CUSIP No.: 900435108
|
SCHEDULE 13D
|
Page 2 of 18 Pages
|
1
|
NAMES OF REPORTING PERSONS
|
|
|
||
Rio Tinto plc
|
|
|
|||
|
|
||||
2
|
CHECK THE APPROPRIATE BOX IF A MEMBER OF A GROUP
|
(a)
|
☐
|
||
(b)
|
☒
|
||||
|
|
||||
3
|
SEC USE ONLY
|
|
|
||
|
|
|
|||
|
|
||||
4
|
SOURCE OF FUNDS (SEE INSTRUCTIONS)
|
|
|
||
WC
|
|
|
|||
|
|
||||
5
|
CHECK BOX IF DISCLOSURE OF LEGAL PROCEEDINGS IS REQUIRED PURSUANT TO ITEM 2(D) OR 2(E)
|
|
☐
|
||
|
|
||||
|
|
||||
6
|
CITIZENSHIP OR PLACE OF ORGANIZATION
|
|
|
||
England and Wales
|
|
|
|||
|
|
||||
NUMBER OF SHARES BENEFICIALLY OWNED BY EACH REPORTING PERSON WITH
|
7
|
SOLE VOTING POWER
|
|
|
|
-0-
|
|
|
|||
|
|
||||
8
|
SHARED VOTING POWER
|
|
|
||
102,196,643 (see Item 5)
|
|
|
|||
|
|
||||
9
|
SOLE DISPOSITIVE POWER
|
|
|
||
-0-
|
|
|
|||
|
|
||||
10
|
SHARED DISPOSITIVE POWER
|
|
|
||
102,196,643 (see Item 5)
|
|
|
|||
|
|
||||
11
|
AGGREGATE AMOUNT BENEFICIALLY OWNED BY EACH REPORTING PERSON
|
|
|
||
102,196,643 (see Item 5)
|
|
|
|||
|
|
||||
12
|
CHECK BOX IF THE AGGREGATE AMOUNT IN ROW (11) EXCLUDES CERTAIN SHARES (SEE INSTRUCTIONS)
|
|
☐
|
||
|
|
||||
|
|
||||
13
|
PERCENT OF CLASS REPRESENTED BY AMOUNT IN ROW (11)
|
|
|
||
50.8 percent (see Item 5)
|
|
|
|||
|
|
||||
14
|
TYPE OF REPORTING PERSON (SEE INSTRUCTIONS)
|
|
|
||
HC, CO
|
|
|
|||
|
|
CUSIP No.: 900435108
|
SCHEDULE 13D
|
Page 3 of 18 Pages
|
|
1
|
NAMES OF REPORTING PERSONS
|
|
|
||
Rio Tinto International Holdings Limited
|
|
|
|||
|
|
||||
2
|
CHECK THE APPROPRIATE BOX IF A MEMBER OF A GROUP
|
(a)
|
☐
|
||
(b)
|
☒
|
||||
|
|
||||
3
|
SEC USE ONLY
|
|
|
||
|
|
|
|||
|
|
||||
4
|
SOURCE OF FUNDS (SEE INSTRUCTIONS)
|
|
|
||
AF
|
|
|
|||
|
|
||||
5
|
CHECK BOX IF DISCLOSURE OF LEGAL PROCEEDINGS IS REQUIRED PURSUANT TO ITEM 2(D) OR 2(E)
|
|
☐
|
||
|
|
||||
|
|
||||
6
|
CITIZENSHIP OR PLACE OF ORGANIZATION
|
|
|
||
England and Wales
|
|
|
|||
|
|
||||
NUMBER OF SHARES BENEFICIALLY OWNED BY EACH REPORTING PERSON WITH
|
7
|
SOLE VOTING POWER
|
|
|
|
-0-
|
|
|
|||
|
|
||||
8
|
SHARED VOTING POWER
|
|
|
||
43,947,833 (see Item 5 )
|
|
|
|||
|
|
||||
9
|
SOLE DISPOSITIVE POWER
|
|
|
||
-0-
|
|
|
|||
|
|
||||
10
|
SHARED DISPOSITIVE POWER
|
|
|
||
43,947,833 (see Item 5 )
|
|
|
|||
|
|
||||
11
|
AGGREGATE AMOUNT BENEFICIALLY OWNED BY EACH REPORTING PERSON
|
|
|
||
43,947,833 (see Item 5 )
|
|
|
|||
|
|
||||
12
|
CHECK BOX IF THE AGGREGATE AMOUNT IN ROW (11) EXCLUDES CERTAIN SHARES (SEE INSTRUCTIONS)
|
|
☐
|
||
|
|
||||
|
|
||||
13
|
PERCENT OF CLASS REPRESENTED BY AMOUNT IN ROW (11)
|
|
|
||
21.6 percent (see Item 5)
|
|
|
|||
|
|
||||
14
|
TYPE OF REPORTING PERSON (SEE INSTRUCTIONS)
|
|
|
||
HC, CO
|
|
|
|||
|
|
CUSIP No.: 900435108
|
SCHEDULE 13D
|
Page 4 of 18 Pages
|
|
1
|
NAMES OF REPORTING PERSONS
|
|
|
||
7999674 Canada Inc.
|
|
|
|||
|
|
||||
2
|
CHECK THE APPROPRIATE BOX IF A MEMBER OF A GROUP
|
(a)
|
☐
|
||
(b)
|
☒
|
||||
|
|
||||
3
|
SEC USE ONLY
|
|
|
||
|
|
|
|||
|
|
||||
4
|
SOURCE OF FUNDS (SEE INSTRUCTIONS)
|
|
|
||
AF
|
|
|
|||
|
|
||||
5
|
CHECK BOX IF DISCLOSURE OF LEGAL PROCEEDINGS IS REQUIRED PURSUANT TO ITEM 2(D) OR 2(E)
|
|
☐
|
||
|
|
||||
|
|
||||
6
|
CITIZENSHIP OR PLACE OF ORGANIZATION
|
|
|
||
Canada
|
|
|
|||
|
|
||||
NUMBER OF SHARES BENEFICIALLY OWNED BY EACH REPORTING PERSON WITH
|
7
|
SOLE VOTING POWER
|
|
|
|
-0-
|
|
|
|||
|
|
||||
8
|
SHARED VOTING POWER
|
|
|
||
21,510,000 (see Item 5)
|
|
|
|||
|
|
||||
9
|
SOLE DISPOSITIVE POWER
|
|
|
||
-0-
|
|
|
|||
|
|
||||
10
|
SHARED DISPOSITIVE POWER
|
|
|
||
21,510,000 (see Item 5)
|
|
|
|||
|
|
||||
11
|
AGGREGATE AMOUNT BENEFICIALLY OWNED BY EACH REPORTING PERSON
|
|
|
||
21,510,000 (see Item 5)
|
|
|
|||
|
|
||||
12
|
CHECK BOX IF THE AGGREGATE AMOUNT IN ROW (11) EXCLUDES CERTAIN SHARES (SEE INSTRUCTIONS)
|
|
☐
|
||
|
|
||||
|
|
||||
13
|
PERCENT OF CLASS REPRESENTED BY AMOUNT IN ROW (11)
|
|
|
||
10.7 percent (see Item 5)
|
|
|
|||
|
|
||||
14
|
TYPE OF REPORTING PERSON (SEE INSTRUCTIONS)
