0001481513--12-312020FYJKSNYSEThree YearsThree YearsP5YP50YP1Yfalse0001481513us-gaap:EmployeeStockOptionMember2019-01-012019-12-310001481513us-gaap:EmployeeStockOptionMember2018-01-012018-12-310001481513us-gaap:ConvertibleNotesPayableMember2020-01-012020-12-310001481513us-gaap:ConvertibleNotesPayableMember2019-01-012019-12-310001481513jks:OtherCommonStockMember2020-12-012020-12-310001481513jks:AmericanDepositarySharesMember2020-12-012020-12-310001481513jks:OtherCommonStockMember2020-01-012020-12-310001481513jks:AmericanDepositarySharesMember2019-05-012019-05-310001481513us-gaap:PrivatePlacementMember2018-02-012018-02-280001481513jks:AmericanDepositarySharesMember2018-02-012018-02-280001481513us-gaap:PrivatePlacementMember2014-01-222014-01-220001481513jks:AmericanDepositarySharesMember2014-01-222014-01-220001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMemberus-gaap:TreasuryStockMember2020-12-310001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMemberus-gaap:RetainedEarningsUnappropriatedMember2020-12-310001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMemberus-gaap:RetainedEarningsAppropriatedMember2020-12-310001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMemberus-gaap:NoncontrollingInterestMember2020-12-310001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMemberus-gaap:CommonStockMember2020-12-310001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMemberus-gaap:AdditionalPaidInCapitalMember2020-12-310001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2020-12-310001481513us-gaap:RetainedEarningsUnappropriatedMember2020-12-310001481513us-gaap:RetainedEarningsAppropriatedMember2020-12-310001481513us-gaap:NoncontrollingInterestMember2020-12-310001481513us-gaap:AdditionalPaidInCapitalMember2020-12-310001481513us-gaap:AccumulatedOtherComprehensiveIncomeMember2020-12-310001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMember2020-12-310001481513us-gaap:RetainedEarningsUnappropriatedMember2019-12-310001481513us-gaap:RetainedEarningsAppropriatedMember2019-12-310001481513us-gaap:NoncontrollingInterestMember2019-12-310001481513us-gaap:AdditionalPaidInCapitalMember2019-12-310001481513us-gaap:AccumulatedOtherComprehensiveIncomeMember2019-12-310001481513us-gaap:RetainedEarningsUnappropriatedMember2018-12-310001481513us-gaap:RetainedEarningsAppropriatedMember2018-12-310001481513us-gaap:NoncontrollingInterestMember2018-12-310001481513us-gaap:AdditionalPaidInCapitalMember2018-12-310001481513us-gaap:AccumulatedOtherComprehensiveIncomeMember2018-12-310001481513us-gaap:RetainedEarningsUnappropriatedMember2017-12-310001481513us-gaap:RetainedEarningsAppropriatedMember2017-12-310001481513us-gaap:NoncontrollingInterestMember2017-12-310001481513us-gaap:AdditionalPaidInCapitalMember2017-12-310001481513us-gaap:AccumulatedOtherComprehensiveIncomeMember2017-12-310001481513us-gaap:TradeAccountsReceivableMemberjks:LoanFourMemberus-gaap:FinancialGuaranteeMemberus-gaap:InventoriesMember2020-12-310001481513us-gaap:TradeAccountsReceivableMemberjks:LoanTwoMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:ZhejiangJinkoMemberjks:LoanOneMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:ZhejiangJinkoAndShareholdersOfGroupMemberjks:LoanSevenMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:ZhejiangJinkoAndJiangxiHejiMemberjks:LoanSevenMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:ShareholdersOfGroupMemberjks:LoanSevenMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:LoanThreeMemberus-gaap:AssetPledgedAsCollateralMemberus-gaap:InventoriesMember2020-12-310001481513jks:LoanSixMemberus-gaap:FinancialGuaranteeMemberus-gaap:UseRightsMember2020-12-310001481513jks:LoanSevenMemberus-gaap:FinancialGuaranteeMemberus-gaap:InventoriesMember2020-12-310001481513jks:LoanFiveMemberus-gaap:FinancialGuaranteeMemberjks:BuildingAndEquipmentMember2020-12-310001481513jks:JinkosolarHoldingMemberjks:LoanSevenMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:JiangxiJinkoMemberjks:LoanSevenMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:ZhejiangJinkoMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:ZhejiangJinkoAndShareholdersOfGroupMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:ZhejiangJinkoAndJiangxiHejiMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:ShareholdersOfGroupMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:JinkosolarHoldingMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:JinkosolarHoldingAndZhejiangJinkoMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:JinkosolarHoldingAndShareholdersMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:JinkosolarHoldingAndJiangxiJinkoMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513jks:JiangxiJinkoMemberus-gaap:FinancialGuaranteeMember2020-12-310001481513us-gaap:LineOfCreditMember2020-12-310001481513us-gaap:LetterOfCreditMember2020-12-310001481513jks:RevolvingLoanFacilityMember2020-12-310001481513jks:GuaranteedByZhejiangJinkoMember2020-12-310001481513jks:GuaranteedByZhejiangJinkoAndShareholdersMember2020-12-310001481513jks:GuaranteedByZhejiangJinkoAndJiangxiHejiMember2020-12-310001481513jks:GuaranteedByShareholdersOfGroupMember2020-12-310001481513jks:GuaranteedByJinkoSolarHoldingMember2020-12-310001481513jks:GuaranteedByJinkoSolarHoldingAndZhejiangJinkoMember2020-12-310001481513jks:GuaranteedByJinkosolarHoldingAndShareholdersMember2020-12-310001481513jks:GuaranteedByJinkoSolarHoldingAndJiangxiJinkoMember2020-12-310001481513jks:GuaranteedByJiangxiJinkoMember2020-12-310001481513jks:GuaranteedAndCollateralizeOnBuildingsEquipmentAndOtherAssetsOfTheGroupMember2020-12-310001481513jks:FinancingsAssociatedWithFailedSaleLeaseBackTransactionsMember2020-12-310001481513jks:DebtScenarioTwoMember2020-12-310001481513jks:DebtScenarioThreeMember2020-12-310001481513jks:DebtScenarioOneMember2020-12-310001481513jks:DebtScenarioFourMember2020-12-310001481513jks:RevolvingLoanFacilityMember2019-12-310001481513us-gaap:TreasuryStockMember2020-12-310001481513us-gaap:CommonStockMember2020-12-310001481513us-gaap:TreasuryStockMember2019-12-310001481513us-gaap:CommonStockMember2019-12-310001481513us-gaap:TreasuryStockMember2018-12-310001481513us-gaap:CommonStockMember2018-12-310001481513us-gaap:TreasuryStockMember2017-12-310001481513us-gaap:CommonStockMember2017-12-310001481513us-gaap:PrivatePlacementMember2019-05-310001481513us-gaap:PrivatePlacementMember2018-02-280001481513jks:EquityIncentivePlan2021Memberus-gaap:SubsequentEventMember2021-03-050001481513jks:LongTermIncentivePlan2014Member2014-08-310001481513jks:LongTermIncentivePlan2009Member2009-07-310001481513jks:LongTermIncentivePlan2014Member2014-08-012014-08-310001481513jks:LongTermIncentivePlan2009Member2009-08-012009-08-310001481513us-gaap:ShareBasedPaymentArrangementEmployeeMemberjks:LongTermIncentivePlan2009Member2009-08-012009-08-310001481513srt:MinimumMember2016-01-012016-12-310001481513srt:MaximumMember2016-01-012016-12-310001481513srt:MinimumMember2015-01-012015-12-310001481513srt:MaximumMember2015-01-012015-12-310001481513jks:FinancingsAssociatedWithFailedSaleLeaseBackTransactionsMember2020-01-012020-12-310001481513jks:FinancingsAssociatedWithFailedSaleLeaseBackTransactionsMember2019-01-012019-12-3100014815132018-01-012018-01-3100014815132017-07-012017-07-3100014815132017-05-012017-05-310001481513jks:RenesolaMember2020-01-012020-12-310001481513jks:SweihanPvMember2019-01-012019-12-310001481513jks:RenesolaMember2019-01-012019-12-310001481513jks:SweihanPvMember2018-01-012018-12-310001481513jks:RenesolaMember2018-01-012018-12-310001481513us-gaap:ElectricityGenerationMemberjks:CapitalizedProjectCostsMember2020-01-012020-12-310001481513srt:NorthAmericaMember2020-01-012020-12-310001481513srt:EuropeMember2020-01-012020-12-310001481513srt:AsiaPacificMember2020-01-012020-12-310001481513jks:ThirdPartyMember2020-01-012020-12-310001481513jks:SolarModulesMember2020-01-012020-12-310001481513jks:SolarCellsMember2020-01-012020-12-310001481513jks:SiliconWafersMember2020-01-012020-12-310001481513jks:SalesOfSolarProjectsMember2020-01-012020-12-310001481513jks:RestOfWorldMember2020-01-012020-12-310001481513jks:RelatedPartyMember2020-01-012020-12-310001481513jks:OtherSolarMaterialMember2020-01-012020-12-310001481513jks:GeneratedElectricityMember2020-01-012020-12-310001481513us-gaap:ElectricityGenerationMemberjks:CapitalizedProjectCostsMember2019-01-012019-12-310001481513srt:NorthAmericaMember2019-01-012019-12-310001481513srt:EuropeMember2019-01-012019-12-310001481513srt:AsiaPacificMember2019-01-012019-12-310001481513jks:ThirdPartyMember2019-01-012019-12-310001481513jks:SolarModulesMember2019-01-012019-12-310001481513jks:SolarCellsMember2019-01-012019-12-310001481513jks:SiliconWafersMember2019-01-012019-12-310001481513jks:SalesOfSolarProjectsMember2019-01-012019-12-310001481513jks:RestOfWorldMember2019-01-012019-12-310001481513jks:RelatedPartyMember2019-01-012019-12-310001481513jks:OtherSolarMaterialMember2019-01-012019-12-310001481513jks:GeneratedElectricityMember2019-01-012019-12-310001481513srt:NorthAmericaMember2018-01-012018-12-310001481513srt:EuropeMember2018-01-012018-12-310001481513srt:AsiaPacificMember2018-01-012018-12-310001481513jks:ThirdPartyMember2018-01-012018-12-310001481513jks:SolarModulesMember2018-01-012018-12-310001481513jks:SolarCellsMember2018-01-012018-12-310001481513jks:SiliconWafersMember2018-01-012018-12-310001481513jks:SalesOfSolarProjectsMember2018-01-012018-12-310001481513jks:RestOfWorldMember2018-01-012018-12-310001481513jks:RelatedPartyMember2018-01-012018-12-310001481513jks:OtherSolarMaterialMember2018-01-012018-12-310001481513jks:GeneratedElectricityMember2018-01-012018-12-310001481513srt:CumulativeEffectPeriodOfAdoptionAdjustmentMemberus-gaap:AccountingStandardsUpdate201409Member2018-01-010001481513jks:JiangxiDesunEnergyCompanyLimitedMember2020-01-012020-12-310001481513jks:JiangxiDesunEnergyCompanyLimitedMember2019-01-012019-12-310001481513jks:JiangxiDesunEnergyCompanyLimitedMember2018-01-012018-12-310001481513us-gaap:AccountingStandardsUpdate201613Member2020-01-012020-12-310001481513srt:MinimumMemberus-gaap:VehiclesMember2020-01-012020-12-310001481513srt:MinimumMemberus-gaap:MachineryAndEquipmentMember2020-01-012020-12-310001481513srt:MinimumMemberus-gaap:FurnitureAndFixturesMember2020-01-012020-12-310001481513srt:MaximumMemberus-gaap:VehiclesMember2020-01-012020-12-310001481513srt:MaximumMemberus-gaap:MachineryAndEquipmentMember2020-01-012020-12-310001481513srt:MaximumMemberus-gaap:FurnitureAndFixturesMember2020-01-012020-12-310001481513us-gaap:BuildingMember2020-01-012020-12-310001481513jks:MachineryAndEquipmentUnderLeaseMember2020-01-012020-12-310001481513jks:MachineryAndEquipmentUnderLeaseMember2018-05-310001481513jks:MachineryAndEquipmentUnderLeaseMember2017-11-300001481513us-gaap:VehiclesMember2020-12-310001481513us-gaap:MachineryAndEquipmentMember2020-12-310001481513us-gaap:FurnitureAndFixturesMember2020-12-310001481513us-gaap:VehiclesMember2019-12-310001481513us-gaap:MachineryAndEquipmentMember2019-12-310001481513us-gaap:FurnitureAndFixturesMember2019-12-310001481513us-gaap:BuildingMember2019-12-310001481513jks:ZhejiangJinkoFinancialLeasingMember2020-01-012020-12-310001481513jks:ZhejiangJinkoFinancialLeasingMember2019-01-012019-12-3100014815132020-07-012020-09-300001481513jks:ConvertibleNotes2024Member2020-01-012020-12-310001481513jks:AtMarketOfferingMember2020-01-012020-12-310001481513jks:SweihansolarHoldingCompanyLimitedMember2020-01-012020-12-310001481513jks:JinkoHuinengTechnologyServicesCoLtdMember2020-10-012020-12-310001481513us-gaap:UseRightsMember2020-12-310001481513us-gaap:TradeAccountsReceivableMember2020-12-310001481513us-gaap:InventoriesMember2020-12-310001481513us-gaap:EquipmentMember2020-12-310001481513us-gaap:BuildingMember2020-12-310001481513jks:BankDepositGuaranteedMember2020-12-310001481513jks:JinkoPowerCoLtdMember2019-04-012019-04-300001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarSichuanCo.Ltd.Member2020-12-012020-12-310001481513jks:JinkosolarInternationalDevelopmentLimitedMember2020-10-012020-10-310001481513jks:RuiXuCoLtd.RuiXuMember2020-04-012020-06-300001481513jks:GovernmentBackgroundCompaniesMemberjks:ShangraoJinkosolarTechnologyLimited.JinkoShangraoMember2020-04-012020-04-300001481513jks:JinkoSolarCompanyLimitedMemberjks:GovernmentBackgroundCompaniesMember2020-01-012020-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:ShangraoJinkosolarTechnologyLimited.JinkoShangraoMember2020-01-012020-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarYiwuCo.Ltd.Member2020-01-012020-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarYiwuCo.Ltd.Member2020-01-012020-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarSichuanCo.Ltd.Member2020-01-012020-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarChuzhouCo.Ltd.Member2020-01-012020-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarYiwuCo.Ltd.Member2019-01-012019-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarChuzhouCo.Ltd.Member2019-01-012019-12-310001481513jks:JinkosolarSichuanCo.Ltd.Member2019-01-012019-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarTechnologyHainingCoMember2018-07-012018-09-300001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarTechnologyHainingCoMember2018-07-012018-09-300001481513jks:PoyangLuohongMember2018-07-012018-09-300001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarTechnologyHainingCoMember2018-04-012018-06-300001481513jks:GovernmentBackgroundCompaniesMemberjks:JinkosolarTechnologyHainingCoMember2018-04-012018-06-3000014815132012-05-012012-05-3100014815132019-05-012019-05-3100014815132018-02-012018-02-280001481513jks:JinkotianshengMember2020-01-012020-12-310001481513jks:JinkotianshengMember2019-01-012019-12-310001481513jks:JinkotianshengMember2018-01-012018-12-310001481513jks:JinkosolarInternationalDevelopmentLimitedMember2020-01-012020-12-310001481513jks:ZhejiangNewMaterialsCo.Ltd.Member2020-12-310001481513jks:ZhejiangJinkoSolarTradingCompanyLimitedMember2020-12-310001481513jks:ZhejiangJinkoSolarCompanyLimitedMember2020-12-310001481513jks:YuhuanJinkoSolarMember2020-12-310001481513jks:YiwuNewMaterialsCo.Ltd.Member2020-12-310001481513jks:XinjiangJinkoSolarMember2020-12-310001481513jks:WideWealthGroupHoldingLimitedMember2020-12-310001481513jks:ShangraoJinkosolarTechnologyLimited.JinkoShangraoMember2020-12-310001481513jks:RuiXuCo.Ltd.RuiXuMember2020-12-310001481513jks:PoyangRuixinInformationTechnologyCoLtdMember2020-12-310001481513jks:JinkosolarYiwuCo.Ltd.Member2020-12-310001481513jks:JinkosolarVietnamCo.Ltd.Member2020-12-310001481513jks:JinkosolarUsIndustrialIncMember2020-12-310001481513jks:JinkoSolarUsIncMember2020-12-310001481513jks:JinkoSolarUsHoldingsIncMember2020-12-310001481513jks:JinkosolarTradingPrivatedLimtedMember2020-12-310001481513jks:JinkoSolarTechnologyMalaysiaMember2020-12-310001481513jks:JinkoSolarTechnologyLimitedMember2020-12-310001481513jks:JinkosolarTechnologyHainingCoMember2020-12-310001481513jks:JinkoSolarSwitzerlandMember2020-12-310001481513jks:JinkosolarSichuanCo.Ltd.Member2020-12-310001481513jks:JinkoSolarShanghaiManagementCo.LtdMember2020-12-310001481513jks:JinkosolarQinghaiCo.Ltd.Member2020-12-310001481513jks:JinkosolarMiddleEastDmccMember2020-12-310001481513jks:JinkoSolarMalaysiaSdnBhdMember2020-12-310001481513jks:JinkosolarLatamHoldingLimitedMember2020-12-310001481513jks:JinkoSolarKoreaCo.Ltd.Member2020-12-310001481513jks:JinkoSolarJapanKKMember2020-12-310001481513jks:JinkoSolarItalySrlMember2020-12-310001481513jks:JinkosolarInternationalDevelopmentLimitedMember2020-12-310001481513jks:JinkoSolarImportAndExportCompanyLimitedMember2020-12-310001481513jks:JinkosolarHouseholdPvSystemLtdMember2020-12-310001481513jks:JinkosolarHongKongLimitedMember2020-12-310001481513jks:JinkoSolarGmbhMember2020-12-310001481513jks:JinkoSolarDenmarkApsMember2020-12-310001481513jks:JinkoSolarCompanyLimitedMember2020-12-310001481513jks:JinkosolarChuzhouCo.Ltd.Member2020-12-310001481513jks:JinkosolarChuxiongCo.Ltd.Member2020-12-310001481513jks:JinkoSolarCanadaCoLtdMember2020-12-310001481513jks:JinkoSolarAustraliaHoldingsCoPtyLtdMember2020-12-310001481513jks:JinkoPvMaterialSupplySdn.BhdMember2020-12-310001481513jks:JinkoPowerInternationalHongkongLimitedMember2020-12-310001481513jks:JiangxiPhotovoltaicMaterialsCompanyLimitedMember2020-12-310001481513jks:CantonBestLimitedMember2020-12-310001481513jks:JiangxiJinkoMemberjks:JinkosolarInternationalDevelopmentLimitedMember2020-10-310001481513jks:JiangxiJinkoMember2020-10-310001481513jks:JinkosolarTechnologyHainingCoMember2019-12-310001481513jks:RequestForArbitrationSubmittedByMfsMember2020-09-032020-09-030001481513jks:CaseAgainstWuxiZhongcaiMember2020-07-032020-07-030001481513jks:JinkoSolarSwitzerlandMember2019-07-012019-07-310001481513jks:JiangxiJinkoMember2019-07-012019-07-310001481513jks:JinkosolarYiwuCo.Ltd.Member2020-09-300001481513jks:JinkosolarTechnologyHainingCoMember2020-09-300001481513jks:JinkosolarChuzhouCo.Ltd.Member2020-09-300001481513jks:OtherLongTermDebtMember2020-12-310001481513jks:LoanAgreementWithPingInternationalFinancialLeasingCo.LtdMember2020-12-310001481513jks:JinkosolarYiwuCo.Ltd.Member2020-12-310001481513jks:JinkosolarTechnologyHainingCoMember2020-12-310001481513jks:JinkosolarSichuanCo.Ltd.Member2020-12-310001481513jks:JinkosolarChuzhouCo.Ltd.Member2020-12-310001481513jks:FinancingsAssociatedWithFailedSaleLeaseBackTransactionsMember2019-12-3100014815132020-01-012020-09-300001481513srt:MinimumMember2020-12-310001481513srt:MaximumMember2020-12-310001481513jks:ConstructionProjectsOfContinuingOperationMember2020-01-012020-12-310001481513jks:ConstructionProjectsOfContinuingOperationMember2019-01-012019-12-310001481513jks:ConstructionProjectsOfContinuingOperationMember2018-01-012018-12-310001481513us-gaap:EmployeeStockOptionMember2020-01-012020-12-310001481513jks:OtherCountriesMember2020-01-012020-12-310001481513country:KY2020-01-012020-12-310001481513country:CN2020-01-012020-12-310001481513jks:OtherCountriesMember2019-01-012019-12-310001481513country:KY2019-01-012019-12-310001481513country:CN2019-01-012019-12-310001481513jks:OtherCountriesMember2018-01-012018-12-310001481513country:KY2018-01-012018-12-310001481513country:CN2018-01-012018-12-310001481513jks:JiangxiDesunEnergyCompanyLimitedMember2020-12-310001481513jks:ZhejiangJinkoFinancialLeasingMember2016-10-012016-12-310001481513jks:ConvertibleNotes2024Member2019-01-012019-12-310001481513jks:ConvertibleNotes2024Member2018-01-012018-12-310001481513us-gaap:TrademarksMember2020-12-310001481513us-gaap:ComputerSoftwareIntangibleAssetMember2020-12-310001481513us-gaap:TrademarksMember2019-12-310001481513us-gaap:ComputerSoftwareIntangibleAssetMember2019-12-310001481513jks:CappedCallOptionsMember2020-01-012020-12-310001481513jks:CappedCallOptionsMember2019-01-012019-12-310001481513jks:CappedCallOptionsMember2018-01-012018-12-310001481513us-gaap:InterestRateSwapMember2017-12-310001481513us-gaap:BorrowingsMember2020-12-310001481513us-gaap:BorrowingsMember2019-12-310001481513us-gaap:BorrowingsMember2018-12-310001481513us-gaap:BorrowingsMember2017-12-310001481513us-gaap:InterestRateCapMember2020-12-310001481513us-gaap:InterestRateCapMember2019-12-310001481513us-gaap:CallOptionMember2019-12-310001481513us-gaap:InterestRateCapMember2018-12-310001481513us-gaap:CallOptionMember2018-12-310001481513us-gaap:InterestRateCapMember2017-12-310001481513us-gaap:ForeignExchangeOptionMember2017-12-310001481513us-gaap:CallOptionMember2017-12-310001481513us-gaap:FairValueInputsLevel3Member2020-01-012020-12-3100014815132017-01-012019-12-310001481513jks:HirasawaPowerMember2018-01-012018-03-310001481513jks:JinkotianshengMember2020-12-310001481513jks:JinkotianshengMember2019-12-310001481513jks:JinkosolarInternationalDevelopmentLimitedMember2020-10-310001481513jks:ShangraoJinkosolarTechnologyLimited.JinkoShangraoMember2020-04-300001481513jks:PoyangLuohongMember2018-09-300001481513jks:JinkotianshengMember2017-03-300001481513jks:SweihanPvPowerCompanyMember2017-02-260001481513jks:JinkoPowerCoLtdMember2017-02-260001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMemberjks:ConvertibleSeniorNotes2016Member2020-01-012020-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMemberjks:CappedCallOptionsMember2020-01-012020-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMemberjks:CappedCallOptionsMember2019-01-012019-12-310001481513srt:ScenarioForecastMembercountry:CNjks:EnterpriseInEncouragedIndustryMember2022-01-012022-12-310001481513srt:ScenarioForecastMembercountry:CNjks:EnterpriseInEncouragedIndustryMember2021-01-012021-12-310001481513srt:MinimumMembercountry:HK2020-01-012020-12-310001481513country:CNjks:YuhuanJinkoAndHainingJinkoMember2020-01-012020-12-310001481513country:CNjks:EnterpriseInEncouragedIndustryMember2020-01-012020-12-310001481513stpr:CA2020-01-012020-12-310001481513country:PT2020-01-012020-12-310001481513country:MY2020-01-012020-12-310001481513country:MX2020-01-012020-12-310001481513country:JP2020-01-012020-12-310001481513country:IT2020-01-012020-12-310001481513country:DE2020-01-012020-12-310001481513country:CH2020-01-012020-12-310001481513country:BR2020-01-012020-12-310001481513country:AU2020-01-012020-12-310001481513country:CNjks:YuhuanJinkoAndHainingJinkoMember2019-01-012019-12-310001481513country:CNjks:EnterpriseInEncouragedIndustryMember2019-01-012019-12-310001481513country:CN2019-01-012019-12-310001481513country:CNjks:EnterpriseInEncouragedIndustryMember2018-01-012018-12-310001481513country:CN2018-01-012018-12-310001481513srt:MinimumMembercountry:US2017-01-012017-12-310001481513srt:MaximumMembercountry:US2017-01-012017-12-310001481513country:US2017-01-012017-12-310001481513country:CN2008-01-012008-01-010001481513jks:PoyangLuohongMember2019-10-012019-12-310001481513jks:JinkoSolarSouthAfricaMember2018-10-012018-12-310001481513us-gaap:InterestRateSwapMember2020-12-310001481513us-gaap:ForwardContractsMember2020-12-310001481513us-gaap:InterestRateSwapMember2019-12-310001481513us-gaap:ForwardContractsMember2019-12-310001481513us-gaap:InterestRateSwapMember2018-12-310001481513us-gaap:ForeignExchangeOptionMember2018-12-310001481513srt:MaximumMemberus-gaap:ForeignExchangeOptionMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MeasurementInputRiskFreeInterestRateMember2020-12-310001481513us-gaap:ForeignExchangeOptionMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MeasurementInputPriceVolatilityMember2020-12-310001481513us-gaap:CallOptionMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MeasurementInputSharePriceMember2020-12-310001481513us-gaap:BorrowingsMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MeasurementInputRiskFreeInterestRateMember2020-12-310001481513us-gaap:BorrowingsMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MeasurementInputPriceVolatilityMember2020-12-310001481513us-gaap:BorrowingsMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MeasurementInputDiscountRateMember2020-12-310001481513srt:MinimumMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MeasurementInputRiskFreeInterestRateMember2020-12-310001481513jks:GuaranteeLiabilitiesMemberus-gaap:FairValueInputsLevel3Memberus-gaap:MeasurementInputDiscountRateMember2020-12-310001481513us-gaap:ForwardContractsMember2020-01-012020-12-310001481513us-gaap:ForwardContractsMember2019-01-012019-12-310001481513us-gaap:ForwardContractsMember2018-01-012018-12-310001481513us-gaap:InterestRateSwapMember2020-01-012020-12-310001481513us-gaap:ForwardContractsMember2020-01-012020-12-310001481513us-gaap:ForeignExchangeOptionMember2020-01-012020-12-310001481513us-gaap:ForeignExchangeForwardMember2020-01-012020-12-310001481513us-gaap:EmbeddedDerivativeFinancialInstrumentsMember2020-01-012020-12-310001481513jks:TotalMember2020-01-012020-12-310001481513jks:ConvertibleSeniorNotesAndCappedCallOptionsMember2020-01-012020-12-310001481513us-gaap:InterestRateSwapMember2019-01-012019-12-310001481513us-gaap:ForwardContractsMember2019-01-012019-12-310001481513us-gaap:ForeignExchangeOptionMember2019-01-012019-12-310001481513us-gaap:ForeignExchangeForwardMember2019-01-012019-12-310001481513us-gaap:EmbeddedDerivativeFinancialInstrumentsMember2019-01-012019-12-310001481513jks:TotalMember2019-01-012019-12-310001481513jks:ConvertibleSeniorNotesAndCappedCallOptionsMember2019-01-012019-12-310001481513us-gaap:InterestRateSwapMember2018-01-012018-12-310001481513us-gaap:ForwardContractsMember2018-01-012018-12-310001481513us-gaap:ForeignExchangeOptionMember2018-01-012018-12-310001481513us-gaap:ForeignExchangeForwardMember2018-01-012018-12-310001481513us-gaap:EmbeddedDerivativeFinancialInstrumentsMember2018-01-012018-12-310001481513jks:TotalMember2018-01-012018-12-310001481513us-gaap:CallOptionMember2020-12-310001481513us-gaap:ForeignExchangeForwardMemberus-gaap:FairValueInputsLevel2Memberus-gaap:FairValueMeasurementsRecurringMember2020-12-310001481513us-gaap:CallOptionMemberus-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2020-12-310001481513us-gaap:ForeignExchangeForwardMemberus-gaap:FairValueMeasurementsRecurringMember2020-12-310001481513us-gaap:CallOptionMemberus-gaap:FairValueMeasurementsRecurringMember2020-12-310001481513us-gaap:ForeignExchangeForwardMemberus-gaap:FairValueInputsLevel2Memberus-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513us-gaap:ForeignExchangeForwardMemberus-gaap:FairValueInputsLevel1Memberus-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513us-gaap:CallOptionMemberus-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513us-gaap:CallOptionMemberus-gaap:FairValueInputsLevel1Memberus-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513us-gaap:ForeignExchangeForwardMemberus-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513us-gaap:CallOptionMemberus-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMemberjks:ConvertibleSeniorNotes2016Member2019-01-012019-12-310001481513jks:LoanAgreementWithPingInternationalFinancialLeasingCo.LtdMember2020-07-012020-07-310001481513jks:JiangxiJinkoLoanAgreementWithShangraoChangxiTradeCo.LtdMember2020-02-012020-02-290001481513jks:LoanAgreementWithChinaEverbrightBankMember2020-01-012020-12-310001481513jks:ConsortiumLoanOneMember2020-01-012020-12-310001481513jks:RuiXuSLoanAgreementWithGovernmentBackgroundCompanyMember2020-01-012020-01-310001481513jks:LoanAgreementWithChinaEverbrightBankMember2019-01-012019-12-310001481513jks:AgreementWithChinaCiticBankMember2019-01-012019-12-310001481513jks:LoanAgreementWithCreditSuisseAgMember2018-01-012018-12-310001481513jks:ConsortiumLoanTwoMember2018-01-012018-12-310001481513jks:LoanAgreementWithCreditSuisseAgMember2017-01-012017-12-310001481513jks:GuochuangInvestmentMember2017-01-012017-12-310001481513jks:ChinaMerchantsBankMember2016-01-012016-12-310001481513jks:ConvertibleSeniorNotes2019Member2019-12-310001481513jks:ConvertibleSeniorNotes2019Member2017-12-310001481513jks:ConvertibleSeniorNotes2019Member2016-12-310001481513jks:ConvertibleSeniorNotes2019Member2017-02-012017-02-010001481513jks:ConvertibleSeniorNotes2019Member2019-01-012019-12-310001481513jks:ConvertibleSeniorNotes2019Member2017-01-012017-12-310001481513jks:ConvertibleSeniorNotes2019Member2016-01-012016-12-310001481513jks:GovernmentBackgroundCompaniesMemberjks:ShangraoJinkosolarTechnologyLimited.JinkoShangraoMember2020-12-310001481513jks:LoanTwoMember2020-12-310001481513jks:LoanOneMember2020-12-310001481513jks:LoanAgreementWithPingInternationalFinancialLeasingCo.LtdMember2020-07-310001481513jks:JiangxiJinkoLoanAgreementWithShangraoChangxiTradeCo.LtdMember2020-02-290001481513jks:RuiXuSLoanAgreementWithGovernmentBackgroundCompanyMember2020-01-310001481513jks:LoanTwoMember2019-12-310001481513jks:LoanOneMember2019-12-310001481513jks:LoanAgreementWithTheExportImportBankOfChinaMember2019-12-310001481513jks:AgreementWithChinaCiticBankMember2019-12-310001481513jks:ConvertibleNotes2024Member2019-05-170001481513jks:SevenYearLoanAgreementMember2018-12-310001481513jks:LoanAgreementWithCreditSuisseAgMember2018-12-310001481513jks:ConsortiumLoanTwoMember2018-12-310001481513jks:LoanAgreementWithCreditSuisseAgMember2017-12-310001481513jks:GuochuangInvestmentMember2017-12-3100014815132017-07-170001481513jks:ChinaMerchantsBankMember2016-12-310001481513jks:ConvertibleSeniorNotes2019Member2014-01-220001481513jks:ConsortiumLoanOneMember2019-01-012019-12-310001481513jks:ConsortiumLoanThreeMember2018-01-012018-12-310001481513jks:LoanAgreementWithChinaEverbrightBankMember2020-12-310001481513jks:ConsortiumLoanTwoMember2020-12-310001481513jks:ChinaMerchantsBankMember2020-12-310001481513jks:LoanAgreementWithChinaEverbrightBankMember2019-12-310001481513jks:ConsortiumLoanThreeMember2019-12-310001481513jks:ConsortiumLoanOneMember2019-12-310001481513srt:MinimumMemberus-gaap:LondonInterbankOfferedRateLIBORMember2020-01-012020-12-310001481513srt:MaximumMemberus-gaap:LondonInterbankOfferedRateLIBORMember2020-01-012020-12-310001481513jks:SaleOfProjectsMemberus-gaap:AccountingStandardsUpdate201409Member2018-01-012018-12-310001481513jks:SaleOfProjectsMemberus-gaap:AccountingStandardsUpdate201409Member2018-01-012018-03-310001481513us-gaap:ShippingAndHandlingMember2020-01-012020-12-310001481513us-gaap:ElectricityMember2020-01-012020-12-310001481513us-gaap:ShippingAndHandlingMember2019-01-012019-12-310001481513us-gaap:ElectricityMember2019-01-012019-12-310001481513us-gaap:ShippingAndHandlingMember2018-01-012018-12-310001481513us-gaap:ElectricityMember2018-01-012018-12-310001481513us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2020-12-310001481513us-gaap:FairValueMeasurementsRecurringMember2020-12-310001481513jks:ConvertibleNotes2024Member2019-12-310001481513jks:ConvertibleNotes2024Member2018-12-310001481513us-gaap:SalesRevenueNetMemberjks:ForeignCurrencyConcentrationRiskMember2020-01-012020-12-310001481513us-gaap:SalesRevenueNetMember2020-01-012020-12-310001481513us-gaap:AccountsReceivableMember2020-01-012020-12-310001481513us-gaap:SalesRevenueNetMember2019-01-012019-12-310001481513us-gaap:AccountsReceivableMember2019-01-012019-12-310001481513us-gaap:SalesRevenueNetMember2018-01-012018-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMember2018-01-012018-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMember2018-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMember2017-12-310001481513jks:PoyangLuohongMemberjks:JinkoSolarSouthAfricaMember2019-12-310001481513jks:JinkoSolarSouthAfricaMember2018-12-3100014815132012-05-310001481513us-gaap:AccountingStandardsUpdate201613Member2019-12-310001481513us-gaap:AccountingStandardsUpdate201613Member2018-12-310001481513jks:AccountsReceivablesNonCurrentMember2020-01-012020-12-310001481513jks:AccountsReceivablesCurrentMember2020-01-012020-12-310001481513jks:AccountsReceivablesNonCurrentMember2019-01-012019-12-310001481513jks:AccountsReceivablesCurrentMember2019-01-012019-12-310001481513jks:AccountsReceivablesNonCurrentMember2018-01-012018-12-310001481513jks:AccountsReceivablesCurrentMember2018-01-012018-12-310001481513jks:AccountsReceivablesNonCurrentMemberus-gaap:AccountingStandardsUpdate201613Member2020-12-310001481513jks:AccountsReceivablesCurrentMemberus-gaap:AccountingStandardsUpdate201613Member2020-12-310001481513jks:AccountsReceivablesNonCurrentMember2020-12-310001481513jks:AccountsReceivablesCurrentMember2020-12-310001481513jks:AccountsReceivablesNonCurrentMemberus-gaap:AccountingStandardsUpdate201613Member2019-12-310001481513jks:AccountsReceivablesCurrentMemberus-gaap:AccountingStandardsUpdate201613Member2019-12-310001481513jks:AccountsReceivablesNonCurrentMember2019-12-310001481513jks:AccountsReceivablesCurrentMember2019-12-310001481513jks:AccountsReceivablesNonCurrentMemberus-gaap:AccountingStandardsUpdate201613Member2018-12-310001481513jks:AccountsReceivablesCurrentMemberus-gaap:AccountingStandardsUpdate201613Member2018-12-310001481513jks:AccountsReceivablesNonCurrentMember2018-12-310001481513jks:AccountsReceivablesCurrentMember2018-12-310001481513jks:AccountsReceivablesNonCurrentMember2017-12-310001481513jks:AccountsReceivablesCurrentMember2017-12-310001481513us-gaap:SellingAndMarketingExpenseMember2020-01-012020-12-310001481513us-gaap:ResearchAndDevelopmentExpenseMember2020-01-012020-12-310001481513us-gaap:GeneralAndAdministrativeExpenseMember2020-01-012020-12-310001481513us-gaap:CostOfSalesMember2020-01-012020-12-310001481513us-gaap:SellingAndMarketingExpenseMember2019-01-012019-12-310001481513us-gaap:ResearchAndDevelopmentExpenseMember2019-01-012019-12-310001481513us-gaap:GeneralAndAdministrativeExpenseMember2019-01-012019-12-310001481513us-gaap:CostOfSalesMember2019-01-012019-12-310001481513us-gaap:SellingAndMarketingExpenseMember2018-01-012018-12-310001481513us-gaap:ResearchAndDevelopmentExpenseMember2018-01-012018-12-310001481513us-gaap:GeneralAndAdministrativeExpenseMember2018-01-012018-12-310001481513us-gaap:CostOfSalesMember2018-01-012018-12-310001481513jks:LeasedAssetsMember2020-12-310001481513jks:LeasedAssetsMember2019-12-3100014815132013-12-3100014815132012-12-310001481513jks:SweihanSolarHoldingCompanyMember2020-12-310001481513jks:JiangxiJinkoEngineeringForSalesOfSolarModulesAndOthersMember2020-12-310001481513jks:SweihanSolarHoldingCompanyMember2019-12-310001481513jks:JiangxiJinkoEngineeringForSalesOfSolarModulesAndOthersMember2019-12-310001481513jks:JinkoTianshengMemberMember2020-12-310001481513jks:JinkoTianshengMemberMember2019-12-310001481513jks:JinkoSolarPowerEngineeringGroupLimitedMember2019-12-3100014815132019-05-3100014815132018-02-280001481513us-gaap:EmployeeStockOptionMember2014-10-102014-10-1000014815132014-08-012014-08-3100014815132018-01-3100014815132017-07-3100014815132017-05-310001481513srt:MinimumMemberjks:FinancingsAssociatedWithFailedSaleLeaseBackTransactionsMember2019-01-012019-12-310001481513srt:MaximumMemberjks:FinancingsAssociatedWithFailedSaleLeaseBackTransactionsMember2019-01-012019-12-310001481513jks:JiangxiJinkoEngineeringMember2020-01-012020-12-310001481513jks:JiangxiJinkoEngineeringMember2019-01-012019-12-310001481513jks:JiangxiJinkoEngineeringMember2018-01-012018-12-310001481513jks:SweihanPvMember2020-01-012020-12-310001481513srt:ScenarioForecastMembercountry:CNjks:HighAndNewTechnologyEnterpriseMember2022-01-012022-12-310001481513srt:ScenarioForecastMembercountry:CNjks:HighAndNewTechnologyEnterpriseMember2021-01-012021-12-310001481513country:US2020-01-012020-12-310001481513country:US2019-01-012019-12-310001481513jks:SalesOfSolarProjectsMember2020-03-012020-03-310001481513jks:JinkoPowerCoLtdMember2020-01-012020-12-310001481513jks:JinkoPowerCoLtdMember2019-01-012019-12-310001481513jks:JinkoPowerCoLtdMember2018-01-012018-12-310001481513us-gaap:ForeignExchangeOptionMember2020-01-012020-12-310001481513us-gaap:ForeignExchangeOptionMember2019-01-012019-12-310001481513us-gaap:ForeignExchangeOptionMember2018-01-012018-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMember2020-01-012020-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMember2019-01-012019-12-310001481513us-gaap:AccountingStandardsUpdate201613Member2020-12-310001481513us-gaap:ForeignExchangeOptionMember2020-12-310001481513us-gaap:ForeignExchangeOptionMember2019-12-310001481513srt:MinimumMember2018-01-012018-01-010001481513srt:MaximumMember2018-01-012018-01-010001481513jks:ConvertibleSeniorNotes2019Member2020-01-012020-12-310001481513jks:ConvertibleNotes2024Member2020-01-012020-12-310001481513jks:JiangxiJinkoEngineeringForOutsourcingServicesMember2020-12-310001481513jks:JiangxiJinkoEngineeringForMiscellaneousMember2020-12-310001481513jks:JiangxiJinkoEngineeringForOutsourcingServicesMember2019-12-310001481513jks:JiangxiJinkoEngineeringForMiscellaneousMember2019-12-310001481513jks:ExecutiveDirectorsMember2019-12-310001481513us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberjks:PowerPlantsInMexicoMember2020-12-310001481513us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberjks:PowerPlantsInMexicoMember2019-12-3100014815132019-11-300001481513jks:JinkosolarTechnologyHainingCoMember2020-01-012020-12-310001481513jks:JinkosolarYiwuCo.Ltd.Member2020-01-012020-09-300001481513jks:JinkosolarSichuanCo.Ltd.Member2020-01-012020-09-300001481513jks:JinkosolarChuzhouCo.Ltd.Member2020-01-012020-09-300001481513jks:PoyangLuohongMember2019-12-310001481513jks:BankAcceptanceNotesMember2020-12-310001481513jks:BankAcceptanceNotesMember2019-12-310001481513us-gaap:UseRightsMember2020-01-012020-12-310001481513us-gaap:OtherIntangibleAssetsMember2020-01-012020-12-3100014815132018-05-012018-05-3100014815132017-11-012017-11-3000014815132016-01-012016-12-3100014815132015-01-012015-12-310001481513us-gaap:BorrowingsMember2020-01-012020-12-310001481513us-gaap:BorrowingsMember2019-01-012019-12-310001481513us-gaap:BorrowingsMember2018-01-012018-12-310001481513us-gaap:CallOptionMember2019-01-012019-12-310001481513us-gaap:InterestRateCapMember2020-01-012020-12-310001481513us-gaap:InterestRateCapMember2019-01-012019-12-310001481513us-gaap:InterestRateCapMember2018-01-012018-12-310001481513us-gaap:CallOptionMember2019-01-012020-12-310001481513us-gaap:CallOptionMember2020-01-012020-12-310001481513jks:JinkotianshengMember2020-01-012020-12-310001481513jks:JinkotianshengMember2019-01-012019-12-310001481513jks:JinkotianshengMember2018-01-012018-12-310001481513jks:JinkoSolarCompanyLimitedMemberjks:GovernmentBackgroundCompaniesMember2020-10-012020-10-310001481513jks:JinkosolarYiwuCo.Ltd.Member2020-08-012020-08-310001481513jks:JinkosolarChuzhouCo.Ltd.Member2020-08-012020-08-310001481513srt:MinimumMemberjks:JinkosolarTechnologyHainingCoMember2020-12-310001481513srt:MaximumMemberjks:JinkosolarTechnologyHainingCoMember2020-12-310001481513jks:JinkosolarSichuanCo.Ltd.Member2020-10-310001481513jks:JinkosolarYiwuCo.Ltd.Member2020-08-310001481513jks:JinkosolarChuzhouCo.Ltd.Member2020-08-310001481513jks:JinkoPowerMemberMember2020-01-012020-12-310001481513jks:JinkoPowerMemberMember2019-01-012019-12-310001481513jks:JinkoPowerMemberMember2018-01-012018-12-310001481513jks:JinkoPowerMemberMember2020-12-310001481513jks:JinkoPowerMemberMember2019-12-310001481513country:HK2020-01-012020-12-310001481513country:CN2020-01-012020-12-310001481513us-gaap:ForeignExchangeOptionMemberus-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2020-12-310001481513us-gaap:ForeignExchangeOptionMemberus-gaap:FairValueMeasurementsRecurringMember2020-12-310001481513us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513us-gaap:FairValueInputsLevel1Memberus-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513us-gaap:FairValueMeasurementsRecurringMember2019-12-310001481513country:CN2020-12-310001481513country:CN2019-12-310001481513country:CN2018-12-310001481513us-gaap:MediumTermNotesMember2017-07-172017-07-170001481513jks:ConvertibleSeniorNotes2019Member2020-12-310001481513jks:ConvertibleNotes2024Member2020-12-310001481513jks:FinancingsAssociatedWithFailedSaleLeaseBackTransactionsMember2020-12-3100014815132017-12-3100014815132017-01-0100014815132016-12-3100014815132016-01-0100014815132015-12-3100014815132015-01-010001481513us-gaap:AccountingStandardsUpdate201409Member2020-12-310001481513us-gaap:AccountingStandardsUpdate201409Member2019-12-310001481513us-gaap:AccountingStandardsUpdate201409Member2018-12-3100014815132018-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMember2020-12-310001481513srt:ParentCompanyMembersrt:ReportableLegalEntitiesMember2019-12-310001481513us-gaap:TreasuryStockMember2020-01-012020-12-310001481513us-gaap:RetainedEarningsUnappropriatedMember2020-01-012020-12-310001481513us-gaap:RetainedEarningsAppropriatedMember2020-01-012020-12-310001481513us-gaap:NoncontrollingInterestMember2020-01-012020-12-310001481513us-gaap:CommonStockMember2020-01-012020-12-310001481513us-gaap:AdditionalPaidInCapitalMember2020-01-012020-12-310001481513us-gaap:AccumulatedOtherComprehensiveIncomeMember2020-01-012020-12-310001481513us-gaap:TreasuryStockMember2019-01-012019-12-310001481513us-gaap:RetainedEarningsUnappropriatedMember2019-01-012019-12-310001481513us-gaap:RetainedEarningsAppropriatedMember2019-01-012019-12-310001481513us-gaap:NoncontrollingInterestMember2019-01-012019-12-310001481513us-gaap:CommonStockMember2019-01-012019-12-310001481513us-gaap:AdditionalPaidInCapitalMember2019-01-012019-12-310001481513us-gaap:AccumulatedOtherComprehensiveIncomeMember2019-01-012019-12-310001481513us-gaap:TreasuryStockMember2018-01-012018-12-310001481513us-gaap:RetainedEarningsUnappropriatedMember2018-01-012018-12-310001481513us-gaap:RetainedEarningsAppropriatedMember2018-01-012018-12-310001481513us-gaap:NoncontrollingInterestMember2018-01-012018-12-310001481513us-gaap:CommonStockMember2018-01-012018-12-310001481513us-gaap:AdditionalPaidInCapitalMember2018-01-012018-12-310001481513us-gaap:AccumulatedOtherComprehensiveIncomeMember2018-01-012018-12-310001481513jks:GovernmentBackgroundCompaniesMember2019-01-012019-12-310001481513jks:JinkoPowerMemberMemberus-gaap:SubsequentEventMember2021-03-302021-03-300001481513srt:MinimumMember2020-01-012020-12-310001481513srt:MaximumMember2020-01-012020-12-310001481513us-gaap:AccountingStandardsUpdate201613Member2020-01-0100014815132019-01-012019-12-3100014815132018-01-012018-12-3100014815132019-12-310001481513us-gaap:CommonStockMember2020-01-012020-12-310001481513jks:AmericanDepositarySharesMember2020-01-012020-12-310001481513jks:ZhejiangNewMaterialsCo.Ltd.Member2020-01-012020-12-310001481513jks:ZhejiangJinkoSolarTradingCompanyLimitedMember2020-01-012020-12-310001481513jks:ZhejiangJinkoSolarCompanyLimitedMember2020-01-012020-12-310001481513jks:YuhuanJinkoSolarMember2020-01-012020-12-310001481513jks:YiwuNewMaterialsCo.Ltd.Member2020-01-012020-12-310001481513jks:XinjiangJinkoSolarMember2020-01-012020-12-310001481513jks:WideWealthGroupHoldingLimitedMember2020-01-012020-12-310001481513jks:ShangraoJinkosolarTechnologyLimited.JinkoShangraoMember2020-01-012020-12-310001481513jks:RuiXuCo.Ltd.RuiXuMember2020-01-012020-12-310001481513jks:PoyangRuixinInformationTechnologyCoLtdMember2020-01-012020-12-310001481513jks:JinkosolarYiwuCo.Ltd.Member2020-01-012020-12-310001481513jks:JinkosolarVietnamCo.Ltd.Member2020-01-012020-12-310001481513jks:JinkosolarUsIndustrialIncMember2020-01-012020-12-310001481513jks:JinkoSolarUsIncMember2020-01-012020-12-310001481513jks:JinkoSolarUsHoldingsIncMember2020-01-012020-12-310001481513jks:JinkosolarTradingPrivatedLimtedMember2020-01-012020-12-310001481513jks:JinkoSolarTechnologyMalaysiaMember2020-01-012020-12-310001481513jks:JinkoSolarTechnologyLimitedMember2020-01-012020-12-310001481513jks:JinkosolarTechnologyHainingCoMember2020-01-012020-12-310001481513jks:JinkoSolarSwitzerlandMember2020-01-012020-12-310001481513jks:JinkosolarSichuanCo.Ltd.Member2020-01-012020-12-310001481513jks:JinkoSolarShanghaiManagementCo.LtdMember2020-01-012020-12-310001481513jks:JinkosolarQinghaiCo.Ltd.Member2020-01-012020-12-310001481513jks:JinkosolarMiddleEastDmccMember2020-01-012020-12-310001481513jks:JinkoSolarMalaysiaSdnBhdMember2020-01-012020-12-310001481513jks:JinkosolarLatamHoldingLimitedMember2020-01-012020-12-310001481513jks:JinkoSolarKoreaCo.Ltd.Member2020-01-012020-12-310001481513jks:JinkoSolarJapanKKMember2020-01-012020-12-310001481513jks:JinkoSolarItalySrlMember2020-01-012020-12-310001481513jks:JinkosolarInternationalDevelopmentLimitedMember2020-01-012020-12-310001481513jks:JinkoSolarImportAndExportCompanyLimitedMember2020-01-012020-12-310001481513jks:JinkosolarHouseholdPvSystemLtdMember2020-01-012020-12-310001481513jks:JinkosolarHongKongLimitedMember2020-01-012020-12-310001481513jks:JinkoSolarGmbhMember2020-01-012020-12-310001481513jks:JinkoSolarDenmarkApsMember2020-01-012020-12-310001481513jks:JinkoSolarCompanyLimitedMember2020-01-012020-12-310001481513jks:JinkosolarChuzhouCo.Ltd.Member2020-01-012020-12-310001481513jks:JinkosolarChuxiongCo.Ltd.Member2020-01-012020-12-310001481513jks:JinkoSolarCanadaCoLtdMember2020-01-012020-12-310001481513jks:JinkoSolarAustraliaHoldingsCoPtyLtdMember2020-01-012020-12-310001481513jks:JinkoPvMaterialSupplySdn.BhdMember2020-01-012020-12-310001481513jks:JinkoPowerInternationalHongkongLimitedMember2020-01-012020-12-310001481513jks:JiangxiPhotovoltaicMaterialsCompanyLimitedMember2020-01-012020-12-310001481513jks:CantonBestLimitedMember2020-01-012020-12-3100014815132020-12-310001481513dei:BusinessContactMember2020-01-012020-12-3100014815132020-01-012020-12-31utr:MWhiso4217:EURiso4217:JPYiso4217:MXNjks:segmentxbrli:sharesiso4217:CNYiso4217:USDiso4217:CNYxbrli:sharesxbrli:pureiso4217:USDxbrli:sharesjks:Plantjks:projectjks:lease

Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 20-F

(Mark One)

                  REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR 12(g) OF THE SECURITIES EXCHANGE ACT OF 1934

OR

                 ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2020.

OR

                  TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

OR

                  SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

Date of event requiring this shell company report

For the transition period from                         to

Commission file number: 001-34615

JinkoSolar Holding Co., Ltd.

(Exact name of Registrant as specified in its charter)

N/A

(Translation of Registrant’s name into English)

Cayman Islands

(Jurisdiction of incorporation or organization)

1 Jingke Road

Shangrao Economic Development Zone

Jiangxi Province, 334100

People’s Republic of China

(86-793) 846-9699

(Address of principal executive offices)

Haiyun (Charlie) Cao, Chief Financial Officer

1 Jingke Road

Shangrao Economic Development Zone

Jiangxi Province, 334100

People’s Republic of China

Tel: (86-793) 846-9699

Fax: (86-793) 846-1152

E-mail: charlie.cao@jinkosolar.com

(Name, Telephone, E-mail and/or Facsimile number and Address of Company Contact Person)

Securities registered or to be registered pursuant to Section 12(b) of the Act:

    

Title of each class

    

Trading Symbol(s)

    

Name of each exchange on which registered

American Depositary Shares, each representing four
ordinary shares, par value US$0.00002 per share

 

JKS

New York Stock Exchange

Ordinary shares, par value US$0.00002 per share*

* Not for trading, but only in connection with the listing of the American depositary shares on New York Stock Exchange.

Securities registered or to be registered pursuant to Section 12(g) of the Act:

None

(Title of Class)

Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act:

None

(Title of Class)

Table of Contents

Indicate the number of outstanding shares of each of the issuer’s classes of capital or common stock as of the close of the period covered by the annual report.

187,434,469 ordinary shares, excluding 455,217 ADSs representing 1,820,868 ordinary shares reserved for future grants under our share incentive plans and conversion of our convertible notes and 2,945,840 ordinary shares as treasury stock, as of December 31, 2020.

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.

Yes No

If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934.

Yes No

Note – Checking the box above will not relieve any registrant required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 from their obligations under those Sections.

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes No

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Yes No

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or an emerging growth company. See definition of “large accelerated filer,” “accelerated filer” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer Accelerated filer Non-accelerated filer

Emerging growth company

If an emerging growth company that prepares its financial statements in accordance with U.S. GAAP, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards† provided pursuant to Section 13(a) of the Exchange Act.

† The term “new or revised financial accounting standard” refers to any update issued by the Financial Accounting Standards Board to its Accounting Standards Codification after April 5, 2012.

Indicate by check mark whether the registrant has filed a report on and attestation to its management's assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.

Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing:

U.S. GAAP

    

International Financial Reporting Standards as issued

by the International Accounting Standards Board

    

Other

If “Other” has been checked in response to the previous question, indicate by check mark which financial statement item the registrant has elected to follow.

Item 17 Item 18

If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Yes No

(APPLICABLE ONLY TO ISSUERS INVOLVED IN BANKRUPTCY PROCEEDINGS DURING THE PAST FIVE YEARS)

Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court. Yes No

Table of Contents

TABLE OF CONTENTS

 

 

PAGE

 

 

 

PART I

5

Item 1.

IDENTITY OF DIRECTORS, SENIOR MANAGEMENT AND ADVISERS

5

Item 2.

OFFER STATISTICS AND EXPECTED TIMETABLE

5

Item 3.

KEY INFORMATION

5

Item 4.

INFORMATION ON THE COMPANY

59

Item 4A.

UNRESOLVED STAFF COMMENTS

88

Item 5.

OPERATING AND FINANCIAL REVIEW AND PROSPECTS

88

Item 6.

DIRECTORS, SENIOR MANAGEMENT AND EMPLOYEES

126

Item 7.

MAJOR SHAREHOLDERS AND RELATED PARTY TRANSACTIONS

136

Item 8.

FINANCIAL INFORMATION

138

Item 9.

THE OFFER AND LISTING

147

Item 10.

ADDITIONAL INFORMATION

147

Item 11.

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

153

Item 12.

DESCRIPTION OF SECURITIES OTHER THAN EQUITY SECURITIES

155

PART II

156

Item 13.

DEFAULTS, DIVIDEND ARREARAGES AND DELINQUENCIES

156

Item 14.

MATERIAL MODIFICATIONS TO THE RIGHTS OF SECURITY HOLDERS AND USE OF PROCEEDS

157

Item 15.

CONTROLS AND PROCEDURES

158

Item 16.

158

Item 16A.

AUDIT COMMITTEE FINANCIAL EXPERT

158

Item 16B.

CODE OF ETHICS

159

Item 16C.

PRINCIPAL ACCOUNTANT FEES AND SERVICES

159

Item 16D.

EXEMPTIONS FROM THE LISTING STANDARDS FOR AUDIT COMMITTEES

159

Item 16E.

PURCHASES OF EQUITY SECURITIES BY THE ISSUER AND AFFILIATED PURCHASERS

160

Item 16F.

CHANGE IN REGISTRANT’S CERTIFYING ACCOUNTANT

160

Item 16G.

CORPORATE GOVERNANCE

161

Item 16H.

MINE SAFETY DISCLOSURE

161

PART III

162

Item 17.

FINANCIAL STATEMENTS

162

Item 18.

FINANCIAL STATEMENTS

162

Item 19.

EXHIBITS

163

- i-

Table of Contents

CONVENTIONS THAT APPLY TO THIS ANNUAL REPORT

Unless otherwise indicated and except where the context otherwise requires, references in this annual report on Form 20-F to:

“we,” “us,” “our company,” “our” or “JinkoSolar” refers to JinkoSolar Holding Co., Ltd., a Cayman Islands holding company, its current and former subsidiaries for the relevant periods;
“2009 Long Term Incentive Plan” refers to the 2009 Long Term Incentive Plan adopted on July 10, 2009, which was subsequently amended and restated;
“2014 Equity Incentive Plan” refers to the 2014 Equity Incentive Plan adopted on August 18, 2014;
“2018”, “2019” and “2020” refers to our fiscal years ended December 31, 2018, 2019 and 2020, respectively;
"2021 Equity Incentive Plan" refers to the 2021 Equity Incentive Plan adopted on March 5, 2021;
“ADSs” refers to our American depositary shares, and “ADRs” refers to the American depositary receipts evidencing our ADSs;
“CE” refers to CE certification, a verification of electromagnetic compatibility (EMC) compliance issued by SGS Taiwan Ltd. certifying compliance with the principal protection requirement of Directive 2004/108/EC of the European Union and EN 61000-6-3:2001+A11:2004 and EN 61000-6-1:2001 standards;
“CQC” refers to the certificate issued by China Quality Certification Centre certifying that our solar modules comply with IEC 61215:2005 and IEC 617302:2004 standards;
“DG projects” refers to distributed generation solar power projects, including ground-mounted distributed generation projects and rooftop distributed generation projects;
“EPC” refers to engineering, procurement and construction;
“Euro,” “EUR” or “€” refers to the legal currency of the European Union;
“FIT” refers to feed-in tariff(s), the government guaranteed and subsidized electricity sale price at which solar power projects can sell to the national power grids. FIT in China is set by the central government consisting of the applicable national government subsidies paid from the Renewable Energy Development Fund, as well as the desulphurized coal benchmark electricity price paid by State Grid;
“ground-mounted projects” refers to solar power projects built on the ground, consisting of ground-mounted DG projects and utility-scale projects;
“ground-mounted DG projects” refers to small-scale ground-mounted projects with capacity less than or equal to 20 MW and 35 kV or lower grid connection voltage grade (except in the northeastern regions, where connection voltage must be 66 kV or lower) and with a substantial portion of the electricity generated to be consumed within the substation area of the grid connection points;
Haining Jinko” refers to Jinko Power Technology (Haining) Co., Ltd, one of our majority-owned subsidiaries in the PRC;
“JET” refers to the certificate issued by Japan Electrical Safety & Environment Technology Laboratories certifying that our modules comply with IEC 61215:2005, IEC 61730-1:2004 and IEC 61730-2:2004 standards;
“Jiangxi Desun” refers to Jiangxi Desun Energy Co., Ltd., an entity in which our founders and substantial shareholders, Xiande Li, Kangping Chen and Xianhua Li, each holds more than 10%, and collectively hold 73%, of the equity interest;
“Jiangxi Jinko” refers to Jinko Solar Co., Ltd., our majority-owned principal operating subsidiary incorporated in the PRC;
"Jiangxi Materials" refers to Jiangxi Photovoltaic Materials Co., Ltd., our majority-owned operating subsidiary incorporated in the PRC by Jiangxi Jinko on December 1, 2010;

2

Table of Contents

“JinkoPower” refers to Jinko Power Technology Co., Ltd., formerly known as Jiangxi JinkoSolar Engineering Co., Ltd., previously one of our indirect subsidiaries, and its subsidiaries;
“JinkoSolar Power” refers to JinkoSolar Power Engineering Group Limited;
“JIS Q 8901” refers to the certificate for the Japanese market from TÜV that demonstrates that a company’s management system ensures the highest standards of reliability in their products;
“JPY” refers to Japanese Yen;
“kV” refers to kilovolts;
“local grid companies” refers to the subsidiaries of the State Grid in China;
“long-term supply contracts” refers to our polysilicon supply contracts with terms of one year or above;
“MCS” refers to MCS certificate of factory production control issued by British Approvals Board for Telecommunications certifying that the production management system of our certain types of solar panels complies with MCS005 Issue 2.3 and MCS010 Issue 1.5 standards;
“NYSE” or “New York Stock Exchange” refers to the New York Stock Exchange Inc.;
“OEM” refers to an original equipment manufacturer who manufactures products or components that are purchased by another company and retailed under that purchasing company’s brand name;
“PRC” or “China” refers to the People’s Republic of China, excluding, for purposes of this annual report, Taiwan, Hong Kong and Macau;
“PV” refers to photovoltaic;
“RMB” or “Renminbi” refers to the legal currency of China;
“shares” or “ordinary shares” refers to our ordinary shares, par value US$0.00002 per share;
“State Grid” refers to State Grid Corporation of China and the local grid companies;
“TÜV” refers to TÜV certificates, issued by TÜV Rheinland Product Safety GmbH certifying that certain types of our solar modules comply with IEC 61215:2005, EN 61215:2005, IEC 61730-1:2004, IEC 61730-2:2004, EN 61730-1:2007 and EN 61730-2:2007 standards;
“UL” refers to the certificate issued by Underwriters Laboratories Inc., to certify that certain types of our solar modules comply with its selected applicable standards;
“US$,” “dollars” or “U.S. dollars” refers to the legal currency of the United States;
“utility-scale projects” refers to ground-mounted projects that are not ground-mounted DG projects;
“watt” or “W” refers to the measurement of electrical power, where “kilowatt” or “kW” means one thousand watts, “megawatts” or “MW” means one million watts and “gigawatt” or “GW” means one billion watts;
“Xinjiang Jinko” refers to Xinjiang Jinko Solar Co., Ltd., one of our majority-owned subsidiaries in the PRC;
“Yuhuan Jinko” refers to Yuhuan Jinko Solar Co., Ltd., one of our majority-owned subsidiaries in the PRC; and
“Zhejiang Jinko” refers to Zhejiang Jinko Solar Co., Ltd., formerly Zhejiang Sun Valley Energy Application Technology Co., Ltd., a solar cell supplier incorporated in the PRC, one of our majority-owned subsidiaries.

3

Table of Contents

Names of certain companies provided in this annual report are translated or transliterated from their original Chinese legal names.

Discrepancies in any table between the amounts identified as total amounts and the sum of the amounts listed therein are due to rounding.

This annual report on Form 20-F includes our audited consolidated financial statements for 2018, 2019 and 2020 and as of December 31, 2019 and 2020.

4

Table of Contents

PART I

ITEM 1.               IDENTITY OF DIRECTORS, SENIOR MANAGEMENT AND ADVISERS

Not Applicable.

ITEM 2.               OFFER STATISTICS AND EXPECTED TIMETABLE

Not Applicable.

ITEM 3.               KEY INFORMATION

A. Selected Financial Data

Our Selected Consolidated Financial Data

The following table presents the selected consolidated financial information of our company. The selected consolidated statements of operations data for the years ended December 31, 2018, 2019 and 2020 and the selected consolidated balance sheets data as of December 31, 2019 and 2020 have been derived from our audited consolidated financial statements, which are included in this annual report beginning on page F-1. The selected consolidated statements of operations data for the years ended December 31, 2016 and 2017, and the selected consolidated balance sheets data as of December 31, 2016, 2017 and 2018 are derived from our audited financial statements not included in this annual report. The selected consolidated financial data should be read in conjunction with, and are qualified in their entirety by reference to, our audited consolidated financial statements and related notes and “Item 5. Operating and Financial Review and Prospects” included elsewhere in this annual report. Our consolidated financial statements are prepared and presented in accordance with accounting principles generally accepted in the United States of America, or U.S. GAAP. The historical results are not necessarily indicative of results to be expected in any future periods. On January 1, 2018, we adopted new revenue guidance ASC Topic 606, “Revenue from Contracts with Customers” (“ASC Topic 606”), by applying the modified retrospective method to those contracts that were not completed as of January 1, 2018. Results for reporting periods beginning on or after January 1, 2018 are presented under ASC Topic 606, while prior period amounts are not adjusted and continue to be reported in accordance with our historical accounting practices under ASC Topic 605 “Revenue Recognition”. We adopted ASC Topic 842, Leases (“ASC Topic 842”) using the modified retrospective transition method with an effective date of January 1, 2019. Consequently, prior periods have not been recast and the disclosures required under ASC Topic 842 are not provided for dates and periods before January 1, 2019. We adopted ASC Topic 326, Measurement of Credit Losses on Financial Instruments” (“ASC Topic 326”), on January 1, 2020, using a modified retrospective approach with a cumulative effect recorded as increase of accumulated retained earnings.

    

2016

    

2017

    

2018

    

2019

    

2020

(RMB)

(RMB)

(RMB)

(RMB)

(RMB)

    

(US$)

(in thousands, except share, per share and per ADS data)

Consolidated Statements of Operations:

 

  

 

  

 

  

 

  

 

  

 

  

Continuing operations:

 

  

 

  

 

  

 

  

 

  

 

  

Revenues

 

21,400,638.1

 

26,472,943.5

 

25,042,613.3

 

29,746,287.8

 

35,129,458.6

 

5,383,825.1

Cost of revenues

 

(17,531,299.2)

 

(23,481,375.1)

 

(21,528,868.4)

 

(24,314,602.1)

 

(28,957,798.1)

 

(4,437,976.7)

Gross profit

 

3,869,338.9

 

2,991,568.4

 

3,513,744.9

 

5,431,685.6

 

6,171,660.5

 

945,848.4

Total operating expenses

 

(2,520,235.7)

 

(2,666,306.2)

 

(2,868,818.1)

 

(3,702,059.1)

 

(4,386,713.1)

 

(672,293.2)

Income from operations

 

1,349,103.2

 

325,262.2

 

644,926.8

 

1,729,626.5

 

1,784,947.4

 

273,555.2

Interest expenses, net

 

(359,296.3)

 

(245,529.6)

 

(295,692.0)

 

(391,582.1)

 

(459,233.8)

 

(70,380.7)

Subsidy income

 

168,646.6

 

147,916.8

 

52,176.5

 

63,017.0

 

191,980.7

 

29,422.3

Exchange gain/(loss), net

 

208,811.4

 

(114,344.6)

 

33,681.1

 

8,808.6

 

(336,522.9)

 

(51,574.4)

Other income/(expense), net

 

8,768.4

 

59,646.9

 

25,817.1

 

17,873.4

 

2,292.2

 

351.3

5

Table of Contents

    

2016

    

2017

    

2018

    

2019

    

2020

(RMB)

(RMB)

(RMB)

(RMB)

(RMB)

    

(US$)

(in thousands, except share, per share and per ADS data)

Investment income

4,902.5

Gain/(loss) on disposal of subsidiaries

5,017.9

257.1

(9,425.4)

19,935.1

Change in fair value of foreign exchange forward contracts

(52,561.8)

(8,211.4)

(44,089.7)

(78,283.5)

191,185.8

29,300.5

Change in fair value of foreign exchange options

(9,720.2)

(330.7)

(3,607.8)

(552.9)

Change in fair value of interest rate swap

(10,364.1)

(16,122.4)

9,701.0

(69,974.5)

(78,878.1)

(12,088.6)

Change in fair value of warrant liability

34,937,341

Change in fair value of convertible senior notes and call option

(110,242.6)

(29,257.5)

(725,791.5)

(111,232.4)

Convertible senior notes issuance costs

(18,646.1)

Income from continuing operations before income taxes

1,247,722.6

148,875.0

407,375.2

1,251,186.2

566,372.0

86,800.3

Income tax expense

(257,487.0)

(4,628.0)

(4,409.5)

(277,979.0)

(178,410.8)

(27,342.7)

Equity in income/(loss) of affiliated companies

(2,055.7)

2,609.9

(48,854.7)

(52,705.9)

(8,077.5)

Income from continuing operations, net of tax

990,235.6

142,191.4

405,575.6

924,352.5

335,255.3

51,380.1

Discontinued operations:

Gain on disposal of discontinued operations before income taxes

1,007,884.1

Income from discontinued operations before income taxes

48,146.2

Income tax expense, net

(54,466.1)

Income from discontinued operations, net of tax

1,001,564.2

Net income

1,991,799.8

142,191.4

405,575.6

924,352.5

335,255.3

51,380.1

Less: Net (loss)/income attributable to non-controlling interests from continuing operations

(432.5)

485.7

(903.2)

25,690.3

104,870.6

16,072.1

Less: Net income attributable to non-controlling interests from discontinued operations

6,044.5

Less: Accretion to redemption value of redeemable non-controlling interests of discontinued operations

159,477.9

Net income attributable to JinkoSolar Holding Co., Ltd.’s ordinary shareholders

1,826,710.0

141,705.7

406,478.8

898,662.2

230,384.7

35,308.0

Net income attributable to JinkoSolar Holding Co., Ltd.’s ordinary shareholders per share from continuing operations

Basic

7.87

1.10

2.64

5.31

1.29

0.20

Diluted

7.63

1.08

2.63

4.85

(1.36)

(0.21)

Net income attributable to JinkoSolar Holding Co., Ltd.’s ordinary shareholders per ADS(1) from continuing operations

Basic

31.48

4.40

10.56

21.22

5.15

0.79

Diluted

30.52

4.32

10.52

19.40

(5.42)

(0.83)

Net income/(loss) attributable to JinkoSolar Holding Co., Ltd.’s ordinary shareholders per share from discontinued operations

Basic

6.64

Diluted

6.40

Net income/(loss) attributable to JinkoSolar Holding Co., Ltd.’s ordinary shareholders per ADS from discontinued operations

Basic

26.56

Diluted

25.60

Weighted average ordinary shares outstanding

Basic

125,870,272

128,944,330

153,806,379

169,363,306

178,938,853

178,938,853

Diluted

130,590,441

131,687,230

154,704,166

166,567,757

171,438,853

171,438,853

Weighted average ADS outstanding

Basic

31,467,568

32,236,083

38,451,595

42,340,827

44,734,713

44,734,713

Diluted

32,647,610

32,921,808

38,676,042

41,641,939

42,859,713

42,859,713

(1)   Each ADS represents four ordinary shares.

6

Table of Contents

As of December 31,

2016

2017

2018

2019

2020

    

(RMB)

    

(RMB)

    

(RMB)

    

(RMB)

    

(RMB)

    

(US$)

(in thousands)

Consolidated Balance Sheet Data:

 

  

 

  

 

  

 

  

 

  

 

  

Cash and cash equivalents

 

2,501,417.5

 

1,928,302.8

 

3,104,916.8

 

5,653,853.7

 

7,481,678.1

 

1,146,617.3

Restricted cash

 

318,784.9

 

833,072.0

 

377,110.8

 

576,546.1

 

593,093.7

 

90,895.6

Restricted short-term investments

 

3,333,450.4

 

3,237,772.9

 

4,058,419.0

 

6,930,501.8

 

6,400,637.2

 

980,940.6

Short-term investments

 

71,301.1

 

2,684.5

 

 

 

570,000.0

 

87,356.3

Account receivable, net – related parties

 

1,414,084.1

 

2,113,042.1

 

675,767.7

 

520,503.6

 

410,358.1

 

62,890.1

Accounts receivable, net – third parties

 

4,753,715.3

 

4,497,634.5

 

5,436,370.7

 

5,266,350.7

 

4,534,758.3

 

694,982.1

Notes receivable – related parties

 

610,200.0

 

 

 

18,628.6

 

33,001.4

 

5,057.7

Notes receivable, net – third parties

 

915,314.8

 

571,231.8

 

1,010,468.5

 

1,529,800.7

 

1,051,561.2

 

161,158.8

Advances to suppliers – related parties

 

661.8

 

 

 

 

 

Advances to suppliers, net – third parties

 

325,766.3

 

397,076.2

 

665,220.9

 

2,522,373.5

 

1,002,613.1

 

153,657.2

Inventories, net

 

4,473,514.7

 

4,273,730.0

 

5,743,327.9

 

5,818,789.0

 

8,376,935.8

 

1,283,821.6

Total current assets

 

19,695,296.4

 

19,607,856.4

 

22,854,259.9

 

31,688,246.7

 

33,682,131.5

 

5,162,012.5

Project assets, net

 

55,063.5

 

473,731.2

 

1,770,621.1

 

798,243.1

 

645,354.7

 

98,904.9

Property, plant and equipment, net

 

4,738,681.4

 

6,680,187.2

 

8,275,899.7

 

10,208,204.5

 

12,455,443.6

 

1,908,880.2

Land use rights, net

 

450,940.6

 

443,269.2

 

574,945.2

 

597,922.5

 

760,961.6

 

116,622.5

Total assets

 

26,090,639.8

 

28,636,404.7

 

35,853,181.9

 

47,844,717.4

 

53,232,374.9

 

8,158,218.4

Accounts payable – related parties

 

 

5,328.9

 

698.0

 

36,309.7

 

14,113.6

 

2,163.0

Accounts payable – third parties

 

4,290,070.5

 

4,658,202.1

 

5,327,094.0

 

4,952,629.9

 

4,436,495.1

 

679,922.6

Notes payable – third parties

 

4,796,766.3

 

5,672,496.6

 

6,036,576.7

 

7,518,569.7

 

9,334,876.3

 

1,430,632.4

Accrued payroll and welfare expenses

 

582,275.7

 

721,380.1

 

810,920.7

 

879,465.3

 

995,054.2

 

152,498.7

Advance from related parties

 

60,541.5

 

37,399.9

 

910.1

 

748.6

 

 

Advance from third parties

 

1,376,919.5

 

748,958.8

 

2,395,228.9

 

4,350,380.3

 

2,451,495.1

 

375,708.1

Bonds payable and accrued interests

 

 

10,256.6

 

10,318.0

 

 

 

Short-term borrowings (including current portion of long-term borrowings, and failed sale-leaseback financing)

 

5,488,629.0

 

6,204,440.3

 

7,103,399.2

 

9,047,249.9

 

8,238,530.8

 

1,262,610.1

Total current liabilities

 

18,362,656.9

 

19,962,416.9

 

24,141,186.3

 

31,277,229.2

 

31,216,795.6

 

4,784,183.2

Long-term borrowings

 

488,519.6

 

379,788.9

 

1,954,830.8

 

1,586,187.2

 

7,301,535.8

 

1,119,009.3

Convertible senior notes

 

 

65.3

 

 

728,215.9

 

 

Total liabilities

 

19,630,426.8

 

21,947,141.6

 

27,399,203.9

 

35,403,690.8

 

40,241,612.9

 

6,167,297.0

Redeemable non-controlling interests

 

 

 

 

 

 

Total JinkoSolar Holding Co., Ltd. shareholders’ equity

 

6,460,708.9

 

6,689,273.3

 

7,839,891.4

 

9,303,318.0

 

9,987,844.3

 

1,530,704.1

Non-controlling interests

 

(495.9)

 

(10.2)

 

614,086.6

 

3,137,708.6

 

3,002,917.7

 

460,217.3

Total liabilities, redeemable non-controlling interests and shareholders’ equity

 

26,090,639.8

 

28,636,404.7

 

35,853,181.9

 

47,844,717.4

 

53,232,374.9

 

8,158,218.4

Outstanding shares as of the year end

 

126,733,266

 

132,146,074

 

156,864,737

 

178,930,297

 

187,434,469

 

187,434,469

Exchange Rate Information

We publish our consolidated financial statements in Renminbi. The conversion of Renminbi into U.S. dollars in this annual report is solely for the convenience of readers. The exchange rate refers to the exchange rate as set forth in the H.10 statistical release of the Federal Reserve Board. Unless otherwise noted, all translations from Renminbi to U.S. dollars and from U.S. dollars to Renminbi in this annual report were made at a rate of RMB6.5250 to US$1.00, the noon buying rate in effect as of December 31, 2020. The Renminbi is not freely convertible into foreign currency. We make no representation that any Renminbi or U.S. dollar amounts could have been, or could be, converted into U.S. dollars or Renminbi, as the case may be, at any particular rate, the rates stated below, or at all. On April 23, 2021, the exchange rate, as set forth in the H.10 statistical release of the Federal Reserve Board, was RMB6.4945 to US$1.00.

