UNITED STATES
SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of May 2025

Commission File Number: 001-31965

Taseko Mines Limited
(Translation of registrant's name into English)

12th Floor - 1040 West Georgia St., Vancouver, BC, V6E 4H1
(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.

[           ] Form 20-F   [ x ] Form 40-F


SUBMITTED HEREWITH

Exhibits

Exhibit   Description
     
99.1   Interim Financial Statements for the period ended March 31, 2025
99.2   Management's Discussion and Analysis for the period ended March 31, 2025


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  Taseko Mines Limited
  (Registrant)
     
Date: May 1, 2025 By: /s/ Bryce Hamming
   
    Bryce Hamming
  Title: Chief Financial Officer

 



 

 

Condensed Consolidated Interim Financial Statements

For the three months ended March 31, 2025 and 2024

(Unaudited)


TASEKO MINES LIMITED

Condensed Consolidated Interim Balance Sheets

(Cdn$ in thousands)
(Unaudited)

      March 31,     December 31,  
  Note   2025     2024  
               
ASSETS              
Current assets              
Cash and equivalents     120,778     172,732  
Accounts receivable 8   7,046     5,643  
Inventories 9   110,314     138,890  
Prepaids     5,493     8,179  
Other financial assets 10   4,913     27,795  
      248,544     353,239  
               
Property, plant and equipment 11   1,901,296     1,770,102  
Inventories 9   38,428     39,586  
Other financial assets 10   959     959  
Deferred tax assets     25,866     25,226  
Goodwill     5,931     5,931  
      2,221,024     2,195,043  
               
LIABILITIES              
Current liabilities              
Accounts payable and accrued liabilities     134,198     129,927  
Current portion of long-term debt 13   35,055     32,853  
Current portion of deferred revenue 16   16,797     13,666  
Current portion of Cariboo consideration payable 14   16,049     16,447  
Interest payable     24,716     9,890  
Current income tax payable     4,053     4,053  
      230,868     206,836  
               
Long-term debt 13   758,340     764,355  
Cariboo consideration payable 14   117,173     129,421  
Deferred revenue 16   77,905     77,327  
Florence royalty obligation 15   86,978     84,383  
Florence copper stream 5c   87,498     67,813  
Provision for environmental rehabilitation     167,530     169,570  
Deferred tax liabilities     176,262     183,964  
Other financial liabilities 18b   10,348     8,152  
      1,712,902     1,691,821  
               
EQUITY              
Share capital 17   560,478     529,413  
Contributed surplus     59,373     57,786  
Accumulated other comprehensive income ("AOCI")     53,653     52,845  
Deficit     (165,382 )   (136,822 )
      508,122     503,222  
      2,221,024     2,195,043  
               
Commitments and contingencies 20            
Subsequent events 13b, 14            

The accompanying notes are an integral part of these condensed consolidated interim financial statements.


TASEKO MINES LIMITED

Condensed Consolidated Interim Statements of Comprehensive (Loss) Income

(Cdn$ in thousands, except share and per share amounts)
(Unaudited)

      Three months ended March 31,  
  Note   2025     2024  
               
Revenues 3   139,149     146,947  
Cost of sales              
Production costs 4   (100,358 )   (107,504 )
Depletion and amortization 4   (22,425 )   (15,024 )
Earnings from mining operations     16,366     24,419  
               
General and administrative     (3,324 )   (3,129 )
Share-based compensation expense 18c   (5,004 )   (5,440 )
Project evaluation expense     (1,169 )   (217 )
Changes in derivatives and other fair value instruments 5a   (25,089 )   (5,221 )
Other income     56     138  
(Loss) income before financing costs and income taxes     (18,164 )   10,550  
               
Finance income     1,330     1,086  
Finance expenses 6   (12,207 )   (12,812 )
Accretion expenses 6   (6,670 )   (7,037 )
Foreign exchange loss     (829 )   (12,017 )
Gain on Cariboo acquisition 12   -     47,426  
Gain on acquisition of control of Gibraltar 12   -     14,982  
(Loss) income before income taxes     (36,540 )   42,178  
               
Income tax recovery (expense) 7   7,980     (23,282 )
Net (loss) income     (28,560 )   18,896  
               
Other comprehensive income              
Items that will remain permanently in other comprehensive income:              
Gain on financial assets     251     65  
Items that may in the future be reclassified to profit (loss):              
Foreign currency translation reserve     557     10,046  
Total other comprehensive income     808     10,111  
               
Total comprehensive (loss) income     (27,752 )   29,007  
               
(Loss) earnings per share              
Basic 19   (0.09 )   0.07  
Diluted 19   (0.09 )   0.06  
               
Weighted average shares outstanding (thousands)              
Basic 19   310,424     290,465  
Diluted 19   310,424     291,962  

The accompanying notes are an integral part of these condensed consolidated interim financial statements.


TASEKO MINES LIMITED

Condensed Consolidated Interim Statements of Cash Flows

(Cdn$ in thousands)
(Unaudited)

      Three months ended March 31,  
  Note   2025     2024  
               
Operating activities              
Net (loss) income for the period     (28,560 )   18,896  
Adjustments for:              
Depletion and amortization 11   22,425     15,024  
Income tax (recovery) expense 7   (7,980 )   23,282  
Finance expenses 6   12,207     12,812  
Finance income     (1,330 )   (1,086 )
Accretion expense 6   6,670     7,037  
Amortization of deferred revenue 16   (1,609 )   (1,590 )
Loss on derivatives 5a   25,089     5,221  
Unrealized foreign exchange loss     2,074     13,688  
Gain on Cariboo acquisition 12   -     (47,426 )
Gain on acquisition of control of Gibraltar 12   -     (1,628 )
Share-based compensation expense 18c   4,169     5,667  
Other operating activities     (2,796 )   (45 )
Net change in working capital 21   25,533     9,722  
Cash provided by operating activities     55,892     59,574  
               
Investing activities              
Gibraltar capitalized stripping costs 11   (38,082 )   (13,957 )
Gibraltar capital expenditures 11   (13,601 )   (7,883 )
Florence Copper development costs 11   (79,981 )   (30,762 )
Other project development costs 11   (594 )   (404 )
Acquisition of Cariboo, net of cash acquired 14   -     (5,116 )
Release of restricted cash 20a   -     12,500  
Net outflows related to copper price options 5b   -     (1,985 )
Interest income and other     1,330     922  
Cash used for investing activities     (130,928 )   (46,685 )
               
Financing activities              
Interest paid     (2,980 )   (23,609 )
Proceeds from Florence financings 5   14,381     79,681  
Repayment of Florence financings 13f   (1,598 )   (1,291 )
Repayment of Gibraltar equipment financings 13e   (8,630 )   (6,043 )
Repayment of Cariboo consideration payable 14   (10,000 )   -  
Net proceeds from share issuances 17   29,630     -  
Net share-based compensation     689     (238 )
Cash provided by financing activities     21,492     48,500  
Effect of exchange rate changes on cash and equivalents     1,590     (205 )
(Decrease) increase in cash and equivalents     (51,954 )   61,184  
Cash and equivalents, beginning of period     172,732     96,477  
Cash and equivalents, end of period     120,778     157,661  
Supplementary cash flow disclosures 21            

The accompanying notes are an integral part of these condensed consolidated interim financial statements.


TASEKO MINES LIMITED

Condensed Consolidated Interim Statements of Changes in Equity

(Cdn$ in thousands)
(Unaudited)

    Number of     Share     Contributed                    
    Shares     capital     surplus     AOCI     Deficit     Total  
                                     
Balance as at January 1, 2024   290,000     486,136     54,833     16,557     (123,378 )   434,148  
Share-based compensation   -     -     5,845     -     -     5,845  
Exercise of options   2,615     5,524     (1,969 )   -     -     3,555  
Share issuance, net   12,061     37,753     -     -     -     37,753  
Settlement of performance share units   -     -     (923 )   -     -     (923 )
Total comprehensive income (loss) for the year   -     -     -     36,288     (13,444 )   22,844  
Balance as at December 31, 2024   304,676     529,413     57,786     52,845     (136,822 )   503,222  
                                     
Balance as at January 1, 2025   304,676     529,413     57,786     52,845     (136,822 )   503,222  
Share-based compensation   -     -     3,153     -     -     3,153  
Exercise of options   633     1,074     (385 )   -     -     689  
Share issuance, net   10,566     29,991     -     -     -     29,991  
Settlement of performance share units   -     -     (1,181 )   -     -     (1,181 )
Total comprehensive income (loss) for the period   -     -     -     808     (28,560 )   (27,752 )
Balance as at March 31, 2025   315,875     560,478     59,373     53,653     (165,382 )   508,122  

The accompanying notes are an integral part of these condensed consolidated interim financial statements.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

1. REPORTING ENTITY

Taseko Mines Limited (the "Company" or "Taseko") is a corporation governed by the British Columbia Business Corporations Act. The unaudited condensed consolidated interim financial statements of the Company as at and for the three months ended March 31, 2025, comprise the Company and its wholly-owned subsidiaries. The Company is principally engaged in the production and sale of metal concentrates, as well as related activities, including mine permitting and development, within the Province of British Columbia, Canada, and the State of Arizona, USA.

As a result of the Company's acquisition of Cariboo Copper Corporation ("Cariboo"), the financial results of the Company after March 25, 2024, reflect its 100% interest in Gibraltar mine ("Gibraltar") (Note 14). The financial results for the period up to and including March 25, 2024, reflect the Company's 87.5% interest in Gibraltar (Note 14).

2. MATERIAL ACCOUNTING POLICIES

2.1 Statement of Compliance

These unaudited condensed consolidated interim financial statements have been prepared in compliance with IFRS Accounting Standards as issued by the International Accounting Standards Board ("IASB") as applicable to the preparation of interim financial statements under IAS 34, Interim Financial Reporting.

These unaudited condensed consolidated interim financial statements were authorized for issuance by the Company's Audit and Risk Committee on May 1, 2025.

2.2 Use of Judgements and Estimates

The preparation of these unaudited condensed consolidated interim financial statements in conformity with IFRS Accounting Standards requires management to make judgments, estimates, and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income, and expenses. Actual results may differ from these estimates. Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimates are revised and in any future periods affected.

The significant judgements made by management in applying the Company's accounting policies and the key sources of estimation uncertainty were the same as those applied to the audited annual consolidated financial statements as at and for the year ended December 31, 2024.

2.3 New Accounting Standards Issued but not yet Effective

In 2024, the IASB issued IFRS 18 Presentation and Disclosure in Financial Statements. IFRS 18 introduces a new structure for the statement of profit or loss, requiring entities to present operating, investing, and financing categories, and enhances disclosures to improve comparability and transparency of financial performance. The standard is effective for annual reporting periods beginning on or after January 1, 2027, and is applied retrospectively. The Company is currently evaluating the impact of the amendments on its condensed interim consolidated financial statements.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

2. MATERIAL ACCOUNTING POLICIES (CONTINUED)

2.3 New Accounting Standards Issued but not yet Effective (Continued)

The IASB also issued the 'Amendments to IFRS 9 and IFRS 7: Financial Instruments and Disclosures'. These amendments focus on financial instruments with ESG-linked features and introduce additional disclosure requirements to enhance transparency of related risks. The amendments are effective for periods beginning on or after January 1, 2026, and are applied retrospectively. The Company is currently evaluating the impact of the amendments on its condensed interim consolidated financial statements.

In addition, the IASB issued the 'Annual Improvements to IFRS Standards 2021-2023 Cycle', which includes amendments to IFRS 1, IFRS 7, IFRS 9, IFRS 10, and IAS 7, aimed at improving consistency and application. The amendments are effective for periods beginning on or after January 1, 2026, and are applied retrospectively. The Company is currently evaluating their impact on its condensed interim consolidated financial statements.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

3. REVENUES

    Three months ended March 31,  
    2025     2024  
Revenues from contracts with customers:            
Copper   128,783     139,552  
Molybdenum   9,767     5,524  
Silver (Note 16b)   1,741     1,727  
Gold   389     -  
    140,680     146,803  
Copper price adjustments for the period   (538 )   (382 )
Molybdenum price adjustments for the period   (993 )   526  
Revenues   139,149     146,947  

4. COST OF SALES

    Three months ended March 31,  
    2025     2024  
Site operating costs   68,917     79,678  
Transportation costs   5,984     10,153  
Change in inventories:            
Changes in finished goods   2,710     20,392  
Changes in sulphide ore stockpiles   28,263     17  
Changes in oxide ore stockpiles   (5,516 )   (2,736 )
Production costs   100,358     107,504  
Depletion and amortization   22,425     15,024  
Cost of sales   122,783     122,528  

Site operating costs include personnel costs, operating waste stripping costs, repair and maintenance costs, consumables, operating supplies and external services.

For the three months ended March 31, 2024, changes in inventories of finished goods also included $13,354 in fair value adjustments to concentrate inventory held at March 25, 2024 that was sold between March 26 and March 31, 2024 (Note 12).


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

5. DERIVATIVES AND OTHER FAIR VALUE INSTRUMENTS

a) Derivatives and Other Fair Value Instruments - Summary

The following is a summary of the realized and unrealized derivative gain or loss incurred during the three months ended March 31, 2025 and 2024:

    Three months ended March 31,   
    2025     2024  
Net realized loss on settled copper collars   1,286     1,636  
Net unrealized loss on outstanding copper collars   21,578     863  
Realized loss on fuel call options   267     66  
Unrealized (gain) loss on fuel call options   (12 )   64  
Net loss on copper price and fuel contracts (b)   23,119     2,629  
             
Fair value adjustment on Cariboo contingent performance payments (Note 14)   (3,310 )   -  
Fair value adjustment on Florence copper stream derivative (c)   5,280     2,592  
Loss on derivatives   25,089     5,221  

b) Derivatives and Other Fair Value Instruments - Copper Collars and Fuel Contracts

No new derivative transactions were entered into by the Company during the three months ended March 31, 2025. The following is a summary of the derivative transactions entered into by the Company during the three months ended March 31, 2024:

Date of        
Purchase Contract Quantity Strike price Period Cost
Mar 2024 Copper collar 42 million lbs US$3.75/ US$5.00 per lb Jul 2024 - Dec 2024 1,985
Feb 2024 Fuel call options 12.5 million ltrs US$0.79 per ltr Feb 2024 - Jun 2024 165

Details of the outstanding options contracts as at March 31, 2025 are summarized in the following table:

 

Quantity

Strike price

Period

Cost

Fair value

Copper collars

27 million lbs

US$4.00 per lb

Q2 2025

1,282

(14)

US$5.00 per lb

Copper collars

54 million lbs

US$4.00 per lb

H2 2025

2,222

3,718

US$5.40 per lb

Fuel call options

9 million ltrs

US$0.65 per ltr

Q2 2025

280

63



TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

5. DERIVATIVES AND OTHER FAIR VALUE INSTRUMENTS (CONTINUED)

c) Derivatives and Other Fair Value Instruments - Florence Copper Stream

On December 19, 2022, the Company signed agreements with Mitsui & Co. (U.S.A.) Inc. ("Mitsui") to form a strategic partnership to develop the Florence Copper project. Mitsui has committed to an initial advance of US$50 million, with proceeds to be received in installments of US$10 million, to be used for the construction of the commercial production facility. The initial advance is in the form of a copper stream agreement (the "Copper Stream") obligates the Company to deliver on 2.67% of the copper produced at Florence Copper, with Mitsui to make an ongoing payment equal to 25% of the monthly average market price of copper on the day immediately preceding delivery under the contract. The Company received the final US$10 million instalment of the US$50 million Copper Stream on January 27, 2025.