|
|
|
||
CO
|
|
|
|||
|
|
CUSIP No.: 900435108
|
SCHEDULE 13D
|
Page 5 of 18 Pages
|
|
1
|
NAMES OF REPORTING PERSONS
|
|
|
||
46117 Yukon Inc.
|
|
|
|||
|
|
||||
2
|
CHECK THE APPROPRIATE BOX IF A MEMBER OF A GROUP
|
(a)
|
☐
|
||
(b)
|
☒
|
||||
|
|
||||
3
|
SEC USE ONLY
|
|
|
||
|
|
|
|||
|
|
||||
4
|
SOURCE OF FUNDS (SEE INSTRUCTIONS)
|
|
|
||
AF
|
|
|
|||
|
|
||||
5
|
CHECK BOX IF DISCLOSURE OF LEGAL PROCEEDINGS IS REQUIRED PURSUANT TO ITEM 2(D) OR 2(E)
|
|
☐
|
||
|
|
||||
|
|
||||
6
|
CITIZENSHIP OR PLACE OF ORGANIZATION
|
|
|
||
Canada
|
|
|
|||
|
|
||||
NUMBER OF SHARES BENEFICIALLY OWNED BY EACH REPORTING PERSON WITH
|
7
|
SOLE VOTING POWER
|
|
|
|
-0-
|
|
|
|||
|
|
||||
8
|
SHARED VOTING POWER
|
|
|
||
15,228,810 (see Item 5)
|
|
|
|||
|
|
||||
9
|
SOLE DISPOSITIVE POWER
|
|
|
||
-0-
|
|
|
|||
|
|
||||
10
|
SHARED DISPOSITIVE POWER
|
|
|
||
15,228,810 (see Item 5)
|
|
|
|||
|
|
||||
11
|
AGGREGATE AMOUNT BENEFICIALLY OWNED BY EACH REPORTING PERSON
|
|
|
||
15,228,810 (see Item 5)
|
|
|
|||
|
|
||||
12
|
CHECK BOX IF THE AGGREGATE AMOUNT IN ROW (11) EXCLUDES CERTAIN SHARES (SEE INSTRUCTIONS)
|
|
☐
|
||
|
|
||||
|
|
||||
13
|
PERCENT OF CLASS REPRESENTED BY AMOUNT IN ROW (11)
|
|
|
||
7.6 percent (see Item 5)
|
|
|
|||
|
|
||||
14
|
TYPE OF REPORTING PERSON (SEE INSTRUCTIONS)
|
|
|
||
CO
|
|
|
|||
|
|
CUSIP No.: 900435108
|
SCHEDULE 13D
|
Page 6 of 18 Pages
|
|
1
|
NAMES OF REPORTING PERSONS
|
|
|
||
535630 Yukon Inc.
|
|
|
|||
|
|
||||
2
|
CHECK THE APPROPRIATE BOX IF A MEMBER OF A GROUP
|
(a)
|
☐
|
||
(b)
|
☒
|
||||
|
|
||||
3
|
SEC USE ONLY
|
|
|
||
|
|
|
|||
|
|
||||
4
|
SOURCE OF FUNDS (SEE INSTRUCTIONS)
|
|
|
||
AF
|
|
|
|||
|
|
||||
5
|
CHECK BOX IF DISCLOSURE OF LEGAL PROCEEDINGS IS REQUIRED PURSUANT TO ITEM 2(D) OR 2(E)
|
|
☐
|
||
|
|
||||
|
|
||||
6
|
CITIZENSHIP OR PLACE OF ORGANIZATION
|
|
|
||
Canada
|
|
|
|||
|
|
||||
NUMBER OF SHARES BENEFICIALLY OWNED BY EACH REPORTING PERSON WITH
|
7
|
SOLE VOTING POWER
|
|
|
|
-0-
|
|
|
|||
|
|
||||
8
|
SHARED VOTING POWER
|
|
|
||
21,510,000 (see Item 5)
|
|
|
|||
|
|
||||
9
|
SOLE DISPOSITIVE POWER
|
|
|
||
-0-
|
|
|
|||
|
|
||||
10
|
SHARED DISPOSITIVE POWER
|
|
|
||
21,510,000 (see Item 5)
|
|
|
|||
|
|
||||
11
|
AGGREGATE AMOUNT BENEFICIALLY OWNED BY EACH REPORTING PERSON
|
|
|
||
21,510,000 (see Item 5)
|
|
|
|||
|
|
||||
12
|
CHECK BOX IF THE AGGREGATE AMOUNT IN ROW (11) EXCLUDES CERTAIN SHARES (SEE INSTRUCTIONS)
|
|
☐
|
||
|
|
||||
|
|
||||
13
|
PERCENT OF CLASS REPRESENTED BY AMOUNT IN ROW (11)
|
|
|
||
10.7 percent (see Item 5)
|
|
|
|||
|
|
||||
14
|
TYPE OF REPORTING PERSON (SEE INSTRUCTIONS)
|
|
|
||
CO
|
|
|
|||
|
|
Exhibit
Number |
Description
|
A
|
Heads of Agreement between Rio Tinto International Holdings Limited and Turquoise Hill Resources Ltd, dated April 9, 2021.
|
B
|
Memorandum of Understanding between Rio Tinto International Holdings Limited and Turquoise Hill Resources Ltd, dated September 9, 2020.(1)
|
C
|
Joint Filing Agreement between Rio Tinto plc, Rio Tinto International Holdings Limited, 7999674 Canada Inc., 46117 Yukon Inc. and 535630 Yukon Inc. (2)
|
D
|
Private Placement Agreement between Ivanhoe Mines Ltd. and Rio Tinto International Holdings Limited(3)
|
E
|
Shareholders’ Agreement between Robert M Friedland and Rio Tinto International Holdings Limited(4)
|
F
|
Registration Rights Agreement by and between Ivanhoe Mines Ltd. and Rio Tinto International Holdings Limited(3)
|
G
|
Amending Agreement between Rio Tinto International Holdings Limited and Ivanhoe Mines Ltd.(4)
|
H
|
Heads of Agreement between Rio Tinto International Holdings Limited and Ivanhoe Mines Ltd.(4)
|
I
|
Amending and Additional Rights Agreement between Rio Tinto International Holdings Limited and Ivanhoe Mines Ltd.(5)
|
J
|
Credit Agreement between Rio Tinto International Holdings Limited and Ivanhoe Mines Ltd.(5)
|
K
|
Heads of Agreement between Ivanhoe Mines Ltd. and Rio Tinto International Holdings Limited dated December 8, 2010(6)
|
L
|
Agreement between Rio Tinto International Holdings Limited and the Government of Mongolia dated June 8, 2011(7)
|
M
|
Press Release dated August 24, 2011(8)
|
N
|
Private Placement Agreement between Ivanhoe Mines Ltd. and Rio Tinto International Holdings Limited dated January 18, 2012(9)
|
O
|
Press Release dated January 24, 2012(9)
|
P
|
Memorandum of Agreement between Rio Tinto plc and Ivanhoe Mines Ltd. dated April 17, 2012(10)
|
Q
|
Amending Agreement between Rio Tinto plc and Ivanhoe Mines Ltd. dated May 22, 2012(11)
|
R
|
Press Release dated July 30, 2012(12)
|
S
|
OT Bridge Funding Agreement between Turquoise Hill Resources Ltd. and Rio Tinto South East Asia Limited dated June 28, 2013.(13)
|
T
|
Omnibus Amending Agreement between Turquoise Hill Resources Ltd., Rio Tinto International Holdings Limited and Rio Tinto South East Asia Limited dated June 28, 2013(14)
|
U
|
Binding Term Sheet between Turquoise Hill Resources Ltd., Rio Tinto International Holdings Limited and Rio Tinto South East Asia Limited dated August 7, 2013(15)
|
V
|
Memorandum of Agreement between Turquoise Hill Resources Ltd., Rio Tinto International Holdings Limited and Rio Tinto South East Asia Limited dated August 23, 2013.(16)
|
W
|
New Bridge Funding Agreement between Turquoise Hill Resources Ltd. and Rio Tinto South East Asia Limited dated August 23, 2013.(16)
|
(1)
|
Filed as an exhibit to the amended Schedule 13D on September 14, 2020
|
(2)
|
Filed as an exhibit to the amended Schedule 13D on January 13, 2014.
|
(3)
|
Filed as an exhibit to the original Schedule 13D on November 3, 2006.
|
(4)
|
Filed as an exhibit to the amended Schedule 13D on September 12, 2007.
|
(5)
|
Filed as an exhibit to the amended Schedule 13D on October 26, 2007.
|
(6)
|
Filed as an exhibit to the amended and restated Schedule 13D on December 14, 2010.