B. Capitalization and Indebtedness

Not Applicable.

C. Reasons for the Offer and Use of Proceeds

Not Applicable.

7

Table of Contents

D. Risk Factors

Our business, financial condition and results of operations are subject to various changing business, competitive, economic, political and social conditions in China and worldwide. In addition to the factors discussed elsewhere in this annual report, the following are some of the important factors that could adversely affect our operating results, financial condition and business prospects, and cause our actual results to differ materially from those projected in any forward-looking statements.

Summary of Risk Factors

Our future growth and profitability depend on the demand for and the prices of solar power products and the development of photovoltaic technologies.
The reduction, modification, delay or elimination of government subsidies and other economic incentives in solar energy industry may reduce the profitability of our business and materially adversely affect our business.
We are exposed to significant guarantee liabilities and if the debtors default, our financial position would be materially and adversely affected.
We require a significant amount of cash to fund our operations and future business developments. If we cannot obtain additional funding on terms satisfactory to us when we need it, our growth prospects and future profitability may be materially and adversely affected.
The oversupply of solar cells and modules in the solar industry may cause substantial downward pressure on the prices of our products and reduce our revenue and earnings.
We face risks associated with the manufacturing, marketing, distribution and sale of our products internationally and the construction and operation of our overseas manufacturing facilities, and if we are unable to effectively manage these risks, our business abroad may be adversely affected and our ability to expand our business abroad may be restricted.
We are subject to anti-dumping and countervailing duties imposed by the U.S. government. We are also subject to safeguard investigation and other foreign trade investigations initiated by the U.S. government and anti-dumping investigation and safeguard investigations initiated by governments in our other markets.
Volatility in the prices of silicon raw materials makes our procurement planning challenging and could have a material adverse effect on our results of operations and financial condition.
We may not be able to obtain sufficient raw materials in a timely manner or on commercially reasonable terms, which could have a material adverse effect on our results of operations and financial condition.
The loss of, or a significant reduction in orders from, any of our customers could significantly reduce our revenue and harm our results of operations.
We manufacture a majority of our products in several provinces in China, which exposes us to various risks relating to long-distance transportation of our silicon wafers and solar cells in the manufacturing process.
Prepayment arrangements to our suppliers for the procurement of silicon raw materials expose us to the credit risks of such suppliers and may also significantly increase our costs and expenses, which could in turn have a material adverse effect on our financial condition, results of operations and liquidity.
Decreases in the price of solar power products, including solar modules, may result in additional provisions for inventory losses.
Shortage or disruption of electricity supply may adversely affect our business.
Our substantial indebtedness could adversely affect our business, financial condition and results of operations.

8

Table of Contents

If we are unable to implement our strategy to expand our PRC operations by completing an initial public offering and listing on the STAR Market, our ability to strengthen our market position and operations in the PRC, including our ability to expand our production capacity and increase our revenues, could be adversely affected.
Even if we complete the STAR Listing, we may not achieve the results contemplated by our business strategy (including with respect to use of proceeds from that offering) and therefore the price of our ADSs may not increase, or may even drop.
Jiangxi Jinko’s status as a publicly traded company that is controlled, but less than wholly owned, by our company could have an adverse effect on us.
It is difficult to predict the effect of the proposed STAR Listing on the ADSs.
Our founders collectively have significant influence over our management and their interests may not be aligned with our interests or the interests of our other shareholders.
We face risks related to health epidemics and other outbreaks. In particular, we were, and could be further, adversely affected by the global outbreak of COVID-19.
Our ADSs may be delisted under the Holding Foreign Companies Accountable Act if the PCAOB is unable to inspect auditors who are located in China. The delisting of our ADSs, or the threat of their being delisted, may materially and adversely affect the value of your investment. Additionally, the inability of the PCAOB to conduct inspections deprives our investors with the benefits of such inspections.
If additional remedial measures are imposed on the “big four” PRC-based accounting firms, including our independent registered public accounting firm, in administrative proceedings brought by the SEC alleging such firms’ failure to meet specific criteria set by the SEC with respect to requests for the production of documents, we could be unable to timely file future financial statements in compliance with the requirements of the Securities Exchange Act of 1934.
Conversion of the convertible notes we offered may dilute the ownership interest of existing shareholders, including holders who had previously converted their convertible notes.
You may not receive dividends or other distributions on our ordinary shares and you may not receive any value for them, if it is illegal or impractical to make them available to you.
Holders of ADSs have fewer rights than shareholders and must act through the depositary to exercise those rights.
You may be subject to limitations on transfers of your ADSs.

Risks Related to Our Business and Industry

Our future growth and profitability depend on the demand for and the prices of solar power products and the development of photovoltaic technologies.

The rate and extent of market acceptance for solar power depends on the availability of government subsidies and the cost-effectiveness, performance and reliability of solar power relative to conventional and other renewable energy sources. Changes in government policies towards solar power and advancements in PV, technologies could significantly affect the demand for solar power products.

Demand for solar power products is also affected by macroeconomic factors, such as energy supply, demand and prices, as well as regulations and policies governing renewable energies and related industries. For example, in June 2016, the FIT in China for utility-scale projects was significantly reduced. As a result, subsequent to a strong demand in the first half of 2016, the domestic market was almost frozen and the competition in the global market also intensified in the second half of 2016. The current international political environment, including existing and potential changes to United States and China trade and tariffs policies, have resulted in uncertainty surrounding the future of the global economy. The global solar module production capacity exceeded demand in 2019, which further intensified competition over pricing. Consequently, the average selling price of our solar modules, which represented 92.7% of our total revenue in 2020, decreased from 2019 to 2020.

9

Table of Contents

Any reduction in the price of solar modules will have a negative impact on our business and results of operations, including our margins. As a result, we may not continue to be profitable on a quarterly or annual basis. In addition, if demand for solar power products weakens in the future, our business and results of operations may be materially and adversely affected.

The reduction, modification, delay or elimination of government subsidies and other economic incentives in solar energy industry may reduce the profitability of our business and materially adversely affect our business.

We believe that market demand for solar power and solar power products in the near term will continue to substantially depend on the availability of government incentives because the cost of solar energy currently exceeds, and we believe will continue to exceed in the near term, the cost of conventional fossil fuel energy and certain non-solar renewable energy, particularly in light of the low level of oil prices in recent years. Examples of government sponsored financial incentives to promote solar energy include subsidies from the central and local governments, preferential tax rates and other incentives. The availability and size of such subsidies and incentives depend, to a large extent, on political and policy developments relating to environmental concerns and other macro-economic factors. Moreover, government incentive programs are expected to gradually decrease in scope or be discontinued as solar power technology improves and becomes more affordable relative to other types of energy. Negative public or community response to solar energy projects could adversely affect the government support and approval of our solar energy business. Adverse changes in government regulations and policies relating to solar energy industry and their implementation, especially those relating to economic subsidies and incentives, could significantly reduce the profitability of our business and materially adversely affect the state of the industry.

We received government grants totaling RMB52.2 million, RMB63.0 million and RMB192.0 million (US$29.4 million) for 2018, 2019 and 2020, respectively, which included government grants for our production scale expansion, technology upgrades and export market development. We cannot assure you that we will continue to receive government grants and subsidies in future periods at a similar level or at all.

As a substantial part of our operations are in the PRC, the policies and regulations adopted by the PRC government towards the solar energy industry are important to the continuing success of our business. Although there has been regulatory support for solar power generation such as subsidies, preferential tax treatment and other economic incentives in recent years, future government policies may not be as supportive. The PRC central government may reduce or eliminate existing incentive programs for economic, political, financial or other reasons. In addition, the provincial or local governments may delay the implementation or fail to fully implement central government regulations, policies or initiatives. Until the solar energy industry becomes commercially profitable without subsidies, a significant reduction in the scope or the discontinuation of government incentive programs in the PRC or other jurisdictions could materially and adversely affect market demand for our products and negatively impact our revenue and profitability.

Besides the PRC, various foreign governments have used policy initiatives to encourage or accelerate the development and adoption of solar power and other renewable energy sources, including certain countries in Europe, notably Italy, Germany, France, Belgium and Spain; certain countries in Asia, including Japan, India and South Korea; countries in North America, such as the United States and Canada; as well as Australia. Examples of government-sponsored financial incentives to promote solar power include capital cost rebates, FIT, tax credits, net metering and other incentives to end-users, distributors, project developers, system integrators and manufacturers of solar power products.

Governments may reduce or eliminate existing incentive programs for political, financial or other reasons, which will be difficult for us to predict. Reductions in FIT programs may result in a significant fall in the price of and demand for solar power and solar power products. For example, subsidies have been reduced or eliminated in some countries such as China, Germany, Italy, Spain and Canada. In May 2018, the National Development and Reform Commission of China (the “NDRC”), the Ministry of Finance and the National Energy Administration in China (the “NEA”) issued a joint notice temporarily halting subsidies for utility-scale solar projects, slashing the quota on distributed solar projects which are eligible for subsidies in 2018 and greatly reducing FIT. The German market represents a major portion of the European solar market for ground-mounted systems and a stable residential and commercial rooftop market. The first subsidy-free grid parity projects of the industry were connected to the grid in 2020, which act as a driver for the additional market growth. Starting from 2011, major export markets for solar power and solar power products such as Japan, Germany, Italy, Spain and the United Kingdom continued to reduce their FIT as well as other incentive measures. For example, from 2012 to 2020, the Japanese government cut down its FIT from JPY40 to JPY21 for projects below 10 KW and from JPY42 to JPY13 for certain projects of 10 KW or above.

10

Table of Contents

In 2020, we generated 81.9% of our total revenue from overseas markets, and North America, Asia Pacific (except China which includes Hong Kong and Taiwan) and Europe represented 28.7%, 27.3% and 13.2% of our total revenue, respectively. As a result, any significant reduction in the scope or discontinuation of government incentive programs in the overseas markets, especially where our major customers are located, could cause demand for our products and our revenue to decline and have a material adverse effect on our business, financial condition, results of operations and prospects. In addition, the announcement of a significant reduction in incentives in any major market may have an adverse effect on the trading price of our ADSs.

We are exposed to significant guarantee liabilities and if the debtors default, our financial position would be materially and adversely affected.

In connection with our disposal of JinkoPower—a downstream business—in 2016, we entered into a master service agreement with JinkoPower, where we agreed to provide a guarantee for JinkoPower’s financing obligations under certain of its loan agreements entered into within a three-year period from October 2016, amounted to RMB2.32 billion (US$355.4 million) as of December 31, 2020. In addition, we have provided guarantees to certain of our related parties. As of December 31, 2020, we had liabilities associated with guarantees to related parties of RMB57.3 million (US$8.8 million). In the event that JinkoPower or the relevant related parties (as the case may be) fail to perform their respective obligations or otherwise default under the relevant loan agreements or other contracts, we will become liable for their respective obligations under those loan agreements or other contracts, which could materially and adversely affect our financial condition.

We require a significant amount of cash to fund our operations and future business developments. If we cannot obtain additional funding on terms satisfactory to us when we need it, our growth prospects and future profitability may be materially and adversely affected.

We require a significant amount of cash to fund our operations, including payments to suppliers for our polysilicon feedstock. We may also require additional cash due to changing business conditions or other future developments, including any investments or acquisitions we may decide to pursue, as well as our research and development activities in order to remain competitive.

Our working capital was RMB2,465.3 million (US$377.8 million) as of December 31, 2020. Our management believes that our cash position as of December 31, 2020, the cash expected to be generated from operations, and funds available from borrowings under our credit facilities will be sufficient to meet our working capital and capital expenditure requirements for at least the next 12 months from the date of this annual report.

Our ability to obtain external financing is subject to a number of uncertainties, including:

our future financial condition, results of operations and cash flow;
the general condition of the global equity and debt capital markets;
regulatory and government support, such as subsidies, tax credits and other incentives;
the continued confidence of banks and other financial institutions in our company and the solar power industry;
economic, political and other conditions in the PRC and elsewhere; and
our ability to comply with any financial covenants under the debt financing.

Any additional equity financing may be dilutive to our shareholders and any debt financing may require restrictive covenants. Additional funds may not be available on terms commercially acceptable to us. Failure to manage discretionary spending and raise additional capital or debt financing as required may adversely impact our ability to achieve our intended business objectives. See “—Our substantial indebtedness could adversely affect our business, financial condition and results of operations.”

Uncertainty about the future of LIBOR and certain other interest “benchmarks” may adversely affect our business.

LIBOR, the London Interbank Offered Rate, is widely used as a reference for setting interest rates on loans globally. LIBOR and certain other interest “benchmarks” may be subject to regulatory guidance and/or reform that could cause interest rates under our current or future debt agreements to perform differently than in the past or cause other unanticipated consequences.

11

Table of Contents

On July 27, 2017, the United Kingdom Financial Conduct Authority (“FCA”), which regulates the LIBOR, announced that it intends to stop persuading or compelling banks to submit rates for the calculation of LIBOR to the administrator of LIBOR after 2021. In June 2019, the FCA asked banks and markets to stop using the LIBOR as a basis for pricing contracts. These announcements indicate that the continuation of LIBOR on the current basis cannot and will not be guaranteed after 2021. It is impossible to predict whether and to what extent banks will continue to provide LIBOR submissions to the administrator of LIBOR or whether any additional reforms to LIBOR may be enacted in the United Kingdom or elsewhere. At this time, no consensus exists as to what rate or rates may become accepted alternatives to LIBOR and it is impossible to predict the effect of any such alternatives on the value of LIBOR-based securities and variable rate loans or other financial arrangements, given LIBOR’s role in determining market interest rates globally. On March 25, 2020, the FCA stated that although the central assumption that firms cannot rely on LIBOR being published after the end of 2021 has not changed, the outbreak of COVID-19 has impacted the timing of many firms’ transition planning, and the FCA will continue to assess the impact of the COVID-19 pandemic on transition timelines and update the marketplace as soon as possible. It is unclear if after 2021 LIBOR will cease to exist or if new methods calculating LIBOR will be established such that it continues to exist after 2021.

Moreover, on July 12, 2019, the Staff of the SEC’s Division of Corporate Finance, Division of Investment Management, Division of Trading and Markets, and Office of the Chief Accountant issued a statement about the potentially significant effects on financial markets and market participants when LIBOR is discontinued in 2021 and no longer available as a reference benchmark rate. The Staff encouraged all market participants to identify contracts that reference LIBOR and begin transitions to alternative rates. On December 30, 2019, the SEC’s Chairman, Division of Corporate Finance and Office of the Chief Accountant issued a statement to encourage audit committees in particular to understand management’s plans to identify and address the risks associated with the elimination of LIBOR, and, specifically, the impact on accounting and financial reporting and any related issues associated with financial products and contracts that reference LIBOR, as the risks associated with the discontinuation of LIBOR and transition to an alternative reference rate will be exacerbated if the work is not completed in a timely manner.

Uncertainty as to the nature of alternative reference rates and as to potential changes or other reforms to LIBOR may adversely affect LIBOR rates and other interest rates. In the event that a published LIBOR rate is unavailable after 2021, the value of such securities, loans or other financial arrangements may be adversely affected, and, to the extent that we are the issuer of or obligor under any such instruments or arrangements, our cost thereunder may increase. Currently, the manner and impact of this transition and related developments, as well as the effect of these developments on our funding costs, investment and trading securities portfolios and business, is uncertain, which may adversely affect our business, prospects, liquidity, capital resources, financial performance or financial condition.

The oversupply of solar cells and modules in the solar industry may cause substantial downward pressure on the prices of our products and reduce our revenue and earnings.

In recent years, the solar industry has been experiencing oversupply across the value chain. Continued increases in solar module production in excess of market demand may result in further downward pressure on the price of solar cells and modules, including our products. Increasing competition could also result in us losing sales or market share. If we are unable, on an ongoing basis, to procure silicon, solar wafers and solar cells at reasonable prices, or mark up the price of our solar modules to cover our manufacturing and operating costs, our revenue and gross margin will be adversely impacted, either due to higher costs compared to our competitors or due to inventory write-downs, or both. In addition, our market share may decline if our competitors are able to price their products more competitively.

We face risks associated with the manufacturing, marketing, distribution and sale of our products internationally and the construction and operation of our overseas manufacturing facilities, and if we are unable to effectively manage these risks, our business abroad may be adversely affected and our ability to expand our business abroad may be restricted.

In 2018, 2019 and 2020, we generated 73.6%, 82.5% and 81.9%, respectively, of our total revenue from sales outside China. We also have manufacturing facilities in the United States and Malaysia. In January 2018, we entered into a master solar module supply agreement (the “Master Agreement”) with NextEra Energy, Inc., or NextEra. Under the Master Agreement, as amended in March 2018, we will supply NextEra up to 2,750 MW of high-efficiency solar modules over four years. In conjunction with the Master Agreement, we established our first U.S. factory in Jacksonville, Florida, which commenced production in the third quarter of 2018 and reached full production capacity of 400 MW in the first half of 2019. We plan to continue to increase manufacturing and sales outside China and expand our customer base overseas.

12

Table of Contents

The manufacturing, marketing, distribution and sale of our products internationally, as well as the construction and operation of our manufacturing facilities outside of China may expose us to a number of risks, including those associated with:

fluctuations in currency exchange rates;
costs associated with understanding local markets and trends;
costs associated with establishment of overseas manufacturing facilities;
marketing and distribution costs;
customer services and support costs;
risk management and internal control structures for our overseas operations;
compliance with the different commercial, operational, environmental and legal requirements;
obtaining or maintaining certifications for production, marketing, distribution and sales of our products or, if applicable, services;
maintaining our reputation as an environmentally friendly enterprise for our products or services;
obtaining, maintaining or enforcing intellectual property rights;
changes in prevailing economic conditions and regulatory requirements;
transportation and freight costs;
employing and retaining manufacturing, technology, sales and other personnel who are knowledgeable about, and can function effectively in, overseas markets;
trade barriers such as trade remedies, which could increase the prices of the raw materials for our solar products, and export requirements, tariffs, taxes and other restrictions and expenses, which could increase the prices of our products and make us less competitive in some countries;
challenges due to our unfamiliarity with local laws, regulation and policies, our absence of significant operating experience in local market, increased cost associated with establishment of overseas operations and maintaining a multinational organizational structure; and
other various risks that are beyond our control.

Our manufacturing capacity outside China requires us to comply with different laws and regulations, including national and local regulations relating to production, environmental protection, employment and the other related matters. Due to our limited experience in doing business in the overseas markets, we are unfamiliar with local laws, regulation and policies. Our failure to obtain the required approvals, permits, licenses, filings or to comply with the conditions associated therewith could result in fines, sanctions, suspension, revocation or non-renewal of approvals, permits or licenses, or even criminal penalties, which could have a material adverse effect on our business, financial condition and results of operations.

13

Table of Contents

For example, the U.S. government has recently begun enforcing a long-existing ban on U.S. importation of products produced with forced labor in ways that may adversely affect our business. Section 307 of the U.S. Tariff Act of 1930, as amended, or Section 307, prohibits U.S. importation of goods that are produced or manufactured, wholly or in part, in any non-U.S. country by forced or indentured labor. On December 2, 2020, U.S. Customs and Border Protection, or CBP, announced that it had issued a withhold release order, or WRO, against cotton products made by the Xinjiang Production Construction Corp, or the XPCC; and on January 13, 2021, CBP issued a broader WRO on all cotton and tomato products produced in Xinjiang, saying that it had identified indicators that these goods were produced with forced labor. As a result of these WROs, U.S. imports of these products may only proceed after the importer demonstrates that the merchandise was not produced with forced labor. Although no WROs have been issued for photovoltaic or other silicon-based products from Xinjiang as of the date of this annual report, some press reports have indicated that the U.S. government may be considering such actions. In addition to existing U.S. law, there have been legislative proposals to enact new laws that could adversely affect our business. On September 22, 2020, the U.S. House of Representatives, by a vote of 406-3, passed the Uyghur Forced Labor Prevention Act, or the UFLP Act 2020. If it had been enacted into law, the UFLP Act 2020 would have prohibited all goods manufactured wholly or in part in Xinjiang to enter the United States unless CBP determined that the goods had not been manufactured by forced labor. In effect, the UFLP Act 2020 would have switched the operation of applicable U.S. law from Section 307, under which CBP issues a WRO when it determines there is an indication that the goods were produced with forced labor, to a prohibition on all imports from Xinjiang unless CBP determines that they were not produced with forced labor. The UFLP Act 2020 was not enacted into law prior to the close of the 116th Congress at the end of 2020. In January and February 2021, a new legislation similar to the UFLP Act 2020, or the UFLP Act 2021, was introduced in the U.S. Senate and U.S. House of Representatives, respectively. We do not tolerate any use of forced labor, whether in our own manufacturing facilities or, to the best of our knowledge, throughout our supply chain. We monitor our manufacturing facilities to ensure no forced labor is used. Our direct sales to the U.S. market accounted for 25.4% and 28.7% of our total revenues in 2019 and 2020, respectively. Given the fact that we have a manufacturing facility in Xinjiang, we cannot assure you that the relevant U.S. authorities will not decide that forced labor exists in the manufacturing of our products or in our supply chain and, pursuant to Section 307, prohibit U.S. imports of our products. Furthermore, if legislation similar to the UFLP Act 2021 were to be enacted, given the difficulty in proving no use of forced labor throughout the supply chain, importation of our products to the United States may be partially or entirely suspended or blocked. Either of these types of regulatory or legislative action would adversely affect our business, financial condition and results of operations.

In addition to the actions taken or being considered by the U.S. government discussed above, there is a growing concern regarding the alleged used of forced labor issue in Xinjiang in the European Union, Australia, Japan and certain other countries. If any new legislation or regulatory action with respect to these issues were to be enacted in those regions that impose additional restrictions or requirements on importation of goods that are produced or manufactured, wholly or in part, in Xinjiang, our business and operation in these regions would be adversely affected.

As we enter into new markets in different jurisdictions, we will face different business environments and industry conditions, and we may spend substantial resources familiarizing ourselves with the new environment and conditions. To the extent that our business operations are affected by unexpected and adverse economic, regulatory, social and political conditions in the jurisdictions in which we have operations, we may experience project disruptions, loss of assets and personnel, and other indirect losses that could adversely affect our business, financial condition and results of operations. For instance, our manufacturing facility in the United States may expose us to various risks, including, among others, failure to obtain the required approvals, permits or licenses, or to comply with the conditions associated therewith, failure to procure economic incentives or financing on satisfactory terms, and failure to procure construction materials, production equipment and qualified personnel for the manufacturing facility in a timely and cost-effective manner. Any of these events may increase the related costs, or impair our ability to run our operations in the future on a cost effective basis, which could in turn have a material adverse effect on our business and results of operations.

14

Table of Contents

We are subject to anti-dumping and countervailing duties imposed by the U.S. government. We are also subject to safeguard investigation and other foreign trade investigations initiated by the U.S. government and anti-dumping investigation and safeguard investigations initiated by governments in our other markets.

Our direct sales to the U.S. market accounted for 10.9%, 25.4% and 28.7% of our total revenues in 2018, 2019 and 2020, respectively. In 2011, SolarWorld Industries America Inc., a solar panel manufacturing company in the United States, filed anti-dumping and countervailing duty petitions with the United States Department of Commerce (the “U.S. Department of Commerce”) and United States International Trade Commission (the “U.S. International Trade Commission”) against the Chinese solar industry, accusing Chinese producers of crystalline silicon photovoltaic (“CSPV”) cells, whether or not assembled into modules, of selling their products (i.e., CSPV cells or modules incorporating these cells) in the United States at less than fair value, and of receiving financial assistance from the Chinese governments that benefited the production, manufacture, or exportation of such products. JinkoSolar was on the list of the solar companies subject to such investigations by the U.S. Department of Commerce. On November 9, 2011, the U.S. Department of Commerce announced that it launched the anti-dumping duty and countervailing duty investigation into the accusations. On December 7, 2012, the U.S. Department of Commerce issued the anti-dumping duty order and countervailing duty order. As a result, cash deposits were required to pay on import into the United States of the CSPV cells, whether or not assembled into modules from China. The announced cash deposit rates applicable to us were 13.94% (for anti-dumping) and 15.24% (for countervailing). The actual anti-dumping duty and countervailing duty rates at which entries of covered merchandise are finally assessed may differ from the announced deposit rates because they are subject to the subsequent administrative reviews by U.S. Department of Commerce.

15

Table of Contents

In January 2014, the U.S. Department of Commerce initiated the first administrative review of the anti-dumping duty order and countervailing duty order with respect to CSPV cells, whether or not assembled into modules, from China. In July 2015, the U.S. Department of Commerce issued the final results of this first administrative review, according to which the anti-dumping and countervailing rates applicable to us were 9.67% and 20.94%, respectively. Such rates apply as the final rates on the import into the United States of the CSPV cells, whether or not assembled into modules from China, from May 25, 2012 to November 30, 2013 for dumping, and from March 26, 2012 to December 31, 2012 for countervailing, respectively. Such rates were the cash deposit rates applicable to us from July 14, 2015. In February 2015 and February 2016, the U.S. Department of Commerce initiated the second administrative and the third administrative review of the anti-dumping duty order and countervailing duty order with respect to CSPV cells, whether or not assembled into modules, from China, respectively. The U.S. Department of Commerce issued the final results of the second administrative review in June and July of 2016 and the final results of the third administrative review in July 2017. As we were not included in the second and the third administrative review, the rates applicable to us remained at 9.67% (for anti-dumping) and 20.94% (for countervailing) after this review. In February 2017, the U.S. Department of Commerce initiated the fourth administrative review of the anti-dumping duty order and countervailing duty order with respect to CSPV cells, whether or not assembled into modules, from China. In July 2018, the U.S. Department of Commerce published the final results of the fourth administrative review. As we were not included in this anti-dumping administrative review, the anti-dumping deposit rates applicable to us remained at 9.67%. The countervailing deposit rates applicable to us were 13.20% after this review. On October 30, 2018, the U.S. Department of Commerce amended the final results of the fourth countervailing administrative review. As a result, the countervailing deposit rates applicable to us were 10.64% after this amendment. On October 29, 2020, the U.S. Department of Commerce amended the final results of the fourth countervailing administrative review pursuant to the final judgement of the United States Court of International Trade; the final subsidy rate applicable to us for the entries made during the period from January 1, 2015 through December 31, 2015 was changed to 4.22%. In November 2017, the U.S. Department of Commerce and the U.S. International Trade Commission initiated five-year reviews to determine whether revocation of the anti-dumping and countervailing duty orders with respect to CSPV cells, whether or not assembled into modules from China, would likely lead to continuation or recurrence of material injury. In March 2018, the U.S. Department of Commerce determined that revocation of the countervailing order would likely lead to continuation or recurrence of a net countervailable subsidy. In March 2019, the U.S. International Trade Commission determined that revocation of the countervailing order would likely lead to the continuation or recurrence of countervailable subsidies. In February 2018, the U.S. Department of Commerce initiated the fifth administrative review of the anti-dumping duty order and countervailing duty order with respect to CSPV cells, whether or not assembled into modules, from China. In July and August 2019, the U.S. Department of Commerce issued the final results of the fifth administrative review, according to which the anti-dumping and countervailing deposit rates applicable to us were 4.06% and 12.76%, respectively. In December 2019, the U.S. Department of Commerce amended the final results of the fifth countervailing administrative review. As a result, the countervailing deposit rate applicable to us was 12.7% after this amendment. In March 2019, the U.S. Department of Commerce initiated the sixth administrative review of the anti-dumping duty order and countervailing duty order with respect to CSPV cells, whether or not assembled into modules, from China. In October 2020, the U.S. Department of Commerce issued the final result of the sixth anti-dumping administrative review, according to which the anti-dumping deposit rate applicable to us was 68.93%. In December 2020, the U.S. Department of Commerce amended the final result of the sixth anti-dumping administrative review, according to which the anti-dumping deposit rate applicable to us was 95.5% after such amendment. In December 2020, the U.S. Department of Commerce issued the final result of the sixth countervailing administrative review, according to which the countervailing deposit rate applicable to us was 12.67%. In April 2021, the U.S. Department of Commerce amended the final result of the sixth countervailing administrative review, according to which the countervailing deposit rate applicable to us was 11.97% after such amendment. In February 2020, the U.S. Department of Commerce initiated the seventh administrative review of the anti-dumping duty order and countervailing duty order with respect to CSPV cells, whether or not assembled into modules, from China. The seventh administrative review is pending as of the date of this annual report, In February 2021, the U.S. Department of Commerce initiated the eighth administrative review of the anti-dumping duty order and countervailing duty order with respect to CSPV cells, whether or not assembled into modules, from China. The eighth administrative review is pending as of the date of this annual report, and therefore, the final anti-dumping and countervailing rates applicable to us are subject to change.

16

Table of Contents

In 2013, SolarWorld Industries America Inc. filed a separate petition with the U.S. Department of Commerce and the U.S. International Trade Commission resulting in the institution of new anti-dumping and countervailing duty investigations against import of certain CSPV products from China. The petitions accused Chinese producers of such certain CSPV modules of dumping their products in the United States and receiving countervailable subsidies from the Chinese government. This action excluded from its scope the CSPV cells, whether or not assembled into modules, from China. In February 2015, following the affirmative injury determination made by U.S. International Trade Commission, the U.S. Department of Commerce issued the anti-dumping duty order and countervailing duty order. As a result, the final cash deposits were required to pay on import into the United States of the CSPV modules assembled in China consisting of CSPV cells produced in a customs territory other than China. The announced cash deposit rates applicable to us were 65.36% (for anti-dumping) and 38.43% (for countervailing). The actual anti-dumping duty and countervailing duty rates at which entries of covered merchandise are finally assessed may differ from the announced deposit rates because they are subject to the administrative reviews by the U.S. Department of Commerce. In April 2016 and April 2017, the U.S. Department of Commerce initiated the first and the second administrative reviews of the anti-dumping duty order and countervailing duty order with respect to CSPV modules assembled in China consisting of CSPV cells produced in a customs territory other than China, respectively. In July and September 2017, the U.S. Department of Commerce issued the final results of this first administrative review. The second administrative reviews of the anti-dumping duty order and countervailing duty order were rescinded by the U.S. Department of Commerce in August 2017 and November 2017, respectively. In May 2019, the U.S. Department of Commerce initiated the third administrative reviews of the anti-dumping duty order and countervailing duty order with respect to CSPV modules assembled in China consisting of CSPV cells produced in a customs territory other than China. The final results of the third administrative reviews are still pending as of the date of this annual report. We were not included in this third administrative reviews, therefore, the cash deposit rates applicable to us remained at 65.36% (for anti-dumping) and 38.43% (for countervailing). In January 2020, the U.S. Department of Commerce and the U.S. International Trade Commission initiated five-year reviews to determine whether revocation of the anti-dumping and countervailing duty orders with respect to CSPV modules assembled in China, consisting of CSPV cells produced in a customs territory other than China, would likely lead to continuation or recurrence of material injury. In May 2020, the U.S. Department of Commerce determined that revocation of the antidumping and countervailing orders would likely lead to a continuation or recurrence of dumping and countervailing subsidies. In September 2020, the U.S. International Trade Commission determined that revocation of the countervailing and antidumping duty orders would likely lead to continuation or recurrence of material injury to an industry in the United States within a reasonably foreseeable time.

In May 2017, U.S. International Trade Commission initiated global safeguard investigation to determine whether CSPV cells (whether or not partially or fully assembled into other products) were being imported into the United States in such increased quantities as to be a substantial cause of serious injury, or the threat thereof, to the domestic industry producing an article like or directly competitive with the imported articles (“Section 201 Investigation”). The Section 201 Investigation was not country specific. They involved imports of the products under investigation from all sources, including China. In September 2017, the U.S. International Trade Commission voted affirmatively in respect of whether imports of CSPV cells (whether or not partially or fully assembled into other products) were causing serious injury to domestic producers of CSPV products. On January 22, 2018, the U.S. President made the final decision to provide a remedy to the U.S. industry, and the CSPV cells/modules concerned were subject to the safeguard measures established in the U.S. President’s final result, which included that the CSPV cells and modules imported would be subject to additional duties of 30%, 25%, 20% and 15% from the first year to the fourth year, respectively, except for the first 2.5 GW of all imported CSPV cells concerned in each of those four years, which are excluded from the additional tariff. On October 10, 2020, the U.S. President issued a proclamation and determined that the section 201 duty of the fourth year beginning in February 2021 will be 18%, instead of 15%. It is believed that the costs of solar power projects in the United States may increase and the demand for solar PV products in the United States may be adversely impacted due to the decision of the White House under the Section 201 Investigation. Although we opened our manufacturing facility in the United States, and the products manufactured in such facility will not be subject to tariffs, we will still be subject to tariffs if we ship our products from our manufacturing facilities overseas into the United States. Our imports of solar cells and modules into the United States were subject to the duties imposed by Section 201 Investigation starting from February 2018. Accordingly, our business and profitability of these products may be materially and adversely impacted by the decision of the White House under the Section 201 Investigation.

17

Table of Contents

In August 2017, the United States Trade Representative initiated an investigation pursuant to the Trade Act of 1974, as amended (the “Trade Act”), to determine whether acts, policies, and practices of the Government of China related to technology transfer, intellectual property, and innovation were actionable under the Trade Act (“Section 301 Investigation”). The findings from the United States Trade Representative with the assistance of the interagency Section 301 committee showed that the acts, policies, and practices of the Chinese government related to technology transfer, intellectual property and innovation were unreasonable or discriminatory and burdened or restricted the U.S. commerce. On March 22, 2018, the U.S. President directed his administration to take a range of actions responding to China’s acts, policies, and practices involving the unfair and harmful acquisition of U.S. technology. These actions included imposing an additional duty of 25% on products from China in aerospace, information and communication technology, and machinery. On April 3, 2018, the United States Trade Representative proposed a list of products from China which would be subject to the additional duty. In June and July 2018, the United States Trade Representative proposed three lists of products from China which were worth approximately US$250 billion (US$34 billion for List 1, US$16 billion for List 2 and US$200 billion for List 3), among which, products on List 1 and List 2 would be imposed a 25% additional duty and products on List 3 would be imposed a 10% additional duty. Certain of our production equipment and raw materials exported from China to be used in our new manufacturing facility in the United States and our solar PV products exported from China were covered by these three lists. In July, August and September 2018, the United States Trade Representative published that the Customs and Border Protection would begin to collect additional duties on the products exported from China on List 1 on July 6, 2018, those on List 2 on August 23, 2018 and those on List 3 on September 24, 2018, respectively. On March 5, 2019, the United States Trade Representative determined that the rates of additional duty for the products on List 3 would remained at 10% until further notice. On May 9, 2019, the United States Trade Representative determined to increase the rates of additional duty for the products on List 3 from 10% to 25% with an effective date on May 10, 2019. In August 2019, the United States Trade Representative determined to impose an additional 10% duty on the fourth list of products of Chinese origin with an annual aggregate trade value of approximately US$300 billion (“List 4”). Certain of our production equipment and raw materials of Chinese origin to be used in our new manufacturing facility in the United States were covered by List 4. The tariff subheadings under List 4 were separated into two lists with different effective dates: the list set forth in annex A of the notice issued by the United States Trade Representative became effective on September 1, 2019; and the list set forth in annex C of the notice became effective on December 15, 2019. On August 30, 2019, the United States Trade Representative determined to increase the rate of additional duty for the products covered by List 4 from 10% to 15%. On December 18, 2019, the United States Trade Representative determined to suspend indefinitely the imposition of additional 15% duty on products covered by annex C of List 4. On January 15, 2020, the United States Trade Representative determined to reduce the rate of the additional duty on products covered by annex A of List 4 from 15% to 7.5%, which became effective on February 14, 2020. The lists of products, which the United States Trade Representative may further revise, may affect the solar industry and the operation of our new manufacturing facility in the United States.

In December 2014, Canada initiated the anti-dumping and countervailing investigations on imports of CSPV modules from China. In June 2015, the Canada Border Services Agency (“CBSA”) found that the CSPV modules under investigation had been dumped and subsidized. In July 2015, the Canadian International Trade Tribunal found that the dumping and subsidizing of the above-mentioned goods had not caused injury, but were threatening to cause injury to the domestic industry. As a result, import into Canada of our CSPV modules under investigation from China was subject to the anti-dumping and countervailing duties. The countervailing duty rate (RMB per Watt) applicable to Jiangxi Jinko and Zhejiang Jinko are 0.028 and 0.046, respectively. For anti-dumping duties, CBSA had set normal value for the imported CSPV modules and the anti-dumping duty would be the difference between the export price and normal value if the export price is lower the normal value. No anti-dumping duties would apply if the export price is equal or more than the normal value. In May 2020, the Canadian International Trade Tribunal (“CITT”) and CBSA initiated an expiry review investigation to determine whether the expiry of their above findings made in June and July 2015 respectively are likely to result in the continuation or resumption of dumping and/or subsidizing of the CSPV modules originating in or exported from China. In October 2020, the CBSA has determined that the expiry of its finding is likely to result in the continuation or resumption of dumping and subsidizing of CSPV modules originating in or exported from China. In March 2021, CITT has determined to continue its abovementioned finding made in July 2015 concerning the dumping and subsidizing of CSPV modules originating in or exported from China. The CBSA will therefore continue to impose anti-dumping and countervailing duties on the CSPV modules originating in or exported from China.

