þ | ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
o | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
Delaware
(State or other jurisdiction of incorporation or organization) |
33-0174996
(I.R.S. Employer Identification No.) |
Common Stock, par value $0.0001 per share | The NASDAQ Stock Market LLC | |
(Title of Each Class) | (Name of Each Exchange on which Registered) |
Large accelerated filer þ | Accelerated filer o | Non-accelerated filer o | Smaller reporting company o | |||
(Do not check if a smaller reporting company) |
2
3
4
5
6
Page
Number
F-1
F-2
F-3
F-4
F-5
F-6
II-1
Filed or
Exhibit
Incorporated by Reference
Furnished
Number
Exhibit Description
Form
File No.
Exhibit
Filing Date
Herewith
Agreement and Plan of Merger,
dated as of September 30, 2009,
by and among ViaSat, Inc.,
WildBlue Holding, Inc. and
Aloha Merger Sub, Inc.
8-K
000-21767
2.1
10/02/2009
Second Amended and Restated
Certificate of Incorporation of
ViaSat, Inc.
10-Q
000-21767
3.1
11/14/2000
First Amended and Restated
Bylaws of ViaSat, Inc.
S-3
333-116468
3.2
06/14/2004
Form of Common Stock Certificate
S-1/A
333-13183
4.1
11/05/1996
Indenture, dated as of October
22, 2009, by and among ViaSat,
Inc., ViaSat Credit Corp.,
Enerdyne Technologies, Inc.,
ViaSat Satellite Ventures, LLC,
VSV I Holdings, LLC, VSV II
Holdings, LLC, ViaSat Satellite
Ventures U.S. I, LLC, ViaSat
Satellite Ventures U.S. II, LLC
and Wilmington Trust FSB, as
trustee
8-K
000-21767
4.1
10/22/2009
Form of 8.875% Senior Note due
2016 of ViaSat, Inc. (attached
as Exhibit A to the Indenture
filed as Exhibit 4.2 hereto)
8-K
000-21767
4.1
10/22/2009
Filed or
Exhibit
Incorporated by Reference
Furnished
Number
Exhibit Description
Form
File No.
Exhibit
Filing Date
Herewith
Registration Rights Agreement,
dated as of October 22, 2009,
by and among ViaSat, Inc.,
ViaSat Credit Corp., Enerdyne
Technologies, Inc., ViaSat
Satellite Ventures, LLC, VSV I
Holdings, LLC, VSV II Holdings,
LLC, ViaSat Satellite Ventures
U.S. I, LLC, ViaSat Satellite
Ventures U.S. II, LLC, J.P.
Morgan Securities Inc., Banc of
America Securities LLC, Wells
Fargo Securities, LLC,
Oppenheimer & Co. Inc. and
Stephens Inc.
8-K
000-21767
4.2
10/22/2009
Registration Rights Agreement,
dated as of December 15, 2009,
by and among ViaSat, Inc. and
the selling stockholders listed
on Schedule A thereto
8-K
000-21767
10.1
12/18/2009
Form of Indemnification
Agreement between ViaSat, Inc.
and each of its directors and
officers
8-K
000-21767
99.1
03/07/2008
ViaSat, Inc. Employee Stock
Purchase Plan (as Amended and
Restated Effective July 1,
2009)
8-K
000-21767
10.1
10/05/2009
1996 Equity Participation Plan
of ViaSat, Inc. (As Amended and
Restated Effective September
29, 2009)
8-K
000-21767
10.2
10/05/2009
Form of Stock Option Agreement
for the 1996 Equity
Participation Plan of ViaSat,
Inc.
8-K
000-21767
10.2
10/02/2008
Form of Restricted Stock Unit
Award Agreement for the 1996
Equity Participation Plan of
ViaSat, Inc.
8-K
000-21767
10.3
10/02/2008
Form of Executive Restricted
Stock Unit Award Agreement for
the 1996 Equity Participation
Plan of ViaSat, Inc.
8-K
000-21767
10.4
10/02/2008
Form of Non-Employee Director
Restricted Stock Unit Award
Agreement for the 1996 Equity
Participation Plan of ViaSat,
Inc.
8-K
000-21767
10.3
10/05/2009
Fourth Amended and Restated
Revolving Loan Agreement dated
July 1, 2009 by and among
ViaSat, Inc., Banc of America
Securities LLC, Bank of
America, N.A., JPMorgan Chase
Bank, N.A., Union Bank, N.A.
and the other lenders party
thereto
10-Q
000-21767
10.2
08/12/2009
Filed or
Exhibit
Incorporated by Reference
Furnished
Number
Exhibit Description
Form
File No.
Exhibit
Filing Date
Herewith
First Amendment to Fourth
Amended and Restated Revolving
Loan Agreement, dated as of
September 30, 2009, by and
among ViaSat, Inc., Banc of
America Securities LLC, Bank of
America, N.A., JPMorgan Chase
Bank, N.A., Union Bank, N.A.,
and the other lenders party
thereto
8-K
000-21767
10.1
10/02/2009
Second Amendment to Fourth
Amended and Restated Revolving
Loan Agreement, dated as of
October 6, 2009, by and among
ViaSat, Inc., Banc of America
Securities LLC, Bank of
America, N.A., JPMorgan Chase
Bank, N.A., Union Bank, N.A.,
Wells Fargo Bank, National
Association and the other
lenders party thereto
8-K
000-21767
10.1
10/09/2009
Letter agreement, dated as of
December 14, 2009, by and among
ViaSat, Inc., Union Bank, N.A.,
and the other lenders party
thereto
10-Q
000-21767
10.2
02/10/2010
Fourth Amendment to Fourth
Amended and Restated Revolving
Loan Agreement, dated as of
March 15, 2010, by and among
ViaSat, Inc., Banc of America
Securities LLC, Bank of
America, N.A., JPMorgan Chase
Bank, N.A., Union Bank, N.A.,
Wells Fargo Bank, National
Association and the other
lenders party thereto
8-K
000-21767
10.1
03/17/2010
Lease, dated March 24, 1998, by
and between W9/LNP Real Estate
Limited Partnership and ViaSat,
Inc. (6155 El Camino Real,
Carlsbad, California)
10-K
000-21767
10.27
06/29/1998
Amendment to Lease, dated June
17, 2004, by and between Levine
Investments Limited Partnership
and ViaSat, Inc. (6155 El
Camino Real, Carlsbad, CA)
10-Q
000-21767
10.1
08/10/2004
Contract for the ViaSat
Satellite Program dated as of
January 7, 2008 between ViaSat,
Inc. and Space Systems/Loral,
Inc.
10-Q
000-21767
10.1
02/06/2008
Beam Sharing Agreement dated
January 11, 2008 between
ViaSat, Inc. and Loral Space &
Communications, Inc.
10-Q
000-21767
10.2
02/06/2008
Amended and Restated Launch
Services Agreement dated May 7,
2009 between ViaSat, Inc. and
Arianespace
10-K
000-21767
10.13
05/28/2009
Filed or
Exhibit
Incorporated by Reference
Furnished
Number
Exhibit Description
Form
File No.
Exhibit
Filing Date
Herewith
Contract for Launch Services
dated March 5, 2009 between
ViaSat, Inc. and ILS
International Launch Services,
Inc.
10-K
000-21767
10.14
05/28/2009
Award/Contract dated March 10,
2010 between ViaSat, Inc. and
Space and Naval Warfare Systems
X
Subsidiaries
10-K
000-21767
21.1
06/01/2010
Consent of
PricewaterhouseCoopers LLP,
Independent Registered Public
Accounting Firm
10-K
000-21767
23.1
06/01/2010
Power of Attorney
10-K
000-21767
see signature page
06/01/2010
Certification Pursuant to
Section 302 of the
Sarbanes-Oxley Act of 2002 of
Chief Executive Officer
X
Certification Pursuant to
Section 302 of the
Sarbanes-Oxley Act of 2002 of
Chief Financial Officer
X
Certifications Pursuant to 18
U.S.C. Section 1350, as Adopted
Pursuant to Section 906 of the
Sarbanes-Oxley Act of 2002
10-K
000-21767
32.1
06/01/2010
*
Indicates management contract, compensatory plan or arrangement.
Portions of this exhibit (indicated by asterisks) have been omitted and separately filed with
the Commission pursuant to a request for confidential treatment pursuant to Rule 24b-2 under the
Securities Exchange Act of 1934.
7
VIASAT, INC.
Date: August 3, 2010
By:
/s/
MARK D. DANKBERG
Chairman and Chief Executive Officer
15A. ITEM NO.
|
15B. SUPPLIES/ SERVICES | 15C. QUANTITY | 15D. UNIT | 15E. UNIT PRICE | 15F. AMOUNT | ||||||||||||||
|
SEE SCHEDULE |
||||||||||||||||||
(X)
|
SEC. | DESCRIPTION | PAGE(S) | (X) | SEC. | DESCRIPTION | PAGE(S) | ||||||||||||||||||
PART I - THE SCHEDULE | PART II - CONTRACT CLAUSES | ||||||||||||||||||||||||
X
|
A | SOLICITATION/ CONTRACT FORM | 1 | X | I | CONTRACT CLAUSES | 108 - 127 | ||||||||||||||||||
X | B | SUPPLIES OR SERVICES AND PRICES/ COSTS | 2 - 34 | PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS | |||||||||||||||||||||
X
|
C | DESCRIPTION/ SPECS./ WORK STATEMENT | 35 - 44 | X | J | LIST OF ATTACHMENTS | 128 | ||||||||||||||||||
X | D | PACKAGING AND MARKING | 45 - 55 | PART IV - REPRESENTATIONS AND INSTRUCTIONS | |||||||||||||||||||||
X
|
E | INSPECTION AND ACCEPTANCE | 56 - 57 | K | REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS | ||||||||||||||||||||
X
|
F | DELIVERIES OR PERFORMANCE | 58 - 61 | ||||||||||||||||||||||
X
|
G | CONTRACT ADMINISTRATION DATA | 62 - 70 | L | INSTRS., CONDS., AND NOTICES TO OFFERORS | ||||||||||||||||||||
X
|
H | SPECIAL CONTRACT REQUIREMENTS | 71 - 107 | M | EVALUATION FACTORS FOR AWARD | ||||||||||||||||||||
CONTRACTING OFFICER WILL COMPLETE ITEM 17 OR 18 AS APPLICABLE | |||||||||||||||||||||||||
17.
[
X
] CONTRACTORS NEGOTIATED AGREEMENT
Contractor is required to sign this document and return 1 copies
to issuing office.)
Contractor agrees to furnish and deliver all items or perform all the services set
forth or otherwise identified above and on any continuation sheets for the consideration
stated herein. The rights and obligations of the parties to this contract shall
be subject to and governed by the following documents:
(a) this award/contract, (b) the solicitation, if any, and (c) such provisions,
representations, certifications, and specifications, as are attached
or incorporated by reference herein.
(Attachments are listed herein.) |
18. [ ] AWARD
(Contractor is not required to sign this
document.)
Your offer on Solicitation Number
N00039-10-R-0011-0001
including the additions or changes made by you which additions or changes are set forth in full above, is hereby accepted as to the items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents : (a) the Governments solicitation and your offer, an (b) this award/contract. No furt her contractual document is necessary. |
||||||||||
19A.
NAME AND TITLE OF SIGNER
(Type or print)
Stephen E. Purcell Senior Contracts Manager |
20A.
NAME OF CONTRACTING OFFICER
MELISSA L. HAWKINS TEL: 619 524 5626 EMAIL: melissa.hawkins@navy.mil |
||||||||||
19B. NAME OF CONTRACTOR
|
19C. DATE SIGNED | 20B. UNITED STATES OF AMERICA | 20C. DATE SIGNED | ||||||||
|
|||||||||||
BY
/s/ S. E.Purcell
|
February 24, 2010 | BY /s/ Melissa L. Hawkins | 10 MAR 2010 | ||||||||
(Signature of person authorized to sign)
|
(Signature of Contracting Officer) | ||||||||||
AUTHORIZED FOR LOCAL REPRODUCTION
|
STANDARD FORM 26 (REV. 4/2008) | |
|
||
Previous edition is usable
|
Prescribed by GSA
FAR (48 CFR) 53.214(a) |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
0001
|
250 | Each | See Table 1 | See Table 1 | ||||||||
FFP
|
||||||||||||
MIDS-LVT (1) AN/USQ-140(V)1(C) | ||||||||||||
Multifunctional Information Distribution System Low Volume Terminals (MIDS-
LVT (1) (AN/USQ-140(V)1(C),
See Notes 1 and 2 |
||||||||||||
FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
0004
|
21 | Each | See Table 1 | See Table 1 | ||||||||
FFP
|
||||||||||||
MIDS LVT(7) AN/USQ-140(V)7(C) | ||||||||||||
Multifunctional Information Distribution System Low Volume Terminals (MIDS-
LVT (7) (AN/USQ-140(V)7(C),
See Notes 1 and 2 |
||||||||||||
FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
0007
|
47 | Each | See Table 1 | See Table 1 | ||||||||
FFP
|
||||||||||||
MIDS LVT(11) AN/USQ-140(V)11(C) | ||||||||||||
Multifunctional Information Distribution System Low Volume Terminals (MIDS-
LVT (11) (AN/USQ-140(V)11(C),
See Notes 1 and 2 |
||||||||||||
FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
0009
|
1 | Lot | NSP | NSP | ||||||||
FFP
|
||||||||||||
WARRANTY | ||||||||||||
Warranty (Not Separately Priced NSP), See Note 4 | ||||||||||||
FOB: Destination |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
0011
FFP |
To Be
Negotiated (TBN) |
Lot | TBN | TBN | ||||||
Engineering Services | ||||||||||
(TBN) Engineering Services (FIRM FIXED PRICE), See Note 6 | ||||||||||
FOB: Destination |
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |||||
0013
|
||||||||||
|
RESERVED |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
0014
|
TBN | Lot | TBN | TBN | ||||||
COST
|
||||||||||
TRAVEL | ||||||||||
(TBN) Travel in support of CLINs 0011 and 0012, See Notes 5 & 6 | ||||||||||
FOB: Destination | ||||||||||
|
||||||||||
|
ESTIMATED COST | TBN |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
0015
|
1 | Lot | NSP | NSP | ||||||||
FFP
|
||||||||||||
Data Exhibit D | ||||||||||||
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit D for CLINs 0011 and 0012 (Not Separately Priced included in the price of CLINs 0011 and 0012) | ||||||||||||
FOB: Destination |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
1002
|
1 | Lot | NSP | NSP | ||||||||
FFP
|
||||||||||||
OPTION | Rights in CDRL A006 | |||||||||||
Technical Data Rights, Computer Software Rights, and Computer Software
Documentation Rights in CDRL A006, TDP,
See note 8 |
||||||||||||
FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
2003
|
94 | Each | See Table 1 | See Table 1 | ||||||||
FFP
|
||||||||||||
OPTION | MIDS LVT(6) AN/USQ-140(V)6(C) | |||||||||||
Multifunctional Information Distribution System Low Volume Terminals (MIDS-
LVT (6) (AN/USQ-140(V)6(C),
See Notes 1 and 2 |
||||||||||||
FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
2006
|
66 | Each | See Table 1 | See Table 1 | ||||||||
FFP
|
||||||||||||
OPTION | MIDS LVT(2) AN/USQ-140(V)2(C) | |||||||||||
Multifunctional Information Distribution System Low Volume Terminals (MIDS-
LVT (2) (AN/USQ-140(V)2(C),
See Notes 1 and 2 |
||||||||||||
FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
2009
|
1 | Lot | NSP | NSP | ||||||||
FFP
|
||||||||||||
OPTION | WARRANTY | |||||||||||
Warranty (Not Separately Priced NSP), See Note 4 | ||||||||||||
FOB: Destination |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
2010
|
1 | Lot | NSP | NSP | ||||||||
FFP
|
||||||||||||
OPTION | Data Exhibit A (except CDRL A006) | |||||||||||
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A (except Data Item A006) for CLINs 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, and 2009 (Not Separately Priced included in the price of CLINs 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, and 2009) | ||||||||||||
FOB: Destination |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
2011
|
TBN | Lot | TBN | TBN | ||||||
FFP
|
||||||||||
OPTION | Engineering Services | |||||||||
(TBN) Engineering Services (FIRM FIXED PRICE), See Note 6 | ||||||||||
FOB: Destination |
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |||||
2013
|
||||||||||
OPTION
|
RESERVED |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
2015
|
1 | Lot | NSP | NSP | ||||||||
FFP
|
||||||||||||
OPTION | Data Exhibit D | |||||||||||
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit D for CLINs 2011 and 2012 (Not Separately Priced included in the price of CLINs 2011 and 2012) | ||||||||||||
FOB: Destination |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
3001
|
203 | Each | See Table 1 | See Table 1 | ||||||||
FFP
|
||||||||||||
OPTION | MIDS-LVT (1) AN/USQ-140(V)1(C) | |||||||||||
Multifunctional Information Distribution System Low Volume Terminals (MIDS-
LVT (1) (AN/USQ-140(V)1(C),
See Notes 1 and 2 |
||||||||||||
FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
3004
|
17 | Each | See Table 1 | See Table 1 | ||||||||
FFP
|
||||||||||||
OPTION | MIDS LVT(7) AN/USQ-140(V)7(C) | |||||||||||
Multifunctional Information Distribution System Low Volume Terminals (MIDS-
LVT (7) (AN/USQ-140(V)7(C),
See Notes 1 and 2 |
||||||||||||
FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
3007
FFP |
42 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS LVT(11) AN/USQ-140(V)11(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (11) (AN/USQ-140(V)11(C), See Notes 1 and 2 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
3008
FFP |
50 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS-LVT Spare LRUs and SRUs
MIDS-LVT Spare Line Replaceable Units and Shop Replaceable Units (SRUs), See Note 1 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
3009
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
WARRANTY
Warranty (Not Separately Priced NSP), See Note 4 FOB: Destination |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
3010
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
Data Exhibit A (except CDRL A006)
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A (except Data Item A006) for CLINs 3001, 3002, 3003, 3004, 3005, 3006, 3007, 3008, and 3009 (Not Separately Priced included in the price of CLINs 3001, 3002, 3003, 3004, 3005, 3006, 3007, 3008, and 3009) FOB: Destination |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
3011
FFP |
TBN | Lot | TBN | TBN | ||||||
OPTION |
Engineering Services
(TBN) Engineering Services (FIRM FIXED PRICE), See Note 6 FOB: Destination |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
3012
CPFF |
TBN | Lot | TBN | TBN | ||||||
OPTION |
Engineering Services
(TBN) Engineering Services (Cost Plus Fixed Fee or Cost Plus Incentive Fee), See Notes 6 & 7 FOB: Destination UNDEFINED |
|||||||||
|
MAX COST | TBN | ||||||||
|
FIXED FEE | TBN | ||||||||
|
TOTAL MAX COST + FIXED FEE | TBN |
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |||||
3013
|
||||||||||
|
||||||||||
OPTION
|
RESERVED |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
3015
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
Data Exhibit D
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit D for CLINs 3011 and 3012 (Not Separately Priced included in the price of CLINs 3011 and 3012) FOB: Destination |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
4002
FFP |
29 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS LVT(4) AN/USQ-140(V)4(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (4) (AN/USQ-140(V)4(C), See Notes 1, 2, and 3 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
4004
FFP |
14 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS LVT(7) AN/USQ-140(V)7(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (7) (AN/USQ-140(V)7(C), See Notes 1 and 2 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
4005
FFP |
52 | Each | TBD | TBD | ||||||||
OPTION |
MIDS LVT(3) AN/USQ-140(V)3(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (3) (AN/USQ-140(V)3(C), See Notes 2 and 9 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
4006
FFP |
58 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS LVT(2) AN/USQ-140(V)2(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (2) (AN/USQ-140(V)2(C), See Notes 1 and 2 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
4008
FFP |
50 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS-LVT Spare LRUs and SRUs
MIDS-LVT Spare Line Replaceable Units and Shop Replaceable Units (SRUs), See Note 1 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
4009
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
WARRANTY
Warranty (Not Separately Priced NSP), See Note 4 FOB: Destination |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
4010
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
Data Exhibit A (except CDRL A006)
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A (except Data Item A006) for CLINs 4001, 4002, 4003, 4004, 4005, 4006, 4007, 4008, and 4009 (Not Separately Priced included in the price of CLINs 4001, 4002, 4003, 4004, 4005, 4006, 4007, 4008, and 4009) FOB: Destination |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
4011
FFP |
TBN | Lot | TBN | TBN | ||||||
OPTION |
Engineering Services
(TBN) Engineering Services (FIRM FIXED PRICE), See Note 6 FOB: Destination |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
4012
CPFF |
TBN | Lot | TBN | TBN | ||||||
OPTION |
Engineering Services
(TBN) Engineering Services (Cost Plus Fixed Fee or Cost Plus Incentive Fee), See Notes 6 & 7 FOB: Destination UNDEFINED |
|||||||||
|
MAX COST | TBN | ||||||||
|
FIXED FEE | TBN | ||||||||
|
TOTAL MAX COST + FIXED FEE | TBN |
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |||||
4013
|
||||||||||
OPTION
|
RESERVED |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
4014
COST |
TBN | Lot | TBN | TBN | ||||||
OPTION |
TRAVEL
(TBN) Travel in support of CLINs 4011 and 4012, See Notes 5 & 6 FOB: Destination |
|||||||||
|
ESTIMATED COST | TBN |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
4015
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
Data Exhibit D
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit D for CLINs 4011 and 4012 (Not Separately Priced included in the price of CLINs 4011 and 4012) FOB: Destination |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5001
FFP |
125 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS-LVT (1) AN/USQ-140(V)1(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (1) (AN/USQ-140(V)1(C), See Notes 1 and 2 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5002
FFP |
21 | Each | See Table | 1 See Table 1 | ||||||||
OPTION |
MIDS LVT(4) AN/USQ-140(V)4(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (4) (AN/USQ-140(V)4(C), See Notes 1, 2, and 3 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5003
FFP |
52 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS LVT(6) AN/USQ-140(V)6(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (6) (AN/USQ-140(V)6(C), See Notes 1 and 2 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5004
FFP |
10 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS LVT(7) AN/USQ-140(V)7(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (7) (AN/USQ-140(V)7(C), See Notes 1 and 2 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5005
FFP |
39 | Each | TBD | TBD | ||||||||
OPTION |
MIDS LVT(3) AN/USQ-140(V)3(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (3) (AN/USQ-140(V)3(C), See Notes 2 and 9 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5006
FFP |
55 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS LVT(2) AN/USQ-140(V)2(C)
Multifunctional Information Distribution System Low Volume Terminals (MIDS- LVT (2) (AN/USQ-140(V)2(C), See Notes 1 and 2 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5008
FFP |
50 | Each | See Table 1 | See Table 1 | ||||||||
OPTION |
MIDS-LVT Spare LRUs and SRUs
MIDS-LVT Spare Line Replaceable Units and Shop Replaceable Units (SRUs), See Note 1 FOB: Origin |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5009
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
WARRANTY
Warranty (Not Separately Priced NSP), See Note 4 FOB: Destination |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5010
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
Data Exhibit A (except CDRL A006)
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A (except Data Item A006) for CLINs 5001, 5002, 5003, 5004, 5005, 5006, 5007, 5008, and 5009 (Not Separately Priced included in the price of CLINs 5001, 5002, 5003, 5004, 5005, 5006, 5007, 5008, and 5009) FOB: Destination |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
5011
FFP |
TBN | Lot | TBN | TBN | ||||||
OPTION |
Engineering Services
(TBN) Engineering Services (FIRM FIXED PRICE), See Note 6 FOB: Destination |
MAX | ||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||
5012
CPFF |
TBN | Lot | TBN | TBN | ||||||
OPTION |
Engineering Services
(TBN) Engineering Services (Cost Plus Fixed Fee or Cost Plus Incentive Fee), See Notes 6 & 7 FOB: Destination UNDEFINED |
|||||||||
|
MAX COST | TBN | ||||||||
|
FIXED FEE | TBN | ||||||||
|
TOTAL MAX COST + FIXED FEE | TBN |
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |||||
5013
|
||||||||||
OPTION
|
RESERVED |
MAX | ||||||||||||
ITEM NO | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |||||||
5015
FFP |
1 | Lot | NSP | NSP | ||||||||
OPTION |
Data Exhibit D
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, Exhibit D for CLINs 5011 and 5012 (Not Separately Priced - included in the price of CLINs 5011 and 5012) FOB: Destination |
PRICE LIST A: WARRANTY UNIT PRICES | ||||||||||||||||||||
LEVEL OF COVERAGE | ||||||||||||||||||||
FIRST | SECOND | THIRD | FOURTH | FIFTH | ||||||||||||||||
ORDERING | ORDERING | ORDERING | ORDERING | ORDERING | ||||||||||||||||
PERIOD | PERIOD | PERIOD | PERIOD | PERIOD | ||||||||||||||||
4 years/ no | 4 years/ no | 4 years/ no | 4 years/ no | 4 years/ no | ||||||||||||||||
associated | associated | associated | associated | associated | ||||||||||||||||
ITEM | hours | hours | hours | hours | hours | |||||||||||||||
MIDS-LVT(1) Radio Terminal Set
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(4) Radio Terminal Set
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(6) Radio Terminal Set
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(7) Radio Terminal Set
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(3) Radio Terminal Set
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(1) Receiver-Transmitter LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(4) Receiver-Transmitter LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(6) Receiver-Transmitter LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(7) Receiver-Transmitter LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Chassis/Harness SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Internal Power Supply SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Power Amplifier Interface SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
DP/AV MUX SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Signal Message Processor SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Receiver/Synthesizer SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Exciter/IPF SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
RTI/Discretes SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
TP/GND MUX SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
AC Adapter LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Voice SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
TACAN SRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Remote Power Supply LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
High Power Amplifier Group (HPAG) Interface Assembly (HIA) Auxiliary LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(11) Radio Terminal Set
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(2) Radio Terminal Set
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(11) Receiver-Transmitter LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
