00-0000000Yes00016800562022FYfalseYes2022-12-3100016800562022-12-310001680056dei:BusinessContactMember2022-01-012022-12-3100016800562022-01-012022-12-310001680056orla:IfrsRevolvingCreditFacilityMember2019-12-282019-12-280001680056orla:IfrsRevolvingCreditFacilityMemberorla:TransactionCostDeductedMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:TransactionCostDeductedMember2020-12-310001680056orla:MineraCerroMember2022-01-012022-12-310001680056orla:MineraCerroMember2017-02-012017-03-310001680056orla:CreditFacilityMember2022-04-282022-04-280001680056orla:IfrsRestrictedStockUnitsRsusMemberorla:AfterAwardDateYearTwoMember2022-01-012022-12-310001680056orla:IfrsRestrictedStockUnitsRsusMemberorla:AfterAwardDateYearThreeMember2022-01-012022-12-310001680056orla:IfrsRestrictedStockUnitsRsusMemberorla:AfterAwardDateYearOneMember2022-01-012022-12-310001680056orla:AfterGrantDateYearTwoMember2022-01-012022-12-310001680056orla:AfterGrantDateYearThreeMember2022-01-012022-12-310001680056orla:AfterGrantDateYearOneMember2022-01-012022-12-310001680056orla:OnGrantDateMember2021-01-012021-12-310001680056orla:AfterGrantDateYearTwoMember2021-01-012021-12-310001680056orla:AfterGrantDateYearOneMember2021-01-012021-12-310001680056orla:SouthRailroadProjectMemberifrs-full:TopOfRangeMember2022-01-012022-12-310001680056orla:SouthRailroadProjectMemberifrs-full:BottomOfRangeMember2022-01-012022-12-310001680056orla:NewmontCorporationMember2022-01-012022-12-310001680056orla:FresnilloObligationMember2021-02-222021-02-220001680056ifrs-full:TopOfRangeMember2022-01-012022-12-310001680056ifrs-full:BottomOfRangeMember2022-01-012022-12-310001680056orla:SilverStreamMember2020-01-012020-12-310001680056orla:IfrsRevolvingCreditFacilityMember2019-01-012019-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:LoanAdvancesMember2022-01-012022-12-310001680056orla:NewmontLoanMember2020-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MiningPropertyMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2022-01-012022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2022-01-012022-12-310001680056ifrs-full:MotorVehiclesMemberifrs-full:TopOfRangeMember2022-01-012022-12-310001680056ifrs-full:MotorVehiclesMemberifrs-full:BottomOfRangeMember2022-01-012022-12-310001680056ifrs-full:BuildingsMemberifrs-full:TopOfRangeMember2022-01-012022-12-310001680056ifrs-full:BuildingsMemberifrs-full:BottomOfRangeMember2022-01-012022-12-310001680056ifrs-full:MiningAssetsMember2022-01-012022-12-310001680056orla:OtherSubsidiariesMember2022-01-012022-12-310001680056orla:OtherSubsidiariesMember2021-01-012021-12-310001680056orla:NevadaProjectsMember2021-01-012021-12-310001680056orla:RestrictedPerformanceShareUnitsRpsuMember2022-01-012022-12-310001680056orla:FresnilloObligationMemberorla:UponReceiptOfCofeceApprovalMember2022-01-012022-12-310001680056orla:FresnilloObligationMemberorla:EarlierOfDecember12022And12MonthsFollowingCommencementOfCommercialProductionMember2022-01-012022-12-310001680056orla:FresnilloObligationMemberorla:AtCaminoRojoProjectMember2022-01-012022-12-310001680056orla:SouthRailroadProjectMember2022-01-012022-12-310001680056ifrs-full:ContingentLiabilityForGuaranteesMember2022-01-012022-12-310001680056orla:RevolvingFacilityMemberifrs-full:TopOfRangeMember2022-01-012022-12-310001680056orla:RevolvingFacilityMemberifrs-full:BottomOfRangeMember2022-01-012022-12-3100016800562019-12-012019-12-310001680056orla:MonitorGoldCorporationMember2022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMemberorla:DepositsToVendorsOnConstructionAssetsMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-01-012021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MiningPropertyMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-01-012021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-01-012021-12-310001680056orla:NewmontLoanMember2021-01-012021-12-310001680056ifrs-full:TopOfRangeMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056ifrs-full:BottomOfRangeMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwoMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentyTwoMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentyThreeMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentySixMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentySevenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentyOneMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentyNineMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentyMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentyFourMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentyFiveMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwentyEightMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwelveMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeThreeMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeThirtyTwoMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeThirtyThreeMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeThirtyOneMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeThirtyMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeThirtyFourMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeThirtyFiveMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeThirteenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeSixteenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeSixMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeSeventeenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeSevenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeOneMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeNineteenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeNineMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeFourteenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeFourMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeFiveMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeFifteenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeElevenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeEightMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeEighteenMemberorla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:PriceRangeTwoMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeTwelveMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeThreeMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeThirteenMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeTenMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeSixteenMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeSixMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeSeventeenMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeSevenMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeOneMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeNineMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeFourteenMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeFourMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeFiveMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeFifteenMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeElevenMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:PriceRangeEightMemberorla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:WarrantsMemberorla:PriceRangeFourMember2021-01-012021-12-310001680056orla:WarrantsMemberorla:PriceRangeFiveMember2021-01-012021-12-310001680056ifrs-full:MotorVehiclesMember2022-01-012022-12-310001680056ifrs-full:ComputerEquipmentMember2022-01-012022-12-3100016800562022-08-120001680056orla:GoldStandardVenturesCorpMember2022-08-122022-08-120001680056orla:MexicanExtraordinaryMiningDutyMember2022-01-012022-12-310001680056orla:OtherCustomersMember2022-01-012022-12-310001680056orla:CustomerMember2022-01-012022-12-310001680056orla:CustomerBMember2022-01-012022-12-310001680056orla:CustomerMember2021-01-012021-12-310001680056orla:MonitorGoldCorporationMember2021-01-012021-12-310001680056orla:MineraCerroMember2021-01-012021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:RightofuseAssetsMember2022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMember2022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MiningPropertyMember2022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MachineryMember2022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:BuildingsMember2022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:RightofuseAssetsMember2022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:OtherPropertyPlantAndEquipmentMember2022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:MiningPropertyMember2022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:MachineryMember2022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:BuildingsMember2022-12-310001680056ifrs-full:RightofuseAssetsMember2022-12-310001680056ifrs-full:OtherPropertyPlantAndEquipmentMember2022-12-310001680056ifrs-full:MachineryMember2022-12-310001680056ifrs-full:GrossCarryingAmountMember2022-12-310001680056ifrs-full:BuildingsMember2022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMember2022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:RightofuseAssetsMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MachineryMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:BuildingsMember2021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:RightofuseAssetsMember2021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:OtherPropertyPlantAndEquipmentMember2021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:MachineryMember2021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:BuildingsMember2021-12-310001680056ifrs-full:RightofuseAssetsMember2021-12-310001680056ifrs-full:OtherPropertyPlantAndEquipmentMember2021-12-310001680056ifrs-full:MachineryMember2021-12-310001680056ifrs-full:GrossCarryingAmountMember2021-12-310001680056ifrs-full:BuildingsMember2021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:RightofuseAssetsMember2020-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMember2020-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MachineryMember2020-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:RightofuseAssetsMember2020-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:OtherPropertyPlantAndEquipmentMember2020-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:MachineryMember2020-12-310001680056ifrs-full:GrossCarryingAmountMember2020-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMember2020-12-310001680056ifrs-full:RetainedEarningsMember2022-01-012022-12-310001680056ifrs-full:RetainedEarningsMember2021-01-012021-12-310001680056country:US2021-01-012021-12-310001680056ifrs-full:IncreaseDecreaseDueToChangesInAccountingPolicyAndCorrectionsOfPriorPeriodErrorsMember2021-01-012021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:LoanAdvancesMember2021-01-012021-12-310001680056orla:MonitorGoldCorporationMember2022-01-012022-12-310001680056orla:MineraCerroMember2022-01-012022-12-310001680056orla:MadisonEnterprisesIncMember2022-01-012022-12-310001680056orla:GoldStandardVenturesUsIncMember2022-01-012022-12-310001680056orla:GoldStandardVenturesCorpMember2022-01-012022-12-310001680056orla:LewisGoldProjectMember2017-12-310001680056orla:GoldAndSilverMemberifrs-full:CommodityPriceRiskMemberorla:CommodityPriceMeasurementInputMember2022-12-310001680056ifrs-full:CurrencyRiskMember2022-12-310001680056orla:MineraCerroMember2021-12-310001680056orla:MineraCaminoRojoMember2021-12-310001680056orla:MineraCerroMember2020-12-310001680056orla:MineraCaminoRojoMember2020-12-310001680056orla:NevadaProjectsMember2022-12-310001680056orla:MineraCerroMember2022-12-310001680056orla:MineraCaminoRojoMember2022-12-310001680056ifrs-full:AccumulatedOtherComprehensiveIncomeMember2022-01-012022-12-310001680056ifrs-full:AccumulatedOtherComprehensiveIncomeMember2021-01-012021-12-310001680056orla:CommonSharesIssuedMember2022-12-310001680056orla:GoldStandardVenturesCorpMember2022-08-120001680056orla:ExerciseOfStockOptionsMember2022-01-012022-12-310001680056orla:PriceRangeTwentyThreeMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentyFiveMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeSevenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeNineMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeFourteenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:EmployeeStockOptionPlanMember2022-12-310001680056orla:EmployeeStockOptionPlanMember2021-12-310001680056orla:EmployeeStockOptionPlanMember2020-12-310001680056orla:WarrantsMemberorla:PriceRangeFiveMember2022-12-310001680056ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMemberorla:IfrsRestrictedStockUnitsRsusMember2022-12-310001680056ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMemberorla:IfrsRestrictedStockUnitsRsusMember2022-12-310001680056ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMemberorla:IfrsRestrictedStockUnitsRsusMember2022-12-310001680056orla:WarrantsMember2022-12-310001680056orla:RestrictedPerformanceShareUnitsRpsuMember2022-12-310001680056orla:IfrsRestrictedStockUnitsRsusMember2022-12-310001680056orla:DeferredShareUnitPlanMember2022-12-310001680056orla:WarrantsMemberorla:PriceRangeThreeMember2021-12-310001680056orla:WarrantsMemberorla:PriceRangeOneMember2021-12-310001680056orla:WarrantsMemberorla:PriceRangeFourMember2021-12-310001680056orla:WarrantsMemberorla:PriceRangeFiveMember2021-12-310001680056ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMemberorla:IfrsRestrictedStockUnitsRsusMember2021-12-310001680056ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMemberorla:IfrsRestrictedStockUnitsRsusMember2021-12-310001680056ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMemberorla:IfrsRestrictedStockUnitsRsusMember2021-12-310001680056orla:WarrantsMember2021-12-310001680056orla:RestrictedPerformanceShareUnitsRpsuMember2021-12-310001680056orla:IfrsRestrictedStockUnitsRsusMember2021-12-310001680056orla:DeferredShareUnitPlanMember2021-12-310001680056orla:WarrantsMemberorla:PriceRangeTwoMember2020-12-310001680056orla:WarrantsMemberorla:PriceRangeThreeMember2020-12-310001680056orla:WarrantsMemberorla:PriceRangeOneMember2020-12-310001680056orla:WarrantsMemberorla:PriceRangeFourMember2020-12-310001680056orla:WarrantsMemberorla:PriceRangeFiveMember2020-12-310001680056orla:WarrantsMember2020-12-310001680056orla:IfrsRestrictedStockUnitsRsusMember2020-12-310001680056orla:DeferredShareUnitPlanMember2020-12-310001680056orla:WarrantsMemberorla:PriceRangeOneMember2022-01-012022-12-310001680056orla:WarrantsMemberorla:PriceRangeFourMember2022-01-012022-12-310001680056orla:WarrantsMemberorla:PriceRangeFiveMember2022-01-012022-12-310001680056orla:WarrantsMemberorla:PriceRangeTwoMember2021-01-012021-12-310001680056orla:WarrantsMemberorla:PriceRangeThreeMember2021-01-012021-12-310001680056orla:WarrantsMemberorla:PriceRangeOneMember2021-01-012021-12-310001680056orla:WarrantsMember2021-01-012021-12-310001680056ifrs-full:KeyManagementPersonnelOfEntityOrParentMemberorla:RestrictedPerformanceShareUnitsRpsuMember2017-01-012017-12-310001680056orla:TermFacilityMember2022-04-280001680056orla:RevolvingFacilityMember2022-04-280001680056orla:CreditFacilityMember2022-04-280001680056ifrs-full:MiningPropertyMemberorla:SouthRailroadLewisAndMonitorGoldProjectsInNevadaMember2022-12-310001680056ifrs-full:MiningPropertyMemberorla:MineraCerroMember2022-12-310001680056ifrs-full:MiningPropertyMember2022-12-310001680056ifrs-full:MiningPropertyMemberorla:SouthRailroadLewisAndMonitorGoldProjectsInNevadaMember2021-12-310001680056ifrs-full:MiningPropertyMemberorla:MineraCerroMember2021-12-310001680056ifrs-full:MiningPropertyMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberorla:DepositsToVendorsOnConstructionAssetsMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MiningPropertyMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-12-310001680056ifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-12-310001680056ifrs-full:GrossCarryingAmountMemberorla:DepositsToVendorsOnConstructionAssetsMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2020-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2020-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MiningPropertyMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2020-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2020-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2020-12-310001680056ifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2020-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:LoanAdvancesMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:LoanAdvancesMember2020-12-310001680056orla:IfrsRevolvingCreditFacilityMember2020-12-310001680056orla:WarrantsExercisedMember2022-12-310001680056orla:EmployeeStockOptionPlanMember2022-12-310001680056orla:DeferredStockUnitMember2022-12-310001680056orla:WarrantsExercisedMember2021-12-310001680056orla:FresnilloObligationMember2021-12-310001680056orla:EmployeeStockOptionPlanMember2021-12-310001680056orla:ConsultingFeesMember2022-01-012022-12-310001680056ifrs-full:KeyManagementPersonnelOfEntityOrParentMember2022-01-012022-12-310001680056orla:ConsultingFeesMember2021-01-012021-12-310001680056ifrs-full:KeyManagementPersonnelOfEntityOrParentMember2021-01-012021-12-310001680056ifrs-full:GrossCarryingAmountMemberorla:DepositsToVendorsOnConstructionAssetsMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2022-01-012022-12-310001680056orla:IfrsRestrictedStockUnitsRsusMember2022-01-012022-12-310001680056orla:IfrsRestrictedStockUnitsRsusMember2021-01-012021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-01-012021-12-310001680056orla:RestrictedCashMember2022-01-012022-12-310001680056orla:IfrsFull_cashMember2022-01-012022-12-310001680056orla:IfrsAccruedLiabilitiesMember2022-01-012022-12-310001680056orla:IfrsAccountsPayableMember2022-01-012022-12-310001680056orla:FresnilloObligationMember2022-01-012022-12-310001680056orla:CreditFacilityMember2022-01-012022-12-310001680056ifrs-full:LoansAndReceivablesCategoryMember2022-01-012022-12-310001680056ifrs-full:LeaseLiabilitiesMember2022-01-012022-12-310001680056orla:RestrictedCashMember2021-01-012021-12-310001680056orla:NewmontLoanMember2021-01-012021-12-310001680056orla:IfrsRevolvingCreditFacilityMember2021-01-012021-12-310001680056orla:IfrsFull_cashMember2021-01-012021-12-310001680056orla:IfrsAccruedLiabilitiesMember2021-01-012021-12-310001680056orla:IfrsAccountsPayableMember2021-01-012021-12-310001680056orla:FresnilloObligationMember2021-01-012021-12-310001680056ifrs-full:LoansAndReceivablesCategoryMember2021-01-012021-12-310001680056ifrs-full:LeaseLiabilitiesMember2021-01-012021-12-310001680056ifrs-full:WarrantReserveMember2022-01-012022-12-310001680056ifrs-full:WarrantReserveMember2021-01-012021-12-310001680056ifrs-full:ReserveOfSharebasedPaymentsMember2022-01-012022-12-310001680056ifrs-full:OtherReservesMember2022-01-012022-12-310001680056ifrs-full:IssuedCapitalMember2022-01-012022-12-310001680056ifrs-full:ReserveOfSharebasedPaymentsMember2021-01-012021-12-310001680056ifrs-full:OtherReservesMember2021-01-012021-12-310001680056ifrs-full:IssuedCapitalMember2021-01-012021-12-310001680056ifrs-full:InterestRateRiskMember2022-01-012022-12-310001680056ifrs-full:InterestRateRiskMember2021-01-012021-12-310001680056orla:GoldAndSilverMemberifrs-full:CommodityPriceRiskMemberorla:CommodityPriceMeasurementInputMember2022-01-012022-12-310001680056orla:GoldAndSilverMemberifrs-full:CommodityPriceRiskMemberorla:CommodityPriceMeasurementInputMember2021-01-012021-12-310001680056ifrs-full:CurrencyRiskMember2021-01-012021-12-310001680056orla:IfrsAccruedLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056orla:FresnilloObligationMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:Level3OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056orla:CreditFacilityMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:Level3OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056ifrs-full:LeaseLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056orla:IfrsAccruedLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2022-12-310001680056orla:IfrsAccruedLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember2022-12-310001680056orla:IfrsAccruedLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2022-12-310001680056orla:IfrsAccountsPayableMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2022-12-310001680056orla:IfrsAccountsPayableMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember2022-12-310001680056orla:IfrsAccountsPayableMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2022-12-310001680056orla:FresnilloObligationMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2022-12-310001680056orla:FresnilloObligationMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2022-12-310001680056orla:CreditFacilityMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2022-12-310001680056orla:CreditFacilityMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2022-12-310001680056ifrs-full:LeaseLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2022-12-310001680056ifrs-full:LeaseLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2022-12-310001680056ifrs-full:Level3OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056ifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056orla:NewmontLoanMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056orla:FresnilloObligationMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056ifrs-full:LeaseLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056orla:NewmontLoanMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2021-12-310001680056orla:NewmontLoanMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056orla:IfrsAccruedLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2021-12-310001680056orla:IfrsAccruedLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember2021-12-310001680056orla:IfrsAccruedLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056orla:IfrsAccountsPayableMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2021-12-310001680056orla:IfrsAccountsPayableMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember2021-12-310001680056orla:IfrsAccountsPayableMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056orla:FresnilloObligationMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2021-12-310001680056orla:FresnilloObligationMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056ifrs-full:LeaseLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2021-12-310001680056ifrs-full:LeaseLiabilitiesMemberifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056ifrs-full:NotLaterThanOneYearMemberifrs-full:LiquidityRiskMember2021-12-310001680056ifrs-full:LaterThanThreeYearsMemberifrs-full:LiquidityRiskMember2021-12-310001680056ifrs-full:LaterThanOneYearAndNotLaterThanThreeYearsMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:RestrictedCashMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056orla:IfrsCashAndCashEquivalentsMemberifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossDesignatedUponInitialRecognitionCategoryMemberifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056ifrs-full:LoansAndReceivablesCategoryMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056orla:RestrictedCashMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2022-12-310001680056orla:RestrictedCashMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2022-12-310001680056orla:IfrsCashAndCashEquivalentsMemberifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossDesignatedUponInitialRecognitionCategoryMemberorla:NotAtFairValueMember2022-12-310001680056orla:IfrsCashAndCashEquivalentsMemberifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossDesignatedUponInitialRecognitionCategoryMemberifrs-full:AtFairValueMember2022-12-310001680056ifrs-full:LoansAndReceivablesCategoryMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2022-12-310001680056ifrs-full:LoansAndReceivablesCategoryMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember2022-12-310001680056ifrs-full:LoansAndReceivablesCategoryMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2022-12-310001680056ifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2022-12-310001680056orla:NotAtFairValueMember2022-12-310001680056ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember2022-12-310001680056ifrs-full:AtFairValueMember2022-12-310001680056orla:RestrictedCashMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056orla:IfrsCashAndCashEquivalentsMemberifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossDesignatedUponInitialRecognitionCategoryMemberifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056ifrs-full:LoansAndReceivablesCategoryMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056orla:RestrictedCashMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2021-12-310001680056orla:RestrictedCashMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056orla:IfrsCashAndCashEquivalentsMemberifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossDesignatedUponInitialRecognitionCategoryMemberorla:NotAtFairValueMember2021-12-310001680056orla:IfrsCashAndCashEquivalentsMemberifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossDesignatedUponInitialRecognitionCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056ifrs-full:LoansAndReceivablesCategoryMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberorla:NotAtFairValueMember2021-12-310001680056ifrs-full:LoansAndReceivablesCategoryMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember2021-12-310001680056ifrs-full:LoansAndReceivablesCategoryMemberifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:AtFairValueMember2021-12-310001680056ifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056ifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2021-12-310001680056orla:NotAtFairValueMember2021-12-310001680056ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember2021-12-310001680056ifrs-full:AtFairValueMember2021-12-310001680056orla:IfrsRestrictedStockUnitsRsusMember2022-01-012022-12-310001680056orla:DeferredShareUnitPlanMember2022-01-012022-12-310001680056orla:IfrsRestrictedStockUnitsRsusMember2021-01-012021-12-310001680056orla:DeferredShareUnitPlanMember2021-01-012021-12-3100016800562022-08-122022-08-120001680056ifrs-full:TopOfRangeMemberorla:GoldStandardVenturesCorpMember2022-08-122022-08-120001680056ifrs-full:BottomOfRangeMemberorla:GoldStandardVenturesCorpMember2022-08-122022-08-120001680056ifrs-full:TopOfRangeMemberorla:PriceRangeTwentyFiveMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056ifrs-full:TopOfRangeMemberorla:PriceRangeSevenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056ifrs-full:TopOfRangeMemberorla:PriceRangeNineMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056ifrs-full:TopOfRangeMemberorla:PriceRangeFourteenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056ifrs-full:BottomOfRangeMemberorla:PriceRangeTwentyThreeMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056ifrs-full:BottomOfRangeMemberorla:PriceRangeTwentyFiveMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056ifrs-full:BottomOfRangeMemberorla:PriceRangeSevenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056ifrs-full:BottomOfRangeMemberorla:PriceRangeNineMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056ifrs-full:BottomOfRangeMemberorla:PriceRangeFourteenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwoMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentyTwoMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentySixMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentySevenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentyOneMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentyNineMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentyMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentyFourMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwentyEightMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwelveMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeThreeMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeThirtyTwoMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeThirtyThreeMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeThirtyOneMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeThirtyMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeThirtyFourMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeThirtyFiveMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeThirteenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeSixteenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeSixMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeSeventeenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeOneMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeNineteenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeFourMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeFiveMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeFifteenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeElevenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeEightMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeEighteenMemberorla:EmployeeStockOptionPlanMember2022-12-310001680056orla:PriceRangeTwoMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeTwelveMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeThreeMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeThirteenMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeTenMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeSixteenMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeSixMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeSeventeenMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeSevenMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeOneMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeNineMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeFourteenMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeFourMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeFiveMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeFifteenMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeElevenMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056orla:PriceRangeEightMemberorla:EmployeeStockOptionPlanMember2021-12-310001680056ifrs-full:ContingentLiabilityArisingFromPostemploymentBenefitObligationsMember2022-12-310001680056ifrs-full:ContingentLiabilityArisingFromPostemploymentBenefitObligationsMember2021-12-310001680056ifrs-full:WarrantReserveMember2022-12-310001680056ifrs-full:RetainedEarningsMember2022-12-310001680056ifrs-full:ReserveOfSharebasedPaymentsMember2022-12-310001680056ifrs-full:OtherReservesMember2022-12-310001680056ifrs-full:IssuedCapitalMember2022-12-310001680056ifrs-full:AccumulatedOtherComprehensiveIncomeMember2022-12-310001680056ifrs-full:WarrantReserveMember2021-12-310001680056ifrs-full:RetainedEarningsMember2021-12-310001680056ifrs-full:ReserveOfSharebasedPaymentsMember2021-12-310001680056ifrs-full:OtherReservesMember2021-12-310001680056ifrs-full:IssuedCapitalMember2021-12-310001680056ifrs-full:AccumulatedOtherComprehensiveIncomeMember2021-12-310001680056ifrs-full:WarrantReserveMember2020-12-310001680056ifrs-full:RetainedEarningsMember2020-12-310001680056ifrs-full:ReserveOfSharebasedPaymentsMember2020-12-310001680056ifrs-full:OtherReservesMember2020-12-310001680056ifrs-full:IssuedCapitalMember2020-12-310001680056ifrs-full:AccumulatedOtherComprehensiveIncomeMember2020-12-310001680056ifrs-full:LiquidityRiskMember2022-01-012022-12-310001680056ifrs-full:CurrencyRiskMember2022-01-012022-12-310001680056orla:NewmontLoanMember2022-01-012022-12-310001680056orla:GoldStandardVenturesCorpMember2022-08-122022-08-120001680056orla:EmployeeStockOptionPlanMember2022-01-012022-12-310001680056orla:EmployeeStockOptionPlanMember2021-01-012021-12-310001680056orla:CreditFacilityMember2022-12-310001680056orla:FresnilloObligationMember2021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:RightofuseAssetsMember2022-01-012022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:OtherPropertyPlantAndEquipmentMember2022-01-012022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:MiningPropertyMember2022-01-012022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:MachineryMember2022-01-012022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:BuildingsMember2022-01-012022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMember2022-01-012022-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:RightofuseAssetsMember2021-01-012021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:OtherPropertyPlantAndEquipmentMember2021-01-012021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:MachineryMember2021-01-012021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:BuildingsMember2021-01-012021-12-310001680056ifrs-full:AccumulatedDepreciationAndAmortisationMember2021-01-012021-12-310001680056country:US2022-01-012022-12-310001680056country:PA2022-01-012022-12-310001680056country:PA2021-01-012021-12-310001680056country:CA2021-01-012021-12-310001680056orla:SiteClosureProvisionsMember2022-12-310001680056orla:IntercompanyDebtMember2022-12-310001680056ifrs-full:PropertyPlantAndEquipmentMember2022-12-310001680056ifrs-full:OtherTemporaryDifferencesMember2022-12-310001680056ifrs-full:PropertyPlantAndEquipmentMember2021-12-310001680056ifrs-full:LongtermBorrowingsMember2021-12-310001680056orla:SilverStreamMember2020-12-310001680056orla:TemporaryDifferencesFromSiteClosureProvisionsMember2022-12-310001680056orla:TemporaryDifferencesFromShareIssueCostsMember2022-12-310001680056orla:TemporaryDifferencesFromNonCapitalLossesMember2022-12-310001680056orla:TemporaryDifferencesFromMineralPropertiesAndExplorationExpendituresMember2022-12-310001680056orla:TemporaryDifferencesFromEquipmentMember2022-12-310001680056ifrs-full:LongtermBorrowingsMember2022-12-310001680056orla:TemporaryDifferencesFromSiteClosureProvisionsMember2021-12-310001680056orla:TemporaryDifferencesFromShareIssueCostsMember2021-12-310001680056orla:TemporaryDifferencesFromNonCapitalLossesMember2021-12-310001680056orla:TemporaryDifferencesFromMineralPropertiesAndExplorationExpendituresMember2021-12-310001680056orla:TemporaryDifferencesFromEquipmentMember2021-12-310001680056orla:IntercompanyDebtMember2021-12-310001680056ifrs-full:OtherTemporaryDifferencesMember2021-12-310001680056orla:CreditFacilityMemberifrs-full:TopOfRangeMember2022-12-310001680056orla:CreditFacilityMemberifrs-full:BottomOfRangeMember2022-12-310001680056orla:FresnilloObligationMemberifrs-full:NotLaterThanOneYearMemberifrs-full:LiquidityRiskMember2022-12-310001680056orla:FresnilloObligationMemberifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMemberifrs-full:LiquidityRiskMember2022-12-310001680056orla:FresnilloObligationMemberifrs-full:LiquidityRiskMember2022-12-310001680056orla:FresnilloObligationMemberifrs-full:NotLaterThanOneYearMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:FresnilloObligationMemberifrs-full:LaterThanOneYearAndNotLaterThanThreeYearsMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:FresnilloObligationMemberifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:FresnilloObligationMemberifrs-full:LiquidityRiskMember2021-12-310001680056ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMemberifrs-full:LiquidityRiskMember2021-12-310001680056ifrs-full:LiquidityRiskMember2021-12-310001680056ifrs-full:NotLaterThanOneYearMemberifrs-full:LiquidityRiskMember2022-12-310001680056ifrs-full:LaterThanThreeYearsMemberifrs-full:LiquidityRiskMember2022-12-310001680056ifrs-full:LaterThanOneYearAndNotLaterThanThreeYearsMemberifrs-full:LiquidityRiskMember2022-12-310001680056ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMemberifrs-full:LiquidityRiskMember2022-12-310001680056ifrs-full:LiquidityRiskMember2022-12-310001680056country:MX2022-01-012022-12-310001680056country:CA2022-01-012022-12-310001680056country:MX2021-01-012021-12-310001680056orla:GoldStandardVenturesCorpMember2022-08-1200016800562020-12-310001680056orla:SouthRailroadProjectMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2022-12-310001680056orla:SouthRailroadProjectMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2022-12-310001680056orla:SouthRailroadProjectMemberifrs-full:LaterThanOneYearMember2022-12-310001680056orla:SouthRailroadProjectMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2022-12-310001680056orla:SouthRailroadProjectMemberifrs-full:BottomOfRangeMember2022-12-310001680056orla:SouthRailroadProjectMember2022-12-310001680056ifrs-full:ContingentLiabilityForGuaranteesMember2022-12-310001680056ifrs-full:ContingentLiabilityForGuaranteesMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMember2019-12-310001680056orla:CreditFacilityMemberifrs-full:TopOfRangeMemberorla:SecuredOvernightFinancingRatesSofrOvernightIndexSwapRateMember2022-12-310001680056orla:CreditFacilityMemberifrs-full:BottomOfRangeMemberorla:SecuredOvernightFinancingRatesSofrOvernightIndexSwapRateMember2022-12-310001680056orla:FresnilloObligationMember2022-12-310001680056orla:TermFacilityMember2022-12-310001680056orla:RevolvingFacilityMember2022-12-310001680056orla:FresnilloObligationMember2022-12-310001680056orla:CreditFacilityMember2022-12-310001680056orla:NewmontLoanMemberifrs-full:NotLaterThanOneYearMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberifrs-full:NotLaterThanOneYearMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberifrs-full:LaterThanOneYearAndNotLaterThanThreeYearsMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:NewmontLoanMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberifrs-full:LiquidityRiskMember2021-12-310001680056orla:NewmontLoanMember2021-12-310001680056orla:IfrsRevolvingCreditFacilityMember2021-12-310001680056orla:FresnilloObligationMember2021-12-310001680056orla:TermFacilityMember2022-01-012022-12-310001680056orla:RevolvingFacilityMember2022-01-012022-12-310001680056orla:CreditFacilityMember2022-01-012022-12-3100016800562022-03-312022-03-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2022-01-012022-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:TransactionCostDeductedMember2022-01-012022-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:InterestAndAccretionMember2022-01-012022-12-310001680056orla:IfrsRevolvingCreditFacilityMember2022-01-012022-12-310001680056orla:FresnilloObligationMember2022-01-012022-12-310001680056ifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMemberifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-01-012021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:TransactionCostDeductedMember2021-01-012021-12-310001680056orla:IfrsRevolvingCreditFacilityMemberorla:InterestAndAccretionMember2021-01-012021-12-310001680056orla:IfrsRevolvingCreditFacilityMember2021-01-012021-12-310001680056orla:FresnilloObligationMember2021-01-012021-12-310001680056ifrs-full:InvestmentPropertyUnderConstructionOrDevelopmentMember2021-01-012021-12-310001680056country:US2022-12-310001680056country:PA2022-12-310001680056country:MX2022-12-310001680056country:CA2022-12-310001680056country:US2021-12-310001680056country:PA2021-12-310001680056country:MX2021-12-310001680056country:CA2021-12-310001680056ifrs-full:PreviouslyStatedMember2021-01-012021-12-310001680056orla:WarrantsMember2022-01-012022-12-310001680056orla:ShareOptionsMember2022-01-012022-12-310001680056orla:RestrictedPerformanceShareUnitsRpsuMember2022-01-012022-12-310001680056orla:IfrsRestrictedStockUnitsRsusMember2022-01-012022-12-310001680056orla:DeferredShareUnitPlanMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:RightofuseAssetsMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MiningPropertyMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MachineryMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:BuildingsMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMember2022-01-012022-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:RightofuseAssetsMember2021-01-012021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:OtherPropertyPlantAndEquipmentMember2021-01-012021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:MachineryMember2021-01-012021-12-310001680056ifrs-full:GrossCarryingAmountMemberifrs-full:BuildingsMember2021-01-012021-12-310001680056ifrs-full:GrossCarryingAmountMember2021-01-012021-12-310001680056orla:MineraCaminoRojoMember2022-01-012022-12-310001680056orla:MineraCaminoRojoMember2021-01-012021-12-310001680056ifrs-full:MiningPropertyMemberorla:SouthRailroadLewisAndMonitorGoldProjectsInNevadaMember2022-01-012022-12-310001680056ifrs-full:MiningPropertyMember2022-01-012022-12-310001680056orla:NevadaProjectsMember2022-01-012022-12-3100016800562021-12-3100016800562021-01-012021-12-31orla:Yorla:EquityInstrumentsorla:Optionsutr:hautr:kmorla:componentorla:Partorla:Optionorla:trancheiso4217:USDxbrli:pureiso4217:CADxbrli:sharesiso4217:MXNiso4217:USDiso4217:USDxbrli:sharesiso4217:CADiso4217:MXNiso4217:CADiso4217:USDxbrli:shares

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

Form 40-F

  Registration statement pursuant to Section 12 of the Securities Exchange Act of 1934

or

  Annual report pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934

For the fiscal year ended December 31, 2022

Commission File Number: 001-39766

Graphic

ORLA MINING LTD.

(Exact name of Registrant as specified in its charter)

Canada

    

1040

    

N/A

(Province or other jurisdiction of
incorporation or organization)

(Primary Standard Industrial
Classification Code Number)

(I.R.S. Employer
Identification Number)

Suite 1010, 1075 West Georgia Street
Vancouver, British Columbia, V6E 3C9, Canada

(604) 564-1852

(Address and telephone number of Registrant’s principal executive offices)

C T Corporation System
28 Liberty Street

New York, New York 10005
(212) 894-8940

(Name, address (including zip code) and telephone number (including area code) of agent for service in the United States)

Securities registered or to be registered pursuant to Section 12(b) of the Act:

Title of each class

    

Trading Symbol(s)

    

Name of each exchange
on which registered

Common Shares, no par value

ORLA

NYSE American

Securities registered or to be registered pursuant to Section 12(g) of the Act: None

Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act: None

For annual reports, indicate by check mark the information filed with this Form: Annual information form Audited annual financial statements:

Annual information form

    

Audited annual financial statements

Indicate the number of outstanding shares of each of the issuer’s classes of capital or common stock as of the close of the period covered by the annual report: 305,809,108

Indicate by check mark whether the Registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Exchange Act during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. YES NO

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). YES NO

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 12b-2 of the Exchange Act.

Emerging growth company

If an emerging growth company that prepares its financial statements in accordance with U.S. GAAP, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards† provided pursuant to Section 13(a) of the Exchange Act.

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. 

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). 

†The term “new or revised financial accounting standard” refers to any update issued by the Financial Accounting Standards Board to its Accounting Standards Codification after April 5, 2012.

EXPLANATORY NOTE

Orla Mining Ltd. (the “Company”) is a Canadian issuer eligible to file its annual report pursuant to Section 13 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), on Form 40-F pursuant to the multi-jurisdictional disclosure system of the Exchange Act. The Company is a “foreign private issuer” as defined in Rule 3b-4 under the Exchange Act. Equity securities of the Company are accordingly exempt from Sections 14(a), 14(b), 14(c), 14(f) and 16 of the Exchange Act pursuant to Rule 3a12-3.

DOCUMENTS INCORPORATED BY REFERENCE

The following documents, or the portions thereof indicated below, that are filed as exhibits to this Annual Report, are incorporated herein by reference:

Annual Information Form

The Company’s Annual Information Form (“AIF”) is filed as Exhibit 99.1 to this Annual Report on Form 40-F (the “Annual Report”).

Management’s Discussion and Analysis

The Company’s management’s discussion and analysis for the year ended December 31, 2022 (“MD&A”) is filed as Exhibit 99.2 to this Annual Report.

Audited Annual Financial Statements

The Company’s audited financial statements as at and for the years ended December 31, 2022 and 2021 (the “Audited Financial Statements”) are filed as Exhibit 99.3 to this Annual Report.

FORWARD-LOOKING STATEMENTS

This document contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), Section 21E of the Exchange Act, the Private Securities Litigation Reform Act of 1995 or in rules and releases made by the United States Securities and Exchange Commission (“SEC”), all as may be amended from time to time, as well as Canadian securities legislation and all other applicable securities legislation (referred to herein as “forward-looking statements”). Forward-looking statements are included to provide information about management’s current expectations and plans that allows investors and others to get a better understanding of the Company’s operating environment, the business operations and financial performance and condition.

Forward-looking statements include, but are not limited to, statements regarding planned exploration, development and mining activities and expenditures; the estimation of mineral resources and mineral reserves; feasibility and pre-feasibility studies and economic results thereof, including, but not limited to, future production, net present value, internal rate of return, costs, and expenses; mine production plans; projected mining and process recovery rates; mining dilution assumptions; timeline for receipt of any required agreements, approvals, or permits; sustaining costs and operating costs; interpretations and assumptions regarding joint venture and potential contract terms; closure costs and requirements; the expected additional material to be included in a future mine plan as a result of the Layback Agreement (as defined in the AIF); terms of and ability to reach a subsequent agreement with Fresnillo plc (“Fresnillo”) to access the sulphide mineral resource at the Camino Rojo Project (as defined in the AIF) and obtaining regulatory approvals related thereto; expectations on the potential extension of the expired mineral concessions with respect to the Cerro Quema Project (as defined in the AIF); proposed exploration plans and expected results of exploration from each of the Camino Rojo Project, Cerro Quema Project, and South Railroad Project (as defined in the AIF); Orla’s ability to obtain required mine licences, mine permits, required agreements with third parties, and regulatory approvals required in connection with exploration plans and future mining and mineral processing operations, including but not limited to, necessary permitting required to implement expected future exploration plans; community and ejido relations; availability of sufficient water for proposed operations; competition for, among other things, acquisitions of mineral reserves and resources, undeveloped lands, and skilled personnel; changes in commodity prices and exchange rates; currency and interest rate fluctuations and the ability to secure the required capital to conduct planned exploration programs, studies, and construction; the ability to cover debt obligations under the Credit Facility (as defined in the AIF); the duration, extent and other implications of the novel coronavirus (“COVID-19”); and the Company’s development objectives and strategies. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential”, “possible” or variations thereof or stating that certain

1

actions, events, conditions or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved (or the negative of any of these terms and similar expressions) are not statements of fact and may be forward-looking statements.

Forward-looking statements are based upon a number of factors and assumptions that, if untrue, could cause actual results, performance, or achievements to be materially different from future results, performance or achievements expressed or implied by such statements. Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic and competitive uncertainties and contingencies that may cause the Company’s actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation, the future price of gold, silver, and copper; anticipated costs and the Company’s ability to fund its programs; the Company’s ability to carry on exploration, development, and mining activities; tonnage of ore to be mined and processed; ore grades and recoveries; decommissioning and reclamation estimates; the Company’s ability to secure and to meet obligations under property agreements, including the Layback Agreement; that all conditions of the Company’s Credit Facility will be met; the timing and results of drilling programs; Mineral Reserve and Mineral Resource estimates and the assumptions on which they are based; the discovery of mineral resources and mineral reserves on the Company’s mineral properties; the obtaining of a subsequent agreement with Fresnillo to access the sulphide Mineral Resource at the Camino Rojo Project and develop the entire Camino Rojo Project mineral resources estimate; that political and legal developments will be consistent with current expectations; the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction, and operation of projects; the timing of cash flows; the costs of operating and exploration expenditures; the Company’s ability to operate in a safe, efficient, and effective manner; the Company’s ability to obtain financing as and when required and on reasonable terms; the impact of the COVID-19 pandemic on the Company’s operations; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; and that there will be no material adverse change or disruptions affecting the Company or its properties.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance or achievements to differ materially from those in the forward-looking statements include, among others: uncertainty and variations in the estimation of mineral resources and mineral reserves; the Company’s dependence on the Camino Rojo Oxide Mine (as defined in the AIF); risks related to the Company’s indebtedness; risks related to exploration, development, and operation activities; risks related to natural disasters, terrorist acts, health crises, and other disruptions and dislocations, including the COVID-19 pandemic; foreign country and political risks, including risks relating to foreign operations and expropriation or nationalization of mining operations; concession risks at the Cerro Quema Project; the receipt of a Category 3 EIA (as defined in the AIF) for the Cerro Quema Project; delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; environmental and other regulatory requirements; delays in or failures to enter into a subsequent agreement with Fresnillo with respect to accessing certain additional portions of the Mineral Resource at the Camino Rojo Project and to obtain the necessary regulatory approvals related thereto; the Mineral Resource estimations for the Camino Rojo Project being only estimates and relying on certain assumptions; loss of, delays in, or failure to get access from surface rights owners; uncertainties related to title to mineral properties; water rights; financing risks and access to additional capital; risks related to guidance estimates and uncertainties inherent in the preparation of feasibility and pre-feasibility studies; uncertainty in estimates of production, capital, and operating costs and potential production and cost overruns; the fluctuating price of gold, silver, and copper; unknown labilities in connection with acquisitions; global financial conditions; uninsured risks; climate change risks; competition from other companies and individuals; conflicts of interest; risks related to compliance with anti-corruption laws; volatility in the market price of the Company’s securities; assessments by taxation authorities in multiple jurisdictions; foreign currency fluctuations; the Company’s limited operating history; litigation risks; the Company’s ability to identify, complete, and successfully integrate acquisitions; intervention by non-governmental organizations; outside contractor risks; risks related to historical data; the Company not having paid a dividend; risks related to the Company’s foreign subsidiaries; risks related to the Company’s accounting policies and internal controls; the Company’s ability to satisfy the requirements of SOX (as defined in the AIF); enforcement of civil liabilities; the Company’s status as a PFIC (as defined as defined in the AIF) for U.S. federal income tax purposes; information and cyber security; gold industry concentration; shareholder activism; and risks associated with executing the Company’s objectives and strategies. Although the Company believes its expectations are based upon reasonable assumptions and have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. See the section entitled “Risk Factors” in the AIF and the MD&A for additional risk factors that could cause results to differ materially from forward-looking statements.

Investors are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained in this Annual Report and the documents incorporated by reference herein are made as of the date of such documents only and, accordingly, are subject to change after such date. The Company disclaims any intent or obligation to update publicly or otherwise revise any forward-

2

looking statements or the foregoing list of assumptions or factors, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws. Investors are urged to read the Company’s subsequent filings, which can be viewed online under the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR”) at www.sedar.com or the Electronic Data Gathering, Analysis and Retrieval (“EDGAR”) at www.sec.gov.

DIFFERENCES IN UNITED STATES AND CANADIAN REPORTING REQUIREMENTS

The Company is permitted, under a multijurisdictional disclosure system (“MJDS”) adopted by the United States, to prepare this Annual Report on Form 40-F in accordance with Canadian disclosure requirements, which are different from those of the United States. The Company is also subject to Canadian auditor independence standards, as well as certain U.S. federal securities laws and the applicable rules and regulations of the SEC and the Public Company Accounting Oversight Board (United States).

The Company prepares its financial statements in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board and the audit is subject to Canadian auditing and auditor independence standards and may not be comparable to those prepared by companies in the United States. In addition, the Company is not required to prepare a reconciliation of its financial statements between IFRS and U.S. generally accepted accounting principles, and has not quantified such differences, which may be significant.

CURRENCY

Unless otherwise indicated, all dollar amounts in this annual report on Form 40-F are in United States dollars. The exchange rate of United States dollars into Canadian dollars, on December 31, 2022 based upon the daily average exchange rate as published by the Bank of Canada, was U.S.$1.00=CDN$1.3544. The exchange rate of United States dollars into Canadian dollars, on March 17, 2023 based upon the daily average exchange rate as published by the Bank of Canada, was U.S.$1.00=CDN$1.3734.

CAUTIONARY NOTE REGARDING MINERAL RESOURCE AND RESERVE ESTIMATES

This Annual Report and the documents incorporated by reference herein and therein, have been prepared in accordance with Canadian standards for the reporting of mineral resource and mineral reserve estimates, which differ from the previous and current standards of the United States securities laws. In particular, and without limiting the generality of the foregoing, the terms “mineral reserve”, “proven mineral reserve”, “probable mineral reserve”, “inferred mineral resources,”, “indicated mineral resources,” “measured mineral resources” and “mineral resources” used or referenced in this Annual Report and the documents incorporated by reference herein and therein are Canadian mineral disclosure terms as defined in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the “CIM Definition Standards”).

For United States reporting purposes, the SEC has adopted amendments to its disclosure rules (the “SEC Modernization Rules”) to modernize the mining property disclosure requirements for issuers whose securities are registered with the SEC under the Exchange Act. The SEC Modernization Rules more closely align the SEC’s disclosure requirements and policies for mining properties with current industry and global regulatory practices and standards, including NI 43-101, and replace the historical property disclosure requirements for mining registrants that were included in Industry Guide 7 under the U.S. Securities Act. As a foreign private issuer that is eligible to file reports with the SEC pursuant to the MJDS, the Company is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and provides disclosure under NI 43-101 and the CIM Definition Standards. Accordingly, mineral reserve and mineral resource information contained in this Annual Report and the documents incorporated by reference herein and therein, may not be comparable to similar information disclosed by United States companies.

As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources.” In addition, the SEC has amended its definitions of “proven mineral reserves” and “probable mineral reserves” to be “substantially similar” to the corresponding CIM Definition Standards that are required under NI 43-101. While the above terms are “substantially similar” to CIM Definition Standards, there are differences in the definitions under the SEC Modernization Rules and the CIM Definition Standards. There is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules or under the prior standards of Industry Guide 7. Accordingly, information contained in this Annual Report and documents incorporated by reference herein and therein, may not be

3

comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

DISCLOSURE CONTROLS AND PROCEDURES AND

INTERNAL CONTROL OVER FINANCIAL REPORTING

Disclosure Controls and Procedures

At the end of the period covered by this Annual Report, an evaluation was carried out under the supervision and with the participation of the Company’s management, including the Chief Executive Officer (“CEO”) and the Chief Financial Officer (“CFO”), of the effectiveness of the Company’s disclosure controls and procedures (as defined in Rules 13a - 15(e) and 15d - 15(e) under the Exchange Act). Based on that evaluation, the CEO and the CFO have concluded that as of the end of the period covered by this Annual Report, the Company’s disclosure controls and procedures were effective in ensuring that: (i) information required to be disclosed by the Company in reports that it files or submits to the SEC under the Exchange Act was recorded, processed, summarized and reported within the time periods specified in applicable rules and forms and (ii) material information required to be disclosed in the Company’s reports filed under the Exchange Act was accumulated and communicated to the Company’s management, including the CEO and the CFO, as appropriate, to allow for accurate and timely decisions regarding required disclosure.

Management’s Annual Report on Internal Control over Financial Reporting

The Company’s management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in National Instrument 52-109 in Canada and in Rules 13a-15(f) and 15d-15(f) under the Exchange Act. The Company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation and fair presentation of financial statements for external purposes in accordance with generally accepted accounting principles.

The Company’s management, including its CEO and CFO, does not expect that its disclosure controls and procedures or internal controls and procedures will prevent all error and all fraud. A control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs.

Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been detected. These inherent limitations include the realities that judgments in decision-making can be faulty, and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by management override of the controls. The design of any system of controls is also based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions; over time, controls may become inadequate because of changes in conditions, or the degree of compliance with the policies or procedures may deteriorate. Because of the inherent limitations in a cost-effective control system, misstatements due to error or fraud may occur and not be detected.

With the participation of the CEO and CFO, management conducted an evaluation of the design and operation of the Company’s internal control over financial reporting as of December 31, 2022, following the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission in Internal Control-Integrated Framework (2013 Framework). This evaluation included review of the documentation of controls, evaluation of the design effectiveness of controls, testing of the operating effectiveness of controls and a conclusion on this evaluation. Based on this evaluation, management concluded in its report that the Company’s internal control over financial reporting was effective as of December 31, 2022.

Attestation Report of the Independent Registered Public Accounting Firm

As an “emerging growth company” (as such term is defined in Rule 12b-2 under the Exchange Act), the Company is not required to include in this Annual Report an attestation report of the Company’s independent registered public accounting firm relating to the Company’s internal control over financial reporting. The Company will be required to provide an attestation report when it no longer qualifies as an emerging growth company.

4

Changes in Internal Control over Financial Reporting

During the period covered by this Annual Report, no changes occurred in the Company’s internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

REGULATION BTR

The Company was not required by Rule 104 of Regulation Blackout Trading Restriction (“BTR”) to send any notice to its directors and executive officers during the fiscal year ended December 31, 2022 concerning any equity security subject to a blackout period under Rule 101 of Regulation BTR.

AUDIT COMMITTEE

Identification

The Company has a separately-designated standing audit committee (the “Audit Committee”) established in accordance with Section 3(a)(58)(A) of the Exchange Act. The Audit Committee is comprised of four individuals: Elizabeth McGregor (Chair), David Stephens, Charles Jeannes and Tamara Brown.

Audit Committee Financial Experts

The Company’s Board of Directors (the “Board”) has determined that each of Elizabeth McGregor, David Stephens, Charles Jeannes and Tamara Brown is (i) an audit committee financial expert, under the applicable criteria prescribed by the SEC in the general instructions of Form 40-F and (ii) independent, under the applicable NYSE American listing standards and requirements.

The SEC has indicated that the designation of a person as an audit committee financial expert does not make such person an “expert” for any purpose, impose on such person any duties, obligations or liability that are greater than those imposed on such person as a member of the Audit Committee and Board in the absence of such designation, or affect the duties, obligations or liability of any other member of the Audit Committee or Board.

Audit Committee Charter

The Company’s Audit Committee charter is attached as a schedule to the AIF which is attached as Exhibit 99.1 to this Annual Report, available for review on the Company’s website at www.orlamining.com and available in print without charge to any shareholder that provides the Company with a written request addressed to the Company’s Corporate Secretary.

CODE OF ETHICS

The Company’s Board has adopted a Code of Business Conduct and Ethics (the “Code”) that applies to all directors, officers and employees of the Company. The Code addresses the items required to be included in a “code of ethics” as set forth in paragraph 9(b) of General Instruction B of Form 40-F, as well as various other topics.

The Code is available on SEDAR at www.sedar.com, the SEC’s Electronic Data Gathering and Retrieval System or “EDAGAR” at www.sec.gov and on the Company’s website at www.orlamining.com. The Company will provide a copy of the Code in print without charge to any person that provides the Company with a written request addressed to the Company’s Corporate Secretary.

PRINCIPAL ACCOUNTANT FEES AND SERVICES

Ernst & Young LLP (“EY”) (PCAOB ID No. 1263) acted as the Company’s Independent Registered Public Accounting Firm for the fiscal years ended December 31, 2022 and 2021. For a description of the total amount billed to the Company by EY for services performed in the last two financial years by category of service (audit fees, audit related fees, tax fees and all other fees), see “Audit Committee - External Auditor Service Fees” in the AIF, which is attached as Exhibit 99.1 to this Annual Report and incorporated by reference herein.

For a description of the Company’s pre-approval policies and procedures related to the provision of non-audit services, see “Audit Committee - Pre-Approval Policies and Procedures” in the AIF, which is attached as Exhibit 99.1 to this Annual Report and incorporated by reference herein.

5

All audit-related fees, tax fees, and all other fees for services provided by EY were approved by the Audit Committee in advance of the services being rendered.

OFF-BALANCE SHEET ARRANGEMENTS

The Company does not have any off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on the Company’s financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that are material to investors.

CONTRACTUAL OBLIGATIONS

The following table summarizes the Company’s contractual obligations, including payments due over the next five years and thereafter, as at December 31, 2022.

Contractual obligations

    

Payments due by period

As at December 31, 2022

Less than

1–3

4–5

After

(thousands of US dollars)

Total

    

1 year

    

years

    

years

    

5 years

Purchase commitments

$

2,819

$

2,819

$

$

$

Trade payables

 

8,851

 

8,851

 

 

 

Accrued liabilities

 

7,967

 

7,967

 

 

 

Lease commitments

 

3,527

 

991

 

1,310

 

1,226

 

Credit Facility and related interest

 

146,006

 

30,678

 

85,566

 

29,762

 

Fresnillo obligations and related interest

23,848

23,848

Total contractual obligations

$

193,018

$

75,154

$

86,876

$

30,988

$

MINE SAFETY DISCLOSURE

Pursuant to Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010, issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities under the regulation of the Federal Mine Safety and Health Review Administration under the Federal Mine Safety and Health Act of 1977.

During the fiscal year ended December 31, 2022, we were not subject to any citations, orders or other legal actions under the Federal Mine Safety and Health Act of 1977.

DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS

Not applicable.

CORPORATE GOVERNANCE

The Company’s corporate governance practices are consistent with all applicable current Canadian regulatory guidelines and standards. The Company is classified as a foreign private issuer in connection with its listing on the NYSE American and is not required to comply with most of the NYSE American’s corporate governance standards (the “NYSE Rules”) and instead may comply with Canadian corporate governance practices. However, the Company’s corporate governance practices incorporate many best practices derived from the NYSE Rules. The significant ways in which the Company’s corporate governance practices differ from those required of domestic companies under the NYSE Rules can be found on the Company’s website at www.orlamining.com. The Company reviews its governance practices and monitors developments in Canada and the United States on an ongoing basis to ensure it is in compliance with applicable rules and standards. The board is committed to sound corporate governance practices which are both in the interest of its shareholders and contribute to effective and efficient decision making.

ADDITIONAL INFORMATION

Additional information relating to the Company, including the Audited Financial Statements, the MD&A and the AIF, can be found on SEDAR at www.sedar.com, on EDGAR at www.sec.gov or on the Company’s website at www.orlamining.com. Shareholders may also

6

contact the Company’s Corporate Secretary by e-mail at info@orlamining.com to request copies of these documents and this annual report on Form 40-F for no charge.

UNDERTAKING

The Company undertakes to make available, in person or by telephone, representatives to respond to inquiries made by the SEC staff, and to furnish promptly, when requested to do so by the SEC staff, information relating to: the securities registered pursuant to Form 40-F; the securities in relation to which the obligation to file an annual report on Form 40-F arises; or transactions in said securities.

CONSENT TO SERVICE OF PROCESS

The Company has previously filed with the SEC a written consent to service of process and power of attorney on Form F-X. Any change to the name or address of the Company’s agent for service shall be communicated promptly to the SEC by amendment to the Form F-X referencing the file number of the Company.

SIGNATURES

Pursuant to the requirements of the Exchange Act, the Registrant certifies that it meets all of the requirements for filing on Form 40-F and has duly caused this registration statement to be signed on its behalf by the undersigned, thereto duly authorized.

Date: March 20, 2023

ORLA MINING LTD.

 

 

 

By:

/s/Jason Simpson

 

Jason Simpson

 

President and Chief Executive Officer 

7

EXHIBIT INDEX

Exhibit

   

Description

 

 

 

99.1

 

Annual Information Form for the year ended December 31, 2022

99.2

 

Management’s Discussion and Analysis for the fiscal year ended December 31, 2022

99.3

 

Audited Annual Consolidated Financial Statements as at and for the fiscal years ended December 31, 2022 and 2021

99.4

 

Certifications of Chief Executive Officer and Chief Financial Officer pursuant to Rule 13a-14(a) or 15d-14 of the Securities Exchange Act of 1934

99.5

 

Certifications of Chief Executive Officer and Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

99.6

 

Consent of Ernst & Young LLP, the Company’s Independent Registered Public Accounting Firm

99.7

Consent of Davidson & Company LLP, Independent Registered Public Accounting Firm

99.8

Consent of J. Andrew Cormier

99.9

 

Consent of Sylvain Guerard

99.10

 

Consent of Carl E. Defilippi

99.11

Consent of John J. Ward

99.12

Consent of Matthew D Gray

99.13

Consent of Michael G. Hester

99.14

Consent of Sue Bird

99.15

Consent of Jesse Aarsen

99.16

Consent of Denys Parra

99.17

Consent of Brent Johnson

99.18

Consent of Lee Josselyn

99.19

Consent of Wade Brunham

99.20

Consent of Jordan Anderson

99.21

Consent of Benjamin Bermudez

99.22

Consent of Richard DeLong

99.23

Consent of Thomas L. Dyer

99.24

Consent of Art S. Ibrado

99.25

Consent of Michael S. Lindholm

99.26

Consent of Kevin Lutes

99.27

Consent of Matthew Sletten

99.28

Consent of Gary L. Simmons

101.INS

XBRL Instance Document

101.SCH

XBRL Taxonomy Extension Schema

101.CAL

XBRL Taxonomy Calculation Linkbase

101.LAB

XBRL Taxonomy Extension Labels Linkbase

101.PRE

XBRL Taxonomy Extension Presentation Linkbase

101.DEF

XBRL Taxonomy Extension Definition Document

104

Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)

8

Table of Contents

Exhibit 99.1

Graphic

Annual Information Form

For the Year Ended December 31, 2022

March 20, 2023


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

TABLE OF CONTENTS

INTRODUCTORY NOTES AND CAUTIONARY STATEMENTS

3

CORPORATE STRUCTURE

8

GENERAL DEVELOPMENT OF THE BUSINESS

9

DESCRIPTION OF THE BUSINESS

15

SUMMARY OF MINERAL RESERVE AND MINERAL RESOURCE ESTIMATES

19

MINERAL PROJECTS

26

RISK FACTORS

83

DESCRIPTION OF CAPITAL STRUCTURE

100

DIVIDENDS

102

MARKET FOR SECURITIES

102

DIRECTORS AND OFFICERS

104

LEGAL PROCEEDINGS AND REGULATORY ACTIONS

107

INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS

108

TRANSFER AGENTS AND REGISTRARS

108

MATERIAL CONTRACTS

108

INTERESTS OF EXPERTS

108

AUDIT COMMITTEE INFORMATION

109

ADDITIONAL INFORMATION

112

SCHEDULE “A”

113

Page 2


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

INTRODUCTORY NOTES AND CAUTIONARY STATEMENTS

GENERAL

In this Annual Information Form (“AIF”), Orla Mining Ltd., together with its subsidiaries, as the context requires, is referred to as the “Company” and “Orla”. Unless otherwise stated, all information contained in this AIF is as at December 31, 2022, being the last day of the Company’s most recently completed financial year.

This AIF should be read in conjunction with the Company’s audited consolidated financial statements and management’s discussion and analysis for the financial year ended December 31, 2022, which are available under the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR”) at www.sedar.com and through the United States Securities and Exchange Commission’s (“SEC”) Electronic Data Gathering and Retrieval System (“EDGAR”) at www.sec.gov.

CURRENCY PRESENTATION AND EXCHANGE RATE INFORMATION

This AIF contains references to Canadian dollars (“C$”) and United States dollars (“$”, “US$”, or “US dollars”). All dollar amounts referenced, unless otherwise indicated, are expressed in United States dollars. Unless otherwise indicated, Canadian dollar amounts have been converted to United States dollars at the indicative exchange rate on December 31, 2022, as quoted by the Bank of Canada, of US$0.7383 = C$1.00.

GOLD PRICES

The high, low, average, and closing London PM fix gold (“gold” or “Au”) prices in United States dollars per troy ounce for each of the three years preceding the period ended December 31, 2022, as quoted by the London Bullion Market Association, were as follows:

    

Year Ended December 31

2022

    

2021

    

2020

High

$

2,039

$

1,943

$

2,067

Low

$

1,629

$

1,684

$

1,474

Average

$

1,800

$

1,799

$

1,770

Closing

$

1,814

$

1,806

$

1,888

SILVER PRICES

The high, low, average, and closing London fix silver (“silver” or “Ag”) prices in United States dollars per troy ounce for each of the three years preceding the period ended December 31, 2022, as quoted by the London Bullion Market Association, were as follows:

    

Year Ended December 31

2022

    

2021

    

2020

High

$

26.18

$

29.59

$

28.89

Low

$

17.77

$

21.53

$

12.01

Average

$

21.71

$

25.14

$

20.55

Closing

$

23.95

$

23.09

$

26.49

Page 3


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This AIF contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities legislation (collectively, “forward-looking statements”). Forward-looking statements are included to provide information about management’s current expectations and plans that allows investors and others to get a better understanding of the Company’s operating environment, the business operations, and financial performance and condition.

Forward-looking statements include, but are not limited to, statements regarding planned exploration, development and mining activities and expenditures; the estimation of Mineral Resources and Mineral Reserves (each as defined herein); feasibility and pre-feasibility studies and economic results thereof, including, but not limited to, future production, net present value, internal rate of return, costs, payback period, and expenses; mine production plans; projected mining and process recovery rates; mining dilution assumptions; timeline for receipt of any required agreements, approvals, or permits; sustaining costs and operating costs; interpretations and assumptions regarding joint venture and potential contract terms; closure costs and requirements; the expected additional material to be included in a future mine plan as a result of the Layback Agreement (as defined below); terms of and ability to reach a subsequent agreement with Fresnillo plc (“Fresnillo”) to access the sulphide Mineral Resource at the Camino Rojo Project (as defined below) and obtaining regulatory approvals related thereto; expectations on the potential extension of the expired mineral concessions with respect to the Cerro Quema Project (as defined below); proposed exploration plans and expected results of exploration from each of the Camino Rojo Project, South Railroad Project (as defined below), and Cerro Quema Project; Orla’s ability to obtain required mine licences, mine permits, required agreements with third parties, and regulatory approvals required in connection with exploration plans and future mining and mineral processing operations, including but not limited to, necessary permitting required to implement expected future exploration plans; community and ejido relations; availability of sufficient water for proposed operations; competition for, among other things, acquisitions of Mineral Reserves and Resources, undeveloped lands, and skilled personnel; changes in commodity prices and exchange rates; currency and interest rate fluctuations and the ability to secure the required capital to conduct planned exploration programs, studies, and construction; the ability to cover debt obligations under the Credit Facility (as defined below); the duration, extent and other implications of the novel coronavirus (“COVID-19”); and the Company’s development objectives and strategies. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential”, “possible”, or variations thereof or stating that certain actions, events, conditions or results “may”, “could”, “would”, “should”, “might”, or “will” be taken, occur or be achieved (or the negative of any of these terms and similar expressions) are not statements of fact and may be forward-looking statements.

Forward-looking statements are based upon a number of factors and assumptions that, if untrue, could cause actual results, performance, or achievements to be materially different from future results, performance, or achievements expressed or implied by such statements. Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic, and competitive uncertainties and contingencies that may cause the Company’s actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation, the future price of gold, silver, and copper; anticipated costs and the Company’s ability to fund its programs; the Company’s ability to carry on exploration, development, and mining activities; tonnage of ore to be mined and processed; ore grades and recoveries; decommissioning and reclamation estimates; the Company’s ability to secure and to meet obligations under property agreements, including the Layback Agreement; that all conditions of the Company’s Credit Facility will be met; the timing and results of drilling programs; Mineral Reserve and Mineral Resource estimates and the assumptions on which they are based; the discovery of Mineral Resources and Mineral Reserves on the Company’s mineral properties; the obtaining of a subsequent agreement with Fresnillo to access the sulphide Mineral Resource at the Camino Rojo Project and develop the entire Camino Rojo Project Mineral Resources estimate; that political and legal developments will be consistent with current expectations; the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction, and operation of projects; the timing of cash flows; the costs of operating and exploration expenditures; the Company’s ability to operate in a safe, efficient, and effective manner; the

Page 4


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Company’s ability to obtain financing as and when required and on reasonable terms; the impact of the COVID-19 pandemic on the Company’s operations; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; and that there will be no material adverse change or disruptions affecting the Company or its properties.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties, and other factors that could cause actual events or results to differ from those expressed or implied. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance, or achievements to differ materially from those in the forward-looking statements include, among others: uncertainty and variations in the estimation of Mineral Resources and Mineral Reserves; the Company’s dependence on the Camino Rojo Oxide Mine (as defined below); risks related to the Company’s indebtedness; risks related to exploration, development, and operation activities; risks related to natural disasters, terrorist acts, health crises, and other disruptions and dislocations, including the COVID-19 pandemic; foreign country and political risks, including risks relating to foreign operations and expropriation or nationalization of mining operations; concession risks at the Cerro Quema Project; the receipt of a Category III EIA (as defined below) for the Cerro Quema Project; delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; environmental and other regulatory requirements; delays in or failures to enter into a subsequent agreement with Fresnillo with respect to accessing certain additional portions of the Mineral Resource at the Camino Rojo Project and to obtain the necessary regulatory approvals related thereto; the Mineral Resource estimations for the Camino Rojo Project being only estimates and relying on certain assumptions; loss of, delays in, or failure to get access from surface rights owners; uncertainties related to title to mineral properties; water rights; financing risks and access to additional capital; risks related to guidance estimates and uncertainties inherent in the preparation of feasibility and pre-feasibility studies; uncertainty in estimates of production, capital, and operating costs and potential production and cost overruns; the fluctuating price of gold, silver, and copper; unknown labilities in connection with acquisitions; global financial conditions; uninsured risks; climate change risks; competition from other companies and individuals; conflicts of interest; risks related to compliance with anti-corruption laws; volatility in the market price of the Company’s securities; assessments by taxation authorities in multiple jurisdictions; foreign currency fluctuations; the Company’s limited operating history; litigation risks; the Company’s ability to identify, complete, and successfully integrate acquisitions; intervention by non-governmental organizations; outside contractor risks; risks related to historical data; the Company not having paid a dividend; risks related to the Company’s foreign subsidiaries; risks related to the Company’s accounting policies and internal controls; the Company’s ability to satisfy the requirements of SOX (as defined below); enforcement of civil liabilities; the Company’s status as a PFIC (as defined below) for U.S. federal income tax purposes; information and cyber security; gold industry concentration; shareholder activism; and risks associated with executing the Company’s objectives and strategies.

This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Although the Company believes its expectations are based upon reasonable assumptions and have attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events, or results not to be as anticipated, estimated, or intended. See the section entitled “Risk Factors” below for additional risk factors that could cause results to differ materially from forward-looking statements.

Investors are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date of this AIF and, accordingly, are subject to change after such date. The Company does not intend, and does not assume any obligation, to update this forward-looking information, except as required by law. Investors are urged to read the Company’s filings with Canadian securities regulatory agencies, which can be viewed online under the Company’s profile on SEDAR at www.sedar.com and the Company’s documents filed with, or furnished to, the SEC, which are available on EDGAR at www.sec.gov.

Page 5


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

As set forth under “Risk Factors” herein, investors are cautioned that all of the mineralization comprising the Company’s Mineral Resource estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by the Company. However, the Mineral Resource estimate assumes that the north wall of the conceptual floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto lands where mineral title is held by Fresnillo and that waste would be mined on Fresnillo’s mineral titles. On December 21, 2020, Orla announced that it had entered into the Layback Agreement. The Layback Agreement allows Orla to expand the Camino Rojo Project oxide pit onto part of Fresnillo’s mineral concession located immediately north of Orla’s property. This expansion will increase oxide and transitional ore available for extraction on Orla’s property below the pit outlined in Orla’s previous 2019 Feasibility Study as set forth in the technical report titled “Feasibility Study, NI 43-101 Technical Report on the Camino Rojo Gold Project, Municipality of Mazapil, Zacatecas, Mexico” dated June 25, 2019 (the “2019 Camino Rojo Report”). The Layback Agreement is only with respect to the portion of the heap leach material included in the current Mineral Reserve. As such, any potential development of the Camino Rojo Project that includes an open pit encompassing the entire Mineral Resource estimate would be dependent on an additional agreement with Fresnillo (or any potential subsequent owner of the mineral titles). It is estimated that approximately two-thirds of the mill Mineral Resource estimate and one-quarter of the leach Mineral Resource estimate comprising the Mineral Resource estimate are dependent on this additional agreement being entered into with Fresnillo. The leach Mineral Resource dependent on the additional agreement is mainly comprised of less oxidized transitional material with the lowest predicted heap-leach recoveries. Delays in, or failure to obtain, an additional agreement with Fresnillo would affect the development of a significant portion of the Mineral Resources of the Camino Rojo Project that are not included in the 2021 Camino Rojo Report (as defined below) mine plan, in particular by limiting access to significant mineralized material at depth. There can be no assurance that the Company will be able to negotiate such additional agreement on terms that are satisfactory to the Company and Fresnillo or that there will not be delays in obtaining the necessary additional agreement. Should such a subsequent agreement with Fresnillo not be obtained on favourable terms, the economics of any potential mine development using the full Mineral Resource estimate would be significantly negatively impacted.

SCIENTIFIC AND TECHNICAL INFORMATION

Unless otherwise indicated, scientific and technical information in this AIF relating to the Company’s mineral properties has been reviewed and approved by J. Andrew Cormier, P.Eng., Chief Operating Officer of the Company, and Sylvain Guerard, P. Geo., Senior Vice President, Exploration of the Company. Mr. Cormier and Mr. Guerard are each a “Qualified Person” as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

The disclosure included in this AIF uses Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and Mineral Resources estimations are made in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards on Mineral Reserves and Mineral Resources adopted by the CIM Council on May 10, 2014 (the “CIM Standards”) and NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. The following definitions are reproduced from the CIM Standards:

A “Mineral Resource” is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated, or interpreted from specific geological evidence and knowledge, including sampling. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories.

An “Inferred Mineral Resource” is that part of a Mineral Resource for which quantity and grade or quality are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that most of the Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

Page 6


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

An “Indicated Mineral Resource” is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.

A “Measured Mineral Resource” is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.

A “Mineral Reserve” is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. The reference point at which Mineral Reserves are defined, usually the point where the ore is delivered to the processing plant, must be stated. It is important that, in all situations where the reference point is different, such as for a saleable product, a clarifying statement is included to ensure that the reader is fully informed as to what is being reported. Mineral Reserves are sub-divided in order of increasing confidence into Probable Mineral Reserves and Proven Mineral Reserves. The public disclosure of a Mineral Reserve must be demonstrated by a Pre-Feasibility Study or Feasibility Study.

A “Probable Mineral Reserve” is the economically mineable part of an Indicated, and in some circumstances, a Measured Mineral Resource. The confidence in the Modifying Factors applying to a Probable Mineral Reserve is lower than that applying to a Proven Mineral Reserve. Probable Mineral Reserve estimates must be demonstrated to be economic, at the time of reporting, by at least a Pre-Feasibility Study.

A “Proven Mineral Reserve” is the economically mineable part of a Measured Mineral Resource. A Proven Mineral Reserve implies a high degree of confidence in the Modifying Factors. Proven Mineral Reserve estimates must be demonstrated to be economic, at the time of reporting, by at least a Pre-Feasibility Study.

“Modifying Factors” are considerations used to convert Mineral Resources to Mineral Reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social, and governmental factors.

CAUTIONARY NOTE TO UNITED STATES INVESTORS CONCERNING ESTIMATES OF MEASURED, INDICATED, AND INFERRED MINERAL RESOURCES

This AIF has been prepared in accordance with Canadian standards for the reporting of Mineral Resource and Mineral Reserve estimates, which differ from the previous and current standards of the United States securities laws. In particular, and without limiting the generality of the foregoing, the terms “Mineral Reserve”, “Proven Mineral Reserve”, “Probable Mineral Reserve”, “Inferred Mineral Resources”, “Indicated Mineral Resources”, “Measured Mineral Resources”, and “Mineral Resources” used or referenced in this AIF are Canadian mineral disclosure terms as defined in accordance with NI 43-101 and the CIM Standards.

Page 7


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

For United States reporting purposes, the SEC has adopted amendments to its disclosure rules (the “SEC Modernization Rules”) to modernize the mining property disclosure requirements for issuers whose securities are registered with the SEC under the Securities Exchange Act of 1934, as amended. The SEC Modernization Rules more closely align the SEC’s disclosure requirements and policies for mining properties with current industry and global regulatory practices and standards, including NI 43-101, and replace the historical property disclosure requirements for mining registrants that were included in Industry Guide 7 under the Securities Act of 1933, as amended (the “US Securities Act”). As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multi-jurisdictional disclosure system, the Company is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and provides disclosure under NI 43-101 and the CIM Standards. Accordingly, Mineral Reserve and Mineral Resource information contained in this AIF may not be comparable to similar information disclosed by United States companies.

As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “Measured Mineral Resources”, “Indicated Mineral Resources”, and “Inferred Mineral Resources.” In addition, the SEC has amended its definitions of “Proven Mineral Reserves” and “Probable Mineral Reserves” to be “substantially similar” to the corresponding CIM Standards that are required under NI 43-101. While the above terms are “substantially similar” to CIM Standards, there are differences in the definitions under the SEC Modernization Rules and the CIM Standards. There is no assurance any Mineral Reserves or Mineral Resources that the Company may report as “Proven Mineral Reserves”, “Probable Mineral Reserves”, “Measured Mineral Resources”, “Indicated Mineral Resources”, and “Inferred Mineral Resources” under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules or under the prior standards of Industry Guide 7. Accordingly, information contained in this AIF may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

NON-GAAP MEASURES

This AIF includes certain performance measures (“non-GAAP measures”) which are not specified, defined, or determined under generally accepted accounting principles (in the Company’s case, International Financial Reporting Standards, or “IFRS”), namely all-in sustaining cost (“AISC”) and cash costs per ounce. These are common performance measures in the gold mining industry, but because they do not have any mandated standardized definitions, they may not be comparable to similar measures presented by other issuers. Accordingly, the Company uses such measures to provide additional information and readers should not consider them in isolation or as a substitute for measures of performance prepared in accordance with generally accepted accounting principles.