In July 2016, Turkish Ministry of Economy initiated anti-dumping investigation against photovoltaic panels and modules classified in Turkish Customs Tariff Code 8541.40.90.00.14, from China. In July 2017, Turkish Ministry of Economy made the final affirmative result of this investigation, pursuant to which import into Turkey of our CSPV panels and modules under investigation from China would be subject to the anti-dumping duty. The anti-dumping duty applicable to us was US$20 per m2.

18

Table of Contents

In July 2017, the Department of Commerce of India initiated anti-dumping investigation concerning imports of solar cells whether or not assembled partially or fully in modules or panels or on glass or some other suitable substrates originating in or exported from mainland China, Taiwan and Malaysia. Such investigation was terminated in March 2018 by the Department of Commerce of India as requested by Indian Solar Manufacturers Association, representing applicants of the domestic industry.

In December 2017, the Directorate General of Safeguards of India initiated a safeguard investigations concerning imports of “solar cells whether or not assembled in modules or panels” (“PUC”) into India to protect the domestic producers of like and directly competitive articles (to the solar cells whether or not assembled in modules or panels) from serious injury/threat of serious injury caused by such increased imports (the “India Safeguard Investigations”). The India Safeguard Investigations were not country specific and involved imports for the products under investigation from all sources, including China. In January 2018, the Directorate General of Safeguards Customs and Central Excise recommended a provisional safeguard duty to be imposed at the rate of 70% ad valorem on the imports of PUC falling under Customs Tariff Item 85414011 of the Customs Tariff Act, 1975 from all countries, including PRC and Malaysia, except some developing countries. In May 2018, Indian central government overruled the Directorate General of Safeguards Customs and Central Excise’s recommendation of provisional safeguard duty at the rate of 70% ad valorem on the imports of PUC. On July 16, 2018, Directorate General of Trade Remedies published the final findings of Safeguard Investigations and recommended to impose the safeguard duty for a period of two years. As of July 30, 2018, Ministry of Finance of India issued a Notification No. 01/2018-Customs (SG) to impose safeguard duty at the following rate effective from July 30, 2018:

25% ad valorem minus anti-dumping duty payable, if any, when imported during the period from July 30, 2018 to July 29, 2019 (both days inclusive);
20% ad valorem minus anti-dumping duty payable, if any, when imported during the period from July 30, 2019 to January 29, 2020 (both days inclusive); and
15% ad valorem minus anti-dumping duty payable, if any, when imported during the period from January 30, 2020 to July 29, 2020 (both days inclusive).

Nothing contained in this notification shall apply to imports of PUC from countries notified as developing countries vide notification no.19/2016-custom (NT) dated February 5, 2016 except PRC and Malaysia.

In March 2020, the Directorate General of Trade Remedies of India initiated a review examining the need for continued imposition of safeguards duty on imports of solar cells whether or not assembled in modules or panels into India. On July 18, 2020, the Directorate General of Trade Remedies of India issued the final findings of review investigation for continued imposition of safeguards duty and recommended extension of safeguards duty for a period of another one year. On July 29, 2020, Ministry of Finance of India issued a Notification No.02/2020-Customs (SG) to impose safeguard duty at the following rate effective from July 30, 2020:

14.9% ad valorem minus anti-dumping duty payable, if any, when imported during the period from July 30, 2020 to January 29, 2021 (both days inclusive); and
14.5% ad valorem minus anti-dumping duty payable, if any, when imported during the period from January 30, 2021 to July 29, 2021 (both days inclusive).

Nothing contained in this notification shall apply to imports of PUC from countries notified as developing countries vide notification No. 19/2016-Customs (N.T.) dated the February 5, 2016, except the PRC, Thailand and Vietnam.

Imposition of anti-dumping and countervailing orders in one or more markets may result in additional costs to us, our customers or both, which could materially adversely affect our business, financial condition, results of operations and future prospects.

19

Table of Contents

Volatility in the prices of silicon raw materials makes our procurement planning challenging and could have a material adverse effect on our results of operations and financial condition.

The prices of polysilicon, the essential raw material for solar cell and module products and silicon wafers have been subject to significant volatility. Historically, increases in the price of polysilicon had increased our production costs. The price of polysilicon increased significantly in 2020 due to the supply shortage of polysilicon. In the first half of 2020, supply of polysilicon was negatively affected by the decreasing downstream demand due to the COVID-19 pandemic. In the second half of 2020, the production capacity of polysilicon of some key manufacturing facilities reduced due to the explosion accidents and maintenance activities, which further intensified the supply shortage. In addition, since the COVID-19 pandemic was under control in China, the demand for solar products recovered rapidly, which also resulted in the increase in the price of polysilicon. We expect that the supply and demand of polysilicon will tightly balance in 2021 and the price of polysilicon will fluctuate due to the release of demand.

We expect that the prices of virgin polysilicon feedstock may continue to be subject to volatility, making our procurement planning challenging. For example, if we refrain from entering into fixed-price, long-term supply contracts, we may miss the opportunities to secure long-term supplies of virgin polysilicon at favorable prices if the spot market price of virgin polysilicon increases significantly in the future. On the other hand, if we enter into more fixed-price, long-term supply contracts, we may not be able to renegotiate or otherwise adjust the purchase prices under such long-term supply contracts if the spot market price declines. As a result, our cost of silicon raw materials could be higher than that of our competitors who source their supply of silicon raw materials through floating-price arrangements or spot market purchases. To the extent we may not be able to fully pass on higher costs and expenses to our customers, our profit margins, results of operations and financial condition may be materially adversely affected.

We may not be able to obtain sufficient raw materials in a timely manner or on commercially reasonable terms, which could have a material adverse effect on our results of operations and financial condition.

In 2018, 2019 and 2020, our five largest suppliers accounted for 56.4%, 55.9% and 66.5%, respectively, of our total silicon purchases by value. In 2018, three of our suppliers individually accounted for more than 10%, and our largest supplier accounted for 15.5% of our total silicon purchases by value. In 2019, one of our suppliers individually accounted for more than 10%, and our largest supplier accounted for 23.3% of our total silicon purchases by value. In 2020, three of our suppliers individually accounted for more than 10%, and our largest supplier accounted for 19.6% of our total silicon purchases by value. In 2018, 2019 and 2020, our five largest group suppliers accounted for 62.9%, 68.6% and 70.0%, respectively, of our total silicon purchases by value. In 2018, three of our group suppliers individually accounted for more than 10%, and our largest group supplier accounted for 22.0% of our total silicon purchases by value. In 2019, four of our group suppliers individually accounted for more than 10%, and our largest group supplier accounted for 25.2% of our total silicon purchases by value. In 2020, four of our group suppliers individually accounted for more than 10%, and our largest group supplier accounted for 19.6% of our total silicon purchases by value. A “group supplier” refers to an aggregation of our suppliers that are within the same corporate group.

Although the global supply of polysilicon has increased significantly, we may experience interruption to our supply of silicon or other raw materials or late delivery in the future for the following reasons, among others:

suppliers under our silicon material supply contracts may delay deliveries for a significant period of time without incurring penalties;
our virgin polysilicon suppliers may not be able to meet our production needs consistently or on a timely basis;
compared with us, some of our competitors who also purchase virgin polysilicon from our suppliers have longer and stronger relationships with and have greater buying power and bargaining leverage over some of our key suppliers; and
our supply of silicon raw materials is subject to the business risk of our suppliers, some of whom have limited operating history and limited financial resources, and one or more of which could go out of business for reasons beyond our control in the current economic environment.

Our failure to obtain the required amounts of silicon raw materials and other raw materials, such as glass, in a timely manner and on commercially reasonable terms could increase our manufacturing costs and substantially limit our ability to meet our contractual obligations to our customers. Any failure by us to meet such obligations could have a material adverse effect on our reputation, ability to retain customers, market share, business and results of operations and may subject us to claims from our customers and other disputes. Furthermore, our failure to obtain sufficient silicon and other raw materials would result in under-utilization of our production facilities and an increase in our marginal production costs. Any of the above events could have a material adverse effect on our growth, profitability and results of operations.

20

Table of Contents

The loss of, or a significant reduction in orders from, any of our customers could significantly reduce our revenue and harm our results of operations.

In 2018, 2019 and 2020, sales to our top five customers represented 20.5%, 23.6% and 19.7% of our total revenue, respectively. In 2020, our largest customer accounted for 5.3% of our total revenue. In 2019, our largest customer accounted for 7.0% of our total revenue. In 2018, our largest customer accounted for 7.2% of our total revenue. In 2018, 2019 and 2020, sales to our top five group customers represented 21.4%, 30.2% and 19.7% of our total revenue, respectively. In 2020, our largest group customer accounted for 5.3% of our total revenue. In 2019, our largest group customer accounted for 10.9% of our total revenue. In 2018, our largest group customer accounted for 7.2% of our total revenue. A “group customer” refers to an aggregation of our customers that are within the same corporate group. Our relationships with our key customers for solar modules have been developed over a relatively short period of time and are generally in nascent stages. Our key module customers include NextEra, Consolidated Edison Development, Trung Nam Construction Investment, Copenhagen Infrastructure Partners, Spower, LLC, Enel Group and Swinerton Builders. We cannot assure you that we will be able to continue to generate significant revenue from these customers or that we will be able to maintain these customer relationships. In addition, we purchase solar wafers and cells and silicon raw materials through toll manufacturing arrangements that require us to make significant capital commitments to support our estimated production output. In the event our customers cancel their orders, we may not be able to recoup prepayments made to suppliers, which could adversely influence our financial condition and results of operations. The loss of sales to any of these customers could also have a material adverse effect on our business, prospects and results of operations.

We manufacture a majority of our products in several provinces in China, which exposes us to various risks relating to long-distance transportation of our silicon wafers and solar cells in the manufacturing process.

The geographical separation of our manufacturing facilities in China necessitates constant long-distance transportation of substantial volumes of our silicon wafers and solar cells between Jiangxi Province, Zhejiang Province, Xinjiang Uygur Autonomous Region, Sichuan Province and Anhui Province. We produce silicon wafers in Jiangxi, Xinjiang and Sichuan, solar cells in Zhejiang, and solar modules in Jiangxi, Zhejiang and Anhui. As a result, we transport a substantial volume of our silicon wafers and solar cells within China.

The constant long-distance transportation of a large volume of our silicon wafers and solar cells may expose us to various risks, including (i) increases in transportation costs, (ii) loss of our silicon wafers or solar cells as a result of any accidents that may occur in the transportation process, (iii) delays in the transportation of our silicon wafers or solar cells as a result of any severe weather conditions, natural disasters or other conditions adversely affecting road traffic, and (iv) disruptions to our production of solar cells and solar modules as a result of delays in the transportation of our silicon wafers and solar cells. Any of these risks could have a material adverse effect on our business and results of operations.

Prepayment arrangements to our suppliers for the procurement of silicon raw materials expose us to the credit risks of such suppliers and may also significantly increase our costs and expenses, which could in turn have a material adverse effect on our financial condition, results of operations and liquidity.

Our supply contracts generally include prepayment obligations for the procurement of silicon raw materials. As of December 31, 2020, we had RMB1.00 billion (US$153.7 million) of advances to our suppliers. We generally do not receive collateral to secure such payments for these contracts, and even if we do, the collateral we received is deeply subordinated and shared with all other customers and other senior lenders of the suppliers.

21

Table of Contents

Our prepayments, secured or unsecured, expose us to the credit risks of our suppliers, and reduce our chances of obtaining the return of such prepayments in the event that our suppliers become insolvent or bankrupt. Moreover, we may have difficulty recovering such prepayments if any of our suppliers fails to fulfill its contractual delivery obligations to us. Accordingly, a default by our suppliers to whom we have made substantial prepayment may have a material adverse effect on our financial condition, results of operations and liquidity. For example, in January 2013, we notified Wuxi Zhongcai Technological Co. Ltd. (“Wuxi Zhongcai”), one of our former polysilicon providers, to terminate our long-term supply agreement, in response to adverse developments in Wuxi Zhongcai’s business. In February 2013, we became involved in two lawsuits with Wuxi Zhongcai over the supply agreement. We provided full provision for the RMB93.2 million of the outstanding balance of prepayments to Wuxi Zhongcai in 2012. We received final judgements from the Supreme People’s Court for the two lawsuits in January and February 2019, respectively, which provided that, among others, Wuxi Zhongcai shall fully return our prepayments and interests accrued thereon. In December 2019, we entered into a settlement agreement for the enforcement of the Supreme People’s Court’s final judgements with Wuxi Zhongcai, Wuxi Zhongcai Group Co., Ltd., the parent company of Wuxi Zhongcai, Wuxi Zhongcai New Materials Co., Ltd. and the legal representative of Wuxi Zhongcai. According to the settlement agreement, Wuxi Zhongcai and Wuxi Zhongcai Group Co., Ltd. will return our prepayments and interests by the end of June 2020 while Wuxi Zhongcai New Materials Co., Ltd. and the legal representative of Wuxi Zhongcai are jointly and severally liable for Wuxi Zhongcai’s obligations under the settlement agreement. As of the date of this annual report, we have received the full repayment of RMB93.2 million (US$14.3 million) from Wuxi Zhongcai and recorded the reversal of previous provision upon actual cash receipt. See “Item 8. Financial Information—A. Consolidated Statements and Other Financial Information—Legal and Administrative Proceedings.”

Decreases in the price of solar power products, including solar modules, may result in additional provisions for inventory losses.

We typically plan our production and inventory levels based on our forecasts of customer demand, which may be unpredictable and can fluctuate materially. Recent market volatility has made it increasingly difficult for us to accurately forecast future product demand trends and the prices of solar power products. Due to the decrease in the prices of solar power products, including solar modules, which have been our principal products since 2010, we recorded inventory provisions of RMB220.2 million, RMB135.9 million and RMB270.9 million (US$41.5 million) in 2018, 2019 and 2020, respectively. If the prices of solar power products continue to decrease, the carrying value of our existing inventory may exceed its market price in future periods, thus requiring us to make additional provisions for inventory valuation, which may have a material adverse effect on our financial position and results of operations.

Shortage or disruption of electricity supply may adversely affect our business.

We consume a significant amount of electricity in our operations. With the rapid development of the PRC economy, demand for electricity has continued to increase. There have been shortages or disruptions in electricity supply in various regions across China, especially during peak seasons, such as the summer, or when there are severe weather conditions. We cannot assure you that there will not be disruptions or shortages in our electricity supply or that there will be sufficient electricity available to us to meet our future requirements. Shortages or disruptions in electricity supply and any increases in electricity costs may significantly disrupt our normal operations, cause us to incur additional costs and adversely affect our profitability.

We face intense competition in solar power product markets. If we fail to adapt to changing market conditions and to compete successfully with existing or new competitors, our business prospects and results of operations would be materially adversely affected.

The markets for solar power products are intensely competitive. We compete with manufacturers of solar power products such as Longi Green Energy Technology Co., Ltd., Trina Solar Ltd., Canadian Solar Inc. and JA Solar Holdings Co., Ltd., in a continuously evolving market. Certain downstream manufacturers, some of which are also our customers and suppliers, have also built out or expanded their silicon wafer, solar cell, or solar module production operations.

Some of our current and potential competitors have a longer operating history, stronger brand recognition, more established relationships with customers, greater financial and other resources, a larger customer base, better access to raw materials and greater economies of scale than we do. Furthermore, some of our competitors are integrated players in the solar industry that engage in the production of virgin polysilicon. Their business models may give them competitive advantages as these integrated players place less reliance on the upstream suppliers, downstream customers or both.

22

Table of Contents

The solar industry faces competition from other types of renewable and non-renewable power industries.

The solar industry faces competition from other renewable energy companies and non-renewable power industries, including nuclear energy and fossil fuels such as coal, petroleum and natural gas. Technological innovations in these other forms of energy may reduce their costs or increase their safety. Large-scale new deposits of fossil fuel may be discovered, which could reduce their costs. Local governments may decide to strengthen their support for other renewable energy sources, such as wind, hydro, biomass, geothermal and ocean power, and reduce their support for the solar industry. The inability to compete successfully against producers of other forms of power would reduce our market share and negatively affect our results of operations.

Technological changes in the solar power industry could render our products uncompetitive or obsolete, which could reduce our market share and cause our revenue and net income to decline.

The solar power industry is characterized by evolving technologies and standards. These technological evolutions and developments place increasing demands on the improvement of our products, such as solar cells with higher conversion efficiency and larger and thinner silicon wafers and solar cells. Other companies may develop production technologies that enable them to produce silicon wafers, solar cells and solar modules with higher conversion efficiencies at a lower cost than our products. Some of our competitors are developing alternative and competing solar technologies that may require significantly less silicon than crystalline silicon wafers and solar cells, or no silicon at all. Technologies developed or adopted by others may prove more advantageous than ours for commercialization of solar power products and may render our products obsolete. As a result, we may need to invest significant resources in research and development to maintain our market position, keep pace with technological advances in the solar power industry, and effectively compete in the future. Our failure to further refine and enhance our products and processes or to keep pace with evolving technologies and industry standards could cause our products to become uncompetitive or obsolete, which could materially adversely reduce our market share and affect our results of operations.

Existing regulations and policies and changes to these regulations and policies may present technical, regulatory and economic barriers to the purchase and use of solar power products, which may significantly reduce demand for our products.

The market for electricity generation products is heavily influenced by government regulations and policies concerning the electric utility industry, as well as by policies adopted by electric utility companies. These regulations and policies often relate to electricity pricing and technical interconnection requirements for customer-owned electricity generation. In a number of countries, these regulations and policies are being modified and may continue to be modified. Customer purchases of, or further investment in the research and development of, alternative energy sources, including solar power technology, could be deterred by these regulations and policies, which could result in a significant reduction in the demand for our products. For example, without a regulatory mandated exception for solar power systems, utility customers may be charged interconnection or standby fees for putting distributed power generation on the electric utility grid. These fees could increase the cost of and reduce the demand for solar power, thereby harming our business, prospects, results of operations and financial condition.

In addition, we anticipate that solar power products and their installation will be subject to oversight and regulation in accordance with national and local regulations relating to building codes, safety, environmental protection, utility interconnection, and metering and related matters. Any new government regulations or utility policies pertaining to solar power products may result in significant additional expenses to the users of solar power products and, as a result, could eventually cause a significant reduction in demand for our products.

We may face termination and late charges and risks relating to the termination and amendment of certain equipment purchases contracts.

We transact with a limited number of equipment suppliers for all our principal manufacturing equipment and spare parts, including our silicon ingot furnaces, squaring machines, wire saws, diffusion furnaces, firing furnaces and screen print machine. We may rely on certain major suppliers to provide a substantial portion of the principal manufacturing equipment and spare parts as part of our expansion plan in the future. If we fail to develop or maintain our relationships with these and other equipment suppliers, or should any of our major equipment suppliers encounter difficulties in the manufacturing or shipment of its equipment or spare parts to us, including due to natural disasters or otherwise fail to supply equipment or spare parts according to our requirements, it will be difficult for us to find alternative providers for such equipment on a timely basis and on commercially reasonable terms. As a result, our production and result of operation could be adversely affected.

23

Table of Contents

Selling our products on credit terms may increase our working capital requirements and expose us to the credit risk of our customers.

To accommodate and retain customers in the negative market environment, many solar module manufacturers, including us, make credit sales and extend credit terms to customers, and this trend is expected to continue in the industry. Most of our sales are made on credit terms and we allow our customers to make payments after a certain period of time subsequent to the delivery of our products. Our accounts receivable turnover were 93 days, 85 days and 68 days in 2018, 2019 and 2020, respectively. Correspondingly, we recorded provisions for accounts receivable from third parties of RMB256.6 million, RMB318.2 million and RMB293.4 million (US$45.0 million) as of December 31, 2018, 2019 and 2020, respectively. Based on our ongoing assessment of the recoverability of our outstanding accounts receivable, and the consideration of the historical credit loss experience, current economic conditions, supportable forecasts of future economic conditions, and any recoveries in assessing the lifetime expected credit losses, we may need to continue to provide for doubtful accounts and write off overdue accounts receivable we determine as not collectible.

Selling our products on credit terms has increased, and may continue to increase our working capital requirements, which may negatively affect our liquidity. We may not be able to maintain adequate working capital primarily through cash generated from our operating activities and may need to secure additional financing for our working capital requirements, which may not be available to us on commercially acceptable terms or at all.

In addition, we are exposed to the credit risk of customers to which we have made credit sales in the event that any of such customers becomes insolvent or bankrupt or otherwise does not make timely payments. For example, we sell our products on credit to certain customers in emerging or promising markets in order to gain early access to such markets, increase our market share in existing key markets or enhance the prospects of future sales with rapidly growing customers. There are high credit risks in doing business with these customers because they are often small, young and high-growth companies with significant unfunded working capital, inadequate balance sheets and credit metrics and limited operating histories. If these customers are not able to obtain satisfactory working capital, maintain adequate cash flow, or obtain construction financing for the projects where our solar products are used, they may be unable to pay for products they have ordered from us or for which they have taken delivery. Our legal recourse under such circumstances may be limited if the customers’ financial resources are already constrained or if we wish to continue to do business with these customers.

We are exposed to various risks related to legal or administrative proceedings or claims that could adversely affect our financial condition, results of operations and reputation, and may cause loss of business.

Litigation in general can be expensive, lengthy and disruptive to normal business operations. Moreover, the results of complex legal proceedings are difficult to predict. We and/or our directors and officers may be involved in allegations, litigation or legal or administrative proceedings from time to time.

24

Table of Contents

In July 2008, Jiangxi Jinko entered into a long-term supply agreement with Wuxi Zhongcai, a producer of polysilicon materials. Jiangxi Jinko provided a prepayment of RMB95.6 million pursuant to such contract. Wuxi Zhongcai subsequently halted production as a result of the adverse changes in the polysilicon market. In February 2013, Jiangxi Jinko sued Wuxi Zhongcai in Shangrao City Intermediate People’s Court for the refund of the outstanding balance of our prepayment of RMB93.2 million after deducting delivery made to Jiangxi Jinko by an affiliate of Wuxi Zhongcai. In February 2013, Wuxi Zhongcai sued Jiangxi Jinko in Shanghai Pudong New Area People’s Court for RMB2.7 million for breaching the contract by failing to make allegedly required payments and rejected the refund of the prepayment of RMB95.6 million to Jiangxi Jinko. In December 2015, Jiangxi Jinko made an alternation of the claim under which it requested the refund of the prepayment of RMB93.2 million, the interests accrued from such prepayment, and the liquidated damages in the amount of RMB93.2 million. In January 2016, Wuxi Zhongcai also changed the complaint, in which it claimed for the liquidated damages amounting to RMB102.0 million and the losses suffered from the termination of the agreement in the amount of RMB150.0 million, and rejected the refund of the prepayment of RMB95.6 million to Jiangxi Jinko. Shanghai High People’s Court ruled on both lawsuits in June 2017. In Jiangxi Jinko v. Wuxi Zhongcai, the court sided with Wuxi Zhongcai and denied Jiangxi Jinko’s complaint. In Wuxi Zhongcai v. Jiangxi Jinko, the court decided that Wuxi Zhongcai shall retain the balance of our prepayment in the amount of RMB93.2 million and the remaining claims of Wuxi Zhongcai were denied. Jiangxi Jinko appealed both court decisions. Wuxi Zhongcai appealed the decision on Wuxi Zhongcai v. Jiangxi Jinko. We provided full provision for the RMB93.2 million of the outstanding balance of prepayments to Wuxi Zhongcai in 2012. We received final judgements for the two lawsuits from the Supreme People’s Court in January and February 2019, respectively, which provide that, among others, Wuxi Zhongcai shall fully return our prepayments and interests accrued thereon. In December 2019, we entered into a settlement agreement for the enforcement of the Supreme People's Court's final judgements with Wuxi Zhongcai, Wuxi Zhongcai Group Co., Ltd., the parent company of Wuxi Zhongcai, Wuxi Zhongcai New Materials Co., Ltd. and the legal representative of Wuxi Zhongcai. According to the settlement agreement, Wuxi Zhongcai and Wuxi Zhongcai Group Co., Ltd. will return our prepayments and interests by the end of June 2020 while Wuxi Zhongcai New Materials Co., Ltd. and the legal representative of Wuxi Zhongcai are jointly and severally liable for Wuxi Zhongcai's obligations under the settlement agreement. As of the date of this annual report, we have received the full repayment of RMB93.2 million (US$14.3 million) from Wuxi Zhongcai and recorded the reversal of previous provision upon actual cash receipt.

In the fourth quarter of 2017, we decided to fulfill the demand for our solar products in South Africa through other overseas manufacturing facilities, and closed our manufacturing facility in South Africa. In December 2017, the South African Revenue Services (“SARS”), issued a letter of demand in terms of the Customs and Excise Act (the “Act”). The demand was for the amount of approximately ZAR573.1 million against JinkoSolar (Pty) Ltd. SARS alleged that JinkoSolar (Pty) Ltd’s importation of certain components for the manufacturer of solar panels and the rebate of customs duty did not comply with the Act. We were of the view that SARS’ decision to persist with the letter of demand for the amounts in question was without any legal basis and intended on vigorously defending JinkoSolar (Pty) Ltd against all these claims. JinkoSolar (Pty) Ltd submitted an application to SARS for the suspension of payment for the amount demanded. In February 2018, JinkoSolar (Pty) Ltd lodged an internal appeal in terms of sections 77A–77F of the Act against the decision of SARS to claim the amounts demanded and the basis thereof to the Customs National Appeals Committee of South Africa. In December 2018, Jiangxi Jinko transferred 100% equity interest in Jinko Solar Investment (Pty) Ltd to an independent third party, at which point both Jinko Solar Investment (Pty) Ltd and its subsidiary JinkoSolar (Pty) Ltd were no longer our affiliated companies and their financial results were no longer consolidated into our consolidated financial statements.

25

Table of Contents

In November 2018, one of our customers in Singapore (the “Singapore Customer”) filed two Notices of Arbitration (“NoAs”) in two arbitrations with Arbitration No. ARB374/18/PPD (“ARB 374”) and Arbitration No. ARB375/18/PPD (“ARB 375”), respectively, against Jinko Solar Import & Export Co., Ltd. (“Jinko IE”) at Singapore International Arbitration Centre. These NoAs were subsequently amended by the Singapore Customer, and Jinko IE received the amended Notices of Arbitration from the Singapore Customer on December 20, 2018. The Singapore Customer claimed respectively in ARB 374 and ARB 375 that the photovoltaic solar modules supplied by Jinko IE to the Singapore Customer under the purchase agreement dated December 25, 2012 (“2012 Contract”) and January 28, 2013 (“2013 Contract”) were defective. The Singapore Customer sought, inter alia, orders that Jinko IE replace the modules and/or that Jinko IE compensate the Singapore Customer for any and all losses sustained by the Singapore Customer as a result of the supply of allegedly defective modules. In January 2019, Jinko IE issued its responses to the NoAs in ARB 374 and ARB 375, disputing the Singapore Customer’s reliance on the arbitration clauses in the 2012 Contract and the 2013 Contract, denying all claims raised by the Singapore Customer, and disputing that the Singapore Customer was entitled to the reliefs claimed in the arbitrations. Arbitration tribunals in both ARB 374 and ARB 375 were constituted on September 5, 2019, which directed on January 14, 2020 that (i) the Singapore Customer shall submit its statement of claim in both ARB 374 and ARB 375 and Jinko IE shall submit its statement of defense no later than five months after Singapore Customer’s submission of statement of claim; and (ii) the hearing of the arbitrations shall be bifurcated with the liability issue to be first determined by the tribunals, and then depending on the outcome of the liability issue, the issue of remedies/damages payable to be determined in the subsequent proceedings in such manner as may be directed by the tribunals. On August 7, 2020, the Singapore Customer submitted its statement of claim in both ARB 374 and ARB 375. In the statement of claim, the Singapore Customer maintained its claim that the photovoltaic solar modules supplied by Jinko IE to them under the 2012 Contract and the 2013 Contract were defective, and that Jinko IE should be liable in respect of all the modules supplied under the 2012 Contract and the 2013 Contract. On December 16, 2020, following Jinko IE’s request, the tribunals in both ARB 374 and ARB 375 directed that Jinko IE’s statement of defense should be submitted by February 11, 2021. On February 11, 2021, Jinko IE submitted its statement of defense and relevant evidence. In the statement of defense, Jinko IE (i) requested the tribunal to declare that it lacks jurisdiction over the dispute; and (ii) denied all the Singapore Customer claims and requested the same be dismissed by the tribunal. On February 22, 2021, upon mutual agreement by Jinko IE and the Singapore Customer, the tribunal directed that ARB 374 and ARB 375 should be consolidated. Based on the limited information currently available to us, it is difficult to provide an in-depth assessment of the Singapore Customer’s claims. We believe that Jinko IE has reasonable grounds to challenge the Singapore Customer’s claims in the arbitrations on jurisdiction and merits and will vigorously defend against the claims made by the Singapore Customer. Information available prior to issuance of the financial statements did not indicate that it is probable that a liability had been incurred at the date of the financial statements and we are also unable to reasonably estimate the range of any liability or reasonably possible loss, if any.

In March 2019, Moura Fábrica Solar – Fabrico e Comércio de Painéis Solares, Lda. (“MFS”) submitted a request for arbitration at International Chamber of Commerce (Case No. 24344/JPA) against Projinko Solar Portugal, Unipessoal Lda (“Projinko”) in connection with dispute arising out of (i) a business unit lease agreement (the “Business Unit Lease Agreement”) entered into on August 23, 2013 between MFS and Jinko Solar (Switzerland) AG (“Jinko Switzerland”), (ii) an assignment agreement dated May 26, 2014, whereby Jinko Switzerland assigned and transferred to Projinko all rights, title, interest, liabilities and obligations under the Business Unit Lease Agreement, and (iii) an amendment agreement relating to the Business Unit Lease Agreement dated December 29, 2015 (the Business Unit Lease Agreement, the assignment agreement and the amendment agreement are collectively referred to as “Lease Agreements”). In order to ensure the performance of parties’ respective obligations under the Lease Agreements, a guarantee from the parent company of MFS, Acciona Energia, S.A.U. and a bank guarantee was granted in favor of Projinko, and a guarantee from the parent company of Projinko, Jiangxi Jinko, and a bank guarantee was also granted in favor of MFS. The notice of request for arbitration had not been duly and effectively served by MFS to Projinko. In July 2019, MFS submitted a request at International Chamber of Commerce to join Jinko Switzerland and Jiangxi Jinko as two additional parties, alleging they were indispensable to the current dispute and claiming against Projinko, Jiangxi Jinko and Jinko Switzerland recovery of two drawdowns by Projinko under the bank guarantee in the amount of €1,965,170 and €846,604, respectively, with the interests thereon as well as economic damages suffered by MFS as a result thereof.

26

Table of Contents

In September 2019, Jiangxi Jinko and Jinko Switzerland submitted to the International Chamber of Commerce that they rejected to arbitrate any dispute with MFS and were not bound by valid and effective arbitration agreement with MFS; Jiangxi Jinko and Jinko Switzerland also opposed the constitution of an arbitration tribunal and the jurisdiction of any arbitration tribunal that may be constituted in the present case. On July 3, 2020, MFS submitted a statement of claim claiming against Projinko, Jiangxi Jinko and Jinko Switzerland for recovery of two drawdowns by Projinko under the bank guarantee in an aggregated amount of €2,812,000, with the interests thereon as well as economic damages suffered by MFS as a result thereof. On September 3, 2020, Projinko, Jiangxi Jinko and Jinko Switzerland submitted their statements of defense requesting the tribunal dismiss all claims made by MFS against Projinko, Jiangxi Jinko and Jinko Switzerland; Projinko also submitted its counterclaim against MFS requesting the tribunal order MFS to pay Projinko €1,008,170 plus accrued interest as a recovery of drawdown by MFS under the bank guarantee granted in favor of MFS. On January 12, 2020, pursuant to the parties’ joint request, the tribunal declared the proceedings suspended until further notice to allow for settlement discussions. In March 2021, the parties fully executed the settlement agreement for the dispute. According to the settlement agreement, the parties automatically and reciprocally release each other from the dispute on the condition that Jinko Switzerland delivers to MFS a payment in the amount of €750,000. In April 2021, Jinko Switzerland made the payment and MFS has confirmed receipt of the same. The parties have provided a letter to the tribunal to withdraw all claims and request the termination of the arbitration proceedings. As of the date of this annual report, the tribunal is processing the request and will finally grant termination of the arbitration proceedings after completion of certain standard formalities.

In March 2019, Hanwha Q CELLS (defined below) filed patent infringement lawsuits against our company and a number of our subsidiaries.

(i) On March 4, 2019, Hanwha Q CELLS USA Inc. and Hanwha Solutions Corporation (The plaintiff has been changed from Hanwha Q CELLS & Advanced Materials Corporation to Hanwha Solutions Corporation (registration no. 110111-0360935) during the course of the proceedings because of restructuring undertaken by its affiliate(s) in relation to ownership of the patent in suit) (collectively, “Plaintiffs A”) filed suit against JinkoSolar Holding Co., Ltd and several of its subsidiary entities, i.e. JinkoSolar (U.S.) Inc, Jinko Solar (U.S.) Industries Inc, Jinko Solar Co., Ltd, Zhejiang Jinko Solar Co., Ltd and Jinko Solar Technology Sdn.Bhd (collectively “Respondents”) at the U.S. International Trade Commission (“ITC”). In the complaint, it was alleged that certain photovoltaic solar cells and modules containing these solar cells supplied by the Respondents infringed U.S. Patent No. 9,893,215 purportedly owned by Hanwha Q CELLS & Advanced Materials Corporation and Plaintiffs A requested a permanent limited exclusion order and a cease and desist order be issued against the Respondents’ allegedly infringing products. On March 5, 2019, Hanwha Q CELLS & Advanced Materials Corporation filed a suit against the Respondents before the U.S. District Court for the District of Delaware (“District Court”) alleging that certain photovoltaic solar cells and modules containing these solar cells supplied by the Respondents infringed U.S. Patent No. 9,893,215 allegedly owned by Hanwha Q CELLS & Advanced Materials Corporation and sought reliefs including compensation for alleged infringement activities, enhanced damages and reasonable attorney fees. On April 9, 2019, the ITC published the Notice of Institution on Federal Register. On April 15, 2019, the District Court granted our motion to stay the court litigation pending final resolution of the ITC. On May 3, 2019, the Respondents submitted their response to the complaint of Plaintiffs A to the ITC requesting ITC among other things to deny all relief requested by Plaintiffs A. On September 13, 2019, the Respondents filed motion for summary determination of non-infringement with ITC. On April 10, 2020, the administrative law judge issued the initial determination granting the Respondents’ motion for summary determination of non-infringement. On June 3, 2020, the ITC determined to affirm the initial determination issued by the administrative law judge granting respondents’ motions for summary determination of non-infringement and terminate the investigation (the “Final Determination”). On July 31, 2020, Plaintiffs A filed its petition to review with the United States Court of Appeals for the Federal Circuit against the ITC’s Final Determination. On August 27, 2020, the Respondents filed the motion to intervene of such appeal. Plaintiffs A filed its opening appeal brief in November 2020. The Respondents filed the principal brief in February 2021.

(ii) On March 4, 2019, Hanwha Q CELLS GmbH (“Plaintiff B”), filed a patent infringement claim against JinkoSolar GmbH before the Düsseldorf Regional Court in Germany alleging that certain photovoltaic solar cells and modules containing these solar cells supplied by JinkoSolar GmbH infringed EP2 220 689 purportedly owned by Plaintiff B. On April 10, 2019, JinkoSolar GmbH filed the first brief with the court stating JinkoSolar GmbH would defend itself against the complaint. On September 9, 2019, JinkoSolar GmbH filed its statement of defense with the court (the “Statement of Defense”), requesting that the claim be dismissed and that Plaintiff B to bear the costs of the legal dispute. On March 3, 2020, Plaintiff B filed its reply to the Statement of Defense with the court. On April 20, 2020, JinkoSolar GmbH filed its rejoinder with the court commenting on Plaintiff B’s reply on March 3, 2020. On May 5, 2020, the oral hearing regarding the validity of the EP2 220 689, Plaintiff B’s entitlement to sue, and the infringement was held before the Düsseldorf Regional Court. On June 16, 2020, the Düsseldorf Regional Court sided with Plaintiff B and ordered that the third party cell technology contained in certain modules delivered by JinkoSolar GmbH infringes Plaintiff B’s patent (the “Judgment”). JinkoSolar GmbH filed its notice of appeal on July 14, 2020. On October 16, 2020, JinkoSolar GmbH submitted grounds of appeal to the Düsseldorf Higher Regional Court. On March 1, 2021, JinkoSolar GmbH submitted appeal joinder to the Düsseldorf Higher Regional Court. On September 28, 2020, Plaintiff B has submitted the request for penalty to Düsseldorf Regional Court, claiming that JinkoSolar GmbH violated the Judgment by continuing to promote infringing products and requesting imposition of penalty for such violation. Though not specified in Plaintiff B’s request, in general we do not expect the amount of such penalty to exceed €250,000. On November 30,2020, JinkoSolar GmbH submitted its response to Plaintiff B’s request for penalty. On April 6, 2021, JinkoSolar GmbH submitted its second response to Plaintiff B’s request for penalty.