Within the agreement, Mitsui has the option to invest an additional US$50 million for a 10% equity interest in Florence Copper (the "Equity Option"). The Equity Option is exercisable by Mitsui at any time up to three years following completion of construction of the commercial production facility. If Mitsui elects to exercise its Equity Option, the Copper Stream will terminate. If the Equity Option is not exercised, the Company will have the right to buy back 100% of the Copper Stream through a cash payment to Mitsui that would provide an internal rate of return of 10% on the stream deposits advanced (the "Buy Back Option"); otherwise, it will terminate once 40 million pounds of copper has been delivered under the agreement.

Under the arrangement, Taseko and Mitsui have also entered into an offtake contract for 81% of the copper cathode produced at Florence during the initial years of production. The contract will cease and be replaced with a marketing agency agreement if the Equity Option is exercised by Mitsui. Mitsui's offtake entitlement would also reduce to 30% if the Equity Option is not exercised, until the Copper Stream deposit is reduced to nil.

The Mitsui agreement is a financial liability measured fair value at each reporting period and includes the Copper Stream, Equity Option and Buy Back Option. The Company has determined that the fair value of the Copper Stream and Buy Back Option to be $87,498 as at March 31, 2025, based on estimates of future production, future copper prices, and other relevant factors. The Equity Option has been estimated to have a nominal fair value at March 31, 2025, and since the inception.

Florence Copper Stream fair value as at December 31, 2024   67,813  
Advance from Florence Copper Stream (US$10 million)   14,381  
Fair value adjustment   5,280  
Foreign exchange translation   24  
Florence Copper Stream as at March 31, 2025   87,498  


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

6. FINANCE AND ACCRETION EXPENSES

    Three months ended March 31,  
    2025     2024  
Interest expense   17,346     14,820  
Amortization of deferred financing charges   617     740  
Less: interest expense capitalized (Note 11)   (5,756 )   (2,748 )
Finance expenses   12,207     12,812  
             
Accretion on deferred revenue (Note 16b)   2,711     1,368  
Accretion on provision for environmental rehabilitation   724     698  
Accretion on Cariboo consideration payable (Note 14)   664     1,555  
Accretion on Florence Royalty Obligation (Note 15)   2,571     3,416  
Accretion expenses   6,670     7,037  
Total finance costs   18,877     19,849  

For the three months ended March 31, 2025, interest expense includes $428 (2024 - $366) from lease liabilities.

For the three months ended March 31, 2025, $5,756 (2024 - $2,748) of borrowing costs have been capitalized to Florence Copper development costs (Note 11).

7. INCOME TAX

    Three months ended March 31,  
    2025     2024  
Current income tax expense   -     805  
Deferred income tax (recovery) expense   (7,980 )   22,477  
Income tax (recovery) expense   (7,980 )   23,282  

8. ACCOUNTS RECEIVABLE

    March 31,     December 31,  
    2025     2024  
Trade and settlement receivables   5,647     5,397  
Other receivables   1,399     246  
Accounts receivable   7,046     5,643  


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

9. INVENTORIES

    March 31,     December 31,  
    2025     2024  
Current:            
Copper concentrate   12,236     14,932  
Molybdenum concentrate   628     642  
Sulphide ore stockpiles   41,337     76,696  
Oxide ore stockpiles   7,451     -  
Materials and supplies   48,662     46,620  
    110,314     138,890  
Long term:            
Oxide ore stockpiles   38,428     39,586  

10. OTHER FINANCIAL ASSETS

    March 31,     December 31,  
    2025     2024  
Current:            
Marketable securities   1,146     895  
Copper price options (Note 5b)   3,704     26,568  
Fuel call options (Note 5b)   63     332  
    4,913     27,795  
Long-term:            
Investment in private companies    500     500  
Reclamation deposits   459     459  
    959     959  

The Company holds strategic investments in publicly traded and privately owned mineral exploration and development companies, including marketable securities. Marketable securities and investments in privately owned companies are accounted for at fair value through other comprehensive income.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

11. PROPERTY, PLANT AND EQUIPMENT

The following schedule shows the continuity of property, plant and equipment net book value for the three months ended March 31, 2025:

Net book value as at January 1, 2025   1,770,102  
Additions:      
Gibraltar capitalized stripping costs   44,018  
Gibraltar capital expenditures   14,041  
Florence Copper development costs   83,227  
Florence Copper capitalized borrowing costs (Note 6)   5,756  
Yellowhead development costs   457  
Aley development costs   225  
Other items:      
Right of use assets   5,852  
Rehabilitation costs asset   31  
Disposals   (529 )
Foreign exchange translation and other   159  
Depletion and amortization   (22,043 )
Net book value as at March 31, 2025   1,901,296  

Net book value   Gibraltar
Mine
    Florence
Copper
    Yellowhead     Aley     Other     Total  
As at January 1, 2025   925,911     800,935     25,762     17,173     321     1,770,102  
Net additions   63,449     89,004     457     225     (88 )   153,047  
Changes in rehabilitation costs asset   31     -     -     -     -     31  
Depletion and amortization   (21,711 )   (102 )   (52 )   -     (178 )   (22,043 )
Foreign exchange translation   -     159     -     -     -     159  
Net book value as at March 31, 2025   967,680     889,996     26,167     17,398     55     1,901,296  

For the three months ended March 31, 2025, the Company capitalized development costs of $83,227 (2024 - $54,947) and borrowing costs of $5,756 (2024 - $2,748) (Note 6) for the Florence Copper project. The capitalization rate for borrowing costs applied by the Company is 8.25%.

Non-cash additions to Gibraltar capitalized stripping costs include $5,936 (2024 - $2,509) of depreciation on mining assets related to capitalized stripping. Depreciation related to the right of use assets for the three months ended March 31, 2025 was $2,799 (2024 - $2,834).


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

12. ACQUISITION OF CARIBOO COPPER CORPORATION

a) Acquisition of Cariboo from Dowa and Furukawa

On March 25, 2024 (the "Acquisition Date"), the Company completed the acquisition of the remaining 50% of Cariboo from Dowa Metals & Mining Co., Ltd. ("Dowa") and Furukawa Co., Ltd. ("Furukawa"), resulting in an additional 12.5% effective interest in Gibraltar, bringing Taseko's total effective interest to 100%. Gibraltar is operated through a joint venture in which Gibraltar Mines Ltd, holds a 75% interest and Cariboo holds the remaining 25% interest.

The acquisition price payable to Dowa and Furukawa ranges from a minimum of $117 million to a maximum of $142 million, with payments spread over a 10-year period (the "Purchase Consideration") from the Acquisition Date. The amount and timing of these payments depend on LME copper prices and Gibraltar's cashflow. The fair value of the Purchase Consideration on the Acquisition Date was determined to be $71,116 (Note 14).

The purchase consideration was allocated to the assets acquired and liabilities assumed, including the additional 12.5% effective interest in the Gibraltar joint venture, based on their estimated fair values at the Acquisition Date. The fair value of the net assets acquired was recorded at $118,542. To account for the difference between the fair value of net assets acquired of $118,542 and the total fair value of consideration payable of $71,116, the Company recognized a bargain purchase gain on Cariboo acquisition on the statement of comprehensive income of $47,426 for the three months ended March 31, 2024.

b) Deemed Disposition at Fair Value of 87.5% Gibraltar Interest on Acquisition of Control

Prior to March 25, 2024, the Company had joint control over the joint arrangement and proportionately consolidated its 87.5% effective interest of all the Gibraltar joint venture's assets, liabilities, income and expenses. On March 25, 2024, the Company acquired the remaining 12.5% interest through its purchase of Cariboo thereby increasing its effective interest to 100% in Gibraltar. As a result, the Company obtained full control and transitioned from joint control and a joint arrangement under IFRS 11 Joint Arrangements to full control under IFRS 10 Consolidated Statements and IFRS 3 Business Combinations. This transition in applicable standards requires the Company to reassess its previously held 87.5% interest in Gibraltar and remeasure this interest at fair value as of the March 25, 2024 acquisition date, with any gains or losses recognized immediately in the statement of comprehensive income. Additionally, the Company is required to measure all identifiable assets acquired and liabilities assumed at their fair values on this deemed acquisition date.

The fair value of copper concentrate inventory as at the deemed acquisition date was determined to be $37,717 compared to the book value of $22,735, which resulted in a gain of $14,982 recognized in the statement of comprehensive income (loss) for the three months ended March 31, 2024.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

13. DEBT

    March 31,     December 31,  
    2025     2024  
Current:            
Lease liabilities (d)   9,278     7,638  
Gibraltar equipment loans (e)   19,033     18,579  
Florence project facility (f)   6,744     6,636  
    35,055     32,853  
Long-term:            
Senior secured notes (a)   706,381     705,756  
Revolving credit facility (b)   -     -  
Lease liabilities (d)   5,644     5,658  
Gibraltar equipment loans (e)   25,546     30,419  
Florence equipment facility (f)   20,769     22,522  
    758,340     764,355  
Total debt   793,395     797,208  

a) Senior Secured Notes

On April 23, 2024, the Company completed an offering of US$500 million aggregate principal amount of senior secured notes (the "2030 Notes"). The 2030 Notes mature on May 1, 2030, and bear interest at an annual rate of 8.25%, payable semi-annually on May 1 and November 1. Of the net proceeds, $556.5 million (US$407 million) was used to redeem the outstanding senior secured notes and related premiums.

The 2030 Notes are secured by liens on the shares of Taseko's wholly owned subsidiary, Gibraltar Mines Ltd., and the subsidiary's rights under the joint venture agreement related to Gibraltar, as well as the shares of Curis Holdings (Canada) Ltd. ("Curis"), Florence Holdings Inc. ("Florence Holdings"), and Cariboo. The 2030 Notes are guaranteed by each of Taseko's existing and future restricted subsidiaries.  The liens on the collateral securing the notes and the guarantees will be first liens, but ranked below the liens of the revolving credit facility. The Company is subject to certain restrictions on asset sales, issuance of preferred stock, dividends, and other restricted payments. There are no maintenance covenants regarding the Company's financial performance.

The 2030 Notes contain customary prepayment options, some of which represent embedded derivatives required to be recognized at fair value, with changes in the fair value recognized in the Company's statement of comprehensive income (loss). The Company has estimated the prepayment options to have a nominal value.

b) Revolving Credit Facility

The Company has in place a secured US$110 million revolving credit facility (the "Facility"). The Facility is secured by first liens against Taseko's rights under the Gibraltar joint venture, as well as the shares of Gibraltar Mines Ltd., Curis, Florence Holdings, and Cariboo. The maturity date of the Facility is November 2, 2027. Amounts outstanding under the Facility bear interest at SOFR plus a margin of 4% and have a standby fee of 1%. As at March 31, 2025, no amount was advanced under the Facility (2024 - nil).


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

13. DEBT (CONTINUED)

b) Revolving Credit Facility (Continued)

The Facility has customary covenants for a revolving credit facility. Financial covenants include a requirement for the Company to maintain a senior debt to EBITDA ratio, an interest coverage ratio, a minimum tangible net worth, and a minimum liquidity amount, as defined under the Facility. The Company was in compliance with these covenants as at March 31, 2025. On April 16, 2025, the Company drew US$25 million under the Facility.

c) Letter of Credit Facilities

The Gibraltar joint venture has in place a $7 million credit facility for the purpose of providing letters of credit ("LC") to key suppliers of Gibraltar to assist with ongoing trade finance and working capital needs. Any LCs issued under the facility are guaranteed by Export Development Canada ("EDC") under its Account Performance Security Guarantee program. The facility is renewable annually, is unsecured, and contains no financial covenants. As at March 31, 2025, $3.75 million is outstanding under this LC facility (2024 - $3.75 million).

The Company also has a US$4 million credit facility for the sole purpose of issuing LCs to certain key contractors in conjunction with the development of Florence Copper. Any LCs issued under this facility will also be guaranteed by EDC. The facility is renewable annually, is unsecured, and contains no financial covenants. As at March 31, 2025, no LCs were issued and outstanding under this LC facility (2024 - nil).

d) Lease Liabilities

Lease liabilities have monthly repayment terms ranging from 12 to 72 months.

e) Gibraltar Equipment Loans

The equipment loans as at March 31, 2025, are secured by most of the existing mobile mining equipment at the Gibraltar mine. These loans commenced between December 2022 and December 2024, have monthly repayment terms of 48 months, and carry interest rates ranging from 6.3% to 9.4%.

f) Florence Equipment Facility

In 2023, the Company entered into a Florence project debt facility with Bank of America, secured against specific equipment, for total proceeds of US$25 million. The facility contains no financial covenants and has monthly repayments over a term of 60 months. The equipment facility bears interest at a blended rate of 9.3%.

g) Debt Continuity

The following schedule shows the continuity of total debt for the three months ended March 31, 2025:

Total debt as at January 1, 2025   797,208  
Lease additions   5,852  
Lease liabilities and equipment loans repayments   (10,228 )
Unrealized foreign exchange loss   65  
Deferred financing charges   (119 )
Amortization of deferred financing charges   617  
Total debt as at March 31, 2025   793,395  


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

14. CARIBOO CONSIDERATION PAYABLE TO PRIOR OWNERS OF CARIBOO

In 2023 and 2024, the Company acquired Cariboo, which increased its effective ownership in Gibraltar from 75% to 100%. On March 15, 2023, the Company acquired Sojitz Corporation's ("Sojitz") 50% interest in Cariboo, resulting in a 12.5% increase in its effective interest in Gibraltar from 75% to 87.5%. On March 25, 2024, the Company acquired the remaining 50% of Cariboo from Dowa and Furukawa (Note 12), securing the remaining 12.5% effective interest in Gibraltar. The liabilities arising from these transactions are collectively referred to as the "Cariboo consideration payable".