Please see the information under the heading “Non-GAAP Measures” in the Company’s management’s discussion and analysis for the financial year ended December 31, 2022, which section is incorporated by reference in this AIF, for a description of the non-GAAP measures noted above. The Company’s management’s discussion and analysis may be found on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

CORPORATE STRUCTURE

NAME, ADDRESS AND INCORPORATION

The Company was incorporated under the Business Corporations Act (Alberta) on May 31, 2007 as a Capital Pool Company (as defined by the TSX Venture Exchange (the “TSXV”)). On June 3, 2010, the Company was continued into British Columbia under the Business Corporations Act (British Columbia) and on April 21, 2015, the Company was continued into Ontario under the Business Corporations Act (Ontario). On June 12, 2015, the Company changed its name from “Red Mile Minerals Corp.” to “Orla Mining Ltd.” On December 2, 2016, in order to facilitate the acquisition of Pershimco Resources Inc. (“Pershimco”), the Company was continued as a federal company under the Canada Business Corporations Act (the “CBCA”). Following the continuance, on December 6, 2016, the plan of arrangement under the CBCA involving Orla and Pershimco (the “Arrangement”) was affected. Pursuant to the Arrangement, among other things, Orla and Pershimco were amalgamated and continued as one company under the name “Orla Mining Ltd.”

Page 8


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The Company’s registered office and its head and principal office is located at Suite 1010 – 1075 West Georgia Street, Vancouver, British Columbia, Canada, V6E 3C9.

INTERCORPORATE RELATIONSHIPS

The following is a diagram of the intercorporate relationships among Orla and its subsidiaries, including their respective jurisdictions of incorporation.

Graphic

Certain inactive subsidiaries with both less than 10% of the total assets of the Company and 10% of the total revenues of the Company are excluded from the diagram. The Company holds 100% of the shares of each subsidiary, provided that, as required under Mexican corporate law, Minera Camino Rojo SA de CV (“Minera Camino Rojo”) has two shareholders – Orla Mining Ltd. holds 98% of the shares and 2% are held by a Canadian subsidiary of the Company, which holds its shares in trust for the Company.

GENERAL DEVELOPMENT OF THE BUSINESS

OVERVIEW

Orla is a Canadian company listed on the Toronto Stock Exchange (“TSX”) under the symbol “OLA” and on the NYSE American LLC (the “NYSE American”) under the symbol “ORLA”. Orla’s corporate strategy is to acquire, explore, develop, and operate mineral properties where its expertise can substantially increase stakeholder value. Orla has three material gold projects, (1) Camino Rojo, located in Zacatecas State, Mexico, (2) South Railroad, located in Nevada, United States, and (3) Cerro Quema, located in Los Santos Province, Panama.

The Camino Rojo project (“Camino Rojo” or the “Camino Rojo Project”) consists of the Camino Rojo oxide gold mine (the “Camino Rojo Oxide Mine”), which achieved commercial production effective April 1, 2022, and the Camino Rojo sulphides project (the “Camino Rojo Sulphides”). The South Railroad project (“South Railroad” or the “South Railroad Project”) consists of the Dark Star and Pinion deposits and is situated within a prospective land package, referred to as the Railroad-Pinion property, along the Carlin trend in Nevada. The Cerro Quema project consists of the Cerro Quema gold project (the “Cerro Quema Gold Project”), which also includes the Caballito copper-gold deposit (“Caballito”). For further details regarding the Camino Rojo Project, the South Railroad Project, and the

Page 9


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Cerro Quema Project, including information regarding their associated NI 43-101 technical reports, see “Summary of Mineral Reserve and Mineral Resource Estimates” and “Mineral Projects”.

GENERAL DEVELOPMENT OF THE BUSINESS

THE PERSHIMCO ACQUISITION

On September 14, 2016, Orla and Pershimco entered into a definitive arrangement agreement to amalgamate the two companies by way of a court-approved Arrangement under the CBCA. Under the Arrangement, each Orla shareholder received one common share of the amalgamated Orla entity (the “Common Shares”) in exchange for each pre-Arrangement common share held. Each Pershimco shareholder received (i) 0.19 of a Common Share for each Pershimco share held; and (ii) 0.04 of a class A common share of Orla. On December 6, 2016, Orla announced the completion of the Arrangement and on December 7, 2016, the post-arrangement Common Shares commenced trading on the TSX Venture Exchange under the symbol “OLA”.

Each class A common share issued under the Arrangement entitled its holder to receive, without payment of additional consideration, one Common Share conditional upon the issuance of a ministerial resolution by the Ministry of Environment of Panama accepting the Environmental and Social Impact Assessment (“ESIA”) for the Cerro Quema Project on or prior to January 31, 2017. As the ESIA was not accepted by such date, any right held by the holders of the Class A common shares was terminated.

THE CAMINO ROJO PROJECT ACQUISITION

On June 21, 2017, Orla announced it had entered into an asset purchase agreement dated June 20, 2017, as amended (the “Camino Agreement”) pursuant to which Orla would acquire the Camino Rojo Project from Goldcorp Inc. (“Goldcorp”) for consideration to Goldcorp consisting of 31,860,141 Common Shares and a 2.0% net smelter royalty (the “Camino Acquisition”). Orla and Goldcorp completed the Camino Acquisition on November 7, 2017, following which Goldcorp held 31,860,141 Common Shares, representing 19.9% of the then outstanding Common Shares of Orla.

On April 18, 2019, Newmont Corporation (“Newmont”) acquired all outstanding common shares of Goldcorp. By virtue of the takeover of Goldcorp by Newmont, Newmont assumed all rights and obligations of Goldcorp pursuant to all Goldcorp contracts with the Company. Where applicable, all future references in this AIF to Goldcorp have been changed to Newmont.

In October 2020, the 2% net smelter returns royalty granted to Newmont as part of the Camino Acquisition was acquired by Maverix Metals Inc. (“Maverix”). In January 2023, Maverix was acquired by Triple Flag Previous Metals Corp. (“Triple Flag”).

The Company and Newmont are parties to an investor rights agreement dated November 7, 2017 (the “Newmont IRA”), which provides Newmont with director nominee and equity participation rights. Orla and Newmont are also parties to an option agreement dated November 7, 2017 (the “Option Agreement”) regarding the potential future development of a sulphide operation at the Camino Rojo Project. See “General Development of the Business – Investor Rights Agreements” and “Mineral Projects – Camino Rojo Project – Project Description, Location, and Access” for additional information on the Newmont IRA and Option Agreement, respectively.

THE GOLD STANDARD ACQUISITON

On June 12, 2022, Orla entered into a definitive arrangement agreement with Gold Standard Ventures Corp. (“Gold Standard”) pursuant to which Orla agreed to acquire all of the issued and outstanding shares of Gold Standard by way of a court-approved plan of arrangement under the Business Corporations Act (British Columbia). Under the terms of the transaction, Gold Standard shareholders received, in exchange for each Gold Standard common share held, 0.1193 of a Common Share (the “Exchange Ratio”) and C$0.0001 in cash. Gold Standard stock options that were outstanding at closing of the transaction were exchanged for stock options to acquire Orla shares

Page 10


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

(“Replacement Options”) based on the Exchange Ratio. The transaction closed on August 12, 2022, resulting in total cash consideration paid of $28,700 and the issuance of 43,688,556 Common Shares to Gold Standard shareholders, as well as the issuance of 1,758,334 Replacement Options.

Gold Standard’s key asset was the South Railroad Project, a feasibility-stage, open pit, heap leach project located on the Carlin trend in Nevada. As part of the transaction, Orla also acquired the Lewis Project, a strategically located, prospective land package on the Battle Mountain trend in Nevada. See “Mineral Projects – South Railroad Project” and “Mineral Projects –  Lewis Project” below for additional information.

On October 25, 2022, the Company filed a business acquisition report with respect to the acquisition of Gold Standard (the “Gold Standard BAR”), which is available under the Company’s profile on SEDAR at www.sedar.com and EDGAR at www.sec.gov.

INVESTOR RIGHTS AGREEMENTS

Orla is a party to an investor rights agreement with both of Newmont and Agnico Eagle Mines Limited (“Agnico Eagle”).

The Newmont IRA was originally entered into with Goldcorp in connection with the Camino Acquisition. The Newmont IRA provides that (i) for so long as Newmont maintains at least a 10% equity interest in the Company, it will have the right to participate in future equity offerings in order to maintain its pro rata ownership; and (ii) Newmont will have the right to appoint one nominee to the Board of Directors. As of March 17, 2023 and to the Company’s knowledge, Newmont owns approximately 14.1% of the issued and outstanding Common Shares. Newmont’s nominee to the Company’s Board of Directors is Mr. Scott Langley. The Newmont IRA is available for review under the Company’s profile on SEDAR at www.sedar.com and EDGAR at www.sec.gov.

On October 18, 2019, the Company entered into an investor rights agreement with Agnico Eagle (as subsequently amended and restated on December 17, 2019, the "Agnico IRA") pursuant to which, among other things, a previous participation right agreement dated January 26, 2019 between Agnico Eagle and the Company was terminated and Agnico Eagle was granted, subject to the terms and conditions set out in the Agnico IRA, certain rights, including the right to participate in certain equity offerings undertaken by the Company and the right to nominate one member to the Company’s Board of Directors. As of the date of this AIF, Agnico Eagle has not exercised its right to nominate a member to the Company’s Board of Directors. The Agnico IRA also provides for certain limited restrictions on the transfer of Common Shares held by Agnico Eagle. The Agnico IRA is available for review under the Company’s profile on SEDAR at www.sedar.com and EDGAR at www.sec.gov.

COVID-19

The global outbreak of COVID-19 in 2020-2023 has had a significant impact on businesses through restrictions put in place by governments around the world, including the jurisdictions in which the Company conducts its business. Over the last three years, Orla’s activities have been affected for a variety of reasons including permitting delays due to government office shutdowns, government orders related to travel, business operations, and stay-at-home orders.

The Board has oversight over management’s response to COVID-19 and has reviewed the plans and protocols in place. The Company has implemented strict COVID-19 protocols, including rigorous screening and testing programs at the site operations. Orla continues to maintain robust organization-wide COVID-19 prevention protocols to support the health of its employees and local communities. Orla is closely monitoring the potential impacts from the pandemic on areas including delivery of equipment, supplies and logistics, construction, and operational costs and schedule, as well as community and government relations. Vaccination programs in Mexico, Panama, and the United States are ongoing. During 2021 and 2022, the Company supported the vaccination of its workers and local communities where the company operates. As of the date of this AIF, of all employees and contractors at Camino Rojo and Cerro Quema, the vast majority had received at least two doses of COVID-19 vaccine.

Page 11


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

As of the date of this AIF, it is not possible to determine the extent of the impact that this global health emergency will have on Orla’s activities as the impacts will depend on future developments which themselves are highly uncertain and cannot be predicted with confidence. These uncertainties arise from the inability to predict the ultimate geographic spread of the pandemic, its extent and intensity, the duration of the outbreak, and possible government, societal, and individual responses to the situation. Although quarantines have been lifted in many jurisdictions and vaccination programs have been initiated, certain jurisdictions that have previously lifted quarantines have been required to re‐impose them and vaccination programs may be implemented slower than expected or may not be as efficacious as expected due to a variety of factors including delays in distribution, vaccine refusal or the emergence of new strains which are resistant to vaccines. See the section of this AIF entitled “Risk Factors – Natural disasters, terrorist acts, health crises and other disruptions and dislocations, including by the COVID-19 pandemic, whether those effects are local, nationwide or global”.

THREE YEAR HISTORY

Developments During 2020

The Company delivered a change of auditor notice dated March 25, 2020 in connection with the change in auditor from Davidson & Company LLP, Chartered Professional Accountants, to Ernst & Young LLP, Chartered Professional Accountants. See the section of this AIF entitled “Interests of Experts – Auditors”.

On April 3, 2020, the Company closed a bought deal financing with a syndicate of underwriters led by Stifel Nicolaus Canada Inc. and including Desjardin Securities Inc., Paradigm Capital Inc. and Cormark Securities Inc. Pursuant to this financing, a total of 36,600,000 Common Shares were sold at a price of C$2.05 per Common Share for aggregate gross proceeds to the Company of C$75,030,000.

On April 16, 2020, the Company appointed J. Andrew Cormier as Chief Operating Officer. Mr. Cormier succeeded Mr. Hans Smit, who retired in December 2019 as Chief Operating Officer.

On August 13, 2020, the Company announced that the Mexican Federal Environmental Department had granted approval of the Company’s environmental impact statement (“EIS”) required for the development of the Camino Rojo Project. The approval of the EIS was conditional upon Orla meeting certain customary conditions and standard requirements. As a result of the approval of the EIS, the Company had received the two principal permits necessary for commencement of construction activities at the Camino Rojo Project.

On December 4, 2020, the Company appointed Eric Colby to the Board, as nominated by Newmont pursuant to the Newmont IRA (see “Investor Rights Agreements” above). Mr. Colby was subsequently replaced by Scott Langley as Newmont’s nominee (see “Developments During 2022” below).

On December 18, 2020, the Common Shares were authorized for listing on the NYSE American under the symbol “ORLA”. The Common Shares commenced trading on the NYSE American on December 22, 2020.

On December 21, 2020, Orla announced it had completed a layback agreement (the “Layback Agreement”) with Fresnillo following the previously announced non-binding letter agreement between Orla and Fresnillo dated March 18, 2020. Closing of the Layback Agreement was subject to receipt of approval from the Federal Competition Commission (Comisión Federal de Competencia Económica or “COFECE”), which was subsequently received. The Layback Agreement allows Orla to expand the Camino Rojo Project oxide pit onto part of Fresnillo’s mineral concession located immediately north of Orla’s property. Orla will have access to oxide and transitional heap leachable Mineral Resources on Orla’s property below the open pit outlined in the 2019 Camino Rojo Report. In addition, the Layback Agreement provides Orla with the right to mine from Fresnillo’s mineral concession, and recover for Orla’s account, all oxide

Page 12


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

and transitional material amenable to heap leaching that is within an expanded open pit. Pursuant to the terms of the Layback Agreement, Orla will pay Fresnillo a total cash consideration of $62.8 million through a staged payment schedule:

$25 million was paid upon receipt of COFECE approval;
$15 million was paid on December 1, 2022; and
$22.8 million is due no later than December 1, 2023.

The remaining payment bears interest at 5% per annum until the date of payment. The Layback Agreement does not preclude or restrict Fresnillo from participating in any future development of the sulphide mineral resource at the Camino Rojo Project.

Developments During 2021

On January 11, 2021, the Company announced the results of an updated Feasibility Study and Mineral Reserve estimate on the Camino Rojo Project. The updated Feasibility Study highlighted a 54% increase in contained gold mineral reserves and a 3.5-year extension to the mine life of the Camino Rojo Project. The estimated after-tax net present value (5% discount rate) of the Camino Rojo Project is now $452 million with an after-tax internal rate of return of 62% at a gold price of $1,600 per ounce. The updated Feasibility Study reflects some of the benefits resulting from the pit expansion made possible through the completion of the Layback Agreement. On February 9, 2021, the Company filed the associated technical report for the Feasibility Study titled “Unconstrained Feasibility Study NI 43-101 Technical Report on the Camino Rojo Gold Project Municipality of Mazapil, Zacatecas, Mexico” dated effective January 11, 2021 (the “2021 Camino Rojo Report”) on SEDAR at www.sedar.com and EDGAR at www.sec.gov. The 2021 Camino Rojo Report supersedes the 2019 Camino Rojo Report. See “Mineral Projects – Camino Rojo Project”.

On February 10, 2021, the Company filed a preliminary short form base shelf prospectus (the “2021 Base Shelf Prospectus”) with the securities regulatory authorities in each of the provinces and territories of Canada, which allows the Company to offer for sale and issue from time to time Common Shares, warrants to purchase Common Shares, subscription receipts, units and debt securities, or any combination thereof (collectively, the “Securities”), having a total aggregate offering price for such securities, of up to C$300,000,000 (or the equivalent thereof in other currencies) during the 25-month period that the 2021 Base Shelf Prospectus, including any amendments thereto, remains effective. The 2021 Base Shelf Prospectus was part of a registration statement on Form F-10 which the Company also filed on February 10, 2021 with the SEC under the U.S. Securities Act relating to the Securities. The previous base shelf prospectus was set to expire in April of 2021. The renewed 2021 Base Shelf Prospectus is effective for a further 25-month period and also qualifies for distribution in the United States. The final 2021 Base Shelf Prospectus was filed with securities regulatory authorities in Canada and with the SEC in the United States on March 12, 2021.

On February 26, 2021, the Company announced that it had completed the Layback Agreement with Fresnillo following receipt of approval from COFECE. Subsequent to the receipt of this approval, Orla made the initial payment of $25 million to Fresnillo.

On June 30, 2021, the Company announced a $35.0 million non-brokered prospectus financing consisting of 9,085,263 Common Shares priced at C$4.75 per Common Share for total gross proceeds of $35,000,000 (C$43,155,000). The financing was subscribed to by accredited investors, including Pierre Lassonde, Agnico Eagle, Trinity Capital Partners Corporation, and a large institutional investor. The financing was completed on July 14, 2021.

On July 28, 2021, the Company announced the results of a Pre-Feasibility Study and Mineral Resource and Mineral Reserve estimate on its Cerro Quema Project. The Pre-Feasibility Study demonstrates the possibility of a low-cost, high-return heap leach project. The estimated Cerro Quema Project after-tax net present value ("NPV") (5% discount rate) is $176 million with an after-tax internal rate of return ("IRR") of 38% at a gold price of US$1,600 per ounce. On September 7, 2021, the Company filed the associated technical report

Page 13


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

for the Pre-Feasibility Study, entitled “Project Pre-Feasibility NI 43-101 Technical Report on the Cerro Quema Gold Oxide Project Province of Los Santos, Panama” and dated effective July 27, 2021 (the “2021 Cerro Quema Report”) under the Company’s profile on SEDAR at www.sedar.com and EDGAR at www.sec.gov. The 2021 Cerro Quema Report has been superseded by the 2022 Cerro Quema Report (as defined below).

On December 6, 2021, the Company announced an initial Mineral Resource estimate for the Caballito copper-gold deposit in Panama. On January 20, 2022, the Company filed the associated technical report titled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” and dated effective January 18, 2022 (the “2022 Cerro Quema Report”) under the Company’s profile on SEDAR at www.sedar.com and EDGAR at www.sec.gov. The 2022 Cerro Quema Report updated the 2021 Cerro Quema Report in order to include the Mineral Resource estimate for Caballito. For further details on the 2022 Cerro Quema Report, see “Mineral Projects – Cerro Quema Project”.

On December 13, 2021, the Company completed the first gold pour at the Camino Rojo Oxide Mine.

Developments During 2022

On March 1, 2022, the Company appointed Chafika Eddine as Chief Sustainability Officer, a newly created position within the Company.

The Company declared commercial production at the Camino Rojo Oxide Mine effective April 1, 2022.

On April 28, 2022, the Company entered into a credit agreement (the “Credit Agreement”) in respect of a US$150 million secured credit facility (the “Credit Facility”). The Credit Facility includes a US$100 million term facility and a US$50 million revolving facility through a syndicate of lenders composed of The Bank of Nova Scotia, Bank of Montreal, and Canadian Imperial Bank of Commerce. The proceeds from the Credit Facility were used to repay the Company’s existing $125 million project finance facility, with the balance of the revolving facility available for general corporate purposes and working capital. The Credit Facility consists of two parts:

(a)$100 million term facility with a five-year term, repayable in 18 equal quarterly instalments that commenced on December 31, 2022.
(b)$50 million revolving facility, with the ability to increase to $75 million, subject to certain conditions and customary consents. The revolving facility has a three-year term, with an option to extend the term of the revolving facility by up to one-year intervals, subject to certain conditions and customary consents. Full repayment of the revolving facility is due upon maturity.

The applicable interest rate for the Credit Facility is based on the term Secured Overnight Financing Rate (SOFR), plus an applicable margin ranging from 2.75% to 3.75% based on the Company’s leverage ratio at the end of each fiscal quarter. The undrawn portion of the revolving facility is subject to a standby fee ranging from 0.6875% to 0.9375%. The Company may select interest periods of one, three, or six months and interest is payable at the end of each interest period, or at a minimum every three months.

On June 12, 2022, the Company entered into the Arrangement Agreement with Gold Standard pursuant to which Orla agreed to acquire all of the issued and outstanding shares of Gold Standard. The transaction closed on August 12, 2022. See “The Gold Standard Acquisition” above for additional information.

On June 23, 2022, the Company held its annual general meeting. At the meeting, Tamara Brown and Scott Langley were elected as directors of the Company, with Mr. Langley replacing Eric Colby as Newmont’s nominee under the Newmont IRA (see “Investor Rights Agreements” above). George Albino and Ritch Hall did not stand for re-election and, accordingly, their term in office as Directors of the Company expired at the close of the annual general meeting.

Page 14


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

On December 19, 2022, the Company’s subsidiary, Minera Camino Rojo, entered into an agreement with the Ejido San Tiburcio in respect of the transfer of certain surface rights associated with the layback area under the Layback Agreement with Fresnillo. This agreement allows the Company to explore and mine on the layback area, subject to receipt of required permits. See “Mineral Projects – Camino Rojo - Project Description, Location, and Access” for additional information.

DESCRIPTION OF THE BUSINESS

SUMMARY

As described above under “General Development of the Business”, the Company is a natural resource exploration, development, and operating company whose current efforts are focused on its Camino Rojo Project, South Railroad Project, and Cerro Quema Project. See “Mineral Projects”.

SPECIALIZED SKILL AND KNOWLEDGE

All aspects of the Company’s business require specialized skills and knowledge. Such skills and knowledge include the areas of geology, mining, metallurgy, environmental, permitting, corporate social responsibility, finance, accounting, and legal. Orla faces competition for qualified personnel with these specialized skills and knowledge, which may increase costs of operations or result in delays.

COMPETITIVE CONDITIONS

The mineral exploration and mining business is competitive. Competition is primarily for: (a) mineral properties that can be developed and operated economically; (b) technical experts that can find, develop, and mine such mineral properties; (c) labour to operate the mineral properties; and (d) capital to finance development and operations.

The Company competes with other mining companies, some of which have greater financial resources and technical facilities, for the acquisition and exploitation of mineral concessions, claims, leases, and other interests, to finance its activities and in the recruitment and retention of qualified employees. The ability of the Company to acquire, develop, and operate precious metal properties will depend not only on its ability to raise the necessary funding and operate its properties economically, but also on its ability to select and acquire suitable prospects for precious metal development and operation or metal exploration. See “Financing Risks” and “Competition” under “Risk Factors”.

HEALTH AND SAFETY

The Company is committed to the health and safety of its employees and strives to create and maintain a safe working environment by complying with all applicable health and safety laws, rules, and regulations. Orla acknowledges that there are safety risks associated with its business and, through proactive risk management, continuously aims to minimize and control these risks. The Company now has a Health and Safety department with full time personnel at Camino Rojo, South Railroad, and Cerro Quema and continues to develop Health and Safety policies and procedures to comply with regulations and industry best practices. For 2022, there were two lost time incidents reported at the Cerro Quema Project and zero lost time incidents reported at the Company’s first operational mine, Camino Rojo. See “Environmental, Social, and Governance – Overview” below for additional information on the Company’s commitment to health and safety.

Page 15


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

EMPLOYEES

As at December 31, 2022, the Company had 294 employees, which includes employees located in Canada (23), Panama (29), Mexico (231) and Nevada (11). In addition, there were 208 contractors working on the Camino Rojo Project, 18 on the South Railroad Project, and 55 on the Cerro Quema Project. No management functions of the Company are performed to any substantial degree by a person other than the Directors or executive officers of the Company.

The Company respects and supports the rights of its employees and contractors, including freedom of association and collective bargaining, and the Company promotes ongoing engagement and proactive dialogue with its workers’ unions. In total, approximately 56% of the workforce at Camino Rojo was unionized in 2022. In 2021, Minera Camino Rojo entered into a collective bargaining agreement with the union, Sindicato Nacional de Trabajadores Mineros Metalúrgicos y Similares de la República Mexicana, Section #335.

BANKRUPTCY AND SIMILAR PROCEDURES

There have been no bankruptcy, receivership, or similar proceedings against the Company or any of its subsidiaries, or any voluntary bankruptcy, receivership, or similar proceedings by the Company or any of its subsidiaries, within the three most recently completed financial years or during or proposed for the current financial year.

FOREIGN OPERATIONS

The locations of the Company’s Camino Rojo Project in Mexico, South Railroad Project in Nevada. and Cerro Quema Project in Panama expose the Company to certain risks, including currency fluctuations and possible political or economic instability that may result in the impairment or loss of mining titles or other mineral rights and opposition from environmental or other non-governmental organizations. Mineral exploration and mining activities in foreign jurisdictions may also be affected in varying degrees by political stability and governmental regulations relating to the mining industry; labour unrest; expropriation; renegotiation, or termination of existing concessions; ability of governments to unilaterally alter agreements; surface land access; illegal mining; changes in taxation policies or laws; and repatriation of funds. Any changes in regulations or shifts in political attitudes in such foreign countries are beyond the Company’s control and may adversely affect the Company’s business.

See “Risk Factors – Foreign Country and Political Risk” and “Risk Factors – Foreign Subsidiaries”.

REORGANIZATIONS

There have been no material reorganizations of the Company or any of its subsidiaries within the three most recently completed financial years or during or proposed for the current financial year.

PRINCIPAL MARKETS AND DISTRIBUTION

The Company currently sells its refined gold and silver to customers located in the United States. The Company evaluates the counterparties to which it sells its product. The Company is not economically dependent on a limited number of customers for the sale of its gold and silver as its products can be sold through numerous world-wide commodity markets, traders, and financial institutions.

Page 16


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

ENVIRONMENTAL, SOCIAL AND GOVERNANCE

OVERVIEW

Orla’s commitment to environmental, social and governance (“ESG”) practices is critical to adding value to its business by allowing Orla to attract and retain top talent, earn the trust of key stakeholders, effectively manage risk, and ensure Orla’s long-term competitiveness and sustainability.

Orla is committed to conducting business in a responsible manner at all times, which means respecting the health and safety of its employees, protecting the environment, respecting the human rights of employees and the residents in the communities in which the Company operates, and contributing to the sustainable development of those communities. Orla believes that it is its responsibility to transform Mineral Resources into a net positive benefit for its stakeholders.

As discussed above under “Health and Safety”, the Company is committed to the health and safety of its employees. To that end, the Board has established an Environmental, Sustainability, Health & Safety Committee which is responsible for all technical matters particularly as they apply to environmental, sustainability, health, and safety concerns, assessing environmental and social risks and the Company’s risk management thereof. Orla has also adopted an Environmental, Sustainability, Health & Safety Policy. The Company will conduct all its operations in a manner that ensures full compliance with its Environmental, Sustainability, Health & Safety Policy, applicable legislation, and government requirements. The aim of this policy is to protect the surroundings in which the Company operates, to minimize and manage environmental risks and to enhance sustainable environmental practices. In addition, the Company has implemented a Corporate Social Responsibility (“CSR”) Policy, which sets out the guidelines by which the Company will (i) endeavour to respect the health and safety of its employees; (ii) protect the environment; (iii) respect the human rights of its employees and the residents in the communities in which the Company operates; and (iv) contribute to the sustainable development of those communities.

In 2022, the Company hired a full-time Chief Sustainability Office (CSO) with the mandate to accelerate Orla’s adoption and implementation of an ESG strategy and disclosure on performance in accordance to globally recognized frameworks and industry best practices.

Orla has been focused on strengthening its ESG approach through aligning Company practices to industry leading standards and a more robust reporting and sustainability disclosure. Orla has also conducted an ESG Materiality Assessment, which focused on identifying and prioritizing the ESG factors with the greatest potential to impact the value of the business. The ESG Materiality Assessment considered leading ESG frameworks and standards (including the Sustainability Accounting Standards Board and the recommendations of the Task Force on Climate-related Financial Disclosures) as well as relevant ESG regulations and initiatives. The ESG Materiality Assessment is reviewed and updated annually.

The following sections provide an overview of certain aspects of Orla’s approach to ESG. A more detailed overview of Orla’s approach to ESG, as well as copies of the Company’s Environmental, Sustainability, Health & Safety Policy, Corporate Social Responsibility Policy, and other governance policies can be found on Orla’s website at www.orlamining.com/about-us/environmental-social-and-governance-esg.

ENVIRONMENT

Mining, exploration, development and production activities are subject to various levels of federal, provincial, state, and local laws and regulations relating to the protection of the environment at all phases of operation. These regulations govern exploration, development, tenure, production, taxes, labour standards, occupational health, waste disposal, protection and remediation of the environment, reclamation, mine safety, toxic substances, and other matters. These regulations mandate, among other things, the maintenance of air

Page 17


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

and water quality standards and land reclamation. They also set forth limitations on the general handling, transportation, storage, and disposal of solid and hazardous waste. Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors, and employees. To the best knowledge of the Company, it is in compliance with all environmental laws and regulations in effect where its properties are located.

Environmental protection requirements did not have a material effect on the capital expenditures, earnings, or competitive position of Orla during the 2022 financial year and are not expected to have a material effect during the 2023 financial year. Orla is committed to ensuring that all its activities are conducted in an environmentally safe and responsible manner and will require that its contractors adhere to the same high environmental standards.

For 2022, there were no category 4 or 5 incidents across the Company operations and projects as defined by the U.S. Environmental Protection Agency and none of the Company’s sites were charged with fines or sanctions related to environmental incidents.

SOCIAL

The Company strives to actively engage and make positive contributions in the communities where it currently operates.

At the Camino Rojo Project, the Company has agreements in place with the ejidos of San Tiburcio, El Berrendo, La Pardita, and San Francisco de los Quijano, with commitments to deliver land leasing payments and certain social support such as scholarships, community infrastructure upgrades, social and economic development initiatives, impact investments, food and medicines to the most vulnerable community members. The Company also established a community response mechanism to receive, document, and resolve community requests, concerns, and complaints. As noted above, the Company has implemented the CSR Policy and has a full-time community relations team for the Camino Rojo Project. The Company has also contracted an independent consulting firm to evaluate the CSR program and advise on its continued development.

In Panama, the Company has an active community relations program and has supported the local communities of Tonosi and Macaracas by providing certain medical equipment, access to water, community infrastructure for education and skills development, and other social assistance.

At the South Railroad Project, the focus in 2022 for social initiatives was oriented to providing donations to local non-profit organizations, schools, youth activities, and community events, including donations to local charities and local baseball, softball, football, and soccer youth sport programs. The Company has also initiated a plan to map local stakeholders and enhance engagement at the project.

For 2022, there were no significant  community-related incidents across the Company operations and projects and no lost operational days due to community concerns.

Page 18


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

GOVERNANCE

Orla recognizes the importance of corporate governance to the effective management of Orla and to the protection of its stakeholders. Orla’s approach to significant issues of corporate governance is designed with a view of ensuring that the business and affairs of Orla are effectively managed to enhance stakeholder value. Additional information on Orla’s corporate governance practices is contained in Orla’s Management Information Circular dated May 12, 2022, prepared for its most recent annual meeting of shareholders held on June 23, 2022 and filed on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. This information will also be contained in the Management Information Circular of the Company to be prepared in connection with the Company’s 2023 annual meeting of shareholders currently scheduled to be held in June 2023, which will be available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. Orla’s current governance policies can be found on Orla’s website at www.orlamining.com/about-us/environmental-social-and-governance-esg/corporate-governance/.

SUMMARY OF MINERAL RESERVE AND MINERAL RESOURCE ESTIMATES

MINERAL RESERVES

The following tables summarize the Company’s Mineral Reserve estimates as at the dates set out in the footnotes.

    

    

    

Proven

    

Probable

    

Proven and Probable

Gold (Au)

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

16,782

0.78

422

41,681

0.73

975

58,463

0.74

1,397

 

 

Sulphide

 

 

 

 

 

 

 

 

Nevada

 

South Railroad

 

Oxide

 

8,960

 

1.15

 

333

 

56,239

 

0.70

 

1,271

 

65,199

 

0.77

 

1,604

 

 

Sulphide

 

 

 

 

 

 

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

21,700

 

0.80

 

562

 

21,700

 

0.81

 

562

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Gold

 

 

  

 

755

 

 

2,808

 

  

 

  

 

3,563

    

    

    

Proven

    

Probable

    

Proven and Probable

SILVER (Ag)

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

16,782

15.6

8,433

41,681

15.1

20,280

58,463

15.3

28,713

 

 

Sulphide

 

 

 

 

 

 

 

 

Nevada

 

South Railroad

 

Oxide

 

8,960

 

N/A

 

437

 

56,239

 

N/A

 

5,700

 

65,199

 

N/A

 

6,137

 

 

Sulphide

 

 

 

 

 

 

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

21,700

 

2.2

 

1,526

 

21,700

 

2.2

 

1,526

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Silver

 

 

  

 

8,870

 

 

27,506

 

  

 

  

 

36,376

Mineral Reserve Footnotes

All Mineral Reserves

1.The Mineral Reserve estimates have been prepared in accordance with the CIM Standards.
2.Rounding as required by reporting guidelines may result in summation differences.
3.The estimate of Mineral Reserves may be materially affected by geology, environment, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
4.koz = 1,000 troy ounces; t = tonne (1,000 kilograms).

Page 19


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Camino Rojo, Mexico

1.Michael G. Hester, FAusIMM of Independent Mining Consultants, Inc. (“IMC”) is the qualified person responsible for the Mineral Reserve estimate for Camino Rojo.
2.The Mineral Reserve estimate for Camino Rojo has an effective date of December 31, 2022. The Mineral Reserve estimate has been updated from the 2021 Camino Rojo Report to account for depletion due to mining activity at the Camino Rojo Oxide Mine and for current gold and silver price and costs. The following table sets out the reconciliation of the Mineral Reserves (in thousands of ounces) at Camino Rojo by category at December 31, 2022 to those set forth in the 2021 Camino Rojo Report.

Gold (Au)

    

Proven

    

Probable

    

Proven and Probable

2021 Camino Rojo Report

466

 

1,122

 

1,589

Depletion

(71)

 

(155)

 

(227)

Price and Costs

 

(1)

 

7

 

7

Stockpile

28

0

28

December 31, 2022

 

422

 

975

 

1,397

Silver (Au)

    

Proven

    

Probable

    

Proven and Probable

2021 Camino Rojo Report

8,951

 

22,555

 

31,506

Depletion

(1,106)

 

(2,410)

 

(3,516)

Price and Costs

 

(45)

 

135

 

90

Stockpile

632

0

632

December 31, 2022

 

8,433

 

20,280

 

28,713

Stockpiles are all derived from Camino Rojo mined material and are calculated using reconciled production figures adjusted for mining accuracy. Stockpile grades are calculated from grade control block grades and depleted by mining accuracy where appropriate. For the stockpile, no cut‐off grade is used for reporting.

3.Mineral Reserves are based on prices of $1,350/oz gold and $18/oz silver.
4.Mineral Reserves are based on net smelter returns (“NSR”) cut-offs that vary by time period to balance mine and plant production capacities. They range from a low of $5.69/t to a high of $10.00/t.
5.NSR value for leach material is as follows:
Kp Oxide: NSR ($/t) = 29.54 x gold (g/t) + 0.053 x silver (g/t), based on gold recovery of 70% and silver recovery of 11%.
Ki Oxide: NSR ($/t) = 23.64 x gold (g/t) + 0.072 x silver (g/t), based on gold recovery of 56% and silver recovery of 15%.
Tran-Hi: NSR ($/t) = 25.32 x gold (g/t) + 0.130 x silver (g/t), based on gold recovery of 60% and silver recovery of 27%.
Tran-Lo: NSR ($/t) = 16.88 x gold (g/t) + 0.164 x silver (g/t), based on gold recovery of 40% and silver recovery of 34%.
6.Operating costs – mining $1.95/t mined; process $3.32/t processed; general and administrative (“G&A”) $2.37/t processed; includes a 2% NSR royalty and a 0.5% extraordinary mining duty payable to the Mexican government, as mandated by federal law.
7.Refining cost per ounce – gold $2.29; silver $2.29.
8.See “Mineral Properties – Camino Rojo Project – Mineral Reserves” for additional information.

South Railroad, Nevada

1.The Mineral Reserve estimate for South Railroad has an effective date of February 17, 2022.
2.Consistent with the Company’s other reported Mineral Reserves, the Mineral Reserve estimate for the South Railroad Project in this AIF has been reported in metric units, which has been converted from Imperial system units currently in use at South

Page 20


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Railroad and in the South Railroad Report (as defined below), using a conversion rate of 0.9071847 between short tonnes and metric tonnes and a conversion rate of 34.285718 between oz/short ton and g/metric tonne.
3.The qualified person responsible for the Mineral Reserves at South Railroad is Jordan M. Anderson of RESPEC Company LLC (“RESPEC”), formerly Mine Development Associates (“MDA”).
4.Mineral Reserves were defined based on pit designs that follow Whittle optimized pit shells created using $1,450 per oz Au and $18.76 per oz Ag. Pit designs followed pit slope recommendations provided by Golder and Associates.
5.Reserves are reported using break-even cut-off grades based on variable recoveries provided by Gary L. Simmons and processing and general and administrative costs:
Dark Star leach cut-off grade 0.17g/t.
Pinion oxide leach cut-off grade 0.17 g/t.
Pinion transition leach cut-off grade 0.24 g/t.
6.Silver is reported for Pinion reserves only.
7.The Mineral Reserves point of reference is the point where is material is placed onto the leach pad.
8.Energy prices of $0.66 per liter of off-road diesel were used to estimate mining costs.
9.See “Mineral Properties – South Railroad Project – Mineral Reserves” for additional information.

Cerro Quema, Panama

1.The Mineral Reserve estimate for Cerro Quema has an effective date of April 22, 2021.
2.The qualified person responsible for the Mineral Reserves is Jesse Aarsen, P.Eng of MMTS.
3.Only Oxide and Mixed material is included in the Mineral Reserves; all Sulphide material is treated as waste.
4.The minimum cut-off grade used for ore/waste determination is NSR>= $6.34/tonne for Oxide and $9.18 for Mixed at the La Pava deposit and $6.50/tonne for Oxide and $8.35/tonne for Mixed at the Quema deposit.
5.All Mineral Reserves stated above include mining dilution, but no mining loss.
6.Associated metallurgical gold recoveries have been estimated as 86% for Oxide at the Quema deposit and 88% for Oxide at the La Pava deposit. Gold recoveries vary according to grade for Mixed material at both the La Pava and Quema deposits.
7.Associated metallurgical silver recoveries have been estimated as 15% for Oxide and 10% for Mixed material at the Quema deposit and 30% for Oxide and 10% for Mixed material at the La Pava deposit.
8.Reserves are based on a US$1,250/oz gold price and US$17/oz silver price.
9.Reserves are converted from resources through the process of pit optimization, pit design, production scheduling, stockpiling, cut-off grade optimization and supported by a positive cash flow model.
10.See “Mineral Properties – Cerro Quema Project – Mineral Reserves” for additional information.

MINERAL RESOURCES

The following tables summarize the Company’s Mineral Resource estimates as at the dates set out in the footnotes.

Measured and Indicated Resources

    

    

    

Measured

    

Indicated

    

Measured and Indicated

Gold (Au)

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

17,923

0.76

437

66,432

0.71

1,515

84,355

0.72

1,952

 

 

Sulphide

 

3,358

 

0.69

 

74

 

255,445

 

0.88

 

7,221

 

258,803

 

0.88

7,296

Nevada

 

South Railroad

 

Oxide

 

9,561

 

1.12

 

343

 

65,450

 

0.67

 

1,410

 

75,011

 

0.73

 

1,753

 

 

Sulphide

 

 

 

 

311

 

3.10

 

31

 

311

 

3.09

31

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

34,270

 

0.64

 

708

 

34,270

 

0.64

 

708

 

 

Sulphide

 

 

 

 

31,952

 

0.31

 

315

 

31,952

 

0.31

315

Total Gold

 

 

  

 

854

 

 

11,200

 

  

 

  

 

12,055

Page 21


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

    

    

    

Measured

    

Indicated

    

Measured and Indicated

Silver (Ag)

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

17,923

15.2

8,756

66,432

12.5

26,745

84,355

13.1

35,501

 

 

Sulphide

 

3,358

 

9.1

 

997

 

255,445

 

7.4

 

60,606

 

258,803

 

7.4

61,603

Nevada

 

South Railroad

 

Oxide

 

2,336

 

6.5

 

488

 

41,193

 

5.0

 

6,617

 

43,529

 

5.08

 

7,105

 

 

Sulphide

 

 

 

 

 

 

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

34,270

 

2.1

 

2,265

 

34,270

 

2.1

 

2,265

 

 

Sulphide

 

 

 

 

31,952

 

2.2

 

2,260

 

31,952

 

2.2

2,260

Total Silver

 

 

  

 

10,241

 

 

98,493

 

  

 

  

 

108,734

    

    

    

Measured

    

Indicated

    

Measured and Indicated

Lead (Pb)

000’s t

    

%

    

koz

000’s t

    

%

    

Mlb

000’s t

    

%

    

Mlb

Mexico

Camino Rojo

Oxide

 

 

Sulphide

 

3,358

 

0.13

%

9

 

255,445

 

0.07

%

404

 

258,803

 

0.07

%

414

Nevada

 

South Railroad

 

Oxide

 

 

 

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Lead

 

 

  

 

9

 

 

404

 

  

 

 

414

    

    

    

Measured

    

Indicated

    

Measured and Indicated

Zinc (Zn)

000’s t

    

%

    

Mlb

000’s t

    

%

    

Mlb

000’s t

    

%

    

Mlb

Mexico

Camino Rojo

Oxide

 

 

Sulphide

 

3,358

 

0.38

%

28

 

255,445

 

0.26

%

1,469

 

258,803

 

0.26

%

1,497

Nevada

 

South Railroad

 

Oxide

 

 

 

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Zinc

 

 

  

 

28

 

 

1,469

 

  

 

 

1,497

    

    

    

Measured

    

Indicated

    

Measured and Indicated

CuEq

Cu

CuEq

Cu

Copper (Cu)

    

000’s t

    

CuEq%

    

Cu%

    

Mlbs

    

Mlbs

000’s t

    

CuEq%

    

Cu%

    

Mlbs

    

Mlbs

Mexico

Camino Rojo

Oxide

 

 

Sulphide

 

 

Nevada

 

South Railroad

 

Oxide

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

 

 

 

 

Sulphide

 

 

31,952

 

0.96

%

0.83

%

676

 

585

31,952

 

0.96

%

0.83

%

676

 

585

Total Copper

 

 

 

585.0

 

585.0

Inferred Mineral Resources

    

    

    

Inferred

    

    

Inferred

Gold (Au)

000’s t

    

g/t

    

koz

Silver (Ag)

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

4,179

0.88

118

Mexico

Camino Rojo

Oxide

4,179

5.7

772

 

 

Sulphide

 

56,564

 

0.87

 

1,577

 

 

 

Sulphide

 

56,564

 

7.5

13,713

Nevada

 

South Railroad

 

Oxide

 

18,662

 

0.45

 

271

 

Nevada

 

South Railroad

 

Oxide

 

1,178

 

2.43

 

92

 

 

Sulphide

 

3,601

 

3.87

 

448

 

 

 

Sulphide

 

 

Panama

 

Cerro Quema

 

Oxide

 

7,482

 

0.33

 

80

 

Panama

 

Cerro Quema

 

Oxide

 

7,482

 

2.4

 

569

 

 

Sulphide

 

22,569

 

0.21

 

155

 

 

 

Sulphide

 

22,569

 

1.2

856

Total Gold

 

 

  

 

2,649

 

 

Total Silver

 

  

 

  

 

16,002

Page 22


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

    

    

    

Inferred

    

    

Inferred

Lead (Pb)

000’s t

    

%

    

Mlb

Zinc (Zn)

000’s t

    

%

    

Mlb

Mexico

Camino Rojo

Oxide

Mexico

Camino Rojo

Oxide

 

 

Sulphide

 

56,564

 

0.05

%

63.1

 

 

 

Sulphide

 

56,564

 

0.23

%

290.4

Nevada

 

South Railroad

 

Oxide

 

 

 

 

Nevada

 

South Railroad

 

Oxide

 

 

 

 

Sulphide

 

 

 

 

 

 

Sulphide

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

 

Sulphide

 

 

 

 

 

 

Sulphide

 

 

Total Lead

 

 

  

 

63.1

 

 

Total Zinc

 

 

  

 

290.4

    

    

    

Inferred

CuEq

Cu

Copper (Cu)

000’s t

    

CuEq%

    

Cu%

    

Mlbs

    

Mlbs

Mexico

Camino Rojo

Oxide

 

 

 

Sulphide

 

Nevada

 

South Railroad

 

Oxide

 

 

 

 

 

Sulphide

 

 

 

Panama

 

Cerro Quema

 

Oxide

 

 

 

 

 

Sulphide

 

22,569

 

0.85

%

0.77

%

425

 

381

Total Copper

 

381

Mineral Resource Notes

All Mineral Resources

1.All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to add precisely. Columns may not sum exactly due to rounding.
2.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources are inclusive of Mineral Reserves. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
3.The Mineral Resource estimates have been prepared in accordance with the CIM Standards.
4.koz = 1,000 troy ounces; mlb = million pounds (imperial); t = tonne (1,000 kilograms).

Camino Rojo, Mexico

1.The effective dates of the Mineral Resource estimates for Camino Rojo are: (i) December 31, 2022 for the oxides (leach material); and (ii) June 7, 2019 for the sulphides (mill material). The oxide Mineral Resource estimate has been updated from the 2021 Camino Rojo Report to account for depletion from mining operations at the Camino Rojo Oxide Mine and for current gold and silver price and costs. The following table sets out the reconciliation of the oxide Mineral Resources (in thousands of ounces) at Camino Rojo by category at December 31, 2022 to those set forth in the 2021 Camino Rojo Report.

Gold (Au)

    

Measured

    

Indicated

    

Measured and Indicated

    

Inferred

2021 Camino Rojo Report

483

 

1,681

2,163

 

120

Depletion

(73)

 

(162)

(235)

 

(2)

Price and Costs

 

 

(4)

 

(4)

 

Stockpile

28

0

28

0

December 31, 2022

 

437

 

1,515

 

1,952

 

118

Page 23


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Silver (Au)

    

Measured

    

Indicated

    

Measured and Indicated

    

Inferred

2021 Camino Rojo Report

9,305

 

29,471

38,776

 

805

Depletion

(1,169)

 

(2,616)

(3,786)

 

(31)

Price and Costs

 

(11)

 

(110)

 

(121)

 

(2)

Stockpile

632

0

632

0

December 31, 2022

 

8,756

 

26,745

 

35,501

772


Stockpiles are all derived from Camino Rojo mined material and are calculated using reconciled production figures adjusted for mining accuracy. Stockpile grades are calculated from grade control block grades and depleted by mining accuracy where appropriate. For the stockpile, no cut‐off grade is used for reporting.

2.Michael G. Hester, FAusIMM, of IMC, is the qualified person responsible for the Mineral Resource estimate for Camino Rojo.
3.Mineral Resources for leach (oxide) material are based on prices of $1,700/oz gold and $21/oz silver.
4.Mineral Resources for mill (sulphide) material are based on prices of $1,400/oz gold, $20/oz silver, $1.05/lb lead, and $1.20/lb zinc.
5.Mineral Resources are based on NSR cut-off grades of $5.69/t for leach material and $13.71/t for mill material.
6.NSR value for leach material is as follows:
Kp Oxide: NSR ($/t) = 37.21 x gold (g/t) + 0.063 x silver (g/t), based on gold recovery of 70% and silver recovery of 11%
Ki Oxide: NSR ($/t) = 29.77 x gold (g/t) + 0.086 x silver (g/t), based on gold recovery of 56% and silver recovery of 15%
Tran-Hi: NSR ($/t) = 31.89 x gold (g/t) + 0.155 x silver (g/t), based on gold recovery of 60% and silver recovery of 27%
Tran-Lo: NSR ($/t) = 21.26 x gold (g/t) + 0.195 x silver (g/t), based on gold recovery of 40% and silver recovery of 34%.
7.NSR value for mill material is 36.75 x gold (g/t) + 0.429 x silver (g/t) + 10.75 x lead (%) + 11.77 x zinc (%), based on recoveries of 86% gold, 76% silver, 60% lead, and 64% zinc.
8.Includes 2% NSR royalty and a US dollar:Mexican Peso exchange rate of 1:19.3.
9.Mineral Resources are constrained within a conceptual pit shell in order to demonstrate reasonable prospects for eventual economic extraction, to meet the definition of Mineral Resource in NI 43-101; mineralization lying outside of the pit shell is not reported as a Mineral Resource.
10.The Mineral Resource estimate assumes that the floating pit cone used to constrain the estimate extends onto land held by Fresnillo. Any potential development of the Camino Rojo property that includes an open pit encompassing the entire Mineral Resource estimate would be dependent on obtaining an agreement with Fresnillo (in addition to the Layback Agreement, which is only with respect to a portion of the heap leach material included in the Mineral Reserve).
11.See “Mineral Properties – Camino Rojo Project – Mineral Resources” for additional information.

South Railroad, Nevada

1.The effective date of all Mineral Resources at the South Railroad Project is January 31, 2022.
2.Michael S. Lindholm, CPG, of RESPEC, is the qualified person responsible for the Mineral Resource estimate for the South Railroad Project.
3.Consistent with the Company’s other reported Mineral Resources, the Mineral Resource estimate for the South Railroad Project in this AIF has been reported in metric units, which have been converted from Imperial system units currently in use at South Railroad and in the South Railroad Report, using conversion factors of 0.90718474 between short tons and metric tonnes and 34.285714 between oz/short ton and g/metric tonne.
4.For all deposits, the cutoff for open pit oxide and transitional Mineral Resources is 0.171 g/t Au, and for sulfide Mineral Resources is 1.543 g/t Au. The cutoff for underground sulphide Mineral Resources is 3.429 g/t Au.
5.Resources are based on a US$1,750/oz gold price. The silver prices were adjusted to maintain a constant silver to gold ratio, which is $22.64/oz at the resource base case.
6.Metallurgical recoveries for optimization were applied as follows:
Dark Star – ROM recoveries vary based on formulas using model block gold grade, redox zone and silicification zone.

Page 24


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Pinion – ROM recoveries vary based on formulas using model block gold grade, redox zone, silicification zone and lithology.
Jasperoid Wash – ROM recoveries vary based on gold grade.
North Bullion – Oxide recovery is 70% from heap leach pad, Sulphide recovery is 85% from mill.
The Mineral Resource has been confined by “reasonable prospects of eventual economic extraction” open pits and underground shells.
7.Pit slope angles are:
Dark Star – Varies from 35 degrees to 47 degrees depending on lithology and face direction.
Pinion – Varies from 31 degrees to 52 degrees depending on lithology and face direction.
Jasperoid Wash and North Bullion – 45 degrees.
8.Bulk density measurements were obtained by the immersion method on drill core samples, and applied bedrock densities are:
Dark Star - 2.27 to 2.63
Pinion - 2.46 and 3.00
Jasperoid Wash - 2.40 to 2.55
North Bullion – 2.34 to 2.80, quantity of density data for Sweet Hollow, POD and South Lodes is minimal, so density data from other deposits in the same formations was used.
9.Due to a lack of silver outside Pinion, silver resources are reported for Pinion only rather than as consolidated resources to avoid reporting erroneous average silver grade.
10.See “Mineral Properties – South Railroad Project – Mineral Resources” for additional information.

Cerro Quema, Panama

1.The Mineral Resource estimate for Cerro Quema has an effective date of November 2, 2021.
2.The qualified person responsible for the Mineral Resource is Sue Bird, P. Eng, of Moose Mountain Technical Services (“MMTS”).
3.The Mineral Resource is based on the following assumptions: for Pava and Quemita: Metal prices of US$1,600/oz gold price and US$18/oz silver price 125% price case pit; 99.9% payable Au; 98.0% payable Ag; US$1.40/oz Au and US$1.20/oz Ag offsite costs (refining, transport and insurance); at Caballito: 100% price pit with Metal prices of US$1,600/oz gold price, US$3.50/lb copper price and US$20/oz silver price and the following smelter terms: in the Oxides: 99% payable Au; 98.0% payable Ag; in the Sulphide 90% payable Au and Ag, and 96% payable Cu; offsite costs of US$1.40/oz Au and US$1.20/oz Ag in the oxides and offsite costs (refining, transport and insurance) of US$16.30/wet metric tonne (“WMT”) for Au, US$116.50/WMT for Cu and US$3.20/WMT for Ag in the sulphides; for all deposits a 4% NSR royalty for Au and Ag and a 5% NSR royalty for Cu.
4.Metallurgical recoveries are: for Pava:  88% Au in oxides and mixed, for Quema:  86% Au in oxides and mixed for Pava, Ag recovery is 30% oxides and mixed in Pava, Ag recovery is 15% in oxides and mixed in Quema. The metallurgical recovery at Caballito have been estimated as 90% for Cu, 55% for Au, and 45% for Ag in the sulphides, and 88% for Au, 45% for Ag, and 0% for Cu in the oxides.
5.The Mineral Resource has been confined by a “reasonable prospects of eventual economic extraction” pit using the following cost assumptions: at Quemita: a mining cost of US$2.56/tonne; at La Pava a mining cost of US$2.40/tonne; at Caballito a mining cost of US$2.20/tonne for both materials to be processed and waste. Processing + G&A costs for each deposit and metallurgical zone are the base case cutoff NSR values.
6.Pit slope angles are 40º.
7.The bulk density in La Pava and Quemita has been determined by Alteration Zone and Core recovery and ranges between 2.07 and 2.62. The bulk density at Caballito has been assigned values of 2.34 and 2.70 tonnes/m3 in the oxides and sulphides, respectively based on bulk density measurements.
8.The 0.96% CuEq% for the Indicated Mineral Resources has been calculated based on 0.83% Cu, 0.31 g/t Au, and 2.2 g/t Ag and the 0.85% CuEq% for the Inferred Mineral Resources has been calculated based on 0.77% Cu, 0.21 g/t Au, and 1.2 g/t Ag.

Page 25


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

9.See “Mineral Properties – Cerro Quema Project – Mineral Resources” for additional information.

MINERAL PROJECTS

The Company’s focus is on the acquisition, exploration, development and exploitation of mineral properties in which the Company’s exploration, development, and operating expertise could substantially enhance shareholder value. The Company’s three material projects are the Camino Rojo Project, the South Railroad Project, and the Cerro Quema Project. The Company also holds a 100% interest in the Monitor Gold exploration project (the “Monitor Gold Project”) and the Lewis project (the “Lewis Project”), both located in Nevada. The Monitor Gold Project and the Lewis Project are not considered to be material projects for the Company.

THE CAMINO ROJO PROJECT

The following disclosure relating to the Camino Rojo Project has been derived, in part, from the 2021 Camino Rojo Report for the Camino Rojo Project, prepared by Carl E. Defilippi, RM, SME of Kappes, Cassiday and Associates (“KCA”), Matthew D. Gray, Ph.D., C.P.G. of Resource Geosciences Incorporated (“RGI”), Michael G. Hester, FAusIMM of IMC and John J. Ward, C.P.G. of John Ward, RG, Groundwater Consultant, LLC, each of whom is independent of the Company and a qualified person under NI 43-101. Reference should be made to the full text of the 2021 Camino Rojo Report, which is available under the Company’s profile on SEDAR at www.sedar.com and on EDGAR at www.sec.gov, as the 2021 Camino Rojo Report contains additional assumptions, qualifications, references, reliances, and procedures that are not fully described herein.

PROJECT DESCRIPTION, LOCATION, AND ACCESS

The Camino Rojo Project is a gold-silver-lead-zinc deposit located in the Municipality of Mazapil, State of Zacatecas, Mexico near the village of San Tiburcio. The project lies 190 km northeast of the city of Zacatecas, 48 km south-southwest of the town of Concepcion del Oro, Zacatecas, and 54 km south-southeast of Newmont’s Peñasquito Mine. The Camino Rojo Project area is centered at approximately 244150E 2675900N UTM NAD27 Zone 14N.

Both Monterrey and Zacatecas have airports with regularly scheduled flights south to Mexico City or north to the USA. There are numerous gravel roads within the property linking the surrounding countryside with the two highways, Highways 54 and 62, which transect the property. In addition, there is a railway approximately 40 km east of San Tiburcio. There are very few locations within the property that are not readily accessible by four-wheel drive vehicles.

The Camino Rojo property consisted of seven concessions held by Minera Camino Rojo, a subsidiary of Orla, covering in aggregate 138,636 ha, with one concession expiring in 2057 and the remaining seven expiring in 2058. As part of the requirements to maintain the concessions in good standing, bi-annual fees must be paid based upon a per-hectare escalating fee, work expenditures must be incurred in amounts determined on the basis of concession size and age, and applicable environmental regulations must be respected.

Pursuant to the agreement whereby Orla acquired the Camino Rojo Project from Goldcorp (which was subsequently acquired and is wholly-owned by Newmont), Newmont was granted a 2% NSR on all metal production from the Camino Rojo Project, except for metals produced under the sulphide joint venture option stipulated in the Camino Agreement. On October 29, 2020, this 2% NSR royalty that pertains to oxide material was acquired by Maverix. Subsequent to the date of the 2021 Camino Rojo Report, Maverix was acquired by Triple Flag. A 0.5% royalty is also payable to the Mexican government as an Extraordinary Mining Duty, mandated by Federal law, and applies to precious metal production from all mining concessions, regardless of owner or other royalty encumbrances. A Special Mining Duty of 7.5% is also payable to the Mexican government on income derived from mineral production.

Orla is the operator of the Camino Rojo Project and has full rights to explore, evaluate, and exploit the property. Pursuant to the Option Agreement, if a sulphide project is defined through a positive Pre-Feasibility Study outlining one of the development scenarios A or B

Page 26


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

below, Newmont may, at its option, enter into a joint venture for the purpose of future exploration, advancement, construction, and exploitation of the sulphide project.

Scenario A: A sulphide project where material from the Camino Rojo Project is processed using the existing infrastructure of the Peñasquito mine, mill and concentrator facilities. In such circumstances, the sulphide project would be operated by Newmont, who would earn a 70% interest in the sulphide project, with Orla owning 30%.
Scenario B: A standalone sulphide project with a mine plan containing at least 500 million tonnes of Proven and Probable Mineral Reserves using standalone facilities not associated with Peñasquito. Under this scenario, the sulphide project would be operated by Newmont, who would earn a 60% interest in the sulphide project, with Orla owning 40%.

Following exercise of its option, if Newmont elects to sell its portion of the sulphide project, in whole or in part, then Orla would retain a right of first refusal on the sale of the sulphide project.

On December 21, 2020, Orla announced that it had completed the Layback Agreement with Fresnillo, granting Orla the right to expand the Camino Rojo oxide pit onto 21.8 ha of Fresnillo’s 782 ha “Guachichil D1” mineral concessions, Title 245418, located immediately to the north of Orla’s property. For details on the Layback Agreement, see “General Development of the Business – Developments During 2020”. The Layback Agreement is only with respect to the portion of the heap leach material included in the Mineral Reserve. As such, any potential development of the Camino Rojo Project that includes an open pit encompassing the entire Mineral Resource estimate would be dependent on an additional agreement with Fresnillo (or any potential subsequent owner of the mineral titles).

Surface rights in the project area are owned by several Ejidos, which are Federally defined agrarian communities and private landowners. The land overlying the Mineral Resource at the Camino Rojo Project, is controlled by Orla under an agreement with the San Tiburcio Ejido, comprised of approximately 360 voting members who collectively control 37,154 ha. Exploration work at the Camino Rojo Project has been carried out under the terms of surface access agreements negotiated with the San Tiburcio Ejido and two neighbouring Ejidos.

Camino Rojo SA de CV (then, a Goldcorp subsidiary) executed two agreements that are still current with the San Tiburcio Ejido that cover the Camino Rojo deposit. Camino Rojo SA de CV subsequently passed the rights and obligations of these agreements to Minera Peñasquito SA de CV (then, a Goldcorp subsidiary), who subsequently transferred the rights and obligations to Minera Camino Rojo. Another agreement to cover surface access for exploration was signed in 2018.

The three agreements currently in effect with Ejido San Tiburcio are:

(a)Previous to Expropriation Occupation Agreement (“COPE”) executed on February 26, 2013 by and between Camino Rojo SA de CV, in its position of “occupant”, and Ejido San Tiburcio, as the owner, with regards to a surface of 2,497.30 ha. In 2022, this surface area was expanded to 2,524.80 ha. The rights and obligations of this agreement were passed to Minera Camino Rojo and the agreement stipulates that the Ejido expressly and voluntarily accepts the expropriation of Ejido lands by Minera Camino Rojo, in effect converting the Ejido land to fee simple private land titled to Minera Camino Rojo. In the event that the Federal agency responsible for the expropriation process, the Secretario de Desarollo Agrario Territorial y Urbano, denies the petition to cede the Ejido lands to Minera Camino Rojo, the agreement automatically converts to a 30-year temporary occupation agreement. Payments are due on a monthly basis and Minera Camino Rojo has made all required payments. This agreement is valid and expires in 2043 and covers the area of the Mineral Resource discussed in the 2021 Camino Rojo Report.
(b)Temporary Occupation Agreement (“COT”), executed on October 30, 2018 by and between Minera Camino Rojo, in its position of occupant, and Ejido San Tiburcio, as owner, with regards to a surface of 5,850 ha. This agreement allows Minera Camino Rojo to explore 5,850 ha of Ejido lands over a 5-year period. Minera Camino Rojo has made all required payments under the COT and the agreement is in good standing.

Page 27


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

(c)Collaboration and Social Responsibility Agreement (“CSRA”), executed on February 26, 2013 by and between Camino Rojo SA de CV, in its position of “collaborator”, and Ejido San Tiburcio, as “beneficiary”, with regards to certain social contributions to be provided in favour of this last CSRA. The rights and obligations of this agreement were passed to Minera Camino Rojo and the agreement stipulates that Minera Camino Rojo will contribute 10,000,000 Pesos annually to the Ejido to be used to promote and execute diverse social and economic development programs to benefit the Ejido. Additionally, at its discretion, Minera Camino Rojo will provide support for adult education, career training, business development assistance, cultural programs, and scholastic scholarships. The agreement expires when exploration or exploitation activities at the Camino Rojo Project end. Annual payments are due on the 29th of June each year. Minera Camino Rojo has made all required payments, thus this agreement is valid and remains in effect until mine closure or project cancellation.

Minera Camino Rojo signed a COT with Ejido El Berrendo on March 4, 2019 that covers 2,631 ha for a five-year period expiring on February 24, 2024. This COT requires annual payments of 2,284,787 Pesos. None of the Mineral Resources or Mineral Reserves discussed in the 2021 Camino Rojo Report, nor proposed infrastructure, is located on Ejido El Berrendo land. Minera Camino Rojo had made all required payments and the agreement is in good standing.

Minera Camino Rojo signed a COT with Ejido La Pardita on August 4, 2022 that covers 4,205 ha for a three-year period expiring on August 3, 2025. This COT requires annual payments of 3,574,250 Pesos. None of the Mineral Resources or Mineral Reserves discussed in the 2021 Camino Rojo Report, nor proposed infrastructure, is located on Ejido La Pardita land. Minera Camino Rojo had made all required payments and the agreement is in good standing.

Fresnillo controls surface rights needed for exploration and mining on the Guachichil D1 mineral concession. Pursuant to the Layback Agreement, 27.5 ha of surface rights controlled by Fresnillo has been acquired by Minera Camino Rojo to mine on a portion of the Guachichil D1 mineral concession that covers the area outside of the Orla concession required for the Project as defined in the 2021 Camino Rojo Report.

No environmental liabilities are apparent on the Camino Rojo Project property. Prior to Orla’s development of the Camino Rojo Project, the property did not contain active or historic mines or prospects, and there were no pre-existing plant facilities nor tailings piles present within the project area. All exploration work has been carried out by Minera Camino Rojo and prior operators in accordance with Mexican environmental standards and regulations. Conditional upon continued compliance, permits for normal exploration activities are expected to be readily attainable.

Exploration and mining activities in Mexico are subject to control by the federal agency of the Secretaria del Medio Ambiente y Recursos Naturales (Secretary of the Environment and Natural Resources), known by its acronym “SEMARNAT”, which has authority over the two principal Federal permits:

a Manifesto de Impacto Ambiental (Environmental Impact Statement), known by its acronym as an “MIA” accompanied by an Estudio de Riesgo (Risk Study); and
Cambio de Uso de Suelo (Change of Land Use) permit, known by its acronym as a “CUS”, supported by an Estudio Tecnico Justificativo (Technical Justification Study).

The Company submitted MIA and CUS permit applications to SEMARNAT on August 29, 2019 and August 30, 2019, respectively, for the construction and operation of an open pit mine as per the project described in the 2019 Camino Rojo Report. Federal environmental authorities approved the CUS permit in December 2019, Minera Camino Rojo made the requisite payment to the National Forestry Commission on January 23, 2020 and Minera Camino Rojo received the CUS permit on February 6, 2020, allowing mine development and operation affecting 816.25 ha. The project as described in the 2021 Camino Rojo Report will require an additional CUS permit to allow for additional surface disturbances related to development of a pit layback onto lands not considered in the August 2019 CUS

Page 28


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

permit application. Minera Camino Rojo has submitted the additional CUS permit and the review and issuance of a resolution by SEMARNAT is expected to take approximately six months.

With respect to the MIA, Minera Camino Rojo received the MIA permit on August 11, 2020, authorizing mine construction and operation of the project described in the 2019 Camino Rojo Report. The project described in the 2021 Camino Rojo Report requires a modification of the MIA permit to allow for additional production related to development of a pit layback onto lands not considered in the August 2019 permit application. Process methods and process infrastructure does not change. The MIA modification was submitted and remains under review by SEMARNAT.

Federal regulations require staged postings of a bond or financial guarantee for the estimated cost of reclamation, proportional to the pending reclamation work created by the project in each development phase, as determined by a technical economic study. On November 11, 2020, Minera Camino Rojo submitted the required first stage reclamation bond of 89.5 Mexican Pesos (approximately $4.5 million) which was accepted by the Federal Treasury, with formal notice given to the Procuraduria Federal de Proteccion al Ambiente on November 13, 2020. All MIA and CUS permit conditions were satisfied, which allowed for site activities to commence for the Project described in the 2019 Camino Rojo Report. In November 2022, the reclamation bond was renewed for $149.0 million Mexican Pesos (approximately $7.7 million). The increase related to additional disturbance from site activities during the construction phase.

Minera Camino Rojo currently has all major permits required to complete construction and operation of the project described in the 2019 Camino Rojo Report, including the permits by the Secretaría de la Defensa Nacional for the purchase, storage and use explosives in mining activities. There are no impediments to construction, mining, and processing activities for the already authorized project. Minera Camino Rojo commenced the start of earthworks on November 26, 2020. Camino Rojo achieved first gold pour on December 13, 2021 and reached commercial production effective April 1, 2022.

Approximately two-thirds of the Mineral Reserves described below are within the currently permitted mine plan. The remaining portion will require additional permits for an expanded pit, as further described above. These permits are expected to be approved in a reasonable timeline. The authors of the 2021 Camino Rojo Report believe that the permitting risk for the Camino Rojo Project is low, similar to that of any mining project of similar scope in North America.

HISTORY

The mining concessions comprising the Camino Rojo property were originally staked to the benefit of Canplats de Mexico, S.A. de C.V., a subsidiary of Canplats Resources Corporation (“Canplats”), in 2007. In 2010, Goldcorp acquired 100% of the concession rights from Canplats. Orla acquired the Camino Rojo Project from Goldcorp in 2017.

The Camino Rojo gold-silver-lead-zinc deposit was discovered in mid-2007, approximately 45 km southwest of Concepcion del Oro, and was originally entirely concealed beneath post-mineral cover in a broad, low relief alluvial valley adjacent to the western flank of the Sierra Madre Oriental. Mineralized road ballast, placed on a dirt road near San Tiburcio, Zacatecas, was traced to its source by geologists from La Cuesta International, working under contract to Canplats. A shallow pit excavated through a thin veneer of alluvium, located adjacent to a stock pond (“Represa”), was the discovery exposure of the deposit. Following a rapid program of surface pitting and trenching for geochemical samples, Canplats began concurrent programs of surface geophysics (resistivity and induced polarization “IP”) and reverse circulation (“RC”) drilling in late 2007, which continued into 2008.

The initial drilling was focused on a 450 metre (“m”) x 600 m gold in rock geochemical anomaly named the Represa zone. Core drilling began in 2008. The geophysical survey defined two principal areas of high chargeability: one centred on the Represa zone and another one km to the west named the Don Julio zone. Drilling demonstrated that the Represa and Don Julio zones are part of the same mineralized zone which crops out at Represa and plunges to the west. The elevated chargeability zones were interpreted as large volumes

Page 29


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

of sulphide mineralized rocks. Drilling by Canplats, and later drilling by Goldcorp, confirmed the presence of extensive sulphide mineralization at depth in the Represa zone, and much lower quantities of sulphide minerals at Don Julio.

By August of 2008, Canplats drilled a total of 92 RC, and 30 diamond-core holes, for a total of 23,988 and 16,044 m respectively, mainly focused in the Represa zone. The surface access and permission to continue drilling were cancelled in early August 2008, by the Ejido of San Tiburcio, Zacatecas. Nevertheless, in November 2008, Canplats published a Mineral Resource estimate for the Represa zone.

In October 2009, Canplats publicly released a PEA on the project, which is historical in nature and is no longer current and should not be relied upon.

Canplats was acquired by Goldcorp in early 2010. Validation, infill, condemnation, and expansion drilling began in January 2011. By the end of 2015, a total of 279,788 m of new core drilling in 415 drill holes and 20,569 m of new RC drilling in 96 drill holes was completed in the Represa and Don Julio zones and immediate surroundings. An additional 31,286 m of shallow rotary air blast (“RAB”) -style, RC drilling in 306 drill holes was completed, with most of the RAB drilling testing other exploration targets within the concession. Airborne gravity, magnetic and transient electromagnetic (“TEM”) surveys were also carried out, the results of which are in the archives of Minera Camino Rojo. As of the end of 2015, a total of 295,832 m in 445 diamond core holes, 44,557 m in 188 RC drill holes, and 31,286 m of RAB drilling had been completed.

Mineral Reserve and Mineral Resource tabulations for the Camino Rojo Project were publicly disclosed by Goldcorp as recently as June 2016. The methodology of Goldcorp’s Mineral Resource estimates have not been publicly disclosed and the authors of the 2021 Camino Rojo Report have not confirmed the validity of the estimates. Therefore, the Goldcorp estimates are regarded as historical estimates only and have since been replaced by the current Mineral Reserve and Mineral Resource estimates as detailed above under the heading “Summary of Mineral Reserves and Mineral Resources”.

As of the date of the 2021 Camino Rojo Report, there was no recorded mineral production from the Camino Rojo Project. For information on mineral production from the Camino Rojo Project subsequent to the 2021 Camino Rojo Report, see “Production, Outlook, and Future Plans – 2022 Production” below.

GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT TYPES

Regional, Local and Property Geology

The Camino Rojo Project deposit is located beneath a broad pediment of Tertiary and Quaternary alluvium along the boundary between the Mesa Central physiographic province and the Sierra Madre Oriental fold and thrust belt near the pre-Laramide continental-margin. Oldest rocks are Triassic metamorphic continental rocks overlain by Early to Middle Jurassic red beds. Upper Jurassic to Upper Cretaceous marine facies rocks overlie the red beds at a disconformity and comprise a package of shelf carbonate rocks comprising the Zuloaga to Cuesta del Cura Formations and the basin-filling flysch sediments of the Indidura and Caracol Formations. The deposit lies within the southern extent of the northwest striking San Tiburcio fault zone.

On the Camino Rojo Project, a gold-silver-zinc-lead deposit lies concealed below shallow (<1 m to 3 m) alluvial cover in a large pediment along the southwest border of the Sierra Madre Oriental. Small water storage pits and trenches expose a portion of the oxide deposit in the discovery area known as Represa zone. The Late Cretaceous Caracol Formation is the primary mineralization host, and at depth, the upper Indidura Formation is a minor mineralization host along the Caracol contact. The gold-silver-lead-zinc deposit is situated above, and extends down into, a zone of feldspathic hornfels developed in the sedimentary strata, and variably mineralized dacitic dikes. The mineralized zones correspond to zones of sheeted sulfidic veins and veinlet networks, creating a bulk-mineable style of gold mineralization. Skarn mineralization has been encountered in the deeper portions of the system. The observed geologic and geochemical characteristics of the gold-silver-lead-zinc deposit at Camino Rojo are consistent with those of a distal oxidized gold skarn

Page 30


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

deposit. The metal suite and style of mineralization at Camino Rojo are similar to the intrusion-related deposits in the Caracol Formation and underlying carbonate rocks adjacent to the diatremes at the Peñasquito mine.

Mineralization styles in the region include polymetallic and copper-gold skarn and limestone manto (replacement) silver-lead-zinc sulphide ores in the Concepcion del Oro District, approximately 50 km north-northeast of the Camino Rojo Project, and gold-silver-lead-zinc mineralized igneous diatreme-breccia, and sulphide-sulosalt-carbonate veinlets and fracture filings in the Caracol Formation at Newmont’s Peñasquito mine.

Mineralized Zones

The Camino Rojo deposit comprises intrusive related, clastic sedimentary strata hosted polymetallic gold, silver, arsenic, zinc, and lead mineralization.