27

Table of Contents

(iii) On March 12, 2019, Hanwha Solutions Corporation (The plaintiff has been changed from Hanwha Q CELLS & Advanced Materials Corporation to Hanwha Solutions Corporation during the course of the proceedings) and Hanwha Q CELLS Australia Pty Ltd (“Plaintiffs C”, together with Plaintiffs A and Plaintiff B, “Hanwha Q CELLS Plaintiffs”) filed suit at Federal Court of Australia (“FCA”) against Jinko Solar Australia Holdings Co. Pty Ltd (“Jinko AUS”). It was alleged that certain photovoltaic solar cells and modules containing these solar cells supplied by Jinko AUS infringed Australian Patent No. 2008323025 purportedly owned by Plaintiffs C. The relief sought by Plaintiffs C includes a declaration of infringement, injunctions restraining future acts of commercial exploitation by way of importing, offering to supply and supplying the relevant products; ancillary relief by way of delivery up for destruction of allegedly infringing product and pecuniary remedies by way of damages (including additional damages) or, at Hanwha’s election, an account of profits; and declarations and injunctions based on the misleading or deceptive conduct claim. It is expected that issues relating to pecuniary relief and their quantum will be separated and deferred for determination after the liability hearing. The FCA served Jinko AUS as the Respondent and the first case management hearing was held on April 12, 2019. The FCA heard the application, and made orders for the conduct of the proceeding at the first case management hearing, following which Jinko AUS submitted its defense and cross-claim to Plaintiffs C’s statement of claim on July 22, 2019. Shortly before the second case management hearing which was held on October 2, 2019, Plaintiffs C requested an amendment to Australian Patent No. 2008323025 (“Amendment Application”) on the stated basis of overcoming prior art relevant to validity and it also appeared that one of the amendments sought by Plaintiffs C was with a view to improving its position in relation to Jinko AUS’s defense to infringement. Plaintiffs C’s Amendment Application was opposed by Jinko AUS and the other Australian respondents and FCA directed Plaintiffs C to give discovery and produce documents in respect to the Amendment Application. The third case management hearing was held on December 13, 2019, after which Jinko AUS submitted particulars of opposition to the Amendment Application and requested for further and better discovery in respect to the Amendment Application. As a result, Hanwha subsequently dropped the amendment in relation to Jinko AUS’s defense to infringement and opposition to the remaining Amendment Application continued for some time but was ultimately not pursued by Jinko AUS and the other Australian respondents. The FCA granted Plaintiffs C’s Amendment Application on August 28, 2020. Following the order directed by FCA at the case management hearing held on November 16, 2020, Plaintiffs C’s has filed its infringement statement at FCA on December 17, 2020 and refers to certain testing undertaken in South Korea in 2018 prior to the commencement of the proceeding, and Jinko AUS has filed a precise non-infringement statement identifying the reasons why certain photovoltaic solar cells and modules supplied by Jinko AUS do not infringe Australian Patent No. 2008323025 on March 9, 2021. A more extensive case management hearing was originally scheduled on March 23, 2021 and has now been adjourned to May 10, 2021. The next case management hearing will set the matter down for a final hearing in the year of 2022 on dates to be advised.

We believe that Hanwha Q CELLS Plaintiffs’ claims in all the above-mentioned cases are lacking legal merit, and will vigorously defend against the claims made by them. We are considering all legal avenues including challenging the validity of U.S. Patent No. 9,893,215 (“the ‘215 Patent”), EP 2 220 689 and Australian Patent No. 2008323025 (collectively, the “Asserted Patents”), and demonstrating our non-infringement of the Asserted Patents. On June 3, 2019, we filed a petition for inter partes review (“IPR”) of the ‘215 Patent with the U.S. Patent and Trademark Appeal Board (“PTAB”). IPR is a trial proceeding conducted at the PTAB to review the patentability of one or more claims in a patent. On December 10, 2019, the PTAB instituted the IPR proceedings of the patentability of claims 12-14 of the ‘215 patent claims in view of prior art. On September 9, 2020, we attended the oral hearing of IPR of the ‘215 patent. On December 9, 2020, the PTAB issued the final decision on our petition for IPR, finding that all challenged claims 12-14 of the ‘215 patent are unpatentable. On February 8, 2021, the patent owner of ‘215 Patent, Hanwha Solutions Corporation, appealed to the United States Court of Appeals for the Federal Circuit against such final decision issued by the PTAB (“215 IPR Appeal”). On February 24, 2021, we have filed the certificate of interest to participate in 215 IPR Appeal.

On June 24, 2019, Jinko filed with the European Patent Office a Notice of Intervention in the opposition proceeding regarding the validity of the EP 2 220 689. On March 25 and March 26, 2021, the opposition oral hearing regarding the validity of the EP2 220 689 was held before the European Patent Office. During the hearing, the European Patent Office held that the EP2 220 689 was maintained in amended form. We expect additional hearing to be held and the final decision be issued at a date to be further notified.

Information available prior to issuance of the financial statements did not indicate that it is probable that a liability had been incurred at the date of the financial statements and we are also unable to reasonably estimate the range of any liability or reasonably possible loss, if any.

In addition, failure to maintain the integrity of internal or customer data could result in harm to our reputation or subject us to costs, liabilities, fines or lawsuits.

28

Table of Contents

Regardless of the merits, responding to allegations, litigation or legal or administration proceedings and defending against litigation can be time-consuming and costly, and may result in us incurring substantial legal and administrative expenses, as well as divert the attention of our management. Any such allegations, lawsuits or proceedings could have a material adverse effect on our business operations. Further, unfavorable outcomes from these claims or lawsuits could adversely affect our business, financial condition and results of operations.

We may continue to undertake acquisitions, investments, joint ventures or other strategic alliances, and such undertakings may be unsuccessful.

We may continue to grow our operations through acquisitions, participation in joint ventures or other strategic alliances with suppliers or other companies in China and overseas along the solar power industry value chain in the future. Such acquisitions, participation in joint ventures and strategic alliances may expose us to new operational, regulatory, market and geographical risks as well as risks associated with additional capital requirements and diversion of management resources. Our acquisitions may expose us to the following risks:

There may be unforeseen risks relating to the target’s business and operations or liabilities of the target that were not discovered by us through our legal and business due diligence prior to such acquisition. Such undetected risks and liabilities could have a material adverse effect on our business and results of operations in the future.
There is no assurance that we will be able to maintain relationships with previous customers of the target, or develop new customer relationships in the future. Loss of our existing customers or failure to establish relationships with new customers could have a material adverse effect on our business and results of operations.
Acquisitions will generally divert a significant portion of our management and financial resources from our existing business and the integration of the target’s operations with our existing operations has required, and will continue to require, significant management and financial resources, potentially straining our ability to finance and manage our existing operations.
There is no assurance that the expected synergies or other benefits from any acquisition or joint venture investment will actually materialize. If we are not successful in the integration of a target’s operations, or are otherwise not successful in the operation of a target’s business, we may not be able to generate sufficient revenue from its operations to recover costs and expenses of the acquisition.
Acquisition or participation in new joint venture or strategic alliance may involve us in the management of operation in which we do not possess extensive expertise.

The materialization of any of these risks could have a material adverse effect on our business, financial condition and results of operations.

We may be subject to non-competition or other similar restrictions or arrangements relating to our business.

We may from time to time enter into non-competition, exclusivity or other restrictions or arrangements of a similar nature as part of our sales agreements with our customers. Such restrictions or arrangements may significantly hinder our ability to sell additional products, or enter into sales agreements with new or existing customers that plan to sell our products, in certain markets. As a result, such restrictions or arrangements may have a material adverse effect on our business, financial condition and results of operations.

In October 2016, we entered into a side agreement with JinkoPower and the investors of JinkoPower, pursuant to the non-compete provisions of which we undertake not to develop any downstream solar power project with a capacity of over 2 MW in China after the disposition of our equity interest in JinkoPower in the fourth quarter of 2016. This non-competition covenant may adversely affect our growth prospects in China.

29

Table of Contents

In September 2017, we provided a non-compete commitment to JinkoPower where we undertake to cease developing new downstream solar projects. In addition, for our existing offshore downstream solar power projects that we are constructing and will connect to the grid, we undertake to endeavor to cause those projects to be transferred to JinkoPower, its subsidiaries or other qualified third parties, to the extent that such transfers will not contravene with applicable laws and regulations and that we are able to obtain written consent of the relevant contracting parties for those projects. This non-competition undertaking may adversely affect our operating results.

The NEA released a “Technology Top Runner” program in 2017, which has more stringent technology standards than other “Top Runner” programs, to promote solar projects using higher-efficiency modules (requiring a conversion efficiency rate of 18.9% or above for monocrystalline solar cells and 18.0% or above for multicrystalline solar cells) and most advanced technologies (especially breakthrough technologies that have not reached the stage of mass production). In order to promote our high-efficiency modules and cutting-edgy N-type cell technologies, (i) we and JinkoPower jointly established Poyang Luohong Power Co., Ltd. (“Poyang Luohong”), a PRC company, in the third quarter of 2018, in which we then held 51% equity interest and had made capital contribution of RMB98 million in cash as of December 31, 2018, and (ii) we formed a bidding consortium with JinkoPower to bid for “Technology Top Runner” solar projects, and had won a 250 MW “Technology Top Runner” solar project in Shangrao, Jiangxi Province (the “Technology Top Runner Project”). We supplied N-type monocrystalline modules to this project, whose conversion efficiency is even higher than our P-type monocrystalline PERC modules. The Technology Top Runner Project was developed by Poyang Luohong. We sold all of our equity interest in Poyang Luohong to an independent third party, and filed the change of ownership with Shangrao Market Supervision Administration on December 17, 2019. We currently do not have plans to develop solar projects in China or overseas. As of December 31, 2020, we did not own any solar project in China, and we had only one solar power project in operation and one project under construction outside China.

Our substantial indebtedness could adversely affect our business, financial condition and results of operations.

We typically require a significant amount of cash to meet our capital requirements, including the expansion of our production capacity, as well as to fund our operations. As of December 31, 2020, we had RMB8.24 billion (US$1.26 billion) in outstanding short-term borrowings (including the current portion of long-term borrowings and failed sale-leaseback financing) and RMB7.30 billion (US$1.12 billion) in outstanding long-term borrowings (excluding the current portion of long-term borrowings and failed sale-leaseback financing). For details regarding our borrowings, see “Item 5. Operating and Financial Review and ProspectsB. Liquidity and Capital Resources” in this annual report.

We may not have sufficient funds available to meet our payment obligations in light of the amount of bank borrowings due in the near term future. This level of debt and the imminent repayment of our notes and other bank borrowings could have significant consequences on our operations, including:

reducing the availability of our cash flow to fund working capital, capital expenditures, acquisitions and other general corporate purposes as a result of our debt service obligations, and limiting our ability to obtain additional financing;
limiting our flexibility in planning for, or reacting to, and increasing our vulnerability to, changes in our business, the industry in which we operate and the general economy; and
potentially increasing the cost of any additional financing.

Any of these factors and other consequences that may result from our substantial indebtedness could have an adverse effect on our business, financial condition and results of operations as well as our ability to meet our payment obligations under our debt.

In addition, we are exposed to various types of market risk in the normal course of business, including the impact of interest rate changes. As of December 31, 2020, RMB938.7 million (US$143.9 million) of our long-term borrowings bears interest at variable rates, generally linked to market benchmarks such as the benchmark interest rate issued by local banks. Any increase in interest rates would increase our finance expenses relating to our variable rate indebtedness and increase the costs of refinancing our existing indebtedness and issuing new debt. Furthermore, since the majority of our short-term borrowings came from Chinese banks, we are exposed to lending policy changes by the Chinese banks. If the Chinese government changes its macroeconomic policies and forces Chinese banks to tighten their lending practices, or if Chinese banks are no longer willing to provide financing to solar power companies, including us, we may not be able to extend our short-term borrowings or make additional borrowings in the future.

30

Table of Contents

We may also incur gain or loss in relation to our change in the fair value of our financial instruments. The change in fair value of financial instruments may fluctuate significantly from period to period due to factors that are largely beyond our control, and may result in us recording substantial gains or losses as a result of such changes. As a result of the foregoing, you may not be able to rely on period to period comparisons of our operating results as an indication of our future performance.

Our failure to maintain sufficient collateral under certain pledge contracts for our short-term loans may materially adversely affect our financial condition, liquidity and results of operations.

As of December 31, 2020, we had short-term borrowings, including the current portion of long-term borrowings and failed sale-leaseback financing, of RMB1.53 billion (US$234.3 million), secured by certain of our inventory, land use rights, property, plant and equipment, bank deposit and accounts receivable. We cannot assure you that we will not be requested by the pledgees to provide additional collateral to bring the value of the collateral to the level required by the pledgees if our inventory depreciates in the future. If we fail to provide additional collateral upon request, the pledgees will be entitled to require the immediate repayment of the outstanding bank loans. In addition, the pledgees may auction or sell the inventory. Furthermore, we may be subject to liquidated damages pursuant to relevant pledge contracts. Although the pledgees have conducted regular site inspections on our inventory since the pledge contracts were executed, they have not requested us to provide additional collateral or take other remedial actions. However, we cannot assure you the pledgees will not require us to provide additional collateral in the future or take other remedial actions or otherwise enforce their rights under the pledge contracts and loan agreements. If any of the foregoing occurs, our financial condition, liquidity and results of operations may be materially adversely affected.

We rely principally on dividends and other distributions on equity paid by our principal operating subsidiary, and limitations on their ability to pay dividends to us could have a material adverse effect on our business and results of operations.

We are a holding company and rely principally on dividends paid by Jiangxi Jinko, our principal operating subsidiary, for cash requirements. Applicable PRC laws, rules and regulations permit payment of dividends by our PRC subsidiaries only out of their retained earnings, if any, determined in accordance with PRC accounting standards. Our PRC subsidiaries are required to set aside a certain percentage of their after-tax profit based on PRC accounting standards each year as reserve funds for future development and employee benefits, in accordance with the requirements of relevant laws and provisions in their respective articles of associations. The percentage should not be less than 10%, unless the reserve funds reach 50% of our registered capital. In addition, under PRC laws, our PRC subsidiaries are prohibited from distributing dividends if there is a loss in the current year. As a result, our PRC subsidiaries may be restricted in their ability to transfer any portion of their net income to us whether in the form of dividends, loans or advances. Any limitation on the ability of our subsidiaries to pay dividends to us could materially adversely limit our ability to grow, make investments or acquisitions that could be beneficial to our businesses, pay dividends or otherwise fund and conduct our business.

If we are unable to implement our strategy to expand our PRC operations by completing an initial public offering and listing on the STAR Market, our ability to strengthen our market position and operations in the PRC, including our ability to expand our production capacity and increase our revenues, could be adversely affected.

In September 2020, we announced that we are considering the opportunity to list Jiangxi Jinko, after certain intragroup restructuring, on the Shanghai Stock Exchange’s Sci-Tech innovation board (the “STAR Market”) within the next three years (the “STAR Listing”). Jiangxi Jinko is our principal operating company and, prior to the completion of equity financing of Jiangxi Jinko in October 2020, was our wholly-owned subsidiary. We conduct substantially all of our business through Jiangxi Jinko and its subsidiaries. We may not be able to complete the STAR Listing for a number of reasons, many of which are outside our control. For example, Jiangxi Jinko must succeed in obtaining PRC governmental approvals required to permit the STAR Listing, and one or more of those approvals may be denied, or significantly delayed, by the PRC regulators for reasons outside our control or unknown to us. In addition, the STAR Listing application may be denied or delayed by the Shanghai Stock Exchange at its discretion.

If we are unable to complete the STAR Listing, we may need to seek other sources of funds to realize our business strategy, such as expanding our production capacity at Jiangxi Jinko, which funds may not be available to us at commercially reasonable terms, or at all. Any such inability to obtain funds may impair our ability to grow Jiangxi Jinko’s business, which could have a material adverse effect on our consolidated operating results and on the price of our ADSs. Moreover, it may take as long as three years before we know whether the STAR Listing will be completed, and therefore we may, in the interim, forego or postpone other alternative actions to strengthen our operations and production capacity in the PRC. In addition, the process underlying the STAR Listing could result in significant diversion of management time as well as substantial out-of-pocket costs, which could further impair our ability to expand our business.

31

Table of Contents

Even if we complete the STAR Listing, we may not achieve the results contemplated by our business strategy (including with respect to use of proceeds from that offering) and therefore the price of our ADSs may not increase, or may even drop.

Even if the STAR Listing is completed, we cannot assure you that we will realize any or all of our anticipated benefits of the STAR Listing. Our completion of the STAR Listing may not have the anticipated effects of strengthening our market position and operations in the PRC. If the STAR Listing is completed, Jiangxi Jinko will have broad discretion in the use of the proceeds from the STAR Listing, and it may not spend or invest those proceeds in a manner that results in our operating success or with which holders of our shares and ADSs agree. Our failure to successfully leverage the completion of the STAR Listing to expand our production capacity in the PRC could result in a decrease in the price of the ADSs. In addition, we cannot assure you that the success of Jiangxi Jinko will have an attendant positive effect on the price of the ADSs.

Jiangxi Jinko’s status as a publicly traded company that is controlled, but less than wholly owned, by our company could have an adverse effect on us.

As the result of actions being taken in connection with the STAR Listing, including placement of shares by Jiangxi Jinko, our principal operating subsidiary, to certain PRC investors and our controlling shareholders, Jiangxi Jinko is no longer a wholly owned subsidiary of our company. This minority interest in Jiangxi Jinko will increase upon completion of the STAR Listing, and the interests of Jiangxi Jinko of these minority shareholders may diverge from the interests of our company and our other subsidiaries in the future. We may face conflicts of interest in managing, financing or engaging in transactions with Jiangxi Jinko, or allocating business opportunities between our subsidiaries.

Our company will retain majority ownership of Jiangxi Jinko after the STAR Listing, but Jiangxi Jinko will be managed by a separate board of directors and officers and those directors and officers will owe fiduciary duties to the various stakeholders of Jiangxi Jinko, including shareholders other than our wholly-owned subsidiary. In the operation of Jiangxi Jinko’s business, there may be situations that arise whereby the directors and officers of Jiangxi Jinko, in the exercise of their fiduciary duties, take actions that may be contrary to the best interests of our company.

During or after the STAR Listing process, there might be certain requirements of the PRC law, including demands from the CSRC, the Shanghai Stock Exchange or other relevant authorities, that might have a bearing on holders of our ordinary shares and ADSs. Recently in order to comply with the PRC law, some of our senior management resigned from our company, while retaining the same roles at Jiangxi Jinko.

In the future, Jiangxi Jinko may issue options, restricted shares and other forms of share-based compensation to its directors, officers and employees, which could dilute our company’s ownership in Jiangxi Jinko. In addition, Jiangxi Jinko may engage in capital raising activities in the future that could further dilute our company’s ownership interest.

Our organizational structure will become more complex, including as a result of preparations for the STAR Listing. We will need to continue to scale and adapt our operational, financial and management controls, as well as our reporting systems and procedures, at both our company and Jiangxi Jinko. The continued expansion of our infrastructure will require us to commit substantial financial, operational and management resources before our revenue increases and without any assurances that our revenue will increase. In addition, holders of our ordinary shares and ADSs may have limited opportunities to purchase Jiangxi Jinko’s shares even if the STAR Listing were completed.

It is difficult to predict the effect of the proposed STAR Listing on the ADSs.

The China Securities Regulatory Commission, or the CSRC, initially launched the STAR Market in June 2019 and trading on the Market began in July 2019. No assurance can be given regarding the effect of the STAR Listing on the market price of the ADSs. The market price of the ADSs may be volatile or may decline, for reasons other than the risk and uncertainties described above, as the result of investor negativity or uncertainty with respect to the impact of the proposed STAR Listing.

Investors may elect to invest in our business and operations by purchasing Jiangxi Jinko’s shares in the STAR Listing or on the STAR Market rather than purchasing the ADSs, and that reduction in demand could lead to a decrease in the market price for the ADSs.

32

Table of Contents

Any failure to maintain effective internal control could have a material adverse effect on our business, results of operations and the market price of the ADSs.

The SEC, as required by Section 404 of the Sarbanes-Oxley Act of 2002 (the “Sarbanes-Oxley Act”), adopted rules requiring most public companies to include a management report on such company’s internal control over financial reporting in its annual report, which contains management’s assessment of the effectiveness of our company’s internal control over financial reporting. In addition, when a company meets the SEC’s criteria, an independent registered public accounting firm must report on the effectiveness of our company’s internal control over financial reporting.

Our management and independent registered public accounting firm have concluded that our internal control over financial reporting as of December 31, 2020 was effective. However, we cannot assure you that in the future our management or our independent registered public accounting firm will not identify material weaknesses during the Section 404 of the Sarbanes-Oxley Act audit process or for other reasons. In addition, because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. As a result, if we fail to maintain effective internal control over financial reporting or should we be unable to prevent or detect material misstatements due to error or fraud on a timely basis, investors could lose confidence in the reliability of our financial statements, which in turn could harm our business, results of operations and negatively impact the market price of the ADSs, and harm our reputation. Furthermore, we have incurred and expected to continue to incur considerable costs and to use significant management time and other resources in an effort to comply with Section 404 and other requirements of the Sarbanes-Oxley Act.

Failure to achieve satisfactory production volumes of our products could result in higher unit production costs.

The production of silicon wafers, solar cells, solar modules and recovered silicon materials involves complex processes. Deviations in the manufacturing process can cause a substantial decrease in output and, in some cases, disrupt production significantly or result in no output. From time to time, we have experienced lower-than-anticipated manufacturing output during the ramp-up of production lines. This often occurs during the introduction of new products, the installation of new equipment or the implementation of new process technologies. As we bring additional lines or facilities into production, we may operate at less than intended capacity during the ramp-up period. In addition, the demand in global solar power product market may decrease, including the demand for solar modules, which may also cause us to operate at less than intended capacity. This would result in higher marginal production costs and lower output, which could have a material adverse effect on our business, financial condition and results of operations.

Demand for solar power products may be adversely affected by seasonality.

Demand for solar power products tends to be weaker during the winter months partly due to adverse weather conditions in certain regions, which complicate the installation of solar power systems, our operating results may fluctuate from period to period based on the seasonality of industry demand for solar power products. Our sales in the first quarter of any year may also be affected by the occurrence of the Chinese New Year holiday during which domestic industrial activity is normally lower than that at other times. Such fluctuations may result in the underutilization of our capacity and increase our average costs per unit. In addition, we may not be able to capture all of the available demand if our capacity is insufficient during the summer months. As a result, fluctuations in the demand for our products may have a material adverse effect on our business, financial condition and results of operations.

Unsatisfactory performance of or defects in our products may cause us to incur additional expenses and warranty costs, damage our reputation and cause our sales to decline.

Our products may contain defects that are not detected until after they are shipped or inspected by our customers.

Our silicon wafer sales contracts normally require our customers to conduct inspection before delivery. We may, from time to time, allow those of our silicon wafer customers with good credit to return our silicon wafers within a stipulated period, which normally ranges from 7 to 15 working days after delivery, if they find our silicon wafers do not meet the required specifications. Our standard solar cell sales contract requires our customer to notify us within 7 days of delivery if such customer finds our solar cells do not meet the specifications stipulated in the sales contract. If our customer notifies us of such defect within the specified time period and provides relevant proof, we will replace those defective solar cells with qualified ones after our confirmation of such defects.

Our solar modules are typically sold with a 10-year warranty for material and workmanship and a 25-year (30-year for dual glass module) linear power output warranty against the maximum degradation of the actual power output for each year after the warranty start date. If a solar module is defective during the relevant warranty period, we will either repair or replace the solar module. As we continue to increase our sales to the major export markets, we may be exposed to increased warranty claims.

33

Table of Contents

In May 2011, we engaged PowerGuard Specialty Insurance Services (“PowerGuard”), a firm specialized in unique insurance and risk management solutions for the wind and solar energy industries, to provide insurance coverage for the product warranty services of our solar modules worldwide effective from May 1, 2011. We renewed the insurance policy provided by PowerGuard upon its expiration in every May from 2011 to 2019. The policy offered back-to-back coverage through a maximum of ten-year limited product defects warranty, as well as a 25-year (30-year for dual glass module) linear warranty against degradation of module power output from the time of delivery. In April 2020, our engagement with PowerGuard expired. In December 2018, we engaged Ariel Syndicate 1910 of Lloyd's ("Ariel Re"), a firm specialized in unique insurance and risk management solutions for the wind and solar energy industries, to provide insurance coverage for the product warranty services of our solar modules worldwide effective from May 2019. We renewed the insurance policy provided by Ariel Re in January 2021 and plan to renew it at the end of 2022. The policy offers back-to-back coverage through a maximum of ten-year limited product defects warranty, as well as a 25-year (30-year for dual glass module) linear warranty against degradation of module power output from the time of delivery.

If we experience a significant increase in warranty claims, we may incur significant repair and replacement costs associated with such claims. In addition, product defects could cause significant damage to our market reputation and reduce our product sales and market share, and our failure to maintain the consistency and quality throughout our production process could result in substandard quality or performance of our products. If we deliver our products with defects, or if there is a perception that our products are of substandard quality, we may incur substantially increased costs associated with returns or replacements of our products, our credibility and market reputation could be harmed and our sales and market share may be materially adversely affected.

Fluctuations in exchange rates could adversely affect our results of operations.

We derive a substantial portion of our sales from international customers and a significant portion of our total revenue have been denominated in foreign currencies, particularly, Euros and U.S. dollars. Our sales outside China represented 73.6%, 82.5% and 81.9% of our total revenue in 2018, 2019 and 2020, respectively. As a result, we may face significant risks resulting from currency exchange rate fluctuations, particularly, among Renminbi, Euros and U.S. dollars. For example, we expect our revenue and gross margin to be adversely affected by the recent appreciation of Renminbi against U.S. dollars, as a substantial portion of our sales are denominated in U.S. dollars. Furthermore, we have outstanding debt obligations, and may continue to incur debts from time to time, denominated and repayable in foreign currencies. We incurred a foreign exchange gain of RMB33.7 million in 2018, a foreign exchange gain of RMB8.8 million in 2019 and a foreign exchange loss in 2020 of RMB336.5 million (US$51.6 million). We cannot predict the impact of future exchange rate fluctuations on our results of operations and may incur net foreign currency losses in the future.

Our consolidated financial statements are expressed in Renminbi. The functional currency of our principal operating subsidiary, Jiangxi Jinko, is also Renminbi. To the extent we hold assets denominated in Euros or U.S. dollars, any appreciation of Renminbi against the Euro or U.S. dollar could reduce the value of our Euro-or U.S. dollar-denominated consolidated assets. On the other hand, if we decide to convert our Renminbi amounts into Euros or U.S. dollars for business purposes, including foreign debt service, a decline in the value of Renminbi against the Euro or U.S. dollar would reduce the Euro or U.S. dollar equivalent amounts of the Renminbi we convert. In addition, a depreciation of Renminbi against the U.S. dollar could reduce the U.S. dollar equivalent amounts of our financial results and the dividends we may pay in the future, if any, all of which may have a material adverse effect on the price of our ADSs.

Since June 2010, the Renminbi has fluctuated against the U.S. dollar, at times significantly and unpredictably. On November 30, 2015, the Executive Board of the International Monetary Fund completed the regular five-year review of the basket of currencies that make up the Special Drawing Right (the “SDR”), and decided that with effect from October 1, 2016, Renminbi will be a freely usable currency and will be included in the SDR basket as a fifth currency, along with the U.S. dollar, the Euro, the Japanese yen and the British pound. In the fourth quarter of 2016, the RMB has depreciated significantly in the backdrop of a surging U.S. dollar and persistent capital outflows of China. With the development of the foreign exchange market and progress towards interest rate liberalization and Renminbi internationalization, the PRC government may in the future announce further changes to the exchange rate system and we cannot assure you that the Renminbi will not appreciate or depreciate significantly in value against the U.S. dollar in the future. It is difficult to predict how market forces or PRC or U.S. government policy may impact the exchange rate between the Renminbi and the U.S. dollar in the future. Any currency exchange losses we recognize may be magnified by PRC exchange control regulations that restrict our ability to convert Renminbi into foreign currency.

34

Table of Contents

Limited hedging transactions are available in China to reduce our exposure to exchange rate fluctuations. Although we have entered into a number of foreign-exchange forward contracts and foreign exchange options with local banks to manage our risks associated with foreign-exchange rates fluctuations, we cannot assure you that our hedging efforts will be effective. Our currency exchange losses may be magnified by PRC exchange control regulations that restrict our ability to convert Renminbi into foreign currency. As a result, fluctuations in exchange rates may have a material adverse effect on our results of operations.

Our operating history may not be a reliable predictor of our prospects and future results of operations.

We commenced processing recoverable silicon materials in June 2006, and manufacturing silicon wafers in 2008. We commenced producing solar cells in July 2009 following our acquisition of Zhejiang Jinko, which has manufactured solar cells since June 2007, and we commenced producing solar modules in August 2009.

Although our revenue experienced significant growth in the past, we cannot assure you that our revenue will increase at previous rates or at all, or that we will be able to continue to operate profitably in future periods. We also experienced net losses in each quarter from the fourth quarter of 2011 to the first quarter of 2013. Our operating history may not be a reliable predictor of our future results of operations, and past revenue growth experienced by us should not be taken as indicative of the rate of revenue growth, if any, that can be expected in the future. We believe that period to period comparisons of our operating results and our results for any period should not be relied upon as an indication of future performance.

Our operations are subject to natural disasters, adverse weather conditions, operating hazards, environmental incidents and labor disputes.

We may experience earthquakes, floods, mudslides, snowstorms, typhoon, power outages, labor disputes or similar events beyond our control that would affect our operations. Our manufacturing processes involve the use of hazardous equipment, such as furnaces, squaring machines and wire saws. We also use, store and generate volatile and otherwise dangerous chemicals and waste during our manufacturing processes, which are potentially destructive and dangerous if not properly handled or in the event of uncontrollable or catastrophic circumstances, including operating hazards, fires and explosions, natural disasters, adverse weather conditions and major equipment failures, for which we cannot obtain insurance at a reasonable cost or at all.

In addition, our silicon wafer and solar module production and storage facilities are located in close proximity to one another in the Shangrao Economic Development Zone in Jiangxi Province, and our solar cell production and storage facilities are located in close proximity to one another in Haining, Zhejiang Province. The occurrence of any natural disaster, unanticipated catastrophic event or unexpected accident in either of the two locations could result in production curtailments, shutdowns or periods of reduced production, which could significantly disrupt our business operations, cause us to incur additional costs and affect our ability to deliver our products to our customers as scheduled, which may adversely affect our business, financial condition and results of operations. Moreover, such events could result in severe damage to property, personal injuries, fatalities, regulatory enforcement proceedings or our being named as a defendant in lawsuits asserting claims for large amounts of damages, which in turn could lead to significant liabilities.

Our Haining facility suspended operation from September 17, 2011 to October 9, 2011 due to an environmental incident. Occurrences of natural disasters, as well as accidents and incidents of adverse weather in or around Shangrao, Haining and Penang in the future may result in significant property damage, electricity shortages, disruption of our operations, work stoppages, civil unrest, personal injuries and, in severe cases, fatalities. Such incidents may result in damage to our reputation or cause us to lose all or a portion of our production capacity, and future revenue anticipated to be derived from the relevant facilities.

35

Table of Contents

Our founders collectively have significant influence over our management and their interests may not be aligned with our interests or the interests of our other shareholders.

As of the date of this annual report, our founders, Xiande Li who is our chairman and chief executive officer, Kangping Chen who is our director, and Xianhua Li who is our director, beneficially owned 8.7%, 6.3% and 3.2%, respectively, or 18.2% in the aggregate, of our outstanding ordinary shares. If the founders act collectively, they will have a substantial influence over our business, including decisions regarding mergers, consolidations and the sale of all or substantially all of our assets, election of directors, dividend policy and other significant corporate actions. They may take actions that are not in the best interest of our company or our securities holders. For example, this concentration of ownership may discourage, delay or prevent a change in control of our company, which could deprive our shareholders of the opportunity to receive a premium for their shares as part of a sale of our company and might reduce the price of our ADSs. On the other hand, if the founders are in favor of any of these actions, these actions may be taken even if they are opposed by a majority of our other shareholders, including you and those who invest in ADSs. In addition, under our current articles of association, the quorum required for the general meeting of our shareholders is two shareholders entitled to vote and present in person or by proxy or, if the shareholder is a corporation, by its duly authorized representative representing not less than one-third in nominal value of our total issued voting shares. As such, a shareholders resolution may be passed at our shareholders meetings with the presence of our founders only and without the presence of any of our other shareholders, which may not represent the interests of our other shareholders, including holders of ADSs.

We have limited insurance coverage and may incur losses resulting from product liability claims, business interruption or natural disasters.

We are exposed to risks associated with product liability claims in the event that the use of our products results in property damage or personal injury. Since our products are ultimately incorporated into electricity generating systems, it is possible that users could be injured or killed by devices that use our products, whether as a result of product malfunctions, defects, improper installations or other causes. Due to our limited operating history, we are unable to predict whether product liability claims will be brought against us in the future or to predict the impact of any resulting adverse publicity on our business. The successful assertion of product liability claims against us could result in potentially significant monetary damages and require us to make significant payments. Our product liability insurance coverage is limited and we may not have adequate resources to satisfy a judgment in the event of a successful claim against us. In addition, we do not carry any business interruption insurance. As the insurance industry in China is still in its relatively early stage of development, even if we decide to take out business interruption coverage, such insurance available in China offers limited coverage compared with that offered in many other countries. Any business interruption or natural disaster could result in substantial losses and diversion of our resources and materially adversely affect our business, financial condition and results of operations.

The grant of employee share options and other share-based compensation could adversely affect our net income.

As of the date of this annual report, share options with respect to 9,194,356 ordinary shares have been granted to our directors, officers and employees pursuant to our 2009 Long Term Incentive Plan, and there are 9,336 ordinary shares issuable upon the exercise of outstanding options granted under the plan. As of the date of this annual report, share options with respect to 10,183,968 ordinary shares have been granted to our directors, officers and employees pursuant to our 2014 Equity Incentive Plan, and there are 452,736 ordinary shares issuable upon the exercise of outstanding options granted under the plan. As of the date of this annual report, no share-based award has been granted pursuant to the 2021 Equity Incentive Plan. U.S. GAAP requires us to recognize share-based compensation as compensation expense in the consolidated statement of operations based on the fair value of equity awards on the date of the grant, with the compensation expense recognized over the period in which the recipient is required to provide service in exchange for the equity award. If we grant more share options to attract and retain key personnel, the expenses associated with share-based compensation may adversely affect our net income. However, if we do not grant share options or reduce the number of share options that we grant, we may not be able to attract and retain key personnel.

36

Table of Contents

Our lack of sufficient patent protection in and outside of China may undermine our competitive position and subject us to intellectual property disputes with third parties, both of which may have a material adverse effect on our business, results of operations and financial condition.

We have developed various production process related know-how and technologies in the production of our products. Such know-how and technologies play a critical role in our quality assurance and cost reduction. In addition, we have implemented a number of research and development programs with a view to developing techniques and processes that will improve production efficiency and product quality. Our intellectual property and proprietary rights from our research and development programs will be crucial in maintaining our competitive edge in the solar power industry. As of the date of this annual report, we have 955 patents and 394 pending patent applications in China. Our patents’ validity is generally ten years. We plan to continue to seek to protect our intellectual property and proprietary knowledge by applying for patents for them. However, we cannot assure you that we will be successful in obtaining patents in China in a timely manner or at all. Moreover, even if we are successful, China currently affords less protection to a company’s intellectual property than some other countries, including the United States. We also use contractual arrangements with employees and trade secret protections to protect our intellectual property and proprietary rights. Nevertheless, contractual arrangements afford only limited protection and the actions we may take to protect our intellectual property and proprietary rights may not be adequate.

In addition, others may obtain knowledge of our know-how and technologies through independent development. Our failure to protect our production process, related know-how and technologies, our intellectual property and proprietary rights or any combination of the above may undermine our competitive position. Third parties may infringe or misappropriate our proprietary technologies or other intellectual property and proprietary rights. Policing unauthorized use of proprietary technology can be difficult and expensive. Litigation, which can be costly and divert management attention and other resources away from our business, may be necessary to enforce our intellectual property rights, protect our trade secrets or determine the validity and scope of our proprietary rights. We cannot assure you that the outcome of such potential litigation will be in our favor. An adverse determination in any such litigation will impair our intellectual property and proprietary rights and may harm our business, prospects and reputation.

We may be exposed to intellectual property infringement or misappropriation claims by third parties, which, if determined adversely to us, could cause us to pay significant damage awards and subject us to injunctions prohibiting sale of our products in certain markets.

Our success depends on our ability to use and develop our technology and know-how, and to manufacture and sell our recovered silicon materials, silicon wafers, solar cells and solar modules, develop solar power projects or otherwise operate our business in the solar industry without infringing the intellectual property or other rights of third parties. We may be subject to litigation involving claims of patent infringement or violation of intellectual property rights of third parties. The validity and scope of claims relating to solar power technology patents involve complex scientific, legal and factual questions and analyses and, therefore, may be highly uncertain. The defense and prosecution of intellectual property suits, patent opposition proceedings, trademark disputes and related legal and administrative proceedings can be both costly and time-consuming and may significantly divert our resources and the attention of our technical and management personnel. An adverse ruling in any such litigation or proceedings could subject us to significant liability to third parties, require us to seek licenses from third parties, to pay ongoing royalties, or to redesign our products or subject us to injunctions prohibiting the manufacture and sale of our products or the use of our technologies. Protracted litigation could also result in our customers or potential customers deferring or limiting their purchase or use of our products until resolution of such litigation.

Our business depends substantially on the continuing efforts of our founders, executive officers and key technical personnel, as well as our ability to maintain a skilled labor force. Our business may be materially adversely affected if we lose their services.

Our success depends on the continued services of our founders, Mr. Xiande Li, Mr. Kangping Chen and Mr. Xianhua Li, and other executive officers and key personnel. We do not maintain key-man life insurance on any of our founders, executive officers and key personnel. If one or more of our founders, executive officers and key personnel are unable or unwilling to continue in their present positions, we may not be able to readily replace them, if at all. As a result, our business may be severely disrupted and we may have to incur additional expenses in order to recruit and retain new personnel. In addition, if any of our executives joins a competitor or forms a competing company, we may lose some of our customers. Each of our founders, executive officers and key personnel has entered into an employment agreement with us that contains confidentiality and non-competition provisions. However, if any dispute arises between our founders, executive officers or key personnel and us, we cannot assure you, in light of uncertainties associated with the PRC legal system, that these agreements could be enforced in China where most of our founders, executive officers and key personnel reside and hold most of their assets. See “—Risks Related to Doing Business in China—Uncertainties and limitations with respect to the PRC legal system could have a material adverse effect on us” in this annual report.

