and the Secretary, and their respective successors and permitted assigns, any right, remedy or claim under or by reason of this Agreement or of any term, covenant or condition hereof, and all of the terms, covenants, conditions, promises, and agreements contained herein shall be for the sole and exclusive benefit of FFB, the Borrower, and the Secretary, and their respective successors and permitted assigns.
Section 13.7
Governing Law
.
This Agreement and the rights and obligations of the parties hereunder shall be governed by, and construed and interpreted in accordance with, Federal law and not the law of any state or locality. To the extent that a court looks to the laws of any state to determine or define the Federal law, it is the intention of the parties hereto that such court shall look only to the laws of the State of New York without regard to the rules of conflicts of laws.
Section 13.8
Severability
.
Any provision of this Agreement that is prohibited or unenforceable in any jurisdiction shall, as to such jurisdiction, be ineffective to the extent of such prohibition or unenforceability without invalidating the remaining provisions hereof, and any such prohibition or unenforceability in any jurisdiction shall not of itself invalidate or render unenforceable such provision in any other jurisdiction.
Section 13.9
Headings
.
The descriptive headings of the various articles, sections, and subsections of this Agreement were formulated and inserted for convenience only and shall not be deemed to affect the meaning or construction of the provisions hereof.
NOTE PURCHASE AGREEMENT - page 29
DOE (Title XVII)
GEORGIA POWER COMPANY
Section
13.10
Counterparts
.
This Agreement may be executed in separate counterparts, each of which when so executed and delivered shall be an original, but all of which together shall constitute but one and the same instrument.
[The remainder of this page is intentionally left blank.]
NOTE PURCHASE AGREEMENT - page 30
DOE (Title XVII)
GEORGIA POWER COMPANY
IN WITNESS WHEREOF,
FFB, the Borrower, and the Secretary have each caused this Agreement to be executed as of the day and year first above mentioned.
|
|
|
FEDERAL FINANCING BANK
|
("FFB"):
|
|
|
|
Signature:
|
/s/ Gary Grippo
|
|
|
Name:
|
Gary Grippo
|
|
|
Title:
|
Vice President and
|
|
Treasurer
|
|
|
|
|
GEORGIA POWER COMPANY
|
(the "Borrower")
|
|
|
|
Signature:
|
/s/ W. Ron Hinson
|
|
|
Print Name:
|
W. Ron Hinson
|
|
|
Title:
|
Executive Vice President,
|
|
Chief Financial Officer
|
|
and Treasurer
|
|
|
|
|
THE SECRETARY OF ENERGY
|
(the "Secretary")
|
|
|
|
Signature:
|
/s/ April Stephenson
|
|
|
Name:
|
April Stephenson
|
|
|
Title:
|
Chief Operating Officer
|
|
Loan Programs Office
|
NOTE PURCHASE AGREEMENT - page 31
DOE (Title XVII)
GEORGIA POWER COMPANY
SCHEDULE I
to
NOTE PURCHASE AGREEMENT
by and among
the Federal Financing Bank,
Georgia Power Company,
and the Secretary of Energy
|
|
1.
|
"Borrower State"
means the State of Georgia.
|
|
|
2.
|
"
Loan Guarantee Agreement
"
means the LOAN GUARANTEE AGREEMENT dated as of February 20, 2014, among GEORGIA POWER COMPANY, as Borrower, and U.S. DEPARTMENT OF ENERGY, as Guarantor and Loan Servicer, as such agreement may be amended, supplemented, and restated from time to time in accordance with its terms.
|
|
|
3.
|
"
Loan Commitment Amount
"
means $3,462,409,117.
|
|
|
4.
|
"Project State"
means Georgia.
|
|
|
5.
|
"
Security Instruments
"
means, collectively, (i) the Loan Guarantee Agreement, and (ii) the "Security Documents" (as that term is defined in the Loan Guarantee Agreement), as such agreements and documents may be amended, supplemented, and restated from time to time in accordance with their respective terms.
|
NOTE PURCHASE AGREEMENT - page 32
DOE (Title XVII)
GEORGIA POWER COMPANY
SCHEDULE II
to
NOTE PURCHASE AGREEMENT
by and among
the Federal Financing Bank,
Georgia Power Company,
and the Secretary of Energy
The Borrower notes that a number of environmental advocacy groups have made public statements in opposition to the issuance of federal loan guarantees to the Borrower, including the Southern Alliance for Clean Energy (“SACE”). Further, SACE has filed numerous requests under the Freedom of Information Act (“FOIA”) for information regarding such loan guarantees and has been involved in litigation with the DOE with respect to such FOIA requests. While the Borrower is not aware of any written threat by any such groups to challenge the validity or enforceability of the Borrower Instruments or to seek to enjoin performance by the Borrower thereunder, the Borrower can provide no assurance that it is aware of all statements (public or otherwise) made by such groups.
NOTE PURCHASE AGREEMENT - page 33
DOE (Title XVII)
GEORGIA POWER COMPANY
EXHIBIT A
TO
NOTE PURCHASE AGREEMENT
FORM
OF
ADVANCE REQUEST
DOE (Title XVII)
GEORGIA POWER COMPANY
ADVANCE REQUEST
**********************************************************************************
PLEASE REFER TO DEPARTMENT OF ENERGY (DOE) REGULATIONS AND INSTRUCTIONS FOR A DESCRIPTION OF (1) ANY OTHER FORMS AND MATERIALS THAT DOE REQUIRES TO BE SUBMITTED IN CONNECTION WITH EACH ADVANCE REQUEST, AND (2) THE TIME LIMITS FOR SUBMITTING THOSE FORMS AND MATERIALS AND THIS ADVANCE REQUEST TO DOE.
PLEASE DIRECT ALL
QUESTIONS
ON HOW TO COMPLETE THIS ADVANCE REQUEST FORM TO THE DOE CONTACT OFFICE INDICATED BELOW.
WHEN COMPLETED, PLEASE DELIVER THIS FORM (TOGETHER WITH ALL OTHER FORMS AND MATERIAL REQUIRED BY DOE)
TO
DOE AT THE ADDRESS OF THE DOE CONTACT OFFICE INDICATED BELOW:
United States Department of Energy Loan Guarantee Program
1000 Independence Avenue, SW Washington, DC 20585
Attention:
Director, Portfolio Management
Telephone No.
(202) 287-6738
Facsimile No.
(202) 287-5816
Email Address
lpo.portfolio@hq.doe.gov
**********************************************************************************
DOE (Title XVII)
GEORGIA POWER COMPANY
Chief Financial Officer
Federal Financing Bank
Reference is made to the following-described Future Advance Promissory Note (the "Note") payable to the Federal Financing Bank ("FFB"), which is guaranteed by the Secretary of Energy (the "Secretary"):
NAME OF BORROWER
(the "Borrower"):
GEORGIA POWER COMPANY
1
FFB NOTE IDENTIFIER
:
_____________________________________
2
The undersigned, as an authorized official of the Borrower, hereby requests FFB to make an advance of funds ("this Advance") under, pursuant to, and in accordance with the applicable terms of the Note.
The undersigned further requests that this Advance be made as follows:
|
|
1.
|
REQUESTED ADVANCE AMOUNT
:
|
The principal amount of this Advance is requested to be
$_______________________.
3
|
|
2.
|
REQUESTED ADVANCE DATE
:
|
This Advance is requested to be made on:
________________________.
4
______________________
1
Insert the corporate name of the Borrower.
If the corporate name of the Borrower at the time of this Advance is different from the corporate name that appears on page 1 of the Note, add "(formerly
_________
)", and insert in this second blank the corporate name of the Borrower as it appears on page 1 of the Note.
2
Insert the "Note Identifier" that FFB assigned to the Note (as provided in the Note Purchase Agreement).
3
Insert the particular amount of funds that the Borrower requests to be advanced.
4
Insert the particular calendar date that the Borrower requests to be date on which this Advance is to be made, which must be a Business Day.
DOE (Title XVII)
GEORGIA POWER COMPANY
Funds in an amount equal to the Requested Advance Amount are requested to be disbursed by electronic funds transfer to the following account(s):
(IF MORE THAN ONE PAYEE IS TO BE PAID FROM THE REQUESTED ADVANCE AMOUNT,
PROVIDE THE INFORMATION BELOW FOR EACH PAYEE).
$_____________________
|
|
A.
|
Correspondent bank (if any) for payee's bank:
|
|
|
|
|
Name of financial institution
|
|
|
|
|
|
Address of financial institution
|
|
|
|
|
|
ABA number of financial institution
|
|
|
|
|
|
|
|
B.
|
Payee's bank and account
|
|
|
|
|
Name of financial institution
|
|
|
|
|
|
Address of financial institution
|
|
|
|
|
|
ABA number of financial institution
|
|
|
|
|
|
Account name
|
|
|
|
|
|
Account number
|
|
|
|
|
|
Taxpayer ID number
|
|
|
|
|
|
|
|
4.
|
MATURITY DATE
______________________________
5
|
________________________
5
Insert the particular calendar date that the Borrower requests to be date on which this Advance is to mature, which date must meet the criteria for Maturity Dates specified in section 7.3.1(a)(5) of the Note Purchase Agreement referred to in the Note.
DOE (Title XVII)
GEORGIA POWER COMPANY
The undersigned certifies that the undersigned has been authorized to execute this Advance Request on behalf of the Borrower and to deliver it to Secretary for review and approval before being forwarded to FFB, and that this authority is valid and in full force and effect on the date hereof.
IN WITNESS WHEREOF, the undersigned has executed this Advance Request and caused it to be delivered to the Secretary for review and approval before being forwarded to FFB.
GEORGIA POWER COMPANY
|
|
|
|
Signature:
|
|
|
|
|
|
Print Name:
|
|
|
|
|
|
Title:
|
|
|
|
|
|
Date:
|
|
|
|
|
|
ADVANCE REQUEST APPROVAL NOTICE
Notice is hereby given to FFB that the preceding Advance Request made by the Borrower identified therein has been approved by or on behalf of the Secretary of Energy for purposes of the Note identified therein.
|
|
|
|
|
|
|
SECRETARY OF ENERGY
|
|
FOR ACCOUNTING
|
|
acting through his or her
|
|
USE ONLY:
|
|
duly authorized designate
|
|
|
|
|
|
DOE Budget
|
|
|
|
Account
|
|
Signature:
|
|
Number
|
|
|
|
|
|
|
|
|
|
Print Name:
|
|
|
|
|
|
|
|
Title:
|
|
|
|
|
|
|
|
Date:
|
|
DOE (Title XVII)
GEORGIA POWER COMPANY
EXHIBIT B
TO
NOTE PURCHASE AGREEMENT
FORM
OF
CERTIFICATE SPECIFYING
AUTHORIZED BORROWER SIGNATORIES
DOE (Title XVII)
GEORGIA POWER COMPANY
CERTIFICATE SPECIFYING
AUTHORIZED BORROWER SIGNATORIES
Federal Financing Bank
Main Treasury Building
1500 Pennsylvania Avenue, NW
Washington, DC 20220
Reference is made to the Note Purchase Agreement dated as of February 20, 2014 (the "Note Purchase Agreement"), among the Federal Financing Bank ("FFB"), Georgia Power Company (the "Borrower"), and the Secretary of Energy. Capitalized terms used herein and not defined herein shall have the respective meanings ascribed to them in the Note Purchase Agreement.
This Certificate Specifying Authorized Borrower Signatories is delivered to FFB pursuant to section 4.1(c) of the Note Purchase Agreement.
The undersigned, on behalf of the Borrower, hereby certifies that:
a.
each of the individuals named below is the duly qualified and incumbent official of the Borrower holding the position title set out opposite the respective individual's name;
b.
each of the individuals named below is authorized to execute and deliver Advance Requests from time to time on behalf of the Borrower; and
c.
the signature of each such individual set out opposite the respective individual's name and title is the genuine signature of such individual:
CERTIFICATE SPECIFYING AUTHORIZED BORROWER SIGNATORIES - page 1
DOE (Title XVII)
GEORGIA POWER COMPANY
Name
Title
Signature
The undersigned certifies that the undersigned has been given the authority to execute this Certificate Specifying Authorized Borrower Signatories on behalf of the Borrower and to deliver it to FFB, and that this authority is valid and in full force and effect on the date hereof.
CERTIFICATE SPECIFYING AUTHORIZED BORROWER SIGNATORIES - page 2
DOE (Title XVII)
GEORGIA POWER COMPANY
IN WITNESS WHEREOF, the undersigned has executed this Certificate Specifying Authorized Borrower Signatories and caused it to be delivered to FFB.
GEORGIA POWER COMPANY
|
|
|
Signature:
|
|
|
|
Print Name:
|
|
|
|
Title:
|
|
|
|
Date:
|
February 20, 2014
|
|
|
CERTIFICATE SPECIFYING AUTHORIZED BORROWER SIGNATORIES - page 3
DOE (Title XVII)
GEORGIA POWER COMPANY
EXHIBIT C
TO
NOTE PURCHASE AGREEMENT
FORM
OF
NOTE
DOE (Title XVII)
GEORGIA POWER COMPANY
|
|
|
|
|
|
FOR FFB USE ONLY
|
|
Note
|
|
|
|
|
Date
|
|
February 20, 2014
|
|
|
|
|
|
Note Identifier:
|
|
|
|
|
|
|
Place
|
|
|
|
|
of Issue
|
|
Washington, DC
|
|
|
|
|
|
Purchase Date:
|
|
Last Day
|
|
|
|
|
for an
|
|
|
|
|
Advance (¶3)
|
|
December 31, 2020
|
|
|
|
|
|
|
|
Maximum
|
|
|
|
|
Principal
|
|
|
Final Maturity
|
|
Amount (¶4)
|
|
$3,462,409,117
|
Date (¶5)
|
February 20, 2044
|
|
|
|
|
|
|
|
|
Payment
|
February 20, May 20,
|
First
|
|
|
Dates
|
August 20
|
Principal
|
|
|
(¶7)
|
& November 20
|
Payment
|
|
|
|
of each year
|
Date (¶8)
|
|
February 20, 2020
|
|
|
|
|
|
Loan
|
Loan Guarantee Agreement, dated as of the Note
|
Guarantee
|
Date between Georgia Power Company, as Borrower and
|
Agreement
|
U.S. Department of Energy, as Guarantor
|
(¶21)
|
|
|
|
|
FUTURE ADVANCE PROMISSORY NOTE
1.
Promise to Pay
.
FOR VALUE RECEIVED, GEORGIA POWER COMPANY,
a Georgia corporation (the "
Borrower
", which term includes any successors or assigns), promises to pay the
FEDERAL FINANCING BANK
("
FFB
"), a body corporate and instrumentality of the United States of America (FFB, for so long as it shall be the holder of this Note, and any successor or assignee of FFB, for so long as such
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 1
DOE (Title XVII)
GEORGIA POWER COMPANY
successor or assignee shall be the holder of this Note, being the "
Holder
"), at the times, in the manner, and with interest at the rates to be established as hereinafter provided, such amounts as may be advanced from time to time by FFB to or for the account of the Borrower under this Note (each such amount being an "
Advance
" and more than one such amounts being "
Advances
").
2.
Reference to Certain Agreements
.
(a)
Program Financing Agreement
. This Note is one of the "Notes" referred to in, and entitled to the benefits of, the Program Financing Agreement dated as of September 2, 2009, made by and between FFB and the Secretary of Energy, acting through the Department of Energy (the "
Secretary
") (such agreement, as it may be amended, supplemented, and restated from time to time in accordance with its terms, being the "
Program Financing Agreement
").
(b)
Note Purchase Agreement
. This Note is the "Note" referred to in, and entitled to the benefits of, the Note Purchase Agreement dated as of even date herewith, made by and among FFB, the Borrower, and the Secretary (such agreement, as it may be amended, supplemented, and restated from time to time in accordance with its terms, being the "
Note Purchase Agreement
").
|
|
3.
|
Advances; Advance Requests; Last Day for Advances
.
|
(a) Subject to the terms and conditions of the Note Purchase Agreement, FFB shall make Advances under this Note in the amounts, at the times, and to the accounts requested by the Borrower from time to time, in each case upon delivery to FFB of a written request by the Borrower for an Advance under this Note, in the form of request attached to the Note Purchase Agreement as Exhibit A thereto (each such request being an "
Advance Request
"), completed as prescribed in the Note Purchase Agreement;
provided
,
however
, that no Advance may be made under this Note after the particular date specified on page 1 of this Note as being the "Last Day for an Advance."
(b) To be effective, an Advance Request must first be delivered to the Secretary for approval and be approved by or on
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 2
DOE (Title XVII)
GEORGIA POWER COMPANY
behalf of the Secretary in writing, and such Advance Request, together with written notification of the Secretary's approval thereof, must be received by FFB on or before (i) the third Business Day, for an Advance Request less than $500,000,000, (ii) the fifth Business Day, for an Advance Request equal to or greater than $500,000,000 but less than $2,000,000,000, or (iii) the tenth Business Day, for an Advance Request equal to or greater than $2,000,000,000 before the particular calendar date specified in such Advance Request that the Borrower requests to be the date on which the respective Advance is to be made.
(c) The Borrower hereby agrees that FFB, for its purposes, may consider any Advance Request approved by or on behalf of the Secretary and delivered to FFB in accordance with the terms of the Note Purchase Agreement to be an accurate representation of the Borrower's request for an Advance under this Note and the Secretary's approval of that Advance Request.
(d) The Borrower hereby agrees that each Advance made by FFB in accordance with a Secretary-approved Advance Request delivered to FFB shall reduce, by the amount of the respective Advance made, FFB's remaining commitment to make Advances under this Note.
|
|
4.
|
Principal Amount of Advances; Maximum Principal Amount
.
|
The principal amount of each Advance shall be the amount specified in the respective Advance Request;
provided
,
however
, that the aggregate principal amount of all Advances made under this Note may not exceed the particular amount specified on page 1 of this Note as the "Maximum Principal Amount" (such amount being the "
Maximum Principal Amount
").
|
|
5.
|
Maturity Dates for Advances
.
|
Each Advance shall mature on the date specified in the respective Advance Request as being the "
Maturity Date
" (such date being the "Maturity Date" for such Advance, provided that such Maturity Date meets the following criteria:
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 3
DOE (Title XVII)
GEORGIA POWER COMPANY
(a) the Maturity Date for the respective Advance must be a "Payment Date" (as that term is defined in paragraph 7 of this Note);
(b) the Maturity Date for the respective Advance may not be a date that will occur after the particular date specified on page 1 of this Note as being the "Final Maturity Date" (such date being the "
Final Maturity Date
"); and
(c) the period of time between the Requested Advance Date for the respective Advance and the Maturity Date for such Advance may not be less than 90 days.
|
|
6.
|
Computation of Interest on Each Advance
.
|
(a) Subject to paragraphs 11 and 15 of this Note, interest on the outstanding principal of each Advance shall accrue from the date on which the respective Advance is made to the date on which such principal is due.
(b) Interest on each Advance shall be computed on the basis of (1) actual days elapsed from (but not including) the date on which the respective Advance is made (for the first payment of interest due under this Note for the respective Advance) or the date on which the payment of interest was last due (for all other payments of interest due under this Note for the respective Advance), to (and including) the date on which payment is next due, and (2) a year of 365 days.
(c) The interest rate applicable to each Advance shall be established by FFB at the time that the respective Advance is made on the basis of the determination made by the Secretary of the Treasury pursuant to section 6(b) (12 U.S.C. § 2285(b)) of the Federal Financing Bank Act of 1973 (Pub. L. No. 93-224, 87 Stat. 937, codified at 12 U.S.C. § 2281
et
seq
.), as amended (the "
FFB Act
"), and shall be equal to three-eighths of 1 percent per annum (0.375%) over the current average yield on outstanding marketable obligations of the United States of comparable maturity, as determined by the Secretary of the Treasury;
provided
,
however
, that the shortest maturity used as the basis for any interest rate determination shall be the remaining
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 4
DOE (Title XVII)
GEORGIA POWER COMPANY
maturity of the most recently auctioned United States Treasury bills having the shortest maturity of all United States Treasury bills then being regularly auctioned.
7.
Payment of Interest; Payment Dates
.
Interest accrued on the outstanding principal balance of each Advance shall be due and payable on each of the particular dates specified on page 1 of this Note as "Payment Dates" (each such date being a "
Payment Date
"), beginning on the first Payment Date to occur after the date on which such Advance is made, up through and including the Final Maturity Date of such Advance.
8.
Payment of Principal
.
(a) The principal amount of each Advance shall be payable in installments, which payments shall be due beginning on the particular date specified as the "First Principal Payment Date" on page 1 of this Note (such date being the "
First Principal Payment Date
"), and shall be due on each Payment Date to occur thereafter until the principal of the respective Advance is repaid in full on or before the Final Maturity Date.
(b) Except as provided in subparagraph (c) of this paragraph 8, with respect to each Advance, the amount of principal due on the First Principal Payment Date, on each Payment Date to occur thereafter, and on the Final Maturity Date shall be, in each case, an installment that is equal to the product of:
(1) the outstanding principal amount of the respective Advance, determined as of the day immediately preceding the First Principal Payment Date;
times
(2) the particular percentage specified for the respective date on the payment schedule attached as Schedule A to this Note,
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 5
DOE (Title XVII)
GEORGIA POWER COMPANY
and shall be sufficient, when added to all other such installments of principal to repay the principal amount of the respective Advance in full on the Final Maturity Date.
(c) In the event that an Advance is made after the First Principal Payment Date, the amount of principal due with respect to such Advance on the first Payment Date to occur after the date on which Advance is made shall be an amount that is equal to the product of:
(1) the principal amount of the Advance on the day the Advance is made;
times
(2) the sum of:
(A) the particular percentage specified for such Payment Date on the payment schedule attached as Schedule A to this Note; and
(B) the respective percentage or percentages, if any, specified for each date on the payment schedule that occurred before such Payment Date;
and shall be sufficient, when added to all other such installments of principal to repay the principal amount of the respective Advance in full on the Final Maturity Date.
9.
Business Days
.
(a) Whenever any Payment Date, the Maturity Date for any Advance, or the Final Maturity Date shall fall on a day on which either FFB or the Federal Reserve Bank of New York is not open for business, the payment which would otherwise be due on such Payment Date, Maturity Date, or the Final Maturity Date shall be due on the first day thereafter on which FFB and the Federal Reserve Bank of New York are both open for business (any such day being a "
Business Day
").
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 6
DOE (Title XVII)
GEORGIA POWER COMPANY
(b) In the case of a Payment Date falling on a day other than a Business Day, the extension of time for making the payment that would otherwise be due on such Payment Date shall (1) be taken into account in establishing the interest rate for each Advance, and (2) be included in computing interest due in connection with such payment and excluded in computing interest due in connection with the next payment.
(c) In the case of the Maturity Date for any Advance or the Final Maturity Date falling on a day other than a Business Day, the extension of time for making the payment that would otherwise be due on such Maturity Date or the Final Maturity Date shall (1) be taken into account in establishing the interest rate for each Advance, and (2) be included in computing interest due in connection with such payment.
10.
Manner of Making Payments
.
(a) For so long as FFB is the Holder of this Note, each payment under this Note shall be paid in immediately available funds by electronic funds transfer to the account of the United States Treasury (for credit to the subaccount of the Secretary) maintained at the Federal Reserve Bank of New York in the manner described below:
U.S. Treasury Department
ABA No.
TREAS NYC/CTR/BNF=
OBI=LGPO
provided
,
however
, that a payment made in the manner described above shall not discharge any portion of a payment obligation under this Note, or be applied as provided in paragraph 13 of this Note, until the payment has been received and credited to the subaccount of FFB (within the account of the United States Treasury maintained at the Federal Reserve Bank of New York) specified by FFB in a written notice to the Secretary, or to such other account as may be specified from time to time by FFB in a written notice to the Secretary.
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 7
DOE (Title XVII)
GEORGIA POWER COMPANY
(b) In the event that FFB is
not
the Holder of this Note, then each payment under this Note shall be made in immediately available funds by electronic funds transfer to such account as shall be specified by the Holder in a written notice to the Borrower.
11.
Late Payments
.
(a) In the event that any payment of any amount owing under this Note is not made when and as due (any such amount being then an "
Overdue Amount
"), then the amount payable shall be such Overdue Amount plus interest thereon (such interest being the "
Late Charge
") computed in accordance with this subparagraph (a):
(1) The Late Charge shall accrue from the scheduled date of payment for the Overdue Amount (taking into account paragraph 9 of this Note) to the date on which payment is made.
(2) The Late Charge shall be computed on the basis of (A) actual days elapsed from (but not including) the scheduled date of payment for such Overdue Amount (taking into account paragraph 9 of this Note) to (and including) the date on which payment is made, and (B) a year of 365 days.
(3) The Late Charge shall accrue at a rate (the "
Late Charge Rate
") equal to one and one-half times the rate to be determined by the Secretary of the Treasury taking into consideration the prevailing market yield on the remaining maturity of the most recently auctioned 13-week United States Treasury bills.
(4) The initial Late Charge Rate shall be in effect until the earlier to occur of either (A) the date on which payment of the Overdue Amount and the amount of the accrued Late Charge is made, or (B) the first Payment Date to occur after the scheduled date of payment for such Overdue Amount. In the event that the Overdue Amount and the amount of the accrued Late Charge are not paid on or before the such
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 8
DOE (Title XVII)
GEORGIA POWER COMPANY
Payment Date, then the amount payable shall be the sum of the Overdue Amount and the amount of the accrued Late Charge, plus a Late Charge on such sum accruing at a new Late Charge Rate to be then determined in accordance with the principles of clause (3) of this subparagraph (a). For so long as any Overdue Amount remains unpaid, the Late Charge Rate shall be redetermined in accordance with the principles of clause (3) of this subparagraph (a) on each Payment Date to occur thereafter, and shall be applied to the Overdue Amount and all amounts of the accrued Late Charge to the date on which payment of the Overdue Amount and all amounts of the accrued Late Charge is made.
(b) Nothing in subparagraph (a) of this paragraph 11 shall be construed as permitting or implying that the Borrower may, without the written consent of the Holder, modify, extend, alter or affect in any manner whatsoever (except as explicitly provided herein) the right of the Holder to receive any and all payments on account of this Note on the dates specified in this Note.
12.
Final Due Date
.
Notwithstanding anything in this Note to the contrary, all amounts outstanding under this Note remaining unpaid as of the Final Maturity Date shall be due and payable on the Final Maturity Date.
13.
Application of Payments
.
Each payment made on this Note shall be applied first to the payment of Late Charges (if any) payable under paragraphs 11 and 16 of this Note, then to the payment of premiums (if any) payable under paragraphs 15 of this Note, then to the payment of accrued interest, and then on account of outstanding principal.
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 9
DOE (Title XVII)
GEORGIA POWER COMPANY
14.
Maturity Extensions
.
(a) With respect to each Advance for which the Borrower has selected a Maturity Date that will occur before the Final Maturity Date (each such Maturity Date being an "
Interim Maturity Date
"), the Borrower may, effective as of such Interim Maturity Date, elect to extend the maturity of all or any portion of the outstanding principal amount of the respective Advance (subject to subparagraph (c) of this paragraph 14) to a new Maturity Date to be selected by the Borrower in the manner and subject to the limitations specified in this subparagraph (a) (each such election being a "
Maturity Extension Election
"; each such elective extension of the maturity of any Advance that has an Interim Maturity Date being a "
Maturity Extension
"; and the Interim Maturity Date that is in effect for an Advance immediately before any such elective Maturity Extension being, from and after such Maturity Extension, the "
Maturity Extension Effective Date
").
(1) Except under the circumstances described in clause (3) of this subparagraph (a), the Borrower shall deliver to FFB (with a copy to the Secretary) written notification of each Maturity Extension Election, in the form of notification attached to this Note as
Annex A-1
(each such notification being a "
Maturity Extension Election Notice
"), making reference to the "Advance Identifier" (as that term is defined in the Agreement) that FFB assigned to such Advance (as provided in the Agreement) and specifying, among other things, the following:
(A) the amount of the outstanding principal of the such Advance with respect to which the Borrower elects to extend the maturity (subject to subparagraph (c) of this paragraph 14); and
(B) the new Maturity Date that the Borrower selects to be in effect for such principal amount after the respective Maturity Extension Effective Date, which date:
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 10
DOE (Title XVII)
GEORGIA POWER COMPANY
(i) may be either a new Interim Maturity Date or the Final Maturity Date; and
(ii) in the event that the Borrower selects a new Interim Maturity Date as the new Maturity Date for any Advance, must meet the criteria for Maturity Dates prescribed in paragraph 5 of this Note (
provided
,
however
, that, for purposes of selecting a new Maturity Date in connection with a Maturity Extension Election, the reference to "the Requested Advance Date for the respective Advance" in subparagraph (c) of paragraph 5 of this Note shall be deemed to be a reference to "the respective Maturity Extension Effective Date").
(2) To be effective, a Maturity Extension Election Notice must be received by FFB on or before the third Business Day before the Interim Maturity Date in effect for the respective Advance immediately before such Maturity Extension.
(3) In the event that either of the circumstances described in subclause (A) or (B) of the next sentence occurs, then a Maturity Extension Election Notice (in the form of notice attached to this Note as
Annex A-2
), to be effective, must first be delivered to the Secretary for approval and be approved by the Secretary in writing, and such Maturity Extension Election Notice, together with written notification of the Secretary's approval thereof, must be received by FFB on or before the third Business Day before the Interim Maturity Date in effect for the respective Advance immediately before such Maturity Extension. The Secretary’s approval of a Maturity Extension Election Notice will be required under either of the following circumstances:
(A) (i) any payment of any amount owing under this Note is not made by the Borrower when and as due, (ii) payment is made by the Secretary in accordance with the guarantee set forth at the end of this Note, and (iii) the Secretary delivers notice to both the Borrower and
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 11
DOE (Title XVII)
GEORGIA POWER COMPANY
FFB advising each of them that each Maturity Extension Election Notice delivered by the Borrower after the date of such notice shall require the approval of the Secretary; or
(B) FFB at any time delivers notice to both the Borrower and the Secretary advising each of them that each Maturity Extension Election Notice delivered by the Borrower after the date of such notice shall require the approval of the Secretary.
(b) With respect to any Advance that has an Interim Maturity Date, in the event that FFB does not receive a Maturity Extension Election Notice (and, if required under clause (3) of subparagraph (a) of this paragraph 14, written notification of the Secretary's approval thereof) on or before the third Business Day before such Interim Maturity Date, then the maturity of such Advance shall be extended automatically in the manner and subject to the limitations specified in this subparagraph (b) (each such automatic extension of the maturity of any Advance that has an Interim Maturity Date also being a "
Maturity Extension
"; and the Interim Maturity Date that is in effect for an Advance immediately before any such automatic Maturity Extension also being, from and after such Maturity Extension, the "
Maturity Extension Effective Date
").
(1) The new Maturity Date for such Advance shall be the immediately following quarterly Payment Date.
(2) If the Interim Maturity Date that is in effect for such Advance immediately before such automatic Maturity Extension is:
(A) a Payment Date that occurs before the First Principal Payment Date, then the amount of principal that will have its maturity extended automatically shall be the entire outstanding principal amount of such Advance; and
(B) either the First Principal Payment Date or a Payment Date that occurs after the First Principal
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 12
DOE (Title XVII)
GEORGIA POWER COMPANY
Payment Date (such Advance being an "Amortizing Advance"), then the amount of principal that will have its maturity extended automatically shall be the outstanding principal amount of such Advance less the principal installment that is due on the respective Maturity Extension Effective Date (as provided in subparagraph (c) of this paragraph 14).
(c) In the event that the maturity of any Amortizing Advance that has an Interim Maturity Date is extended under either subparagraph (a) or (b) of this paragraph 14, then the principal installment that is due on the respective Maturity Extension Effective Date, in accordance with the principal repayment schedule that applied to such Amortizing Advance immediately before such Maturity Extension Effective Date, shall nevertheless be due and payable on such Maturity Extension Effective Date notwithstanding such Maturity Extension.
(d) In the event that the maturity of any Advance that has an Interim Maturity Date is extended under either subparagraph (a) or (b) of this paragraph 14, then the interest rate for such Advance, from and after the respective Maturity Extension Effective Date, shall be the particular rate that is established by FFB, as of such Maturity Extension Effective Date, in accordance with the principles of subparagraph (c) of paragraph 6 of this Note.
(e) In the event that the maturity of any Amortizing Advance that has an Interim Maturity Date is extended under either subparagraph (a) or (b) of this paragraph 14, then the amount of the quarterly principal installments that will be due after the respective Maturity Extension Effective Date shall be equal to the amount of the quarterly installments of principal that were due in accordance with the principal repayment schedule that applied to such Amortizing Advance immediately before such Maturity Extension Effective Date.
(f) In the event that the maturity of any Amortizing Advance that has an Interim Maturity Date is extended under either subparagraph (a) or (b) of this paragraph 14, then for each such Amortizing Advance, the quarterly installments of
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 13
DOE (Title XVII)
GEORGIA POWER COMPANY
principal shall be due beginning on the first Payment Date to occur after the respective Maturity Extension Effective Date, and shall be due on each Payment Date to occur thereafter up through and including the earlier to occur of either (A) the new Maturity Date for such extended Amortizing Advance, on which date the entire unpaid principal amount of such extended Amortizing Advance shall also be payable, subject to further Maturity Extensions if the new Maturity Date is an Interim Maturity Date, or (B) the date on which the entire principal amount of such extended Amortizing Advance, and all unpaid interest (and Late Charges, if any) accrued thereon, are paid.
(g) The maturity of each Advance may be extended more than once as provided in this paragraph 14, but upon the occurrence of the Final Maturity Date, no further Maturity Extensions may occur.
15.
Prepayments
.
(a) The Borrower may elect to prepay all or any portion of the outstanding principal amount of any Advance made under this Note, or to prepay this Note in its entirety, in the manner, at the price, and subject to the limitations specified in this paragraph 15 (each such election being a "
Prepayment Election
").
(b) The Borrower shall deliver to FFB (and if FFB is not the Holder, then also to the Holder) and to the Secretary written notification of each Prepayment Election (each such notification being a "
Prepayment Election Notice
"), specifying:
(1) the Advance Identifier that FFB assigned to the respective Advance (as provided in the Note Purchase Agreement);
(2) the particular date on which the Borrower intends to prepay the respective Advance (such date being the "
Intended Prepayment Date
" for the respective Advance), which date must be a Business Day; and
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 14
DOE (Title XVII)
GEORGIA POWER COMPANY
(3) the amount of principal of the respective Advance that the Borrower intends to prepay, which amount may be either:
(A) the total outstanding principal amount of such Advance; or
(B) an amount less than the total outstanding principal amount of such Advance (any such amount being a "
Portion
").
(c) To be effective, a Prepayment Election Notice must be received by FFB (and if FFB is not the Holder, then also by the Holder) on or before the fifth Business Day before the date specified therein as the Intended Prepayment Date for the respective Advance or Portion.
(d) The Borrower shall pay to the Holder a price for the prepayment of any Advance or Portion (such price being the "
Prepayment Price
" for such Advance or Portion) determined as follows:
(1) in the event that the Borrower elects to prepay the entire outstanding principal amount of any Advance, then the Borrower shall pay to the Holder a Prepayment Price for such Advance equal to the sum of:
(A) the price for such Advance that would, if such Advance (including all unpaid interest accrued thereon through the Intended Prepayment Date) were purchased by a third party and held to the Maturity Date of such Advance, produce a yield to the third-party purchaser for the period from the date of purchase to the Maturity Date of such Advance substantially equal to the interest rate that would be set on a loan from the Secretary of the Treasury to FFB to purchase an obligation having a payment schedule identical to the payment schedule of such Advance for the period from the Intended Prepayment Date to the Maturity Date of such Advance; and
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 15
DOE (Title XVII)
GEORGIA POWER COMPANY
(B) all unpaid Late Charges (if any) accrued on such Advance through the Intended Prepayment Date;
(2) in the event that the Borrower elects to prepay a Portion of any Advance, then the Borrower shall pay to the Holder a Prepayment Price for such Portion that would equal such Portion's pro rata share of the Prepayment Price that would be required for a prepayment of the entire principal amount of such Advance (determined in accordance with the principles of clause (1) of this subparagraph (d)); and
(3) in the event that the Borrower elects to prepay this Note in its entirety, then the Borrower shall pay to the Holder an amount equal to the sum of the Prepayment Prices for all outstanding Advances (determined in accordance with the principles of clause (1) of this subparagraph (d)).
(e) Payment of the Prepayment Price for any Advance or any Portion shall be due to the Holder before 3:00 p.m. (Washington, DC, time) on the Intended Prepayment Date for such Advance or Portion.
(f) Each prepayment of a Portion shall, as to the principal amount of such Portion, be subject to a minimum amount equal to $100,000.00 of principal; except that the minimum principal amount limitation shall not apply to a prepayment of a Portion if:
(1) the prepayment is made to satisfy the Borrower's obligation to make a mandatory prepayment under the "Security Instruments" (as that term is defined in paragraph 21 of this Note); and
(2) the Borrower has certified to that fact in the respective Prepayment Election Notice.