|
(7)
|
Filed as an exhibit to the amended Schedule 13D on June 28, 2011.
|
(8)
|
Filed as an exhibit to the amended Schedule 13D on August 24, 2011.
|
(9)
|
Filed as an exhibit to the amended Schedule 13D on January 26, 2012.
|
(10)
|
Filed as an exhibit to the amended Schedule 13D on April 20, 2012.
|
(11)
|
Filed as an exhibit to the amended Schedule 13D on May 24, 2012.
|
(12)
|
Filed as an exhibit to the amended Schedule 13D on August 2, 2012.
|
(13)
|
Filed as an exhibit to the amended Schedule 13D on July 9, 2013. Confidential treatment has been requested. Confidential material has been redacted and separately filed with the SEC.
|
(14)
|
Filed as an exhibit to the amended Schedule 13D on July 3, 2013.
|
(15)
|
Filed as an exhibit to the amended Schedule 13D on August 14, 2013. Confidential treatment has been requested. Confidential material has been redacted and separately filed with the SEC.
|
(16)
|
Filed as an exhibit to the amended Schedule 13D on August 23, 2013. Confidential treatment has been requested. Confidential material has been redacted and separately filed with the SEC.
|
Rio Tinto plc
|
||
|
||
By:
|
/s/ Steven Allen
|
|
Name: Steven Allen
|
||
Title: Company Secretary
|
Rio Tinto International Holdings Limited
|
||
|
||
By:
|
/s/ Steven Allen
|
|
Name: Steven Allen
|
||
Title: Director
|
7999674 Canada Inc.
|
||
|
||
By:
|
/s/ Julie Parent
|
|
Name: Julie Parent
|
||
Title: Secretary
|
46117 Yukon Inc.
|
||
|
||
By:
|
/s/ Julie Parent
|
|
Name: Julie Parent
|
||
Title: Secretary
|
535630 Yukon Inc.
|
||
|
||
By:
|
/s/ Julie Parent
|
|
Name: Julie Parent
|
||
Title: Secretary
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Directors
|
|
|
|
|||
Simon Thompson
|
|
Chairman of Rio Tinto
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United Kingdom
|
Jakob Stausholm
|
|
Chief Executive, Rio Tinto
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
Denmark
|
Megan Clark AC
|
|
Company Director
|
|
Level 7, 360 Collins Street
Melbourne VIC 3000
Australia
|
|
Australia
|
Simon Henry
|
|
Company Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United Kingdom
|
Sam Laidlaw
|
|
Company Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United Kingdom
|
Hinda Gharbi
|
|
Company Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
Australia
|
Michael L’Estrange AO
|
|
Company Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
Australia
|
Simon McKeon AO
|
|
Company Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
Australia
|
Jennifer Nason
|
|
Company Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United States / Australia
|
Ngaire Woods CBE
|
Company Director
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
United Kingdom
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Executive Officers
|
|
|
|
|||
Jakob Stausholm
|
|
Chief Executive, Rio Tinto
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
Denmark
|
Bold Baatar
|
|
Chief Executive, Rio Tinto Copper
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
Mongolia
|
Alf Barrios
|
|
Chief Commercial Officer
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
Spain / United States
|
Peter Cunningham
|
|
Interim Chief Financial Officer
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United Kingdom
|
Mark Davies
|
Group Executive, Safety, Technology & Projects
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
Australia
|
|||
Sinead Kaufman
|
Chief Executive, Rio Tinto Minerals
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
Ireland /Australia
|
|||
Barbara Levi
|
|
Chief Legal Officer & External Affairs
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
Italy
|
James Martin
|
Chief People Officer
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
United Kingdom
|
|||
Kellie Parker
|
Chief Executive Australia
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
Australia
|
|||
Arnaud Soirat
|
Chief Operating Officer
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
France
|
|||
Peter Toth
|
Group Executive, Strategy and Development
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
Hungary /Australia
|
|||
Simon Trott
|
Chief Executive, Rio Tinto Iron Ore
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
Australia
|
|||
Ivan Vella
|
Chief Executive, Aluminum
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
Australia
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Directors
|
|
|
|
|||
Matthew Cox
|
|
Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United Kingdom
|
Steven Allen
|
|
Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United Kingdom
|
John Kiddle
|
|
Director
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United Kingdom
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Executive Officers
|
|
|
|
|||
Rio Tinto Secretariat Limited
|
|
Secretary
|
|
6 St James’s Square
London SW1Y 4AD
United Kingdom
|
|
United Kingdom
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Directors
|
|
|
|
|||
Robert Morgan
|
|
Director and President
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Julie Parent
|
|
Director and Secretary
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Executive Officers
|
|
|
|
|||
Robert Morgan
|
|
President
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Julie Parent
|
|
Secretary
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Director
|
|
|
|
|||
Robert Morgan
|
|
Director and President
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Executive Officers
|
|
|
|
|||
Robert Morgan
|
|
President
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Julie Parent
|
|
Secretary
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Directors
|
|
|
|
|||
Robert Morgan
|
|
Director and President
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Julie Parent
|
|
Director and Secretary
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Name
|
|
Present Principal
Occupation
|
|
Business Address
|
|
Citizenship
|
Executive Officers
|
|
|
|
|||
Robert Morgan
|
|
President
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Julie Parent
|
|
Secretary
|
|
400-1190 Avenue des Canadiens-de-Montréal,
Montreal QC H3B 0E3 Canada
|
|
Canada
|
Exhibit
Number |
|
Description
|
A
|
Heads of Agreement between Rio Tinto International Holdings Limited and Turquoise Hill Resources Ltd, dated April 9, 2021.
|
|
B
|
|
Memorandum of Understanding between Rio Tinto International Holdings Limited and Turquoise Hill Resources Ltd, September 9, 2020.(1)
|
C
|
Joint Filing Agreement between Rio Tinto plc, Rio Tinto International Holdings Limited, 7999674 Canada Inc., 46117 Yukon Inc. and 535630 Yukon Inc. (2)
|
|
D
|
|
Private Placement Agreement between Ivanhoe Mines Ltd. and Rio Tinto International Holdings Limited(3)
|
E
|
|
Shareholders’ Agreement between Robert M Friedland and Rio Tinto International Holdings Limited(3)
|
F
|
|
Registration Rights Agreement by and between Ivanhoe Mines Ltd. and Rio Tinto International Holdings Limited(3)
|
G
|
|
Amending Agreement between Rio Tinto International Holdings Limited and Ivanhoe Mines Ltd.(4)
|
H
|
|
Heads of Agreement between Rio Tinto International Holdings Limited and Ivanhoe Mines Ltd.(4)
|
I
|
|
Amending and Additional Rights Agreement between Rio Tinto International Holdings Limited and Ivanhoe Mines Ltd.(5)
|
J
|
|
Credit Agreement between Rio Tinto International Holdings Limited and Ivanhoe Mines Ltd.(5)
|
K
|
|
Heads of Agreement between Ivanhoe Mines Ltd. and Rio Tinto International Holdings Limited dated December 8, 2010(6)
|
L
|
|
Agreement between Rio Tinto International Holdings Limited and the Government of Mongolia dated June 8, 2011(7)
|
M
|
|
Press Release dated August 24, 2011(8)
|
N
|
|
Private Placement Agreement between Ivanhoe Mines Ltd. and Rio Tinto International Holdings Limited dated January 18, 2012(9)
|
O
|
|
Press Release dated January 24, 2012(9)
|
P
|
|
Memorandum of Agreement between Rio Tinto plc and Ivanhoe Mines Ltd. dated April 17, 2012(10)
|
Q
|
|
Amending Agreement between Rio Tinto plc and Ivanhoe Mines Ltd. dated May 22, 2012(11)
|
R
|
|
Press Release dated July 30, 2012(12)
|
(1)
|
Filed as an exhibit to the amended Schedule 13D on September 14, 2020
|
(2)
|
Filed as an exhibit to the amended Schedule 13D on January 13, 2014.