MIDS-LVT(2) Receiver-Transmitter LRU
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Chassis/Harness SRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Internal Power Supply (IPS) SRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Power Amplifier SRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Signal Message Processor SRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Receiver/Synthesizer SRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Exciter/IPF SRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
RTI/Discretes SRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
DP/Dual ADDSI SRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Voice SRU LVT(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Mounting Base Auxiliary LRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Cooling Unit LRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
PSA LRU LVT(2)/(11) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Ancillary Set LVT(2) only
|
[***] | [***] | [***] | [***] | [***] | |||||||||||||||
Ancillary Set with Voice LVT(11) only
|
[***] | [***] | [***] | [***] | [***] |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. | |
0001-0004:
|
0005: | 0006-0007 : | ||
MIN:12
MAX:416 |
MIN: 0
MAX: 91 |
MIN: 0
MAX: 117 |
2001-2004:
|
2005: | 2006-2007: | ||
MIN: 0
MAX:377 |
MIN: 0
MAX: 78 |
MIN: 0
MAX: 110 |
3001-3004:
|
3005: | 3006-3007: | ||
MIN: 0
MAX:338 |
MIN: 0
MAX: 65 |
MIN: 0
MAX: 104 |
4001-4004:
|
4005: | 4006-4007: | ||
MIN:0
MAX:286 |
MIN: 0
MAX: 52 |
MIN: 0
MAX: 97 |
5001-5004:
|
5005: | 5006-5007: | ||
MIN: 0
|
MIN: 0 | MIN: 0 | ||
MAX: 208
|
MAX: 39 | MAX: 91 |
* | This clause will be included in all cost plus fixed fee completion type delivery orders. | |
** | These elements will be completed in individual delivery orders. |
*** | If the delivery order is fully funded, this will state Cost. If the delivery order is not fully funded, this will state Funds. |
* | This clause will be included in all cost plus fixed fee term type (i.e., level of effort) delivery orders. | |
** | These elements will be completed in individual delivery orders. |
* | This clause will be included in all cost plus incentive fee type delivery orders. | |
** | These elements will be completed in individual delivery orders. |
* | This clause will be included in all task or delivery orders that are incrementally funded. | |
** | These elements will be completed in individual delivery orders. |
Learning | Rate | |||||
MIDS Modules | T1R1 | Curve | Curve | |||
Chassis/Harness SRU LVT(1)
|
* | * | * | |||
Internal Power Supply SRU
|
* | * | * | |||
Power Amplifier Interface SRU
|
* | * | * | |||
Voice SRU
|
* | * | * | |||
Tailored Processor/Ground Mux SRU
|
* | * | * | |||
Data Processor/Avionics Mux SRU
|
* | * | * | |||
Signal Message Processor SRU**
|
* | * | * | |||
RTI/Discretes SRU
|
* | * | * | |||
Receiver/Synthesizer SRU
|
* | * | * | |||
TACAN SRU
|
* | * | * | |||
Exciter/IPF SRU
|
* | * | * | |||
Remote Power Supply LRU
|
* | * | * | |||
HPAG Interface Assembly LRU
|
* | * | * | |||
AC Adapter LRU
|
* | * | * | |||
Chassis/Harness SRU LVT(2)/(11)
|
* | * | * | |||
Data Processor/Dual ADDSI SRU - LVT(2)/(11)
|
* | * | * | |||
Power Supply Assembly LVT(2)/(11)
|
* | * | * | |||
Cooling Unit LRU LVT (2)/(11)
|
* | * | * | |||
Mounting Base LRU LVT(2)/(11)
|
* | * | * | |||
Interconnect Cables LVT(2)
|
* | * | * | |||
Interconnect Cables LVT(11)
|
* | * | * | |||
MIDS-LVT(3)
|
* | * | * |
* | These amounts are included in the ViaSat Pricing Model submitted with its proposal Number 091129.A. This Pricing Model is incorporated by reference into this contract. | |
** | Includes U-TVB CTIC/DS-101 Hybrid |
Learning Curve Formula
|
Y = A(X) b (Q) r | |
Learning Curve Theory
|
Unit or Cumulative Average * |
Variable | Definitions | |
Y
|
* | |
A
|
* | |
X
|
* | |
b
|
Learning Curve Slope | |
Q
|
Delivery Order Quantity | |
r
|
Rate Curve Slope |
* | To be completed by the contractor. |
Technical Data/ | ||||||||
Computer Software | ||||||||
CDRL | Description | Rights Classification | Price | |||||
A001
|
Acceptance Test Procedures | Unlimited | $ | 0 | ||||
A002
|
Acceptance Test Procedures (LRU)(SRU) | Unlimited | $ | 0 | ||||
A003
|
Production Metrics | Unlimited | $ | 0 | ||||
A004
|
Hazardous Material Summary Report | Unlimited | $ | 0 | ||||
A005
|
Contractor Repair Database | Unlimited | $ | 0 | ||||
A006
|
Technical Data Package | * | $ | * | ||||
A007
|
Regression Verification Procedure (RVP) | Unlimited | $ | 0 | ||||
A008
|
Regression Verification Report (RVR) | Unlimited | $ | 0 | ||||
A009
|
Engineering Change Proposal (ECP) Class I | Unlimited | $ | 0 | ||||
A010
|
Notice of Revision (NOR) | Unlimited | $ | 0 | ||||
A011
|
ECP Product Baseline (PBL) | Unlimited | $ | 0 | ||||
A012
|
ECP Class II | Unlimited | $ | 0 | ||||
A013
|
Request for Deviation (RFD) | Unlimited | $ | 0 | ||||
A014
|
Configuration Management Accounting Report (CMAR) | Unlimited | $ | 0 | ||||
A015
|
Configuration Data Information | Unlimited | $ | 0 | ||||
A016
|
Data Accession List | Unlimited | $ | 0 |
* | If the Government orders data item A006, the Governments data and software rights in that data item will be in accordance with the DFARS data and software rights clauses in the contract unless the Government and Contractor agree on data and software rights for the Government that are greater than those obtained by the Government via those DFARS clauses. |
Name of Holiday | Time of Observance | |
New Years Day
|
1 January | |
Martin Luther King Jr. Day
|
Third Monday in January | |
Presidents Day
|
Third Monday in February | |
Memorial Day
|
Last Monday in May | |
Independence Day
|
4 July | |
Labor Day
|
First Monday in September | |
Columbus Day
|
Second Monday in October | |
Veterans Day
|
11 November | |
Thanksgiving Day
|
Fourth Thursday in November | |
Christmas Day
|
25 December |
(3) Automobile liability:
|
$200,000 per person | |
|
$500,000 per occurrence | |
|
$20,000 per occurrence for property damage |
(3) Automobile liability:
|
$200,000 per person | |
|
$500,000 per occurrence | |
|
$20,000 per occurrence for property damage |
X | The EIT to be provided under this contract has been designated as a National Security System. | |
The EIT acquired by the contractor is incidental to this contract. | ||
The EIT to be provided under this contract would require a fundamental alteration in the nature of the product or its components in order to comply with the EIT Accessibility Standards. | ||
The EIT to be provided under this contract will be located in spaces frequented only by service personnel for maintenance, repair, or occasional monitoring of equipment. | ||
Compliance with the EIT Accessibility Standards would impose an undue burden on the agency. | ||
The EIT to be provided under this contract is purchased in accordance with FAR Subpart 13.2 prior to January 1, 2003. |
NAVY &
|
Commanding Officer | |
MARINE CORPS:
|
Navy and Marine Corps Public Health Center | |
|
Attn: IH/HMIRS | |
|
620 John Paul Jones Cir., Suite 100 | |
|
Portsmouth, VA 23708-2103 | |
|
Telephone: (757) 953-0746/0741; DSN: 377-0746 / 0471 | |
|
FAX: (757) 953-0685 | |
|
||
AIR FORCE:
|
USASSAM | |
|
Attn: HMIRS | |
|
2513 Kennedy Cir. | |
|
Brooks AFB, TX 78235-5116 | |
|
Telephone: (210) 536-5447; DSN: 240-5447 | |
|
FAX: (210) 536-2315 | |
|
||
ARMY:
|
Chief | |
|
USAMC LOGSA Packaging, Storage, Containerization Center | |
|
ATTN: AMXLS-AT-P | |
|
11 Hap Arnold Blvd. | |
|
Tobyhanna, PA 18466-5097 | |
|
Telephone: (570) 615-7685; DSN: 795-7685 | |
|
FAX: (570) 895-7175 |
TYPE OF SHIPMENT | APPLICABLE REGULATIONS | |
|
||
1. Domestic
|
A | |
2. Domestic Air Commercial
|
A, B, C | |
3. Domestic Air Military
|
A, F | |
4. Export Surface
|
A, E, G | |
5. Export Air Commercial
|
A, D, G | |
6. Export Air Military
|
F, G |
SHIP TO:
|
MARK FOR: | |
RECEIVING OFFICER
|
Contract #: N00039-10-D-0032 | |
|
Delivery Order #: * | |
|
Item #: * | |
|
Receiving Officer Code: * |
* | Shipping instructions will be provided in each individual delivery order or by separate correspondence near the time of delivery. |
(a) | The Contractor shall provide a durable, readable, and indelible identification label or plate that is securely applied, fastened, or attached to each LRU and SRU in a conspicuous location. The label text font size shall be no smaller than 8pt. | |
(b) | The LRU label or plate shall identify the following (accepted abbreviations are noted): |
(c) | The SRU label or plate shall be affixed to the visible edge when the card cage cover is removed and shall identify the following (accepted abbreviations are noted): |
(d) | An additional SRU label or plate shall be affixed to other free space on the SRU and shall identify the following (accepted abbreviations are noted): |
(e) | If a warranty applies, the contractor shall additionally affix a Warranty Label to the individual LRU/SRU that: |
** | Once per item. |
52.246-2
|
Inspection Of SuppliesFixed Price | AUG 1996 | ||
52.246-3
|
Inspection Of Supplies Cost-Reimbursement | MAY 2001 | ||
52.246-4
|
Inspection Of ServicesFixed Price | AUG 1996 | ||
52.246-5
|
Inspection Of Services Cost-Reimbursement | APR 1984 | ||
52.246-7
|
Inspection Of Research And Development Fixed Price | AUG 1996 | ||
52.246-8
|
Inspection Of Research And Development Cost Reimbursement | MAY 2001 | ||
52.246-16
|
Responsibility For Supplies | APR 1984 | ||
252.246-7000
|
Material Inspection And Receiving Report | MAR 2008 |
52.242-15
|
Stop-Work Order | AUG 1989 | ||
52.242-15 Alt I
|
Stop-Work Order (Aug 1989) Alternate I | APR 1984 | ||
52.242-17
|
Government Delay Of Work | APR 1984 | ||
52.247-30
|
F.O.B. Origin, Contractors Facility | FEB 2006 | ||
52.247-34
|
F.O.B. Destination | NOV 1991 | ||
52.247-48
|
F.O.B. DestinationEvidence Of Shipment | FEB 1999 | ||
52.247-55
|
F.O.B. Point For Delivery Of Government-Furnished Property | JUN 2003 |
CLIN(S) | PERIOD(S) OF PERFORMANCE FOR ISSUING ORDERS | |
0001 - 0015
|
FROM DATE OF CONTRACT AWARD THROUGH ONE (1) YEAR THEREAFTER |
CLIN(S) | PERIOD(S) OF PERFORMANCE FOR ISSUING ORDERS | |
1001 - 1002
|
FROM DATE OF CONTRACT AWARD THROUGH FIVE YEARS THEREAFTER | |
2001 - 2015
|
FROM DATE OF OPTION EXERCISE THROUGH ONE YEAR THEREAFTER | |
3001 - 3015
|
FROM DATE OF OPTION EXERCISE THROUGH ONE YEAR THEREAFTER | |
4001 - 4015
|
FROM DATE OF OPTION EXERCISE THROUGH ONE YEAR THEREAFTER | |
5001 - 5015
|
FROM DATE OF OPTION EXERCISE THROUGH ONE YEAR THEREAFTER |
ITEM(S) | QTY/UNIT | DELIVERY SCHEDULE/PERIOD OF PERFORMANCE | ||
0001-0008, 2001-2008,
3001-3008, 4001-4008 5001-5008 |
In accordance with (IAW) each Delivery Order | IAW each delivery order issued under the contract and within the requirements stated in clause F-2. |
ITEM(S) | QTY/UNIT | DELIVERY SCHEDULE/PERIOD OF PERFORMANCE | ||
1002*
|
1 LOT | Upon issuance of a delivery order for this CLIN |
* | The Government may order Data Rights under CLIN 1002 on an individual CDRL basis in accordance with Clause F-2, Period of Performance for Ordering, Orders, and Options to Extend the Contract. For those CDRLs identified in Section B, Table 3, with a price of $0, the Government immediately obtains the rights in those CDRLs identified in the schedule, at no cost, when those CDRLs are delivered to the Government under individual delivery order(s) |
ITEM(S) | DESTINATION | QUANTITY | DELIVERY SCHEDULE/PERIOD OF PERFORMANCE | |||
0011-0014
|
IAW each delivery order |
IAW each delivery
or task order |
IAW each delivery or task order | |||
|
||||||
0010, 0015, 1001,
2010, 2015, 3010, 3015, 4010, 4015, 5010, 5015 |
IAW CDRL, Exhibit A | 1 LOT | IAW CDRL, Exhibit A | |||
|
||||||
0009, 2009, 3009,
4009, 5009 |
IAW each delivery order |
IAW each delivery
order |
IAW Clause H-39 (Warranty
Clause) |
WAWF Invoice Type *
|
Insert Contract Invoice Type | |
|
||
Issuing Office DODAAC
|
Insert the UIC of the issuing contract office | |
|
||
Admin DODAAC
|
Insert the UIC of the contract administering office [SF26=Block 6; DD1155=Block 7 (Block 6 if SeaPort order); SF1449=Block 16] | |
|
||
Inspector DODAAC (if applicable)
|
Insert the UIC of the inspecting activity | |
|
||
Inspector Contact Information
|
Insert Inspector name, phone number, and email address | |
|
||
Service Acceptor DODAAC
or
Service Approver DODAAC (Cost
Voucher).
|
Insert Acceptor name, phone number, and email address | |
|
||
Acceptor Contact Information
|
Insert Acceptor name, phone number, and email address | |
|
||
COR Contact Information
|
If other than above, Insert the COR name, email address and phone number. | |
|
||
LPO Contact Information
|
Insert Local Processing Official name, phone number, and email address | |
|
||
DCAA Auditor DoDAAC **:
|
Insert the UIC of the DCAA Auditor | |
|
||
Service Approver DoDAAC **:
|
Insert the UIC of the on-site Approver who signs off on the final cost voucher | |
|
||
PAY DODAAC
|
Insert the UIC of the paying DFAS activity [SF26=Block 12 (labeled Code); DD1155=Block 15 (Block 12 if SeaPort order); SF1449=Block 18a] |
* | Select Cost Voucher for all cost-type, T&M, or Labor Hour; or 2-n-1 (Services Only) for fixed price services where inspection of services can be performed and documented. | |
** | Only applies to cost vouchers. | |
(g) | After submitting the document(s) to WAWF, click on Send More Email Notifications and add the acceptor/receiver email addresses noted below in the email address blocks. This additional notification to the government is necessary to ensure that the acceptor/receiver is aware that the invoice documents have been submitted into WAWF: |
Send Additional Email Notification(s) to: | ||||||
Name | Phone | Role | ||||
Dave Felker
|
David.Felker@navy.mil | (619) 524-1493 | COR | |||
Maat Little
|
Maat.Little@dcma.mil | (858) 495-7473 | Receiver | |||
Same as Receiver
|
Same as Receiver | Same as Receiver | Acceptor |
(e) | A separate invoice will be prepared for each delivery order or purchase order. Do not combine the payment claims for supplies provided under this contract ordered through multiple delivery orders within one invoice. |
WAWF Invoice Type *
|
Insert Contract Invoice Type | |
|
||
Issuing Office DODAAC
|
Insert the UIC of the issuing contract office | |
|
||
Admin DODAAC
|
Insert the UIC of the contract administering office [SF26=Block 6; DD1155=Block 7 (Block 6 if SeaPort order); SF1449=Block 16] | |
|
||
Inspector DODAAC (if
applicable) |
Insert the UIC of the inspecting activity | |
|
||
Inspector Contact Information
|
Insert Inspector name, phone number, and email address | |
|
||
Acceptor, Ship To DODAAC
(for Combo) or, Service Approver DODAAC (Cost Voucher) |
Insert the UIC of the accepting activity | |
|
||
Acceptor Contact Information
|
Insert Acceptor name, phone number, and email address | |
|
||
COR Contact Information
|
If other than above, Insert the COR name, email address and phone number. | |
|
||
LPO Contact Information
|
Insert Local Processing Official name, phone number, and email address | |
|
||
DCAA Auditor DoDAAC **
|
Insert the UIC of the DCAA Auditor | |
|
||
Service Approver DoDAAC **
|
Insert the UIC of the on-site Approver who signs off on the final cost voucher | |
|
||
PAY DODAAC
|
Insert the UIC of the paying DFAS activity [SF26=Block 12 (labeled Code); DD1155=Block 15 (Block 12 if SeaPort order); SF1449=Block 18a] |
* | Select Invoice and Receiving Report (Combo) if billing for goods, or goods and incidental services together; or Cost Voucher for all cost-type, T&M, or Labor Hour | |
** | Only applies to cost vouchers. |
Send Additional Email Notification(s) to: | ||||||
Name | Phone | Role | ||||
David Felker
|
David.Felker | (619) 524-1493 | COR | |||
Maat Little
|
Maat.Little@dcma.mil | (858) 495-7473 | Receiver | |||
Same as Receiver
|
Same as Receiver | Same as Receiver | Acceptor |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Name:
|
Melissa Hawkins | |
Activity:
|
Space and Naval Warfare Systems Command | |
Code:
|
2.1D2 | |
Address:
|
Naval Base Point Loma, Naval Mine and Anti-Submarine Command
Complex
33000 Nixie Way San Diego, CA 92147-5110 |
|
Phone:
|
(619) 524-5626 |
* | To be completed in individual delivery orders when the Government opts to use a Government Bill of Lading to pay for shipment of terminals and spares. |
* | If for reasons of company proprietary interest, it is desired to withhold names of individuals from the report, a unique identifier (such as a payroll number) will be accepted; provided, however, that no more than one such identifier is utilized by any individual under this or any other contract effort and that the names of the individuals so identified will be made available to the Contracting Officer when requested. | |
** | Does not apply to completion type orders. |
Type of Contract | ||||
Instrument (see | ||||
DFARS | ||||
CLIN | Contract Type by CLIN | 204.7003(a)(3)) | ||
0001-0008,
2001-2008,
3001-3008,
4001-4008,
5001-5008
|
Firm-fixed-price | D | ||
|
||||
0009, 2009, 3009,
4009, 5009 |
Not Separately Priced (NSP) | |||
|
||||
0010, 2010, 3010,
4010, 5010 |
NSP | D | ||
|
||||
0011, 2011, 3011,
4011, 5011 |
Firm Fixed Price | D | ||
|
||||
0012, 2012, 3012,
4012, 5012 |
Cost Plus Fixed Fee/Cost Plus
Incentive Fee |
D | ||
|
||||
0014, 2014, 3014,
4014, 5014 |
Cost-Reimbursement with No Fee | D | ||
|
||||
0015, 2015, 3015,
4015, 5015 |
NSP | D | ||
|
||||
1001
|
Firm Fixed Price | D | ||
|
||||
1002
|
NSP | D |
* | This clause will be included in any incrementally funded task or delivery order and completed with the incrementally funded dollar amount and a date through which this funding should cover contract performance in each individual task or delivery order. |
* | Any inconsistencies between specifications shall be resolved by giving precedence in the following order: |
CLIN(Including any SLINs Thereunder)
MINIMUM
MAXIMUM
See Section B, Note 2
See Section B, Note 2
0 EACH
50 each
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
See Section B
See Section B, Note 2
See Section B
See Section B, Note 2
See Section B
See Section B, Note 2
See Section B
See Section B, Note 2
0 EACH
50 each
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
0 EACH
50 each
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
0 EACH
50 each
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
0 EACH
50 each
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
1 LOT
* | CLINs 0009, 0010, 2009, 2010, 3009, 3010, 4009, 4010, 5009, and 5010 are not separately priced; these CLINs are included in the Firm Fixed Price for CLINs 0001 through 0008, 2001 through 2008, 3001 through 3008, 4001 through 4008, and 5001 through 5008 respectively. | |
** | CLINs 0015, 2015, 3015, 4015, and 5015 are not separately priced; these CLINs when ordered in a cost plus fixed fee order are included in the Cost Plus Fixed Fee of CLINs 0012, 2012, 3012, 4012, and 5012 respectively. | |
*** | CLINs 0015, 2015, 3015, 4015, and 5015 are not separately priced; these CLINs when ordered in a cost plus incentive fee order are included in the Cost Plus Incentive Fee of CLINs 0012, 2012, 3012, 4012, and 5012 respectively. |
(A) | Individual orders shall be placed using one of the following selection procedures: |
(1) | The ordering officer may request technical proposals and price proposals from each awardee and make award(s) to the contractor(s) whose proposal(s), in the judgment of the ordering officer, represents the best value to the government. The contractor is permitted to propose improvements (e.g., performance, schedule, prices contained in or listed at TBD in Section B of this contract) in its quotation. Best value is defined as the expected outcome of an acquisition that, in the Governments estimation, provides the greatest overall benefit in response to the requirement (FAR 2.101). | ||
(2) | The ordering officer may utilize existing contract prices determined in accordance with clause B-4. The contractor may propose price improvements to clause B-4 at any time |
after contract award. |
(B) | The Government desires continuous improvements in terminal & spares pricing via updates to the pricing structure contained in clause B-4. The Government considers a price improvement to be an updated pricing structure (e.g., learning curve in clause B-4) that results in a lower, overall MIDS-LVT price. If the contractor proposes terminal and spares pricing independent of clause B-4, the Government may elect to disregard such prices even if they may be lower than prices derived from clause B-4. If determined to be the best value to the Government, the ordering officer may utilize an offerors higher prices from an existing clause B-4 or a proposed updated clause B-4. | |
(C) | Regardless of the selection procedures utilized, the ordering officer will consider existing prices from Section B (including clause B-4) and any proposed price improvements to clause B-4, and may consider a variety of factors, including, but not limited to: |
(a) | information received from the contractor(s) in response to the contracting officers request for cost/technical proposals, if requested; | ||
(b) | past performance under this contract including all outstanding and previous delivery orders; | ||
(c) | the price and extent of technical data rights, computer software rights, and computer software documentation rights in the Technical Data Package; | ||
(d) | warranty prices; | ||
(e) | delivery rate(s). |
If the ordering officer utilizes selection procedure (A)(1), the RFP will specify instructions for submitting a proposal, identify the technical factors that will be used in the evaluation, along with their relative order of importance, and will state the relative importance of the technical factors to price. The technical factors in the RFP may not include all of those identified in paragraph (C) above, and may include other technical factors more appropriate for the particular requirement. | ||
(D) | The ordering officer may elect not to compete the award of any particular order if one or more of the following conditions exist: |
(a) | The agency need for such supplies or services is so urgent that providing the opportunity would result in unacceptable delays; | ||
(b) | Only one contractor is capable of providing such supplies or services at the level of quality required because the supplies or services are unique or highly specialized; | ||
(c) | The order should be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order; | ||
(d) | It is necessary to place an order to satisfy a minimum guarantee; or | ||
(e) | If the Government utilizes existing prices in Section B (Clause B-4) provided such prices were based on adequate price competition. |
NAME
|
Melissa L. Hawkins | |
|
||
ADDRESS
|
Naval Base Point Loma, Naval Mine and Anti-Submarine Command
|
|
|
Complex
|
|
|
33000 Nixie Way
|
|
|
San Diego, CA 92147-5110 | |
|
||
TELEPHONE
|
(619) 524-5626 | |
|
||
E-MAIL
|
melissa.hawkins@navy.mil |
(a) | Instruction Generale Interministerielle 1300/SGDN/DR of 12 March 1982; | ||
(b) | Instruction Interministerielle 2000/SGDN/SSD/DR of 01 October 1986; and | ||
(c) | Instruction 2500/DEF/C23 of 26 January 1983. |
| PCM-ANS 1/R/A del 28.01.1986 | ||
| ANS-NDA 296 |
| ANS-S/R e altre |
a) | The Contractor has submitted a Certificate of Compliance (H-12) after successful completion of contractor Qualification which was performed in accordance with a Government approved contractor qualification plan/procedure. The certificate shall state, as applicable, that the Contractors first article meets all of the requirements of the MIDS Functional and Allocated baselines detailed in Attachment F. | ||
b) | The Contractor has submitted an EMC Features Approval (H-16). | ||
c) | The Contractor has submitted a signed COMSEC Approval for Use (H-17). | ||
d) | The Contractor has submitted a signed Air Worthiness certificate (H-15) for terminals to be operated in an airborne environment. | ||
e) | The Contractor has successfully demonstrated LRU and SRU interchangeability in accordance with Clause C-2. | ||
f) | The contractors terminal has successfully passed any Government executed qualification testing that the Government, at its discretion, deems necessary. |
SOURCE | DESCRIPTION | QTY | DATE | DESTINATION | NOTES | |||||
*
|
* | * | * | * | * |
* | In support of this contract, the Contractor is authorized to use the Government Furnished Property currently authorized for use on Contract N00039-00-D-2101. |
SOURCE | DESCRIPTION | QTY | DATE | DESTINATION | NOTES | |||||
IPO
|
MIDS CORE Software*
MIDS TIO Software* MIDS ADDSI Software* MIDS CSIA Software* NSIO Software* NCP software* FDL Software* |
1 EA
1 EA 1 EA 1 EA |
Initial: 3 Months After Contract Award. Updates version provided as available. | Available on EMS | Version Description Documents will be provided with the software. Deliveries shall include all source, definition, build files, and all other necessary files to create executables, plus final executables. | |||||
|
||||||||||
NSA
|
[***] | 1 per FMS SMP SRU ordered. | 6 months after effective date of each production order | Contractors Plant | See clauses H.21. |
* | Updated versions to be provided as they become available |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
(b) | Only the material listed above in the quantities shown will be furnished by the Government notwithstanding any provisions of the specification(s) to the contrary. Government Furnished Material will be delivered, all transportation charges paid, to the cognizant contract administration office specified herein, in care of the Contractors plant. |
A. | Acceptance: The execution of an official document (DD Form 250) by an authorized representative of the Government. | |