Sojitz Transaction

The acquisition price consisted of a minimum amount of $60 million payable over a five-year period ("Sojitz minimum payments") and potential contingent performance payments depending on Gibraltar copper revenues and copper prices over the next five years ("Sojitz Contingent Consideration"). There is no interest payable on the minimum amounts. An initial $10 million was paid to Sojitz upon closing and the remaining minimum amount is payable in $10 million annual instalments over five years thereafter.

The contingent performance payments are payable annually for five years only if the average LME copper price exceeds US$3.50 per pound in a year. The payments are calculated by multiplying Gibraltar copper revenues by a price factor, which is based on a sliding scale ranging from 0.38% at US$3.50 per pound copper to a maximum of 2.13% at US$5.00 per pound copper or above. Total contingent payments cannot exceed $57 million over the five-year period, limiting the acquisition cost to a maximum of $117 million.

The third annual instalment of $10 million was paid in February 2025, whereas the contingent payment of $6,645 for the 2024 calendar year was paid on April 1, 2025. The Sojitz minimum payments are a financial liability measured at amortized cost.  The Sojitz Contingent Consideration is a financial liability measured at fair value through profit and loss.

Dowa and Furukawa Transaction

Amounts owing by Cariboo to Dowa and Furukawa are by way of non-interest bearing secured and unsecured promissory notes (collectively, the "Cariboo Notes" or "Dowa and Furukawa minimum payments") totaling $117 million which are guaranteed by Taseko. The secured Cariboo Notes are collateralized by Cariboo's 25% Gibraltar joint venture interest.  An initial payment of $5 million was made to Dowa and Furukawa against the Cariboo Notes on closing with the remaining principal payable in annual instalments over a 10-year period commencing in April 2026, with the secured Cariboo Notes repayable first.  At average LME copper prices below US$4.00 per pound, the annual repayments of the Cariboo Notes will be $5 million. This repayment amount will increase proportionally, reaching a maximum of $15.25 million when average LME copper prices are US$5.00 per pound or higher. Annual principal payments cannot exceed 6.25% of Gibraltar's annual cashflow between 2025 and 2028, and 10% between 2029 and 2033. Any remaining balance of the Cariboo Notes will be paid as a final balloon payment in April 2034.  The fair value of the Cariboo Notes on the Acquisition Date was determined to be $71,116. The Dowa and Furukawa minimum payments are a financial liability measured at amortized cost, with estimated annual instalments considering the repayment mechanism described above.

In addition, up to $25 million in contingent consideration is payable by Taseko to Dowa and Furukawa if average LME copper prices exceed US$5.00 per pound or higher consistently over the next ten years (the "Dowa and Furukawa Contingent Performance Payments"). The Dowa and Furukawa Contingent Performance Payments is a financial liability measured at fair value through profit and loss. The Company estimates this liability to have nil value as at March 31, 2025.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

14. CARIBOO CONSIDERATION PAYABLE TO PRIOR OWNERS OF CARIBOO (CONTINUED)

As at March 31, 2025, the estimated present value of the Cariboo consideration payable is as follows:

    Sojitz     Dowa and
Furukawa
    Total  
Balance as at December 31, 2024   72,209     73,659     145,868  
Consideration paid   (10,000 )   -     (10,000 )
Fair value adjustment on contingent performance payments (Note 5a)   (3,310 )   -     (3,310 )
Accretion on minimum consideration payable (Note 6)   532     132     664  
Balance as at March 31, 2025   59,431     73,791     133,222  

As at March 31, 2025, the current and long-term portions of the Cariboo consideration payable is as follows:

Payable to   Sojitz     Dowa and
Furukawa
    Total  
Minimum consideration payable   26,377     73,791     100,168  
Contingent performance payments payable   33,054     -     33,054  
Total Cariboo consideration payable   59,431     73,791     133,222  
Less current portion:                  
Minimum consideration payable   9,404     -     9,404  
Contingent performance payments payable   6,645     -     6,645  
Long-term portion of Cariboo consideration payable   43,382     73,791     117,173  

15. FLORENCE ROYALTY OBLIGATION

On January 15, 2024, Florence Holdings, an indirect wholly-owned subsidiary of Taseko, entered into agreements with Taurus Mining Royalty Fund L.P. ("Taurus"), pursuant to which Florence Holdings received US$50 million from Taurus in exchange for a perpetual gross revenue royalty interest in certain real property, mining and other rights held by Florence ("Florence Royalty Obligation"). The effective royalty rate is 2.05% of the gross revenue from the sale of all copper from Florence Copper for the life of mine. Proceeds from the royalty transaction were contributed to Florence Copper to fund the construction and development of the commercial production facility.

For accounting purposes, the purchase agreement is a financial liability at amortized cost. For the three months ended March 31, 2025, the Company recorded accretion on the royalty obligation of $2,571 (2024 - $3,416) in the statement of comprehensive income (loss).

Balance as at December 31, 2024   84,383  
Accretion (Note 6)   2,571  
Foreign exchange translation   24  
Balance as at March 31, 2025   86,978  


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

16. DEFERRED REVENUE

    March 31,     December 31,  
    2025     2024  
Current:            
Customer advance payments (a)   6,918     4,311  
Osisko silver stream agreement (b)   9,879     9,355  
Current portion of deferred revenue   16,797     13,666  
Long-term portion of Osisko silver stream agreement (b)   77,905     77,327  
Total deferred revenue   94,702     90,993  

a) Customer Advance Payments

As at March 31, 2025, the Company had received advance payments from a customer on 1.2 million pounds of copper concentrate inventory (December 31, 2024 - 0.9 million pounds).

b) Silver Stream Purchase and Sale Agreement

Between 2017 and 2023, the Company has entered into silver stream purchase and sale agreements with Osisko Gold Royalties Ltd. ("Osisko"), whereby the Company received upfront cash deposits payments totaling US$49.3 million for the sale of an equivalent amount of its 87.5% share of Gibraltar payable silver production until 6.3 million ounces of silver have been delivered to Osisko. After that threshold has been met, 35% of an equivalent amount of Taseko's share of all future payable silver production from Gibraltar will be delivered to Osisko.

On December 20, 2024, the Company amended the silver stream with Osisko and received US$12.7 million for the sale of an equivalent amount of the remaining 12.5% share of Gibraltar payable silver production until 6.8 million ounces of silver have been delivered to Osisko in aggregate. After that threshold has been met, 35% of an equivalent amount of Taseko's share of all future payable silver production from Gibraltar will be delivered to Osisko.

The current portion of deferred revenue is an estimate based on deliveries anticipated over the next twelve months.

Balance as at December 31, 2024

86,682

Accretion on deferred revenue (Note 6)

2,711

Amortization of deferred revenue (Note 3)

(1,609)

Balance as at March 31, 2025

87,784



TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

17. EQUITY

At-the-market Equity Offering Program

On May 3, 2023, the Company announced that it entered into an equity distribution agreement providing for an at-the-market equity offering program ("ATM") for potential share issuances at an aggregate offering price of up to US$50 million. 

As at March 31, 2025, the Company had issued a total of 22,627,320 shares under the ATM program in exchange for total gross proceeds of US$49,976, equivalent to $69,881. For the three months ended March 31, 2025, a total of 10,566,354 shares were issued for gross proceeds of US$21,519, equivalent to $30,994.

18. SHARE-BASED COMPENSATION

a) Share Options

    Options
(thousands)
    Average price  
Outstanding as at January 1, 2025   9,033     2.01  
Granted   2,813     3.06  
Exercised   (634 )   1.09  
Forfeited   (51 )   1.94  
Outstanding as at March 31, 2025   11,161     2.33  
Exercisable as at March 31, 2025   8,283     2.21  

During the three months ended March 31, 2025, the Company granted 2,813,300 (2024 - 2,906,000) share options to directors, executives and employees, exercisable at an average exercise price of $3.06 per common share (2024 - $1.83 per common share) over a five-year period. The total fair value of options granted was $4,867 (2024 - $3,022) based on a weighted average grant-date fair value of $1.73 (2024 - $1.04) per option.

The fair value of options was measured at the grant date using the Black-Scholes formula. Expected volatility is estimated by considering historic average share price volatility. The inputs used in the Black-Scholes formula are as follows:

Expected term (years)   5.0  
Forfeiture rate   0%  
Volatility   64%  
Dividend yield   0%  
Risk-free interest rate   3.2%  
Weighted-average fair value per option $ 1.73  


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

18. SHARE-BASED COMPENSATION (CONTINUED)

b) Deferred, Performance and Restricted Share Units

    PSUs
(thousands)
    DSUs
(thousands)
    RSUs
(thousands)
 
Outstanding as at January 1, 2024   1,955     2,301     370  
Granted   880     304     500  
Cancelled   -     -     (80 )
Settled   (530 )   -     -  
Outstanding as at January 1, 2025   2,305     2,605     790  
Granted   742     265     489  
Cancelled   -     -     (60 )
Settled   (595 )   -     -  
Outstanding as at March 31, 2025   2,452     2,870     1,219  

During the three months ended March 31, 2025, 264,900 DSUs were issued to directors (2024 - 303,750), 741,600 PSUs to senior executives (2024 - 880,000) and 489,000 RSUs to non-executives (2024 - 500,000). The fair value of DSUs, PSUs and RSUs granted was $5,593 (2024 - $3,067), with a weighted average fair value at the grant date of $3.06 per unit for the DSUs (2024 - $1.78 per unit), $4.43 per unit for the PSUs (2024 - $2.87 per unit), and $3.06 per unit for the RSUs (2024 - $1.78). Deferred share units and restricted share units are cash settled share-based compensation. Performance share units are accounted for as equity settled share-based compensation.

c) Share-based Compensation Summary

Share-based compensation expense is comprised as follows:

    Three months ended March 31,  
    2025     2024  
Share options expense   2,375     1,538  
Performance share units expense   778     678  
Restricted share units expense   249     151  
Change in fair value of deferred share units   1,947     3,300  
Less: share options expensed in production costs   (345 )   (227 )
    5,004     5,440  


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

19. (LOSS) EARNINGS PER SHARE

(Loss) earnings per share, calculated on a basic and diluted basis, is as follows:

    Three months ended March 31,  
    2025     2024  
Net (loss) income attributable to common shareholders - basic and diluted   (28,560 )   18,896  
(in thousands of common shares)            
Weighted-average number of common shares   310,424     290,465  
Effect of dilutive securities:            
Stock options, deferred, performance and restricted share units   -     1,497  
Weighted-average number of diluted common shares   310,424     291,962  
(Loss) earnings per common share            
Basic (loss) earnings per share   (0.09 )   0.07  
Diluted (loss) earnings per share   (0.09 )   0.06  

20. COMMITMENTS AND CONTINGENCIES

a) Commitments

The Company is a party to certain contracts relating to service and supply agreements. Future minimum payments under these agreements as at March 31, 2025, are presented in the following table:

Remainder of 2025   12,025  
2026   12,038  
2027   1,763  
2028   -  
2029 and thereafter   -  
Total commitments   25,826  

As at March 31, 2025, the Company had commitments to incur capital expenditures of $24,560 (December 31, 2024 - $47,863) for Florence Copper and $6,489 (December 31, 2024 - $6,600) for Gibraltar.

As at March 31, 2025, the Company has provided surety bonds to the regulatory authorities for Gibraltar's reclamation obligations totaling $124.2 million (December 31, 2024 - $108.5 million). For Florence Copper, the Company has provided surety bonds totaling $51.9 million (December 31, 2024 - $51.9 million) to the federal and state regulators as reclamation security. Security for reclamation obligations is returned once the site is reclaimed to a satisfactory level and there are no ongoing monitoring and maintenance requirements.

During the first quarter of 2024, the Company replaced its letter of credit with the Province of British Columbia with a surety bond, which resulted in a $12,500 release of restricted cash to the Company's cash and equivalents.

b) Contingencies

There are no known contingencies that would impact the financial position or performance of the Company as at March 31, 2025.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

21. SUPPLEMENTARY CASH FLOW INFORMATION

    Three months ended March 31,  
    2025     2024  
Change in non-cash working capital items            
Accounts receivable   (1,400 )   1,795  
Inventories   23,415     8,675  
Prepaids   2,383     2,267  
Accounts payable and accrued liabilities1   (1,475 )   (1,939 )
Advance payment on product sales   2,610     (1,069 )
Interest payable   -     (24 )
Mineral tax payable   -     17  
    25,533     9,722  
Non-cash investing and financing activities            
Cariboo acquisition, net assets (Note 12)   -     61,232  
Assets acquired under capital lease   248     48  
Right-of-use assets    5,604     539  
1 Excludes accounts payable and accrued liability changes on capital expenditures.        

22. FAIR VALUE MEASUREMENTS

Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. The fair value hierarchy establishes three levels to classify the inputs to valuation techniques used to measure fair value, based on the reliability of the inputs used to estimate the fair values.

Level 1: quoted prices (unadjusted) in active markets for identical assets or liabilities;

Level 2: inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly (i.e., as prices) or indirectly (i.e., derived from prices); and

Level 3: inputs for the asset or liability that are not based on observable market data (unobservable inputs).