|
(3)
|
Filed as an exhibit to the original Schedule 13D on November 3, 2006.
|
(4)
|
Filed as an exhibit to the amended Schedule 13D on September 12, 2007.
|
(5)
|
Filed as an exhibit to the amended Schedule 13D on October 26, 2007.
|
(6)
|
Filed as an exhibit to the amended and restated Schedule 13D on December 14, 2011.
|
(7)
|
Filed as an exhibit to the amended Schedule 13D on June 28, 2011.
|
(8)
|
Filed as an exhibit to the amended Schedule 13D on August 24, 2011.
|
(9)
|
Filed as an exhibit to the amended Schedule 13D on January 26, 2012.
|
(10)
|
Filed as an exhibit to the amended Schedule 13D on April 20, 2012.
|
(11)
|
Filed as an exhibit to the amended Schedule 13D on May 24, 2012.
|
(12)
|
Filed as an exhibit to the amended Schedule 13D on August 2, 2012.
|
Exhibit
Number |
|
Description
|
S
|
|
OT Bridge Funding Agreement between Turquoise Hill Resources Ltd. and Rio Tinto South East Asia Limited dated June 28, 2013.(13)
|
T
|
|
Omnibus Amending Agreement between Turquoise Hill Resources Ltd., Rio Tinto International Holdings Limited and Rio Tinto South East Asia Limited dated June 28, 2013(14)
|
U
|
|
Binding Term Sheet between Turquoise Hill Resources Ltd., Rio Tinto International Holdings Limited and Rio Tinto South East Asia Limited dated August 7, 2013(15)
|
V
|
|
Memorandum of Agreement between Turquoise Hill Resources Ltd., Rio Tinto International Holdings Limited and Rio Tinto South East Asia Limited dated August 23, 2013.(16)
|
W
|
|
New Bridge Funding Agreement between Turquoise Hill Resources Ltd. and Rio Tinto South East Asia Limited dated August 23, 2013.(16)
|
(13)
|
Filed as an exhibit to the amended Schedule 13D on July 9, 2013. Confidential treatment has been requested. Confidential material has been redacted and separately
filed with the SEC.
|
(14)
|
Filed as an exhibit to the amended Schedule 13D on July 3, 2013.
|
(15)
|
Filed as an exhibit to the amended Schedule 13D on August 14, 2013. Confidential treatment has been requested. Confidential material has been redacted and
separately filed with the SEC.
|
(16)
|
Filed as an exhibit to the amended Schedule 13D on August 23, 2013. Confidential treatment has been requested. Confidential material has been redacted and
separately filed with the SEC.
|
A. |
As stated in TRQ’s annual management’s discussion and analysis for its financial year ended December 31, 2020, it was estimated that there is a base case incremental funding requirement of approximately US$2.3
billion in order to complete the development of the OT Project (the “Anticipated Funding Shortfall”).
|
B. |
In order to ensure the continued funding and timely development of the OT Project, the parties have entered into this Agreement to, among other things, provide for their agreed funding plan that is intended to
address the Anticipated Funding Shortfall, the principal components of which are:
|
|
(i) |
up to approximately US$1.4 billion from the re-profiling of the existing OT Project Financing;
|
|
(ii) |
up to US$500 million from additional A Loans at OT LLC;
|
|
(iii) |
up to US$750 million from a co-lending by a member of the Rio Tinto Group to OT LLC under the OT Project Financing to address any deficiencies in the aggregate of (i) or (ii) above; and
|
|
(iv) |
up to US$500 million from an equity offering by TRQ,
|
C. |
The parties reaffirm their desire for cooperation and alignment to enable the successful delivery of the OT Project. This agreement further paves the way for collaborative and proactive engagement with the
Government of Mongolia (“GOM”) and the Parliamentary Working Group to resolve the concerns of GOM with the OT Project.
|
1. |
In this Agreement, certain capitalized terms used herein (including in the recitals hereto) are defined in Schedule A.
|
2. |
This Agreement shall be interpreted in accordance with the rules set out in Schedule B.
|
3. |
Re-profiling. The parties desire the Rio Tinto Manager to engage with the Senior
Lenders to negotiate a re-profiling of the Senior Loans, by way of an amendment to the existing OT Project Financing Agreements, to reduce the Anticipated Funding Shortfall by up to approximately US$1.4 billion and to ensure better alignment
of the existing OT Project Financing with the Updated OT Project Mine Plan (the “Re-profiling”), and RTIHL shall cause the Rio Tinto Manager to undertake such negotiations and
discussions regarding the Re-profiling as contemplated by Sections 7 and 8.
|
4. |
Additional A Loans. The parties desire the Rio Tinto Manager to engage with the IFI
Lenders to negotiate up to US$500 million (in aggregate) of one or more additional A Loans under the OT Project Financing to be provided by one or more such IFI Lenders on the same terms and conditions as the existing A Loans as such may be
amended by the Re-profiling (the “Additional A Loans”), and RTIHL shall cause the Rio Tinto Manager to undertake such negotiations and discussions regarding the Additional A Loans as
contemplated by Sections 7 and 8.
|
5. |
Scope. The parties desire the Re-profiling and Additional A Loans to include the
specific terms listed in the Disclosure Letter.
|
6. |
Replacement B Loans and MIGA Loans. If necessary to replace any Senior Lender who
does not want to participate in the Re-profiling, the parties agree that new B Loans and/or MIGA Loans may be obtained by OT LLC from existing or new Senior Lenders to replace existing B Loans and/or MIGA Loans, provided that the aggregate
principal amount of B Loans and MIGA Loans is not increased above those principal amounts for B Loans and MIGA Loans set out in Schedule F. If necessary in accordance with the foregoing, RTIHL shall cause the Rio Tinto Manager to undertake
such negotiations and discussions regarding the replacement B Loans and/or MIGA Loans as contemplated by Sections 7 and 8. For purposes of this Agreement, any reference to the Re-profiling includes any replacement B Loans and/or MIGA Loans
pursuant to this Section 6.
|
7. |
Negotiations. The parties agree that the Rio Tinto Manager, with the assistance of
the treasury group of Rio Tinto, shall lead the process and negotiations for the Re-profiling and Additional A Loans with the Senior Lenders and IFI Lenders with support from and consultation with TRQ and OT. TRQ, as provider of the TRQ DSU,
and Rio Tinto, as provider of the Rio Tinto CSU, may participate in such discussions with the Senior Lenders and IFI Lenders and RTIHL shall cause the Rio Tinto Manager to use its reasonable commercial efforts to enable TRQ to participate in
such discussions.
|
8. |
Timing. Each of the parties shall use its reasonable commercial efforts to cause the
Re-Profiling and Additional A Loans to be negotiated and secured, and the conditions for the Re-profiling and Additional A Loans in Schedule C within its control to be satisfied, no later than the Outside Date, provided that (i) the parties
shall first obtain the approval of the OT LLC board to commence negotiations for the Re-profiling, the Additional A Loans and the Co-Lending and (ii) the Rio Tinto Manager, in consultation with TRQ and Rio Tinto, shall be entitled to make all
material determinations with respect to timing and strategy for such negotiations, having regard to the status of discussions with GOM and other factors. In addition to and on a parallel track with the foregoing, each of the parties shall use
its reasonable commercial efforts to seek and obtain the approval of the OT LLC board to the final terms of the Re-profiling, the Additional A Loans and the Co-Lending, as may be required and as applicable. The Rio Tinto Manager shall prepare
an information package on the Re-profiling and Additional A Loans for distribution to the Senior Lenders and IFI Lenders. If for any reason the Re-profiling and the Additional A Loans are not secured by the Outside Date, either party may
withdraw from the process for the Re-profiling and Additional A Loans in which case both parties shall have no further obligations in respect of Sections 3 to 12. For greater
certainty, a withdrawal by either party from the Re-profiling and Additional A Loan process in accordance with the foregoing shall not relieve (x) the Rio Tinto Lender of its Co-Lending
commitment set forth in Sections 13 to 18 or otherwise affect such Co-Lending commitment or (y) TRQ of its Equity Offering commitment set forth in Sections 19 to 23 or otherwise affect such Equity Offering commitment.