B. | Cosmetic damage: Cosmetic damage includes faded or chipped paint, scratches, minor dents, nicks, or other damage resulting from normal and customary use that does not affect the operational use or maintenance of the item. | |
C. | Defect: A condition or characteristic that causes an items performance not to meet the specifications or other requirements of the contract, or when an item lacks something essential for completeness for its intended use. A defect does not necessarily affect performance. | |
D. | Design and Manufacturing Requirements: The structural and engineering plans and manufacturing particulars, including precise measurements, tolerances, materials and finished product tests for the items being procured under this contract. | |
E. | Failure: A breakdown or degradation of operation or function. Failures include items returned to the contractors facility that are identified as NEOF (RTOK, NFF and A-799). |
F. | Individual Coverage: Warranty coverage that requires the contractor to correct all failures for any reason (except for Out-of-warranty Items or Non-warranty Items) via individual warranty claim actions for each failure at no additional cost to the Government. | |
G. | Items: MIDS-LVT (1, 2, 3, 4, 5, 6, 7, 8, 9, 10 and 11) Terminal Sets, LRUs, SRUs and ancillary items delivered under this contract, inclusive of all hardware, firmware, software (except GFE software). | |
H. | No Evidence of Failure: The term No Evidence of Failure or NEOF, as used herein, means a returned item that upon initial checkout by the contractor, successfully completes the performance verification testing as defined in the LRU or SRU Acceptance Test Plan (ATP). NEOF is the same as a Retest Okay (RTOK), No Fault Found (NFF), Can Not Duplicate (CND) or A-799. | |
I. | Non-warranty Items: Items that are not warranted, or are excluded under the exclusion clause of this contract. | |
J. | Out-of-warranty Items: Items for which the timeframe in calendar years exceeds the warranty. | |
K. | Repair: The elimination of a defect or correction of a failure. Correction of cosmetic damage is not required unless it effects the operation or maintenance of the item. | |
L. | Repetitive Failure: When at least 3 items delivered to the government over any six-month period of time have failed with the same root cause, the failures are considered repetitive. | |
M. | Retrofit Plan: A retrofit plan describes how the contractor will implement corrections to defects or systemic failures for all fielded items. | |
N. | Systemic/Performance Coverage: Warranty coverage that requires the contractor to correct the cause of repetitive failures or defects for all items. A retrofit plan for repetitive failures or defects is required. | |
O. | Terminal: Includes all of the SRUs and LRUs that make up a MIDS-LVT (1, 2, 3, 4, 5, 6, 7, and 11) ordered under Section B. | |
P. | Turn-Around Time, Contractor Issue: The Contractor Issue TAT (CITAT) clock begins upon receipt of a customer/user requisition at the contractor site, and ends upon delivery to the customer at either a Continental United States (CONUS) operational site, or a CONUS beach/field detachment for military forwarding to an Outside CONUS (OCONUS) site. | |
Q. | Turn-Around Time, Depot Repair: The contractor Depot Repair TAT clock begins upon receipt of a returned SRU or LRU at the contractor site, and ends when it is either placed into wholesale inventory or shipped to user. | |
R. | Warranty: Individual and Systemic/Performance Coverage. |
S. | Turn-Around Time, Warranty: Working days from the time an asset is inducted for repair until the item is certified ready for issue. |
A. | The rights and remedies of the Government provided for in this warranty do not limit, but are in addition to, the rights the Government has under any other clause of this contract. The requirements of this warranty do not limit the Governments rights under the inspection and acceptance provisions of the contract. | ||
B. | This warranty shall not be voided by any Government performed repair of any warranted item when accomplished in accordance with accepted Government maintenance concepts. | ||
C. | The Government shall not be responsible for any extension or delay in the scheduled deliveries or periods under this contract as a result of the contractors obligation to repair or replace defective or failed items. There shall not be any adjustments of the delivery schedule or periods of performance as a result of the repair or replacement of defective or failed items, unless provided for by the inclusion of a modification, with adequate consideration to the Government in this contract. |
(1) | Combat damage | ||
(2) | Damage or failures, that are beyond the control of and not attributable to the contractor, that are caused by: |
(a) | willful misconduct | ||
(b) | abuse | ||
(c) | improper user installation or application (e.g. improper cabling, rack mounting, power input or exposure to environmental conditions beyond specific capabilities) | ||
(d) | maintenance not executed in accordance with the Government maintenance concept | ||
(e) | negligence in transportation, with the exception of transportation covered under warranty paragraph XIIB, handling, or storage | ||
(f) | use by non-contractor personnel of shipping containers other than those specified per ASTM D3951-95 Standard Practice for Commercial Packaging, if use of such container resulted in damage | ||
(g) | catastrophic damage such as fire, flood or explosion | ||
(h) | act of God |
A. | Labeling or Plating | ||
The contractor shall provide contractor data markings for identification of each LRU and SRU in accordance with the requirements contained in Section D. | |||
B. | Transportation costs | ||
The contractor shall be responsible for the cost of transporting warranted items back to the Government designated point of delivery. Shipment shall be made by the most expedient means available. Preservation, packaging, packing and handling of repaired items shall be in accordance with the requirements contained in Section D. |
(a) | In performance of this contract, the Contractor shall participate with the other MIDS production contractors, Government, and SSAs in the TWG, PRB, and ICWG. The TWG shall be a forum, chaired by the Government, that provides the communication link between the MIDS production contractors, the Government, the SSAs, the MIDS International Program Office (IPO), national representatives, and senior technical and platform integrator representatives, for resolving interface and technical problems. The PRB shall be a forum, chaired by the Government, that addresses and monitors the status and disposition of problems and deficiencies. The ICWG shall be a forum for the MIDS production contractors, Government, and SSAs to discuss technical issues concerning Engineering Change Proposals (ECPs) to ensure that all parties agree on the exact technical wording of Specification change(s) prior to the MIDS production contractors submitting ECPs to the Government. The purpose of the ICWG is to develop, control, and coordinate changes to the MIDS Functional Baseline and Allocated Baseline documents prior to submission of an ECP and Companion ECPs to the Government. Incident to its participation in the TWG, PRB, and ICWG, the Contractor agrees to disclose to other MIDS Production and SSA contractors, after the execution of suitable proprietary information protection agreements, data and software requested by the TWG, PRB, or ICWG that are relevant and necessary to ensure a complete and successful agreement on the technical wording of potential FBL and ABL ECPs. | ||
(b) | In the event that the Contractor considers any direction, or other conduct by the TWG, PRB, and ICWG, or any member thereof, to constitute a change to this contract, it shall refrain from acting thereon, and shall so notify the Contracting Officer in accordance with the terms and conditions of the Notification of Changes clause of this contract. | ||
(c) | In addition to participating in the TWG, PRB, and ICWG, the Contractor shall establish associate contractor relationships, as described below, to ensure the successful completion of interface control documentation. | ||
(d) | All data and software to which limited/restricted rights apply that is furnished by the Contractor to other MIDS production contractors, the Government and SSAs |
through the TWG, PRB, and ICWG shall bear the appropriate markings as delineated in DFARS 252.227-7013 and 252.227-7014. Except with the prior written permission of the Contractor, the Government shall not release, use, or disclose, in whole, or in part, such data or software for any purpose other than the performance of the interface requirements of this contract. This provision, however, shall not limit the rights of the Government in such data and software that are lawfully obtained from another source. | |||
(e) | Furthermore, the Contractor hereby agrees that it shall use data and software to which limited/restricted rights apply, whether provided by the Government, other MIDS production contractors, or SSAs through the TWG, PRB, or ICWG, solely for the purposes of fulfilling the TWG, PRB, and ICWG requirements detailed in this contract, and agrees to indemnify and hold the Government harmless against any claim asserted by any party arising out of the Contractors use of such data and software. This provision, however, shall not limit any right of the Contractor to use such data and software that is lawfully obtained from some other source. | ||
(f) | The Contractor shall be responsible for notifying the Government as to any information, including data and software, requested at the TWG, PRB, and ICWG that the Contractor believes to be of a limited/restricted rights nature. | ||
(g) | Nothing in this clause shall be construed as limiting the parties rights under the Rights in Technical Data and Computer Software clauses contained in this contract. | ||
(h) | While the Government will attempt to facilitate the exchange of information amongst the MIDS production contractors, Government, and SSAs, the Contractor is solely responsible for obtaining and providing all information necessary to successfully perform the requirements of this contract. |
Definitions
JUL 2004
Gratuities
APR 1984
Covenant Against Contingent Fees
APR 1984
Restrictions On Subcontractor Sales To The Government
SEP 2006
Anti-Kickback Procedures
JUL 1995
Cancellation, Rescission, and Recovery of Funds for
Illegal or Improper Activity
JAN 1997
Price Or Fee Adjustment For Illegal Or Improper Activity
JAN 1997
Limitation On Payments To Influence Certain Federal
Transactions
SEP 2007
Contractor Code of Business Ethics and Conduct
DEC 2008
Security Requirements
AUG 1996
Printed or Copied Double-Sided on Recycled Paper
AUG 2000
Central Contractor Registration
APR 2008
Personal Identity Verification of Contractor Personnel
SEP 2007
Reporting Subcontract Awards
SEP 2007
Protecting the Governments Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
SEP 2006
Material Requirements
AUG 2000
Defense Priority And Allocation Requirements
APR 2008
Audit and RecordsNegotiation
MAR 2009
Order of PrecedenceUniform Contract Format
OCT 1997
Price Reduction for Defective Cost or Pricing Data
OCT 1997
Subcontractor Cost or Pricing Data
OCT 1997
Integrity of Unit Prices
OCT 1997
Pension Adjustments and Asset Reversions
OCT 2004
Reversion or Adjustment of Plans for Postretirement
Benefits (PRB) Other than Pensions
JUL 2005
Notification of Ownership Changes
OCT 1997
Requirements for Cost or Pricing Data or Information
Other Than Cost or Pricing DataModifications
OCT 1997
Allowable Cost And Payment
DEC 2002
Fixed Fee
MAR 1997
Cost ContractNo Fee
APR 1984
Payments Of Allowable Costs Before Definitization
DEC 2002
Notice of Price Evaluation Preference for HUBZone Small
Business Concerns
JUL 2005
Utilization of Small Business Concerns
MAY 2004
Small Business Subcontracting Plan
APR 2008
Liquidated Damages-Subcontracting Plan
JAN 1999
Small Disadvantaged Business Participation
ProgramDisadvantaged Status and Reporting
APR 2008
Post-Award Small Business Program Rerepresentation
APR 2009
Child Labor Cooperation with Authorities and Remedies
AUG 2009
Walsh-Healey Public Contracts Act
DEC 1996
Prohibition Of Segregated Facilities
FEB 1999
Equal Opportunity
MAR 2007
Notification Of Visa Denial
JUN 2003
Equal Opportunity For Special Disabled Veterans, Veterans
of the Vietnam Era, and Other Eligible Veterans
SEP 2006
Affirmative Action For Workers With Disabilities
JUN 1998
Employment Reports On Special Disabled Veterans, Veterans
Of The Vietnam Era, and Other Eligible Veterans
SEP 2006
Notification of Employee Rights Concerning Payment of
Union Dues or Fees
DEC 2004
Combating Trafficking in Persons
FEB 2009
Employment Eligibility Verification
JAN 2009
Pollution Prevention and Right-to-Know Information
AUG 2003
Drug-Free Workplace
MAY 2001
Ozone-Depleting Substances
MAY 2001
Toxic Chemical Release Reporting
AUG 2003
Restrictions on Certain Foreign Purchases
JUN 2008
Authorization and Consent
DEC 2007
Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
Patent Indemnity
APR 1984
Filing Of Patent ApplicationsClassified Subject Matter
DEC 2007
Insurance Work On A Government Installation
JAN 1997
InsuranceLiability To Third Persons
MAR 1996
Federal, State And Local Taxes
APR 2003
TaxesForeign Fixed-Price Contracts
JUN 2003
Cost Accounting Standards
OCT 2008
Administration of Cost Accounting Standards
MAR 2008
Payments
APR 1984
Discounts For Prompt Payment
FEB 2002
Limitation On Withholding Of Payments
APR 1984
Extras
APR 1984
Progress Payments
JUL 2009
Progress Payments (Jul 2009) Alternate III
APR 2003
Interest
OCT 2008
Limitation Of Cost
APR 1984
Limitation Of Funds
APR 1984
Prompt Payment
OCT 2008
Prompt Payment (Oct 2008) Alternate I
FEB 2002
Payment by Electronic Funds TransferCentral Contractor
Registration
OCT 2003
Disputes
JUL 2002
Disputes (Jul 2002) - Alternate I
DEC 1991
Protest After Award
AUG 1996
Protest After Award (Aug 1996) - Alternate I
JUN 1985
Applicable Law for Breach of Contract Claim
OCT 2004
Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
Continuity Of Services
JAN 1991
Privacy or Security Safeguards
AUG 1996
Notice of Intent to Disallow Costs
APR 1984
Penalties for Unallowable Costs
MAY 2001
Certification of Final Indirect Costs
JAN 1997
Bankruptcy
JUL 1995
ChangesFixed Price
AUG 1987
ChangesFixed Price (Aug 1987) - Alternate I
APR 1984
ChangesFixed-Price (Aug 1987) - Alternate II
APR 1984
ChangesCost-Reimbursement
AUG 1987
ChangesCost-Reimbursement (Aug 1987) - Alternate I
APR 1984
ChangesCost Reimbursement (Aug 1987) - Alternate II
APR 1984
Change Order Accounting
APR 1984
Subcontracts
JUN 2007
Competition In Subcontracting
DEC 1996
Subcontracts for Commercial Items
AUG 2009
Government Property
JUN 2007
Government Property (Jun 2007) Alternate I
JUN 2007
Use And Charges
JUN 2007
Limitation Of LiabilityHigh-Value Items
FEB 1997
Limitation Of LiabilityServices
FEB 1997
Preference For U.S. Flag Air Carriers
JUN 2003
Value Engineering
FEB 2000
Termination For Convenience Of The Government (Fixed-Price)
MAY 2004
Termination (Cost Reimbursement)
MAY 2004
Default (Fixed-Price Supply & Service)
APR 1984
Excusable Delays
APR 1984
Computer Generated Forms
JAN 1991
Contracting Officers Representative
DEC 1991
Prohibition On Persons Convicted of Fraud or Other
Defense-Contract-Related Felonies
DEC 2008
Requirement to Inform Employees of Whistleblower Rights
JAN 2009
Disclosure Of Information
DEC 1991
Payment For Subline Items Not Separately Priced
DEC 1991
Control Of Government Personnel Work Product
APR 1992
Central Contractor Registration (52.204-7) Alternate A
SEP 2007
Oral Attestation of Security Responsibilities
NOV 2001
Requirements for Contracts Involving Export-Controlled
Items
JUL 2008
Provision Of Information To Cooperative Agreement Holders
DEC 1991
Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DEC 2006
Acquisition Streamlining
DEC 1991
Substitutions for Military or Federal Specifications and
Standards
NOV 2005
Radio Frequency Identification
FEB 2007
Reporting of Government-Furnished Equipment in the DoD
Item Unique Identification (IUID) Registry
NOV 2008
Pricing Adjustments
DEC 1991
Cost Estimating System Requirements
DEC 2006
Excessive Pass-Through Charges
MAY 2008
Small Business Subcontracting Plan (DOD Contracts)
APR 2007
Compliance With Local Labor Laws (Overseas)
JUN 1997
Drug Free Work Force
SEP 1988
Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 1993
Buy American Act And Balance Of Payments Program
JAN 2009
Qualifying Country Sources As Subcontractors
APR 2003
Report of Contract Performance Outside the United States
and CanadaSubmission after Award
MAY 2007
Identification Of Expenditures In The United States
JUN 2005
Quarterly Reporting of Actual Contract Performance
Outside the United States
MAY 2007
Restriction on Acquisition of Speciality Metals
JUL 2009
Restriction on Acquisition of Certain Articles Containing
Speciality Metals
JUL 2009
Preference For Certain Domestic Commodities
DEC 2008
Duty-Free Entry
OCT 2006
Restriction On Acquisition Of Ball and Roller Bearings
MAR 2006
Trade Agreements
JUL 2009
Restrictions on Contingent Fees for Foreign Military Sales
APR 2003
Exclusionary Policies And Practices Of Foreign Government
APR 2003
Waiver of United Kingdom Levies
APR 2003
Correspondence in English
JUN 1997
Antiterrorism/Force Protection Policy for Defense
Contractors Outside the United States
MAR 2006
Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business
Concerns
SEP 2004
Non-estoppel
OCT 1966
Release Of Past Infringement
AUG 1984
Readjustment Of Payments
OCT 1966
Rights in Technical DataNoncommercial Items
NOV 1995
Rights in Noncommercial Computer Software and
Noncommercial Computer Software Documentation
JUN 1995
Rights in Bid or Proposal Information
JUN 1995
Validation of Asserted RestrictionsComputer Software
JUN 1995
Limitations on the Use or Disclosure of
Government-Furnished Information Marked with Restrictive
Legends
JUN 1995
Deferred Ordering Of Technical Data Or Computer Software
APR 1988
Technical DataWithholding Of Payment
MAR 2000
Validation of Restrictive Markings on Technical Data
SEP 1999
Compliance With Spanish Laws and Insurance
DEC 1998
Customs Exemptions (Germany)
JUN 1997
Tax Exemptions (Italy)
JAN 2002
Tax Exemptions (Spain)
JUN 1997
Supplemental Cost Principles
DEC 1991
Progress Payments For Foreign Military Sales Acquisitions
DEC 1991
Electronic Submission of Payment Requests and Receiving
Reports
MAR 2008
DOD Progress Payment Rates
OCT 2001
Assignment of Claims (Overseas)
JUN 1997
Levies on Contract Payments
DEC 2006
Choice of Law (Overseas)
JUN 1997
Earned Value Management System
APR 2008
Frequency Authorization
DEC 1991
Information Assurance Contractor Training and
Certification
JAN 2008
Material Management And Accounting System
JUL 2009
Pricing Of Contract Modifications
DEC 1991
Requests for Equitable Adjustment
MAR 1998
Subcontracts for Commercial Items and Commercial
Components (DoD Contracts)
AUG 2009
Material Inspection And Receiving Report
MAR 2008
Warranty Of Data
DEC 1991
Notification Of Transportation Of Supplies By Sea
MAR 2000
Notification of Anticipated Program Termination or
Reduction
DEC 2006
N00039-10-D-0032
Page 112 of 137
(1) | Any order for a single item in excess of the quantity ceiling for that CLIN. | ||
(2) | Any order for a combination of items in excess of the contractors delivery rate required in Clause F-2 | ||
or | |||
(3) | A series of orders from the same ordering office that together call for quantities exceeding the limitation in subparagraph (1) or (2) of this section. |
N00039-10-D-0032
Page 113 of 137
N00039-10-D-0032
Page 114 of 137
Material | ||
(If none, insert None) | Identification No. | |
None
|
N00039-10-D-0032
Page 115 of 137
(1) | Federal Insecticide, Fungicide and Rodenticide Act; | ||
(2) | Federal Food, Drug and Cosmetics Act; | ||
(3) | Consumer Product Safety Act; | ||
(4) | Federal Hazardous Substances Act; or |
N00039-10-D-0032
Page 116 of 137
(5) | Federal Alcohol Administration Act. |
MATERIAL (If None, Insert None.) | ACT | |
None
|
N00039-10-D-0032
Page 117 of 137
N00039-10-D-0032
Page 118 of 137
N00039-10-D-0032
Page 119 of 137
ITEM | CONTRACT LINE | |||||
DESCRIPTION | ITEMS | QUANTITY | ||||
TOTAL
|
N00039-10-D-0032
Page 120 of 137
N00039-10-D-0032
Page 121 of 137
N00039-10-D-0032
Page 122 of 137
* | To be completed in individual delivery or task orders if and when a cost plus incentive fee CLIN is ordered. |
N00039-10-D-0032
Page 123 of 137
N00039-10-D-0032
Page 124 of 137
N00039-10-D-0032
Page 125 of 137
N00039-10-D-0032
Page 126 of 137
N00039-10-D-0032
Page 127 of 137
ATTACHMENT A
|
Statement of Work (SOW) for MIDS LVT Production | |
ATTACHMENT B
|
Small Business Subcontracting Plan * | |
ATTACHMENT C
|
RESERVED | |
ATTACHMENT D
|
RESERVED | |
ATTACHMENT E
|
RESERVED | |
ATTACHMENT F
|
Index and Data Lists | |
ATTACHMENT G
|
RESERVED | |
ATTACHMENT H
|
DD Form 254, Contract Security Classification Specification | |
ATTACHMENT I
|
Acceptance Test Requirements Matrix for MIDS LVT (1) | |
ATTACHMENT J
|
Acceptance Test Requirements Matrix for MIDS LVT (2)/(11) | |
ATTACHMENT K
|
Acceptance Test Requirements Matrix for MIDS LVT (3) | |
ATTACHMENT L
|
RESERVED | |
ATTACHMENT M
|
RESERVED | |
ATTACHMENT N
|
Acceptance Test Requirements Matrix for Terminals Executing NSIO and NCP Software | |
EXHIBIT A
|
MIDS LVT CDRLs |
* | The small business subcontracting plan submitted with ViaSat Proposal Number 091129.A of 21 December 2009 is hereby incorporated into the contract by reference. |
1
2
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
3
4
5
6
7
3.8.1.1 | Problem Report (PR) Resolution Process. In support of the PR resolution process the contractor shall: |
8
9
10
11
12
3.9.4 | Configuration Status Accounting |
13
14
ATTACHMENT F | 30 September 2009 |
Contents:
|
|||
Cover
|
1 | page | |
Summary List
|
2 | pages | |
Index/Data Lists
|
45 | pages | |
Appendix A
|
6 | pages |
Data List | Rev | Date | Nomenclature/Description | Report Date: 17-Sep-09 | ||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 3(C) | |||||
[***]
|
[***] | [***] | RECEIVER TRANSMITTER RT-1840(C)/U | |||||
[***]
|
[***] | [***] | RECEIVER TRANSMITTER RT-1785(C)/U | |||||
[***]
|
[***] | [***] | RECEIVER TRANSMITTER RT-1841(C)/U | |||||
[***]
|
[***] | [***] | RECEIVER TRANSMITTER RT-1842(C)/U | |||||
[***]
|
[***] | [***] | RECEIVER TRANSMITTER RT-1843(C)/U | |||||
[***]
|
[***] | [***] | REMOTE POWER SUPPLY PP-8476/U | |||||
[***]
|
[***] | [***] | POWER SUPPLY ASSEMBLY PP-8453/U | |||||
[***]
|
[***] | [***] | COOLING UNIT HD-1213/U | |||||
[***]
|
[***] | [***] | HIGH POWER AMPLIFIER GROUP INTERFACE ASSEMBLY J-6500/U | |||||
[***]
|
[***] | [***] | ALTERNATING CURRENT CONVERTER CV-4344/U | |||||
[***]
|
[***] | [***] | MOUNTING PLATE | |||||
[***]
|
[***] | [***] | RECEIVER TRANSMITTER RT-1868(C)/U | |||||
[***]
|
[***] | [***] | CHASSIS/HARNESS | |||||
[***]
|
[***] | [***] | INTERNAL POWER SUPPLY | |||||
[***]
|
[***] | [***] | POWER AMPLIFIER ANTENNA INTERFACE UNIT | |||||
[***]
|
[***] | [***] | VOICE | |||||
[***]
|
[***] | [***] | TAILORED PROCESSOR/GROUND MUX | |||||
[***]
|
[***] | [***] | DATA PROCESSOR/AIRBORNE MUX | |||||
[***]
|
[***] | [***] | SIGNAL MESSAGE PROCESSOR | |||||
[***]
|
[***] | [***] | RECEIVER TRANSMITTER INTERFACE (RTI)/DISCRETES | |||||
[***]
|
[***] | [***] | RECEIVER/SYNTHESIZER | |||||
[***]
|
[***] | [***] | TACAN | |||||
[***]
|
[***] | [***] | EXCITER/INTERFERENCE PROTECTION FEATURE (IPF) | |||||
[***]
|
[***] | [***] | CHASSIS/HARNESS (RT-1785 & RT-1868) | |||||
[***]
|
[***] | [***] | DATA PROCESSOR/DUAL ADDSI | |||||
[***]
|
[***] | [***] | CORE PROCESSOR SOFTWARE (CSCI) | |||||
[***]
|
[***] | [***] | TAILORED INPUT/OUTPUT (TIO) PROCESSOR SOFTWARE (CSCI) | |||||
[***]
|
[***] | [***] | SUBSCRIBER INTERFACE ARMY (SIA) CSCI | |||||
[***]
|
[***] | [***] | ENHANCED ADDSI (E-ADDSI) CSCI | |||||
[***]
|
[***] | [***] | MIDS-ON-SHIP (MOS) SOFTWARE |
[***] | Page 1 of 2 |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Data List | Rev | Date | Nomenclature/Description | Report Date: 17-Sep-09 | ||||
[***]
|
[***] | [***] | ANCILLARY SET | |||||
[***]
|
[***] | [***] | ANCILLARY SET (W/VOICE) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 1(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 2(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 3(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 4(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 5(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 6(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 7(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 8(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 9(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V)10(C) | |||||
[***]
|
[***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V)11(C) |
[***] | Page 2 of 2 |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change No: New DL for FY10 | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V) 3(C)
|
||||||||||||||||
Cage | Document | |||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||
|
||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFlCATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||
|
||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION ADDENDUM (SSSA) FOR THE MIDS-LVT(3) FIGHTER DATA LINK (FDL) | ||||
|
||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT INTERFACE CONTROL DOCUMENT, FIGHTER DATA LINK (FDL)/F-15 A/B/C/D/E AIR VEHICLE |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10 Lot.