(g) In the event that the Borrower makes a Prepayment Election with respect to any Portion of an Advance, then the Prepayment Price paid for such Portion will be applied as provided in paragraph 13 of this Note, and, with respect to
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 16
DOE (Title XVII)
GEORGIA POWER COMPANY
application to outstanding principal, such Prepayment Price shall be applied to installments of principal in the inverse order of maturity.
(h) In the event that the Borrower makes a Prepayment Election with respect to any Portion of an Advance, then the outstanding principal amount of such Advance from and after such partial prepayment, shall be due and payable in accordance with this subparagraph (h).
(1) The amounts of the scheduled installments of principal that will be due after such partial prepayment shall be equal to the amounts of the scheduled installments of principal that were due in accordance with the payment schedule that applied to such Advance immediately before such partial prepayment.
(2) The scheduled installments of principal shall be due beginning on the first Payment Date to occur after such partial prepayment, and shall be due on each Payment Date to occur thereafter up through and including the date on which the entire principal amount of such Advance and all unpaid interest (and Late Charges, if any) accrued thereon, are paid.
|
|
16.
|
Rescission of Prepayment Elections; Late Charges for Late Payments of Prepayment Prices
.
|
(a) The Borrower may rescind any Prepayment Election made in accordance with paragraph 15 of this Note, but only in accordance with this paragraph 16.
(b) The Borrower shall deliver to FFB, with a copy to the Secretary, written notification of each rescission of a Prepayment Election (each such notification being an "
Election Rescission Notice
") specifying the particular Advance for which the Borrower wishes to rescind such Prepayment Election, which specification must make reference to the particular "Advance Identifier" (as that term is defined in the Note Purchase Agreement) that FFB assigned to such Advance (as provided in the Note Purchase Agreement). The Election Rescission Notice may be
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 17
DOE (Title XVII)
GEORGIA POWER COMPANY
delivered by facsimile transmission to FFB at (202) 622-0707 or at such other facsimile number or numbers as FFB may from time to time communicate to the Borrower.
(c) To be effective, an Election Rescission Notice must be received by FFB not later than 3:30 p.m. (Washington, DC, time) on the second Business Day before the Intended Prepayment Date.
(d) In the event that the Borrower (1) makes a Prepayment Election in accordance with paragraph 15 of this Note, (2) does not rescind such Prepayment Election in accordance with this paragraph 16, and (3) does not, before 3:00 p.m. (Washington, DC, time) on the Intended Prepayment Date, pay to FFB the Prepayment Price described in paragraph 15(d) of this Note, then a Late Charge shall accrue on any such unpaid amount from the Intended Prepayment Date to the date on which payment is made, computed in accordance with the principles of paragraph 11 of this Note.
17.
Amendments to Note
.
To the extent not inconsistent with applicable law, this Note shall be subject to modification by such amendments, extensions, and renewals as may be agreed upon from time to time by the Holder and the Borrower, with the approval of the Secretary.
18.
Certain Waivers
.
The Borrower hereby waives any requirement for presentment, protest, or other demand or notice with respect to this Note.
19.
Effective Until Paid
.
Subject to section 6.2 of the Note Purchase Agreement, this Note shall continue in full force and effect until all amounts due and payable hereunder have been paid in full.
|
|
20.
|
Secretary's Guarantee of Note
.
|
Upon execution of the guarantee in the form of the Secretary’s Guarantee attached as Exhibit G to the Note Purchase
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 18
DOE (Title XVII)
GEORGIA POWER COMPANY
Agreement (the "
Guarantee
"), the payment by the Borrower of all amounts due and payable under this Note, when and as due, shall be guaranteed by the United States of America, acting through the Secretary, pursuant to Title XVII of the Energy Policy Act of 2005, as amended (42 U.S.C. § 16511
et
seq
.). In consideration of the Guarantee, the Borrower promises to the Secretary to make all payments due under this Note when and as due.
|
|
21.
|
Security Instruments
.
|
This Note is permitted to be executed and delivered by, and is entitled to the benefits and security of, the "
Security Instruments
" (as defined in the Note Purchase Agreement), whereby the Borrower pledged and granted a security interest in certain property of the Borrower, described therein, to secure the payment of and performance of certain obligations owed to the Secretary, as set forth in the Security Instruments. For purposes of the Security Instruments, in consideration of the undertakings by the Secretary set forth in the Program Financing Agreement, the Note Purchase Agreement, and the Guarantee, the Secretary shall be considered to be, and shall have the rights, powers, privileges, and remedies of, the Holder of this Note.
22.
Guarantee Payments; Reimbursement
.
If the Secretary makes any payment, pursuant to the Guarantee, of any amount due and payable under this Note, each and every such payment so made shall be deemed to be a payment hereunder;
provided
,
however
, that no payment by the Secretary pursuant to the Guarantee shall be considered a payment for purposes of determining the existence of a failure by the Borrower to perform its obligation to the Secretary to make all payments under this Note when and as due. The Secretary shall have any rights by way of subrogation, agreement or otherwise which arise as a result of such payment pursuant to the Guarantee and as provided in the particular agreement specified on page 1 of this Note as the "Loan Guarantee Agreement" between the Borrower and the United States of America, acting through the Secretary, to evidence the Borrower's obligation to reimburse the Secretary for payment made by the Secretary pursuant to the Guarantee.
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 19
DOE (Title XVII)
GEORGIA POWER COMPANY
|
|
23.
|
Default and Enforcement
.
|
(a) In case of a default by the Borrower under this Note or the occurrence of an "Event of Default" (as defined in the Security Instruments), then, in consideration of the obligation of the Secretary under the Guarantee, the Secretary, in the name of the Secretary or the United States of America, shall have all rights, powers, privileges, and remedies of the Holder of this Note, in accordance with the terms of this Note and the Security Instruments, including, without limitation, the right to (i) enforce or collect all or any part of the obligation of the Borrower under this Note or arising as a result of the Guarantee; (ii) accelerate (as provided in paragraph 24); (iii) compromise or otherwise negotiate with the Borrower (but not affecting amounts due and payable to the Holder under this Note and the Guarantee); (iv) bring suit against or foreclose upon any or all of the security interests granted by the Borrower; and (v) to file proofs of claim or any other document in any bankruptcy, insolvency, or other judicial proceeding, and to vote such proofs of claim.
(b) The Borrower acknowledges that FFB has agreed in the Note Purchase Agreement that, in consideration of the Guarantee, the Secretary shall have the sole authority (vis-à-vis FFB), in the case of a default by the Borrower under this Note or the occurrence of an Event of Default under the Security Instruments, in respect of acceleration (as provided in paragraph 24), the exercise of other remedies available hereunder or under the Note Purchase Agreement, and the disposition of sums or property recovered.
24.
Acceleration
.
Upon the occurrence and continuation of a default by the Borrower under this Note or an Event of Default under the Security Instruments (subject to the terms of the Loan Guarantee Agreement), the Secretary, pursuant to the Security Instruments, may declare the entire unpaid principal amount of this Note, all interest thereon, and all other amounts payable under this Note, and upon such declaration such amounts shall become, due and
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 20
DOE (Title XVII)
GEORGIA POWER COMPANY
payable to the Secretary, under the circumstances described, and in the manner and with the effect provided, in the Security Instruments.
25.
Governing Law
.
This Note shall be governed by, and construed and interpreted in accordance with, the Federal law and not the law of any state or locality. To the extent that a court looks to the laws of any state to determine or define the Federal law, it is the intention of the parties hereto that such court shall look only to the laws of the State of New York without regard to the rules of conflicts of laws.
26.
Schedule A Incorporated
.
Schedule A is an integral part of this Note and is incorporated herein by reference.
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 21
DOE (Title XVII)
GEORGIA POWER COMPANY
IN WITNESS WHEREOF,
the Borrower has caused this Note to be signed in its corporate name and its corporate seal to be hereunder affixed and attested by its officers thereunto duly authorized, all as of the day and year first above written.
|
|
|
|
|
|
|
|
GEORGIA POWER COMPANY
|
|
|
|
|
|
|
By:
|
|
|
|
Signature:
|
|
|
|
|
|
|
|
|
Print Name:
|
|
|
|
|
|
|
|
|
Title:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Attest:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Signature:
|
|
(SEAL)
|
|
|
|
|
|
|
Print Name:
|
|
|
|
|
|
|
|
|
Title:
|
Corporate Secretary
|
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 22
DOE (Title XVII)
GEORGIA POWER COMPANY
SCHEDULE A
PAYMENT SCHEDULE FOR
PRINCIPAL OF
EACH OUTSTANDING ADVANCE
|
|
|
|
|
|
|
|
|
|
|
|
|
Payment Date
|
Principal Payments
|
(month/day/year)
|
(%)
|
|
|
|
|
2/20/2020
|
0.417%
|
5/20/2020
|
0.417%
|
8/20/2020
|
0.417%
|
11/20/2020
|
0.417%
|
2/20/2021
|
0.417%
|
5/20/2021
|
0.417%
|
8/20/2021
|
0.417%
|
11/20/2021
|
0.417%
|
2/20/2022
|
0.417%
|
5/20/2022
|
0.417%
|
8/20/2022
|
0.417%
|
11/20/2022
|
0.417%
|
2/20/2023
|
0.417%
|
5/20/2023
|
0.417%
|
8/20/2023
|
0.417%
|
11/20/2023
|
0.417%
|
2/20/2024
|
0.417%
|
5/20/2024
|
0.417%
|
8/20/2024
|
0.417%
|
11/20/2024
|
0.417%
|
2/20/2025
|
0.417%
|
5/20/2025
|
0.417%
|
8/20/2025
|
0.417%
|
11/20/2025
|
0.417%
|
2/20/2026
|
0.417%
|
5/20/2026
|
0.417%
|
8/20/2026
|
0.417%
|
11/20/2026
|
0.417%
|
2/20/2027
|
0.417%
|
5/20/2027
|
0.417%
|
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 23
DOE (Title XVII)
GEORGIA POWER COMPANY
|
|
|
8/20/2027
|
0.417%
|
11/20/2027
|
0.417%
|
2/20/2028
|
0.417%
|
5/20/2028
|
0.417%
|
8/20/2028
|
0.417%
|
11/20/2028
|
0.417%
|
2/20/2029
|
0.417%
|
5/20/2029
|
0.417%
|
8/20/2029
|
0.417%
|
11/20/2029
|
0.417%
|
2/20/2030
|
0.417%
|
5/20/2030
|
0.417%
|
8/20/2030
|
0.417%
|
11/20/2030
|
0.417%
|
2/20/2031
|
0.417%
|
5/20/2031
|
0.417%
|
8/20/2031
|
0.417%
|
11/20/2031
|
0.417%
|
2/20/2032
|
0.417%
|
5/20/2032
|
0.417%
|
8/20/2032
|
0.417%
|
11/20/2032
|
0.417%
|
2/20/2033
|
0.417%
|
5/20/2033
|
0.417%
|
8/20/2033
|
0.417%
|
11/20/2033
|
0.417%
|
2/20/2034
|
0.417%
|
5/20/2034
|
0.417%
|
8/20/2034
|
0.417%
|
11/20/2034
|
0.417%
|
2/20/2035
|
2.027%
|
5/20/2035
|
2.027%
|
8/20/2035
|
2.027%
|
11/20/2035
|
2.027%
|
2/20/2036
|
2.027%
|
5/20/2036
|
2.027%
|
8/20/2036
|
2.027%
|
11/20/2036
|
2.027%
|
2/20/2037
|
2.027%
|
5/20/2037
|
2.027%
|
8/20/2037
|
2.027%
|
11/20/2037
|
2.027%
|
2/20/2038
|
2.027%
|
5/20/2038
|
2.027%
|
8/20/2038
|
2.027%
|
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 24
DOE (Title XVII)
GEORGIA POWER COMPANY
|
|
|
11/20/2038
|
2.027%
|
2/20/2039
|
2.027%
|
5/20/2039
|
2.027%
|
8/20/2039
|
2.027%
|
11/20/2039
|
2.027%
|
2/20/2040
|
2.027%
|
5/20/2040
|
2.027%
|
8/20/2040
|
2.027%
|
11/20/2040
|
2.027%
|
2/20/2041
|
2.027%
|
5/20/2041
|
2.027%
|
8/20/2041
|
2.027%
|
11/20/2041
|
2.027%
|
2/20/2042
|
2.027%
|
5/20/2042
|
2.027%
|
8/20/2042
|
2.027%
|
11/20/2042
|
2.027%
|
2/20/2043
|
2.027%
|
5/20/2043
|
2.027%
|
8/20/2043
|
2.027%
|
11/20/2043
|
2.027%
|
2/20/2044
|
2.008%
|
(qtr pymts; no cap int; mstr pymt sched) NOTE - page 25
DOE (Title XVII)
GEORGIA POWER COMPANY
ANNEX A-1
TO
FUTURE ADVANCE PROMISSORY NOTE
FORM
OF
MATURITY EXTENSION ELECTION NOTICE
DOE (Title XVII)
GEORGIA POWER COMPANY
MATURITY EXTENSION ELECTION NOTICE
****************************************************************
PART 1 OF THIS FORM HAS BEEN COMPLETED BY DOE. THE BORROWER SHOULD COMPLETE PART 2 OF THIS FORM ONLY FOR THOSE PARTICULAR ADVANCES IDENTIFIED IN PART 1 OF THIS FORM WITH RESPECT TO WHICH THE BORROWER ELECTS TO HAVE THE MATURITY EXTENDED TO A NEW MATURITY DATE
OTHER THAN
THE IMMEDIATELY FOLLOWING QUARTERLY PAYMENT DATE.
DIRECT ALL
QUESTIONS
ON HOW TO COMPLETE THIS FORM TO THE ASSIGNED CONTACT OFFICE FOR THE BORROWER:
United States Department of Energy
Loan Guarantee Program
1000 Independence Avenue, SW
Washington, DC 20585
Attention:
Director, Portfolio Management
Telephone No. (202) 287-6738
Facsimile No. (202) 287-5816
Email Address
lpo.portfolio@hq.doe.gov
WHEN COMPLETED, DELIVER THIS
ORIGINAL
FORM
TO FFB
AT THE FOLLOWING ADDRESS:
Manager
Federal Financing Bank
Main Treasury Building
1500 Pennsylvania Avenue, NW
Washington, DC 20220
Telephone: (202) 622-2470 Facsimile: (202) 622-0707
THE BORROWER SHOULD
NOT
COMPLETE THIS FORM
OR
DELIVER IT TO FFB IF THE BORROWER DESIRES TO HAVE THE MATURITY OF ALL OF THE ADVANCES IDENTIFIED IN PART 1 OF THIS FORM EXTENDED AUTOMATICALLY TO THE IMMEDIATELY FOLLOWING QUARTERLY PAYMENT DATE.
IF THE BORROWER DOES
NOT
RETURN THIS FORM TO FFB, THE MATURITY OF ALL OF THE ADVANCES IDENTIFIED IN PART 1 OF THIS FORM WILL BE EXTENDED AUTOMATICALLY TO THE IMMEDIATELY FOLLOWING QUARTERLY PAYMENT DATE.
****************************************************************
MATURITY EXTENSION ELECTION NOTICE - page 1
DOE (Title XVII)
GEORGIA POWER COMPANY
MATURITY EXTENSION ELECTION NOTICE
Manager
Federal Financing Bank
Reference is made to the following-described Future Advance Loan (the "Loan") payable to the Federal Financing Bank ("FFB"), which is guaranteed by the Secretary of Energy ("DOE"):
|
|
|
Name of Borrower (the "Borrower") :
|
|
|
|
Georgia Power Company
|
|
|
|
FFB Note Identifier:
|
|
|
|
Part 1 (To be completed by
DOE):
Each of the advances of funds ("Advances") identified in this Part 1 will mature
on ______________________ (the "Maturity Date").
|
|
|
|
|
|
|
|
FFB
|
|
ORIGINAL
|
|
ORIGINAL
|
|
OUTSTANDING
|
ADVANCE
|
|
ADVANCE
|
|
ADVANCE
|
|
PRINCIPAL
|
IDENTIFIER
|
|
DATE
|
|
AMOUNT
|
|
AMOUNT
|
|
|
|
|
|
|
|
|
|
|
|
$
|
|
$
|
|
|
|
|
$
|
|
$
|
|
|
|
|
$
|
|
$
|
|
|
|
|
$
|
|
$
|
|
|
|
|
|
|
|
MATURITY EXTENSION ELECTION NOTICE - page 2
DOE (Title XVII)
GEORGIA POWER COMPANY
Part 2:
Notice is hereby given to FFB (and DOE) of the Borrower's
election that the maturity of each of the Advances identified in this Part 2 be extended as follows:
|
|
|
|
|
|
|
|
|
|
|
|
AMOUNT OF
|
|
|
FFB
|
|
OPTIONAL
|
|
PRINCIPAL
|
|
NEW
|
ADVANCE
|
|
PRINCIPAL
|
|
TO BE
|
|
MATURITY
|
IDENTIFIER
1
|
|
PAYMENT
2
|
|
EXTENDED
3
|
|
DATE
4
|
|
|
|
|
|
|
|
|
|
$
|
|
|
|
|
|
|
$
|
|
|
|
|
|
|
$
|
|
|
|
|
|
|
$
|
|
|
|
|
|
|
|
|
|
|
|
1
Complete 1 line in Part 2 for each Advance with respect to which the Borrower elects to have the maturity extended to a new Maturity Date
other than
the next Payment Date. Insert the FFB Advance Identifier that FFB assigned to the respective Advance for each Advance identified in Part 1 with respect to which the Borrower elects to have the maturity so extended.
2
The Borrower has the option of making a payment of principal on the Maturity Date without any premium being charged. For each Advance, insert the amount of any such optional principal payment that will be paid on the Maturity Date.
3
For each Advance, insert the amount of principal for which the maturity is to be extended. That amount must equal the
difference between
the outstanding principal amount for the respective Advance, as specified in Part 1, and the optional principal payment (if any) for such Advance inserted by the Borrower in Part 2.
4
For each Advance, insert the particular calendar date that the Borrower selects to be the
new
Maturity Date to be in effect for the respective Advance after the Maturity Extension, which new Maturity Date must meet all the criteria for Maturity Dates specified in section 7.3.1(a)(5) of the Note Purchase Agreement referred to in the Note.
MATURITY EXTENSION ELECTION NOTICE - page 3
DOE (Title XVII)
GEORGIA POWER COMPANY
The undersigned hereby certifies that the authority of the undersigned to execute and deliver this Maturity Extension Election Notice on behalf of the Borrower is valid and in full force and effect on the date hereof.
|
|
|
|
|
|
|
|
|
|
|
GEORGIA POWER COMPANY
|
|
|
|
(the "Borrower")
|
|
|
|
|
|
|
|
By:
|
|
|
|
|
|
|
|
Name:
|
|
|
|
|
|
|
|
Title:
|
|
|
|
|
|
|
|
Date:
|
|
|
|
|
|
MATURITY EXTENSION ELECTION NOTICE - page 4
DOE (Title XVII)
GEORGIA POWER COMPANY
ANNEX A-2
TO
FUTURE ADVANCE PROMISSORY NOTE
FORM
OF
MATURITY EXTENSION ELECTION NOTICE
(DOE APPROVAL REQUIRED)
DOE (Title XVII)
GEORGIA POWER COMPANY
MATURITY EXTENSION ELECTION NOTICE
(DOE APPROVAL REQUIRED)
****************************************************************
PART 1 OF THIS FORM HAS BEEN COMPLETED BY DOE. THE BORROWER SHOULD COMPLETE PART 2 OF THIS FORM ONLY FOR THOSE PARTICULAR ADVANCES IDENTIFIED IN PART 1 OF THIS FORM WITH RESPECT TO WHICH THE BORROWER ELECTS TO HAVE THE MATURITY EXTENDED TO A NEW MATURITY DATE
OTHER THAN
THE IMMEDIATELY FOLLOWING QUARTERLY PAYMENT DATE.
DIRECT ALL
QUESTIONS
ON HOW TO COMPLETE THIS FORM TO THE ASSIGNED CONTACT OFFICE FOR THE BORROWER:
WHEN COMPLETED, DELIVER THIS
ORIGINAL
FORM
TO DOE
AT THE ADDRESS OF THE CONTACT OFFICE INDICATED BELOW:
United States Department of Energy
Loan Guarantee Program
1000 Independence Avenue, SW
Washington, DC 20585
Attention:
Director, Portfolio Management
Telephone No. (202) 287-6738
Facsimile No. (202) 287-5816
Email Address
lpo.portfolio@hq.doe.gov
THE BORROWER SHOULD
NOT
COMPLETE THIS FORM
OR
DELIVER IT TO DOE IF THE BORROWER DESIRES TO HAVE THE MATURITY OF ALL OF THE ADVANCES IDENTIFIED IN PART 1 OF THIS FORM EXTENDED AUTOMATICALLY TO THE IMMEDIATELY FOLLOWING QUARTERLY PAYMENT DATE.
IF THE BORROWER DOES
NOT
RETURN THIS FORM TO DOE, THE MATURITY OF ALL OF THE ADVANCES IDENTIFIED IN PART 1 OF THIS FORM WILL BE EXTENDED AUTOMATICALLY TO THE IMMEDIATELY FOLLOWING QUARTERLY PAYMENT DATE.
****************************************************************
MATURITY EXTENSION ELECTION NOTICE (DOE APPROVAL REQ'D) - page 1
DOE (Title XVII)
GEORGIA POWER COMPANY
MATURITY EXTENSION ELECTION NOTICE
Manager
Federal Financing Bank
Reference is made to the following-described Future Advance Note (the "Note") payable to the Federal Financing Bank ("FFB"), which is guaranteed by the Secretary of Energy ("DOE"):
|
|
|
Name of Borrower (the "Borrower"):
|
|
|
|
Georgia Power Company
|
|
|
|
FFB Note Identifier:
|
|
|
|
Part 1 (To be completed by
DOE):
Each of the advances of funds ("Advances") identified in this Part 1 will mature on _____________________
(the "Maturity Date").
|
|
|
|
|
|
|
|
FFB
|
|
ORIGINAL
|
|
ORIGINAL
|
|
OUTSTANDING
|
ADVANCE
|
|
ADVANCE
|
|
ADVANCE
|
|
PRINCIPAL
|
IDENTIFIER
|
|
DATE
|
|
AMOUNT
|
|
AMOUNT
|
|
|
|
|
|
|
|
|
|
|
|
$
|
|
$
|
|
|
|
|
$
|
|
$
|
|
|
|
|
$
|
|
$
|
|
|
|
|
$
|
|
$
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MATURITY EXTENSION ELECTION NOTICE (DOE APPROVAL REQ'D) - page 2
DOE (Title XVII)
GEORGIA POWER COMPANY
Part 2:
Notice is hereby given to FFB (and DOE) of the Borrower's election that the maturity of each of the Advances identified in this Part 2 be extended as follows:
|
|
|
|
|
|
|
|
|
|
|
|
AMOUNT OF
|
|
|
FFB
|
|
OPTIONAL
|
|
PRINCIPAL
|
|
NEW
|
ADVANCE
|
|
PRINCIPAL
|
|
TO BE
|
|
MATURITY
|
IDENTIFIER
1
|
|
PAYMENT
2
|
|
EXTENDED
3
|
|
DATE
4
|
|
|
|
|
|
|
|
|
|
$
|
|
|
|
|
|
|
$
|
|
|
|
|
|
|
$
|
|
|
|
|
|
|
$
|
|
|
|
|
|
|
|
|
|
|
|
____________________________________________________________________________________________
_
1
Complete 1 line in Part 2 for each Advance identified in Part 1 with respect to which the Borrower elects to have the maturity extended to a new Maturity Date
other than
the next Payment Date. Insert the FFB Advance Identifier that FFB assigned to the respective Advance for each Advance identified in Part 1 with respect to which the Borrower elects to have the maturity so extended.
2
The Borrower has the option of making a payment of principal on the Maturity Date without any premium being charged. For each Advance, insert the amount of any such optional principal payment that will be paid on the Maturity Date.
3
For each Advance, insert the amount of principal for which the maturity is to be extended. That amount must equal the
difference between
the outstanding principal amount for the respective Advance, as specified in Part 1, and the optional principal payment (if any) for such Advance inserted by the Borrower in Part 2.
4
For each Advance, insert the particular calendar date that the Borrower selects to be the
new
Maturity Date" to be in effect for the respective Advance after the Maturity Extension, which new Maturity Date must meet all the criteria for Maturity Dates specified in section 7.3.1(a)(5) of the Note Purchase Agreement referred to in the Note.
MATURITY EXTENSION ELECTION NOTICE (DOE APPROVAL REQ'D) - page 3
DOE (Title XVII)
GEORGIA POWER COMPANY
RUS
The undersigned hereby certifies that the authority of the undersigned to execute and deliver this Maturity Extension Election Notice on behalf of the Borrower is valid and in full force and effect on the date hereof.
|
|
|
GEORGIA POWER COMPANY
|
(the "Borrower")
|
|
|
|
|
|
By:
|
|
|
|
Name:
|
|
|
|
Title:
|
|
|
|
Date:
|
|
NOTICE OF DOE APPROVAL OF
MATURITY EXTENSION ELECTION NOTICE
Notice is hereby given to FFB that the preceding Maturity Extension Election Notice made by the Borrower identified therein has been approved by DOE for purposes of the Note identified therein.
|
|
SECRETARY OF ENERGY,
|
acting through his or her
|
duly authorized designee
|
|
By:
|
|
Name:
|
|
Title:
|
|
Date:
|
MATURITY EXTENSION ELECTION NOTICE (DOE APPROVAL REQ'D) - page 4
DOE (Title XVII)
GEORGIA POWER COMPANY
EXHIBIT D
TO
NOTE PURCHASE AGREEMENT
FORM
OF
OPINION OF BORROWER'S COUNSEL
re:
BORROWER INSTRUMENTS
|
|
|
|
|
|
TROUTMAN SANDERS LLP
Attorneys at Law
Bank of America Plaza
600 Peachtree Street, NE
Suite 5200
Atlanta, Georgia 30308-2216
404.885.3000 telephone
404.885.3900 facsimile
troutmansanders.com
|
February 20, 2014
Federal Financing Bank Main Treasury Building
1500 Pennsylvania Avenue, NW
Washington, DC 20220
Ladies and Gentlemen:
We have acted as counsel to Georgia Power Company, a Georgia corporation (the
“
Borrower
”),
in connection with (i) the issuance by the Borrower of a future advance promissory note dated as of February 20, 2014 to the Federal Financing Bank (“
FFB
”) in a maximum principal amount of $3,462,409,177 (the “
Note
”), and (ii) a Note Purchase Agreement dated as of February 20, 2014 (the
“
Note Purchase Agreement
”
and, together with the Note, the
“
Borrower’s Instruments
”),
among FFB, the Borrower and the U.S. Department of Energy, acting by and through the Secretary of Energy (the
“
Guarantor
”).
Capitalized terms used herein and not otherwise defined herein shall have the meanings assigned thereto in the Note Purchase Agreement.
We are rendering the opinions set forth herein at the request of the Borrower in accordance with Section 3.2.2 of the Note Purchase Agreement. This Opinion Letter is intended solely for the benefit of the FFB in connection with the Note Purchase Agreement, and may not be relied upon by any other Person or for any other purpose. No part of this Opinion Letter may be quoted, incorporated or otherwise referred to in any other document or communication or filed with or otherwise furnished to any other Person without our prior written consent, except that FFB may furnish a copy of this Opinion Letter: (a) in connection with any legal proceedings relating to the Borrower’s Instruments or the enforcement thereof; (b) as may otherwise be required by applicable law or legal process; or (c) to permitted prospective and actual assignees of, and participants in the interests of, FFB under the Borrower’s Instruments. For the avoidance of doubt, it is agreed that any Person who becomes an assignee of FFB’s interest in the Borrower’s Instruments in accordance with the terms of the Borrower’s Instruments may rely on this Opinion Letter as though delivered to such Person on the date hereof. In all cases, reliance upon this Opinion Letter is conditioned upon acceptance of the assumptions, qualifications and other limitations that are set forth herein.
In rendering our opinions herein, we have also examined copies of: (a) the Borrower’s Instruments; (b) the charter and by-laws of the Borrower (certified by an officer of the Borrower as currently in effect); (c) a certificate of existence for the Borrower issued by the Secretary of State of the State of Georgia dated February
[ ],
2014 and a tax clearance certificate for the Borrower issued by the Georgia Department of Revenue dated February [ ], 2014; and (d) resolutions adopted by the Board of Directors of the Borrower (certified by an officer of the
ATLANTA BEIJING CHICAGO HONG KONG NEW YORK NORFOLK ORANGE COUNTY PORTLAND
RALEIGH RICHMOND SAN DIEGO SHANGHAI TYSONS CORNER VIRGINIA BEACH WASHINGTON, DC
February 20, 2014
Page 2
Borrower as currently in effect) relating to the Borrower’s Instruments and the Transactions (Items (b) through (d) above are referred to collectively as the
“
Organizational Documents
”).
In addition, we have reviewed a copy of the Loan Guarantee Agreement, dated as of the date hereof, between the Borrower and the Guarantor (the
“
Loan Guarantee Agreement
”).
In addition, we have made such investigations of the statutes and regulations of the States of New York and Georgia, and the federal statutes and regulations of the United States of America, which in our professional judgment, we believe are applicable to the Borrower for purposes of providing this Opinion Letter (collectively, the
“
Applicable Laws
”).
For the purposes of this Opinion Letter: (a) the term
“
Transactions
”
means the execution and delivery by the Borrower of the Borrower’s Instruments and the transactions contemplated thereby; and (b) the term “Georgia Power Material Written Agreement” used in paragraph 7 below includes only: (i) those documents filed as (A) Exhibits 4(c)1, 4(c)2, and 10(c)1 through 10(c)25, inclusive, to the Borrower’s Annual Report on Form 10-K for the fiscal year ended December 31, 2012, (B) Exhibits 4(c)1, 4(c)2, and 10(c)1 to the Borrower’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2013, (C) Exhibits 10(c)1 and 10(c)2 to the Borrower’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2013, and (D) Exhibit 4(c)1 to the Borrower’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2013, in each case as filed with the United States Securities and Exchange Commission; and (ii) those agreements listed on
Schedule A
hereto.
In addition, we have reviewed the financing order issued by the Georgia Public Service Commission on October 28, 2013 pursuant to Section 46-2-28 of the Official Code of Georgia Annotated (the
“
PSC Financing Order
”).
In conducting our examinations, we have assumed the genuineness of all signatures, the legal capacity of all individual signatories, the accuracy of all documents submitted to us as originals and the conformity to originals of all documents submitted to us as copies (whether or not certified). In addition, we have assumed, and without independent investigation have relied upon, the factual accuracy of the representations, warranties and other information contained in the items we examined, upon one or more certificates as to certain factual matters from officers of the Borrower and upon the assumptions we have made in this Opinion Letter. We have not conducted or commissioned any search of the books, records, files, financial statements or tax returns of any Person, searched any internal file, court file, public record or other information source, or undertaken any other independent investigation, examination or inquiry to determine or confirm the existence or absence of any facts relevant to the opinions expressed herein. The Borrower’s Instruments and Organizational Documents are the only items of their respective types reviewed by us in connection with or covered by us in this Opinion Letter. In addition, we have not conducted a docket search or otherwise conducted an independent review or investigation of any official records of any court or Governmental Authority.
We have assumed for purposes of our opinion that the Secretary of the United States Department of Energy has made all of the consultations required under Title XVII of the Energy Policy Act of 2005 (42 U.S.C. Sections 16511 through 16514)(“
Title
XVII
”),
and the regulations promulgated thereunder at 10 C.F.R. Part 609 (the
“
Title XVII Regulations
”),
February 20, 2014
Page 3
including, without limitation, the consultations with the Secretary of the Treasury required by Section 1702(a) of Title XVII (42 U.S.C. Section 16512(a)) and 10 C.F.R. Section 609.9(d)(4), and has made the required determinations under Title XVII and the Title XVII Regulations, including, without limitation, the determinations required by Section 1702(d) of Title XVII (42 U.SC. Section 16512(d)) and Section 1702(e) of Title XVII (42 U.S.C. 16512(e)). In addition, we have assumed for purposes of our opinion that the Project meets the technical requirements of Section 1703(a) of Title XVII (42 U.S.C. Section 16513(a)) and constitutes an “advanced nuclear energy facility” under Section 1703(b)(4) of Title XVII (42 U.S.C. 16513(b)(4)). In addition, we have assumed: (i) the Office of Management and Budget (“
OMB
”) has reviewed and approved the Guarantor’s calculation of the credit subsidy cost for the Borrower’s loan guarantee in accordance with the requirements of 10 C.F.R. Section 609.9(d)(4), and that such credit subsidy cost was determined in accordance with the requirements of the Federal Credit Reform Act of 1990 (2 U.S.C. Sections 661a through 661f), and the related pronouncements of the OMB thereunder (OMB Circular A-11, Part 5 and OMB Circular A-129); and (ii) the Director of the OMB has made the determinations required under the Omnibus Appropriations Act, 2009, P.L. No. 111-8, Division C, Title III, as amended by Section 408 of the Supplemental Appropriations Act, 2009, P.L. No. 111-32 (the “Appropriations Act”) and has certified in writing compliance with the requirements of the Appropriations Act.
We express no opinion respecting the Borrower’s Instruments, or any right, power, privilege, remedy or interest intended or purported to be created thereunder, insofar as: (a) any of the rights, powers, privileges, remedies and interests of a Person thereunder may be limited by: (i) applicable bankruptcy, insolvency, fraudulent conveyance or transfer, reorganization or other laws affecting any rights, powers, privileges, remedies and interests of creditors generally (including, without limitation, post-petition interest), (ii) rules or principles (of equity, public policy or otherwise) affecting the enforcement of obligations generally, whether considered at law, in equity or otherwise, including (without limitation) those pertaining to materiality, good faith, fair dealing, diligence, reasonableness, unconscionability, impossibility of performance, suretyship rights or defenses (of a co-borrower, guarantor or otherwise), waiver, laches, estoppel or judicial deference, or (iii) the exercise of the discretionary powers of any court or other authority before which may be brought any proceeding seeking equitable or other remedies, including (without limitation) specific performance, injunctive relief and indemnification; (b) the rights, powers, privileges, remedies and interests of any Person under any Borrower’s Instruments or applicable law may be exercised or otherwise enforced in bad faith, in a commercially unreasonable manner or for immaterial breaches; and (c) agreements to agree, exculpations and indemnifications, penalties, jury trial and other waivers, releases, and powers of attorney, without which terms and provisions (and assuming that a court would sever any such terms and provisions from such respective Borrower’s Instruments) FFB nevertheless has legally adequate rights and remedies under the Borrower’s Instruments and applicable law for pursuit of a claim for principal and interest owed by the Borrower under the Note, subject, however, to clauses (a) and (b) above, and the other paragraphs of this Opinion Letter.
We express no opinion with respect to the selection of any governing law, jurisdiction or venue other than New York, or of any federal court jurisdiction or venue in any jurisdiction where the requisite federal requirements have not been met, or the applicable laws of any county, town, municipality or other local or special political subdivision. Furthermore, we express no
February 20, 2014
Page 4
opinion as to matters pertaining to any applicable law respecting: the USA Patriot Act of 2001, as amended, or any other applicable law pertaining to restricted or embargoed assets, countries or persons; employment or labor; pension or benefit plans; antitrust or unfair competition; racketeering; fiduciary duties; taxes or levies; securities, futures, commodities and the like; assignment of governmental accounts, contracts or claims; any copyrights, patents, trademarks or other intellectual property; or except as noted in paragraphs number 6 and 7(c) below, any filings or notices. In addition, we express no opinion with respect to the Atomic Energy Act of 1954, as amended, the Cargo Preference Act of 1954, as amended, Section 1702(k) of Title XVII or the Dodd-Frank Wall Street Reform and Consumer Protection Act.
Our express assumptions and qualifications are not in limitation of others that customarily apply (expressly or impliedly) to legal opinion letters, including that: (a) each party to a Borrower’s Instrument or other document we examined (other than the Borrower): (i) has satisfied all legal requirements applicable to it to the extent necessary to make each such document enforceable by or against it, and (ii) is properly identified therein; (b) other than with respect to the Borrower, each Borrower’s Instrument has been duly executed and delivered by each party thereto and, each such Borrower’s Instrument is the legal, valid and binding obligation of each such party, enforceable as written against each such party in accordance with its terms and provisions; (c) there has not been any mutual mistake of fact, misunderstanding, fraud, duress or undue influence, and any requirement of good faith, fair dealing and conscionability has been met; (d) there are no written or oral agreements or understandings among the parties, and there is no usage of trade or course of dealing among the parties, that in either case would define, supplement or qualify any term or provision of any Borrower’s Instrument; (e) no Person will in the future take any action (including a decision not to act) that: (1) is prohibited under any Borrower’s Instrument, or (2) may be permitted, but not required, under any Borrower’s Instrument if such action would result in any violation of applicable law or constitute any violation or default under any other Borrower’s Instrument; (f) the proceeds of the loans to be made to the Borrower pursuant to the Borrower’s Instruments will be disbursed in accordance with the Borrower’s Instruments and at Closing, not less than $1,000,000 will be so disbursed; (g) all conditions precedent to the effectiveness of the Borrower’s Instruments have been duly satisfied or waived; (h) each of the documents we examined would be enforced as written; and (i) each certificate, report or other document issued by any governmental official, office or agency concerning any person, real or personal property, or status is, and all public records (including their proper indexing and filing) are, accurate, complete, authentic and current.