|
9. |
Approvals. The final terms of the Re-profiling and Additional A Loans, including full
form binding documentation, must be acceptable to TRQ and Rio Tinto in their respective discretion and will be subject to the approval of each of OT LLC, TRQ and Rio Tinto.
|
10. |
Conditions. The Re-profiling and the Additional A Loans shall be subject to the
satisfaction of the conditions set forth in Schedule C in favour of the parties (and which must be satisfied or waived by both parties in their respective discretion) on the Effective Date.
|
11. |
TRQ DSU. If necessary for the Re-profiling, any Additional A Loans and the
Co-Lending, TRQ shall agree to amend the TRQ DSU to cover such Re-profiling, Additional A Loans and Co-Lending on terms that are acceptable to TRQ in its discretion.
|
12. |
Rio Tinto CSU. If necessary for the Re-profiling and any Additional A Loans, RTIHL
shall cause Rio Tinto to agree to amend the Rio Tinto CSU to cover such Re-profiling and Additional A Loans on terms that are acceptable to Rio Tinto in its discretion. Rio Tinto shall be entitled to a Completion Support Agreement Fee in
respect of such Re-profiling and Additional A Loans on the terms set out in Section 23 of the MOA mutatis mutandis.
|
13. |
Commitment. Subject to Sections 14 to 18, RTIHL, on behalf of a member of the Rio
Tinto Group to be designated by RTIHL (the “Rio Tinto Lender”), hereby provides a commitment to provide the lesser of (i) US$750 million, and (ii) the aggregate of the sums referred to
in clauses 13a. and 13b., in the aggregate principal amount of senior loans to OT LLC (the “Co-Lending”) to cover in whole or in part:
|
|
a. |
the aggregate principal amount of any Senior Loan repayments required to be made from and including June 15, 2022 until and including June 15, 2024 after giving effect to the Re-profiling, if any; and
|
|
b. |
the shortfall, if any, between US$500 million and the aggregate principal amount of Additional A Loans secured by OT LLC,
|
14. |
Key Terms. The Co-Lending shall take the form of pari passu Senior Loans under Clause 7.1(a) of the CTA and will share pro rata in the security package for the OT Project Financing on the same terms as
the other Senior Loans. The Co-Lending shall constitute a separate Supplemental Senior Facility and shall have pricing (including all upfront and other fees) and maturity and other terms and conditions through the use of tranches that mirror
the exact pricing (including all upfront and other fees), amortisation schedule, final maturity date and other terms and conditions of each tranche of the third party Senior Loans (excluding commercial bank tranches) that has been the subject of a full or partial Re-profiling or, if no Re-profiling has occurred, in accordance with Clause 7.2 (b) of the CTA. The Co-Lending shall be disbursed from time to time as OT LLC
requires funding of OT Project costs upon satisfaction or waiver of the initial and subsequent conditions precedent with respect thereto as set forth in Schedules 2 and 3 of the CTA. To the extent the Re-profiling and/or the Additional A
Loans is or are to occur in accordance with this Agreement, then the Effective Date of each element of Applicable Funding shall occur on the same date.
|
15. |
Consent. TRQ consents, and RTIHL shall cause Rio Tinto to consent, to the Co-Lending
in accordance with Clause 4.2(a) of the CTA, including the execution and delivery to the Intercreditor Agent of TRQ’s express consent to the Co-Lending becoming Guaranteed Senior Debt Obligations and Rio Tinto’s express consent to the
Co-Lending becoming Covered Obligations.
|
16. |
Approvals and Conditions. The execution and delivery by the Rio Tinto Lender of the
Supplemental Senior Facility with respect to the Co-Lending shall be subject to (i) the satisfaction of the conditions set forth in Schedule C in favour of the Rio Tinto Lender on the Effective Date, (ii) the TRQ DSU being amended to cover
the Co-Lending on terms that are acceptable to Rio Tinto, acting reasonably and (iii) the terms of the OT Project Financing Agreements with respect to a Sponsor Senior Loan not being amended in any material respect from the terms of the OT
Project Financing Agreements existing as at the date of this Agreement (and each such condition in (i), (ii) and (iii) must be satisfied, or waived by the Rio Tinto Lender in its discretion, acting reasonably). For purposes of this Section
16, “material” includes any amendment to the OT Project Financing Agreements where the Rio Tinto Lender is treated different than the other Senior Lenders and such amendment is adverse to the Rio Tinto Lender or any of other member of the Rio
Tinto Group.
|
17. |
Timing. Without qualifying the commitment of the Rio Tinto Lender to provide the
Co-Lending pursuant to Section 13 (subject to the conditions in Section 16 in favour of the Rio Tinto Lender on the Effective Date), each of the parties shall use its reasonable commercial efforts to cause the conditions in Section 16 within
its control to be satisfied by no later than the Outside Date, provided that the parties shall first obtain the approval of the OT LLC board to commence negotiations for the Re-profiling, the Additional A Loans and Co-Lending. Subject to the
conditions to the Co-Lending set forth in Section 16 having been satisfied (or otherwise waived by the Rio Tinto Lender in its discretion, acting reasonably), RTIHL shall cause the Rio Tinto Lender to execute all relevant Co-Lending
transaction agreements and documents and make the Co-Lending available to OT LLC (i) if the Re-profiling and/or the Additional A Loans have been secured in accordance with the terms of this Agreement, on the Effective Date, (ii) if RTIHL
withdraws from the process for the Re-profiling and Additional A Loans in accordance with Section 8, by no later than the earlier of the Outside Date and 15 days following the conditions to the Co-Lending set forth in Section 16 having been
satisfied (or otherwise waived by the Rio Tinto Lender in its discretion, acting reasonably) and (iii) if TRQ withdraws from the process for the Re-profiling and Additional A Loans in accordance with Section 8, by no later than the Outside
Date. If the conditions to the Co-Lending set forth in Section 16 are not satisfied (or otherwise waived by the Rio Tinto Lender in its discretion, acting reasonably) by the Outside Date, then RTIHL shall have no further obligations in
respect of Sections 13 to 18.
|
18. |
Rio Tinto CSU. RTIHL shall cause Rio Tinto to agree to amend the Rio Tinto CSU to
cover the Co-Lending on the same terms as the existing Rio Tinto CSU or on such other terms that are acceptable to Rio Tinto in its discretion (acting reasonably), and Rio Tinto shall be entitled to a Completion Support Agreement Fee in
respect of the Co-Lending on the terms set out in Section 23 of the MOA mutatis mutandis, commencing upon the first drawdown of the Co-Lending.
|
19. |
Key Terms and Objectives. Subject to Sections 20 to 23 and the Co-Lending having been
made available, within six months following the Effective Date, TRQ covenants and agrees to conduct and complete an equity offering of its common shares (an “Equity Offering”) in the
form of, at TRQ’s discretion, either (i) a rights offering of common shares (the “Rights Offering”) or (ii) a public offering or private placement of common shares (a “Placement”), in either case sufficient to generate an amount of gross proceeds (“Total Proceeds”) which will be not less than the
lesser of (i) US$500 million and (ii) the Future Funding Shortfall. TRQ may in its discretion increase the Total Proceeds under the Equity Offering. TRQ shall provide RTIHL with notice of any such increase at least 20 days (or 30 days if any
such increase is US$500 million or more) in the advance of the filing of any preliminary prospectus or offering memorandum or any other offering document or term sheet for the Equity Offering or such shorter period as RTIHL may indicate to
TRQ is necessary to obtain any internal approvals. TRQ’s covenant and agreement to conduct and complete an Equity Offering hereunder shall be conditional upon, at such time, RTIHL being in compliance in all material respects with its
obligations under this Agreement and each member of the Rio Tinto Group being in compliance in all material respects with its agreements, covenants and obligations under all other agreements with TRQ (or OT) (or the waiver of such condition
by TRQ in its discretion, acting reasonably). Without limiting RTIHL’s rights under this Agreement, if, for any reason, TRQ does not complete the Equity Offering within six months following the Effective Date, any remaining availability
under the Co-Lending may be terminated by the Rio Tinto Lender in its discretion. For greater certainty, any limitations or restrictions set forth in this Section 19 shall not apply, following the completion of the Equity Offering to be
conducted by TRQ as required by this Agreement, to any placement or issuance of equity by TRQ made in accordance with TRQ’s rights under the existing agreements between TRQ and a member of the Rio Tinto Group.