The fair value of the senior secured notes, a Level 1 measurement, is determined based upon publicly available information. The fair values of the senior secured notes are $735,968 (December 31, 2024 - $735,038) and the face value is $719,400 (December 31, 2024 - $719,250) as at March 31, 2025. The fair value of all other financial assets and liabilities approximate their carrying values. The Company has certain financial assets and liabilities that are measured at fair value on a recurring basis and uses the fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value, with Level 1 inputs having the highest priority.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

22. FAIR VALUE MEASUREMENTS (CONTINUED)

    Level 1     Level 2     Level 3     Total  
March 31, 2025                        
Financial assets and liabilities designated as FVPL                        
Derivative asset copper put and call options   -     3,704     -     3,704  
Derivative asset fuel call options   -     63     -     63  
Cariboo contingent performance payable   -     -     (33,054 )   (33,054 )
Florence copper stream and buy back option   -     -     (87,498 )   (87,498 )
Trade and settlement receivables   5,647     -     -     5,647  
    5,647     3,767     (120,552 )   (111,138 )
Financial assets designated as FVOCI                        
Marketable securities   1,146     -     -     1,146  
Investment in private companies   -     -     500     500  
Reclamation deposits   459     -     -     459  
    1,605     -     500     2,105  
December 31, 2024                        
Financial assets and liabilities designated as FVPL                        
Derivative asset copper put and call options   -     26,568     -     26,568  
Derivative asset fuel call options   -     332     -     332  
Cariboo contingent performance payable   -     -     (36,363 )   (36,363 )
Florence copper stream and buy back option   -     -     (67,813 )   (67,813 )
Trade and settlement receivables   5,397     -     -     5,397  
    5,397     26,900     (104,176 )   (71,879 )
Financial assets designated as FVOCI                        
Marketable securities   895     -     -     895  
Investment in private companies   -     -     500     500  
Reclamation deposits   459     -     -     459  
    1,354     -     500     1,854  

There have been no transfers between fair value levels during the reporting period. The carrying value of cash and equivalents, accounts receivables, accounts payable and accrued liabilities approximate their fair value as at March 31, 2025.

The Company's metal concentrate sales contracts are subject to provisional pricing with the selling price adjusted at the end of the quotational period. At each reporting date, the Company's settlement receivable on these contracts are marked-to-market based on a quoted forward price for which there exists an active commodity market.


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

22. FAIR VALUE MEASUREMENTS (CONTINUED)

The Cariboo contingent performance payables and the Florence copper stream and buy back option, each Level 3 instruments, are estimated based on forecasted copper prices and sales volumes over their respective contract periods. The total estimated payments are then discounted to determine their fair value.

As at March 31, 2025, the determination of the estimated fair value of the investment includes comparison to the market capitalization of comparable public companies.

23. SEGMENTED INFORMATION

Based on the primary locations that we consider to be cash generating units ("CGUs") where the Company generates revenue, or plans to generate revenue, there are three reportable segments reported to the Chief Executive Officer, the Chief Operating Decision Maker ("CODM") - Gibraltar, Florence Copper and Yellowhead. Corporate activities are not considered a reportable segment and are included as a reconciliation to total consolidated results. These corporate activities include all exploration initiatives, corporate growth activities and groups that provide administrative, technical, financial and other support to the reportable segments. For producing segments, the Company evaluates performance based on earning (loss) from mining operations. The majority of the Company's earnings from mining operations, with associated revenue, production costs and depreciation, is attributable to the Gibraltar segment. Earnings from mining operations under the Florence segment, is solely related to depreciation on assets not currently engaged in the development of the commercial production facility. Other operating income (expenses) includes general and administrative, share-based compensation expense, project evaluation expense, changes in derivatives and other fair value instruments, and other income (expense). Net finance and other expense includes finance income and expenses, accretion expense, foreign exchange gains and losses, gain on Cariboo acquisition, and gain on acquisition of control of Gibraltar. Total assets do not include intra-group receivables between segments.

    Three months ended March 31, 2025  
    Gibraltar    

Florence
Copper

    Yellowhead     Corporate     Total  
Earnings (loss) from mining operations   16,468     (102 )   -     -     16,366  
Other operating expenses   (23,266 )   (6,110 )   -     (5,154 )   (34,530 )
Loss before financing costs and income taxes   (6,798 )   (6,212 )   -     (5,154 )   (18,164 )
Net finance and other expenses   (2,911 )   (1,224 )   -     (14,241 )   (18,376 )
(Loss) income before taxes   (9,709 )   (7,436 )   -     (19,395 )   (36,540 )

    Three months ended March 31, 2024  
    Gibraltar     Florence
Copper
    Yellowhead     Corporate     Total  
Earnings from mining operations   24,419     -     -     -     24,419  
Other operating expenses   (2,733 )   (1,780 )   -     (9,356 )   (13,869 )
Income (loss) before financing costs and income taxes   21,686     (1,780 )   -     (9,356 )   10,550  
Net finance and other expenses   (8,264 )   (7,126 )   -     47,018     31,628  
Income (loss) before taxes   13,422     (8,906 )   -     37,662     42,178  


TASEKO MINES LIMITED
Notes to the Condensed Consolidated Interim Financial Statements
(Cdn$ in thousands)
(Unaudited)

23. SEGMENTED INFORMATION (CONTINUED)

    As at March 31, 2025  
    Gibraltar     Florence
Copper
    Yellowhead     Corporate     Total  
Total Assets   1,160,404     912,032     26,470     122,118     2,221,024  
Total Liabilities   563,133     272,965     220     876,584     1,712,902  
Property, plant and equipment   967,680     889,996     26,167     17,453     1,901,296  

    As at December 31, 2024  
    Gibraltar     Florence
Copper
    Yellowhead     Corporate     Total  
Total Assets   1,182,605     828,422     26,024     157,992     2,195,043  
Total Liabilities   561,165     250,211     335     880,110     1,691,821  
Property, plant and equipment   925,911     800,935     25,762     17,494     1,770,102  




TASEKO MINES LIMITED

Management's Discussion and Analysis

 

This management's discussion and analysis ("MD&A") is intended to help the reader understand Taseko Mines Limited ("Taseko", "we", "our" or the "Company"), our operations, financial performance, and current and future business environment.  This MD&A is intended to supplement and complement the consolidated financial statements and notes thereto, prepared in compliance with IFRS Accounting Standards as issued by the International Accounting Standards Board ("IASB") as applicable to the preparation of interim financial statements under IAS 34, Interim Financial Reporting, for the three months ended March 31, 2025 (the "Financial Statements").  You are encouraged to review the Financial Statements in conjunction with your review of this MD&A and the Company's other public filings, which are available on the Canadian Securities Administrators' website at www.sedarplus.com ("SEDAR+") and on the Electronic Data Gathering, Analysis and Retrieval ("EDGAR") system on the United States Securities and Exchange Commission's ("SEC") website at www.sec.gov.

This MD&A is prepared as of May 1, 2025.  All dollar figures stated herein are expressed in thousands of Canadian dollars ("$", "Cdn$"), unless otherwise indicated.  Included throughout this MD&A are references to non-GAAP performance measures, which are denoted with an asterisk.  An explanation of these non-GAAP measures and their calculations are provided on page 24.

Cautionary Statement on Forward-Looking Information

This discussion includes certain statements that may be deemed "forward-looking statements".  All statements in this discussion, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploration activities, and events or developments that the Company expects are forward-looking statements.  Although we believe the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements.  Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions.  Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements.  All of the forward-looking statements made in this MD&A are qualified by these cautionary statements.  We disclaim any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except to the extent required by applicable law.  Further information concerning risks and uncertainties associated with these forward-looking statements and our business may be found in the Company's other public filings with the SEC and Canadian provincial securities regulatory authorities.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Table of Contents

Overview 3
   
Highlights 3
   
Review of Operations 5
   
Operations Analysis 6
   
Gibraltar Outlook 7
   
Florence Copper 8
   
Long-term Growth Strategy 9
   
Market Review 10
   
Financial Performance 11
   
Financial Condition Review 17
   
Summary of Quarterly Results 21
   
Critical Accounting Policies and Estimates 22
   
Internal and Disclosure Controls Over Financial Reporting 22
   
Key Management Personnel 23
   
Non-GAAP Performance Measures 24
   
Technical Information 30


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Overview

Taseko is a copper-focused mining company that seeks to create long-term shareholder value by acquiring, developing and operating large tonnage mineral deposits in stable jurisdictions that are capable of supporting a mine for decades.  The Company's principal assets are the wholly owned Gibraltar mine ("Gibraltar"), located in central British Columbia ("BC") and is one of the largest copper mines in North America, and the Florence Copper project ("Florence" or "Florence Copper"), which is located in Arizona and is currently under construction.  Taseko also owns the Yellowhead copper, New Prosperity copper-gold, and Aley niobium projects in British Columbia.

Highlights

Operating data   Three months ended
March 31,
 
(Gibraltar – 100% basis)   2025     2024     Change  
Tons mined (millions)   23.2     22.8     0.4  
Tons milled (millions)   7.9     7.7     0.2  
Production (million pounds Cu)   20.0     29.7     (9.7 )
Sales (million pounds Cu)   21.8     31.7     (9.9 )



Financial data     Three months ended
March 31,
 
($ in thousands, except for per share amounts)     2025       2024       Change  
Revenues     139,149       146,947       (7,798 )
Cash flows from operations     55,892       59,574       (3,682 )
Net (loss) income     (28,560 )     18,896       (47,456 )
Per share – basic (“EPS”)   $ (0.09 )   $ 0.07     $ (0.16 )
Earnings from mining operations before depletion, amortization and non-recurring items*     38,791       52,797       (14,006 )
Adjusted EBITDA*     34,391       49,923       (15,532 )
Adjusted net (loss) income*     (6,943 )     7,728       (14,671 )
Per share – basic (“Adjusted EPS”)*   $ (0.02 )   $ 0.03     $ (0.05 )

On March 25, 2024, the Company completed its acquisition of the remaining 50% interest in Cariboo Copper Corp. ("Cariboo") from Dowa Metals & Mining Co., Ltd. ("Dowa") and Furukawa Co., Ltd. ("Furukawa") increasing its effective interest in Gibraltar from 87.5% to 100%.  As a result, the financial results reported in this MD&A reflect the Company's 87.5% effective interest for the period from March 15, 2023 to March 25, 2024 and 100% effective interest thereafter.  For more information on the Company's acquisition of Cariboo, refer to the Financial Statements-Note 12.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

First Quarter Review

 Earnings from mining operations before depletion, amortization and non-recurring items* was $38.8 million, Adjusted EBITDA* was $34.4 million and cash flows from operations was $55.9 million;

 GAAP net loss was $28.6 million ($0.09 loss per share) and Adjusted net loss* was $6.9 million ($0.02 loss per share);

 Gibraltar produced 20.0 million pounds of copper at a total operating cost (C1)* of US$2.26 per pound of copper produced.  Copper head grade was 0.19% and recovery was 68% for the quarter reflecting the milling of lower grade stockpiled material which contained more oxidized material;

 Gibraltar sold 21.8 million pounds of copper and 364 thousand pounds of molybdenum. The average realized copper price of US$4.24 per pound and Canadian dollar to US dollar exchange rate of 1.43, contributed to revenues of $139.1 million for the period;

 Construction of the Florence Copper commercial production facility is advancing on schedule and on budget, and was approximately 78% complete at March 31, 2025.  A total of 29 production wells were constructed in the quarter bringing the total number of completed wells to 80 of the 90 planned to be drilled during the construction phase.  Wellfield drilling activities are ramping down in April and will be completed on schedule in May.  The solvent extraction and electrowinning areas continue to advance with a focus on pipe and settler welding and electrical installation.  First copper cathode production is expected in the fourth quarter of 2025;

 The Company completed share issuances under its at-the-market ("ATM") equity offering prospectus, issuing 10.6 million common shares for gross proceeds of $31.0 million (US$21.5 million) in the first quarter;

 The Company has copper collar contracts to secure a minimum copper price of US$4.00 per pound for 81 million pounds of copper for the remainder of 2025; and

 At March 31, 2025, the Company had a cash balance of $121 million and available liquidity of $279 million including its undrawn corporate revolving credit facility.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Review of Operations

Gibraltar

Operating data (100% basis)     Q1 2025       Q4 2024       Q3 2024       Q2 2024       Q1 2024  
Tons mined (millions)     23.2       24.0       23.2       18.4       22.8  
Tons milled (millions)     7.9       8.3       7.6       5.7       7.7  
Strip ratio     4.6       1.9       1.2       1.6       1.7  
Site operating cost per ton milled*   $ 8.73     $ 12.18     $ 14.23     $ 13.93     $ 11.73  
Copper concentrate                                        
   Head grade (%)     0.19       0.22       0.23       0.23       0.24  
   Copper recovery (%)     67.5       78.2       78.9       77.7       79.0  
   Production (million pounds Cu)     20.0       28.6       27.1       20.2       29.7  
   Sales (million pounds Cu)     21.8       27.4       26.3       22.6       31.7  
   Inventory (million pounds Cu)     2.3       4.1       2.9       2.3       4.9  
Molybdenum concentrate                                        
   Production (thousand pounds Mo)     336       578       421       185       247  
   Sales (thousand pounds Mo)     364       607       348       221       258  
Per unit data (US$ per Cu pound produced)                                        
   Site operating cost*   $ 2.41     $ 2.52     $ 2.91     $ 2.88     $ 2.21  
   By-product credit*     (0.33 )     (0.42 )     (0.25 )     (0.26 )     (0.17 )
   Site operating cost, net of by-product credit*     2.08       2.10       2.66       2.62       2.04  
   Off-property cost*     0.18       0.32       0.26       0.37       0.42  
   Total operating cost (C1)*   $ 2.26     $ 2.42     $ 2.92     $ 2.99     $ 2.46  

TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Operations Analysis

First Quarter Review

In the first quarter, mining activity at Gibraltar was focused on waste stripping for a new pushback in the Connector pit, which resulted in a higher than normal strip ratio and lower mined ore in the period.  Lower grade stockpiled ore was the primary source of mill feed, resulting in lower copper production compared to recent quarters.

Gibraltar produced 20.0 million pounds of copper in the first quarter and copper head grade was 0.19%, well below average reserve grade.  Copper recovery was 68% and was notably impacted by oxidation in the stockpiled ore which mainly originated from the upper benches of the Connector pit.  Mill throughput was 7.9 million tons in the quarter, above nameplate capacity due to the lower work index ore in the Connector pit.

A total of 23.2 million tons were mined in the first quarter comparable to recent quarters.  The average strip ratio was 4.6, as a total of 4.2 million tons of ore were mined. This includes 2.2 million tons of oxide ore that was added to the heap leach pads as plans for restart of the solvent extraction and electrowinning ("SX/EW") plant continue in Q2 2025.

Capitalized stripping totaling $38.1 million was higher in the first quarter attributed to greater mining of waste tons above the average strip ratio for the Connector pit.  Total site costs* including capitalized stripping was $107.0 million in the quarter consistent with the comparative prior year quarter.  Decreased consumption of mining inputs such as diesel and explosives due to processing of stockpile material as well as lower diesel prices were offset by higher milling costs.