Incd changes for Core BC5, and from ECP00015 & 00147 |
|||||||||||||||
RECEIVER TRANSMITTER RT-1840(C)/U
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | CHASSIS/HARNESS | ||||||
|
||||||||||
|
[***] | [***] | [***] | INTERNAL POWER SUPPLY | ||||||
|
||||||||||
|
[***] | [***] | [***] | POWER AMPLIFIER ANTENNA INTERFACE UNIT | ||||||
|
||||||||||
|
[***] | [***] | [***] | VOICE | ||||||
|
||||||||||
|
[***] | [***] | [***] | TAILORED PROCESSOR/GROUND MUX | ||||||
|
||||||||||
|
[***] | [***] | [***] | DATA PROCESSOR/AIRBORNE MUX | ||||||
|
||||||||||
|
[***] | [***] | [***] | SIGNAL MESSAGE PROCESSOR | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER TRANSMITTER INTERFACE (RTI) DISCRETES | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER/SYNTHESIZER | ||||||
|
||||||||||
|
[***] | [***] | [***] | TACAN | ||||||
|
||||||||||
|
[***] | [***] | [***] | EXCITER/INTERFERENCE PROTECTION FEATURE (lPF) | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] |
SYSTEM/SEGMENT ICD APPENDIX A OF CB021-01M-01
(SOFTWARE SECTION) |
||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR RECEIVER TRANSMITTER | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] |
RELIABILITY PROGRAM PLAN FOR RADIO TERMINAL
SET AN/USQ-140(V)(C) |
||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10 Lot. Incd
NORs for Core BC5, CSIA BCC 6.00, IPV6 STD, ECP00015 & 00147 |
|||||||||||||||
RECEIVER TRANSMITTER RT-1785(C)/U
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | INTERNAL POWER SUPPLY | ||||||
|
||||||||||
|
[***] | [***] | [***] | POWER AMPLIFIER ANTENNA INTERFACE UNIT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SIGNAL MESSAGE PROCESSOR | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER TRANSMITTER INTERFACE (RTI) DISCRETES | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER/SYNTHESIZER | ||||||
|
||||||||||
|
[***] | [***] | [***] |
EXCITER/INTERFERENCE PROTECTION FEATURE
(IPF) |
||||||
|
||||||||||
|
[***] | [***] | [***] | CHASSIS/HARNESS (RT-1785 & RT-1868) | ||||||
|
||||||||||
|
[***] | [***] | [***] | DATA PROCESSOR/DUAL ADDSI | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] |
SYSTEM SEGMENT SPECIFICATION ADDENDUM (SSSA)
MIDS LVT(2) |
||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] |
SYSTEM/SEGMENT ICD ADDENDUM FOR MIDS LVT(2)
AND LVT(11) (WITH APPENDICES) |
||||||
|
||||||||||
47358
|
[***] | [***] | NOTICE OF REVISION (NOR) TO CB021-02M-01 ICDA FROM ECP00268 (UPDATES OF LVT-11 DETAILS) | |||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR MIDS MAIN TERMINAL | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | RELIABILITY PROGRAM PLAN FOR LVT 2 | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | CHASSIS/HARNESS | ||||||
|
||||||||||
|
[***] | [***] | [***] | INTERNAL POWER SUPPLY | ||||||
|
||||||||||
|
[***] | [***] | [***] | POWER AMPLIFIER ANTENNA INTERFACE UNIT | ||||||
|
||||||||||
|
[***] | [***] | [***] | VOICE | ||||||
|
||||||||||
|
[***] | [***] | [***] | TAILORED PROCESSOR/GROUND MUX | ||||||
|
||||||||||
|
[***] | [***] | [***] | DATA PROCESSOR/AIRBORNE MUX | ||||||
|
||||||||||
|
[***] | [***] | [***] | SIGNAL MESSAGE PROCESSOR | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER TRANSMITTER INTERFACE (RTI) DISCRETES | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER/SYNTHESIZER | ||||||
|
||||||||||
|
[***] | [***] | [***] | EXCITER/INTERFERENCE PROTECTION FEATURE (IPF) | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] |
SYSTEM/SEGMENT ICD APPENDIX A OF CB021-01M-01
(SOFTWARE SECTION) |
||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR RECEIVER TRANSMITTER | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] |
RELIABILITY PROGRAM PLAN FOR RADIO TERMINAL
SET AN/USQ-140(V)(C) |
||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT | ||||||
|
||||||||||
|
[***] | [***] | [***] |
(NSIO/NCP SOFTWARE OPTION) SSS ADDENDUM FOR
THE MIDS LVT WITH NSIO AND NCP |
||||||
|
||||||||||
|
[***] | [***] | [***] | (NSIO/NCP SOFTWARE OPTION) S/S ICD ADDENDUM FOR THE MIDS LVT WITH NSIO AND NCP | ||||||
|
||||||||||
|
[***] | [***] | [***] | (NSIO/NCP SOFTWARE OPTION) APPENDIX A TO THE S/S ICD ADDENDUM FOR THE MIDS LVT WITH NSIO AND NCP |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10 Lot.
Incd changes for Core BC5, and NORs from ECP00015 & 00147 |
|||||||||||||||
RECEIVER TRANSMITTER RT-1842(C)/U
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | CHASSIS/HARNESS | ||||||
|
||||||||||
|
[***] | [***] | [***] | INTERNAL POWER SUPPLY | ||||||
|
||||||||||
|
[***] | [***] | [***] | POWER AMPLIFIER ANTENNA INTERFACE UNIT | ||||||
|
||||||||||
|
[***] | [***] | [***] | TAILORED PROCESSOR/GROUND MUX | ||||||
|
||||||||||
|
[***] | [***] | [***] | DATA PROCESSOR/AIRBORNE MUX | ||||||
|
||||||||||
|
[***] | [***] | [***] | SIGNAL MESSAGE PROCESSOR | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER TRANSMITTER INTERFACE (RTI) DISCRETES | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER/SYNTHESIZER | ||||||
|
||||||||||
|
[***] | [***] | [***] | TACAN | ||||||
|
||||||||||
|
[***] | [***] | [***] | EXCITER/INTERFERENCE PROTECTION FEATURE (IPF) | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] |
SYSTEM/SEGMENT ICD APPENDIX A OF CB021 -01M-01
(SOFTWARE SECTION) |
||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR RECEIVER TRANSMITTER | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] |
RELIABILITY PROGRAM PLAN FOR RADIO TERMINAL
SET AN/USQ-140(V)(C) |
||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | CHASSIS/HARNESS | ||||||
|
||||||||||
|
[***] | [***] | [***] | INTERNAL POWER SUPPLY | ||||||
|
||||||||||
|
[***] | [***] | [***] | POWER AMPLIFIER ANTENNA INTERFACE UNIT | ||||||
|
||||||||||
|
[***] | [***] | [***] | TAILORED PROCESSOR/GROUND MUX | ||||||
|
||||||||||
|
[***] | [***] | [***] | DATA PROCESSOR/AIRBORNE MUX | ||||||
|
||||||||||
|
[***] | [***] | [***] | SIGNAL MESSAGE PROCESSOR | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER TRANSMITTER INTERFACE (RTI) DISCRETES | ||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER/SYNTHESIZER | ||||||
|
||||||||||
|
[***] | [***] | [***] | EXCITER/INTERFERENCE PROTECTION FEATURE (IPF) | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | SYSTEM/SEGMENT ICD APPENDIX A OF CB021-01M-01 (SOFTWARE SECTION) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR RECEIVER TRANSMITTER | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | RELIABILITY PROGRAM PLAN FOR RADIO TERMINAL SET AN/USQ-140(V)(C) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT | ||||||
|
||||||||||
|
[***] | [***] | [***] | (NSIO/NCP SOFTWARE OPTION) SSS ADDENDUM FOR THE MIDS LVT WITH NSIO AND NCP | ||||||
|
||||||||||
|
[***] | [***] | [***] | (NSIO/NCP SOFTWARE OPTION) S/S ICD ADDENDUM FOR THE MIDS LVT WITH NSIO AND NCP | ||||||
|
||||||||||
|
[***] | [***] | [***] | (NSIO/NCP SOFTWARE OPTION) APPENDIX A TO THE S/S ICD ADDENDUM FOR THE MIDS LVT WITH NSIO AND NCP |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change:
Updated for FY10 Lot.
Incd changes for Core BC5, and from NORs ECP00015 & 00147 |
|||||||||||||||
REMOTE POWER SUPPLY PP-8476/U
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] |
SYSTEM/SEGMENT ICD APPENDIX A OF
CB021-01M-01 (SOFTWARE SECTION) |
||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | CIDS AND ICD FOR REMOTE POWER SUPPLY | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] |
INSTALLATION DRAWING FOR REMOTE POWER
SUPPLY |
||||||
|
||||||||||
F0057
|
[***] | [***] | [***] |
INSTALLATION MACHINED DRAWING FOR
REMOTE POWER SUPPLY |
||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] |
RELIABILITY PROGRAM PLAN FOR RADIO
TERMINAL SET AN/USQ-14Q(V)(C) |
||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change:
Updated for FY10 Lot. Incd
Core BC5, CSIA BCC 6.00, IPV6 STD, and ECP00015 & 00147 |
|||||||||||||||
POWER SUPPLY ASSEMBLY PP-8453/U
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATlON (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION ADDENDUM (SSSA) MIDS LVT(2) | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] |
SYSTEM/SEGMENT ICD ADDENDUM FOR MIDS
LVT(2) AND LVT(11) (WITH APPENDICES) |
||||||
|
||||||||||
47358
|
[***] | [***] | NOTICE OF REVISION (NOR) TO CB021-02M-01 ICDA FROM ECP00268 (UPDATES OF LVT-11 DETAILS) | |||||||
|
||||||||||
|
[***] | [***] | [***] | IPS FOR THE MIDS LVT(2) POWER SUPPLY ASSY | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | RELIABILITY PROGRAM PLAN FOR LVT 2 | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] |
SYSTEM SEGMENT SPECIFICATION ADDENDUM (SSSA)
MIDS LVT(2) |
||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] |
SYSTEM/SEGMENT ICD ADDENDUM FOR MIDS LVT(2)
AND LVT(11) (WITH APPENDICES) |
||||||
|
||||||||||
47358
|
[***] | [***] | NOTICE OF REVISION (NOR) TO CB021-02M-01 ICDA FROM ECP00268 (UPDATES OF LVT-11 DETAILS) | |||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | PIDS AND ICD FOR COOLING UNIT FOR MIDS LVT(2) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR COOLING UNIT | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | RELIABILITY PROGRAM PLAN FOR LVT 2 | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICO) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | SYSTEM/SEGMENT ICD APPENDIX A OF CB021-01M-01 (SOFTWARE SECTION) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | CIDS AND ICD FOR HIGH POWER AMPLIFIER GROUP INTERFACE ASSEMBLY (HIA) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | INSTALLATION DRAWING FOR HPAG INTERFACE ADAPTER | |||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR HPAG INTERFACE ASSY | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | RELIABILITY PROGRAM PLAN FOR RADIO TERMINAL SET AN/USQ-140(V)(C) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10
Lot.
Incd Core BC5 changes and NORs from ECP00015 & 00147 |
|||||||||||||||
ALTERNATING CURRENT CONVERTER CV-4344/U
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | CIDS AND ICD FOR AC ADAPTER | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR AC ADAPTER |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change No: | |||||||||||||||
MOUNTING PLATE
|
||||||||||||||||
Cage | Document | |||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||
|
||||||||
0D0D0
|
[***] | [***] | [***] | MOUNTING BASE ASSY DRAWING AND PARTS LIST |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10 Lot. Incd
NORs for BC5, CSIA BCC 6.00, IPV6 STD, and from ECP00015 & 00147 |
|||||||||||||||
RECEIVER TRANSMITTER RT-1868(C)/U
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
|
[***] | [***] | [***] | INTERNAL POWER SUPPLY | ||||||
|
||||||||||
|
[***] | [***] | [***] | POWER AMPLIFIER ANTENNA INTERFACE UNIT | ||||||
|
||||||||||
|
[***] | [***] | [***] | VOICE | ||||||
|
||||||||||
|
[***] | [***] | [***] | SIGNAL MESSAGE PROCESSOR | ||||||
|
||||||||||
|
[***] | [***] | [***] |
RECEIVER TRANSMITTER INTERFACE (RTI)
DISCRETES |
||||||
|
||||||||||
|
[***] | [***] | [***] | RECEIVER/SYNTHESIZER | ||||||
|
||||||||||
|
[***] | [***] | [***] |
EXCITER/INTERFERENCE PROTECTION FEATURE
(IPF) |
||||||
|
||||||||||
|
[***] | [***] | [***] | CHASSIS/HARNESS (RT-1785 & RT-1868) | ||||||
|
||||||||||
|
[***] | [***] | [***] | DATA PROCESSOR/DUAL ADDSI | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION (SSS) FOR THE MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM (MIDS) LOW-VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM SEGMENT SPECIFICATION ADDENDUM (SSSA) MIDS LVT(2) | ||||||
|
||||||||||
|
[***] | [***] | [***] | SYSTEM/SEGMENT INTERFACE CONTROL DOCUMENT (ICD) FOR MIDS LOW VOLUME TERMINAL AND ANCILLARY EQUIPMENT | ||||||
|
||||||||||
|
[***] | [***] | [***] |
SYSTEM/SEGMENT ICD ADDENDUM FOR MIDS
LVT(2) AND LVT(11) (WITH APPENDICES) |
||||||
|
||||||||||
47358
|
[***] | [***] | NOTICE OF REVISION (NOR) TO CB021-02M01 ICDA FROM ECP00268 (UPDATES OF LVT-11 DETAILS) | |||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR MIDS MAIN TERMINAL | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
GK663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | RELIABILITY PROGRAM PLAN FOR LVT 2 | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No: Updated for FY10 Lot.
Incd EMD and Prod changes into PIDS (changed from Rev 2 to 6) |
|||||||||||||||
CHASSIS/HARNESS
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | PIDS FOR MAIN TERMINAL CHASSIS | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR MAIN TERMINAL CHASSIS | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR CHASSIS | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K653
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No: Updated for FY10
Lot. Incd ECP00190 changes |
|||||||||||||||
INTERNAL POWER SUPPLY
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | PIDS FOR INTERNAL POWER SUPPLY (IPS) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR INTERNAL POWER SUPPLY | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] |
INSTALLATION DRAWING FOR INTERNAL
POWER SUPPLY |
||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10 Lot.
Incd ECP00191 changes and added NOR for ECP00015 |
|||||||||||||||
POWER AMPLIFIER ANTENNA INTERFACE UNIT
|
||||||||||||||||
Cage | Document | |||||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||||
|
||||||||||||
OK426
|
[***] | [***] | [***] | PIDS FOR RF AMPLIFIER | ||||||||
|
||||||||||||
OK426
|
[***] | [***] | [***] | PIDS FOR ANNEX A ICD FOR RF AMPLIFIER | ||||||||
|
||||||||||||
OK426
|
[***] | [***] | [***] | PIDS FOR POWER AMPLIFIER ANNEX B FUNCTIONAL ALLOCATION | ||||||||
|
||||||||||||
OK426
|
[***] | [***] | [***] | PIDS FOR POWER AMPLIFIER ANNEX C POWER-UP & START-UP PROCEDURES | ||||||||
|
||||||||||||
OK426
|
[***] | [***] | [***] | CIDS FOR ANNEX D, LOW NOISE AND SWITCH AMPLIFIER (LNASA) RF AMPLIFIER | ||||||||
|
||||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION DRAWING FOR POWER AMPLIFIER RF | ||||||||
|
||||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||||
|
||||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||||
|
||||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||||
|
||||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10 Lot.