Three stages of mineralization, including two styles of high-grade gold-silver mineralization, have been observed in the Camino Rojo deposit:

Stage 1 K-metasomatism (adularia)-pyrite – K-metasomatism with disseminated pyrite replaced the mudstone, siltstone and fine-grained sandstones in the Caracol Formation. Mineralization is typically low-grade gold with 0.1-0.4 g/t.
Stage 2 Intermediate Sulphidation (“IS”) veins – IS veins with pyrite-arsenopyrite-sphalerite±galena, calcite and minor quartz. Moderate to high grade gold (0.4 to +4.0 g/t), high zinc grades (0.5 to >2.0% Zn) and high values of As, Pb and Ba, with variable Ag.
Stage 3 LS veins – colloform banded quartz veins, drusy-coxcomb quartz veins, and quartz-cemented, polymictic hydrothermal breccia with pyrite-galena-sulphosalts, adularia and electrum. Moderate to high gold grades (2.0 to 15.0 g/t) with high silver (100 to 500 g/t), and high As and Sb values, but variable to low Zn, Pb, and Ba values.

At hand specimen scale, mineralization is controlled by bedding and fractures. The sandy and silty beds of the turbidite sequences of the Caracol Formation are preferentially mineralized, with pyrite disseminations and semi-massive stringers hosted within them, presumably due to higher syn-mineralizing fluid porosity and permeability relative to the enclosing shale beds. Basal layers of the turbiditic sandstone beds are often preferentially mineralized. Bedding discordant open space filling fractures and structurally controlled breccia zones host banded sulphide veins and sulphide matrix breccias. Some higher-grade vein and breccia zones are localized along the margins of dikes of intermediate composition. Gold-silver mineralization has been observed in drill core over vertical intervals greater than 400 m, with gold-silver mineralization occurring in a broad NE-SW trending elongate zone as much as 300 m wide and 700 m long.

Oxidation was observed to range from complete oxidation in the uppermost portions of the deposit, generally underlain or surrounded by a zone of mixed oxide and sulphide mineralization where oxidation is complete along fracture zones and within permeable strata, but lacking in the remainder of the rock, which then is generally underlain by a sulphide zone in which no oxidation is observed. Oxidation of the deposit is approximately 100%, generally extending from surface to depths of 100 m to 150 m and to depths of as much as 400 m along fracture zones. The underlying transitional zone of mixed oxide/sulphide extends over a vertical interval in excess of 100 m and is characterized by partial oxidation controlled by bedding and fractures. The sandy layers of the turbiditic sequence are preferentially oxidized, creating a stratigraphically interlayered sequence of oxide and sulphide material at the centimetre-scale, with oxidation along structures affecting all strata. Gold bearing strata of the of the Caracol Formation are preferentially oxidized and auriferous zones range from partially to completely oxidized, thus the metallurgical characteristics of mixed oxide/sulphide may vary greatly, with some material exhibiting characteristics similar to oxide material.

Page 31


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The 2021 Camino Rojo Report concludes that the distribution of mineralization at Camino Rojo is controlled by both primary bedding and discordant open space filling structures. Pervasive, near surface oxidation extends to depths in excess of 100 m and extends to greater depths along structurally controlled zones of fracturing and permeability.

Deposit Types

The observed geologic and geochemical characteristics of the gold-silver-lead-zinc deposit are consistent with those of a distal oxidized gold skarn deposit. The near surface portion of the Camino Rojo deposit has characteristics consistent with those of the distal skarn zone, transitional to epithermal mineralization, and overlies garnet bearing skarn mineralization encountered in the deeper portions of the system. Skarn deposits often exhibit predictable patterns of mineral zoning and metal zoning. Application of skarn zoning models to exploration allows for inferences about the possible lateral and depth extents of the mineralized system at the Camino Rojo deposit and can be used to guide further exploration drill programs.

EXPLORATION

The 2021 Camino Rojo Report summarizes exploration efforts by Orla through to January 11, 2021, the date of the 2021 Camino Rojo Report. See “Production, Outlook, and Future Plans” below for information on exploration activities subsequent to January 11, 2021.

Orla has conducted reconnaissance geological evaluations of portions of its mining concessions. Exploration activities completed included: geologic mapping; rock chip and soil geochemical sampling; and IP geophysical surveys. As of the effective date of the 2021 Camino Rojo Report, 695.2 line-km of IP surveys had been completed in four separate grids over the known area of mineralization, over the proposed area of infrastructure development, and to the west and south of the resource area, and over five separate grids in the Camino Rojo 5 concession. All grids were designed with 400 m line separation and stations every 100 m. Dipole spacing was selected to search for features at depths greater than 100 to 200 m. Chargeability anomalies with some similarities to the Camino Rojo deposit were identified. Three anomalies in the vicinity of the Represa zone were drill tested by nineteen RC holes totalling 5,662.5 m. No significant mineralization was encountered. Five separate IP grids in the Camino 5 claim defined several chargeability anomalies with some similarities to the Camino Rojo Project. As of the date of the 2021 Camino Rojo Report, one of the chargeability anomalies at the Las Miserias target has been drill tested by seven RC drillholes totaling 2,096.5 m. No significant mineralization was encountered.

A small orientation soil survey was conducted over the resource area and 66 soil samples were collected. Results from the survey indicate the geochemical “halo” over the deposit is tightly restricted to sub/outcrop. Anomalous gold (>0.2 g/t) is most closely associated with elevated arsenic (>100 parts per million (“ppm”)) and zinc (>300 ppm). More than 1,500 rock chip samples have been collected from throughout the mining concessions comprising the project. No significant rock chip gold anomalies were identified, but low-level anomalies were detected in the Las Miserias area, associated with a silicified breccia and a chargeability anomaly.

Regional exploration continues to field check interpreted targets, consisting of coincident historical geochemical, airborne geophysical and satellite imagery anomalies. Ten areas of alteration of sedimentary strata have been identified, and although no significant geochemical results have been returned from them to date, they are considered of interest as possible distal alteration zones to mineralized areas.

DRILLING

The drillhole database used for the Feasibility Study contains 911 drillholes and 370,566 m of drilling. During 2007 and 2008, Canplats drilled 121 holes for 39,831 m of drilling, about 11% of the drilling by metres. This was 92 RC holes and 29 core holes. Between 2011 and 2015, Goldcorp drilled 779 holes for 328,587 m of drilling. These were 95 RC holes, 306 RAB holes, and 378 core holes. The 2015 holes and some of the late 2014 holes were drilled for geotechnical investigations. Orla drilling included in the Mineral Resource

Page 32


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

estimate was conducted during 2018 and consisted of 6 RC holes for 803 m of drilling and 5 core holes for 1,345 m of drilling, totalling 11 holes and 2,148 m of drilling. There was limited non-resource drilling completed by Orla in 2018, 2019, and 2020.

The 2021 Camino Rojo Report concludes that the drilling and sampling procedures for the Camino Rojo drill samples are reasonable and adequate and there do not appear to be any drilling, sampling, or recovery factors which would materially impact the accuracy and reliability of the results that are included in the database used for the Mineral Resource estimate or the Mineral Reserve estimate.

Analytical work comparing various drilling campaigns and drilling types indicates potential down hole contamination in some of the wet Canplats RC drilling. The suspect sample intervals were not used for the resource modeling for the 2021 Camino Rojo Report. This impacted about 2,100 m, or about 5%, of the Canplats drilling.

In addition to the 11 holes drilled by Orla used in the Mineral Resource model database, through the effective date of the 2021 Camino Rojo Report, Orla completed geotechnical, metallurgical, condemnation, regional exploration, sulphide zone exploration and water exploration and development drilling totalling 21,796.02 m, as summarized in the table below. For a summary of drilling subsequent to the date of the 2021 Camino Rojo Report, see “Production, Outlook, and Future Plans” below.

Non-Resource Drilling Completed by Orla, 2018, 2019 and 2020

Purpose

    

Drillhole Type

    

Total Number of Holes

    

Total (m)

Clay Exploration

DDH

5

56.00

Condemnation

RC

7

1,767.85

Geotech Infrastructure Substrate

 

DDH

 

19

 

323.35

Geotech/Condemnation

 

DDH

 

4

 

642.00

Metallurgy

 

DDH

 

14

 

2,288.50

Infill/Sulphide Zone

 

DDH

 

3

 

1,959.70

Regional Exploration

 

RC

 

26

 

7,748.50

Monitoring Wells

 

RC/rotary

 

11

 

916.51

Water Exploration

 

RC

 

16

 

5,340.51

Water Production

 

RC/rotary

 

2

 

715.60

 

Total

 

107

 

21,758.52

The clay exploration drilling indicated that clay required for leach pad and pond construction is present but was not able to confirm adequate amounts. The condemnation holes verified that the proposed sites for project infrastructure will not impede development of Mineral Resources. The geotechnical holes provided the information necessary to determine pit slope stabilities and design criteria for the process plant, leach pad, waste dumps, and ponds, and confirmed that the proposed locations for each are suitable. Metallurgical drillholes provided material for testing. The water exploration, monitoring, and development drilling provided information needed for hydrologic modeling and indicated that wells at the project site can provide an adequate water supply to the Camino Rojo Project.

SAMPLING, ANALYSIS, AND DATA VERIFICATION

Sampling and analysis were supervised by the geological staff of Canplats for 2007 and 2008 drilling and by Goldcorp for 2011 through 2014 drilling and by Orla for 2018 drilling.

After collection in the field, the Canplats core and RC samples were transported by truck to a secure warehouse in San Tiburcio, a distance of about 5 km. After each drill core sample was split in half by sawing and bagged, the sample bags were tied shut with non-slip plastic ties. The sample bags were then moved to a locked storage area in the core logging and storage facility controlled by the company geologists. Prior to shipping, several sample bags were placed into large woven nylon ‘rice’ bags, their contents were marked

Page 33


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

on each bag, and each bag was securely sealed. The sample bags were delivered directly to the ALS Chemex assay laboratory in Guadalajara, Jalisco State, Mexico by company personnel.

During the Goldcorp tenure, samples were transported from the field to a secure warehouse and logging area in San Tiburcio, usually twice a day, morning and late afternoon. Sealed individual sample bags of sawn core were loaded into numbered rice sacks which were tied closed and placed in the secure storage building each afternoon. Once or twice a week the sealed sacks were loaded into a delivery truck operated under contract to ALS Chemex and delivered to the preparation labs.

Orla took possession of the Goldcorp facility in San Tiburcio. As of the date of the 2021 Camino Rojo Report, the core, many of the assay pulps, and the RC chip trays were stored at this facility. The facility is walled with locked gates. During the 2018 drill campaign, at the end of each drill shift, Orla personnel moved RC cutting samples and drill core to this facility. Samples for assay were packaged in shipping sacks and delivered directly to the ALS Chemex sample preparation facility in Zacatecas.

ALS Chemex was the primary assay laboratory used for the routine assaying of surface and drill samples for both the Canplats, Goldcorp, and Orla drilling/sampling programs. All the assays were done at the ALS Chemex laboratory in North Vancouver, British Columbia, certified under ISO 9001: 2000, and 2008, and accredited under ISO 17025:2005.

The Canplats samples were prepared for assaying at the ALS Chemex sample preparation laboratory in Guadalajara, Mexico. Most of the Goldcorp samples were prepared at the ALS Chemex sample preparation laboratory in Zacatecas, Mexico. However, during 2013 and 2014 samples were also sent to the ALS Chihuahua facility and the ALS Guadalajara preparation lab as well as Zacatecas facility. Orla samples were prepared at the ALS Chemex facility in Zacatecas.

Upon receipt at the sample preparation labs the samples were dried, crushed in their entirety to >70% passing a two- millimetre (“mm”) screen. The crushed material was riffle split to extract an approximate 250-gram sub-sample that was pulverized to >85% passing 75 microns in a disc pulverizer. This sample preparation procedure is the standard ALS Chemex “PREP-31” procedure. Each of the 250-gram pulps were riffle split into two sealed paper sample envelopes, with one split air-shipped to the ALS Chemex assay facility in North Vancouver. The second split was returned to the property for storage. The same sample preparation procedure was used for core and RC chips. ALS Chemex is independent of each of Canplats, Goldcorp, and Orla.

The core and RC samples collected by Canplats, Goldcorp, and Orla, as well as the surface pit and trench samples collected by Canplats, were assayed with the same analytical methods and at the same laboratory, the ALS Chemex facility in North Vancouver, British Columbia. For gold, all were assayed using the Au-AA23 30-gram fire assay fusion, with Atomic Absorption finish. A total of 33 other elements were determined four-acid sample digestion followed by Inductively Coupled Plasma Atomic Emission Spectrometry (“ICP-AES”). This is ALS Chemex method code ME-ICP61. Over-limits for gold were automatically re-assayed with 30-gram fire assay fusion with gravimetric finish (method code Au-GRA21). Over-limits for silver, copper, lead, and zinc were automatically performed by four acid digestion of the sample followed by analysis by ICP-AES. This is ALS Chemex method code ME-OG62 for material grade samples. RAB-style RC samples from 2011 to 2014 were analyzed at ALS Chemex using method code ME-MS61m, which employs the same four-acid digestion, and a combination of ICP-AES, mass-spectrometry, and cold-vapour Atomic Absorption to determine 48 elements plus mercury. Most of the RAB holes are peripheral to the main deposit area.

The Canplats quality assurance/quality control (“QA/QC”) program was based on the insertion of control samples at a target rate of 5% to the assay laboratory. A quality control sample was to be inserted randomly within every 20 consecutive samples, alternating between standard, blank or duplicate samples. The standard and blank samples were inserted into the sample sequence as the sample shipment was being readied. Duplicate samples were inserted into the sample sequence at the time of collection. The final, compiled database for 2007 and 2008 drilling included 2,165 blanks and standards, and 1,078 field duplicates. However, relatively few of the Canplats QA/QC samples (about three holes) are included in the current Camino Rojo database. IMC believes the Canplats drilling is adequately verified by the Goldcorp drilling results. Based on 5m composite there are 673 Canplats composites in 51 different holes that also have Goldcorp composites within 10m. The distributions of the gold values are comparable.

Page 34


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Goldcorp’s QA/QC program included the use of blanks, standards, and field duplicates for all drilling to monitor potential sample numbering issues and contamination during sample preparation, as well as analytical accuracy and precision. The control sample insertion rate was originally targeted at 7%, and Goldcorp personnel inserted all QA/QC samples during sample collection, prior to placing the samples in the storage area for shipment to the laboratory. A blank was inserted every 25 samples. Standards were inserted every 50 samples usually immediately following the blanks. Field duplicates were inserted every 100th sample. A total of 10,583 control samples were inserted in 2011 through 2013, for a realized control insertion rate of just below 8%.

A comprehensive compilation and review of Goldcorp’s QA/QC program determined that while adequate, the program had several aspects that could be significantly improved through a few simple and easy to implement changes including: (i) at 8% the overall insertion rate was considered low and that a higher proportion of QA/QC samples, distributed more evenly, were needed; (ii) over significant periods of time only a single standard had been used and that several standards should be used on a rotation basis; and (iii) the ¼ core duplicate could not assess variability in the regular samples properly and that the full second half of core should be used instead. Early in 2014 a new QA/QC protocol was adopted where a QA/QC material would be inserted every 10th sample for an improved insertion rate of 10%. Three standards were used in a rotation, alternating with blanks and duplicates such that every 80 samples two blanks, two ½ core duplicates, and 4 standards were inserted into the sample sequence.

The Goldcorp QA/QC samples were included in the database provided to IMC.

Orla’s QA/QC program included training of project geologists and drillers on proper sampling methods at the drill rig, field visits by the responsible Qualified Person, systematic insertion into the sample stream and assay of blank samples, standards, and duplicate samples. During the 2018 drill program, project geologists inserted blank samples into the sample stream at an interval of one blank sample every 50 samples on regular intervals. A total of 29 blanks were inserted into the sample stream and 19 of the blanks were preceded by a sample containing detectable gold. The blank sample that was immediately preceded by the highest-grade drill sample, 5.57 ppm, yielded the highest measured gold concentration of 0.16 ppm. If it is assumed that the blank samples truly are “blank” and do not contain gold above the 0.005 ppm detection limit, then these data are consistent with a slight and immaterial amount of contamination during sample preparation. Standards were inserted into the sample stream every 50 samples. Five different standards of different gold grades were used. A comparison of standard assay results from ALS Chemex to the certified assay means for the standards indicates that the assays obtained during the 2018 drilling program are reliable. Field duplicates were inserted into the sample stream at a ratio of one duplicate every 50 samples. Field duplicates were submitted blind to the laboratory, i.e. the lab could not distinguish which samples were field duplicates. A total of 31 field duplicates were analysed. The field duplicates show high variation compared to originals for both Au and Ag and 10% of rig split duplicates have greater than 60% absolute relative difference in Au assay and 47% absolute relative difference in Ag assay from originals. The variance in gold was further examined by segregating data by drilling method. Both RC and drillcore samples exhibit the same variances of Au. Preparation duplicates were inserted into the sample stream at a ratio of one duplicate every 100 samples. A total of 15 preparation duplicates were analysed. 90% of sample preparation duplicates have less than 22% absolute relative difference Au and less than 20% absolute relative difference Ag from originals. The precision demonstrated by the coarse reject duplicates is within normal ranges observed for gold deposits and the data indicates the sampling is reliable and adequate for resource estimation purposes. Assay (lab) duplicates were inserted into the sample stream at a ratio of one duplicate every 100 samples. A total of 12 lab duplicates were analysed. The pulp re-assays show low variance compared to the original assay for both Au and Ag and 90% of laboratory pulp duplicates have less than 13% absolute relative difference Au and less than 10% absolute relative difference Ag from originals. The precision demonstrated by the pulp re-assays is within normal ranges observed for gold deposits and the data indicates the sampling is reliable and adequate for resource estimation purposes. Check assays from an independent lab of the same pulp assayed by ALS Chemex have not yet been performed. Bureau Veritas (“BV”) labs has performed independent assays on a second pulp prepared by ALS Chemex and sent out for independent assay for 64 samples. BV gold assays yielded a mean 11.9% higher than the ALS Chemex assays. Because the BV assays are of a second pulp, not the same pulp assayed by ALS, no conclusions can be drawn about the repeatability of assays between the labs.

Page 35


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The 2021 Camino Rojo Report concludes that the historical sample preparation, analysis, QA/QC programs and sample security measures conducted by Canplats, Goldcorp, and Orla, all as more fully described in the 2021 Camino Rojo Report, were reasonable and adequate to ensure the reliability of the drilling database and that the respective QA/QC programs met or exceeded industry standards.

The sampling data used for the Mineral Resource estimate for the 2021 Camino Rojo Report was verified by IMC. IMC selected 20 holes at random from the Camino Rojo database and compared the database with original assay certificates The gold, silver, lead, and zinc assays in the database were compared with the certificates. The checked data amounted to about 7,623 assay intervals. A review of the RC drilling was also done, as previous reports indicated potential issues with the Canplats RC drilling and that a portion of the Canplats RC drilling that was considered wet was probably contaminated and should not be used for Mineral Resource estimates. IMC conducted a comparison of the four population sets based on pairing 5m composites. Based on a review of cross sections, most of the wet RC drilling is not in the constrained oxide pit developed for the 2021 Camino Rojo Report. Additional analysis was done with decay analysis and visual review of the assays in the holes. Based on the analysis IMC decided the assay intervals marked as wet or humid for certain drillholes are potentially contaminated and should not be used for resource modeling. This impacted about 2100m, or about 5%, of the Canplats drilling.

RGI conducted field reviews during Orla’s 2018 drill program to verify drilling and sampling techniques and drillhole collar locations. RGI reviewed: drill methods; drill core; Orla’s drill logs; Orla’s geologic and oxidation database; and Orla’s geological interpretations and model. No discrepancies, inconsistencies, or geologically implausible interpretations were noted. RGI independently evaluated the drill sample assay data, including a comparison of the project drillhole database against original assay certificates from the 2018 drill program. No unresolved discrepancies were noted.

IMC concluded that the database assay values and the drill hole database, after the deletion of the potentially contaminated RC samples, are acceptable for the purposes of preliminary economic assessments, prefeasibility, and feasibility level studies. Likewise, RGI concluded that the 2018 geologic and drillhole assay database is suitable for use in Mineral Resource and Mineral Reserve estimation and for the purposes of feasibility level studies. There were no limitations on the ability of the authors of the 2021 Camino Rojo Report to conduct the data verification procedures.

MINERAL PROCESSING AND METALLURGICAL TESTING

Historical metallurgical test work programs on the Camino Rojo property were commissioned by the prior operators of the project between 2010 and 2015. A confirmatory metallurgical test program was commissioned by Orla in 2018 to confirm the results and conclusions from the previous campaigns. In total, 107 column leach tests (85 on representative samples for the material types and pit area) and 164 bottle roll tests have been completed to date the date of the 2021 Camino Rojo Report on the Camino Rojo ore body as well as physical characterization and preliminary flotation test work.

Canplats commissioned SGS Mineral Services Minerals in Durango, Mexico to conduct bottle roll, column leach, and flotation tests in two programs on Camino Rojo drill core samples and in 2009 publicly disclosed results of 18 column leach tests, 61 bottle roll tests, and 35 flotation tests.

In 2010, Mine and Quarry Engineering Services, on behalf of Canplats, commissioned KCA to perform additional metallurgical test work based on material mineralization according to the geological and mineral interpretations at the time. Test work performed included cyanide shake tests on 569 individual samples and 16 composites, 16 column leach tests, as well as percolation and agglomeration tests.

Between 2012 and 2015, Goldcorp carried out several metallurgical programs on oxide, sulphide, and transition material. This work was performed by several different metallurgical testing groups including KCA, Blue Coast Research Metallurgy in Parksville, British Columbia, and Hazen Research in Golden, Colorado.

Page 36


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

KCA completed three separate test programs for Goldcorp between 2012 and 2015 including column leach tests, agglomeration and percolation tests, bottle roll tests and cyanide shake tests. The column tests were completed on composite samples of split core by material types and lithologies. The 2012 program included 28 column tests on 14 different composites by pit oxidation level and material type. The 2014 program included 68 direct and carbon in leach bottle leach tests on cut and broken core intervals. The 2015 program included 26 column tests on 13 different composites by lithology.

The Blue Coast Research Metallurgy program consisted of a variability study, small scale gravity tests, and a flotation flowsheet development. The variability program subjected 98 samples to small-scale bench flotation, small-scale leach testing, and small-scale gravity recovery tests. Flotation flowsheet development testing was conducted on three bulk sulphide composites: one from the Represa zone and two from the West Extension.

The Hazen Research test program included grinding, flotation, and cyanide leaching studies of sulphide and transitional material on some 112 composites.

Orla commissioned KCA in 2018 to perform confirmatory test work on the Camino Rojo ore. The Camino Rojo ore body contains three basic material types which include oxide, sulphide, and transition material. The test work included column leach and bottle roll leach tests on each of the primary ore types (Kp Oxide, Ki Oxide, Transition Hi and Transition Lo) as well as physical characterization and cyanide neutralization test work. These material types have been further defined into distinct groups beyond the basic classifications. Oxide material has been classified relative to the material’s K alteration values from ICP testing and include the Kp (pervasive) and Ki (incipient) oxides. Transition material has been classified based on oxidation level via qualitative indicators which include Transition-Hi (60 to 90% oxidized), Transition-Lo (30 to 60% oxidized), and Transition-S (Sulphide, <30% oxidized). Transition-S material is not included in the Mineral Resource for the Camino Rojo Project.

Preliminary oxidative treatment test work was conducted by KCA in 2020 to evaluate an alkaline atmospheric oxidation (“AAO”) process as a pre-treatment for heap leach materials. The AAO process is designed to oxidize sulphide material by agglomerating the material with cement and soda ash and circulating an alkaline solution through the material, along with air sparging. The alkaline solution is circulated for several weeks; the material is then rinsed with water followed by normal cyanide leaching. The preliminary AAO test program included two column leach tests on Trans-Lo material crushed to -9.5 mm (one with AAO pre-treatment and one without). The AAO pre-treated column achieved 11% higher recovery compared to the column without pre-treatment suggesting that there may be an opportunity to increase recoveries on transition and mixed sulphide material with AAO pre-treatment. Additional test work is required to confirm these results and optimize reagent requirements for the process and will need to be completed before any evaluation of potential economic benefits can be made.

Based on the metallurgical tests completed on the Camino Rojo deposit, key design parameters for the project include:

Crush size of 100% passing 38mm (P80 28mm);
Estimated gold recoveries (including 2% field deduction) of:
70% for Kp Oxide;
56% for Ki Oxide;
60% for Trans-Hi; and
40% for Trans-Lo;
Estimated silver recoveries (including 3% field deduction) of:
11% for Kp Oxide;
15% for Ki Oxide;
27% for Trans-Hi and
34% for Trans-Lo;
Design leach cycle of 80 days;

Page 37


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Agglomeration with cement not required for permeability or stability;
Average cyanide consumption of 0.35 kg/t ore;
Average lime consumption of 1.25 kg/t ore.

The key design parameters are based on a substantial number of metallurgical tests including 85 column leach tests on samples representative of domains in the current deposit model. These 85 representative samples from documented drill holes with good spatial distribution in the proposed pit include 41 columns tests on Kp Oxide material, 7 column tests on Ki Oxide material, 16 column tests on Trans-Hi material and 21 column tests on Trans-Lo material. The 22 non-representative columns were excluded based on the following criteria:

Columns on Trans-S or sulphide material that were not considered in the Mineral Reserve.
Mix of Tran-S or other material types.
Samples taken from outside of the proposed pit area.

An additional 54 bottle roll leach tests with direct correlations with the column tests have been included as part of the evaluation to support these results and conclusions.

In general, the Camino Rojo deposit shows variability in gold and silver recoveries based on material type and geological domain with preg-robbing organic carbon being the only significant deleterious element identified, which is primarily associated with the transition material at depth along the outer edges of the deposit. Recoveries for the oxide material are good and will yield acceptable results using conventional heap leaching methods with cyanide. Recoveries for the transition material are lower compared with the oxide material for conventional leaching with some areas of transition showing reasonably high recoveries. Reagent consumptions for all material types are reasonably low.

Preg robbing, a phenomenon where gold and gold-cyanide complexes are preferentially absorbed by carbonaceous, and to a lesser extent, other material within the orebody, presents a low risk to the overall project. A significant investigation by Orla into the preg robbing material indicates that potentially preg robbing material represents a small percentage of the total material to be processed and will not be encountered until later in the project life and can be mitigated by proper ore control.

MINERAL RESOURCE ESTIMATES

Subsequent to the effective date of the 2021 Camino Rojo Report, the Company completed an update of the Mineral Resource Estimate for the Camino Rojo Oxide Mine to account for depletion through mining activities as of December 31, 2022 and updated gold and silver prices and costs. See “Summary of Mineral Reserve and Mineral Resource Estimates” above.

The Mineral Resource estimate includes potential mill resources, which are sulphide dominant, and the potential heap leach resources, which are oxide dominant and were the emphasis of the 2021 Camino Rojo Report. The Mineral Resources are based on a block model developed by IMC during January and February 2019. This updated model incorporated the 2018 Orla drilling program and updated geologic models.

The gold and silver Mineral Resource includes material amenable to heap leach recovery methods (leach material) and material amenable to mill and flotation concentration methods (mill material). The resources amenable to heap leach methods are oxide dominant and were the emphasis of the updated Feasibility Study.

The lead and zinc Mineral Resources are in sulphide dominant material and are recovered along with the gold and silver in the mill material.

Page 38


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The Mineral Resources from the leach material are reported inclusive of those Mineral Resources that were converted to Mineral Reserves. The Mineral Resources from the mill material were excluded from the mine design in the 2021 Camino Rojo Report.

There are certain risks associated with the Mineral Resource estimate that investors should be aware of. Please see “Risk Factors – The Camino Rojo Project Mineral Resource estimate assumes that the Company can access mineral titles and lands that are not controlled by the Company” and “Risk Factors – Mineral Resource estimations for the Camino Rojo Project are only estimates and rely on certain assumptions”.

Except as set out herein, neither the Company nor the authors of the 2021 Camino Rojo Report believe that there are significant risks to the Mineral Resource estimates based on environmental, permitting, legal, title, taxation, socio-economic, marketing, or political factors. The Camino Rojo Project is in a jurisdiction friendly to mining. The most significant risks to the Mineral Resource are related to economic parameters such as prices lower than forecast, recoveries lower than forecast, or costs higher than the current estimates.

The Mineral Resource estimate was prepared based on the Qualified Person’s reasoned judgment, in accordance with CIM Best Practices Guidelines and his professional standards of competence, that there is a reasonable expectation that all necessary permits, agreements and approvals will be obtained and maintained, including the additional agreement with Fresnillo to allow mining of waste material on its mineral concessions. In particular, when determining the prospects for eventual economic extraction, consideration was given to industry practice, and a timeframe of 10-15 years.

MINERAL RESERVE ESTIMATES

Subsequent to the effective date of the 2021 Camino Rojo Report, the Company completed an update of the Mineral Reserve Estimate for the Camino Rojo Oxide Mine to account for depletion through mining activities through to December 31, 2022 and for updated gold and silver prices. See “Summary of Mineral Reserve and Mineral Resource Estimates” above.

The effective date of this updated Mineral Reserve estimation is December 31, 2022. The Mineral Reserve estimation is based on an open pit mine plan and mine production schedule developed by IMC. Processing is based on crushing and heap leaching to recover gold and silver. The Mineral Reserve is based on a gold price of $1,350 per ounce and a silver price of $18.00 per ounce. Measured Mineral Resource in the mine production schedule was converted to Proven Mineral Reserve and Indicated Mineral Resource in the schedule was converted to Probable Mineral Reserve.

Neither the Company nor IMC believes that there are significant risks to the Mineral Reserve estimate based on metallurgical or infrastructure factors or environmental, permitting, legal, title, taxation, socio-economic, marketing, or political factors. There has been a significant amount of metallurgical testing and the infrastructure requirements are relatively straightforward compared to many operations. However, recoveries lower than forecast would result is loss of revenue for the project. There has also been some potential preg-robbing material identified in the deposit, as discussed in the 2021 Camino Rojo Report, but this does not appear to represent a significant risk.

There is risk to the Mineral Reserve estimate based on mining factors. The slope angle assumptions are based on careful application of wall control blasting. Failure of the wall control blasting to perform as expected would result in less ore available for the process plant and potentially a shorter project life. Other risks to the Mineral Reserve estimate are related to economic parameters such as prices lower than forecast or costs higher than the current estimates. The impact of these is modeled in the sensitivity study with the economic analysis discussed below.

All of the mineralization comprised in the Mineral Reserve estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by Orla. A portion of the waste mining will be on a mineral concession controlled by Fresnillo as per the Layback Agreement. Additional work is required to bring material on the Fresnillo mineral concession to the Measured and Indicated Mineral

Page 39


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Resource categories. Therefore, in the 2021 Camino Rojo Report and in the updated Mineral Reserve estimate, all material to be mined on the Fresnillo mineral concession is considered waste.

Approximately two-thirds of the Mineral Reserves are within the currently permitted mine plan. The remaining portion will require a CUS and related permit amendments for an expanded pit.

Processing is by crushing and heap leaching at a rate of 18,900 tonnes per day or about 6.90 million tonnes per year. This is based on Orla’s budget crusher production for 2023 and is about 5% higher than the original design capacity of 18,000 tpd or 6.57 million tonnes per year.

The Mineral Reserve estimate includes allowances for mining dilution and ore loss. IMC and the Company believe that reasonable amounts of dilution and loss were incorporated into the block model used for the Mineral Reserve estimate. Compositing assays into composites and estimating blocks with multiple composites introduces some smoothing of model grades that are analogous to dilution and ore loss effects.

MINING OPERATIONS (MINING METHODS)

The Camino Rojo mine is a conventional open pit mine. Mine operations consist of drilling medium diameter blast holes (approximately 17 cm), blasting with either explosive slurries or ammonium nitrate/fuel oil (“ANFO”) depending on water conditions, and loading into large off-road trucks with hydraulic shovels and wheel loaders. Ore is delivered to the primary crusher and waste is delivered to the waste storage facility southeast of the pit. There is also a low-grade stockpile facility to store marginal resource for processing at the end of commercial pit operations. The mine plan was developed to supply ore to a conventional crushing and heap leach facility with the capacity to process 18,000 tonnes per day (“tpd”).

The mine plan is based on three mining phases. The phase 1 starter pit will target relatively high-grade Mineral Reserves in the central portion of the deposit. Phase 2 pushes the pit to final mining limits in the east and a portion of the north side. The phase 3 final pit pushes walls to final positions in the north, west and south. The final pit design is based on the results of a floating cone and Lerchs-Grossman analysis using the parameters discussed in the 2021 Camino Rojo Report.

Eventually, mining will be conducted below the water table, expected during Year 5 of commercial operation. Estimates of pit dewatering requirements have been prepared for cost estimation purposes. These are based on the median expected water in-flows.

The mine plan contained in the 2021 Camino Rojo Report was prepared on the assumption that Orla would be permitted to expand the Camino Rojo Project oxide pit onto part of Fresnillo’s mineral concession located immediately north of Orla’s property, that Orla will have access to oxide and transitional heap leachable material, and that Orla would have the right to mine from Fresnillo’s mineral concession, and recover for Orla’s account, all oxide and transitional material amenable to heap leaching that are within an expanded open pit. In the 2021 Camino Rojo Report and in the updated Mineral Reserve estimate in this AIF, all material to be mined on Fresnillo’s concession is classified as waste. Subsequent to the 2021 Camino Rojo Report, Orla acquired the surface rights associated with the layback area under the Layback Agreement with Fresnillo. See “General Development of the Business – Three Year History – Developments During 2022”.

The mine production schedule is based on processing the resource by crushing and heap leaching at a production rate of 18,000 tpd, or 6,570 kilotonnes per year, with ore production ramping up during the first three months of Year 1 so that the plant operates at full capacity from the second quarter of Year 1 through Year 8. Open pit mining is completed near the end of Year 9. Capping and reclamation of the waste storage facility is completed during Year 10, and the low-grade stockpile is reclaimed and processed by the middle of Year 11.

Page 40


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Subsequent to the date of the 2021 Camino Rojo Report, open pit mining commenced in August 2021, first gold pour occurred on December 13, 2021, and the project achieved commercial production effective April 1, 2022. See “Production, Outlook, and Future Plans” below for additional information on production at the Camino Rojo Project.

PROCESSING AND RECOVERY OPERATIONS

Test work results developed by KCA and others have indicated that the part of the Camino Rojo Mineral Resource is amenable to heap leaching for the recovery of gold and silver. Based on a Mineral Reserve of 67.4 million tonnes and established processing rate of 18,000 tpd of ore, both as set forth in the 2021 Camino Rojo Report, the project has an estimated mine life of approximately 10.4 years.

A summary of the processing design criteria as set forth in the 2021 Camino Rojo Report is presented in the following table:

Processing Design Criteria Summary

ITEM

    

DESIGN CRITERIA

Annual Tonnage Processed

6,570,000 tonnes

Crushing Production Rate

18,000 tonnes/day average

Crushing Operation

 

12 hours/shift, 2 shifts/day, 7 days/week

Crusher Availability

 

75%

Crushing Product Size

 

80% -28mm

Conveyor Stacking System Availability

 

80%

Leaching Cycle, days (Total)

 

80

Average Sodium Cyanide Consumption, kg/t

 

0.35

Average Lime Consumption, kg/t

 

1.25

Average Oxide Gold Recovery, Kp

 

70%

Average Oxide Gold Recovery, Ki

 

56%

Average Transition-Hi Gold Recovery

 

60%

Average Transition-Lo Gold Recovery

 

40%

Overall Gold Recovery

 

62%

Average Oxide Silver Recovery, Kp

 

11%

Average Oxide Silver Recovery, Ki

 

15%

Average Transition-Hi Silver Recovery

 

27%

Average Transition-Lo Silver Recovery

 

34%

Overall Silver Recovery

 

20%

Ore will be mined using standard open pit mining methods and delivered to the crushing circuit using haul trucks which will direct-dump into a dump hopper; front-end loaders will feed material to the dump hopper as needed from a run of mine (“ROM”) stockpile located near the primary crusher. Ore will be crushed to a final product size of 80% passing 28mm (100% passing 38mm) using a two-stage closed crushing circuit. The crushing circuit will operate 7 days/week, 24 hours/day with an overall estimated availability of 75%.

The crushed product will be stockpiled using a fixed stacker, reclaimed by belt feeders to a reclaim conveyor, and conveyed to the heap stacking system by an overland conveyor system. Pebble lime will be added to the reclaim conveyor belt for pH control; agglomeration with cement is not needed.

Stacked ore will be leached using a drip irrigation system for solution application; sprinkler irrigation will be used beginning in Year 5 of operations to increase evaporation rates and avoid the need for water treatment from pit dewatering. After percolating through the

Page 41


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

ore, the gold and silver bearing pregnant leach solution will drain by gravity to a pregnant solution pond where it will be collected and pumped to a Merrill-Crowe recovery plant. Pregnant solution will be pumped through clarification filter presses to remove any suspended solids before being deaerated in a vacuum tower to remove oxygen. Ultra-fine zinc dust will be added to the deaerated pregnant solution to precipitate gold and silver values, which will be collected by precipitate filter presses. Barren leach solution leaving the precipitate filter presses will flow to a barren solution tank and will then be pumped to the heap for further leaching. High strength cyanide solution will be injected into the barren solution to maintain the cyanide concentration in the leach solutions at the desired levels.

The precipitate from the Merrill-Crowe recovery plant will be processed in the refinery. Precipitate will be treated by an electric mercury retort with a fume collection system for drying and removal of mercury before being mixed with fluxes and smelted using an induction smelting furnace to produce the final doré product.

An event pond and pregnant solution pond are included to collect contact solution from storm or solution surge events. Solution collected will be returned to the process as soon as practical. Evaporators will be installed in the event pond beginning in Year 5 of operation, or as needed, to control excess solution generated by pit dewatering.

Subsequent to the date of the 2021 Camino Rojo Report, the crushing circuit at the Camino Rojo Project commenced operation in October 2021, followed by the stacking circuit in November 2021 and the Merrill-Crowe plant in December 2021. The first gold pour occurred on December 13, 2021 and commercial production was achieved effective April 1, 2022. See “Production, Outlook, and Future Plans” below for additional information on production at the Camino Rojo Project.

INFRASTRUCTURE

Access to the project site is by the paved four lane Mexican Highway 54 and Route 62, a secondary paved highway that passes through San Tiburcio. This is approximately 260 km southwest of Monterrey and 190 km northeast of Zacatecas. Mine production haulage roads include multiple branches off the main haul road from the pit, including access to the mine truck shop, waste rock dump, and low-grade stockpile. Approximately 2.6 km of haul roads exist from the top of the pit ramp to all associated haul truck destinations. Access to the project is limited to one main gate to access process and camp areas, ensuring only authorized employees, contractors, and visitors are allowed onto the property or inside the critical facilities. The entrance is staffed 24 hours a day, 7 days a week for identification control, random checks, drug and alcohol monitoring, and vehicle check-in/out.

The project infrastructure includes a one-km by 30 m air strip to allow for small passenger planes to land and take off at the project site. The air strip does not include any infrastructure or provisions for fueling or maintenance of planes or other aircraft.

The onsite operations camp consists of 112 rooms with a capacity of 176 persons.

Power supply to the Camino Rojo Project is connected to the national grid at Concepción del Oro. Overhead powerlines connect 34.5 kV, three phase and 60 Hz power system, to a metering and switching substation located nearby. Power from the main substation is distributed at 34.5 kV. Emergency power generators supply electric power to critical process equipment, the mine camp, and the raw water pumping system. Internet and limited cellular communications are currently available, though these systems will be expanded for operations.

Total project water supply is sourced from production wells located within the property boundary. Total water consumption for the project will average 24 liters per second (“L/s”) with a peak water demand of 33 L/s. A production well has been drilled approximately 2.7 km from the raw water tank.

Pumping from production wells will likely be reduced commensurate with the amount of additional produced water from dewatering operations that will eventually replace the pumping. This is anticipated to begin in Year 5 of operations. The dewatering volume is

Page 42


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

expected to increase with pit depth and may eventually exceed the water demands for process and mine operations. The excess water from dewatering operations will likely require either evaporation by additional dust control or mechanical evaporators, or disposal by other methods.

Project buildings are primarily prefabricated steel buildings or concrete masonry unit buildings and include an administration building, mine camp facilities, a Merrill-Crowe Process Facility, refinery, laboratory, process maintenance workshop, reagent storage building, mine truck shop, contractor mine office building, light duty truck shop, fuel stations, warehouse, explosives magazine, guard house, and medical clinic.

Additional infrastructure for the Camino Rojo Project includes an-exploration office, core preparation, and storage facility located in San Tiburcio. Dirt and gravel roads throughout the project site provide access to the Company’s concessions.

ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT

Baseline environmental studies required for mine permitting were commissioned by Orla in April 2018 and were completed in May 2019 by independent consultants. The project area includes five flora species with legally protected status and nine fauna species that are listed as threatened or protected. In accordance with federal laws, 100% of the protected plants will be rescued and transplanted prior to construction and qualified biologists will survey the areas to be disturbed to identify nesting areas, dens and lairs of animals present. Any animals not naturally prone to leave the area that are found will be relocated to suitable habitats elsewhere in the property area. Current and ongoing environmental investigations are still in progress.

A key objective of the Company is to design, build and operate the Camino Rojo Project in such a way that it does not cause significant adverse effects during construction, operation, closure, and post-closure. To aid this objective, a number of environmental management plans were developed prior to the start of construction. Reclamation will be undertaken during mining activities where possible, but the majority of work will occur after the completion of mining and final gold recovery. The reclamation land use objective will be to return the land to its traditional use as a grazing area for goats and wildlife habitat. Closure objectives include securing the site to assure physical safety of people, protecting wildlife, protecting surface and groundwater quality and quantity, minimizing erosion, and controlling fugitive dust. Closure activities are discussed in the 2021 Camino Rojo Report. After the completion of final closure, the site will require regular maintenance for the first approximately 10 years post-closure or until there is no further signs of changing conditions, including physical, geochemical, and biological monitoring and maintenance and surplus water management. Costs for concurrent reclamation and closure have been estimated at $28.6 million over the life of the project (in addition to $7.6 million for G&A costs during closure activities). These costs are in addition to any reclamation and closure costs considered in the normal operating and sustaining cost estimates.

In April 2018, Orla commissioned Environmental Resources Management (“ERM”), a global provider of environmental, health, safety, risk, social consulting, and sustainability related services group to conduct an independent assessment of social and community impacts of the development of the Camino Rojo Project, and to provide guidance on actions and policies needed to ensure that Orla obtains and maintains social license to operate. The study was completed in May 2019, updated internally during 2022 and salient results are being incorporated into the project development and permitting plans. ERM identified the principal social and community impacts of the project and opined that the project does not put at risk the social environment of the nearby communities because the impacts can be mitigated or made positive with the implementation of a Social Management System (“SMS”). ERM has designed this SMS based on International Association of Impact Assessment best practices.

See “Project Description, Location, and Access” above for additional information on permitting at Camino Rojo.

Page 43


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

CAPITAL AND OPERATING COST ESTIMATES

Capital and operating costs for the process and general administration components of the Camino Rojo Project were estimated by KCA with cost information based on firm vendor quotes and committed costs for construction provided by Orla. Costs for the mining components were provided by IMC. Estimated costs are considered to have an accuracy of +/-15%.

Capital Cost Estimates

The total life of mine (“LOM”) capital cost for the Camino Rojo Project as set forth in the 2021 Camino Rojo Report is $167.5 million, including $9.8 million in working capital and not including reclamation and closure costs which are estimated at $28.6 million, value added tax (“IVA”) or other taxes. A total contingency of $13.8 million or approximately 10% of the total LOM capital costs is included. IVA is applied to all capital costs at 16% and is assumed to be fully refundable within one calendar year.

The following table presents the capital cost requirements for the Camino Rojo Project as set forth in the 2021 Camino Rojo Report:

Capital Cost Summary

Description

    

Cost ($)

Pre-Production Capital

$

134,056,000

Working Capital and Initial Fills

$

9,845,000

Sustaining Capital – Mine and Process

$

23,565,000

TOTAL (excluding IVA)

$

167,467,000

The 2021 Camino Rojo Report estimated total pre-production capital costs for the Camino Rojo Project at $143.9 million, including all process equipment and infrastructure, construction indirect costs, mine contractor mobilization and working capital. Where prices were quoted in Mexican Pesos and an exchange rate of 19.3 Mexican Pesos = $1.00 was used.

Camino Rojo achieved commercial production effective April 1, 2022, with total pre-production capital costs of $130.1 million (exclusive of VAT).

Operating Cost Estimates

The average LOM operating cost for the Camino Rojo Project is $8.17 per tonne of ore processed. The following table presents the LOM operating cost requirements for the Camino Rojo Project as set forth in the Camino Rojo Report.

Operating Cost Summary

Description

    

LOM Cost ($/t)

Mine

$

3.37

Process and Support Services

$

3.20

Site G&A

$

1.60

TOTAL

$

8.17

Mining costs were provided by IMC at $1.77 per tonne (excluding pre-production tonnes, which are considered in the capital cost estimate) mined (LOM $3.37 per tonne of ore processed) and are based on updated quotes for contract mining with estimated owner’s mining costs.

Page 44


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Process operating costs have been estimated by KCA from first principles. Labour costs were estimated using project specific staffing, salary and wage and benefit requirements. Unit consumptions of materials, supplies, power, water and delivered supply costs were also estimated. LOM average processing costs are estimated at $3.20 per tonne ore.

G&A costs have been estimated by KCA with input from Orla. G&A costs include project specific labour and salary requirements and operating expenses, including social contributions, land access and water rights. G&A costs are estimated at $1.60 per tonne ore.

Mining costs were estimated based on updated firm proposals during the current EPCM work. Updated costs were received in the 3rd and 4th quarters of 2020 and are presented with no added contingency based upon the design and operating criteria present in the 2021 Camino Rojo Report. IVA is not included in the operating cost estimate.

The operating costs presented are based upon the ownership of all process production equipment and site facilities, including the onsite laboratory. The owner will employ and direct all process operations, maintenance and support personnel for all site activities.

Operating costs estimates have been based upon information obtained from the following sources: contractor mining quotes and owner mining costs from IMC; G&A costs estimated by KCA with input from Orla; project metallurgical test work and process engineering; supplier quotes for reagents and fuel; recent KCA project file data; and experience of KCA staff with other similar operations. Where specific data do not exist, cost allowances have been based upon consumption and operating requirements from other similar properties for which reliable data exist. Freight costs have been estimated where delivered prices were not available.

Total mine operating cost during commercial production is estimated at $226.7 million.

Detailed costs for each discipline are included in the 2021 Camino Rojo Report. For additional information on operating costs since the start of production at Camino Rojo, please refer to the Company’s management’s discussion and analysis for the financial year ended December 31, 2022.

ECONOMIC ANALYSIS

Based on the estimated production parameters, capital costs, and operating costs, a cash flow model was prepared for the economic analysis of the Camino Rojo Project. The project economics detailed in the 2021 Camino Rojo Report are based solely on the project itself and do not consider any potential mineralization extracted from Fresnillo’s mineral concession as this material was treated as waste materials for the purpose of the 2021 Camino Rojo Report.

The project economics were evaluated using a discounted cash flow method, which measures the net present value (“NPV”) of future cash flow streams. At the time of writing the 2021 Camino Rojo Report, construction activities for the Camino Rojo Project were in progress. All costs related to project development were included in the pre-production capital estimate, including those already spent as of the date of the 2021 Camino Rojo Report. Capital already spent was included in the Year-1 totals but were not discounted. This gives the best estimate of the project NPV and IRR as of the date of the 2021 Camino Rojo Report.

Page 45


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

A summary of the key economic parameters as set forth in the 2021 Camion Rojo Report is shown in the following table:

Key Economic Parameters

Item

    

Value

    

Units

Gold Price

 

1,600

$/oz

Silver Price

 

20

$/oz

Gold Avg. Recovery

 

62

%

Silver Avg. Recovery

 

20

%

Treatment Rate

 

18,000

tpd

Refining and Transportation Cost, gold

 

1.40

$/oz

Refining and Transportation Cost, gold

 

1.20

$/oz

Payable Factor, gold

 

99.9

%

Payable Factor, silver

 

98.0

%

Annual Produced Gold, Avg.

 

94,000

oz

Annual Produced Silver, Avg.

 

597,000

oz

Income and Corporate Tax Rate

 

30

%

Special Mining Tax Rate

 

7.5

%

Royalties:

 

  

Mine Claim

 

2.0

%

Extraordinary Mining Duty

 

0.5

%

Page 46


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Economic Analysis Summary

Production Data

    

Life of Mine

 

10.4 Years

Mine Throughput per day

 

18,000 Tonnes Ore/day

Mine Throughput per year

 

6,570,000 Tonnes Ore/year

Total Tonnes to Crusher

 

67,363,000 Tonnes Ore

Grade Gold (Avg.)

 

0.73 g/t

Grade Silver (Avg.)

 

14.55 g/t

Contained Gold oz

 

1,588,000 ounces

Contained Silver oz

 

31,506,000 ounces

Metallurgical Recovery Gold (Overall)

 

62% 

Metallurgical Recovery Silver (Overall)

 

20%

Average Annual Gold Production

 

94,000 ounces

Average Annual Silver Production

 

597,000 ounces

Total Gold Produced

 

980,000 ounces

Total Silver Produced

 

6,189,000 ounces

LOM Strip Ratio (W:O)

 

0.92

Operating Costs (Average LOM)

 

  

Mining (including preproduction tonnes)

$1.75/tonne mined

Mining (processed)

$3.37/tonne ore processed

Processing & Support

$3.20/tonne ore processed

G&A

$1.60/tonne ore processed

Total Operating Cost

$8.17/tonne ore processed

Total By-Product Cash Cost(1)

$490/ounce gold

All-in Sustaining Cost (AISC)(1)

$543/ounce gold

Capital Costs (Excluding IVA and Closure)

  

Initial Capital

$134 Million

LOM Sustaining Capital

$24 Million

Total LOM Capital

$158 million

Working Capital and Initial Fills

$10 Million

Closure Costs

$29 Million

Financial Analysis

  

Gold Price Assumption

$1,600/ounce

Silver Price Assumption

$20/ounce

Average Annual Cashflow (Pre-Tax)

$106 million

Average Annual Cashflow (After-Tax)

$79 million

Internal Rate of Return (IRR), Pre-Tax

82.4%

Internal Rate of Return (IRR), After-Tax

61.8%

NPV @ 5% -(Pre-Tax)

$668 million

NPV @ 5% -(After-Tax)

$452 million

Pay-Back Period (Years based on After-Tax)

1.5 years


Page 47


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Notes:

(1)Total cash cost and AISC are non-GAAP measures and are net of silver credits and includes royalties payable. See “Introductory Notes and Cautionary Statements – Non-GAAP Measures” for additional information.

Sensitivity

To estimate the relative economic strength of the Camino Rojo Project, base case sensitivity analyses were completed analyzing the economic sensitivity to several parameters including changes in gold price, capital costs, average operating cash cost per tonne of ore processed, and exchange rate. The sensitivities are based on +/- 25% of the base case for capital costs, operating costs, and exchange rate and select gold prices, ranging from $1,250 per ounce to $1,950 per ounce. Variation in gold price has the largest influence on the sensitivity of the Camino Rojo Project. From these sensitivities it can be seen that the Camino Rojo Project is economically robust.

The economic indicators chosen for sensitivity evaluation are the IRR and NPV at 5% and 10% discount rates.

After-Tax Sensitivity Analysis Results

    

NPV

    

Variation

    

IRR

    

5%

    

10%

Gold Price

 

  

 

  

 

  

 

  

$

1,250

 

44.4

%  

$

287,625,123

$

201,282,921

$

1,425

 

53.3

%  

$

369,731,522

$

264,885,795

100%  

$

1,600

 

61.8

%  

$

451,837,920

$

328,488,669

$

1,775

 

70.0

%  

$

533,944,319

$

392,091,544

$

1,950

 

78.1

%  

$

616,050,718

$

455,694,418

Capital Costs

75%  

$

149,258,295

 

80.3

%  

$

477,297,593

$

354,437,261

90%  

$

171,424,694

 

68.1

%  

$

462,021,789

$

338,868,106

100%  

$

186,202,293

 

61.8

%  

$

451,837,920

$

328,488,669

110%  

$

200,979,892

 

56.5

%  

$

441,654,051

$

318,109,233

125%  

$

223,146,291

 

49.9

%  

$

426,378,248

$

302,540,078

Operating Costs

75%  

$

412,732,587

 

67.5

%  

$

517,769,533

$

378,081,236

90%  

$

495,279,104

 

64.1

%  

$

478,210,566

$

348,325,696

100%  

$

550,310,116

 

61.8

%  

$

451,837,920

$

328,488,669

110%  

$

605,341,128

 

59.5

%  

$

425,465,275

$

308,651,643

125%  

$

687,887,645

 

55.9

%  

$

385,906,308

$

278,896,103

Exchange Rate

 

  

 

  

 

  

 

  

75%  

 

14.475

 

58.9

%  

$

441,864,790

$

320,238,383

90%  

 

17.37

 

60.8

%  

$

448,512,634

$

325,737,640

100%  

 

19.30

 

61.8

%  

$

451,837,920

$

328,488,669

110%  

 

21.23

 

62.7

%  

$

454,557,049

$

330,737,925

125%  

 

24.125

 

63.7

%  

$

457,821,959

$

333,439,033

Page 48


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

PRODUCTION, OUTLOOK, AND FUTURE PLANS

Since January 11, 2021, the effective date of the 2021 Camino Rojo Report, efforts on the Camino Rojo Project have focussed on bringing the mine as outlined in the Feasibility Study to production. Earthworks and equipment deliveries at Camino Rojo commenced in November 2020. On December 13, 2021, the Company achieved first gold pour and commercial production was achieved effective April 1, 2022.

2021 Exploration

In addition to the Camino Rojo sulphide zone directional diamond drilling program (started in Q4 2020) that was completed in early April 2021 (4,119 metres drilled in 2021, of the 2020-21 program totaling 6,079m), the Camino Rojo regional exploration program continued in 2021 and included geophysical airborne (drone) magnetic survey (approximately 319 square km), rotary air blast (“RAB”) reconnaissance drilling as well as soil geochemical sampling and mechanical trenching. In addition, a geophysical IP (induced polarization) survey totaling 85.7 line-km has been completed. This target definition work led to the definition of exploration targets to the north-east and south-west of the Camino Rojo deposit as well as over an area located 3 km to the south.

2022 Exploration

Near-mine exploration continued in 2022 and consisted of directional diamond drilling at the Camino Rojo sulphide zone (9,174 m drilled) as well as conventional diamond drilling to test for near-pit oxide mineralization extension (3,093 m drilled). Drilling at the Camino Rojo sulphide zone has continued to confirm the continuity of wider, higher-grade (>2 g/t) gold mineralization and better defined the geological controls on gold mineralization. Near-pit oxide extension drilling has indicated potential for additional oxide material near the current ultimate pit boundaries.

Regional exploration also continued in 2022. The regional exploration program included geophysical airborne (drone) magnetic survey (approximately 271 square km), induced polarization survey (approximately 125 line-km), and RAB, RC, and diamond drill core drilling of priority exploration targets to the northeast and southwest of the Camino Rojo Oxide Mine deposit.

Planned 2023 Exploration

Exploration activities in Mexico will continue throughout 2023, with near-mine and regional exploration being performed with the goal of increasing oxide reserves, advancing the sulphide deposit development scenario options, and drill testing priority regional exploration targets defined in 2021 and 2022 to discover new satellite deposits. In addition to drill testing regional targets, target definition work consisting of airborne magnetic (drone) survey, soil and rock geochemical sampling, and IP survey will be extended over additional parts of the Camino Rojo Project.

2021 - 2022 Production

In 2021, 2,422 ounces of gold were produced by the Company following the first gold pour on December 13, 2021. In 2022, the Company produced 109,596 ounces of gold, with an average mining rate of 18,251 tpd. The average grade mined, excluding low grade material that was stockpiled, was 0.82 g/t of gold during the year. For additional information, see the heading “Discussion of Operations – Camino Rojo Operational Update” in the Company’s management’s discussion and analysis for the financial year ended December 31, 2022.

Page 49


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

THE SOUTH RAILROAD PROJECT

The following disclosure relating to the South Railroad Project has been derived, in part, from the technical report , entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” dated March 14, 2022, with an effective date of February 23, 2022 (the “South Railroad Report”), prepared by Matthew Sletten, PE, of M3 Engineering & Technology Corp. (“M3”), Benjamin Bermudez, PE, of M3; Art S. Ibrado, PE, of Fort Lowell Consulting PLLC; Michael S. Lindholm, CPG, of RESPEC; Thomas Dyer, PE, of RESPEC; Jordan Anderson, QP RM-SME, of RESPEC; Gary L. Simmons, QP-MMSA, of GL Simmons Consulting, LLC; Richard DeLong, QP-MMSA, RG, PGm of EM Strategies; and Kevin Lutes, PE, of NewFields Mining Design & Technical Services, each of whom is independent of the Company and a qualified person under NI 43-101.

The South Railroad Report was prepared for Gold Standard. Following the Company’s acquisition of Gold Standard, the Company filed the technical report under its profile on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. Reference should be made to the full text of the South Railroad Report, as it contains additional assumptions, qualifications, references, reliances, and procedures that are not fully described herein.

PROPERTY DESCRIPTION, LOCATION, AND ACCESS

The South Railroad Project is situated on the Railroad-Pinion property, which comprises two contiguous areas of mineral tenure held by the Company that straddle the Piñon Range in the Railroad mining district at the southeast end of the Carlin trend, a northwest-southeast trending belt of prolific gold endowment in northern Nevada. In previous technical reports, the northern portion of the land holdings, now referred to as the North Railroad portion of the property, has been referred to as the Railroad project and the Railroad property. The southern portion of the Railroad-Pinion property, now referred to as the South Railroad portion of the property, was referred to as the Pinion project and the Pinion property in previous technical reports. In November 2017, Gold Standard published a technical report on the Railroad-Pinion property, which included a mineral resource estimate for the North Bullion, POD, and Sweet Hollow gold deposits, located in the North Railroad portion of the Railroad-Pinion property, approximately 6 miles north of the Dark Star and Pinion deposits. Based on available information, North Bullion, POD, and Sweet Hollow would not likely share a common mining infrastructure with Dark Star and Pinion.

The Railroad-Pinion property in the Piñon Range is accessed primarily from the four-lane transcontinental U.S. Interstate 80 (“I-80”), approximately 275 miles west of Salt Lake City, Utah, and 290 miles east of Reno, Nevada. The project is located between 8 and 18 miles south of I-80 and can be reached by a series of paved and gravel roads from Elko, Nevada (population 18,300). The property is centered approximately at UTM NAD27 Zone 11 coordinates of 585,000E and 4,480,000N.

The North and South Railroad portions of the Railroad-Pinion property constitute a combined land position totaling 53,570 acres, and with partial interests taken into consideration, 50,600 acres net acres of land in Elko County, Nevada. The Company owns, or otherwise controls 100% of the subsurface mineral rights on a total of 29,942 acres of land held as patented and unpatented lode claims. This includes 1,455 unpatented claims owned by the Company and 207 unpatented claims held under lease. The Company also owns or leases 30 patented claims. There is also a total of 23,628 gross acres of private lands of which the Company’s ownership of the subsurface mineral rights varies from 49.2% to 100%, for a net position of approximately 20,658 gross acres.

Private surface and private mineral property are wholly owned and subject to lease agreement payments and property taxes (paid on an annual basis) as determined by Elko County. Unpatented lode mining claims grant the holder 100% of the locatable mineral rights and access to the surface for exploration activities which cause insignificant surface disturbance. Ownership of the unpatented mining claims is in the name of the holder (locator), subject to the paramount title of the United States of America, under the administration of the United States Bureau of Land Management (the “BLM”). Under the Mining Law of 1872, which governs the location of unpatented mining claims on federal lands, the locator has the right to explore, develop, and mine minerals on unpatented mining claims without payments of production royalties to the U.S. government, subject to the surface management regulation of the BLM. Currently, annual claim-maintenance fees are the only federal payments related to unpatented mining claims. The mineral rights do not expire if the

Page 50


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

unpatented claims are maintained by paying an annual fee of $165 per claim to the U.S. Department of Interior, BLM prior to the end of the business day on August 31 every year. A notice of intent to hold must also be filed with the Elko County Recorder on or before November 1 annually, along with a filing fee of $12.00 per claim, plus a $4.00 document fee.

The Company has completed its federal claim maintenance fee obligations for the owned and leased unpatented claims for the 2022-2023 assessment year. As of the date of this AIF, the Company’s estimated claim maintenance fee cost for 2023 for the owned and leased unpatented claims is $294,414 per annum, and the company’s total estimated annual cost to maintain its property package is $1,614,916.

Portions of the unpatented and private lands are encumbered with royalties predominantly in the form of standard Net (or Gross) Smelter Return (“NSR” or “GSR”) and Mineral Production (“MP”) royalty agreements, or Net Profit Interest (“NPI”) agreements, ranging from 1% to 5%. Additional details as well as the locations and aerial distribution of the currently relevant royalty encumbrances for the South Railroad Project are set forth in Section 4.2 of the South Railroad Report.

As of the effective date of the South Railroad Report, the authors thereof were not aware of any significant factors or risks that may affect access, title, or the right or ability to perform work on the property. The Company controls sufficient ground and has sufficient permitting in place to access the project and continue future exploration programs. See “Environment and Permitting” below for additional information.

HISTORY

The Railroad–Pinion property is being explored on an ongoing basis by the Company using geological mapping, geochemical and geophysical surveying, and drilling. Exploration work by Gold Standard commenced in 2010 and resulted in the identification of 17 prospect areas or zones of mineralization within the property.

Twenty-one different historical operators are known to have drilled 1,084 holes, for a total of 500,544.1 ft, from 1969 through 2008. As of the database effective dates of the South Railroad Report, Gold Standard had drilled 1,121 holes for a total of 953,112 ft. At least 80% of all drilling used RC methods. However, the amount of RC drilling may be understated because the hole-types are not known for a substantial number of holes drilled in the late 1980s and 1990s, when RC drilling was common. See “Drilling” below for additional information on historic drilling.

Several historical mineral resource estimates have been estimated by a variety of companies for the Pinion, Dark Star, and POD deposits. These historical mineral resources are superseded by the current mineral resources presented under the heading “Summary of Mineral Reserves and Mineral Resources” above. See Section 6 of the South Railroad Report for additional information on historical estimates on the South Railroad Project.

The North Railroad portion of the property covers the historic Railroad district. Sources cited in the South Railroad Report suggested that historic production records for the district are not very reliable for the period between 1869 and 1905. Only the total volumes of tons mined, and commodity produced were reported, if they were reported. These sources estimated the total value of production through 1956 to be worth $2 million using the value of the commodity produced for the year it was produced. A reported 43,940 total tons of ore were mined with mineral production distributed as follows:

Gold - 6,918 ounces
Silver - 382,000 ounces
Copper - 2,850,000 pounds
Lead - 4,340,000 pounds
Zinc - 372,000 pounds

Page 51


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

There has been no mineral production reported for the South Railroad portion of the property.

See “Outlook and Future Plans” below for additional information on Gold Standard and the Company’s activities on the property after the date of the South Railroad Report.

GEOLOGICAL SETTING, MINERALIZATION AND DEPOSIT TYPES

The South Railroad Project is located in the southern portion of the Carlin trend, centered on the Railroad dome in the Piñon Range, which is comprised of Ordovician through Permian marine sedimentary rocks. Eastern assemblage formations throughout the property include the Pogonip, Hanson Creek, Eureka Quartzite, Lone Mountain Dolomite, Oxyoke, Beacon Peak, Sentinel Mountain Dolomite, and Devils Gate Limestone and Tripon Pass formations. Siliceous clastic units include those of the Webb, Chainman, and Tonka formations. The north-south-striking Bullion fault corridor separates Tertiary volcanic rocks to the east from the Paleozoic sedimentary units in the range, which have been intruded by a complex of Eocene igneous rocks centered south of Bald Mountain, in the core and east flank of the range.

The gold-silver deposits within the South Railroad Project that are the focus of the South Railroad Report are considered to be Carlin-type, sedimentary-rock-hosted deposits. Precious metal mineralization is generally submicroscopic, disseminated, and hosted principally in sedimentary rocks, with some mineralization in felsic dikes and sills as well.

In the South Railroad portion of the property, the Dark Star Main and Dark Star North zones, which comprise the Dark Star deposit are hosted primarily within Pennsylvanian-Permian rocks, with minor amounts of gold mineralization found in the Chainman Formation and Tertiary conglomerates. The deposits are centered along the roughly north-south Dark Star fault corridor, within which is a horst block and associated silicified zone bounded by the West fault and Dark Star fault. Gold mineralization in the horst block is hosted in the middle, coarse-grained conglomeratic and bioclastic limestone-bearing unit of a Pennsylvanian-Permian undifferentiated sequence interpreted to be equivalent to the Tomera Formation. Mineralization dips steeply to the west near the surface at Dark Star Main and Dark Star North, but dips less steeply at depth at Dark Star Main.

Also, in the South Railroad portion of the property, the Pinion deposit is situated in a sequence of Paleozoic sedimentary rocks exposed within large horst blocks in which the sedimentary rocks have been broadly folded into a south- to southeastward-plunging, asymmetric anticline. The axis of this Pinion anticline trends approximately N50ºW to N60ºW and can be traced for approximately 2.0 mi (3.2 km). The limbs of the anticline dip shallowly at 10° to 25° to the west, and more steeply at 35° to 50° to the east. Disseminated gold and silver mineralization at the Pinion deposit is strongly controlled by a 10 ft to 400 ft-thick (3 m to 120 m-thick) dissolution-collapse breccia at the contact between calcarenite of the Devils Gate Limestone and the overlying silty micrite of the Tripon Pass Formation. Gold deposition was contemporaneous with breccia development, quartz veins formation, silica ± barite replacement, and infill of open spaces.

The Jasperoid Wash disseminated gold deposit, also located in the South Railroad portion of the property, is hosted by altered Tertiary feldspar porphyry dikes and their host Pennsylvanian-Permian conglomeratic rocks of a Tomera Formation equivalent. The deposit has approximate extents of 4,600 ft (1,400 m) to the north and a width of about 3,600 ft (1,100 m), and is partially contained within an elongate, north to south, steeply dipping structural corridor. Drilling shows the deposit dips steeply to the west nearby and within Tertiary dikes; east of the dikes, the deposit dips gently to the west. The gold is Inferred to be submicroscopic in grain size, however, petrographic studies have yet to be performed.

In the North Railroad portion of the property, disseminated gold mineralization has been defined by drilling in the North Bullion, POD, and Sweet Hollow zones. The mineralization is focused in the footwall of the Bullion fault zone. Faults appear to be important controls on mineralization. In general, gold-silver mineralization is localized in gently to moderately dipping, strongly sheared rocks of the Webb and Tripon Pass formations, in dissolution-collapse breccia developed above and within silty micrite of the Tripon Pass Formation, and calcarenite of the Devils Gate Limestone. The top of gold mineralization varies from 350 ft to 1,300 ft (105 m to 400 m) below the

Page 52


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

surface and varies in dip from 10° to 45° to the east. Gold is associated with “sooty” sulfide minerals, silica, carbon, clay, barite, realgar, and orpiment.

EXPLORATION

The South Railroad Report summarizes exploration efforts by Gold Standard through to February 23, 2022, the date of the South Railroad Report. See “Outlook and Future Plans” below for information on exploration activities completed by Gold Standard and Orla subsequent to such date.

The Railroad–Pinion property was explored on an ongoing basis by Gold Standard using geological mapping, geochemical and geophysical surveying, and drilling. Prior to 2015, exploration activities by Gold Standard were focused in the North Railroad portion of the property. Work completed in 2015 was largely focused on the Pinion area in the South Railroad portion of the property, after its acquisition in 2014. A thorough discussion of these work programs and their results and interpretations is available in previous technical reports on the property.

Exploration work by Gold Standard since 2010 resulted in the identification of 17 prospect areas or zones of mineralization within the overall property position, including the Bald Mountain area and North Bullion deposits in the North Railroad-Pinion portion of the property, the Pinion, Dark Star, and Jasperoid Wash deposits, and other areas of the South Railroad portion of the property. Drilling conducted by Gold Standard is summarized below and in Section 10 of the South Railroad Report.

DRILLING

MDA/RESPEC received from Gold Standard on October 4, 2021, a summary of all drilling conducted within the property during 2018 through 2021. This data was used to update the property-wide drilling information summarized in the 2020 technical report for the property (Ibrado et al. (2020)). In total, there are records from a total of 1,453,656 ft drilled in 2,205 holes since drilling commenced in 1969. These totals exclude two holes for which MDA/RESPEC has collar locations, but no depths drilled, hole type, company or assays. Twenty-one different historical operators are known to have drilled 1,084 holes, for a total of 500,544 ft, from 1969 through 2008. As of September 21, 2021, Gold Standard had drilled 1,121 holes for a total of 953,112 ft, as set forth in the table below. This includes 16 holes for 12,140 ft drilled in the Pinion area after the June 2, 2021 effective date of the Pinion resource database; five holes for 1,220 ft drilled in the Dark Star area after the June 15, 2021 effective date of the Dark Star resource database; and 38 holes for 12,409 ft drilled in the North Bullion area after the August 21, 2020 effective date of the North Bullion resource database. The drilling was done using Imperial units of measure.

Approximately 81% of the holes have records to indicate they were drilled with RC methods. There is a total of 33,357 ft drilled in 88 historical holes for which MDA/RESPEC had no reliable information on the type of hole or drilling methods used. The authors of the South Railroad Report believed the amount of RC drilling may be understated because the historical holes with no hole-type attribute were drilled in the late 1980s and 1990s when RC drilling was common.

Page 53


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

All Railroad-Pinion Drilling 1969 – 2021

    

    

    

    

    

RC + 

    

RC + 

    

    

    

    

Rotary 

Rotary 

Core Tail 

Core Tail

Unknown

Unknown 

Period

& RC Holes

& RC (ft)

Core Holes

Core (ft)

Holes

 (ft)

 Type Holes

Type (ft)

Total Holes

Total (ft)

Historical Drilling 1969 - 2008

938

432,591

58

34,595

88

33,357

1,084

500,544

  

  

Gold Standard 2010 - 2021

847

667,707

233

217,607

41

67,798

1,121

953,112

  

  

Totals

 

1,785

 

1,100,298

 

291

 

252,202

 

41

 

67,798

 

88

 

33,357

 

2,205

 

1,453,656

See Section 10 of the South Railroad Report for additional information on drilling conducted at the Railroad-Pinion property and “Outlook and Future Plans” below for information on drilling activities completed by Gold Standard and Orla subsequent to the effective date of the South Railroad Report.

SAMPLING, ANALYSIS AND DATA VERIFICATION

Sampling and Analysis – North Railroad

Commencing in 2010, drilling company employees collected Gold Standard’s RC samples at the rig. Those samples were then picked up at the drill sites by representatives of ALS Minerals (“ALS”) or Inspectorate America Corporation (“Inspectorate”), a division of Bureau Veritas Mineral Laboratories USA (“Bureau Veritas”) and transported by truck to their respective laboratories in either Elko or Reno, Nevada (for ALS), or Elko (for Bureau Veritas). Excessively wet samples were kept at the drill sites for a few days to drain and dry prior to collection by the laboratory staff.

ALS and Bureau Veritas were commercial laboratories independent of Gold Standard. ALS is accredited through the International Organization for Standardization/International Electrotechnical Commission (“ISO/IEC”) 17025:2005 for specific analytical procedures, while most of their laboratories have attained ISO 9001:2008 certification. Bureau Veritas’ laboratories in Sparks, Nevada is accredited to the standard ISO/IEC 17025:2017, RG- MINERAL:2017. The Bureau Veritas laboratory in Vancouver, British Columbia is accredited to the standard ISO/IEC 17025:2005 and ISO 9001:2008.

Core samples were transported daily from the drill sites to Gold Standard’s logging and core-cutting facility in Elko by Gold Standard personnel. After logging and marking core-sample intervals by Gold Standard geologists, the core was photographed prior to being sawed lengthwise by contractor technicians. Whole HQ-size core was sawed in half. Whole PQ-size core was sawed in quarters. One half of the HQ core, and three quarters of the PQ core, were returned to the core boxes and the remainder was placed in pre-numbered sample bags that were closed with ties. Following insertion of QA/QC blanks and certified reference materials (“CRMs”), the core samples were transported by representatives of ALS or Bureau Veritas to their respective laboratories for preparation and analysis.

Page 54


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Samples from Gold Standard’s RC and core drilling at North Bullion in 2010 through 2014, and at Bald Mountain in 2014, were prepared at the ALS laboratories in Elko and Reno, Nevada. The samples were dried and crushed in their entirety to 70% at less than 0.079 in. The crushed samples were riffle-split to obtain 8.82 oz subsamples that were pulverized to 85% less than 75 microns. The pulps were shipped by air freight by ALS to the ALS laboratory in North Vancouver, British Columbia, for analysis. Gold was determined by 30 g fire-assay fusion with an AA finish (method code Au-AA23). Samples assayed at ≥0.292 oz Au/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish (method code Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion. In some cases, the ICP analyses were conducted on pulps from 5.0 ft drill samples. In other cases, ICP analyses were conducted on composited pulps representing 20 ft drill intervals. Samples that assayed >292 oz/t for silver or zinc by ICP were re-analyzed using AA following aqua regia digestion of 0.1 g aliquots.