Our opinions are limited to the date hereof. We do not undertake to advise you of any facts or circumstances occurring or coming to our attention subsequent to the Closing. Whenever any opinion in this Opinion Letter refers to or includes the performance of any obligation or the issuance of any instrument or certificate after the Closing, it is based on our assumption that: (i) all relevant facts and circumstances will be the same at such future time as we believe them to be at the Closing (except as noted in the next clause); (ii) each party will have taken all future or further actions necessary or appropriate thereto; (iii) no relevant filings, approvals, permits or similar items will have expired or otherwise adversely changed; and (iv) no changes will have occurred in any of the Borrower’s Instruments, other relevant documents, applicable law, trade usage or course of dealings.
February 20, 2014
Page 5
Finally, for purposes of this Opinion Letter we express no opinion as to the laws of any jurisdiction other than the Applicable Laws. Also please be aware that, consistent with the opinion practices of the New York and Georgia bars, our opinions contained in this Opinion Letter are expressions of our professional judgment regarding the legal matters addressed and are not guarantees or warranties that a court or other authority will reach any particular result. This Opinion Letter is limited to the matters set forth herein, and no opinion may be inferred or implied beyond the matters expressly contained herein.
Based upon and subject to the foregoing, we are of the opinion that:
1.
The Borrower is a corporation validly existing and in good standing under the laws of the State of Georgia.
2.
The Borrower has the corporate power and authority to carry on the public utility business in which it is engaged and to execute and deliver, and perform its obligations under, the Borrower’s Instruments.
3.
The Borrower has taken all necessary corporate action to authorize the execution and delivery, and performance of its obligations under, the Borrower’s Instruments.
4.
Each of the Borrower’s Instruments has been duly executed and delivered by the Borrower.
5.
Each of the Borrower’s Instruments constitutes the legal, valid and binding obligation of the Borrower, enforceable against the Borrower in accordance with its terms.
6.
The Borrower has received all Governmental Approvals required to be obtained by the Borrower to enter into and perform its obligations under the Borrower’s Instruments.
7.
The execution and delivery by the Borrower of the Borrower’s Instruments and the performance of its obligations thereunder, as of the date hereof, in accordance with their respective terms (a) will not violate the Organizational Documents of the Borrower, (b) will not result in a material breach or constitute an event of default under any Georgia Power Material Written Agreement, (c) will not violate the PSC Financing Order, and (d) will not violate either (i) assuming the Borrower’s compliance with the covenants in the Loan Guarantee Agreement as to the application of proceeds, Regulations T, U or X of the Board of Governors of the Federal Reserve System or (ii) any existing Applicable Laws.
We confirm to you that, to our knowledge, based solely on the representation of the Borrower in Section 8.9(b) of the Note Purchase Agreement (a copy of which is attached hereto as Part I of Schedule B) and the conducting of a survey of lawyers within our firm who have performed legal services for the Borrower, that, except as disclosed in writing to FFB and the Secretary in Schedule II to the Note Purchase Agreement (a copy of which is attached hereto as
February 20, 2014
Page 6
Part II of Schedule B), there is no litigation or other proceeding pending, or threatened in writing, against the Borrower in any court or before any Governmental Authority which challenge the validity as to the Borrower or the enforceability against the Borrower of any of the Borrower’s Instruments, or seeks to enjoin the performance by the Borrower of, the Borrower’s Instruments.
Very truly yours,
TROUTMAN SANDERS LLP
SCHEDULE A TO OPINION LETTER
1.
Term Loan Agreement, dated as of November 20, 2013, by and between Georgia Power Company and Intesa Sanpaolo S.p.A.
2.
Term Loan Agreement, dated as of November 20, 2013, by and between Georgia Power Company and Canadian Imperial Bank of Commerce, New York Agency
3.
Term Loan Agreement, dated as of November 20, 2013, by and between Georgia Power Company and Branch Banking and Trust Company
4.
Trust Indenture, dated as of July 1, 2009, by and between the Development Authority of Burke County (Georgia) (the
“
Burke Authority
”)
and The Bank of New York Trust Company, N.A., as trustee, and the related Loan Agreement, dated as of July 1, 2009 by and between Georgia Power Company and the Burke Authority
5.
Trust Indenture, dated as of June 1, 2012, by and between the Burke Authority and The Bank of New York Trust Company, N.A., as trustee, and the related Loan Agreement, dated as of June 1, 2012 by and between Georgia Power Company and the Burke Authority
6.
Trust Indenture, dated as of November 1, 2013, by and between the Burke Authority and The Bank of New York Trust Company, N.A., as trustee, and the related Loan Agreement, dated as of November 1, 2013 by and between Georgia Power Company and the Burke Authority
7.
Trust Indenture, dated as of September 1, 2009, by and between the Development Authority of Bartow County (Georgia) (the
“
Bartow Authority
”)
and The Bank of New York Trust Company, N.A., as trustee, and the related Loan Agreement, dated as of September 1, 2009 by and between Georgia Power Company and the Bartow Authority
SCHEDULE B TO OPINION LETTER
|
|
I.
|
Representation Provided by the Borrower in Section 8.9(b) of the Note Purchase Agreement
|
Except as disclosed in writing to FFB and the Secretary in Schedule II to this Agreement, there is no litigation or other proceeding pending, or threatened in writing, against the Borrower in any court or before any Governmental Authority which challenges the validity as to the Borrower or the enforceability against the Borrower of any of the Borrower’s Instruments, or seeks to enjoin the performance by the Borrower of, the Borrower’s Instruments.
|
|
II.
|
Information Provided by the Borrower in Schedule II to the Note Purchase Agreement
|
The Borrower notes that a number of environmental advocacy groups have made public statements in opposition to the issuance of federal loan guarantees to the Borrower, including the Southern Alliance for Clean Energy (“SACE”). Further, SACE has filed numerous requests under the Freedom of Information Act (“FOIA”) for information regarding such loan guarantees and has been involved in litigation with the DOE with respect to such FOIA requests. While the Borrower is not aware of any written threat by any such groups to challenge the validity or enforceability of the Borrower Instruments or to seek to enjoin performance by the Borrower thereunder, the Borrower can provide no assurance that it is aware of all statements (public or otherwise) made by such groups.
EXHIBIT E
TO
NOTE PURCHASE AGREEMENT
FORM
OF
OPINION OF SECRETARY'S COUNSEL
re:
SECRETARY'S GUARANTEE
February 20, 2014
Federal Financing Bank Main Treasury Building
1500 Pennsylvania Avenue, NW
Washington, D.C. 20220
U.S. Department of Energy
Loan Guarantee Program - Loan No. 1021
Ladies and Gentlemen:
As the
_________
General Counsel of the United States Department of Energy (the
“
Department
”), I am familiar with the Secretary’s Guarantee dated as of February 20, 2014 (the “
Secretary’s Guarantee
”) issued by the Secretary of Energy (the “
Secretary
”) relating to the Future Advance Promissory Note dated as of February 20, 2014, issued by Georgia Power Company, payable to the Federal Financing Bank in the maximum principal amount of $3,462,409,117, pursuant to the Note Purchase Agreement dated as of February 20, 2014 (the “
Note Purchase Agreement”),
by and among the Federal Financing Bank, Georgia Power Company, as the borrower, and the Secretary of Energy, acting through the Department.
For purposes of rendering this opinion, I (or members of my staff) have reviewed (i) Title XVII of the Energy Policy Act of 2005, Pub. L. No. 109-58, as amended, including without limitation as amended by section 406 of the American Recovery and Reinvestment Act of 2009, Pub. L. No.111-5 (“
Title XVII
”) and the regulations promulgated thereunder, (ii) an executed original of the Secretary’s Guarantee, (iii) an executed original of the Note Purchase Agreement, and (iv) originals, or copies certified or otherwise identified to our satisfaction, of such other agreements, instruments, certificates, records, and other documents as in my judgment are necessary or appropriate to enable me to render the opinion expressed below.
This opinion is delivered to you pursuant to section 4.2(c) of the Note Purchase Agreement.
Based on the foregoing and upon such further investigation as I have deemed necessary, I am of the opinion that:
1. The execution and delivery of the Secretary’s Guarantee on behalf of the
Secretary, the consummation by the Department of the transactions contemplated thereby, and the performance by the Department of the Secretary’s obligations thereunder are authorized by applicable law.
2. The Secretary’s Guarantee has been executed and delivered by an official of the Department who is duly authorized to execute and deliver such document on behalf of the Secretary.
3. Pursuant to the Note Purchase Agreement, the obligation of the United States of America to pay amounts due and payable under the Secretary’s Guarantee when such amounts become due and payable in accordance with its terms, constitutes the absolute obligation of the United States of America, against which no offset may be made by the United States of America in discharge of its obligation to make these payments.
4. Pursuant to section 1702(j) of Title XVII, the full faith and credit of the United States is pledged to the payment of all amounts due and payable under the Secretary’s Guarantee with respect to principal and interest.
Sincerely,
General Counsel
_______
EXHIBIT F
TO
NOTE PURCHASE AGREEMENT
FORM
OF
SECRETARY'S CERTIFICATE
SECRETARY'S CERTIFICATE
Federal Financing Bank Main Treasury Building
1500 Pennsylvania Avenue, NW
Washington, DC 20220
Reference is made to:
(a)
the Program Financing Agreement dated as of September 2, 2009, made by and between the Federal Financing Bank ("FFB") and the Secretary of Energy (the
"Secretary")
(such agreement, as it may be amended, supplemented, and restated from time to time in accordance with its terms, being the
"Program Financing Agreement");
(b)
the Note Purchase Agreement dated as of February 20, 2014 (the
"Note Purchase Agreement),
made by and among FFB, Georgia Power Company (the "Borrower"), and the
Secretary; and
(c)
the Future Advance Promissory Note dated as of February 20, 2014 (the "Note"), issued by the Borrower payable to FFB in the maximum principal amount of $3,462,409,117.
Pursuant to section 3.3.1(c) of the Note Purchase Agreement, the undersigned hereby certifies the following:
1.
I am the Chief Operating Officer, Loan Programs Office, U.S. Department of Energy.
2.
I have been given the authority to execute this Certificate on behalf of the Secretary, and to deliver it to FFB, and that this authority is valid and in full force and effect as of the date hereof.
3.
I am furnishing this certificate to FFB with the intent that it be relied upon by FFB as a basis for taking or withholding action under the Note Purchase Agreement.
SECRETARY'S CERTIFICATE - page 1
4.
As the duly authorized designate of the Secretary for these purposes, I have duly executed on behalf of the Secretary a guarantee dated February 20, 2014 (the
"Secretary's Guarantee"),
relating to the Note.
5.
The executed Secretary's Guarantee conforms exactly to the form of "Secretary's Guarantee" prescribed in the Note Purchase Agreement.
6.
The Department of Energy, as compliance agent for FFB under the Program Financing Agreement, has received from the Borrower both the certifications regarding lobbying that is required to be filed by recipients of federal loans, in the form of certificate set forth in Appendix A to 31 C.F.R. Part 21 and, if required under 31 C.F.R. Part 21, the disclosure forms to report lobbying, in the form of disclosure form set forth in Appendix B to 31 C.F.R. Part 21. The Department of Energy Loan Programs Office retains custody of the executed original certificates (and, if applicable, disclosure forms) as agent for FFB under the terms of the Program Financing Agreement, subject to delivery of actual possession of the original certificate (and, if applicable, disclosure form) to FFB or its
designate upon request by FFB or its designate.
7.
The Borrower has certified to the Department of Energy that the Borrower does not have a judgment lien against any of its property for a debt owed to the United States of America and that the Borrower does not have an outstanding debt (other than a debt under the Internal Revenue Code of 1986) owed to the United States of America or any agency thereof that is in delinquent status, as the term "delinquent status" is defined in 31 C.F.R. § 285.13(d).
SECRETARY'S CERTIFICATE - page 2
IN WITNESS WHEREOF, the undersigned has executed this Certificate and caused it to be delivered to FFB.
SECRETARY OF ENERGY
acting through his or her duly
authorized designate
|
|
|
Signature:
|
|
|
|
Name:
|
April Stephenson
|
|
|
Title:
|
Chief Operating Officer
|
|
Loan Programs Office
|
|
|
Date:
|
February 20, 2014
|
|
|
|
|
SECRETARY'S CERTIFICATE - page 3
EXHIBIT G
TO
NOTE PURCHASE AGREEMENT
FORM
OF
SECRETARY'S GUARANTEE
SECRETARY'S GUARANTEE
The United States of America, acting through the Secretary of Energy ("Secretary"), hereby guarantees to the Federal Financing Bank, its successors and assigns ("FFB"), all payments of principal, interest, premium (if any), and late charges (if any), when and as due in accordance with the terms of the note dated February 20, 2014, issued by Georgia Power Company (the "Borrower") payable to FFB in the maximum principal amount of $3,462,409,117, to which this Secretary's Guarantee is attached (such note being the "Note"), with interest on the principal until paid, irrespective of (i) acceleration of such payments under the terms of the Note, or (ii) receipt by the Secretary of any sums or property from its enforcement of its remedies for the Borrower's default.
This Secretary's Guarantee is issued pursuant to Title XVII of the Energy Policy Act of 2005, as amended (42 U.S.C. § 16511 et seq.), section 6 of the Federal Financing Bank Act of 1973 (12 U.S.C. § 2285), and the Note Purchase Agreement dated as of February 20, 2014, among FFB, the Borrower, and the Secretary.
UNITED STATES OF AMERICA
|
|
|
By:
|
|
|
|
Name:
|
April Stephenson
|
|
|
Title:
|
Chief Operating Officer
|
|
Loan Programs Office
|
|
Department of Energy
|
|
|
Date:
|
February 20, 2014
|
|
|
Exhibit 4.4
EXECUTION VERSION
Prepared by and return
after recording to:
John A. Decker, Esq.
Hunton & Williams LLP
600 Peachtree Street, NE, Suite 4100
Atlanta, GA 30308
DEED TO SECURE DEBT, SECURITY AGREEMENT AND FIXTURE FILING
BY
GEORGIA POWER COMPANY,
Grantor,
TO
PNC BANK, NATIONAL ASSOCIATION, doing business as
MIDLAND LOAN SERVICES,
a division of PNC BANK, NATIONAL ASSOCIATION,
in its capacity as Collateral Agent, Grantee
Relating to Premises in:
Burke County, Georgia
DATED: As of February 20, 2014
FOR PURPOSES OF O.C.G.A. § 11-9-334(H), THIS DEED TO SECURE DEBT IS A “CONSTRUCTION MORTGAGE”. THIS INSTRUMENT IS TO BE RECORDED IN THE REAL PROPERTY RECORDS IN BURKE COUNTY, GEORGIA AND SHALL SERVE AS A FINANCING STATEMENT. THIS INSTRUMENT CONVEYS A SECURITY INTEREST IN GOODS WHICH ARE OR ARE TO BECOME FIXTURES PURSUANT TO O.C.G.A. SECTION 11-9-502(c).
Deed to Secure Debt
DEED TO SECURE DEBT, SECURITY AGREEMENT AND FIXTURE FILING
THIS DEED TO SECURE DEBT, SECURITY AGREEMENT AND FIXTURE FILING
(this “
Deed to Secure Debt
”) is made as of February 20, 2014, by
GEORGIA POWER COMPANY
, a Georgia corporation, with an office at 241 Ralph McGill Boulevard, N.E., Atlanta, Georgia 30308 (“
Grantor
”), to
PNC BANK, NATIONAL ASSOCIATION, doing business as MIDLAND LOAN SERVICES
,
a division of PNC Bank, National Association
, with an office at 10851 Mastin Street, Suite 700, Overland Park, Kansas 66210, as grantee, assignee and secured party, in its capacity as Collateral Agent on behalf of the Secured Parties, as such terms are defined in the Loan Guarantee Agreement, defined below (together with any successors or assigns in such capacity, the “
Grantee
”).
I
RECITALS
WHEREAS, Grantor is the owner and holder of an undivided 45.7% interest as tenant-in-common in those certain “Additional Unit Properties” (the “
Additional Unit Properties
”) and “Related Facilities” (the “
Related Facilities
”), as such terms are defined in that certain Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement, dated as of April 21, 2006, and recorded in Book 598, at page 71,
et seq.
, Burke County, Georgia Records, as amended (the “
Ownership Agreement
”), which Additional Unit Properties and Related Facilities are located on that certain real property located in the State of Georgia (the “
State
”), and more fully described in
Exhibit “A”
attached hereto (the “
Premises
”), which forms a portion of the property subject to the grant contained herein.
WHEREAS, on the date hereof, Grantor entered into that certain Note Purchase Agreement (as the same may be amended, restated, modified or otherwise supplemented and in effect from time to time, hereinafter referred to as the “
Note Purchase Agreement
”), by and among Grantor, the Federal Financing Bank, a body corporate and instrumentality of the United States of America (“
FFB
”), and the U.S. Department of Energy, an agency of the United States of America acting through the Secretary of Energy (or appropriate authorized representative thereof) (“
DOE
”), pursuant to which a promissory note will be issued by Grantor and purchased by FFB (the “
FFB Promissory Note
”), in an aggregate principal amount not to exceed three billion four hundred sixty-two million four hundred nine thousand one hundred seventeen and NO 100/ DOLLARS ($3,462,409,117), and having a scheduled final maturity date of the thirtieth (30
th
) anniversary of the date hereof.
WHEREAS, pursuant to that certain Secretary’s Guarantee, dated as of the date hereof (as the same may be amended, restated, modified or otherwise supplemented and in effect from time to time, the “
DOE Guarantee
”), given by DOE, as guarantor (in such capacity, “
Guarantor
”), to and for the benefit of FFB, Guarantor guaranteed the obligations of Grantor under the FFB Promissory Note and the other documents and instruments executed in connection therewith.
WHEREAS, pursuant to that certain Loan Guarantee Agreement, dated as of the date hereof, by and between Grantor and Guarantor (as the same may be amended, restated, modified
Deed to Secure Debt
or otherwise supplemented and in effect from time to time, the “
Loan Guarantee Agreement
”), Grantor, among other things, agreed to reimburse Guarantor for any payments made by Guarantor under the DOE Guarantee.
WHEREAS, pursuant to that certain Collateral Agency Agreement, dated as of the date hereof, by and among Grantor, Guarantor and Grantee (as the same may be amended, restated, modified or otherwise supplemented and in effect from time to time, the “
Collateral Agency Agreement
”), the Guarantor has appointed Grantee as Collateral Agent on behalf of the Secured Parties.
WHEREAS, Grantor wishes to provide further assurance and security to the Grantee and the Secured Parties by granting, and the Grantee and the Secured Parties require that Grantor grant to the Grantee, as Collateral Agent on behalf of the Secured Parties, security title, a security interest in and a first Lien upon certain property of the Grantor as described in Article II below, subject only to the Permitted Liens (as defined in
Exhibit “C”
hereto), to secure all of the Secured Obligations.
WHEREAS, terms used herein with an initial capital letter or initial capital letters and not otherwise defined herein shall have the meanings given such terms in the Loan Guarantee Agreement.
II
THE GRANT
GRANTING CLAUSES
NOW, THEREFORE, to secure the Secured Obligations and the performance of the covenants of the Grantor contained herein and in the other Loan Documents and to declare the terms and conditions on which the Secured Obligations and the performance of the covenants of the Grantor contained herein and in the other Loan Documents, are secured, and in consideration of the issuance of the DOE Guarantee, the Loan Guarantee Agreement and the Secured Obligations, the Grantor by these presents does grant, bargain, sell, alienate, remise, release, convey, assign, transfer, mortgage, hypothecate, pledge, set over and confirm to the Grantee, all property, rights, privileges and franchises of the Grantor described in the following Granting Clauses (except any Excepted Property (as hereinafter defined)), of every kind and description, real, personal or mixed, tangible or intangible, whether now owned or hereafter acquired by the Grantor, and does grant a security interest therein for the purposes herein expressed:
GRANTING CLAUSE FIRST
I.
Grantor’s undivided 45.7% interest as tenant-in-common in and to the agreements, contracts, instruments and other documents identified in
Exhibit “B”
to this Deed to Secure Debt (but as to Items 6, 7, 10 and 12 in
Exhibit “B”
, only to the extent applicable to the Additional Unit Properties or the Related Facilities or both) (the “
Assigned Agreements
”), including all rights of the Grantor under such Assigned Agreements;
II.
Grantor’s undivided 45.7% interest as tenant-in-common in and to the Additional Unit Properties and the Related Facilities, which interest includes, but is not limited to, the
following (in each case only to the extent included in the Additional Unit Properties or the Related Facilities or both):
A.
The Grantor’s estate, right, claim and interest in the Premises;
B.
all of the Grantor’s estate, right, claim and interest, in and to all buildings, structures and other improvements of every kind and description now or hereafter owned by the Grantor, and erected, situated, or placed upon the Premises (the “
Improvements
”), together with any and all personal property now or hereafter owned by the Grantor and located in or on, forming part of, attached to, used or intended to be used in connection with, or incorporated in any such Improvements, including all extensions of, additions to, betterments, renewals of, substitutions for and replacements for any of the foregoing;
C.
all claims, demands, rights, title and interest of the Grantor, now owned or hereafter acquired, including without limitation, any after-acquired title, license, remainder or reversion, in and to any and all (i) alleys, sidewalks, streets, avenues, strips and gores of land belonging, adjacent or pertaining to the Premises or the Improvements; (ii) storm and sanitary sewer, water, gas, electric, railway and telephone services relating to the Premises and the Improvements; and (iii) tenements, hereditaments, easements, appurtenances, other rights, liberties, reservations, allowances and privileges relating to the Premises or the Improvements or in any way now or hereafter appertaining thereto, including, without limitation, all right, title and interest of the Grantor, in and to the Declaration of Covenants, as may be further amended hereafter pursuant to the terms of the Loan Documents, and any homestead and any other claims at law or in equity;
D.
all right, title and interest of the Grantor in and to all tangible and intangible personal property (“
Personal Property
”) now or hereafter owned by the Grantor and located in, on or at the Premises or the Improvements and used in connection therewith, including, without limitation:
(i)
all building materials and equipment located upon the Premises and intended for construction, reconstruction, alteration, repair or incorporation in or to the Improvements now or hereafter to be constructed thereon, whether or not yet incorporated in such Improvements (all of which shall be deemed to be included in the Secured Property (as defined below) upon delivery thereto);
(ii)
all machines, machinery, fixtures, apparatus, equipment or articles used in supplying electricity, light and power;
(iii)
all fixtures now or hereafter owned by the Grantor and attached to or contained in and used in connection with the Premises or the Improvements; and
(iv)
all facilities, machinery, equipment and fixtures for the generation, transmission and distribution of electric energy including, without limitation, all plants, powerhouses, dams, diversion works, generators, turbines, engines, boilers, fuel handling and transportation facilities, air and water pollution control and sewage and solid waste disposal facilities, switchyards, towers, substations, transformers, poles, lines, cables,
conduits, ducts, conductors, meters, street lights, regulators and all other property used or to be used for any or all of such purposes; and
E.
Grantor’s undivided 45.7% interest as tenant-in-common in and to all permits, licenses, and franchises and Governmental Approvals applicable to the construction and operation of the Additional Unit Properties and Related Facilities.
III.
All right, title and interest of the Grantor, in and to all “general intangibles” (as such term is defined in O.C.G.A. § 11‑9‑102(a)(43)) that constitute rights in or rights to use software and other intellectual property applicable to the construction and operation of the Additional Unit Properties and Related Facilities.
IV.
All right, title and interest of the Grantor, in and to all nuclear fuel loaded in the reactor cores of the Units.
GRANTING CLAUSE SECOND
Together with all and singular the tenements, hereditaments and appurtenances belonging or in anywise appertaining to the aforesaid property or any part thereof, with the reversion and reversions, remainder and remainders thereof.
EXCEPTED PROPERTY
There is, however, expressly excepted and excluded from the lien and operation of this Deed to Secure Debt all right, title and interest of the Grantor in the following described property of the Grantor, now owned or hereafter acquired (herein sometimes referred to as “
Excepted Property
”):
A.
(a) all rights and obligations of the Grantor as “Agent” under and as defined in the Ownership Agreement; (b) all rights and obligations of the Grantor as “Agent” under and as defined in the Operating Agreement; (c) all rights and obligations of the Grantor in its capacity as “Additional Units Agent” under and as defined in the Declaration of Covenants; (d) the rights and easements granted in the Declaration of Covenants to the Grantor in its capacity as an Existing Units Owner (as defined in the Declaration of Covenants), together with any and all real and personal property and equipment of Grantor in its capacity as an Existing Unit Owner now existing or hereafter constructed or installed on the real property subject to the Declaration of Covenants in accordance with the terms of the Declaration of Covenants; (e) all rights and obligations of the Grantor in its capacity as “Participating Party” with respect to its “Ownership Interest” in the “Existing Units” under and as those terms are defined in the Operating Agreement; (f) the rights and easements granted to the Grantor in Paragraph 3(d) of the Declaration of Covenants, together with any and all real and personal property and equipment of the Grantor now existing or hereafter constructed or installed on the real property subject to the Declaration of Covenants in accordance with the terms of the Declaration of Covenants; (g) the rights and obligations of the Grantor in its capacity as “Participant” with respect to an “Undivided Ownership Interest” in the “Existing Units” under and as those terms are defined in the Nuclear Managing Board Agreement; (h) the rights and obligations of the Grantor in its capacity as “Participant” with respect to an “Undivided Ownership Interest” in “Plant Hatch” under and as those terms are defined in the Nuclear Managing Board Agreement;
(i) the rights and obligations of the Grantor in its capacity as “Participants’ Agent” as agent for the other “Participants” in accordance with the “Participation Agreements” under and as those terms are defined in the Nuclear Managing Board Agreement; (j) Grantor’s “Ownership Interest” in the “Existing Units” as those terms are defined in the Operating Agreement; (k) Grantor’s “Undivided Ownership Interest” in the “Existing Units” as those terms are defined in the Nuclear Managing Board Agreement; (l) Grantor’s “Ownership Interest” in “Plant Hatch” as those terms are defined in the Nuclear Managing Board Agreement; and (m) all rights and obligations of the Grantor as “Agent” under and as defined in the Development Agreement. No rights are granted to or conferred upon Grantee or any Receiver (as defined below) by this Deed to Secure Debt or any other Loan Documents to act by or on behalf or in the place of the Grantor as such “Agent” under either or both of the Ownership Agreement or the Operating Agreement, whether before or after an Event of Default or otherwise;
B.
all cash or other money on hand or in banks or other financial institutions, cash equivalents, deposit accounts, revenues, income and earnings, accounts, accounts receivable and unbilled revenue, rents, tolls, issues, product and profits, claims, credits, demands, choses in action and judgments, contracts, contract rights, leases (except with respect to claims, credits, demands, choses in action and judgments, contracts and contract rights and leases arising out of or constituting any of the Assigned Agreements), shares, stocks, interests, participations or other equivalents, allowances for emissions or similar rights granted by any governmental authority, bonds, notes, repurchase agreements, evidences of indebtedness and other securities and instruments, letters of credit (other than letters of credit that are a supporting obligation to Secured Property), bills, patents, patent licenses and other patent rights, patent applications, service marks, trade names and trademarks, copyrights and domain names, all “general intangibles” (as such term is defined in O.C.G.A. § 11‑9‑102(a)(43)) that do not constitute rights in or rights to use software and other intellectual property rights, other than any property referred to in this paragraph which is specifically described in Granting Clause First or Granting Clause Second;
C.
all automobiles, buses, trucks, other motor vehicles, truck cranes, tractors, trailers, rolling stock, railcars and similar vehicles and movable equipment, and all parts, tools, accessories and supplies used in connection with any of the foregoing;
D.
all vessels, boats, barges and other marine equipment, all airplanes, airplane engines, helicopters and other flight equipment, and all parts, tools, accessories and supplies used in connection with any of the foregoing;
E.
all goods, stock in trade, inventory, wares and merchandise acquired or produced for the purpose of resale in the ordinary course of business, all materials and supplies and other personal property which are consumable (otherwise than by ordinary wear and tear) in their use in the operation of the business of the Grantor, and all hand and other portable tools and equipment; and all fuel, including nuclear fuel, excluding, however, all nuclear fuel loaded in the reactor cores of the Units and other fuel located on the Premises that is necessary for the operation of the Units or is required by any of the COLs;
F.
all timber, coal, ore, gas (natural or otherwise), oil and other minerals and all rights and interests in any of the foregoing, whether or not such minerals or timber shall
have been mined, extracted or otherwise separated from the land included in the Secured Property and all electric energy, gas, steam, water and other products purchased by Grantor, or generated or produced by the Additional Unit Properties prior to an Event of Default;
G.
all permits, licenses, franchises, leases, contracts, agreements, contract rights and other rights: (1) not specifically subjected or required to be subjected to the lien hereof by the express provisions of this Deed to Secure Debt, whether now owned or hereafter acquired by the Grantor; (2) which by their terms or by reason of applicable law would become void or voidable if granted, conveyed, mortgaged, transferred, assigned or pledged hereunder by the Grantor; (3) which cannot be granted, conveyed, mortgaged, transferred, assigned or pledged by this Deed to Secure Debt without the consent of other parties whose consent is not secured (provided that the lien hereof shall automatically attach to such interest upon securing the applicable party’s(ies’) consent thereto); (4) the granting, conveying, mortgaging, transferring or assigning of which would result in a breach or a default thereof or would permit the termination or cancellation thereof; or (5) which otherwise may not be hereby lawfully and effectively granted, conveyed, mortgaged, transferred and assigned by the Grantor;
H.
all property, real, personal and mixed, which is:
(i)
not specifically described in the Granting Clause First or Granting Clause Second;
(ii)
not specifically subjected or required to be subjected to the lien of this Deed to Secure Debt by any provision hereof; and
(iii)
not part of any property specifically subjected or required to be subjected to the lien hereof by the express provisions of this Deed to Secure Debt;
I.
any personal property in which the grant of a security interest would be prohibited by applicable law, as confirmed by a legal opinion in form and substance, and from counsel, reasonably satisfactory to Grantee (an “
Opinion of Counsel
”);
J.
all property released pursuant to Article V of this Deed to Secure Debt; and
K.
all and singular the tenements, hereditaments and appurtenances belonging or in anywise appertaining to the aforesaid Excepted Property or any part thereof, with the reversion and reversions, remainder and remainders thereof.
TO HAVE AND TO HOLD all such property, rights, privileges and franchises hereby and hereafter granted, bargained, sold, alienated, remised, released, conveyed, assigned, transferred, mortgaged, hypothecated, pledged, set over or confirmed as aforesaid, or intended, agreed or covenanted so to be, together with all the tenements, hereditaments and appurtenances thereto appertaining (said properties, rights, privileges and franchises being herein collectively called the “
Secured Property
”), unto the Grantee, and its successors and assigns, forever. For the avoidance of doubt, the Secured Property shall not include the following: (A) all rights and property interests (contractual, statutory, regulatory or otherwise) authorized by law or regulation to be imposed on and collected from the Grantor’s customers, including any and all specific
charges and surcharges (nonbypassable or otherwise); (B) the cash proceeds collected, and accounts receivable arising, from such rights and property interests; (C) all rights to assign, sell, convey or otherwise transfer any or all of such rights and property interests in connection with the issuance and sale of any debt obligations the repayment of which is to be secured by any or all of such rights and property interests and the proceeds therefrom; and (D) all cash proceeds from the issuance and sale of any such debt obligations (items (A) through (D), collectively, the “
Securitization Property
”).
SUBJECT, HOWEVER, to Permitted Liens.
UPON CONDITION that, until the happening of an Event of Default and subject to the provisions of Article V of this Deed to Secure Debt, and not in limitation of the rights elsewhere provided in this Deed to Secure Debt, including the rights set forth in Article V of this Deed to Secure Debt, the Grantor shall be permitted to possess, use, manage, operate and enjoy the Secured Property.
PROVIDED, HOWEVER, should the indebtedness evidenced by the FFB Promissory Note be Indefeasibly Paid in cash in full (other than unasserted contingent indemnity obligations and other obligations that expressly survive termination of the applicable documents), all commitments of FFB to the Grantor under the Note Purchase Agreement and the other FFB Credit Facility Documents be terminated, and the Grantor shall have Indefeasibly Paid in cash all sums due from the Grantor under the Loan Guarantee Agreement and the other Loan Documents (other than unasserted contingent indemnity obligations and other obligations that expressly survive termination of the applicable documents), then this Deed to Secure Debt shall be cancelled and surrendered, and the Grantee shall execute and deliver to the Grantor such instruments as the Grantor shall require to evidence such cancellation and surrender. The term “Indefeasibly Paid” means paid by the Borrower and with respect to such payment (i) more than 90 days have passed since the date such payment was made without there having been filed any Insolvency Proceeding (as defined in the Loan Guarantee Agreement) with respect to the Borrower, or (ii) in the event any Insolvency Proceeding shall have been filed with respect to such Borrower within 90 days of the date of such payment, no claim of avoidance with respect to such payment under Section 547 of the Bankruptcy Code (as defined in the Owners Direct Agreement) shall have been made before the expiration of the applicable period prescribed in Section 546(a) of the Bankruptcy Code.
This Deed to Secure Debt is intended to operate and is to be construed as a deed passing the title to the Secured Property to Grantee and is made under those provisions of the existing laws of the State relating to deeds to secure debt and is not a mortgage. This Deed to Secure Debt is also a security agreement granting a present and continuing security interest and security title in the portion of the Secured Property constituting personal property or fixtures.
III
GENERAL AGREEMENTS AND COVENANTS
3.1.
Payment and Performance
. Grantor shall pay promptly as and when due all amounts owing by Grantor in respect of the Secured Obligations at the times and in the manner provided in the Loan Documents and shall perform the obligations of Grantor in full when they
are required to be performed pursuant to the Loan Documents, subject to any applicable grace period, cure period or cure right provided for such payment or performance in any Loan Document.
3.2.
Other Covenants
. Grantor shall comply with any and all covenants applicable to Grantor and the Secured Property set forth in the Loan Documents, subject to any applicable grace period, cure period and cure right provided therefor.
3.3.
Uniform Commercial Code
.
(a)
This Deed to Secure Debt constitutes a Security Agreement as that term is used in the Uniform Commercial Code in the State (the “
Code
”) with respect to any part of the Secured Property which may or might now or hereafter be or be deemed to be personal property, fixtures or property other than real property (including all replacements thereof, additions thereto and substitutions therefor) (collectively, the “
Personal Property Collateral
”). Grantor hereby grants to Grantee a security interest in the Personal Property Collateral. All of Grantor’s right, title and interest in the Personal Property Collateral is hereby assigned to Grantee to secure the payment of the Secured Obligations. The Grantor shall and Grantee may cause to be recorded in the county in which the Premises are located, as well as with the applicable offices of the State, such financing statements and fixture filings as shall be necessary or desirable in order to establish, maintain, preserve, protect and continue the validity, perfection and priority of Grantee’s Lien upon the Personal Property Collateral.
(b)
At any time after an Event of Default has occurred and shall be continuing, Grantee shall have the remedies of a secured party under the Code, including without limitation the right to take immediate and exclusive possession of the Personal Property Collateral or any part thereof. The remedies of Grantee hereunder are cumulative and the exercise of any one or more of the remedies provided for herein or under the Code shall not be construed as a waiver of any of the other remedies of the Grantee, including having the Personal Property Collateral deemed part of the real property upon any foreclosure so long as any part of the Secured Obligations remains unsatisfied.
3.4.
Ownership of the Secured Property
.
(a)
The Grantor represents and warrants that, at the time of the execution and delivery of this Deed to Secure Debt, the Grantor (i) owns fee simple title to that portion of the Secured Property constituting real property, and (ii) owns valid legal and beneficial or equitable title to that portion of the Secured Property constituting personal property (tangible and intangible) of the Grantor, in each case free and clear of any other Liens of any kind except for Permitted Liens.
(b)
The Grantor represents and warrants that the Improvements constituting real property that are part of the Secured Property are located only on the Premises.
(c)
The Grantor covenants and agrees that it shall, subject to the provisions of Article V, establish, maintain, preserve, protect and continue the validity, perfection and priority of the lien of this Deed to Secure Debt at all times prior to the date this Deed to Secure Debt is required to be cancelled and surrendered pursuant to Article II.
3.5.
Further Assurances
. Grantor agrees that, upon the request of Grantee from time to time, it will, at Grantor’s sole cost and expense, execute, acknowledge and deliver all such additional instruments and further assurances of title and will do or cause to be done all such further acts and things as may reasonably be necessary to fully effectuate the intent of this Deed to Secure Debt. In the event that Grantor shall fail to do any of the foregoing, after giving effect to any applicable grace period, cure period and cure right provided therefor in any Loan Document, Grantee may, in its sole discretion, do so in the name of Grantor, and Grantor hereby appoints Grantee as its attorney-in-fact to do any of the foregoing.
IV
EVENT OF DEFAULT AND REMEDIES
4.1.
Event of Default
. The occurrence of an “Event of Default” (as defined in the Loan Guarantee Agreement), shall constitute an “Event of Default” for all purposes under this Deed to Secure Debt. The Secured Obligations shall be subject to acceleration by DOE upon an Event of Default in accordance with the terms of the Loan Guarantee Agreement.