37

Table of Contents

Furthermore, recruiting and retaining capable personnel, particularly experienced engineers and technicians familiar with our products and manufacturing processes, is vital to maintain the quality of our products and improve our production methods. There is substantial competition for qualified technical personnel, and we cannot assure you that we will be able to attract or retain qualified technical personnel. If we are unable to attract and retain qualified employees, key technical personnel and our executive officers, our business may be materially adversely affected.

Compliance with environmentally safe production and construction and renewable energy development regulations can be costly, while non-compliance with such regulations may result in adverse publicity and potentially significant monetary damages, fines and suspension of our business operations.

We are required to comply with all national and local environmental protection regulations for our operations, including in China, the United States and Malaysia. For example, regulations on emission trading and pollution permits in Zhejiang Province allow entities to increase their annual pollution discharge limit by purchasing emissions trading credits. Entities that purchase emission credits can increase their annual discharge limit by registering the credits with the relevant environmental authorities and amending their pollution permits or obtaining new ones. We have entered into several emissions trading contracts to purchase credits to increase our annual discharge limit and registered all credits as required under a local regulation that became effective on October 9, 2010. However, as our business grows, we may increase our discharge level in the future and we cannot guarantee you that we will continue to be below our annual discharge limit. The penalties for exceeding the annual discharge limit may include corrective orders, fines imposed by the local environmental authority of up to RMB50,000 or, in extreme circumstances, revocation of our pollution permit. Some of our subsidiaries need to obtain and maintain pollution discharge permits or registrations, and some of our subsidiaries are in the process of application for such permits and registrations, which are subject to application, renewal or extension on an annual basis or within a longer period. We cannot assure you that we are or will be able to successfully obtain, renew or extend these permits in a timely manner or at all.

We use, store and generate volatile and otherwise dangerous chemicals and wastes during our manufacturing processes, and are subject to a variety of government regulations related to the use, storage and disposal of such hazardous chemicals and waste. In accordance with the requirements of the Regulations on the Safety Management of Hazardous Chemicals, which became effective on March 15, 2002 and were amended on December 1, 2011 and December 7, 2013, we are required to engage state-qualified institutions to conduct the safety evaluation on our storage instruments related to our use of hazardous chemicals and file the safety evaluation report with the competent safety supervision and administration authorities every three years. In compliance with Jiaxing City environmental authority’s requests, we commenced efforts to meet their targets for hazardous chemical and wastes in May 2012. Environmental authorities of Haining City and Jiaxing City evaluated our efforts and confirmed that we satisfied their targets in September 2012. Moreover, we filed a report with the competent safety supervision and administration authorities and public security agencies concerning the actual storage situation of our hyper-toxic chemicals and other hazardous chemicals that constitute major of hazard sources.

Moreover, we are required to obtain construction permits before commencing constructing production facilities. We are also required to obtain the approvals from PRC environmental protection authorities before commencing commercial operations of our manufacturing facilities. We are also required to comply with renewable energy development regulations and directives for our operations in China. We commenced construction of a portion of our solar cell and solar module production facilities prior to obtaining the construction permits and commenced operations of certain of our production facilities prior to obtaining the environmental approvals for commencing commercial operation and completing the required safety evaluation procedure and we, through Poyang Luohong, a joint venture in which we then held 51% equity interest, had commenced the construction of the Technology Top Runner Project prior to obtaining the construction permits, land use certificates and certain other approvals. Although we have subsequently obtained all required environmental approvals covering all of existing production capacity except a portion of solar cell and solar module production capacity and we have disposed of all our equity interest in Poyang Luohong, we cannot assure you that we will not be penalized by the relevant government authorities for our non-compliance with the PRC environmental protection, safe production and construction regulations, including renewable energy development regulations and directives.

38

Table of Contents

In late August 2011, our Haining facility experienced a suspected leakage of fluoride into a nearby small water channel due to extreme and unforeseen weather conditions. On September 15, 2011, residents of Hongxiao Village in proximity to the Haining facility gathered to protest the discharge. The Haining facility suspended production on September 17, 2011. We also took steps recommended by an environmental engineering firm licensed by the PRC government (“Licensed Engineers”). On September 28, 2011, a committee of experts (the “Experts Committee”) established by the Haining government approved a set of recommendations developed by the Licensed Engineers with our assistance and the Haining government to be implemented by us. On October 6, 2011, the Experts Committee, the Environmental Bureau of the Haining government and representatives of Hongxiao Village reviewed the steps taken by us based on the recommendations of the Experts Committee and provided their comments to JinkoSolar’s management. On October 9, 2011, the Experts Committee notified us that the Experts Committee was satisfied with the steps taken by us and we resumed production at the Haining facility. In 2012, we carried out a series of environmental protection efforts intended to ensure our compliance with relevant standards and requirements. See “Item 4. Information on the Company—B. Business Overview—Environmental Matters.” In January 2013, Haining City environmental authority issued the “Environmental Management Compliance Certificate for 2012” to us, confirming our compliance with environmental requirements.

Although we will try to take measures to prevent similar incidents from occurring again in the future, we cannot assure you that our operations will not be disrupted by similar or other environmental incidents. In addition, the relevant authorities may issue more stringent environmental protection, safe production and construction regulations in the future that may impact our manufacturing facilities in China or abroad, and the costs of compliance with new regulations could be substantial. If we fail to comply with the future environmentally safe production and construction laws and regulations, we may be required to pay fines, suspend construction or production, or cease operations. Moreover, any failure by us to control the use of, or to adequately restrict the discharge of, dangerous substances could subject us to potentially significant monetary damages and fines or the suspension of our business operations.

We face risks related to health epidemics and other outbreaks. In particular, we were, and could be further, adversely affected by the global outbreak of COVID-19.

Our business could be adversely affected by the effects of novel coronavirus (“COVID-19”), Ebola virus disease, influenza A (“H1N1”), avian flu, severe acute respiratory syndrome (“SARS”), or other epidemic outbreak.

39

Table of Contents

In December 2019, a strain of COVID-19 was reported to have surfaced in Wuhan, China, which subsequently spread throughout China. The Chinese central government and local governments in Wuhan and other cities in China have introduced various temporary measures to contain the COVID-19 outbreak, such as extension of the Lunar New Year holidays and travel restrictions, which have impacted and could further impact national and local economy to different degrees. As the COVID-19 subsequently spreads globally, many governments in other countries and regions have also introduced travel restrictions, lock-down policies, suspension of business activities and other temporary measures. The global spread of the COVID-19 has created significant volatility and uncertainty, as well as economic disruption. Our production could be severely affected if our employees or the regions in which our facilities are located are affected by the COVID-19. For example, a facility could be closed by government authorities for a sustained period of time, some or all of our workforce could be unavailable due to quarantine, fear of catching the disease or other factors, and local, national or international transportation or other infrastructure could be affected, leading to delays or loss of production. In addition, our suppliers and customers are subject to similar risks, which could lead to a shortage of raw materials or a reduction in our customers’ demand for our products. We may have to decrease the selling price of our products to attract and retain customers if the demand for our products decreases. We rely on a variety of common carriers to transport our raw materials from our suppliers, and to transport products from us to our customers. Problems suffered by any of these common carriers could result in shipping delays, increased costs or some other supply chain disruption and could therefore have a material adverse effect on our operations. While it is unknown how long these conditions will last and what the complete financial effect will be to us, our supply of certain raw materials and logistics during the first quarter of 2020 was temporarily affected, causing some module shipments to be postponed to the second quarter of 2020. As a result, some of our customers delayed their payments, which temporarily affected our cash flow. In addition, our capacity utilization rate of certain overseas manufacturing facility has been temporarily affected as we have to limit the number of workers gathering at the facility pursuant to the instructions of the local authorities. In the second and third quarters of 2020, logistics and transportation continued to be affected in certain parts of the world and regional demands were adjusting due to the pandemic. In the fourth quarter of 2020, logistic efficiency in certain overseas markets was adversely impacted by another wave of the COVID-19 pandemic and the situation may continue in the second half of 2021. In response to the COVID-19 outbreak, we implemented a number of initiatives to ensure business continuity, including ensuring the safety and health of our employees and minimizing the impact of the outbreak on production and delivery by stocking up on critical raw materials and optimizing production and logistics, as well as flexibly adjusting the manufacturing facilities from which we ship our products . The situation of the COVID-19 outbreak is very fluid and we are closely monitoring its impact on us. There may be further adverse impact on our operation, liquidity, financial condition and results of operations if the conditions last a sustained period of time and continue to develop globally.

In April 2009, an outbreak of influenza A caused by the H1N1 virus occurred in Mexico and the United States, and spread into a number of countries rapidly. There have also been reports of outbreaks of a highly pathogenic avian flu, caused by the H1N1 virus, in certain regions of Asia and Europe. In past few years, there were reports on the occurrences of avian flu in various parts of China, including a few confirmed human cases. In April 2013, there were reports of cases of H7N9 avian flu in southeast China, including deaths in Shanghai and Zhejiang Province. An outbreak of avian flu in the human population could result in a widespread health crisis that could adversely affect the economies and financial markets of many countries, particularly in Asia. Additionally, any recurrence of SARS, a highly contagious form of atypical pneumonia, similar to the occurrence in 2003 which affected China, Hong Kong, Taiwan, Singapore, Vietnam and certain other countries, would also have similar adverse effects.

These outbreaks of contagious diseases and other adverse public health developments in China and around the world would have a material adverse effect on our business operations. These could include our ability to travel or ship our products outside China as well as temporary closure of our manufacturing facilities. Such closures or travel or shipment restrictions would severely disrupt our business operations and adversely affect our financial condition and results of operations. We have not adopted any written preventive measures or contingency plans to combat any future outbreak of avian flu, SARS or any other epidemic.

40

Table of Contents

Risks Related to Doing Business in China

We may fail to comply with laws and regulations regarding PV production in China.

On January 15, 2018, the Ministry of Industry and Information Technology of China (the “MIIT”) promulgated the Standard Conditions of Photovoltaic Production Industry, or the Photovoltaic Production Rule, in place of its old version, which establishes a basic regulatory framework for PV production industry. The Photovoltaic Production Rule provides, among other matters, requirements in relation to the production layout, project establishment filing and enterprise qualification, requirements with regard to the production scale, product quality, cell efficiency, energy consumption and operational life span of various PV products, and requirements related to quality management and obtaining the pollution discharge permits and other environmental requirements. On May 29, 2020, the MIIT published the draft Interim Standard Conditions of Photovoltaic Production Industry (2020 version) (Draft for Comment), for public comment, or the 2020 Draft Photovoltaic Production Rule, which among other things, strengthens requirements with regard to the investment standard, product quality and cell efficiency, and sets forth encouragement in intelligent manufacturing. It is not certain whether and when the 2020 Draft Photovoltaic Production Rule will be officially promulgated, and whether it will be in the same form and content as the 2020 Draft Photovoltaic Production Rule, and if enacted in substantially the form published for public comment, such tightened requirements may increase our compliance and production costs. Our failure to comply with these rules and the laws and regulations related thereto, if and when effective, could result in fines, sanctions, suspension, revocation or non-renewal of approvals, permits or licenses, which could have a material adverse effect on our business, financial condition and results of operations.

We cannot assure you that we will be able to promptly and adequately respond to changes of laws and regulations, or that our employees and contractors will act in accordance with our internal policies and procedures. Failure to comply with such laws and regulations relating to PV production may materially adversely affect our business, financial condition and results of operations.

Our ADSs may be delisted under the Holding Foreign Companies Accountable Act if the PCAOB is unable to inspect auditors who are located in China. The delisting of our ADSs, or the threat of their being delisted, may materially and adversely affect the value of your investment. Additionally, the inability of the PCAOB to conduct inspections deprives our investors with the benefits of such inspections.

The Holding Foreign Companies Accountable Act, or the HFCA Act, was enacted on December 18, 2020. The HFCA Act states if the SEC determines that we have filed audit reports issued by a registered public accounting firm that has not been subject to inspection by the PCAOB for three consecutive years beginning in 2021, the SEC shall prohibit our shares or ADSs from being traded on a national securities exchange or in the over the counter trading market in the United States.

Our auditor, the independent registered public accounting firm that issues the audit report included elsewhere in this annual report, as an auditor of companies that are traded publicly in the United States and a firm registered with the PCAOB, is subject to laws in the United States pursuant to which the PCAOB conducts regular inspections to assess its compliance with the applicable professional standards. Since our auditor is located in China, a jurisdiction where the PCAOB has been unable to conduct inspections without the approval of the Chinese authorities, our auditor is currently not inspected by the PCAOB.

On March 24, 2021, the SEC has adopted interim final amendments to implement the submission and disclosure requirements of the HFCA Act. We will not be required to comply with the interim final amendments until the SEC has identified us as having a “non-inspection” year under a process to be subsequently established by the SEC. The SEC is assessing how to implement other requirements of the HFCA Act including the identification process and the trading prohibition requirements described above.

The SEC may propose additional rules or guidance that could impact us if our auditor is not subject to PCAOB inspection. For example, on August 6, 2020, the President’s Working Group on Financial Markets, or the PWG, issued the Report on Protecting United States Investors from Significant Risks from Chinese Companies to the then President of the United States. This report recommended the SEC implement five recommendations to address companies from jurisdictions that do not provide the PCAOB with sufficient access to fulfil its statutory mandate. Some of the concepts of these recommendations were implemented with the enactment of the HFCA Act. However, some of the recommendations were more stringent than the HFCA Act. For example, if a company was not subject to PCAOB inspection, the report recommended that the transition period before a company would be delisted would end on January 1, 2022.

41

Table of Contents

It is unclear when the SEC will complete its rulemaking and when such rules will become effective and what, if any, of the PWG recommendations will be adopted. The implications of this possible regulation in addition to the requirements of the HFCA Act are uncertain. Such uncertainty could cause the market price of the ADSs to be materially and adversely affected, and our securities could be delisted or prohibited from being traded “over-the-counter” earlier than would be required by the HFCA Act. If our securities are unable to be listed on another securities exchange by then, such a delisting would substantially impair your ability to sell or purchase the ADSs when you wish to do so, and the risk and uncertainty associated with a potential delisting would have a negative impact on the price of the ADSs.

The PCAOB’s inability to conduct inspections in China prevents it from fully evaluating the audits and quality control procedures of our independent registered public accounting firm. As a result, we and investors in our ordinary shares and the ADSs are deprived of the benefits of such PCAOB inspections. The inability of the PCAOB to conduct inspections of auditors in China makes it more difficult to evaluate the effectiveness of our independent registered public accounting firm’s audit procedures or quality control procedures as compared to auditors outside of China that are subject to the PCAOB inspections, which could cause investors and potential investors in our stock to lose confidence in our audit procedures and reported financial information and the quality of our financial statements.

In May 2013, the PCAOB announced that it had entered into a Memorandum of Understanding on Enforcement Cooperation with the CSRC and the PRC Ministry of Finance, which establishes a cooperative framework between the parties for the production and exchange of audit documents relevant to investigations undertaken by the PCAOB in the PRC or by the CSRC or the PRC Ministry of Finance in the United States. The PCAOB continues to be in discussions with the CSRC and the PRC Ministry of Finance to permit joint inspections in the PRC of audit firms that are registered with the PCAOB and audit Chinese companies that trade on U.S. exchanges.

If additional remedial measures are imposed on the “big four” PRC-based accounting firms, including our independent registered public accounting firm, in administrative proceedings brought by the SEC alleging such firms’ failure to meet specific criteria set by the SEC with respect to requests for the production of documents, we could be unable to timely file future financial statements in compliance with the requirements of the Securities Exchange Act of 1934.

Starting in 2011, the Chinese affiliates of the “big four” accounting firms, including our independent registered public accounting firm, were affected by a conflict between the United States and Chinese law. Specifically, for certain United States listed companies operating and audited in mainland China, the SEC and the PCAOB sought to obtain from the Chinese accounting firms access to their audit work papers and related documents. The firms were, however, advised and directed that under Chinese law they could not respond directly to the United States regulators on those requests, and that requests by foreign regulators for access to such papers in China had to be channelled through the CSRC.

In late 2012, this impasse led the SEC to commence administrative proceedings under Rule 102(e) of its Rules of Practice and also under the Sarbanes-Oxley Act of 2002 against the Chinese accounting firms, including our independent registered public accounting firm. In January 2014, the administrative law judge reached an initial decision to impose penalties on the firms including a temporary suspension of their right to practice before the SEC. The accounting firms filed a petition for review of the initial decision. On February 6, 2015, before a review by the commissioners of the SEC had taken place, the firms reached a settlement with the SEC. Under the settlement, the SEC accepts that future requests by the SEC for the production of documents will normally be made to the CSRC. The firms will receive matching Section 106 requests, and are required to abide by a detailed set of procedures with respect to such requests, which in substance require them to facilitate production via the CSRC. If they fail to meet specified criteria, the SEC retains authority to impose a variety of additional remedial measures on the firms depending on the nature of the failure. Remedies for any future noncompliance could include, as appropriate, an automatic six-month bar on a single firm’s performance of certain audit work, commencement of a new proceeding against a firm, or in extreme cases the resumption of the current proceeding against all four firms. Under the terms of the settlement, the underlying proceeding against the four China-based accounting firms was deemed dismissed with prejudice four years after entry of the settlement. The four-year mark occurred on February 6, 2019.

In the event that the SEC restarts the administrative proceedings, depending upon the final outcome, listed companies in the United States with major PRC operations may find it difficult or impossible to retain auditors in respect of their operations in the PRC, which could result in financial statements being determined to not be in compliance with the requirements of the Exchange Act, including possible delisting. Moreover, any negative news about any such future proceedings against these audit firms may cause investor uncertainty regarding China-based, United States listed companies and the market price of the ADSs may be adversely affected.

42

Table of Contents

If our independent registered public accounting firm were denied, even temporarily, the ability to practice before the SEC and we were unable to timely find another registered public accounting firm to audit and issue an opinion on our consolidated financial statements, our consolidated financial statements could be determined not to be in compliance with the requirements of the Exchange Act. Such a determination could ultimately lead to the delisting of the ADSs from the NYSE or deregistration from the SEC, or both, which would substantially reduce or effectively terminate the trading of the ADSs in the United States.

The approval of the MOFCOM for or in connection with our corporate restructuring in 2007 and 2008 may be subject to revocation, which will have a material adverse effect on our business, operating results and trading price of our ADSs.

On August 8, 2006, six PRC governmental and regulatory agencies, including the Ministry of Commerce of the People’s Republic of China (the “MOFCOM”), and the CSRC promulgated a rule entitled “Provisions Regarding Mergers and Acquisitions of Domestic Enterprises by Foreign Investors”, or Circular 10, which became effective on September 8, 2006 and was amended in June 2009. Article 11 of Circular 10 requires PRC domestic enterprises or domestic natural persons to obtain the prior approval of MOFCOM when an offshore company established or controlled by them proposes to merge with or acquire a PRC domestic company with which such enterprises or persons have a connected relationship.

On January 1, 2020, the Foreign Investment Law of the People’s Republic of China (the “Foreign Investment Law”) came into effect. On February 5, 2020, the MOFCOM stated in a reply to the public that the provisions in Circular 10 do not conflict with the Foreign Investment Law and its implementing regulations should continue to apply. The MOFCOM will, in conjunction with the implementation of the Foreign Investment Law and its implementing regulations, study relevant issues related to Circular 10 and start relevant work at appropriate time to further improve the foreign mergers and acquisitions system under the framework of the Foreign Investment Law.

We undertook a restructuring in 2007, or the 2007 Restructuring, and our founders and JinkoSolar Investment Limited (“JinkoSolar Investment”) (previously known as JinkoSolar Technology Limited and Paker Technology Limited), obtained the approval of Jiangxi MOFCOM, for the acquisition of certain equity interest in Jiangxi Desun and the pledge by our founders of their equity interest in Jiangxi Desun to JinkoSolar Investment, or the 2007 acquisition and pledge. However, because our founders are PRC natural persons and they controlled both JinkoSolar Investment and Jiangxi Desun, the 2007 acquisition and pledge would be subject to Article 11 of Circular 10 and therefore subject to approval by MOFCOM at the central government level. To remedy this past non-compliance, we undertook another corporate restructuring in 2008, or the 2008 Restructuring, under which the share pledge was terminated on July 28, 2008 and JinkoSolar Investment transferred all of its equity interest in Jiangxi Desun to Long Faith Creation Limited (“Long Faith”), an unrelated Hong Kong company, on July 31, 2008. In addition, on November 11, 2008, we received written confirmation from Jiangxi MOFCOM in its reply to our inquiry that there had been no modification to the former approvals for the 2007 acquisition and pledge and JinkoSolar Investment’s transfer of its equity interest in Jiangxi Desun to Long Faith, and we might continue to rely on those approvals for further transactions. Nevertheless, we cannot assure you that MOFCOM will not revoke such approval and subject us to regulatory actions, penalties or other sanctions because of such past non-compliance. If the approval of Jiangxi MOFCOM for the 2007 acquisition and pledge were revoked and we were not able to obtain MOFCOM’s retrospective approval for the 2007 acquisition and pledge, Jiangxi Desun may be required to return the tax benefits to which only a foreign-invested enterprise was entitled and which were recognized by us during the period from April 10, 2007 to December 31, 2007, and the profit distribution to JinkoSolar Investment in December 2008 may be required to be unwound. Under an indemnification letter issued by our founders to us, our founders have agreed to indemnify us for any monetary losses we may incur as a result of any violation of Circular 10 in connection with the restructuring we undertook in 2007. We cannot assure you, however, that this indemnification letter will be enforceable under the PRC law, our founders will have sufficient resources to fully indemnify us for such losses, or that we will not otherwise suffer damages to our business and reputation as a result of any sanctions for such non-compliance.

Meanwhile, given the uncertainty with respect to what constitutes a merger with or acquisition of a PRC domestic enterprise and what constitutes circumvention of its approval requirements under the Circular 10, we cannot assure you that the 2008 Restructuring is in all respects compliance with Circular 10. If MOFCOM subsequently determines that its approval of the 2008 Restructuring was required, we may face regulatory actions or other sanctions by MOFCOM or other PRC regulatory agencies. Such actions may include compelling us to terminate the contracts between Jiangxi Desun and us, the limitation of our operating privileges in China, the imposition of fines and penalties on our operations in China, restrictions or prohibition on the payment or remittance of dividends by Jiangxi Jinko or others that may have a material adverse effect on our business, financial condition, results of operations, reputation and prospects, as well as the trading price of our ADSs.

43

Table of Contents

Adverse changes in political and economic policies of the PRC government could have a material adverse effect on the overall economic growth of the PRC, which could reduce the demand for our products and materially adversely affect our competitive position.

Our business is primarily based in the PRC and a portion of our sales are made in the PRC. Accordingly, our business, financial condition, results of operations and prospects are affected significantly by economic, political and legal developments in the PRC. The PRC economy differs from the economies of most developed countries in many respects, including:

the level of government involvement;
the level of development;
the growth rate;
the control of foreign exchange; and
the allocation of resources.

While the PRC economy has grown significantly in the past 30 years, the growth has been uneven, both geographically and among various sectors of the economy. The PRC government has implemented various measures to encourage economic growth and guide the allocation of resources. Some of these measures benefit the overall PRC economy, but may have a negative effect on us. For example, our financial condition and results of operations may be materially adversely affected by government control over capital investments or changes in tax regulations that are applicable to us.

The PRC economy has been transitioning from a planned economy to a more market-oriented economy. Although in recent years the PRC government has implemented measures emphasizing the utilization of market forces for economic reform, the reduction of state ownership of productive assets and the establishment of sound corporate governance in business enterprises, a substantial portion of the productive assets in China is still owned by the PRC government. The continued control of these assets and other aspects of the national economy by the PRC government could materially adversely affect our business. The PRC government also exercises significant control over China’s economic growth through allocating resources, controlling payment of foreign currency-denominated obligations, setting monetary policy and providing preferential treatment to particular industries or companies. We cannot predict whether changes in China’s political, economic and social conditions, laws, regulations and policies will have any material adverse effect on our current or future business, financial condition and results of operations.

44

Table of Contents

Uncertainties and limitations with respect to the PRC legal system could have a material adverse effect on us.

We are incorporated in Cayman Islands and are subject to laws and regulations applicable to foreign investment in China and, in particular, laws applicable to wholly foreign owned companies. The PRC legal system is based on written statutes. Prior court decisions have limited precedential value. Since 1979, PRC legislation and regulations have significantly enhanced the protections afforded to various forms of foreign investments in China. However, since these laws and regulations are relatively new and the PRC legal system continues to rapidly evolve, the interpretations of many laws, regulations and rules are not always uniform and enforcement of these laws, regulations and rules involve uncertainties and inconsistencies, which may limit legal protections available to us. For example, we may have to resort to administrative and court proceedings to enforce the legal protection that we enjoy either by law or contract. However, since PRC administrative authorities and courts have significant discretion in interpreting and implementing statutory and contractual terms, it may be more difficult than in more developed legal systems to evaluate the outcome of administrative and court proceedings and the level of legal protection we enjoy. These uncertainties may impede our ability to obtain or maintain licenses and permits or enforce the contracts we have entered into with our business partners, clients and suppliers. In addition, such uncertainties, including the inability to obtain or maintain licenses and permits and enforce our contracts, could materially adversely affect our business and operations. Furthermore, intellectual property rights and confidentiality protections in China may not be as effective as in the United States or other countries. Accordingly, we cannot predict the effect of future developments in the PRC legal system, including the promulgation of new laws, changes to existing laws or the interpretation or enforcement thereof, or the preemption of national laws by local regulations. In addition, due to jurisdictional limitations, matters of comity and various other factors, the SEC, U.S. Department of Justice and other U.S. authorities may be limited in their ability to pursue bad actors, including in instances of fraud, in the PRC. For example, there are significant legal and other obstacles to obtaining information needed for investigations or litigation in the PRC. Similar limitations apply to the pursuit of actions against individuals, including officers, directors and individual gatekeepers, who may have engaged in fraud or other wrongdoing. See “—It may be difficult to effect service of process on, or to enforce any judgments obtained outside the PRC against, us, our directors, or our senior management members who live inside the PRC.” Moreover, local authorities in the PRC may be constrained in their ability to assist U.S. authorities and overseas investors. In addition, according to Article 177 of the PRC Securities Law, which became effective in March 2020, no overseas securities regulator, including the SEC, PCAOB, and the Department of Justice, can directly conduct investigations or evidence collection activities within the PRC and no entity or individual in China may provide documents and information relating to securities business activities to overseas regulators without Chinese government approval. Furthermore, shareholder claims that are common in the U.S., including class action under securities laws and fraud claims, generally are difficult or impossible to pursue as a matter of law or practicality in the PRC. Investors in the PRC may not have the ability to pursue or seek certain legal claims and remedies against China-based Issuers, or their officers, directors, and gatekeepers in U.S. courts as private plaintiffs, and may have to rely on domestic legal claims and remedies that are available in the PRC, which can be significantly different from those available in the United States and difficult to pursue. These uncertainties and limitations could limit the legal protections available to us and other foreign investors, including you. In addition, any litigation in China may be protracted and result in substantial costs and diversion of resources and management attention.

PRC regulations may subject our future mergers and acquisitions activity to national security review.

In February 2011, the General Office of the State Council of China (the “State Council”) promulgated Circular 6, a notice on the establishment of a security review system for mergers and acquisitions of domestic enterprises by foreign investors. Circular 6 became effective on March 4, 2011. To implement Circular 6, MOFCOM promulgated the MOFCOM Security Review Rules on August 25, 2011, which became effective on September 1, 2011. According to Circular 6 and the MOFCOM Security Review Rules, national security review is required to be undertaken to complete mergers and acquisitions (i) by foreign investors of enterprises relating to national defense and (ii) through which foreign investors may acquire de facto control of a domestic enterprise that could raise national security concerns. When determining whether to subject a specific merger or acquisition to national security review, the MOFCOM will look at the substance and actual impact of the transaction. Bypassing national security review by structuring transactions through proxies, trusts, indirect investments, leases, loans, control through contractual arrangements or offshore transactions by foreign investors is prohibited.

45

Table of Contents

Under the framework of the Foreign Investment Law that came into effect on January 1, 2020, the scope of national security review expands from mergers and acquisitions to all foreign investment activities. According to Article 35 of the Foreign Investment Law, a security review system for foreign investment will be established in the country, under which the security review shall be conducted for any foreign investment affecting or having the possibility to affect national security. According to Article 40 of the Foreign Investment Law, where any country or region takes any discriminatory prohibitive or restrictive measures, or other similar measures against China in terms of investment, China may take corresponding measures against the said country or region in light of the actual conditions.

In addition, even if a merger or acquisition by foreign investors is not currently subject to national security review, or is determined to have no impact on national security after such review, it may still be subject to future review. A change in conditions (such as change of business activities, or amendments to relevant documents or agreements) may trigger the national security review requirement, then the foreign investor to the merger or acquisition must apply for the relevant approval with the MOFCOM.

Currently, there are no public provisions or official interpretations specifically providing that our current businesses fall within the scope of national security review and there is no requirement that foreign investors to those merger and acquisition transactions completed prior to the promulgation of Circular 6 take initiatives to submit such transactions to MOFCOM for national security review. However, as there is no clear statutory interpretation on the implementation of the security review system, there is no assurance that the relevant PRC regulatory authorities will have the same view as us when applying them. If our future merger and acquisition transactions and other indirect investments are subject to the national security review, the application of the national security review may further complicate our future merger and acquisition and investment activities, and our expansion strategy may be adversely affected as a result.

PRC regulations relating to overseas investment by PRC residents may restrict our overseas and cross-border investment activities and adversely affect the implementation of our strategy as well as our business and prospects.

On July 4, 2014, the State Administration of Foreign Exchange of China (the “SAFE”) issued the Circular on the Administration of Foreign Exchange Issues Related to Overseas Investment, Financing and Roundtrip Investment by Domestic Residents through Offshore Special Purpose Vehicles (the “SAFE Circular 37”), which replaced the former circular commonly known as “SAFE Circular 75” promulgated on October 21, 2005. The SAFE Circular 37 requires PRC residents to register with the competent local SAFE branch in connection with their direct establishment or indirect control of an offshore special purpose vehicle, for the purpose of overseas investment and financing, with such PRC residents’ legally owned assets or equity interests in domestic enterprises or offshore assets or interests. The SAFE Circular 37 further requires amendment to the registration in the event of any significant changes with respect to the special purpose vehicle, such as increase or decrease of capital contribution by PRC individuals, share transfer or exchange, merger, division or other material event. In the event that a PRC shareholder holding interests in a special purpose vehicle fails to fulfill the required SAFE registration, the PRC subsidiaries of that special purpose vehicle may be prohibited from making profit distributions to the offshore parent and from carrying out subsequent cross-border foreign exchange activities, and the special purpose vehicle may be restricted in its ability to contribute additional capital into its PRC subsidiary. Moreover, failure to comply with the various SAFE registration requirements described above could result in liability under PRC law for evasion of foreign exchange controls.

We believe that all of our beneficial owners who are PRC citizens or residents have completed their registrations with the competent local SAFE branch in accordance with the SAFE Circular 75 before the promulgation of SAFE Circular 37. However, we may not at all times be fully aware or informed of the identities of all of our beneficial owners who are PRC citizens or residents, and we may have little control over either our present or prospective direct or indirect PRC resident beneficial owners or the outcome of such registration procedures. We cannot assure you that the SAFE registrations of our present beneficial owners or future beneficial owners who are PRC citizens or residents have been or will be amended to reflect, among others, the shareholding information or equity investment as required by the SAFE Circular 37 and subsequent implementation rules at all times. The failure of these beneficial owners to comply with the registration procedures set forth in the SAFE Circular 37 may subject such beneficial owners and our PRC subsidiaries to fines and legal sanctions. Such failure may also result in restrictions on our PRC subsidiaries’ ability to distribute profits to us or our ability to inject capital into our PRC subsidiaries or otherwise materially adversely affect our business, financial condition and results of operations. Furthermore, it is unclear how the SAFE Circular 37 and any future regulation concerning offshore or cross-border transactions will be interpreted and implemented by the relevant PRC government authorities. We cannot predict how these regulations will affect our business operations or future strategy.

46

Table of Contents

On December 25, 2006, the People’s Bank of China promulgated the Measures for Administration of Individual Foreign Exchange, and on January 5, 2007, the SAFE promulgated relevant Implementation Rules. On February 15, 2012, the SAFE promulgated the Notice on Various Issues Concerning Foreign Exchange Administration for Domestic Individuals Participating in Equity Incentive Plans of Overseas Listed Companies (the “Stock Option Notice”). The Stock Option Notice terminated the Application Procedures of Foreign Exchange Administration of Domestic Individuals’ Participating in an Employee Stock Holding Plan or Stock Option Plan of an Overseas Listed Company issued by the SAFE on March 28, 2007. According to the Stock Option Notice, PRC citizens who are granted shares or share options by a company listed on an overseas stock market according to its employee stock holding plan or stock incentive plan are required to register with the SAFE or its local counterparts by following certain procedures.

We and our employees who are PRC citizens and individual beneficiary owners, or have been granted restricted shares or share options, are subject to the Individual Foreign Exchange Rules and its relevant implementation regulations. The failure of our PRC individual beneficiary owners and the restricted holders to complete their SAFE registrations pursuant to the SAFE’s requirement or the Individual Foreign Exchange Rules may subject these PRC citizens to fines and legal sanctions. It may also limit our ability to contribute additional capital into our PRC subsidiaries, and limit our PRC subsidiaries’ ability to distribute dividends to us, or otherwise materially adversely affect our business.

On December 26, 2017, the NDRC promulgated the Administrative Measures for the Outbound Investment of Enterprises (the “new ODI Measure”), which took effect from March 1, 2018, and replaced the Administrative Measures for Approval and Record-filing on Overseas Investment Projects promulgated by the NDRC on April 8, 2014. The new ODI Measure will further enhance supervision of overseas investments through reports of seriously unfavorable events, inquiry letters and related supervision systems. Where PRC citizens make investments abroad through overseas enterprises under their control, the new ODI Measure will apply mutatis mutandis.

Besides overseas investments of PRC subsidiaries, all of our overseas investments may subject to supervision and inspection under the new ODI Measure, which may materially increase the complexity of regulatory compliance aspect of our overseas investments. However, the implementation and interpretation of the new ODI Measure are uncertain and will subject to the practice of the NDRC.

Our ability to access financing could be adversely affected by PRC regulations.

Laws, regulations and policies issued in the PRC may apply to our company. For example, the NDRC issued the NDRC Circular, which came into effect on September 14, 2015. The NDRC Circular requires domestic enterprises and/or their overseas controlled enterprises or branches to procure the registration of any issue of debt securities outside the PRC with the NDRC prior to such issue, and to notify the NDRC of the particulars of such issue within a prescribed timeframe after such issue. The NDRC’s acceptance of any application for registration is subject to the availability of a sufficient amount within the NDRC’s stipulated foreign debt aggregate quota (the “Aggregate Quota”). Registrations for issue of foreign debt may not be accepted by the NDRC for either administrative reasons or due to the Aggregate Quota having been fully utilized at the time of filing. There is also no assurance that any registration with the NDRC will not be revoked or amended in the future.

The application of relevant laws, regulations and policies issued in the PRC, such as the NDRC Circular, could therefore restrict our ability to raise debt financing and could also impose registration and reporting requirements that could affect our ability to raise debt financing in a timely manner.

47

Table of Contents

Our China-sourced income is subject to PRC withholding tax under the CIT Law, and we may be subject to PRC corporate income tax at the rate of 25%.

We are a Cayman Islands holding company with a substantial part of our operations conducted through our operating subsidiaries in China. Under the Corporate Income Tax Law of the PRC (the “CIT Law”) which became effective on January 1, 2008 and was amended on February 24, 2017 and December 29, 2018, and the Regulation on the Implementation of the CIT Law (the “Implementation Rules of the CIT Law”) which became effective on January 1, 2008 and was amended on April 23, 2019, China-sourced passive income of non-PRC tax resident enterprises, such as dividends paid by a PRC subsidiary to its overseas parent and gains on sales of securities, is generally subject to a 10% withholding tax. Under an arrangement between China and Hong Kong, such dividend withholding tax rate is reduced to 5% if the beneficial owner of the dividends is a Hong Kong tax resident enterprise which directly owns at least 25% of the PRC company distributing the dividends and has owned such equity for at least 12 consecutive months before receiving such dividends. For example, as JinkoSolar Investment is a Hong Kong company and has owned 73.3% of the equity interest in Jiangxi Jinko directly for more than 12 consecutive months to date, any dividends paid by Jiangxi Jinko to JinkoSolar Investment will be entitled to a withholding tax at the reduced rate of 5% after obtaining approval from the competent PRC tax authority, provided that JinkoSolar Investment is deemed the beneficial owner of such dividends and that JinkoSolar Investment is not deemed to be a PRC tax resident enterprise as described below. However, according to the Circular of the State Taxation Administration on How to Understand and Identify a “Beneficial Owner” under Tax Treaties (“STA Circular 601”), effective on October 27, 2009, and the Announcement of the State Taxation Administration on the Determination of “Beneficial Owners” in the Tax Treaties (“STA Announcement 30”), effective on June 29, 2012, an applicant for treaty benefits, including benefits under the arrangement between China and Hong Kong on dividend withholding tax, that does not carry out substantial business activities or is an agent or a conduit company may not be deemed a “beneficial owner” of the PRC subsidiary and therefore, may not enjoy such treaty benefits. If JinkoSolar Investment is determined to be ineligible for such treaty benefits, any dividends paid by Jiangxi Jinko to JinkoSolar Investment will be subject to the PRC withholding tax at a 10% rate instead of a reduced rate of 5%. On February 3, 2018, the State Taxation Administration of China (the “STA”) released Announcement of the State Taxation Administration on Issues concerning the “Beneficial Owner” in Tax Treaties (the “STA Announcement 9”) which replaced STA Circular 601 and STA Announcement 30. The STA Announcement 9 comprehensively updates the assessment principles for the determination of beneficial ownership under agreements between China and other jurisdictions for the avoidance of double taxation. The STA Announcement 9 has also tightened the first two unfavorable factors of STA Circular 601. This will be challenging for some non-resident taxpayers as their treaty benefits may be denied for the lack of beneficial ownership status.