A minority of the 2010 through 2012 drill samples were analyzed by SGS Canada Inc. (“SGS”) of Vancouver, British Columbia. The assay certificates do not indicate how or where the samples were prepared for analysis. At the SGS laboratory in Burnaby, British Columbia, gold was determined by 30 g fire-assay fusion with an AA finish and separate aliquots were analyzed by ICP for 35 major, minor, and trace elements. SGS was a commercial laboratory independent of Gold Standard. MDA is not aware of certifications held by SGS at that time.

In 2013, pulps from previously prepared samples from North Bullion were analyzed by Bureau Veritas in Sparks, Nevada. Gold was determined by 30 g fire-assay fusion with an AA finish. Some of the samples were analyzed using a 30 g aliquot by fire-assay fusion and gravimetric finish. In 2014, some of the Bald Mountain drill sample pulps were re-analyzed at Bureau Veritas’ laboratory in Vancouver, British Columbia for copper by cyanide-H2SO4 leach. Other pulps were analyzed for 45 major, minor and trace elements by a combination of ICP and mass spectrometry (“ICP-MS”) after 4-acid digestion.

Samples from the 2015, 2016, and 2017 drilling at North Bullion and Bald Mountain were analyzed at ALS and Bureau Veritas. At ALS the methods and procedures of preparation were the same as those used in 2010 through 2014. Gold was determined using ALS method code Au-AA23 and Au-GRA21 principally in the ALS laboratory in North Vancouver. Most gold assays on 2017 North Bullion samples were performed in the ALS laboratory in Reno with the same methods (Au-AA23; Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion in the North Vancouver laboratory. In some cases, these were composited pulps representing 20 ft drill intervals.

A significant portion of the samples from the 2016 North Bullion drilling, and the majority of the 2017 North Bullion samples, were prepared and analyzed by Bureau Veritas. These samples were prepared in the Bureau Veritas laboratory in Elko. After crushing, a 8.0 oz riffle-split subsample was obtained from each drill sample. These subsamples were pulverized to 200-mesh size and the pulps were shipped to the Bureau Veritas laboratory in Sparks, Nevada. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. The pulps were shipped via air freight by Bureau Veritas to their analytical laboratory in Vancouver where they were analyzed for 45 major, minor and trace elements by ICP-MS after four-acid digestion.

Samples from Gold Standard’s 2019 North Bullion drilling were analyzed at Bureau Veritas. At total of 40 major, minor and trace elements, including gold, were analyzed by ICP following an aqua regia digestion. The 2020 North Bullion drilling samples were analyzed at ALS for gold using a 30 g aliquot by fire-assay fusion followed by an AA finish.

Sampling and Analysis – South Railroad

Commencing in 2012, Gold Standard’s RC samples stored by the drill rig were collected at the drill sites by representatives of ALS or Bureau Veritas and transported via truck to their respective laboratories in Elko, Nevada. Excessively wet samples were kept at the drill sites for a few days to drain and dry prior to collection by the laboratory staff.

Core samples were transported daily from the drill sites to Gold Standard’s logging and core cutting facility in Elko by Gold Standard personnel. After logging and marking core-sample intervals by Gold Standard geologists, the core was photographed prior to being

Page 55


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

sawed lengthwise by contractor technicians. Whole HQ-size core was sawed in half. Whole PQ-size core was sawed in quarters. One half of the HQ core, and three quarters of the PQ core, were returned to the core boxes and the remainder was placed in pre-numbered sample bags that were closed with ties. Following insertion of QA/QC blanks and CRM, the core samples were transported by representatives of ALS or Bureau Veritas to their respective laboratories for preparation and analysis.

Samples from Gold Standard’s drilling in 2012, 2014, 2015, 2016, and 2017 were analyzed by ALS. The samples were prepared at the ALS laboratory in Elko, Nevada. The samples were dried and crushed in their entirety to 70% at less than 0.079 in. The crushed samples were riffle-split to obtain 8.0 oz subsamples that were pulverized to 85% at less than 75 microns. The pulps were shipped via air freight by ALS to the ALS laboratory in North Vancouver, British Columbia, for analysis. Gold was determined by 30 g fire-assay fusion with an AA finish (method code Au-AA23). Samples assayed at ≥0.292 oz/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish (method code Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion. In some cases, the ICP analyses were conducted on pulps from 5.0 ft drill samples. In other cases, ICP analyses were conducted on composited pulps representing 20 ft drill intervals. Some samples in 2014 were analyzed for silver by fire-assay fusion of 30 g aliquots with a gravimetric finish. In 2014, some samples were also assayed for 48 major, minor and trace elements by ICP-MS after four-acid digestions. During 2017, samples were analyzed for gold by cyanide leach with an AA finish.

In 2018, Pinion area drill samples were analyzed at Bureau Veritas and AAL. At the Bureau Veritas laboratory in Sparks, Nevada, samples were crushed in their entirety and riffle-split to obtain 8.0 oz subsamples. These subsamples were pulverized to 200-mesh size. Gold was determined by 30 g fire-assay fusion with an AA finish. Some samples were analyzed for gold by cyanide leach with an AA finish. The pulps were shipped to the Bureau Veritas laboratory in Vancouver, British Columbia. Carbon, CO2, and sulfur were determined by induction-furnace infrared absorption and thermal conductivity (“LECO”) analyses of 0.1 g aliquots. Gold, silver, and 35 major, minor and trace elements were assayed by ICP following aqua regia digestion of 0.5 g aliquots. Additional silver assays were completed in 2019 at Bureau Veritas using drill-sample pulps from previous analyses. Silver was determined by AA following four-acid digestion of 1.0 g aliquots.

At AAL in Sparks, Nevada, composited pulps of 2018 Pinion area drill samples were analyzed for gold by 30 g fire-assay fusion with an AA finish, and in some cases, with a gravimetric finish. Some of the samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver, and 49 major, minor and trace elements were determined in some samples by ICP-MS following digestion in aqua regia.

AAL also analyzed selected, previously assayed drill-sample pulps for elemental barium using an energy-dispersive, x-ray fluorescence (“XRF-ED”) procedure. Pressed-powder pellets made from 2.0 g aliquots of sample pulps were used for the XRF-ED analyses, which were performed in 2018 and 2019. Other selected sample pulps were analyzed for barium using XRF-ED with 2.0 g pressed-powder pellets. Some of these were also analyzed for barite using wave-length dispersive x-ray fluorescence (“XRF-WD”) following lithium metaborate fusion of 0.5 g aliquots. Other sample pulps were analyzed for elemental barium by NITON hand-held XRF on both loose-powder aliquots. These were also analyzed by x-ray diffraction (“XRD”) for barite, witherite, and calcite, as well as sulfur and carbon by induction-furnace infrared (LECO).

Gold Standard also performed assays of elemental barium together with 39 major, minor, and trace elements using hand-held NITON XRF analyzers. These assays were done in 2018 in Elko, Nevada by independent contractor Rangefront Geological using selected drill-sample pulps in loose powder form.

In 2019, the Pinion drilling samples were analyzed at Bureau Veritas. Gold was determined by ICP following an aqua regia digestion and by cyanide leach followed by an AA finish. Silver was analyzed by AA following a 4-acid digestion and by ICP following an aqua regia digestion. Thirty-seven major, minor and trace elements were analyzed by ICP following an aqua regia digestion. Carbon species, sulfur species and CO2 were determined by LECO methods.

Page 56


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The 2020 drilling samples from Pinion were analyzed at Paragon Geochemical (“Paragon”). Paragon is an independent commercial analytical laboratory in Sparks, Nevada with ISO/IEC 17025 certification. Thirty-four major, minor and trace elements were analyzed by ICP following an aqua regia digestion. Some of the samples were analyzed by ICP following a 4-acid digestion. Silver was analyzed by AA and by ICP following a 4-acid digestion. Gold was determined using a 30 g fire-assay fusion with an ICP finish. Gold was also analyzed by cyanide leach of a 30 g aliquot with an AA finish.

In 2021, Pinion drilling samples were analyzed at AAL, Bureau Veritas and Paragon. The same methods of analysis used at each of these three laboratories in prior years were also used for the 2021 drilling samples. Gold Standard obtained XRF barium assays in-house using NITON and Olympus units, and through AAL and Paragon Laboratories.

Gold Standard’s 2015 drilling samples from the Dark Star area were mostly analyzed by Bureau Veritas after preparation in the Bureau Veritas laboratory in Elko, Nevada. The samples were crushed in their entirety and riffle-split to obtain 8.0 oz subsample. These subsamples were pulverized to 200-mesh size. Gold was determined by 30 g fire-assay fusion with an AA finish in Bureau Veritas’ laboratory in Sparks, Nevada. Composited pulps were analyzed in Bureau Veritas’ laboratory in Vancouver, British Columbia, for gold, silver and 35 major, minor and trace elements by ICP-MS following aqua regia digestion of 0.5 g aliquots. Some of the 2015 pulps were re-analyzed by ALS in in North Vancouver, British Columbia, for gold by 30 g fire-assay fusion with an AA finish.

The 2016 and 2017 drilling samples from the Dark Star area were analyzed in part by Bureau Veritas and in part by ALS, with sample preparation in their respective laboratories in Elko, Nevada, using the same procedures that were used for the Pinion area samples as summarized above. The ALS assays were carried out in their Reno and North Vancouver laboratories where gold was determined by 30 g fire-assay fusion with an AA finish. Samples with ≥0.292 oz Au/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish. Silver and 34 major, minor, and trace elements were assayed by ICP following aqua regia digestion of 0.5 g aliquots.

The Bureau Veritas assays of the 2016 and 2017 Dark Star drilling samples were performed in Bureau Veritas’ laboratories in Sparks, Nevada, and Vancouver, British Columbia. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish and in some cases with a gravimetric finish. Some samples were analyzed for gold by cyanide leach and an AA finish, and some samples were analyzed for gold with a screen-fire assay procedure. Gold, silver, and 35 major, minor, and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots.

The 2018 and 2019 drilling samples from the Dark Star area were prepared in either Bureau Veritas’ Elko or Sparks, Nevada, laboratories and analyzed in their Sparks and Vancouver laboratories. Gold and multi-element assays were carried out with the same methods and procedures used for the 2016-2017 samples. In addition, some samples were analyzed for carbon species, sulfur species, and CO2 by LECO methods.

Bureau Veritas was the principal laboratory for the analysis of the 2020 and 2021 Dark Star drilling samples. Silver was analyzed by AA following a 4-acid digestion, as well as by ICP following an aqua regia digestion. Gold was determined using a 30 g fire-assay fusion with an AA finish. Gold was also analyzed using a 30 g cyanide leach with an AA finish. Thirty-seven major, minor and trace elements, including gold and silver, were analyzed by ICP following an aqua regia digestion. Carbon species, sulfur species and CO2 were determined with LECO methods.

ALS analyzed some of the 2020 Dark Star samples for gold using a 30 g fire-assay fusion with an AA finish, as well as a 30 g cyanide leach with an AA finish. Samples that assayed ≥0.292 oz Au/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish.

AAL analyzed gold in some of the 2021 Dark Star drilling samples using a 30 g cyanide leach with an AA finish. Samples were also analyzed for gold using a 30 g fire-assay fusion followed by an ICP finish. Samples that assayed ≥0.292 oz Au/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish.

Page 57


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The 2017 drilling samples from the Jasperoid Wash area were analyzed in part by Bureau Veritas and in part by ALS following preparation at their respective laboratories in Elko, Nevada. Gold and multi-element analyses were performed at their respective laboratories in Sparks, Nevada, Vancouver and North Vancouver, British Columbia, using the same methods and procedures used for the 2016-2018 Dark Star samples as summarized above.

All of the 2018 drill samples from Jasperoid Wash were prepared and analyzed by Bureau Veritas in Sparks, Nevada and Vancouver, British Columbia, using the same methods and procedures used for the 2016-2019 Dark Star samples as summarized above.

The 2019 drill samples from Jasperoid Wash were analyzed at Bureau Veritas. Thirty-seven major, minor and trace element, including gold and silver, were analyzed by ICP following an aqua regia digestion. Gold was also analyzed by cyanide leach. Carbon species, sulfur species and CO2 were determined with LECO methods. In 2020, some of the earlier Jasperoid Wash drilling samples were analyzed for silver using AA following a 4-acid digestion.

Gold Standard’s 2017 and 2018 drilling samples from the Dixie area were prepared by Bureau Veritas in Sparks, Nevada and Elko, Nevada. Analyses were conducted in the Bureau Veritas Sparks and Vancouver laboratories. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver and 35 major, minor and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots. Composited pulps from the 2018 drilling were analyzed for carbon species, sulfur species and CO2 by LECO methods in the Vancouver laboratory.

Most RC samples from Gold Standard’s 2018 drilling at the Ski Track area were prepared by Bureau Veritas in Sparks, Nevada and Elko, Nevada. Analyses were conducted in the Bureau Veritas Sparks and Vancouver laboratories. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver, and 35 major, minor and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots. Composited pulps from the 2018 drilling were analyzed for carbon species, sulfur species, and CO2 by LECO methods in the Vancouver laboratory.

For additional information on the specific assaying and analytical procedures used by historic operators of the property prior to Gold Standard, see Section 11 of the South Railroad Report.

Data Verification

Mr. Lindholm is satisfied that the Pinion, Dark Star, Jasperoid Wash, and North Bullion drilling databases are in good condition. Various audits and checks were performed by MDA to verify collar coordinates, down-hole deviation surveys, geology, and assay data in the drill-hole database. All Gold Standard gold assay data was verified using digital laboratory certificates. However, about one third of the Pinion assays and one quarter of the Dark Star assays from historical drill campaigns were unsupported with original assay certificates. The same is true at North Bullion, where Gold Standard drilling makes up only 28% of the database, almost all of which is in the North Bullion deposit. The drill-hole data at the POD, Sweet Hollow and South Lodes deposits is almost entirely historical. Drill-hole data lacking adequate supporting documentation, as well as data from holes observed during sectional modeling to be inconsistent with surrounding holes, were treated as lower confidence, or excluded from use in modeling and estimation.

In 2019, Gold Standard supplemented their Pinion silver database with re-assayed individual samples for which composites of multiple intervals had previously been analyzed. Over 50% of the original certificates were available for all silver data and were used for verification. QA/QC data was also evaluated, and the silver data was deemed acceptable for use in estimation of classified mineral resources.

There is no evidence of significant historical QA/QC programs for drilling prior to 2014. For Gold Standard programs at Dark Star, Pinion, and Jasperoid Wash, the QA/QC program was minimal in 2014 through 2016 but was more comprehensive in 2017 to 2020.

Page 58


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Similarly at North Bullion, over the full-time span of the Gold Standard drilling from 2010 to 2012 there is a reasonable implementation of QA/QC protocols, but during some periods of time it is less substantial. The results and amount of QA/QC data, as well as non-remedied QA/QC “failures,” were considered in mineral resource classification for the Dark Star, Pinion, Jasperoid Wash and North Bullion deposits. Mr. Lindholm concludes that the Dark Star, Pinion, and Jasperoid Wash analytical data are adequate for the purposes used in the South Railroad Report, subject to issues described in Section 12 of the South Railroad Report. The issues described in Section 12 of the South Railroad Report were considered in assigning levels of confidence and the classification of the Mineral Resources.

Cyanide-soluble gold assays at Dark Star and Pinion were verified, but no QA/QC data was available for evaluation. Carbon and sulfur species data were audited and determined to be adequate for use in their respective estimates done for waste handling and metallurgical characterization. No QA/QC data was associated with the carbon and sulfur analyses.

Barium was estimated in the Pinion deposit block model for metallurgical characterization. Barium analyses were done using pressed-powder energy-dispersive XRF-ED and loose-powder NITON XRF analytical methods. These methods were evaluated by running additional analyses on duplicate pulp samples by various methods. After evaluating the reliability and relationship of barium assays produced by the two methods, and verification of the data, the data was used to model and estimate NITON XRF-derived barium grades.

MINERAL PROCESSING AND METALLURGICAL TESTING

The current study of the South Railroad portion of the Railroad-Pinion project focuses on two main sources of ore, for which Mineral Reserves are declared: the Pinion and Dark Star deposits. These deposits have different geo-metallurgical characteristics, which are briefly summarized as follows:

The Pinion deposit can be characterized as hard and abrasive material, with a steep feed P80 vs. gold recovery response. Much of the gold is contained in the rock ground mass and requires fine crushing (-1/4” inch) to liberate gold for the most efficient cyanide-leach extraction. Gold recovery has proven to be sensitive to high barite/silica content in the mulilithic breccia (mlbx) ore type. Gold recovery from the high-barite/silica materials benefits the most from fine crushing. This deposit can be heap leached without crushing, at low gold recovery, conventionally crushed and leached at modestly higher gold recovery, or HPGR-crushed at higher gold recovery.
The Dark Star deposit can be characterized as hard and moderately abrasive material, with a flat feed P80 vs. gold recovery response. Most of the gold is contained in fractures that have been oxidized and accessible to cyanide solutions that easily pass through the rock matrix. Consequently, high gold extractions are achieved at coarse particle size, requiring no crushing prior to heap leaching.

A large number of variability and master composites (mostly from PQ core) were selected by Gold Standard for feasibility level testing on the Dark Star and Pinion Deposits. Standard metallurgical testing protocols consisted of bottle roll leach testing at 80 percent passing (P80) size targets of 75 microns (200 mesh) and 1,700 microns (10 mesh), and column leaching testing at various P80 sizes ranging from 0.375 inch to 1.0 inch (9.5 mm to 25 mm). Additional composites were crushed using High Pressure Grinding Rolls (HPGR), at medium press force, and subjected to column leaching. The total number of metallurgical tests, by deposit, is presented in the table below.

Page 59


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Summary of Leach Tests Performed

Number of Tests

Test Procedure

    

Dark Star

    

Pinion

Bottle Roll P80 Target = 75 microns (200 mesh)

 

121

 

195

Bottle Roll P80 Target = 1,700 microns (10 mesh)

 

121

 

207

Conv. Crush Columns P80 Target = 0.375-1.0 inch (9.5-25 mm)

 

99

 

90

HPGR Crush Columns P80 Target = 0.20-0.24 inch (5-6 mm)

 

11

 

23

ROM heap leach head grade vs. gold recovery models were developed for Dark Star and Pinion and silver recovery models were developed for Pinion. Silver recovery was not modelled for Dark Star as silver grades are too low to be of economic significance.

Due to the multiple material types, and the dependence of gold recoveries on head grades and crush size, 71 gold and silver recovery vs head grade equations were developed, along with recovery vs solution-to-ore ratio equations. Of the recovery equations, 28 are for Pinion oxide and transition ROM ores and 16 are for Dark Star oxide and transition ROM ores. The recovery equations can be found in Section 13 of the South Railroad Report.

The gold and silver recovery equations for each ore type were delivered to the mine modelers for incorporation into the block calculations.

The overall life-of-mine ROM average gold recovery for the Dark Star deposit is estimated at 71.9 percent and the Pinion deposit is estimated at 56.3 percent.

The major reagent consumptions for heap leaching of Pinion and Dark Star ore have been taken from available metallurgical test results from column leach tests on crushed material. No test data exists at the ROM particle size, so the selected reagent consumptions have been estimated based on test results on the coarsest samples tests 1.5 inch (37 mm). Cyanide consumptions have been estimated at 0.44 lb/ton (0.22 kg/tonne) for Pinion and 0.46 lb/ton (0.23 kg/tonne) for Dark Star. Lime consumption is estimated at 2.0 lb/ton (1.0 kg/tonne) for both Pinion and Dark Star ores.

The process selected for recovery of gold and silver from the Pinion and Dark Star ore is a conventional ROM heap leach. Oxide and transition ore types will be mined by standard open pit mining methods from two separate pits. The ore will be truck-stacked on the heap as ROM ore directly, without crushing, in 30-foot lifts. Lime will be added directly to the haul trucks for pH control.

The stacking rate will be in accordance with the mine plan. The ROM ore placement is equivalent to a LOM average of 22,000 tonnes per day, with the peak in Year 5 of an average of 29,700 tonnes per day.

Gold and silver in the stacked ore will be leached with a dilute cyanide solution using a drip irrigation system at application rates in the range of 4,800-6,100 gallons per minute. The leached gold and silver will be recovered from solution using a carbon adsorption circuit. The gold and silver will be stripped from carbon using a desorption process, followed by electrowinning to produce a precipitate sludge. The precipitate sludge will be processed using a retort oven for drying and mercury recovery, and then refined in a melting furnace to produce gold and silver doré bars.

MINERAL RESOURCE ESTIMATE

See “Summary of Mineral Reserve and Mineral Resource Estimates” above for the Company’s current Mineral Resource estimates for the South Railroad Project.

Page 60


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The estimated Mineral Resources presented were classified in order of increasing geological and quantitative confidence into Inferred, Indicated, and Measured categories to be in accordance with the CIM Standards. Mineral Resources are reported at cutoffs that are reasonable for deposits of this nature given anticipated mining methods and plant processing costs, while also considering economic conditions, because of the regulatory requirements that a mineral resource exists “in such form and quantity and of such a grade or quality that it has reasonable prospects for eventual economic extraction.”

MDA modeled geology and metal domains for the Dark Star, Pinion, and Jasperoid Wash deposits, then estimated and classified gold mineral resources. A silver estimate was also produced for the Pinion deposit. Gold Standard provided the geologic modeling for the various deposits and were intimately involved with metal domain modeling. Block sizes were 30 ft x 30 ft x 30 ft for Dark Star and Pinion, and 20 ft x 20 ft x 20 ft for Jasperoid Wash. The block size for modeling and estimation at the North Bullion deposits model was 10 ft x 10 ft x 10 ft for evaluation of underground potential, but reblocked to 30 ft x 30 ft x 30 ft to optimize open pits. Estimation was done using inverse-distance methods with powers ranging from two to four. Multiple models were estimated in order to optimize the estimation parameters.

The estimate of mineral resources for the Railroad-Pinion property is the block-diluted inverse-distance estimate and is reported at variable cutoffs for open-pit and underground mining. The cutoff for oxidized and transitional redox material in an open pit is 0.005 oz Au/ton (0.171 g Au/t), whereas the cutoff for sulfide material is 0.045 oz Au/ton (1.543 g Au/t). Potential sulfide underground resources, present only at the North Bullion deposit, are reported at a cutoff of 0.100 oz Au/ton (3.429 g Au/t). Mineral Resources were classified as Measured, Indicated or Inferred for each deposit separately. Factors considered for classification include results of data verification and QA/QC results, the level of geologic understanding of each deposit, and performance of past mineral resource block models with new drilling. The Mineral Resources set forth under the heading “Summary of Mineral Reserve and Mineral Resource Estimates” present the optimized pit- and underground grade shell-constrained estimated mineral resources for the Dark Star, Pinion, Jasperoid Wash, and North Bullion deposits based on a $1,750/oz gold price.

Barium was estimated into the Pinion deposit block model for use in metallurgical characterization of the Pinion mineralized material. The average barium grade is ~2.25% for the gold mineralization grading at least 0.005 oz Au/ton (0.171 g Au/t). Factoring between barium analytical results were required, which added some uncertainty to the model.

Cyanide-soluble gold block models were produced for the Pinion and Dark Star deposits. These estimates appear reasonable in areas with Gold Standard drilling, however, there is less confidence in some areas where cyanide-soluble gold data is lacking, such as where historical drilling is predominant.

An acid-base accounting model was generated for Pinion and Dark Star to characterize waste material for mine planning and handling. An organic carbon model was also produced to evaluate effects on metallurgy at Pinion. Because of limited data, these estimates can only be considered as guides for environmental planning and metallurgy.

MINERAL RESERVE ESTIMATE

See “Summary of Mineral Reserve and Mineral Resource Estimates” above for the Company’s current Mineral Reserve estimates for the South Railroad Project.

Measured and Indicated mineral resources were used as the basis to define mineral reserves for both the Dark Star and Pinion deposits. Mineral Reserve definition was done by first identifying ultimate pit limits using economic parameters and applying pit optimization techniques. The resulting optimized pit shells were then used for guidance in pit design to allow access for equipment and personnel. Modifying factors including mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social, and governmental factors have been applied in the estimate of mineral reserves.

Page 61


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

RESPEC provided the final production schedule to M3 who developed the final cash-flow model which demonstrates that the Pinion and Dark Star deposits make a positive cash flow and are reasonable with respect to statement of Mineral Reserves for these deposits. Within the designed pits there are a total of 267.2 million tonnes of waste associated with the in-pit mineral reserves. This results in an overall project strip ratio of 4.1 tonnes of waste for each ton of material processed.

MINING OPERATIONS

The Feasibility Study for the South Railroad Project includes mining at both the Dark Star and Pinion deposits; both are planned as open-pit, truck and shovel operations. The truck and shovel method provides reasonable costs and selectivity for these deposits.

The production schedule considers the processing of material by ROM. All ROM material will be dumped in place directly on the ROM leach pad. Monthly periods were used to create the production schedule with pre-stripping starting in Dark Star at month -6. Start of ROM processing is assumed to be month 2.

The total Dark Star mining rate would ramp up from 18,000 tonnes per day to about 73,000 tonnes per day over a period of six months. A maximum of 99,000 tonnes per day is used in the production schedule during the peak mining of deeper Dark Star material. Pre-production mining is planned to start in Dark Star North and then progress to Pinion in Year 1. The maximum mining rate required in Pinion is 114,000 tonnes per day.

The Feasibility Study has assumed owner mining to keep the cost lower than it would be with contract mining. The production schedule was used along with additional efficiency factors, cycle times, and productivity rates to develop the first principle hours required for primary mining equipment to achieve the production schedule. Primary mining equipment includes drills, loaders, hydraulic shovels, and 181-tonne capacity haul trucks.

Waste storage facility designs were created for the Feasibility Study to contain the material that is not processed. A 1.3 swell factor was assumed which provides for both swell when mined and re-compaction when placed into the facility.

PROCESSING AND RECOVERY OPERATIONS

The process selected for recovery of gold and silver from the Pinion and Dark Star ore is a conventional heap-leach recovery circuit. The ore will be mined by standard open pit mining methods from two separate pits. Pinion and Dark Star ore will be truck-stacked on the heap as ROM ore directly, without crushing.

Oxide and transition material types will be leached with a dilute cyanide solution. The leached gold and silver will be recovered from solution using a carbon adsorption circuit. Gold and silver will be stripped from carbon using a desorption process, followed by electrowinning to produce a precipitate sludge. The precipitate sludge will be processed using a retort oven for drying and mercury separation and recovery, and then refined in a melting furnace to produce gold and silver doré bars.

The Pinion and Dark Star deposits have a total estimated mineral reserve of 65.2 million tonnes. The total estimated mine life is 8 years; solution application on the heap leach pad will continue for an additional 2.5 years after mining operations have ceased to recover additional solubilized metal ounces. The nominal ore placement rate on the pad is an average of 8 million tonnes per annum, equivalent to 22,000 tonnes per day.

The gold and silver recoveries for heap leaching of the Pinion and Dark Star ore have been taken from the recommendations detailed in Section 13 of the South Railroad Report, as discussed above under “Mineral Processing and Metallurgical Testing”. For the Pinion and Dark Star mineral resources, the overall life-of-mine average gold recovery for the ore is estimated at 64.5 percent. For the Pinion and Dark Star mineral resources, the overall life-of-mine average silver recovery for the ore is estimated at 11 percent.

Page 62


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

INFRASTRUCTURE, PERMITTING AND COMPLIANCE ACTIVITIES

Infrastructure

Project infrastructure for South Railroad has been developed to support the mining and heap leaching operations. Electrical power will be generated onsite by generators powered by liquified natural gas (LNG). Project buildings located at the site will include Security and Emergency services, Administration, Change House, Crushing, Truck Shop, ADR/Refinery Plant, and Laboratory buildings. These will mainly be located between Pinion and Dark Star pits for ease of access and be connected by local roads and haul routes.

Environment and Permitting

Gold Standard conducted environmental baseline studies over the past several years as part of their ongoing permitting efforts and in preparation for the submittal of permit applications for conduct mining operations. The main portion for the project area has been surveyed for surface water resources, including Waters of the United States (“WOTUS”), biological resources, and cultural resources. The project access road, and the water management area remain to be surveyed. In 2018, Gold Standard commenced material characterization testing of the mineralized material and waste rock to determine the metal leaching and acid generation potential. Additionally, an evaluation of the groundwater resources was commenced to determine groundwater supply potential, as well as the potential impacts from groundwater pumping and pit lake development. Gold Standard has had several meetings with BLM since January 2019 to determine any additional baseline data collection needs for the permitting process.

Within and adjacent to the project area there are Greater Sage Grouse and Golden Eagles. These species will have an effect on how the project is permitted and what mitigation in required or proposed. The Company is working with the BLM on the management of these species.

The review and approval process for the Plan Application by the BLM constitutes a federal action under the National Environmental Policy Act (“NEPA”) and BLM regulations. Thus, for the BLM to process the Plan Application the BLM is required to comply with the NEPA and prepare either an Environmental Assessment (“EA”), or an Environmental Impact Statement (“EIS”). The BLM has determined that this process requires an EIS, due to the mine dewatering and potential pit lake. The Company will also need an Individual Section 404 Permit from the United States Army Corps of Engineers, and this agency will be a cooperating agency on the NEPA documents.

As of the date of this AIF, the Notice of Intent is with the BLM for review. The Company expects the Notice of Intent to be filed in the Federal Register in 2023.

There are a number of environmental permits issued by the Nevada Department of Environmental Protection (“NDEP”) that are necessary to develop the project and which the Company needs to permit the project. The NDEP issues permits that address water and air pollution, as well as land reclamation. The Nevada Division of Water Resources (“NDWR”) issues water rights for the use and management of water.

South Railroad is a previously explored mineral property with exploration related disturbance. However, there have been very long periods of non-operation. There are no known ongoing environmental issues with any of the regulatory agencies. Gold Standard conducted baseline data collection for a couple of years for environmental studies required to support the Plan Application and permitting process. The waste and mineralized material characterization and the hydrogeologic evaluation are currently in their latter stages of development. Material characterization indicates the need to manage a significant portion of the waste rock as potentially acid generating in engineered facilities. Additional results to date indicate limited cultural issues, air quality impacts appear to be within State of Nevada standards, traffic and noise issues are present but at low levels, and socioeconomic impacts are positive.

Page 63


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Social and community impacts have been and are being considered and evaluated for the Plan Amendment and Plan Application performed for the project in accordance with the NEPA and other federal laws. Potentially affected Native American tribes, tribal organizations, and/or individuals are consulted during the preparation of all plan amendments to advise on the proposed projects that may have an effect on cultural sites, resources, and traditional activities.

Potential community impacts to existing population and demographics, income, employment, economy, public finance, housing, community facilities, and community services are evaluated for potential impacts as part of the NEPA process. There are no known social or community issues that would have a material impact on the project’s ability to extract mineral resources. Identified socioeconomic issues (employment, payroll, services and supply purchases, and state and local tax payments) are anticipated to be positive.

A Tentative Plan for Permanent Closure (“TPPC”) for the project would be submitted to the NEDP with the Water Pollution Control Permit application. In the TPPC, the proposed heap leach closure approach would consist of fluid management through evaporation, covering the heap leach pad and waste rock facilities with growth media, and then revegetating. The design of the process components is not sufficiently advanced to determine the closure costs. Any residual heap leach or waste rock facilities drainage will be managed with evaporation cells.

Gold Standard developed a Water Management Plan for South Railroad in support of the Feasibility Study. The Water Management Plan formed the basis for evaluating the infrastructure and associated cost to manage water through the life cycle of the mine. The purpose of the Water Management Plan is to present the water management strategies that focus on water as an asset and allow the Company to proactively plan and manage water from development to post-closure such that operational and stakeholder water needs are met, and that human health and the environment are protected.

CAPITAL AND OPERATING COSTS

The capital expenditure schedule for the LOM as set forth in the South Railroad Report is shown in the table below.

Capital Expenditure Schedule

Initial

Sustaining

Capital Expenditure ($000)

    

Year -1

    

Year 1

    

Year 2

    

Year 3

    

Year 4

    

Year 5

    

Year 6

    

Year 7

    

Year 8

    

Year 9

    

Year 10

    

Total

Mine Pre-Prod.

$

22,640

 

 

 

 

 

 

 

 

 

 

$

22,640

Mine Capital

$

13,943

$

10,703

$

16,798

$

16,306

$

16,914

$

16,284

$

10,884

$

9,147

$

5,588

 

 

$

116,568

Process

$

152,458

$

27,169

$

8,953

$

15,149

$

6,798

$

13,850

$

5,375

$

2,563

$

1,329

$

1,223

$

1,644

$

236,511

Owner’s Cost

$

1,157

 

 

 

 

 

 

 

 

 

 

$

1,157

Total

$

190,197

$

37,872

$

25,751

$

31,455

$

23,712

$

30,133

$

16,259

$

11,710

$

6,918

$

1,223

$

1,644

$

376,873

The total production cost includes mine operations, process plant operations, general and administration, reclamation and closure, and government fees. The following table below shows the operating costs as set forth in the South Railroad Report over the LOM by area.

Page 64


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

LOM Operating Costs

LOM Operating Cost ($000)

Mining

    

$

616,504

Process Plant

$

147,424

G&A

$

37,750

Refining

$

5,153

Total Operating Cost

$

806,832

Royalty

$

10,911

Salvage Value

$

(12,410)

Reclamation/Closure

$

22,569

Total Production Cost

$

827,901

The Feasibility Study indicates an average gold production over the estimated 8-year LOM of about 124,000 ounces per year, with peak production in Year 2 of 197,000 ounces of gold. Cash costs are estimated to be $792 per ounce of gold after by-product credit, and AISC is estimated to be $1,021 per ounce of gold1. The resulting after-tax cash flow is $403.2 million, for an after-tax NPV (5%) of $314.8 million and an estimated payback period of 1.9 years. A summary of the pre-tax and after-tax Feasibility Study economic indicators is shown in the following table.

Economic Analysis Summary

Indicators

    

Before-Tax

    

After-Tax

 

LOM Cash Flow ($000)

$

497,330

$

403,162

NPV @ 5% ($000)

$

388,866

$

314,791

NPV @ 10% ($000)

$

307,248

$

247,592

IRR

 

49.2

%  

 

44.3

%

Payback (years)

 

1.9

 

1.93

Sensitivity Analysis

The following table shows the sensitivity analysis of the key economic indicators (cash flow, NPV, IRR, and payback) to changes in gold prices.

Page 65


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Sensitivity Analysis

Financial Indicators

    

Spot Case

    

Base +$150

    

Base Case

    

Base -150

    

Base -250

 

Gold Price (per troy oz)

$

1,899

$

1,800

$

1,650

$

1,500

$

1,400

Silver Price (per troy oz)

$

21.50

$

21.50

$

21.50

$

21.50

$

21.50

Pre-tax Cash Flow, $M

$

753.9

$

651.9

$

497.3

$

342.8

$

239.8

Pre-tax Net Present Value (5%) in $M

$

603.0

$

517.9

$

388.9

$

259.9

$

173.9

Pre-tax Internal Rate of Return (IRR)

 

68.2

%  

 

60.8

%  

 

49.2

%  

 

36.5

%  

 

27.2

%

Pre-tax Payback (Years)

 

1.6

 

1.7

 

1.9

 

2.1

 

2.4

After-tax Cash Flow, $M

$

606.3

$

526.1

$

403.2

$

280.9

$

199.0

After-tax Net Present Value (5%) in $M

$

486.4

$

418.7

$

314.8

$

211.2

$

141.6

After-tax Internal Rate of Return (IRR)

 

62.1

%  

 

55.3

%  

 

44.3

%  

 

32.6

%  

 

24.0

%

After-tax Payback (Years)

 

1.6

 

1.7

 

1.9

 

2.2

 

2.4


1 Note: Total cash cost and AISC are non-GAAP measures. See “Introductory Notes and Cautionary Statements – Non-GAAP Measures” for additional information.

Page 66


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

OUTLOOK AND FUTURE PLANS

2022 Exploration

Upon taking ownership of the South Railroad Project in August 2022, the Company accelerated exploration activities and expanded the project’s 2022 program. The 2022 program objectives included: (i) confirming historical drill results, and (ii) providing additional information, including increased drill hole spacing density, specific gravity measurements, and material for preliminary metallurgical test work necessary for Mineral Resources estimation upgrade and growth. In 2022, a total 9,796m of RC and 777m of diamond drill core drilling were completed.

Planned 2023 Exploration

Exploration activities at South Railroad Project will continue through 2023. The 2023 exploration program will consist of both near deposit and near mineralized zones drilling as well as regional exploration drilling. The objective of near deposit and mineralized zone exploration drilling will be to increasing oxide resources. For regional exploration drilling, the objective is to discover new oxide and/or sulphide hosted gold mineralization with the potential for economic extraction. In addition, target definition work consisting of soil and rock geochemical sampling and geological mapping will be completed to support continued target generation and definition.

THE CERRO QUEMA PROJECT

The following disclosure relating to the Cerro Quema Project has been derived, in part, from the 2022 Cerro Quema Report for the Cerro Quema Project, prepared by Carl E. Defilippi, RM SME, of KCA; Sue Bird, P. Eng., of MMTS; Jesse Aarsen, P.Eng, of MMTS; Denys Parra, RM SME, of Anddes Asociados SAC (“Anddes”); Dr. Matthew D. Gray, Ph.D., C.P.G., of RGI; Brent Johnson, RM SME, P.G., of HydroGeoLogica, Inc. (“HydroGeoLogica”); Lee Josselyn, P.E. of Linkan Engineering (“Linkan”); and Wade Brunham, M.Sc. PWS, R.P.Bio, of Environmental Resources Management (“ERM”), each of whom is independent of the Company and a qualified person under NI 43-101. Reference should be made to the full text of the 2022 Cerro Quema Report, which is available under the Company’s profile on SEDAR at www.sedar.com and on EDGAR at www.sec.gov, as the 2022 Cerro Quema Report contains additional assumptions, qualifications, references, reliances, and procedures that are not fully described herein.

PROJECT DESCRIPTION, LOCATION, AND ACCESS

The Cerro Quema Project is located in the Azuero Peninsula, Los Santos Province, Panama. The property lies 193 straight line kilometres (km) SW of Panama City, 45 km S-SW of the town of Chitré.

The Cerro Quema Project is 82 km by road from Chitré, of which 75 km are on paved Federal highways Via Chitré-Macaracas and Via Macaracas-Tonosí. A 7 km unsurfaced road connects the Cerro Quema Project to the Federal highway. Driving time from Chitré is approximately 1.5 hours, and with the exception of temporal road closings during extreme rain events, the Cerro Quema Project is road accessible through all seasons. Equipment and supplies can be internationally sourced, shipped through the Panama Canal, and then trucked to site.

Chitré provides basic commercial services to a regional population of approximately 80,000. Alonso Valderrama airport in Chitré has regular commercial air service with daily flights to Panama City. A helipad at the camp of the Company’s subsidiary, Minera Cerro Quema SA (“MCQ”), allows helicopter access for emergency services.

The Cerro Quema Project comprises three contracts between the Republic of Panama and MCQ that grant exclusive rights for mineral extraction of class IV metallic minerals (silver and gold) over 14,893 ha, dated between February 26, 1997 and March 3, 1997. The original 20-year term for the concessions expired on February 26, 2017 (Contracts 19 and 20) and March 3, 2017 (Contract 21). MCQ

Page 67


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

has applied for the prescribed 10-year extension to these contracts as it is entitled to under Panamanian mineral law. MCQ believes it has complied with all legal requirements in relation to the concessions. On March 6, 2017, the Ministry of Commerce and Industry provided written confirmation to MCQ that the extension applications were received, and that exploration work could continue while the MCQ waits for the renewal of the concessions. MCQ has also received verbal assurances from government officials that the renewal applications are complete with no outstanding legal issues. The renewal of the mining rights has been duly accredited by the Minister of Commerce, identified with registration numbers 0-08-0-10393814-2021, 0-08-0-10393872-2021, and 0-08-0-10393847-2021 and the renewal is pending endorsement by the Comptroller General of the Nation.

On April 26, 2017, MCQ received authorization from the Ministry of Environment to drill in two areas outside of the existing permitted drill area. On June 28, 2017, MCQ received a permit to use water for drilling. A permit was received on May 8, 2018 to drill in the Sombrero zone and on May 11, 2018 two permits to use water for drilling were received. An existing permit that allows drilling in the areas of the current resources was extended for two years in May 2018.

In October 2018, the government accepted 2018 concession tax payments, and in February 2019, MCQ paid the 2019 concession tax payments. A new drilling permit for the Pelona area in the eastern part of the concessions was received on February 11, 2019. All drill permits are currently active.

General elections were held in Panama in May 2019, which resulted in a change in federal government effective July 1, 2019. Subsequent to this, two permits allowing temporary use of water for exploration drilling were received on November 12, 2019 and an additional two temporary water permits were received on January 13, 2020. On February 3, 2020, the 2020 annual report and concession payments were made and accepted.

As of the date of the 2022 Cerro Quema Report and this AIF, final concession renewals have not been received and are still under revision.

The Government of Panama retains a 4% net smelter royalty. Other than the 4% Federal royalty, the project is unencumbered by other royalties, net profit interests, participation rights, or back-in options.

MCQ owns the surface rights for the land required to mine the Mineral Reserves discussed in the 2022 Cerro Quema Report and to construct and operate a heap leach facility and part of the land required for proposed upgrades to the project access road. Exploration work on land not controlled by MCQ has been carried out under the terms of surface access agreements negotiated with private landowners.

A specific title risk for MCQ is a failure of the Panamanian government to renew mining concessions as permitted by law. Prior operators and MCQ have met legal requirements to maintain in good standing the mining concession titles, however, as discussed above, the response of Federal authorities has been inconsistent with the mining law, and legally permitted concession renewals have repeatedly been delayed. Similarly, failure of the Panamanian government to approve the copper extraction rights for the same exploration contracts for which gold and silver rights had been granted, will affect the viability of potential development of the Caballito zone. Subsequent to the 2022 Cerro Quema Report, MCQ was granted an exploration contract for copper for the same area as the gold and silver rights. However, this contract is awaiting endorsement by the Comptroller General of the Nation.

An environmental impact assessment (“EIA”) and permits are in place for a continuous vat leach operation, however, the current project described in the 2022 Cerro Quema Report requires a modification to the existing permits. To develop a mine at Cerro Quema, a Category III EIA is required from the Ministry of Environment. An application for this permit was submitted in 2015 and the Ministry has completed the technical evaluation of the EIA. Timing of approval is presently not known but the Ministry’s response time has exceeded the time periods specified in Article 41 of the Decree Law 23 applicable to EIA permit resolutions.

Page 68


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

HISTORY

Cerro Quema was initially identified as a potential economic mineral deposit during United Nations supported national surveys in the late 1960’s. The Compañía de Exploración Minera, S.A. (“CEMSA”) investigated the area in 1986 and obtained the exploration concession for Cerro Quema in 1988. Cyprus Minerals Company (“Cyprus”) formed a joint venture with CEMSA in 1990 through Cyprus Minera de Panama, S.A. (“Cyprus Minera”). From 1990 to 1994, Cyprus Minera conducted advanced exploration drilling of the La Pava, Quema and Quemita zones. Cyprus Minera merged with Amax Gold Inc. in 1993 to form Cyprus Amax Minerals and formed MCQ to proceed with permitting and development.

Campbell Resources Inc. (“Campbell”) purchased the right of first refusal on the Cerro Quema Project from CEMSA and subsequently exercised that right when Cyprus Minera put the property up for sale in 1996. Campbell subsequently earned a 100% interest in the Cerro Quema Project, carried out an infill drilling program to further define the resources, and completed a Pre-Feasibility Study (“PFS”). Campbell sold its 100% interest in the Project to Carena Equities Corporation of Panama (“Carena”) in August 2001. RNC Resources Ltd. (“RNC”) entered into an agreement with Carena in January 2002 wherein RNC agreed to complete a “bankable” Feasibility Study on the Cerro Quema Project and to place the project into production for a 50% participation in the project.

On September 27, 2007, Bellhaven signed a definitive agreement with Carena to acquire a 40% interest in the Cerro Quema Project. Pershimco Resources Inc. acquired the property in September 2010 through an agreement with Bellhaven, RNC, Carena, MCQ, Central Sun Mining Inc., and Julio Benedetti to acquire all interests in the Cerro Quema Project held by the corporation MCQ. Under the terms of this agreement, Pershimco acquired all interests and obligations of MCQ.

In 2014, Pershimco publicly released a PFS which disclosed a Mineral Resource and Mineral Reserve for the Cerro Quema Project. The PFS reported Measured and Indicated Resources of 552,000 oxide-derived ounces of gold and Proven and Probable Reserves of 488,000 ounces of gold.

Since the effective date of the 2014 PFS, significant additional drillhole data has become available, rendering the 2014 Mineral Resource and Mineral Reserve estimates obsolete. The 2014 Resource and Reserve estimates are not current, have not been verified by the authors of the 2022 Cerro Quema Report, and should not be relied upon. Orla is not treating the 2014 estimates as current estimates. The 2014 Mineral Resource and Mineral Reserve estimates are now superseded by the current Mineral Resource and Mineral Reserve estimates described above under the heading “Summary of Mineral Reserves and Mineral Resources”.

On September 14, 2016, Orla and Pershimco entered into a definitive arrangement agreement to amalgamate the two companies by way of a court-approved arrangement. On December 6, 2016, Orla announced the completion of the arrangement and MCQ became a wholly-owned subsidiary of Orla, thus the property is 100% owned by Orla.

On September 7, 2021, Orla filed the 2021 Cerro Quema Report, which included a PFS for its Cerro Quema oxide gold project. The 2022 Cerro Quema Report is an update to the 2021 Cerro Quema Report and includes the Mineral Resource estimate for the Caballito Cu-Au deposit.

There has been no production from the Cerro Quema Project.

GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT TYPES

Regional Geology

Panama is located at the junction of four tectonic plates, the South American, Caribbean, Cocos, and Nazca plates. Late Cretaceous subduction of the Farallon plate (remnants of which today are the Cocos and Nazca plates) beneath the Caribbean plate triggered

Page 69


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

development of a volcanic arc. Radiometric ages dates of arc-related volcanic rocks indicate that onset of subduction was approximately 75 Ma (mega-annum). Arc magmatism persisted through the Miocene and migrated north during the mid-Miocene due to a change of subduction direction caused by collision of the Panamanian volcanic arc with Columbia.

Subduction related compression and transpression along the South Panama Deformed Belt, where the Nazca plate meets the Panama micro-plate, is likely responsible for the major tectonic structures, including faults and folds, observed in the Azuero Peninsula. The subduction of the Farallon plate and subsequent volcanic arc formation resulted in deposition of arc-related intrusive, volcanic and volcanoclastic sequences within and upon the uplifted basement of the Azuero Peninsula.

Local Geology

The Cerro Quema Project is underlain by the Rio Quema Formation of the Azuero Arc Unit, comprising a volcanosedimentary sequence interpreted as the volcaniclastic apron of the Cretaceous Panamanian volcanic arc, representing a fore-arc basin developed between the subduction trench and the magmatic arc. Lower portions of the formation consist of andesitic lava flows and well bedded crystal rich sandstone and siltstone turbidites interbedded with hemipelagic thin limestone beds. The upper portion of the formation consists of volcaniclastic sediments interlayered with massive to laminar andesitic flows, dacite domes, dacite hyaloclastites, and polymictic conglomerates. Total thickness of the Rio Quema Formation is 1700m and it overlies both the Azuero Igneous Basement and the Azuero Proto Arc, and is discordantly overlain by the Tonosí Formation.

The Cerro Quema Au deposits are hosted exclusively in rocks that are part of a submarine dacitic dome complex developed upon marine sandstones and siltstones. These rocks are exposed in an elongate E-W trending belt north of and parallel to the Rio Joaquin Fault, a reverse movement, dip-slip fault that has juxtaposed Azuero igneous basement against the Azuero arc group units.

Hornblende from the Cerro Quema dacites have been dated at 69.7 +1.2 Ma by 40Ar/39Ar method thus providing an approximate age of the development of the dacite dome complex. The dacites are crosscut by undeformed diorite and basaltic andesite dikes, and south of the San Joaquin Fault a quartz diorite porphyry at La Prieta was emplaced into the volcanosedimentary strata of the Rio Quema Formation.

Based upon radiometric age dates of volcanic rocks and cross cutting relationships with biostratigraphic units in the Azuero Peninsula, the age of formation of the Cerro Quema deposits is estimated to be Lower Eocene, 55 to 49 Ma.

Property Geology

The Cerro Quema Project is spatially associated with the E-trending regional Rio Joaquin fault system. The fault zone is 30 km long and shows evidence of reverse dip-slip movement. It juxtaposed Azuero Igneous basement rocks against Azuero Arc Group rocks. Mesoscale open folds in the region have SW plunging axes and moderate limb dips, indicative of dextral transpression with dominant reverse dip-slip motion. The Cerro Quema mineralized zone lies 1.5 to 3 km north of the Rio Joaquin fault. MCQ has mapped numerous steeply dipping NE and NW striking faults that may be second order features related to the Rio Joaquin fault. Longo has postulated sinistral movement along the most prominent of the NE striking faults, possibly resulting in dismemberment of an originally continuous mineralized zone with the La Pava zone being the left lateral offset of the Quema-Quemita deposit.

Mineralization

Discrete gold mineralized zones have been identified by drilling and surface mapping along an E-W trending zone of hydrothermal alteration of dacitic volcanic rocks of the Rio Quema Formation. The mineralized belt extends from La Pava West at the western end to La Pelona, 11 km further east.

Page 70


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Distinct styles of mineralization observed today are due primarily to supergene effects on the primary mineralization. The known mineralized zones (Pava, Quema-Quemita, Idaida-Caballito, Pelona) were likely similar to Caballito before oxidation. Three mineralization styles are observed:

1.Epithermal high sulfidation Au mineralization, associated with variably intensely developed advanced argillic alteration of dacitic rocks with local areas of silicification and leaching resulting in vuggy silica alteration typical of high sulfidation epithermal deposits. This style is manifested in the mineralized deposits at La Pava and Quema-Quemita.
2.Cu-Au mineralization, exemplified by the Idaida-Caballito mineralized zone, differs from the other mineralized zones in its relatively high Cu content and a strong Cu-Au association. Copper mineralization is associated with hypogene pyrite, bornite, chalcopyrite, and enargite and occurs as an irregular breccia body with sulphide cement. Type 2 mineralization post dates formation of the Type 1 high sulfidation mineralization and is superimposed upon it but formed as part of the same mineralizing event.
3.Cu-Au mineralization as seen at La Prieta, an altered and mineralized zone centred upon a Miocene quartz diorite intrusion, 2.6 km south of the main E-W belt of mineralization. Disseminated and fracture-controlled pyrite and chalcopyrite is associated with intermediate argillic alteration. This mineralized zone has not been studied in detail or drilled.

The observed geological and geochemical characteristics of the La Pava and Quema-Quemita gold deposits at Cerro Quema are consistent with those of volcanic hosted, epithermal, high sulfidation (HS) gold-silver deposits.

The Caballito Cu-Au sulphide deposit is preserved below unaltered Rio Quema dacitic dome rocks and is interpreted to represent the proxy for an eroded and oxidized La Pava and Quemita high-sulphidation Au deposit.

EXPLORATION

Since acquiring the project in 2017, Orla has actively explored the property seeking to better define the known mineralized zones and to discover additional mineralization. In addition to the drill programs described below and in further detail in the 2022 Cerro Quema Report, exploration activities in 2017 and 2018 included geologic mapping; rock chip geochemical sampling; and induced polarization and magnetic terrestrial geophysical surveys. Field exploration activities in 2019 and 2020 were nil as work focussed on engineering, environmental, and permitting matters. For an overview of exploration activities and planned activities at the Cerro Quema Project subsequent to the date of the 2022 Cerro Quema Report, see “Outlook and Future Plans” below.

As of the date of the 2022 Cerra Quema Report, Orla had completed ~137 line-km of induced polarization (IP) geophysical surveys in 9 separate grids. Concurrent with the IP survey, magnetic data was collected over ~106 line-km on the same grids.

Chargeability and resistivity anomalies at Sombrero, Idaida, and Caballito were successfully used to define drill targets and as an aid in interpreting the orientation and limits of sulphide mineralization. Magnetic anomalies mapped igneous intrusions and zones of suspected magnetite destructive hydrothermal alteration. Resistive features at La Pava mapped the extent of silica alteration. Resistive features at La Pelona correlated with silica alteration mapped at surface and deep resistive features were identified that were recommended for drill testing. Resistivity highs with associated magnetic lows were identified at Las Placetas and recommended for drill testing. Linear conductive and magnetic anomalies, untested by drilling, were identified at Picadores and recommended for drill testing. Geophysical surveys at Howler failed to detect any features that correlated with the exposed vein mineralization, however resistivity anomalies with associated high chargeability were identified and a possible high angle mineralized conduit was inferred from the data. IP surveys at La Prieta completed in 2021 delineated a well-defined chargeability anomaly consisting of a circular outer ring (~1400 m in diameter) of chargeability high values and a core of elevated chargeability values with a diameter of about 600 m. The anomaly extends for the depth of investigation (~400 m below surface). Associated with the core of the chargeability anomaly is a donut shaped resistivity low (200 to 500 ohm m) of roughly the same dimension. In the center of the resistivity donut shaped anomaly the calculated values are 1200 ohm

Page 71


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

m. The chargeability and resistivity pattern delineated on the La Prieta grid have visual characteristics and physical parameters that are typical of porphyry systems.

Geologic mapping and concurrent rock chip geochemical sampling were conducted at 1:5,000 scale over approximately 3,000 Ha, focussed on the Quema-Quemita, La Pava, Chontal, Monte Bonito, Las Placetas, Filo Monte Bonito, Idaida, and Caballito targets. As of the date of the 2022 Cerro Quema Report, Orla had collected an analysed a total of 84 rock chip samples. The results of the rock chip sampling confirmed anomalous Au in rock samples at Chontal, Sombrero, Idaida, and Picadores areas. Sampling confirmed the known gold mineralized areas defined during prior exploration campaigns and tested outcrops at Picadores and La Prieta.

DRILLING

Cyprus conducted the first known exploration drilling at the project in 1990, and during the period 1990 to 1994, Cyprus completed a total of 7,228 metres of drilling at Quema-Quemita, 16,171 metres of drilling at La Pava and 248 metres of drilling at Caballito. In 1996, Campbell Resources is reported to have completed 1,749.6 meters of diamond core drilling. Pershimco completed 16,905 metres of drilling at Quema-Quemita, 32,710 metres of drilling at La Pava and 816 metres of drilling at Caballito.

Since acquiring the Cerro Quema Project and as of the effective date of the 2022 Cerro Quema Report, Orla had completed a total of 8,117 metres in 64 diamond core drillholes at the Quema-Quemita deposit and 4,454 metres in 23 diamond core drillholes at the Caballito deposit. Orla had also completed metallurgical sampling drill programs of 345.6 metres in three diamond core holes at the La Pava deposit and 283.5 metres in three diamond core holes at the Quema deposit.

Energold Drilling, Panama, under contract to Orla, began drilling in January 2017. In total 93 diamond holes were drilled during 2017-2018, including three metallurgy holes. The initial drill program was targeting areas proximal to the existing Quema oxide gold deposit that had a high potential to host additional resources. Drilling was successful in identifying a new zone of mineralization at El Domo, on the northwest side of the Quema-Quemita deposit. Targets for this initial program included areas of alteration that could host undiscovered gold zones in oxidized material, potential extensions to the pits outlined in the 2014 PFS and possible upgrades to the resources within the PFS pits based on better geological modelling of the higher-grade parts of the deposits plus a re-interpretation of the base of the oxide zone.

Near the end of 2017, Orla began drilling at the Caballito zone with an initial 7-hole drill program targeting mineralization near surface on the ridge top. This program only had limited success with only two of the holes drilled down slope hitting Au mineralization. The program was however successful in identifying a zone of previously unknown copper mineralization.

In early August 2017, Orla drill tested an airborne EM anomaly at Caballito. This resulted in the Cu-Au discovery hole at Caballito being drilled. Drilling in late 2018 intersected a new zone of mineralization at Sombrero. A previously untested geophysical anomaly halfway between Caballito and Quema-Quemita.

See “Outlook and Future Plans” below for additional information on the Company’s activities at Cerro Quema subsequent to the 2022 Cerro Quema Report.

SAMPLING, ANALYSIS AND DATA VERIFICATION

The following outlines the core sampling procedures implemented by Orla between 2017 and 2018.

ALS personnel place samples in aluminum trays which are transferred to ovens where they are dried for 12 hours at 90°C. The entire sample is then crushed to -10 mesh (2 mm) using a Rock labs Boyd crusher. Sieve tests are conducted at least twice a day to ensure that material is being crushed to the appropriate size. If the quantity passing falls below 80%, crusher jaws are adjusted accordingly. A

Page 72


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

written record of this test is available for review. The crusher is cleaned with high-pressure air after every sample. After every 10 samples a coarse blank sample is passed through the crusher.

Each crushed sample weighs approximately 5 kg. This material is split using a Jones riffle splitter. A 500-gram aliquot of each sample is taken for assay, placed and heat-sealed in a small plastic bag marked with a bar-coded sample tag. The remaining material is returned to the original sample bag and stored on site. The standards, blanks and duplicates are introduced into the assay stream by Orla geologists before shipping. All custody and packing process protocol is executed by ALS representatives on site for shipment by air courier to ALS Chemex in Lima, Perú, for analysis. ALS Chemex is independent of Orla.

At the Lima laboratory, all gold results are obtained by ALS Minerals (Au-AA23) using fire assay fusion and atomic absorption spectroscopy finish. All samples are also analyzed for multi-elements, including silver and copper, using Aqua Regia with ICP-AES. Samples with copper values in excess of 1% by ICP analysis are re-run with Cu AA46 aqua regia and atomic absorption analysis.

During the 2017-2018 Orla drill programs, drill collar locations were identified in the field using a GARMIN GPS-60CSx hand-held GPS unit. After each drill hole was completed, a cement monument with hole number and depth was constructed at the site. The collar locations were surveyed using a differential GPS system and base station (RTK). This system is accurate to 5 cm. All exploration drill holes are surveyed with the FLEXIT smart-tool single shot. Measurements with the FLEXIT are taken at 50 metre intervals throughout the hole.

Drill program design, QA/QC and interpretation of results are performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices.

Prior to Orla’s acquisition of the Cerro Quema Project, practices with regards to the collection of samples by Pershimco included the following, as outlined by KCA in 2014:

(i)Diamond drill core and RC cuttings samples were collected, each approximately one metre. In the event there was a loss of core or cuttings, a change in lithological contact, vein contact or a change in matrix from oxide to sulphide, the minimum sample size allowed was 0.5 metres and the maximum sample size allowed was 1.5 metres.
(ii)Lithological contacts, vein contacts and sulphide content were respected with an appropriate sample interval where possible.
(iii)A thorough QA/QC program was implemented, which included one field blank and at least one certified reference material, (also referred to as a standard), for every batch of 20 samples sent to the laboratory.

The principal lab used by Pershimco was Activation Laboratories (“Actlabs”). Samples were sent to Actlab’s Panama lab for preparation and the resulting pulps were sent to Actlabs in Ancaster, ON, Canada for analysis. Individual samples were entered into the Laboratory Information Management System by Actlabs personnel, dried, and finely crushed. The samples are then returned for a second time to the dryer, and immediately upon their removal from the dryer, were pulverized and riffle-split. Prepared samples were then placed into air-deprived zip lock bags and then into 5-gallon plastic containers, which were sealed and shipped by courier services to Actlabs in Ancaster, Ontario, Canada for assaying. Silver and copper sample tenors were determined using a multi-element ICP method, and gold was determined using fire assay method with atomic absorption finish. Gold values exceeding the 2.5 g/t Au were rerun using fire assay with a gravimetric finish.

The Actlabs’ Quality System is accredited to international quality standards through the ISO/IEC 17025 (ISO/IEC 17025 includes ISO 9001 and ISO 9002 specifications) with CAN-P-1758 (Forensics), CAN-P-1579 (Mineral Analysis) and CAN-P-1585 (Environmental) for specific registered tests by the SCC. The accreditation program includes ongoing audits, which verify the QA system and all applicable registered test methods. Actlabs is also accredited by the National Environmental Laboratory Accreditation Conference program and Health Canada.

Page 73


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Data Verification

The Qualified Person for the Mineral Resource estimate and QA/QC, Sue Bird, visited the Cerro Quema Project on May 4, 2021. During this visit, collar locations at all three deposits were verified, as were the core storage, security and sampling techniques. Mineralization in the core for each deposit was verified. The database provide to MMTS by Orla has been checked with minor corrections made to the database based on Certificate checks. Check assays and twinned holes done previously, as well as check assays done based on MMTS recommendations in 2020 all conclude that the database is suitable for resource estimation. Historic drilling and RC drilling were validated statistically and did not show a material bias. Therefore, Sue Bird concluded that historic drilling is not biased and it has been used for the resource estimate.

MINERAL PROCESSING AND METALLURGICAL TESTING

Historical metallurgical test work programs on the Cerro Quema property were commissioned by the prior operators of the Cerro Quema Project. A confirmatory metallurgical test program was commissioned by Orla in 2018 to confirm the results and conclusions from the previous campaigns. In total, 43 column leach tests, 67 bottle roll tests and 30 vat leach tests have been completed to date on the Cerro Quema ore body.

Based on the metallurgical testing completed on the deposit, key design parameters for the Cerro Quema Project include:

A constant field gold recovery of 88% for all La Pava oxide material and 86% for Quema-Quemita oxides;
Oxide material from La Pava responds very well to cyanide bottle roll and column leaching yielding high gold extractions and low reagent consumptions;
La Pava and Quema-Quemita mixed materials are less amenable to heap leaching and are discounted based on sulphur content to recoveries of 57% for La Pava and 62% for Quema-Quemita;
The data shows no dependence of gold extraction on crush size for the materials and size ranges tested (150 mm to 12.5 mm);
A constant field silver recovery of 30% for all La Pava oxide material and 15% for Quema-Quemita oxides;
A constant field silver recovery of 25% for all La Pava mixed material and 10% for Quema-Quemita mixed;
Silica clay material shows poor permeability and will require blending with silica material to maintain heap permeability without cement agglomeration;
Design leach cycle of 70 days;
Agglomeration with cement not required for permeability or stability;
Average cyanide consumption of 0.19 kilograms per tonne (kg/t) ore for La Pava, and 0.18 kg/t ore for Quema-Quemita; and
Average lime consumption of 1.4 kg/t ore for La Pava and 2.5 kg/t ore for Quema-Quemita.

Page 74


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The key design parameters are based on a substantial number of metallurgical tests including 43 column leach tests on samples representative of domains in the current deposit model. These 43 representative samples from documented drillholes with good spatial distribution in the proposed pit. In general, the Cerro Quema deposit shows variability in gold and silver recoveries based on material type and alteration type with sulphur being the only significant deleterious element identified, which is primarily associated with the mixed material at depth. Recoveries for the oxide material are good and will yield acceptable results using conventional heap leaching methods with cyanide. Recoveries for the mixed material are lower and reagent consumptions are higher when compared with the oxide for conventional leaching.

Preliminary flotation and cyanidation tests on samples from the Caballito deposit were completed by Orla in 2018 by Bureau Vertis Commodities Canada Ltd. Based on the results from these tests, the Caballito Resource estimate used metallurgical recoveries within the sulphides of 90% for copper, 55% for gold, and 45% for silver and payable metal factors of 90% for gold and 90% for silver and 96% for copper.

MINERAL RESOURCES

See “Summary of Mineral Reserve and Mineral Resource Estimates” above for the Company’s current Mineral Resource estimates for the Cerro Quema Project.

The Mineral Resource estimate for the La Pava, Quemita, and Caballito deposits of the Cerro Quema Project has an effective date of November 2, 2021. La Pava and Quemita and consists of an Au-Ag oxide zone and mixed zone. Caballito consists primarily of a Cu-Au-Ag sulfide zone and a minor Au-Ag oxide zone. The sulphide zone for the La Pava and Quemita deposits is not included in this resource estimate. Resource summaries are presented under the heading “Summary of Mineral Reserve and Mineral Resource Estimates” for oxide/mixed and sulfides at the base case NSR cut-off grades as indicated in the notes to the table. Sensitivity of the Mineral Resource estimate to cutoff grade is summarized by area and zone in the 2022 Cerro Quema Report. The base case cutoff is highlighted for each deposit and zone.

Mineral Resources are reported inclusive of those Mineral Resources converted to Mineral Reserves. The Mineral Resource Estimate includes Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources were estimated using the 2019 CIM Best Practice Guidelines and are reported using the 2014 CIM Standards.

The following factors, among others, could affect the Mineral Resource estimate: commodity price and exchange rate assumptions; pit slope angles; assumptions used in generating the Lerchs Grossman (“LG”) pit shell, including metal recoveries, and mining and process cost assumptions. The Qualified Person is not aware of any environmental, permitting, legal, title, taxation, socioeconomic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate, other than the permitting issues as discussed above under “Project Description, Location, and Access” and as further discussed in Section 4.2 of the 2022 Cerro Quema Report. Please also refer to “Risk Factors – Concessions Risk” and “Risk Factors – EIA Permit”.

Ordinary Kriging (OK) has been used for Au, Cu and Ag interpolations. The base case cut-off grade within the “reasonable prospects of eventual economic extraction” constraining pit is based on the same NSR cutoffs used to define the oxide reserves in the 2022 Cerro Quema Report. The base case cutoff grade for the sulphides is US$15.00/tonne and is based on processing cost for comparable projects. All cutoffs are also based on the recoveries, processing and smelter terms as summarized in the notes to the tables.

Page 75


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

MINERAL RESERVES

See “Summary of Mineral Reserve and Mineral Resource Estimates” above for the Company’s current Mineral Reserve estimates for the Cerro Quema Project.

Only Measured and Indicated Resource Class materials are included in the Mineral Reserves. All Inferred Resource Class material is treated as waste in calculating economic pit limits and in subsequent reserves reporting, scheduling, and economics. The effective date of the Mineral Reserves is April 22, 2021.

Proven and Probable Reserves are derived from the Measured and Indicated Resource Class blocks within the designed pits and are summarized under the heading “Summary of Mineral Reserve and Mineral Resource Estimates”. Mineral Reserves are stated as Crusher Feed and represent mined ore processed through the crusher and delivered to the heap leach facility.

MINING OPERATIONS

A PFS level mine plan, mine production schedule, and mine capital and operating costs has been developed for the Cerro Quema Project. The Cerro Quema Project includes detailed pit designs and phases for the La Pava and Quema pits. Detailed designs are based an economic pit limit established through a series of pit optimizations carried out using the LG algorithm with a range of input metal prices.

The PFS level detailed pit designs demonstrate the viability of mining operations for the Cerro Quema deposits and are used to develop the mine plan and production schedule. The production schedule uses production requirements, mine operating considerations, product prices, recoveries, destination capacities, equipment performance, haul cycle times, and operating costs to provide an optimized seven-year mine plan with an average annual throughput of 3.65 million tonnes per annum (“Mtpa”) of Crusher Feed and average annual tonnes moved of 6 Mtpa.

Mine operations are planned to be typical of similar small scale open pit operations, consisting of conventional drill, blast, load, haul, and stockpile operations. Direct Mining and Mine Maintenance is planned as Owner operated mining operations. The Owner will be responsible for all equipment mob/demob, operating, and labour costs as well as maintenance of the mining equipment. Blasting unit operations will be performed by a specific blasting company contractor. Supervision, geology, and mine planning will be done by the Owner.

PROCESSING AND RECOVERY OPERATIONS

The Cerro Quema Project will be a 10,000 tonne per day heap leach operation with a single stage crushing circuit and conveyor stacking system on a single use pad. Gold will be leached from the ore with a dilute cyanide solution and recovered in a carbon adsorption-desorption-recovery plant to produce doré bars.

Ore will be mined using standard open pit mining methods and delivered to the crushing circuit using haul trucks which will direct dump into a dump hopper; a front-end loader will feed material to the dump hopper as needed from a ROM stockpile located near the primary crusher. Ore will be crushed to a final product size of 80% passing 105 mm in a single stage jaw crusher. The crushing circuit will operate 7 days/week, 24 hours/day, 365 days/year with an overall estimated availability of 75%.

The crushed product will be conveyed from the crushing circuit and stockpiled using a fixed stacker near the heap. Stockpiled material will be reclaimed by belt feeders and conveyed to the conveyor stacking system. Pebble lime will be added to the reclaim conveyor for pH control before being stacked onto the heap; barren process solution will be added to the ore once it is over the lined leach pad.

Page 76


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Stacked ore will be leached using a drip and/or sprinkler irrigation system for solution application depending on water balance requirements. After percolating through the ore, gold, and silver-bearing solution will drain by gravity to a pregnant solution pond where it will be collected and pumped to a carbon in column (“CIC”) adsorption circuit. Gold and silver values will be loaded onto activated carbon in one train of five cascade columns. Barren solution from the final column will flow by gravity to a barren tank and will then be pumped to the heap for further leaching. High strength cyanide solution will be injected into the barren solution to maintain the cyanide concentration in the leach solutions at the desired level.

Loaded carbon from the CIC will be stripped using a pressure Zadra desorption circuit in 2.5 tonne batches. During the desorption process, gold, and silver will be continuously extracted by electrowinning from the pregnant eluate concurrently with desorption. The gold sludge will be washed from the electrowinning cell cathodes, treated in a mercury retort to recovery mercury values, and smelted to produce the final doré product.

Carbon from the adsorption circuit will be acid washed prior to each stripping cycle in an acid wash vessel. A portion of the carbon will be thermally regenerated using a kiln after each strip to maintain carbon activity.

Diesel generators will be used to supply electric power to all elements of the process plant.

An excess solution (stormwater) pond is included to contain any leach solutions and/or precipitation events that cannot be managed during normal operations. The excess solution will be returned to the barren tank as a make-up solution during average precipitation years. During wet years, excess solution will need to be treated and discharged. Cyanide present in the excess solution will be neutralized using sodium metabisulfite followed by additional treatment in a heap leach water treatment plant to remove any other deleterious elements; solutions being discharged will pass through a pair of scavenger carbon columns to recover any metal values in solution prior to treatment. Make-up water will be from a combination of excess solution and wells.

INFRASTRUCTURE

An existing site access road intersects with Via Tonosi approximately 32 km south of Macaracas. The access road runs north approximately 7 km to the location of the platform constructed between La Pava and Quema-Quemita by Orla. Improvements to the existing road will be required and include widening to approximately 9 m to allow two over-the-road trucks to pass; re-contouring to eliminate grades in excess of 7%; and grading to a ditch on one side for drainage.

Raw water will be supplied by Well Number 4-2013 located approximately 1.1 km north, north east of the existing platform at an elevation of 190 metres above sea level (“masl”). Raw water will be stored in a tank located approximately south-southeast of the existing platform near the access road to La Pava at an elevation of 480 masl. The raw water will be used for dust control, fire water, and process water make-up.

The diesel fuel used for equipment will be offloaded and stored in a cylindrical horizontal steel tank located on the western end of the existing platform at 423 masl. This tank will supply fuel for the mine fleet and light vehicles. For power generation, two 100 m3 horizontal diesel storage tanks will ensure adequate fuel supply is available to operate the generators.

A medical clinic will be located in the administration office building on the existing platform and is intended to be staffed by medical professionals that can provide proper treatment. Medical treatment will be limited to the attendance of minor accidents and stabilization of patients that have received minor trauma. In the event high level medical care is needed, the ambulance will be equipped and prepared for emergency transport to the nearest medical facility.

Internal communications will be by radio frequency which is already installed at the Cerro Quema site. External communications will be through a mix of landline, cellular and VOIP. Primary communications and any required equipment will be located within the server room in the administration building.

Page 77


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

ENVIRONMENTAL, PERMITTING, AND SOCIAL OR COMMUNITY FACTORS

Environmental

Baseline environmental studies were completed by previous operators of the Cerro Quema Project. For the 2022 Cerro Quema Report, Orla commissioned independent consultants to conduct more complete baseline environmental studies over the project area. A key objective is to design and build the project in such a way that it does not cause significant adverse effects during construction, operation, closure, and post-closure. To aid this objective, a number of Environmental Management Plans will be developed. An outline of some of the key plans is provided in the 2022 Cerro Quema Report. These plans will need to be developed further before construction begins. They will also need to be reviewed and revised during the life of the project.

Reclamation will be undertaken during mining activities where possible, but the majority of reclamation work will occur after the completion of mining and final gold recovery. The reclamation land use objective will be to return the land to its traditional use as local wildlife habitat. Closure objectives include securing the site to assure physical safety of people, protecting wildlife, protecting surface and groundwater quality and quantity, minimizing erosion, and controlling fugitive dust.

Permitting

Environmental assessment requirements in Panama are regulated by Decree Law #123 which specifies measures by which the process of submitting and reviewing an Environmental Impact Study (Estudio de Impacto Ambiental – EIA) for a proposed project shall be carried out, in accordance with the provisions of Law No. 41 of July 1, 1998 – Environmental Protection Law of the Republic of Panama.

The proposed Cerro Quema Project falls under Article 16 of the Decree (Associated International Standard Industrial Classification of All Economic Activities [ISIC] Code #1310). In accordance with the Decree, the Cerro Quema Project is classified as a Category III EIA.

Prior project operator Pershimco completed an EIA and permits are in place for a continuous vat leach operation previously proposed by Pershimco. However, as the current project will utilize heap leach processing methods, an application for the required Category III EIA permit was submitted in 2015. The Ministry has completed the technical evaluation of the EIA, and MCQ believes the Ministry is in the process of preparing the formal resolution to approve it. Timing of approval is presently not known.