4.2.
Foreclosure/Power of Sale
. Upon the occurrence and during the continuation of an Event of Default, Grantee shall have the right to foreclose the lien hereof, either by judicial action or by power of sale, for the Secured Obligations or any part thereof and/or exercise any right, power or remedy provided in this Deed to Secure Debt or any of the other Loan Documents. At any such foreclosure, Grantee, at its option, may sell the Secured Property at public sale or sales before the door of the courthouse in the county in which the Secured Property or any part of the Secured Property is situated, to the highest bidder for cash, in order to pay the Secured Obligations, after advertising the time, place and terms of sale once a week for four (4) weeks immediately preceding such sale (but without regard to the number of days) in a legal organ in which Sheriff’s sales are advertised in said county. Grantee may bid for and acquire the Secured Property or any part thereof at any sale made under or by virtue of this Deed to Secure Debt and, in lieu of paying cash therefor, may make settlement for the purchase price by crediting against the purchase price the unpaid amounts due and owing in respect of the Secured Obligations or any other liabilities after deducting from the sales price the expenses of the sale and the costs of the action or proceedings and any other sums that Grantee is authorized to deduct under this Deed to Secure Debt or applicable law. At any such public sale, Grantee may execute and deliver to the purchaser a conveyance of the Secured Property, and to this end, Grantor hereby constitutes and appoints Grantee the agent and attorney-in-fact of Grantor to make such sale and conveyance, and thereby to divest Grantor of all right, title, interest, equity and equity of redemption that Grantor may have in and to the Secured Property and to vest the same in the purchaser or purchasers at such sale, and all the acts and doings of said agent and attorney-in-fact are hereby ratified and confirmed and any recitals in said conveyance or conveyances as to facts essential to a valid sale shall be binding upon Grantor. The aforesaid power of sale and agency hereby granted are coupled with an interest and are irrevocable by dissolution, insolvency or otherwise, and are granted as cumulative of the other remedies provided hereby or by law for collection of the indebtedness secured hereby. In the event of any such foreclosure sale by Grantee, Grantor shall be deemed a tenant holding over and shall forthwith deliver possession to the purchaser or purchasers at such sale or be summarily dispossessed according to provisions of law applicable to tenants holding over. The purchaser or purchasers at such sale (a) must be financially responsible, as determined by Grantee, taking into
account the remaining obligations at the time of such sale under the Ownership Agreement, the Operating Agreement and the Nuclear Managing Board Agreement, and (b) must become a party or parties to each such agreement, and assume (i) the rights and obligations of Grantor under the Ownership Agreement as a “Participating Party” solely with respect to the portion of Grantor’s “Ownership Interest” in the “Additional Units” (as those terms are defined in the Ownership Agreement) acquired by such purchaser, (ii) the rights and obligations of Grantor under the Operating Agreement solely with respect to the portion of Grantor’s “Ownership Interest” in the “Additional Units” (as those terms are defined in the Operating Agreement) acquired by such purchaser, (iii) the rights and obligations of Grantor under the Declaration of Covenants as an “Additional Units Owner” solely with respect to the portion of Grantor’s ownership interest in the “Additional Units Property” (as those terms are defined in the Declaration of Covenants) acquired by such purchaser, (iv) the rights and obligations of Grantor under the Nuclear Managing Board Agreement solely as a “Participant” with respect to the portion of Grantor’s “Undivided Ownership Interest” in the “Additional Units” and related facilities, equipment, inventory and common facilities (as those terms are defined in the Nuclear Managing Board Agreement) acquired by such purchaser, and (v) the rights and obligations of Grantor under the Development Agreement as a “Participating Party” solely with respect to the portion of Grantor’s ownership interest in the Additional Units (as those terms are defined in the Development Agreement), in each of the foregoing cases (i) through (v) arising from and after the date of such assumption. For the avoidance of doubt, nothing in this Section 4.2 requires or permits Grantee or such purchaser, to accede to (1) the rights and obligations of the Grantor in its capacity as “Agent” under and as defined in the Ownership Agreement, (2) the rights and obligations of the Grantor in its capacity as “Agent” under and as defined in the Operating Agreement, (3) the rights and obligations of the Grantor in its capacity as “Participating Party” with respect to its “Ownership Interest” in the “Existing Units” under and as those terms are defined in the Operating Agreement, (4) the rights and obligations of the Grantor in its capacity as an “Existing Units Owner” under and as defined in the Declaration of Covenants, (5) the rights and obligations of the Grantor in its capacity as “Additional Units Agent” under and as defined in the Declaration of Covenants, (6) the rights and obligations of the Grantor under Paragraph 3(d) of the Declaration of Covenants, (7) the rights and obligations of the Grantor in its capacity as “Participant” with respect to an “Undivided Ownership Interest” in the “Existing Units” under and as those terms are defined in the Nuclear Managing Board Agreement, (8) the rights and obligations of the Grantor in its capacity as “Participant” with respect to an “Undivided Ownership Interest” in “Plant Hatch” under and as those terms are defined in the Nuclear Managing Board Agreement, (9) the rights and obligations of the Grantor in its capacity as “Participants’ Agent” as agent for the other “Participants” in accordance with the “Participation Agreements” under and as those terms are defined in the Nuclear Managing Board Agreement; (10) Grantor’s “Ownership Interest” in the “Existing Units” as those terms are defined in the Operating Agreement; (11) Grantor’s “Undivided Ownership Interest” in the “Existing Units” as those terms are defined in the Nuclear Managing Board Agreement; (12) Grantor’s “Ownership Interest” in “Plant Hatch” as those terms are defined in the Nuclear Managing Board Agreement; and (13) the rights and obligations of the Grantor in its capacity as “Agent” under and as defined in the Development Agreement.
4.3.
Sale of Personal Property Collateral
. Upon the occurrence and during the continuation of an Event of Default, Grantee may sell the Personal Property Collateral either (a) concurrently with and in conjunction with a sale of the balance of the Secured Property, in
which case the provisions of Section 4.2 hereof shall apply to the Personal Property Collateral as well as to the balance of the Secured Property, or (b) separately and apart from the balance of the Secured Property in the form and manner provided by the Code. The Grantor stipulates and agrees that a sale of the Personal Property Collateral as described in the preceding sentence is a commercially reasonable manner of disposing of the Personal Property Collateral. To the extent that the Code shall require prior notice of sale or other disposition of the Personal Property Collateral, ten (10) days written notice shall be deemed to be reasonable notice. Upon the occurrence and during the continuation of an Event of Default, the Grantee also may sell the Personal Property Collateral or any part thereof in one or more parcels at public or private sale for cash or credit or for future delivery, and at such price or prices and upon such other terms as are commercially reasonable or otherwise as is permitted by applicable law. The Grantee shall not be obligated to make any sale of the Personal Property Collateral regardless of a notice of sale having been given. The Grantee may adjourn any public or private sale from time to time by announcement at the time and place fixed therefor, and such sale may, without further notice, be made at the time and place to which it was so adjourned.
4.4.
Remedies Cumulative and Non-Waiver
. No remedy or right of Grantee hereunder, under the Loan Guarantee Agreement or any of the other Loan Documents, or available under applicable law, shall be exclusive of any other right or remedy. Each such remedy or right shall be in addition to every other remedy or right now or hereafter existing under any such document or under applicable law. No delay in the exercise of, or omission to exercise, any remedy or right accruing on the occurrence of any Event of Default shall impair any such remedy or right or be construed to be a waiver of any such Event of Default or an acquiescence therein, nor shall it affect any subsequent Event of Default of the same or a different nature, nor shall it extend or affect any grace period, cure period or cure right. Every remedy or right may be exercised concurrently or independently, when and as often as may be deemed expedient by the Grantee. All obligations of Grantor hereunder, and all rights, powers and remedies of Grantee hereunder, shall be in addition to, and not in limitation of, those provided by law or in the Loan Guarantee Agreement, or contained in any of the other Loan Documents or any other written agreement or instrument relating to any of the Secured Obligations or any security therefor.
4.5.
Expenses
. In any proceeding to foreclose the lien of this Deed to Secure Debt, there shall be allowed and included, as additional indebtedness and/or obligations, including without limitation, reimbursement obligations, in the judgment or decree resulting therefrom, all expenses paid or incurred by or on behalf of Grantee in the protection of the Secured Property and the exercise of Grantee’s rights and remedies hereunder, which expenses may be estimated as to items to be expended after entry of any judgment or decree of foreclosure and prior to foreclosure. Such expenses shall include: reasonable attorney’s fees actually incurred, determined without regard to any statutory presumption, appraiser’s fees, outlays for documentary and expert evidence, stenographer’s charges, publication costs, survey costs, and costs of procuring all abstracts of title, title searches and examinations, title insurance policies, and any similar data and assurances with respect to title to the Secured Property as Grantee may deem reasonably necessary either to prosecute any such proceeding or to evidence to bidders at any sale pursuant to such decree the true condition of the title to or value of the Secured Property or any part thereof. All such expenses shall be due and payable by Grantor upon demand.
4.6.
Grantee’s Performance of Grantor’s Obligations
.
A. Following the occurrence of an Event of Default and during the continuance thereof, Grantee, either before or after acceleration of the Secured Obligations or before the foreclosure of the lien of this Deed to Secure Debt, may, but shall not be required to (a) make any payment or perform any act herein, in any other Loan Document or any Assigned Agreement which is required of Grantor (whether or not Grantor is personally liable therefor) in any form and manner deemed expedient to Grantee; (b) make full or partial payments of principal or interest on any prior mortgage or encumbrance; (c) purchase, discharge, compromise or settle any tax lien or other prior lien on title or claim thereof, or redeem from any tax sale or forfeiture affecting the Secured Property, or contest any impositions of material Taxes or assessments; and (d) rent, operate, maintain and manage the Additional Unit Properties and Related Facilities and pay operating costs and expenses, including management fees, of every kind and nature in connection therewith, so that the Additional Unit Properties and Related Facilities shall be operational and usable for their intended purposes and perform any obligation of Grantor under the Assigned Agreements or other Secured Property. All monies paid for any of the purposes herein authorized, and all expenses paid or incurred in connection therewith, including attorneys’ fees, shall constitute Secured Obligations, and shall become due and payable upon demand. Grantee, in making any payment hereby authorized: (x) for the payment of impositions of material Taxes or assessments, may do so according to any bill or statement, without inquiry into the validity of any tax, assessment, sale, forfeiture, tax lien or title or claim thereof; (y) for the purchase, discharge, compromise or settlement of any other prior lien, may do so without inquiry as to the validity or amount of any claim or lien which may be asserted; or (z) for the rental, operation or management of the Additional Unit Properties and Related Facilities or the payment of operating cost and expenses thereof, may do so in such amounts and to such persons as Grantee may deem appropriate and may enter into such contracts therefor as Grantee may deem appropriate or may perform the same itself. In exercising any of the foregoing rights, Grantee may act as attorney-in-fact or agent of Grantor or in its own name, either personally or by its agents.
B. Following the occurrence of an Event of Default and during the continuance thereof, Grantee, either before or after acceleration of the Secured Obligations or before the foreclosure of the lien of this Deed to Secure Debt, may, but shall not be required to, continue or complete the construction, furnishing and equipping of the Additional Unit Properties and Related Facilities, including by paying any Completion Costs. The Completion Costs shall be Secured Obligations and shall be payable solely as provided for in Section 4.10 and subject to the provisions of Section 10.20 of the Loan Guarantee Agreement. In exercising any of the foregoing rights, Grantee may act as attorney in fact or agent of Grantor or in its own name, either personally or by its agents.
4.7.
Right of Possession
. Following the occurrence of an Event of Default and during the continuance thereof, Grantor shall, immediately upon Grantee’s demand, surrender to Grantee, and Grantee shall be entitled to take actual possession of the Secured Property or any part thereof, personally or by its agent or attorneys. Grantee may enter upon and take and maintain possession or may apply to the court in which a foreclosure is pending to be placed in possession of all or any part of the Secured Property, together with all documents, books, records, papers, and accounts of Grantor or the then owner of the Secured Property relating
thereto. Grantee may exclude Grantor, solely in its capacity as an owner of an interest in the Additional Unit Properties and the Related Facilities, and any agents and servants from the Secured Property, but Grantee shall not exclude Grantor as “Agent” under either or both of the Ownership Agreement or the Operating Agreement and shall not exclude Grantor in its capacity as an Existing Units Owner (as defined in the Declaration of Covenants). As attorney-in-fact or agent of Grantor or such owner, or in its own name, Grantee may hold, operate, manage, and control all or any part of the Secured Property, either personally or by its agents. Grantee shall have full power to use such measures, legal or equitable, as it may deem proper or necessary to enforce the payment or security of the rents, issues, deposits, profits, and avails of the Secured Property, including actions for recovery of rent, actions in forcible detainer, and actions in distress for rent, all without notice to Grantor.
4.8.
Appointment of Receiver
. If an Event of Default has occurred and is continuing, Grantee, without regard to the value, adequacy or occupancy of the Secured Property as security for the Secured Obligations, shall be entitled as a matter of right if it so elects to the appointment of a receiver (“
Receiver
”), either ex parte or upon prior notice to Grantor, and to enter upon and take possession of the Secured Property in the manner it deems appropriate or as the court otherwise may direct. Any such Receiver shall have all the usual powers and duties of receivers in similar cases. This Deed to Secure Debt shall secure the expenses, including without limitation, Receiver’s fees, attorney’s fees, costs and agent’s compensation, which are incurred pursuant to the powers herein contained. The right to enter, take possession of, manage and operate the Secured Property, whether by Receiver or otherwise, shall be cumulative to any other right or remedy and may be exercised concurrently therewith or independently thereof. Grantee or Receiver, as the case may be, shall be liable to account only for such rents, income and other benefits actually received by Grantee or Receiver. Notwithstanding the appointment of Receiver or any other custodian, Grantee shall be entitled as pledgee to the possession and control of any cash, deposits or instruments at the time held by, or payable or deliverable under the terms of this Deed to Secure Debt to Grantee and/or the Secured Parties.
4.9.
Rescission of Notice of Default
. Grantee (on behalf of the Secured Parties) may from time to time rescind any notice of default or notice of sale before any sale as provided above, by executing and delivering to Grantor a written notice of such rescission. The exercise by Grantee of such right of rescission shall not (a) constitute a waiver of any breach or default then existing or subsequently occurring, (b) impair the right of Grantee to execute and deliver to Grantor other declarations or notices of default to satisfy the obligations of this Deed to Secure Debt or the obligations secured hereby, or (c) otherwise affect any provision, covenant or condition of any Loan Document or any of the rights, obligations or remedies of Grantee or the Secured Parties hereunder or thereunder.
4.10.
Application of Proceeds
. The proceeds of any sale of, and other amounts generated by the holding, leasing, management, operation or other use of the Secured Property, shall be applied by Grantee (or the Receiver, if one is appointed) in the following order unless otherwise required by applicable law:
(a)
to the payment of the costs and expenses of taking possession of the Secured Property and of holding, using, leasing, repairing, improving and selling the same, including, without limitation: (1) Receiver’s fees and expenses, including the
repayment of the amounts evidenced by any Receiver’s certificates; (2) court costs; (3) attorneys’ fees and expenses and accountants’ fees and expenses; and (4) costs of advertisement;
(b)
to the payment and performance of the Secured Obligations (other than the Completion Costs), in each case in such manner and order of preference as Grantee in its sole discretion may determine;
(c)
upon payment and performance of the Secured Obligations (other than the Completion Costs), to the payment of the Completion Costs; and
(d)
to the balance, if any
, to the Persons legally entitled thereto.
4.11.
Waiver of Jury Trial
.
EACH OF THE PARTIES HERETO HEREBY KNOWINGLY, VOLUNTARILY, AND INTENTIONALLY WAIVES ANY RIGHTS IT MAY HAVE TO A TRIAL BY JURY IN RESPECT OF ANY LITIGATION BASED HEREON, OR ARISING OUT OF, UNDER, OR IN CONNECTION WITH, THIS DEED TO SECURE DEBT OR ANY OTHER LOAN DOCUMENT, OR ANY COURSE OF CONDUCT, COURSE OF DEALING, STATEMENTS (WHETHER VERBAL OR WRITTEN), OR ACTIONS OF THE GRANTOR. THIS PROVISION IS A MATERIAL INDUCEMENT FOR EACH PARTY TO ENTER INTO THIS DEED TO SECURE DEBT AND THE OTHER LOAN DOCUMENTS. EACH OF THE PARTIES HERETO REPRESENTS THAT IT HAS DISCUSSED THE WAIVER CONTAINED IN THIS SECTION 4.11 WITH ITS COUNSEL, UNDERSTANDS THE RAMIFICATIONS OF SUCH WAIVER, AND KNOWINGLY AND VOLUNTARILY AGREES TO SUCH WAIVER.
4.12.
Grantee’s Compliance with Governmental Rules
. Grantee’s exercise of its rights and remedies pursuant to this Article IV shall be in accordance with all applicable Governmental Rules, including, to the extent applicable, receipt of NRC approval for the exercise by Grantee of the applicable right or remedy.
V
POSSESSION AND USE; RELEASES; EMINENT DOMAIN
5.1.
Right of Grantor to Possess and Operate the Secured Property
.
So long as DOE or its successor shall not have taken possession of the Secured Property in accordance with the Security Documents and applicable Governmental Rules, the Grantor shall have the right to possess, use, manage, operate and enjoy the Secured Property, subject to the provisions of the Loan Documents, including but not limited to the right to sell, exchange or otherwise dispose of, free from the lien of this Deed to Secure Debt, any facilities, machinery, equipment, fixtures, furniture, apparatus, tools or implements, materials or supplies or other similar property being a part of the Secured Property, which shall have become old, inadequate, obsolete, worn out, unfit, unadaptable, unserviceable, undesirable or unnecessary for use in the operations of the Additional Unit Properties and Related Facilities, upon replacing the same by or substituting for the same, other facilities, machinery, equipment, fixtures, furniture, apparatus, tools or implements, materials or supplies or other property not necessarily of the same character and, PROVIDED that the value and utility of the Secured Property as an entirety will not thereby
be materially impaired, and which substituted property shall forthwith become, without further action, subject to the lien of this Deed to Secure Debt;
5.2.
Dispositions or Releases of the Secured Property Without the Grantee’s Consent
. The Grantor shall have the right, at any time and from time to time so long as no Event of Default shall have occurred and be continuing, without the consent or approval of Grantee, to do any of the following:
A.
abandon, terminate, cancel, amend, release or make alterations in or substitutions of any contracts, easements, rights-of-way or other agreements subject to the lien of this Deed to Secure Debt, subject to the provisions of Section 7.4 of the Loan Guarantee Agreement, and PROVIDED that any amended, altered or substituted contracts, easements, rights-of-way or other agreements shall forthwith, without further action, become subject to the lien of this Deed to Secure Debt to the same extent as those previously existing;
B.
surrender or modify any franchise, right (charter and statutory), power, license, governmental consent or permit subject to the lien of this Deed to Secure Debt which it may own or hold or under which it may be operating, PROVIDED that, in the opinion of the board of directors of the Grantor, the preservation of such franchise, right, power, license, governmental consent or permit is no longer necessary in the construction or operation of the Additional Unit Properties and Related Facilities or any such modification does not adversely affect, in any material respect, the construction or operation of the Additional Unit Properties and Related Facilities, and PROVIDED FURTHER that the exercise of the unilateral right of any municipality or any other political subdivision to terminate a permit, power, license, governmental consent or franchise shall not be deemed to be a surrender or modification of the same;
C.
grant, free from the lien of this Deed to Secure Debt, ground leases, rights-of-way and easements over and/or across or in respect of the Premises, or release rights-of-way and easements constituting portions of the Secured Property, PROVIDED that, in the opinion of the board of directors of the Grantor,
no such grant will materially impair the construction or operation of the Additional Unit Properties and Related Facilities and no such release shall occur with respect to any right-of-way or easement that is necessary to the construction or operation of the Additional Unit Properties and Related Facilities;
D.
sell, exchange or otherwise dispose of, free from the lien of this Deed to Secure Debt, all fuel, including nuclear fuel, excluding, however, all nuclear fuel loaded in the reactor cores of the Units and other fuel located on the Premises that is necessary for the operation of the Units or is required by any of the COLs;
E.
demolish, dismantle, tear down, use for scrap or abandon any property in the Secured Property, or abandon any part of the Secured Property other than land and estates in land, if in the opinion of the board of directors of the Grantor such demolition, dismantling, tearing down, scrapping or abandonment is necessary in the construction or operation of the Additional Unit Properties and Related Facilities and the value and utility of the Secured Property, taken as a whole, will not thereby be materially impaired;
F.
alter, repair, replace, change the location or position of and add to its plants, structures, machinery, systems, equipment, fixtures and appurtenances that are subject to the lien of this Deed to Secure Debt, PROVIDED that no change shall be made in the location of any such property subject to the lien of this Deed to Secure Debt which removes such property into a jurisdiction in which this Deed to Secure Debt and any required financing or continuation statement covering security interests in such property have not been recorded, registered or filed in the manner required by law to preserve the lien of this Deed to Secure Debt on such property or otherwise impairs the lien hereof.
The Grantee shall, from time to time, at Grantor’s written request, execute a written instrument to confirm a release of the lien of this Deed to Secure Debt in connection with any action taken by the Grantor under this Section 5.2, upon receipt by the Grantee of (i) a copy of a resolution certified by an Authorized Official of the Grantor to have been duly adopted by the board of directors of the Grantor and to be in full force and effect on the date of the applicable release, and delivered to the Grantee (a “
Board Resolution
”), (ii) a Borrower Certificate stating that no Event of Default has occurred and is continuing as of the date of the release and that said action was duly taken in conformity with a designated paragraph of this Section, (iii) an Opinion of Counsel stating that said action was or will be duly taken by the Grantor in conformity with this Section and that the execution of such release by the Grantee is appropriate to confirm the release of the lien of this Deed to Secure Debt with respect to the released Secured Property under this Section, and (iv) reimbursement to the Grantee and DOE of all reasonable costs and expense actually incurred in connection with any such request.
5.3.
Eminent Domain
.
A.
If Grantor desires to sell any or all of the Secured Property to a governmental authority or its designee possessing the power of eminent domain under a threat to exercise the same, the Grantee shall release the property subject to such threat upon being furnished with a Borrower Certificate requesting such release, describing the property to be released and stating that in the opinion of the board of directors of the Grantor, the sale to a governmental authority or its designee possessing the power of eminent domain under a colorable threat to exercise the same is in the best interests of the Grantor.
B.
If a court of competent jurisdiction shall enter an order authorizing the taking of any or all of the Secured Property pursuant to an eminent domain proceeding or any or all of the Secured Property shall otherwise be taken pursuant to the power of eminent domain, the Grantee shall release the property subject to the order from the lien of this Deed to Secure Debt upon being furnished with a Borrower Certificate requesting such release, describing the property to be released, stating that such property has been taken pursuant to an eminent domain proceeding or any or all of the Secured Property shall otherwise be taken pursuant to eminent domain, and attaching a copy of the order or such other documentation that evidences such taking through the power of eminent domain.
5.4.
Written Disclaimer of Grantee
.
In case the Grantor proposes to sell, exchange or otherwise dispose of or has sold, exchanged or otherwise disposed of any property not subject to the lien hereof and the recipient
thereof requests the Grantor to furnish a written disclaimer or quitclaim by the Grantee of any interest in such property under this Deed to Secure Debt, the Grantee shall at Grantor’s expense execute such an instrument without substitution of other property or cash upon receipt by the Grantee of:
A.
a written request signed in the name of the Grantor by an Authorized Official of the Grantor (a “
Grantor Request
”) for the execution of such disclaimer or quitclaim and transmitting therewith a form of instrument to effect such disclaimer or quitclaim;
B.
a Borrower Certificate which shall identify the sale, exchange or other disposition or proposed sale, exchange or other disposition, describe the property sold or to be sold, exchanged or otherwise disposed of, state that such property is not subject to the lien of this Deed to Secure Debt, and state that the recipient of such property has requested a written disclaimer or quitclaim by the Grantee;
C.
an Opinion of Counsel, which shall also state that such property is not subject to the lien hereof and not required to be subjected thereto by any of the provisions hereof; and
D.
reimbursement to the Grantee and DOE of all reasonable costs and expense actually incurred in connection with any such Grantor Request.
5.5.
Powers Exercisable Notwithstanding Event of Default
.
If an Event of Default has occurred and is continuing and the Grantor remains in possession of all or substantially all of the Secured Property, the Grantor may exercise the powers conferred upon it in this Article (even though it would otherwise be prohibited from doing so while an Event of Default is continuing as provided therein), if the Grantee in its discretion (based upon such opinions and certifications as the Grantee deems necessary), shall specifically consent to such action, in which event none of the instruments required to be furnished to the Grantee under this Article as a condition to the exercise of such powers need state that no Event of Default has occurred and is continuing as provided therein. Notwithstanding the foregoing, Grantee’s consent shall not be required to effectuate a release of all nuclear fuel loaded in the reactor cores of the Units pursuant to the foregoing provisions of this paragraph prior to the earliest date on which (a) Grantee, its agent, DOE, or a trustee or Receiver lawfully appointed shall take possession of all or substantially all of the Secured Property, or (b) the Secured Property shall be sold upon a foreclosure of the lien hereof.
5.6.
Powers Exercisable by Grantee or Receiver
.
In case all or substantially all of the Secured Property shall be in the possession of a trustee or Receiver lawfully appointed, the powers hereinbefore in this Article conferred upon the Grantor with respect to the sale, exchange or other disposition and release of the Secured Property may be exercised by such trustee or Receiver (with the consent of the Grantee, in its sole discretion), in which case a written request signed by such Receiver or trustee shall be deemed the equivalent of any Board Resolution or Grantor Request required by this Article and a certificate signed by such trustee or Receiver shall be deemed the equivalent of any Borrower
Certificate required by this Article and such certificate need not state that no Event of Default has occurred and is continuing.
5.7.
Purchaser Protected
.
No purchaser or other recipient in good faith of property or rights purporting to be released herefrom shall be bound to ascertain the authority of the Grantee to execute the release or to inquire as to the satisfaction of any conditions herein prescribed for the exercise of such authority. No purchaser or other recipient in good faith of any property or rights permitted by this Article to be sold, exchanged or otherwise disposed of by the Grantor shall be under any obligation to ascertain or inquire into the authority of the Grantor to make any such sale, exchange or other disposition. Grantee may execute a release in connection with this Article V of this Deed to Secure Debt upon satisfaction of the conditions necessary to effectuate such release and any such release shall be sufficient for the purpose of this Deed to Secure Debt and shall constitute a good and valid release of the property therein described from the lien hereof.
VI
MISCELLANEOUS
6.1.
Notices
. Any notice or other communication required or permitted to be given under this Deed to Secure Debt shall be given or sent, deemed received and otherwise governed in accordance with the Collateral Agency Agreement.
6.2.
Time of Essence
. Time is of the essence of this Deed to Secure Debt.
6.3.
Covenants Run with Land
. All of the covenants of this Deed to Secure Debt shall run with the land comprising the Secured Property.
6.4.
Governing Law
. This Deed to Secure Debt shall be governed by and shall be construed and enforced in accordance with the laws of the State
.
6.5.
Severability
. If any provision of this Deed to Secure Debt, or any paragraph, sentence, clause, phrase, or word, or their application, in any circumstance, is held invalid, the validity of the remainder of this Deed to Secure Debt shall be construed as if such invalid part were never included.
6.6.
Non-Waiver
. Unless expressly provided in this Deed to Secure Debt to the contrary, no consent or waiver, express or implied, by any party, to or of any breach or default by any other party shall be deemed a consent to or waiver of the performance by such defaulting party of any other obligations or the performance by any other party of the same, or of any other, obligations.
6.7.
Headings
. The headings of sections and paragraphs in this Deed to Secure Debt are for convenience or reference only and shall not be construed in any way to limit or define the content, scope, or intent of the provisions.
6.8.
Grammar
. As used in this Deed to Secure Debt, the singular shall include the plural, and masculine, feminine, and neuter pronouns shall be fully interchangeable, where the context so requires.
6.9.
Successors and Assigns
. This Deed to Secure Debt shall be binding upon and inure to the benefit of Grantor and Grantee, and their respective successors, assigns, legal representatives, and all other persons or entities claiming under or through such party.
6.10.
Mortgagee in Possession
. Nothing contained in this Deed to Secure Debt shall be construed as constituting Grantee a mortgagee in possession in the absence of the actual taking of possession of the Secured Property.
6.11.
Incorporation of Loan Guarantee Agreement; No Conflicts
. The terms of the Loan Guarantee Agreement are incorporated by reference herein as though set forth in full detail. In the event of any conflict between the terms and provisions of this Deed to Secure Debt and the Loan Guarantee Agreement, the terms and provisions of the Loan Guarantee Agreement shall control.
6.12.
No Strict Construction
. The parties hereto have participated jointly in the negotiation and drafting of this Deed to Secure Debt. In the event an ambiguity or question of intent or interpretation arises, this Deed to Secure Debt shall be construed as if drafted jointly by the parties hereto and no presumption or burden of proof shall arise favoring or disfavoring any party by virtue of the authorship of this Deed to Secure Debt.
6.13.
Intentionally omitted
.
6.14.
Compliance with Applicable Law
. Notwithstanding any provision of this Deed to Secure Debt to the contrary, in the event that any provision in this Deed to Secure Debt shall violate any provision of State law regarding foreclosure (the “
State Foreclosure Law
”), the provisions of the State Foreclosure Law shall take precedence over such provision of this Deed to Secure Debt, but shall not invalidate or render unenforceable any other provision of this Deed to Secure Debt that can be construed in a manner consistent with State Foreclosure Law.
6.15.
Secured Obligations to Include Judgments
. The obtaining of any judgment by Grantee and/or the Secured Parties (other than a judgment foreclosing this Deed to Secure Debt) and any levy of any execution under any such judgment upon the Secured Property shall not affect in any manner or to any extent the lien of this Deed to Secure Debt upon the Secured Property or any part thereof, or any liens, powers, rights and remedies of Grantee and/or the Secured Parties hereunder, but such liens, powers, rights and remedies shall continue unimpaired as before until the judgment or levy is satisfied. Furthermore, Grantor acknowledges and agrees that the Secured Obligations are secured by the Secured Property from the time of execution of this Deed to Secure Debt. Grantor specifically acknowledges and agrees that, in certain circumstances, the Secured Property, in and of itself, if foreclosed or realized upon might not be sufficient to satisfy the outstanding amount of the Secured Obligations. Accordingly, Grantor acknowledges that Grantor will remain liable for any deficiency judgments with respect to the Secured Obligations in addition to any amounts Grantee and/or the Secured Parties may realize on sales of other property or any other collateral given as security for the Secured Obligations.
Specifically, and without limitation of the foregoing, it is agreed that it is the intent of the parties hereto that in the event of a judicial foreclosure of this Deed to Secure Debt, that the Secured Obligations shall not be deemed merged into any judgment of foreclosure, but shall rather remain outstanding to the fullest extent permitted by applicable law.
6.16.
Survival
. If the Secured Property is released from this Deed to Secure Debt, any of the terms and provisions of this Deed to Secure Debt that expressly survive pursuant to the terms of this Deed to Secure Debt shall nevertheless survive the release or satisfaction of this Deed to Secure Debt, whether voluntarily granted by Grantee or the Secured Parties, as a result of a judgment upon judicial foreclosure of this Deed to Secure Debt, as a result of a non-judicial foreclosure of the Secured Property pursuant to this Deed to Secure Debt or in the event a deed in lieu of foreclosure is granted by Grantor to Grantee and/or the Secured Parties.
6.17.
WAIVER OF GRANTOR’S RIGHTS
. BY EXECUTION OF THIS DEED TO SECURE DEBT, GRANTOR EXPRESSLY: (A) ACKNOWLEDGES THE RIGHT TO ACCELERATE THE SECURED OBLIGATIONS AND THE POWER OF ATTORNEY GIVEN HEREIN TO GRANTEE TO SELL THE PROPERTY BY NONJUDICIAL FORECLOSURE UPON DEFAULT BY GRANTOR WITHOUT ANY JUDICIAL HEARING AND WITHOUT ANY NOTICE (EXCEPT AS OTHERWISE PROVIDED HEREIN); (B) EXCEPT TO THE EXTENT PROVIDED OTHERWISE HEREIN, WAIVES ANY AND ALL RIGHTS WHICH GRANTOR MAY HAVE UNDER THE CONSTITUTION OF THE UNITED STATES (INCLUDING THE FIFTH AND FOURTEENTH AMENDMENTS THEREOF), THE VARIOUS PROVISIONS OF THE CONSTITUTIONS FOR THE SEVERAL STATES, OR BY REASON OF ANY OTHER APPLICABLE LAW, TO NOTICE AND TO JUDICIAL HEARING PRIOR TO THE EXERCISE BY GRANTEE OF ANY RIGHT OR REMEDY HEREIN PROVIDED TO GRANTEE; (C) ACKNOWLEDGES THAT GRANTOR HAS READ THIS DEED TO SECURE DEBT AND ITS PROVISIONS HAVE BEEN EXPLAINED FULLY TO GRANTOR AND GRANTOR HAS CONSULTED WITH COUNSEL OF GRANTOR’S CHOICE PRIOR TO EXECUTING THIS DEED TO SECURE DEBT; AND (D) ACKNOWLEDGES THAT ALL WAIVERS OF THE AFORESAID RIGHTS OF GRANTOR HAVE BEEN MADE KNOWINGLY, INTENTIONALLY AND WILLINGLY BY GRANTOR AS PART OF A BARGAINED FOR LOAN TRANSACTION.
6.18.
Security Title
. Any reference herein to the term “lien”, “Lien” or words of similar import shall be deemed also to mean “security title” and “security interest” of this Deed to Secure Debt.
6.19.
Future Advances
. This Deed to Secure Debt secures not only present indebtedness but also future advances, whether such future advances are obligatory or are to be made at the option of the Secured Parties, or otherwise, and the Lien securing such future advances shall relate to the date of this Deed to Secure Debt and have the same priority as the Lien securing loans made on the date hereof. The amount of indebtedness secured hereby may increase or decrease from time to time, and the rate or rates of interest payable may vary from time to time.
6.20.
Completion Costs
. Grantee acknowledges and agrees that upon the occurrence of any default or Event of Default under this Deed to Secure Debt or other Loan Document the
payment of the Completion Costs shall be made solely as provided for in Section 4.10(c) of this Deed to Secure Debt and subject to the provisions of Section 10.20 of the Loan Guarantee Agreement.
6.21.
Owner Documents
. Notwithstanding any provision of this Deed to Secure Debt to the contrary, Grantee acknowledges and agrees (a) that prior to and in connection with any sale of Secured Property by judicial action or power of sale, whether under or pursuant to the provisions of Section 4.2, Section 4.3, Section 4.4 or otherwise, Grantee must comply with the provisions of Section 4.2(g) of the Ownership Agreement as amended by the Owners Direct Agreement, (b) that prior to any sale of Secured Property by judicial action or power of sale pursuant to the provisions of Section 4.2, Section 4.3, Section 4.4 or otherwise, Grantee’s rights, whether directly or indirectly through a receiver, to take possession of such Secured Property or make any payments or perform any obligations on behalf of Grantor with respect to such Secured Property, must be exercised in accordance with the Owner Documents as amended by (or otherwise as agreed in) the Owners Direct Agreement, and (c) the purchaser of any Secured Property at any sale by judicial action or power of sale, whether under or pursuant to the provisions of Section 4.2, Section 4.3, Section 4.4 or otherwise, will acquire such Secured Property subject to the Owner Documents, as amended by the Owners Direct Agreement, and, in accordance with the last sentence of Section 4.2, must accede to (i) the rights and obligations of Grantor under the Ownership Agreement as a “Participating Party” solely with respect to the portion of Grantor’s “Ownership Interest” in the “Additional Units” (as those terms are defined in the Ownership Agreement) acquired by such purchaser, (ii) the rights and obligations of Grantor under the Operating Agreement solely with respect to the portion of Grantor’s “Ownership Interest” in the “Additional Units” (as those terms are defined in the Operating Agreement) acquired by such purchaser, (iii) the rights and obligations of Grantor under the Declaration of Covenants as an “Additional Units Owner” solely with respect to the portion of Grantor’s ownership interest in the “Additional Units Property” (as those terms are defined in the Declaration of Covenants) acquired by such purchaser, (iv) the rights and obligations of Grantor under the Nuclear Managing Board Agreement solely as a “Participant” with respect to the portion of Grantor’s “Undivided Ownership Interest” in the “Additional Units” and related facilities, equipment, inventory and common facilities (as those terms are defined in the Nuclear Managing Board Agreement) acquired by such purchaser, and (v) the rights and obligations of Grantor under the Development Agreement as a “Participating Party” solely with respect to the portion of Grantor’s ownership interest in the Additional Units (as those terms are defined in the Development Agreement), in each of the foregoing cases (i) through (v) arising from and after the date of such assumption. For the avoidance of doubt, nothing in this Section 6.21 requires or permits Grantee, under (a) or (b) above, or such purchaser, under (c) above, to accede to (1) the rights and obligations of the Grantor in its capacity as “Agent” under and as defined in the Ownership Agreement, (2) the rights and obligations of the Grantor in its capacity as “Agent” under and as defined in the Operating Agreement, (3) the rights and obligations of the Grantor in its capacity as “Participating Party” with respect to its “Ownership Interest” in the “Existing Units” under and as those terms are defined in the Operating Agreement, (4) the rights and obligations of the Grantor in its capacity as an “Existing Units Owner” under and as defined in the Declaration of Covenants, (5) the rights and obligations of the Grantor in its capacity as “Additional Units Agent” under and as defined in the Declaration of Covenants, (6) the rights and obligations of the Grantor under Paragraph 3(d) of the Declaration of Covenants, (7) the rights and obligations of the Grantor in its capacity as “Participant” with respect to an
“Undivided Ownership Interest” in the “Existing Units” under and as those terms are defined in the Nuclear Managing Board Agreement, (8) the rights and obligations of the Grantor in its capacity as “Participant” with respect to an “Undivided Ownership Interest” in “Plant Hatch” under and as those terms are defined in the Nuclear Managing Board Agreement, and (9) the rights and obligations of the Grantor in its capacity as “Participant’s Agent” as agent for the other “Participants” in accordance with the “Participation Agreements” under and as those terms are defined in the Nuclear Managing Board Agreement; (10) Grantor’s “Ownership Interest” in the “Existing Units” as those terms are defined in the Operating Agreement; (11) Grantor’s “Undivided Ownership Interest” in the “Existing Units” as those terms are defined in the Nuclear Managing Board Agreement; (12) Grantor’s “Ownership Interest” in “Plant Hatch” as those terms are defined in the Nuclear Managing Board Agreement; and (13) the rights and obligations of the Grantor as “Agent” under the Development Agreement.