|
20. |
Rights Offering. Any Rights Offering will be conducted in a form and structure
substantially similar to the rights offerings described in TRQ’s final short form prospectus and registration statements dated November 25, 2013 as modified by terms of this Agreement. TRQ agrees that the Rights Offering will not be subject
to a minimum subscription condition or any other condition other than the mechanical conditions applicable to holders of rights respecting the exercise of their rights that are customary in rights offerings conducted by issuers having common
shares listed on the TSX. All or part of the rights issued to any member of the Rio Tinto Group may be assigned by such members to one or more members of the Rio Tinto Group. The subscription price for each TRQ common share to be issued under
the Rights Offering will be determined by TRQ prior to filing a final prospectus, subject to the price being a minimum 15% discount to the market price of TRQ’s common shares at the time of pricing of the Rights Offering (or such larger
discount to the extent so required by the TSX).
|
21. |
Placement. Each member of the Rio Tinto Group shall be entitled to maintain its pro rata ownership of TRQ as part of any Placement as provided for in the existing contractual agreements between the parties (more specifically, the PPA) (“Pro Rata Entitlement”). No Placement (or Rio Tinto’s Pro Rata Entitlement) shall require approval of the shareholders of TRQ unless the completion of the Placement and Rio Tinto’s Pro Rata Entitlement are
conditional on the completion of the other with the objective of ensuring that a Placement may not be completed unless Rio Tinto is capable of availing itself of its Pro Rata Entitlement. All or part of the Pro Rata Entitlement may be
assigned by the applicable member of the Rio Tinto Group to one or more other members of the Rio Tinto Group. For the avoidance of doubt, failure to obtain any required approval of the shareholders of TRQ does not in any way limit or defer
TRQ’s obligation to conduct and complete an Equity Offering within six months following the Effective Date in accordance with the terms of this Agreement.
|
22. |
Offering Documents. TRQ agrees to provide RTIHL and its advisors a reasonable opportunity to review and comment on any prospectus, registration statement, offering memorandum or other offering document or term sheet for any Equity
Offering and other material communications with the TSX, NYSE and other regulatory authorities regarding any Equity Offering.
|
23. |
Underwriting Commitment. If RTIHL elects to do so by notice to TRQ at least 10 days
in advance of the filing of any preliminary prospectus for the Rights Offering, RTIHL may provide a standby underwriting commitment in respect of the Total Proceeds of the Rights Offering (the “Underwriting Commitment”). In consideration for the Underwriting Commitment, TRQ agrees to pay to RTIHL on closing of the Rights Offering a fee equal to 3% of the Total Proceeds. Other than the Underwriting Commitment, there
shall be no additional standby underwriting commitment provided by any other person in respect of the Rights Offering. All or part of the Underwriting Commitment may be assigned by RTIHL to one or more members of the Rio Tinto Group. For
greater certainty, in the event RTIHL is not providing an Underwriting Commitment with respect to the Rights Offering, then TRQ shall have the right to make all determinations regarding the identity of any standby commitment provider and the
terms and conditions of such other standby underwriting commitment.
|
24. |
Proposals. After the Future Date, any proposal by TRQ or any of its subsidiaries or
any of their respective representatives for any additional Senior Loans, bonds, streams prepays or other similar instruments at TRQ or any of its subsidiaries (including OT LLC) or accommodation for same in the OT Project Financing Agreements shall first be presented to Rio Tinto to obtain its consent (where such consent is required pursuant to existing contractual rights) and alignment of the parties before any such proposal
is discussed or shared with EOT or GOM or at any OT LLC board or shareholder meeting. For the avoidance of doubt, without limiting the rights of the parties under the PPA and all other agreements between TRQ and a member of the Rio Tinto
Group, TRQ shall not directly or indirectly, prior to completion of the Equity Offering, engage with EOT, GOM or the OT LLC board without having first obtained Rio Tinto’s consent, or the approval of the Technical Committee, in relation to
any funding considerations or proposals.
|
25. |
Funding Review. During the three month period following the Future Date, TRQ and Rio
Tinto will meet to review the funding options for the Future Funding Shortfall. As part of this review, the parties will in good faith (i) discuss potential sources of funding and a potential funding plan to satisfy the Future Funding
Shortfall (after taking into account the net proceeds received by TRQ under the Equity Offering) and (ii) discuss a potential implementation process for those potential sources of funding to which Rio Tinto may be prepared to consent at the
time. If the parties agree on such a funding plan and implementation process, then the parties will endeavour to follow such plan and process and consider the terms of any agreed potential sources of funding. However, TRQ acknowledges that
Rio Tinto has certain consent rights under its agreements with TRQ, including the TRQ FSA, and that certain funding proposals that TRQ may present to Rio Tinto may be subject to such consent rights and in no event shall this Section 25
constitute a waiver of any such rights under the TRQ FSA or otherwise.
|
26. |
Rio Tinto Guidance. Other than the Re-profiling, Additional A Loans and the
Co-Lending, Rio Tinto has advised TRQ that it has considered, and does not currently support or expect to consent to (where its consent is required), any additional debt (including additional Senior Loans and bonds) or other sources of
funding (including streams and prepays) at TRQ or any of its subsidiaries (including OT LLC). TRQ acknowledges such guidance from Rio Tinto.
|
27. |
TRQ Guidance. TRQ has advised Rio Tinto that, subject to the restrictions in this
Agreement, (i) TRQ continues to prioritise OT LLC and/or TRQ raising funding by way of additional debt and / or hybrid funding and (ii) after the Future Date (subject to Section 32), TRQ may continue its evaluation of, and may present to Rio
Tinto for its consideration and input, any such debt and hybrid funding options. Rio Tinto acknowledges such guidance from TRQ and confirms that, after the Future Date, it will consider all reasonable funding proposals presented to it by TRQ.
TRQ acknowledges that Rio Tinto has certain consent rights under its agreements with TRQ, including the TRQ FSA, and that certain funding proposals that TRQ may present to Rio Tinto may be subject to such consent rights.
|
28. |
Additional Rights Offerings. The parties acknowledge that any balance of the funding
required for OT LLC to achieve completion of the underground mine may need to be met by way of one or more additional TRQ rights or other equity offerings if the Future Funding Shortfall is not fully addressed by the Re-profiling, Additional
A Loans, Co-Lending, Equity Offering or other funding sources contemplated by Section 25. For the avoidance of doubt, other than Section 30, nothing in this Agreement shall in any way limit or waive Rio Tinto’s rights to require a TRQ rights
offering under, and subject to, the TRQ FSA.
|
29. |
Reservation of Rights. Except as expressly affected or modified by any provision of
this Agreement, each of TRQ and RTIHL (on behalf of itself and Rio Tinto) reserves all of its rights in respect of its contractual rights in relation to funding and related consent matters.
|
30. |
FSAs. Except as set out in Section 15, nothing in this Agreement shall constitute a
consent, or in any way limit or waive Rio Tinto’s consent rights, under the TRQ FSA or the OT FSA or amount to a waiver or limitation of any existing contractual rights and obligations as between TRQ and any member of the Rio Tinto Group.