In 2020, MCQ contracted ERM Consultants Canada Ltd. (“ERM”) to assess if the information presented in the EIA is in accordance with the requirements established by Panamanian regulations, International Finance Corporation Performance Standards 2012 (IFC PS), and currently accepted industry best practices. ERM found no fatal flaws with respect to Panamanian regulations but identified areas where environmental permitting studies and management plans should be improved to fully meet local requirements, International Standards and currently accepted industry practices. ERM provided recommendations that should be followed as the project advances, as summarized in the 2022 Cerro Quema Report.

Social Impact

The Category III EIA submitted for approval in 2015 included community studies providing a general understanding of the social fabric and stakeholders associated with the Cerro Quema Project. In 2020, Orla engaged an independent consultant to conduct an EIS gap assessment and also to provide a Social Impact Assessment (“SIA”) Scoping to complete a full SIA for the Cerro Quema Project. Although Panamanian regulations do not require mining projects to present a detailed social assessment, Orla is committed to preparing a comprehensive SIA in compliance with existing local requirements and international guidelines.

Page 78


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

CAPITAL AND OPERATING COSTS

Capital and operating costs for the process and general and administration components of the Cerro Quema Project were estimated by KCA with information from Anddes and Linkan. Costs for the mining components were provided by MMTS. The estimated costs are considered to have an accuracy of +/-25%.

The total LOM capital cost for the Cerro Quema Project is US$211.7 million, including US$7.2 million in working capital and initial fills, not including reclamation and closure costs estimated at US$15.4 million, ITBMS (value added tax) or other taxes; Cerro Quema is assumed to be fully exempt from ITBMS. The following table presents the capital requirements for the Cerro Quema Project.

Capital Cost Summary

Description

    

Cost (US$)

Pre-Production Capital

$

163,671,000

Working Capital & Initial Fills

$

7,216,000

Sustaining Capital – Mine & Process

$

40,797,000

Total excluding ITBMS

$

211,685,000

The average life of mine operating cost for the Cerra Quema Project is US$10.34 per tonne of ore processed. The following table presents the LOM operating cost requirements for the Cerro Quema Project.

Operating Cost Summary

Description

    

Cost (US$/t ore)

Mine

$

3.50

Process & Support Services

$

4.44

Site G & A

$

2.40

Total

$

10.34

Mining costs during heap leach operations (Years 1-7) were provided by MMTS at US$2.15 per tonne mined (US$3.50 per tonne of ore) and are based on quotes for mining equipment and estimated Owner’s mining costs.

Process operating costs have been estimated by KCA from first principles. Labour costs were estimated using project specific staffing, salary and wage, and benefit requirements. Unit consumptions of materials, supplies, power, water and delivered supply costs were also estimated. LOM average processing costs are estimated at US$4.44 per tonne ore.

G&A costs have been estimated by KCA with input from Orla. G&A costs include project specific labour and salary requirements and operating expenses, including social contributions and land access. G&A costs are estimated at US$2.40 per tonne ore.

Operating costs were estimated based on Q1 2021 US dollars and are presented with no added contingency based upon the design and operating criteria presented in the 2022 Cerro Quema Report. ITBMS is not included in the operating costs.

The operating costs presented are based upon the ownership of all process production equipment and site facilities, not including the onsite power generation set. The owner will employ and direct all process operations, maintenance, and support personnel for all site activities.

Page 79


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Based on the estimated production schedule, revenue, capital costs, operating costs, taxes, and royalties, a cash flow model was prepared by KCA for the economic analysis of the Cerro Quema Project. All of the information used in this economic evaluation has been taken from work completed by KCA, Moose Mountain, Anddes, and Linkan as described in the 2022 Cerro Quema Report.

The Cerro Quema Project economics were evaluated using a discounted cash flow (DCF) method, which measures NPV of future cash flow streams. The results of the economic analyses represent forward-looking information as defined under Canadian securities law (see “Introductory Notes and Cautionary Statements – Cautionary Note Regarding Froward-Looking Statements”). The results depend on inputs that are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those presented here.

The final economic model was developed by KCA using the following assumptions:

The cashflow model is based on the mine production schedule from MMTS;
The period of analysis of 12 years includes two years of pre-production and investment, seven years of production and three years for closure and reclamation;
Gold price of US$1,600/oz;
Silver price of US$20/oz;
Processing rate of 10,000 tpd ore;
Overall recoveries of 87% for gold and 26% for silver as discussed in Section 13.0 of the 2022 Cerro Quema Report;
Capital and operating costs as discussed in the 2022 Cerro Quema Report;
Net Smelter Royalties of 4%;
Income Tax Rate of 25%; and
ITBMS exempt.

The Cerro Quema Project economics based on these criteria from the cash flow model are summarized in the table below.

Page 80


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Economic Analysis Summary

Production Data

    

  

    

Life of Mine

    

6.0

    

Years

Design Production Throughput per day

10,000

 

Tonnes Ore /day

Design Production Throughput per year

3,650,000

 

Tonnes Ore /year

Total Tonnes to Crusher

21,738,000

 

Tonnes Ore

Grade Au (Avg.)

0.80

 

g/t

Grade Ag (Avg.)

2.18

 

g/t

Contained Au oz

562,000

 

Ounces

Contained Ag oz

1,526,000

 

Ounces

Metallurgical Recovery Au (Overall)

87

%  

  

Metallurgical Recovery Ag (Overall)

26

%  

  

Average Annual Gold Production

81,000

 

Ounces

Average Annual Silver Production

66,000

 

Ounces

Total Gold Produced

489,000

 

Ounces

Total Silver Produced

399,000

 

Ounces

LOM Strip Ratio (W:O)

0.66

 

  

Operating Costs (Average LOM)

  

 

  

Mining (including preproduction tonnes & costs)

$

2.26

 

/Tonne mined

Mining (Years 1-7 tonnes & costs)

$

2.15

 

/Tonne mined

Mining (processed)

$

3.50

 

/Tonne Ore processed

Processing & Support

$

4.44

 

/Tonne Ore processed

G&A

$

2.40

 

/Tonne Ore processed

Total Operating Cost

$

10.34

/Tonne Ore processed

Total By-Product Cash Cost (1)

$

511

/Ounce Au

All-in Sustaining Cost (ASIC) (1)

$

626

/Ounce Au

Capital Costs (Excluding IVA and Closure)

 

  

  

Initial Capital

$

164

million

LOM Sustaining Capital

$

41

million

Total LOM Capital

$

204

 

million

Working Capital & Initial Fills

$

7

million

Closure Costs

$

15

million

Financial Analysis

 

  

  

Gold Price Assumption

$

1,600

/Ounce

Silver Price Assumption

$

20

/Ounce

Average Annual Cashflow (Pre-Tax)

$

72

million

Average Annual Cashflow (After-Tax)

$

62

million

Internal Rate of Return (IRR), Pre-Tax

 

47.8

%  

  

Internal Rate of Return (IRR), After-Tax

 

37.8

%  

  

NPV @ 5% (Pre-Tax)

$

233

million

NPV @ 5% (After-Tax)

$

176

million

Pay-Back Period (Years based on After-Tax)

 

1.7

Years


Page 81


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Notes:

(1)Total cash cost and AISC are non-GAAP measures and are net of silver credits and includes royalties payable. See “Introductory Notes and Cautionary Statements – Non-GAAP Measures” for additional information.

Sensitivity Analysis

To estimate the relative economic strength of the Cerro Quema Project, base case sensitivity analyses have been completed analyzing the economic sensitivity to key parameters including changes in gold price, total capital cost, and average operating cash cost per tonne of ore processed. The after-tax sensitivity analysis is presented in the table below. The economic indicators chosen for sensitivity evaluation are the IRR and NPV at 5% and 10% discount rates. From these sensitivities, it can be seen that the project is economically robust.

Sensitivity Analysis (After Tax)

NPV

    

Variation

    

IRR

    

5%

  

10%

Gold Price

 

  

 

  

 

  

 

  

80%

$

1,280

 

22.9

%  

$

87,153,871

$

52,033,034

90%

$

1,440

 

30.6

%  

$

131,371,880

$

87,103,411

100%

$

1,600

 

37.8

%  

$

175,589,889

$

122,173,789

110%

$

1,760

 

44.5

%  

$

219,807,898

$

157,244,167

120%

$

1,920

 

51.0

%  

$

264,025,906

$

192,314,544

Capital Costs

 

  

 

  

 

  

 

  

75%

$

170,518,548

 

54.0

%  

$

210,697,536

$

154,900,748

90%

$

200,106,345

 

43.4

%  

$

189,632,948

$

135,264,573

100%

$

219,831,543

 

37.8

%  

$

175,589,889

$

122,173,789

110%

$

239,556,740

 

33.0

%  

$

161,546,830

$

109,083,005

125%

$

269,144,537

 

27.1

%  

$

140,482,241

$

89,446,830

Operating Costs

 

  

 

  

 

  

 

  

75%

$

168,527,635

 

42.0

%  

$

208,013,005

$

147,130,446

90%

$

202,233,162

 

39.5

%  

$

188,559,135

$

132,156,452

100%

$

224,703,514

 

37.8

%  

$

175,589,889

$

122,173,789

110%

$

247,173,865

 

36.0

%  

$

162,620,642

$

112,191,126

125%

$

280,879,392

 

33.2

%  

$

143,166,772

$

97,217,132

OUTLOOK AND FUTURE PLANS

Since the date of the 2022 Cerro Quema Report, the Company has continued to explore the La Pava, Quemita, and Caballito deposits, including exploration drilling and preliminary metallurgical testing, as well as conducting drill testing La Pelona and La Prieta exploration targets.

Page 82


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

2022 Exploration

Exploration activities resumed at Cerro Quema in 2022, with a combination of near-deposit and regional exploration diamond drilling. Near-deposit drilling focused on infill and metallurgical drilling at the Caballito deposit (4,339 m and 599 metres drilled, respectively) and expansion drilling targeting sulphide mineralization below the oxide-gold deposit at La Pava (1,343 metres drilled). Regional exploration drilling consisted of follow-up drilling at Quemita Norte (1,328 metres drilled), and drill testing regional exploration targets at La Pelona (540 metres drilled) and La Prieta (1, 494 metres drilled).

Planned 2023 Exploration

The planned 2023 exploration program will consist of approximately 5,500 m of drilling to follow-up on encouraging drill results returned from La Pelona and La Prieta regional exploration targets during the 2022 exploration program. The objective of the 2023 drilling at La Pelona will be to test the strike length of a chargeability high for oxide hosted Au-Cu mineralization and sulphide hosted Cu-Au mineralization. At La Prieta, the objective will be to continue drill testing the multi-phase intrusive body to better define potential for sulphide-hosted intrusion related Cu-Au mineralization.

MONITOR GOLD PROJECT

The Company holds a 100% interest in the Monitor Gold Project, which covers approximately 2,800 ha in central Nevada. The Monitor Gold Project is not considered to be a material project for the Company. The Company acquired the Monitor Gold Project pursuant to an agreement dated January 25, 2018 (the “Monitor Agreement”). The Monitor Agreement is structured as a lease between the vendor, Mountain Gold Claims LLC (“Mountain Gold”), a privately held Nevada company, Orla, and Monitor Gold Corporation, a wholly-owned subsidiary of Orla.

In 2022, activities at the Monitor Gold Project included the Company advancing drill permitting activities for the drill program developed in 2021 to test the King Solomon and Green Monster targets. Additional activities are planned for 2023 to continue advancing the drill permits. No drilling is planned in 2023 at the Monitor Gold Project.

LEWIS PROJECT

The Lewis Project was acquired by the Company through its acquisition of Gold Standard. The project is strategically located adjacent to the north and within the Plan of Operations boundary of Nevada Gold Mines’ Phoenix Operation. The Lewis Project has an Inferred Mineral Resource of 206,000 ounces of gold (7.74 million tonnes at 0.83 g/t gold) and several additional prospective targets that have the potential to expand the resource base. For additional detail, see the technical report entitled "Technical Report and Mineral Resource Estimate for the Lewis Project, Lander County, Nevada, USA” dated June 15, 2020 and an effective date of May 1, 2020, which is available on SEDAR and EDGAR under Gold Standard’s profile at www.sedar.com and www.sec.gov, respectively, as well as the Company’s website. The Lewis Project is not considered to be a material project for the Company. No exploration activities are planned at the Lewis Project in 2023.

RISK FACTORS

In addition to the usual risks associated with an investment in a mineral exploration, development, and operating company, the Company believes that, in particular, the risk factors set out below should be considered. It should be noted that this list is not exhaustive and that other risk factors may apply. If any of these risks materialize into actual events or circumstances or other possible additional risks and uncertainties of which the Directors of the Company are currently unaware or which they consider not to be material in relation to the Company’s business, actually occur, the Company’s assets, liabilities, financial condition, results of operations (including future results of operations), business, and business prospects could be materially adversely affected. In such circumstances, the price of the

Page 83


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Company’s securities could decline, and investors may lose all or part of their investment. An investment in the Company may not be suitable for all investors.

UNCERTAINTY IN THE ESTIMATION OF MINERAL RESERVES AND MINERAL RESOURCES

The figures for Mineral Reserves and Mineral Resources contained in this AIF are estimates only and no assurance can be given that the anticipated tonnages and grades will be achieved, that the indicated level of recovery will be realized, or that Mineral Reserves or Mineral Resources will be mined or processed profitably. The Company cannot give any assurance that such estimates will be achieved. Failure to achieve such estimates could have an adverse impact on the Company’s future cash flows, profitability, results of operations and financial condition.

Until a deposit is actually mined and processed, the quantity of metal and grades must be considered as estimates only. Actual Mineral Reserves or Mineral Resources may not conform to geological, metallurgical, or other expectations, and the volume and grade of ore recovered may differ from estimated levels. There are numerous uncertainties inherent in estimating Mineral Reserves and Mineral Resources, including many factors beyond the Company’s control. Such estimation is a subjective process, and the accuracy of any Mineral Reserve or Mineral Resource estimate is a function of the quantity and quality of available data and of the assumptions made and judgments used in engineering and geological interpretation. It is inherently impossible to have full knowledge of particular geological structures, faults, voids, intrusions, natural variations in and within rock types and other occurrences. Failure to identify such occurrences in the Company’s assessment of Mineral Reserves and Mineral Resources may have a material adverse effect on the Company’s future cash flows, results of operations, and financial condition.

Short-term operating factors relating to the Mineral Reserves, such as the need for orderly development of the ore bodies or the processing of new or different ore grades, may cause the mining operation to be unprofitable in any particular accounting period. In addition, there can be no assurance that gold recoveries in small scale laboratory tests will be duplicated in larger scale tests under on-site conditions or during production. Fluctuations in gold, silver, copper, and base or other precious metals prices, results of drilling, metallurgical testing and production, and the evaluation of studies, reports, and plans subsequent to the date of any estimate may result in a revision of estimates from time to time or may render the estimates uneconomic to exploit. Mineral Resource and Mineral Reserve data is not indicative of future results of operations. Estimated Mineral Resources or Mineral Reserves for the Company’s properties are evaluated from time to time and may require adjustments or downward revisions based upon further exploration or development work, geological interpretation, drilling results, metal prices, or actual production experience. Any material reductions in estimates could have a material adverse effect on the Company’s results of operations and financial condition.

The category of Inferred Mineral Resource is the least reliable Mineral Resource category and is subject to the most variability. Due to the uncertainty which may attach to Inferred Mineral Resources, there is no assurance that Inferred Mineral Resources will be upgraded to Proven Mineral Reserves and Probable Mineral Reserves as a result of continued exploration. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

DEPENDENCE ON THE CAMINO ROJO OXIDE MINE

The Camino Rojo Oxide Mine accounts for all of the Company’s current production and is expected to continue to account for all of its production in the near term. Any adverse condition affecting mining, processing conditions, expansion plans, or ongoing permitting at the Camino Rojo Oxide Mine could have a material adverse effect on the Company’s financial performance and results of operations. Even though the Company has established mining operations and estimates of future production, various factors, including costs, actual mineralization, consistency and reliability of ore grades, processing rates, and commodity prices can affect cash flow and profitability, and there can be no assurance that current or future estimates of these factors will reflect actual results and performance. The cost and availability of suitable machinery, supplies, mining equipment, and skilled labour, the existence of competent operational management and prudent financial administration, as well as the availability and reliability of appropriately skilled and experienced consultants, can also affect successful project operations. The activities of the Company at the Camino Rojo Oxide Mine may also be subject to prolonged

Page 84


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

disruption from a variety of risks normally encountered in production of precious metals as further described below under “Risk Factors – Exploration, Development and Production Risks”. The failure of the Company to achieve its production estimates could have a material and adverse effect on future cash flows, profitability, results of operations, and financial condition.

INDEBTEDNESS

As of December 31, 2022, Orla had aggregate consolidated indebtedness under its Credit Facility as discussed under the heading “General Development of the Business – Developments During 2022”. As a result, the Company is required to use a portion of its cash flow to service principal and interest on its debt, which will limit the cash flow available for other business opportunities. The Company’s ability to make scheduled payments of the principal of, to pay interest on, or to refinance indebtedness depends on its future performance, which is subject to economic, financial, competitive, and other factors beyond its control. The Company may not generate cash flow from operations in the future sufficient to service debt and make necessary capital expenditures. If the Company is unable to generate such cash flow, it may be required to adopt one or more alternatives, such as selling assets, restructuring debt, or obtaining additional equity capital on terms that may be onerous or highly dilutive. The Company’s ability to refinance its indebtedness will depend on the capital markets and its financial condition at such time. The Company may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default. The terms of the Credit Facility also require the Company to satisfy various affirmative and negative covenants and financial ratios. These covenants and ratios limit, among other things, the Company’s ability to incur further indebtedness, create certain liens on assets, engage in certain types of transactions, or pay dividends. The Company can provide no assurances that in the future, it will not be limited in its ability to respond to changes in its business or competitive activities or be restricted in its ability to engage in mergers, acquisitions, or dispositions or acquisitions of assets. Furthermore, a failure to comply with these covenants and ratios would likely result in an event of default under the Credit Facility and would allow the lenders to accelerate the debt, which could materially and adversely affect the Company’s business, financial condition, and results of operations, as well as the market price of the Company’s securities.

EXPLORATION, DEVELOPMENT, AND PRODUCTION RISKS

The business of exploring for minerals, development, and mining involves a high degree of risk. The operations of the Company may be disrupted by a variety of risks and hazards normally encountered in the exploration, development, and production of precious metals, including, without limitation, unusual and unexpected geologic formations, seismic activity, rock bursts, cave-ins, flooding, and other conditions involved in the drilling and removal of material, any of which could result in damage to, or destruction of, mines and other producing facilities, personal injury or loss of life, and damage to tailings dams, property, and environmental damage, all of which may result in possible legal liability. The occurrence of any of these events could result in a prolonged interruption of the Company’s activities that would have a material adverse effect on its business, financial condition, results of operations, and prospects. Further, the Company may be subject to liability or sustain losses in relation to certain risks and hazards against which it cannot insure or for which it may elect not to insure. The occurrence of operational risks and/or a shortfall or lack of insurance coverage could have a material adverse impact on the Company’s results of operations and financial condition.

The exploration for and development of mineral deposits involves significant risks, which even a combination of careful evaluation, experience and knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties that are explored are ultimately developed into producing mines. Even when mineralization is discovered, it may take several years until production is possible, during which time the economic feasibility of production may change. Major expenses may be required to locate and establish Mineral Reserves, to develop metallurgical processes, and to construct mining and processing facilities at a particular site. It is impossible to ensure that the exploration or development programs planned by Orla will result in a profitable commercial mining operation. Whether a mineral deposit will be commercially viable depends on a number of factors, some of which are: the particular attributes of the deposit, such as size, grade and proximity to infrastructure, metal prices that are highly cyclical, and government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals, and environmental protection. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital. There is no certainty that the expenditures made towards the

Page 85


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

search and evaluation of mineral deposits will result in discoveries or development of commercial quantities of ore. Development projects have no operating history upon which to base estimates of future capital and operating costs. For development projects, Mineral Resource estimates and estimates of operating costs are, to a large extent, based upon the interpretation of geologic data obtained from drill holes and other sampling techniques, and feasibility and pre-feasibility studies, which derive estimates of capital and operating costs based upon anticipated tonnage and grades of ore to be mined and processed, ground conditions, the configuration of the ore body, expected recovery rates of minerals from ore, estimated operating costs, and other factors. As a result, actual production, cash operating costs, and economic returns could differ significantly from those estimated. It is not unusual for new mining operations to experience problems during the start-up phase, and delays in the commencement of production can often occur.

NATURAL DISASTERS, TERRORIST ACTS, HEALTH CRISES AND OTHER DISRUPTIONS AND DISLOCATIONS, INCLUDING BY THE COVID-19 PANDEMIC, WHETHER THOSE EFFECTS ARE LOCAL, NATIONWIDE OR GLOBAL

Upon the occurrence of a natural disaster, pandemic, or upon an incident of war, riot, or civil unrest, the impacted country, and the overall global economy, may not efficiently and quickly recover from such an event, which could have a material adverse effect on the Company. Terrorist attacks, public health crises including epidemics, pandemics, outbreaks of new infectious diseases or viruses, and related events can result in volatility and disruption to global supply chains, operations, mobility of people, patterns of consumption and service, and the financial markets, which could affect interest rates, credit ratings, credit risk, inflation, business, financial conditions, results of operations, and other factors relevant to the Company.

Global markets have been adversely impacted by emerging infectious diseases and/or the threat of outbreaks of viruses, other contagions or epidemic diseases, including the novel COVID-19, and many industries, including the mining industry, have been impacted. The outbreak has led to a widespread crisis that is adversely affecting the economies and financial markets of many countries. If increased levels of volatility continue, or in the event of a rapid destabilization of global economic conditions, there may be an adverse effect on commodity prices, demand for metals, availability of equity or credit, investor confidence, and general financial market liquidity, all of which may adversely affect the Company’s business and the market price of the Company’s securities. In addition, there may not be an adequate response to emerging infectious diseases, or significant restrictions may be imposed by a government, either of which may impact mining operations. There are potentially significant economic and social impacts, including labour shortages and shutdowns, delays and disruption in supply chains, social unrest, government or regulatory actions or inactions, including quarantines, travel restrictions, declaration of national emergencies, permanent changes in taxation or policies, decreased demand or the inability to sell and deliver doré or concentrates and resulting commodities, declines in the price of commodities, delays in permitting or approvals, suspensions or mandated shut downs of operations, governmental disruptions, or other unknown events with potentially significant impacts. At this time, the Company cannot accurately predict what impacts there will be or what effects these conditions will have on the business, including those uncertainties relating to the ultimate geographic spread, the duration of the outbreak, and the length of restrictions or responses that have been or may be imposed by the governments. Given the global nature of the Company’s operations, the Company may not be able to accurately predict which operations will be impacted. Any outbreak or threat of an outbreak of a contagious or epidemic disease could have a material adverse effect on the Company, its business and operational results, and the market price of its securities.

FOREIGN COUNTRY AND POLITICAL RISK

The Company’s principal mineral properties are located in Mexico, Panama, and the United States. The Company is subject to certain risks as a result of conducting foreign operations, including, but not limited to: currency fluctuations; possible political or economic instability that may result in the impairment or loss of mineral titles or other mineral rights; opposition from environmental or other non-governmental organizations; government regulations relating to the mining industry; renegotiation, cancellation, or forced modification of existing contracts; expropriation or nationalization of property; changes in laws or policies or increasing legal and regulatory requirements including those relating to taxation, royalties, imports, exports, duties, currency, or other claims by government entities, including retroactive claims and/or changes in the administration of laws, policies, and practices; uncertain political and economic environments; war, terrorism, narco-terrorist actions or activities, sabotage, and civil disturbances; delays in obtaining or the inability

Page 86


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

to obtain or maintain necessary governmental or similar permits or to operate in accordance with such permits or regulatory requirements; currency fluctuations; import and export regulations, including restrictions on the export of gold or other minerals; limitations on the repatriation of earnings; and increased financing costs. Any changes in regulations or shifts in political attitudes are beyond the control of the Company and may adversely affect its business.

The introduction of new tax laws, regulations, or rules, or changes to, or differing interpretation of, or application of, existing tax laws, regulations, or rules in any of the countries in which the Company currently conducts business or in the future may conduct business, could result in an increase in taxes, or other governmental charges, duties, or impositions. No assurance can be given that new tax laws, rules, or regulations will not be enacted or that existing tax laws will not be changed, interpreted, or applied in a manner that could result in the Company being subject to additional taxation or that could otherwise have a material adverse effect on the Company.

Although the Company believes that its exploration and production activities are currently carried out in accordance with all applicable rules and regulations, new rules and regulations may be enacted, and existing rules and regulations may be applied in a manner that could limit or curtail production or development of the Company’s properties. Amendments to current laws and regulations governing the operations and activities of the Company or more stringent implementation thereof could have a material adverse effect on the Company’s business, financial condition, and results of operations.

The Company’s primary operations are currently conducted in Mexico. Violence in Mexico is well documented and has, over time, been increasing. Conflicts between the drug cartels and violent confrontations with authorities are not uncommon. Other criminal activity, such as kidnapping and extortion, is also an ongoing concern. Many incidents of crime and violence go unreported and efforts by police and other authorities to reduce criminal activity are challenged by a lack of resources, corruption, and the pervasiveness of organized crime. Incidents of criminal activity have occasionally affected the communities in the vicinity of the Company’s operations. Such incidents may prevent access to the Company’s mines or offices; halt or delay operations and production; result in harm to employees, contractors, visitors, or community members; increase employee absenteeism; create or increase tension in nearby communities; or otherwise adversely affect the Company’s ability to conduct business. The Company can provide no assurance that security incidents, in the future, will not have a material adverse effect on its operations.

In addition, one of the Company’s material mineral properties is located in Panama. Panama remains a developing country. If the economy of Panama fails to continue growth or suffers a recession, it may have an adverse effect on the Company’s operations in that country.

The Company does not carry political risk insurance.

CONCESSIONS RISKS

The original 20-year term for the concessions at the Cerro Quema Project expired on February 26, 2017 (Contracts 19 and 20) and March 3, 2017 (Contract 21). The Company has applied for the prescribed 10-year extension to these contracts as it is entitled to under Panamanian mineral law. The Company believes it has complied with all legal requirements in relation to the concessions. On March 6, 2017, the Ministry of Commerce and Industry provided written confirmation to the Company that the extension applications were received, and that exploration work could continue while the Company waits for the renewal of the concessions. The Company has also received verbal assurances from government officials that the renewal applications are complete with no outstanding legal issues. The Company has continued to receive drill permits and the Panamanian  Ministry of Commerce has continued to accept tax payments and reports on the concessions.

As of the date of this AIF, final concession renewals have not been received and are still in document control awaiting final approval by the Panamanian Comptroller General. There is no assurance that the Company will receive the extensions or receive them within a reasonable time period. Failure to receive the extensions would have a material adverse effect on the Company’s business, financial condition, and results of operations.

Page 87


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

EIA PERMIT

To develop a mine at Cerro Quema, a Category III EIA is required from the Ministry of Environment. An application for this permit was submitted in 2015. The Company is actively engaged with government officials at various levels in regard to the EIA and concession renewals. The Ministry has completed the technical evaluation of the EIA, and MCQ believes the Ministry is in the process of preparing the formal resolution to approve it. Timing of approval is presently not known but the Ministry’s response time has exceeded the time periods specified in Article 41 of the Decree Law 23 applicable to EIA permit resolutions. There is no assurance that the Company will receive the various approvals, including the modification to the EIA, or receive them within a reasonable time period. Failure to receive the EIA would have a material adverse effect on the Company’s business, financial condition, and results of operations.

PERMITTING RISKS

The Company’s operations in each of the jurisdictions in which it operates are subject to receiving and maintaining permits (including environmental permits) from appropriate governmental authorities. Furthermore, prior to any development on any of its properties, the Company must receive permits from appropriate governmental authorities. The Company can provide no assurance that necessary permits will be obtained, that previously issued permits will not be suspended for a variety of reasons, including through government or court action, or that delays will not occur in connection with obtaining all necessary permits, renewals of permits for existing operations, or additional permits for any possible future changes to operations, or additional permits associated with new legislation. In addition, the timing of permits is uncertain and processing times may be negatively affected by COVID-19. The Company can provide no assurance that it will continue to hold or obtain, if required to, all permits necessary to develop or continue operating at any particular site, which would materially adversely affect its operations.

For example, for the Company’s South Railroad Project, the BLM will need to publish the Notice of Intent in the Federal Register to officially commence the Environmental Impact Statement process for the project pursuant to NEPA. Once the Notice of Intent is published in the Federal Register, public scoping meetings can commence in conjunction with the Environmental Impact Statement. If successful, this process will culminate in the BLM issuing a Record of Decision permit for the project. The Company will also need an Individual Section 404 Permit from the United States Army Corps of Engineers and this agency will be a cooperating agency on the NEPA documents. South Railroad will also require various other environmental permits issued by the Nevada Department of Environmental Protection and from other state and local agencies.

ENVIRONMENTAL AND OTHER REGULATORY REQUIREMENTS

The activities of the Company are subject to environmental regulations promulgated by government agencies from time to time. Environmental legislation generally provides for restrictions and prohibitions on spills, releases, or emissions of various substances produced in association with certain mining industry operations, such as seepage from tailings disposal areas, which would result in environmental pollution. A breach of such legislation may result in imposition of fines and penalties. In addition, certain types of operations require the submission and approval of environmental impact assessments. Environmental legislation is evolving to stricter standards and enforcement, and fines and penalties for noncompliance are more stringent. Environmental assessments of proposed projects carry a heightened degree of responsibility for companies and directors, officers, and employees. The cost of compliance with changes in governmental regulations has a potential to reduce the profitability of operations. Environmental hazards may exist on the properties in which the Company holds its interests or on properties that will be acquired which are unknown to the Company at present and which have been caused by previous or existing owners or operators of those properties.

The Company’s current or future activities, including exploration and development activities and operations of the Company require licenses, permits, or other approvals from various governmental authorities and activities are and will be governed by laws and regulations governing exploration, labour standards, occupational health, waste disposal, toxic substances, land use, environmental protection, safety, mine permitting, and other matters. Companies engaged in exploration and development activities generally experience increased costs and delays as a result of the need to comply with applicable laws, regulations, and permits. There can be no

Page 88


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

assurance that all permits that the Company may require for exploration and development will be obtainable on reasonable terms or on a timely basis, or that such laws and regulations would not have an adverse effect on any project that the Company may undertake. The Company believes it is in substantial compliance with all material laws and regulations that currently apply to its activities and that it does not currently have any material environmental obligations. However, there may be unforeseen environmental liabilities resulting from exploration, development, and/or mining activities and these may be costly to remedy.

The Company does not maintain insurance against all environmental risks. As a result, any claims against the Company may result in liabilities that could have a significant adverse effect on the operations and financial condition of the Company.

Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in exploration and development operations may be required to compensate those suffering loss or damage by reason of the exploration and development activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations and, in particular, environmental laws.

Amendments to current laws, regulations, and permits governing operations and activities of exploration companies, or more stringent implementation thereof, could have a material adverse impact on the Company and cause increases in expenditures and costs or require abandonment or delays in developing new mining properties.

The Company cannot give any assurances that breaches of environmental laws (whether inadvertent or not) or environmental pollution will not materially or adversely affect its financial condition. There is no assurance that future changes to environmental regulation, if any, will not adversely affect the Company.

For example, an ecological tax implemented by the state Congress of Zacatecas in 2017 could have a significant impact on the economics of the Camino Rojo Project. This tax is applied to cubic metres of material extracted during mining, square metres of material impacted by dangerous substances, tonnes of carbon dioxide produced during mining processes, and tonnes of waste stored in landfills. Due to the uncertainty of application of this tax and turbulence between active mining companies and the State of Zacatecas, the long-term effects and implementation of this ecological tax are currently unknown and were not considered in the 2021 Camino Rojo Report. The Company in the process of negotiating an agreement with the Zacatecas government in respect of the ecological tax. This agreement is expected to negotiate and limit the application of the ecological tax to carbon emissions from transportation equipment and the recovery of topsoil in areas that do not form a portion of the mining activities at the Camino Rojo Project.

THE CAMINO ROJO PROJECT MINERAL RESOURCE ESTIMATE ASSUMES THAT THE COMPANY CAN ACCESS MINERAL TITLES AND LANDS THAT ARE NOT CONTROLLED BY THE COMPANY

All of the mineralization comprised in the Company’s Mineral Resource estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by Orla. However, the Mineral Resource estimate assumes that the north wall of the conceptual floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto lands where mineral title is held by Fresnillo and that waste would be mined on Fresnillo’s mineral titles. On December 21, 2020, Orla announced that it had completed the Layback Agreement. The Layback Agreement allows Orla to expand the Camino Rojo Oxide Mine pit onto part of Fresnillo’s mineral concession located immediately north of Orla’s property. This expansion will increase oxide ore available for extraction on Orla’s property below the pit outlined in Orla’s previous 2019 Camino Rojo Report.

However, the Layback Agreement is only with respect to the portion of the heap leach material included in the current Mineral Reserve. As such, any potential development of the Camino Rojo Project that includes an open pit encompassing the entire Mineral Resource estimate would be dependent on an additional agreement with Fresnillo (or any potential subsequent owner of the mineral titles). It is estimated that approximately two-thirds of the mill resource estimate and one-quarter of the leach resource estimate comprising the

Page 89


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Mineral Resource estimate are dependent on this additional agreement being entered into with Fresnillo. The leach Mineral Resource dependent on the additional agreement is mainly comprised of less oxidized transitional material with the lowest predicted heap-leach recoveries.

Delays in, or failure to obtain, an additional agreement with Fresnillo would affect the development of a significant portion of the Mineral Resources of the Camino Rojo Project that are not included in the 2021 Camino Rojo Report mine plan, in particular by limiting access to significant mineralized material at depth. There can be no assurance that the Company will be able to negotiate such additional agreement on terms that are satisfactory to the Company and Fresnillo or that there will not be delays in obtaining the necessary additional agreement. Should such a subsequent agreement with Fresnillo not be obtained on favourable terms, the economics of any potential mine development using the full Mineral Resource estimate would be significantly negatively impacted.

MINERAL RESOURCE ESTIMATIONS FOR THE CAMINO ROJO PROJECT ARE ONLY ESTIMATES AND RELY ON CERTAIN ASSUMPTIONS

The estimation of Mineral Resources relies on the judgment of the independent Qualified Person preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results, and industry practices. Valid estimates made at a given time may significantly change when new information becomes available.

In particular, the estimation of Mineral Resources for the Camino Rojo Project has assumed that there is a reasonable prospect for reaching an additional agreement with Fresnillo with respect to the mill resource included in the Mineral Resource estimate. While the Company believes that the Mineral Resource estimates for the Camino Rojo Project are well established and reflect best estimates, by their nature resource estimates are imprecise and depend on inferences that may ultimately prove to be inaccurate, including the assumption that an additional agreement with Fresnillo will be reached.

Although all mineralization included in the Company’s Mineral Resource estimate for the Camino Rojo Project are located on mineral concessions controlled by the Company, failure to reach an additional agreement with Fresnillo would result in a significant reduction of the Mineral Resource estimate by limiting access to Mineral Resources below the current Mineral Reserves. Any material changes in Mineral Resource estimates may have a material adverse effect on the Company.

SURFACE RIGHTS

There are four ejido communities in the vicinity of the main area of drilling at the Camino Rojo Project and other ejido lands cover most of the rest of the property. The lands that are used by the Company for the open pit mine and heap leach facility are subject to an expropriation agreement between the Company and the Ejido San Tiburcio. Currently, the Company has the legal possession of such lands until 2043. For exploration activities, the Company enters into temporary occupation agreements with the ejido communities, which allow the Company to use the surface of the lands for its mining activities for a set period of time. In Mexico, mining rights that are covered under a concession do not include direct ownership or possession rights over the surface, or surface access, and at any particular time the Company may be involved in negotiations with various ejido communities to enter into new temporary occupation agreements or other surface access agreements or amend existing agreements. Failure to reach new agreements or disputes regarding existing agreements may cause, blockades, suspension of operations, delays to projects, and, on occasion, may lead to legal disputes. Any such failure to reach new agreements or disputes regarding existing agreements may have a material adverse effect on the Company’s business.

The Company currently owns all surface rights required for exploration and development of the Cerro Quema Project.

Access to the Company’s South Railroad Project and certain mineral properties at the project are or will be governed by surface use agreements or other forms of access rights or agreements such as easements and rights-of-way. Failure to meet or otherwise satisfy

Page 90


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

required contractual obligations and make payments with respect to such agreements and rights or to otherwise obtain such agreements or rights may result in loss of access to the project or to certain mineral properties.

TITLE MATTERS

The acquisition of title to mineral tenures in Mexico, Panama and the United States is a detailed and time-consuming process. Although the Company has diligently investigated title to all mineral tenures and, to the best of its knowledge, title to all of its properties is in good standing, this should not be construed as a guarantee of title. The Company can provide no assurances that there are no title defects affecting its properties. Other parties may dispute title to any of the Company’s mineral properties and any of the Company’s properties may be subject to prior unregistered liens, agreements, transfers or claims, and title may be affected by, among other things, undetected encumbrances or defects or governmental actions. Title to the Company’s properties may also be affected by undisclosed and undetected defects. If any claim or challenge is made regarding title, the Company may be subject to monetary claims or be unable to develop properties as permitted or to enforce its rights with respect to its properties.

Certain of the Company’s mineral rights at the South Railroad Project consist of unpatented mining claims. Unpatented mining claims are unique real property interests and are generally considered to be subject to greater risk than other real property interests because the legal validity of unpatented mining claims is often uncertain. Unpatented mining claims provide only possessory title and their legal validity is often subject to contest by third parties or the federal government. These uncertainties relate to such things as the sufficiency of mineral discovery, proper posting and marking of mining claim boundaries and location monuments, assessment work, unregistered agreements, undetected defects, and possible conflicts with other mining claims. Since a substantial portion of all mineral exploration, development and mining in the western United States now occurs on unpatented mining claims, this uncertainty is inherent in the mining industry.

The South Railroad Project is also subject to annual compliance with assessment work or fee requirements, property taxes, lease payments and other contractual payments and obligations. Any failure to make such payments or comply with such requirements or obligations could result in the loss of all or a portion of the Company’s interest in the South Railroad Project.

In addition, certain of the Company’s subsurface mineral rights to the South Railroad Project are secured or controlled by a contractual interest in private surface and mineral property in the form of various surface use agreements and mining/mineral leases. Subject to the terms of those agreements and leases, certain of those agreements and leases may have not have provisions for automatic renewal. If the Company is not able to negotiate for the extension of those agreements and leases they may expire and no longer form part of the Company’s mineral portfolio, which may have a material adverse effect on the Company’s business.

WATER RIGHTS

The Company’s current and future mining operations will require significant quantities of water for mining, ore processing and related support facilities. In particular, the Company’s properties in Mexico and Nevada are in areas where water is scarce and competition among users for continuing access to water is significant. Continuous production and project development is dependent on the Company’s ability to acquire and maintain water rights and claims and to defeat claims adverse to current water uses in legal proceedings. The Company cannot predict the potential outcome of future legal proceedings relating to enforcement of water rights, claims and uses, or potential pressure from other users of water, government agencies and officials, and/or non-governmental organizations to limit the amount of water made available to or used for mining activities, regardless of legally valid water rights. Water shortages may also result from weather or environmental and climate impacts outside of the Company’s control, see “Risk Factors – Climate Change Risk”. Shortages in water supply or the inability to acquire and maintain water rights could result in development delays, as well as production and processing interruptions. In addition, the scarcity of water in certain regions could result in increased costs to obtain sufficient quantities of water for the Company to develop projects or conduct operations.

Page 91


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The loss of some or all water rights, ongoing litigation to enforce existing or new water rights, ongoing shortages of water to which the Company has rights and/or significantly higher costs to obtain sufficient quantities of water could result in the Company’s inability to develop its projects, maintain production at current or expected levels, require the Company to curtail or shut down mining operations and could prevent the Company from pursuing expansion or development opportunities, which could adversely affect the Company’s results of operations and financial condition. Laws and regulations may be introduced in some jurisdictions in which the Company operates which could also limit access to sufficient water resources, adversely affecting existing operations or expansion or development plans.

For example, in Nevada, where the Company’s South Railroad Project is located, all water belongs to the public and is subject to appropriation for beneficial uses, such as mining. The Nevada State Engineer is responsible for administering and enforcing Nevada water law, which includes the appropriation of surface and ground water in the State. Water rights may be acquired by making an application to the State Engineer to acquire new water rights, or by leasing or purchasing existing water rights from a third party. New water rights are issued by the State Engineer based on prior appropriation (also known as “first in time, first in right”), which prioritizes parties with senior water rights in the event of overallocation, and water availability within an applicable hydrographic basin. The acquisition of water rights in Nevada is a systemic issue in mining and if water rights cannot be obtained on economically viable terms by the Company, the development of the South Railroad Project will be delayed or may no longer be economically feasible.

FINANCING RISKS

The Company’s mining, process, exploration, and development activities may require additional financing. Historically, the Company has been financed through the issuance of Common Shares, debt, and other equity securities. Although the Company has been successful in the past in obtaining financing, there can be no assurance that additional funding, if required, will be available to it in the future to fulfill the Company’s existing obligations or further exploration and development and, if obtained, on terms favourable to the Company. The ability of the Company to arrange additional financing in the future will depend, in part, on prevailing capital market conditions as well as the business performance of the Company. If the Company raises additional financing through the issuance of Common Shares or securities convertible into Common Shares, this may result in dilution to the equity ownership of the Company’s existing shareholders. Failure to obtain required financing could result in delay or indefinite postponement of its anticipated activities in the coming years and could cause the Company to forfeit its interests in some or all of the Company’s properties or to reduce or terminate the Company’s operations. Failure to obtain required financing would have a material adverse effect on the Company’s business, financial condition, and results of operations.

PRODUCTION ESTIMATES

The Company has Mineral Reserve estimations for its existing Camino Rojo, South Railroad, and Cerro Quema Projects and such estimates are based on a Feasibility Study for Camino Rojo and South Railroad and a Pre-Feasibility Study for Cerro Quema. The Company has also published production and cost guidance for 2023. The Company cannot give any assurance that such estimates will be achieved. Failure to achieve such estimates could have an adverse impact on the Company’s future cash flows, profitability, results of operations, and financial condition. The realization of estimates is dependent on, among other things, the accuracy of Mineral Reserve and Mineral Resource estimates, the accuracy of assumptions regarding grades and recovery rates, ground conditions (including hydrology), the physical characteristics of deposits, the presence or absence of particular metallurgical characteristics, and the accuracy of the estimated rates and costs of mining, haulage, and processing. Actual production may vary from estimates for a variety of reasons, including the actual ore mined varying from estimates of grade or tonnage; dilution and metallurgical and other characteristics (whether based on representative samples of ore or not); short-term operating factors such as the need for sequential development of ore bodies; mine failures or slope failures; industrial accidents; natural phenomena such as inclement weather conditions, floods, droughts, rock slides, and earthquakes; encountering unusual or unexpected geological conditions; changes in power costs and potential power shortages; shortages of principal supplies needed for mining operations, including explosives, fuels, chemical reagents, water, equipment parts, and lubricants; plant and equipment failure; the inability to process certain types of ores; labour shortages or strikes; and restrictions or regulations imposed by government agencies or other changes in the regulatory environment. Such occurrences could

Page 92


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

also result in damage to mineral properties or mines, interruptions in production, injury or death to persons, damage to property of the Company or others, monetary losses, and legal liabilities, in addition to adversely affecting mineral production.

COST ESTIMATES

Capital and operating cost estimates discussed herein may not prove accurate. Capital and operating cost estimates are based on the interpretation of geological data, feasibility studies, anticipated climatic conditions, market conditions for required products and services, and other factors and assumptions regarding foreign exchange currency rates. Any of the following events could affect the ultimate accuracy of such estimate: unanticipated changes in grade and tonnage of ore to be mined and processed; incorrect data on which engineering assumptions are made; delay in construction schedules, unanticipated transportation costs; the accuracy of major equipment and construction cost estimates; labour negotiations; changes in government regulation (including regulations regarding prices, cost of consumables, royalties, duties, taxes, permitting, and restrictions on production quotas on exportation of minerals); and title claims. Changes in the Company’s anticipated production costs could have a major impact on any future profitability. Changes in costs of the Company’s anticipated mining and processing operations could occur as a result of unforeseen events, including international and local economic and political events, a change in commodity prices, increased costs (including oil, steel, and diesel) and scarcity of labour, and could result in changes in profitability or Mineral Reserve and Mineral Resource estimates. Many of these factors may be beyond the Company’s control. There is no assurance that actual costs will not exceed such estimates. Exceeding cost estimates could have an adverse impact on the Company’s future results of operations or financial condition.

METAL PRICES

The Company’s long-term viability depends, in large part, upon the market price of gold, silver, and copper. Market price fluctuations of gold could adversely affect the profitability of the Company’s operations and lead to impairments and write downs of mineral properties. Metal prices have fluctuated widely, particularly in recent years. The marketability of metals is also affected by numerous other factors beyond the control of the Company, including government regulations relating to price, royalties, global consumption patterns, supply of, and demand for, metals, speculative activities, allowable production, and importing and exporting of minerals, the effect of which cannot accurately be predicted. There can be no assurance that the price of any commodities will be such that any of the properties in which the Company has an interest may be mined at a profit.

Declining metal prices can also impact operations by requiring a reassessment of the feasibility of a particular project. Even if a project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause substantial delays and/or may interrupt operations until the reassessment can be completed, which may have a material adverse effect on the Company’s results of operations.

UNKNOWN LIABILITIES IN CONNECTION WITH ACQUISITIONS

As part of the Company’s acquisitions, including its recent acquisition of Gold Standard, the Company has assumed certain liabilities and risks. While the Company conducted thorough due diligence in connection with such acquisitions, there may be liabilities or risks that the Company failed, or was unable, to discover in the course of performing the due diligence investigations or for which the Company was not indemnified. Any such liabilities, individually or in the aggregate, could have a material adverse effect on the Company’s financial position and results of operations.

GLOBAL FINANCIAL CONDITIONS

Market events and conditions, including the disruptions in the international credit markets and other financial systems, along with political instability, falling currency prices expressed in United States dollars, ongoing hostilities in Ukraine and sanctions imposed by nations on Russia and Belarus, the uncertainty surrounding global supply chain, inflation, rising interest rates, and the critical measures implemented by governments globally related to the recent spread of diseases have resulted in commodity prices remaining volatile.

Page 93


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

These conditions have also caused fear and a loss of confidence in global credit markets, resulting in a climate of greater volatility, tighter regulations, less liquidity, widening credit spreads, increased credit losses, and tighter credit conditions. Notwithstanding various actions by governments, concerns about the general condition of the capital markets, financial instruments, banks and investment banks, insurers, and other financial institutions have caused the broader credit markets to be volatile. These events are illustrative of the effect that events beyond the Company’s control may have on: commodity prices; demand for metals, including gold, silver and copper; availability of credit; investor confidence; and general financial market liquidity, all of which may adversely affect the Company’s business.

These factors may impact the ability of the Company to obtain equity or debt financing in the future and, if obtained, on terms favourable to the Company. Increased levels of volatility and market turmoil can adversely impact the Company’s operations and the value, and the price of the Common Shares could be adversely affected.

UNINSURED RISKS

Exploration, development, and production operations on mineral properties involve numerous risks, including but not limited to unexpected or unusual geological operating conditions, rock bursts, cave-ins, fires, floods, landslides, earthquakes, and other environmental occurrences, risks relating to the storage and shipment of precious metal concentrates or doré bars, and political and social instability. Such occurrences could result in damage to mineral properties, damage to underground development, damage to production facilities, personal injury or death, environmental damage to the Company’s properties or the properties of others, delays in the ability to undertake exploration, monetary losses, and possible legal liability. Should such liabilities arise, they could reduce or eliminate future profitability and result in increasing costs and a decline in the value of the securities of the Company.

Although the Company maintains insurance to protect against certain risks in such amounts as it considers reasonable, its insurance policies do not cover all the potential risks associated with a mining company’s operations. The Company may also be unable to maintain insurance to cover these risks at economically feasible premiums. Insurance coverage may not continue to be available or may not be adequate to cover any resulting liability. Moreover, insurance against risks such as environmental pollution or other hazards as a result of exploration and production is not always available to the Company or to other companies in the mining industry on acceptable terms. The Company might also become subject to liability for pollution or other hazards which it may not be insured against or which the Company may elect not to insure against because of premium costs or other reasons. The Company does not currently maintain insurance against political risks, underground development risks, production facilities risks, business interruption or loss of profits, theft of doré bars, the economic value to re-create core samples, environmental risks, and other risks. Furthermore, insurance limits currently in place may not be sufficient to cover losses arising from insured events. Losses from any of the above events may cause the Company to incur significant costs that could have a material adverse effect upon its financial performance and results of operations.

CLIMATE CHANGE

A number of governments have introduced or are moving to introduce climate change legislation and treaties at the international, national, state/provincial, and local levels. Regulation relating to emission levels (such as carbon taxes), energy efficiency, and reporting of climate-change related risks is becoming more stringent. If the current regulatory trend continues, this may result in increased costs at some or all of the Company’s operations. In addition, the physical risks of climate change may also have an adverse effect on the Company’s operations. These risks include, among other things, extreme weather events, resource shortages, changes in rainfall and in storm patterns and intensities, water shortages, and extreme temperatures. Climate-related events such as mudslides, floods, droughts and fires can also have significant impacts, directly and indirectly, on the Company’s operations and could result in damage to facilities, disruptions in accessing its sites with labour and essential materials or in shipping products from its mines, risks to the safety and security of its personnel and to communities, shortages of required supplies such as fuel and chemicals, inability to source enough water to supply its development and operations (see “Risk Factors – Water Rights” above), and the temporary or permanent cessation of one or more of the Company’s operations.

Page 94


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

There can be no assurance that efforts to mitigate the risks of climate changes will be effective and that the physical risks of climate change will not have an adverse effect on the Company’s business, financial condition, and results of operations.

COMPETITIVE LANDSCAPE

The mineral exploration business is competitive in all of its phases. The Company competes with numerous other companies and individuals, including competitors with greater financial, technical, and other resources than the Company, in the search for and acquisition of exploration and development rights on desirable mineral properties, for capital to finance its activities, and in the recruitment and retention of qualified employees. There is no assurance that the Company will continue to be able to compete successfully with its competitors in acquiring exploration and development rights, financing, or recruiting and retaining employees.

CONFLICTS OF INTEREST

The Company’s Directors and officers may serve as directors or officers of other companies or have significant shareholdings in other resource companies and, to the extent that such other companies may participate in ventures in which the Company may participate, the Directors of the Company may have a conflict of interest in negotiating and concluding terms respecting the extent of such participation. In the event that such a conflict of interest arises at a meeting of the Company’s Directors, a Director who has such a conflict will abstain from voting for or against the approval of such participation or such terms. In accordance with the CBCA, the Directors of the Company are required to act honestly, in good faith and in the best interests of the Company.

COMPLIANCE WITH ANTI-CORRUPTION LAWS

The Company is subject to various anti-corruption laws and regulations including, but not limited to, the Canadian Corruption of Foreign Public Officials Act, the Foreign Corrupt Practices Act of the United States of America, and similar laws in any country in which the Company conducts business. In general, these laws prohibit a company and its employees and intermediaries from bribing or making other prohibited payments to foreign officials or other persons to obtain or retain business or gain some other business advantage. In recent years, there has been a general increase in both the frequency of enforcement and the severity of penalties under such laws, resulting in greater scrutiny and punishment to companies convicted of violating anti-corruption and anti-bribery laws. Furthermore, a company may be found liable for violations by not only its employees, but also by its contractors and third-party agents.

The Company’s Camino Rojo Project is located in Mexico and the Cerro Quema Project is located in Panama, both of which countries which are perceived as having fairly high levels of corruption. Orla cannot predict the nature, scope, or effect of future anti-corruption regulatory requirements to which the Company’s operations might be subject or the manner in which existing laws might be administered or interpreted.

Failure to comply with the applicable legislation and other similar foreign laws could expose the Company and/or its senior management to civil and/or criminal penalties, other sanctions and remedial measures, legal expenses, and reputational damage, all of which could materially and adversely affect the Company’s business, financial condition, and results of operations. Likewise, any investigation of any potential violations of the applicable anti-corruption legislation by Canadian, American, or foreign authorities could also have an adverse impact on the Company’s business, financial condition, and results of operations.

As a consequence of these legal and regulatory requirements, the Company has instituted policies with regard to business ethics, which have been designed to ensure that Orla and its employees comply with applicable anti-corruption laws and regulations. However, there can be no assurance or guarantee that such efforts have been and will be completely effective in ensuring the Company’s compliance, and the compliance of its employees, consultants, contractors, and other agents, with all applicable anti-corruption laws and regulations.

Page 95


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

SHARE PRICE FLUCTUATIONS

The Common Shares are listed and posted for trading on the TSX and the NYSE American. An investment in the Company’s securities is highly speculative. In recent years, the securities markets have experienced a high level of price and volume volatility, and the market price of securities of many companies, particularly those considered exploration, development, and early-production stage companies such as the Company, have experienced wide fluctuations in price which have not necessarily been related to the operating performance, underlying asset values, or prospects of such companies. There can be no assurance that continual fluctuations in price will not occur.

TAX MATTERS

The Company is subject to income taxes and other taxes in a variety of jurisdictions and the Company’s tax structure is subject to review by both Canadian and foreign taxation authorities. The Company’s taxes are affected by a number of factors, some of which are outside of its control, including the application and interpretation of the relevant tax laws and treaties. If the Company’s filing position were to be challenged for whatever reason, this could have a material adverse effect on the Company’s business, results of operations, and financial condition.

CURRENCY FLUCTUATIONS

The Company’s operations in Mexico, Panama, and the United States make it subject to foreign currency fluctuations and such fluctuations may materially affect the Company’s financial position and results. The Company reports its financial results in U.S. dollars, with the majority of transactions denominated in U.S. dollars, Canadian dollars, and Mexican pesos. As the exchange rates of the Canadian dollar and Mexican peso fluctuate against the U.S. dollar, the Company will experience foreign exchange gains or losses. The Company has used forward contracts in the past to assist in mitigating the potential negative impact of foreign currency fluctuation. As at the date of this AIF, the Company does not have any outstanding forward contracts and doe not use an active hedging strategy to reduce the risk associated with currency fluctuations but may decide to do so in the future.

LIMITED OPERATING HISTORY

The Company has a limited history of generating operating revenues and profits and the development of the Company’s other properties will require the commitment of substantial financial resources. The amount and timing of expenditures will depend on a number of factors, some of which are beyond the Company’s control, including the progress of ongoing exploration, studies, and development, the results of consultant analysis and recommendations, and the execution of any joint venture agreements with strategic parties, if any. There can be no assurance that the Company will continue to generate profits in the future.

LITIGATION RISK

All industries, including the mining industry, are subject to legal claims, with and without merit. Defence and settlement costs of legal claims can be substantial, even with respect to claims that have no merit. Due to the inherent uncertainty of the litigation and dispute resolution process, the litigation process could take away from management time and efforts and the resolution of any particular legal proceeding to which the Company may become subject could have a material adverse effect on the Company’s financial position, results of operations, or the Company’s property development or operations.

ACQUISITIONS AND INTEGRATION

From time to time, the Company examines opportunities to acquire additional mining assets and businesses. An example is the Company’s recent acquisition of Gold Standard. Any acquisition that the Company may choose to complete may be of a significant size, may change the scale of the Company’s business and operations, and may expose the Company to new geographic, political, operating, financial, and geological risks. The Company’s success in its acquisition activities depends on its ability to identify suitable acquisition

Page 96


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

candidates, negotiate acceptable terms for any such acquisition, and integrate the acquired operations successfully with those of the Company. Any acquisitions would be accompanied by risks. For example, there may be a significant change in commodity prices after the Company has committed to complete the transaction and established the purchase price or exchange ratio; a material property may prove to be below expectations; the Company may have difficulty integrating and assimilating the operations and personnel of any acquired companies, realizing anticipated synergies and maximizing the financial and strategic position of the combined enterprise, and maintaining uniform standards, policies and controls across the organization; the integration of the acquired business or assets may disrupt the Company’s ongoing business and its relationships with employees, customers, suppliers, and contractors; and the acquired business or assets may have unknown liabilities which may be significant. In the event that the Company chooses to raise debt capital to finance any such acquisition, the Company’s leverage will be increased. If the Company chooses to use equity as consideration for such acquisition, existing shareholders may experience dilution. Alternatively, the Company may choose to finance any such acquisition with its existing resources. There can be no assurance that the Company would be successful in overcoming these risks or any other problems encountered in connection with such acquisitions.

NON-GOVERNMENTAL ORGANIZATION INTERVENTION

In recent years, certain communities of both indigenous people and others, as well as non-governmental organizations, have been vocal and negative with respect to mining activities. The Company’s relationship with the communities in which it operates is critical to ensure the future success of its existing operations and the construction and development of its projects. Community groups or non-governmental organizations may create or inflame public unrest and anti-mining sentiment among the inhabitants in areas of mineral development. These communities and organizations have taken such actions as protests, road closures, work stoppages, and initiating lawsuits for damages. Such organizations can be involved, with financial assistance from various groups, in mobilizing sufficient local anti-mining sentiment to prevent the issuance of required permits for the development of mineral projects of other companies. While the Company is committed to operating in a socially responsible manner and obtain and increase its social acceptance to operate, there is no guarantee that the Company’s efforts in this respect will mitigate this potential risk. Any actions by communities and non-governmental organizations may have a material adverse effect on the Company’s development activities, financial position, cash flow, and results of operations.

OUTSIDE CONTRACTOR RISKS

Certain aspects of the Company’s mining operations, such as drilling, blasting, development, transportation, and other day-to-day operations, are conducted by outside contractors. As a result, the Company is subject to a number of risks, including: reduced control over the aspects of the tasks that are the responsibility of the contractors; failure of the contractors to perform under their agreements with the Company; inability to replace the contractors if their contracts are terminated; interruption of services in the event that the contractors cease operations due to insolvency or other unforeseen events; failure of the contractors to comply with applicable legal and regulatory requirements; and failure of the contractors to properly manage their workforce resulting in labour unrest or other employment issues.

UNRELIABLE HISTORICAL DATA

The Company has compiled technical data in respect of the Camino Rojo, Cerro Quema, and South Railroad Projects, some of which was not prepared by the Company. While the data represents a useful resource for the Company, much of it must be verified by the Company before being relied upon in formulating exploration programs.

NO DIVIDENDS

No dividends on the Common Shares have been paid by the Company to date and the Company may not declare or pay any cash dividends in the foreseeable future. Any payments of dividends will be dependent upon the financial requirements of the Company to finance future growth, the financial condition of the Company, and other factors which the Company’s Board of Directors may consider

Page 97


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

appropriate in the circumstances. In addition, under the terms of the Credit Facility, the Company is restricted from paying a dividend on the Common Shares unless certain covenants and ratios are met. See “Dividends” below.

FOREIGN SUBSIDIARIES

The Company conducts certain of its operations through foreign subsidiaries and some of its assets are held in such entities. Any limitation on the transfer of cash or other assets between the Company and such entities, or among such entities, could restrict the Company’s ability to fund its operations efficiently. Any such limitations, or the perception that such limitations may exist now or in the future, could have an adverse impact on the Company’s valuation and stock price.

ACCOUNTING POLICIES AND INTERNAL CONTROLS

The Company prepares its financial reports in accordance with IFRS applicable to publicly accountable enterprises. In preparing financial reports, management may need to rely upon assumptions, make estimates, or use their best judgment in determining the financial condition of the Company. Significant accounting policies are described in more detail in the Company’s annual consolidated financial statements. In order to have a reasonable level of assurance that financial transactions are properly authorized, assets are safeguarded against unauthorized or improper use, and transactions are properly recorded and reported, the Company has implemented and continues to analyze its internal control systems for financial reporting. Although the Company believes its financial reporting and annual consolidated financial statements are prepared with reasonable safeguards to ensure reliability, the Company cannot provide absolute assurance.

INTERNAL CONTROL OVER FINANCIAL REPORTING PURSUANT TO THE SARBANES-OXLEY ACT

The Company is required to assess its internal controls in order to satisfy the requirements of the Sarbanes–Oxley Act of 2002 (“SOX”). SOX requires an annual assessment by management of the effectiveness of the Company’s internal control over financial reporting. The Company may fail to achieve and maintain the adequacy of its internal control over financial reporting, as such standards are modified, supplemented, or amended from time to time, and the Company may not be able to ensure that it can conclude on an ongoing basis that it has effective internal controls over financial reporting in accordance with SOX. The Company’s failure to satisfy the requirements on an ongoing, timely basis could result in the loss of investor confidence in the reliability of its financial statements which, in turn, could harm the Company’s business and negatively impact the trading price of its securities. In addition, any failure to implement required new or improved controls, or difficulties encountered in their implementation, could harm the Company’s operating results or cause it to fail to meet its reporting obligations. There can be no assurance that the Company will be able to remediate material weaknesses, if any, identified in future periods, or maintain all of the controls necessary for continued compliance, and there can be no assurance that the Company will be able to retain sufficient skilled finance and accounting personnel.

Future acquisitions of companies, if any, may provide the Company with challenges in implementing the required processes, procedures, and controls in its acquired operations. Future acquired companies, if any, may not have disclosure controls and procedures or internal control over financial reporting that are as thorough or effective as those required by securities laws currently applicable to the Company.

No evaluation can provide complete assurance that the Company’s internal control over financial reporting will detect or uncover all failures of persons within the Company to disclose material information otherwise required to be reported. The effectiveness of the Company’s controls and procedures could also be limited by simple errors or faulty judgments. In addition, as the Company continues to expand, the challenges involved in implementing appropriate internal controls over financial reporting will increase and will require that the Company continue to improve its internal controls over financial reporting. Although the Company intends to devote substantial time and incur costs, as necessary, to ensure compliance, the Company cannot be certain that it will be successful in complying with these requirements on an ongoing basis.

Page 98


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

The Company’s internal control over financial reporting may not prevent or detect all misstatements because of inherent limitations. Additionally, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because changes in conditions or deterioration in the degree of compliance with the Company’s policies and procedures.

ENFORCEMENT OF CIVIL LIABILITIES

Substantially all of the assets of the Company are located outside of Canada and certain of the Directors of the Company are resident outside of Canada. As a result, it may be difficult or impossible to enforce judgments granted by a court in Canada against the assets of the Company or the Directors of the Company residing outside of Canada.

POSSIBLE U.S. FEDERAL INCOME TAX CONSEQUENCES FOR U.S. INVESTORS

The Company may be treated as a “passive foreign investment company” under the U.S. Internal Revenue Code, which could result in adverse U.S. federal income tax consequences for U.S. investors. Prospective U.S. investors should be aware that they could be subject to certain adverse U.S. federal income tax consequences if the Company is classified as a passive foreign investment company (“PFIC”) for U.S. federal income tax purposes. The determination of whether the Company is a PFIC for a taxable year depends, in part, on the application of complex U.S. federal income tax rules, which are subject to differing interpretations, and such determination will depend on the composition of the Company’s income, expenses, and assets from time to time and the nature of the activities performed by its officers and employees. Prospective U.S. investors should consult their own tax advisors regarding the likelihood and consequences of the Company being treated as a PFIC for U.S. federal income tax purposes, including the advisability of making certain elections that may mitigate certain possible adverse income tax consequences but may result in an inclusion in gross income without receipt of such income.

INFORMATION AND CYBER SECURITY

The Company’s information systems, and those of its third-party service providers and vendors, are vulnerable to an increasing threat of continually evolving cyber security risks. Unauthorized parties may attempt to gain access to these systems or the Company’s information through fraud or other means of deceiving the Company’s third-party service providers or vendors.

The Company’s operations depend, in part, on how well the Company and its suppliers, protect networks, equipment, information technology (“IT”) systems and software against damage from a number of threats. Orla has entered into agreements with third parties for hardware, software, telecommunications, and other services in connection with its operations. The Company also depends on the timely maintenance, upgrade, and replacement of networks, equipment, IT systems, and software, as well as pre-emptive expenses to mitigate the risks of failures. Any of these and other events could result in information system failures, delays, and/or increases in capital expenses. The failure of information systems or a component of information systems could, depending on the nature of any such failure, adversely impact the Company’s reputation and results of operations.

Although to date the Company has not experienced any known material losses relating to cyber attacks or other data/information security breaches, there can be no assurance that Orla will not incur such losses in the future. The Company’s risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As a result, cyber security and the continued development and enhancement of controls, processes, and practices designed to protect systems, computers, software, data, and networks from attack, damage, or unauthorized access remain a priority.

Any future significant compromise or breach of the Company’s data/information security, whether external or internal, or misuse of data or information, could result in additional significant costs, lost sales, fines, and lawsuits, and damage to the Company’s reputation. In addition, as the regulatory environment related to data/information security, data collection and use, and privacy becomes increasingly rigorous, with new and constantly changing requirements applicable to the Company’s business, compliance with those requirements

Page 99


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

could also result in additional costs. As cyber threats continue to evolve, the Company may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any security vulnerabilities.

GOLD INDUSTRY CONCENTRATION

Orla is concentrated in the gold mining industry, and as such, the Common Shares and Orla’s profitability will be particularly sensitive to changes in, and its performance will depend to a greater extent on, the overall condition of the gold mining industry. Orla may be susceptible to an increased risk of loss, including losses due to adverse occurrences affecting the Company more than the market as a whole, as a result of the fact that its operations are concentrated in the gold mining sector.

SHAREHOLDER ACTIVISM

Publicly traded companies are often subject to demands or publicity campaigns from activist shareholders advocating for changes to corporate governance practices, such as executive compensation practices, social issues, or for certain corporate actions or reorganizations. There can be no assurance that the Company will not be subject to any such campaign, including proxy contests, media campaigns, or other activities. Responding to challenges from activist shareholders can be costly and time consuming and may have an adverse effect on the Company’s reputation. In addition, responding to such campaigns would likely divert the attention and resources of the Company’s management and Board, which could have an adverse effect on the Company’s business and results of operations. Even if the Company were to undertake changes or actions in response to activism, activist shareholders may continue to promote or attempt to effect further changes and may attempt to acquire control of the Company. If shareholder activists are ultimately elected to the Board, this could adversely affect the Company’s business and future operations. This type of activism can also create uncertainty about the Company’s future strategic direction, resulting in loss of future business opportunities, which could adversely affect the Company’s business, future operations, profitability, and the Company’s ability to attract and retain qualified personnel.

DESCRIPTION OF CAPITAL STRUCTURE

COMMON SHARES

The authorized share capital of the Company consists of an unlimited number of Common Shares without par value and an unlimited number of Class A preferred shares. As of December 31, 2022, there were 305,809,108 Common Shares and no Class A preferred shares issued and outstanding and, as of the date of this AIF, there were 306,660,411 Common Shares and no Class A preferred shares issued and outstanding. The Class A preferred shares were issued in connection with the acquisition of Pershimco, and all such shares were cancelled in accordance with their terms.

Page 100


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Holders of Common Shares are entitled to receive notice of any meetings of shareholders of the Company, to attend and to cast one vote per Common Share at all such meetings. Holders of Common Shares do not have cumulative voting rights with respect to the election of Directors and, accordingly, holders of a majority of the Common Shares entitled to vote in any election of Directors may elect all Directors standing for election. Holders of Common Shares are entitled to receive on a pro rata basis such dividends, if any, as and when declared by the Board at its discretion from funds legally available for the payment of dividends and upon the liquidation, dissolution or winding up of the Company are entitled to receive on a pro rata basis the net assets of the Company after payment of debts and other liabilities, in each case subject to the rights, privileges, restrictions, and conditions attaching to any other series or class of shares ranking senior in priority to or on a pro rata basis with the holders of Common Shares with respect to dividends or liquidation. The Common Shares do not carry any pre-emptive, subscription, redemption, or conversion rights, nor do they contain any sinking or purchase fund provisions.

WARRANTS

None of the Company’s outstanding share purchase warrants are listed and posted for trading on the TSX or the NYSE American and none of the Company’s outstanding share purchase warrants are governed by the terms of a warrant indenture.

The following table summarizes information about the number of warrants outstanding as of December 31, 2022 and as of the date of this AIF:

Expiry date

    

Exercise price

    

December 31, 2022

    

Date of this AIF

December 18, 2026

C$

3.00

 

29,545,000

 

29,174,500

Total number of warrants

 

 

29,545,000

 

29,174,500

Weighted average exercise price

C$

3.00

C$

3.00

STOCK OPTIONS, RESTRICTED SHARE UNITS, DEFERRED SHARE UNITS AND BONUS SHARES

As at March 20, 2023:

7,085,064 Common Shares are issuable on exercise of outstanding stock options;
443,267 Common Shares are issuable upon vesting of outstanding Restricted Share Units (or cash may be payable in lieu of 94,063 of such Common Shares);
559,725 Common Shares are issuable upon vesting of outstanding Deferred Share Units (or cash may be payable in lieu thereof); and
1,512,250 Common Shares are issuable on exercise of outstanding Replacement Options.

In addition, the Company has granted an entitlement to its Chairman of the Board to receive a one-time award of 500,000 Common Shares (“Chairman Bonus Shares”) at a deemed price of C$1.39 per Chairman Bonus Share in consideration for his acting as Chairman of the Board, which Chairman Bonus Shares have certain vesting restrictions. The Chairman Bonus Shares will vest and become issuable on the date that Mr. Jeannes ceases to act as a director of the Company, unless the Chairman Bonus Shares sooner vest upon a change of control of the Company as defined in the award agreement.

Page 101


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

DIVIDENDS

The Company has not paid any dividends on its Common Shares since its incorporation. The Company has no present intention of paying dividends on its Common Shares, as it anticipates that all available funds will be invested to finance the growth of its business. The payment of future cash dividends, if any, will be reviewed periodically by the Board and will depend upon, among other things, conditions then existing including earnings, financial condition, and capital requirements, restrictions in financing agreements, business opportunities and conditions, and other factors. In addition, under the terms of the Credit Facility, the Company is prohibited from declaring, paying or setting aside for payment any dividend on the Common Shares unless certain financial covenants and ratios are met. See “Risk Factors – No Dividends”.

MARKET FOR SECURITIES

TRADING PRICE AND VOLUME

The Common Shares are currently listed and posted for trading on the TSX under the symbol “OLA” and on the NYSE American under the symbol “ORLA”. The following table sets forth information relating to the trading of the Common Shares on the TSX and NYSE American for the most recently completed financial year ended December 31, 2022.

TSX

NYSE AMERICAN

Month

    

High (C$)

    

Low (C$)

    

Volume

    

Month

    

High ($)

    

Low ($)

    

Volume

January 2022

 

5.18

 

4.11

 

6,075,963

 

January 2022

 

4.12

 

3.22

 

134,251

February 2022

 

5.26

 

4.07

 

8,287,175

 

February 2022

 

4.09

 

3.22

 

124,374

March 2022

 

6.30

 

5.04

 

13,009,822

 

March 2022

 

5.00

 

3.98

 

329,007

April 2022

 

6.59

 

5.10

 

7,040,385

 

April 2022

 

5.23

 

3.99

 

173,377

May 2022

 

5.88

 

4.71

 

8,373,946

 

May 2022

 

4.61

 

3.57

 

238,052

June 2022

 

5.61

 

3.52

 

8,608,831

 

June 2022

 

4.44

 

2.74

 

255,579

July 2022

 

3.99

 

3.00

 

6,933,857

 

July 2022

 

3.06

 

2.30

 

185,012

August 2022

 

4.77

 

3.69

 

9,292,881

 

August 2022

 

3.68

 

2.86

 

316,310

September 2022

 

4.56

 

3.87

 

11,666,920

 

September 2022

 

3.49

 

2.82

 

272,297

October 2022

 

5.09

 

4.21

 

5,204,195

 

October 2022

 

3.71

 

3.09

 

231,052

November 2022

 

5.50

 

4.07

 

7,885,347

 

November 2022

 

4.02

 

2.96

 

403,107

December 2022

 

5.74

 

4.91

 

7,277,166

 

December 2022

 

4.43

 

3.60

 

210,690

The price of the Common Shares as quoted by the TSX and NYSE American on December 31, 2022 was C$ 5.48 and $4.04, respectively, and on March 17, 2023 was C$5.99 and $4.50, respectively.

Page 102


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

PRIOR SALES

Except as disclosed below with respect to the Company’s equity compensation arrangements, the Company did not issue any securities in its most recent financial year that are of a class that is not listed or quoted for trading on a marketplace. During 2022, the Company issued the following securities under its equity compensation arrangements:

    

    

    

Issue Price /

Type of Security

Number of Securities

Date Issued

Exercise Price

Stock options

 

250,000

 

March 1, 2022

$

5.37

 

674,080

 

March 24, 2022

$

5.98

 

50,000

 

July 4, 2022

$

3.71

 

171,960

 

December 5, 2022

$

5.06

 

105,644

December 30, 2022

$

5.48

Restricted share units(1)

 

172,301

March 24, 2022

$

5.98

Deferred share units(1)

 

57,692

March 24, 2022

$

5.98

 

11,598

June 23, 2022

$

3.88

Replacement Options(2)

 

1,758,334

August 12, 2022

 

Various


Notes:

(1)Represents the deemed value of the restricted share units or the deferred share units on the date of award by the Company, although no money has been, or will be, paid to the Company in connection with the issuance of Common Shares pursuant to such rights.
(2)See “General Development of the Business – The Gold Standard Acquisition” for additional information. The Replacement Options have an exercise price between C$4.78 and C$18.87.