6.22.
Fixture Filing
. Certain of the Secured Property is or will become “fixtures” (as that term is defined in the Code), and this Deed to Secure Debt, upon being filed for record in the real estate records of the county wherein such fixtures are situated, shall operate also as a financing statement filed as a fixture filing in accordance with the applicable provisions of the Code upon such of the Secured Property that is or may become fixtures.
(SIGNATURE PAGE FOLLOWS)
Deed to Secure Debt
IN WITNESS WHEREOF, Grantor has duly signed and delivered this Deed to Secure Debt as of the date first above written.
|
|
|
Signed, sealed and delivered
in the presence of the following
witnesses:
/s/ Jessica N. Ackel
Unofficial Witness
/s/ Angel R. Robinson
Notary Public
(NOTARY SEAL)
My Commission Expires:
9-30-14
|
GRANTOR:
GEORGIA POWER COMPANY, a Georgia corporation
By:
/s/ W. Ron Hinson
Name: W. Ron Hinson
Title: Executive Vice President, Chief Financial Officer and Treasurer
Attest:
/s/ Laura I. Patterson
Name: Laura I. Patterson
Title: Comptroller and Assistant Secretary
(CORPORATE SEAL)
|
[Signature Page to Deed to Secure Debt]
EXHIBIT A
LEGAL DESCRIPTION
ALL THAT TRACT OR PARCEL OF LAND lying and being in G.M.D. 66, Burke County, Georgia, being more particularly described as follows:
TO FIND THE TRUE POINT OF BEGINNING, begin at the concrete monument found marked "VNP-10", said concrete monument found having Plant Vogtle Plant Grid System coordinates of North 2999.146 feet, East 6076.479 feet and Georgia State Plane Coordinates [East Zone] of North 1138093.720 feet, East 776288.384 feet; thence run north 28 degrees 16 minutes 50 seconds west a distance of 2272.05 feet to a point (Reference Point #1) having Plant Vogtle Plant Grid System coordinates of North 5000.00 feet, East 5000.00 feet and Georgia State Plane Coordinates [East Zone] of North 1140094.311 feet, East 775212.126 feet (Reference Point #1 also being located North 27 degrees 32 minutes 17 seconds West a distance of 2426.79 feet from the point formed by the intersection of the centerlines of River Road and Ebenezer Church Road); thence run North 63 degrees 26 minutes 06 seconds East a distance of 447.21 feet to a point (Tie Point 9), said point having Plant Vogtle Plant Grid System coordinates of North 5200.00 feet, East 5400.00 feet and Georgia State Plane Coordinates [East Zone] of North 1140294.276 feet, East 775612.099 feet, and said point being the TRUE POINT OF BEGINNING. FROM THE TRUE POINT OF BEGINNING AS THUS ESTABLISHED, thence running North 00 degrees 00 minutes 00 seconds West a distance of 4500.00 feet to a point, said point having Plant Vogtle Plant Grid System coordinates of North 9700.00 feet, East 5400.00 feet and Georgia State Plane Coordinates [East Zone] of North 1144793.871 feet, East 775612.288 feet; thence running North 90 degrees 00 minutes 00 seconds East a distance of 3200.00 feet to a point, said point having Plant Vogtle Plant Grid System coordinates of North 9700.00 feet, East 8600.00 feet and Georgia State Plane Coordinates [East Zone] of North 1144793.736 feet, East 778812.000 feet; thence running South 00 degrees 00 minutes 00 seconds East a distance of 1000.00 feet to a point, said point having Plant Vogtle Plant Grid System coordinates of North 8700.00 feet, East 8600.00 feet and Georgia State Plane Coordinates [East Zone] of North 1143793.826 feet, East 778811.958 feet; thence running North 90 degrees 00 minutes 00 seconds East a distance of 300.00 feet to a point, said point having Plant Vogtle Plant Grid System coordinates of North 8700.00 feet, East 8900.00 feet and Georgia State Plane Coordinates [East Zone] of North 1143793.814 feet, East 779111.931 feet; thence running South 00 degrees 00 minutes 00 seconds East a distance of 2800.00 feet to a point, said point having Plant Vogtle Plant Grid System coordinates of North 5900.00 feet, East 8900.00 feet and Georgia State Plane Coordinates [East Zone] of North 1140994.066 feet, East 779111.813 feet; thence running South 50 degrees 31 minutes 39 seconds West a distance of 1101.14 feet to a point, said point having Plant Vogtle Plant Grid System coordinates of North 5200.00 feet, East 8050.00 feet and Georgia State Plane Coordinates [East Zone] of North 1140294.164 feet, East 778261.860 feet; thence running North 90 degrees 00 minutes 00 seconds West a distance of 2650.00 feet to a point, said point being the TRUE POINT OF BEGINNING; said tract containing 358.70 acres, more or less, all as shown on that certain ALTA/ACSM Land Title Survey Plant Vogtle 3 & 4 for Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, City of Dalton, Chicago Title Insurance Company,
U.S. Department of Energy, and PNC Bank National Association, d/b/a Midland Loan Services, Inc, a
Division of PNC Bank, National Association, Georgia Power
Drawing Number P319-3, dated March 14, 2013, prepared by Lowe Engineers, and certified November 22, 2013, by Donald C. Sherrill, Georgia Registered Land Surveyor No. 2358.
TOGETHER WITH the easements benefitting the above described property under and pursuant to that certain Declaration of Covenants and Cross-Easements for Vogtle Additional Units by Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia, a public body corporate and politic and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, dated as of April 21, 2006, filed for record May 15, 2006 at 3:27 p.m., recorded in Deed Book 598, Page 35, Burke County, Georgia Records; as amended by that certain Omnibus Amendment Regarding Plant Vogtle Additional Units Description by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation organized and existing under the Georgia Electric Membership Corporation Act, Municipal Electric Authority of Georgia, a public body corporate and politic and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, d/b/a Dalton Utilities, dated as of December 1, 2013, recorded or to be recorded in the aforesaid Records; as further amended by that certain Amendment to Declaration of Covenants and Cross-Easements for Vogtle Additional Units by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation organized and existing under the Georgia Electric Membership Corporation Act, Municipal Electric Authority of Georgia, a public body corporate and politic organized and existing under Section 46-3-110, et seq., of the Official Code of Georgia Annotated, and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, d/b/a Dalton Utilities, dated as of December 18, 2013, recorded or to be recorded in the aforesaid Records.
EXHIBIT B
ASSIGNED AGREEMENTS
1. the EPC Contract;
2. the Westinghouse Fuel Assembly Agreement;
3. the Fuel Disposal Agreements (other than those to be entered into after the Guarantee Issuance Date);
4. the Nuclear Operating Agreement;
5. the Software License;
6. the Development Agreement;
7. the Nuclear Managing Board Agreement;
8. the Borrower’s rights under the Southern Nuclear Direct Agreement (including pursuant to Section 2.07 (
License
) thereof);
9. the Ownership Agreement;
10. the Declaration of Covenants;
11. the Cost Allocation Procedures;
12. the Operating Agreement;
13. the Letter Agreement for Construction Services;
14. the Toshiba Guarantee;
15. the Shaw Guarantee; and
16. the Additional Project Documents (including Grantor’s rights under leases of nuclear fuel, if any)
B
Deed to Secure Debt
EXHIBIT C
PERMITTED LIENS
“Permitted Liens” means:
I.
Liens Imposed by Governmental Rule
.
A. liens for taxes, assessments and other governmental charges not delinquent;
B. liens for taxes, assessments and other governmental charges already delinquent which are currently being contested in good faith by appropriate proceedings and with respect to which the Grantor shall have set aside on its books adequate reserves;
C. mechanics’, workmen’s, repairmen’s, materialmen’s, warehousemen’s, contractors’, subcontractors’ and carriers’ liens and other similar liens arising in the ordinary course of business or incident to current construction for charges which (i) are not delinquent or (ii) are being contested in good faith and have not proceeded to final non-appealable judgment and with respect to which the Grantor shall have set aside on its books adequate reserves;
D. liens in respect of judgments or awards with respect to which there exists a stay of execution pending such appeal or proceedings for review and with respect to which the Grantor shall in good faith currently be prosecuting an appeal or proceedings for review and shall have set aside on its books adequate reserves;
E. to the extent arising by operation of law or required by law or governmental regulation, liens or privileges of any employees of the Grantor for salary or wages earned but not yet payable and with respect to which the Grantor shall have set aside on its books adequate reserves;
F. to the extent arising by operation of law or required by law or governmental regulation, liens for worker’s compensation awards which are not delinquent or which are being contested in good faith by appropriate proceedings and with respect to which the Grantor shall have set aside on its books adequate reserves;
G. any lien or other matter required by law or governmental regulation as a condition to the completion or operation of the Project for amounts which are not delinquent and with respect to which the Grantor shall have set aside on its books adequate reserves;
H. any lien or other matter required by law or governmental regulation to enable the Grantor to maintain self-insurance or to participate in any funds established to cover any insurance risks or in connection with worker’s compensation, unemployment insurance, retirement pensions or other social security, or to share in the privileges or benefits required for companies participating in such arrangements, in each case for amounts which are not delinquent and with respect to which the Grantor shall have set aside on its books adequate reserves;
I. controls, restrictions, obligations, duties and/or other burdens imposed by federal, state, municipal or other law or other governmental regulation, license or permit, upon the
Secured Property or any part thereof or the operation or use thereof or upon the Grantor with respect to the Secured Property or any part thereof or the operation or use thereof with respect to any franchise, grant, license, permit or public purpose requirement, or any rights reserved to or otherwise vested in governmental authorities to impose any such controls, restrictions, obligations, duties and/or other burdens;
J. any restrictions on assignment and/or requirements of any assignee to qualify as a permitted assignee (or be exempt from such requirement), in each case imposed by the Nuclear Regulatory Commission or any other Governmental Authority,
provided
,
however
, that the Grantor shall promptly notify DOE upon obtaining Knowledge of the imposition of any such restrictions or requirements by any non-federal Governmental Authority and shall use commercially reasonable efforts to cooperate with the Secured Parties and such Governmental Authority in connection with the Secured Parties’ efforts to challenge, or seek clarification from or discussions with such Governmental Authority with respect to the relevant restrictions or requirements;
K. ordinances establishing assessments for sewer, lighting or other local improvement districts;
II.
Liens Recorded Prior to the Recordation of this Deed to Secure Debt
.
A. All matters pursuant to or in accordance with that certain Plant Alvin W. Vogtle Nuclear Units One and Two Purchase and Ownership Participation Agreement, dated August 27, 1976 beginning in Deed Book 107, Page 287, Burke County, Georgia Records, attached as Exhibit “D” to that certain General Warranty Deed and Bill of Sale from Georgia Power Company, a Georgia corporation to Municipal Electric Authority of Georgia, a public body corporate and politic and a public corporation of the State of Georgia, dated January 27, 1977, filed for record January 27, 1977 at 11:32 a.m., recorded in Deed Book 107, Page 247, aforesaid Records; as amended by the following instruments but not limited to these:
(a) As amended January 18, 1977 referred to in that certain Plant Vogtle Owners Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units by and between Georgia Power Company, Oglethorpe Power Corporation, the Municipal Electric Authority of Georgia and the City of Dalton, Georgia acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, dated May 13, 2005, filed for record May 25, 2005 at 12:05 p.m., recorded in Deed Book 547, Page 1, aforesaid Records;
(b) As amended February 24, 1977 referred to in that certain Plant Vogtle Owners Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units by and between Georgia Power Company, Oglethorpe Power Corporation, the Municipal Electric Authority of Georgia and the City of Dalton, Georgia acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, dated May 13, 2005, filed for record May 25, 2005 at 12:05 p.m., recorded in Deed Book 547, Page 1, aforesaid Records;
(c) As amended November 16, 1983 referred to in that certain General Warranty Deed and Bill of Sale from Georgia Power Company, a Georgia corporation to Municipal Electric Authority of Georgia, a public body corporate and politic and an instrumentality of the State of Georgia, dated March 14, 1984, filed for record March 15, 1984 at 12:10 p.m., recorded in Deed Book 138, Page 405, aforesaid Records.
(d) Purchase, Amendment, Assignment and Assumption Agreement by and between Georgia Power Company and Municipal Electric Authority of Georgia, dated April 9, 1985, as amended, referred to in that certain Plant Vogtle Owners Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units by and between Georgia Power Company, Oglethorpe Power Corporation, the Municipal Electric Authority of Georgia and the City of Dalton, Georgia acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, dated May 13, 2005, filed for record May 25, 2005 at 12:05 p.m., recorded in Deed Book 547, Page 1, aforesaid Records;
B. the Owner Documents, including without limitation, the following:
(a) Plant Vogtle Owners Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units by and between Georgia Power Company, Oglethorpe Power Corporation, the Municipal Electric Authority of Georgia and the City of Dalton, Georgia acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, dated May 13, 2005, filed for record May 25, 2005 at 12:05 p.m., recorded in Deed Book 547, Page 1, aforesaid Records; as amended by that certain Amendment No. 1 to Plant Vogtle Owners Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units by and between Georgia Power Company, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of April 21, 2006, filed for record May 15, 2006 at 3:27 p.m., recorded in Deed Book 598, Page 230, aforesaid Records; as further amended by that certain Amendment No. 2 to Plant Vogtle Owners Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units by and between Georgia Power Company, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of April 8, 2008, filed for record September 10, 2008 at 12:17 p.m., recorded in Deed Book 714, Page 271, aforesaid Records; as further amended by that certain Omnibus Amendment Regarding Plant Vogtle Additional Units Description by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation organized and existing under the Georgia Electric Membership Corporation Act, Municipal Electric Authority of Georgia, a public body corporate and politic and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, d/b/a Dalton Utilities, dated as of December 1, 2013, filed for record __________ __ , 2014 at__: __ __.m., recorded in Deed Book __ , Page __ , aforesaid Records; as affected by that certain Agreement and Amendment No. 3 to Plant Vogtle Owners Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units by and between Georgia Power Company, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia,
City of Dalton, Georgia, acting by and through its Board of Water, Light and Sinking Fund Commissioners d/b/a Dalton Utilities, MEAG Power SPVJ LLC, MEAG Power SPVP LLC and MEAG Power SPVM LLC, dated as of the date hereof, filed for record __________ __ , 2014 at__: __ __.m., recorded in Deed Book __ , Page __ , aforesaid Records;
(b) Plant Alvin W. Vogtle Nuclear Units Amended and Restated Operating Agreement by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia and City of Dalton, Georgia, an incorporated municipality in the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners, dated as of April 21, 2006, filed for record May 15, 2006 at 3:27 p.m., recorded in Deed Book 598, Page 240, aforesaid Records; as amended by that certain Amendment No. 1 to Plant Alvin W. Vogtle Nuclear Units Amended and Restated Operating Agreement by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia and City of Dalton, Georgia, acting by and through its Board of Water, Light and Sinking Fund Commissioners d/b/a Dalton Utilities, dated as of April 8, 2008, filed for record September 10, 2008 at 12:20 p.m., recorded in Deed Book 714, Page 278, aforesaid Records; as further amended by that certain Omnibus Amendment Regarding Plant Vogtle Additional Units Description by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation organized and existing under the Georgia Electric Membership Corporation Act, Municipal Electric Authority of Georgia, a public body corporate and politic and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, d/b/a Dalton Utilities, dated as of December 1, 2013, filed for record __________ __ , 2014 at __: __ __.m., recorded in Deed Book ___ , Page __ , aforesaid Records; as affected by that certain Agreement and Amendment No. 2 to Plant Alvin W. Vogtle Nuclear Units Amended and Restated Operating Agreement by and between Georgia Power Company, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia, City of Dalton, Georgia, acting by and through its Board of Water, Light and Sinking Fund Commissioners d/b/a Dalton Utilities, MEAG Power SPVJ LLC, MEAG Power SPVP LLC and MEAG Power SPVM LLC, dated as of the date hereof, filed for record __________ __ , 2014 at__: __ __.m., recorded in Deed Book __ , Page __ , aforesaid Records;
(c) Declaration of Covenants and Cross-Easements for Vogtle Additional Units by Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia, a public body corporate and politic and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, dated as of April 21, 2006, filed for record May 15, 2006 at 3:27 p.m., recorded in Deed Book 598, Page 35, aforesaid Records; as amended by that certain Omnibus Amendment Regarding Plant Vogtle Additional Units Description by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation organized and existing under the Georgia Electric Membership Corporation Act, Municipal Electric Authority of Georgia, a public body corporate and politic and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund
Commissioners of the City of Dalton, Georgia, d/b/a Dalton Utilities, dated as of December 1, 2013, filed for record __________ __ , 2014 at__: __ __.m., recorded in Deed Book ___ , Page __ , aforesaid Records; as further amended by that certain Amendment to the Declaration of Covenants and Cross-Easements for Vogtle Additional Units by Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia, a public body corporate and politic and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, dated as of December 18, 2013, filed for record __________ __ , 2014 at__: __ __.m., recorded in Deed Book ___ , Page __ , aforesaid Records; and
(d) Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation formed under the laws of the State of Georgia, Municipal Electric Authority of Georgia, a public body corporate and politic and an instrumentality of the State of Georgia and City of Dalton, Georgia, an incorporated municipality of the State of Georgia acting by and through its Board of Water, Light and Sinking Fund Commissioners, dated as of April 21, 2006, filed for record May 15, 2006 at 3:27 p.m., recorded in Deed Book 598, Page 71, aforesaid Records; as amended by that certain Amendment No. 1 to Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation formed under the laws of the State of Georgia, Municipal Electric Authority of Georgia, a public body corporate and politic and an instrumentality of the State of Georgia and City of Dalton, Georgia, an incorporated municipality of the State of Georgia acting by and through its Board of Water, Light and Sinking Fund Commissioners, dated as of April 8, 2008, filed for record September 10, 2008 at 12:22 p.m., recorded in Deed Book 714, Page 285, aforesaid Records; as further amended by that certain Omnibus Amendment Regarding Plant Vogtle Additional Units Description by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation organized and existing under the Georgia Electric Membership Corporation Act, Municipal Electric Authority of Georgia, a public body corporate and politic and City of Dalton, Georgia, an incorporated municipality of the State of Georgia, acting by and through the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia, d/b/a Dalton Utilities, dated as of December 1, 2013, filed for record __________ __ , 2014 at __:__ __.m., recorded in Deed Book ___, Page ___, aforesaid Records; as affected by that certain Agreement and Amendment No. 2 to Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement by and between Georgia Power Company, Oglethorpe Power Corporation (An Electric Membership Corporation), Municipal Electric Authority of Georgia, City of Dalton, Georgia, acting by and through its Board of Water, Light and Sinking Fund Commissioners d/b/a Dalton Utilities, MEAG Power SPVJ LLC, MEAG Power SPVP LLC and MEAG Power SPVM LLC, dated as of the date hereof, filed for record __________ __ , 2014 at__: __ __.m., recorded in Deed Book __ , Page __ , aforesaid Records; as further amended by that certain Owners Consent to Assignment and Direct Agreement and Amendment to Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation organized and existing under the laws of the State of Georgia,
Municipal Electric Authority of Georgia, a public body corporate and politic and an instrumentality of the State of Georgia, the City of Dalton, Georgia, an incorporated municipality of the State of Georgia acting by and through its Board of Water, Light and Sinking Fund Commissioners, the United States Department of Energy acting by and through the Secretary of Energy and PNC Bank, National Association, doing business as Midland Loan Services, a division of PNC Bank, National Association, dated as of __________ __, 2014, filed for record __________ __, 2014 at __:__ __.m., recorded in Deed Book ___, Page ___, aforesaid Records;
C. All those matters as disclosed by that certain plat recorded in File No. A 3120, aforesaid Records;
D. All those matters as disclosed by that certain plat recorded in File No. A 2984, aforesaid Records;
E. All those matters as disclosed by that certain plat recorded in File No. A-2695, aforesaid Records;
F. Terms, conditions and obligations as contained in that certain Owners Consent to Assignment and Direct Agreement and Amendment to Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement by and between Georgia Power Company, a Georgia corporation, Oglethorpe Power Corporation (An Electric Membership Corporation), an electric membership corporation organized and existing under the laws of the State of Georgia, Municipal Electric Authority of Georgia, a public body corporate and politic and an instrumentality of the State of Georgia, the City of Dalton, Georgia, an incorporated municipality of the State of Georgia acting by and through its Board of Water, Light and Sinking Fund Commissioners, the United States Department of Energy acting by and through the Secretary of Energy and PNC Bank, National Association, doing business as Midland Loan Services, a division of PNC Bank, National Association, dated as of __________ __, 2014, filed for record __________ __, 2014 at __:__ __.m., recorded in Deed Book ___, Page ___, aforesaid Records.
G. Those matters as disclosed by that certain survey entitled “ALTA/ACSM Land Title Survey of Plant Vogtle 3&4 For Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, City of Dalton, Chicago Title Insurance Company, U.S. Department of Energy, and PNC Bank, National Association d/b/a Midland Loan Services, a Division of PNC Bank, National Association”, prepared by Lowe Engineers, bearing the seal and certification of Donald C. Sherrill, Georgia Registered Land Surveyor No. 2358, dated March 14, 2013, and certified November 22, 2013, being Drawing Number P319-3, as follows:
(a) Fence crossing the east-central boundary line of subject property.
H. the Liens of the Collateral Agent;
III.
Other Permitted Superior Liens
.
A. the Liens of the Collateral Agent;
B. Liens on and leases of all office furniture, equipment and supplies and all data processing, accounting and other office computer equipment, software and supplies, leased or
purchased in the ordinary course of business, except for any such property that is provided pursuant to the IP Agreements;
C. any Liens or other rights that (i) any one or more of the EPC Contractor and any “Contractor Interests” (as such term is defined in the EPC Contract) may have or obtain in, to or on insurance policies and the proceeds thereof pursuant to or as required by Section 15.4 or Article 16 of the EPC Contract or (ii) Westinghouse Electric Company LLC, a Delaware limited liability company, and any of its suppliers and subcontractors of any tier may have or obtain in, to or on insurance policies and the proceeds thereof pursuant to or as required by Article XII of the Westinghouse Fuel Assembly Agreement or Article XVII of the Westinghouse License Agreement;
D. with respect to any property (including, without limitation, easements, licenses or rights-of-way beneficial to Grantor) acquired after the date of this Deed to Secure Debt and included in the Secured Property:
(a) any (i) Liens encumbering such property or (ii) easements, leases, restrictions, covenants, rights-of-way, exceptions, reservations or other rights affecting such property as of the date of acquisition of such property for streets, roads, bridges, pipes, pipe lines, railroads, spur lines, towers, poles, wires, conduits, mains, metering stations, electric, electronic, optical, or other power or signal transmission and distribution lines, telecommunications and telephone lines, flood rights, river control and development rights, sewage and drainage rights, (and defects and irregularities in title of such property), and in each of cases (i) and (ii) affecting such property as of the date of acquisition of such property, to the extent that such Liens, defects, easements, leases, restrictions, covenants, rights-of-way, exceptions, reservations, other rights and irregularities do not in the aggregate materially impair the ability of any Person to construct or operate the Project or the use of the Secured Property taken as a whole for the purposes for which it is held by the Grantor;
(b) as of the date of acquisition of such property, any restrictions, covenants, defects or irregularities in or other deficiencies of title to any easement or rights-of-way included in such property of or used by the Grantor for pipe lines, telephone lines, telecommunications lines, power lines, towers, poles, wires, conduits, mains, electric transmission lines and distribution lines, substations, metering stations, signal transmission and distribution lines or for similar purposes or appurtenances thereto, or other improvements thereon, and to any real estate of or used or to be used by the Grantor primarily for such easement or right-of-way purposes, if (i) the Grantor shall have obtained from the apparent owner of the lands or estates therein covered by any such easement or right-of-way a sufficient right, by the terms of the instrument granting such right-of-way, to the use thereof for the construction, operation or maintenance of the lines, appurtenances or improvements for which the same are used or are to be used, (ii) the Grantor has power under eminent domain, or similar statutes, to remove such deficiencies, or (iii) such deficiencies may be otherwise remedied without undue effort or expense;
E. easements, leases, restrictions, covenants, rights-of-way, exceptions, reservations or other rights burdening the Secured Property as of the date of this Deed to Secure Debt for streets, roads, bridges, pipes, pipe lines, railroads, spur lines, towers, poles, wires, conduits, mains, metering stations, electric, electronic, optical, or other power or signal transmission and distribution lines, telecommunications and telephone lines, flood rights, river control and development rights, sewage and drainage rights, (and defects and irregularities in title of any property of the Grantor included in the Secured Property and affecting the Secured Property as of the date of this Deed to Secure Debt), to the extent that such easements, leases, restrictions, covenants, rights-of-way, exceptions, reservations, other rights, defects and irregularities (i) do not in the aggregate materially impair the ability of any Person to construct or operate the Project or the use of the Secured Property taken as a whole for the purposes for which it is held by the Grantor and (ii) are not otherwise listed under paragraph II (
Liens Recorded Prior to the Recordation of this Deed to Secure Debt
) above;
F. any restrictions, covenants, defects or irregularities in or other deficiencies of title as of the date of this Deed to Secure Debt to any easement or rights-of-way (included in the Secured Property as of the date of this Deed to Secure Debt) of or used by the Grantor for pipe lines, telephone lines, telecommunications lines, power lines, towers, poles, wires, conduits, mains, electric transmission lines and distribution lines, substations, metering stations, signal transmission and distribution lines or for similar purposes or appurtenances thereto, or other improvements thereon, and to any real estate of or used or to be used by the Grantor primarily for such easement or right-of-way purposes, if (i) the Grantor shall have obtained from the apparent owner of the lands or estates therein covered by any such easement or right-of-way a sufficient right, by the terms of the instrument granting such right-of-way, to the use thereof for the construction, operation or maintenance of the lines, appurtenances or improvements for which the same are used or are to be used, (ii) the Grantor has power under eminent domain, or similar statutes, to remove such deficiencies, or (iii) such deficiencies may be otherwise remedied without undue effort or expense;
IV.
Other Permitted Liens
.
Each of the following Liens, in each case only to the extent such Lien is not otherwise a Permitted Lien under I-III above and is subject and subordinate to the lien of this Deed to Secure Debt:
A. other liens subordinate to the first-priority liens in favor of the Secured Parties hereunder and subject to an intercreditor agreement in form and substance satisfactory to DOE;
B. easements, leases, restrictions, covenants, rights-of-way, exceptions, reservations or other rights burdening the Secured Property for streets, roads, bridges, pipes, pipe lines, railroads, spur lines, towers, poles, wires, conduits, mains, metering stations, electric, electronic, optical, or other power or signal transmission and distribution lines, telecommunications and telephone lines, flood rights, river control and development rights, sewage and drainage rights, to the extent that such easements, leases, restrictions, covenants, rights-of-way, exceptions, reservations and other rights do not in the aggregate materially impair the ability of any Person to construct or operate the Project or the use of the Secured Property taken as a whole for the purposes for which it is held by the Grantor;
C. liens upon lands encumbered by easements, licenses or rights-of-way beneficial to the Grantor for any of the purposes specified in paragraph IV.B. of this definition, securing indebtedness neither created, assumed nor guaranteed by the Grantor nor on account of which it customarily pays interest, to the extent such liens do not in the aggregate materially impair the use of the Secured Property taken as a whole for the purposes for which it is held by the Grantor;
D. rights reserved to or vested in others to take or receive any part of any timber, coal, ore, gas (natural or otherwise), oil or other minerals on the property of the Grantor in the Secured Property, to the extent such rights or the exercise thereof do not in the aggregate materially impair the ability of any Person to construct or operate the Project or the use of the Secured Property taken as a whole for the purposes for which it is held by the Grantor;
E. slope and drainage reservations; and
F. liens which have been bonded for the full amount of the obligations secured by such lien in accordance with all applicable Governmental Rules or for the payment of which adequate security arrangements have been made in the discretion of DOE.
Exhibit 4.5
EXECUTION VERSION
|
|
|
|
After recording return to:
S, Marcus Calloway, Esq.
Calloway Title and Escrow, LLC
Suite 285
4170 Ashford Dunwoody Road
Atlanta, GA. 30319
|
|
PLEASE CROSS REFERENCE TO:
Deed Book 598, Page 71, Burke County, Georgia records,
Deed Book 714, Page 285, Burke County, Georgia records,
Deed Book ___, Page __, Burke County, Georgia records,
Deed Book ___, Page ___, Burke County, Georgia records
Deed Book ___, Page __, Burke County, Georgia records, and
Deed Book ___, Page ___, Burke County, Georgia records
|
OWNERS CONSENT TO ASSIGNMENT AND DIRECT AGREEMENT
AND AMENDMENT TO PLANT ALVIN W. VOGTLE
ADDITIONAL UNITS OWNERSHIP PARTICIPATION AGREEMENT
This OWNERS CONSENT TO ASSIGNMENT AND DIRECT AGREEMENT AND AMENDMENT TO PLANT ALVIN W. VOGTLE ADDITIONAL UNITS OWNERSHIP PARTICIPATION AGREEMENT (this "
Agreement
"), dated as of February 20, 2014, is by and among GEORGIA POWER COMPANY, a corporation organized and existing under the laws of the State of Georgia ("
GPC
"), OGLETHORPE POWER CORPORATION (AN ELECTRIC MEMBERSHIP CORPORATION), an electric membership corporation organized and existing under the laws of the State of Georgia ("
OPC
"), MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA, a public body corporate and politic and an instrumentality of the State of Georgia ("
MEAG
"), and the CITY OF DALTON, GEORGIA, an incorporated municipality in the State of Georgia acting by and through its Board of Water, Light and Sinking Fund Commissioners ("
Dalton
") (GPC, OPC, Dalton and, to the extent it owns an undivided interest in the Project (as defined below), MEAG, being hereinafter individually referred to as an "
Owner
" and, collectively, the "
Owners
"; such term shall also include each MEAG Borrower (if any) that becomes a party to this Agreement by execution of an Accession Agreement described in recital 5), the UNITED STATES DEPARTMENT OF ENERGY acting by and through the Secretary of Energy (or appropriate authorized representative thereof) ("
DOE
"), and PNC BANK, NATIONAL ASSOCIATION, doing business as Midland Loan Services, a division of PNC Bank, National Association (the "
GPC Collateral Agent
").
RECITALS
1. WHEREAS, each of the Owners intends to expand the facilities at the existing nuclear power generating facility commonly known as the Alvin W. Vogtle Electric Generating
Plant located in Burke County, Georgia, near Waynesboro, Georgia, on the west bank of the Savannah River, by developing, constructing, owning, operating and maintaining two additional nuclear generating units, consisting of two Westinghouse AP1000 nuclear reactors, each with a nominally rated generating capacity of approximately 1,100 megawatts, natural draft cooling towers, intake and discharge structures, associated transmission facilities, fuel and ancillary structures supporting the power generation process (collectively, the "
Project
"), located adjacent to such existing facility;
2. WHEREAS, the Owners have entered into the Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement, dated as of April 21, 2006 and recorded in Deed Book 598 at pages 71-229, Burke County, Georgia Records, as amended by Amendment No. 1 dated as of April 8, 2008 and recorded in Deed Book 714 at pages 285-292, Burke County, Georgia Records, as further amended by Omnibus Amendment Regarding Plant Vogtle Additional Units Description, made as of the 1
st
day of December 2013 and recorded or to be recorded in the Burke County, Georgia Records (the "
Omnibus Amendment
") (as amended by this Agreement and as further amended in accordance with this Agreement, the "
Ownership Agreement
");
3. WHEREAS, in connection with the Project, GPC, acting for itself and in its capacity as agent for the other Owners (in such capacity, the "
Owners' Agent
"), entered into that certain Engineering, Procurement and Construction Agreement, dated as of April 8, 2008 (the "
EPC Contract
"), with a consortium consisting of Westinghouse Electric Company LLC and Stone & Webster, Inc. (either or both of Westinghouse Electric Company LLC and Stone & Webster, Inc. being hereinafter referred to, individually or collectively (as the context shall require), as "
EPC Contractor
");
4. WHEREAS, (a) on the date hereof, the Federal Financing Bank, a body corporate and instrumentality of the United States of America ("
FFB
"), DOE, and each of GPC and OPC entered into a Note Purchase Agreement, under which certain promissory notes will be issued by GPC and OPC, respectively, and purchased by FFB; and (b) it is contemplated that one or more wholly owned subsidiaries of MEAG (each a "
MEAG Borrower
", and together with GPC and OPC, each a "
Borrower
" and collectively the "
Borrowers
") may hereafter each enter into a separate Note Purchase Agreement with FFB and DOE or a separate loan agreement, note purchase agreement or other credit documentation with one or more third party lenders and/or DOE (each of the Note Purchase Agreements or such other loan agreements, note purchase agreements or other credit documentation referred to in this recital 4, a "
Note Purchase Agreement
") pursuant to which each such MEAG Borrower will execute certain promissory notes to evidence its indebtedness pursuant to the applicable Note Purchase Agreement (each promissory note or similar obligation executed by a Borrower to evidence its indebtedness pursuant to the applicable Note Purchase Agreement, a "
Promissory Note
");
5. WHEREAS, it is contemplated that (a) each MEAG Borrower will accede to and become a party to this Agreement pursuant to a separate accession agreement substantially in the form of Appendix A attached hereto (each, an "
Accession Agreement
") at the time of the issuance of its Promissory Note, and (b) simultaneously with such MEAG Borrower becoming a party to this Agreement pursuant to an Accession Agreement, the amendments to the Ownership Agreement, the Operating Agreement, the Nuclear Managing Board Agreement and the
Development Agreement set forth in each of the Agreement and Amendment No. 2 to the Ownership Agreement, dated as of the date hereof, by and among the Owners and recorded or to be recorded in the Burke County, Georgia Records, the Agreement and Amendment No. 2 to the Operating Agreement, dated as of the date hereof, by and among the Owners and recorded or to be recorded in the Burke County, Georgia Records, the Agreement and Amendment No. 2 to the Nuclear Managing Board Agreement, dated as of the date hereof, by and among the Owners, and the Agreement and Amendment No. 3 to the Development Agreement, dated as of the date hereof, by and among the Owners and recorded or to be recorded in the Burke County, Georgia Records, will become effective upon satisfaction of the conditions to effectiveness of such amendments set forth therein;
6. WHEREAS, pursuant to those certain Secretary's Guarantees, dated as of the date hereof (in the case of GPC and OPC) and, in the case of a MEAG Borrower, the guarantee instrument(s) identified as a "DOE Guarantee" in the applicable Accession Agreement (collectively, the "
DOE Guarantees
"), by DOE, to and for the benefit of FFB or other third party lenders, DOE is guaranteeing all or a portion of the indebtedness of a Borrower evidenced by its respective Promissory Note or Promissory Notes, as applicable;
7. WHEREAS, pursuant to those certain Loan Guarantee Agreements, dated as of the date hereof (in the case of GPC and OPC) or as of the date of the applicable Accession Agreement (in the case of any MEAG Borrower), by and between each Borrower and DOE (each a "
Loan Guarantee Agreement
"), each Borrower has agreed (or, in the case of a MEAG Borrower, will agree) to reimburse DOE for any payments made by DOE under such Borrower's DOE Guarantee (with respect to a MEAG Borrower, each such Loan Guarantee Agreement, together with the respective Loan Guarantee Documents, Note Purchase Agreement, respective Promissory Notes and the other documents and instruments executed in connection therewith, the "
Credit Facility Documents
");
8. WHEREAS, as security for GPC's reimbursement and other obligations under GPC's Loan Guarantee Agreement and other Loan Guarantee Documents, GPC has concurrently herewith made a collateral assignment of and granted a security interest in, among other collateral, its rights in and to the Assigned Agreements (as defined in Section 1.01) and its undivided ownership interest in the Project (the "
GPC Security Interest
") to the GPC Collateral Agent for the benefit of DOE in accordance with the terms and subject to the conditions of GPC's Security Documents and GPC's other Loan Guarantee Documents (as such terms are defined in Section 1.01);
9. WHEREAS, OPC has made a collateral assignment of its rights and granted a security interest in substantially all of its real and personal tangible assets and certain intangible assets, including its rights in and to the Assigned Agreements and its undivided ownership interest in the Project (the "
OPC Security Interest
") to the OPC Trustee (as defined in Section 1.01) under that certain Indenture, dated as of March 1, 1997, made by OPC to the OPC Trustee (the
"
OPC Indenture
")
, and to evidence and provide security for OPC's obligations to FFB under OPC's Promissory Notes and reimbursement obligations to DOE with respect to any payments made by DOE under OPC's DOE Guarantee, OPC is issuing under the OPC Indenture, in each case, as an Additional Obligation (as defined in the OPC Indenture), (i) two Promissory Notes to FFB and (ii) two reimbursement promissory notes to DOE (the "
DOE Reimbursement Notes
");
10. WHEREAS, as security for each MEAG Borrower's obligations under its respective Credit Facility Documents, it is contemplated that such MEAG Borrower will make a collateral assignment of and grant a security interest in, among other collateral, its rights in and to the Assigned Agreements and its undivided ownership interest in the Project, and that MEAG will pledge all of the equity interests in such MEAG Borrower (each of the foregoing security interests collectively, a "
MEAG Borrower Security Interest
" and, together with the GPC Security Interest and the OPC Security Interest, collectively the "
Security Interests
" and individually a "
Security Interest
"), in each case to a collateral agent or trustee for the benefit of and to be appointed by DOE and/or third party lenders for this purpose and that will accede to this Agreement pursuant to an Accession Agreement (each such collateral agent or trustee, a "
MEAG Borrower Collateral Agent
"; such MEAG Borrower Collateral Agent, DOE and the applicable third party lenders, the "
MEAG Borrower Secured Parties
") in accordance with the terms and subject to the conditions of the respective MEAG Borrower's Security Documents and the respective MEAG Borrower's other Credit Facility Documents; and,
11. WHEREAS, it is a condition precedent to DOE's execution and delivery of the Loan Guarantee Documents with respect to each DOE Guaranteed Loan for the benefit of a Borrower that each of the parties hereto execute and deliver this Agreement and that this Agreement shall have become effective;
NOW, THEREFORE, in consideration of the foregoing, and for other good and valuable consideration, the receipt, adequacy and sufficiency of which are hereby acknowledged, and intending to be legally bound, the parties hereto hereby agree upon the terms and subject to the conditions as follows:
|
|
SECTION 1:
|
Definitions and Interpretation
.
|
1.01
Definitions
. For purposes of this Agreement, the following terms shall have the following meanings:
"
Accession Agreement
" has the meaning ascribed to it in recital 5.