Molybdenum production was 336 thousand pounds in the first quarter compared to 247 thousand pounds in the comparative prior year quarter.  Higher molybdenum grades, on average, are expected in Connector pit ore.  Grades will improve as stockpile ore feed decreases.  At an average molybdenum price of US$20.53 per pound for the quarter, molybdenum contributed a meaningful by-product credit of US$0.33 per pound of copper produced.

Off-property costs were US$0.18 per pound of copper produced.  These lower costs reflect Gibraltar's 2025 offtake agreements with very favorable treatment and refining charges ("TCRC").  On a blended basis, TCRCs are effectively nil for this year.

Total operating cost (C1)* was US$2.26 per pound of copper produced in the first quarter compared to US$2.46 in the comparative prior year quarter.  Higher capitalized stripping costs, improved  molybdenum by-product credits, and lower off property costs all contributed to driving down total operating cost (C1), partially offset by the effect of lower copper production as shown in the bridge graph below:


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Gibraltar Outlook

Mining activities are now focused in the Connector pit, which will be the source of mill feed in 2025 and the years ahead.  Copper production in the first quarter was approximately 10% below expectations, due to low recoveries from oxidized ore.  In addition, mining rates in the upper benches of Connector pit have been behind plan due to challenging ground conditions resulting in lower equipment productivities.  As a result, access to higher quality ore has been delayed from the second quarter to the third quarter, and annual copper production for 2025 is expected to be approximately 10 million pounds below the previous guidance of 120 to 130 million pounds.  Significant increases in head grades and recoveries are expected in the second half of 2025 and continuing into 2026.

Increased mill availability and higher throughput is also expected this year, as major maintenance projects were completed in both mills last year.  Refurbishment of the Gibraltar SX/EW plant, which has been idle since 2015, is nearing completion, with first cathode production expected in the second quarter, supplementing Gibraltar copper concentrate production. 

Molybdenum production is forecast to increase in 2025 as molybdenum grades are expected to be notably higher as more Connector pit ore is processed, also weighted to the second half of the year.

The Company has offtake agreements covering Gibraltar concentrate production in 2025 and 2026, which contain significantly lower, and in certain cases negative (premium), TCRC rates reflecting the tightening copper smelting market.  In 2024, TCRCs accounted for approximately US$0.09 per pound of off-property costs, and, with the new offtake agreements, the Company expects average TCRCs to reduce to nil in 2025 and 2026.

Potential US import tariffs are not expected to have a material impact on sales at Gibraltar as the mine produces copper and molybdenum concentrates that are sold to international metal traders and delivered to Asian markets.  Offtake agreements are in place for substantially all of Gibraltar's copper concentrate production in 2025 and 2026, and no changes to these sales channels are expected during this period. 

The Company has a prudent hedging program in place to protect a minimum copper price and Gibraltar cash flow during the Florence Copper construction period.  Currently, the Company has copper collar contracts in place that secure a minimum copper price of US$4.00 per pound for 81 million pounds of copper production for the remainder of 2025 (refer to "Financial Condition Review-Hedging Strategy" for details).


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Florence Copper

The Company has all key permits in place for the commercial production facility at Florence and construction of the Florence Copper commercial production facility continues to advance on schedule.  Approximately 670,000 project hours have been worked with no reportable injuries or environmental incidents.  The Company has a fixed-price contract with the general contractor for construction of the SX/EW plant and associated surface infrastructure.

A total of 80 production wells out of a total of 90 new wells to be drilled during the construction phase have been completed as of March 31, 2025.  Process ponds and surface water runoff pond construction are complete, and installation of high-density polyethylene piping in the main pipeline corridor continued.  Mechanical and piping installations throughout the SX/EW plant and electrical work continue to advance.  Assembly of the modular office and dry buildings were also completed, and work on the exterior finishing has started.

Site activities are focused on hiring additional personnel and other initiatives to support operational readiness and the ramp up of production.

Florence Copper capital spend
(US$ in thousands)
  Three months ended
March 31, 2025
 
Commercial facility construction costs   51,364  
Site and PTF operations   6,069  
Total Florence Copper capital spend   57,433  

Florence Copper commercial facility construction costs were US$51.4 million in the first quarter and, since the beginning of construction, US$206.3 million has been incurred on the Florence Copper commercial facility as of March 31, 2025.

In January 2025, the Company received its final US$10 million instalment from its US$50 million copper stream with Mitsui & Co. (U.S.A.) Inc. ("Mitsui").  The remaining Florence Copper commercial production facility construction costs are expected to be funded from the Company's available liquidity and cash flows from Gibraltar.

The Company has a technical report titled "NI 43-101 Technical Report Florence Copper Project, Pinal County, Arizona" dated March 30, 2023 (the "Florence 2023 Technical Report") on SEDAR+.  The Florence 2023 Technical Report was prepared in accordance with National Instrument 43-101 ("NI 43-101") and incorporated the results of test work from the production test facility ("PTF") as well as updated capital and operating costs (Q3 2022 basis) for the commercial production facility.

Project highlights based on the Florence 2023 Technical Report are detailed below:

 Net present value of US$930 million (at US$3.75 copper price, 8% after-tax discount rate);

 After-tax internal rate of return of 47%;

 Payback period of 2.6 years;

 Operating costs (C1) of US$1.11 per pound of copper produced;

 Annual production capacity of 85 million pounds of LME grade A copper cathode;

 Mine life of 22 years;

 Total life of mine production of 1.5 billion pounds of copper; and

 Initial capital cost of US$232 million (Q3 2022 basis).


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Based on the Florence 2023 Technical Report, the estimated construction costs for the Florence Copper commercial production facility were US$232 million and management expects that total construction costs will be within a range of 10% to 15% higher than this estimate.  Florence Copper remains on track for first copper cathode production in Q4 2025.

Long-term Growth Strategy

Taseko's strategy has been to grow the company by acquiring and developing a pipeline of projects focused on copper in North America.  We continue to believe this will generate long-term returns for shareholders.  Our other development projects are located in BC, Canada.

Yellowhead copper project

The Yellowhead copper project ("Yellowhead") is expected to produce 4.4 billion pounds of copper over a 25-year mine life.  During the first 5 years of operation, Yellowhead is expected to produce an average of 200 million pounds of copper per year.  Yellowhead also contains valuable precious metal by-products with 440,000 ounces of gold production and 19 million ounces of silver production over the life of mine. The Yellowhead project is subject of technical report published in January 2020.

Taseko plans to publish an updated technical report on Yellowhead in 2025 using updated long-term metal price assumptions, updated project costing, and incorporating the new Canadian tax credits available for copper mine development.

The Company is ready to enter the environmental assessment ("EA") process and plans to submit an Initial Project Description to formally commence the EA process with regulators in Q2 2025.  The Company is focusing discussions with regulators on developing a streamlined permitting process.  Taseko also opened a Yellowhead project office in 2024 to support ongoing engagement with local communities including First Nations.

New Prosperity copper-gold project

In late 2019, the Tŝilhqot'in Nation, as represented by the Tŝilhqot'in National Government, and Taseko entered into a confidential dialogue, with the involvement of the Province of BC, seeking a long-term resolution to the conflict regarding Taseko's proposed copper-gold mine previously known as New Prosperity, acknowledging Taseko's commercial interests and the Tŝilhqot'in Nation's opposition to the project.

This dialogue has been supported by the parties' agreement, beginning December 2019, to a series of standstill agreements on certain outstanding litigation and regulatory matters relating to Taseko's tenures and the area in the vicinity of Teẑtan Biny (Fish Lake).

This dialogue process has made meaningful progress in recent months and is close to completion.  The Tŝilhqot'in Nation and Taseko acknowledge the constructive nature of discussions, and the opportunity to conclude a long-term and mutually acceptable resolution of the conflict that also makes an important contribution to the goals of reconciliation in Canada.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Aley niobium project

The converter pilot test is ongoing to provide additional process data to support the design of commercial process facilities, and final product samples to support product marketing initiatives.  The Company has also initiated a scoping study to investigate the potential for Aley niobium oxide production to supply the growing market for niobium-based batteries.

Market Review

Copper Molybdenum Canadian/US Dollar Exchange

1 Commodity prices in US dollars per pound.

2 Sources: London Metal Exchange for copper prices, Platts Metals for molybdenum prices, Bank of Canada for Canadian dollar/US dollar exchange rates.

Copper prices are currently around US$4.17 per pound compared to US$4.39 per pound at March 31, 2025 and the first quarter average copper price of US$4.24 per pound.  Since the beginning of April, copper prices have  experienced significant volatility influenced by trade uncertainty and the threat of an escalating global trade war, particularly between China and the US. China produces approximately 50% of the global refined copper and the US imports approximately 50% of its copper.  The US copper market had seen significant stockpiling during the beginning of the year, with a significant premium on the COMEX price compared to the LME price, in response to threatened US tariffs on copper imports.

Recent US import tariffs are not expected to have a material impact on sales at Gibraltar as the mine produces copper and molybdenum concentrates that are sold to international metal traders and delivered to Asian markets.  Offtake agreements are in place for substantially all of Gibraltar's copper concentrate production in 2025 and 2026, and no changes to these sales channels are expected during this period.  Cathode produced by Gibraltar's SX/EW plant will generally be shipped overseas if a tariff between US and Canada is prohibitive.  The Company does not expect any material impact on Gibraltar operating costs as a result of the new tariffs.  Production at Florence is expected to remain in the US for domestic consumption.

Longer-term demand for copper is expected to remain strong driven by electrification, renewable energy transition, artificial intelligence and overall industrial activity while tight supply conditions are expected to continue due to few available sources of new primary copper supply.  These factors continue to provide unprecedented catalysts and support a higher copper price in the longer term as new mine supply lags behind growth in copper demand.

Smelter treatment and refining charges remain historically low, including spot rates at negative (premium) rates, driven by an increase in global copper smelting capacity and disruptions in the supply of copper concentrates.  Potential shortages of copper metal could continue, which could lead to higher copper prices further into 2025.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Approximately 8% of the Company's revenue is made up of molybdenum sales and Connector pit ore is expected to provide higher molybdenum grades in the coming years.  Molybdenum prices are currently around US$20.10 per pound compared to US$19.95 per pound at March 31, 2025 and the first quarter average molybdenum price of US$20.53 per pound.  The Company's sales agreements specify molybdenum pricing based on published Platts Metals reports.

The Company's sales contracts are priced in US dollars while a majority of Gibraltar's costs are Canadian dollar denominated, and, therefore, fluctuations in the Canadian dollar/US dollar exchange rate can have a significant effect on the Company's financial results.

Financial Performance

Earnings

    Three months ended
March 31,
 
(Cdn$ in thousands)   2025     2024     Change  
Net (loss) income   (28,560 )   18,896     (47,456 )
Unrealized foreign exchange loss   2,074     13,688     (11,614 )
Unrealized loss on derivatives and fair value adjustment   23,536     3,519     20,017  
Accretion on Florence royalty obligation   2,571     3,416     (845 )
Accretion on Cariboo consideration payable   664     1,555     (891 )
Gain on acquisition of Cariboo       (47,426 )   47,426  
Gain on acquisition of control of Gibraltar1       (14,982 )   14,982  
Realized gain on sale of inventory2       13,354     (13,354 )
Non-recurring other expenses       138     (138 )
Estimated tax effect of adjustments   (7,228 )   15,570     (22,798 )
Adjusted net (loss) income   (6,943 )   7,728     (14,671 )

1 The $15.0 million gain on acquisition of control of Gibraltar in Q1 2024 relates to the measurement at fair value of Taseko’s 87.5% interest in Gibraltar finished copper concentrate inventory held at the date of acquisition of control of Gibraltar (March 25, 2024) as a result of the Company’s acquisition of Cariboo.  These gains have been eliminated from Adjusted net income (loss) in the period of the acquisition transaction and added back in the period the inventory was sold.

2 Q1 2024 cost of sales included $13.4 million of fair value adjustments to Gibraltar finished copper concentrate inventory held at the date of acquisition of Cariboo that was subsequently sold and realized between March 26 and March 31, 2024.  This realized portion of the gain has been included in Adjusted net (loss) income.

Adjusted net loss was $6.9 million ($0.02 loss per share) in the first quarter compared to Adjusted net income of $7.7 million ($0.03 earnings per share) in the comparative prior year quarter.  The decrease in Adjusted earnings of $14.7 million was primarily due to lower sales volumes and production from the processing of lower quality stockpile material as Gibraltar engages in a pushback in the Connector pit to access the next ore zone.  The decrease in copper production and sales was partially offset by a stronger copper price environment and a stronger US dollar compared to the comparative prior year quarter.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Cost of sales in the first quarter was consistent with the comparative prior year quarter on a total dollar basis but reflects the higher cost of stockpile material on a per pound basis due to lower sales volumes in the quarter.  Mining costs generally decreased due to shorter haul distances in Connector and lower diesel prices as ore release was more focused in the Gibraltar pit in the first part of the prior year but were offset by increased milling costs arising from higher throughput.

Net loss was $28.6 million ($0.09 loss per share) in the first quarter after factoring in unrealized losses on derivatives primarily due to the increasing copper price trend in the quarter and its effect on the fair value of outstanding copper hedges covering production for the remainder of 2025.  Net income was $18.9 million ($0.07 earnings per share) in the comparative prior year quarter which benefited from gains recorded on the acquisition of Cariboo from Dowa and Furukawa.

No adjustments were made to Adjusted net (loss) income for price adjustments on settlement during the period.

Revenues

    Three months ended
March 31,
 
(Cdn$ in thousands)   2025     20241     Change  
Copper contained in concentrate   127,735     143,924     (16,189 )
Molybdenum concentrates   9,650     6,603     3,047  
Silver   1,741     1,727     14  
Gold   389         389  
Total gross revenue*   139,515     152,254     (12,739 )
Less: Treatment and refining costs   (366 )   (5,307 )   4,941  
Revenue   139,149     146,947     (7,798 )
                   
Sales of copper in concentrate2 (thousand pounds)   20,907     27,447     (6,540 )
Average realized copper price (US$ per pound)   4.24     3.89     0.35  
Average LME copper price (US$ per pound)   4.24     3.83     0.41  
Average exchange rate (Cdn$/US$)   1.44     1.35     0.09  

1 Q1 2024 results reflect the Company’s 87.5% effective interest in Gibraltar for the period from January 1 to March 24, 2024 and 100% effective interest for the period from March 25 to March 31, 2024.