The CIT Law, however, also provides that enterprises established outside China whose “de facto management bodies” are located in China are considered “PRC tax resident enterprises” and will generally be subject to the uniform 25% PRC corporate income tax rate as to their global income. Under the Implementation Rules of the CIT Law, “de facto management bodies” is defined as the bodies that have, in substance, overall management control over such aspects as the production and operation, personnel, accounts and properties of an enterprise. On April 22, 2009, the STA promulgated the Notice Regarding the Determination of Chinese-Controlled Offshore Incorporated Enterprises as PRC Tax Resident Enterprises on the Basis of De Facto Management Bodies (“STA Circular 82”). According to STA Circular 82, an offshore-incorporated enterprise controlled by a PRC enterprise or a PRC enterprise group will be regarded as a PRC tax resident by virtue of having its “de facto management body” in China only if certain conditions are met. Despite of those conditions, as STA Circular 82 only applies to enterprises incorporated outside China controlled by PRC enterprises or a PRC enterprise, it remains unclear how the PRC tax authorities will determine the location of “de facto management bodies” for offshore enterprises that are controlled by individual PRC tax residents or non-PRC enterprises, as our company and JinkoSolar Investment. Therefore, it remains unclear whether the PRC tax authorities would regard our company or JinkoSolar Investment as PRC tax resident enterprises. If our company and JinkoSolar Investment are regarded by PRC tax authorities as PRC tax resident enterprises for PRC corporate income tax purposes, any dividends distributed from Jiangxi Jinko to JinkoSolar Investment and ultimately to our company could be exempt from the PRC withholding tax, while our company and JinkoSolar Investment will be subject to the uniform 25% corporate income tax rate on our global income at the same time.

48

Table of Contents

Dividends payable by us to our foreign investors and gains on the sale of our shares or ADSs may become subject to PRC corporate income tax liabilities.

The Implementation Rules of the CIT Law provide that (i) if the enterprise that distributes dividends is domiciled in China, or (ii) if gains are realized from transferring equity interests of enterprises domiciled in China, then such dividends or capital gains are treated as China-sourced income. It is not clear how “domicile” will be interpreted under the CIT Law. It may be interpreted as the jurisdiction where the enterprise is incorporated or where the enterprise is a tax resident. Therefore, if our company and our subsidiaries in Hong Kong are considered PRC tax resident enterprises for tax purposes, any dividends we pay to our overseas shareholders or ADS holders, as well as any gains realized by such shareholders or ADSs holders from the transfer of our shares or ADSs, may be viewed as China-sourced income and, as a consequence, be subject to PRC corporate income tax at 10% or a lower treaty rate. If we are required to withhold PRC income tax on dividends we pay to our overseas shareholders or ADS holders, or if you are required to pay PRC income tax on gains from the transfer of our shares or ADSs, the value of your investment in our shares or ADSs may be materially adversely affected.

Our ability to make distributions and other payments to our shareholders depends to a significant extent upon the distribution of earnings and other payments made by our subsidiaries in the PRC.

We conduct a substantial part of our operations through our operating subsidiaries in China. Our ability to make distributions or other payments to our shareholders depends on payments from these operating subsidiaries in China, whose ability to make such payments is subject to PRC regulations. Regulations in the PRC currently permit payment of dividends only out of accumulated profits as determined in accordance with accounting standards and regulations in China. According to the relevant PRC laws and regulations applicable to our operating subsidiaries in China and their respective articles of association, these subsidiaries are each required to set aside 10% of their after-tax profits based on PRC accounting standards each year as statutory common reserves until the accumulative amount of these reserves reaches 50% of their registered capital. These reserves are not distributable as cash dividends. As of December 31, 2020, these general reserves amounted to RMB692.0 million (US$106.1 million), accounting for 3.3% of the total registered capital of all of our operating subsidiaries in China. In addition, under the CIT Law and its Implementation Rules, dividends from our operating subsidiaries in China to us are subject to withholding tax to the extent that we are considered a non-PRC tax resident enterprise under the CIT Law. See “—Our China-sourced income is subject to PRC withholding tax under the CIT Law, and we may be subject to PRC corporate income tax at the rate of 25%.” Furthermore, if our operating subsidiaries in China incur debt on their own behalf in the future, the instruments governing the debt may restrict their ability to pay dividends or make other distributions to us such as requiring prior approval from relevant banks.

Restrictions on currency exchange may limit our ability to receive and use our revenue effectively.

Certain portions of our revenue and expenses are denominated in Renminbi. If our revenue denominated in Renminbi increases or expenses denominated in Renminbi decrease in the future, we may need to convert a portion of our revenue into other currencies to meet our foreign currency obligations, including, among others, payment of dividends declared, if any, in respect of our ADSs. Under China’s existing foreign exchange regulations, foreign currency under current account transactions, such as dividend payments and trade-related transactions are generally convertible. Accordingly, our operating subsidiaries in China are able to pay dividends in foreign currencies without prior approval from the SAFE, by complying with certain procedural requirements. On January 1, 2020, the Foreign Investment Law and its implementing regulations came into effect. According to the Foreign Investment Law, a foreign investor may, in accordance with the law, freely transfer into or out of the PRC its contributions, profits, capital earnings, income from asset disposal, intellectual property rights royalties acquired, compensation or indemnity legally obtained, income from liquidation, etc., made or derived within the territory of the PRC in RMB or any foreign currency, subject to no illegal restriction by any entity or individual in terms of the currency, amount, frequency of such transfer into or out of the PRC, etc. The foreign exchange control in the field of foreign investment has been continuously relaxed. However, in practice, laws and regulations regarding the legality of foreign exchange projects still need to be followed. The SAFE issued the Circular on Further Promoting the Reform of Foreign Exchange Administration and Improving Examination of Authenticity and Compliance on January 26, 2017, pursuant to which the SAFE restated the procedures and reemphasized the bona-fide principle for banks to follow during their review of certain cross-border profit remittance. We cannot assure you that the PRC government would not take further measures in the future to restrict access to foreign currencies for current account transactions. Foreign exchange transactions by our operating subsidiaries in China under capital accounts continue to be subject to significant foreign exchange controls and require the approval of, or registration with, PRC governmental authorities. In particular, if one of our operating subsidiaries in China borrows foreign currency loans from us or other foreign lenders, these loans must be registered with the SAFE.

49

Table of Contents

If we finance our subsidiaries in China by means of additional capital contributions, these capital contributions must be filed or approved by certain government authorities, including the MOFCOM or its local counterparts. On August 29, 2008, the SAFE promulgated Circular 142, which used to regulate the conversion by a foreign-invested company of foreign currency into Renminbi by restricting how the converted Renminbi may be used. On March 30, 2015, the SAFE issued the Circular on Reforming the Administration Approach Regarding the Foreign Exchange Capital Settlement of Foreign-invested Enterprises (“Circular 19”), which became effective on June 1, 2015 and replaced Circular 142. Circular 19 provides that the conversion from foreign currency registered capital of foreign-invested enterprises into the Renminbi capital may be at foreign-invested enterprises’ discretion, which means that the foreign currency registered capital of foreign-invested enterprises for which the rights and interests of monetary contribution has been confirmed by the local foreign exchange bureau (or the book-entry of monetary contribution has been registered) can be settled at the banks based on the actual operational needs of the enterprises. However, Circular 19 does not materially change the restrictions on the use of foreign currency registered capital of foreign-invested enterprises that Circular 142 has set forth. On June 9, 2016, the SAFE promulgated the Circular on Reforming and Standardizing the Administrative Provisions on Capital Account Foreign Exchange (“Circular 16”), which applies to all domestic enterprises in China. Circular 19 and Circular 16 continue to prohibit foreign-invested enterprises from, among other things, spending Renminbi capital converted from its foreign currency registered capital on expenditures beyond its business scope. Therefore, Circular 19 and Circular 16 may significantly limit the ability of our operating subsidiaries in China to transfer and use Renminbi funds from its foreign currency denominated capital, which may adversely affect our business, financial condition and results of operations.

The expiration or reduction of tax incentives by the PRC government may have a material adverse effect on our operating results.

The CIT Law imposes a uniform tax rate of 25% on all PRC enterprises, including foreign-invested enterprises, and eliminates or modifies most of the tax exemptions, reductions and preferential treatments available under the previous tax laws and regulations. Under the CIT Law, enterprises that were established before March 16, 2007 and already enjoyed preferential tax treatments have (i) in the case of preferential tax rates, continued to enjoy such tax rates that were gradually increased to the new tax rates within five years from January 1, 2008 or, (ii) in the case of preferential tax exemptions or reductions for a specified term, continued to enjoy the preferential tax holiday until the expiration of such term.

Jiangxi Jinko, Jiangxi Materials, Zhejiang Jinko, Yuhuan Jinko, Haining Jinko and Xinjiang Jinko were designated by the relevant local authorities as “High and New Technology Enterprises” under the CIT Law. Jiangxi Jinko, Jiangxi Materials, Zhejiang Jinko and Xinjiang Jinko were subject to a preferential tax rate of 15% for 2018, 2019 and 2020. Zhejiang Jinko plans to renew this qualification to enjoy the preferential tax rate of 15% in 2021, 2022 and 2023. Jiangxi Jinko and Jiangxi Materials have successfully renewed this qualification for 2019, 2020 and 2021. Xinjiang Jinko was designated by the relevant local authorities as an “Enterprise in the Encouraged Industry” and was subject to a preferential tax rate of 15% for 2018, 2019 and 2020. It was also designated by the relevant local authorities as a “High and New Technology Enterprise” in 2020, and will enjoy the preferential tax rate of 15% in 2021 and 2022. Yuhuan Jinko and Haining Jinko enjoyed the preferential tax rate of 15% in 2019 and 2020 and will continue to enjoy such rate in 2021. Sichuan Jinko was designated by the relevant local authorities as an “Enterprise in the Encouraged Industry” and is subject to a preferential tax rate of 15% for 2020, 2021 and 2022. However, we cannot assure you that Jiangxi Jinko, Jiangxi Materials, Zhejiang Jinko, Yuhuan Jinko, Haining Jinko, Xinjiang Jinko or Sichuan Jinko will continue to qualify as “High and New Technology Enterprises” or “Enterprise in the Encouraged Industries” when subject to reevaluation in the near future. In addition, there are uncertainties on how the CIT Law and its Implementation Rules will be enforced, and whether its future implementation will be consistent with its current interpretation. If the corporate income tax rates of some of our PRC subsidiaries increase, our financial condition and results of operations would be materially adversely affected.

According to the Provisional Regulation of the PRC on Value-Added Tax as amended on November 19, 2017 and its implementing rules, and the Announcement on Relevant Policies for Deepening Value-Added Tax Reform promulgated on March 20, 2019, effective from the date of April 1, 2019, gross proceeds from sales and importation of goods and provision of services are generally subject to a value-added tax (“VAT”) at 13%, instead of 16%, with exceptions for certain categories of goods that are taxed at a rate at 9%, instead of 10%.

50

Table of Contents

The State Council promulgated the Circular of the State Council on Cleaning up and Standardizing Preferential Policies on Tax and Other Aspects (“Circular 62”), on November 27, 2014 in an effort to render the preferential policies on tax, non-tax income, fiscal expenditure, and other aspects of the local government consistent with the PRC central laws and regulations. According to the Circular 62, the local tax authorities shall conduct the special clean-up action, which leads to preferential policies violating PRC central laws and regulations being declared ineffective and repealed and preferential policies not violating PRC central laws and regulations being retained. In addition, the special clean-up action requires that all provincial governments and relevant authorities shall, prior to the end of March 2015, report the outcome of the special clean-up action in respect of preferential policies on tax and other aspects to the Ministry of Finance, and the Ministry of Finance shall then forward the outcome to the State Council for final determination. On May 10, 2015, the State Council issued the Circular on Matters Relating to Preferential Policies for Tax and Other Aspects (“Circular 25”), which suspended the implementation of special clean-up action of Circular 62. Circular 25 provides that in respect of existing local preferential policies with specified time limit, such time limit shall still apply; if there is no specified time limit, the local governments shall have the discretion to set up a transitional period to adjust the policies. Furthermore, it provides that preferential tax policies stipulated in the agreements between local governments and enterprises remain valid and the implemented part of the policies shall not be retrospectively affected. However, it is not clear whether or not and when the special clean-up action will resume. The repeal of any preferential policy on tax and other aspects may materially adversely affect our financial condition and business operations.

We face uncertainty with respect to indirect transfers of equity interests in PRC tax resident enterprises by non-PRC holding companies.

Under the current PRC tax regulations, indirect transfers of equity interests and other properties of PRC tax resident enterprises by non-PRC holding companies may be subject to PRC tax. In accordance with the Announcement of the State Taxation Administration on Several Issues concerning the Enterprise Income Tax on the Indirect Transfers of Properties by Non-Resident Enterprises (“STA Announcement 7”), issued by the STA on February 3, 2015, if a non-PRC tax resident enterprise indirectly transfers equities and other properties of a PRC tax resident enterprise and such indirect transfer will produce a result identical or substantially similar to direct transfer of equity interests and other properties of the PRC tax resident enterprise, the non-PRC tax resident enterprise may be subject to PRC withholding tax at a rate up to 10%. The Announcement of the State Taxation Administration on Matters Concerning Withholding of Income Tax of Non-resident Enterprises at Source (“STA Announcement 37”), which was issued by the STA on October 17, 2017 and became effective on December 1, 2017, renovates the principles and procedures concerning the indirect equity transfer tax withholding for a non-PRC tax resident enterprise. Failure to comply with the tax payment obligations by a non-PRC tax resident will result in penalties, including full payment of tax owed, fines and default interest on those tax.

According to STA Announcement 7, where a non-resident enterprise indirectly transfers equity interests or other properties of PRC tax resident enterprises, (“PRC Taxable Property”) to avoid its tax liabilities by implementing arrangements without reasonable commercial purpose, such indirect transfer shall be re-characterized and recognized as a direct transfer of PRC Taxable Property. As a result, gains derived from such indirect transfer and attributable to PRC Taxable Property may be subject to PRC withholding tax at a rate of up to 10%. In the case of an indirect transfer of property of establishments of a foreign enterprise in the PRC, the applicable tax rate would be 25%. STA Announcement 7 also illustrates certain circumstances which would indicate a lack of reasonable commercial purpose. STA Announcement 7 further sets forth certain “safe harbors” which would be deemed to have a reasonable commercial purpose. As a general principle, the STA also issued the Administration of General Anti-Tax Avoidance (Trial Implementation) (“GATA”), which became effective on February 1, 2015 and empowers the PRC tax authorities to apply special tax adjustments for “tax avoidance arrangements.”

There is uncertainty as to the application of STA Announcement 7 as well as the newly issued STA Announcement 37 and GATA. For example, it may be difficult to evaluate whether or not the transaction has a reasonable commercial purpose, and such evaluation may be based on ambiguous criteria which have not been formally declared or stated by tax authorities. As a result, any of our disposals or acquisitions of the equity interests of non-PRC entities which indirectly hold PRC Taxable Property or any offshore transaction related to PRC Taxable Property, including potential overseas restructuring, might be deemed an indirect transfer under PRC tax regulations. Therefore, we may be at risk of being taxed under STA Announcement 7 and STA Announcement 37 and we may be required to expend valuable resources to comply with STA Announcement 7 and STA Announcement 37 or to establish that we should not be taxed thereunder, which may materially adversely affect our financial condition and results of operations.

51

Table of Contents

As a foreign company, our acquisitions of PRC companies may take longer and be subject to higher level of scrutiny by the PRC government, which may delay or prevent any intended acquisition.

Circular 10 established additional procedures and requirements including the requirements that in certain instances foreign investors obtain MOFCOM’s approval when they acquire equity or assets of a PRC domestic enterprise. According to Article 35 of the Foreign Investment Law, a security review system for foreign investment will be established in the country, under which the security review shall be conducted for any foreign investment affecting or having the possibility to affect national security. According to Article 40 of the Foreign Investment Law, where any country or region takes any discriminatory prohibitive or restrictive measures, or other similar measures against the People’s Republic of China in terms of investment, the People’s Republic of China may take corresponding measures against the said country or region in light of the actual conditions. In the future, we may want to grow our business in part by acquiring complementary businesses, although we do not have plans to do so at this time. Complying with Circular 10 the Foreign Investment Law and other relevant regulations to complete these transactions could be time-consuming and costly, and could result in an extensive review by the PRC government and its increased control over the terms of the transaction, and any required approval processes may delay or inhibit our ability to complete such transactions, which could affect our ability to expand our business or maintain our market share.

Our failure to make payments of statutory social welfare and housing funds to our employees could adversely and materially affect our financial condition and results of operations.

According to the relevant PRC laws and regulations, we are required to pay certain statutory social security benefits, including medical care, injury insurance, unemployment insurance, maternity insurance and pension benefits, and housing funds, for our employees. Our failure to comply with these requirements may subject us to monetary penalties imposed by the relevant PRC authorities and proceedings initiated by our employees, which could materially adversely affect our business, financial condition and results of operations.

In line with local customary practices, we have not made full contribution to the social insurance funds, and the contributions we made to the social insurance funds met the requirement of the local minimum wage standard, instead of the employees’ actual salaries as required, and have not made full contribution to the housing funds. We estimate the aggregate amount of unpaid social security benefits and housing funds in China to be RMB605.8 million (US$92.8 million) as of December 31, 2020. We may be required by the relevant PRC authorities to pay these statutory social security benefits and housing funds within a designated time period. In addition, an employee is entitled to seek compensation by resorting to labor arbitration at the labor arbitration center or filing a labor complaint with the labor administration bureau within a designated time period. We have made provisions for such unpaid social security benefits and housing funds of our former and current PRC subsidiaries. All employee participants in our share incentive plans who are domestic individual participants may be required to register with SAFE. We may also face regulatory uncertainties that could restrict our ability to adopt additional option plans for our directors and employees under PRC law.

All employees participating in our share incentive plans who are domestic individual participants may be required to register with SAFE. We may also face regulatory uncertainties that could restrict our ability to adopt additional option plans for our directors and employees under PRC law.

On February 15, 2012, SAFE released the Stock Option Notice, which superseded the Application Procedures of Foreign Exchange Administration for Domestic Individuals Participating in an Employee Stock Holding Plan or Stock Option Plan of an Overseas-Listed Company, issued by SAFE in 2007. According to the Stock Option Notice, PRC individual participants include directors, supervisors, senior management personnel and other employees who are PRC citizens (which includes citizens of Hong Kong, Macau and Taiwan) or foreign individuals who reside in the PRC for 12 months consecutively. Under the Stock Option Notice, PRC and foreign citizens who receive equity grants from an overseas listed company are required, through a PRC agent or PRC subsidiary of such listed company, to register with SAFE and complete certain other bank and reporting procedures. In addition, according to the Stock Option Notice, domestic individual participants must complete the registration with SAFE or its local branch within three days rather than 10 days from the beginning of each quarter.

Failure to comply with such provisions may subject us and the participants of our share incentive plans who are domestic individual participants to fines and legal sanctions and prevent us from further granting options under our share incentive plans to our employees, and we may become subject to more stringent review and approval processes with respect to our foreign-exchange activities, such as in regards to our PRC subsidiaries’ dividend payment to us or in regards to borrowing foreign currency, which could adversely affect our business operations.

52

Table of Contents

It may be difficult to effect service of process on, or to enforce any judgments obtained outside the PRC against, us, our directors, or our senior management members who live inside the PRC.

A majority of our existing directors and senior management members reside in the PRC and a substantial part of our assets and the assets of such persons are located in the PRC. Accordingly, it may be difficult for investors to effect service of process on any of these persons or to enforce judgments obtained outside of the PRC against us or any of these persons. The PRC does not have treaties providing for the reciprocal recognition and enforcement of judgments awarded by courts in many developed countries, including the Cayman Islands, the United States and the United Kingdom. Therefore, the recognition and enforcement in the PRC of judgments of a court in any of these jurisdictions in relation to any matter not subject to a binding arbitration provision may be difficult or even impossible.

Higher labor costs and inflation in China may adversely affect our business and our profitability.

Labor costs in China have risen in recent years as a result of the enactment of new labor laws and social development. In addition, inflation in China has increased. According to the National Bureau of Statistics of China, consumer price inflation in China was 2.1%, 2.9% and 2.5% in 2018, 2019 and 2020, respectively. Because we purchase raw materials from suppliers in China, higher labor cost and inflation in China increases the costs of labor and raw materials we must purchase for manufacturing. As we expect our production staff to increase and our manufacturing operations to become more labor intensive when we commence silicon wafer and solar module production, rising labor costs may increase our operating costs and therefore negatively impact our profitability.

Because we source contractors and purchase raw materials in China, higher labor cost and inflation in China increases the costs of labor and raw materials we procure for production. In addition, our suppliers may also be affected by higher labor costs and inflation. Rising labor costs may increase our operating costs and partially erode the cost advantage of our China-based operations and therefore negatively impact our profitability.

Risks Related to Our ADSs

The market price for our ADSs has been volatile, which could result in substantial losses to investors.

The market price for our ADSs has been and may continue to be highly volatile and subject to wide fluctuations, which could result in substantial losses to investors. The closing prices of our ADSs ranged from US$12.36 to US$87.55 per ADS in 2020. The price of our ADSs may continue to fluctuate in response to factors including the following:

announcements of new products by us or our competitors;
technological breakthroughs in the solar and other renewable power industries;
reduction or elimination of government subsidies and economic incentives for the solar industry;
news regarding any gain or loss of customers by us;
news regarding recruitment or loss of key personnel by us or our competitors;
announcements of competitive developments, acquisitions or strategic alliances in our industry;
changes in the general condition of the global economy and credit markets;
general market conditions or other developments affecting us or our industry;
the operating and stock price performance of other companies, other industries and other events or factors beyond our control;
regulatory developments in our target markets affecting us, our customers or our competitors;
announcements regarding patent litigation or the issuance of patents to us or our competitors;
announcements of studies and reports relating to the conversion efficiencies of our products or those of our competitors;

53

Table of Contents

actual or anticipated fluctuations in our quarterly results of operations;
changes in financial projections or estimates about our financial or operational performance by securities research analysts;
changes in the economic performance or market valuations of other solar power technology companies;
release or expiry of lock-up or other transfer restrictions on our outstanding ordinary shares or ADSs;
sales or perceived sales of additional ordinary shares or ADSs; and
commencement of, or our involvement in, litigation.

Any of these factors may result in large and sudden changes in the volume and price at which our ADSs will trade.

We cannot give any assurance that these factors will not occur in the future again. In addition, the securities market has from time to time experienced significant price and volume fluctuations that are not related to the operating performance of particular companies. Particularly, concerns over economic slowdown resulting from the COVID-19 pandemics have triggered a U.S. key market-wide circuit breaker for several times since March 9, 2020, leading to a historic drop for the U.S. capital market. No guarantee can be given on how the capital markets will react although actions have been taken worldwide to combat the spread of the COVID-19. These market fluctuations may also have a material adverse effect on the market price of our ADSs. In the past, following periods of volatility in the market price of their stock, many companies have been the subject of securities class action litigation. If we become involved in similar securities class action litigation in the future, it could result in substantial costs and diversion of our management’s attention and resources and could harm our stock price, business, prospects, financial condition and results of operations.

Conversion of the convertible notes we offered may dilute the ownership interest of existing shareholders, including holders who had previously converted their convertible notes.

The conversion of some or all of the convertible notes will dilute the ownership interests of existing shareholders and existing holders of our ADSs. Any sales in the public market of the ADSs issuable upon such conversion could adversely affect prevailing market prices of our ADSs. In addition, the existence of the convertible notes may encourage short selling by market participants because the conversion of the convertible notes could depress the price of our ADSs.

Provisions of the convertible notes we offered could also discourage an acquisition of us by a third party.

Certain provisions of the convertible notes could make it more difficult or more expensive for a third party to acquire us, or may even prevent a third party from acquiring us. For example, in terms of the convertible notes we offered in 2019, upon the occurrence of certain transactions constituting a fundamental change, holders of the convertible notes will have the right, at their option, to require us to repurchase all of their convertible notes or any portion of the principal amount of the convertible notes in integral multiples of US$1,000. We may also be required to increase the conversion rate for conversions in connection with certain fundamental changes. By discouraging an acquisition of us by a third party, these provisions could have the effect of depriving the holders of our ordinary shares and holders of our ADSs of an opportunity to sell their ordinary shares and ADSs, as applicable, at a premium over prevailing market prices.

The zero strike call option transaction may affect the value of the convertible notes and/or our ADSs and may result in market activity in the convertible notes and/or our ADSs.

In connection with the issuance of the convertible notes in 2019, we entered into a zero strike call option transaction with the option counterparty, having an expiration date of July 28, 2021. Pursuant to the zero strike call option transaction, we will pay a premium for the right to receive, without further payment, a specified number of ADSs, with delivery thereof by the option counterparty at expiry (subject to our right to cash settle), subject to early settlement of the zero strike call option transaction in whole or in part. In the case of physical settlement at expiration or upon any early settlement, the option counterparty will deliver to us the number of ADSs underlying the zero strike call option transaction or the portion thereof being settled early. In the case of cash settlement, the option counterparty will pay us cash based on the price of our ADSs based on a valuation period prior to such settlement. The zero strike call option transaction is intended to facilitate privately negotiated derivative transactions with respect to our ADSs between the option counterparty (or its affiliate) and investors in the convertible notes by which those investors will be able to hedge their investment in the convertible notes.

54

Table of Contents

The option counterparty (or its affiliate) may modify its hedge positions by entering into or unwinding derivative transactions with respect to the ADSs and/or purchasing or selling ADSs or other securities of ours in secondary market transactions at any time following the pricing of the convertible notes and shortly before or after the expiry or early settlement of the zero strike call option transaction, and, we have been advised that the option counterparty may unwind its derivative transactions and/or purchase or sell ADSs in connection with the expiry of the zero strike call option transaction or any early settlement of the zero strike call option transaction relating to any conversion, repurchase or redemption of the convertible notes. Those activities could also increase (or reduce the size of any decrease in) or decrease (or reduce the size of any increase in) the market price of our ADSs and/or the convertible notes.

We do not make any representation or prediction as to the direction or magnitude of any potential effect that the transactions described above may have on the price of our ADSs or the convertible notes nor how investors in the convertible notes may use, manage or unwind any privately negotiated derivative transactions with the option counterparty. In addition, we do not make any representation that the option counterparty (or its affiliate) will engage in these transactions or that these transactions, once commenced, will not be discontinued without notice.

We are subject to counterparty risk with respect to the zero strike call option transactions.

The option counterparty is a financial institution, and we will be subject to the risk that the option counterparty may become insolvent, default or otherwise fail to perform its obligations under the zero strike call option transaction. Our exposure to the credit risk of the option counterparty will not be secured by any collateral and will depend on many factors but, generally, will increase if the market price of our ADSs increases. If the option counterparty were to become insolvent, default or otherwise fail to perform its obligations under the zero strike call option transaction, we may suffer more dilution than we currently anticipate with respect to the ADSs assuming we physically settle the zero strike call option transaction. We can provide no assurance as to the financial stability or viability of the option counterparty.

You may not receive dividends or other distributions on our ordinary shares and you may not receive any value for them, if it is illegal or impractical to make them available to you.

Under Cayman Islands law, we may only pay dividends out of our profits or our share premium account provided always that we are able to pay our debts as they fall due in the ordinary course of our business. Our ability to pay dividends will therefore depend on our ability to generate sufficient profits. We cannot give any assurance that we will declare dividends of any amounts, at any rate or at all in the future. We have not paid any dividends in the past. Future dividends, if any, will be paid at the discretion of our board of directors and will depend upon our future operations and earnings, capital expenditure requirements, general financial conditions, legal and contractual restrictions and other factors that our board of directors may deem relevant. Our shareholders may, by ordinary resolution, declare a dividend, but no dividend may exceed the amount recommended by our board of directors. See “—Risks Related to Our Business and Industry—We rely principally on dividends and other distributions on equity paid by our principal operating subsidiary, and limitations on their ability to pay dividends to us could have a material adverse effect on our business and results of operations” above for additional legal restrictions on the ability of our PRC subsidiaries to pay dividends to us.

The depositary of our ADSs has agreed to pay to you the cash dividends or other distributions it or the custodian receives on ordinary shares or other deposited securities underlying our ADSs, after deducting its fees and expenses. You will receive these distributions in proportion to the number of ordinary shares your ADSs represent. However, the depositary is not responsible for making such distribution if it decides that it is unlawful or impractical to make a distribution available to any holders of ADSs. For example, it would be unlawful to make a distribution to a holder of ADSs if it consists of securities that require registration under the Securities Act but that are not properly registered or distributed under an applicable exemption from registration. The depositary may also determine that it is not feasible to distribute certain property through the mail. Additionally, the value of certain distributions may be less than the cost of mailing such distributions. In these cases, the depositary may determine not to distribute such property. We have no obligation to register under U.S. securities laws any ADSs, ordinary shares, rights or other securities received through such distributions. We also have no obligation to take any other action to permit the distribution of ADSs, ordinary shares, rights or anything else to holders of ADSs. This means that you may not receive distributions we make on our ordinary shares or any value for them if it is illegal or impractical for us to make them available to you. These restrictions may cause a material decline in the value of our ADSs.

Holders of ADSs have fewer rights than shareholders and must act through the depositary to exercise those rights.

As a holder of ADSs, you will not be treated as one of our shareholders and you will not have shareholder rights. Instead, the depositary will be treated as the holder of the shares underlying your ADSs. However, you may exercise some of the shareholders’ rights through the depositary, and you will have the right to withdraw the shares underlying your ADSs from the deposit facility.

55

Table of Contents

Holders of ADSs may only exercise the voting rights with respect to the underlying ordinary shares in accordance with the provisions of the deposit agreement. Under our current articles of association, the minimum notice period required to convene a general meeting is ten days. When a general meeting is convened, you may not receive sufficient notice of a shareholders’ meeting to permit you to withdraw the ordinary shares underlying your ADSs to allow you to cast your vote with respect to any specific matter. In addition, the depositary and its agents may not be able to send voting instructions to you or carry out your voting instructions in a timely manner. We plan to make all reasonable efforts to cause the depositary to extend voting rights to you in a timely manner, but we cannot assure you that you will receive the voting materials in time to ensure that you can instruct the depositary to vote your ADSs. Furthermore, the depositary and its agents will not be responsible for any failure to carry out any instructions to vote, for the manner in which any vote is cast or for the effect of any such vote. As a result, you may not be able to exercise your right to vote and you may lack recourse if the shares underlying your ADSs are not voted as you requested. In addition, in your capacity as an ADS holder, you will not be able to call a shareholder meeting.

You may be subject to limitations on transfers of your ADSs.

Your ADSs are transferable on the books of the depositary. However, the depositary may close its transfer books at any time or from time to time when it deems expedient in connection with the performance of its duties. In addition, the depositary may refuse to deliver, transfer or register transfers of ADSs generally when our books or the books of the depositary are closed, or at any time if we or the depositary deem it advisable to do so because of any requirement of law or of any government or government body, or under any provision of the deposit agreement, or for any other reason.

We are a Cayman Islands exempted company and, because judicial precedent regarding the rights of shareholders is more limited under Cayman Islands law than that under U.S. law, you may have less protection for your shareholder rights than you would under U.S. law.

Our corporate affairs are governed by our memorandum and articles of association, as amended and restated from time to time, the Companies Law (2020 Revision) of the Cayman Islands as amended from time to time and the common law of the Cayman Islands. The rights of shareholders to take action against the directors, actions by minority shareholders and the fiduciary duties of our directors to us under Cayman Islands law are to a large extent governed by the common law of the Cayman Islands. The common law of the Cayman Islands is derived in part from comparatively limited judicial precedent in the Cayman Islands as well as that from English common law, which has persuasive, but not binding, authority on a court in the Cayman Islands. The rights of our shareholders and the fiduciary duties of our directors under Cayman Islands law are not as clearly established as they would be under statutes or judicial precedent in some jurisdictions in the United States. In particular, the Cayman Islands have a less developed body of securities laws than the United States. In addition, some U.S. states, such as Delaware, have more fully developed and judicially interpreted bodies of corporate law than the Cayman Islands.

In addition, Cayman Islands companies may not have standing to initiate a shareholder derivative action before federal courts of the United States.

As we are a Cayman Islands exempted company and a substantial part of our consolidated assets are located outside of the United States and a substantial part of our current operations are conducted in China, there is uncertainty as to whether the courts of the Cayman Islands or China would recognize or enforce judgments of U.S. courts predicated upon the civil liability provisions of the securities laws of the United States or any state against us and our officers and directors, most of whom are not residents of the United States and the substantial majority of whose assets are located outside the United States. In addition, it is uncertain whether the Cayman Islands or PRC courts would entertain original actions brought in the Cayman Islands or in China against us or our officers and directors predicated on the federal securities laws of the United States. While there is no statutory enforcement in the Cayman Islands of judgments obtained in the federal or state courts of the United States (and the Cayman Islands are not a party to any treaties for the reciprocal enforcement or recognition of such judgments), a judgment obtained in such jurisdiction will be recognized and enforced in the courts of the Cayman Islands at common law, without any re-examination of the merits of the underlying dispute, by an action commenced on the foreign judgment debt in the Grand Court of the Cayman Islands, provided such judgment (a) is given by a foreign court of competent jurisdiction, (b) imposes on the judgment debtor a liability to pay a liquidated sum for which the judgment has been given, (c) is final, (d) is not in respect of taxes, a fine or a penalty, and (e) was not obtained in a manner and is not of a kind the enforcement of which is contrary to natural justice or the public policy of the Cayman Islands. However, the Cayman Islands courts are unlikely to enforce a judgment obtained from the U.S. courts under civil liability provisions of the U.S. federal securities law if such judgment is determined by the courts of the Cayman Islands to give rise to obligations to make payments that are penal or punitive in nature. Because such a determination has not yet been made by a court of the Cayman Islands, it is uncertain whether such civil liability judgments from U.S. courts would be enforceable in the Cayman Islands.

56

Table of Contents

As a result of all of the above, shareholders of a Cayman Islands company may have more difficulty in protecting their interests in the face of actions taken by our management, members of the board of directors or controlling shareholders than they would as shareholders of a company incorporated in a jurisdiction in the United States. For example, contrary to the general practice in most corporations incorporated in the United States, Cayman Islands incorporated companies may not generally require that shareholders approve sales of all or substantially all of a company’s assets. The limitations described above will also apply to the depositary who is treated as the holder of the shares underlying your ADSs.

Our current articles of association contain anti-takeover provisions that could prevent a change in control even if such takeover is beneficial to our shareholders.

Our current articles of association contain provisions that could delay, defer or prevent a change in control of our company that could be beneficial to our shareholders. These provisions could also discourage proxy contests and make it more difficult for you and other shareholders to elect directors and take other corporate actions. As a result, these provisions could limit the price that investors are willing to pay in the future for our ADSs. These provisions might also discourage a potential acquisition proposal or tender offer, even if the acquisition proposal or tender offer is at a price above the then current market price of our ADSs. These provisions provide that our board of directors has authority, without further action by our shareholders, to issue preferred shares in one or more series and to fix their designations, powers, preferences, privileges, and relative participating, optional or special rights and the qualifications, limitations or restrictions, including dividend rights, conversion rights, voting rights, terms of redemption and liquidation preferences, any or all of which may be greater than the rights associated with our ordinary shares, in the form of ADSs or otherwise. Our board of directors may decide to issue such preferred shares quickly with terms calculated to delay or prevent a change in control of our company or make the removal of our management more difficult. If our board of directors decides to issue such preferred shares, the price of our ADSs may fall and the voting and other rights of holders of our ordinary shares and ADSs may be materially adversely affected.

We are a foreign private issuer within the meaning of the rules under the Exchange Act, and as such we are exempt from certain provisions applicable to U.S. domestic public companies.

Because we qualify as a foreign private issuer under the Exchange Act, we are exempt from certain provisions of the securities rules and regulations in the United States that are applicable to U.S. domestic issuers, including:

the rules under the Exchange Act requiring the filing with the SEC of quarterly reports on Form 10-Q, quarterly certifications by the principal executive and financial officers, or current reports on Form 8-K;
the sections of the Exchange Act regulating the solicitation of proxies, consents, or authorizations in respect of a security registered under the Exchange Act;
the sections of the Exchange Act requiring insiders to file public reports of their stock ownership and trading activities and liability for insiders who profit from trades made in a short period of time; and
the selective disclosure rules by issuers of material nonpublic information under Regulation FD.

We are required to file an annual report on Form 20-F within four months of the end of each financial year. Press releases relating to financial results and material events will also be furnished to the SEC on Form 6-K. However, the information we are required to file with or furnish to the SEC will be less extensive and less timely compared to that required to be filed with the SEC by U.S. domestic issuers. As a result, you may not be afforded the same protections or information that would be made available to you were you investing in a U.S. domestic issuer.

57

Table of Contents

As an exempted company incorporated in the Cayman Islands, we may adopt certain home country practices in relation to corporate governance matters. These practices may afford less protection to shareholders than they would enjoy if we complied fully with the NYSE corporate governance listing standards.