"
Additional Installment Option Payment Amount
" has the meaning ascribed to it in Section 2.08(e)(iv).
"
Additional Offer Notice
" has the meaning ascribed to it in Section 2.08(d)(ii) or Section 2.08(e)(i), as applicable.
"
Additional Proportionate Interests
" has the meaning ascribed to it in Section 2.08(d)(i).
"
Additional Units
" means Vogtle Unit No. 3 and Vogtle Unit No. 4.
"
Advance Notice Period
" has the meaning ascribed to it in Section 2.08(a)(i).
"
Agreement
" has the meaning ascribed to it in the preamble.
"
Agreement Termination Date
" means the first day on which the Debt Termination Date has occurred for all Borrowers.
"
Assigned Agreements
" means the Owner Documents, the IP Agreements and the agreements listed on Appendix B.
"
Bankruptcy Code
" means Title 11 of the United States Code entitled "Bankruptcy", as now and hereafter in effect, or any successor statute.
"
Beacon Software
" means the AP1000-compatible version of Best Estimate Analysis for Core Operation Nuclear - Direct Margin Monitor System and its related deliverables to be used in the operation of the Project.
"
Beacon Software Agreement
" means the agreement, to be entered into after the date of this Agreement by the EPC Contractor and the Owners or the Owners’ Agent if the Beacon Software is not provided pursuant to the EPC Contract, pursuant to which the Owners will acquire the Beacon Software including a license for the use thereof.
"
Borrower(s)
" has the meaning ascribed to it in recital 4; provided, however, that a Borrower shall exclude any Person with respect to which the Debt Termination Date has occurred.
"
Commercial Operation
" means, with respect to an Additional Unit, midnight following the achievement of all of the following with respect to such Additional Unit: (i) successful completion of the requisite performance tests provided for in the EPC Contract; (ii) demonstration by the Owners' Agent that the related transmission facilities have been completed and such Additional Unit is capable of producing and delivering energy to the transmission system; and (iii) such Additional Unit is declared available for dispatch.
"
Continuing Owner
" has the meaning ascribed to it in Section 2.08(c)(i).
"
Continuing Owner Offer Period
" has the meaning ascribed to it in Section 2.08(d)(ii) or Section 2.08(e)(i), as applicable.
"
Continuing Owner Purchase Election
" has the meaning ascribed to it in Section 2.08(d)(ii) or Section 2.08(e)(i), as applicable.
"
Cost Allocation Procedures
" means the Plant Vogtle Cost Allocation Procedures, produced in accordance with the Development Agreement.
"
Cost of Construction
" has the meaning ascribed to it in the Ownership Agreement.
"
Credit Facility Documents
" has the meaning ascribed to it in recital 7.
"
Dalton
" has the meaning ascribed to it in the preamble.
"
Debarment Regulations
" means (i) the Government wide Debarment and Suspension (Non-procurement) regulations (Common Rule), 53 Fed. Reg. 19204 (May 26, 1988), (ii) Subpart 9.4 (Debarment, Suspension, and Ineligibility) of the Federal Acquisition Regulations, 48 C.F.R. 9.400 9.409, and (iii) the revised Government wide Debarment and Suspension (Non-procurement) regulations (Common Rule), 60 Fed. Reg. 33037 (June 26, 1995).
"
Debt Termination Date
" means, with respect to any Person, the first day on which the indebtedness evidenced by all of such Person's Promissory Notes has been Indefeasibly Paid in cash in full (other than unasserted contingent indemnity obligations and other obligations that expressly survive termination of the applicable documents), all commitments of FFB or third party lenders (as applicable) under such Person's Note Purchase Agreement and its other Loan Guarantee Documents or Credit Facility Documents, as applicable, have terminated, and such Person has Indefeasibly Paid in cash all sums due from it under its Loan Guarantee Agreement and its other Loan Guarantee Documents (other than unasserted contingent indemnity obligations and other obligations that expressly survive termination of the applicable documents).
"
Declaration of Covenants
" means the Declaration of Covenants and Cross-Easements for Vogtle Additional Units, made as of April 21, 2006 and recorded in Deed Book 598 at pages 35-70, Burke County, Georgia Records, among the Owners, as amended by the Omnibus Amendment.
"
Defaulting Borrower
" means any Borrower with respect to which an LGA Event of Default has occurred and is continuing.
"
Development Agreement
" means the Plant Vogtle Owners Agreement Authorizing Development, Construction, Licensing and Operation of Additional Generating Units, dated as of May 13, 2005 and recorded in Deed Book 547 at pages 1-35, Burke County, Georgia Records, among the Owners, as amended by Amendment No. 1, dated as of April 21, 2006 and recorded in Deed Book 598 at pages 230-239, Burke County, Georgia Records, as further amended by a letter agreement, dated April 19, 2007, as supplemented by a First Addendum, dated as of April 8, 2008, as further amended by Amendment No. 2, dated as of April 8, 2008 and recorded in Deed Book 714 at pages 271-277, Burke County, Georgia Records, as further amended by the Omnibus Amendment.
"
DOE
" has the meaning ascribed to it in the preamble.
"
DOE Collateral Agent(s)
" means the GPC Collateral Agent, the OPC Trustee or any MEAG Borrower Collateral Agent, as applicable.
"
DOE Cure Payment
" has the meaning ascribed to it in Section 2.04(b).
"
DOE EPC Assumption Election
" has the meaning ascribed to it in Section 2.08(c)(i).
"
DOE EPC Assumption Election Notice
" has the meaning ascribed to it in Section 2.08(c)(i).
"
DOE Guaranteed Loan
" means the indebtedness evidenced by a Promissory Note that is guaranteed, in whole or in part, by DOE pursuant to the applicable DOE Guarantee.
"
DOE Guarantees
" has the meaning ascribed to it in recital 6.
"
DOE Initial Closing Payment Amount
" has the meaning ascribed to it in Section 2.08(d)(iii)(B).
"
DOE Reimbursement Notes
" has the meaning ascribed to it in recital 9.
"
Downgrade Notice
" has the meaning ascribed to it in Section 2.03.
"
Electing Continuing Owner
" has the meaning ascribed to it in Section 2.08(d)(ii) or Section 2.08(e)(i), as applicable.
"
EPC Assignment and Assumption
" has the meaning ascribed to it in Section 2.08(c)(v).
"
EPC Contract
" has the meaning ascribed to it in recital 3.
"
EPC Contract Notice of Termination
" has the meaning ascribed to it in Section 2.08(a)(i).
"
EPC Contract Termination Consultation Period
" has the meaning ascribed to it in Section 2.08(a)(i).
"
EPC Contractor
" has the meaning ascribed to it in recital 3.
"
Exchange Act
" means the Securities and Exchange Act of 1934.
"
Federal Government Business Day
" means any Georgia Business Day other than a day on which FFB or the Federal Reserve Bank of New York is not open for business.
"
FFB
" has the meaning ascribed to it in recital 4.
"
Final Percentage Interest
" has the meaning ascribed to it in the Ownership Agreement. For the avoidance of doubt, the Final Percentage Interest of each Owner is: (i) in the case of GPC, 45.7%; (ii) in the case of MEAG, 22.7%, as the same may be reduced to reflect transfers to one or more of the MEAG Borrowers; (iii) in the case of each MEAG Borrower that becomes an Owner, as provided in the Agreement and Amendment No. 2 to the Ownership Agreement, dated as of the date hereof, by and among the Owners and recorded or to be recorded in the Burke County, Georgia Records; (iv) in the case of OPC, 30%; and (v) in the case of Dalton, 1.6%.
"
Fitch
" means Fitch Ratings, a part of the Fitch Group.
"
Georgia
Business Day
" means any calendar day other than a Saturday, Sunday or legal holiday recognized by the State of Georgia.
"
GPC
" has the meaning ascribed to it in the preamble.
"
GPC Collateral Agent
" has the meaning ascribed to it in the preamble.
"
GPC Security Interest
" has the meaning ascribed to it in recital 8.
"
Indefeasibly Paid
" means (a) at any time before both Additional Units have achieved Commercial Operation (as each such term is defined in the Ownership Agreement), paid by a Borrower and with respect to such payment (i) more than 90 days have passed since the date such payment was made without there having been filed any Insolvency Proceeding with respect
to such Borrower, or (ii) in the event any Insolvency Proceeding shall have been filed with respect to such Borrower within 90 days of the date of such payment, no claim of avoidance with respect to such payment under section 547 of the Bankruptcy Code shall have been made before the expiration of the applicable period prescribed in Section 546(a) of the Bankruptcy Code, and (b) at any time from and after the Commercial Operation of both Additional Units, paid.
"
Individual Purchaser Amount
" has the meaning ascribed to it in Section 2.08(d)(iv)(B).
"
Initial Closing
" has the meaning ascribed to it in Section 2.08(d)(iii).
"
Initial Closing Quarterly Information Date
" has the meaning ascribed to it in Section 2.08(d)(iii)(B).
"
Initial Transferred Proportionate Interest
" has the meaning ascribed to it in Section 2.08(d)(i).
"
Insolvency Proceedings
" means any bankruptcy, insolvency, liquidation, reorganization, restructuring, controlled management, suspension of payments, scheme of arrangement, appointment of provisional liquidator, receiver or administrative receiver, petition for winding up or similar proceeding, under any applicable law, relating to debtor and creditor rights in any jurisdiction and whether voluntary or involuntary.
"
Investment Grade
" means, with respect to a rating given by a Major Rating Agency, (a) in the case of Moody's, a rating equal to or higher than Baa3 (or the equivalent), (b) in the case of S&P, a rating equal to or higher than BBB- (or the equivalent), (c) in the case of Fitch, a rating equal to or higher than BBB- (or the equivalent) and (d) in the case of a Substitute Rating Agency, an investment grade credit rating equivalent to any of the foregoing ratings.
"
IP Agreement Default
" has the meaning ascribed to it in Section 2.04(a).
"
IP Agreement Default Notice
" has the meaning ascribed to it in Section 2.04(a).
"
IP Agreements
" means the EPC Contract, the Westinghouse Fuel Assembly Agreement, the Westinghouse License Agreement, the Software License, the Southern Nuclear Direct Agreement (as defined in each Loan Guarantee Agreement), the Beacon Software Agreement (if any), any replacement agreement for any of the foregoing and any Additional Project Document (as defined in each Loan Guarantee Agreement) for the supply of fuel assemblies and/or related required software for the Project.
"
Knowledge
" means, with respect to any Owner, the actual knowledge of any officer of such Owner.
"
LGA Event of Default
" means, with respect to any Borrower, an "Event of Default" as such term is defined in such Borrower's Loan Guarantee Agreement.
"
Loan Guarantee Agreement
" has the meaning ascribed to it in recital 7.
"
Loan Guarantee Documents
" means, with respect to any Borrower, the Loan Documents as defined in such Borrower's Loan Guarantee Agreement.
"
Major Rating Agencies
" means (a) each of S&P, Moody's and Fitch; and (b) if any of Moody's, S&P or Fitch ceases to rate the relevant Owner or MEAG, as the case may be, or fails to make a rating of such Owner or MEAG, as the case may be, publicly available for reasons outside of the control of such Borrower or (in the case of a MEAG Borrower or MEAG) MEAG, as the case may be, a Substitute Rating Agency.
"
MEAG
" has the meaning ascribed to it in the preamble.
"
MEAG Borrower
" has the meaning ascribed to it in recital 4.
"
MEAG
Borrower
Collateral
Agent
" has the meaning ascribed to it in recital 10.
"
MEAG Borrower Secured Parties
" has the meaning ascribed to it in recital 10.
"
MEAG
Borrower
Security
Interest
" has the meaning ascribed to it in recital 10.
"
MEAG SPV Equity
"
has the meaning ascribed to it in Section 2.02(a).
"
Moody's
" means Moody's Investors Service, Inc.
"
New Aggregate Percentage Interest
" has the meaning ascribed to it in Section 2.08(d)(iv).
"
No Replacement EPC Event
" has the meaning ascribed to it in Section 2.08(b).
"
Non-Continuing Owner
" has the meaning ascribed to it in Section 2.08(c)(i).
"
Non-Continuing Owner Additional Payment Amount
" has the meaning ascribed to it in Section 2.08(d)(iv)(B).
"
Non-Continuing Owner Payment Amount
" has the meaning ascribed to it in Section 2.08(d)(iii)(B).
"
Note
Purchase
Agreement
" has the meaning ascribed to it in recital 4.
"
NRC
" means the U.S. Nuclear Regulatory Commission, an agency of the United States of America.
"
Nuclear Managing Board Agreement
" means the Second Amended and Restated Nuclear Managing Board Agreement for Plant Hatch and Plant Vogtle, dated as of April 21, 2006, among the Owners, as amended by Amendment No. 1 dated as of April 8, 2008.
"
ODA
Cost of Construction
" means, with respect to any Person, without duplication, (a) all Cost of Construction incurred by such Person and (b) with respect to an Additional Unit, all other costs incurred by such Person in connection with the planning, design, licensing, acquisition, construction, completion, startup, commissioning, renewal, addition, modification,
replacement or Decommissioning (as defined in the Ownership Agreement) of the applicable Additional Unit Property (as defined in the Ownership Agreement), or any portion thereof, that are (or, in the case of costs of DOE or its designee, including unreimbursed DOE Cure Payments and costs of DOE contemplated under Section 2.08, would, assuming such costs were costs of an Owner, be) properly recordable in accordance with the Electric Plant Instructions (as defined in the Uniform System of Accounts (as defined in the Ownership Agreement)), including interest cost attributable to the carrying of such Person's respective investment in such Additional Unit Property.
"
Offer Notice
" has the meaning ascribed to it in Section 2.08(d)(ii) or Section 2.08(e)(i), as applicable.
"
Omnibus Amendment
" has the meaning ascribed to it in recital 2.
"
OPC
" has the meaning ascribed to it in the preamble.
"
OPC
Indenture
" has the meaning ascribed to it in recital 9.
"
OPC
Indenture Event of Default
" means an "Event of Default" as such term is defined in the OPC Indenture.
"
OPC Security Interest
"
has the meaning ascribed to it in recital 9.
"
OPC Trustee
" means U.S. Bank National Association, as successor to SunTrust Bank, formerly SunTrust Bank, Atlanta, in its capacity as trustee under the OPC Indenture.
"
Operating Agreement
" means the Plant Alvin W. Vogtle Nuclear Units Amended and Restated Operating Agreement, dated as of April 21, 2006 and recorded in Deed Book 598 at pages 240-290, Burke County, Georgia Records, among the Owners, as amended by Amendment No. 1, dated as of April 8, 2008 and recorded in Deed Book 714 at pages 278-284, Burke County, Georgia Records, as further amended by the Omnibus Amendment.
"
Operator
" means Southern Nuclear Operating Company, Inc., a corporation organized and existing under the laws of the State of Delaware.
"
Owner Documents
" means the Ownership Agreement, the Development Agreement, the Nuclear Managing Board Agreement, the Declaration of Covenants, the Cost Allocation Procedures and the Operating Agreement and all other contracts related to the Project entered into by the Owners related to any adjustments of undivided ownership interests in the Project or any changes material to the role of GPC with respect to the Project as Owners' Agent or otherwise.
"
Owners
" has the meaning ascribed to it in the preamble; provided, however, that following the sale or other transfer by an Owner of all of its Ownership Interest to another Person, such Owner shall no longer be an Owner for purposes of this Agreement.
"
Owners'
Agent
" has the meaning ascribed to it in recital 3.
"
Ownership Agreement
" has the meaning ascribed to it in recital 2.
"
Ownership Agreement IP Default
" has the meaning ascribed to it in Section 2.04(a).
"
Ownership Agreement IP Default Notice
" has the meaning ascribed to it in Section 2.04(a).
"
Ownership Interest
" has the meaning ascribed to it in the Ownership Agreement.
"
Parties
" means, collectively, the Owners, DOE and the GPC Collateral Agent.
"
Person
" means any natural person, corporation, company, partnership, limited liability company, firm, voluntary association, joint venture, trust, unincorporated organization, governmental authority, state instrumentality, political subdivision, or any other entity whether acting in an individual, fiduciary or other capacity.
"
Prior Aggregate Percentage Interest
" has the meaning ascribed to it in Section 2.08(d)(iv).
"
Project
" has the meaning ascribed to it in recital 1.
"
Project Termination Notice
" has the meaning ascribed to it in Section 2.08(a)(i).
"
Promissory Note
" has the meaning ascribed to it in recital 4.
"
Purchaser
" means, (a) with respect to any acquisition of a Non-Continuing Owner's Ownership Interest pursuant to Section 2.08(d), DOE and/or the Electing Continuing Owners, as applicable, individually or collectively (as the context shall require) and (b) with respect to any acquisition of a Non-Continuing Owner's Ownership Interest pursuant to Section 2.08(e), DOE or the Electing Continuing Owners, as applicable, individually or collectively (as the context shall require).
"
Purchaser Additional Payment Amount
" has the meaning ascribed to it in Section 2.08(d)(iv)(B).
"
Purchaser's Ownership Interest
" has the meaning ascribed to it in Section 2.08(d)(v).
"
Replacement EPC Contract
" has the meaning ascribed to it in Section 2.08(a)(i).
"
Replacement EPC Termination Notice
" has the meaning ascribed to it in Section 2.08(a)(i).
"
Retained Ownership Interest
" has the meaning ascribed to it in Section 2.08(d)(v).
"
S&P
" means Standard & Poor's Financial Services LLC.
"
Security
Documents
" means, (a) with respect to GPC, the Deed to Secure Debt (as defined in GPC's Loan Guarantee Agreement), (b) with respect to OPC, the OPC Indenture and (c) with respect to any MEAG Borrower, each mortgage, deed to secure debt, indenture, security
agreement and equity pledge agreement and other similar security document for the benefit of the MEAG Borrower Collateral Agent to which such MEAG Borrower is a party.
"
Security
Interest
" has the meaning ascribed to it in recital 10.
"
Software License
" means the Software License, dated as of April 8, 2008, between GPC, acting for itself and as Owners' Agent, and the EPC Contractor.
"
Subsequent Closing
" has the meaning ascribed to it in Section 2.08(d)(iv).
"
Substitute Rating Agency
" means any "nationally recognized statistical rating organization" within the meaning of Rule 15c3-1(c)(2)(vi)(F) under the Exchange Act selected by the relevant Owner and, if the relevant Owner is a subsidiary of MEAG, MEAG, as the case may be (as certified by its Chief Executive Officer or Chief Financial Officer) as a replacement agency for Moody's, S&P or Fitch, or all of them, as the case may be.
"
Suspension Period
" has the meaning ascribed to it in Section 2.08(c)(iii).
"
Suspension Period Payment Amount
" All costs and expenses incurred by DOE (a) pursuant to its obligation under the first sentence of Section 2.08(c)(iv) or (b) in connection with providing, or pursuant to, any payment assurance or indemnity provided pursuant to the second sentence of Section 2.08(c)(iv).
"
Trust Estate
" has the meaning ascribed to it in the OPC Indenture.
"
Westinghouse Fuel Assembly Agreement
" means the Contract for AP1000 Fuel Fabrication, Design and Related Services, dated as of April 3, 2009, between the Operator, acting as agent for GPC (acting for itself and as agent for the other Owners), collectively as owner, and Westinghouse Electric Company LLC, as amended by Amendment No. 1 dated as of June 21, 2012.
"
Westinghouse License Agreement
" means the Amended and Restated License Agreement, dated February 9, 2012, between Southern Nuclear Operating Company, Inc., for itself and as agent for Alabama Power Company and GPC (acting for itself and as agent for the other Owners), collectively as licensee, and Westinghouse Electric Company LLC.
1.02
Interpretation
. Except as otherwise expressly provided, the following rules of interpretation shall apply to this Agreement:
(a)
the definitions of terms herein shall apply equally to the singular and plural forms of the terms defined;
(b)
whenever the context may require, any pronoun shall include the corresponding masculine, feminine and neuter forms;
(c)
the words "include," "includes" and "including" shall be deemed to be followed by the phrase "without limitation";
(d)
the word "will" shall be construed to have the same meaning and effect as the word "shall";
(e)
unless the context requires otherwise, any definition of or reference to any agreement, instrument or other document herein (i) shall be construed as referring to such agreement, instrument or other document as from time to time amended, supplemented or otherwise modified (subject to any restrictions on such amendments, supplements or modifications set forth herein, therein or in any Loan Guarantee Document), (ii) shall include all documents, instruments or agreements issued or executed in replacement thereof and (iii) shall include any appendices, schedules and exhibits thereto (but shall exclude, in the case of this Agreement, Appendix C hereto, which is provided for illustrative purposes only);
(f)
a reference to a Person includes its successors and permitted assigns, and a reference to an Owner includes any permitted transferee of all or a portion of such Owner's undivided interest in the Project (including, in the case of MEAG, any MEAG Borrower);
(g)
any reference to any applicable law shall include all references to such applicable law as amended from time to time;
(h)
the words "herein," "hereof" and "hereunder," and words of similar import, shall be construed to refer to this Agreement in its entirety and not to any particular provision hereof; and
(i)
all references herein to Articles, Sections and Appendices shall be construed to refer to Articles and Sections of, and Appendices to, this Agreement.
SECTION 2:
Consent to Assignment; General Undertakings
.
2.01.
Acknowledgement of Financing Arrangements
. Each Owner hereby acknowledges that (a) pursuant to the applicable DOE Guarantee, DOE has guaranteed (or, in the case of a MEAG Borrower, will in the future guarantee) the obligations of each Borrower under the Promissory Note issued by such Borrower, which note evidences (or, in the case of a MEAG Borrower, will evidence) the DOE Guaranteed Loan being made (or, in the case of a MEAG Borrower, to be made) available to such Borrower for the purpose of financing a portion of such Borrower's undivided ownership interest in the Project and its obligations under the Ownership Agreement and the EPC Contract; and (b) pursuant to the applicable Security Documents, (i) GPC has granted and each MEAG Borrower will grant a Security Interest in, among other collateral, its rights under the Assigned Agreements and MEAG will grant a Security Interest in all of the equity ownership interests in such MEAG Borrower, to the applicable DOE Collateral Agent as first priority security, subject, in each case, to Permitted Liens (as defined in the applicable Security Document for such Borrower), for the repayment and performance of the obligations of such Borrower arising under or in connection with its respective Loan Guarantee Documents or Credit Facility Documents, as applicable, and (ii) OPC has granted a Security Interest in, among other collateral, its rights under the Assigned Agreements to the OPC Trustee as first priority security, subject to Permitted Exceptions (as defined in the OPC Indenture) for the repayment of the obligations of OPC under its Promissory Notes and DOE Reimbursement Notes.
2.02.
Consent to Security
.
(a)
Each Owner hereby consents to the granting of each Security Interest by each Borrower (including, without the need for further consent or acknowledgement, each grant in the future by a MEAG Borrower contemplated by Section 2.01(b) and, in the case of each MEAG Borrower, the pledge by MEAG of all of the equity ownership interests in such MEAG Borrower (the "
MEAG SPV Equity
")) pursuant to such Borrower's Security Documents and to the exercise of DOE's and the applicable DOE Collateral Agent's rights and remedies thereunder in accordance with the terms of such Security Documents and this Agreement. Notwithstanding any provision of this Agreement to the contrary, DOE and each DOE Collateral Agent party hereto acknowledges and agrees that nothing in this Agreement shall be construed as a consent by OPC, MEAG, any MEAG Borrower or Dalton to any assignment (whether collateral or otherwise) by GPC of any of its rights or obligations in its capacity as agent for the Owners under any of the Owner Documents, and that any such attempted assignment, unless done strictly in accordance with the provisions for removal or resignation of the Owners' Agent in the Owner Documents, shall be null and void.
(b)
Each of the Owners agrees that the grant of the Security Interests by the Borrowers and MEAG pursuant to the Security Documents does not relieve it from its obligation to continue performance of the Assigned Agreements to which it is a party.
2.03.
Notice of Downgrade
. Prior to Commercial Operation of both Additional Units, each Borrower and the Owners' Agent shall give notice to DOE and to each of the other Owners, promptly after (x) such Borrower (or, in the case of a MEAG Borrower, any credit rating applicable to any bonds issued by MEAG in connection with the Project) has been, and (y) in the case of the Owners' Agent, the Owners' Agent obtains Knowledge that any Owner (or, in the case of a MEAG Borrower, any credit rating applicable to any bonds issued by MEAG in connection with the Project) has been, downgraded below Investment Grade by any Major Rating Agency (each such notice, a "
Downgrade Notice
").
2.04.
Notice of Ownership/IP Agreement Payment Defaults; DOE Right to Cure
.
(a)
Upon the occurrence of any payment default by an Owner under the Ownership Agreement (to the extent such payment is required to meet such Owner's payment obligations under any IP Agreement) (an "
Ownership Agreement IP Default
") or any payment default by an Owner (or its agent) under any IP Agreement (an "
IP Agreement Default
"), such Owner (but only if such Owner is a Borrower) and the Owners' Agent shall, (x) not later than five Georgia Business Days after such default, give DOE prompt notice thereof (each such notice, as the case may be, an "
Ownership Agreement IP Default Notice
" or an "
IP Agreement Default Notice
"), and (y) in the case of an IP Agreement Default Notice, promptly after such Person obtains Knowledge of any of the additional facts specified under clauses (i) through (iv) below during the continuance of the IP Agreement Default that materially affect the information previously delivered, give DOE a further notice that shall specify such additional facts in reasonable detail, in each case as of the date of such further notice:
(i)
the amount of the payment default and all damages or other charges (if any) to be paid as a result thereof;
(ii)
an estimate of all other amounts owed by such Owner under the relevant IP Agreement;
(iii)
an estimate of any other overdue liabilities or unperformed obligations of such Owner then outstanding with respect to the Project, including under the Owner Documents and the IP Agreements; and
(iv)
an estimate of any other liabilities or obligations of such Owner under the relevant IP Agreement which are likely to fall due within 90 days after the date of the IP Agreement Default Notice.
(b)
Each Borrower agrees that DOE shall have the right, but not the obligation, to cure any Ownership Agreement IP Default or IP Agreement Default by a Borrower in the event such Ownership Agreement IP Default or IP Agreement Default is not cured by another Owner within five Georgia Business Days following delivery of the Ownership Agreement IP Default Notice or IP Agreement Default Notice, by making such payment on the defaulting Borrower's behalf (each such payment, a "
DOE Cure Payment
") by advancing funds for such purpose on behalf of such Borrower pursuant to such Borrower's Loan Guarantee Agreement and Security Documents.
(c)
Each Owner has the right to reimburse DOE for any DOE Cure Payment. Upon making the reimbursement, the Owner shall have the rights under Section 7.7 of the Ownership Agreement with respect to such reimbursed amount.
(d)
Upon delivering a notice of intent to make an overdue payment on behalf of a defaulting Owner pursuant to Section 7.7(c) of the Ownership Agreement with respect to any Ownership Agreement IP Default, such Owner shall promptly provide DOE with the details of that notice and the amount of the payment.
2.05.
Consultation with DOE Following Notice of Downgrade or Ownership/IP Agreement Default
.
(a)
The Owners and DOE agree that following the delivery of a Downgrade Notice, an Ownership Agreement IP Default Notice or an IP Agreement Default Notice, they will consult with one another as to the impact of such downgrade or default on the Project or the downgraded or defaulting Person's ability to perform its obligations pursuant to the Owner Documents and the IP Agreements, and potential courses of action.
(b)
To facilitate such consultation process, (i) at the request of DOE, each Owner agrees to meet with DOE in Atlanta, Georgia with respect to a Downgrade Notice, an Ownership Agreement IP Default Notice or an IP Agreement Default Notice; and (ii) at the request of Owners holding a majority of the aggregate Ownership Interests (as defined in the Ownership Agreement), DOE agrees to meet with the Owners in Washington, D.C. with respect to a Downgrade Notice, an Ownership Agreement IP Default Notice or an IP Agreement Default Notice. Each such meeting shall be at reasonable times and upon reasonable prior notice by the Person requesting the meeting.
2.06.
Rejection of Ownership Agreement in Bankruptcy
. If a Borrower files for bankruptcy protection and rejects the Ownership Agreement as an executory contract, DOE or the relevant DOE Collateral Agent (or its transferee) will have the right to require that the remaining Owners enter into a replacement agreement for such rejected agreement with DOE (or the DOE Collateral Agent or transferee), as a replacement Owner for the Borrower that rejected the Ownership Agreement, on substantially the same terms and conditions as such rejected agreement.
2.07.
Limitation of Liability for Owners' Agent and for DOE
. In no event shall any action or omission by GPC, as the Owners' Agent, under this Agreement constitute a default by a Borrower under its respective Loan Guarantee Agreement. The provisions of the Ownership Agreement that provide limitations on the liability of GPC with respect to any actions or omissions in its capacity as Owners' Agent shall be applicable to any actions or omissions by GPC, as Owners' Agent, under this Agreement. With respect to any actions or omissions by DOE under this Agreement with respect to any Borrower, the provisions of the applicable Loan Guarantee Agreement that provide limitations on the liability of DOE to such Borrower shall apply to such actions or omissions with respect to such Borrower, except as otherwise expressly provided herein.
2.08
Termination of EPC Contract by Owners' Agent
.
(a) (i) The Owners' Agent shall provide 90 days' prior notice to DOE (such notice, an "
EPC Contract Notice of Termination
") in advance of exercising, in accordance with the terms and conditions of the Owner Documents, the Owners' right under Section 22.3 of the EPC Contract to terminate the EPC Contract (such 90 day period, or such shorter period satisfactory to DOE, the "
Advance Notice Period
"). The Owners' Agent shall deliver a copy of the EPC Contract Notice of Termination to each of the other Owners. The EPC Contract Notice of Termination shall (1) provide the earliest date on which the EPC Contract will be terminated (which date shall not be earlier than 90 days following the date of delivery of the EPC Contract Notice of Termination or such earlier date satisfactory to DOE) and (2) indicate whether the requisite Owners, acting in accordance with the terms and conditions of the Owner Documents, (A) intend to continue with the development and construction of the Project if such Owners are able to enter into a replacement engineering, procurement and construction agreement (a "
Replacement EPC Contract
") on terms and conditions satisfactory to them, acting in accordance with the terms and conditions of the Owner Documents (in which case the EPC Contract Notice of Termination shall constitute a "
Replacement EPC Termination Notice
"), or (B) do not intend to enter into a Replacement EPC Contract (in which case the EPC Contract Notice of Termination shall constitute a "
Project Termination Notice
" and the Advance Notice Period shall constitute an "
EPC Contract Termination Consultation Period
").
(ii) Notwithstanding any other term or provision of this Section 2.08, all actions to be taken by any one or more of the Owners or by the Owners' Agent shall be taken pursuant to and in compliance with the terms and conditions of the Owner Documents. Except as otherwise expressly set forth in this Section 2.08 with respect to (A) authority granted by the Owners to the Owners' Agent to take specific actions
described herein and (B) the rights and obligations of the various Parties to purchase or sell Ownership Interests in accordance with the terms hereof and of the Owner Documents, nothing in this Section 2.08 shall, or shall be construed as, altering, modifying, expanding, contracting, limiting or otherwise changing the respective rights and obligations of each of the Owners with respect to each other Owner or the Owners' Agent, or of the Owners' Agent with respect to the Owners or each Owner, in each case as set forth in the Owner Documents.
(b) In the event the Owners' Agent delivers a Replacement EPC Termination Notice to DOE, the Owners, acting in accordance with the terms and conditions of the Owner Documents, (i) may elect to exercise the Owners' right under Section 22.3 of the EPC Contract to terminate the EPC Contract following the expiration of the Advance Notice Period and (ii) shall have a period of 180 days from the date the Replacement EPC Termination Notice is delivered to DOE during which the Owners that intend to continue with the development and construction of the Project shall seek to enter into a Replacement EPC Contract on terms and conditions satisfactory to them (acting in accordance with the terms and conditions of the Owner Documents) and, with respect to GPC, to the Georgia Public Service Commission. In the event such Owners (acting in accordance with the terms and conditions of the Owner Documents) do not enter into such a Replacement EPC Contract within such 180-day period (such failure to enter into a Replacement EPC Contract, a "
No Replacement EPC Event
"), then each Borrower shall be subject to the obligations, if any, set forth in such Borrower's Loan Guarantee Documents with respect to such No Replacement EPC Event.
(c) (i) In the event the Owners' Agent delivers a Project Termination Notice, each Borrower shall be subject to the obligations, if any, set forth in such Borrower's Loan Guarantee Documents with respect to a Project Termination Notice. During the EPC Contract Termination Consultation Period DOE may elect, subject to Section 2.08(d)(v), to assume in writing all of the rights and obligations under the EPC Contract of (A) GPC (other than in its capacity as Owners' Agent) and (B) the other Owners that have not elected to continue with the development and construction of the Project in accordance with the provisions of Section 3.8 of the Development Agreement (the "
DOE EPC Assumption Election
") by delivering notice of such election to each Owner (the "
DOE EPC Assumption Election Notice
"). GPC and each other Owner that has not elected to continue with the development and construction of the Project in accordance with Section 3.8 of the Development Agreement shall be referred to individually as a "
Non-Continuing Owner
" and collectively as the "
Non-Continuing Owners
." Any Owner (other than GPC) that has elected to continue with the development and construction of the Project in accordance with Section 3.8 of the Development Agreement shall be referred to as a "
Continuing Owner
."
(ii) The rights of the Continuing Owners to continue with the development and construction of the Project with DOE pursuant to this Section 2.08 are in addition to the rights provided to the Continuing Owners to continue with the development and construction of the Project pursuant to Section 3.8 of the Development Agreement.