For detailed information about the Company’s equity compensation arrangements, specifically, the Company’s Stock Option Plan, Restricted Share Unit Plan and Deferred Share Unit Plan, including the compensation principles that govern the grants made, please refer to the Management Information Circular of the Company dated May 12, 2022 prepared for its most recent annual meeting of shareholders held on June 23, 2022 and filed on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. This information will also be contained in the Management Information Circular of the Company to be prepared in connection with the Company’s 2023 annual meeting of shareholders currently scheduled to be held in June 2023, which will be available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Page 103


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

DIRECTORS AND OFFICERS

NAME, OCCUPATION AND SECURITY HOLDING

The following table sets out the name, province or state, and country of residence of each current Director and executive officer of the Company, their respective positions held with the Company and their respective principal occupations during the preceding five years.

Name, Province and Country of Residence, and Position

Director/Officer Since

Principal Occupation for the Past Five Years

Jason D. Simpson 3

President, Chief Executive Officer and Director

Ontario, Canada

November 2018

Director, President and Chief Executive of the Company since November 2018; Chief Operating Officer of Torex Gold Resources Inc. (mining company) from January 2013 to November 2018.

Charles A. Jeannes 1, 2, 4

Director
(Non-Executive Chairman of the Board of Directors)

Nevada, USA

June 2017

Non-Executive Chairman of the Board of Directors; Director of Tahoe Resources Inc. from January 2017 to February 2019; Director of Pan American Silver Corp. since February 2019 and Wheaton Precious Metals Corp. (formerly Silver Wheaton Corp.) since November 2016 (mining companies); former President and Chief Executive Officer of Goldcorp (mining company) from 2009 until April 2016, and Executive Vice President, Corporate Development from 2006 until 2008; serves as a Trustee of the Wolf Pack Athletic Association of the University of Nevada (a non-profit Board).

Tim Haldane 3, 4

Director

Arizona, USA

June 2017

Mining professional with international project development experience; previously Senior Vice-President of Operations - USA and Latin America at Agnico Eagle (mining company) from 2014 until February 2017.

Jean Robitaille 2, 3

Director

Ontario, Canada

December 2016

Executive Vice-President, Chief Strategy & Technology Officer at Agnico Eagle (mining company) since 2022; 35 years at Agnico Eagle, including as Senior Vice-President, Corporate Development, Business Strategy & Technical Services (2020-2022), Senior Vice-President, Business Strategy & Technical Services (2014-2019), Senior Vice-President, Technical Services and Project Development (2008 to 2013), Vice-President, Metallurgy and Marketing, General Manager, Metallurgy and Marketing and Mill Superintendent and Project Manager; prior to Agnico Eagle, Mr. Robitaille worked as a metallurgist with Teck Mining Group (mining company); director of Pershimco Resources Inc. (2011 to 2016).

Page 104


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Name, Province and Country of Residence, and Position

Director/Officer Since

Principal Occupation for the Past Five Years

David Stephens 1, 4

Director

Ontario, Canada

March 2018

Partner, Agentis Capital Mining Partners (capital markets advisory) and consultant (mining and technology) from 2019-present; Head of Engineering at Vrify Technologies Inc. (mining investment technology) from 2020-2022; Vice President, Corporate Development and Marketing at Goldcorp (mining company) from 2017-2019; Vice President, Treasurer of Goldcorp (2016-2017).

Elizabeth McGregor 1, 2

Director

British Columbia, Canada

June 2019

Executive Vice President and Chief Financial Officer of Tahoe Resources Inc. (mining company) from August 9, 2016 until the acquisition by Pan American Silver Corp. on February 22, 2019; prior to her role as Chief Financial Officer, she served as Tahoe Resources Inc.’s VP Treasurer; Goldcorp (mining company) from 2007 to 2013, where she held various financial roles including Director of Project Finance and Cost Control; Administration Manager at the Peñasquito mine; and Director of Risk. She has served as a director of Kinross Gold Corporation (“Kinross”) since November 6, 2019 and Infield Minerals Corp. since February 28, 2022 (both mining companies)

Tamara Brown 1, 2

Director

Ontario Canada

June 2023

Partner, Oberon Capital Corporation (boutique investment bank) from 2022 to present; Director, Lithium Royalty Corp. (mining royalty company) from 2023 – Present; Director, Titan Minerals (mining company) from 2022 – present; Director, Superior Gold (mining company) from 2017 to present and interim CEO from 2020 to 2021. Previous experience also includes positions as a non-executive director of Lundin Gold and Eastmain Resources; as well as Vice President, Investor Relations and Corporate Development (Americas) for Newcrest Mining; Vice President, Corporate Development and Investor Relations for Primero Mining; and Director of Investor Relations for IAMGOLD (all mining companies).

Scott Langley

Director

Ontario, Canada

June 2023

Vice President, Corporate Development, Newmont Corporation (mining company) since 2022. Previously was the Managing Director, Head of North American Metals & Mining, Bank of America (finance) from 2019 to 2022 and Managing Director, National Bank (finance) from 2016 to 2019.

Etienne Morin

Chief Financial Officer

British Columbia, Canada

April 2018

Chief Financial Officer of the Company since April 2018; previously held various financial and capital markets roles at Goldcorp (mining company) from 2006 to 2018, including Director, Investor Relations; Director, Corporate Development; Director, Business Planning and Financial Evaluations.

Page 105


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Name, Province and Country of Residence, and Position

Director/Officer Since

Principal Occupation for the Past Five Years

Andrew Cormier

Chief Operating Officer

Ontario, Canada

April 2020

Chief Operating Officer of the Company since April 2020; previously was VP Development and Construction at Alamos Gold Inc. from 2013 to 2020; Project Manager at AuRico Gold Inc. 2007-2013; Principal Metallurgist at SNC-Lavalin from 2004-2007; he worked for various mining companies in operations; from 1993 to 2004.

Sylvain Guerard

Senior Vice President, Exploration

Ontario, Canada

August 2020

Senior Vice President, Exploration of the Company since August 2020; Senior Vice President Exploration at McEwen Mining Inc. from 2017 to August 2020; Senior Vice President, Exploration at Kinross from 2014 to 2016 and various other roles at Kinross from 2009 to 2014 (all mining companies).

Chafika Eddine

Chief Sustainability Officer

British Columbia, Canada

March 2022

Chief Sustainability Officer of the Company since March 2022; Sustainability and Governance Consultant for various mining companies, including Lundin Mining and New Gold, 2015 to March 2022; Corporate Social Responsibility Manager (Director level) for Hudbay Minerals, 2012-2015; Vice-President Corporate Affairs for Bear Creek Mining, 2004-2009.

Paul Mann

Vice President, Finance and Accounting

British Columbia, Canada

April 2022

Vice President, Finance and Accounting of the Company since 2022 and previously the Company’s Corporate Controller from 2018 to 2022. Previously was Corporate Controller, Fortuna Silver Mines (mining company) from 2016 to 2018 and VP Finance and Reporting at Hunter Dickinson (mining management services) from 2007 to 2016.

Andrew Bradbury

Vice President, Corporate Development and Investor Relations

Ontario, Canada

April 2022

Vice President, Corporate Development and Investor Relations of the Company since 2022 and previously Director, Investor Relations from 2020 to 2022. Previously held roles in corporate development and business improvement at Teranga Gold Corporation (mining company).


Notes:

(1)Member of the Audit Committee. Ms. McGregor is the Chairperson of the Audit Committee.
(2)Member of the Human Resources and Compensation Committee. Mr. Robitaille is the Chairman of the Human Resources and Compensation Committee.
(3)Member of the Environmental, Sustainability, Health & Safety Committee. Mr. Haldane is the Chairman of the Environmental, Sustainability, Health & Safety Committee.
(4)Member of the Corporate Governance & Nominating Committee. Mr. Stephens is the Chairman of the Corporate Governance & Nominating Committee.

Each Director’s term of office expires at the next annual meeting of shareholders of the Company or when his/her successor is duly elected or appointed, unless his/her term ends earlier in accordance with the articles or by-laws of the Company, he/she resigns from office or he/she becomes disqualified to act as a Director of the Company.

As at March 20, 2023, and based on the disclosure available on the System for Electronic Disclosure by Insiders (“SEDI”), the Directors and executive officers of the Company, as a group, beneficially own, directly or indirectly, or exercise control or direction over 7,038,132

Page 106


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Common Shares, representing approximately 2.55% of the total number of Common Shares outstanding before giving effect to the exercise of stock options, restricted share units, deferred share units or warrants to purchase Common Shares held by such Directors and executive officers.

CEASE TRADE ORDERS, BANKRUPTCIES, PENALTIES OR SANCTIONS

To the knowledge of the Company, none of the Directors or executive officers of the Company is, as at the date of this AIF, or was within ten years before the date of this AIF, a director, chief executive officer or chief financial officer of any company (including the Company), that: (a) was subject to a cease trade order or similar order or an order that denied the relevant company access to any exemption under securities legislation, which order was in effect for a period of more than 30 consecutive days (an “Order”) that was issued while the director or executive officer was acting in the capacity as director, chief executive officer or chief financial officer; or (b) was subject to an Order that was issued after the director or executive officer ceased to be a director, chief executive officer or chief financial officer and which resulted from an event that occurred while that person was acting in the capacity as director, chief executive officer or chief financial officer.

None of the Directors or executive officers of the Company or, to the Company’s knowledge, any shareholder holding a sufficient number of securities of the Company to affect materially the control of the Company have been subject to: (a) any penalties or sanctions imposed by a court relating to securities legislation or by a securities regulatory authority or have entered into a settlement agreement with a securities regulatory authority, or (b) any other penalties or sanctions imposed by a court or regulatory body that would likely be considered important to a reasonable investor in making an investment decision.

None of the Directors or executive officers of the Company, or, to the Company’s knowledge, any shareholder holding a sufficient number of securities of the Company to affect materially the control of the Company: (a) is, as at the date of this AIF, or has been within ten years before the date of this AIF, a director or executive officer of any company (including the Company) that, while that person was acting in that capacity, or within a year of that person ceasing to act in that capacity, became bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency or was subject to or instituted any proceedings, arrangement or compromise with creditors or had a receiver, receiver manager or trustee appointed to hold its assets; or (b) has, within the ten years before the date of this AIF, become bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency, or become subject to or instituted any proceedings, arrangement or compromise with creditors, or had a receiver, receiver manager or trustee appointed to hold the assets of the director, executive officer or shareholder.

CONFLICTS OF INTEREST

To the best of the Company’s knowledge, and other than as disclosed in this AIF, there are no known existing or potential conflicts of interest between the Company and any of the Company’s Directors or officers. However, certain of the Directors and officers of the Company are directors, officers and/or shareholders of other private and publicly listed companies, including companies that engage in mineral exploration and development and therefore it is possible that a conflict may arise between their duties to the Company and their duties to such other companies. All such conflicts will be dealt with pursuant to the provisions of the applicable corporate legislation and the Company’s Code of Business Conduct and Ethics. In the event that such a conflict of interest arises at a meeting of the Directors, a Director affected by the conflict must disclose the nature and extent of his interest and abstain from voting for or against matters concerning the matter in respect of which the conflict arises. Directors and executive officers are required to disclose any conflicts or potential conflicts to the Board of Directors as soon as they become aware of them. See the section of this AIF entitled “Risk Factors – Conflicts of Interest”.

LEGAL PROCEEDINGS AND REGULATORY ACTIONS

There are no material legal proceedings or regulatory actions involving Orla or its properties as at the date of this AIF, and Orla is not aware of any such proceedings or actions currently contemplated.

Page 107


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS

No Director or executive officer of the Company, no person or company that beneficially owns, or controls or directs, directly or indirectly, more than 10% of any class or series of the Company’s outstanding voting securities and no associate or affiliate of any of such persons or companies has any material interest, direct or indirect, in any transaction within the three most recently completed financial years or during the current financial year that has materially affected or is reasonably expected to materially affect the Company.

TRANSFER AGENTS AND REGISTRARS

The transfer agent and registrar for the Common Shares is Computershare Investor Services Inc. at its principal offices in Vancouver, British Columbia and Toronto, Ontario. The co-transfer agent and registrar for the Common Shares in the United States of America is Computershare Trust Company, N.A. in Canton, Massachusetts, Jersey City, New Jersey and Louisville, Kentucky.

MATERIAL CONTRACTS

The only material contracts entered into by the Company within the financial period ended December 31, 2022 or since such time or before such time that are still in effect, other than those in the ordinary course of business, are as follows:

1.The Credit Agreement in respect of the Credit Facility. See “General Development of the Business – Developments During 2022” for further details.
2.The Layback Agreement. See “General Development of the Business – Developments During 2020 and Development During 2021” for further details.
3.The Arrangement Agreement. See “General Development of the Business – Gold Standard Acquisition” for further details.

INTERESTS OF EXPERTS

QUALIFIED PERSONS UNDER NI 43-101

The following persons have been named as having prepared or certified a report, valuation, statement, or opinion described or included in a filing, or referred to in a filing, made under National Instrument 51-102 – Continuous Disclosure Obligations during, or relating to, the Company’s financial year ended December 31, 2022:

2021 Camino Rojo Report – Carl E. Defilippi, RM, SME of KCA, Matthew D. Gray, Ph.D., C.P.G. of RGI, Michael G. Hester, FAusIMM of IMC and John J. Ward, C.P.G. of John Ward, RG, Groundwater Consultant, LLC. Mr. Hester is also the qualified person responsible for the updated Mineral Reserve and Mineral Resource estimates for the Camino Rojo Oxide Mine as set out in this AIF under “Summary of Mineral Reserve and Mineral Resource Estimates”.
2022 Cerro Quema Report – Carl E. Defilippi, RM SME, of KCA, Sue Bird, P. Eng., of MMTS, Jesse Aarsen, P.Eng, of MMTS, Denys Parra, RM SME, of Anddes, Dr. Matthew D. Gray, Ph.D., C.P.G., of RGI, Brent Johnson, RM SME, P.G., of HydroGeoLogica, Lee Josselyn, P.E. of Linkan and Wade Brunham, M.Sc. PWS, R.P.Bio, of ERM.
South Railroad Report – Matthew Sletten, PE of M3, Benjamin Bermudez, PE of M3, Art S. Ibrado, PE, of Fort Lowell Consulting PLLC, Michael Lindholm, CPG, of RESPEC, Thomas Dyer, PE, of RESPEC, Jordan Anderson, QP RM-SME, of

Page 108


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

RESPEC, Gary L. Simmons, QP-MMSA of GL Simmons Consulting, LLC, Richard DeLong, QP-MMSA, RG, PGm, of EM Strategies, and Kevin Lutes, PE, of NewFields Mining Design & Technical Services.

None of the foregoing persons, or any director, officer, employee, or partner thereof, as applicable, received or has received a direct or indirect interest in the Company’s property or the property of any of the Company’s associates or affiliates. Each of the aforementioned persons are independent of the Company and held an interest in either less than 1% or none of the Company’s securities or the securities of any associate or affiliate of the Company at the time of preparation of the respective reports and after the preparation of such reports and estimates, and they did not receive any direct or indirect interest in any of the Company’s securities or the securities of any associate or affiliate of the Company in connection with the preparation of the applicable report. None of the aforementioned persons nor any director, officer, employee, or partner, as applicable, of the aforementioned companies or partnerships is currently expected to be elected, appointed, or employed as a Director, officer or employee of the Company or of any associate or affiliate of the Company.

All scientific and technical information in this AIF has been reviewed and approved by J. Andrew Cormier, P.Eng., and Sylvain Guerard, P. Geo., each of whom is a “Qualified Person” under NI 43-101. As of the date hereof, Mr. Cormier held 75,200 Common Shares, 759,652 stock options, and 52,315 restricted share units of the Company and Mr. Guerard held 4,271 Common Shares, 242,803 stock options, and 17,524 restricted share units.

AUDITORS

The Company’s independent auditors are Ernst & Young LLP, Chartered Professional Accountants, who have issued an Independent Auditor’s Report in respect to the Company’s consolidated financial statements for the year ended December 31, 2022. Ernst & Young LLP has advised the Company that they are independent with respect to the Company within the context of the CPA Code of Professional Conduct of the Chartered Professional Accountants of British Columbia and in compliance with Rule 3520 of the Public Company Accounting Oversight Board (United States) (PCAOB).

Davidson & Company LLP, Chartered Professional Accountants, were the auditor of Gold Standard and has issued an Independent Auditor’s Report in respect of Gold Standard’s consolidated financial statements for the year ended December 31, 2021, which was included in the Gold Standard BAR.

AUDIT COMMITTEE INFORMATION

The Audit Committee has the responsibility of, among other things: overseeing financial reporting, internal controls, the audit process and the establishment of “whistleblower” and related policies; recommending the appointment of the independent auditor and reviewing the annual audit plan and auditor compensation; pre-approving audit, audit related and tax services to be provided by the independent auditor; and reviewing and recommending approval to the Board of Directors of annual and quarterly financial statements and management’s discussion and analysis.

The Audit Committee’s charter sets out its responsibilities and duties, qualifications for membership, procedures and reporting to the Company’s Board of Directors. A copy of the charter is attached hereto as Schedule “A” to this AIF.

COMPOSITION OF THE AUDIT COMMITTEE

The Audit Committee is comprised of four Directors. The following table sets out the name of each current Audit Committee member and whether they are “independent” and “financially literate”. To be considered independent, a member of the Audit Committee must not have any direct or indirect material relationship with the Company. A material relationship is a relationship which could, in the view of the Board, reasonably interfere with the exercise of a member’s independent judgement. To be considered financially literate, a member of the Audit Committee must have the ability to read and understand a set of financial statements that present a breadth and

Page 109


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

level of complexity of accounting issues that are generally comparable to the breadth and complexity of the issues that can reasonably be expected by the Company’s financial statements.

Name of Member

    

Independent 

    

Financially Literate

Elizabeth McGregor

Yes(1)

Yes(1)

Charles A. Jeannes

Yes(1)

Yes(1)

David Stephens

Yes(1)

Yes(1)

Tamara Brown

Yes(1)

Yes(1)


Note:

(1)As defined under National Instrument 52-110 Audit Committees (“NI 52-110”) and within the meaning of the applicable NYSE American listing standards and requirements.

RELEVANT EDUCATION AND EXPERIENCE

The education and experience of each Audit Committee member that is relevant to the performance of his or her responsibilities as an Audit Committee member and, in particular, any education or experience that would provide the member with: an understanding of the accounting principles used by Orla to prepare its financial statements; the ability to assess the general application of such accounting principles in connection with the accounting for estimates, accruals and provisions; experience preparing, auditing, analyzing, or evaluating financial statements that present a breadth and level of complexity of accounting issues that are generally comparable to the breadth and complexity of issues that can reasonably be expected to be raised by Orla’s financial statements, or experience actively supervising one or more persons engaged in such activities; and an understanding of internal controls and procedures for financial reporting, is set out below.

ELIZABETH MCGREGOR

Ms. McGregor served as the Executive Vice President and Chief Financial Officer of Tahoe Resources Inc. from August 2016 until the acquisition by Pan American Silver Corp. in February 2019. Ms. McGregor is a Canadian Chartered Professional Accountant (CPA, CA) and, prior to her role as Chief Financial Officer, served as Tahoe Resources Inc.’s VP Treasurer. She directed financial planning, corporate liquidity, financial reporting and risk management. Prior to joining Tahoe Resources Inc., she worked at Goldcorp from 2007 to 2013 where she held various financial roles including Director of Project Finance and Cost Control; Administration Manager at the Peñasquito mine; and Director of Risk. Ms. McGregor has also served as a director of Kinross Gold Corporation since November 6, 2019. Ms. McGregor began her career at KPMG as Audit Manager. She holds a B.A. (Hons) from Queen’s University in Kingston.

DAVID STEPHENS

Mr. Stephens is a partner at Agentis Capital Mining Partners, which provides capital markets advisory services. Mr. Stephens also provides consulting services in the mining and technology industries through his private consulting company. He was the Vice President, Corporate Development and Marketing at Goldcorp until its acquisition by Newmont on April 18, 2019, having previously served as Vice President and Treasurer. Prior to joining Goldcorp, Mr. Stephens spent ten years working in investment banking and equity research at various organizations including Macquarie Capital Markets Canada Ltd. and Orion Securities. Mr. Stephens holds a Bachelor’s degree in Electrical Engineering and Computer Science from Harvard University.

CHARLES JEANNES

Mr. Jeannes served as President and Chief Executive Officer of Goldcorp from 2009 until April 2016, and Executive Vice President, Corporate Development from 2006 until 2008. From 1999 until the acquisition of Glamis Gold Ltd. (“Glamis”) by Goldcorp, he was

Page 110


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

Executive Vice President, Administration, General Counsel and Secretary of Glamis. Prior to joining Glamis, Mr. Jeannes worked for Placer Dome Inc., most recently as Vice President of Placer Dome North America. He is also currently a Director of Pan American Silver Corp. and Wheaton Precious Metals Corp. (formerly Silver Wheaton Corp.) and serves as a Trustee of the Wolf Pack Athletic Association of the University of Nevada (a non-profit Board). He holds a Bachelor of Arts degree from UNR and graduated from the University of Arizona School of Law with honours in 1983. He practiced law from 1983 until 1994 and has broad experience in capital markets, mergers and acquisitions, public and private financing, and international operations.

TAMARA BROWN

Ms. Brown is a partner at Oberon Capital Corporation, a boutique investment banking firm. Ms. Brown is currently an Independent Director of Superior Gold Inc. (TSX), where she also serves on the audit committee, Titan Minerals Ltd. (ASX) and Lithium Royalty Corp. She was previously a Non-Executive Director for Lundin Gold Inc. and Eastmain Resources Inc. and was the Interim CEO of Superior Gold Inc. from 2020 to 2021. Her previous executive roles include Vice President, Investor Relations and Corporate Development (Americas) for Newcrest Mining, Vice President, Corporate Development and Investor Relations for Primero Mining Corp., and Director of Investor Relations for IAMGOLD Corp. She has a Bachelor of Engineering degree from Curtin University in Australia and has completed the Chartered Business Valuator course at York University.

AUDIT COMMITTEE OVERSIGHT

Since the commencement of Orla’s most recently completed financial year, there has not been a recommendation of the Audit Committee to nominate or compensate an external auditor which was not adopted by the Board of Directors.

RELIANCE ON CERTAIN EXEMPTIONS

At no time since the commencement of the Company’s most recently completed financial year has the Company relied on the exemption in Section 2.4, Section 3.2, Section 3.4, Section 3.5 or Section 3.8 of NI 52-110 or an exemption from NI 52-110, in whole or in part, granted under Part 8 of NI 52-110.

PRE-APPROVAL POLICIES AND PROCEDURES

The Audit Committee has established policies and procedures that are intended to control the services provided by the Company’s auditors and to monitor their continuing independence. Under these policies, no services may be undertaken by the Company’s auditors, unless the engagement is specifically approved by the Audit Committee or the services are included within a category that has been pre-approved by the Audit Committee. The maximum charge for services is established by the Audit Committee when the specific engagement is approved or the category of services pre-approved. Management is required to notify the Audit Committee of the nature and value of pre-approved services undertaken.

The Audit Committee will not approve engagements relating to, or pre-approve categories of, non-audit services to be provided by Orla’s auditors (i) if such services are of a type whereby the performance of which would cause the auditors to cease to be independent within the meaning of applicable rules, and (ii) without consideration, among other things, of whether the auditors are best situated to provide the required services and whether the required services are consistent with their role as auditor.

EXTERNAL AUDITOR SERVICE FEES

The aggregate fees billed by the Company’s external auditors in each of the last two financial years are as follows:

    

    

Audit-Related

    

    

All Other

Financial Year Ended

Audit Fees (1)

Fees (2)

Tax Fees (3)

Fees (4)

Page 111


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

December 31, 2022

C$

506,000

C$

NIL

C$

27,000

C$

NIL

December 31, 2021

C$

418,100

C$

NIL

C$

67,600

C$

NIL


Notes:

(1)Fees billed for professional services rendered by the Company’s external auditor for the audit and review of the financial statements or services that are normally provided by the external auditor in connection with statutory and regulatory filings or engagements.
(2)Fees billed by the Company’s external auditor for assurance-related services that are not included in “audit fees”.
(3)Fees for professional services rendered by the Company’s external auditor for tax compliance, tax advice and tax planning.
(4)Fees for products and services provided by the Company’s external auditor, other than services reported under the table headings “Audit Fees”, “Audit-Related Fees” or “Tax Fees”.

ADDITIONAL INFORMATION

Additional information relating to the Company may be found on SEDAR at www.sedar.com, on EDGAR at www.sec.gov and on the Company’s website at www.orlamining.com.

Additional information, including Directors’ and officers’ remuneration and indebtedness, principal holders of the Company’s securities and securities authorized for issuance under equity compensation plans, is contained in the Management Information Circular of the Company dated May 12, 2022 prepared for its most recent annual meeting of shareholders held on June 23, 2022 and filed on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. This information will also be contained in the Management Information Circular of the Company to be prepared in connection with the Company’s 2023 annual meeting of shareholders, currently scheduled to be held in June 2023 which will be available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. Additional financial information is provided in the Company’s audited consolidated financial statements and management discussion and analysis for the financial year ended December 31, 2022, which are filed on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Page 112


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

SCHEDULE “A”

CHARTER OF THE AUDIT COMMITTEE

INTRODUCTION

The primary responsibility of the Audit Committee (the “Committee”) is to oversee Orla Mining Ltd.’s (the, “Company” or “Orla”) financial reporting process on behalf of the Company’s Board of Directors (the “Board”) in order to assist the directors of the Company in meeting their responsibilities with respect to financial reporting by the Company.

Management is responsible for the preparation, presentation and integrity of the Company’s financial statements and for the appropriateness of the accounting principles and reporting policies that are used by the Company. The independent auditors are responsible for auditing the Company’s annual financial statements.

1.RESPONSIBILITIES AND AUTHORITY

The role, responsibility, authority and power of the Committee includes, but is not be limited to the following:

(a)the Committee shall be directly responsible for the appointment and termination (subject to Board and shareholder ratification), compensation and oversight of the work of the independent auditors, including resolution of disagreements between management and the independent auditors regarding financial reporting;
(b)the Committee shall ensure that at all times there are direct communication channels between the Committee and the internal auditors, if applicable, and the external auditors of the Company to discuss and review specific issues, as appropriate;
(c)the Committee shall discuss with the independent auditors (and internal auditors, if applicable) the overall scope and plans for their audits, including the adequacy of staff. The Committee shall discuss with management and the independent auditors the adequacy and effectiveness of the accounting and financial controls, including the Company’s policies and procedures to assess, monitor, and manage business risk and legal risk;
(d)the Committee shall, at least annually, obtain and review a report by the independent auditors:
(i)describing their internal quality control procedures;
(ii)reviewing any material issues raised by the most recent internal quality control review, or peer review, or any inquiry or investigation by a government or professional institute or society, within the preceding five years, respecting any independent audit carried out by the independent auditors, and any steps taken to deal with any such issues; and
(iii)outlining all relationships between the independent auditor and the Company in order to assess the auditor’s independence;
(e)the Committee shall review and assess the performance of the independent auditors annually and share the results with the Board.

Page 113


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

(f)the Committee shall meet separately, on a regular basis, with management and the independent auditors to discuss any issues or concerns, current or forthcoming, warranting Committee attention. As part of this process, the Committee shall provide sufficient opportunity for the independent auditors to meet privately with the Committee;
(g)the Committee shall receive regular reports from the independent auditors on critical policies and practices of the Company, including all alternative treatment of financial information within generally accepted accounting principles which have been discussed with management. Where alternative treatment exists, the independent auditors shall be invited to express their opinion as to whether the Company is using best practices; 
(h)the Committee shall review management’s assertion on its assessment of the effectiveness of internal controls as of the end of the most recent fiscal year and the independent auditors’ report on management’s assertion;
(i)the Committee shall review and discuss earnings press releases (including the non-GAAP measures presented in such releases), as well as information and earnings guidance provided to analysts and rating agencies;
(j)the Committee shall review the interim and annual financial statements and disclosures under management’s discussion and analysis of financial condition and results of operations with management and the annual audited statements with the independent auditors, prior to recommending them to the Board for approval, release or inclusion in any reports to shareholders and/or securities commissions;
(k)the Committee shall receive reports, if any, from corporate legal representatives of evidence of material violation of securities laws or breaches of fiduciary duty;
(l)the Committee shall review and ensure that procedures are in place for the receipt, retention and treatment of complaints received by the Company regarding accounting and auditing matters, as well as the confidential, anonymous submission by employees of concerns regarding questionable accounting or auditing matters;
(m)the Committee shall meet as often as it deems appropriate to discharge its responsibilities and, in any event, at least four (4) times per year. Additional meetings may be held as deemed necessary by the Chair of the Audit Committee (the “Chair”) or as requested by any Committee member or the external auditors or management;
(n)the Committee shall review all issues related to a change of auditor, including the information to be included in the notice of change of auditor and the planned steps for an orderly transition;
(o)the Committee shall pre-approve all non-audit services to be provided to the Company by the external auditors;
(p)the Committee shall assess policies and procedures for cash management and review investment strategies for the Company’s cash balances on an annual basis;
(q)the Committee shall review the Company’s overall tax plan and any material tax planning initiatives on an annual basis;
(r)the Committee shall review the Company’s insurance policies on an annual basis and consider the extent of any uninsured exposure and the adequacy of coverage;
(s)the Committee shall review and approve the Company’s policy with regard to the hiring of current and former partners or employees of the present and former external auditors;

Page 114


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

(t)the Committee shall review the expenses of the Chief Executive Officer and the Chairman of the Board on a quarterly basis;
(u)the Committee shall report on all the foregoing matters to the directors of the Company at the next Board meeting following;
(v)subject to the provisions of Part 3 of National Instrument 52-110, at all times, the membership of the Committee shall be such that:
(i)it shall be comprised of no fewer than three members;
(ii)each of the members thereof shall be “unrelated directors” or “independent” directors of the Company, as may be defined by the Toronto Stock Exchange, the British Columbia Securities Commission or any other regulator to which the Company reports or may report in the future;
(iii)each member of the Committee shall be financially literate in terms of the ability to read and understand a set of financial statements;
(iv)no member of the Committee shall have a material business relationship with the Company; 
(w)no business shall be transacted by the Committee except at a meeting of the members thereof at which;
(v)a majority of the members thereof are present;
(vi)by a resolution in writing signed by all of the members of the Committee;
(x)the minutes of all meetings of the Audit Committee shall be provided to the Board.

2.WHISTLEBLOWER POLICY

With regard to the Company’s Whistleblower Policy (the “Whistleblower Policy”), the Committee shall:

(a)review periodically and recommend to the Board any amendments to the Whistleblower Policy and monitor the procedures established by management to ensure compliance;
(b)review actions taken by management to ensure compliance with the Whistleblower Policy and its response to any violations; and
(c)review all reports received pursuant to the Whistleblower Policy and investigate each complaint and take appropriate action within the guidelines set forth in the Whistleblower Policy.

Page 115


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2022

United States dollars unless otherwise stated

3.RESPONSIBILITIES OF THE COMMITTEE CHAIR

The fundamental responsibility of the Chair is to be responsible for the management and effective performance of the Committee and to provide leadership to the Committee in fulfilling its Charter and any other matters delegated to it by the Board. To that end, the Chair’s responsibilities shall include:

(d)working with the Chairman of the Board to establish the frequency of Committee meetings and the agendas for such meetings;
(e)providing leadership to the Committee and presiding over Committee meetings;
(f)facilitating the flow of information to and from the Committee and fostering and environment in which Committee members may ask questions and express their viewpoints;
(g)reporting to the Board with respect to significant activities of the Committee and any recommendations of the Committee;
(h)addressing, or causing to be addressed, all concerns communicated to the Chair under the Whistleblower Policy;
(i)leading the Committee in annually reviewing and assessing the adequacy of its mandate and evaluating its effectiveness in fulfilling its mandate; and
(j)taking such other steps as are reasonably required to ensure that the Committee carries out its mandate.

4.ADOPTION

ADOPTED AND APPROVED by the Board on December 6, 2016.

AMENDED AND APPROVED by the Committee and the Board on August 5, 2021.

FURTHER AMENDED AND APPROVED by the Committee and the Board on August 8, 2022.

Page 116


Table of Contents

Exhibit 99.2

Graphic

Management’s Discussion and Analysis

Year ended December 31, 2022

Amounts in United States dollars


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

TABLE OF CONTENTS

I.

OVERVIEW

3

II.

HIGHLIGHTS

4

III.

OUTLOOK AND UPCOMING MILESTONES

5

IV.

GUIDANCE

6

A.   2022 GUIDANCE COMPARISON

6

B.   2023 GUIDANCE

7

V.

DISCUSSION OF OPERATIONS

8

A.   CAMINO ROJO, MEXICO

8

B.   SOUTH RAILROAD PROJECT, NEVADA

13

C.   CERRO QUEMA PROJECT, PANAMA

15

VI.

COVID-19 GLOBAL HEALTH EMERGENCY

17

VII.

NON-GAAP MEASURES

17

VIII.

SUMMARY OF QUARTERLY RESULTS

20

IX.

THREE AND TWELVE MONTHS ENDED DECEMBER 31, 2022

22

X.

LIQUIDITY

26

XI.

CAPITAL RESOURCES

27

XII.

RELATED PARTY TRANSACTIONS

28

XIII.

OFF-BALANCE SHEET ARRANGEMENTS

28

XIV.

PROPOSED TRANSACTIONS

28

XV.

CRITICAL ACCOUNTING ESTIMATES

29

XVI.

FINANCIAL INSTRUMENTS

31

XVII.

OUTSTANDING SHARE DATA

32

XVIII.

CAUTIONARY NOTES

32

XIX.

RISKS AND UNCERTAINTIES

35

Page 2


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

I.OVERVIEW

Orla Mining Ltd. is a mineral exploration, development, and production company that trades on the Toronto Stock Exchange under the ticker symbol “OLA” and on the NYSE American under the symbol “ORLA”. The “Company”, “Orla”, “we”, and “our” refer to Orla Mining Ltd. and its subsidiaries unless the context otherwise indicates.

Orla’s corporate strategy is to acquire, develop, and operate mineral properties where our expertise can substantially increase stakeholder value. We have three material gold projects, (1) Camino Rojo, located in Zacatecas State, Mexico, (2) South Railroad, located in Nevada, United States, and (3) Cerro Quema, located in Los Santos Province, Panama.

Camino Rojo consists of the Camino Rojo oxide gold mine (the “Camino Rojo Oxide Mine” or “Camino Rojo”), which achieved commercial production effective April 1, 2022, and the Camino Rojo sulphides project (the “Camino Rojo Sulphides”). South Railroad (“South Railroad” or the “South Railroad Project”) consists of the Dark Star and Pinion deposits and is situated within a prospective land package, referred to as the Railroad-Pinion property, along the Carlin trend in Nevada. Cerro Quema consists of the Cerro Quema gold project (the “Cerro Quema Gold Project”), which also includes the Caballito copper-gold deposit (“Caballito”). This Management’s Discussion and Analysis (“MD&A”) of the financial condition and results of operations of the Company should be read in conjunction with our consolidated financial statements for the year ended December 31, 2022. The Cautionary Notes in section XVIII  are an important part of this document.

Additional information about our Company, including our most recent consolidated financial statements and annual information form, is available on the Company website at www.orlamining.com, under the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR”) at www.sedar.com, and the Company’s documents filed with, or furnished to, the United States Securities and Exchange Commission (“SEC”), which are available through the SEC’s Electronic Data Gathering and Retrieval System (“EDGAR”) at www.sec.gov.

This MD&A is current as of March 20, 2023.

Andrew Cormier, P.Eng., the Chief Operating Officer of the Company, is a Qualified Person, as the term is defined in National Instrument 43-101 (“NI 43-101”) and has reviewed and approved the technical information disclosed in this MD&A.

Page 3


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

II.HIGHLIGHTS

Q4 2022 Highlights

32,438 gold ounces sold during the quarter, generating $56.8 million in revenue.
All-in sustaining costs1 for the quarter were $634 per ounce sold.
Adjusted earnings 1 of $20.7 million resulting in adjusted earnings per share of $0.07.
Net income of $18.7 million for the quarter resulting in earnings per share of $0.06.
Cash flow from operating activities before changes in non-cash working capital of $55.1 million.
Cash on hand at December 31, 2022 of $96.3 million.

FY 2022 Highlights

107,502 gold ounces sold during the year, generating $193.2 million in revenue.
All-in sustaining costs1 for the year were $611 per ounce sold.
Adjusted earnings1 of $57.1 million resulting in adjusted earnings per share of $0.21
Net income of $45.8 million for the year resulting in earnings per share of $0.17.
Cash flow from operating activities before changes in non-cash working capital of $111.1 million.
Completed the acquisition of Gold Standard Ventures Corp. (Gold Standard), the owner of South Railroad, a permitting-stage, open pit, heap leach project located on the Carlin trend in Nevada.
Declared commercial production at the Camino Rojo Oxide Mine on April 1, 2022.


1.Non-GAAP measure. Please refer to section VII - NON-GAAP MEASURES of this MD&A for a reconciliation of this measure to the most comparable figures presented in our financial statements.

Page 4


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Operating

    

Q4 2022

    

2022

Gold production

ounces

32,017

109,596

Gold sold

ounces

32,438

107,502

Average realized gold price 1

per ounce

$

1,743

$

1,790

Cost of sales – operating cost

million

$

13.5

$

45.6

Cash cost per ounce 1

per ounce

$

453

$

449 2

All-in sustaining cost per ounce 1

per ounce

$

634

$

611 2

Revenue

million

$

56.8

$

193.2

Net income (loss)

million

$

18.7

$

45.8

Earnings (loss) per share – basic

$/share

$

0.06

$

0.17

Adjusted earnings (loss) 1

million

$

20.7

$

57.1

Adjusted earnings (loss) per share 1

$/share

$

0.07

$

0.21

Cash flow from operating activities before changes in non-cash working capital

million

$

55.1

$

111.1

Free cash flow 1

million

$

11.6

$

82.0

Financial position

At December 31, 2022

Cash and cash equivalents

million

$

96.3

Net debt 1

million

$

49.5

III.OUTLOOK AND UPCOMING MILESTONES

We remain focused on advancing the Company’s strategic objectives and near-term milestones, which include the following:

Maintaining robust health and safety protocols, including COVID-19 prevention measures, to support the health of our employees and local communities.

1.Non-GAAP measure. Please refer to section VII — NON-GAAP MEASURES of this MD&A for a reconciliation of this measure to the most comparable figures presented in our financial statements.
2.The Company declared commercial production at Camino Rojo effective April 1, 2022. Consequently, the “year to date” figures for cash cost per ounce and all-in sustaining cost per ounce are for the period April 1, 2022 to December 31, 2022.

Page 5


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Maintaining consistent performance at the Camino Rojo Oxide Mine.
Continuing project permitting activities at South Railroad.
Continuing project permitting activities at Cerro Quema.
Continuing to advance development activities at Camino Rojo Sulphides.
Continuing exploration programs across our portfolio:

o

Camino Rojo, Mexico, Sulphides Phase 3 drilling program to support optimal development scenario.

o

Camino Rojo, Mexico, regional exploration program to discover new mineral resources.

o

South Railroad, Nevada sulphide and oxide exploration programs to increase reserve base and discover new mineral resources.

o

Testing regional targets in Panama.

During the first quarter of 2023, the Company will make its first income tax payment (including the Special Mining Duty) in Mexico of approximately $34 million related to the 2022 fiscal year. Cashflow from operating activities before changes in non-cash working capital and cash flow per share will be impacted accordingly. Beginning in May 2023, the Company expects to make monthly tax installments.

IV.GUIDANCE

A.2022 GUIDANCE COMPARISON

On February 24, 2022, the Company announced its first annual guidance, which included the outlook for production, operating costs, capital costs, and exploration spending at Camino Rojo and Cerro Quema. On September 12, 2022, the Company announced an increase to 2022 exploration spending to $18 million following the Company’s acquisition of Gold Standard and, on October 11, 2022, the Company announced an increase in annual production guidance to 100,000 to 110,000 ounces from the previous 90,000 to 100,000 ounces. The following table sets forth the revised guidance compared to the Company’s performance in 2022.

    

    

2022 Revised Guidance

    

2022 Actual

Gold Production

oz

100,000 – 110,000

109,596

All-in Sustaining Costs (“AISC”) 2,3

$/oz Au sold

$600 - $700

$611

Capital Expenditures 3

 

  

 

  

 

  

Sustaining Capital Expenditures

$

$

5 million

 

$

3.5 million

Non-Sustaining Capital Expenditures

$

$

20 million

 

$

10.1 million4

Total Capital Expenditures

$

$

25 million

 

$

13.6 million

Exploration 3

 

 

  

 

 

  

Mexico

$

$

10 million

 

$

9.8 million

Panama

$

$

5 million

 

$

4.1 million

Nevada

$

$

3 million

 

$

3.8 million

Total Exploration

$

$

18 million

 

$

17.7 million


Page 6


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

1.The Company declared commercial production at Camino Rojo effective April 1, 2022. Consequently, 2022 figure for all-in sustaining cost per ounce is for the period April 1, 2022 to December 31, 2022.
2.AISC is a non-GAAP measure. See section VII — NON-GAAP MEASURES of this MD&A for additional information.
3.Exchange rates used to forecast cost metrics in the guidance include MXN/USD of 20.0 and CAD/USD of 1.25.
4.Excludes $4.3 million of capitalized exploration, which is included in Exploration-Mexico below.

The Camino Rojo Oxide Mine produced 109,596 ounces of gold during its first full year of operation, ahead of expectation. Following the first gold pour in December 2021, the mine completed a successful ramp-up period during the first quarter of 2022. Ore stacking rates during the year was above plan allowing more ore to be placed on the heap leach pad during the year which contributed to the higher production compared to guidance. Non-Sustaining capital Expenditures were significantly under budget as a result of lower construction costs mainly from cost contingencies not being used. Sustaining capital was due to lower deferred stripping cost and certain items being deferred to 2023.

Exploration spending was mainly in line with guidance as all programs were completed as planned during the year. A total of $4.3 million of Mexico exploration spending related to the sulphide zone was capitalized to Property, Plant and Equipment.

B.2023 GUIDANCE

For 2023, the Company expects production to be in the range of 100,000 to 110,000 ounces. The Company has a planned exploration spending of $35 million in 2023 of which $2 million is included in sustaining capital. In addition, Orla expects to repay $45.0 million in debt and other obligations during the course of 2023. This includes $22.2 million related to principal repayments on the credit facility and $22.8 million as a final payment on the Layback Agreement.

    

    

FY 2023 Guidance

Gold Production

oz

100,000 – 110,000

All-in Sustaining Costs (“AISC”) 2,3

$/oz Au sold

$750 - $850

Capital Expenditures 3

 

  

 

  

Sustaining Capital Expenditures

$

$

6 million

Non-Sustaining Capital Expenditures

$

$

4 million

Total Capital Expenditures

$

$

10 million

Exploration 3

 

 

  

Mexico

$

$

20 million

USA (Nevada)

$

$

10 million

Panama

$

$

3 million

Total Exploration

$

$

33 million

Site Admin & Permitting Expenses (Nevada/Panama)

$

$

11 million

Corporate G&A

$

$

15 million


5.The outlook constitutes forward-looking statements within the meaning of applicable securities legislation, see Cautionary Note Regarding Forward-Looking Information below.
6.AISC is a non-GAAP measure. See section VII — NON-GAAP MEASURES of this MD&A for additional information.
7.Exchange rates used to forecast cost metrics include MXN/USD of 20.0 and CAD/USD of 1.28.

AISC guidance for 2023 is $750 to $850 per ounce of gold sold. The increase in AISC over 2022 is due primarily to increased maintenance costs, price inflation, and an increase G&A costs at corporate office as we added a third project with South Railroad in 2022. Sustaining capital expenditures include construction of a dome at the stockpile for dust control management, which was not

Page 7


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

initially in the feasibility study ($2M) and approximately $2 million of capitalized exploration cost to drill the Layback Area. The majority of exploration expense is in Mexico, with the objective of testing regional targets and conducting Phase 3 drilling at the sulphides to better understand the underground scenario. Site administration costs are primarily permitting related expenses at South Railroad.

V.DISCUSSION OF OPERATIONS

A.CAMINO ROJO, MEXICO

Camino Rojo is a gold-silver-lead-zinc deposit located in the Municipality of Mazapil, State of Zacatecas, Mexico near the village of San Tiburcio. The project lies 190 kilometres northeast of the city of Zacatecas, 48 km south-southwest of the town of Concepción del Oro, Zacatecas, and 54 kilometres south-southeast of Newmont’s Peñasquito mine.

Refer to the Company’s filed annual information form dated March 20, 2023, for the year ended December 31, 2022 (the “Annual Information Form”), for historical context and project background.

CAMINO ROJO OPERATIONAL UPDATE

The Company declared commercial production at Camino Rojo on April 1, 2022 following sixteen months of construction which began in December 2020. Camino Rojo achieved record quarterly gold production of 32,017 ounces of gold in Q4 2022, primarily as a result of an increased average ore stacking rate during the quarter which achieved a record 19,591 tonnes per day, 9% above nameplate capacity of 18,000 tonnes per day. The average mining rate during the fourth quarter was 41,128 tonnes per day which resulted in a strip ratio of 0.70 during the quarter and 0.67 for the full year 2022. The average grade of ore processed during the fourth quarter was 0.78 g/t gold, in line with plan, and the average grade of ore processed for the full year 2022, was 0.82 g/t gold, approximately 5% higher than plan.

Gold sold during the fourth quarter and for the first full year of operation totaled 32,438 ounces and 107,502 ounces, respectively.

Fourth quarter cash costs and AISC totaled $453 and $634 per ounce of gold sold, respectively. The key contributors to the AISC being at the lower end of the guidance range are attributable to mining softer ore than anticipated in the upper benches of the mine during the first year of operation. As a result of the softer ore, maintenance required on the crushing, conveying and stacking systems was less than anticipated due to low wear. Lower consumption rates on key inputs such as electricity and reagents also contributed to the low AISC.

Mined ore tonnes are reconciling well to the block model and process recoveries to date are in line with the metallurgical recovery model.

Page 8


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Camino Rojo Operating Highlights

    

    

Q4 2022

    

2022

 

Total Ore Mined

tonnes

2,227,611

8,299,621

 

Ore - processed

tonnes

1,777,118

6,579,070

 

Low Grade Ore – stockpiled

 

tonnes

 

450,493

 

1,720,551

Waste Mined

 

tonnes

 

1,556,189

 

5,535,125

Total Mined

 

tonnes

 

3,783,801

 

13,834,747

Strip Ratio

 

w:o

 

0.70

 

0.67

Total Ore Mined Gold Grade

 

g/t

 

0.69

 

0.71

Ore – processed

 

g/t

 

0.78

 

0.82

Low Grade Ore – stockpiled

 

g/t

 

0.30

 

0.33

Processing

 

  

 

  

 

  

Ore Crushed

 

tonnes

 

1,744,711

 

6,485,707

Ore Stacked

 

tonnes

 

1,802,376

 

6,882,063

Stacked Ore Gold Grade

 

g/t

 

0.79

 

0.82

Gold Produced

 

oz

 

32,017

 

109,596

Daily Stacking Rate – Average*

 

tpd

 

19,591

 

18,251

Daily Stacked Throughput / Nameplate Capacity

 

tonnes

 

109

%  

101

%

 

At December 31, 2022

Total Crushed Ore Stockpile

 

tonnes

 

166,695

Total Crushed Ore Stockpile Au Grade

 

g/t

 

0.86

Total ROM Ore Stockpile**

 

tonnes

 

2,120,642

Total ROM Ore Stockpile Grade

 

g/t

 

0.34


*Average stacking rate calculation excludes truck-stacked overliner material (0 tonnes for Q4 2022 and 220,432 tonnes for YTD 2022).
**ROM ore stockpile includes mined ore not yet crushed, and low-grade stockpiles.

ENVIRONMENTAL AND PERMITTING

On March 3, 2022, a request was submitted to SEMARNAT for approval of the open pit east and west expansion, as well as waste and low grade ore stockpiles. Receipt of these permits is still pending.

LAYBACK AREA

In December 2020, the Company entered into a Layback Agreement (the “Layback Agreement”) with Fresnillo plc (“Fresnillo”), granting Orla the right to expand the Camino Rojo Oxide Mine pit onto 21.8 ha of Fresnillo’s 782 ha “Guachichil D1” mineral concession, located immediately to the north of Orla’s property.

SURFACE RIGHTS

Fresnillo controlled the surface rights needed for exploration and mining on the Guachichil D1 mineral concession. Pursuant to the Layback Agreement, 27.5 ha of surface rights (“Layback Area”) controlled by Fresnillo were acquired by Minera Camino Rojo SA de CV to mine on a portion of the Guachichil D1 mineral concession that covers the Layback Area, as required for the Camino Rojo Oxide

Page 9


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Mine as defined in the 2021 Feasibility Study1 for Camino Rojo. Near the end of 2022, we finalized the ratification process with local communities related to the transfer of surface access rights pertaining to the Layback Area.

CHANGE IN LAND USE PERMIT

As a result of the Layback Agreement, the project as described in the 2021 Camino Rojo Report will require an additional Change of Land Use (in Spanish, Cambio de Uso de Suelo, or “CUS”) permit to allow for additional surface disturbances related to development of a pit layback onto lands not considered in the August 2019 CUS permit application. The application for the additional CUS permit was submitted to the Secretariat of Environment and Natural Resources (known by its Spanish acronym, “SEMARNAT”) in February, 2023. We expect the review process by SEMARNAT will take up to six months prior to issuance of a resolution.

ENVIRONMENTAL IMPACT STATEMENT

With respect to the Environmental Impact Statement (in Spanish, Manifesto de Impacto Ambiental, or “MIA”), the project described in the 2021 Camino Rojo Report requires a modification of the MIA permit to allow for the additional production related to the development of a pit layback onto lands not considered in the August 2019 permit application. This MIA modification has been submitted and remains under review by SEMARNAT.

Any potential development of Camino Rojo that would include an open pit encompassing the entire mineral resource estimate, including the sulphide material, will depend on an additional agreement with Fresnillo (or any potential subsequent owner of the mineral titles) and additional permits from government agencies.

Additional work is required to bring material on the Fresnillo concession to the measured and indicated mineral resource category, which will then facilitate a mineral resource and reserve update. Work required includes an estimated 2,500 metres of drilling, detailed QA/QC, and integration of Orla’s geological and resource models with Fresnillo’s drill data.

EXPLORATION

The Camino Rojo land package is under-explored and its proximity to the large Camino Rojo mineralized system provides highly prospective opportunities. Exploration on the project is somewhat challenging due to the presence of a thin alluvial soil and caliche cover restricting geochemical surface expressions, but the potential to discover mineralization is considered excellent. As such, we continue to conduct regional exploration at Camino Rojo.

At Camino Rojo, our near-mine and regional exploration activities in 2022 focused on increasing oxide resources & reserves, supporting advancement of the sulphide deposit development scenarios, and testing priority targets defined in 2021 in an effort to make new satellite discoveries. Near-mine work included continuation of the north-to-south oriented drill program on the sulphide deposit to support a planned updated resource estimate. Oxide resource drilling on the Fresnillo Layback Area was delayed, pending completion of the transfer of surface rights (see “Layback Area” above).

Regional exploration work included reverse circulation (“RC”) and diamond drill core drilling of priority regional exploration targets and continued target definition activities.


1

The 2021 Feasibility Study in respect of the Camino Rojo Oxide Mine is set forth in the technical report titled “Unconstrained Feasibility Study NI 43-101 Technical Report on the Camino Rojo Gold Project, Municipality of Mazapil, Zacatecas, Mexico” dated effective January 11, 2021 (the “2021 Camino Rojo Report”), which is available on the Company’s website, at www.sedar.com, and at www.sec.gov.

Page 10


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

In 2023, Orla will continue to focus on increasing oxide resources and reserves, supporting advancement of the sulphide deposit development scenarios, and testing priority exploration targets in an effort to make new satellite deposit discoveries. Near-mine work will include continuation of the north-to-south oriented drilling on the sulphide deposit, reducing north-to-south drill spacing to approximately 50m and overall drill spacing to approximately 25 to 35m. This additional drilling will support an updated resource estimate and upgraded resource category classification for the sulphide deposit.

Oxide resource drilling on the Fresnillo Layback Area is planned, pending receipt of necessary drill permits.

Regional exploration work will include follow-up diamond drill core drilling at the Guanamero target as well as RC and diamond drill core drilling at other priority regional exploration targets.

CAMINO ROJO SULPHIDES

Historical drilling on the Camino Rojo Sulphides, conducted by the previous project owners, indicated the gold grade of the deposit to be widely disseminated and a large, open-pit mining scenario was the favoured development pathway. A lower grade open pit development scenario would necessitate higher capital expenditures for a large processing facility and extensive material handling. To understand if an alternative, more targeted, development approach was possible, the presence of higher grades had to be confirmed. It was interpreted that portions of the deposit were comprised of higher grade steeply northwest dipping vein sets. To test for the higher grades and to confirm the geological model, Orla began drilling into the Camino Rojo Sulphides in the opposite (south) orientation of historical drilling. Since the fourth quarter 2020, two phases of drilling have been conducted with the results indicating the presence of continuous, higher-grade gold domains which could be amenable to underground mining, allowing for a smaller processing facility and less material handling.

Most recently, the south oriented Phase 2 drill program has returned higher-grade gold intercepts (>2 g/t) over wide widths (>30m). These results are derived from a 9,174-metre drill program conducted in 2022, to reinforce the geologic model and to continue to confirm the continuity of wide zones of higher-grade gold mineralization. Fifteen diamond drill holes were completed during this drill program. Results from the Phase 2 drill program are available on the Company’s website and in the press release dated September 12, 2022 (Orla Mining Advances Exploration & Growth Pipeline) and January 31, 2023 (Orla Mining Continues to Intersect Wide, Higher-Grade Sulphide Zones and Expose Deeper Potential at Camino Rojo, Mexico).

The first metallurgical results from the Phase 2 drilling confirm the potential for a standalone processing option for the Camino Rojo Sulphides thereby conserving the potential for the Company to retain 100% ownership in a potential project1. Metallurgical testing will continue as each new phase of drill core becomes available.

Based on the positive results encountered in the Phase 1 and 2 programs, more closely spaced, south-oriented drilling will be required to fully capture the extent of a potential underground resource. To date, Orla has completed approximately 15,253m of directional drilling which has continued to inform Orla’s perspective on the development approach to the deposit. This drilling has strengthened the possibility and confidence for a Preliminary Economic Assessment (“PEA”) that contemplates underground mining. Orla will continue infill drilling the Camino Rojo Sulphides deposit in 2023 with a 34,000m, 57 drill hole drill program. This additional drilling will result in higher-grade (>2g/t Au) portions of the deposit having approximately 50m spacing of South-oriented drill holes and overall drill hole spacing of approximately 25-30m. Upon the completion of additional south oriented directional drilling and testwork programs, a PEA is expected to be completed based on the optimal development method.


1.In the event a project at the Camino Rojo Sulphides project has been defined by the Company through a Pre-Feasibility Study outlining a development scenario using the existing infrastructure at Peñasquito, Newmont Corporation may, at its option, enter into a joint venture where it would own 70% of the project, with Orla owning 30%.

Page 11


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

REGIONAL EXPLORATION

The Camino Rojo regional exploration program continued through the end of 2022, consisting of airborne (drone) magnetic and induced polarization geophysical surveys, as well as soil geochemical sampling, mechanical trenching, and RC and core drilling. Results from the 2022 drill program are available on the Company’s website and in our press release dated January 31, 2023 (Orla Mining Continues to Intersect Wide, Higher-Grade Sulphide Zones and Expose Deeper Potential at Camino Rojo, Mexico).

Regional exploration in 2023 will consist of up to 20,000m of RC and up to 5,000m of core drilling to drill test priority exploration targets along the northeast-southwest mine trend and northwest-southeast regional trend. Target generation and development activities, including airborne drone magnetic and induced polarization geophysical surveys, geochemical sampling and mechanical trenching will also be completed.

COMMUNITY AND SOCIAL

At Camino Rojo during 2022, there were no notable incidents or community-related operational interruptions. Late in December, the Company signed an agreement with the Ejido San Tiburcio, the owner of the communal land where the operation is located. This agreement allows the Company to access the Layback Area (see “Layback Area” above).

During 2022, approximately 41% of Camino Rojo’s total direct and indirect employees came from local communities, and another 28% came from Zacatecas State. All of the Company’s 439 employees are from Mexico.

The Company maintains and updates regularly its community, social relations, and environmental management program. The Community Environmental Monitoring Committee continues its participation in the quarterly water monitoring program and other environmental related activities. The Sustainability Risk Committee, which is comprised of members of the Company and community relations advisors, continued to hold monthly meetings.

During 2022, we:

Provided COVID-19 tests and protective equipment to the San Tiburcio health center.
Continued running the Community Center with different activities such as reading clubs, music classes, students support, fitness classes, nutritional assistance, activities with elderly people, and childrens cinema.
Continued funding scholarships and adult education programs and provided a scholarship for university students.
Provided local business with funding for equipment as part of the local entrepreneurs program and entrepreneurship training.
Provided medical equipment to San Tiburcio for the local ambulance service.
Continued support for an additional doctor for the San Tiburcio health center to extend health attention to community members.
Finished the refurbishment of the community water storage pond and transferred its operation to the Ejido and the Community of San Francisco de Los Quijano. We continued providing assistance to the community of El Berrendo to permit the construction of a water well, provided technical and economic assistance to replace a water pump in the San Tiburcio community well, and trucked water into the community to help alleviate the situation while their well was not operational. We also completed the installation of the solar water well system for San Francisco de Los Quijano.

Page 12


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Launched an initiative to subsidize the inclusion of San Tiburcios ejido members older than 65 years into the Mexican universal health and pension plan.
Started a plan to help the community develop the first community-led poultry farm.
Supported the participation of all its female employees in the Mexican chapter of Women in Mining and launched its annual campaign for breast cancer awareness, which included workshops, conferences, and access to mammograms and screenings.

Our community relations team continues to maintain communication with local communities to understand how the Company can best provide support.

B.SOUTH RAILROAD PROJECT, NEVADA

In August 2022, the Company acquired all the outstanding common shares of Gold Standard, a publicly listed company that owns the South Railroad Project. The South Railroad Project is located along the Pinon mountain range, approximately 24 kilometers south-southeast of Carlin, Nevada, in the Railroad mining district.

Refer to the Company’s Annual Information Form for historical context and project background.

PERMITTING

The Bureau of Land Management (“BLM”) has implemented a process for the Plan of Operations for the South Railroad Project that commences prior to the submittal and continues through the review and approval process. Orla’s predecessor, Gold Standard, submitted a Plan of Operations for the project in November 2020 and in December 2020, the BLM determined that a plan was complete. The review and approval process for the Plan of Operations by the BLM constitutes a federal action under the National Environmental Policy Act (“NEPA”) and BLM regulations. The BLM is required to comply with the NEPA and the BLM has determined that an Environmental Impact Statement (“EIS”) is required. A NEPA contractor was selected in August 2021 and initiated work in September 2021. The BLM will publish the Notice of Intent in the Federal Register to officially commence the NEPA process. Orla will also need an Individual Section 404 Permit from the United States Army Corps of Engineers, and this agency will be a cooperating agency on the NEPA documents.

There are several environmental permits issued by the Nevada Department of Environmental Protection (“NDEP”) that are necessary to develop the project and which Orla needs to permit the project. The NDEP issues permits that address water and air pollution, as well as land reclamation. The Nevada Division of Water Resources issues water rights for the use and management of water, and an application for water rights at South Railroad has been made.

The South Railroad Project is a previously explored mineral property with exploration related disturbance. However, there have been very long periods of non-operation. There are no known ongoing environmental issues with any of the regulatory agencies. Prior to Orla’s acquisition, Gold Standard had been conducting baseline data collection for several years to facilitate environmental studies required to support the EIS and permitting process and Orla is continuing this work. The waste rock and mineralized material characterization and the hydrogeologic evaluation are completed and under review by the BLM and NDEP. Material characterization indicates the need to manage a significant portion of the waste rock as potentially acid generating in engineered facilities. Additional results to date indicate limited cultural issues, air quality impacts appear to be within State of Nevada standards, traffic and noise issues are present but at low levels, and socioeconomic impacts are positive.

Page 13


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Social and community impacts have been and are being considered and evaluated in accordance with the NEPA and other federal laws. Potentially affected Native American tribes, tribal organizations and/or individuals are consulted during the preparation of the EIS to advise on the proposed projects that may have an effect on cultural sites, resources, and traditional activities.

Potential community impacts to existing population and demographics, income, employment, economy, public finance, housing, community facilities and community services are evaluated for potential impacts as part of the NEPA process. There are no known social or community issues that would have a material impact on the project’s ability to extract mineral resources. Identified socioeconomic issues (employment, payroll, services and supply purchases, and state and local tax payments) are anticipated to be positive.

NEXT STEPS

Continued Permitting Activities

We expect the BLM to file the Notice of Intent in the Federal Register in 2023. Once the Notice of Intent is filed, public scoping meetings can commence in conjunction with the development of the EIS. We have engaged SWCA Environmental Consultants to manage the EIS process on behalf of the BLM.

Detailed Design Work and Awarding of the EPCM Contract

We anticipate awarding the Engineering, Procurement & Construction Management contract for the South Railroad Project in 2023. Detailed engineering and design work could then commence in preparation for a construction decision following receipt of the Record of Decision permit.

EXPLORATION

The South Railroad Project is a prospective land package for the discovery of additional Carlin- and associated low sulfidation-type gold mineralization outside the already defined gold resources and reserves at the Pinion and Dark Star deposits. The potential for definition of additional oxide resources is considered very good. As such, we continue to conduct near deposit and regional exploration at the South Railroad Project.

Following the acquisition of the South Railroad Project in August 2022, Orla continued the Gold Standard drill program targeting oxide hosted mineralization at Pinion SB and LT target areas. Upon completion of drilling at Pinion SB and LT target areas in September, Orla immediately started an oxide resource drill program. This new drill program was completed in December of 2022. Our drill program targeted resource upgrades at POD, Sweet Hollow, and Jasperoid Wash targets, as well as advancing the Dixie deposit towards a maiden oxide resource estimate. Assay results are available in our press release dated February 8, 2023 (Orla Mining Drills Significant Gold Intersections at Multiple Oxide Targets upon Reactivation of Exploration at South Railroad Project, Nevada).

In 2023, Orla intends to update mineral resources for target areas that were drilled in 2022. In addition, Orla will drill test multiple exploration targets, including the extension of known mineralization (deposits) and newly developed targets supported by geology, geochemistry, and geophysical data. Key near-deposit exploration targets to be drilled in 2023 include Pinon SB, as well as extensions of gold mineralization at Jasperoid Wash, Dixie, POD, Sweet Hollow, and North Bullion. Regional exploration will drill test the potential for additional satellite deposits, including Carlin- epithermal- and skarn-type gold and base metal mineralization as well as geological and geochemical field work to develop and advance early-stage targets to the drill-stage across the >25 km strike length of the property.

Page 14


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

COMMUNITY AND SOCIAL

Following the acquisition of the South Railroad Project, Orla maintained the initiatives for community engagement started by Gold Standard. In Q4 2022, we provided donations to local nonprofit organizations, schools, youth activities, and community events.

C.CERRO QUEMA PROJECT, PANAMA

The Cerro Quema Gold Project is 100% owned by the Company and is located on the Azuero Peninsula in Los Santos Province in southwestern Panama, about 45 kilometres southwest of the city of Chitre and about 190 kilometres southwest of Panama City. The project is at the exploration and development stage for a proposed open pit mine with heap leach processing. Orla owns the mineral rights as well as the surface rights over the areas of the current mineral resources and mineral reserves, the proposed mine development, and the priority drill targets.

Refer to the Company’s Annual Information Form for historical context and project background.

ENVIRONMENTAL AND PERMITTING

We have an ongoing environmental management plan that includes maintaining sediment dams, revegetation of previously disturbed areas, and active sediment and erosion control activities. Baseline surface water quality sampling and groundwater level measurements are also ongoing.

Mineral concessions are comprised of three contracts between the Republic of Panama and Minera Cerro Quema SA, a wholly owned subsidiary of Orla. The original 20-year term for these concessions expired on February 26, 2017 (Contracts 19 and 20) and March 3, 2017 (Contract 21). The Company has applied for the prescribed 10-year extension to these contracts as it is entitled to under Panamanian mineral law.

As of the date of this MD&A, formal approval of the extension of these concessions has not yet been received. In the absence of such approval, construction or development activities of the Cerro Quema Project cannot proceed. In March 2017, the Ministry of Commerce and Industry provided written confirmation to the Company that it had received the extension applications, and that exploration work could continue while the Company waits for the renewal. We have received verbal assurances from government officials that the renewal applications are complete with no outstanding legal issues. Since the expiry of the concessions, we have continued to receive ongoing exploration permits, and the Ministry of Commerce has continued to accept our annual reports and concession fees.

In May 2021, the extension of the exploitation contracts was signed by both the Ministry of Commerce and Industry and by Orla. As of the date of this MD&A, the documents are with the Comptroller General for final review and approval. The final process requires the signing and publication of the resolution in the official Gazette — this process is pending.

The mine environmental permitting process has been ongoing and in February 2021, the Ministry of Environment conducted their final site inspection of the Cerro Quema Project. As a result of the positive site inspection review, the Category 3 Environmental & Social Impact Assessment (“ESIA”) technical aspects were approved. The final process requires the signing and publication of the resolution in the official Gazette — this process is pending.

Page 15


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

NEXT STEPS

Upon receipt of concession renewals and applicable permits, we expect to continue to advance Cerro Quema towards feasibility level which would provide the basis for a construction decision. Key areas of review include the following:

Complete additional feasibility-level mine plan studies on areas including drilling and blasting, detailed equipment sizing, and contractor mining cost trade-off.
Complete confirmatory metallurgical test work on representative samples for each metallurgical type, specifically column leach tests on coarse crushed material and draindown chemistry.
Complete additional studies and cost estimates for surface and groundwater flows, quality, storage, and treatment.
Complete additional geotechnical studies at the proposed heap leach, waste rock dump, open pits, and processing areas.
Evaluate the availability of local services and personnel to maximize local hiring and procurement.
Investigate power generation opportunities from the overland conveying system to help alleviate the on-site power generation requirements.

EXPLORATION

The discovery of the Caballito mineralized zone in 2017 and follow-up drilling executed by Orla in 2018 led to the definition of significant copper and gold sulphide mineralization with open pit potential. The Caballito-style mineralization differs from the Pava and Quemita oxide deposits as it consists of copper-gold sulphide mineralization that will not be amenable to heap leaching and will require a different processing method.

On December 6, 2021, we announced an independent mineral resource estimate for the Caballito copper-gold deposit at the Cerro Quema project. Please refer to our press release dated December 6, 2021 (Orla Mining Announces Initial Mineral Resource for Caballito Copper-Gold Deposit in Panama).

The Cerro Quema property shows potential for additional oxide mineralization, but the main upside resides in the sulphide-hosted potential of the project which remains largely under-explored.

The 2022 Cerro Quema exploration program consisted of drill testing regional exploration targets defined by recent geochemical soil sampling, geophysical IP surveys, bedrock mapping, prospecting, and in some cases, historical drilling in the earlier part of the year and infill, metallurgical, and expansion (step-out) drilling of known deposits in the later part of the year. In total, approximately 9,044m of drilling was completed in 2022 in Panama. The regional exploration component of the program consisted of drilling two diamond drill holes in La Pelona target and three holes in La Prieta target. Drilling in both target areas returned encouraging results and additional drilling has been planned for 2023. Assay results are available in our press release dated September 12, 2022 (Orla Mining Advances Exploration & Growth Pipeline).

In 2023, we expect the exploration program at Cerro Quema will be more limited than the 2022 program. Drilling activities will follow up on regional exploration results from the 2022 program. At La Pelona, approximately 3,000m of drilling will test the potential for additional oxide-hosted gold and sulphide-hosted copper-(gold) mineralization along strike. At La Prieta, approximately 2,500m of drilling will continue to test and evaluate the Prieta intrusive body to host economic intrusion-related copper-gold mineralization.

Page 16


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

COMMUNITY AND SOCIAL

Our community and social focus at Cerro Quema during Q4 2022 continued, oriented primarily at providing access to the internet, and communication and computing facilities for community members, mainly children and youth.

During the last quarter of 2022, the Company:

Supported the community educational and information technologies center in Altos de Guera, in Tonosi District.
Completed the reforestation program that reached a total of 206 ha.
Through close collaboration between workers and community members, supported waste collection campaigns to minimize urban waste contamination in the region.
Provided computing equipment and maintenance support for key infrastructure to the rural hospital of Tonosi.
Promoted the use of local employment and service providers by our contractors.

VI.COVID-19 GLOBAL HEALTH EMERGENCY

The Board of Directors has oversight over management’s response to COVID-19 and has reviewed the plans and protocols in place. As necessary, the Company has implemented COVID-19 protocols, with some sites having rigorous screening and testing programs at our sites. Orla continues to maintain robust organization-wide COVID-19 prevention protocols to support the health of our employees and local communities.

Since 2020, in response to the COVID-19 pandemic, the Company has in place committees at each operation that meet regularly to discuss and execute operational protocols and safety measures and to update them as necessary. Operations resumed (with appropriate safety protocols in place) in late 2020 after initial suspensions of work in spring of that year.

Uncertainty remains about the future impacts the pandemic could have on our business. Changes to the current situation could adversely affect our exploration, development, and production activities.

As of the date of this MD&A, it is not possible to determine the extent of the impact that this global health emergency will have on our activities as the impacts will depend on future developments which themselves are highly uncertain and cannot be predicted with confidence. These uncertainties arise from the inability to predict the ultimate geographic spread of the disease, its extent and intensity, the duration of the outbreak, and possible government, societal, and individual responses to the situation.

VII.NON-GAAP MEASURES

We have included herein certain performance measures (“non-GAAP measures”) which are not specified, defined, or determined under generally accepted accounting principles (“GAAP”). These non-GAAP measures are common performance measures in the gold mining industry, but because they do not have any mandated standardized definitions, they may not be comparable to similar measures presented by other issuers. Accordingly, we use such measures to provide additional information and you should not consider them in isolation or as a substitute for measures of performance prepared in accordance with GAAP.  In this section, all currency figures in tables are in thousands, except per-share and per-ounce amounts.

Page 17


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

AVERAGE REALIZED GOLD PRICE

Average realized gold price per ounce sold is calculated by dividing gold sales proceeds received by the Company for the relevant period by the ounces of gold sold. The Company believes the measure is useful in understanding the gold price realized by the Company throughout the period.

AVERAGE REALIZED GOLD PRICE

    

Q4 2022

    

Q4 2021

    

2022

    

2021

Revenue

$

56,758

 

4,091

$

193,230

 

4,091

Silver sales

(229)

 

(30)

(836)

 

(30)

Gold sales

 

56,529

 

4,061

 

192,394

 

4,061

Ounces of gold sold

 

32,438

 

2,422

 

107,502

 

2,422

AVERAGE REALIZED GOLD PRICE PER OUNCE SOLD

$

1,743

 

1,677

$

1,790

 

1,677

NET DEBT

Net debt is calculated as total debt adjusted for unamortized deferred financing charges less cash and cash equivalents and short-term investments at the end of the reporting period. This measure is used by management to measure the Company’s debt leverage. The Company believes that in addition to conventional measures prepared in accordance with IFRS, net debt is useful to evaluate the Company’s leverage and is also a key metric in determining the cost of debt.

NET DEBT

    

December 31, 2022

    

December 31, 2021

Current portion of long term debt

$

45,000

$

25,293

Long term debt

100,795

136,060

Less: Cash and cash equivalents

 

(96,278)

 

(20,516)

NET DEBT

$

49,517

$

140,837

ADJUSTED EARNINGS (LOSS) AND ADJUSTED EARNINGS (LOSS) PER SHARE

Adjusted earnings (loss) excludes deferred taxes, unrealized foreign exchange, changes in fair values of financial instruments, impairments and reversals due to net realizable values, restructuring and severance, and other items which are significant but not reflective of the underlying operational performance of the Company. We believe these measures are useful to market participants because they are important indicators of the strength of our operations and the performance of our core business.

ADJUSTED EARNINGS

    

Q4 2022

    

Q4 2021

    

2022

    

2021

Net income (loss) for the period

$

18,690

$

(5,018)

$

45,770

$

(26,278)

Unrealized foreign exchange

1,971

1,903

(1,862)

3,921

Loss on early settlement of project loan

 

 

 

13,219

 

ADJUSTED EARNINGS (LOSS)

$

20,661

$

(3,115)

$

57,127

$

(22,357)

Millions of shares outstanding – basic

304.5

247.6

272.2

241.4

Adjusted earnings (loss) per share – basic

$

0.07

$

(0.01)

$

0.21

$

(0.09)

Page 18


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Companies may choose to expense or capitalize their exploration expenditures. Orla generally expense our exploration costs based on our accounting policy. To assist the reader in comparing against those companies which capitalize their exploration costs, we note that included within Orla’s net income (loss) for each period are exploration costs which were expensed, as follows:

    

Q4 2022

    

Q4 2021

    

2022

    

2021

Exploration & evaluation expense

$

5,605

$

2,863

$

18,939

$

15,108

FREE CASH FLOW

The Company believes market participants use Free Cash Flow to evaluate the Company’s operating cash flow capacity to meet non-discretionary outflows of cash. Free Cash Flow is not meant to be a substitute for the cash flow information presented in accordance with IFRS. Free Cash Flow is calculated as the sum of cash flow from operating activities and cash flow from investing activities, excluding certain unusual transactions.

FREE CASH FLOW

    

Q4 2022

    

Q4 2021

    

2022

    

2021

Cash flow from operating activities

$

31,836

$

(17,087)

$

95,311

$

(24,742)

Cash flow from investing activities

(20,188)

(10,563)

(13,356)

(113,266)

FREE CASH FLOW

$

11,648

$

(27,650)

$

81,955

$

(138,008)

Millions of shares outstanding – basic

304.5

247.6

272.2

241.4

Free cash flow per share – basic

$

0.04

$

(0.11)

$

0.30

$

(0.57)

CASH COST AND ALL-IN SUSTAINING COST

The Company calculates cash cost per ounce by dividing the sum of operating costs and royalty costs, net of by-product silver credits, by ounces of gold sold. Management believes that this measure is useful to market participants in assessing operating performance.