Incd ECP00059 NOR into CIDS |
|||||||||||||||
VOICE
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0178B
|
[***] | [***] | [***] | CIDS AND ICD FOR VOICE PROCESSOR | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | SRS FOR VOICE PROCESSOR (CSCI) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | IRS/IDD, CORE/SMP INTERFACE AND THE CORE/VOICE INTERFACE | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR VOICE MODULE ASSY | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0178B
|
[***] | [***] | [***] | USERS MANUAL FOR VOICE PROCESSOR SRU | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No:
NOR ECP00238-25 |
|||||||||||||||
TAILORED PROCESSOR/GROUND MUX
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | PIDS FOR TAILORED PROCESSOR/GROUND MUX | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | CIDS FOR GROUND MUX LAMINA ANNEX B | ||||||
|
||||||||||
0178B
|
[***] | [***] | [***] | CIDS AND ICD FOR TP/ DATA PROCESSOR CCAS | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | ICD FOR GROUND MUX LAMINA (APPENDIX B1 OF PIDS) | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | HARDWARE SOFTWARE INTERFACE DOCUMENT GROUND MUX LAMINA | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR TAILORED PROCESSOR/X.25 MUX MODULE ASSY | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0178B
|
[***] | [***] | [***] | USERS MANUAL FOR DP/TP CCA | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No:
NOR ECP00238-26 |
|||||||||||||||
DATA PROCESSOR/AIRBORNE MUX
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | PIDS FOR DP/AV MUX | ||||||
|
||||||||||
0178B
|
[***] | [***] | [***] | CIDS AND ICD FOR TP/ DATA PROCESSOR CCAS | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | PIDS FOR AIRBORN MUX LAMINA ANNEX B | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | ICD FOR AIRBORN MUX LAMINA (APPENDIX B OF PIDS) | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | HARDWARE SOFTWARE INTERFACE DOCUMENT AIRBORN MUX LAMINA | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL FOR DP/MUX MODULE ASSY | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0178B
|
[***] | [***] | [***] | USERS MANUAL FOR DP/TP CCA | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No: Revised for the next
Lot build REMOVED ECP00271 FR Reqt |
|||||||||||||||
SIGNAL MESSAGE PROCESSOR
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | PIDS FOR SIGNAL/MESSAGE PROCESSOR | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR SIGNAL MESSAGE PROCESSOR | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | SRS FOR SIGNAL/MESSAGE PROCESSOR (CSCI) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | NOTICE OF REVISION (NOR) TO SRS FOR SIGNAL/MESSAGE PROCESSOR (CSCI) FROM ECP00213, CL II GOVT ADMIN CHANGES | |||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | IRS/IDD, CORE/SMP INTERFACE AND THE CORE/VOICE INTERFACE | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL FOR SIGNAL/MESSAGE PROCESSOR MODULE ASSY | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No: Updated for FY10
Lot. Incd EMD and Prod changes from ECP00093 & 00147 |
|||||||||||||||
RECEIVER TRANSMITTER INTERFACE (RTI)/DISCRETES
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | PIDS FOR RECEIVER/TRANSMITTER INTERFACE (RTI) DISCRETES | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | CIDS FOR DISCRETES LAMINA ANNEX B | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | ICD FOR DISCRETES LAMINA (APPENDIX B1 OF CIDS) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR RECEIVER/TRANSMITTER INTERFACE | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | HARDWARE SOFTWARE INTERFACE DOCUMENT DISCRETES LAMINA | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR RTI | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No:
NOR ECP00273-29 |
|||||||||||||||
RECEIVER/SYNTHESIZER
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | PIDS AND ICD FOR RECEIVER SYNTHESIZER | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | NOTICE OF REVISION (NOR) TO PIDS AND ICD FOR RECEIVER SYNTHESIZER REV AE FROM ECP00179, I/Q ANALOG TEST OUTPUT CHARACTERISTICS CHANGE (F&ABL DISCREP) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR RECEIVER/SYNTHESIZER MODULE ASSY | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | OUTLINE DRAWING FOR RECEIVER/SYNTHESIZER | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No:
NOR ECP00267-27 |
|||||||||||||||
TACAN
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | PIDS AND ICD FOR TACAN | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | SRS FOR TACAN PROCESSOR CSCI | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | IRS/IDD FOR THE TACAN | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR TACAN MODULE ASSY | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | PIDS FOR EXCITER/IPF | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | ICD FOR EXCITER/IPF (ANNEX 1 OF PIDS) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR EXCITER/IPF MODULE ASSY | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No:
NOR ECP00238-32 |
|||||||||||||||
CHASSIS/HARNESS (RT-1785 & RT-1868)
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | PIDS FOR CHASSIS | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR MAIN TERMINAL CHASSIS | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INTERFACE CONTROL DRAWING FOR CHASSIS | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | ICD FOR THE RF CONTROL AND REPORT BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Revised to incorporate
approved changes from CCB 98 |
|||||||||||||||
DATA PROCESSOR/DUAL ADDSI
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | CIDS FOR DP/DUAL ADDSI WITH ANNEX A & B | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | CIDS FOR DUAL ADDSI LAMINA (ANNEX B) | ||||||
|
||||||||||
0178B
|
[***] | [***] | [***] | CIDS AND ICD FOR TP/ DATA PROCESSOR CCAS | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] | ICD FOR DUAL ADDSI LAMINA (APPENDIX B1 OF CIDS) | ||||||
|
||||||||||
A0062
|
[***] | [***] | [***] |
HARDWARE SOFTWARE INTERFACE DOCUMENT DUAL
ADDSI LAMINA |
||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | INSTALLATION CONTROL DRAWING, MODULE ASSEMBLY, DATA PROCESSOR/DUAL ADDSI | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | REVISIONS TO INSTALLATION CONTROL DWG, MODULE ASSEMBLY, DATA PROCESSOR/DUAL ADDSI | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | ICD FOR THE VME BUS | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | EMI CONTROL PLAN | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | TEMPEST CONTROL PLAN (CLASSIFIED) | ||||||
|
||||||||||
0K663
|
[***] | [***] | [***] | BIT REPORT |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10 Lot.
Incd BC5 changes into specifications |
|||||||||||||||
CORE PROCESSOR SOFTWARE (CSCI)
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | SRS FOR CORE (CSCI) PROCESSOR | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] |
IRS/IDD, CORE/SMP INTERFACE AND THE
CORE/VOICE INTERFACE |
||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | IRS/IDD CORE TO TAILORED I/O INTERFACE |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | SRS FOR TAILORED I/O PROCESSOR, BC 5 | ||||||
|
||||||||||
F0057
|
[***] | [***] | [***] | IRS/IDD FOR THE TAILORED I/O (CSCI) | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | IRS/IDD CORE TO TAILORED I/O INTERFACE |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Updated for FY10 Lot.
Incd changes into CPDS for CSIA BCC 6.00 per ECP00320 |
|||||||||||||||
SUBSCRIBER INTERFACE ARMY (SIA) CSCI
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | COMPUTER PROGRAM DEVELOPMENT SPECIFICATION (CPDS) FOR SUBSCRIBER INTERFACE ARMY (SIA) CSCI |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change:
Updated for FY10 Lot
Incd changes for IPV6 STD into SRS per ECP00270 |
|||||||||||||||
ENHANCED ADDSI (E-ADDSI) CSCI
|
||||||||||||||||
Cage | Document | |||||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||||
|
||||||||||||
47358
|
[***] | [***] | [***] | SRS, ENHANCED ADDSI CSCI | ||||||||
|
||||||||||||
A0062
|
[***] | [***] | [***] | HARDWARE SOFTWARE INTERFACE DOCUMENT DUAL ADDSI LAMINA |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change No: Revised for
next Lot -
REMOVED ECP00271 FR Reqt |
|||||||||||||||
MIDS-ON-SHIP (MOS) SOFTWARE
|
||||||||||||||||
Cage | Document | |||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | CPDS FOR NAVY SHIP I/O COMPUTER PROGRAM FOR THE NAVY SHIP HIGH POWER (NSHIP) LINK 16 TERMINAL | ||||||
|
||||||||||
0D0D0
|
[***] | [***] | [***] | SRS NAVY COMMUNICATIONS PROCESSOR (NCP) OF THE MOS TERMINAL |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change
No./Descrip:
NOR ECP00267-33 |
|||||||||||||||
ANCILLARY SET
|
||||||||||||||||
Cage | Document | |||||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||||
|
||||||||||||
47358
|
[***] | [***] | [***] | POWER CABLE, 115VAC, 1 PHASE 50-400HZ | ||||||||
|
||||||||||||
47358
|
[***] | [***] | [***] | PARTS LIST, POWER CABLE, 115VAC, 50-400HZ | ||||||||
|
||||||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, LVT(2), EXTERNAL, EMI, W1 | ||||||||
|
||||||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, LVT(2), EXTERNAL, EMI, W2 | ||||||||
|
||||||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, LVT(2), EXTERNAL, EMI, W3 | ||||||||
|
||||||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, EXTERNAL, W/ETR, W5 | ||||||||
|
||||||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, LVT(2), EXTERNAL, EMI, W6 | ||||||||
|
||||||||||||
53919
|
[***] | CONNECTOR ADAPTER FOR ANTENNA A AND B (C FEMALE TO HN MALE) | ||||||||||
|
||||||||||||
53919
|
[***] | CONNECTOR ADAPTER FOR ANTENNA A AND B (HN MALE TO N FEMALE) | ||||||||||
|
||||||||||||
53919
|
[***] | CONNECTOR ADAPTER FOR ANTENNA A AND B (N MALE TO C FEMALE} |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Data List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: |
Change: Preliminary ECP00268
NOR VSATE-055-02 in process to replace the W5 Voice Cable |
|||||||||||||||
ANCILLARY SET (W/ VOICE)
|
||||||||||||||||
Cage | Document | |||||||||||
Code | Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | ||||||||
47358
|
[***] | [***] | [***] | POWER CABLE, 115VAC, 1 PHASE 50-400HZ | ||||||||
47358
|
[***] | [***] | [***] | PARTS LIST, POWER CABLE, 115VAC, 50-400HZ | ||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, LVT(2), EXTERNAL, EMI, W1 | ||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, LVT(2), EXTERNAL, EMI, W2 | ||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, LVT(2), EXTERNAL, EMI, W3 | ||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, VOICE, W/ETR, W5 | ||||||||
47358
|
[***] | [***] | NOTICE OF REVISION (NOR) FROM ECP00268 THAT CREATES A NEW SPEC CONTROL DWG FOR THE W5 VOICE CABLE ASSY, MIDS LVT(11) (P/N: 1083328) | |||||||||
47358
|
[***] | [***] | [***] | CABLE ASSY, LVT(2), EXTERNAL, EMI, W6 | ||||||||
53919
|
[***] |
CONNECTOR ADAPTER FOR ANTENNA A AND B (C
FEMALE TO HN MALE) |
||||||||||
53919
|
[***] |
CONNECTOR ADAPTER FOR ANTENNA A AND B
(HN MALE TO N FEMALE) |
||||||||||
53919
|
[***] |
CONNECTOR ADAPTER FOR ANTENNA A AND B (N
MALE TO C FEMALE) |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Revised for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)1(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||||
|
||||||||
[***]
|
[***] | [***] | RECEIVER TRANSMITTER RT-1840(C)/U | |||||
|
||||||||
[***]
|
[***] | [***] | REMOTE POWER SUPPLY PP-8476/U |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Revised for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)2(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1785(C)/U | |||
|
||||||
[***] | [***] | [***] | POWER SUPPLY ASSEMBLY PP-8453/U | |||
|
||||||
[***] | [***] | [***] | COOLING UNIT HD-1213/U | |||
|
||||||
[***] | [***] | [***] | MOUNTING PLATE | |||
|
||||||
[***] | [***] | [***] | ANCILLARY SET |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change No: Released for FY10 | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)3(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | RADIO TERMINAL SET (RTS) AN/USQ-140(V) 3(C) |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Revised for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)4(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1841(C)/U | |||
[***] | [***] | [***] | REMOTE POWER SUPPLY PP-8476/U |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Updated for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)5(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1841(C)/U | |||
|
||||||
[***] | [***] | [***] | REMOTE POWER SUPPLY PP-8476/U | |||
|
||||||
[***] | [***] | [***] |
HIGH POWER AMPLIFIER GROUP
INTERFACE ASSEMBLY J-6500/U |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Updated for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)6(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1842(C)/U | |||
|
||||||
[***] | [***] | [***] | REMOTE POWER SUPPLY PP-8476/U |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Updated for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)7(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1843(C)/U | |||
|
||||||
[***] | [***] | [***] | REMOTE POWER SUPPLY PP-8476/U |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Updated for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)8(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1841(C)/U | |||
|
||||||
[***] | [***] | [***] | REMOTE POWER SUPPLY PP-8476/U | |||
|
||||||
[***] | [***] | [***] |
HIGH POWER AMPLIFIER GROUP INTERFACE
ASSEMBLY J-6500/U |
|||
|
||||||
[***] | [***] | [***] | ALTERNATING CURRENT CONVERTER CV-4344/U |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Updated for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)9(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1841(C)/U | |||
|
||||||
[***] | [***] | [***] | REMOTE POWER SUPPLY PP-8476/U | |||
|
||||||
[***] | [***] | [***] | ALTERNATING CURRENT CONVERTER CV-4344/U |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Updated for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)10(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1843(C)/U | |||
|
||||||
[***] | [***] | [***] | REMOTE POWER SUPPLY PP-8476/U | |||
|
||||||
[***] | [***] | [***] | ALTERNATING CURRENT CONVERTER CV-4344/U |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Index List:
|
Rev: | Activity: | JPEO JTRS | Cage Code: | Date: | |||||||||||
[***]
|
[***]
|
MIDS International Program Office |
[***]
|
|||||||||||||
Title: | Change: Updated for FY10 Lot | |||||||||||||||
RADIO TERMINAL SET (RTS) AN/USQ-140(V)11(C)
|
||||||||||||||||
Data List Number | Rev | Rev Date | NOMENCLATURE/DESCRIPTION | |||
|
||||||
[***] | [***] | [***] | POWER SUPPLY ASSEMBLY PP-8453/U | |||
|
||||||
[***] | [***] | [***] | COOLING UNIT HD-1213/U | |||
|
||||||
[***] | [***] | [***] | MOUNTING PLATE | |||
|
||||||
[***] | [***] | [***] | RECEIVER TRANSMITTER RT-1868(C)/U | |||
|
||||||
[***] | [***] | [***] | ANCILLARY SET (W/ VOICE) |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
Page 1 of 1
Appendix A to Attachment F | November 4, 2009 |
| Paragraphs 4.2.4.2.3 (Mission Load Test) and 4.2.4.7.d (EMC Features Verifications) LVT System Segment Specification (SSS) must be verified in accordance with the SSS. | |
| Paragraphs 4.2.4.2.3 (Mission Load Test) and 4.2.4.7.d (EMC Features Verifications) LVT (2) SSS Addendum (SSSA) must be verified in accordance with the SSSA. | |
| Paragraphs 4.2.4.2.3 (Mission Load Test) LVT (3) SSS Addendum (SSSA) must be verified in accordance with the SSSA. |
1 of 7
Appendix A to Attachment F | November 4, 2009 |
| CTIC/DS-101 Hybrid (CDH) in the signal message processor SRU shall be required. | |
| Connectors external to the Terminal shall have the same part number as specified in the LVT(1) system/segment ICD (#CB021-01M-01) and the LVT(2) system/segment ICD addendum (#CB021-02M-01). |
2 of 7
Appendix A to Attachment F | November 4, 2009 |
Cancelled Military Specification/Standard | Disposition of Military Specification/Standard | |
ISO 68
|
ISO 68-1 and ISO 68-2 | |
MIL-B-5087B
|
MIL-STD-464 | |
MIL-STD-172C
|
Requirement deleted. | |
MIL-C-17D
|
Requirement deleted. | |
MIL-C-26074
|
Use best commercial practices (BCP) | |
MIL-C-5541D
|
MIL-C-5541E or Use BCP | |
MIL-C-28748B
|
MIL-DTL-28748C or Use BCP | |
MIL-C-28754B
|
MIL-C-28754D supplement 1 | |
MIL-C-28809B
|
Use BCP | |
MIL-C-0038999E
|
MIL-C-38999J & supplement 1 | |
MIL-C-39012B
|
MIL-PRF-39012D & amendments 1 & 2 | |
MIL-E-4158E
|
MIL-HDBK-454 as guidance | |
MIL-E-5400T
|
MIL-HDBK-5400 as guidance | |
MIL-F-14072C
|
Use BCP | |
MIL-H-5606E
|
MIL-H-5606G notice 1 | |
MIL-H-83282C
|
MIL-PRF-83282D & amendment 1 | |
MIL-I-46058C
|
Use BCP | |
MIL-I-81550C
|
Use BCP | |
MIL-L-6081C
|
MIL-PRF-6081D | |
MIL-L-7808J
|
MIL-PRF-7808L | |
MIL-L-23699C
|
MIL-PRF-23699F | |
MIL-M-26542/4B
|
Requirement deleted. | |
MIL-M-38510H
|
Requirement deleted. | |
MIL-P-13949A
|
Requirement deleted. | |
MIL-P-23377F
|
MIL-PRF-23377H | |
MIL-P-55110D
|
Requirement deleted. | |
MIL-S-901C
|
MIL-S-901D | |
MIL-S-7742B
|
Requirement deleted. | |
MIL-S-8516E
|
Use BCP | |
MIL-S-8802F
|
MIL-S-8802F amendment 4 & notice 1 | |
MIL-S-8879A
|
Requirement deleted. | |
MIL-S-23586C
|
MIL-PRF-23586F | |
MIL-T-5422F
|
MIL-STD-810E notices 1, 2 & 3 | |
MIL-T-5624N
|
Use BCP | |
MIL-T-23103A
|
Requirement deleted. | |
MIL-T-28800
|
Requirement deleted. | |
MIL-T-83133C
|
MIL-T-83133D amendment 1 | |
FED-STD-313C
|
FED-STD-313D | |
FED-STD-595B
|
FED-STD-595B change notice 1 | |
MIL-STD-129L
|
MIL-STD-129N |
3 of 7
Appendix A to Attachment F | November 4, 2009 |
Cancelled Military Specification/Standard | Disposition of Military Specification/Standard | |
MIL-STD-130G
|
MIL-STD-130J | |
MIL-STD-167
|
MIL-STD-167-I valid notice 1, and MIL-STD-167-2 valid notice 1. | |
MIL-STD-275D
|
Requirement deleted. | |
MIL-STD-291B
|
MIL-STD-291C | |
MIL-STD-415D
|
Use BCP | |
MIL-STD-454M
|
MIL-HDBK-454 as guidance | |
MIL-STD-462
|
MIL-STD-462C | |
MIL-STD-470B
|
MIL-HDBK-470 as guidance | |
MIL-STD-490A
|
Requirement deleted. | |
MIL-STD-781D
|
MIL-HDBK-781A as guidance | |
MIL-STD-785B
|
Requirement deleted. | |
MIL-STD-794E
|
MIL-STD-2073-1C | |
MIL-STD-810E
|
MIL-STD-810E notices 1, 2, 3 | |
MIL-STD-882B
|
MIL-STD-882C & notice 1 | |
MIL-STD-883C
|
Requirement deleted. | |
MIL-STD-1130B
|
Requirement deleted. | |
MIL-STD-1275A
|
MIL-STD-1275B | |
MIL-STD-1472D
|
MIL-STD-1472E | |
MIL-STD-1686B
|
MIL-STD-1686C | |
MIL-STD-1753
|
Requirement deleted. | |
MIL-STD-1788A
|
Use BCP | |
MIL-STD-1815A
|
Use BCP | |
MIL-STD-2000A
|
Requirement deleted. | |
MIL-STD-2073-1B
|
MIL-STD-2073-1C | |
MIL-STD-2076
|
Requirement deleted. | |
MIL-STD-2084
|
MIL-HDBK-2084 with change notice 1 as guidance | |
DOD-STD-2167A
|
IEEE/EIA 12207.2 as guidance | |
MIL-HDBK-5F
|
MIL-HDBK-5G volume 1 change notice 3 and volume 2 change notice 3 as guidance | |
MIL-HDBK-217F
|
MIL-HDBK-217F change notice 2 as guidance | |
MIL-HDBK-781
|
MIL-HDBK-781A as guidance |
4 of 7
Appendix A to Attachment F | November 4, 2009 |
Inspection:
|
Inspection (I) is defined as a visual method of verification that determines compliance with required characteristics without the use of special laboratory equipment, procedures, items, or services. Inspection is used to verify construction features, parts compliance, and document or drawing compliance, software source and object code compliance, workmanship, and physical condition. This method may require moving, turning, or partially disassembling hardware to gain visual access, but it does not require operation of the item. Inspections may be required during manufacture, assembly, and final acceptance. | |
|
||
Analysis:
|
Analysis (A) is defined as a method of verification wherein the item or its design is studied to determine if it meets specified requirements. Analysis includes the technical evaluation of drawings, software listings, equations, charts, graphs, diagrams, or representative data. | |
|
||
Demonstration:
|
Demonstration (D) is defined as a method of verification wherein compliance with a requirement is ascertained without operating the item. Demonstration is used to verify characteristics such as human engineering features, service access features, and transportability. Demonstration may involve special test equipment and simulation techniques to create the necessary environment. | |
|
||
Test:
|
Test (T) is defined as a method of verification wherein operating performance is measured quantitatively or qualitatively during or after the controlled application of real or simulated, functional, or environmental stimuli. The test may require multiple applications of these stimuli to provide a statistical level of confidence in the final results. Measurement may involve the use of laboratory equipment, recorders, items, or services. |
5 of 7
Appendix A to Attachment F | November 4, 2009 |
* | Repair any Failures Detected |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
6 of 7
Appendix A to Attachment F | November 4, 2009 |
[***] |
* | 1 Axis (Worst Case) |
* | Repair any Failures Detected | ||
* | Repeat 2.5 Minutes of Vibration after Repair Action |
[***] |
* | Repair any Failures Detected | ||
* | Repeat 3 Temperature Cycles after Repair Action |
| Vibration exposure and temperature cycles can be performed simultaneously. | ||
| C above may be omitted if electrical testing is performed during vibration exposure. | ||
[***] | |||
| Stabilization has occurred when the temp. at the point of maximum thermal inertia, as determined by engineering thermal survey/test, does not change by more than 2° C/Hr. | ||
| Random vibration is the preferred type of vibration. Sinusoidal might be used but for a longer duration subject to Government approval. |
* | Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions. |
7 of 7
DEPARTMENT OF DEFENSE
|
1. CLEARANCE AND SAFEGUARDING | ||
|
|||
CONTRACT SECURITY CLASSIFICATION SPECIFICATION
|
a. FACILITY CLEARANCE REQUIRED
SECRET |
||
|
|||
(The requirements of the DoD Industrial Security Manual apply to all
security aspects of this effort.) |
b. LEVEL OF SAFEGUARDING REQUIRED
SECRET |
||
2.