Notwithstanding the foregoing, in determining whether TRQ or OT LLC has sufficient resources for purposes of Section 9 of the TRQ FSA or Section 9 of the OT FSA, such determination shall assume and take into account (A) prior to the earlier
of (i) the Re-profiling and/or the Additional A Loans being secured and (ii) the Outside Date, TRQ having access to the entire proceeds from the Co-Lending (and, for the purposes of clause (A) of this Section 30, without consideration of
whether or not the conditions to the availability of the Co-Lending set forth in Section 16 have been satisfied) and (B) after the Re-profiling and/or the Additional A Loans being secured, the actual amount of the Co-Lending then secured and
available at any relevant point in time.
|
31. |
If discussions with GOM result in a long-term domestic power supply arrangement that requires OT LLC to fund an additional power generation source and related infrastructure, the parties will consider a separate
funding arrangement as may be agreed between TRQ and Rio Tinto in the form of additional Senior Loans or a stand-alone project financing or other financing instruments that may be appropriate.
|
32. |
Subject to Section 29, the parties shall promptly seek from the Arbitrator, on a consent basis and without costs, a without prejudice dismissal of the Arbitration and an order vacating the Interim Measures Order.
Except as permitted by this Agreement and subject to Section 24, TRQ shall not, directly or indirectly, seek or propose or engage in discussions regarding additional Senior Loans, bonds, streams, prepays or other similar instruments at TRQ or
any of its subsidiaries (including OT LLC) or accommodation for same in the OT Project Financing Agreements. The restriction in the preceding sentence shall terminate upon the earlier of (i) the Effective Date and (ii) the Outside Date (the “Future Date”), unless the Future Funding Shortfall is US$500 million or less, in which case such restriction shall continue until the Support Termination Date and Section 25 shall not be
applicable.
|
33. |
Other than (i) any arbitration instituted or filed by any party pursuant to Section 52 which shall be permitted in relation to a breach by the other party of its obligations under this Agreement and (ii) any
arbitration, litigation or other legal proceeding instituted or filed by either party to enforce its rights related to a breach of the other party’s obligations under any agreement between TRQ and RTIHL, each of TRQ and RTIHL agrees to not
initiate or pursue, or make any public announcement threatening to initiate or pursue, any arbitration, litigation, injunction or other equitable relief or other legal proceeding regarding funding or related consent matters until after the
completion of the Equity Offering.
|
34. |
The parties agree to use their respective reasonable commercial efforts to seek the support of the GOM and EOT to the Re-profiling, Additional A Loans and Co-Lending.
|
35. |
TRQ acknowledges that the Rio Tinto Manager will lead discussions with GOM and EOT in consultation with TRQ.
|
36. |
Except to the extent directly applied by OT LLC to the payment of OT Project costs within 30 days of receipt, all cash proceeds of the Additional A Loans and Co-Lending and the net proceeds provided by any member of
the Rio Tinto Group under the Equity Offering (or Pro Rata Entitlement) shall be managed by a member of the Rio Tinto Group in accordance with an arrangement substantially similar to the arrangement set forth in the cash management services
agreement dated December 15, 2015 between 9539549 Canada Inc., as service provider, TRQ and RTIHL.
|
37. |
Funding from the Additional A Loans, Co-Lending, Equity Offering and Pro Rata Entitlement shall be applied in the following order of priority: (i) to pay all required fees, costs and expenses of the Re-profiling,
Additional A Loans, Co-Lending and Equity Offering; (ii) to fund OT Project costs relating to underground and power, if applicable, (including the servicing of Senior Loans and the payment of interest and fees in relation thereto); and (iii)
to fund TRQ’s general and administrative costs.
|
38. |
In connection with the completion of the Re-profiling, Additional A Loans, Co-Lending and Equity Offering, the parties shall enter into an agreed-upon flow of funds (i) in a form that is acceptable to the parties in
their respective discretion and (ii) with indemnification obligations in the event of a failure to adhere to such flow of funds.
|
39. |
TRQ makes the representations and warranties set forth in Schedule D as at the date of this Agreement and the Effective Date and acknowledges that they may be relied upon by each of RTIHL and the Rio Tinto Lender.
|
40. |
RTIHL makes the representations and warranties set forth in Schedule E as at the date of this Agreement and acknowledges that they may be relied upon by TRQ.
|
41. |
The representations and warranties of the parties contained in this Agreement are only made as of the dates indicated in Sections 39 and 40 but survive for the purposes of allowing a party to sue for a breach of a
representation and warranty that party is entitled to rely upon on the basis that the representation or warranty was not true as at the date such representation and warranty was made. No party shall be entitled to bring a claim on the basis of
a breach of the representations and warranties that party is entitled to rely upon after the second anniversary of the date on which such representation and warranty was made.
|
42. |
Subject to any confidentiality obligations which may be imposed by any Governmental Authority, each party shall promptly notify the other of any material demand, request or inquiry (formal or informal) by any
Governmental Authority, stock exchange, TRQ shareholder or other OT stakeholder that concerns any matter that may affect any of the transactions contemplated by this Agreement. For the avoidance of doubt, the foregoing does not require
notification of any legal advice a party may receive.
|
43. |
All notices and other communications given or made pursuant to this Agreement will be in writing and will be deemed to have been duly given or made as of the date delivered or sent if delivered personally or sent by
electronic mail, respectively or as of the following Business Day if sent by prepaid overnight courier, to the parties at the following addresses (or at such other addresses as will be specified by either party by notice to the other party in
accordance with these provisions):
|
|
a. |
If to TRQ:
Turquoise Hill Resources Ltd.
1 Place Ville-Marie, Suite 3680
Montreal, Quebec H3B 3P2 Canada
Attention: Corporate Secretary
E-Mail: corporate.secretary@turquoisehill.com
|
|
b. |
If to RTIHL:
Rio Tinto International Holdings Limited
6 St. James’s Square
London, England SW1Y 4AD United Kingdom
Attention: Group Company Secretary
E-Mail: Company.Secretarial@riotinto.com
|
44. |
Each of the parties acknowledges that it is intended, as of the date of this Agreement, that the Co-Lending transaction be exempt from the formal valuation and minority approval requirements of Multilateral
Instrument 61-101—Take-Over Bids and Special Transactions (“MI 61-101”), provided, however, that the parties acknowledge that a
further determination will need to be made at the time the size and definitive terms of the Co-Lending are known and such transaction is to be entered into. Each of the parties further acknowledges that, as of the date of this Agreement, none
of the Re-profiling, Additional A Loans or any Rights Offering would be subject to MI 61-101.
|
45. |
No modification of this Agreement will be valid unless made in writing and duly executed by each of the parties.
|
46. |
Each of the parties will take, from time to time and without additional consideration, such further actions and execute such additional instruments as may be reasonably necessary or convenient to implement and carry
out the intent and purpose of this Agreement.
|
47. |
Except as expressly permitted in this Agreement, no party may assign its rights or obligations under this Agreement without the prior written consent of the other party.
|
48. |
This Agreement will be binding upon and enure to the benefit of the respective successors and permitted assigns of the parties.
|
49. |
Time is of the essence in this Agreement.
|
50. |
The parties agree that this Agreement supersedes the MOU, which MOU is terminated as of the date of this Agreement.
|
51. |
This Agreement will be governed by the laws of the Province of British Columbia and the federal laws of Canada applicable therein.
|
52. |
The parties agree that any matter in dispute under this Agreement shall be resolved in accordance with Part 16 of the PPA.
|
53. |
This Agreement may be executed in counterparts, each of which will be deemed to be an original and all of which taken together will be deemed to constitute one and the same instrument. Delivery of an executed
signature page to this Agreement by any party by electronic transmission will be as effective as delivery of a manually executed copy of this Agreement by such party
|
TURQUOISE HILL RESOURCES LTD.