(iii) As a condition to completing the EPC Assignment and Assumption, DOE must satisfy the requirements of Article 29 of the EPC Contract with respect to an assignee;
provided
,
however,
that if any approvals of any governmental authority, including the NRC, are required as a condition to completing the EPC Assignment and Assumption and cannot be obtained within the EPC Contract Termination Consultation Period, then, upon receipt from DOE of the assurance of payment and indemnity described in the immediately following clause (iv), the Owners' Agent shall exercise the Owners' right to suspend the work under the EPC Contract prior to the expiration of the EPC Contract Termination Consultation Period, and such suspension shall continue until the earlier of (A) such time as such approvals shall have been obtained or (B) the termination of the EPC Contract by the EPC Contractor pursuant to Section 22.5(a)(vi) of the EPC Contract (the "
Suspension Period
"). If, prior to the expiration of the EPC Contract Termination Consultation Period, DOE has not delivered the DOE EPC Assumption Election Notice to the Owners, or DOE has delivered the DOE EPC Assumption Election Notice to the Owners and either (X) all approvals described in the immediately preceding sentence are not obtained within 365 days of the date of such notice or (Y) DOE has failed to make any payment required under Section 2.08(c)(iv) on a timely basis, then the Owners' Agent may exercise the Owners' right under Section 22.3 of the EPC Contract to terminate the EPC Contract.
(iv) All costs and expenses charged by the EPC Contractor, or otherwise chargeable by the Owners' Agent to the Owners pursuant to the Ownership Agreement, for or in connection with a suspension of work under the EPC Contract pursuant to the immediately preceding clause (iii), shall be solely for the account of DOE. The obligation of the Owners' Agent to suspend the work under the EPC Contract pursuant to clause (iii) shall be conditioned upon the prior receipt by the Owners' Agent from DOE of (A) an assurance of payment satisfactory to the Owners' Agent, including that such assurance of payment (and payments to be made thereunder) shall not be subject to appropriations risk, and (B) an indemnity to each Non-Continuing Owner and the Owners' Agent (and their respective officials, advisors, servants, officers, directors, employees, representatives, attorneys and agents) in form and substance satisfactory to it, from and against any cost, loss, expense or damage, including, without limitation, attorney fees and expenses, suffered or incurred by it and arising directly out of such suspension, subject to a cap to be agreed upon by DOE, each Non-Continuing Owner and the Owners' Agent. In the event DOE fails to make any payment required under this Section 2.08(c)(iv) on a timely basis, the Continuing Owners, if any, shall be responsible for, and shall make payment of, any such missed or late payment. Each Continuing Owner shall be responsible for, and shall make payment of, the amount of any late or missed payment realized by multiplying (X) the total amount of such missed or late payment by (Y) the percentage realized by dividing the Ownership Interest of such Continuing Owner by the total Ownership Interests of all Continuing Owners.
(v) In the event DOE has made the DOE EPC Assumption Election in accordance with the requirements of Section 2.08(c)(i), then prior to the later to occur of the expiration of the EPC Contract Termination Consultation Period or the expiration of the Suspension Period, DOE shall assume, in a writing satisfactory to each Non-Continuing Owner and subject to Section 2.08(d)(v), all of the rights and obligations of each Non-Continuing Owner (other than the rights and obligations of GPC in its capacity as Owners' Agent) under the EPC Contract, and each Non-Continuing Owner shall execute
and deliver such additional documentation as shall be reasonably necessary in furtherance of the assignment to, and assumption by, DOE of all of the right, title and interest of each Non-Continuing Owner in and to the EPC Contract (other than any right, title and interest of GPC in its capacity as Owners' Agent) (the "
EPC Assignment and Assumption
").
(vi) In the event DOE has made the DOE EPC Assumption Election in accordance with Section 2.08(c)(i) and DOE has completed the EPC Assignment and Assumption in accordance with the requirements of Section 2.08(c)(v), then one or more of DOE and the Continuing Owners shall have the right to acquire all or a portion (as the case may be) of the Ownership Interest of each Non-Continuing Owner, either in accordance with Section 2.08(d) or in accordance with Section 2.08(e), at any time following receipt of all approvals and consents required by law, including any approval required from the NRC. DOE shall have the sole right to decide whether such acquisition by the Purchaser shall proceed under the provisions of Section 2.08(d) or 2.08(e).
(vii) In the event the Owners' Agent has delivered a Project Termination Notice in accordance with Section 2.08(a)(i), upon the earlier to occur of (A) DOE's completion of the EPC Assignment and Assumption in accordance with Section 2.08(c)(v) or (B) the commencement of the Suspension Period in accordance with Section 2.08(c)(iii), the Non-Continuing Owners shall not be responsible for payment of any Cost of Construction incurred after the date of either such occurrence.
(d)
Dilution Option
. (i) If DOE exercises its right pursuant to Section 2.08(c)(vi) to acquire a portion of the Ownership Interest of each Non-Continuing Owner pursuant to this Section 2.08(d), then such portion with respect to each Non-Continuing Owner shall be referred to in this Section 2.08(d) as the "
Initial Transferred Proportionate Interest
". In the event the Purchaser incurs additional ODA Cost of Construction after the Initial Closing, then the Ownership Interest of the Purchaser shall be adjusted as necessary by acquiring from each Non-Continuing Owner additional portions of the Ownership Interest of each Non-Continuing Owner (the "
Additional Proportionate Interests
") through one or more Subsequent Closings.
(ii) In the event there are any Continuing Owners, in advance of exercising its right pursuant to Section 2.08(c)(vi) to acquire a portion of the Ownership Interest of each Non-Continuing Owner in accordance with this Section 2.08(d), DOE shall first offer each Continuing Owner the opportunity to acquire a pro rata portion of the entire Initial Transferred Proportionate Interest of each Non-Continuing Owner, with such pro rata portion based on the Ownership Interest of each such Continuing Owner in proportion to the aggregate Ownership Interests of the Continuing Owners, by providing a written notice (for purposes of this Section 2.08(d), the "
Offer Notice
") to each Continuing Owner, with a copy of such Offer Notice to each Non-Continuing Owner. During the 120-day period following receipt of the Offer Notice (for purposes of this Section 2.08(d), the "
Continuing Owner Offer Period
"), each Continuing Owner may deliver to DOE (with a copy to each Non-Continuing Owner and each other Continuing Owner) notice of its election, subject to receipt of required regulatory approvals, including any approval required from the NRC, to acquire its pro rata portion of the Initial Transferred Proportionate Interest of each Non-Continuing Owner (for purposes of this
Section 2.08(d), a "
Continuing Owner Purchase Election
" and any Continuing Owner that delivers such a Continuing Owner Purchase Election, an "
Electing Continuing Owner
"). In the event all Continuing Owners are Electing Continuing Owners, then such Electing Continuing Owners shall proceed in an expeditious manner to an Initial Closing in accordance with Section 2.08(d)(iii). In the event there is more than one Continuing Owner, and less than all of the Continuing Owners are Electing Continuing Owners, then DOE shall offer the unaccepted portion of the Initial Transferred Proportionate Interest to the Electing Continuing Owners, on a pro rata basis according to the Ownership Interest of each such Electing Continuing Owner (for purposes of this Section 2.08(d), the "
Additional Offer Notice
"), who shall then have 30 days to accept such Additional Offer Notice by delivering to DOE (with a copy to each Non-Continuing Owner and each other Continuing Owner) notice of such acceptance. In the event any Additional Offer Notice is not accepted, DOE and any Electing Continuing Owners shall proceed in an expeditious manner to an Initial Closing in accordance with Section 2.08(d)(iii). In the event all of the Additional Offer Notices are accepted, the Electing Continuing Owners shall proceed in an expeditious manner to an Initial Closing in accordance with Section 2.08(d)(iii). In the event there are no Electing Continuing Owners during the Continuing Owner Offer Period, then DOE shall proceed in an expeditious manner to an Initial Closing in accordance with Section 2.08(d)(iii).
(iii) Subject to completion of the procedures required by Section 2.08(d)(ii), the Purchaser may deliver to each Non-Continuing Owner and to the Owners' Agent notice of a closing date for the Purchaser's acquisition of the Initial Transferred Proportionate Interest (the "
Initial Closing
"), which date shall not be less than 30 days after the date of delivery of such notice. At the Initial Closing for each Non-Continuing Owner:
(A) each of the Purchaser and such Non-Continuing Owner shall execute and deliver such documentation as shall be reasonably necessary in order to convey and assign to the Purchaser the Initial Transferred Proportionate Interest of such Non-Continuing Owner;
(B) each of DOE and such Non-Continuing Owner shall deliver to each other and each Continuing Owner a report, in such detail as shall reasonably be requested by any such recipient, which shall set forth, as of the date of the most recently completed fiscal quarter of the Owners' Agent and that is at least 60 days prior to the date of the Initial Closing (the "
Initial Closing Quarterly Information Date
"), (1) in the case of such Non-Continuing Owner's report, the aggregate ODA Cost of Construction paid or incurred by the Non-Continuing Owner with respect to such Non-Continuing Owner's Ownership Interest, which shall be net of any refunds received by such Non-Continuing Owner with respect to any disputed amounts paid under the EPC Contract (the "
Non-Continuing Owner Payment Amount
"), and (2) in the case of DOE's report, the aggregate ODA Cost of Construction paid or incurred by DOE or its designee, which shall be net of any refunds received by DOE with respect to any disputed amounts paid under the EPC Contract, multiplied by a fraction, the numerator of which is such Non-Continuing Owner's Ownership Interest and the denominator of which is the
aggregate Ownership Interests of all Non-Continuing Owners (the "
DOE Initial Closing Payment Amount
");
(C) if the Purchaser includes one or more Electing Continuing Owners, (I) such Electing Continuing Owners shall make payment to DOE or its designee in immediately available funds by wire transfer (or other means acceptable to all parties to the Initial Closing) of the DOE Initial Closing Payment Amount (or in the event the Purchaser includes DOE together with one or more Electing Continuing Owners, payment by the Electing Continuing Owners of a pro rata portion of the DOE Initial Closing Payment Amount based on the portion of the Initial Transferred Proportionate Interest to be acquired by the Electing Continuing Owners), and (II) DOE or its designee and such Electing Continuing Owners shall execute and deliver such documentation as shall be reasonably necessary in order to assign to the Purchaser all or a portion (as applicable) of the right, title and interest of DOE in and to the EPC Contract; and
(D) the Electing Continuing Owners shall make payment to DOE or its designee in immediately available funds by wire transfer (or other means acceptable to all parties to the Initial Closing) of the Suspension Period Payment Amount (or, in the event the Purchaser includes DOE together with one or more Electing Continuing Owners, a pro rata portion of the Suspension Period Payment Amount based on the portion of the Initial Transferred Proportionate Interest to be acquired by DOE and the portion of the Initial Transferred Proportionate Interest to be acquired by the Electing Continuing Owners).
For any such Initial Closing with respect to a Non-Continuing Owner, the Initial Transferred Proportionate Interest shall be equal to such Non-Continuing Owner's Final Percentage Interest, multiplied by a fraction, the numerator of which is the DOE Initial Closing Payment Amount with respect to such Non-Continuing Owner and the denominator of which is the sum of the Non-Continuing Owner Payment Amount and the DOE Initial Closing Payment Amount. (For illustrative purposes only, see the calculation set forth in Example 1 on Appendix C attached hereto.)
(iv) In the event an Initial Closing occurs with respect to a Non-Continuing Owner and the Purchaser in such Initial Closing incurs additional ODA Cost of Construction following the Initial Closing Quarterly Information Date, one or more additional closings (each, a "
Subsequent Closing
") will be held, at which the Purchaser will acquire from such Non-Continuing Owner an Additional Proportionate Interest with respect to such Non-Continuing Owner. A Subsequent Closing shall occur on the 60
th
day following the end of any fiscal quarter following the Initial Closing Quarterly Information Date in which the Purchaser incurs such additional ODA Cost of Construction. At any such Subsequent Closing for a Non-Continuing Owner:
(A) each of the Purchaser and such Non-Continuing Owner shall execute and deliver such documentation as shall be reasonably necessary in order to convey and assign to the Purchaser the Additional Proportionate Interest of such Non-Continuing Owner; and
(B) each of such Non-Continuing Owner and each Purchaser shall deliver to each other, each other Purchaser and each Continuing Owner a report, in such detail as shall reasonably be requested by any such recipient, which shall set forth, as of the end of such fiscal quarter, (1) in the case of each Purchaser's report, the aggregate ODA Cost of Construction paid or incurred by such Purchaser through the end of such fiscal quarter, which shall be net of any refunds received by such Purchaser with respect to any disputed amounts paid under the EPC Contract (the "
Individual Purchaser Amount
"; the aggregate of all Individual Purchaser Amounts with respect to such Subsequent Closing, the "
Purchaser Additional Payment Amount
"), and (2) in the case of such Non-Continuing Owner's report, the aggregate ODA Cost of Construction paid or incurred by such Non-Continuing Owner through the end of such fiscal quarter, which shall be net of any refunds received by such Non-Continuing Owner with respect to any disputed amounts paid under the EPC Contract (the "
Non-Continuing Owner Additional Payment Amount
").
The Additional Proportionate Interest to be assigned and conveyed to the Purchaser at any Subsequent Closing shall be equal to the New Aggregate Percentage Interest minus the Prior Aggregate Percentage Interest. With respect to any Subsequent Closing, the "
New Aggregate Percentage Interest
" shall be equal to (X) the amount realized by dividing the Purchaser Additional Payment Amount with respect to such Non-Continuing Owner by an amount equal to the sum of the Non-Continuing Owner Payment Amount and the Purchaser Additional Payment Amount and (Y) multiplying such amount realized by such Non-Continuing Owner's Final Percentage Interest. With respect to any Subsequent Closing, the "
Prior Aggregate Percentage Interest
" shall be equal to the aggregate Ownership Interest of the relevant Non-Continuing Owner conveyed and assigned to the Purchaser through the Initial Closing and all prior Subsequent Closings. (For illustrative purposes only, see the calculation set forth in Example 2 on Appendix C attached hereto.)
(v) The Ownership Interest held by the Purchaser, however acquired, at any particular time in question shall be referred to herein as the "
Purchaser's Ownership Interest
" and the Ownership Interest retained by the Non-Continuing Owner at any particular time in question shall be referred to herein as the "
Retained Ownership Interest
." In connection with an assumption of the EPC Contract by a Purchaser pursuant to this Section 2.08, the Purchaser, on the one hand, and the Non-Continuing Owner, on the other hand, shall share the proceeds of any refunds of previously paid disputed amounts, liquidated damages, warranty claims and other amounts payable to the Owners under or in respect of the EPC Contract pro rata based on the Purchaser's Ownership Interest and the Retained Ownership Interest at the time such proceeds are paid. Any refund of all or any part of the Suspension Period Payment Amount will be paid to DOE (or, if one or more Electing Continuing Owners has acquired all or a portion of the Non-Continuing Owners' Ownership Interests, shared pro rata among DOE and each of the Electing Continuing Owners based on the portion of the Non-Continuing Owners' Ownership Interests acquired by each of them).
(vi) With respect only to an assignment and conveyance of OPC's Ownership Interest pursuant to this Section 2.08(d), the DOE Initial Closing Payment Amount and each Purchaser Additional Payment Amount applicable to OPC's Ownership Interest shall, prior to the applicable Initial Closing or Subsequent Closing, be deemed a loan without interest in a like amount by the applicable Purchaser to OPC (for purposes of the calculations set forth above in this Section 2.08(d) only and not for purposes of the OPC Indenture, such amounts shall be deemed additional ODA Cost of Construction paid or incurred by DOE or its designee and shall not be deemed additional ODA Cost of Construction paid or incurred by OPC). At the applicable Initial Closing or Subsequent Closing, the portion of OPC's Ownership Interest then assigned and conveyed to a Purchaser shall be deemed purchased by such Purchaser for a purchase price equal to the amount of such deemed loan of such Purchaser, and such purchase price shall be deemed paid by such Purchaser through the satisfaction in full of such deemed loan effective automatically upon such Initial Closing or Subsequent Closing, as the case may be.
(e)
Installment Option
. (i) In the event there are any Continuing Owners, in advance of exercising its right pursuant to Section 2.08(c)(vi) to acquire the Ownership Interest of each Non-Continuing Owner in accordance with this Section 2.08(e), DOE shall first offer each Continuing Owner the opportunity to acquire a pro rata portion of the entire Ownership Interest of each Non-Continuing Owner, with such pro rata portion based on the Ownership Interest of each such Continuing Owner in proportion to the aggregate Ownership Interests of the Continuing Owners, by providing a written notice (for purposes of this Section 2.08(e), the "
Offer Notice
") to each Continuing Owner, with a copy of such Offer Notice to each Non-Continuing Owner. During the 120-day period following receipt of the Offer Notice (for purposes of this Section 2.08(e), the "
Continuing Owner Offer Period
"), each Continuing Owner may deliver to DOE (with a copy to each Non-Continuing Owner and each other Continuing Owner) notice of its election, subject to receipt of required regulatory approvals, including any required approvals of the NRC, to acquire its pro rata portion of the entire Ownership Interest of each Non-Continuing Owner (for purposes of this Section 2.08(e), a "
Continuing Owner Purchase Election
" and any Continuing Owner that delivers such a Continuing Owner Purchase Election, an "
Electing Continuing Owner
"). In the event all Continuing Owners are Electing Continuing Owners, then such Electing Continuing Owners shall proceed in an expeditious manner to a closing in accordance with Section 2.08(e)(ii). In the event there is more than one Continuing Owner, and less than all of the Continuing Owners are Electing Continuing Owners, then DOE shall offer the unaccepted portion of the entire Ownership Interest of each Non-Continuing Owner to the Electing Continuing Owners, on a pro rata basis according to the Ownership Interest of each such Electing Continuing Owners (for purposes of this Section 2.08(e), the "
Additional Offer Notice
"), who shall then have 30 days to accept such Additional Offer Notice by delivering to DOE (with a copy to each Non-Continuing Owner and each other Continuing Owner) notice of such acceptance. In the event any Additional Offer Notice is not accepted, DOE shall have the right to acquire the entire Ownership Interest of each Non-Continuing Owner and shall proceed in an expeditious manner to a closing in accordance with Section 2.08(e)(iii), and no Electing Continuing Owner shall have the right to acquire the Ownership Interest of a Non-Continuing Owner. In the event there are no Electing Continuing Owners during the
Continuing Owner Offer Period, then DOE shall proceed in an expeditious manner to a closing in accordance with Section 2.08(e)(iii)
(ii) Subject to completion of the procedures set forth in Section 2.08(e)(i), if one or more Continuing Owners intends to exercise their right pursuant to Section 2.08(c)(vi) to acquire all of the Ownership Interest of each Non-Continuing Owner pursuant to this Section 2.08(e), then such Electing Continuing Owners shall have the right to acquire such Ownership Interest for a purchase price equal to the aggregate ODA Cost of Construction paid or incurred by the Non-Continuing Owner at the time of the closing of the acquisition, payable in immediately available funds at the closing of such acquisition. The Electing Continuing Owners may exercise such right by delivering to DOE, each Non-Continuing Owner and to the Owners' Agent notice of a closing date for the acquisition by the Electing Continuing Owners of all of the Ownership Interest of each Non-Continuing Owner, which date shall not be less than 30 days after the date of delivery of such notice. At the closing for each Non-Continuing Owner:
(A) the Electing Continuing Owners and such Non-Continuing Owner shall execute and deliver such documentation as shall be reasonably necessary in order to convey and assign to the Electing Continuing Owners all of the Ownership Interest of such Non-Continuing Owner;
(B) DOE or its designee and such Electing Continuing Owners shall execute and deliver such documentation as shall be reasonably necessary in order to assign to the Electing Continuing Owners all of the right, title and interest of DOE in and to the EPC Contract; and
(C) the Electing Continuing Owners shall make payment to DOE or its designee in immediately available funds by wire transfer (or other means acceptable to all Parties) of the Suspension Period Payment Amount.
(iii) Subject to completion of the procedures set forth in Section 2.08(e)(i), if DOE elects to acquire all of the Ownership Interest of each Non-Continuing Owner pursuant to this Section 2.08(e), then DOE shall have the right to acquire each such Ownership Interest for a purchase price equal to the aggregate ODA Cost of Construction paid or incurred by the Non-Continuing Owner at the time of the closing of the acquisition, payable in equal payments in 40 consecutive quarterly installments without interest, on (x) if the Non-Continuing Owner is a Borrower, each date for payment of principal or interest or both specified in the applicable Promissory Note, which date is on a quarterly basis, and (y) if the Non-Continuing Owner is not a Borrower, the first Federal Government Business Day of each calendar quarter, in each case commencing with the first complete calendar quarter following the closing date. DOE may exercise such right by delivering to each Non-Continuing Owner and to the Owners' Agent notice of a closing date for the acquisition by DOE or its designee of all of the Ownership Interest of each Non-Continuing Owner, which date shall not be less than 30 days after the date of delivery of such notice. At the closing for each Non-Continuing Owner, DOE or its designee, the Continuing Owners and such Non-Continuing Owner shall execute and deliver such documentation as shall be reasonably necessary in order to convey and
assign to DOE or its designee all of the Ownership Interest of such Non-Continuing Owner and to document the installment purchase by DOE.
(iv) Notwithstanding the provisions of Section 2.08(e)(iii), with respect to the acquisition of OPC's Ownership Interest pursuant to such Section, OPC shall only assign and convey portions of its Ownership Interest as installment payments are made by DOE or its designee, such assignments and conveyances to be in portions equal to OPC's Ownership Interest on the date of the conveyance and assignment multiplied by a fraction, the numerator of which is the sum of (1) the principal amount of the installment payment then being made by DOE or its designee (which installment payment shall be in the amount of the aggregate unreimbursed ODA Cost of Construction of OPC on the date of the conveyance and assignment, which amount shall be net of any refunds received by OPC with respect to any disputed amount under the EPC Contract, multiplied by a fraction the numerator of which is one (1) and the denominator of which is the result of (a) forty (40) minus (b) the number of such installments previously paid by DOE or its designee pursuant to this Section 2.08(e)) and (2) the aggregate additional ODA Cost of Construction paid or incurred by DOE or its designee as of the date of the conveyance and assignment, which amount shall be net of any refunds received by DOE or its designee with respect to any disputed amount under the EPC Contract, multiplied by a fraction, the numerator of which is OPC's Ownership Interest on such date and the denominator of which is the aggregate Ownership Interests of DOE and all Non-Continuing Owners on such date (in each case without regard to such conveyance and assignment), and which amount shall, in the case of subsequent assignments and conveyances, be determined since the date of the immediately preceding assignment and conveyance (the "
Additional Installment Option Payment Amount
"), and the denominator of which is the sum of (I) the aggregate unreimbursed ODA Cost of Construction of OPC on the date of the conveyance and assignment, which amount shall be net of any refunds received by OPC with respect to any disputed amount under the EPC Contract, and (II) the Additional Installment Option Payment Amount. (For illustrative purposes only, see the calculation set forth in Example 3 on Appendix C attached hereto.) With respect to any assignment and conveyance of OPC's Ownership Interest pursuant to this Section 2.08(e), each Additional Installment Option Payment Amount shall, prior to the applicable assignment and conveyance, be deemed a loan without interest in a like amount by DOE to OPC (for purposes of the calculations set forth above in this Section 2.08(e)(iv) only and not for purposes of the OPC Indenture, such amounts shall be deemed additional ODA Cost of Construction paid by DOE or its designee and shall not be deemed additional ODA Cost of Construction paid by OPC). At each assignment and conveyance, the portion of OPC's Ownership Interest then assigned and conveyed based on such Additional Installment Option Payment Amount (and not based upon the installment payments being made pursuant to this Section 2.08(e)) shall be deemed purchased by DOE or its designee for a purchase price equal to the amount of such deemed loan, and such purchase price shall be deemed paid by DOE or its designee by the satisfaction in full of such deemed loan effective automatically upon the applicable closing.
|
|
SECTION 3:
|
Ownership Agreement Amendments
.
|
3.01
Ownership Agreement Amendments
. The Owners hereby amend the Ownership Agreement as set forth in Section 3.02 and Section 3.03.
3.02
Additional Definitions
.
Appendix A
of the Ownership Agreement is hereby amended to add the following definitions in alphabetical order with the other definitions therein:
"
DOE
" means the United States Department of Energy acting by and through the Secretary of Energy (or appropriate authorized representative thereof).
"
DOE Security Document
" means the deed to secure debt, mortgage, indenture, security agreement, equity pledge agreement or other instrument, other than the OPC Indenture, pursuant to which title to the Ownership Interest of any Participating Party (and, in the case of any MEAG SPV, the MEAG SPV Equity in such Participating Party) is granted as security or a lien is created against such title in order to secure (a) indebtedness owed by such Participating Party to an agency or instrumentality of the United States government or other third party lender(s), which indebtedness has been guaranteed, in whole or in part, by DOE, and the proceeds of which are or have been used for the construction of the Additional Units, (b) reimbursement obligations owed by such Participating Party to an agency or instrumentality of the United States government, with respect to payments by such agency or instrumentality under any guarantee with respect to such indebtedness, and (c) other obligations owed by such Participating Party to an agency or instrumentality of the United States government pursuant to the agreements related to the foregoing.
"
DOE Trustee
" means a security title and lien holder under a DOE Security Document.
"
EPC Assignment and Assumption
" has the meaning given such term in the Owners Direct Agreement.
"MEAG SPV Equity"
means the equity ownership interests in each MEAG SPV.
"
Non-Continuing Owner
" has the meaning given such term in the Owners Direct Agreement.
"
Owners Direct Agreement
" means the Owners Consent to Assignment and Direct Agreement and Amendment to Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement among GPC, OPC, MEAG, Dalton, DOE, PNC Bank, National Association, doing business as Midland Loan Services, a division of PNC Bank, National Association, and each MEAG Borrower (as defined therein) that becomes a party thereto, dated as of February 20, 2014.
"
Project Termination Notice
" has the meaning given such term in the Owners Direct Agreement.
"
Suspension Period
" has the meaning given such term in the Owners Direct Agreement.
3.03
Article IV Amended Section
.
Article IV
of the Ownership Agreement is hereby amended to revise Section 4.2 by deleting subsection (g) in its entirety and replacing it with the following new subsection:
(g) In addition to each Participating Party's right to transfer or sell its Ownership Interest under Section 4.2(a), all or any portion of any Participating Party's Ownership Interest in the Additional Units Property (and, in the case of any MEAG SPV, the MEAG SPV Equity) may be transferred or sold pursuant to a foreclosure action or power of sale without complying with the provisions of this Section 4.2 (but only in such instance and without affecting such rights for future transfers), if the transfer or sale is conducted in accordance with this Section 4.2(g).
(i)
This Section 4.2(g) shall apply:
(A)
To all or any portion of OPC's Ownership Interest in the Additional Units Property if (1) an "Event of Default" has occurred and is continuing under the terms of OPC's Indenture ("
OPC Default
"), and (2) an agency or instrumentality of the United States government is a holder of indebtedness secured by OPC's Indenture (the security title and lien holder under the OPC Indenture, the "
OPC Trustee
"); or
(B)
To all or any portion of the Ownership Interest in the Additional Units Property of any Participating Party, other than OPC, if an event of default (howsoever described) has occurred and is continuing under the terms of the DOE Security Document of such Participating Party ("
DOE Default
"); or
(C)
In the case of any MEAG SPV, to all or any portion of the MEAG SPV Equity of such MEAG SPV Participating Party if an applicable DOE Default has occurred and is continuing.
(ii)
Prior to any sale or transfer under this Section 4.2(g) (but without prejudice to any right of the OPC Trustee or the applicable DOE Trustee, as the case may be, to commence the public advertisement process for a public sale), the OPC Trustee in the event of an OPC Default, or the applicable DOE Trustee in the event of a DOE Default (the applicable trustee for such sale or transfer will hereinafter be referred to as the "
Trustee
") shall deliver to the other Participating Parties a written notice of its intention to transfer or sell such Ownership Interest (or, in the case of any MEAG SPV, the MEAG SPV Equity) (the "
Default Sale Notice
"). After receipt of the Default Sale Notice, the other Participating Parties shall have one hundred twenty (120) days to deliver to the Trustee one or more written offers to purchase such Ownership Interest (or MEAG SPV Equity, as applicable) in its entirety on an as-is, where-is basis, without recourse to the Trustee, free and clear of the lien of OPC's Indenture (in the case of an OPC Default) and free and clear of the lien of the applicable DOE Security Document (in the case of a DOE Default), for a cash purchase price identified in such offer, subject only to receipt of all required regulatory approvals (each, a "
Co-Owner Purchase Offer
"). If one or more Co-Owner Purchase Offers are received by the Trustee within such one hundred twenty-day period, the Trustee must, within one hundred eighty (180) days after delivery of the Default Sale Notice:
(A)
identify to all the Participating Parties that submitted Co-Owner Purchase Offers the Co-Owner Purchase Offer that contains the highest purchase price (the "
Prevailing Co-Owner Purchase Offer
"); and
(B)
give notice to such Participating Parties of its acceptance or rejection of the Prevailing Co-Owner Purchase Offer.
(iii)
If the Trustee accepts the Prevailing Co-Owner Purchase Offer, then the other Participating Parties will have the right, within thirty (30) days after notice of such acceptance, to participate in the Prevailing Co-Owner Purchase Offer pro rata in accordance with their respective Ownership Interests or as the Participating Parties may otherwise agree.
(iv)
If the Prevailing Co-Owner Purchase Offer is accepted: (A) such acceptance shall constitute a binding agreement between the Trustee and the purchasing Participating Parties obligating the Trustee to sell, and the purchasing Participating Parties to purchase, the Ownership Interest (or MEAG SPV Equity, as applicable) identified in the Default Sale Notice at the purchase price specified in the Prevailing Co-Owner Purchase Offer, subject only to receipt of all required regulatory approvals; and (B) the purchasing Participating Parties will be obligated to tender the full amount of the purchase price in immediately available funds to the Trustee within ten (10) days of receipt of all regulatory approvals required for such sale, lease or other conveyance.
(v)
If
(A)
the Trustee does not receive any Co-Owner Purchase Offers within the one hundred twenty-day period provided above;
(B)
the purchasing Participating Parties fail to tender the purchase price within the ten-day period as provided above; or
(C)
the Trustee rejects the Prevailing Co-Owner Purchase Offer,
then the Trustee may thereafter proceed to sell, lease or otherwise convey such Ownership Interest (or MEAG SPV Equity, as applicable) to any entity, including any Participating Party, without re-offering such Ownership Interest (or MEAG SPV Equity, as applicable) to the other Participating Parties and without complying with this Section 4.2 (but only in such instance and without affecting such rights for future transfers); provided, however, that the Participating Parties will not be prohibited from participating in any auction or other bid process for such Ownership Interest (or MEAG SPV Equity, as applicable) after any such event; provided, further that any such sale, lease or other conveyance to an entity other than a Participating Party must be made to an entity (1) that is financially responsible, taking into account the remaining obligations at the time of such transfer or sale under this Agreement, the Amended and Restated Operating Agreement and the Nuclear Managing Board Agreement and (2) that, in the case of a transfer of Ownership Interests, becomes a party to, and assumes (i) the rights and obligations of such Participating Party hereunder as a Participating Party solely with respect to the portion of its Ownership Interest in the Additional Units acquired by such
entity, (ii) the rights and obligations of such Participating Party under the Operating Agreement solely with respect to the portion of its "Ownership Interest" in the "Additional Units" (as those terms are defined in the Operating Agreement) acquired by such entity, (iii) the rights and obligations of such Participating Party under the Declaration of Covenants as an "Additional Units Owner" solely with respect to the portion of its ownership interest in the "Additional Units Property" (as those terms are defined in the Declaration of Covenants) acquired by such entity, and (iv) the rights and obligations of such Participating Party under the Nuclear Managing Board Agreement solely as a "Participant" with respect to the portion of its "Undivided Ownership Interest" in the "Additional Units" and related facilities, equipment, inventory and common facilities (as those terms are defined in the Nuclear Managing Board Agreement) acquired by such entity, in each of the foregoing cases (i) through (iv) arising from and after the date of such assumption; provided, further, that if the Trustee has not, within two (2) years after the occurrence of any of the events described in clauses (A) through (C) above, consummated a sale, lease or other conveyance of such Ownership Interest (or MEAG SPV Equity, as applicable), the Trustee may not thereafter sell, lease or otherwise convey such Ownership Interest (or MEAG SPV Equity, as applicable) without first re-offering it to the other Participating Parties in accordance with this Section 4.2(g). So long as NRC approval of such a sale, lease or other conveyance is promptly applied for and pursued with due diligence, such two-year period shall be extended until the NRC grants or denies such approval and such action becomes final and non-appealable.
(vi)
For the avoidance of doubt, nothing in this Section 4.2 requires or permits any entity (including any purchasing Participating Party) that acquires an Ownership Interest of a Participating Party (or MEAG SPV Equity, as applicable) identified in a Default Sale Notice to accede to:
(1) if such Participating Party is Agent under and as defined in this Agreement, the rights and obligations of such Participating Party in its capacity as Agent under this Agreement,
(2) if such Participating Party is "Agent" under and as defined in the Operating Agreement, the rights and obligations of such Participating Party in its capacity as "Agent" under and as defined in the Operating Agreement,
(3) the rights and obligations of such Participating Party in its capacity as "Participating Party" with respect to its "Ownership Interest" in the "Existing Units" under and as those terms are defined in the Operating Agreement,
(4) the rights and obligations of such Participating Party in its capacity as an "Existing Units Owner" under and as defined in the Declaration of Covenants,
(5) if such Participating Party is "Additional Units Agent" under and as defined in the Declaration of Covenants, the rights and obligations of such Participating Party in its capacity as "Additional Units Agent" under and as defined in the Declaration of Covenants,
(6) the rights and obligations of such Participating Party under Paragraph 3(d) of the Declaration of Covenants,
(7) the rights and obligations of such Participating Party in its capacity as "Participant" with respect to an "Undivided Ownership Interest" in the "Existing Units" under and as those terms are defined in the Nuclear Managing Board Agreement,
(8) the rights and obligations of such Participating Party in its capacity as "Participant" with respect to an "Undivided Ownership Interest" in "Plant Hatch" under and as those terms are defined in the Nuclear Managing Board Agreement,
(9) if such Participating Party is "Participants' Agent" under and as defined in the Nuclear Management Board Agreement, the rights and obligations of such Participating Party in its capacity as "Participants' Agent" as agent for the other "Participants" in accordance with the "Participation Agreements" under and as those terms are defined in the Nuclear Managing Board Agreement,
(10) such Participating Party's "Ownership Interest" in the "Existing Units" as those terms are defined in the Operating Agreement,
(11) such Participating Party's "Undivided Ownership Interest" in the "Existing Units" as those terms are defined in the Nuclear Managing Board Agreement,
(12) such Participating Party's "Ownership Interest" in "Plant Hatch" as those terms are defined in the Nuclear Managing Board Agreement, and
(13) if such Participating Party is "Agent" under and as defined in the Development Agreement, the rights and obligations of such Participating Party in its capacity as "Agent" under and as defined in the Development Agreement.
3.04
Article VII Amended Section
.
Article VII
of the Ownership Agreement is hereby amended to revise Section 7.4 by deleting subsection (a) in its entirety and replacing it with the following new subsection:
(a) After the Effective Date but prior to Commercial Operation of each Additional Unit, the Participating Parties shall be responsible for, and shall pay, the Cost of Construction of each Additional Unit incurred after the Effective Date but prior to Commercial Operation in proportion to their respective Ownership Interests in such Additional Units in accordance with the further provisions of this Section 7.4;
provided, however
, that in the event the Agent delivers a Project Termination Notice in accordance with Section 2.08(a)(i) of the Owners Direct Agreement, upon the earlier to occur of (i) DOE's completion of the EPC Assignment and Assumption in accordance with Section 2.08(c)(v) of the Owners Direct Agreement or (ii) the commencement of the Suspension Period in accordance with Section 2.08(c)(iii) of the Owners Direct Agreement, the Non-Continuing Owners shall not be responsible for payment of any Cost of Construction incurred after the date of either such occurrence. All Fuel Costs for each Additional Unit incurred after the Effective Date but prior to Commercial Operation of such
Additional Unit shall be paid by the Parties in accordance with the provisions of Section 4.6 hereof and pursuant to the further provisions of this Section 7.4.
SECTION 4:
Representations and Warranties
.
4.01
Owner Representations and Warranties
. Each Owner hereby represents and warrants to DOE (but only with respect to such Owner making the representation and warranty):
(a)
Due Organization
. (i) GPC is duly organized, validly existing and in good standing under the laws of the State of Georgia; OPC is duly organized, validly existing and in good standing under the laws of the State of Georgia; MEAG is a public body corporate and politic and an instrumentality of the State of Georgia duly organized and validly existing under the laws of the State of Georgia; and Dalton is an incorporated municipality in the State of Georgia duly organized and validly existing under the laws of the State of Georgia.
(ii) Such Owner has the requisite power and authority to own and operate its business and properties and to carry on its business as such business is now being conducted and is duly qualified to do business in the State of Georgia and in any other jurisdiction in which the transaction of its business makes such qualification necessary and the failure to be so qualified would reasonably be expected to have a material adverse effect on such Owner.
(b)
Authorization
. Such Owner has full power and authority to execute and deliver this Agreement and to perform its obligations hereunder, and the execution, delivery and performance of this Agreement by such Owner has been duly authorized by the necessary action on the part of such Owner; this Agreement has been duly executed and delivered by such Owner and is the valid and binding obligation of such Owner enforceable in accordance with its terms, subject to bankruptcy, insolvency, reorganization, moratorium or similar laws for the general relief of creditors and general principles of equity, regardless of whether enforcement is considered in a proceeding at law or in equity.