THIS SPECIFICATION IS FOR:
(X and complete as
applicable)
|
3. THIS SPECIFICATION IS: (X and complete as applicable) |
|
a. PRIME CONTRACT NUMBER | a. ORIGINAL (Complete date in all cases) | DATE: (YYYYMMDD) | |||||||||||||||||||
X
|
N00039-10-D-0032 ECD: 20160226 | 20100224 | ||||||||||||||||||||
|
b. SUBCONTRACT NUMBER |
b. REVISED
(Supersedes
all previous specs) |
REVISION NO. | DATE: (YYYYMMDD) | ||||||||||||||||||
|
c. SOLICITATION OR OTHER NUMBER N00039-10-R-0011 | DUE DATE: (YYYYMMDD) | c. FINAL (Complete Item 5 in all cases) | DATE: (YYYYMMDD) | ||||||||||||||||||
a. NAME, ADDRESS, AND ZIP CODE
|
b. CAGE CODE | c. Cognizant Security Office (Name, Address, Zip) | ||||||
VIASAT, INCORPORATED |
DEFENSE SECURITY SERVICE (DSS) (IOFWD) |
|||||||
6155 EL CAMINO REAL
|
47358 | 11770 BERNARDO PLAZA COURT, SUITE 450 | ||||||
CARLSBAD, CA. 92009
|
SAN DIEGO, CA. 92128-2426
|
|||||||
a. NAME, ADDRESS, AND ZIP CODE
|
b. CAGE CODE | c. COGNIZANT SECURITY OFFICE (Name, Address, And Zip) | ||||
|
||||||
|
||||||
|
||||||
a. LOCATION
|
b. CAGE CODE | c. COGNIZANT SECURITY OFFICE (Name, Address, And Zip) | ||||
|
||||||
|
||||||
|
||||||
DD FORM 254, DEC 1999 | PREVIOUS EDITION IS OBSOLETE |
PR NO.: N00039-10-R-0011 | SOLICITATION/CONTRACT NUMBER: N00039-10-R-0011/N00039-10-D-0032 |
13. | SECURITY GUIDANCE. The security classification guidance needed for this classified effort is identified below. If any difficulty is encountered in applying this guidance or if any other contributing factor indicates a need for changes in this guidance, the contractor is authorized and encouraged to provide recommended changes; to challenge the guidance or the classification assigned to any information or material furnished or generated under this contract; and to submit any questions for interpretation of this guidance to the official identified below. Pending final decision, the information involved shall be handled and protected at the highest level of classification assigned or recommended. (Fill in as appropriate for the classified effort. Attach, or forward under separate correspondence, any documents/guides/extracts referenced herein. Add additional pages as needed to provide complete guidance.) |
14. | ADDITIONAL SECURITY REQUIREMENTS. Requirements, in addition to ISM requirements, are established for this contract. x YES c NO | |
(If Yes, identify the partinent contractual clauses in the contract itself, or provide an
appropriate statement that identifies
the additional requirements. Provide a copy of the requirements to the cognizant security office. Use Item 13 if additional space is needed.) |
15. | INSPECTIONS. Elements of this contract are outside the inspection resposibility of the cognizant security office. c YES x NO |
a. TYPED NAME OF CERTIFYING OFFICIAL
|
b. TITLE | c. TELEPHONE (Include Area Code) | ||||
VERNA F. MINARD
|
SECURITYS CONTRACTING OFFICERS | (619) 533-3005 | ||||
VERNA, MINARD@NAVY.MIL
|
REPRESENTATIVE (COR) | |||||
d. ADDRESS
(Include Zip Code)
|
17. REQUIRED DISTRIBUTION | ||
COMMANDING OFFICER
|
x a. CONTRACTOR | ||
SPAWAR SYSTEMS CENTER CODE 83310
|
c b. SUBCONTRACTOR | ||
53560 HULL ST.
|
x c. COGNIZANT SECURITY OFFICE FOR PRIME AND SUBCONTRATOR | ||
SAN DIEGO, CA 92152-5001
|
x d. U.S. ACTIVITY RESPONSIBLE FOR OVERSEAS SECURITY ADMINISTRATION | ||
e. SIGNATURE
20100224 |
x
e. ADMINISTRATIVE CONTRACTING OFFICER CODE 024A-B MELISSA HAWKINS
x f. OTHERS AS NECESSARY CODES 83310, JPEO JTRS10 RICHARD JONES |
||
|
DD FORM 254 (BACK), DEC 1989 | (BACK) |
BLOCK 13 CONTINUED: | PAGE 3 OF 4 |
BLOCK 13 CONTINUED: | PAGE 4 OF 4 |
| Responsibility or the development and administration of Government computer security programs, and including direction and control of risk analysis an/or threat assessment. | ||
| Significant involvement in life-critical or mission-critical systems. | ||
| Responsibility for the preparation or approval of data for input into a system, which does not necessarily involve personal access to the system, but with relatively high risk for effecting grave damage or realizing significant personal gain. | ||
| Relatively high risk assignments associated with or directly involving the accounting, disbursement, or authorization for disbursement from systems of (1) dollar amounts of $10 million per year or greater, or (2) lesser amounts if the activities of the individual are not subject to technical review by higher authority in the IT-I category to ensure the integrity of the system. | ||
| Positions involving major responsibility for the direction, planning, design, testing, maintenance, operation, monitoring, and/or management of systems hardware and software. | ||
| Other positions as designated by Joint Program Executive Office Joint Tactical Radio Systems (JPEO JTRS) that involve relatively high risk for effecting grave damage or realizing significant personal gain. |
| Access to and/or processing of proprietary data, information requiring protection under the Privacy Act of 1974, and Government-developed privileged information involving the award of contracts; | ||
| Accounting, disbursement, or authorization for disbursement from systems of dollar amounts less than $10 million per year. Other positions are designated by JPEO JTRS that involve a degree of access to a system that creates a significant potential for damage or personal gain less than that in IT-I positions. Personnel whose duties meet the criteria for an IT-II Position require a favorably adjudicated National Agency Check (NAC). |
| All other positions involving Federal IT activities. Incumbent in this position has non-privileged access to one or more DoD information systems, application, or database to which they are authorized access. Personnel whose duties meet the criteria for an IT-III Position designation require a favorably adjudicated NAC. |
Qualified Cleared Personnel Do NOT Require Trustworthiness Investigations: |
| A hard copy of the SF85P; | |
| All pertinent signed release forms; | |
| SF87 or FD258 Fingerprint Card or electronic fingerprint transmission |
2
| Immediately notify the COR or TR of the employees termination. | ||
| Fax a termination VAL to Code 83320 at (619) 553-6169. | ||
| Return any badge and decal to Code 83320. |
3
I. | GENERAL. |
a. | Contractor Performance. In performance of this Contract the following security services and procedures are incorporated as an attachment to the DD 254. The Contractor will conform to the requirements of DoD 5220.22-M, Department of Defense National Industrial Security Program, Operating Manual (NISPOM). When visiting the Joint Program Executive Office, Joint Tactical Radio System Command (JPEO JTRS) at Old Town Campus (OTC) the Contractor will comply with the security directives used regarding the protection of classified and controlled unclassified information, SECNAVINST 5510.36 (series), SECNAVINST 5510.30 (series), and NRADINST 5720.1(series). Both of the SECNAV instructions are available online at http://neds.nebt.daps.mil/directives/table52.html . A copy of NRADINST 5720.1 will be provided upon receipt of a written request from the Contractors Facility Security Officer (FSO) to the SPAWAR Systems Command Securitys Contracting Officers Representative (COR), Code 83310. If the Contractor establishes a cleared facility or Defense Security Service (DSS) approved off-site location from SPAWAR SYSCOM, the security provisions of the NISPOM will be followed within this cleared facility. | ||
b. | Security Supervision. Space and Naval Warfare Systems Center Pacific (SSC Pacific) will exercise security supervision over all contractors visiting JPEO JTRS and will provide security support to the Contractor as noted below. The Contractor will identify, in writing to Securitys COR, an on-site Point of Contact to interface with Securitys COR. |
II. | HANDLING CLASSIFIED MATERIAL OR INFORMATION. |
a. | Control and Safeguarding. Contractor personnel located at JPEO JTRS are responsible for the control and safeguarding of all classified material in their possession. All contractor personnel will be briefed by their FSO on their individual responsibilities to safeguard classified material. In addition, all contractor personnel are invited to attend SSC Pacific conducted Security Briefings, available at this time by appointment only. In the event of possible or actual loss or compromise of classified material, the on-site Contractor will immediately report the incident to SSC Pacifics Code 83310, telephone (619) 553-3005, as well as the Contractors FSO. A Code 83310 representative will investigate the circumstances, determine culpability where possible, and report results of the inquiry to the FSO and the Cognizant DSS Field Office. On-site contractor personnel will promptly correct any deficient security conditions identified by a SSC Pacific Security representative. | ||
b. | Storage. |
1. | Classified material may be stored in containers authorized by SSC Pacifics Physical Security Branch, Code 83320 for the storage of that level of classified material. Classified material may also be stored in Contractor owned containers brought on board JPEO JTRS with Code 83320s written permission. Areas located within cleared contractor facilities on board JPEO JTRS will be approved by DSS. | ||
2. | The use of Open Storage areas must be pre-approved in writing by Code 83320 for the open storage, or processing, of classified material. Specific supplemental security controls for open storage areas, when required, will be provided by SSC Pacific, Code 83320. |
c. | Transmission of Classified Material. |
1. | All classified material transmitted by mail for use by long term visitors will be addressed as follows: |
4
(a) | TOP SECRET, Non-Sensitive Compartmented Information (non-SCl) material using the Defense Courier Service: SSC Pacific: 271582-SN00, SSC Pacific. | ||
(b) | CONFIDENTIAL and SECRET material transmitted by FedEx, USPS Registered, Express mail will be addressed to COMMANDER, SPACE & NAVAL WARFARE SYSTEMS COMMAND, 4301 PACIFIC HWY, SAN DIEGO CA 92110-3127. The inner envelope will be addressed to the attention of the Contracting Officers Representative (COR) or applicable Technical Representative (TR) for this contract, to include their code number. |
2. | All SECRET material hand carried to JPEO JTRS by contractor personnel must be delivered to the Classified Material Control Center (CMCC), Code 83430, building 33, room 1305, for processing. | ||
3. | All CONFIDENTIAL material hand carried to JPEO JTRS by contractor personnel that is intended to remain at JPEO JTRS shall be provided to the designated recipient or proper cleared JPEO JTRS employee. | ||
4. | All JPEO JTRS classified material transmitted by contractor personnel from JPEO JTRS will be sent via the JPEO JTRS Technical COR or TR for this contract. | ||
5. | The sole exception to the above is items categorized as a Data Deliverable. All contract Data Deliverables will be sent directly to the Technical COR or TR and a notification of deliverables without attachments will be sent to the cognizant PCO, unless otherwise stated in the contract. |
III. | INFORMATION SYSTEMS (IS) Security. Contractors using ISs, networks, or computer resources to process classified, sensitive unclassified and/or unclassified information will comply with the provisions of SECNAVINST 5239.3 (series) and local policies and procedures. Contractor personnel must ensure that systems they use at JPEO JTRS have been granted a formal letter of approval to operate by contacting their Information Assurance Office. | |
IV. | VISITOR CONTROL PROCEDURES. | |
Title 18 USC 701 provides for criminal sanctions including fine or imprisonment for anyone in possession of a badge who is not entitled to have possession. Sec. 701. Official badges, identification cards, other insignia. Whoever manufactures, sells, or possesses any badge, identification card, or other insignia, of the design prescribed by the head of any department or agency of the United States for use by any officer or employee thereof, or any colorable imitation thereof, or photographs, prints, or in any other manner makes or executes any engraving, photograph, print, or impression in the likeness of any such badge, identification card, or other insignia, or any colorable imitation thereof, except as authorized under regulations made pursuant to law, shall be fined under this title or imprisoned not more than six months, or both. |
a. | Contractor personnel assigned to JPEO JTRS will be considered long-term visitors for the purpose of this contract. | ||
b. |
Contractors that have been awarded a classified contract must submit visit requests
using only the Joint Personnel Adjudication System (JPAS). All government activities have been directed to use
JPAS when transmitting or receiving VALs. Therefore, contractors who work on classified contracts are
required to have established an account through JPAS for their
facility. This database contains all U.S.
citizens who have received a clearance of Confidential, Secret, and/or Top Secret. The visit request can be submitted
for one year. When submitting visit requests to SPAWAR Systems Center Pacific use its Security Management
Office (SMO) number (660015). This information is provided in accordance with guidance provided to contractors
via the Defense Security Service (DSS) website
https://www.dss.mil/portal/ShowBinary/BEA%20Repository/new dss internet/about dss/press room/jpas. proced ures final.pdf (DSS guidance dated 24 April 2007, subject: Procedures Governing the Use of JPAS by Cleared Contractors). |
5
c. | For visitors to receive a SPAWAR Systems Center Pacific badge their Government point of contact must approve their visit request and the visitor must present government issued photo identification. | ||
d. | Visit requests for long-term visitors must be received at least one week prior to the expected arrival of the visitor to ensure necessary processing of the request. | ||
e. | Code 83320 will issue temporary identification badges to Contractor personnel following receipt of a valid VAL from the Contractors FSO. The responsible SPAWARCOM COR will request issuance of picture badges to contractor personnel. Identification badges are the property of the U.S. Government, will be worn in plain sight, and used for official business only. Unauthorized use of an SSC Pacific badge will be reported to the DSS. | ||
f. | Prior to the termination of a Contractor employee with a SSC Pacific badge or active VAL on file the FSO must: |
1. | Notify in writing Code 83320, the COR, Securitys COR, and the laboratory managers of any laboratories into which the employee had been granted unescorted access of the termination and effective date. In emergencies, a facsimile may be sent or a telephone notification may be used. The telephone notification, however, must be followed up in writing within five working days. | ||
2. | Immediately confiscate any SSC Pacific issued identification badge, (to include Common Access Card (CAC) and OP Form 55 card, if issued), and vehicle decals and return them to Code 83320 no later than five working days after the effective date of the termination. |
g. | Common Access Card (CAC), |
1. | VAL must be on file, form completed and signed, approved by the contractors COR, and sent to the Badge and Pass Office, Code 83320. |
V. | INSPECTIONS. Code 83310 personnel may conduct periodic inspections of the security practices of the on-site Contractor. All contractor personnel will cooperate with Code 83351 representatives during these inspections. A report of the inspection will be forwarded to the Contractors employing facility, Securitys COR and Technical COR. The Contractor must be responsive to the Code 83310 representatives findings. | |
VI. | REPORTS. As required by the NISPOM, Chapter 1, Section 3, contractors are required to report certain events that have an impact on the status of the facility clearance (FCL), the status of an employees personnel clearance (PCL), the proper safeguarding of classified information, or an indication classified information has been lost or compromised. |
a. | The Contractor will ensure that certain information pertaining to assigned contractor personnel or operations is reported to Securitys COR, Code 83310. If further investigation is warranted it will be conducted by Code 83310. This reporting will include the following: |
1. | The denial, suspension, or revocation of security clearance of any assigned personnel; | ||
2. | Any adverse information on an assigned employees continued suitability for continued access to classified access; | ||
3. | Any instance of loss or compromise, or suspected loss or compromise, of classified information; | ||
4. | Actual, probable or possible espionage, sabotage, or subversive information; or | ||
5. | Any other circumstances of a security nature that would effect the contractors operation on board |
6
JPEO JTRS. | |||
b. | In addition to the NISPOM reporting requirements, any conviction and/or violation of the Foreign Corrupt Practices Act, or any other violation of the International Traffic in Arms Regulations (ITAR) shall immediately be reported to the Designated Disclosure Authority (DDA), COR/TR/PM and Contracting Officer. |
VII. | PHYSICAL SECURITY. |
a. | SSC Pacific will provide appropriate response to emergencies occurring onboard this command. The Contractor will comply with all emergency rules and procedures established for SSC Pacific. | ||
b. | A roving Contract Security Guard patrol will be provided by SSC Pacific. Such coverage will consist of, but not be limited to, physical checks of the window or door access points, classified containers, and improperly secured documents or spaces. Specific questions or concerns should be addressed to Code 83320. | ||
c. | All personnel aboard SSC Pacific property are subject to random inspections of their vehicles and personal items. Consent to these inspections is given when personnel accept either a badge or a vehicle pass/decal permitting entrance to this command. | ||
d. | Information about parking restrictions may be found on the Security web site at https://iweb.spawar.navy.mil/services/security/html/Parking.html . |
VIII. | COR RESPONSIBILITIES. |
a. | Review requests by cleared contractors for retention of classified information beyond a two-year period and advise the contractor of disposition instructions and/or submit a Final DD 254 to Securitys COR. | ||
b. | In conjunction with the appropriate transportation element, coordinates a suitable method of shipment for classified material when required. | ||
c. | Certify and approve Registration For Scientific and Technical Information Services requests (DD 1540) (DTIC). | ||
d. | Ensure timely notice of contract award is given to host commands when contractor performance is required at other locations. | ||
e. | Certify need-to-know on visit requests and conference registration forms. |
IX. | SPECIAL CONSIDERATIONS FOR ON-SITE CLEARED FACILITIES. | |
Any cleared contractor facility on board JPEO JTRS will be used strictly for official business associated with this contract. No other work may be performed aboard this facility. Additional JPEO JTRS contracts may be performed in this cleared facility, but only on a case-by-case basis. The COR, Securitys COR, and Contracting Officer must all be in agreement that this particular arrangement best suits the needs of the Government. At the end of this contract the on-site facility must be vacated, with proper written notification being submitted to the DSS and Securitys COR. | ||
X. | ITEMS PROHIBITED ABOARD JPEO JTRS AND SSC PACIFIC. | |
The following items are prohibited within any JPEO JTRS & SSC Pacific controlled areas, with the exception of personnel authorized to possess weapons in the performance of required duties. Also, note exceptions for alcohol possession and consumption on board SSC Pacific property. |
7
WEAPONS |
1. | Ammunition | ||
2. | Fireworks | ||
3. | Molotov Cocktail | ||
4. | Pipe Bomb | ||
5. | Black Jack | ||
6. | Slingshots | ||
7. | Billy/Sand Club | ||
8. | Nunchakus | ||
9. | Sand Bag: Partially filled with sand and swung like a mace | ||
10. | Metal (Brass) Knuckle | ||
11. | Dirk or Dagger | ||
12. | Switch Blade or Butterfly Knife | ||
13. | Knife with a blade (cutting edge) longer than 4 inches | ||
14. | Razor with Unguarded blade. | ||
15. | Pipe, Bar or Mallet to be used as a club. | ||
16. | Compressed Air or Spring Fired Pellet/BB gun | ||
17. | Tear Gas/Pepper Spray Weapon | ||
18. | Pistol, Revolver, Rifle, Shotgun or any other Firearm | ||
19. | Bows, Crossbows or Arrows | ||
20. | Bowie Style Hunting Knife | ||
21. | Any weapon prohibited by State law | ||
22. | Any object similar to the aforementioned items | ||
23. | Any offensive or defensive weapons not described above, but likely to cause injury (i.e., Stun Gun, Blow Gun). | ||
24. | Any abrasive, caustic, acid, chemical agent or similar substance, with which to inflict property damage or personal injury | ||
25. | Combination Tools with Knife Blades Longer Than 4 inches (i.e., Gerber, Leatherman, etc.) |
Military personnel aboard JPEO JTRS and SSC Pacific controlled areas not authorized to possess a firearm, as part of prescribed military duties will be apprehended if found in possession. Civilians in unauthorized possession of a firearm will be detained while civilian authorities are notified. | ||
CONTROLLED SUBSTANCES | ||
The unauthorized possession or use of controlled substances defined as marijuana, narcotics, hallucinogens, psychedelics, or other controlled substances included in Schedule I, II, III, IV, or V established by Section 202 of the Comprehensive Drug Abuse Prevention and Control Act of 1970 (84 Stat. 1236) is prohibited. | ||
CONTRABAND | ||
Contraband defined as all equipment, products and materials of any kind which are used, intended for use, or designed, for use in injecting, ingesting, inhaling, or otherwise introducing into the human body, marijuana or other controlled substances, in violation of law. This includes: hypodermic syringes, needles, and other objects to inject controlled substances in the body or objects to ingest, inhale or otherwise introduce marijuana, cocaine or hashish oil into the body is prohibited. | ||
ALCOHOL |
8
All JPEO JTRS, tenant command and other government employees, as well as support contractors and authorized visitors may bring unopened containers of alcohol on board the Center if it remains in their private vehicles except where expressly authorized for an approved event. Alcohol beverages will be consumed only at designated facilities for which written permission by the Commanding Officer is granted. | ||
Personnel desiring to hold a social function and serve alcohol, should send a memo (hard copy) to the Commanding Officer, via the appropriate division head, the Director of Security, and the Public Affairs Officer. The Public Affairs Officer will approve or disapprove the facility use request based on availability and general use policy. If facility use is approved, the Public Affairs Officer will forward the memo to the Commanding Officer for approval/disapproval. | ||
COUNTERFEIT CURRENCY | ||
Counterfeit currency defined as any copy, photo, or other Likeness of any U.S. currency, either past or present, not authorized by the U.S. Treasury Department is prohibited. | ||
XI. | ESCORTING POLICY. |
a. | All personnel within JPEO JTRS and SSC Pacifics fenced perimeters, with the exception of emergency personnel such as fire, ambulance, or hazardous material response personnel responding to an actual emergency, must wear an SSC Pacific issued badge. Only U.S. citizens and U.S. Permanent Residents (former immigrant aliens) may be escorted under this policy. ALL JPEO JTRS FOREIGN NATIONAL VISITORS MUST BE PROCESSED THROUGH THE SPAWAR FOREIGN VISITS COORDINATOR OFFICE, 8335. Contact phone number, (858) 537-8884. | ||
b. | All pictured badged JPEO JTRS and tenant command employees, as well as those contractors and other government employees who have an E on their picture badge may escort visitors wearing a red escort-required badge. |
XIII. | CELLULAR PHONE USAGE. |
a. | Cellular phone use is prohibited in all secure spaces, i.e. Open Storage areas, classified laboratories. | ||
b. | Vehicle operators on DoD installations and operators of Government vehicles shall not use cellular phones, unless the vehicle is safely parked or unless they are using a hands-free device, and are also prohibited from wearing of any other portable headphones, earphones, or other listening devices while operating a motor vehicle. | ||
c. | The use of cellular phones, portable headphones, earphones, or other listening devices while jogging, walking bicycling, or skating on roads and streets on Navy installations is prohibited except for use on designated bicycle and running paths and sidewalks. |
9
a. | Reproduced without prior approval of the originator of the material. All Intelligence material shall bear a prohibition against reproduction while in your custody; or | ||
b. | Released to foreign nationals or immigrant aliens who you may employ, regardless of their security clearance or access authorization, except with the specific permission of the Office of Naval Intelligence (ON1-5), via Securitys Contracting Officers Representative (COR); or | ||
c. | Released to any activity or person of the contractors organization not directly engaged in providing services under the contract or to another contractor (including subcontractors), government agency, private individual, or organization without prior approval of the originator of the material, and prior approval and certification of need-to- know by the designated project manager/contract sponsor. |
10
11
12
13
All work is to be performed in accordance with DoD and Navy Operations Security (OPSEC) requirements, per the following applicable documents: |
National Security Decision Directive 298
|
DOD 5205.02
|
OPNAVINST 3432.1 |
SPAWARINST 3432.1 |
National Operations Security Program (NSDD) 298 |
DOD Operations Security (OPSEC) Program |
DON Operations Security |
Operations Security Policy |
| The contractor will practice OPSEC and implement OPSEC countermeasures to protect DOD Critical Information. Items of Critical Information are those facts, which individually, or in the aggregate, reveal sensitive details about SPAWAR or the contractors security or operations related to the support or performance of this SOW, and thus require a level of protection from adversarial collection or exploitation not normally afforded to unclassified information. | ||
| Contractor must protect Critical Information and other sensitive unclassified information and activities, especially those activities or information which could compromise classified information or operations, or degrade the planning and execution of military operations performed or supported by the contractor in support of the mission. Protection of Critical Information will include the adherence to and execution of countermeasures which the contractor is notified by or provided by SPAWAR, for Critical information on or related to the SOW. | ||
| Sensitive unclassified information is that information marked FOR OFFICIAL USE ONLY (or FOUO), Privacy Act of 1974, COMPANY PROPRIETARY, and also information as identified by SPAWAR or the SPAWAR Security COR. | ||
| SPAWAR has identified the following items as Critical Information that may be related to this SOW : |
| Known or probable vulnerabilities to any U.S. system and their direct support systems. | ||
| Details of capabilities or limitations of any U.S. system that reveal or could reveal known or probable vulnerabilities of any U.S. system and their direct support systems. | ||
| Details of information about military operations, missions and exercises. | ||
| Details of U.S. systems supporting combat operations (numbers of systems deployed, deployment timelines, locations, effectiveness, unique capabilities, etc.). | ||
| Operational characteristics for new or modified weapon systems (Probability of Kill (Pk), Countermeasures, Survivability, etc.). | ||
| Required performance characteristics of U.S. systems using leading edge or greater technology (new, modified or existing). | ||
| Telemetered or data-linked data or information from which operational characteristics can be inferred or derived. | ||
| Test or evaluation information pertaining to schedules of events during which Critical information might be captured. (advance greater than 3 days). | ||
| Details of SPAWAR/SSC Pacific unique Test or Evaluation capabilities (disclosure of unique capabilities). |
14
| Existence and/or details of intrusions into or attacks against DoD Networks or Information Systems, including, but not limited to, tactics, techniques and procedures used, network vulnerabilities exploited, and data targeted for exploitation. | ||
| Network User IDs and Passwords. | ||
| Counter-IED capabilities and characteristics, including success or failure rates, damage assessments, advancements to existing or new capabilities. | ||
| Vulnerabilities in Command processes, disclosure of which could allow someone to circumvent security, financial, personnel safety, or operations procedures. | ||
| Force Protection specific capabilities or response protocols (timelines/equipment/numbers of personnel/training received/etc.). | ||
| Command leadership and VIP agendas, reservations, plans/routes etc. | ||
| Detailed facility maps or installation overhead photography (photo with annotation of Command areas or greater resolution than commercially available). | ||
| Details of COOP, SPAWAR/SSC Pacific emergency evacuation procedures, or emergency recall procedures. | ||
| Government personnel information that would reveal force structure and readiness (such as recall rosters or deployment lists). | ||
| Compilations of information that directly disclose Command Critical Information. |
| The above Critical information and any that the contractor develops, regardless if in electronic or hardcopy form, must be protected by a minimum of the following countermeasures: |
| All emails containing Critical information must be DoD Public Key Infrastructure (PKI) signed and PKI encrypted when sent. | ||
| Critical Information may not be sent via unclassified fax. | ||
| Critical Information may not be discussed via non-secure phones. | ||
| Critical Information may not be provided to individuals that do not have a need to know it in order to complete their assigned duties. | ||
| Critical Information may not be disposed of in recycle bins or trash containers. | ||
| Critical Information may not be left unattended in uncontrolled areas. | ||
| Critical Information in general should be treated with the same care as FOUO or proprietary information. | ||
| Critical Information must be destroyed in the same manner as FOUO. | ||
| Critical information must be destroyed at contract termination or returned to the government at the governments discretion. |
| The contractor shall document items of Critical Information that are applicable to contractor operations involving information on or related to the SOW. Such determinations of Critical Information will be completed using the DoD OPSEC 5 step process as described in National Security Decision Directive (NSDD) 298, National Operations Security Program. | |
| OPSEC training must be Included as part of the contractors ongoing security awareness program conducted in accordance with Chapter 3, Section 1, of the NISPOM. NSDD 298, DoD 5205.02, DOD Operations Security (OPSEC) Program, and OPNAVINST 3432.1, Operations Security should be used to assist in creation or management of training curriculum. | |
| If the contractor cannot resolve an issue concerning OPSEC they will contact the SPAWAR Security COR (who will consult with the SPAWAR/SSC Pacific OPSEC Manager). | |
| All above requirements MUST be passed to all Sub-contractors. |
15
ATTACHMENT I | 10/22/09 |
|
Contents: | |||
|
Cover | 1 page | ||
|
Text | 5 pages |
ATTACHMENT I | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.1.4 (If Applicable)
|
TACAN-only state | T | ||
3.2.1.1.1.2.19
|
Time slot operations | T | ||
3.2.1.1.1.3.2.2
|
Normal mode | T | ||
3.2.1.1.1.3.3.2
|
Normal range mode | T | ||
3.2.1.1.1.3.6.1
|
Mode 1 | T | ||
3.2.1.1.1.3.7.1
|
Normal output power mode | T | ||
3.2.1.1.1.3.7.2
|
Low output power mode | T | ||
3.2.1.1.1.3.7.5
|
Medium output power mode | T | ||
3.2.1.1.1.4.7
|
Loading of cryptovariables | T | ||
3.2.1.1.1.4.8
|
Erasure of cryptovariables | T | ||
3.2.1.1.1.4.8 c.