The Company has provided an AISC performance measure that reflects all the expenditures that are required to produce an ounce of gold from operations. While there is no standardized meaning of the measure across the industry, the Company’s definition conforms to the all-in sustaining cost definition as set out by the World Gold Council in its guidance dated November 14, 2018. Orla believes that this measure is useful to market participants in assessing operating performance and the Company’s ability to generate free cash flow from current operations.

Figures are presented only from April 1, 2022, as the Camino Rojo Oxide Gold Mine commenced commercial production on that date.

CASH COST

    

Q4 2022

    

Q4 2021

    

2022

    

2021

Cost of sales – operating costs

$

13,482

$

$

36,231

$

Related to previous quarter

 

 

(503)

 

Royalties

 

1,439

 

 

3,755

 

Silver sales

 

(229)

 

 

(617)

 

CASH COST

$

14,692

$

$

38,866

$

Ounces sold

 

32,438

 

 

86,618

 

Cash cost per ounce sold

$

453

$

n/a

$

449

$

n/a

Page 19


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

ALL-IN SUSTAINING COST

    

Q4 2022

    

Q4 2021

    

2022

    

2021

Cash cost, as above

$

14,692

$

$

38,866

$

General and administrative

2,741

 

 

7,634

 

Share based payments

 

526

 

 

1,582

 

Accretion of site closure provision

 

160

 

 

395

 

Amortization of site closure provision

 

105

 

 

448

 

Sustaining capital

 

2,116

 

 

3,533

 

Lease payments

 

216

 

 

442

 

ALL-IN SUSTAINING COST

$

20,556

$

$

52,900

$

Ounces sold

 

32,438

 

 

86,618

 

All-in sustaining cost per ounce sold

$

634

$

n/a

$

611

$

n/a

VIII.SUMMARY OF QUARTERLY RESULTS

The figures in the following table are based on the unaudited consolidated financial statements of the Company which were prepared in accordance with IFRS.

$thousands

    

Q4 2022

    

Q3 2022

    

Q2 2022

    

Q1 2022

    

Q4 2021

    

Q3 2021

    

Q2 2021

    

Q1 2021

Revenue

$

56,758

$

49,030

$

48,037

$

39,405

$

4,091

$

$

$

Cost of sales

(18,572)

 

(19,473)

 

(17,134)

 

(10,190)

 

(1,358)

 

 

 

 

38,186

 

29,557

 

30,903

 

29,215

 

2,733

 

 

 

Exploration expense

 

(5,605)

 

(8,327)

 

(2,541)

 

(2,466)

 

(2,863)

 

(3,573)

 

(3,761)

 

(4,911)

Office and administrative

 

(805)

 

(769)

 

(714)

 

(633)

 

(557)

 

(487)

 

(358)

 

(509)

Professional fees

 

(555)

 

(357)

 

(875)

 

(450)

 

(408)

 

(241)

 

(551)

 

(502)

Regulatory and transfer agent

 

(17)

 

(44)

 

(42)

 

(198)

 

(83)

 

(162)

 

(213)

 

(204)

Salaries and wages

 

(1,364)

 

(1,172)

 

(1,256)

 

(1,662)

 

(826)

 

(759)

 

(754)

 

(593)

Depreciation

 

(115)

 

(85)

 

(41)

 

(36)

 

(34)

 

(52)

 

(35)

 

(33)

Share based payments

 

(526)

 

(518)

 

(538)

 

(865)

 

(432)

 

(416)

 

(498)

 

(983)

Foreign exchange

 

(1,891)

 

3,842

 

2,429

 

(1,366)

 

(2,313)

 

(3,320)

 

4,771

 

(2,864)

Interest and finance costs

 

(2,018)

 

(2,304)

 

(2,076)

 

(325)

 

(207)

 

(450)

 

(324)

 

(315)

Other

 

35

 

865

 

(13,837)

 

(241)

 

(28)

 

(94)

 

824

 

107

Tax expense

 

(6,635)

 

(11,793)

 

(12,009)

 

(2,191)

 

 

 

 

Net income (loss)

 

18,690

 

8,895

 

(597)

 

18,782

 

(5,018)

 

(9,554)

 

(899)

 

(10,807)

Net income (loss) per share (basic)

$

0.06

$

0.03

$

(0.00)

$

0.08

$

(0.02)

$

(0.04)

$

(0.00)

$

(0.05)

Net income (loss) per share (diluted)

$

0.06

$

0.03

$

(0.00)

$

0.07

$

(0.02)

$

(0.04)

$

(0.00)

$

(0.05)

Page 20


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

REVENUE AND COST OF SALES

The Camino Rojo Oxide Mine was in construction throughout 2021. In Q4 2021, while the mine was still under construction and not yet in commercial production, we produced and sold a small amount of gold. We declared commercial production effective April 1, 2022. From Q1 2022 onwards, we have been producing and selling gold as produced.

Upon commercial production, we commenced recording depletion, depreciation and amortization (“DD&A”) on the mine and related plant and equipment.

EXPLORATION EXPENSE

Throughout 2021 and into Q1 2022, we continued construction and ramp-up activities. Consequently, during this period of construction, exploration and evaluation expenditures at Camino Rojo were capitalized and not expensed. In 2021, we also completed the Layback Agreement with Fresnillo, which gives us access to the Layback Area, and filed the 2021 Camino Rojo Report which incorporated the Layback Area. We also conducted work to update technical studies and issued a technical report for our Cerro Quema Oxide Project.

Quarterly variations in exploration expense are due to seasonality and the timing of payment of mining concession fees, drilling activities. In 2021, exploration expenses and site activities were lower than previous quarters due to the temporary global shutdown and work-from-home orders caused by the COVID-19 pandemic. In Q4 2020, we commenced construction at Camino Rojo. Consequently, development costs began to be capitalized, and exploration and evaluation costs at Camino Rojo decreased accordingly.

In Q3 2022, we acquired Gold Standard, and continued significant exploration and evaluation activities at South Railroad, and we also continued further exploration activities at Camino Rojo and Cerro Quema.

ADMINISTRATIVE COSTS

Administrative costs and professional fees have trended with the level of activity of the Company, and with major transactions such as the Company’s refinancing of the Project Loan (as defined below) and the execution of the Gold Standard transaction in Q2/Q3 2023.

SALARIES AND WAGES

Salaries have generally increased from 2021 to 2022 as a result of growth during the construction and operation phases at Camino Rojo and of the Company as a whole.

SHARE BASED PAYMENTS

Share-based payments expense is generally related to the number of stock options and restricted share units (“RSUs”) vesting during the quarter. The grants typically occur during the first quarter of each year; consequently, those quarters tend to be greater than the others as a percentage of awards and grants vest (and are therefore expensed) immediately.

INTEREST AND FINANCE COSTS

From December 2019 until April 2022, the Company had project financing outstanding of $125 million (the “Project Loan”), the interest on which was expensed prior to commencement of construction. In December 2020 (Q4 2020) we commenced construction at Camino Rojo; consequently, we commenced capitalizing interest on the Project Loan, which decreased interest expense in subsequent quarters.

Page 21


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

In April 2022, the Project Loan was refinanced and replaced with the credit facility of $150 million (the “Credit Facility”), of which $130 million was drawn down upon closing of the refinancing. In January 2021, we acquired the Layback Area, which included obligations of $37.8 million (the “Fresnillo obligations”) bearing interest at 5%. This interest was capitalized and therefore had no effect on earnings from December 1, 2020 to March 31, 2022.

Upon commencement of commercial production on April 1, 2022 (Q2 2022), borrowing costs such as interest and accretion on the Project Loan, the Fresnillo obligations and the Credit Facility are once again expensed, rather than capitalized as they had been during construction of the Camino Rojo mine. Consequently, we expect earnings to be impacted by such interest each quarter.

FOREIGN EXCHANGE

Foreign exchange gains and losses vary based on fluctuation of the Canadian dollar and the Mexican peso versus the US dollar. Effective January 1, 2022, the US dollar became the functional currency of Minera Camino Rojo SA de CV.

We funded the construction of the Camino Rojo Oxide Mine by funding US-dollar-denominated loans from the Canadian parent company to our Mexican operating subsidiary. The balance is significant, and since the Canadian parent is Canadian-dollar functional, this leads to foreign exchange gains or losses arising from changes in the USD-CAD exchange rate. Our Mexican operating subsidiary is US-dollar functional; consequently, no offsetting foreign exchange was recorded. This has been the single largest contributor to volatility in our foreign exchange after Q1 2021.

OTHER EXPENSES

At inception of the $125.0 million Project Loan in 2019, we incurred loan initiation transaction costs totaling approximately $12.1 million, and these costs were being amortized over the originally expected life of the loan.

In Q2 2022, we repaid the Project Loan in its entirety ahead of its expiry date. At that time, an amount of $10.7 million, mainly related to the value of the warrants issued in conjunction with the Project Loan, remained unamortized, which we then expensed immediately (along with the $2.5 million early repayment cash premium paid).

TAX EXPENSE

Prior to Q1 2022, the Company had incurred losses each quarter and consequently no income taxes were payable in those quarters. In Q4 2021, we commenced earning revenues from gold sales.

In common with all other mining companies operating in Mexico, the Company is subject to a 7.5% Special Mining Duty (“SMD”) on earnings from mining operations, in addition to corporate income tax.

IX.THREE AND TWELVE MONTHS ENDED DECEMBER 31, 2022

The following commentaries are based on accompanying audited consolidated financial statements for the year ended December 31, 2022, (ii) unaudited condensed interim consolidated financial statements for the three and nine months ended September 30, 2022, and

Page 22


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

(iii) the audited consolidated financial statements for the year ended December 31, 2021, each of which were prepared in accordance with IFRS.

BALANCE SHEET

Comparison of balance sheets at December 31, 2022 to December 31, 2021.

    

Dec 31, 2022

    

Dec 31, 2021

    

Commentary

Cash

$

96,278

$

20,516

Increase is due primarily to cash generated by operating activities at Camino Rojo.

Other current assets

36,584

27,829

During Q3 2022, we acquired Gold Standard and recognized approximately $2 million in reclamation bonds and $2 million of prepaid insurance.

Property, plant and equipment

 

224,416

 

221,384

 

Exploration and evaluation properties

 

242,743

 

82,743

 

During Q3 2022, we acquired Gold Standard and recognized $160 million in respect of the South Railroad project as an E&E property.

Other long term assets

 

13,795

 

12,423

 

  

Current liabilities, excluding current portion of long term debt

 

52,777

 

12,475

 

Increase is driven substantially by current income taxes payable now that the Camino Rojo mine is in production.

Long term debt (current + long term)

 

145,795

 

161,353

 

In December 2022, $15 million was paid to Fresnillo in relation to the obligations under the Layback Agreement. We also repaid the $11 million Newmont loan during Q2 2022.

Other long term liabilities

 

18,260

 

6,650

 

The increase is substantially due to additional site closure provisions, deferred revenue recognized upon the acquisition of Gold Standard, and routine increases in lease obligations.

INCOME (LOSS) FOR THE QUARTER

COMPARISON TO SAME QUARTER LAST YEAR (Q4 2022 VS Q4 2021)

Gold ounces sold in Q4 2022 were 32,438 oz vs 2,422 in Q4 2021. Average price was $1,743/oz in Q4 2022 from $1,677 per oz in Q4 2021, as spot gold price increased during the period.
Production costs per ounce decreased compared to the prior year. The Company declared commercial production at Camino Rojo on April 1, 2022.
The increase in general and administrative costs over the comparative quarter was driven primarily by an increase in salary and wage costs (which was driven by increased number of personnel and their related benefits and payroll taxes).

Page 23


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Exploration costs in Q4 2022 totaled $5.6 million compared to $2.9 million in Q4 2021. This was driven primarily by the acquisition of South Railroad where we spent approximately $5.3 million on exploration and permitting activities after the acquisition, and increased exploration spending at Cerro Quema (drill program underway), partly offset by the comparatively less exploration expense at Camino Rojo.

COMPARISON TO LAST QUARTER (Q4 2022 VS Q3 2022)

Gold ounces sold in Q4 2022 were 32,438 oz vs 28,749 in Q3 2022. Average price was $1,743/oz in Q4 2022 from $1,699/oz in Q3 2022 as spot gold prices increased during the period.
Production costs per ounce remained generally unchanged compared to Q3 2022.
The increase in general and administrative costs over Q3 2022 was driven primarily by higher professional fees due to the timing of work performed (i.e., work expected in Q3 was actually conducted and incurred in Q4).
Exploration costs in Q4 2022 totaled $5.6 million compared to $8.3 million in Q3 2022. This was driven primarily by a greater level of exploration and permitting activities of South Railroad immediately after the acquisition (seasonality).

INCOME (LOSS) FOR THE YEAR

COMPARISON TO LAST YEAR (2022 VS 2021)

Gold ounces sold in 2022 were 107,502 oz vs 2,422 in 2021. Average price was $1,790/oz in 2022 from $1,677 per oz in 2021 as spot gold price increased during the period.
Production costs per ounce decreased compared to the prior year. The Company declared commercial production at Camino Rojo on April 1, 2022. The production costs were incurred while the mine was still under construction and not yet in commercial production.
Earnings from mining operations total $127.9 million in 2022 compared to $2.7 million in 2021.

Page 24


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

CASHFLOWS

Comparison of twelve months ended December 31, 2022 to twelve months ended December 31, 2021.

Twelve months ended

December 31

Commentary

    

2022

    

2021

    

Cash flow from operating activities

$

95,311

$

(24,742)

 

Only 2,422 ounces of gold sales in 2021 as the Camino Rojo Oxide Gold Mine was still under construction.

 

107,502 ounces of gold sales in 2022, as the Camino Rojo Oxide Gold Mine was in commercial production for most of the year.

Cash flow from investing activities

 

(13,356)

 

(113,266)

 

In 2021, mine construction and associated large VAT payments.

 

In 2022, the mine had largely been constructed, and we have been receiving VAT refunds related to claims filed in 2021during construction. We also paid $15 million related to the Layback Agreement.

Cash flow from financing activities

 

(5,379)

 

85,951

 

In 2021, received cash from the final drawdown of the Project Loan, and from equity financing and exercise of options and warrants, which were partly offset by interest payments on long term debts.

In 2022, repaid in full the Project Loan and the Newmont loan and also paid interest on long term debts, which were partly offset by cash receipts from the Credit Facility and proceeds from the exercise of options and warrants.

SELECT ANNUAL INFORMATION

    

2022

    

2021

    

2020

    

US$ 000's

    

US$ 000's

    

US$ 000's

Revenue

$

193,230

$

4,091

$

Net income (loss)

$

45,770

$

(26,278)

$

(27,694)

Basic income (loss) per share

$

0.17

$

(0.11)

$

(0.13)

Diluted income (loss) per share

$

0.16

$

(0.11)

$

(0.13)

Total assets

$

613,816

$

364,895

$

239,195

Total non-current financial liabilities

$

103,294

$

137,250

$

70,278

Page 25


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

X.LIQUIDITY

As at December 31, 2022, the Company had cash and cash equivalents of $96.3 million and positive working capital of $35.1 million. During the three and twelve months ended December 31, 2022, the Company generated revenues of $56.8 million and $193.2 million, respectively.

At December 31, 2022 and at the date of this MD&A, the Company had the following debt outstanding:

Credit Facility term loan of $94.5 million.
Credit Facility revolving loan of $30.0 million.
Fresnillo obligations of $22.8 million which is due in December 2023.

HISTORICAL CONTEXT

Prior to 2022, the Company’s primary source of funding had been the issuance of equity securities for cash through prospectus offerings and private placements to sophisticated investors and institutions, debt financing, and from the exercise of warrants and options. Prior to April 1, 2022, Camino Rojo was in startup and testing, although the mine had started producing gold during these startup and testing activities. We declared commercial production at April 1, 2022.

EXPECTED SOURCES OF CASH

We began earning cash flow from metal sales in December 2021. We expect to fund the operating costs and the operating and strategic objectives of the Company over the next twelve months with existing cash on hand and metal sales, although we may also receive proceeds from exercises of options and warrants over time.

MEXICAN VALUE ADDED TAXES RECOVERABLE (“VAT”)

Our Mexican entities pay value added taxes on certain goods and services we purchase in country. Value added taxes paid in Mexico are fully recoverable. VAT recovery returns in Mexico are subject to complex filing requirements and detailed audit or review by the fiscal authorities. Consequently, the amount and timing of refunds is uncertain.

A summary of the claims outstanding at December 31, 2022 for Mexican VAT paid each year (table expressed in US$ 000’s):

    

Mexican VAT paid 

    

Mexican VAT paid

    

    

on acquisition of 

on acquisition of 

Construction and 

Arising in the year

Camino Rojo

Layback Area

operations

Total 

2017

$

3,697

$

$

$

3,697

2018

245

245

2019

 

 

 

291

 

291

2020

 

 

 

166

 

166

2021

 

 

723

 

135

 

858

2022

 

 

 

8,597

 

8,597

Total Mexican VAT recoverable

$

3,697

$

723

$

9,434

$

13,854

Page 26


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Prior to, and during construction, we paid significant amounts in Mexican VAT. In the latter half of 2021, we began receiving Mexican VAT refunds on a generally regular basis. Of the above amounts, approximately $4.4 million is under dispute with the taxation authority, of which $3.7 million is VAT paid on the acquisition of Camino Rojo in 2017.

CONTRACTUAL OBLIGATIONS

Contractual obligations

Payments due by period

As at December 31, 2022

12 months or

13 months to

37 months to

After 60

(thousands of US dollars)

    

Total

    

less

    

36 months

    

60 months

    

months

Purchase commitments

    

$

2,819

    

$

2,819

    

$

    

$

    

$

Trade payables

 

8,851

 

8,851

 

 

 

Accrued liabilities

 

7,967

 

7,967

 

 

 

Lease commitments

 

3,527

 

991

 

1,310

 

1,226

 

Credit Facility and related interest

 

146,006

 

30,678

 

85,566

 

29,762

 

Fresnillo obligation and related interest

 

23,848

 

23,848

 

 

 

Total contractual obligations

$

193,018

$

75,154

$

86,876

$

30,988

$

XI.CAPITAL RESOURCES

DEBT

FRESNILLO OBLIGATIONS

Pursuant to the terms of the Layback Agreement, Fresnillo agreed to deferred payments of $62.8 million, of which $40 million was paid as of December 31, 2022, with the balance expected to be repaid in December 2023 ($22.8 million). This amount bears interest at 5% per annum, payable quarterly.

CREDIT FACILITY

The Credit Facility includes a $100 million term facility and a $50 million revolving facility through a syndicate of lenders composed of The Bank of Nova Scotia, Bank of Montreal, and Canadian Imperial Bank of Commerce. The proceeds from the Credit Facility were used to repay the Project Loan, with the balance of the revolving facility being available for general corporate purposes and working capital.

The Credit Facility consists of two parts:

1.$100 million term facility with a five-year term, repayable in 18 equal quarterly instalments commencing December 31, 2022.
2.$50 million revolving facility, with the ability to increase to $75 million, subject to certain conditions and customary consents. The revolving facility has a three-year term, with an option to extend the term of the revolving facility by up to one-year intervals, subject to certain conditions and customary consents. Full repayment of the revolving facility is due upon maturity.

Page 27


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

The applicable interest rate for each Credit Facility is based on the term Secured Overnight Financing Rate (SOFR), plus an applicable margin based on the Company’s leverage ratio at the end of each fiscal quarter. The undrawn portion of the revolving facility is subject to a standby fee. Interest is payable at the end of each interest period, or at least every three months. The Company may prepay all or any portion of the amounts owed under the Credit Facility without penalty.

EQUITY

The Company filed a preliminary base shelf prospectus pursuant to which it may raise up to C$300 million in equity or similar instruments. The final base shelf prospectus was filed on March 12, 2021 and is valid for 25 months.

As of the date of this MD&A, 29.2 million warrants remain outstanding, all of which have an exercise price less than the market value of the underlying shares.

XII.RELATED PARTY TRANSACTIONS

The Company’s related parties include “key management personnel”, whom we define as the Chief Executive Officer, the Chief Operating Officer, the Chief Financial Officer, the Chief Sustainability Officer, the Senior Vice President Exploration,  and members of the Board of Directors of the Company.

Other than compensation in the form of salaries or directors’ fees, and termination benefits and share based payments (options, RSUs, DSUs, and bonus shares), there were no other material transactions with this group of individuals.

Compensation to key management personnel was as follows:

    

Q4 2022

    

Q4 2021

    

2022

    

2021

Salaries and short term incentives

    

$

318

    

$

287

    

$

3,871

    

$

1,580

Directors fees

 

65

 

48

 

 

291

 

183

Share based payments

 

405

 

321

 

 

1,987

 

1,750

$

788

$

656

$

6,149

$

3,513

During the period covered by this MD&A, and to the date of this MD&A, there are no other related parties.

XIII.OFF-BALANCE SHEET ARRANGEMENTS

We have no off-balance sheet arrangements requiring disclosure under this section.

XIV.PROPOSED TRANSACTIONS

We have no proposed transactions requiring disclosure under this section.

Page 28


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

XV.CRITICAL ACCOUNTING ESTIMATES

In preparing the accompanying audited annual consolidated financial statements, we have made judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income, and expenses. Actual results may differ from these estimates.

We review estimates and their underlying assumptions on an ongoing basis. Revisions to estimates are recognized prospectively.

Judgements, estimates, and assumptions that we have made in applying accounting policies that have the most significant effects on the amounts recognized in the accompanying consolidated financial statements include:

MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES

Mineral resource and mineral reserve estimates are estimates of the quantity of ore that can be economically extracted from the Company’s mining properties. Such estimates impact the financial statements in the following ways:

Mineral resource and mineral reserve estimates are key factors considered in determining whether technical feasibility and commercial viability of extracting a mineral resource are demonstrable which influences the classification of expenditure,
The carrying value of assets may be affected due to changes in estimated mineral reserves and resources if the change is considered an indicator of impairment,
Depreciation of producing mineral properties is affected by changes in reserve estimates,
Site closure provisions may change where reserve estimate changes affect expectations about when such activities will occur and the associated cost of these activities.

The mineral resource and mineral reserve estimates are based on information compiled by qualified persons within the meaning of NI 43-101. Such information includes geological and technical data on the size, depth, shape and grade of the ore body and suitable production techniques and recovery rates. Such an analysis requires complex geological judgements to interpret the data. The estimation of recoverable reserves is based upon factors such as estimates of foreign exchange rates, commodity prices, future capital requirements and production costs, along with geological assumptions and judgements made in estimating the size and grade of the ore body.

As the economic assumptions used may change and as additional geological information is produced during the operation of a mine, estimates of mineral resources and mineral reserves may change.

VALUATION OF METAL-IN-PROCESS INVENTORY

The measurement of inventory, including the determination of its net realizable value (“NRV”), especially as it relates to metal production inventory involves the use of estimates.

NRV is calculated as the estimated price at the time of sale based on prevailing metal prices, less estimated future production costs to convert the inventory into saleable form and associated selling costs, discounted where applicable. In determining the value of metal on the leach pads, we make estimates of rock densities, tonnages, grades, and the recoverability of ore stacked on leach pads to estimate its value. Changes in these estimates can result in a change in carrying amounts of inventory, which could result in charges to cost of sales.

Page 29


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

The determination of forecast sales prices, recovery rates, grade, assumed contained metal in stockpiles, work-in-process and leach pad inventory and production and selling costs all requires significant assumptions that impact the carrying value of production inventories.

ASSET RETIREMENT AND SITE CLOSURE OBLIGATIONS

We make estimates and assumptions in determining the provisions for asset retirement and site closure. The estimates and assumptions include determining the amount and timing of future cash flows, inflation rates, and discount rates. The ultimate rehabilitation costs are uncertain, and cost estimates can vary in response to many factors, including judgements of the extent of rehabilitation activities, technological changes, and regulatory changes.

Consequently, there could be significant adjustments to the site closure provision recorded, which would affect future financial position, results of operations, and changes in financial position. The provision is management’s best estimate of the present value of the future asset retirement and site closure obligation. Actual future expenditures may differ from the amounts currently provided.

FAIR VALUE MEASUREMENT

Management uses valuation techniques in measuring the fair value of mineral properties acquired, share options granted and restricted share units, deferred share units, and bonus shares awarded.

We determine the fair value of share-based payments awarded using the Black Scholes option pricing model which requires us to make certain estimates, judgements, and assumptions in relation to the expected life of the share options, expected volatility, expected risk‐free rate, and expected forfeiture rate.

Changes to these assumptions could have a material impact on the recorded value of mineral properties acquired during the period, and share based compensation expense recognized in the Company’s financial statements.

TITLE TO MINERAL PROPERTIES

Although the Company has taken steps to verify title to mineral properties in which it has an interest, these procedures do not guarantee the Company’s title. Such properties may be subject to prior agreements or transfers and title may be affected by undetected defects. Further, we make judgements for properties where concessions terms have expired, and a renewal application has been made and is awaiting approval. We use judgement as to whether the concession renewal application is probable to be received, but ultimately this is beyond our control. If a renewal application is not approved, we could lose rights to those mineral concessions.

ASSESSMENT OF IMPAIRMENT INDICATORS

We apply judgement in assessing whether indicators of impairment exist for our exploration and evaluation (“E&E”) properties and for our mineral properties which could result in a test for impairment.

For our E&E properties, we consider internal and external factors, such as our rights to explore, planned expenditures on E&E activities, the changes in mineral resources and mineral reserves, the potential for viable operations, significant decline in the market value of the Company, changes in metal prices and costs and changes in interest rates to determine whether there are any indicators of impairment or reversal of a previous impairment.

For our mineral properties, we consider external factors such as changes in technology, the market, the economy, or the legal environment, interest rates, and the market capitalization of the Company compared to the book value of the asset. We also consider

Page 30


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

internal factors such as economic performance of the asset, idle properties and plans to discontinue operations, useful life of the property, our ability to repatriate or use profits from the property, restrictions on access, environmental restrictions, and political instability.

We consider other factors such as typical practice in foreign jurisdictions related permit renewals, our continued ability to operate as usual while awaiting renewals, our continued performance under regulatory requirements, and the ongoing acceptance by authorities of our annual fees.

INCOME TAXES AND VALUE ADDED TAXES

Our operations involve dealing with uncertainties and judgements in the application of complex tax regulations in multiple jurisdictions.

We recognize potential tax liabilities for uncertain tax positions and matters identified based on our judgement of whether, and the extent to which, additional taxes will be due. We adjust these liabilities after considering changing facts and circumstances. However, due to the complexity of some of these uncertainties, the ultimate outcome may result in a payment that is materially different from our estimate of the tax liabilities.

VAT receivables are generated on the purchase of supplies and services by our companies. The timing and collection of VAT receivables is uncertain as VAT refund procedures in certain jurisdictions require a significant amount of documentation and follow-up. We are exposed to liquidity risk, credit risk and currency risk with respect to our VAT recoverable balances if tax authorities are unwilling to make payments in a timely manner pursuant to our refund filings.

XVI.FINANCIAL INSTRUMENTS

In the normal course of business, the Company is inherently exposed to certain financial risks, including market risk, credit risk, and liquidity risk, through its use of financial instruments. The timeframe and the way we manage these risks varies based upon our assessment of these risks and available alternatives for mitigation.

We do not acquire or issue derivative financial instruments for trading or speculative purposes. All transactions undertaken are to support our operations.

Page 31


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

XVII.OUTSTANDING SHARE DATA

As of the date of this MD&A, the Company had the following equity securities outstanding

306,660,411 common shares
29,174,500 warrants
8,597,314 stock options
500,000 bonus shares
443,267 restricted share units
559,725 deferred share units

You can find further details about these potentially issuable securities in the notes to the accompanying audited annual consolidated financial statements for the year ended December 31, 2022.

XVIII.CAUTIONARY NOTES

CAUTIONARY NOTE TO UNITED STATES INVESTORS REGARDING PRESENTATION OF MINERAL RESERVE AND MINERAL RESOURCE ESTIMATES

This MD&A has been prepared in accordance with Canadian standards for the reporting of mineral resource and mineral reserve estimates, which differ from the previous and current standards of the United States securities laws. In particular, and without limiting the generality of the foregoing, the terms “mineral reserve”, “proven mineral reserve”, “probable mineral reserve”, “inferred mineral resources”, “Indicated mineral resources”, “measured mineral resources”, and “mineral resources” used or referenced in this MD&A are Canadian mineral disclosure terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on mineral reserves and mineral resources adopted by the CIM Council on May 10, 2014 (the “CIM Standards”).

For United States reporting purposes, the United States Securities and Exchange Commission (the “SEC”) has adopted amendments to its disclosure rules (the “SEC Modernization Rules”) to modernize the mining property disclosure requirements for issuers whose securities are registered with the SEC under the Securities Exchange Act of 1934, as amended. The SEC Modernization Rules more closely align the SEC’s disclosure requirements and policies for mining properties with current industry and global regulatory practices and standards, including NI 43-101, and replace the historical property disclosure requirements for mining registrants that were included in Industry Guide 7 under the Securities Act of 1933, as amended (the “Securities Act”). As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multijurisdictional disclosure system, the Company is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and provides disclosure under NI 43-101 and the CIM Standards. Accordingly, mineral reserve and mineral resource information contained in this MD&A may not be comparable to similar information disclosed by United States companies.

As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources.” In addition, the SEC has amended its definitions of “proven mineral reserves” and “probable mineral reserves” to be “substantially similar” to the corresponding CIM Standards that are required under NI

Page 32


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

43-101. While the above terms are “substantially similar” to CIM Standards, there are differences in the definitions under the SEC Modernization Rules and the CIM Standards. There is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules or under the prior standards of Industry Guide 7. Accordingly, information contained in this MD&A may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION

This MD&A contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities legislation (collectively referred to herein as “forward-looking information” or “forward-looking statements”). Forward-looking statements are included to provide information about management’s current expectations and plans that allows investors and others to get a better understanding of the Company’s operating environment, the business operations and financial performance and condition. Forward-looking information is provided as of the date of such documents only and the Company does not intend, and does not assume any obligation, to update this forward-looking information, except as required by law.

Forward-looking statements include, but are not limited to, statements regarding: mine production plans; projected mining and process recovery rates; timeline for receipt of any required agreements, approvals, or permits; sustaining, operating, and exploration costs; interpretations and assumptions regarding joint venture and potential contract terms; the expected additional material to be included in a future mine plan as a result of the Layback Agreement; terms of and ability to reach a subsequent agreement with Fresnillo to access the sulphide mineral resource at Camino Rojo and obtaining regulatory approvals related thereto; expectations on the potential extension of the expired mineral concessions with respect to the Cerro Quema Project; proposed exploration plans and expected results of exploration from each of the Camino Rojo Project, South Railroad Project, and Cerro Quema Project; Orla’s ability to obtain required mine licences, mine permits, required agreements with third parties, and regulatory approvals required in connection with exploration plans and future mining and mineral processing operations; community and ejido relations; changes in commodity prices and exchange rates; currency and interest rate fluctuations and the ability to secure the required capital to conduct planned exploration programs, studies, and construction; the ability to cover debt obligations under the Credit Facility; the duration, extent and other implications of COVID-19; and the Company’s development objectives and strategies. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential”, “possible” or variations thereof or stating that certain actions, events, conditions or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved (or the negative of any of these terms and similar expressions)) are not statements of fact and may be forward-looking statements.

Forward-looking statements are necessarily based upon a number of factors and assumptions that, if untrue, could cause actual results, performance, or achievements to be materially different from future results, performance or achievements expressed or implied by such statements. Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic and competitive uncertainties and contingencies that may cause the Company’s actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation, the future price of gold, silver, and copper; anticipated costs and the Company’s ability to fund its programs; the Company’s ability to carry on exploration, development, and mining activities; tonnage of ore to be mined and processed; ore grades and recoveries; decommissioning and reclamation estimates; the Company’s ability to secure and to meet obligations under property agreements, including the Layback Agreement; that all conditions of the Company’s Credit Facility will be met; the timing and results of drilling programs; mineral reserve and mineral resource estimates and the assumptions on which they are based; the discovery of mineral resources and mineral reserves on the Company’s mineral properties; the obtaining of a subsequent agreement with Fresnillo to access the sulphide mineral resource at

Page 33


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

the Camino Rojo Project and develop the entire Camino Rojo Project mineral resources estimate; that political and legal developments will be consistent with current expectations; the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction, and operation of projects; the timing of cash flows; the costs of operating and exploration expenditures; the Company’s ability to operate in a safe, efficient, and effective manner; the Company’s ability to obtain financing as and when required and on reasonable terms; the impact of the COVID-19 pandemic on the Company’s operations; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; and that there will be no material adverse change or disruptions affecting the Company or its properties.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance or achievements to differ materially from those in the forward-looking statements include, among others: uncertainty and variations in the estimation of mineral resources and mineral reserves; the Company’s dependence on the Camino Rojo Oxide Mine; risks related to the Company’s indebtedness; risks related to exploration, development, and operation activities; risks related to natural disasters, terrorist acts, health crises, and other disruptions and dislocations, including the COVID-19 pandemic; foreign country and political risks, including risks relating to foreign operations and expropriation or nationalization of mining operations; concession risks at the Cerro Quema Project; the receipt of a Category 3 EIA for the Cerro Quema Project; delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; environmental and other regulatory requirements; delays in or failures to enter into a subsequent agreement with Fresnillo with respect to accessing certain additional portions of the mineral resource at the Camino Rojo Project and to obtain the necessary regulatory approvals related thereto; the mineral resource estimations for the Camino Rojo Project being only estimates and relying on certain assumptions; loss of, delays in, or failure to get access from surface rights owners; uncertainties related to title to mineral properties; water rights; financing risks and access to additional capital; risks related to guidance estimates and uncertainties inherent in the preparation of feasibility and pre-feasibility studies; uncertainty in estimates of production, capital, and operating costs and potential production and cost overruns; the fluctuating price of gold, silver, and copper; unknown labilities in connection with acquisitions; global financial conditions; uninsured risks; climate change risks; competition from other companies and individuals; conflicts of interest; risks related to compliance with anti-corruption laws; volatility in the market price of the Company’s securities; assessments by taxation authorities in multiple jurisdictions; foreign currency fluctuations; the Company’s limited operating history; litigation risks; the Company’s ability to identify, complete, and successfully integrate acquisitions; intervention by non-governmental organizations; outside contractor risks; risks related to historical data; the Company not having paid a dividend; risks related to the Company’s foreign subsidiaries; risks related to the Company’s accounting policies and internal controls; the Company’s ability to satisfy the requirements of the Sarbanes-Oxley Act of 2002; enforcement of civil liabilities; the Company’s status as a passive foreign investment company for U.S. federal income tax purposes; information and cyber security; gold industry concentration; shareholder activism; and risks associated with executing the Company’s objectives and strategies.

This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Although the Company believes its expectations are based upon reasonable assumptions and have attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. See the section entitled “Risk Factors” below, and in the section entitled “Risk Factors” in the Annual Information Form, for additional risk factors that could cause results to differ materially from forward-looking statements.

Investors are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date of this MD&A only and, accordingly, are subject to change after such date. The Company disclaims any intent or obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of assumptions or factors, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws. Investors are urged to read the Company’s filings with Canadian securities regulatory agencies, which can be viewed online under the Company’s profile on

Page 34


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

SEDAR at www.sedar.com and the Company’s documents filed with, or furnished to, the SEC, which are available through EDGAR at www.sec.gov.

XIX.RISKS AND UNCERTAINTIES

For more extensive discussion on risks and uncertainties refer to the Annual Information Form for additional information regarding these risks and other risks and uncertainties in respect of the Company’s business and share price.

The risks described below are not the only risks and uncertainties that the Company faces. Although the Company has done its best to identify the risks to its business, there is no assurance that it has captured every material or potentially material risk and the risks identified below may become more material to the Company in the future or could diminish in importance. Additional existing risks and uncertainties not presently identified by the Company, risks that the Company currently does not consider to be material, and risks arising in the future could cause actual events to differ materially from those described in the Company’s forward-looking information, which could materially affect the Company’s business, results of operations, financial condition, and Company’s share price.

ESTIMATES OF MINERAL RESOURCES AND MINERAL RESERVES AND PRODUCTION RISKS

The figures for mineral reserves and mineral resources contained in the Company’s public disclosure record are estimates only and no assurance can be given that the anticipated tonnages and grades will be achieved, that the indicated level of recovery will be realized, or that mineral reserves or mineral resources will be mined or processed profitably. The Company cannot give any assurance that such estimates will be achieved. Failure to achieve such estimates could have an adverse impact on the Company’s future cash flows, profitability, results of operations, and financial condition.

Until a deposit is actually mined and processed, the quantity of metal and grades must be considered as estimates only. Actual mineral reserves or mineral resources may not conform to geological, metallurgical, or other expectations, and the volume and grade of ore recovered may differ from estimated levels. There are numerous uncertainties inherent in estimating mineral reserves and mineral resources, including many factors beyond the Company’s control. Such estimation is a subjective process, and the accuracy of any mineral reserve or mineral resource estimate is a function of the quantity and quality of available data and of the assumptions made and judgments used in engineering and geological interpretation. It is inherently impossible to have full knowledge of particular geological structures, faults, voids, intrusions, natural variations in and within rock types and other occurrences. Failure to identify such occurrences in the Company’s assessment of mineral reserves and mineral resources may have a material adverse effect on the Company’s future cash flows, results of operations, and financial condition.

DEPENDENCE ON THE CAMINO ROJO OXIDE MINE

The Camino Rojo Oxide Mine accounts for all of the Company’s current production and is expected to continue to account for all of its production in the near term. Any adverse condition affecting mining, processing conditions, expansion plans, or ongoing permitting at the Camino Rojo Oxide Mine could have a material adverse effect on the Company’s financial performance and results of operations. Even though the Company has established mining operations and estimates of future production, various factors, including costs, actual mineralization, consistency and reliability of ore grades, processing rates, and commodity prices can affect cash flow and profitability, and there can be no assurance that current or future estimates of these factors will reflect actual results and performance. The cost and availability of suitable machinery, supplies, mining equipment, and skilled labour, the existence of competent operational management and prudent financial administration, as well as the availability and reliability of appropriately skilled and experienced consultants, can also affect successful project operations. The activities of the Company at the Camino Rojo Oxide Mine may also be subject to prolonged disruption from a variety of risks normally encountered in production of precious metals as further described under “Mining Industry” below. The failure of the Company to achieve its production estimates could have a material and adverse effect on future cash flows, profitability, results of operations, and financial condition.

Page 35


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

INDEBTEDNESS

As of the date of this MD&A, Orla had aggregate consolidated indebtedness under its Credit Facility as discussed above in section 0 – “Liquidity”. As a result, the Company is required to use a portion of its cash flow to service principal and interest on its debt, which will limit the cash flow available for other business opportunities. The Company’s ability to make scheduled payments of the principal of, to pay interest on, or to refinance indebtedness depends on its future performance, which is subject to economic, financial, competitive, and other factors beyond its control. The Company may not generate cash flow from operations in the future sufficient to service debt and make necessary capital expenditures. If the Company is unable to generate such cash flow, it may be required to adopt one or more alternatives, such as selling assets, restructuring debt, or obtaining additional equity capital on terms that may be onerous or highly dilutive. The Company’s ability to refinance its indebtedness will depend on the capital markets and its financial condition at such time. The Company may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default. The terms of the Credit Facility also require the Company to satisfy various affirmative and negative covenants and financial ratios. These covenants and ratios limit, among other things, the Company’s ability to incur further indebtedness, create certain liens on assets, engage in certain types of transactions, or pay dividends. The Company can provide no assurances that in the future, it will not be limited in its ability to respond to changes in its business or competitive activities or be restricted in its ability to engage in mergers, acquisitions, or dispositions or acquisitions of assets. Furthermore, a failure to comply with these covenants and ratios would likely result in an event of default under the Credit Facility and would allow the lenders to accelerate the debt, which could materially and adversely affect the Company’s business, financial condition, and results of operations, as well as the market price of the Company’s securities.

Page 36


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

EXPLORATION, DEVELOPMENT, AND PRODUCTION RISKS

The business of exploring for minerals, development, and mining involves a high degree of risk. The operations of the Company may be disrupted by a variety of risks and hazards normally encountered in the exploration, development, and production of precious metals, including, without limitation, unusual and unexpected geologic formations, seismic activity, rock bursts, cave-ins, flooding, and other conditions involved in the drilling and removal of material, any of which could result in damage to, or destruction of, mines and other producing facilities, personal injury or loss of life, and damage to tailings dams, property, and environmental damage, all of which may result in possible legal liability. The occurrence of any of these events could result in a prolonged interruption of the Company’s activities that would have a material adverse effect on its business, financial condition, results of operations, and prospects. Further, the Company may be subject to liability or sustain losses in relation to certain risks and hazards against which it cannot insure or for which it may elect not to insure. The occurrence of operational risks and/or a shortfall or lack of insurance coverage could have a material adverse impact on the Company’s results of operations and financial condition.

The exploration for and development of mineral deposits involves significant risks, which even a combination of careful evaluation, experience, and knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties that are explored are ultimately developed into producing mines. Even when mineralization is discovered, it may take several years until production is possible, during which time the economic feasibility of production may change. Major expenses may be required to locate and establish mineral reserves, to develop metallurgical processes, and to construct mining and processing facilities at a particular site. It is impossible to ensure that the exploration or development programs planned by the Company will result in a profitable commercial mining operation. Whether a mineral deposit will be commercially viable depends on a number of factors, some of which are: the particular attributes of the deposit, such as size, grade and proximity to infrastructure, metal prices that are highly cyclical, and government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals, and environmental protection. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital. There is no certainty that the expenditures made towards the search and evaluation of mineral deposits will result in discoveries or development of commercial quantities of ore. Development projects have no operating history upon which to base estimates of future capital and operating costs. For development projects, mineral resource estimates and estimates of operating costs are, to a large extent, based upon the interpretation of geologic data obtained from drill holes and other sampling techniques, and feasibility and pre-feasibility studies, which derive estimates of capital and operating costs based upon anticipated tonnage and grades of ore to be mined and processed, ground conditions, the configuration of the ore body, expected recovery rates of minerals from ore, estimated operating costs, and other factors. As a result, actual production, cash operating costs, and economic returns could differ significantly from those estimated. It is not unusual for new mining operations to experience problems during the start-up phase, and delays in the commencement of production can often occur.

OUR ACTIVITIES MAY BE ADVERSELY AFFECTED BY NATURAL DISASTERS, TERRORIST ACTS, HEALTH CRISES AND OTHER DISRUPTIONS AND DISLOCATIONS, INCLUDING BY THE COVID-19 PANDEMIC, WHETHER THOSE EFFECTS ARE LOCAL, NATIONWIDE, OR GLOBAL

Upon the occurrence of a natural disaster, pandemic, or upon an incident of war, riot, or civil unrest, the impacted country, and the overall global economy, may not efficiently and quickly recover from such an event, which could have a material adverse effect on the Company. Terrorist attacks, public health crises including epidemics, pandemics, outbreaks of new infectious diseases or viruses, and related events can result in volatility and disruption to global supply chains, operations, mobility of people, patterns of consumption and service, and the financial markets, which could affect interest rates, credit ratings, credit risk, inflation, business, financial conditions, results of operations, and other factors relevant to the Company.

Global markets have been adversely impacted by emerging infectious diseases and/or the threat of outbreaks of viruses, other contagions or epidemic diseases, including the novel COVID-19, and many industries, including the mining industry, have been impacted. The outbreak has led to a widespread crisis that is adversely affecting the economies and financial markets of many countries. If increased

Page 37


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

levels of volatility continue, or in the event of a rapid destabilization of global economic conditions, there may be an adverse effect on commodity prices, demand for metals, availability of equity or credit, investor confidence, and general financial market liquidity, all of which may adversely affect the Company’s business and the market price of the Company’s securities. In addition, there may not be an adequate response to emerging infectious diseases, or significant restrictions may be imposed by a government, either of which may impact mining operations. There are potentially significant economic and social impacts, including labour shortages and shutdowns, delays and disruption in supply chains, social unrest, government or regulatory actions or inactions, including quarantines, travel restrictions, declaration of national emergencies, permanent changes in taxation or policies, decreased demand or the inability to sell and deliver doré or concentrates and resulting commodities, declines in the price of commodities, delays in permitting or approvals, suspensions or mandated shut downs of operations, governmental disruptions, or other unknown events with potentially significant impacts. At this time, the Company cannot accurately predict what impacts there will be or what effects these conditions will have on the business, including those uncertainties relating to the ultimate geographic spread, the duration of the outbreak, and the length of restrictions or responses that have been or may be imposed by the governments. Given the global nature of the Company’s operations, the Company may not be able to accurately predict which operations will be impacted. Any outbreak or threat of an outbreak of a contagious or epidemic disease could have a material adverse effect on the Company, its business and operational results, and the market price of its securities.

FOREIGN COUNTRY AND POLITICAL RISK

The Company’s principal mineral properties are located in Mexico, Panama, and the United States. The Company is subject to certain risks as a result of conducting foreign operations, including, but not limited to: currency fluctuations; possible political or economic instability that may result in the impairment or loss of mineral titles or other mineral rights; opposition from environmental or other non-governmental organizations; government regulations relating to the mining industry; renegotiation, cancellation, or forced modification of existing contracts; expropriation or nationalization of property; changes in laws or policies or increasing legal and regulatory requirements including those relating to taxation, royalties, imports, exports, duties, currency, or other claims by government entities, including retroactive claims and/or changes in the administration of laws, policies, and practices; uncertain political and economic environments; war, terrorism, narco-terrorist actions or activities, sabotage, and civil disturbances; delays in obtaining or the inability to obtain or maintain necessary governmental or similar permits or to operate in accordance with such permits or regulatory requirements; currency fluctuations; import and export regulations, including restrictions on the export of gold or other minerals; limitations on the repatriation of earnings; and increased financing costs. Any changes in regulations or shifts in political attitudes are beyond the control of the Company and may adversely affect its business.

The introduction of new tax laws, regulations, or rules, or changes to, or differing interpretation of, or application of, existing tax laws, regulations, or rules in any of the countries in which the Company currently conducts business or in the future may conduct business, could result in an increase in taxes, or other governmental charges, duties, or impositions. No assurance can be given that new tax laws, rules, or regulations will not be enacted or that existing tax laws will not be changed, interpreted, or applied in a manner that could result in the Company being subject to additional taxation or that could otherwise have a material adverse effect on the Company.

Although the Company believes that its exploration and production activities are currently carried out in accordance with all applicable rules and regulations, new rules and regulations may be enacted, and existing rules and regulations may be applied in a manner that could limit or curtail production or development of the Company’s properties. Amendments to current laws and regulations governing the operations and activities of the Company or more stringent implementation thereof could have a material adverse effect on the Company’s business, financial condition, and results of operations.

The Company’s primary operations are currently conducted in Mexico. Violence in Mexico is well documented and has, over time, been increasing. Conflicts between the drug cartels and violent confrontations with authorities are not uncommon. Other criminal activity, such as kidnapping and extortion, is also an ongoing concern. Many incidents of crime and violence go unreported and efforts by police and other authorities to reduce criminal activity are challenged by a lack of resources, corruption, and the pervasiveness of organized

Page 38


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

crime. Incidents of criminal activity have occasionally affected the communities in the vicinity of the Company’s operations. Such incidents may prevent access to the Company’s mines or offices; halt or delay operations and production; result in harm to employees, contractors, visitors, or community members; increase employee absenteeism; create or increase tension in nearby communities; or otherwise adversely affect the Company’s ability to conduct business. The Company can provide no assurance that security incidents, in the future, will not have a material adverse effect on its operations.

In addition, one of the Company’s material mineral properties is located in Panama. Panama remains a developing country. If the economy of Panama fails to continue growth or suffers a recession, it may have an adverse effect on the Company’s operations in that country.

The Company does not carry political risk insurance.

PERMITS AND LICENSES

The Company’s operations in each of the jurisdictions in which it operates are subject to receiving and maintaining permits (including environmental permits) from appropriate governmental authorities. Furthermore, prior to any development on any of its properties, the Company must receive permits from appropriate governmental authorities. The Company can provide no assurance that necessary permits will be obtained, that previously issued permits will not be suspended for a variety of reasons, including through government or court action, or that delays will not occur in connection with obtaining all necessary permits, renewals of permits for existing operations, or additional permits for any possible future changes to operations, or additional permits associated with new legislation. In addition, the timing of permits is uncertain and processing times may be negatively affected by COVID-19. The Company can provide no assurance that it will continue to hold or obtain, if required to, all permits necessary to develop or continue operating at any particular site, which would materially adversely affect its operations.

GOVERNMENT REGULATION

The exploration, development, and mining activities of the Company are subject to various federal, provincial/state, and local laws governing prospecting, development, taxes, labour standards, toxic substances, and other matters. Exploration, development, and mining activities are also subject to various federal, provincial/state, and local laws and regulations relating to the protection of the environment. These laws mandate, among other things, the maintenance of air and water quality standards, and land reclamation. These laws also set forth limitations on the generation, transportation, storage, and disposal of solid and hazardous waste. Although the Company’s exploration, development, and mining activities are currently carried out in accordance with all applicable rules and regulations governing operations and exploration activities, no assurance can be given that new rules and regulations, amendments to current laws and regulations or more stringent implementation thereof could have a substantial adverse impact on the Company’s activities.

ENVIRONMENTAL RISKS AND HAZARDS

All phases of the Company’s mineral exploration, development, and mining operations are subject to environmental regulation in the various jurisdictions in which it operates. Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors, and employees. There is no assurance that future changes in environmental regulations, laws, and permits, if any, will not adversely affect the Company’s operations. Environmental hazards may exist on the properties on which the Company holds interests which are unknown to the Company at present, which have been caused by previous or existing owners or operators of the properties. The Company may become liable for such environmental hazards caused by previous owners and operators of the properties even where it has attempted to contractually limit its liability.

Page 39


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

Government approvals and permits are currently, and may in the future be, required in connection with the Company’s operations. To the extent such approvals are required and not obtained; the Company may be curtailed or prohibited from proceeding with planned exploration, development, or mining of mineral properties.

Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations.

THE CAMINO ROJO MINERAL RESOURCE ESTIMATE ASSUMES THAT THE COMPANY CAN ACCESS MINERAL TITLES AND LANDS THAT ARE NOT CONTROLLED BY THE COMPANY

All of the mineralization comprised in the Company’s mineral resource estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by Orla. However, the mineral resource estimate assumes that the north wall of the conceptual floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto lands where mineral title is held by Fresnillo and that waste would be mined on Fresnillo’s mineral titles. On December 21, 2020, Orla announced that it had completed the Layback Agreement. The Layback Agreement allows Orla to expand the Camino Rojo Oxide Mine pit onto part of Fresnillo’s mineral concession located immediately north of Orla’s property. This expansion will increase oxide ore available for extraction on Orla’s property below the pit outlined in Orla’s previous, 2019 technical report on the project.

However, the Layback Agreement is only with respect to the portion of the heap leach material included in the current mineral reserve. As such, any potential development of the Camino Rojo Project that includes an open pit encompassing the entire mineral resource estimate would be dependent on an additional agreement with Fresnillo (or any potential subsequent owner of the mineral titles). It is estimated that approximately two-thirds of the mill resource estimate and one-quarter of the leach resource estimate comprising the mineral resource estimate are dependent on this additional agreement being entered into with Fresnillo. The leach mineral resource dependent on the additional agreement is mainly comprised of less oxidized transitional material with the lowest predicted heap-leach recoveries.

Delays in, or failure to obtain, an additional agreement with Fresnillo would affect the development of a significant portion of the mineral resources of the Camino Rojo Project that are not included in the 2021 Camino Rojo Report mine plan, in particular by limiting access to significant mineralized material at depth. There can be no assurance that the Company will be able to negotiate such additional agreement on terms that are satisfactory to the Company and Fresnillo or that there will not be delays in obtaining the necessary additional agreement. Should such a subsequent agreement with Fresnillo not be obtained on favourable terms, the economics of any potential mine development using the full mineral resource estimate would be significantly negatively impacted.

MINERAL RESOURCE ESTIMATIONS FOR CAMINO ROJO ARE ONLY ESTIMATES AND RELY ON CERTAIN ASSUMPTIONS

The estimation of mineral resources relies on the judgment of the independent Qualified Person preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results, and industry practices. Valid estimates made at a given time may significantly change when new information becomes available.

In particular, the estimation of mineral resources for the Camino Rojo Project has assumed that there is a reasonable prospect for reaching an additional agreement with Fresnillo with respect to the mill resource included in the mineral resource estimate. While the Company believes that the mineral resource estimates for the Camino Rojo Project are well established and reflect best estimates, by their nature

Page 40


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

resource estimates are imprecise and depend on inferences that may ultimately prove to be inaccurate, including the assumption that an additional agreement with Fresnillo will be reached.

Although all mineralization included in the Company’s mineral resource estimate for the Camino Rojo Project are located on mineral concessions controlled by the Company, failure to reach an additional agreement with Fresnillo would result in a significant reduction of the mineral resource estimate by limiting access to mineral resources below the current mineral reserves. Any material changes in mineral resource estimates may have a material adverse effect on the Company.

SURFACE RIGHTS

There are four ejido communities in the vicinity of the main area of drilling at the Camino Rojo Project and other ejido lands cover most of the rest of the property. The lands that are used by the Company for the open pit mine and heap leach facility are subject to an expropriation agreement between the Company and the Ejido San Tiburcio. Currently, the Company has the legal possession of such lands until 2043. For exploration activities, the Company enters into temporary occupation agreements with the ejido communities, which allow the Company to use the surface of the lands for its mining activities for a set period of time. In Mexico, mining rights that are covered under a concession do not include direct ownership or possession rights over the surface, or surface access, and at any particular time the Company may be involved in negotiations with various ejido communities to enter into new temporary occupation agreements or other surface access agreements or amend existing agreements. Failure to reach new agreements or disputes regarding existing agreements may cause, blockades, suspension of operations, delays to projects, and, on occasion, may lead to legal disputes. Any such failure to reach new agreements or disputes regarding existing agreements may have a material adverse effect on the Company’s business.

The Company currently owns all surface rights required for exploration and development of the Cerro Quema Project.

Access to the Company’s South Railroad Project and certain mineral properties at the project are or will be governed by surface use agreements or other forms of access rights or agreements such as easements and rights-of-way. Failure to meet or otherwise satisfy required contractual obligations and make payments with respect to such agreements and rights or to otherwise obtain such agreements or rights may result in loss of access to the project or to certain mineral properties.

TITLE MATTERS

The acquisition of title to mineral tenures in Mexico, Panama and the United States is a detailed and time-consuming process. Although the Company has diligently investigated title to all mineral tenures and, to the best of its knowledge, title to all of its properties is in good standing, this should not be construed as a guarantee of title. The Company can provide no assurances that there are no title defects affecting its properties. Other parties may dispute title to any of the Company’s mineral properties and any of the Company’s properties may be subject to prior unregistered liens, agreements, transfers or claims, and title may be affected by, among other things, undetected encumbrances or defects or governmental actions. Title to the Company’s properties may also be affected by undisclosed and undetected defects. If any claim or challenge is made regarding title, the Company may be subject to monetary claims or be unable to develop properties as permitted or to enforce its rights with respect to its properties.

Certain of the Company’s mineral rights at the South Railroad Project consist of unpatented mining claims. Unpatented mining claims are unique real property interests and are generally considered to be subject to greater risk than other real property interests because the legal validity of unpatented mining claims is often uncertain. Unpatented mining claims provide only possessory title and their legal validity is often subject to contest by third parties or the federal government. These uncertainties relate to such things as the sufficiency of mineral discovery, proper posting and marking of mining claim boundaries and location monuments, assessment work, unregistered agreements, undetected defects and possible conflicts with other mining claims. Since a substantial portion of all mineral exploration,

Page 41


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

development and mining in the western United States now occurs on unpatented mining claims, this uncertainty is inherent in the mining industry.

The South Railroad Project is also subject to annual compliance with assessment work or fee requirements, property taxes, lease payments and other contractual payments and obligations. Any failure to make such payments or comply with such requirements or obligations could result in the loss of all or a portion of the Company’s interest in the South Railroad Project.

In addition, certain of the Company’s subsurface mineral rights to the South Railroad Project are secured or controlled by a contractual interest in private surface and mineral property in the form of various surface use agreements and mining/mineral leases. Subject to the terms of those agreements and leases, certain of those agreements and leases may have not have provisions for automatic renewal. If the Company is not able to negotiate for the extension of those agreements and leases they may expire and no longer form part of the Company’s mineral portfolio, which may have a material adverse effect on the Company’s business.

COMMODITY PRICES

The profitability of mining operations is significantly affected by changes in the market price of gold and other minerals. The level of interest rates, the rate of inflation, world supply of these minerals and stability of exchange rates can all cause significant fluctuations in metal prices. Such external economic factors are in turn influenced by changes in international investment patterns and monetary systems and political developments. The price of gold and other minerals has fluctuated widely in recent years, and future serious price declines could cause commercial production to be impracticable.

UNKNOWN LIABILITIES IN CONNECTION WITH ACQUISITIONS

As part of the Company’s acquisitions, including its recent acquisition of Gold Standard, the Company has assumed certain liabilities and risks. While the Company conducted thorough due diligence in connection with such acquisitions, there may be liabilities or risks that the Company failed, or was unable, to discover in the course of performing the due diligence investigations or for which the Company was not indemnified. Any such liabilities, individually or in the aggregate, could have a material adverse effect on the Company’s financial position and results of operations.

UNINSURED RISKS

The Company carries insurance to protect against certain risks in such amounts as it considers adequate. Risks not insured against include environmental pollution or other hazards against which such corporations cannot insure or against which they may elect not to insure.

ACQUISITIONS AND INTEGRATION

From time to time, the Company examines opportunities to acquire additional mining assets and businesses. An example is the Company’s recent acquisition of Gold Standard. Any acquisition that the Company may choose to complete may be of a significant size, may change the scale of the Company’s business and operations, and may expose the Company to new geographic, political, operating, financial, and geological risks. The Company’s success in its acquisition activities depends on its ability to identify suitable acquisition candidates, negotiate acceptable terms for any such acquisition, and integrate the acquired operations successfully with those of the Company.

Page 42


Table of Contents

ORLA MINING LTD.

Management’s Discussion and Analysis

Three and twelve months ended December 31, 2022

United States dollars unless otherwise stated

LITIGATION RISK

All industries, including the mining industry, are subject to legal claims, with and without merit. Defence and settlement costs of legal claims can be substantial, even with respect to claims that have no merit. Due to the inherent uncertainty of the litigation and dispute resolution process, the litigation process could take away from management time and efforts and the resolution of any particular legal proceeding to which the Company may become subject could have a material adverse effect on the Company’s financial position, results of operations, or the Company’s property development or operations.

CONFLICTS OF INTEREST

Certain directors of the Company also serve as directors and/or officers of other companies involved in natural resource exploration and development. Consequently, there exists the possibility for such directors to be in a position of conflict. Any decision made by such directors involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with the Company and such other companies. In addition, such directors will declare, and refrain from voting on, any matter in which such directors may have a conflict of interest.

COMPLIANCE WITH ANTI-CORRUPTION LAWS

The Company is subject to various anti-corruption laws and regulations including, but not limited to, the Canadian Corruption of Foreign Public Officials Act, the US Foreign Corrupt Practices Act, and similar laws in any country in which the Company conducts business. In general, these laws prohibit a company and its employees and intermediaries from bribing or making other prohibited payments to foreign officials or other persons to obtain or retain business or gain some other business advantage. In recent years, there has been a general increase in both the frequency of enforcement and the severity of penalties under such laws, resulting in greater scrutiny and punishment to companies convicted of violating anti-corruption and anti-bribery laws. Furthermore, a company may be found liable for violations by not only its employees, but also by its contractors and third-party agents.

The Company’s Camino Rojo Project is located in Mexico and the Cerro Quema Project is located in Panama, both of which countries which are perceived as having fairly high levels of corruption. Orla cannot predict the nature, scope, or effect of future anti-corruption regulatory requirements to which the Company’s operations might be subject or the manner in which existing laws might be administered or interpreted.

Failure to comply with the applicable legislation and other similar foreign laws could expose the Company and/or its senior management to civil and/or criminal penalties, other sanctions and remedial measures, legal expenses, and reputational damage, all of which could materially and adversely affect the Company’s business, financial condition, and results of operations. Likewise, any investigation of any potential violations of the applicable anti-corruption legislation by Canadian, American, or foreign authorities could also have an adverse impact on the Company’s business, financial condition, and results of operations.

As a consequence of these legal and regulatory requirements, the Company has instituted policies with regard to business ethics, which have been designed to ensure that Orla and its employees comply with applicable anti-corruption laws and regulations. However, there can be no assurance or guarantee that such efforts have been and will be completely effective in ensuring the Company’s compliance, and the compliance of its employees, consultants, contractors, and other agents, with all applicable anti-corruption laws and regulations.

Page 43


P1YP3YP5YP3Y0.33330.33330.33330.33330.33330.33330.33330.33330.3333

Exhibit 99.3

Graphic

Consolidated Financial Statements

 

Years ended December 31, 2022 and 2021

 

Presented in United States dollars

Report of Independent Registered Public Accounting Firm

To the Shareholders and the Board of Directors of Orla Mining Ltd.

Opinion on the Financial Statements

We have audited the accompanying consolidated balance sheets of Orla Mining Ltd. (the “Company”) as of December 31, 2022 and 2021, the related consolidated statements of income (loss) and comprehensive income (loss), cash flows and changes in equity for each of the two years in the period ended December 31, 2022, and the related notes (collectively referred to as the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company at December 31, 2022 and 2021, and its consolidated financial performance and its cash flows for each of the two years in the period ended December 31, 2022, in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board (“IFRSs”).

Basis for Opinion

These financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on the Company’s financial statements based on our audit. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (“PCAOB”) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audit we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting. Accordingly, we express no such opinion.

Our audit included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audit also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audit provides a reasonable basis for our opinion.

/s/ Ernst & Young LLP

Chartered Professional Accountants

We have served as the Company’s auditor since 2020.

Vancouver, Canada

March 19, 2023

ORLA MINING LTD.
Consolidated Balance Sheets

(thousands of United States dollars)

December 31, 

December 31, 

As at

    

2022

    

2021

ASSETS

Current assets

Cash and cash equivalents

$

96,278

$

20,516

Trade and other receivables

365

306

Value added taxes recoverable (note 12)

8,659

16,776

Inventory (note 11)

 

22,446

 

9,657

Prepaid expenses

 

2,824

 

1,090

Restricted cash

2,290

 

132,862

 

48,345

Restricted cash

 

1,142

 

3,680

Value added taxes recoverable (note 12)

 

5,229

 

7,444

Long-term inventory (note 11)

4,096

1,299

Property, plant and equipment (note 14)

224,416

7,635

Mineral properties under construction (note 15)

213,749

Exploration and evaluation properties (notes 13 and 16)

 

242,743

 

82,743

Deferred tax asset

2,405

Other non-current assets

923

TOTAL ASSETS

$

613,816

$

364,895

LIABILITIES

Current liabilities

Trade and other payables (note 17)

$

11,708

$

6,816

Accrued liabilities (note 18)

 

7,967

 

5,659

Current portion of long term debt (note 19)

45,000

25,293

Taxes payable

 

33,102

 

97,777

37,768

Lease obligations (note 24)

 

2,327

 

1,029

Long term debt (note 19)

 

100,795

 

136,060

Deferred revenue (note 13)

7,500

Site closure provisions (note 25)

 

8,261

 

5,460

Other long term liabilities (note 18)

172

161

TOTAL LIABILITIES

 

216,832

 

180,478

SHAREHOLDERS’ EQUITY

Share capital (note 26)

 

445,316

 

269,198

Reserves

 

24,009

 

29,306

Accumulated other comprehensive income

 

(1,583)

 

2,441

Accumulated deficit

 

(70,758)

 

(116,528)

TOTAL SHAREHOLDERS’ EQUITY

 

396,984

 

184,417

TOTAL LIABILITIES AND SHAREHOLDERS’ EQUITY

$

613,816

$

364,895

/s/ Jason Simpson

    

/s/ Elizabeth McGregor

Jason Simpson, Director

Elizabeth McGregor, Director

The accompanying notes are an integral part of these consolidated financial statements.

Page 3

ORLA MINING LTD.
Consolidated Statements of Income (Loss) and Comprehensive Income (Loss)

(thousands of United States dollars)

Years ended December 31

    

2022

    

2021

REVENUE (note 5)

$

193,230

$

4,124

COST OF SALES

 

  

 

  

Operating costs (note 6(a))

 

(45,597)

 

(1,280)

Depletion and depreciation (note 7)

(14,953)

Royalties (note 6(b))

 

(4,819)

 

(111)

 

(65,369)

 

(1,391)

EARNINGS FROM MINING OPERATIONS

127,861

2,733

EXPLORATION AND EVALUATION EXPENSES (note 8)

(18,939)

(15,108)

GENERAL AND ADMINISTRATIVE EXPENSES (note 9)

(10,913)

(7,207)

OTHER

 

 

  

Interest income

2,167

341

Depreciation

 

(277)

 

(154)

Share based payments (note 28)

 

(2,447)

 

(2,329)

Interest and accretion expense (note 10)

 

(8,890)

 

(1,637)

Loss on early settlement of project loan (note 20(b))

(13,219)

Foreign exchange gain (loss)

 

3,014

 

(3,726)

Other gain (loss)

 

41

 

809

 

(19,611)

 

(6,696)

INCOME (LOSS) BEFORE TAXES

78,398

(26,278)

Income taxes (note 35)

(32,628)

INCOME (LOSS) FOR THE PERIOD

$

45,770

$

(26,278)

OTHER COMPREHENSIVE INCOME (LOSS)

 

 

  

Items that may in future periods be reclassified to profit or loss:

 

 

  

Foreign currency differences arising on translation

 

(4,024)

 

(561)

TOTAL COMPREHENSIVE INCOME (LOSS)

$

41,746

$

(26,839)

WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING (note 27)

 

 

Basic (millions)

272.2

241.4

Diluted (millions)

292.8

241.4

EARNINGS (LOSS) PER SHARE (note 27)

Basic

$

0.17

$

(0.11)

Diluted

$

0.16

$

(0.11)

The accompanying notes are an integral part of these consolidated financial statements.

Page 4

ORLA MINING LTD.

Consolidated Statements of Cash Flows

(thousands of United States dollars)

    

Years ended December 31

2022

    

2021

OPERATING ACTIVITIES

Income (loss) for the year

$

45,770

$

(26,278)

Adjustments for:

Interest and accretion

 

6,723

 

1,296

Income tax expense

32,628

Income taxes paid

(3,150)

Interest income received

 

2,167

 

458

Payment of cash settled RSUs and DSUs

(2,049)

 

Adjustments for items not affecting cash:

 

 

Depreciation and depletion

 

15,230

 

154

Share based payments (note 28)

2,447

2,329

Loss on early settlement of project loan

 

13,219

 

Unrealized foreign exchange loss (gain)

(1,862)

3,921

Other

 

(31)

 

23

Cash provided by (used in) operating activities before changes in non-cash working capital

111,092

(18,097)

Changes in non-cash working capital (note 30(b))

 

(15,781)

(6,645)

Cash provided by (used in) operating activities

95,311

(24,742)

INVESTING ACTIVITIES

 

 

  

Purchase of plant and equipment

 

(5,726)

(3,302)

Deposits and other payments on long term assets

 

(855)

Mineral properties and related construction

 

(12,252)

(92,939)

Payment pursuant to the Layback Agreement (note 23)

(15,000)

Acquisition of Gold Standard, net of cash received (note 13)

 

(1,226)

Restricted cash and environmental bonding

 

3,176

(979)

Value added taxes received

18,527

(16,046)

Cash provided by (used in) investing activities

(13,356)

(113,266)

FINANCING ACTIVITIES

 

  

Advances received on (payments of) the Camino Rojo project loan

 

(127,500)

50,000

Proceeds from issuance of common shares, net of issuance costs

 

(261)

33,442

Payment of the Newmont loan (note 21)

 

(10,836)

Advances received from Credit Facility (note 22)

 

130,000

Principal repayments of the Credit Facility (note 22)

(5,550)

Proceeds from exercise of stock options and warrants

 

20,024

14,754

Transaction costs related to financing facilities (note 22)

 

(1,866)

 

(289)

Interest paid

 

(8,816)

 

(11,307)

Lease payments

(574)

(649)

Cash provided by financing activities

 

(5,379)

 

85,951

 

 

Effects of exchange rate changes on cash

 

(814)

393

Net increase (decrease) in cash

 

75,762

(51,664)

Cash, beginning of period

 

20,516

72,180

CASH, END OF YEAR

$

96,278

$

20,516

Supplemental cash flow information (note 30)

The accompanying notes are an integral part of these consolidated financial statements.

Page 5

ORLA MINING LTD.

Consolidated Statements of Changes in Equity

(thousands of United States dollars)

Common shares

Reserves

Accumulated

Number of

Share based

Other

Retained

shares

payments

Warrants

Comprehensive

earnings

    

(thousands)

    

Amount

    

reserve

    

reserve

    

Total

    

Income (loss)

    

(deficit)

    

Total

Balance at January 1, 2021

 

229,286

$

217,948

$

8,486

$

21,395

$

29,881

$

3,002

$

(90,250)

$

160,581

Shares issued pursuant to a financing

 

9,085

34,442

 

34,442

Shares issued for property payments

 

33

150

 

150

Share issuance costs

 

(1,000)

 

(1,000)

Warrants exercised (note 26(b))

 

8,060

16,419

(2,140)

(2,140)

 

14,279

Options exercised

 

687

752

(277)

(277)

 

475

RSUs settled

 

449

487

(487)

(487)

 

Share based payments

 

 

 

2,329

 

 

2,329

 

 

 

2,329

Loss for the year

 

 

(26,278)

(26,278)

Other comprehensive loss

 

(561)

 

(561)

Balance at December 31, 2021

 

247,600

269,198

10,051

19,255

29,306

2,441

(116,528)

184,417

Balance at January 1, 2022

 

247,600

$

269,198

$

10,051

$

19,255

$

29,306

$

2,441

$

(116,528)

$

184,417

Shares issued pursuant to acquisition (note 13)

 

43,689

149,363

149,363

Share issuance costs (note 26)

 

(261)

(261)

Replacement options issued (note 13)

 

1,647

1,647

1,647

Warrants exercised (note 26)

 

10,697

21,334

(5,143)

(5,143)

16,191

Options exercised (note 28)

 

3,675

6,866

(3,033)

(3,033)

3,833

RSUs redeemed (note 28)

 

36

138

(138)

(138)

RSUs settled in cash (note 28)

 

(1,320)

(403)

(403)

(1,723)

RSUs reclassified to cash settled (note 28)

(310)

(310)

(310)

DSUs redeemed (note 28)

 

112

165

(165)

(165)

DSUs settled in cash (note 28)

(167)

(159)

(159)

(326)

Share based payments (note 28)

2,407

2,407

2,407

Income for the year

45,770

45,770

Other comprehensive loss

 

(4,024)

(4,024)

Balance at December 31, 2022

 

305,809

$

445,316

$

9,897

$

14,112

$

24,009

$

(1,583)

$

(70,758)

$

396,984

The accompanying notes are an integral part of these consolidated financial statements.

Page 6

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

1.CORPORATE INFORMATION AND NATURE OF OPERATIONS

Orla Mining Ltd. was incorporated in Alberta in 2007 and was continued into British Columbia in 2010 and subsequently into Ontario under the Business Corporations Act (Ontario) in 2014. In 2016, the Company was continued as a federal company under the Canada Business Corporations Act. The “Company”, “Orla”, “we”, and “our” refer to Orla Mining Ltd. and its subsidiaries. The registered office of the Company is located at Suite 1010, 1075 West Georgia Street, Vancouver, Canada.

The Company is engaged in the acquisition, exploration, development, and exploitation of mineral properties, and holds the Camino Rojo gold and silver mine in Zacatecas State, Mexico, Cerro Quema gold project in Panama, and the South Railroad and Lewis gold projects in Nevada, USA.

These consolidated financial statements have been prepared on the assumption that the Company will continue as a going concern, meaning it will continue in operation for the foreseeable future and will be able to realize assets and discharge liabilities in the ordinary course of operations. Different bases of measurement may be appropriate if the Company is not expected to continue operations for the foreseeable future. The Company declared commercial production at Camino Rojo, effective April 1, 2022.

Page 7

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

2.BASIS OF PREPARATION

(a)

Statement of compliance and basis of presentation

We have prepared these consolidated financial statements of the Company in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”).

The consolidated financial statements have been prepared on the historical cost basis, except for certain financial instruments that are measured at fair values at the end of each reporting period, as explained in the accounting policies below. The consolidated financial statements are presented in United States dollars.

On March 19, 2023, the Board of Directors approved these consolidated financial statements for issuance.

(b)

Basis of consolidation

These consolidated financial statements include the accounts of the Company and its subsidiaries, all of which are wholly owned. Where necessary, we have made adjustments to the financial statements of subsidiaries to bring their accounting policies in line with the accounting policies of the consolidated group. We have eliminated all material intercompany transactions, balances, revenues, and expenses upon consolidation.

Subsidiaries are included in the consolidated financial results of the Company from the effective date of acquisition or control and up to the effective date of disposition or loss of control. Control is achieved when the Company has power over the investee, is exposed to or has rights to variable returns from its involvement with an investee and has the ability to affect those returns through its power over the investee.