As a non-U.S. company with ADSs listed on the NYSE, we are subject to the NYSE corporate governance listing standards. However, in reliance on Section 303A.11 of the NYSE Listed Company Manual, which permits a foreign private issuer to follow the corporate governance practices of its home country, we have adopted certain corporate governance practices that may differ significantly from the NYSE corporate governance listing standards. For example, we may include non-independent directors as members of our compensation committee and nominating and corporate governance committee, and our independent directors are not required to hold regularly scheduled meetings at which only independent directors are present. Such home country practice differs from the NYSE corporate governance listing standards, because there are no specific provisions under the Companies Law (2020 Revision) of the Cayman Islands imposing such requirements. Accordingly, executive directors, who may also be our major shareholders or representatives of our major shareholders, may have greater power to make or influence major decisions than they would if we complied with all the NYSE corporate governance listing standards. While we may adopt certain practices that are in compliance with the laws of the Cayman Islands, such practices may differ from more stringent requirements imposed by the NYSE rules and as such, our shareholders may be afforded less protection under Cayman Islands law than they would under the NYSE rules applicable to U.S. domestic issuers. See “Item 16G. Corporate Governance.”

We may be a passive foreign investment company, which could result in adverse U.S. federal income tax consequences to U.S. Holders of our ADSs or ordinary shares.

A non U.S. corporation will be considered a passive foreign investment company, which we refer to as a PFIC, for U.S. federal income tax purposes in any taxable year in which either 75% or more of its gross income is “passive income” or 50% or more of its assets constitute “passive assets” (generally determined on the basis of a quarterly average). The calculation of the value of our assets will be based, in part, on the market value of the ADSs, which is subject to change. The determination as to whether a non U.S. corporation is a PFIC is based upon the application of complex U.S. federal income tax rules (which are subject to differing interpretations), the composition of income and assets of the non U.S. corporation from time to time and the nature of the activities performed by its officers and employees.

Based upon our current and projected income, assets and activities, we do not expect to be considered a PFIC for our current taxable year or in the foreseeable future. However, because the determination of whether we are a PFIC will be based upon the composition of our income, assets and the nature of our business, as well as the income, assets and business of entities in which we hold at least a 25% interest, from time to time, and because there are uncertainties in the application of the relevant rules, there can be no assurance that the United States Internal Revenue Service, will not take a contrary position.

If we are a PFIC for any taxable year during which a U.S. Holder, as defined in “Item 10. Additional Information—E. Taxation—U.S. Federal Income Taxation—Passive Foreign Investment Company”, holds the ADSs or ordinary shares, the U.S. Holder might be subject to increased U.S. federal income tax liability and to additional reporting obligations. See “Item 10. Additional Information—E. Taxation—U.S. Federal Income Taxation—Passive Foreign Investment Company.” U.S. Holders are encouraged to consult their own tax advisors regarding the applicability of the PFIC rules to their purchase, ownership and disposition of the ADSs or ordinary shares.

We may issue additional ordinary shares, other equity or equity-linked or debt securities, which may materially adversely affect the price of our ordinary shares or ADSs. Hedging activities may depress the trading price of our ordinary shares.

We may issue additional equity, equity-linked or debt securities for a number of reasons, including to finance our operations and business strategy (including in connection with acquisitions, strategic collaborations or other transactions), to satisfy our obligations for the repayment of existing indebtedness, to adjust our ratio of debt to equity, to satisfy our obligations upon the exercise of outstanding warrants or options or for other reasons. Any future issuances of equity securities or equity-linked securities could substantially dilute your interests and may materially adversely affect the price of our ordinary shares or ADSs. We cannot predict the timing or size of any future issuances or sales of equity, equity-linked or debt securities, or the effect, if any, that such issuances or sales may have on the market price of our ordinary shares or ADSs. Market conditions could require us to accept less favorable terms for the issuance of our securities in the future.

58

Table of Contents

Substantial future sales of our ordinary shares or ADSs in the public market, or the perception that such sales could occur, could cause the price of our ordinary shares or ADSs to decline.

Sales of our ordinary shares or ADSs in the public market, or the perception that such sales could occur, could cause the market price of our ordinary shares to decline. As of December 31, 2020, we had 187,434,469 ordinary shares outstanding, excluding 455,217 ADS representing 1,820,868 ordinary shares reserved for future grants under our share incentive plans and conversion of our convertible notes, and 2,945,840 ordinary shares as treasury stock. The number of ordinary shares outstanding and available for sale will increase when our employees and former employees who are holders of restricted share units and options to acquire our ordinary shares become entitled to the underlying shares under the terms of their units or options. To the extent these shares are sold into the market, or are converted to ADSs which are sold into the market place, the market price of our ordinary shares or ADSs could decline.

Your right to participate in any future rights offerings may be limited, which may cause dilution to your holdings.

We may from time to time distribute rights to our shareholders, including rights to acquire our securities. However, we cannot make these rights available in the United States unless we register the rights and the securities to which the rights relate under the Securities Act or an exemption from the registration requirements is available. We are under no obligation to file a registration statement with respect to any such rights or securities or to endeavor to cause a registration statement to be declared effective. Moreover, we may not be able to establish an exemption from registration under the Securities Act. Accordingly, you may be unable to participate in our rights offerings and may experience dilution in your holdings.

ITEM 4.               INFORMATION ON THE COMPANY

A. History and Development of the Company

Our legal and commercial name is JinkoSolar Holding Co., Ltd. Our principal executive office is located at 1 Jingke Road, Shangrao Economic Development Zone, Jiangxi Province, 334100, People’s Republic of China. Our telephone number at this address is (86-793) 846-9699 and our fax number is (86-793) 846-1152. Our registered office in the Cayman Islands is Cricket Square, Hutchins Drive, P.O. Box 2681, Grand Cayman, KY1-1111, Cayman Islands.

We commenced our operations in June 2006 through our then consolidated subsidiary Jiangxi Desun Energy Co., Ltd. We were incorporated as a limited liability company in the Cayman Islands on August 3, 2007. Following a series of equity transactions, we established a holding company structure with us being the ultimate holding company in 2009. We conduct our business principally through our majority-owned operating subsidiary in China, Jiangxi Jinko. As of December 31, 2020, we had nine production facilities globally and 23 oversea subsidiaries in Japan, South Korea, Vietnam, India, Turkey, Germany, Italy, Switzerland, the United States, Mexico, Brazil, Chile, Australia, Portugal, Canada, Malaysia, the United Arab Emirates, Kenya and Denmark. As of the same date, we also had global sales teams in China, the United Kingdom, France, Spain, Bulgaria, Greece, Ukraine, Jordan, Saudi Arabia, Tunisia, Morocco, Kenya, South Africa, Costa Rica, Colombia, Panama, Kazakhstan, Malaysia, Myanmar, Sri Lanka, Thailand, Vietnam, Poland and Argentina to conduct sales, marketing and brand development for our products around the world.

On May 19, 2010, we completed our initial public offering, in which we offered and sold 5,835,000 ADSs representing 23,340,000 ordinary shares, raising US$64.2 million in proceeds before expenses to us. Our ADSs are listed on the New York Stock Exchange under the symbol “JKS.”

On November 10, 2010, we completed a follow-on public offering of 3,500,000 ADSs representing 14,000,000 ordinary shares, of which 2,000,000 ADSs were sold by us and 1,500,000 ADSs were sold by the selling shareholders.

On May 17, 2011, we completed an offering of US$125 million of 4.0% convertible senior notes due 2016.

On September 25, 2013, we completed a follow-on public offering of 4,370,000 ADSs representing 17,480,000 ordinary shares, including 570,000 ADSs sold pursuant to the underwriters’ full exercise of their option to purchase additional ADSs.

On January 22, 2014, we completed a follow-on public offering of 3,750,000 ADSs representing 15,000,000 ordinary shares and a concurrent offering of US$150.0 million in aggregate amount of 4.0% convertible senior notes due 2019.

In March 2015, we opened a solar cell and module manufacturing facility with the production capacity of 450 MW and 500 MW, respectively, in Penang, Malaysia.

59

Table of Contents

In November 2016, as a result of the sale of all of the 55% equity interest indirectly held by us in JinkoPower, we disposed of our downstream solar power project business in China and received US$250 million in cash.

In February 2017, we announced completion of repurchase of 4.00% convertible senior notes due 2019 at the option of holders of the notes. An aggregate principal amount of US$61,074,000 of the notes was tendered for repurchase, with US$10,000 convertible senior notes remaining outstanding after such repurchase.

In May 2017, Abu Dhabi Water and Electricity Authority, Sweihan Solar Holding Company Limited (“Sweihan Holding”), a joint venture between Marubeni Corporation and us and a syndicate of international and local banks entered into financial agreements for the Sweihan Photovoltaic Independent Power Project in Abu Dhabi.

In September 2017, we filed a prospectus supplement to sell up to an aggregate of US$100 million of our ADSs through an at-the-market equity offering program (the “2017 ATM Program”). In January 2018, we terminated the 2017 ATM Program and did not sell any ADSs under the 2017 ATM Program.

In January 2018, we entered into a master supply agreement with NextEra. Under such master agreement, as amended in March 2018, we will supply NextEra up to 2,750 MW of high-efficiency solar modules over four years. In conjunction with this agreement, we opened our first U.S. factory in Jacksonville, Florida, which commenced production in the third quarter of 2018 and reached full production capacity in the first half of 2019.

In February 2018, we closed the follow-on public offering of 4,140,000 ADSs, each representing four of our ordinary shares, par value US$0.00002 per share, at US$18.15 per ADS. The net proceeds of the follow-on offering to us, after deducting underwriting commissions and fees and estimated offering expenses, was US$71.1 million. Concurrently we completed the private placement with Tanka International Limited, an exempted company incorporated in the Cayman Islands held by Mr. Xiande Li, our chairman and chief executive officer, and Mr. Kangping Chen, our director, of its purchase of US$35 million of our ordinary shares.

In April 2018, we signed a memorandum of understanding to partner with the Kazakhstan’s International Centre for Green Technologies and Investment Projects on solar power development. In June 2018, we entered into a contract to supply 50MW high-efficiency polycrystalline module to the Burnoye -2 solar plant located in Zhambyl region in south Kazakhstan, which is expected to become the country’s largest solar power plant upon completion.

In April 2018, we entered into a supply agreement with a European counterparty to supply high-efficiency solar modules for its 754 MW PV plant in Mexico.

In June 2018, JinkoSolar (U.S.) Inc., a majority-owned subsidiary of us, entered into a three-year agreement to supply 1.43GW of high-efficiency modules to sPower, a leading renewable energy independent power producer.

In June 2018, we supplied 275.4 MWdc of high-efficiency modules to Green Light Contractors Pty Ltd for use in the Bungala Solar Farm near Port Augusta, South Australia, the largest solar PV project under construction in Australia.

In August 2018, we signed a 240MW solar module supply agreement with Powerchina Huadong Engineering Corporation Limited for the second phase of the 420 MW Dau Tieng solar plant in Vietnam, which is expected to become the largest solar power project in Southeast Asia upon completion.

In January 2019, our large-area N-type TOPCon monocrystalline silicon solar cell achieved a record high efficiency of 24.2% in a test by the Photovoltaic and Wind Power Systems Quality Test Center at the Chinese Academy of Sciences.

In April 2019, we started to expand our high efficiency mono wafer production capacity with the construction of a new Greenfield 5 GW mono wafer production facility in Leshan, Sichuan Province, China, which was completed in December 2019.

60

Table of Contents

In May 2019, we completed a follow-on public offering of 4,671,875 ADSs, each representing four of our ordinary shares, at US$16.00 per ADS. Concurrently with the offering, we issued convertible senior notes of US$85 million due 2024 to support capital expenditure and supplement working capital. The notes will mature on June 1, 2024 and the holders will have the right to require us to repurchase for cash all or any portion of their notes on June 1, 2021. The interest rate is 4.5% per annum payable semi-annually, in arrears. As of the date of this annual report, the convertible notes of US$15.75 million in aggregate have been converted. In connection with the issuance of the convertible notes, we entered into a zero strike call option transaction with an affiliate of Credit Suisse Securities (USA) LLC, whom we refer to as the option counterparty, having an expiration date of July 28, 2021. Pursuant to the zero strike call option transaction, we will pay a premium for the right to receive, without further payment, a specified number of ADSs, with delivery thereof by the option counterparty at expiry (subject to our right to cash settle), subject to early settlement of the zero strike call option transaction in whole or in part. In the case of physical settlement at expiration or upon any early settlement, the option counterparty will deliver to us the number of ADSs underlying the zero strike call option transaction or the portion thereof being settled early. In the case of cash settlement, the option counterparty will pay us cash based on the price of our ADSs based on a valuation period prior to such settlement. The zero strike call option transaction is intended to facilitate privately negotiated derivative transactions with respect to our ADSs between the option counterparty (or its affiliate) and investors in the convertible notes by which those investors will be able to hedge their investment in the convertible notes.

In June 2019, we supplied Trung Nam Group with 258MW of monocrystalline PERC double glass modules which were installed at one of the largest solar-wind hybrid projects in Vietnam.

In June 2019, we supplied Power Construction Corporation of China with 351MW of solar modules, which were installed at the Hồng Phong solar PV plant in Vietnam, one of the largest PV projects in the Asia Pacific region.

In November 2019, we supplied X-ELIO, a leading company in the development, construction and operation of photovoltaic plants, with 950 MW of our ultra-high efficiency Cheetah 72 cells solar modules to be installed at different projects across Spain and Mexico.

In November 2019, we supplied 300MW of our high energy density Tiger panels for an ultra-high voltage demonstration plant in Qinghai Province, China.

In March 2020, we announced a share repurchase program of up to US$100 million of our ordinary shares represented by ADSs within twelve months. Purchases may be made from time to time on the open market at prevailing market prices in open-market transactions, privately negotiated transactions or block trades, and/or through other legally permissible means, depending on market conditions and in accordance with the applicable rules and regulations. The timing and conditions of the share repurchases will be subject to various factors including the requirements under Rule 10b-18 and Rule 10b5-1 of the Exchange Act, as well as our insider trading policy. We plan to use our existing funds to fund repurchases made under the share repurchase program. We have repurchased an aggregate of 305,660 ADSs as of the date of this annual report.

In June 2020, Mr. Shaoguo Ji was appointed as our Chief Human Resources Officer (CHO).

In August 2020, we unveiled our RE100 roadmap by providing detail on our approach to achieve 100% powered by renewables by 2025.

In August 2020, we signed a contract with Shanghai Electric Hongkong Co., Limited to supply approximately 1 GW of solar modules for Phase V of the Dubai Electricity and Water Authority Solar Park. This project is located in Dubai, and is part of the government's sustainable development to support the Dubai Clean Energy Strategy 2050 with the goal of providing 75% of Dubai's total power output from clean energy sources by 2050. We would supply its high efficiency Swan series modules, which would meet the high requirements of Dubai's scorching temperatures and on the leveled cost of energy.

In September 2020, we supplied Trung Nam Group with 611MW of Tiger bifacial transparent backsheet modules, which were installed at the Thuan Nam solar power plant project in Vietnam. Located in Thuan Nam, the Thuan Nam solar power plant project was one of the largest solar power projects by capacity that were using bifacial modules in both Vietnam and Southeast Asia.

In September 2020, we announced our intention to cooperate with ENEOS Corporation, Japan's largest oil refiner, on the provision of solar modules for a Virtual Power Plant project. For this project, our high-efficiency monocrystalline products would be deployed and installed on the roof of gas stations connected to a cloud-based distributed power plant, and would become our first Virtual Power Plant project in Japan.

61

Table of Contents

In September 2020, our board of directors approved a strategic plan to access China's capital markets through our principal operating subsidiary Jiangxi Jinko. We had been considering the opportunity to list Jiangxi Jinko, after certain intragroup restructuring on the STAR Market within the next three years. To qualify Jiangxi Jinko for a STAR Market listing and to raise additional capital to support its continuous expansion, our board of directors also approved an equity financing of Jiangxi Jinko.

In October 2020, the previously announced equity financing of Jiangxi Jinko was completed. Immediately after the closing, reputable Chinese third-party investors including China Industrial Bank Group, CIIT Asset Management Co., Ltd., YunShang Fund, Huaho Capital, and China Capital Management Co., Ltd., China Securities Investment Co., Ltd., together with our founders and senior management personnel, directly or through their investment arms, would collectively own approximately a 26.7% equity interest in Jiangxi Jinko. Following the closing of this transaction, we would actively prepare for the planned STAR Market listing of Jiangxi Jinko pursuant to relevant laws and regulations in China. We would remain the majority and controlling shareholder of Jiangxi Jinko after its STAR Market listing.

In November 2020, we and our subsidiary JinkoSolar (Sichuan) Co., Ltd. ("Sichuan Jinko") signed a long-term purchase agreement with certain subsidiaries of Tongwei Co., Ltd. The raw materials procurement would ensure a stable supply of polycrystalline silicon in line with our strategic and operational plans. Under the agreement, we locked in nearly 100,000 metric tons of polycrystalline silicon, and both parties could negotiate additional purchases. The price for any additional order would be negotiated and determined based on market conditions.

In November 2020, our wholly-owned subsidiary JinkoSolar Sweihan (HK) Limited ("Sweihan HK") entered into a share and debt purchase agreement with Jinko Power (HK) Company Limited ("Jinko HK"), an indirectly wholly-owned subsidiary of JinkoPower. Pursuant to the agreement, Sweihan HK will sell its 50% equity interest in Sweihan Holding to Jinko HK. Sweihan Holding holds a 40% equity interest in Sweihan PV Power Company P.J.S.C., the operating entity of a 1,200 MW photovoltaic power plant in Abu Dhabi (the "Sweihan Power Station"). Upon completion of the transaction, Jinko HK will indirectly hold a 20% equity interest in Sweihan PV Power Company P.J.S.C. The closing of this transaction is subject to, among other conditions, approvals by Emirates Water and Electricity Company, other shareholders of Sweihan Holding and Sweihan PV Power Company P.J.S.C., and the project finance lenders.

In December 2020, Mr. Longgen Zhang resigned as our director and Mr. Haiyuan (Charlie) Cao was appointed as our director.

In connection with its proposed listing on the STAR Market, relevant PRC law requires that the senior management of Jiangxi Jinko be different from that of its controlling shareholder, our company. Accordingly, in December 2020, our board of directors approved the following changes to our senior management: (i) Mr. Kangping Chen, Mr. Gener Miao, Dr. Jiun-Hua Allen Guo, Mr. Shaoguo Ji and Dr. Hao Jin resigned as chief executive officer, chief marketing officer, chief operating officer, chief human resources officer and chief technology officer of our company, respectively, while retaining the same roles at Jiangxi Jinko (which runs substantially all of our business); and (ii) Mr. Xiande Li, our founder and the chairman of our board of directors, was additionally appointed as our chief executive officer. We do not believe these changes will have material impact on our business operations, because the relevant management members will continue performing their previous responsibilities at Jiangxi Jinko and our chief executive officer and chief financial officer will continue managing the overall business of our company under the direction of our board of directors.

In December 2020, we filed a prospectus supplement to sell up to an aggregate of US$100 million of our ADSs through an at-the-market equity offering program (the "2020 ATM Program"). In January 2021, we completed the 2020 ATM Program, under which we sold 1,494,068 ADSs and received US$98.25 million after deducting commissions and offering expenses.

B.

Business Overview

We are a global leader in the PV industry based in China. We have built a vertically integrated solar power product value chain, manufacturing from silicon wafers to solar modules. We sell most of our solar modules under our own “JinkoSolar” brand, with a small portion of solar modules on an OEM basis. We also sell silicon wafers and solar cells that we do not use in our solar module production.

62

Table of Contents

We sell our products in major export markets and China. As of December 31, 2020, we had nine production facilities globally and 23 oversea subsidiaries in Japan, South Korea, Vietnam, India, Turkey, Germany, Italy, Switzerland, the United States, Mexico, Brazil, Chile, Australia, Portugal, Canada, Malaysia, the United Arab Emirates, Kenya and Denmark. As of the same date, we also had global sales teams in China, the United Kingdom, France, Spain, Bulgaria, Greece, Ukraine, Jordan, Saudi Arabia, Tunisia, Morocco, Kenya, South Africa, Costa Rica, Colombia, Panama, Kazakhstan, Malaysia, Myanmar, Sri Lanka, Thailand, Vietnam, Poland and Argentina to conduct sales, marketing and brand development for our products around the world. In addition, as of December 31, 2020, we had an aggregate of over 2,000 customers in over 100 countries and regions for our solar modules, including distributors, project developers and system integrators.

Our solar cells and modules utilize advanced solar technologies, such as the passivated emitter rear cell (“PERC”) technology and half cell technology, and have achieved industry-leading conversion efficiency. In 2018, 2019 and 2020, the average conversion efficiency rate of our solar cells using our P-type monocrystalline silicon wafers was 21.9%, 22.3% and 22.9%, respectively. In 2018, 2019 and 2020, the average conversion efficiency rate of our N-type monocrystalline solar cells was 22.8%, 23.3% and 23.5%, respectively. We believe that both of these average conversion efficiency rates were consistently higher than industry average. In May 2018, our P-type monocrystalline solar cells broke the world record by hitting conversion efficiency rate of 23.95%. In December 2018, our N-type monocrystalline solar cells reached the conversion efficiency rate of 24.2%. In June 2019, our P-type monocrystalline solar cells and N-type monocrystalline solar cells reached the maximum conversion efficiency rate of 24.38% and 24.58%, respectively. In July 2020, the maximum conversion efficiency rate of our N-Type monocrystalline solar cells reached 24.79%.

Our high-quality manufacturing capabilities have enabled us to produce solar cells and modules meeting the industry’s highest performance standards. All of our solar modules sold in Europe are CE, IEC, TÜV, and MCS certified, all of our solar module sold in India are BIS certified, all of our solar modules sold in North America are UL certified and our monocrystalline solar modules sold in China are CQC certified. In 2013, our solar modules passed TÜV Nord’s Dust & Sand Certification Test, demonstrating their suitability for installation in desert regions, and we also unveiled our “Eagle II” solar modules, which represent a new standard for performance and reliability. In May 2017, we became one of the first Chinese PV manufacturers to pass the intensive UV test according to IEC 61345 from TÜV Rheinland. In July 2017, we guaranteed that all our standard PV modules meet IEC 62804 double anti-PID standards. In May 2018, our entire portfolio of PV modules passed the Potential Induced Degradation resistance test as required by TÜV Nord’s IEC TS 62804-1 standards. In March 2019, we received the 5th “All Quality Matters Award” from TÜV Rheinland.

We leverage our vertically integrated platform and cost-efficient manufacturing capabilities in China to produce high quality products at competitive costs. Our solar cell and silicon wafer operations support our solar module production. As of December 31, 2020, we had an integrated annual capacity of 22 GW for mono wafers, 11 GW for solar cells and 31 GW for solar modules. Our manufacturing facilities are primarily located in five provinces across China, Florida of the United States and Penang of Malaysia, providing convenient and timely access to key resources and suppliers.

We no longer have any downstream solar power projects in China after we disposed of our downstream solar power projects business in China in the fourth quarter of 2016, but still have two overseas solar power projects which are located in Mexico and Argentina.

Our Products and Services

Our product mix has evolved rapidly since our inception, as we have incorporated more of the solar power value chain through the expansion of our production capabilities and acquisitions. We currently manufacture a series of products from silicon wafers to solar modules. Our principal product is solar modules, but we also sell silicon wafers and solar cells from time to time to meet our customers’ demand. In 2020, sales of solar modules, silicon wafers and solar cells represented 92.7%, 1.3% and 1.0%, respectively, of our total revenues. In addition, we also sell small volumes of recovered silicon materials to optimize the utilization of our production capacity.

The following table sets forth details of our sales volume by product for the periods indicated:

    

2018

    

2019

    

2020

Products

(MW)

(MW)

(MW)

Silicon wafers

 

1,168.6

 

2,383.3

 

1,583.7

Solar cells

 

364.9

 

478.1

 

670.6

Solar modules

 

11,170.5

 

14,207.5

 

18,770.6

63

Table of Contents

Leveraging our expertise in manufacturing high quality solar modules and substantial experience in the solar industry, we commenced developing solar power projects and providing solar system integration services in late 2011. In November 2019, we entered into an agreement to sell two solar power plants in Mexico with a combined capacity of 155 MW to an independent third party, which was completed in March 2020.

Unless otherwise specified, the results presented in this annual report do not include the results of our downstream solar power project business in China, a discontinued operation.

On January 1, 2018, we adopted new revenue guidance ASC Topic 606, “Revenue from Contracts with Customers”, by applying the modified retrospective method to those contracts that were not completed as of January 1, 2018. Results for reporting periods beginning on or after January 1, 2018 are presented under ASC Topic 606, while prior period amounts are not adjusted and continue to be reported in accordance with our historical accounting practices under ASC Topic 605 “Revenue Recognition”. See “Item 5. Operating and Financial Review and Prospects—A. Operational Results—Selected Statement of Operations Items—Revenues.”

In 2018, 2019 and 2020, revenues from sales of products to subsidiaries of Renesola Zhejiang Ltd. (“ReneSola”), one of our related parties controlled by an immediate family member of principal shareholders and directors of our company, who are also the executive officers of our company, amounted to RMB47.4 thousand, nil and nil, respectively.

In 2018, 2019 and 2020, revenues from sales of products to subsidiaries of Sweihan PV Power Company P.S.J.C, one of our related parties, amounted to RMB1,416.8 million, RMB144.3 million and RMB51.2 million (US$7.8 million), respectively.

In 2018, 2019 and 2020, sales of solar module products to subsidiaries of JinkoPower amounted to RMB38.9 million, RMB7.8 million and RMB5.1 million (US$0.8 million), respectively.

Solar Modules

We commenced producing solar modules in August 2009. In 2020, we sold 18.8 GW of solar modules and generated RMB32.56 billion (US$4.99 billion) of revenue from sales of solar modules, which accounted for 92.7% of our total revenue. We expect that sales of solar modules will continue to be our largest revenue source in the future. We expect to sell increasing volumes of solar modules in the overseas markets.

In May 2018, our entire portfolio of PV modules passed the Potential Induced Degradation resistance test as required by TÜV Nord’s IEC TS 62804-1 standards.

In May 2018, we launched the Cheetah component, the industry’s first mass production shipment of 400W PV modules, leading the industry into the PV 4.0 era. The 72-piece module of the Cheetah component has a maximum power of 405W.

In February 2019, we launched the Swan series of components, the industry’s first mass production of transparent double-sided backboard components with the front power up to 400W.

In May 2019, power generated by our 72 version high efficiency monocrystalline module reached 469.3W.

In October 2019, we launched a new high efficiency Tiger module using 9-busbar Mono PERC and Tiling Ribbon (TR) technology. With module efficiency of 20.78%, the new Tiger module is capable of generating up to 460 Wp of peak power output which makes it suitable for both utility and rooftop installations.

In September 2020, the maximum conversion efficiency of our N-Type mono bifacial module reached 23.01%.

In May 2020, we officially launched our 2020 flagship Tiger Pro module series. The module series could generate a maximum power output of up to 580Wp, which was 40% higher than current mainstream products installed in utility projects. All these high energy density modules used innovative multi-wire 9BB and TR tiling ribbon technology to reach significantly improved performance with a conversion efficiency of up to 21.6%.

In June 2020, our innovative Tiger Pro Series of high-efficiency modules received the world's first IEC 61701 Ed. 3 (FDIS) certification for salt mist corrosion test issued by TÜV Nord AG, an independent provider of technical services for testing, inspection, certification, consultation and training.

64

Table of Contents

In August 2020, we launched our new generation of 610W Tiger Pro High-efficiency monocrystalline TR solar module and our BIPV solutions, Building Integrated Photovoltaics product series, which were unveiled at SNEC 2020 in Shanghai.

On August 21, 2020, we were ranked as a top solar brand in debt financed projects and named a most "bankable" PV manufacturer by Bloomberg New Energy Finance. Forty-nine global solar module manufacturers were ranked based on Bloomberg New Energy Finance's global survey of key PV stakeholders assessing which module brands used in projects are most likely to obtain non-recourse debt financing from commercial banks.

In September 2020, we supplied Trung Nam Group with 611MW of Tiger bifacial transparent backsheet modules, which were installed at the Thuan Nam solar power plant project in Vietnam. Located in Thuan Nam, the Thuan Nam solar power plant project was one of the largest solar power projects by capacity that were using bifacial modules in both Vietnam and Southeast Asia.

In November 2020, we supplied 541 MW Tiger Series modules for the first phase of the Xuan Thien project in Vietnam. This project was considered as one of the largest solar power projects in Southeast Asia. This project demonstrates the latest PV development and energy transformation in Southeast Asia.

Solar Cells

We commenced production of solar cells in July 2009 following our acquisition of Zhejiang Jinko. The efficiency of a solar cell converting sunlight into electricity is represented by the ratio of electrical energy produced by the solar cell to the energy from sunlight that reaches the solar cell. The conversion efficiency of solar cells is determined to a large extent by the quality of silicon wafers used to produce the solar cells. In 2018, we led the industry in the resizing of the 158 mm x 158 mm solar cell. In 2019, we released solar cells of larger size and incorporating the tilling ribbon technology, which greatly increased the power of the components and brought more benefits to customers. In 2020, we developed and mass produced highly efficient P-type monocrystalline solar cells of 163 mm x 163 mm and 182 mm x 182 mm, and constructed an industry-leading production line for N-type monocrystalline solar cells. In December 2020, our maximum mass production efficiency of P-type monocrystalline solar cells and N-type monocrystalline solar cells reached 23.2% and 24.2%, respectively.

In May 2018, our P-type monocrystalline solar cells broke the world record by hitting conversion efficiency of 23.95%.

In December 2018, our N-type multicrystalline solar cells broke the world record by hitting conversion efficiency of 22.12%.

In December 2018, our N-type monocrystalline solar cells reached the conversion efficiency of 24.2%.

In June 2019, our P-type monocrystalline solar cells and N-type monocrystalline solar cells reached the maximum conversion efficiency of 24.38% and 24.58%, respectively.

In September 2020, the maximum solar conversion efficiency of our large-area N-type monocrystalline silicon solar cells reached 24.9%, which was confirmed by the Institute for Solar Energy Research in Hamelin (ISFH) in Germany and set a world record for large-size contact-passivated solar cells.

Silicon Wafers

We commenced production of monocrystalline silicon wafers and multicrystalline silicon wafers in March 2008 and July 2008, respectively.

In 2018, we developed P-type and N-type monocrystalline silicon wafers with high quality and low oxygen content of 158 mm x 158 mm. In 2019, we developed technologies for silicon wafers of larger size, which resolved technical difficulties such as non-destructive cutting and concentric circle defects, and combined with N4/N5 technology, greatly improved the quality and efficiency of N-type monocrystalline silicon wafers while reducing its cost. In 2020, we developed and mass produced high quality silicon wafers of 182 mm x 182 mm, and conducted research on silicon wafers of 210 mm x 210 mm or larger size. We optimized Outer-furnace Czochralski technology and charging technology and developed and verified N7/N8 technology, which greatly improved the quality and efficiency of silicon wafers while increasing manufacturing capacity and reducing costs.

Recovered Silicon Materials

We commenced processing of recoverable silicon materials into recovered silicon materials in June 2006. We are able to process and recover a broad range of recoverable silicon materials, which enables us to reduce our overall silicon material costs and improve product quality and yield.

65

Table of Contents

Solar Power Generation and Solar System EPC Services

We commenced developing solar power projects in China in 2011 and generated revenue from sales of electricity generated by our own solar power projects when they were connected to the grid. In November 2016, we disposed of our downstream solar power project business in China.

We obtained two small solar power projects as the repayment of our accounts receivable in Italy and commenced developing solar power projects overseas in 2016, which were disposed of in 2018.

In November 2019, we entered into an agreement to sell two solar power plants in Mexico with a combined capacity of 155 MW to an independent third party, which was completed in March 2020. Currently, we have two overseas solar power projects which are located in Mexico and Argentina.

In addition, in order to promote our high-efficiency modules and cutting-edge N-type cell technologies, we, through a joint venture, Poyang Luohong, in which we then held 51% equity interest, had bid and won a 250 MW solar project under NEA’s “Technology Top Runner” program in Shangrao, Jiangxi Province. The Technology Top Runner Project was connected to grid on December 8, 2019. We sold all of our equity interest in Poyang Luohong to an independent third party buyer and filed such change of ownership with Shangrao Market Supervision Administration on December 17, 2019. We considered the Technology Top Runner Project as a unique business opportunity. Other than the two overseas solar power projects in Mexico and Argentina, currently we do not have plans to develop any other solar projects in China or overseas.

Manufacturing

We manufacture and sell solar modules, solar cells, silicon wafers and recovered silicon materials.

Manufacturing Capacity and Facilities

Manufacturing Capacity

Our annual production capacity for mono wafers, solar cells and solar modules as of December 31, 2020 was 22 GW, 11 GW and 31 GW, respectively.

Property and Plant

We both own and lease properties for our operations. When we state that we own certain properties in China, we own the relevant land use rights because land is owned by the PRC state under the PRC land system. As of the date of this annual report, we had obtained land use rights to 3.5 million square meters of land. The following table sets forth the size, use and the location of the land, to which we had obtained the land use rights, as the date of this annual report:

    

Industrial Use

    

Residential Use

Location

(square meters)

(square meters)

Shangrao, Jiangxi Province

 

1,499,102

 

195,387

Haining, Zhejiang Province

 

676,040

 

18,963

Leshan, Sichuan Province

415,588

Yuhuan, Zhejiang Province

 

92,540

 

Yiwu, Zhejiang Province

281,089

Chuzhou, Zhejiang Province

289,091

Yili, Xinjiang Province

29,049

Total

 

3,275,740

 

214,350

We also lease manufacturing facilities with a total gross floor area of 32,067 square meters in Shangrao from Jiangxi Desun for production use. We also lease office space and manufacturing facilities in various locations around the world where we maintain subsidiaries and offices.

66

Table of Contents

Except as indicated otherwise, we own the facilities completed and under construction and own the right to use the relevant land for the durations described below (including capacities and major equipment):

    

    

Plant Size

    

    

Facility

(square

Products

    

Location

    

No.

    

meters)

    

Duration of Land Use Right

    

Major equipment

Silicon Ingots and Wafers

 

Shangrao Economic Development Zone, Jiangxi

 

1

 

68,397

 

(i) March 16, 2010 to February 3, 2057; (ii) December 9, 2009 to September 23, 2058; (iii) July 6, 2009 to August 10, 2059; (iv) July 10, 2009 to February 7, 2057; (v )January 6, 2009 to August 10, 2059

 

Monocrystalline furnaces, multicrystalline furnaces, wire saws, wire squarers

Silicon Ingots

 

Yili,Xinjiang

 

2

 

165,333

 

(i) May 28,2016 to May 27, 2026;(ii) January 1,2017 to December 31, 2029

 

Monocrystalline furnaces

Leshan, Sichuan

12

279,469

May 31, 2019 to May 30, 2069

Solar Cells

 

Yuanhua Town, Haining, Zhejiang

 

3

 

107,865

 

(i) November 23, 2009 to June 6, 2057; (ii) October 29, 2009 to May 26, 2058; (iii) August 17, 2010 to July 25, 2060

 

Diffusion furnaces, sintering furnaces, PECVD antireflection coatings manufacturing equipment, automatic printers

 

Penang, Malaysia

 

4

 

8,191

 

January 1, 2015 to December 31, 2022

Solar Modules

 

Shangrao Economic Development Zone, Jiangxi

 

5

 

134,950

 

July 6, 2009 to August 10, 2059

 

Laminating machine, solar cell module production line before and after component lamination, automatic glue spreads’ working station, solar cell module testing devices

 

Yuanhua Town, Haining, Zhejiang

 

6

 

98,497

 

September 9, 2016 to September 8, 2066

 

Yuanhua Town, Haining, Zhejiang

 

7

 

89,543

 

(i) October 29, 2009 to May 26, 2058; (ii) August 17, 2010 to July 25, 2060; (iii) September 15, 2010 to August 29, 2060

 

Penang, Malaysia

 

8

 

12,679

 

January 1, 2015 to December 31, 2022

 

Yuhuan, Zhejiang

 

9

 

92,540

 

September 9, 2016 to September 8, 2066

 

Yuanhua Town, Haining

 

10

 

140,647

 

March 22,2018 to March 15, 2068

 

Jacksonville, Florida

 

11

 

26,538

 

May 1, 2018 to April 30, 2028

Chuzhou, Anhui

13

289,091

April 13, 2020 to April 12, 2070

 

Yiwu, Zhejiang

 

14

 

281,089

 

March 12, 2020 to March 12, 2020

As of December 31, 2020, short-term borrowings of RMB926.4 million (US$142.0 million) and long-term borrowings of RMB908.7 million (US$139.3 million) were secured by land use rights, plant and equipment. We believe our current land use rights, existing facilities and equipment are adequate for our current requirements.

Major Plans to Construct, Expand or Improve Facilities

We have entered into purchase and other agreements for purchase of additional manufacturing equipment and expansion of our production capacities. Our capital commitments under these contracts amounted to RMB3.63 billion (US$555.6 million) as of December 31, 2020, of which RMB3.24 billion (US$496.4 million) will be due in 2021 and RMB386.2 million (US$59.2 million) will be due after one year but within five years. We may terminate these agreements or revise their terms in line with our new plan and as a result, may be subject to cancellation, late charges and forfeiture of prepayments. See “Item 3. Key Information—D. Risk Factors—Risks Related to Our Business and Industry—We may continue to undertake acquisitions, investments, joint ventures or other strategic alliances, and such undertakings may be unsuccessful.” and “Item 3. Key Information—D. Risk Factors—Risks Related to Our Business and Industry—We may face termination and late charges and risks relating to the termination and amendment of certain equipment purchases contracts.”

Manufacturing Process

Silicon Ingot Manufacturing

We produce monocrystalline silicon ingots in electric furnaces. We place silicon materials, consisting of virgin polysilicon feedstock and recovered silicon materials of various grades according to formulas developed in-house into a quartz crucible in the furnace, where the silicon materials are melted. While heating the silicon materials, we pump a stream of argon, a chemically inert gas, into the furnace to remove the impurities vaporized during the heating process and to inhibit oxidation, thus enhancing the purity of the silicon ingots. A thin crystal “seed” is dipped into the molten silicon to determine the crystal orientation