|
||
By:
|
/s/ Steve Thibeault
|
|
Name: Steve Thibeault
Title: Interim Chief Executive Officer
|
||
RIO TINTO INTERNATIONAL HOLDINGS LIMITED
|
||
By:
|
/s/ Steve Allen
|
|
Name: Steve Allen
Title: Group Corporate Secretary
|
||
(a) |
“this Agreement” means this Agreement, including the schedules and recitals hereto, as it may from time to time be supplemented, amended or modified and in effect; and the words “hereby”, “herein”, “hereto”, “hereof”
and “hereunder” and other words of similar import refer to this Agreement as a whole and not to any particular Section, subsection, clause, subclause, paragraph, subparagraph or other subdivision;
|
(b) |
all references in this Agreement to designated “Sections” are to the designated Sections of this Agreement unless otherwise expressly provided;
|
(c) |
the headings are for convenience only and do not form a part of this Agreement and are not intended to interpret, define or limit the scope, extent or intent of this Agreement or any provision hereof;
|
(d) |
the word “including”, when following any general statement, term or matter, is not to be construed to limit such general statement, term or matter to the specific items or matters set forth immediately following such
word or to similar items or matters whether or not non-limiting language (such as “without limitation” or “but not limited to” or words of similar import) is used with reference thereto, but rather such general statement, term or matter is to
be construed to refer to all other items or matters that could reasonably fall within the broadest possible scope of such general statement, term or matter;
|
(e) |
all references to currency are deemed to mean lawful money of the United States of America and all amounts to be calculated or paid pursuant to this Agreement are to be calculated in lawful money of the United States
of America and paid in immediately available funds;
|
(f) |
any reference to secured in relation to the Re-profiling, Additional A Loans and Co-Lending means the entering into of definitive documentation in relation thereto;
|
(g) |
any reference to an agreement includes, unless otherwise expressly provided herein, a reference to all amendments and supplements thereto and in force from time to time;
|
(h) |
any reference to persons include individuals, corporations, limited and unlimited liability companies, general and limited partnerships, associations, trusts, unincorporated organizations, joint ventures,
Governmental Authorities and other entities; and
|
(i) |
any reference to an entity includes and is also a reference to any entity that is a successor to such entity.
|
1. |
All third party approvals and consents which may be required for the Applicable Funding shall have been obtained.
|
2. |
Applicable Funding shall be entitled to the benefit of the TRQ DSU and Rio Tinto CSU.
|
3. |
Other than the Class Actions, no new material claims, arbitration, litigation, inquiries, investigations or other legal proceedings shall have been commenced after the date of the Agreement by or against TRQ or Rio
Tinto or any of their respective subsidiaries and which have impacted adversely, or if decided adversely, would reasonably be expected to affect adversely, the implementation, performance or completion of any of the Re-profiling, Additional A
Loans, Co-Lending and Equity Offering or which relates to any Prohibited Payment with respect to the conduct of business of TRQ or any of its subsidiaries or with respect to the OT Project.
|
4. |
No Suspensive Event shall have occurred or be continuing.
|
5. |
No event shall have occurred and be continuing that constitutes, or may with the passage of time or otherwise constitute, an Event of Default under the CTA which has not otherwise been waived by Senior Lenders
|
6. |
Material operations and/or development at the OT Project shall not have been suspended (unless such suspension at the outset would not reasonably be expected to last more than 60 days and such operations and/or
development at the OT Project are restored and operating substantially as at the time prior to such suspension on or before the end of such 60 day period), provided, however, this condition will be deemed to be satisfied for purposes of the
relevant suspension once such operations and/or development at the OT Project are restored and operating substantially as at the time prior to such suspension
|
7. |
Investment Agreement, ARSHA and UDP continue to be in full force and effect
|
8. |
No Material Adverse Change shall have occurred and be continuing
|
9. |
Board of directors of OT LLC and the Technical Committee shall have approved a decision to proceed with the undercut of the underground at the OT Project
|
10. |
Satisfactory support for the Applicable Funding from the GOM and EOT shall have been obtained
|
11. |
Satisfaction of all conditions for the Applicable Funding to constitute the incurrence of Supplemental Senior Debt under the CTA
|
12. |
Satisfactory binding documentation for cash management and flow of funds in accordance with Sections 36 and 38
|
13. |
Representations and warranties of TRQ in this Agreement shall be true and correct in all material respects
|
14. |
TRQ being in compliance in all material respects with its agreements, covenants and obligations under this Agreement and all other agreements between TRQ and a member of the Rio Tinto Group
|
15. |
The Co-Lending is exempt from (or not subject to) the formal valuation and minority approval requirements of MI 61-101.
|
(a) |
TRQ is a corporation duly incorporated, organized and validly existing under the laws of the Yukon and no proceedings have been taken or authorized by it or, to the best of its knowledge, by any other person, with
respect to the bankruptcy, insolvency, liquidation, dissolution or winding-up of TRQ;
|
(b) |
TRQ’s execution and delivery of this Agreement, including all matters contemplated hereby, has been authorized by all necessary corporate action and TRQ has the corporate power and authority to enter into and perform
its obligations under this Agreement;
|
(c) |
No approval of the shareholders of TRQ is required for this Agreement or, subject to Section 44 in respect of the Co-Lending, any of the transactions contemplated by this Agreement;
|
(d) |
None of the execution and delivery of this Agreement, the implementation of the transactions contemplated by this Agreement or the fulfillment of, or compliance with, the terms and provisions hereof by TRQ do or
will, with the giving of notice or the lapse of time or otherwise:
|
|
(i) |
result in the breach of, or violate any term or provision of, TRQ’s constating documents; or
|
|
(ii) |
conflict with, result in the breach of, constitute a default under, or accelerate or permit the acceleration of the performance required by, any material agreement to which TRQ is a party or by which it is bound or
to which any of its material assets are subject or any applicable law to which TRQ is subject;
|
(e) |
This Agreement has been duly executed and delivered by TRQ and is a valid and binding obligation of TRQ enforceable against it in accordance with its terms subject to bankruptcy, insolvency and other laws affecting
the enforcement of creditors’ rights generally and to general principles of equity; and
|
(f) |
To the best of its knowledge and belief, neither TRQ nor any of its subsidiaries (including OT LLC) or any person acting on behalf of TRQ or any such subsidiary, has made any Prohibited Payment with respect to the
conduct of business of TRQ or any such subsidiary or with respect to the OT Project, including in connection with obtaining licences, permits, concessions or other authorizations for the OT Project.
|
(a) |
RTIHL is a corporation duly incorporated, organized and validly existing under the laws of England and no proceedings have been taken or authorized by it or, to the best of its knowledge, by any other person, with
respect to the bankruptcy, insolvency, liquidation, dissolution or winding-up of RTIHL;
|
(b) |
RTIHL’s execution and delivery of this Agreement, including all matters contemplated hereby, has been authorized by all necessary corporate action and RTIHL has the corporate power and authority to enter into and
perform its obligations under this Agreement;
|
(c) |
None of the execution and delivery of this Agreement, the implementation of the transactions contemplated by this Agreement or the fulfillment of, or compliance with, the terms and provisions hereof by RTIHL do or
will, with the giving of notice or the lapse of time or otherwise:
|
|
(i) |
result in the breach of, or violate any term or provision of, RTIHL’s constating documents; or
|
|
(ii) |
conflict with, result in the breach of, constitute a default under, or accelerate or permit the acceleration of the performance required by, any material agreement to which RTIHL is a party or by which it is bound or
to which any of its material assets are subject or any applicable law to which RTIHL is subject; and
|
(d) |
This Agreement has been duly executed and delivered by RTIHL and is a valid and binding obligation of RTIHL enforceable against it in accordance with its terms subject to bankruptcy, insolvency and other laws
affecting the enforcement of creditors’ rights generally and to general principles of equity.
|
(e) |
To the best of its knowledge and belief, neither RTIHL nor any of its subsidiaries (excluding TRQ or any of its subsidiaries) or any person acting on behalf of RTIHL or any such subsidiary, has made any Prohibited
Payment with respect to the conduct of business of RTIHL or any such subsidiary or with respect to the OT Project, including in connection with obtaining licences, permits, concessions or other authorizations for the OT Project.
|
Tranche
|
Aggregate Principal Amount (US$M)
|
Outstanding Amount[1]
|
IFC
|
425
|
423
|
EBRD
|
425
|
423
|
EDC
|
750
|
746
|
US EXIM
|
309
|
306
|
EFIC
|
150
|
149
|
MIGA
|
699
|
695
|
IFC & EBRD B-Loans
|
1,591
|
1,583
|
Total
|
4,349
|
4,326
|