2 Sales of copper in concentrate includes a net smelter payable deduction of approximately 3.5% to derive net payable pounds of copper sold. 

Copper revenues were $127.7 million in the first quarter compared to $143.9 million in the comparative prior year quarter.  Copper revenues decreased overall by $16.2 million due to 6.5 million fewer pounds being sold resulting in a negative volume variance of $34.4 million, partially offset by a favorable price variance of $10.3 million due to higher realized copper prices of US$0.35 per pound in the current quarter and a favorable foreign exchange variance of $7.9 million due to the strength of the US dollar against the Canadian dollar in the quarter.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Molybdenum revenues were $9.7 million in the first quarter compared to $6.6 million in the comparative prior year quarter.  The increase in molybdenum revenues of $3.0 million was primarily driven by increased sales volume and the impact of Taseko's increased effective interest in Gibraltar.

The Company also benefitted from payable gold for the first time as one of its concentrate offtake agreements paid for gold contained in the Gibraltar concentrate.

Treatment and refining costs decreased by $4.9 million to $0.4 million in the first quarter (Q1 2024 - $5.3 million) reflecting the lower TCRC rates realized under the Company's 2025 favorable offtake agreement terms.

Cost of sales

      Three months ended
March 31,
 
(Cdn$ in thousands)     2025       20241       Change  
Site operating costs     68,917       79,678       (10,761 )
Transportation costs     5,984       10,153       (4,169 )
Changes in inventories:                        
   Changes in inventories of finished goods     2,710       20,392       (17,682 )
   Changes in inventories of sulphide ore stockpiles     28,263       17       28,246  
   Changes in inventories of oxide ore stockpiles     (5,516 )     (2,736 )     (2,780 )
Production costs     100,358       107,504       (7,146 )
Depletion and amortization     22,425       15,024       7,401  
Cost of sales     122,783       122,528       255  
                         
Site operating costs per ton milled*   $ 8.73     $ 11.73     $ (3.00 )

1 Q1 2024 results reflect the Company’s 87.5% effective interest in Gibraltar for the period from January 1 to March 24, 2024 and 100% effective interest for the period from March 25 to March 31, 2024.

Site operating costs decreased by $10.8 million to $68.9 million in the first quarter (Q1 2024 - $79.7 million) primarily driven by increased capitalized stripping costs related to the current pushback in the Connector pit.  Site operating costs also benefited from lower input prices such as diesel and lower consumption of key mining consumables including diesel as the first part of 2024 mine operations involved longer haul distances from the bottom of the Gibraltar pit.  Lower mining costs in the current quarter were partially offset by higher milling costs due to higher throughput and additional costs incurred to process the lower quality stockpile material.

Transportation costs decreased by $4.2 million to $6.0 million in the first quarter (Q1 2024 - $10.2 million) reflecting the lower sales volume during the quarter.

Cost of sales is also impacted by changes in finished goods and stockpile inventories.  Stockpiled ore material was used to supplement mined ore in the first quarter depleting 5.5 million tons of sulphide ore stockpiles and contributing to an increase in production costs of $28.3 million during the quarter.  Copper finished goods inventories decreased by 1.8 million pounds due to shipment timing and contributed to an increase in cost of sales of $2.7 million in the first quarter.  Oxide ore stockpiles increased by 2.2 million tons as Gibraltar continues to mine through the oxide ore layer in the Connector pit and add material to the heap leach pads.  This contributed to a decrease in production costs of $5.5 million in the quarter.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

In the comparative prior year quarter, cost of sales included $13.4 million of fair value adjustments related to the sale of concentrate inventory held at the date of acquisition of control of Gibraltar (March 25, 2024) arising from the Company's acquisition of Cariboo.

Depletion and amortization increased by $7.4 million to $22.4 million in the first quarter (Q1 2024 - $15.0 million) for depreciation included stockpile inventory costs that were processed during the quarter.

Other expenses (income)

    Three months ended
March 31,
 
(Cdn$ in thousands)   2025     2024     Change  
General and administrative   3,324     3,129     195  
Share-based compensation expense   5,004     5,440     (436 )
Realized loss on derivative instruments   1,553     1,702     (149 )
Unrealized loss on derivative instruments   21,566     927     20,639  
Unrealized loss on Florence copper stream derivative   5,280     2,592     2,688  
Unrealized gain on Cariboo contingent performance payment   (3,310 )       (3,310 )
Project evaluation expense   1,169     217     952  
Gain on Cariboo acquisition       (47,426 )   47,426  
Gain on acquisition of control of Gibraltar1       (14,982 )   14,982  
Other income, net   (56 )   (138 )   82  
Other expenses (income)   34,530     (48,539 )   83,069  

1 The $15.0 million gain on acquisition of control of Gibraltar in Q1 2024 relates to the write-up to fair value for Taseko’s 87.5% interest in Gibraltar finished copper concentrate inventory held at the date of acquisition of control of Gibraltar (March 25, 2024) as a result of the Company’s acquisition of Cariboo.

General and administrative expenses of $3.3 million in the first quarter were consistent with costs incurred in the comparative prior year quarter.

Share-based compensation expenses is comprised of the expense associated with share options and performance share units, and fair value adjustments on deferred share units and restricted share units.  Share-based compensation expenses decreased by $0.4 million to $5.0 million in the first quarter (Q1 2024 - $5.4 million) primarily due to the decrease in the Company's share price and its impact on the valuation of deferred and restricted share units.  For more information, refer to the Financial Statements-Note 18.

Realized loss on derivative instruments was $1.6 million in the first quarter consistent with $1.7 million in the comparative prior year quarter and pertains to the amortization of premiums paid for copper collars and fuel calls held by the Company as part of the Company's hedging strategy.  Unrealized loss on derivative instruments was $21.6 million in the quarter compared to $0.9 million in the comparative prior year quarter and relates to the change in fair value on the Company's outstanding copper collars and fuel call options reflecting the increasing copper price trend during the current quarter.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Unrealized loss on Florence copper stream derivative was $5.3 million in the first quarter compared to $2.6 million in the comparative prior year quarter and reflects upward changes in forward copper prices and discount rates applied over the Florence copper stream term.

Unrealized gain on Cariboo contingent performance payment was $3.3 million in the first quarter and reflects changes in forecast copper prices and Gibraltar revenues over the Sojitz earn-out period.

Project evaluation expense represent costs associated with the New Prosperity project and other technical expenditures undertaken by Taseko's engineering and technical teams on various project initiatives.

On March 25, 2024, the Company completed its acquisition of the remaining 50% of Cariboo from Dowa and Furukawa and increased its effective interest in Gibraltar from 87.5% to 100%.  The Company recognized a gain on acquisition of Cariboo of $47.4 million representing the difference between the estimated fair value of net assets acquired and the estimated fair value of total consideration payable.  The acquisition also gave the Company full control over Gibraltar resulting in the remeasurement of its previously held 87.5% interest in Gibraltar according to IFRS accounting standards.  The Company recognized a gain on acquisition of control of Gibraltar of $15.0 million representing the fair value adjustment on finished copper concentrate inventory held at the date of acquisition to fair value.  Further details on the Cariboo acquisition can be found in the Financial Statements-Note 12b.

Finance and accretion expenses

    Three months ended
March 31,
 
(Cdn$ in thousands)   2025     2024     Change  
Interest expense   17,346     14,820     2,526  
Amortization of deferred financing charges   617     740     (123 )
Finance income   (1,330 )   (1,086 )   (244 )
Less: interest expense capitalized   (5,756 )   (2,748 )   (3,008 )
Finance expenses, net   10,877     11,726     (849 )
                   
Accretion on deferred revenue   2,711     1,368     1,343  
Accretion on PER   724     698     26  
Accretion on Cariboo consideration payable   664     1,555     (891 )
Accretion on Florence royalty obligation   2,571     3,416     (845 )
Accretion expenses   6,670     7,037     (367 )

Net finance expenses were $10.9 million in the first quarter compared to $11.7 million in the prior year quarter.  Interest expense increased by $2.5 million to $17.3 million in the quarter (Q1 2024 - $14.8 million), primarily driven by the impact of the higher principal and coupon of the 8.25% senior secured notes due May 2030 that were issued in April 2024 being captured in the current quarter and not the comparative prior year quarter.  Capitalized interest attributable to the funding of Florence Copper development costs increased by $3.0 million to $5.8 million in the quarter (Q1 2024 - $2.7 million) proportionate with the increased spending for the construction of the Florence Copper commercial production facility.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Accretion expenses decreased by $0.4 million to $6.7 million in the first quarter (Q1 2024 - $7.0 million) primarily due to the decreases in accretion on Cariboo consideration payable and the Florence royalty obligation reflecting lower forecast copper prices over the terms of the obligations, offset by increases in accretion on deferred revenue reflecting higher silver ounces delivered under the Osisko silver stream in the current quarter.

Income tax

    Three months ended
March 31,
 
(Cdn$ in thousands)   2025     2024     Change  
Current income tax expense       805     (805 )
Deferred income tax (recovery) expense   (7,980 )   22,477     (30,457 )
Income tax (recovery) expense   (7,980 )   23,282     (31,262 )
                   
Effective tax rate   21.8%     55.2%     (33.4)%  
Canadian statutory rate   27.0%     27.0%      
BC mineral tax rate   9.5%     9.5%      

A reconciliation of the effective tax rate is presented below:

    Three months ended
March 31,
 
(Cdn$ in thousands)   2025     2024     Change  
Income tax (recovery) expense at Canadian statutory rate of 36.5%   (12,953 )   15,390     (28,343 )
Permanent differences   5,228     6,570     (1,342 )
Foreign tax rate differential   152     32     120  
Unrecognized tax benefits   (151 )   1,290     (1,441 )
Deferred tax adjustments related to prior periods   (256 )       (256 )
Income tax (recovery) expense   (7,980 )   23,282     (31,262 )

The effective tax rate for the first quarter was 22% compared to 55% in the comparative prior year quarter.  The effective tax rate for the quarter is lower than the combined BC mineral tax rate and the federal statutory income tax rate of 36.5% primarily due to $23.5 million in unrealized losses on derivatives and fair value adjustments that are not deductible for BC mineral tax purposes.

Current income tax expense represents estimated BC mineral tax payable for the period.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Financial Condition Review

Balance sheet review

(Cdn$ in thousands)   March 31,
2025
    December 31,
2024
    Change  
Cash and equivalents   120,778     172,732     (51,954 )
Other current assets   127,766     180,507     (52,741 )
Property, plant and equipment   1,901,296     1,770,102     131,194  
Other assets   71,184     71,702     (518 )
Total assets   2,221,024     2,195,043     25,981  
Current liabilities1   195,813     173,983     21,830  
Debt:                  
   Senior secured notes   719,400     706,741     12,659  
   Equipment-related financings   73,995     90,467     (16,472 )
Cariboo consideration payable   117,173     129,421     (12,248 )
Deferred revenue   77,905     77,327     578  
Other liabilities   528,616     513,882     14,734  
Total liabilities   1,712,902     1,691,821     21,081  
Equity   508,122     503,222     4,900  
                   
Net debt* (debt minus cash and equivalents)   672,617     624,476     48,141  
Total common shares outstanding (millions)   315.9     304.7     11.2  

1 Excludes current portion of long-term debt.

The Company's asset base is principally comprised of property, plant and equipment reflecting the capital-intensive nature of its large scale, open pit mining operation at Gibraltar and construction of the commercial facility at Florence.  Other current assets primarily include accounts receivable, inventories (concentrate inventories, ore stockpiles and supplies), prepaid expenses, and marketable securities.  Concentrate inventories, accounts receivable and cash balances can fluctuate due to the timing of sales and cash settlements.

Property, plant and equipment increased $131.2 million in the first quarter, which includes Florence Copper construction costs of $83.2 million (capital project costs of $75.5 million and site costs of $7.7 million) and Gibraltar capital expenditures of $58.1 million (capitalized stripping costs of $44.0 million and other capital expenditures of $14.1 million).

Net debt increased $48.1 million in the first quarter, primarily due to decreases in cash and equivalents as the Company continues its funding of construction of the Florence Copper commercial facility and the effect of a stronger US dollar and the foreign exchange impact on US dollar-denominated borrowings, offset by repayments of the Company's equipment financings during the quarter.

Cariboo consideration payable relates to earn-out payments on the acquisition of Cariboo.  Cariboo consideration payable decreased by $12.2 million primarily due to payments made to Sojitz of $10.0 million in the first quarter.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Deferred revenue relates to the advance payments received from Osisko for the delivery of future silver production from Gibraltar and customer advance payments on copper concentrate.

Other liabilities increased by $14.7 million in the first quarter primarily due to the receipt of the final US$10.0 million instalment on the Mitsui copper stream.

At May 1, 2025, there were 315,875,348 common shares and 11,161,200 stock options outstanding.  More information on these instruments and the terms of their exercise can be found in the Financial Statements-Notes 17 and 18.

Liquidity, cash flow and capital resources

At March 31, 2025, the Company had cash and equivalents of $120.8 million (December 31, 2024 - $172.7 million) and available liquidity of $279.0 million (December 31, 2024 - $331.0 million).

Cash flows provided by operations were $55.9 million in the first quarter compared to $59.6 million in the comparative prior year quarter.  Operating margins from Gibraltar decreased in the quarter as a result of lower sales volumes but operating cash flows benefited from the release of stockpile inventories in the quarter, the costs for which were incurred in prior periods.

Cash flows used for investing activities were $130.9 million in the first quarter compared to $46.7 million in the comparative prior year quarter.  Investing activities include $51.7 million for capital expenditures at Gibraltar (capitalized stripping of $38.1 million and sustaining capital expenditures of $13.6 million) and $80.0 million for capital expenditures at Florence Copper including $7.7 million in site costs.

Cash flows provided by financing activities were $21.5 million in the first quarter compared to $48.5 million in the comparative prior year quarter.  Financing activities include $29.6 million (US$21.1 million) in net proceeds from shares issued under the Company's ATM equity offering prospectus and $14.4 million (US$10 million) from the final instalment of the US$50 million Mitsui copper stream offset by $10.2 million in debt repayments and $3.0 million in interest payments and $10.0 million payment to Sojitz related to the acquisition of Cariboo.

Liquidity outlook

At March 31, 2025, the Company had approximately $279.0 million (December 31, 2024 - $331.0 million) of available liquidity including $120.8 million in cash and equivalents and US$110 million undrawn capacity on its Credit Facility.  The Company drew US$25 million from its Credit Facility in April.