|
T | |||
3.2.1.1.1.4.8 d.
|
T | |||
3.2.1.1.1.5.2
|
Network time | T | ||
3.2.1.1.1.5.3.1
|
NTR without external time reference | T | ||
3.2.1.1.1.5.3.1 a.
|
T | |||
3.2.1.1.1.5.3.1 b.
|
T | |||
3.2.1.1.1.5.3.1 c.
|
T | |||
3.2.1.1.1.5.3.1 d.
|
T | |||
3.2.1.1.1.5.4.3
|
Initial network entry | T | ||
3.2.1.1.1.5.5.1
|
General | T | ||
3.2.1.1.1.5.5.2
|
Coarse synchronization | T | ||
3.2.1.1.1.5.5.2 a.
|
T | |||
3.2.1.1.1.5.5.2 b.
|
T | |||
3.2.1.1.1.5.5.3
|
Fine synchronization | T | ||
3.2.1.1.1.5.5.5.1
|
General | T | ||
3.2.1.1.1.5.5.5.2
|
Type 2(0) RTT-A interrogation | T | ||
3.2.1.1.1.5.5.5.4
|
RTT reply | T | ||
3.2.1.1.1.5.5.5.4.a
|
T | |||
3.2.1.1.1.5.5.5.4.b
|
T | |||
3.2.1.1.1.5.5.6
|
TOA measurement, RTT interrogation | T | ||
3.2.1.1.1.5.6.2
|
Terminal clock | T | ||
3.2.1.1.1.5.6.4
|
Time-of-arrival measurement accuracy | T | ||
3.2.1.1.1.5.6.7
|
Terminal chronometer | T | ||
3.2.1.1.1.5.6.7 a
|
T | |||
3.2.1.1.1.5.6.7 b
|
T | |||
3.2.1.1.1.5.6.7 c
|
T | |||
3.2.1.1.1.5.6.7 d
|
T | |||
3.2.1.1.1.6.6
|
Terminal initialization data | T | ||
3.2.1.1.1.15.2
|
Message construction | T | ||
3.2.1.1.1.15.3.1
|
Terminal-generated messages | T | ||
3.2.1.1.1.19.1
|
General | T |
1
ATTACHMENT I | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.1.1.1.19.2
|
Adaptable parameters | T | ||
3.2.1.1.1.19.2 e.
|
T | |||
3.2.1.1.1.19.2 f.
|
T | |||
3.2.1.1.1.19.5
|
Start-up | T | ||
3.2.1.1.1.19.5 a.
|
T | |||
3.2.1.1.1.19.7
|
Prime power interruption | T | ||
3.2.1.1.1.20.2
|
Network information exchange | T | ||
3.2.1.1.1.21
|
RF signal output capability | T | ||
3.2.1.1.1.21.1
|
Antenna interface signal output | T | ||
3.2.1.1.1.21.1 b.
|
T | |||
3.2.1.1.1.21.1 b.1
|
T | |||
3.2.1.1.1.21.1 b.3
|
T | |||
3.2.1.1.1.21.1 b.5
|
T | |||
3.2.1.1.1.21.1 c.
|
T | |||
3.2.1.1.1.21.1 d.
|
T | |||
3.2.1.1.1.21.1 e.
|
T | |||
3.2.1.1.1.21.1.1
|
RF pulse spectrum | T | ||
3.2.1.1.1.21.1.1 a.
|
T | |||
3.2.1.1.1.21.1.1 b.
|
T | |||
3.2.1.1.1.21.1.1 c.
|
T | |||
3.2.1.1.1.21.1.2
|
Out-of-band emission characteristics | T | ||
3.2.1.1.1.21.1.2 a.
|
T | |||
3.2.1.1.1.22
|
TDMA transmission compatibility capability | T | ||
3.2.1.1.1.22 f.
|
T | |||
3.2.1.1.1.22.1.2
|
1030/1090 MHz emissions | T | ||
3.2.1.1.1.22.1.2 a.
|
T | |||
3.2.1.1.1.23
|
Reception performance capability and RF signal input capability | T | ||
3.2.1.1.1.23.1
|
General | T | ||
3.2.1.1.1.23.2
|
Dynamic range | T | ||
3.2.1.1.1.24.2
|
Error rates | T | ||
3.2.1.1.2 (If Applicable)
|
TACAN mode | T | ||
3.2.1.1.2 b. (If Applicable)
|
T | |||
3.2.1.1.2 c. (If Applicable)
|
T | |||
3.2.1.1.2 d. (If Applicable)
|
T | |||
3.2.1.1.2.1 (If Applicable)
|
Air-to-ground capability | T | ||
3.2.1.1.2.1 a. (If Applicable)
|
T | |||
3.2.1.1.2.1 b. (If Applicable)
|
T | |||
3.2.1.1.2.1 c. (If Applicable)
|
T | |||
3.2.1.1.2.1 c.1. (If Applicable)
|
T | |||
3.2.1.1.2.1 c.2. (If Applicable)
|
T | |||
3.2.1.1.2.1 c.4. (If Applicable)
|
T | |||
3.2.1.1.2.1 c.6. (If Applicable)
|
T |
2
ATTACHMENT I | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.1.1.2.1 c.7. (If Applicable)
|
T | |||
3.2.1.1.2.1.1 (If Applicable)
|
Identification | T | ||
3.2.1.1.2.1.1 a. (If Applicable)
|
T | |||
3.2.1.1.2.2 (If Applicable)
|
Air-to-air capability | T | ||
3.2.1.1.2.2 a. (If Applicable)
|
T | |||
3.2.1.1.2.2 a.1. (If Applicable)
|
T | |||
3.2.1.1.2.2 a.2. (If Applicable)
|
T | |||
3.2.1.1.2.2 a.4. (If Applicable)
|
T | |||
3.2.1.1.2.2 a.5. (If Applicable)
|
T | |||
3.2.1.1.2.2 b. (If Applicable)
|
T | |||
3.2.1.1.2.2 b.1. (If Applicable)
|
T | |||
3.2.1.1.2.2 b.4. (If Applicable)
|
T | |||
3.2.1.1.2.2 b.6. (If Applicable)
|
T | |||
3.2.1.1.2.2 b.7. (If Applicable)
|
T | |||
3.2.1.1.2.3.1 (If Applicable)
|
Transmission | T | ||
3.2.1.1.2.5 (If Applicable)
|
TACAN-Host Information Exchange Capability | T | ||
3.2.1.2.1
|
Terminal standby mode | T | ||
3.2.1.2.1 a.
|
T | |||
3.2.1.2.1.1
|
Data retention capability | T | ||
3.2.1.2.1.2
|
Loading of cryptovariables capability | T | ||
3.2.1.2.1.2 a.
|
T | |||
3.2.1.2.1.2 b.
|
T | |||
3.2.1.2.1.3
|
Cryptovariable erase capability | T | ||
3.2.3.1 (If Applicable)
|
Data bus interface description | T | ||
3.2.3.1 c.
|
T | |||
3.2.3.1.1 (If Applicable)
|
General rules | T | ||
3.2.3.1.1.3.7 (If Applicable)
|
TACAN control data | T | ||
3.2.3.1.1.3.8
|
BIT initiate | T | ||
3.2.3.1.1.3.9
|
TOMA NOGO | T | ||
3.2.3.1.2 (If Applicable)
|
Avionics data bus interface | T | ||
3.2.3.1.2.1
|
MIL-STD-1553B | T | ||
3.2.3.1.2.3 (If Applicable)
|
PR EN 3910 | T | ||
3.2.3.1.3 (If Applicable)
|
X25 data bus interface | T | ||
3.2.3.1.4 (If Applicable)
|
Ethernet interface | T | ||
3.2.3.2
|
Suppression signal interface description | T | ||
3.2.3.2.1 a.
|
T | |||
3.2.3.2.1 b.
|
T | |||
3.2.3.2.1 c.
|
T | |||
3.2.3.2.1 e.
|
T | |||
3.2.3.2.1 f.
|
T | |||
3.2.3.2.1 g.
|
T | |||
3.2.3.2.2 a.
|
T |
3
ATTACHMENT I | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.3.2.2 b.
|
T | |||
3.2.3.2.2 c.
|
T | |||
3.2.3.3
|
Antenna interface description | I | ||
3.2.3.3 c.
|
T | |||
3.2.3.3 d.
|
T | |||
3.2.3.6 (If Applicable)
|
TACAN interface description | T | ||
3.2.3.6 a. (If Applicable)
|
T | |||
3.2.3.6 c. (If Applicable)
|
T | |||
3.2.3.7.1
|
Timing signal interface description Mode 1 | T | ||
3.2.3.7.1.1
|
Time synchronization input interface | T | ||
3.2.3.7.1.2
|
Time synchronization output interface | T | ||
3.2.3.7.2
|
Timing signal interface description Mode 2 | T | ||
3.2.3.7.2.1
|
Time synchronization and input interface | T | ||
3.2.3.7.2.2
|
Time Synchronization and output interface | T | ||
3.2.3.11
|
Platform mounting interface description | T | ||
3.2.3.12 (If Applicable)
|
Voice interface description | T | ||
3.2.3.12.1 (If Applicable)
|
2.4 kbps voice analog interface | T | ||
3.2.3.12.2 (If Applicable)
|
16 kbps voice analog interface | T | ||
3.2.3.12.3 (If Applicable)
|
Push-to-talk | T | ||
3.2.3.13.1
|
SDU zeroize interface | T | ||
3.2.3.13.2
|
Terminal power on interface | T | ||
3.2.3.13.3
|
Terminal standby interface | T | ||
3.2.3.14
|
Status Interface | T | ||
3.2.3.14.1
|
Time slot synchronization | T | ||
3.2.3.14.2
|
Reception detect | T | ||
3.2.3.14.3
|
Output power level | T | ||
3.2.3.14.5
|
Advanced slot notification interfaces. | T | ||
3.2.3.14.7
|
Active receive indication interface. | T | ||
3.2.3.14.8
|
IFF Emergency switch interface. | T | ||
3.2.4
|
Physical characteristics | I | ||
3.2.4.1
|
Protective coatings | I | ||
3.2.4.2
|
Volume and form factor | I | ||
3.2.4.2.2
|
Front connector configuration | I | ||
3.2.4.3
|
Weight | I | ||
3.2.4.4
|
Color | I | ||
3.2.4.4 a.
|
I | |||
3.2.4.4 b.
|
I | |||
3.2.4.5
|
Mounting provisions | T | ||
3.2.4.6
|
Electrical connector configuration | I | ||
3.2.4.6 b.
|
I | |||
3.2.5.2.6
|
Built-in-tests | T | ||
3.2.5.2.6.1
|
Start-up BIT | T |
4
ATTACHMENT I | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.5.2.6.2
|
Operational BIT | T | ||
3.2.5.2.6.3
|
Manually initiated BIT | T | ||
3.3.1.3
|
Environmental stress screening (ESS) | T | ||
3.3.3 a.
|
I | |||
3.3.3 b.
|
I | |||
3.3.3 c.
|
I | |||
3.3.3 d.
|
I | |||
3.3.3 e.
|
I | |||
3.3.3 f.
|
I | |||
3.3.3 g.
|
I | |||
3.3.4
|
Workmanship | I | ||
3.3.4 a.
|
I | |||
3.3.4 b.
|
I | |||
3.3.4 c.
|
I |
5
ATTACHMENT J | 10/22/09 |
|
Contents: | |||
|
Cover | 1 page | ||
|
Text | 4 pages |
ATTACHMENT J | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Methods | ||
3.2.1.1.1.2.10.1
|
General | T | ||
3.2.1.1.1.2.12.1
|
General | T | ||
3.2.1.1.1.2.12.2
|
Normal range waveform jitter | T | ||
3.2.1.1.1.2.12.3
|
Extended range waveform jitter | T | ||
3.2.1.1.1.2.13
|
Synchronization preamble reception | T | ||
3.2.1.1.1.2.14
|
Forward error correction and error detection decoding | T | ||
3.2.1.1.1.3.2.1
|
General | T | ||
3.2.1.1.1.3.2.2
|
Normal mode | T | ||
3.2.1.1.1.3.2.3
|
Polling mode | T | ||
3.2.1.1.1.3.3.2
|
Normal range mode | T | ||
3.2.1.1.1.3.6.1
|
Mode 1 | T | ||
3.2.1.1.1.3.7.1
|
Normal output power mode | T | ||
3.2.1.1.1.3.7.5
|
Medium output power mode | T | ||
3.2.1.1.1.4.7
|
Loading of cryptovariables | T | ||
3.2.1.1.1.4.8 c.
|
Erasure of cryptovariables | T | ||
3.2.1.1.1.5.2
|
Network time | T | ||
3.2.1.1.1.5.3.1 c.
|
T | |||
3.2.1.1.1.5.3.1 d.
|
T | |||
3.2.1.1.1.5.4.1
|
Initial entry message transmission | T | ||
3.2.1.1.1.5.4.3
|
Initial network entry | T | ||
3.2.1.1.1.5.4.3 a.
|
T | |||
3.2.1.1.1.5.4.3 d.
|
T | |||
3.2.1.1.1.5.5.1
|
General | T | ||
3.2.1.1.1.5.5.2
|
Coarse synchronization | T | ||
3.2.1.1.1.5.5.2 a.
|
T | |||
3.2.1.1.1.5.5.2 b.
|
T | |||
3.2.1.1.1.5.5.2 c.2
|
T | |||
3.2.1.1.1.5.5.2 c.3
|
T | |||
3.2.1.1.1.5.5.3
|
Fine synchronization | T | ||
3.2.1.1.1.5.5.3 a.
|
T | |||
3.2.1.1.1.5.5.3 b.
|
T | |||
3.2.1.1.1.5.5.3 c.
|
T | |||
3.2.1.1.1.5.5.3 d.
|
T | |||
3.2.1.1.1.5.5.5.1
|
General | T | ||
3.2.1.1.1.5.5.5.2
|
Type 2(0) RTT-A interrogation | T | ||
3.2.1.1.1.5.5.5.4.
|
RTT reply | T | ||
3.2.1.1.1.5.5.5.4. a.
|
T | |||
3.2.1.1.1.5.5.5.4. b.
|
T | |||
3.2.1.1.1.5.5.6
|
TOA measurement, RTT interrogation | T | ||
3.2.1.1.1.5.6.2
|
Terminal clock | T |
T: | Test | |
I: | Inspection |
1
ATTACHMENT J | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Methods | ||
3.2.1.1.1.5.6.4
|
Time-of-arrival measurement accuracy | T | ||
3.2.1.1.1.5.6.7
|
Terminal chronometer | T | ||
3.2.1.1.1.5.6.7 a.
|
T | |||
3.2.1.1.1.5.6.7 b.
|
T | |||
3.2.1.1.1.5.6.7 d.
|
T | |||
3.2.1.1.1.6.6
|
Terminal initialization data | T | ||
3.2.1.1.1.6.7
|
Host control input | T | ||
3.2.1.1.1.8.2.1.1
|
Time slot block allocation set initialization | T | ||
3.2.1.1.1.8.2.1.2
|
Time slot block allocation set change | T | ||
3.2.1.1.1.8.3.3.2
|
Initial entry PG | T | ||
3.2.1.1.1.8.3.4
|
Validity checking | T | ||
3.2.1.1.1.8.4.11
|
Initialization assignments | T | ||
3.2.1.1.1.8.4.12
|
Host control inputs | T | ||
3.2.1.1.1.8.5 a.
|
T | |||
3.2.1.1.1.10.3
|
Host control inputs | T | ||
3.2.1.1.1.19.1
|
General | T | ||
3.2.1.1.1.19.2
|
Adaptable parameters | T | ||
3.2.1.1.1.19.2 a.
|
T | |||
3.2.1.1.1.19.2 b.
|
T | |||
3.2.1.1.1.19.2 c.
|
T | |||
3.2.1.1.1.19.2 e.
|
T | |||
3.2.1.1.1.19.2 f.
|
T | |||
3.2.1.1.1.19.5 a.
|
T | |||
3.2.1.1.1.19.5 b.
|
T | |||
3.2.1.1.1.19.7
|
Prime power interruption | T | ||
3.2.1.1.1.19.8
|
Terminal configuration | T | ||
3.2.1.1.1.20.1.2
|
Host-to-Terminal local information exchange | T | ||
3.2.1.1.1.20.2
|
Network information exchange | T | ||
3.2.1.1.1.20.2.1
|
Terminal-to-host message transfer | T | ||
3.2.1.1.1.21.1 b.
|
T | |||
3.2.1.1.1.21.1 b.1
|
T | |||
3.2.1.1.1.21.1 b.5
|
T | |||
3.2.1.1.1.21.1 d.
|
T | |||
3.2.1.1.1.21.1.1
|
RF pulse spectrum | T | ||
3.2.1.1.1.21.1.1 a.
|
T | |||
3.2.1.1.1.21.1.1 c.
|
T | |||
3.2.1.1.1.21.1.2 a.
|
T | |||
3.2.1.1.1.22
|
TDMA transmission compatibility capability | T | ||
3.2.1.1.1.22 a.
|
T | |||
3.2.1.1.1.22 b.
|
T | |||
3.2.1.1.1.22 c.
|
T | |||
3.2.1.1.1.22 f.
|
T | |||
3.2.1.1.1.22 h.
|
T |
T: | Test | |
I: | Inspection |
2
ATTACHMENT J | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Methods | ||
3.2.1.1.1.22.1.2 a.
|
T | |||
3.2.1.2.1
|
Terminal standby mode | T | ||
3.2.1.2.1.2
|
Loading of cryptovariables capability | T | ||
3.2.1.2.1.2 b.
|
T | |||
3.2.1.2.1.3
|
Cryptovariable erase capability | T | ||
3.2.1.5.1.2
|
Cryptovariable erase capability | T | ||
3.2.1.6
|
Operational Mode | T | ||
3.2.3.1.1.3.8
|
BIT initiate | T | ||
3.2.3.3 c.
|
T | |||
3.2.3.3 d.
|
T | |||
3.2.3.3 e.
|
T | |||
3.2.3.5
|
Support equipment interface description | T | ||
3.2.3.12 (If Applicable)
|
Voice interface description | T | ||
3.2.3.12.1 (If Applicable)
|
2.4 kbps voice analog interface | T | ||
3.2.3.12.2 (If Applicable)
|
16 kbps voice analog interface | T | ||
3.2.3.12.3 (If Applicable)
|
Push-to-talk | T | ||
3.2.3.13.5
|
I/O configuration identifier | T | ||
3.2.3.18.1
|
ADDSI interface | T | ||
3.2.3.18.1.1
|
ADDSI interface | T | ||
3.2.3.18.1.2
|
GPS Interface | T | ||
3.2.3.18.1.3
|
Ethernet Interface | T | ||
3.2.3.18.2
|
BIT Display | T | ||
3.2.3.18.3
|
On/Off/Standby switch | T | ||
3.2.3.18.4
|
Secure Data Unit (SDU) interface | T | ||
3.2.3.18.5
|
Support Equipment interface | T | ||
3.2.3.18.6
|
Prime Power interface | T | ||
3.2.3.18.7
|
Status indicator | T | ||
3.2.3.18.8
|
Grounding | T | ||
3.2.3.18.9
|
Loading indicator | T | ||
3.2.3.18.12
|
ETR Interface | T | ||
3.2.3.18.13
|
Manual Initiated BIT | T | ||
3.2.3.18.14
|
Additional message processing | T | ||
3.2.4
|
Physical characteristics | I | ||
3.2.4.1
|
Protective coatings | I | ||
3.2.4.2
|
Volume and form factor | I | ||
3.2.4.2.1
|
MIDS LVT(2) configuration | I | ||
3.2.4.2.2
|
Front connector configuration | I | ||
3.2.4.3
|
Weight | I | ||
3.2.4.4
|
Color | I | ||
3.2.4.4 a.
|
I | |||
3.2.4.4 b.
|
I | |||
3.2.4.5
|
Mounting provisions | I | ||
3.2.4.6
|
Electrical connector configuration | I |
T: | Test | |
I: | Inspection |
3
ATTACHMENT J | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Methods | ||
3.2.4.6 a.
|
I | |||
3.2.4.6 b.
|
I | |||
3.2.4.6 c.
|
I | |||
3.3.1.2.7
|
Screws | I | ||
3.3.1.3
|
Environmental stress screening | T | ||
3.3.3 a.
|
I | |||
3.3.3 b.
|
I | |||
3.3.3 c.
|
I | |||
3.3.3 d.
|
I | |||
3.3.3 e.
|
I | |||
3.3.3 f.
|
I | |||
3.3.3 g.
|
I | |||
3.3.4
|
Workmanship | I | ||
3.3.4 a.
|
I | |||
3.3.4 b.
|
I | |||
3.3.4 c.
|
I |
T: | Test | |
I: | Inspection |
4
ATTACHMENT K | 10/22/09 |
Contents: | ||||
Cover | 1 page | |||
Text | 3 pages |
ATTACHMENT K | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.1.1.1.2.19
|
Time slot operations | T | ||
3.2.1.1.1.3.2.2
|
Normal mode | T | ||
3.2.1.1.1.3.3.2
|
Normal range mode | T | ||
3.2.1.1.1.3.6.1
|
Mode 1 | T | ||
3.2.1.1.1.3.7.1
|
Normal output power mode | T | ||
3.2.1.1.1.3.7.2
|
Low output power mode | T | ||
3.2.1.1.1.3.7.5
|
Medium output power mode | T | ||
3.2.1.1.1.4.7
|
Loading of cryptovariables | T | ||
3.2.1.1.1.4.8
|
Erasure of cryptovariables | T | ||
3.2.1.1.1.4.8 c.
|
T | |||
3.2.1.1.1.4.8 d.
|
T | |||
3.2.1.1.1.5.2
|
Network time | T | ||
3.2.1.1.1.5.3.1
|
NTR without external time reference | T | ||
3.2.1.1.1.5.3.1 a.
|
T | |||
3.2.1.1.1.5.3.1 b.
|
T | |||
3.2.1.1.1.5.3.1 c.
|
T | |||
3.2.1.1.1.5.3.1 d.
|
T | |||
3.2.1.1.1.5.4.3
|
Initial network entry | T | ||
3.2.1.1.1.5.5.1
|
General | T | ||
3.2.1.1.1.5.5.2
|
Coarse synchronization | T | ||
3.2.1.1.1.5.5.2 a.
|
T | |||
3.2.1.1.1.5.5.2 b.