(c)
Non-Contravention
. The execution, delivery and performance of this Agreement by such Owner and the consummation of the transactions contemplated hereby do not and will not contravene the organizational documents of such Owner and do not and will not conflict with or result in a breach of or default under any material indenture, mortgage, lease, agreement, instrument, judgment, decree, order or ruling to which such Owner is a party or by which it or any of its material properties is bound or affected.
(d)
Approvals
. There are no approvals or consents of governmental authorities or other Persons not yet obtained, the absence of which would materially impair such Owner's ability to execute, deliver and perform its obligations under this Agreement.
(e)
No Previous Assignments
. Such Owner has no notice of, and has not consented to, any previous assignment by any Borrower of all or any part of its rights under the Assigned Agreements (other than the assignment by OPC to the OPC Trustee pursuant to the OPC Indenture).
4.02
Rural Utilities Service
. OPC hereby represents and warrants to each other party to this Agreement, as of the date of this Agreement, that OPC has satisfied all conditions required to be satisfied by it under the loan contract currently in effect between OPC and the Rural Utilities Service in connection with the execution and delivery of, and performance of its obligations under, this Agreement; such execution, delivery and performance do not and will not violate the terms and conditions of such loan contract; and there are no approvals or consents required to be obtained from, or filings or other reports to be made with, the Rural Utilities Service, under such loan contract or otherwise, in connection with such execution, delivery and performance that have not already been obtained or made.
SECTION 5:
Other Covenants of Owners' Agent and Owners
.
5.01
Debarment Regulations
. GPC, as the Owners' Agent, agrees not to enter into any transactions in connection with the Project with any Person who is debarred, suspended, declared ineligible or voluntarily excluded from participation in procurement or non-procurement transactions with any United States federal government department or agency pursuant to any of the Debarment Regulations.
5.02
Timber and Mineral Rights
. The Owners shall not, individually or through the Owners' Agent or the Operator, (a) mine, extract or separate any timber, coal, ore, gas (natural or otherwise), oil or other minerals from the Identified Sites (as defined in the Ownership Agreement) or any other real property rights that constitute Additional Unit Properties (as defined in the Ownership Agreement), or (b) transfer any rights or interests in any such timber, coal, ore, gas (natural or otherwise), oil or other minerals to any other Person, unless, in each of cases (a) and (b), doing so could not reasonably be expected to materially impair the ability of any Person to construct or operate the Project or the use of the collateral that makes up any Security Interest taken as a whole for the purposes for which it is held by the applicable Borrower.
SECTION 6:
Miscellaneous Provisions
.
6.01
Notices and Other Communications
. All notices, consents and other communications provided for herein shall be in writing and shall be delivered by hand or overnight courier service, mailed by certified or registered mail or sent by facsimile or electronic mail as follows:
If to GPC:
Georgia Power Company
241 Ralph McGill Blvd.
Atlanta, GA 30308
Attention: Office of the General Counsel
Facsimile: (404) 506-2725
Email: tpbishop@southernco.com
If to OPC:
Oglethorpe Power Corporation
2100 East Exchange Place
Tucker, Georgia 30034-5336
Attention: Chief Financial Officer
Facsimile: (770) 270-7977
Email: betsy.higgins@opc.com
If to MEAG:
Municipal Electric Authority of Georgia
1470 Riveredge Pkwy, NW
Atlanta, Georgia 30328-4686
Attention: President and CEO
Facsimile: (866) 422-2976
Email: bjohnston@meagpower.org
With a copy to:
Municipal Electric Authority of Georgia
1470 Riveredge Pkwy, NW
Atlanta, Georgia 303028-4686
Attention: Senior Vice President & General Counsel
Facsimile: (866) 422-2976
Email: pdegnan@meagpower.org
If to Dalton:
Board of Water, Light and Sinking Fund
Commissioners of The City of Dalton, Georgia
d/b/a Dalton Utilities
1200 V. D. Parrott, Jr. Parkway
Dalton, Georgia 30721
Attention: CEO
Facsimile: (706) 278-7230
Email: dcope@dutil.com
If to DOE:
United States Department of Energy
Loan Guarantee Program
1000 Independence Avenue, SW
Washington, D.C. 20585
Attn: Director, Portfolio Management
Facsimile: (202) 287-6967
Email: lpo.portfolio@hq.doe.gov
With a copy to:
United States Department of Energy
Loan Guarantee Program
1000 Independence Ave., SW
Washington, D.C. 20585
Attn: Kenneth Cestari
Email: Kenneth.Cestari@hq.doe.gov
Telephone: (202) 287-5523
If to the GPC Collateral Agent:
PNC Bank, National Association,
doing business as Midland Loan Services, a division of PNC Bank, National Association
10851 Mastin Street, Suite 700
Overland Park, KS 66210
Attention: Government Services
Telephone: (913) 253-9000
Facsimile: (913) 253-9709
Email address: mls.doe@midlandls.com
With a copy to (which copy shall not constitute notice):
PNC Bank, National Association,
doing business as Midland Loan Services, a division of PNC Bank, National Association
10851 Mastin Street, Suite 700
Overland Park, KS 66210
Attention: General Counsel
Telephone: (913) 253-9000
Facsimile: (913) 253-9709
Email address: governmentservices@midlandls.com
All notices or other communications required or permitted to be given hereunder shall be considered as properly given (a) if delivered in person, (b) if sent by overnight delivery service, (c) in the event overnight delivery service is not readily available, if mailed by first class mail, postage prepaid, registered or certified with return receipt requested, (d) if sent by facsimile (with such transmission verified by return transmission by first class mail, facsimile or electronic mail), or (e) if transmitted by electronic mail (with such transmission verified by return transmission by first class mail, facsimile or electronic mail). Notice so given shall be effective upon delivery to the addressee, except that (x) communications or notices transmitted by facsimile or other direct electronic means shall be deemed to have been validly and effectively given on the day (if a Federal Government Business Day and, if not, on the next following Federal Government Business Day) on which it is validly transmitted if received (with such receipt subsequently verified by return transmission by first class mail, facsimile or electronic mail) before 2:00 p.m., recipient's time, and if received after that time, on the next following Federal Government Business Day and (y) if any notice is tendered to an addressee and the
delivery thereof is refused by such addressee, such notice shall be effective upon such tender. Any party shall have the right to change its address for notice hereunder to any other location by giving prior notice to the other parties in the manner set forth above.
6.02
Governing Law; Submission to Jurisdiction
.
(a)
The validity, construction, and performance of this Agreement shall be governed by and interpreted in accordance with the laws of the State of Georgia.
(b)
The parties hereto agree to the non-exclusive jurisdiction of the United States District Court for the District of Columbia for any legal proceedings that may be brought by a party hereto arising out of or in connection with this Agreement or for recognition or enforcement of any judgment. Each party hereto accepts, generally and unconditionally, the jurisdiction of the aforesaid court for legal proceedings arising out of or in connection with this Agreement. Each party hereto hereby waives any right to stay or dismiss any action or proceeding under or in connection with this Agreement brought before the foregoing court on the basis of forum non-conveniens or improper venue. For the avoidance of doubt, the parties hereto do not, by this Section 6.02, waive any first-to-file challenges to venue.
6.03
Waiver of Jury Trial
. EACH PARTY HEREBY IRREVOCABLY WAIVES ALL RIGHT TO TRIAL BY JURY IN ANY ACTION, PROCEEDING OR COUNTERCLAIM (WHETHER BASED ON CONTRACT, TORT OR OTHERWISE) ARISING OUT OF OR RELATING TO THIS AGREEMENT.
6.04
Counterparts
. This Agreement may be executed in one or more duplicate counterparts and when signed by all of the parties shall constitute a single binding agreement. The delivery of an executed counterpart of this Agreement by electronic means, including by telecopy, facsimile or by portable document format (PDF) attachment to email, shall be as effective as delivery of an original executed counterpart of this Agreement.
6.05
Headings Descriptive
. Section and subsection headings in this Agreement are included herein for convenience of reference only and shall not affect the construction of or interpretation of and shall not constitute a part of this Agreement for any other purpose or be given any substantive effect.
6.06
Severability
. In case any one or more of the provisions contained in this Agreement should be invalid, illegal or unenforceable in any respect, the validity, legality and enforceability of the remaining provisions shall not in any way be affected or impaired thereby, and the parties thereto shall enter into good faith negotiations to replace the invalid, illegal or unenforceable provision.
6.07
Amendments, Waivers
. No amendment, modification or waiver of any of the provisions of this Agreement will be effective unless in writing (including a writing evidenced by a facsimile transmission) and signed by each of the parties hereto, and any waiver shall be a waiver only with respect to the specific instance involved and shall in no way impair the rights of the parties making such waiver or the obligations of the other parties to such party in any other respect or at any other time.
6.08
Remedies Cumulative
. The rights and remedies of the parties under this Agreement are cumulative, not alternative, and are not exclusive of any rights or remedies provided by law.
6.09
Termination
. The Owners agree not to terminate the Ownership Agreement prior to the Agreement Termination Date. On the Agreement Termination Date, this Agreement shall be deemed terminated and each of the Parties shall be released, relieved and discharged from any obligation or liability hereunder other than any liabilities on the part of a Borrower accruing on or prior to such Borrower's Debt Termination Date, and DOE agrees upon the Agreement Termination Date to provide a written release, discharge and satisfaction of this Agreement;
provided
,
however
, that if DOE has completed the EPC Assignment and Assumption, then Sections 1.01, 1.02, 2.07, 2.08(c)(iv), (vi) and (vii), 2.08(d) and (e), 6.01 through 6.09 (inclusive) and 6.12 through 6.17 (inclusive) shall survive until such time as the Owners no longer have any obligations to DOE under Sections 2.08(c)(vi), 2.08(d) and (e) and DOE no longer has any obligations to the Owners under Section 2.08(c)(iv).
6.10
Successors and Assigns; Accession Agreements
.
(a)
This Agreement may be assigned by a DOE Collateral Agent to a successor collateral agent or trustee in accordance with the applicable Loan Guarantee Documents and otherwise in accordance with the written consent of the other parties hereto. Upon an assignment of this Agreement by any DOE Collateral Agent, such DOE Collateral Agent will be released from its obligations hereunder in accordance with the applicable Loan Guarantee Documents to which it is a party.
(b)
This Agreement may not be assigned by any Borrower without the prior consent of the applicable DOE Collateral Agent in accordance with the applicable Loan Guarantee Documents.
(c)
The parties hereto agree that, upon an Accession Agreement being entered into by a MEAG Borrower and a MEAG Borrower Collateral Agent, without any further action being required by any other party hereto:
(i)
the MEAG Borrower party thereto shall be added to this Agreement as an Owner, MEAG Borrower and Borrower, and shall have all of the rights and obligations of an Owner, MEAG Borrower and Borrower hereunder as if it were a named Owner, MEAG Borrower and Borrower hereunder;
(ii)
the MEAG Borrower Collateral Agent party thereto shall be added to this Agreement as a MEAG Borrower Collateral Agent and DOE Collateral Agent, and shall have all of the rights and obligations of a MEAG Borrower Collateral Agent and DOE Collateral Agent hereunder as if it were a named MEAG Borrower Collateral Agent and DOE Collateral Agent hereunder;
(iii)
this Agreement and the respective rights and obligations of the parties hereto shall continue in full force and effect as and from the date of such Accession Agreement; and
(iv)
all notices, consents and other communications provided to such MEAG Borrower or MEAG Borrower Collateral Agent shall be provided to the respective contact details specified in such Accession Agreement.
6.11
Further Assurances
. Each Owner shall act in a commercially reasonable manner to cooperate with the DOE Collateral Agents and perform all additional acts reasonably requested by them to effectuate the purposes of this Agreement. Each of the parties hereto agrees that it shall act in a commercially reasonable manner to take such further action and shall execute and deliver such additional documents and instruments (in recordable form, if reasonably requested) as any DOE Collateral Agent may reasonably request to effectuate the terms of this Agreement, including to create or perfect in the State of Georgia and elsewhere a Security Interest in favor of any DOE Collateral Agent in and to the Assigned Agreements.
6.12
Entire Agreement
. This Agreement constitutes the entire agreement and understanding of the parties with respect to its subject matter and supersedes all oral communication and prior writings with respect thereto.
6.13
Recordation; Covenants Running with the Land
. This Agreement or a memorandum thereof may be filed of record in the real property records of the county in the State of Georgia in which the Project is located. All provisions of this Agreement, including the benefits and burdens, shall run with the land and be binding upon and inure the benefit of the parties hereto and their respective successors, assigns, personal representatives, lessees, permittees and licensees, and such provisions shall be deemed to be enforceable covenants and equitable servitudes running with the land and shall bind any person having at any time any interest or estate in the rights and benefits granted herein as though such provisions were recited and stipulated in full in each and every deed of conveyance, license or lease thereof or occupancy agreement pertaining thereto.
6.14
Conflict of Documents
. In the event of any ambiguity, conflict or inconsistency between the provisions of this Agreement and the Assigned Agreements, the provisions of this Agreement shall prevail and govern to the extent of such ambiguity, conflict or inconsistency.
6.15
Relationship of Parties
. This Agreement is not intended to and does not create or establish between the parties any relationship as partners, joint venturers, employer and employee, master and servant, or principal and agent.
6.16
Compliance with Applicable Law
. The exercise of the rights and remedies of DOE and each DOE Collateral Agent party hereto pursuant to the Security Documents shall be in accordance with all applicable laws, including, to the extent applicable, receipt of NRC approval for the exercise by such Person of the applicable right or remedy.
6.17
Restrictions on Transfers of Undivided Ownership Interests
. Notwithstanding any provision of this Agreement to the contrary, DOE and each DOE Collateral Agent party hereto acknowledges and agrees that (a) prior to and in connection with any sale by judicial action or power of sale pursuant to a Borrower's Security Documents or otherwise with respect to all or any portion of (i) such Borrower's undivided interest in the Additional Units or (ii) the MEAG SPV Equity, as applicable, the DOE Collateral Agent under such Security Documents
must comply with the provisions of Section 4.2(g) of the Ownership Agreement (as amended hereby), (b) prior to any sale by judicial action or power of sale pursuant to a Borrower's Security Documents or otherwise with respect to all or any portion of (i) such Borrower's undivided interest in the Additional Units or (ii) the MEAG SPV Equity, as applicable, the rights of DOE and each DOE Collateral Agent, whether directly or indirectly through a receiver, to take possession of, or make any payments or perform any obligations with respect to, all or such portion of such Borrower's undivided interest, must be exercised in accordance with the Owner Documents, as amended by (or otherwise as agreed in) this Agreement, and (c) such undivided interest (or MEAG SPV Equity, as applicable) or portion thereof, whether purchased pursuant to any such sale by judicial action or power of sale or otherwise, shall be subject, without limitation, to the Owner Documents, as amended by this Agreement, and the purchaser of any such ownership interests must accede to (i) the rights and obligations of such Borrower under the Ownership Agreement as a "Participating Party" solely with respect to the portion of its "Ownership Interest" in the "Additional Units" (as those terms are defined in the Ownership Agreement) acquired by such purchaser, (ii) the rights and obligations of such Borrower under the Operating Agreement solely with respect to the portion of its "Ownership Interest" in the "Additional Units" (as those terms are defined in the Operating Agreement) acquired by such purchaser, (iii) the rights and obligations of such Borrower under the Declaration of Covenants as an "Additional Units Owner" solely with respect to the portion of its ownership interest in the "Additional Units Property" (as those terms are defined in the Declaration of Covenants) acquired by such purchaser, and (iv) the rights and obligations of such Borrower under the Nuclear Managing Board Agreement solely as a "Participant" with respect to the portion of its "Undivided Ownership Interest" in the "Additional Units" and related facilities, equipment, inventory and common facilities (as those terms are defined in the Nuclear Managing Board Agreement) acquired by such purchaser, in each of the foregoing cases (i) through (iv) arising from and after the date of such assumption. For the avoidance of doubt, nothing in this Section 6.17 requires or permits such purchaser to accede to (1) if such Borrower is "Agent" under and as defined in the Ownership Agreement, the rights and obligations of such Borrower in its capacity as "Agent" under and as defined in the Ownership Agreement, (2) if such Borrower is "Agent" under and as defined in the Operating Agreement, the rights and obligations of such Borrower in its capacity as "Agent" under and as defined in the Operating Agreement, (3) the rights and obligations of such Borrower in its capacity as "Participating Party" with respect to its "Ownership Interest" in the "Existing Units" under and as those terms are defined in the Operating Agreement, (4) the rights and obligations of such Borrower in its capacity as an "Existing Units Owner" under and as defined in the Declaration of Covenants, (5) if such Borrower is "Additional Units Agent" under and as defined in the Declaration of Covenants, the rights and obligations of such Borrower in its capacity as "Additional Units Agent" under and as defined in the Declaration of Covenants, (6) the rights and obligations of such Borrower under Paragraph 3(d) of the Declaration of Covenants, (7) the rights and obligations of such Borrower in its capacity as "Participant" with respect to an "Undivided Ownership Interest" in the "Existing Units" under and as those terms are defined in the Nuclear Managing Board Agreement, (8) the rights and obligations of such Borrower in its capacity as "Participant" with respect to an "Undivided Ownership Interest" in "Plant Hatch" under and as those terms are defined in the Nuclear Managing Board Agreement, (9) if such Borrower is "Participants' Agent" under and as defined in the Nuclear Managing Board Agreement, the rights and obligations of such Borrower in its capacity as "Participants' Agent" as agent for the other "Participants" in
accordance with the "Participation Agreements" under and as those terms are defined in the Nuclear Managing Board Agreement, (10) such Borrower's "Ownership Interest" in the "Existing Units" as those terms are defined in the Operating Agreement, (11) such Borrower's "Undivided Ownership Interest" in the "Existing Units" as those terms are defined in the Nuclear Managing Board Agreement, (12) such Borrower's "Ownership Interest" in "Plant Hatch" as those terms are defined in the Nuclear Managing Board Agreement, and (13) if such Borrower is "Agent" under and as defined in the Development Agreement, the rights and obligations of such Borrower in its capacity as "Agent" under and as defined in the Development Agreement.
6.18
Effectiveness
. By executing this Agreement, the parties hereto agree to be bound by the terms of this Agreement as of the date first written above.
(SIGNATURE PAGE FOLLOWS)
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and delivered by their respective officers or representatives hereunto duly authorized as of the date first above written.
|
|
|
Signed, sealed and delivered in the presence of:
/s/ Jessica N. Ackel
Witness
/s/ Angel R. Robinson
Notary Public
My Commission expires: 9-30-14
Notarial Seal
|
GEORGIA POWER COMPANY,
For itself and as the Owners
'
Agent
By:
/s/ W. Ron Hinson
Name:W. Ron Hinson
Its:Executive Vice President, Chief
Financial Officer and Treasurer
Attest:
/s/ Laura I. Patterson
Its:Comptroller and Assistant Secretary
|
|
(CORPORATE SEAL)
|
|
|
Signed, sealed and delivered in the presence of:
/s/ Shalewa Smith
Witness
/s/ Jean L. Wheeler
Notary Public
My Commission expires: May 7, 2016
Notarial Seal
|
OGLETHORPE POWER CORPORATION (AN ELECTRIC MEMBERSHIP CORPORATION)
By:
/s/ Elizabeth B. Higgins
Name:Elizabeth B. Higgins
Its:Executive Vice President and Chief
Financial Officer
Attest:
/s/ JoAnn Smith
Its:Assistant Secretary
|
|
(CORPORATE SEAL)
|
|
|
Signed, sealed and delivered in the presence of:
/s/ William Jourdain
Witness
/s/ Pam Witherow
Notary Public
My Commission expires: June 13, 2015
Notarial Seal
|
CITY OF DALTON, GEORGIA
BY: BOARD OF WATER, LIGHT AND SINKING FUND COMMISSIONERS
d/b/a DALTON UTILITIES
By:
/s/ Don Cope
Name:Don Cope
Title:President and Chief Executive Officer
Attest:
/s/ Tom Bundros
Its:Chief Operating Officer
|
|
(SEAL)
|
(SIGNATURES CONTINUE ON NEXT PAGE)
|
[Signature Page to Owners Direct Agreement]
|
|
|
Signed, sealed and delivered in the presence of:
/s/ Peter M. Degnan
Witness
/s/ Dale Dyer
Notary Public
My Commission expires: Aug. 22, 2014
Notarial Seal
|
MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA
By:
/s/ Robert P. Johnston
Name:Robert P. Johnston
Its:President and Chief Executive
Officer
Attest:
/s/ Dale Dyer
Its: Asst. to President and Chief
Executive Officer
|
|
(CORPORATE SEAL)
|
|
|
Signed, sealed and delivered in the presence of:
/s/ KJ Heimert
Witness
/s/ Shafia Tanvir
Notary Public
My Commission expires: 10-14-15
Notarial Seal
|
U.S. DEPARTMENT OF ENERGY
By:
/s/ April Stephenson
Name:April Stephenson
Its:Chief Operating Officer, Loan
Programs Office
Attest:
/s/ Kenneth C. Cestari
Its:Attorney - Advisor
|
|
(SEAL)
|
|
|
Signed, sealed and delivered in the presence of:
/s/ Danny Bright
Witness
/s/ Katrina Garrard
Notary Public
My Commission expires: 06/21/15
Notarial Seal
|
PNC BANK, NATIONAL ASSOCIATION,
Doing business as Midland Loan Services, a division of PNC Bank, National Association,
as Collateral Agent
By:
/s/ Bradley J. Hauger
Name:Bradley J. Hauger
Its:Senior Vice President Servicing Officer
Attest: __________________________
Its:
|
|
(SEAL)
|
[Signature Page to Owners Direct Agreement]
Appendix A
[EXECUTED VERSIONS WILL BE SET UP IN RECORDABLE FORM]
FORM OF ACCESSION AGREEMENT
This ACCESSION AGREEMENT, dated as of
[_____]
, 20
[__]
(this "
Accession Agreement
") is made by
[insert name of relevant MEAG Borrower]
, (the "
MEAG Borrower
"), and PNC BANK, NATIONAL ASSOCIATION, doing business as Midland Loan Services, a division of PNC Bank, National Association ("
Midland
"), as collateral agent for DOE (the "
MEAG Borrower Collateral Agent
"), and the UNITED STATES DEPARTMENT OF ENERGY acting by and through the Secretary of Energy (or appropriate authorized representative thereof) ("
DOE
"). All capitalized terms used herein and not otherwise defined shall have the meanings assigned thereto in the Owners Consent to Assignment and Direct Agreement (as defined below).
W
I
T
N E S S E T H:
WHEREAS, pursuant to the Owners Consent to Assignment and Direct Agreement and Amendment to Plant Alvin W. Vogtle Additional Units Ownership Participation Agreement, dated as of February 20, 2014 (the "
Owners Consent to Assignment and Direct Agreement
"), by and among GEORGIA POWER COMPANY, a corporation organized and existing under the laws of the State of Georgia ("
GPC
"), OGLETHORPE POWER CORPORATION (AN ELECTRIC MEMBERSHIP CORPORATION), an electric membership corporation organized and existing under the laws of the State of Georgia ("
OPC
"), MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA, a public body corporate and politic and an instrumentality of the State of Georgia ("
MEAG
"), and the CITY OF DALTON, GEORGIA, an incorporated municipality in the State of Georgia acting by and through its Board of Water, Light and Sinking Fund Commissioners ("
Dalton
"), DOE, and Midland, as the GPC Collateral Agent , it is contemplated that, at the time of entry of any MEAG Borrower into a MEAG Borrower Loan Guarantee Agreement, such MEAG Borrower and a MEAG Borrower Collateral Agent will accede to and become a party to the Owners Consent to Assignment and Direct Agreement pursuant to an Accession Agreement (as defined therein);
WHEREAS,
[on or about the date hereof]
, MEAG has transferred
[
]
% of its ownership interest in the Project to the MEAG Borrower (constituting a
[__]
% undivided ownership interest in the Project);
WHEREAS, as of the date hereof, the MEAG Borrower entered into a Note Purchase Agreement with
[FFB, DOE or other third party lenders thereto]
, under which a DOE Guaranteed Loan is to be made available to the MEAG Borrower for the purpose of financing a portion of the MEAG Borrower's ownership interest in the Project;
WHEREAS, pursuant to
[insert name of applicable guarantee instrument(s)]
, dated as of the date hereof (the "
DOE Guarantee
"), DOE is guaranteeing
[all][a portion of]
the obligations of the MEAG Borrower under such Note Purchase Agreement and the other Credit Facility Documents executed in connection therewith;
WHEREAS, pursuant to a Loan Guarantee Agreement, dated as of the date hereof, between the MEAG Borrower and DOE, the MEAG Borrower has agreed to reimburse DOE for any payments made by DOE under such DOE Guarantee;
WHEREAS, pursuant to certain Security Documents, dated as of the date hereof, as security for the MEAG Borrower's obligations under its respective Credit Facility Documents, the MEAG Borrower has made a collateral assignment of, and has granted a security interest in, among other collateral, its rights in and to the Assigned Agreements and its undivided ownership interest in the Project, and MEAG has pledged all of the equity interests in the MEAG Borrower, in each case to the MEAG Borrower Collateral Agent for the benefit of the MEAG Borrower Secured Parties in accordance with the terms and subject to the conditions of such Security Documents and other Credit Facility Documents;
WHEREAS, the MEAG Borrower and the MEAG Borrower Collateral Agent have agreed to execute this Accession Agreement and to be bound by the Owners Consent to Assignment and Direct Agreement on the terms and conditions contained herein and therein.
NOW, THEREFORE, in consideration of the foregoing, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties hereby agree as follows:
|
|
(1)
|
Subject to the provisions of this Accession Agreement, the MEAG Borrower hereby adopts and agrees to be bound by the terms and conditions of the Owners Consent to Assignment and Direct Agreement as if it were a named Owner, MEAG Borrower and Borrower thereunder, and agrees to be bound by and to comply with all of the obligations of an Owner, MEAG Borrower and Borrower thereunder.
|
|
|
(2)
|
Subject to the provisions of this Accession Agreement, the MEAG Borrower Collateral Agent hereby adopts and agrees to be bound by the terms and conditions of the Owners Consent to Assignment and Direct Agreement as if it were a MEAG Borrower Collateral Agent and DOE Collateral Agent thereunder, and agrees to be bound by and to comply with all of the obligations of a MEAG Borrower Collateral Agent and DOE Collateral Agent thereunder.
|
|
|
(3)
|
The MEAG Borrower (as if it were a named Owner under the Owners Consent to Assignment and Direct Agreement) hereby makes for DOE's benefit all of its respective representations and warranties contained in Section 4 (other than Section 4.01(a)(i)) of the Owners Consent to Assignment and Direct Agreement as though such representations and warranties were set forth in full in this Accession Agreement. The MEAG Borrower hereby represents and warrants that it is duly organized, validly existing and in good standing under the laws of the State of Georgia.
|
|
|
(4)
|
Subject to and as modified by the provisions of this Accession Agreement, the MEAG Borrower and the MEAG Borrower Collateral Agent agree, and each of the parties to the Owners Consent to Assignment and Direct Agreement have agreed therein, that the Owners Consent to Assignment and Direct Agreement and the respective rights and
|
obligations of the parties thereto shall continue in full force and effect as and from the date hereof.
|
|
(5)
|
All notices, consents and other communications provided to or by the MEAG Borrower or the MEAG Borrower Collateral Agent pursuant to this Accession Agreement or the Owners Consent to Assignment and Direct Agreement shall be provided in accordance with Section 6.01 of the Owners Consent to Assignment and Direct Agreement as follows:
|
If to the MEAG Borrower:
[name of MEAG Borrower]
Municipal Electric Authority of Georgia
1470 Riveredge Pkwy, NW
Atlanta, Georgia 30328-4686
Attention: President and CEO
Facsimile: 866-422-2976
Email: bjohnston@meagpower.org
With a copy to:
Municipal Electric Authority of Georgia
1470 Riveredge Pkwy, NW
Atlanta, Georgia 303028-4686
Attention: Senior Vice President & General Counsel
Facsimile: 866-422-2976
Email: pdegnan@meagpower.org
If to the MEAG Borrower Collateral Agent:
[______________________]
[______________________]
Attention:
[_____]
Facsimile:
[_____]
Email:
[_____]
|
|
(6)
|
The provisions of Section 1.02 of the Owners Consent to Assignment and Direct Agreement apply to this Accession Agreement as though they were set out in full in this Accession Agreement, except that references to the Owners Consent to Assignment and Direct Agreement are to be construed as references to this Accession Agreement.
|
|
|
(7)
|
The validity, construction, and performance of this Accession Agreement shall be governed by and interpreted in accordance with the laws of the State of Georgia.
|
|
|
(8)
|
The parties hereto agree to the non-exclusive jurisdiction of the United States District Court for the District of Columbia for any legal proceedings that may be brought by a party hereto arising out of or in connection with this Accession Agreement or for
|
recognition or enforcement of any judgment. Each party hereto accepts, generally and unconditionally, the jurisdiction of the aforesaid court for legal proceedings arising out of or in connection with this Accession Agreement. Each party hereto hereby waives any right to stay or dismiss any action or proceeding under or in connection with this Accession Agreement brought before the foregoing court on the basis of forum non-conveniens or improper venue. For the avoidance of doubt, the parties hereto do not, by this Section 8, waive any first-to-file challenges to venue.
|
|
(9)
|
EACH PARTY HEREBY IRREVOCABLY WAIVES ALL RIGHT TO TRIAL BY JURY IN ANY ACTION, PROCEEDING OR COUNTERCLAIM (WHETHER BASED ON CONTRACT, TORT OR OTHERWISE) ARISING OUT OF OR RELATING TO THIS ACCESSION AGREEMENT.
|
|
|
(10)
|
This Accession Agreement may be executed in one or more duplicate counterparts and when signed by all of the parties shall constitute a single binding agreement. The delivery of an executed counterpart of this Accession Agreement by electronic means, including by telecopy, facsimile or by portable document format (PDF) attachment to email, shall be as effective as delivery of an original executed counterpart of this Accession Agreement.
|
|
|
(11)
|
This Accession Agreement may be assigned by the MEAG Borrower Collateral Agent to a successor collateral agent or trustee in accordance with the MEAG Borrower's Loan Guarantee Documents and otherwise in accordance with the written consent of the other parties to the Owners Consent to Assignment and Direct Agreement. Upon an assignment of this Accession Agreement by the MEAG Borrower Collateral Agent, it will be released from its obligations hereunder in accordance with the MEAG Borrower's Loan Guarantee Documents to which it is a party.
|
|
|
(12)
|
This Accession Agreement may not be assigned by the MEAG Borrower without the prior consent of the MEAG Borrower Collateral Agent in accordance with the applicable Loan Guarantee Documents.
|
|
|
(13)
|
Promptly upon entering into this Accession Agreement, the MEAG Borrower shall deliver a fully-executed copy of this Accession Agreement to each of the other parties to the Owners Consent to Assignment and Direct Agreement.
|
[THE REMAINDER OF THIS PAGE INTENTIONALLY BLANK]
IN WITNESS WHEREOF, the undersigned do hereby affix their signatures as of the date first above written.
[SIGNATURE PAGE WILL BE FORMATTED FOR RECORDING, WITH WITNESS/NOTARY AND ANY OTHER RECORDING REQUIREMENTS]
|
|
[____________________],
as MEAG Borrower
|
|
By: ___________________________________
|
Name:
|
Title:
|
|
[____________________]
,
as MEAG Borrower Collateral Agent
|
|
By: ___________________________________
|
Name:
|
Title:
|
|
U.S. DEPARTMENT OF ENERGY
|
|
By: ___________________________________
|
Name:
|
Title:
|
|
Appendix B
ADDITIONAL ASSIGNED AGREEMENTS
|
|
1.
|
The Contract DE-CR01-09RW09005 (Vogtle Electric Generating Plant, Unit 3), dated November 5, 2008, as amended on November 5, 2008, between the Operator and the U.S. Department of Energy, and the Contract DE-CR01-09RW09006 (Vogtle Electric Generating Plant, Unit 4), dated November 5, 2008, as amended on November 5, 2008, between the Operator and the U.S. Department of Energy;
|
|
|
2.
|
the Amended and Restated Nuclear Operating Agreement, dated as of April 21, 2006, between the Owners' Agent and the Operator;
|
|
|
3.
|
the Letter Agreement, dated July 28, 2006, and the Letter Agreement dated July 30, 2008, in each case between GPC, as Owners' Agent, and the Operator;
|
|
|
4.
|
the Guaranty Agreement, dated as of April 8, 2008, by Toshiba Corporation in favor of GPC, acting for itself and as Owners' Agent;
|
|
|
5.
|
the Guaranty Agreement, dated as of April 8, 2008, by The Shaw Group, Inc. in favor of GPC, acting for itself and as Owners' Agent; and
|
|
|
6.
|
the Additional Project Documents (as defined in each Loan Guarantee Agreement).
|
B
Appendix C
ILLUSTRATIONS
|
|
1.
|
Illustration of an Initial Closing under Section 2.08(d)(iii) (
Dilution Option
)
|
For illustrative purposes only, if GPC was a Non-Continuing Owner and the Non-Continuing Owner Payment Amount for GPC was $1,000,000,000 and the DOE Initial Closing Payment Amount with respect to GPC's Ownership Interest was $1,000,000,000, then the Initial Transferred Proportionate Interest would be equal to 0.5 times GPC's 45.7% Final Percentage Interest, such that GPC would retain a 22.85% Ownership Interest and would assign and convey to the Purchaser a 22.85% Ownership Interest.
|
|
2.
|
Illustration of a Subsequent Closing under Section 2.08(d)(iv) (
Dilution Option
)
|
For illustrative purposes only, if GPC was a Non-Continuing Owner and the Non-Continuing Owner Payment Amount for GPC was $1,000,000,000 and the DOE Initial Closing Payment Amount with respect to GPC's Ownership Interest was $1,000,000,000, then the Initial Transferred Proportionate Interest would be equal to 0.5 times GPC's 45.7% Final Percentage Interest, such that GPC would retain a 22.85% Ownership Interest and would assign and convey to the Purchaser a 22.85% Ownership Interest at the Initial Closing. For such illustrative purposes, assuming the Purchaser incurred $500,000,000 of additional ODA Cost of Construction during the next fiscal quarter and GPC incurred no additional ODA Cost of Construction during the next fiscal quarter (as a Non-Continuing Owner GPC would have no obligation to pay Cost of Construction), then the Purchaser Additional Payment Amount would be equal to $1,500,000,000, the New Aggregate Percentage Interest would be equal to 0.6 times GPC's 45.7% Final Percentage Interest (or 27.42%), and the Additional Proportionate Interest would be equal to 27.42% minus 22.85% (or 4.57%). Following such Subsequent Closing, the Purchaser would own a 27.42% Ownership Interest and GPC would retain an 18.28% Ownership Interest.
|
|
3.
|
Illustration of a closing under Section 2.08(e)(iv) (
Installment Option
)
(
OPC-specific
)
|
|
|
•
|
Assumptions: at the point in time of the EPC Assignment and Assumption (1) OPC is a Non-Continuing Owner, (2) OPC's Ownership Interest is 30% and (3) OPC has aggregate ODA Cost of Construction of $2 billion.
|
|
|
•
|
Under Section 2.08(e) DOE elects to purchase all of OPC's Ownership Interest.
|
|
|
•
|
Prior to the first installment payment, DOE spends $200 million on ODA Cost of Construction relating to OPC's then 30% Ownership Interest; and then between the first installment payment and the second installment payment DOE spends another $200 million on ODA Cost of Construction relating to the 30% Ownership Interest (note, for the formula that amount will be reduced as OPC will no longer own a 30% Ownership Interest -- see below).
|
|
|
•
|
Prior to the first installment payment, OPC spends an additional $20 million on ODA Cost of Construction relating to OPC's then 30% Ownership Interest (property taxes, etc.); and then between the first installment payment and the second installment payment OPC spends
|
another $10 million on ODA Cost of Construction relating to its then reduced Ownership Interest.
|
|
•
|
The first installment payment would be $50.5 million ($2.02 billion in OPC unreimbursed ODA Cost of Construction (the initial $2 billion plus the additional $20 million) x (1 / (40-0))).
|
|
|
•
|
On the first installment payment date, OPC is to transfer an Ownership Interest = 30% x (($50.5 million installment payment + $200 million in DOE ODA Cost of Construction) / ($2.02 billion in OPC unreimbursed ODA Cost of Construction + $200 million in DOE ODA Cost of Construction)). This is 30% x 0.1128. This is 3.384% transferred (so OPC retains 30% - 3.384% or 26.616%).
|
|
|
•
|
On the second installment payment date, OPC is to transfer an Ownership Interest = 26.616% x (($50.76 million installment payment ($1.9795 billion in OPC unreimbursed ODA Cost of Construction (the $2.02 billion referenced in the bullet point above, minus the $50.5 million previous installment, plus the additional $10 million) x (1 / (40-1))) + $177.44 million in DOE ODA Cost of Construction (the portion of the $200 million on 30% bears to 26.616%))/($1.9795 billion in OPC unreimbursed ODA Cost of Construction + $177.44 million in DOE ODA Cost of Construction). This is 26.616% x 0.1058. This is 2.816% transferred (so OPC retains 26.616% - 2.816% or 23.800%).
|