In the first quarter, the Company completed its ATM offering and issued 10.6 million common shares for gross proceeds of $31.0 million (or US$21.5 million).  The Company also received the final US$10 million instalment on the US$50 million Mitsui copper stream.

The Company expects to return to life of mine average copper production of 120 to 130 million pounds after the current pushback in the Connector pit is completed.  The Company initiated a pushback and stripping campaign in the Connector pit in the first quarter, which is expected to continue through the second quarter.  During this period, lower quality ore stockpiles are being used to supplement mined ore and as such 2025 production will be weighted heavily towards the second half of the year.  Molybdenum production is also expected to increase due to higher expected molybdenum grades in Connector pit ore.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Refurbishment of Gibraltar's SX/EW plant is now complete and is expected to start producing copper cathode in the second quarter to supplement Gibraltar's copper production in concentrate from its concentrator mills.  Gibraltar has no other significant capital projects planned for the remainder of 2025.

The Company has significant capital commitments for the remaining construction of the Florence commercial facility.  The Company intends to finance the remaining capital costs over the next 12 months from available liquidity, cash flows from Gibraltar and its corporate Credit Facility.

If needed, the Company could raise further additional capital through equity financings or asset sales, including royalties, sales of project interests, or joint ventures, or additional credit facilities, including additional notes offerings or increasing borrowings from commercial banks or credit funds.  The Company evaluates these financing alternatives based on a number of factors, including the prevailing metal prices and projected operating cash flows from Gibraltar, relative valuation, liquidity requirements, covenant restrictions and other factors, in order to optimize the Company's cost of capital and maximize shareholder value.

Future changes in copper and molybdenum market prices could also impact the timing and amount of cash available for future investment in the Company's capital commitments and development projects, debt obligations and other uses of capital.  To mitigate commodity price risks in the short term, copper price options are entered into for a substantial portion of Gibraltar's copper production and the Company has a long track history of doing so.  The Company currently has copper price protection in place for 81 million pounds of production for the remainder of the year.

Hedging strategy

The Company generally fixes all or substantially all of the copper prices of its copper concentrate shipments at the time of shipment.  Where the customer's offtake contract does not provide a price fixing option, the Company may look to undertake a quotational period hedge directly with a financial institution as the counterparty in order to fix the price of the shipment.

To protect against sudden and unexpected copper price volatility in the market, the Company's hedging strategy aims to secure a minimum price for a significant portion of future copper production using copper put options that are either purchased outright or substantially funded by the sale of copper call options that are out of the money.  The amount and duration of the copper hedge positions is based on an assessment of business-specific risk elements combined with the copper pricing outlook.  Copper price and quantity exposure are reviewed regularly to ensure that adequate revenue protection is in place.

Hedge positions are typically extended by adding incremental quarters at established floor prices (the strike price of the copper put option) to provide the necessary price protection.  Considerations for the cost of the hedging program include an assessment of Gibraltar's estimated production costs, copper price trends and the Company's fixed capital requirements during the relevant period.  During periods of volatility or step changes in the copper price, the Company may revisit outstanding hedging contracts and determine whether copper put (floor) or call (ceiling) levels should be adjusted in line with the market while maintaining copper price protection.

From time to time, the Company will look at potential hedging opportunities that mitigate the risk of rising input costs, including foreign exchange and fuel prices, where such a strategy is cost effective.  To protect against a potential operating margin squeeze that could arise from oil and diesel price shocks, the Company purchases fuel call options to provide a price ceiling for diesel that is used by the mining fleet.  The Company does not apply hedge accounting to any of its commodity or input cost derivatives.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

A summary of the Company's outstanding hedge positions is as follows:

    Notional amount   Strike price   Term to maturity   Original cost
At March 31, 2025                
Copper collars   27 million lbs   Floor - US$4.00 per lb
Ceiling - US$5.00 per lb
  Q2 2025   $1.3 million
Copper collars   54 million lbs   Floor - US$4.00 per lb
Ceiling - US$5.40 per lb
  H2 2025   $2.2 million
Fuel calls   9 million ltrs   US$0.65 per ltr   Q2 2025   $0.3 million

Commitments and contingencies

    Payments due  
(Cdn$ in thousands)   Remainder
of 2025
    2026     2027     2028     2029     Thereafter     Total  
Debt                                          
   2030 Notes                       719,400     719,400  
   Interest   59,351     59,351     59,351     59,351     59,351     29,675     326,430  
Equipment loans                                          
   Principal   19,290     27,500     14,027     11,275             72,092  
   Interest   4,112     3,461     1,554     463             9,590  
Lease liabilities                                          
   Principal   7,800     4,551     1,801     466     252     52     14,922  
   Interest   973     486     150     27     7     1     1,644  
Cariboo acquisition payments                                          
   Sojitz1       10,000     10,000     10,000             30,000  
   Dowa and Furukawa2       8,000     9,000     9,000     8,000     78,000     112,000  
PER3                       167,530     167,530  
Capital expenditures   31,049                         31,049  
Other expenditures                                          
   Transportation-related services4   12,025     12,038     1,763                 25,826  

1 On March 15, 2023, the Company completed the acquisition of 50% of Cariboo from Sojitz.  The acquisition price payable to Sojitz is a minimum of $60 million payable over a 5-year period and potential contingent payments depending on Gibraltar copper revenue and copper prices.  $30 million of the $60 million minimum amount has been paid to Sojitz as of March 31, 2025.  The remaining minimum amounts will be paid in $10 million annual instalments over the next 3 years.  There is no interest payable on the minimum amounts.  The Company also estimates $30 million will be payable over the next 3 years related to the contingent consideration, which has not been included in the table above.

2 On March 25, 2024, the Company completed the acquisition of the remaining 50% of Cariboo from Dowa and Furukawa.  The acquisition price payable to Dowa and Furukawa is a minimum of $117 million and a maximum of $142 million payable over a 10-year period.  The quantum and timing of these payments depends on copper prices and Gibraltar cash flow.  An initial payment of $5 million was paid to Dowa and Furukawa on closing, with remaining consideration payable in annual instalments starting in April 2026.

3 Provisional for environmental rehabilitation amounts presented represent the present value of estimated costs of legal and constructive obligations required to retire an asset, including decommissioning and other site restoration activities, primarily for Gibraltar and Florence.  At March 31, 2025, the Company has provided surety bonds for $124.2 million for Gibraltar’s reclamation security and $51.9 million for Florence’s reclamation security.

4 Transportation-related services include ocean freight and port handling services, which are both cancelable upon certain operating circumstances.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

At March 31, 2025, the Company has capital expenditure commitments relating to the Florence Copper commercial facility construction project totaling $24.6 million (December 31, 2024 - $47.9 million).

In December 2024, Gibraltar received an amendment to its M-40 permit in which the required closure bonding with the Province of BC to increase from $108.5 million to $139.9 million.  Gibraltar was required to post this additional bonding over the next 15 months and in March 2025 posted additional surety bonds of $15.7 million to the Province of BC.  The Company intends to post additional surety bonds to meet the remaining bonding requirements from insurance underwriters.

Summary of Quarterly Results


(Cdn$ in thousands,
except per share amounts)
    2025       2024       2023    
    Q1       Q4       Q3       Q2       Q1       Q4       Q3       Q2    

Revenues     139,149        167,799        155,617        137,730        146,947        153,694        143,835        111,924     

Net (loss) income     (28,560 )     (21,207 )     (180 )     (10,953 )     18,896       38,076       871       9,991    

Basic EPS     (0.09 )     (0.07 )           (0.04 )     0.07       0.13             0.03    

Adjusted net income (loss)*     (6,943 )     10,468       8,228       30,503       7,728       24,061       19,659       (4,376 )

Adjusted basic EPS     (0.02 )     0.03       0.03       0.10       0.03       0.08       0.07       (0.02 )

Adjusted EBITDA     34,391       55,602       47,689       70,777       49,923       69,107       62,695       22,218    

                                                                   

Copper sales
(million pounds)
    21.8       27.4       26.3       22.6       31.7       31.4       28.1       22.8    

Realized copper price
(US$ per pound)
    4.24       4.13       4.23       4.49       3.89       3.75       3.83       3.78    

Total operating costs*
(US$ per pound)
    2.26       2.42       2.92       2.99       2.46       1.91       2.20       2.66    

Financial results for the last eight quarters reflect: volatile copper and molybdenum prices and foreign exchange rates that impacted realized sales prices; and, the variability in the quarterly sales volumes due to copper grades and timing of shipments which impacts revenue recognition.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Critical Accounting Policies and Estimates

The Company's material accounting policies are presented in Note 2.4 of the 2024 annual consolidated financial statements.  The preparation of the financial statements in conformity with IFRS requires management to make judgments, estimates and assumptions that affect the application of accounting policies, including the accounting for the Cariboo acquisition, and the reported amounts of assets, liabilities, income and expenses.  Actual results may differ from these estimates.  Estimates and underlying assumptions are reviewed on an ongoing basis.  Revisions to accounting estimates are recognized in the period in which the estimates are revised and in any future periods affected.

In the process of applying the Company's accounting policies, significant areas where judgment is required include the determination of the timing of transfer of control of inventory for revenue recognition, provisions for environmental rehabilitation, reserve and resource estimation, functional currency, the determination of the accounting treatment for the advance payment under the silver purchase and sale agreement reported as deferred revenue, and recovery of other deferred tax assets.

Significant areas of estimation include reserve and resource estimation, fair value of assets and liabilities acquired in a business combination, asset valuations and the measurement of impairment charges or reversals, valuation of inventories, plant and equipment lives, tax provisions, provisions for environmental rehabilitation, valuation of financial instruments and derivatives, capitalized stripping costs and share-based compensation.  Key estimates and assumptions made by management with respect to these areas have been disclosed in the notes to Financial Statements.

The accuracy of reserve and resource estimates is a function of the quantity and quality of available data and the assumptions made and judgment used in the engineering and geological interpretation, and may be subject to revisions based on various factors.  Changes in reserve and resource estimates may impact the carrying value of property, plant and equipment, the calculation of deprecation expense, the capitalization of stripping costs incurred during production, and the timing of cash flows related to the provision for environmental rehabilitation.

Changes in forecast prices of commodities, exchange rates, production costs and recovery rates may change the economic status of reserve and resources.  Forecast prices of commodities, exchange rates, production costs and recovery rates, and discount rates assumptions, either individually or collectively, may impact the carrying value of derivative financial instruments, inventories, property, plant and equipment, and intangibles, as well as the measurement of impairment charges or reversals.  These factors also impacted the fair values of assets and liabilities recorded on the acquisition of Cariboo disclosed in the Financial Statements-Notes 12 and 14.

Internal and Disclosure Controls Over Financial Reporting

The Company's management is responsible for establishing and maintaining adequate internal controls over financial reporting ("ICFR") and disclosure controls and procedures ("DC&P").

The Company's internal control system over financial reporting is designed to provide reasonable assurance to management and the Board of Directors regarding the preparation and fair presentation of published financial statements.  Internal controls over financial reporting includes those policies and procedures that:

(1) pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of assets of the Company;


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

(2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with IFRS Accounting Standards, and that receipts and expenditures of the Company are being made only in accordance with authorizations of management and directors of the Company; and,

(3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company's assets that could have a material effect on the financial statements.

The Company's internal control system over disclosure controls and procedures is designed to provide reasonable assurance that material information relating to the Company is made known to management and disclosed to others and information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted by us under securities legislation is recorded, processed, summarized and reported within the time periods specified in the securities legislation.

All internal control systems, no matter how well designed, have inherent limitations.  Therefore, even those systems determined effective can provide only reasonable assurance with respect to financial reporting and disclosure.

There have been no changes in our internal control over financial reporting and disclosure controls and procedures during the three months ended March 31, 2025 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting and disclosure.

Key Management Personnel

Key management personnel ("KMP") include the members of the Board of Directors and executive officers of the Company.

The Company contributes to a post-employment defined contribution pension plan on behalf of certain KMP.  This retirement compensation arrangement (the "RCA Trust") was established to provide benefits to certain executive officers on or after retirement in recognition of their long service.  Upon retirement, the participant is entitled to the distribution of the accumulated value of the contributions under the RCA Trust.  Obligations for contributions to the defined contribution pension plan are recognized as compensation expense in the periods during which services are rendered by the executive officers.

Certain executive officers are entitled to termination and change in control benefits.  In the event of termination without cause, other than a change in control, these executive officers are entitled to an amount ranging from 12-months' to 18-months' salary.  In the event of a change in control, if a termination without cause or a resignation occurs within 12 months following the change in control, these executive officers are entitled to receive, among other things, an amount ranging from 12-months' to 24-months' salary and accrued bonus, and all stock options held by these individuals will fully vest.

Executive officers and directors also participate in the Company's share option program (refer to the Financial Statements-Note 18).


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Compensation for KMP (including all members of the Board of Directors and executive officers) is as follows:

    Three months ended
March 31,
 
(Cdn$ in thousands)   2025     2024  
Salaries and benefits   3,113     2,595  
Post-employment benefits   220     220  
Share-based compensation   4,000     4,861  
Total KMP compensation   7,333     7,676  

Non-GAAP Performance Measures

This MD&A includes certain non-GAAP performance measures that do not have a standardized meaning prescribed by IFRS.  These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers.  The Company believes that these measures are commonly used by certain investors, in conjunction with conventional IFRS measures, to enhance their understanding of the Company's performance.  These measures have been derived from the Company's financial statements and applied on a consistent basis.  The following tables below provide a reconciliation of these non-GAAP measures to the most directly comparable IFRS measures.

Total operating cost and site operating cost, net of by-product credit

Total operating cost includes all costs absorbed into inventory, as well as transportation costs and insurance recoverable.  Site operating cost is calculated by removing net changes in inventory, depletion and amortization, insurance recoverable, and transportation costs from cost of sales.  Site operating cost, net of by-product credit is calculated by subtracting by-product credits from site operating cost.  Site operating cost, net of by-product credit per pound is calculated by dividing the aggregate of the applicable costs by pounds of copper produced.  Total operating cost per pound is the sum of site operating costs, net of by-product credits and off-property costs divided by pounds of copper produced.  By-product credit is calculated based on actual sales of molybdenum (net of treating costs) and silver during the period divided by the total pounds of copper produced during the period.  These measures are calculated on a consistent basis for the periods presented.