|
T | |||
3.2.1.1.1.5.5.3
|
Fine synchronization | T | ||
3.2.1.1.1.5.5.5.1
|
General | T | ||
3.2.1.1.1.5.5.5.2
|
Type 2(0) RTT-A interrogation | T | ||
3.2.1.1.1.5.5.5.4
|
RTT reply | T | ||
3.2.1.1.1.5.5.5.4.a
|
T | |||
3.2.1.1.1.5.5.5.4.b
|
T | |||
3.2.1.1.1.5.5.6
|
TOA measurement, RTT interrogation | T | ||
3.2.1.1.1.5.6.2
|
Terminal clock | T | ||
3.2.1.1.1.5.6.4
|
Time-of-arrival measurement accuracy | T | ||
3.2.1.1.1.5.6.7
|
Terminal chronometer | T | ||
3.2.1.1.1.5.6.7 a
|
T | |||
3.2.1.1.1.5.6.7 b
|
T | |||
3.2.1.1.1.5.6.7 c
|
T | |||
3.2.1.1.1.5.6.7 d
|
T | |||
3.2.1.1.1.6.6
|
Terminal initialization data | T | ||
3.2.1.1.1.15.2
|
Message construction | T | ||
3.2.1.1.1.15.3.1
|
Terminal-generated messages | T | ||
3.2.1.1.1.19.1
|
General | T |
T: | Test | |
I: | Inspection |
1
ATTACHMENT K | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.1.1.1.19.2
|
Adaptable parameters | T | ||
3.2.1.1.1.19.2 e.
|
T | |||
3.2.1.1.1.19.2 f.
|
T | |||
3.2.1.1.1.19.5
|
Start-up | T | ||
3.2.1.1.1.19.5 a.
|
T | |||
3.2.1.1.1.19.7
|
Prime power interruption | T | ||
3.2.1.1.1.20.2
|
Network information exchange | T | ||
3.2.1.1.1.21
|
RF signal output capability | T | ||
3.2.1.1.1.21.1
|
Antenna interface signal output | T | ||
3.2.1.1.1.21.1 b.
|
T | |||
3.2.1.1.1.21.1 b.1
|
T | |||
3.2.1.1.1.21.1 c.
|
T | |||
3.2.1.1.1.21.1 d.
|
T | |||
3.2.1.1.1.21.1 e.
|
T | |||
3.2.1.1.1.21.1.1
|
RF pulse spectrum | T | ||
3.2.1.1.1.21.1.1 a.
|
T | |||
3.2.1.1.1.21.1.2
|
Out-of-band emission characteristics | T | ||
3.2.1.1.1.21.1.2 a.
|
T | |||
3.2.1.1.1.22
|
TDMA transmission compatibility capability | T | ||
3.2.1.1.1.22 f.
|
T | |||
3.2.1.1.1.22.1.2
|
1030/1090 MHz emissions | T | ||
3.2.1.1.1.22.1.2 a.
|
T | |||
3.2.1.1.1.23
|
Reception performance capability and RF signal input capability | T | ||
3.2.1.1.1.23.1
|
General | T | ||
3.2.1.1.1.23.2
|
Dynamic range | T | ||
3.2.1.1.1.24.2
|
Error rates | T | ||
3.2.1.2.1
|
Terminal standby mode | T | ||
3.2.1.2.1 a.
|
T | |||
3.2.1.2.1.1
|
Data retention capability | T | ||
3.2.1.2.1.2
|
Loading of cryptovariables capability | T | ||
3.2.1.2.1.2 a.
|
T | |||
3.2.1.2.1.2 b.
|
T | |||
3.2.1.2.1.3
|
Cryptovariable erase capability | T | ||
3.2.3.1 (If Applicable)
|
Data bus interface description | T | ||
3.2.3.1 c.
|
T | |||
3.2.3.1.1.3.9
|
TOMA NOGO | T | ||
3.2.3.1.2 (If Applicable)
|
Avionics data bus interface | T | ||
3.2.3.2
|
Suppression signal interface description | T | ||
3.2.3.2.1 b.
|
T | |||
3.2.3.2.1 c.
|
T | |||
3.2.3.2.1 g.
|
T | |||
3.2.3.2.2 a.
|
T |
T: | Test | |
I: | Inspection |
2
ATTACHMENT K | 10/22/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.3.3
|
Antenna interface description | I | ||
3.2.3.3 c.
|
T | |||
3.2.3.3 d.
|
T | |||
3.2.3.6
|
TACAN interface description | T | ||
3.2.3.6 a.
|
T | |||
3.2.3.6 c.
|
T | |||
3.2.3.7.1
|
Timing signal interface description Mode 1 | T | ||
3.2.3.7.1.1
|
Time synchronization input interface | T | ||
3.2.3.7.1.2
|
Time synchronization output interface | T | ||
3.2.3.7.2
|
Timing signal interface description Mode 2 | T | ||
3.2.3.7.2.1
|
Time synchronization and input interface | T | ||
3.2.3.11
|
Platform mounting interface description | T | ||
3.2.3.13.1
|
SDU zeroize interface | T | ||
3.2.3.13.2
|
Terminal power on interface | T | ||
3.2.3.13.3
|
Terminal standby interface | T | ||
3.2.3.14.1
|
Time slot synchronization | T | ||
3.2.3.14.8
|
IFF Emergency switch interface. | T | ||
3.2.4
|
Physical characteristics | I | ||
3.2.4.1
|
Protective coatings | I | ||
3.2.4.2
|
Volume and form factor | I | ||
3.2.4.2.2
|
Front connector configuration | I | ||
3.2.4.3
|
Weight | I | ||
3.2.4.4 b.
|
I | |||
3.2.4.5
|
Mounting provisions | T | ||
3.2.4.6
|
Electrical connector configuration | I | ||
3.2.4.6 b.
|
I | |||
3.2.5.2.6
|
Built-in-tests | T | ||
3.2.5.2.6.1
|
Start-up BIT | T | ||
3.2.5.2.6.2
|
Operational BIT | T | ||
3.2.5.2.6.3
|
Manually initiated BIT | T | ||
IF76301A328A5068 Rev C
Section 3.4.2
|
Environmental Stress Requirements | T | ||
3.3.3 a.
|
I | |||
3.3.3 b.
|
I | |||
3.3.3 c.
|
I | |||
3.3.4
|
Workmanship | I | ||
3.3.4 a.
|
I | |||
3.3.4 b.
|
I | |||
3.3.4 c.
|
I |
T: | Test | |
I: | Inspection |
3
ATTACHMENT N | 10/27/09 |
|
Contents: | |||
|
Cover | 1 page | ||
|
Text | 4 pages |
ATTACHMENT N | 10/27/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.1.1.1.2.19
|
Time slot operations | T | ||
3.2.1.1.1.3.2.2
|
Normal mode | T | ||
3.2.1.1.1.3.3.2
|
Normal range mode | T | ||
3.2.1.1.1.3.6.1
|
Mode 1 | T | ||
3.2.1.1.1.3.7.1
|
Normal output power mode | T | ||
3.2.1.1.1.4.7
|
Loading of cryptovariables | T | ||
3.2.1.1.1.4.8
|
Erasure of cryptovariables | T | ||
3.2.1.1.1.4.8 c.
|
T | |||
3.2.1.1.1.4.8 d.
|
T | |||
3.2.1.1.1.5.2
|
Network time | T | ||
3.2.1.1.1.5.3.1
|
NTR without external time reference | T | ||
3.2.1.1.1.5.3.1 a.
|
T | |||
3.2.1.1.1.5.3.1 b.
|
T | |||
3.2.1.1.1.5.3.1 c.
|
T | |||
3.2.1.1.1.5.3.1 d.
|
T | |||
3.2.1.1.1.5.4.3
|
Initial network entry | T | ||
3.2.1.1.1.5.5.1
|
General | T | ||
3.2.1.1.1.5.5.2
|
Coarse synchronization | T | ||
3.2.1.1.1.5.5.2 a.
|
T | |||
3.2.1.1.1.5.5.2 b.
|
T | |||
3.2.1.1.1.5.5.3
|
Fine synchronization | T | ||
3.2.1.1.1.5.5.5.1
|
General | T | ||
3.2.1.1.1.5.5.5.2
|
Type 2(0) RTT-A interrogation | T | ||
3.2.1.1.1.5.5.5.4
|
RTT reply | T | ||
3.2.1.1.1.5.5.5.4.a
|
T | |||
3.2.1.1.1.5.5.5.4.b
|
T | |||
3.2.1.1.1.5.5.6
|
TOA measurement, RTT interrogation | T | ||
3.2.1.1.1.5.6.2
|
Terminal clock | T | ||
3.2.1.1.1.5.6.4
|
Time-of-arrival measurement accuracy | T | ||
3.2.1.1.1.5.6.7
|
Terminal chronometer | T | ||
3.2.1.1.1.5.6.7 a
|
T | |||
3.2.1.1.1.5.6.7 b
|
T | |||
3.2.1.1.1.5.6.7 c
|
T | |||
3.2.1.1.1.5.6.7 d
|
T | |||
3.2.1.1.1.6.6
|
Terminal initialization data | T | ||
3.2.1.1.1.15.2
|
Message construction | T | ||
3.2.1.1.1.15.3.1
|
Terminal-generated messages | T | ||
3.2.1.1.1.19.1
|
General | T | ||
3.2.1.1.1.19.2
|
Adaptable parameters | T | ||
3.2.1.1.1.19.2 e.
|
T | |||
3.2.1.1.1.19.2 f.
|
T |
T: | Test | |
I: | Inspection |
1
ATTACHMENT N | 10/27/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.1.1.1.19.5
|
Start-up | T | ||
3.2.1.1.1.19.5 a.
|
T | |||
3.2.1.1.1.19.7
|
Prime power interruption | T | ||
3.2.1.1.1.20.2
|
Network information exchange | T | ||
3.2.1.1.1.21
|
RF signal output capability | T | ||
3.2.1.1.1.21.1
|
Antenna interface signal output | T | ||
3.2.1.1.1.21.1 b.
|
T | |||
3.2.1.1.1.21.1 b.1
|
T | |||
3.2.1.1.1.21.1 c.
|
T | |||
3.2.1.1.1.21.1 d.
|
T | |||
3.2.1.1.1.21.1 e.
|
T | |||
3.2.1.1.1.21.1.1
|
RF pulse spectrum | T | ||
3.2.1.1.1.21.1.1 a.
|
T | |||
3.2.1.1.1.21.1.2
|
Out-of-band emission characteristics | T | ||
3.2.1.1.1.21.1.2 a.
|
T | |||
3.2.1.1.1.22
|
TDMA transmission compatibility capability | T | ||
3.2.1.1.1.22 f.
|
T | |||
3.2.1.1.1.22.1.2
|
1030/1090 MHz emissions | T | ||
3.2.1.1.1.22.1.2 a.
|
T | |||
3.2.1.1.1.23
|
Reception performance capability and RF signal input capability | T | ||
3.2.1.1.1.23.1
|
General | T | ||
3.2.1.1.1.23.2
|
Dynamic range | T | ||
3.2.1.1.1.24.2
|
Error rates | T | ||
3.2.1.2.1
|
Terminal standby mode | T | ||
3.2.1.2.1 a.
|
T | |||
3.2.1.2.1.1
|
Data retention capability | T | ||
3.2.1.2.1.2
|
Loading of cryptovariables capability | T | ||
3.2.1.2.1.2 a.
|
T | |||
3.2.1.2.1.2 b.
|
T | |||
3.2.1.2.1.3
|
Cryptovariable erase capability | T | ||
3.2.3.1
|
Data bus interface description | T | ||
3.2.3.1 c.
|
T | |||
3.2.3.1.1
|
General rules | T | ||
3.2.3.1.1.3.8
|
BIT initiate | T | ||
3.2.3.1.1.3.9
|
TDMA NOGO | T | ||
3.2.3.2
|
Suppression signal interface description | T | ||
3.2.3.2.1 a.
|
T | |||
3.2.3.2.1 b.
|
T | |||
3.2.3.2.1 c.
|
T | |||
3.2.3.2.1 e.
|
T | |||
3.2.3.2.1 f.
|
T | |||
3.2.3.2.2 a.
|
T |
T: | Test | |
I: | Inspection |
2
ATTACHMENT N | 10/27/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.2.3.2.2 c.
|
T | |||
3.2.3.3
|
Antenna interface description | I | ||
3.2.3.3 c.
|
T | |||
3.2.3.3 d.
|
T | |||
3.2.3.7.2
|
Timing signal interface description Mode 2 | T | ||
3.2.3.7.2.1
|
Time synchronization and input interface | T | ||
3.2.3.11
|
Platform mounting interface description | T | ||
3.2.3.12
|
Voice interface description | T | ||
3.2.3.12.1
|
2.4 kbps voice analog interface | T | ||
3.2.3.12.2
|
16 kbps voice analog interface | T | ||
3.2.3.12.3
|
Push-to-talk | T | ||
3.2.3.13.1
|
SDU zeroize interface | T | ||
3.2.3.13.2
|
Terminal power on interface | T | ||
3.2.3.13.3
|
Terminal standby interface | T | ||
3.2.3.14
|
Status Interface | T | ||
3.2.3.14.1
|
Time slot synchronization | T | ||
3.2.3.14.2
|
Reception detect | T | ||
3.2.3.14.7
|
Active receive indication interface. | T | ||
3.2.4
|
Physical characteristics | I | ||
3.2.4.2
|
Volume and form factor | I | ||
3.2.4.2.2
|
Front connector configuration | I | ||
3.2.4.3
|
Weight | I | ||
3.2.4.4
|
Color | I | ||
3.2.4.4 a.
|
I | |||
3.2.4.4 b.
|
I | |||
3.2.4.5
|
Mounting provisions | T | ||
3.2.4.6
|
Electrical connector configuration | I | ||
3.2.4.6 b.
|
I | |||
3.2.5.2.6
|
Built-in-tests | T | ||
3.2.5.2.6.1
|
Start-up BIT | T | ||
3.2.5.2.6.2
|
Operational BIT | T | ||
3.2.5.2.6.3
|
Manually initiated BIT | T | ||
3.3.1.3
|
Environmental stress screening (ESS) | T | ||
3.3.3 a.
|
I | |||
3.3.3 b.
|
I | |||
3.3.3 c.
|
I | |||
3.3.3 d.
|
I | |||
3.3.3 e.
|
I | |||
3.3.3 f.
|
I | |||
3.3.3 g.
|
I | |||
3.3.4
|
Workmanship | I | ||
3.3.4 a.
|
I |
T: | Test | |
I: | Inspection |
3
ATTACHMENT N | 10/27/09 |
Verification | ||||
SSS SECTION REFERENCE | TITLE | Method | ||
3.3.4 b.
|
I | |||
3.3.4 c.
|
I |
T: | Test | |
I: | Inspection |
4
CDRL General Instructions | 17 Feb 2010 |
Approval:
|
The data submission is acceptable as submitted. | |
|
||
Approval-With-
Comments: |
The data submission will be acceptable when Government comments are satisfactorily incorporated. | |
|
||
Comments:
|
The data submission is deficient in scope, format, technical content and/or intelligibility and requires rework. The data submission will not be considered for further action by the Government until the comments are adequately incorporated. |
1 of 3
CDRL General Instructions | 17 Feb 2010 |
2 of 3
CDRL General Instructions | 17 Feb 2010 |
* | The unclassified mailing address shall be put on the inside wrapping of the classified mailing. |
3 of 3
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for
reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection
of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject
to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A001
TEST PROCEDURE
RADIO TERMINAL SET ACCEPTANCE TEST PROCEDURE (ATP)
DI-NDTI-80603A (SEE BLK 16)
SOW 3.2.1
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for
reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection
of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject
to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A002
TEST PROCEDURE
LRU/SRU ACCEPTANCE TEST PROCEDURE (ATP)
DI-NDTI-80603A
SOW 3.2.2, 3.2.3
JPEO JTRS MIDS PMO
LT
SEE BLK 16
OTIME
SEE BLK 16
a.
ADDRESSEE
b.
COPIES
A
11.
AS OF DATE
13.
DATE IF SUBSEQUENT SUBM.
Draft
Final
Reg
Repro
BLK 9. SEE CDRL GENERAL INSTRUCTIONS.
BLK 12. 90 DAYS PRIOR TO START OF ACCEPTANCE TESTING.
BLK 14. SEE CDRL GENERAL INSTRUCTIONS.
SEE
BLK 16
1
15.
TOTAL
→
1
JOHN FORAN , DATA MANAGER
30 Sep 2009
DAVID FELKER, COR
30 Sep 2009
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for
reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection
of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject
to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting
Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER
MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A003
METRICS REPORT
MIDS LVT PROD RPT
SEE BLK 16
SOW 3.4.7
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for
failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER
MGMT
MIDS-LVT
AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A004
HAZARDOUS MATERIAL SUMMARY REPORT
DI-ILSS-81168A
(See Blk 16)
SOW 3.5
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER
MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A005
DATABASE DESIGN DESCRIPTION
CONTRACTOR DATABASE
DI-IPSC-81437A
SOW 3.7.2.1, 3.7.3
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
1001
A
TDP
X
TM
OTHER
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A006
TECHNICAL DATA PACKAGE
SEE BLK 16
SOW 3.9.2
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
PRODUCT DRAWINGS AND ASSOCIATED LISTS
B. EXHIBIT/ATTACHMENT NO.
C. CLIN
D. CDRL DATA ITEM NO.
A
1001
A006
1. DELIVERABLE PRODUCT
(X and complete as applicable.)
a. ORIGINALS (Specify current design activitys full size reproducible drawing or digital data file(s) on which is kept the revision record as official)(Identify specification, type, grade and class, etc.)
b. REPRODUCTIONS (Identify specifications, type, grade and class, etc., and quantity of each)
c. DIGITAL DATA (Identify specification, exchange media, etc. and specify original (master) or copy)
SEE BLK 9
2. CAGE CODE AND DOCUMENT NUMBERS (X ONE)
a. CONTRACTOR
b. GOVERNMENT Complete (1) and (2) or (3)
(2) Use Document Numbers
(3) To Be Assigned By:
3. DRAWING FORMATS AND DRAWING FORMS (X one and complete as applicable)
X
a. CONTRACTOR FORMATS. Forms to be supplied by contractor.
b. GOVERNMENT FORMATS. Forms to be supplied by Contractor. Samples supplied by (Specify)
c. GOVERNMENT FORMATS. Forms to be supplied as Government Furnished Material by (Specify)
4. TYPES OF DRAWINGS SELECTION (X one)
a. CONTRACTOR SELECTS
X
b. GOVERNMENT SELECTS (Specify)
Use ASME Y14.24 Drawing Types
Block 1.c. The Contractor shall deliver the drawings in the native file format and in digital CALS Type 4 Raster image files (JEDMICS), per MIL-PRF-28002C, on Compact Optical Media IAW ISO 9660 and Compact Disc Exchange (CDEX)
requirements. Text type documents, such as, but not limited to, specifications, vendor item and specification control documents, drawings and lists shall be provided in Portable Document Format (pdf). To take advantage of the
latest in digital media technology, final media decisions shall be made at the time of delivery by the requiring office identified in Block 6 of the CDRL. Transfer media shall be marked and labeled, and comply with the
interface requirements of MIL-STD-1840.
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER
MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A007
TEST PROCEDURE
REGRESSION VERIFICATION PROCEDURE (RVP)
DI-NDTI-80603A
SOW 3.9.3.1.1
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A008
TEST/INSPECTION REPORT
REGRESSIVE VERIFICATION REPORT (RVR)
DI-NDTI-80809B
SOW 3.9.3.1.1
JPEO JTRS MIDS PMO
LT
SEE BLK 16
ASREQ
SEE BLK 16
a.
ADDRESSEE
b.
COPIES
11.
AS OF DATE
13.
DATE IF SUBSEQUENT SUBM.
Draft
Final
Reg
Repro
BLK 9. SEE CDRL GENERAL INSTRUCTIONS.
BLK 12. DELIVER REPORT NLT 30 DAYS AFTER COMPLETION OF VERIFICATION.
SEE
BLK 16
1
15.
TOTAL
→
1
JOHN FORAN , DATA MANAGER
30 Sep 2009
DAVID FELKER, COR
30 Sep 2009
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A009
ENGINEERING CHANGE
PROPOSAL (ECP)
ENGINEERING CHANGE PROPOSAL (ECP), CLASS I
CCB APPROVABLE
DI-CMAN-80639C (SEE BLK 16)
SOW 3.9.3.1.1.1
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A010
NOTICE OF REVISION (NOR)
DI-CMAN-80642C (SEE BLK 16)
SOW
3.9.3.1.1.1
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A011
ENGINEERING CHANGE PROPOSAL (ECP)
ECP, CLASS I, NON-APPROVABLE
DI-CMAN-80639C (SEE BLK 16)
SOW
3.9.3.1.1.2
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED
TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A012
ENGINEERING CHANGE PROPOSAL (ECP)
ENGINEERING CHANGE PROPOSAL (ECP),
CLASS II
DI-CMAN-80639C (SEE BLK 16)
SOW
3.9.3.1.2
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A013
REQUEST FOR DEVIATION (RFD)
DI-CMAN-80640C (SEE BLK 16)
SOW 3.9.3.2
JPEO JTRS MIDS PMO
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A014
CONFIGURATION STATUS ACCOUNTING INFORMATION
CONFIGURATION MANAGEMENT ACCOUNTING
REPORT (CMAR)
DI-CMAN-81253A
SOW 3.9.4.1
JPEO JTRS MIDS PMO
LT
SEE BLK 16
SEMIA
30 DAEOQ
a.
ADDRESSEE
b.
COPIES
11.
AS OF DATE
0
13.
DATE IF SUBSEQUENT SUBM.
30 DARP
Draft
Final
Reg
Repro
BLK 9, 14. SEE CDRL GENERAL INSTRUCTIONS.
SEE
BLK 16
1
15.
TOTAL
→
1
JOHN FORAN , DATA MANAGER
30 Sep 2009
DAVID FELKER, COR
30 Sep 2009
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A015
AS BUILT CONFIGURATION LIST (ABCL)
CONFIGURATION DATA INFORMATION
DI-CMAN-81516
SOW 3.9.4.2
JPEO JTRS MIDS PMO
LT
SEE BLK 16
OTIME
SEE BLK 16
a.
ADDRESSEE
b.
COPIES
11.
AS OF DATE
13.
DATE IF SUBSEQUENT SUBM.
Draft
Final
Reg
Repro
BLK 9. SEE CDRL GENERAL INSTRUCTIONS.
BLK 12. CONCURRENT WITH EACH DELIVERY OF A CONFIGURATION ITEM TO THE
GOVERNMENT.
BLK 14. SEE CDRL GENERAL INSTRUCTIONS.
SEE
BLK 16
1
15.
TOTAL
→
1
JOHN FORAN , DATA MANAGER
30 Sep 2009
DAVID FELKER, COR
30 Sep 2009
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
(1 Data Item)
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive
Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0010, 2010, 3010, 4010, 5010
A
TDP
TM
OTHER MGMT
MIDS-LVT AN/USQ-140(V) (C)
N00039-10-D-0032
F.
CONTRACTOR
VIASAT INC.
A016
DATA ACCESSION LIST (DAL)
DI-MGMT-81453A
SOW 3.10.1
JPEO JTRS MIDS PMO
LT
SEE BLK 16
ANNLY
90 DAC
a.
ADDRESSEE
b.
COPIES
11.
AS OF DATE
13.
DATE IF SUBSEQUENT SUBM.
Draft
Final
Reg
Repro
BLK 9, 14. SEE CDRL GENERAL INSTRUCTIONS.
SEE
BLK 16
1
15.
TOTAL
→
1
JOHN FORAN , DATA MANAGER
30 Sep 2009
DAVID FELKER, COR
30 Sep 2009
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page
1
of
1
Pages
PRICE GROUP
ESTIMATED TOTAL PRICE
/s/ Mark D. Dankberg | ||||
Mark D. Dankberg | ||||
Chief Executive Officer |
/s/ Ronald G. Wangerin | ||||
Ronald G. Wangerin | ||||
Chief Financial Officer | ||||