(Cdn$ in thousands, unless otherwise indicated)     Q1 2025       Q4 2024     Q3 2024       Q2 2024     Q1 2024  
Cost of sales     122,783       134,940     124,883       108,637     122,528  
Less:                                    
   Depletion and amortization     (22,425 )     (24,641 )   (20,466 )     (13,721 )   (15,024 )
   Net change in inventories of finished goods     (2,710 )     4,064     2,938       (10,462 )   (20,392 )
   Net change in inventories of ore stockpiles     (22,747 )     (3,698 )   9,089       1,758     2,719  
   Transportation costs     (5,984 )     (10,170 )   (8,682 )     (6,408 )   (10,153 )
Site operating cost     68,917       100,495     107,712       79,804     79,678  
Less by-product credits:                                    
   Molybdenum, net of treatment costs     (8,774 )     (16,507 )   (8,962 )     (7,071 )   (6,112 )
   Silver, excluding amortization of deferred revenue     (131 )     (139 )   (241 )     (144 )   (137 )


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

   Gold, net of refining costs     (389 )                    
Site operating cost, net of by-product credit     59,623       83,849     98,509       72,589     73,429  
Total pounds of copper produced (thousand pounds)     19,959       28,595     27,101       20,225     26,694  
Total costs per pound produced     2.99       2.94     3.63       3.59     2.75  
Average exchange rate for the period (Cdn$ / US$)     1.44       1.40     1.36       1.37     1.35  
Site operating cost, net of by-product credits
(US$ per pound)
  $ 2.08     $ 2.10   $ 2.66     $ 2.62   $ 2.04  
Site operating cost, net of by-product credit     59,623       83,849     98,509       72,589     73,429  
Add off-property costs:                                    
   Treatment and refining costs     (510 )     2,435     816       3,941     4,816  
   Transportation costs     5,984       10,170     8,682       6,408     10,153  
Total operating cost     65,097       96,454     108,007       82,938     88,398  
Total operating cost (C1) (US$ per pound)   $ 2.26     $ 2.42   $ 2.92     $ 2.99   $ 2.46  

Total site costs

Total site costs include site operating costs charged to cost of sales and mining costs capitalized to property, plant and equipment in the period.  This measure is intended to capture total site operating costs incurred during the period calculated on a consistent basis for the periods presented.

(Cdn$ in thousands)   Q1 2025     Q4 2024     Q3 2024     Q2 2024     Q1 20241  
Site operating costs   68,917     100,495     107,712     79,804     79,678  
Capitalized stripping costs   38,082     1,981     3,631     10,732     16,152  
Total site costs – Taseko’s share   106,999     102,476     111,343     90,536     95,830  
Total site costs – 100% basis   106,999     102,476     111,343     90,536     109,520  

1 Q1 2024 results reflect the Company’s 87.5% effective interest in Gibraltar for the period from January 1 to March 24, 2024 and 100% effective interest for the period from March 25 to March 31, 2024.

Adjusted net income (loss) and Adjusted EPS

Adjusted net income (loss) removes the effect of the following transactions from net income (loss) as reported under IFRS:

 Unrealized foreign currency gains and losses;

 Unrealized derivative gains and losses and fair value adjustments;

 Other operating costs;

 Call premium on settlement of debt;

 Loss on settlement of debt, net of capitalized interest;

 Bargain purchase gains on Cariboo acquisition;

 Gain on acquisition of control of Gibraltar;

 Realized gain on sale of finished goods inventory;


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

 Inventory write-ups fair value that was sold or processed;

 Accretion on Florence royalty obligations;

 Accretion on Cariboo consideration payable;

 Non-recurring other expenses for Cariboo adjustment; and

 Finance and other non-recurring costs of Cariboo acquisition.

Management believes these transactions do not reflect the underlying operating performance of the Company's core mining business and are not necessarily indicative of future operating results.  Furthermore, unrealized gains and losses on derivative instruments, changes in the fair value of financial instruments, and unrealized foreign currency gains and losses are not necessarily reflective of the underlying operating results for the periods presented.

Adjusted earnings per share ("Adjusted EPS") is Adjusted net income (loss) attributable to common shareholders of the Company divided by the weighted average number of common shares outstanding for the period.

(Cdn$ in thousands)     Q1 2025       Q4 2024       Q3 2024       Q2 2024  
Net loss     (28,560 )     (21,207 )     (180 )     (10,953 )
Unrealized foreign exchange loss (gain)     2,074       40,462       (7,259 )     5,408  
Unrealized derivative loss (gain) and fair value adjustment     23,536       (25,514 )     1,821       10,033  
Other operating costs1           4,132       4,098       10,435  
Call premium on settlement of debt                       9,571  
Loss on settlement of debt, net of capitalized interest                       2,904  
Realized gain on sale of inventory2                       3,768  
Inventory write-ups to fair value that was sold or processed3           1,905       3,266       4,056  
Accretion on Florence royalty obligation     2,571       3,682       3,703       2,132  
Accretion on Cariboo consideration payable     664       4,543       9,423       8,399  
Non-recurring other expenses for Cariboo adjustment                       394  
Estimated tax effect of adjustments     (7,228 )     2,465       (6,644 )     (15,644 )
Adjusted net (loss) income     (6,943 )     10,468       8,228       30,503  
Adjusted EPS   $ (0.02 )   $ 0.03     $ 0.03     $ 0.10  

1 Other operating costs relate to the in-pit crusher relocation project and care and maintenance costs due to the June 2024 labour strike.

2 Realized gain on sale of inventory relates to copper concentrate inventory held at March 25, 2024 that was written-up to fair value as part of the acquisition of control of Gibraltar, and subsequently sold.  The realized portion of these gains have been added back to Adjusted net (loss) income in the period the inventory was sold.

3 Inventory write-ups to net realizable value that was sold or processed relates to stockpile inventories that were written-up to fair value as part of the acquisition of control of Gibraltar.  These write-ups have been included in Adjusted net (loss) income in the period when the inventories were sold or processed.

(Cdn$ in thousands)     Q1 2024       Q4 2023       Q3 2023       Q2 2023  
Net income     18,896       38,076       871       9,991  
Unrealized foreign exchange loss (gain)     13,688       (14,541 )     14,582       (10,966 )
Unrealized derivative loss (gain) and fair value adjustment     3,519       1,636       4,518       (6,470 )
Gain on Cariboo acquisition     (47,426 )                  
Gain on acquisition of control of Gibraltar1     (14,982 )                  
Realized gain on sale of inventory2     13,354                    
Accretion on Florence royalty obligation     3,416                    
Accretion on Cariboo consideration payable     1,555                    
Non-recurring other expenses for Cariboo adjustment     138       (916 )     1,244       1,714  
Estimated tax effect of adjustments     15,570       (194 )     (1,556 )     1,355  
Adjusted net income (loss)     7,728       24,061       19,659       (4,376 )
Adjusted EPS   $ 0.03     $ 0.08     $ 0.07     $ (0.02 )

1 Gain on acquisition of control of Gibraltar relates to the write-up of copper concentrate inventory to fair value for Taseko’s 87.5% interest in Gibraltar at March 25, 2024.

2 Realized gain on sale of inventory relates to copper concentrate inventory held at March 25, 2024 that was written-up to fair value as part of the acquisition of control of Gibraltar, and subsequently sold.  The realized portion of these gains have been added back to Adjusted net income (loss) in the period the inventory was sold.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Adjusted EBITDA

Adjusted earnings before interest, taxes, depreciation and amortization ("Adjusted EBITDA") is presented as a supplemental measure of the Company's performance and ability to service debt.  Adjusted EBITDA is frequently used by securities analysts, investors and other interested parties in the evaluation of companies in the industry, many of which present adjusted EBITDA when reporting their results.  Issuers of "high yield" securities also present adjusted EBITDA because investors, analysts and rating agencies considering it useful in measuring the ability of those issuers to meet debt service obligations.

Adjusted EBITDA represents net income before interest, income taxes, depreciation and amortization, and also eliminates the impact of a number of transactions that are not considered indicative of ongoing operating performance.  Certain items of expense are added back and certain items of income are deducted from net income that are not likely to recur or are not indicative of the Company's underlying operating results for the reporting periods presented or for future operating performance and consist of:

 Unrealized foreign exchange gains and losses;

 Unrealized derivative gains and losses and fair value adjustments;

 Amortization of share-based compensation expense;

 Other operating costs;

 Call premium on settlement of debt;

 Loss on settlement of debt;

 Bargain purchase gains on Cariboo acquisition;

 Gain on acquisition of control of Gibraltar;

 Realized gains on sale of finished goods inventory;

 Inventory write-ups to net realizable value that was sold or processed; and

 Finance and other non-recurring costs of Cariboo acquisition.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

(Cdn$ in thousands)   Q1 2025     Q4 2024     Q3 2024     Q2 2024  
Net loss   (28,560 )   (21,207 )   (180 )   (10,953 )
Depletion and amortization   22,425     24,641     20,466     13,721  
Finance and accretion expenses   18,877     21,473     25,685     21,271  
Finance income   (1,330 )   (1,674 )   (1,504 )   (911 )
Income tax (recovery) expense   (7,980 )   11,707     (200 )   (3,247 )
Unrealized foreign exchange loss (gain)   2,074     40,462     (7,259 )   5,408  
Unrealized derivative loss (gain) and fair value adjustment   23,536     (25,514 )   1,821     10,033  
Share-based compensation expense (recovery)   5,349     (323 )   1,496     2,585  
Other operating costs       4,132     4,098     10,435  
Call premium on settlement of debt               9,571  
Loss on settlement of debt               4,646  
Realized gain on sale of inventory1               3,768  
Inventory write-ups to fair value that was sold or processed2       1,905     3,266     4,056  
Non-recurring other expenses for Cariboo acquisition               394  
Adjusted EBITDA   34,391     55,602     47,689     70,777  

1 Realized gain on sale of inventory relates to copper concentrate inventory held at March 25, 2024 that was written-up to fair value as part of the acquisition of control of Gibraltar and subsequently sold.  The realized portion of these gains have been added back to Adjusted EBITDA in the period the inventory was sold.

2 Inventory write-ups to net realizable value that was sold or processed relates to stockpile inventories that were written-up to fair value as part of the acquisition of control of Gibraltar.  These write-ups have been included in Adjusted EBITDA in the period when the inventories were sold or processed.

(Cdn$ in thousands)   Q1 2024     Q4 2023     Q3 2023     Q2 2023  
Net income   18,896     38,076     871     9,991  
Depletion and amortization   15,024     13,326     15,993     15,594  
Finance and accretion expense   19,849     12,804     14,285     13,468  
Finance income   (1,086 )   (972 )   (322 )   (757 )
Income tax expense   23,282     17,205     12,041     678  
Unrealized foreign exchange loss (gain)   13,688     (14,541 )   14,582     (10,966 )
Unrealized derivative loss (gain) and fair value adjustment   3,519     1,636     4,518     (6,470 )
Share-based compensation expense   5,667     1,573     727     417  
Gain on Cariboo acquisition   (47,426 )            
Gain on acquisition of control of Gibraltar1   (14,982 )            
Realized gain on sale of inventory2   13,354              
Non-recurring other expenses for Cariboo acquisition   138             263  
Adjusted EBITDA   49,923     69,107     62,695     22,218  

1 Gain on acquisition of control of Gibraltar relates to the write-up of copper concentrate inventory to fair value for Taseko’s 87.5% interest in Gibraltar at March 25, 2024.

2 Realized gain on sale of inventory relates to copper concentrate inventory held at March 25, 2024 that was written-up to fair value as part of the acquisition of control of Gibraltar, and subsequently sold.  The realized portion of these gains have been added back to Adjusted EBITDA in the period the inventory was sold.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Earnings from mining operations before depletion, amortization and non-recurring items

Earnings from mining operations before depletion, amortization and non-recurring items is earnings from mining operations with depletion and amortization, and any items that are not considered indicative of ongoing operating performance added back.  The Company discloses this measure, which has been derived from the Company's financial statements and applied on a consistent basis, to assist in understanding the results of the Company's operations and financial position, and it is meant to provide further information about the financial results to investors.

    Three months ended
March 31,
 
(Cdn$ in thousands)   2025     2024  
Earnings from mining operations   16,366     24,419  
Add:            
   Depletion and amortization   22,425     15,024  
   Realized gain on sale of inventory1       13,354  
Earnings from mining operations before depletion, amortization and non-recurring items   38,791     52,797  

1 Realized gain on sale of inventory relates to copper concentrate inventory held at March 25, 2024 that was written-up to fair value as part of the acquisition of control of Gibraltar and subsequently sold.  The realized portion of these gains have been added back to earnings from mining operations in the period the inventory was sold.

Site operating costs per ton milled

The Company discloses this measure, which has been derived from the Company's financial statements and applied on a consistent basis, to provide assistance in understanding the Company's site operations on a tons milled basis.

on a consistent basis, to provide assistance in understanding the Company’s site operations on a tons milled basis.

(Cdn$ in thousands)     Q1 2025       Q4 2024       Q3 2024       Q2 2024       Q1 20241  
Site operating costs (included in cost of sales)                                        
   Taseko’s share     68,917       100,495       107,712       79,804       79,678  
   100% basis     68,917       100,495       107,712       79,804       90,040  
Tons milled (thousand tons – 100% basis)     7,898       8,250       7,572       5,728       7,677  
Site operating costs per ton milled   $ 8.73     $ 12.18     $ 14.23     $ 13.93     $ 11.73  

1 Q1 2024 results reflect the Company’s 87.5% effective interest in Gibraltar for the period from January 1 to March 24, 2024 and 100% effective interest for the period from March 25 to March 31, 2024.


TASEKO MINES LIMITED

Management's Discussion and Analysis

 

Technical Information

The technical information contained in this MD&A related to Florence Copper is based on the report titled "NI 43-101 Technical Report - Florence Copper Project, Pinal County, Arizona" issued March 30, 2023 with an effective date of March 15, 2023, which is available on SEDAR+.  The Florence Copper technical report was prepared under the supervision of Richard Tremblay, P. Eng., MBA, Richard Weymark, P. Eng., MBA, and Robert Rotzinger, P. Eng.  Mr. Tremblay is employed by the Company as Chief Operating Officer, Mr. Weymark is employed by the Company as Vice President, Engineering, and Mr. Rotzinger is employed by the Company as Vice President, Capital Projects.  All three are Qualified Persons as defined by NI 43-101.