Orla Mining Ltd. is the ultimate parent entity of the group. At December 31, 2022 and 2021, the principal operating subsidiaries of the Company, their geographic locations, and the ownership interests held by the Company, were as follows:

    

    

    

Ownership

    

    

Name

Principal activity

Dec 31, 2022

Dec 31, 2021

Location

Minera Camino Rojo SA de CV

 

Production

 

100

%  

100

%  

Mexico

Minera Cerro Quema SA

 

Exploration

 

100

%  

100

%  

Panama

Gold Standard Ventures Corp.

Holding company

100

%  

Canada

Gold Standard Ventures (US) Inc.

Exploration

100

%  

USA

Madison Enterprises Inc.

Exploration

100

%  

USA

Monitor Gold Corporation

 

Exploration

 

100

%  

100

%  

USA

3.SIGNIFICANT ACCOUNTING POLICIES

We have applied the accounting policies set out below consistently to all periods presented in these financial statements.

The significant judgements we made in applying the Company’s accounting policies and the key sources of estimation uncertainty arising in the preparation of these consolidated financial statements are discussed in note 4.

    

(a)Foreign currencies

    

    

(i)

Foreign currency transactions

Transactions in foreign currencies are translated into the respective functional currencies of each entity at the exchange rates in effect on the dates of the transactions.

Page 8

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

Monetary assets and liabilities denominated in foreign currencies are translated into the functional currency at the exchange rate at the reporting date. Non-monetary assets and liabilities that are measured at fair value in a foreign currency are translated into the functional currency at the exchange rate when the fair value was determined. Non-monetary items that are measured at historical cost in a foreign currency are translated at the exchange rate in effect at the date of the transaction. Foreign currency differences are generally recognized in profit or loss.

(ii)

Translation to presentation currency

These consolidated financial statements are presented in United States dollars (“US dollar”, or “USD”).

The presentation currency differs from the functional currency of the parent company and some of its subsidiaries (note 3(a)). We translate the assets and liabilities of entities with functional currencies other than the US dollar into US dollars at the official central bank exchange rates in effect on the reporting date. The results of operations of those entities are translated into US dollars at the average exchange rates in effect during the reporting period. We recognize the foreign currency differences which arise from translation in other comprehensive (loss) income.

When we dispose of an entity in its entirety, or partially such that we have lost control, we reclassify the cumulative amount in the translation reserve related to that operation to profit or loss as part of the gain or loss on disposal.

(iii) Functional currency

The functional currency of each of the Company’s principal operating subsidiaries, all of which are wholly owned, is the United States dollar. The functional currency of the parent company, Orla Mining Ltd., is the Canadian dollar.

The Company’s principal operating subsidiaries are Minera Camino Rojo SA de CV, Minera Cerro Quema SA, Gold Standard Ventures Corp., Gold Standard Ventures (US) Inc., Madison Enterprises (Nevada) Inc., and Monitor Gold Corporation.

Change in functional currency

As a result of the continued advancement of Camino Rojo and the resulting changes in underlying transactions, events, and circumstances, we reassessed the functional currency of Minera Camino Rojo SA de CV. We determined that the functional currency of Minera Camino Rojo SA de CV is the United States dollar. Consequently, the functional currency for this subsidiary changed from Mexican pesos to United States dollars effective January 1, 2022. This change in functional currency has been applied prospectively effective January 1, 2022.

(b)

Cash and cash equivalents

Cash and cash equivalents include cash on hand, demand deposits, and money market instruments, with maturities from the date of acquisition of three months or less, which are readily convertible to known amounts of cash and are subject to insignificant changes in value.

(c)

Restricted cash

Restricted cash consists of amounts lodged with government bodies or their designated banking institutions in support of mandated environmental, permitting, or employee retirement obligations.

(d)Inventories

Inventories include production inventory, and materials and supplies inventory.

All inventories are valued at the lower of average cost or net realizable market value (“NRV”). NRV is calculated using the estimated price at the time of sale based on prevailing and forecast metal prices less estimated future production costs to convert the inventory into saleable form and associated selling costs. Any write-downs of inventory to its NRV are included in cost of

Page 9

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

sales in the period. If there is a subsequent increase in the value of inventory, the previous write-downs to NRV are reversed to the extent that the related inventory has not yet been sold.

We classify inventory we do not expect to use within one year as non-current.

(i)Production inventory

Production inventory consists of stockpiled ore, in-process inventory, and finished goods. These are valued at the lower of weighted average cost and estimated NRV.

The value of all production inventories includes direct production costs and attributable overhead and depreciation incurred to bring the materials to their current point in the processing cycle.

Stockpiled ore represents unprocessed ore that has been extracted from the mine but not yet processed. The value of stockpiled ore is based on the costs incurred, including depreciation, in bringing the ore to the stockpiles. Costs are added to the stockpiled ore based on current mining costs per recoverable ounce and are removed at the average cost per recoverable ounce in the stockpile. We classify stockpiled ore that we do not expect to process within the next twelve months as non-current.

In-process inventory represents ore that is being treated on the leach pads and in the processing plant to extract the contained metals and to convert them to a saleable form. Estimates of recoverable metal in the leach pads are calculated based on the quantities of ore placed on the leach pads (measured tonnes added to the leach pads), the grades of ore placed on the leach pads (based on assays), and estimated recovery percentages (based on estimated recovery assumptions). The nature of the leaching process inherently limits the ability to precisely monitor leach pad inventory levels. Accordingly, we refine estimates based on engineering studies or actual results achieved over time. The ultimate recovery of metals from the leach pads will not be known until the leaching process is concluded at the end of the mine life.

The cost of in-process inventory is derived from current mining, crushing, stacking, leaching and plant costs, less the cost of metals transferred to finished goods inventory during the period at the weighted average cost per recoverable ounce.

Finished goods inventory is metal in the form of doré bars that have been poured and are ready to be shipped to a refiner.

Costs are transferred from finished goods inventory and recorded as cost of sales when the refined metal is sold.

(ii) Materials and supplies inventory

Materials and supplies inventories consist primarily of parts and consumables required in the mining and ore processing activities. Materials and supplies inventories are measured at the lower of weighted average cost and NRV. Cost includes purchase price, freight, and other directly attributable costs. We record provisions to reduce the carrying value of materials and supplies inventories when we determine such materials and supplies are obsolete or unusable.

(e)Mineral properties and related construction

We capitalize costs directly related to development or construction projects until the asset is available for use in the manner intended by us (“commercial production”), after which we move these costs to “producing mineral properties”.

We assess the stage of a mine under development and construction to determine when the mine is substantially complete and ready for its intended use. The criteria we use to assess when the mine is ready for its intended use are determined based on the unique nature of each mine construction project, such as the complexity of the project and its location. We consider various technical and physical performance criteria to assess when the production phase is considered to have commenced. Refer to note 15 for the factors we consider.

When we conclude that a mine under development and construction has commenced commercial production, we reclassify all balance sheet amounts from “Mineral properties and related construction” to balance sheet captions “Producing mineral properties” and “Plant and equipment”.

Page 10

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

We do not record depreciation until the mine is substantially complete and available for its intended use.

When a mine development project moves into the production phase, we:

stop capitalizing certain mine development costs, and we treat such costs as either (i) part of the cost of inventory or (ii) we expense them,
stop capitalizing borrowing costs,
commence depreciation of the producing mineral property,
continue to capitalize costs relating to mining asset additions or improvements, and costs related to the development of mineable reserves.

(i)Proceeds before commercial production

During the year ended December 31, 2021, we early adopted the “Amendments to IAS 16 Property, Plant and Equipment: Proceeds before Intended Use”. Under the amendments, proceeds from selling items before the mine under construction reaches commercial production should be recognized in profit or loss, together with the costs of producing those items.

(f)Producing mineral properties

Producing mineral properties consist of costs transferred from “Mineral properties under construction” when a mining property reaches commercial production, and acquired mining properties in the production stage.

When a mine construction project moves into the production stage, we cease capitalizing mine construction costs. Upon commencement of commercial production, we charge production costs to metal-in-process inventory, although we capitalize costs related to (1) property, plant and equipment additions or improvements, (2) open pit stripping activities that provide a future benefit, or (3) expenditures that meet the criteria for capitalization in accordance with IAS 16 Property, Plant and Equipment.

Drilling and related costs for an ore body where proven and probable reserves exist and the activities are directed at obtaining additional information on the ore body or converting mineralized material to proven and probable reserves are capitalized. All other drilling and related costs are expensed as incurred.

(i)Stripping costs

In open pit mining operations, it is necessary to incur costs to remove waste material in order to access the ore body, which is known as stripping. Stripping costs incurred prior to the production stage of a mineral property (pre-stripping costs) are capitalized as part of the carrying amount of the related mineral property.

During the production phase of an open pit mine, stripping costs incurred that provide improved access to ore that will be produced in future periods and that would not have otherwise been accessible are capitalized to deferred stripping asset. The costs qualifying for capitalization are those costs directly incurred to perform the stripping activity that provides or improves access to the identified component of ore, plus an allocation of directly attributable overhead costs, which are determined using a strip ratio methodology. The strip ratio represents the ratio of the estimated total volume of waste material to the estimated total quantity of economically recoverable ore of the mineral reserves for which access has been provided or improved. The deferred stripping asset is capitalized as part of the carrying amount of the mineral property. Capitalized stripping costs are amortized based on the estimated recoverable ounces contained in mineral reserves that directly benefit from the stripping activities. Costs for waste removal that do not give rise to future economic benefits are included in cost of sales.

(ii)Depletion

Depletion commences once the mineral property is capable of operating in the manner intended by management. Producing mineral properties are depleted on a units-of-production basis over the estimated useful life of the mine. This depletion is

Page 11

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

calculated using the ratio of (i) gold ounces produced from the mine in the period, over (ii) the total gold ounces expected to be produced in current and future periods.

Major capital works projects conducted after the mine commences commercial production are not depreciated until such works are completed and put into use in a manner intended by management.

We review depreciation methods, remaining useful lives and residual values at least annually and we account for changes in estimates prospectively.

(iii)Impairment

At the end of each reporting period, we review our mineral properties, and related plant and equipment to determine whether there is any indication that these assets are impaired. If any such indication exists, we estimate the recoverable amount. If the asset’s carrying amount exceeds its recoverable amount, we recognize an impairment loss in profit or loss.

We assess impairment at the cash-generating unit (“CGU”) level, which is the smallest identifiable group of assets that generates cash inflows that are largely independent of the cash inflows from other assets. Each individual mining interest that is an operating mine is typically a CGU.

The recoverable amount of a mine is the greater of an asset’s fair value less costs to dispose (“FVLCD”) and value in use (“VIU”). FVLCD is defined as the amount that would be obtained from the sale of the asset in an orderly transaction between market participants at the measurement date. VIU is determined as the present value of the estimated future cash flows expected to arise from the continued use of the asset in its present form and from its ultimate disposal.

Mineral properties, and plant and equipment that have been impaired are tested for possible reversal of the impairment when events or changes in circumstances indicate that the recoverable amount of the associated CGU has increased. When an impairment loss reverses in a subsequent period, the revised carrying amount shall not exceed the carrying amount that would have been determined had no impairment loss been recognized for the asset previously, less subsequent depletion and depreciation. Reversals of impairment losses are recognized in profit or loss in the period in which the reversal occurs.

(g)

Exploration and evaluation (“E&E”) expenditures

Exploration and evaluation expenditures include the search for mineral resources, and the determination of technical feasibility, and assessment of the commercial viability of, an identified mineral resource. Activities include acquisition of rights to explore; topographical, geological, geochemical and geophysical studies; exploratory drilling; trenching; sampling; and evaluation of the technical feasibility and commercial viability of extracting a mineral resource.

We capitalize as exploration and evaluation assets the acquisition costs of exploration properties (whether acquired in a business combination or through an acquisition of assets).

We expense all other E&E expenditures, including non-refundable advance royalty payments.

Exploration and evaluation properties are subsequently measured at cost less accumulated impairment.

When the technical feasibility and economic viability of a project are demonstrable, funding is in place, and a positive development decision is made, we test the mineral property for impairment and transfer the costs to “Mineral properties and related construction”. We capitalize subsequent expenditures on the project.

We assess exploration and evaluation properties for impairment when indicators and circumstances suggest that the carrying amount may exceed its recoverable amount. Typical indicators of impairment include:

the period for which we have the right to explore in the specific area has expired during the period or will expire in the near future, and is not expected to be renewed;

Page 12

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

substantive expenditure on further exploration for and evaluation of mineral resources in the specific area is neither budgeted nor planned;
exploration for and evaluation of mineral resources in the specific area have not led to the discovery of commercially viable quantities of mineral resources and we have decided to discontinue such activities in the specific area;
sufficient data exists to indicate that, although a development in the specific area is likely to proceed, the carrying amount of the exploration and evaluation asset is unlikely to be recovered in full via successful development or by sale.

If any such indication exists, we estimate the recoverable amount of the asset to determine the extent of the impairment. Where it is not possible to estimate the recoverable amount of an individual asset, we estimate the recoverable amount of the cash generating unit to which the asset belongs. The recoverable amount is the higher of fair value less costs to sell and value in use. In assessing value in use, we discount the estimated future cash flows to their present value using a pre‐tax discount rate that reflects current market assessments of the time value of money and the risks specific to the E&E asset. If we estimate the recoverable amount of an asset to be less than its carrying amount, we recognize an impairment loss in profit or loss for the period.

Where an impairment loss subsequently reverses, the carrying amount of the asset (or cash generating unit) is increased to the revised estimate of its recoverable amount, but to an amount that does not exceed the carrying amount that would have been determined had no impairment loss been recognized for the asset (or cash generating unit) in prior years. We recognize reversals of impairment immediately in profit or loss.

(h)

Property, plant and equipment

Equipment is initially recognized at cost. Cost includes purchase price, directly attributable costs, and the estimated present value of any future costs of decommissioning and removal. Equipment is carried at cost, net of accumulated depreciation and impairments. We depreciate equipment to their residual values over their estimated useful lives, as follows:

Mine equipment

Units-of-production over mineral reserves

Plant equipment and related buildings

Units-of-production over mineral reserves

Other equipment

    

Straight line over useful life

Office equipment

Straight line over useful life

Vehicles

 

Straight line over useful life, typically 4 years

Hardware and software

 

Straight line over useful life, typically 3 years

(i)

Borrowing costs

We capitalize interest and other costs that we incur in connection with the borrowing of funds (“borrowing cost”) that are directly attributable to the acquisition, or construction of an asset that necessarily takes a substantial period of time to get ready for its intended use or sale (“a qualifying asset”) as part of the cost of that asset. We expense other borrowing costs in the period in which they occur.

When we borrow funds specifically for the purpose of constructing or obtaining a qualifying asset, we capitalize the actual borrowing costs specifically incurred including the amortization of loan initiation costs, less any investment income earned on the temporary investment of those funds.

To the extent we borrow funds generally and use them for the purpose of constructing or obtaining a qualifying asset, we use a weighted average interest rate of the borrowing costs applicable to all our general borrowings that are outstanding during the period.

We stop capitalizing borrowing costs when substantially all the activities necessary to prepare the qualifying asset for its intended use are complete.

Page 13

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

We expense borrowing costs related to exploration and evaluation.

(j)

Leases

At the inception of a contract, we assess whether a contract is, or contains, a lease based on whether the contract conveys the right to control the use of an identified asset for a period of time in exchange for consideration. To assess whether a contract conveys the right to control the use of an identified asset, we consider whether:

the contract involves the use of an identified asset, either explicitly or implicitly, including consideration of supplier substitution rights;
we have the right to obtain substantially all the economic benefits from the use of the asset throughout the period of use; and
we have the right to direct the use of the asset.

We recognize a right-of-use (“ROU”) asset, which is initially measured based on the initial amount of the lease liability plus any initial direct costs incurred less any lease incentives received. We depreciate the ROU asset to the earlier of the end of the useful life or the lease term using either the straight-line or units-of-production method, depending on which method more accurately reflects the expected pattern of consumption of the future economic benefits. The lease term includes periods covered by an option to extend if we determine the Company is reasonably likely to exercise the option.

We initially measure the lease liability at the present value of the lease payments that are not yet paid as of the commencement date, discounted using the interest rate implicit in the lease or, if that rate cannot be readily determined, the Company’s incremental borrowing rate. We then measure the lease liability at amortized cost using the effective interest method and remeasure it when there is a change in future lease payments.

We apply the short-term lease (defined as leases with an initial lease term of 12 months or less) and low-value asset recognition exemptions. For these leases, we recognize the lease payments an expense over the term of the lease unless another systematic basis is more representative of the time pattern in which economic benefits from the leased assets are consumed.

(k)

Asset retirement and site closure obligations

We record an asset retirement and site closure obligation when a legal or constructive obligation exists as a result of past events and we can make a reliable estimate of the undiscounted future cash flows required to satisfy the asset retirement and site closure obligation. Such costs include decommissioning or dismantling plant and equipment, and reclamation, closure, and post-closure monitoring of the property.

The estimated future cash flows are discounted to a net present value using an applicable risk-free interest rate. We accrete the provision for asset retirement and site closure obligations over time to reflect the unwinding of the discount and charge the accretion expense to profit or loss for the period.

We remeasure the asset retirement and site closure obligation at the end of each reporting period for changes in estimates or circumstances, such as changes in legal or regulatory requirements, increased obligations arising from additional disturbance due to mining and exploration activities, changes to cost estimates, and changes to risk-free interest rates.

Asset retirement and site closure obligations related to exploration and evaluation activities are expensed. Asset retirement and site closure obligations relating to “mineral properties and related construction”, and to exploration and evaluation properties, are initially capitalized with a charge to the related mineral property. Changes to the obligation which arise as a result of changes in estimates and assumptions are also accounted for as changes in the carrying amounts of related mining property.

Page 14

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(l)

Provisions

We recognize provisions when (i) the Company has a present legal or constructive obligation as a result of a past event, (ii) it is probable that an outflow of resources embodying economic benefits will be required to settle the obligation, and (iii) we can make a reliable estimate of the amount of the obligation. Where we expect some or all of a provision to be reimbursed (for example, under an insurance contract), we recognize the reimbursement as a separate asset, but only when the reimbursement is virtually certain. We present the expense relating to each provision in profit or loss net of any reimbursements.

If the effect of the time value of money is material, we discount the provision using a pre-tax discount rate that reflects the risks specific to the liability. The increase in the provision due to the passage of time is recognized as accretion expense in profit or loss.

(m)Revenue

The Company’s primary source of revenue is the sale of refined gold and silver. The Company’s performance obligations relate primarily to the delivery of refined gold and silver to its customers.

Revenue related to the sale of metal is recognized when the customer obtains control of the metal. In determining whether the Company has satisfied a performance obligation, we consider whether (i) the Company has a present right to payment, (ii) the Company has transferred physical possession of the metal to the customer; (iii) the customer has the significant risks and rewards of ownership of the metal; and (iv) the customer has legal title to the metal.

We sell refined gold and silver primarily to refiners, bullion banks or members of the London Bullion Market Association (“LBMA”). The sales price is fixed on the date of sale based on spot price or by mutual agreement. We recognize revenue from sales of gold and silver at the time when risk and rewards of ownership and title transfers to the customer, which typically coincides with the date that the customer remits payment. Under certain contracts with customers the transfer of control may occur when the gold or silver is in transit from the mine to the refinery. At this point in time, the customer has legal title to and the risk and rewards of ownership of the gold or silver; therefore, the customer is able to direct the use of and obtain substantially all of the remaining benefits from the gold or silver.

Revenue from refined sales is recognized net of treatment and refining charges.

(n)Deferred revenue

The Company recognizes deferred revenue in the event it receives payments from customers in consideration for future commitments to deliver metals and before such sale meets the criteria for revenue recognition. The Company will recognize amounts in revenue as the metals are delivered to the customer. Specifically, for the silver stream agreement arising from the acquisition of Gold Standard Ventures Corp., we will amortize deferred revenue to revenue using ounces of silver sold over the estimated total ounces of silver expected to be delivered over the life of mine.

(o)

Share based payments

(i)

Stock options, restricted share units (RSUs) and deferred share units (DSUs)

The Company grants stock options, and awards RSUs and DSUs to employees, officers and directors from time to time. At the date of grant or award, we estimate the fair values of the stock options, RSUs and DSUs which will eventually vest. These estimated fair values are recognized as share-based compensation expense over the specific vesting periods, with a corresponding increase to reserves, a component of equity.

We determine the fair value of stock options using a Black-Scholes option pricing model with market-related inputs as of the date of grant. The fair value of RSUs and DSUs is the market value of the underlying shares as of the date of award. Cash-settled RSUs are remeasured using the market value of the underlying shares at the end of each reporting period. Stock option grants and RSU awards with several tranches of vesting are accounted for as separate awards with different vesting periods and fair values. We account for changes to the estimated number of awards that will eventually vest prospectively.

Page 15

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(ii)

Bonus shares

The Company has issued bonus shares, which have vested upon the completion of a specified period of service. The fair value of the bonus shares is determined on the date of award; this fair value has been recognized in share-based compensation expense over the service period.

(p)

Income taxes

Income tax expense comprises current and deferred tax. It is recognized in profit or loss except to the extent that it relates to a business combination or items recognized directly in equity or OCI.

(i)

Current tax

Current tax expense comprises the expected tax payable on taxable income for the year and any adjustment to income tax payable in respect of previous years. It is measured using tax rates enacted or substantively enacted at the reporting date. Current tax also includes any withholding tax arising from interest and dividends.

(ii)

Deferred tax

Deferred tax is recognized in respect of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for taxation purposes. Deferred tax is not recognized for:

temporary differences on the initial recognition of assets or liabilities in a transaction that is not a business combination, and at the time of the transaction, affects neither the accounting profit nor taxable profit (tax loss);
temporary differences related to investments in subsidiaries, associates and joint arrangements to the extent that we are able to control the timing of the reversal of the temporary differences and it is probable that they will not reverse in the foreseeable future; and
taxable temporary differences arising on the initial recognition of goodwill.

We recognize deferred tax assets for unused tax losses, unused tax credits and deductible temporary differences to the extent that it is probable that future taxable profits will be available against which they can be used. If the amount of taxable temporary differences is insufficient to recognize a deferred tax asset in full, then future taxable profits are considered based on the business plans for the individual taxable entity. We review deferred tax assets at each reporting date and reduce them when we consider it no longer probable that the related tax benefit will be realized. Unrecognized deferred tax assets are reassessed at each reporting date and recognized to the extent that it has become probable that future taxable profits will be available against which they can be used.

Deferred tax is measured at the tax rates that are expected to apply to the temporary differences when they reverse, using tax rates enacted or substantively enacted at the reporting date.

Deferred tax assets and liabilities are offset only when there are sufficient taxable temporary differences relating to the same taxation authority and the same taxable entity which are expected to reverse in the same period or in the carried back/forward period as the expected reversal of the deductible temporary difference.

(q)

Earnings (loss) per share

Basic earnings (loss) per share is based on profit (loss) attributable to common shareholders, divided by the weighted average number of common shares outstanding during the reporting period.

Page 16

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

Diluted earnings (loss) per share is based on profit (loss) attributable to common shareholders, divided by the weighted average number of common shares outstanding during the reporting period after adjusting for the effects of all dilutive potential ordinary shares.

(r)Business combinations

We account for business combinations using the acquisition method when the acquired set of activities and assets meets the definition of a business and when control is transferred to the Company. In determining whether a particular set of activities and assets is a business, we assess whether the set of assets and activities acquired includes, at a minimum, an input and substantive process and whether the acquired set has the ability to produce outputs.

The consideration transferred in the acquisition is generally measured at fair value, as are the identifiable net assets acquired. Any goodwill that arises is tested annually for impairment. Any gain on a bargain purchase is recognized in profit or loss immediately. We expense transaction costs as incurred, except if they are related to the issuance of debt or equity securities. The consideration transferred does not include amounts related to the settlement of pre-existing relationships. Such amounts are generally recognized in profit or loss.

Any contingent consideration is measured at estimated fair value at the date of acquisition. If an obligation to pay contingent consideration that meets the definition of a financial instrument is classified as equity, then it is not remeasured and settlement is accounted for within equity. Otherwise, other contingent consideration is remeasured at fair value at each reporting date and subsequent changes in the fair value of the contingent consideration are recognized in profit or loss.

If share-based payment awards (replacement awards) are required to be exchanged for awards held by the acquiree’s employees (acquiree’s awards), then all or a portion of the acquirer’s replacement awards is included in measuring the consideration transferred in the business combination. This determination is based on the market-based measure of the replacement awards compared with the market-based measure of the acquiree’s awards and the portion to which the replacement awards relate to pre-combination service.

The results of businesses acquired during a reporting period are included in the consolidated financial statements starting from the date of acquisition.

(s)Financial instruments

(i)

Financial assets

We initially recognize financial assets when the Company becomes party to the contractual provisions of the instrument. Subsequent to initial recognition, we classify financial assets as measured at amortized cost, fair value through other comprehensive income (“FVOCI”) or fair value through profit or loss (“FVTPL”) after considering both our business model for managing the financial asset and the contractual cash flow characteristics of the financial asset.

A financial asset is measured at amortized cost if both of the following conditions are met:

the asset is held within a business model whose objective is to hold assets in order to collect contractual cash flows, and
the contractual terms of the financial asset give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding.

A financial asset is measured at FVOCI if both of the following conditions are met:

the financial asset is held within a business model whose objective is achieved by both collecting contractual cash flows and selling financial assets, and

Page 17

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

the contractual terms of the financial asset give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding.

We may make an irrevocable election at initial recognition to carry at FVOCI particular investments in equity instruments that would otherwise be measured at FVTPL.

A financial asset is required to be measured at FVTPL unless it is measured at amortized cost or at FVOCI.

If we change our business model for managing financial assets, we reclassify all affected financial assets on a prospective basis, without restating any previously recognized gains, losses or interest.

If the asset is reclassified to fair value, we determine the fair value at the reclassification date, and recognize in profit or loss any gain or loss arising from a difference between the previous carrying amount and fair value.

An embedded derivative is a component of a hybrid contract that also includes a non-derivative host, with the effect that some of the cash flows of the combined instrument vary in a way similar to a stand-alone derivative. A derivative that is attached to a financial instrument but is contractually transferable independently of that instrument, or has a different counterparty, is not an embedded derivative, and is treated as a separate financial instrument.

Upon initial recognition, we measure a financial asset at its fair value. However, we measure trade receivables that do not have a significant financing component at their transaction price. After initial recognition, we measure financial assets at amortized cost, FVOCI, or FVTPL.

Changes in fair value of a financial asset that is carried at FVTPL are recognized in profit or loss, and changes in fair value of a financial asset that is carried at FVOCI are recognized in other comprehensive income, unless it is part of a hedging relationship.

Gains or losses on a financial asset that is carried at FVTPL are recognized in profit or loss, and gains or losses on a financial asset that is carried at FVOCI are recognized in other comprehensive income, unless it is part of a hedging relationship. A gain or loss on a financial asset that is measured at amortized cost and is not part of a hedging relationship is recognized in profit or loss when the asset is derecognized, impaired, amortized, or reclassified.

(ii)Financial liabilities

We initially recognize financial liabilities when the Company becomes party to the contractual provisions of the instrument. At initial recognition, we measure each financial liability at its fair value. In the case of a financial liability not at FVTPL, we deduct transaction costs that are directly attributable to the issuance of the financial liability.

Subsequent to initial recognition, we classify and measure all financial liabilities at amortized cost using the effective interest method, except for financial liabilities at FVTPL.

We may, at initial recognition, irrevocably designate a financial liability as measured at FVTPL.

(iii)Impairment

We recognize a loss allowance for expected credit losses on financial assets, based on lifetime expected credit losses.

For the Company’s trade receivables, we determine the lifetime expected losses for all of our trade receivables. The expected lifetime credit loss provision for the Company’s trade receivables is based on historical counterparty default rates and we adjust for relevant forward-looking information if necessary.

Page 18

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(a)Forthcoming requirements

Amendments to IAS 1 and IFRS Practice Statement 2 Disclosure of Accounting Policies are intended to help preparers in deciding which accounting policies to disclose in their financial statements. The amendments are effective for annual periods beginning on or after 1 January 2023.

Amendments to IAS 8 Definition of Accounting Estimates help entities to distinguish between accounting policies and accounting estimates. The amendments are effective for annual periods beginning on or after 1 January 2023.

Amendments to IAS 12 Deferred Tax related to Assets and Liabilities arising from a Single Transaction clarify how companies account for deferred tax on transactions such as leases and decommissioning obligations. The amendments are effective for annual periods beginning on or after 1 January 2023.

We are reviewing the amendments listed above and have not yet concluded the potential effects of these amendments on our financial position, changes in financial position, and results of operations. We plan to adopt the amendments on 1 January 2023.

4.

SIGNIFICANT ACCOUNTING JUDGEMENTS AND ESTIMATES

(a)

Significant judgements

In preparing the consolidated financial statements, we make judgments when applying our accounting policies. The judgments that have the most significant effect on the amounts recognized in the consolidated financial statements are outlined below.

(i)

Assessment of impairment indicators

We apply judgement in assessing whether indicators of impairment exist for our exploration and evaluation (“E&E”) properties and for our mineral properties which could result in a test for impairment.

For our E&E properties, we consider internal and external factors, such as our rights to explore, planned expenditures on E&E activities, the changes in mineral resources and mineral reserves, the potential for viable operations, significant decline in the market value of the Company, changes in metal prices and costs and changes in interest rates to determine whether there are any indicators of impairment or reversal of a previous impairment.

For our mineral properties, we consider external factors such as changes in technology, the market, the economy, or the legal environment, interest rates, and the market capitalization of the Company compared to the book value of the asset. We also consider internal factors such as economic performance of the asset, idle properties and plans to discontinue operations, useful life of the property, our ability to repatriate or use profits from the property, restrictions on access, environmental restrictions, and political instability.

Although the Company has taken steps to verify title to exploration and evaluation properties in which it has an interest, these procedures do not guarantee the Company’s title. Such properties may be subject to prior agreements or transfers and title may be affected by undetected defects. Further, we make judgements for properties where concessions terms have expired, and a renewal application has been made and is awaiting approval. We use judgement as to whether the concession renewal application is probable to be received, but ultimately this is beyond our control. If a renewal application is not approved, we could lose rights to those concessions.

We consider other factors such as typical practice in foreign jurisdictions related permit renewals, our continued ability to operate as usual while awaiting renewals, our continued performance under regulatory requirements, and the ongoing acceptance by authorities of our annual fees.

Page 19

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(ii)

Commencement of commercial production

Determining when a mine under construction is substantially complete and ready for its intended use requires significant judgement. Some of the criteria we used to make that determination for the Camino Rojo Oxide Gold Mine included:

completion of all major capital expenditures to bring the mine to the condition necessary for steady state operation,
completion of a reasonable period of testing of the mine plant and equipment,
ability to produce saleable product (ie, the ability to produce metal within specifications),
transfer of the mine from the construction group to operating personnel,
mine and plant reaching a pre-determined percentage of design capacity,
metal content (the grade) of ore being mined sufficiently consistent with the mine plan,
mineral recoveries being at or near the expected production level,
ability to sustain ongoing production of metal.

No one factor was more important than any other factor; consequently, we considered these collectively to determine that the date of commencement of commercial production for the Camino Rojo Oxide Gold Mine was April 1, 2022.

(iii)

Recovery of deferred tax assets

At each reporting period, we assess whether it is probable that the Company is able to benefit from tax loss carryforwards and other temporary differences.

We consider the recoverability of deferred tax assets based on future taxable income to determine the deferred tax asset to be recognized. Significant assumptions used to determine future taxable income include estimates for commodity prices, reserves and resources, operating costs, financing costs, development capital, and scheduling and mine design. Revisions to these estimates could result in material adjustments to the financial statements.

The determination of the ability of the Company to utilize tax losses carried forward to offset income taxes payable in the future and to utilize temporary differences which will reverse in the future requires management to exercise judgement and make assumptions about the Company’s future performance.

(b)

Significant estimates

The preparation of financial statements in conformity with IFRS requires the use of estimates that affect the amounts reported and disclosed. These estimates are based on our knowledge of the relevant facts and circumstances, having regard to previous experience, but actual results may differ materially from the amounts included in the consolidated financial statements. Information about assumptions and other sources of estimation uncertainty as at December 31, 2022 that have a significant risk of resulting in a material adjustment to the carrying amounts of assets and liabilities within the next 12 months are outlined below.

(i)

Mineral resource and mineral reserve estimates

Mineral resource and mineral resource estimates are estimates of the amount of ore that can be economically extracted from the Company’s mining properties. Such estimates impact the financial statements in the following ways:

Page 20

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

Mineral resource and mineral reserve estimates are key factors considered in determining whether technical feasibility and commercial viability of extracting a mineral resource are demonstrable which influences the classification of expenditure,

The carrying value of assets may be affected due to changes in estimated mineral reserves and resources if the change is considered an indicator of impairment,

Depreciation of producing mineral properties is affected by changes in reserve estimates,

Site closure provisions may change where reserve estimate changes affect expectations about when such activities will occur and the associated cost of these activities.

The mineral resource and mineral reserve estimates are based on information compiled by qualified persons within the meaning of Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). Such information includes geological and technical data on the size, depth, shape and grade of the ore body and suitable production techniques and recovery rates. Such an analysis requires complex geological judgements to interpret the data. The estimation of recoverable reserves is based upon factors such as estimates of foreign exchange rates, commodity prices, future capital requirements and production costs, along with geological assumptions and judgements made in estimating the size and grade of the ore body

As the economic assumptions used may change and as additional geological information is produced during the operation of a mine, estimates of mineral resources and mineral reserves may change.

(ii)

Valuation of production inventory

The measurement of inventory, including the determination of its NRV, especially as it relates to metal production inventory involves the use of estimates.

NRV is calculated as the estimated price at the time of sale based on prevailing metal prices, less estimated future production costs to convert the inventory into saleable form and associated selling costs, discounted where applicable. In determining the value of metal on the leach pads, we make estimates of rock densities, tonnages, grades, and the recoverability of ore stacked on leach pads to estimate its value. Changes in these estimates can result in a change in carrying amounts of inventory, which could result in charges to cost of sales. The determination of forecast sales prices, recovery rates, grade, assumed contained metal in stockpiles, work-in-process and leach pad inventory and production and selling costs all requires significant assumptions that impact the carrying value of production inventories.

(iii)

Asset retirement and site closure obligations

We make estimates and assumptions in determining the provisions for asset retirement and site closure. The estimates and assumptions include determining the amount and timing of future cash flows, inflation rates, and discount rates. The ultimate rehabilitation costs are uncertain, and cost estimates can vary in response to many factors, including judgements of the extent of rehabilitation activities, technological changes, and regulatory changes. Consequently, there could be significant adjustments to the provisions established, which would affect future financial position, results of operations, and changes in financial position. The provision is management’s best estimate of the present value of the future asset retirement and site closure obligation. Actual future expenditures may differ from the amounts currently provided.

(iv)

Fair value measurement

Management uses valuation techniques in measuring the fair value of share options granted and restricted share units, deferred share units, and bonus shares awarded. Such valuation techniques are also used for estimating the fair value upon initial recognition of the purchase price allocated to the assets and liabilities of South Railroad and Lewis.

We determine the fair value of share-based payments awarded using the Black Scholes option pricing model which requires us to make certain estimates, judgements, and assumptions in relation to the expected life of the share options, expected volatility, expected risk‐free rate, and expected forfeiture rate. Changes to these assumptions could have a material impact on the Company’s financial statements.

Page 21

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

5.

REVENUE

Camino Rojo was under commissioning during the three months ended March 31, 2022. The Company declared commercial production at Camino Rojo, effective April 1, 2022.

Revenue by significant product type:

    

Years ended

December 31

2022

    

2021

Gold

$

192,394

$

4,094

Silver

 

836

 

30

Revenue

$

193,230

$

4,124

Customer A

$

129,866

$

4,124

Customer B

47,937

Others

 

15,427

 

Revenue

$

193,230

$

4,124

6.COST OF SALES

(a)Operating costs

    

Years ended

December 31

    

2022

    

2021

Mining and processing costs

$

44,538

$

1,247

Refining and transportation costs

 

1,059

 

33

$

45,597

$

1,280

(b)Royalties

    

Years ended 

December 31

    

2022

    

2021

Camino Rojo Oxide 2% NSR royalty (note 14)

$

3,818

$

111

Mexican 0.5% Extraordinary Mining Duty

1,001

$

4,819

$

111

Page 22

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

7.DEPLETION AND DEPRECIATION

    

Years ended

December 31

    

2022

    

2021

Depletion of producing mineral property

$

5,806

$

Depreciation of plant and equipment

 

9,147

 

Depletion and depreciation

$

14,953

$

Camino Rojo was under construction during 2021 and the three months ended March 31, 2022. The Company declared commercial production at Camino Rojo effective April 1, 2022. Consequently, no depletion was recorded prior to April 1, 2022.

8.EXPLORATION AND EVALUATION EXPENSES

Years ended

December 31

    

2022

    

2021

Camino Rojo Project

$

3,765

$

9,908

Cerro Quema Project

 

7,176

 

4,771

Nevada projects

 

7,616

 

366

Other

 

382

 

63

$

18,939

$

15,108

9.GENERAL AND ADMINISTRATIVE EXPENSES

    

Years ended

December 31

    

2022

    

2021

Office and administrative

$

2,921

$

1,911

Professional fees

 

2,237

 

1,702

Regulatory and transfer agent

 

301

 

662

Salaries and benefits

 

5,454

 

2,932

$

10,913

$

7,207

10.INTEREST AND ACCRETION EXPENSE

    

Years ended

December 31

    

2022

    

2021

Interest (note 10(a))

$

7,368

$

32

Accretion (note 10(b))

 

1,522

 

1,605

Interest and accretion expense

$

8,890

$

1,637

Page 23

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(a)Interest expense

    

Years ended

December 31

    

2022

    

2021

Project loan (note 20)

$

869

$

Credit Facility (note 22)

 

4,903

 

Fresnillo obligation (note 23)

 

1,383

 

Interest expense on leases (note 24)

 

87

 

32

Other

 

126

 

$

7,368

$

32

The Company declared commercial production at Camino Rojo effective April 1, 2022. Borrowing costs prior to that date were capitalized and consequently do not appear in interest expense.

(b)Accretion expense

    

Years ended

December 31

    

2022

    

2021

Project loan (note 20)

$

261

$

Newmont loan (note 21)

 

366

 

1,382

Credit Facility (note 22)

 

387

 

Accretion of site closure provisions (note 25)

 

508

 

223

$

1,522

$

1,605

11.INVENTORY

    

December 31, 

    

December 31,

    

2022

    

2021

Current

Stockpiled ore

$

1,869

$

2,458

In-process inventory

 

15,961

 

6,513

Finished goods inventory

 

1,406

 

Materials and supplies

 

3,210

 

686

Inventory – current

$

22,446

$

9,657

Long term

Stockpiled ore

$

4,096

$

1,299

Long term inventory consists of stockpiled ore that is not expected to be processed within 12 months.

Included within inventory at December 31, 2022 is $6,341,000 of depreciation of property, plant, and equipment (December 31, 2021 — $nil).

There were no write downs to reduce the carrying value of inventories to net realizable value during the years ended December 31, 2022 and 2021.

12.VALUE ADDED TAXES RECOVERABLE

Our Mexican entities pay value added taxes (called “IVA” in Mexico) on certain goods and services we purchase. Value added taxes paid in Mexico are fully recoverable. However, IVA recovery returns in Mexico are subject to complex filing requirements and detailed audit or review by the fiscal authorities. Consequently, the timing of receipt of refunds is uncertain. The Mexican tax authorities began issuing payments on these IVA claims to the Company in November 2021.

Page 24

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

We have used judgement in classifying the current and non-current portions of our Mexican VAT receivables. Factors considered include the regularity of payments received since receiving the first payment, communication from the Mexican tax authorities with respect to specific claims and the expected length of time for refunds in accordance with Mexico’s regulations. Of the long term portion, approximately $4.4 million (December 31, 2021 - $3.4 million) is under dispute with the taxation authorities.

13.ACQUISITION OF GOLD STANDARD VENTURES CORP.

On August 12, 2022, the Company completed the acquisition of Gold Standard Ventures Corp (“Gold Standard”) through a plan of arrangement (the “Transaction”). On closing of the Transaction, shareholders of Gold Standard received 0.1193 (“Exchange Ratio”) Orla shares plus C$0.0001 cash per each Gold Standard share. This resulted in total cash consideration paid of $28,000 and the issuance of 43,688,556 Orla common shares to Gold Standard shareholders. Gold Standard stock options that were outstanding at August 12, 2022 were exchanged for stock options to acquire Orla shares (“Replacement Options”) at the Exchange Ratio, resulting in the issuance of 1,758,334 Replacement Options. We accounted for this acquisition as a purchase of assets. Accordingly, we allocated the sum of consideration paid and transaction costs incurred to the net assets acquired based on relative fair values.

The purchase consideration was calculated as follows:

Cash consideration

    

$

28

Estimated fair value of 43,688,556 common shares issued by the Company

 

149,363

Estimated fair value of 1,758,334 Replacement Options issued by the Company

 

1,647

Transaction costs

 

3,030

Total purchase price

$

154,068

Assets acquired and liabilities assumed:

Cash and cash equivalents

    

$

1,821

Restricted cash (pursuant to environmental bonding)

 

2,704

Receivables and other assets

 

2,170

Right of use assets

 

117

Trade and other payables

 

(3,524)

Lease liabilities

 

(117)

Asset retirement obligations

 

(1,603)

Deferred revenue

(7,500)

Subtotal

 

(5,932)

Mineral properties – Nevada – South Railroad Project

 

146,000

Mineral properties – Nevada – Lewis Project

 

14,000

Total assets acquired and liabilities assumed, net

$

154,068

The fair value of Orla common shares issued was determined using the Company’s share price of C$4.36 on the date of closing of the Transaction and the exchange rate of 1.2741 CAD/USD.

Each Replacement Option gives the holder rights to acquire common shares of the Company. The exercise price of the Replacement Options was determined by dividing the exercise price of the Gold Standard stock options by the Exchange Ratio. The full option value of the Replacement Options was accounted for as consideration, and no future compensation expense will be recorded with respect to the Replacement Options.

Page 25

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

The fair value of the Replacement Options was determined using the Black-Scholes option pricing model using the following assumptions:

Exercise price – various prices ranging from C$4.78 to C$18.87; Share price at issuance date – C$4.36;

Expected volatility – 45%; Expected life – 1.9 years; Risk free interest rate – 3.3% and expected dividends – nil.

On issuance, the weighted average fair value of the Replacement Options was C$0.58.

In 2020, prior to acquisition by Orla, Gold Standard had entered into a silver streaming arrangement (“Silver Stream”) whereby an investor had made an upfront cash payment of $2,000,000, pursuant to which Gold Standard agreed to deliver to the investor 100% of the silver production from the potential South Railroad mine over the life of that mine. The investor agreed to pay an ongoing cash purchase price equal to 15% of the prevailing silver price at the time of delivery. The upfront payment for the Silver Stream had been accounted for as deferred revenue by Gold Standard. Upon our acquisition of Gold Standard, we recognized an estimated fair value of $7,500,000 for this Silver Stream using a discount rate of 6.5%. This deferred revenue will be credited to future silver sales as that revenue is recognized.

14.PROPERTY, PLANT AND EQUIPMENT

The Camino Rojo Project lies 190 km NE of the city of Zacatecas, 48 km S-SW of the town of Concepcion del Oro, and 54 km S-SE of Newmont Corporation’s (“Newmont”) Peñasquito Mine.

In November 2017, we acquired the Camino Rojo Project, a gold and silver oxide heap leach project located in Zacatecas State, Mexico, from Goldcorp Inc. (now, Newmont Corporation). A 2% net smelter return royalty (the “Royalty”) on the sale of all metal production from the oxide material at Camino Rojo is payable. Newmont later sold this royalty, and the royalty holder as at December 31, 2022 was Triple Flag Precious Metals Corp.

The Company and Newmont also entered into an option agreement regarding the potential development of sulphide operations at Camino Rojo. Pursuant to the option agreement, Newmont will, subject to the applicable sulphide project meeting certain thresholds, have an option to acquire a 60% or 70% interest in the applicable sulphide project (“Sulphide Option”). The Royalty excludes revenue on the sale of metals produced from a sulphide project. However, should Newmont decide not to elect to acquire an interest in an applicable sulphide project, or if an applicable sulphide project does not meet certain threshold, Newmont would be entitled to a 2% net smelter return royalty on metals produced from the sulphide material.

In February 2021, the Company completed a Layback Agreement with Fresnillo plc (“Fresnillo”) and certain of its subsidiaries which allows Orla to expand the Camino Rojo mine oxide pit onto part of Fresnillo’s mineral concession located immediately north of Orla’s property. The Company agreed to pay Fresnillo total cash consideration of $62.8 million in staged payments (note 23).

Page 26

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

In December 31, 2020 we commenced construction of the oxide gold mine and on April 1, 2022, we declared commercial production at Camino Rojo.

In common with all mining companies in Mexico, Camino Rojo is subject to an Extraordinary Mining Duty of 0.5% of revenues from precious metals. This Extraordinary Mining Duty is included within Cost of Sales – Royalties (note 6(b)).

Producing

    

    

Machinery

    

    

Other right

    

mineral

and

Other

of use

    

property

    

Buildings

    

equipment

    

assets

    

assets

    

Total

Cost

  

  

  

  

  

  

At December 31, 2020

$

$

$

392

$

435

$

338

$

1,165

Additions

 

 

67

 

2,437

 

845

 

1,769

 

5,118

Transfers from mineral properties under construction

 

 

 

2,484

 

 

 

2,484

Due to changes in exchange rates

 

 

(1)

 

(75)

 

(19)

 

12

 

(83)

At December 31, 2021

 

 

66

 

5,238

 

1,261

 

2,119

 

8,684

Additions

 

6,616

 

1,788

 

3,272

 

666

 

2,300

 

14,642

Transfer from mineral properties under construction

127,002

58,869

36,684

608

223,163

Reclassification of capitalized interest

(19,020)

11,585

7,341

94

Change in site closure provision (note 25)

1,155

(300)

(190)

665

Leased assets derecognized at end of lease

(215)

(215)

Due to changes in exchange rates

(9)

(44)

(53)

At December 31, 2022

$

115,753

$

72,008

$

52,345

$

2,620

$

4,160

$

246,886

Accumulated depreciation

 

  

 

  

 

  

 

  

 

  

 

  

At December 31, 2020

$

$

$

235

$

162

$

58

$

455

Depletion and depreciation

 

 

6

 

115

 

127

 

352

 

600

Due to changes in exchange rates

 

 

 

 

(1)

 

(5)

 

(6)

At December 31, 2021

6

350

288

405

1,049

Depletion and depreciation

 

9,641

 

6,280

 

4,541

 

421

 

764

 

21,647

Leased assets derecognized at end of lease

 

 

 

 

 

(215)

 

(215)

Due to changes in exchange rates

(4)

(7)

(11)

At December 31, 2022

$

9,641

$

6,286

$

4,891

$

705

$

947

$

22,470

Net book value

 

 

  

 

  

 

  

 

  

 

  

At December 31, 2021

$

$

60

$

4,888

$

973

$

1,714

$

7,635

At December 31, 2022

$

106,112

$

65,722

$

47,454

$

1,915

$

3,213

$

224,416

Page 27

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

15.MINERAL PROPERTIES UNDER CONSTRUCTION

(a)Camino Rojo Oxide Gold Mine

At historical cost

Accumulated

Deposits to

foreign

Mineral

construction

Construction in

Other costs

 exchange on

Carrying

    

properties

    

vendors

    

progress

    

capitalized

    

translation

    

value

At December 31, 2020

$

39,272

$

28,079

$

4,845

$

836

$

(1,760)

$

71,272

Additions

 

62,800

 

11,411

 

56,528

 

 

 

130,739

Borrowing costs capitalized

 

 

 

 

13,967

 

 

13,967

Change in site closure provision

 

 

 

 

4,653

 

 

4,653

Transfer within categories

 

 

(37,832)

 

37,832

 

 

 

Transfers to equipment

 

 

 

(2,484)

 

 

 

(2,484)

Due to changes in exchange rates

(4,398)

(4,398)

At December 31, 2021

$

102,072

$

1,658

$

96,721

$

19,456

$

(6,158)

$

213,749

Additions

 

 

 

5,636

 

 

 

5,636

Borrowing costs capitalized

 

 

 

 

4,085

 

 

4,085

Change in site closure provision

 

 

 

 

(238)

 

 

(238)

Transfer within categories

 

(4,060)

 

(1,589)

 

(509)

 

 

6,158

 

Transfer to producing mineral property

 

(98,012)

 

 

(101,848)

 

(23,303)

 

 

(223,163)

Transfer to other non-current assets

 

 

(69)

 

 

 

 

(69)

At December 31, 2022

$

$

$

$

$

$

Determining when a mine under construction is substantially complete and ready for its intended use requires significant judgement (note 4(a)).

Using multiple criteria, we determined that the date of commencement of commercial production for the Camino Rojo Oxide Gold Mine was April 1, 2022. No borrowing costs were capitalized subsequent to March 31, 2022.

16.EXPLORATION AND EVALUATION PROPERTIES

The Company’s exploration and evaluation properties consist of the Cerro Quema Project in Panama and the Nevada projects (South Railroad, Lewis and Monitor Gold projects in Nevada, United States).

   

Nevada projects

   

Cerro Quema

   

Total

Acquisition costs

 

  

 

  

 

  

At December 31, 2020 and 2021

$

314

$

82,429

$

82,743

Acquisition of Gold Standard Ventures Corp. (note 13)

160,000

160,000

At December 31, 2022

$

160,314

$

82,429

$

242,743

(a)Projects in Nevada, United States

(i)South Railroad Project

The South Railroad project is located in Elko County, Nevada, USA.

Prior to its acquisition by Orla, the previous owners of the South Railroad Project entered into various agreements to acquire or lease certain claims, properties and surface rights subject to net smelter return royalties (“NSR”) ranging between 1% and 5%. Certain of these claims are also subject to a 1.5% mineral production royalty. The agreements are subject to specific lease terms, extension options, back-in rights, buy down or purchase provisions, and work commitments.

Page 28

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

To maintain the agreements in good standing, minimum payments and work commitments are required each year. During 2022, the payments required under the agreements consisted of $1,311,100 in lease payments and $1,000,000 in work commitments, all of which requirements were met by the Company. To maintain the agreements in good standing, the Company expects to spend the following amounts:

    

Total work 

    

Total lease 

    

    

commitments

    

payments

    

Total

Year 2023

$

1,300

$

1,070

$

2,370

Year 2024

 

1,300

 

682

 

1,982

Year 2025

 

300

 

682

 

982

Year 2026

 

300

 

694

 

994

$

3,200

$

3,128

$

6,328

The South Railroad project is subject to a silver stream arrangement (note 13).

(ii)Lewis Gold Project

During the year ended December 31, 2017, Gold Standard acquired a 100% right, title and interest in mining claims located in the Battle Mountain Mining District in Lander County, Nevada, USA (the “Lewis Gold Project”).

(iii)Monitor Gold Project

The Company holds a 100% interest in the Monitor Gold Project, which covers approximately 2,800 ha in central Nevada.

To maintain the option agreements in good standing, minimum payments and work commitments are required each year until 2038, all of which are in good standing.

(b)Cerro Quema Project

The Cerro Quema Project is located on the Azuero Peninsula in Los Santos Province, Panama. The project is at the exploration and development stage for a proposed open pit mine with process by heap leaching. We own the mineral rights as well as the surface rights over the current mineral resource areas, proposed mine development areas, and priority drill target areas.

The original 20-year terms for the exploitation concessions expired in February and March of 2017. The Company has applied for the prescribed ten-year extension to these concessions as it is entitled to under Panamanian mineral law. In March 2017, the Ministry of Commerce and Industry provided written confirmation to the Company that the extension applications had been received and that exploration work could continue while the Company awaits renewal of the concessions. As of the date of these financial statements, final concession renewals have not been received and are still under review. In the absence of such renewals, construction or development activities of the Cerro Quema Project cannot proceed. However, we continue to receive ongoing drilling, water use, environmental and other permits, and have paid concession taxes, and issued the annual reports in the normal course.

The Company published the results of a Pre-Feasibility Study on the Cerro Quema Project entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” dated January 18, 2022.

17.TRADE AND OTHER PAYABLES

    

December 31, 

    

December 31, 

2022

2021

Trade payables

$

6,707

$

5,966

Royalties payable

2,119

113

Payroll related liabilities

 

848

 

339

Current portion of lease obligations (note 24)

 

846

 

372

Other

 

1,188

 

26

Page 29

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

$

11,708

$

6,816

Page 30

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

18.

ACCRUED LIABILITIES

    

December 31, 

    

December 31, 

2022

2021

Current

Goods or services received awaiting vendor invoices

$

3,139

2,045

Land and water fees

1,795

Payroll related

2,532

1,244

Accrued interest on Credit Facility (note 22)

1,660

Restricted share units expected to be cash settled (note 28(b))

352

Other

284

575

Accrued liabilities – current

$

7,967

$

5,659

Long term

 

 

Payroll related

$

172

$

161

19.LONG TERM DEBT

    

December 31, 2022

    

Current

    

Long term

    

Total

Camino Rojo Project Loan (note 20)

$

$

$

Newmont loan (note 21)

 

 

 

Credit facility (note 22)

 

22,200

 

100,795

 

122,995

Fresnillo obligation (note 23)

 

22,800

 

 

22,800

$

45,000

$

100,795

$

145,795

    

December 31, 2021

    

Current

    

Long term

    

Total

Camino Rojo Project Loan (note 20)

$

$

113,260

$

113,260

Newmont loan (note 21)

 

10,293

 

 

10,293

Credit facility (note 22)

 

 

 

Fresnillo obligation (note 23)

 

15,000

 

22,800

 

37,800

$

25,293

$

136,060

$

161,353

20.CAMINO ROJO PROJECT LOAN

(a)Project loan

In December 2019, the Company entered into a loan agreement with Trinity Capital Partners Corporation (“Trinity Capital”) and certain other lenders with respect to a credit debt facility of $125 million for the development of Camino Rojo (the “Project Loan”).

The Project Loan provided a total of $125 million to the Company, available in three tranches. The Company drew these funds down between 2019 and 2021. The Project Loan was denominated in US dollars, and bore interest at 8.8% per annum, payable quarterly, and was secured by all the assets of Camino Rojo and the fixed assets of the Cerro Quema Project. The principal amount was due upon maturity in December 2024.

On December 1, 2020, we commenced construction of the Camino Rojo Oxide Gold Mine and began capitalizing the interest on this loan to “mineral properties under construction”. On April 1, 2022, we commenced commercial production at the Camino

Page 31

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

Rojo Oxide Gold Mine and began expensing the interest on this loan. The Project Loan was fully repaid in April 2022 and replaced with the Credit Facility (see note 22).

Loan

Interest and

Transaction

    

advances

    

accretion

    

costs

    

Net

At December 31, 2020

$

75,000

$

$

(14,304)

$

60,696

Advances during the year

50,000

(165)

49,835

Accretion during the period, capitalized

9,613

2,817

12,430

Cash interest paid

(9,613)

(9,613)

Foreign exchange

(88)

(88)

At December 31, 2021

125,000

(11,740)

113,260

Accretion during the period, capitalized

2,764

848

3,612

Accretion during the period, expensed

869

261

1,130

Cash interest paid

(3,633)

(3,633)

Foreign exchange

(88)

(88)

Principal repayment including early repayment premium

(127,500)

(127,500)

Loss on early settlement of project loan

2,500

10,719

13,219

At December 31, 2022

$

$

$

$

(b)Loss on early settlement of project loan

Upon draw down of the first tranche, in December 2019, the Company issued 32.5 million common share purchase warrants (with an exercise price of C$3.00 per warrant and expiry date of December 18, 2026) to the lenders in connection with the closing. Including these warrants, a total of $12,039,000 was considered transaction costs to be amortized over the then-expected five year life of the project loan.

On April 28, 2022, the Company entered into a Credit Facility (note 22) and used a portion of the proceeds of the Credit Facility to repay the Camino Rojo project loan in full. Consequently, the remaining unamortized transaction costs were expensed.

    

2022

    

2021

Unamortized transaction costs written off (non-cash)

$

10,719

$

Early repayment premium paid (cash)

 

2,500

 

Loss on early settlement of project loan

$

13,219

$

21.NEWMONT LOAN

As part of the Company’s acquisition of the Camino Rojo project from Newmont, Newmont agreed to provide interest-free loans to the Company for all the annual landholding costs at Camino Rojo until December 2019. The loans were to be repaid upon declaration of commencement of commercial production of a heap leach operation at Camino Rojo. On May 6, 2022, we repaid this loan in full.

Year ended

Year ended

December 31, 

December 31, 

    

2022

    

2021

Beginning of the year

$

10,293

$

9,440

Accretion during the year

 

366

 

1,382

Modification gains arising from changes in estimates

 

 

(220)

Foreign exchange

 

177

 

(309)

Principal repayment

(10,836)

End of the year

$

$

10,293

Page 32

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

22.CREDIT FACILITY

On April 28, 2022, the Company entered into a Credit Facility consisting of a $100 million term facility and a $50 million revolving facility through a syndicate of lenders composed of The Bank of Nova Scotia, Bank of Montreal, and Canadian Imperial Bank of Commerce. The Credit Facility is secured by the Company’s present and future assets, property and all proceeds thereof other than present and future assets owned by Cerro Quema, which is excluded from the collateral. The proceeds from the Credit Facility were used to repay the existing Project Loan (note 20), with the balance of the revolving facility being available for general corporate purposes and working capital.

The Credit Facility consists of two parts:

1.$100 million term facility with a five-year term, repayable in 18 equal quarterly instalments commencing December 31, 2022.

2.

$50 million revolving facility, with the ability to increase to $75 million, subject to certain conditions and customary consents. The revolving facility has a three-year term, with an option to extend the term of the revolving facility by up to one-year intervals, subject to certain conditions and customary consents. Full repayment of the revolving facility is due upon maturity.

The applicable interest rate for each Credit Facility is based on the term Secured Overnight Financing Rate (“SOFR”), plus an applicable margin ranging from 2.75% to 3.75% based on the Company’s leverage ratio at the end of each fiscal quarter. The undrawn portion of the revolving facility is subject to a standby fee ranging from 0.6875% to 0.9375%.

The Credit Facility is subject to certain covenants – refer to note 32(c) for details. The Company may prepay all or any portion of the amounts owed under the credit agreement without penalty.

    

    

Revolving

    

    

Term facility

    

facility

    

Total

At December 31, 2021

$

$

$

Advances during the year

 

100,000

 

30,000

 

130,000

Transaction costs paid, which are accreted over the term of each facility

 

(1,435)

 

(431)

 

(1,866)

Interest expense during the year

3,772

1,131

4,903

Accretion during the year

 

304

83

387

Interest paid during the year

 

(2,481)

 

(738)

 

(3,219)

Principal repayments during the year

 

(5,550)

 

 

(5,550)

Reallocated to accrued interest payable

 

(1,272)

 

(388)

 

(1,660)

At December 31, 2022

$

93,338

$

29,657

$

122,995

Current

 

22,200

 

 

22,200

Non-current

 

71,138

 

29,657

 

100,795

$

93,338

$

29,657

$

122,995

Upon closing of the Credit Facility, the Company drew down the $100 million term facility and $30 million from the revolving facility. The Company incurred $2.2 million in advisory, legal and upfront fees that were directly attributable to the Credit Facility. The following details how we accounted for these initial transaction costs:

    

Transaction

    

    

    

costs

    

Allocated to the term facility

$

1,435

Accreted over the expected life (5 years)

Allocated to the revolving facility, drawn amount

 

431

 

Accreted over the expected life (3 years)

Allocated to the revolving facility, undrawn amount

 

287

 

Expensed at loan inception date

Total transaction costs incurred

$

2,153

 

Page 33

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

23.

FRESNILLO OBLIGATION

Pursuant to the terms of the Layback Agreement, we agreed to pay Fresnillo total cash consideration of $62.8 million through the following staged payment schedule:

i.$25 million upon closing of the transaction (paid);
ii.$15 million on December 1, 2022 (paid); and
iii.$22.8 million on December 1, 2023

The amounts payable bear interest at 5% per annum, payable quarterly. To March 31, 2022, we capitalized the interest on this loan to “Mineral properties and related construction”. On April 1, 2022, we commenced commercial production at the Camino Rojo Oxide Gold Mine and began to expense the interest on this obligation.

    

Year ended

Year ended

December 31,

    

December 31,

2022

2021

Beginning of the year

$

37,800

$

Initial recognition

 

37,800

Accretion capitalized

 

473

1,654

Accretion expensed (note 10)

 

1,383

Principal repaid

(15,000)

Cash interest paid

(1,856)

(1,654)

End of the year

$

22,800

$

37,800

Current

22,800

 

15,000

Non-current

 

22,800

$

22,800

$

37,800

24.

LEASE OBLIGATIONS

The Company has lease contracts for mining equipment, vehicles and buildings. Leases of mining equipment have lease terms of five years, while vehicles and buildings generally have lease terms between three and five years.

(a)

Lease obligations

    

Year ended

    

Year ended

December 31, 

December 31, 

    

2022

    

2021

Beginning of year

$

1,401

$

273

Additions

 

2,300

 

1,769

Interest expense

 

87

 

32

Lease payments

 

(661)

 

(681)

Due to changes in exchange rates

 

46

 

8

End of period

$

3,173

$

1,401

Current

$

846

$

372

Non-current

 

2,327

 

1,029

$

3,173

$

1,401

Page 34

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b)

Lease expenses recognized

    

Year ended

    

Year ended

December 31, 

December 31, 

    

2022

    

2021

Interest on lease liabilities

$

87

$

32

Variable lease payments not included in the measurement of lease liabilities

 

15,586

 

4,579

Expenses relating to short-term leases

 

168

 

131

Expenses relating to leases of low-value assets, excluding short-term leases

 

108

 

155

$

15,949

$

4,897

The maturity analysis of lease liabilities is disclosed in note 33(b)(ii).

25.

SITE CLOSURE PROVISIONS

    

    

Cerro Quema 

    

Nevada

    

Camino Rojo

    

Project

    

projects

    

Total

At December 31, 2020

$

175

$

343

$

$

518

Change in estimated cash flows resulting from current activities

4,738

4,738

Accretion during the period

223

223

Foreign exchange

 

(19)

 

 

(19)

At December 31, 2021

 

5,117

 

343

 

5,460

Acquisition of Gold Standard (note 13)

1,603

1,603

Changes in cost estimates

351

351

Change in estimated cash flows resulting from current activities

427

427

Remediation activities conducted during the period

(88)

(88)

Accretion during the period (note 10)

494

14

508

At December 31, 2022

$

6,301

$

343

$

1,617

$

8,261

Current

$

$

$

$

Non-current

 

6,301

 

343

1,617

 

8,261

$

6,301

$

343

$

1,617

$

8,261

    

    

Cerro Quema

Nevada

 

    

Camino Rojo

Project

projects

 

Estimated settlement dates

2033 to 2047

2034

 

Undiscounted risk-adjusted cash flows

$

8,644

$

343

$

1,724

Inflation rate

 

7.0

%  

 

2.7

%

Discount rate

 

9.6

%  

 

3.2

%

26.SHARE CAPITAL

(a)Authorized share capital

The Company’s authorized share capital consists of an unlimited number of common shares without par value and an unlimited number of preferred shares without par value.

On August 12, 2022, the Company issued 43,688,556 Orla Mining Ltd common shares to Gold Standard Ventures Corp shareholders (note 13). The Company incurred issuance costs of C$338,000 ($261,000).

Page 35

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b)Warrants

The following summarizes information about the number of warrants outstanding during 2022.

    

Exercise

December 31

December 31

Expiry date

    

price

    

2021

    

Exercised

    

Expired

    

2022

June 12, 2022

 

C$

1.65

 

4,742,500

 

(4,742,500)

 

 

November 7, 2022

 

C$

1.40

 

3,000,000

 

(3,000,000)

 

 

December 18, 2026

 

C$

3.00

 

32,500,000

 

(2,955,000)

 

 

29,545,000

Total number of warrants

 

 

40,242,500

 

(10,697,500)

 

 

29,545,000

Weighted average exercise price

 

 

C$

2.72

 

C$

1.95

 

C$

 

C$

3.00

The following summarizes information about warrants outstanding during 2021:

    

Exercise

    

December 31

    

    

    

December 31

Expiry date

price

2020

Exercised

Expired

2021

February 15, 2021

 

C$

2.35

 

7,782,994

 

(7,439,744)

 

(343,250)

 

July 8, 2021

 

C$

0.62

 

370,000

 

(370,000)

 

 

June 12, 2022

 

C$

1.65

 

4,992,500

 

(250,000)

 

 

4,742,500

November 7, 2022

 

C$

1.40

 

3,000,000

 

 

 

3,000,000

December 18, 2026

 

C$

3.00

 

32,500,000

 

 

 

32,500,000

Total number of warrants

 

  

 

48,645,494

 

(8,059,744)

 

(343,250)

 

40,242,500

Weighted average exercise price

 

  

 

C$

2.64

 

C$

2.25

 

C$

2.35

 

C$

2.72

Subsequent to the reporting period, the Company issued 370,500 common shares for proceeds of C$1,111,500 ($830,000) pursuant to the exercise of warrants.

27.EARNINGS (LOSS) PER SHARE

Earnings (loss) per share has been calculated using the weighted average number of common shares outstanding for the years ended December 31, 2022 and 2021 as follows:

(a)Basic

    

Years ended

December 31

    

2022

    

2021

Income (loss) for the period

$

45,770

$

(26,278)

Weighted average number of common shares (thousands)

 

272,202

 

241,379

Basic earnings (loss) per share

$

0.17

$

(0.11)

Page 36

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b)Diluted

    

Years ended

December 31

    

2022

    

2021

Income (loss) for the period

$

45,770

$

(26,278)

Weighted average number of common shares (thousands)

 

272,202

 

241,379

Weighted average shares dilution adjustments:

 

  

 

  

Warrants

 

14,526

 

Options

 

4,544

 

RSUs

 

392

 

DSUs

 

652

 

Bonus shares

 

500

 

Weighted average number of ordinary shares

 

292,816

 

241,379

Diluted earnings (loss) per share

$

0.16

$

(0.11)

Potential ordinary shares are not included in the calculation of diluted loss per share for the year ended December 31, 2021 because their effect would be anti-dilutive.

28.SHARE-BASED PAYMENTS

The Company has four different forms of share-based payments for eligible recipients – stock options, restricted share units (“RSUs”), deferred share units (“DSUs”), and bonus shares. The bonus shares have fully vested but have not yet been issued.

Years ended December 31

Share- based payments expense

2022

2021

Stock options (note 28(a))

    

$

1,396

    

$

1,350

Restricted share units (note 28(b))

 

743

 

738

Deferred share units (note 28(c))

 

308

 

241

Share based payments expense

$

2,447

$

2,329

(a)Stock options

Stock options granted by the Company prior to 2022 typically had a five-year life, with one third each vesting on grant date, and one year and two years after grant date. In 2022, stock options granted by the Company have a five-year life, with one third each vesting one, two, and three years after grant date.

Gold Standard stock options that were outstanding at August 12, 2022 were exchanged for Replacement Options at the Exchange Ratio, resulting in the issuance of 1,758,334 Replacement Options (note 13). The Replacement Options held by or on behalf of an individual who continued as a director, officer, employee or consultant of the Company are exercisable until the original expiry date of such option, and the Replacement Options held by or on behalf of an individual who did not continue

Page 37

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

as a director, officer, employee or consultant of the Company following the acquisition date are exercisable until the earlier of August 12, 2024 and the original expiry date of such options.

2022

2021

Weighted

Weighted

average

average

Stock options outstanding

    

Number

    

exercise price

    

Number

    

exercise price

Beginning of year

    

9,900,874

    

C$

1.86

    

9,959,927

    

C$

1.60

Replacement Options issued (note 13)

1,758,334

8.43

Granted

 

1,278,264

 

5.56

 

678,347

 

4.74

Exercised

 

(3,674,769)

 

1.34

 

(687,400)

 

0.87

Expired, forfeited or cancelled

 

(83,814)

 

16.81

 

(50,000)

 

1.39

End of year

 

9,178,889

 

C$

3.71

 

9,900,874

 

C$

1.86

Vested, end of year

 

7,701,986

 

C$

3.38

 

8,704,157

 

C$

1.63

The stock options granted during the years ended December 31, 2022 had a grant date fair value of C$4,094,000 ($3,145,000) using the following weighted average assumptions:

Share price at grant date ranging from C$3.71 to C$5.98, expected volatility 46%, expected life – 3 years, risk free interest rate 2.9% and expected dividends – nil.

The stock options granted during the year ended December 31, 2021 had a grant date fair value of C$1,294,000 ($1,032,000) using the following weighted average assumptions:

Share price at grant date – C$4.74, expected volatility – 45%, expected life – 5 years, risk free interest rate – 1.0% and expected dividends – nil.

Page 38

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

The stock options outstanding at December 31, 2022, were as follows:

    

Exercise

    

Remaining life

    

    

Number

Expiry date

price (C$)

(years)

Number

vested

January 15, 2023

 

16.43

 

0.0

 

5,964

 

5,964

February 1, 2023

 

4.78

 

0.1

 

7,731

 

February 26, 2023

 

7.43

 

0.2

 

129

 

43

February 28, 2023

 

1.06

 

0.2

 

30,000

 

30,000

March 5, 2023

 

17.69

 

0.2

 

148,446

 

148,446

May 31, 2023

 

1.25

 

0.4

 

400,000

 

400,000

June 23, 2023

 

1.06 - 5.98

 

0.5

 

295,749

 

246,797

June 27, 2023

 

1.25

 

0.5

 

746,770

 

746,770

July 1, 2023

 

1.06 - 5.98

 

0.5

 

224,773

 

189,351

September 10, 2023

 

1.25

 

0.7

 

100,000

 

100,000

November 13, 2023

 

1.30

 

0.9

 

250,000

 

250,000

January 31, 2024

 

14.59

 

1.1

 

112,611

 

112,611

March 29, 2024

 

1.06

 

1.2

 

1,453,417

 

1,453,417

August 12, 2024

 

4.78 - 8.81

 

1.6

 

1,280,635

 

1,280,635

August 13, 2024

1.65

1.6

103,212

103,212

January 30, 2025

 

8.81

 

2.1

 

17,316

 

17,316

March 25, 2025

2.21

2.2

871,825

871,825

April 16, 2025

2.39

2.3

600,000

600,000

April 20, 2025

2.58

2.3

50,000

50,000

July 1, 2025

3.82

2.5

300,000

300,000

August 24, 2025

6.03

2.6

200,000

200,000

September 1, 2025

5.80

2.7

50,000

50,000

September 23, 2025

8.55

2.7

4,770

4,770

December 4, 2025

7.63

2.9

5,964

5,964

January 21, 2026

7.05 - 7.43

3.1

50,388

42,922

March 24, 2026

4.80

3.2

512,924

341,944

April 19, 2026

4.76

3.3

50,000

33,333

October 4, 2026

4.04

3.8

50,000

33,333

January 10, 2027

4.78

4.0

40,566

March 1, 2027

 

5.37

 

4.2

 

250,000

 

83,333

March 24, 2027

5.98

4.2

611,515

June 23, 2027

3.88

4.5

26,580

July 4, 2027

3.71

4.5

50,000

December 5, 2027

5.06

4.9

171,960

December 30, 2027

5.48

5.0

 

105,644

 

Total number of stock options

9,178,889

7,701,986

Page 39

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

The stock options outstanding at December 31, 2021, were as follows:

    

Exercise

    

Remaining life

    

    

Number

Expiry date

price (C$)

(years)

Number

vested

June 23, 2022

 

1.39

 

0.5

 

2,200,000

 

2,200,000

May 31, 2023

 

1.25

 

1.4

 

700,000

 

700,000

June 27, 2023

 

1.25

 

1.5

 

944,514

 

944,514

September 10, 2023

 

1.25

 

1.7

 

100,000

 

100,000

November 13, 2023

 

1.30

 

1.9

 

1,000,000

 

1,000,000

March 29, 2024

 

1.06

 

2.2

 

1,835,227

 

1,835,227

May 15, 2024

 

1.00

 

2.4

 

117,450

 

117,450

August 13, 2024

 

1.65

 

2.6

 

103,212

 

103,212

March 25, 2025

 

2.21

 

3.2

 

1,022,124

 

677,646

April 16, 2025

 

2.39

 

3.3

 

600,000

 

400,000

April 20, 2025

2.58

3.3

50,000

33,334

July 1, 2025

3.82

3.5

300,000

200,000

August 24, 2025

6.03

3.6

200,000

133,334

September 1, 2025

5.80

3.7

50,000

33,334

March 24, 2026

4.80

4.2

578,347

192,774

April 19, 2026

4.76

4.3

50,000

16,666

October 4, 2026

4.04

4.8

50,000

16,666

Total number of stock options

 

 

 

9,900,874

 

8,704,157

Subsequent to the reporting period, 419,305 stock options were exercised, for gross proceeds to the Company of C$478,000 ($351,000).

(b)Restricted Share Units

Restricted Share Units (“RSU’s) awarded by the Company typically vest one-third each one, two, and three years after award date.

    

Number of RSUs outstanding:

2022

    

2021

Outstanding, January 1

 

707,840

 

921,356

Awarded

 

172,301

 

235,091

Vested and settled

 

(402,430)

 

(448,607)

Forfeitures during the period

(34,444)

Outstanding, December 31

 

443,267

 

707,840

Number vesting in the year

Number of RSUs outstanding:

    

Total

    

2022

    

2023

    

2024

    

2025

Outstanding, December 31, 2021

    

707,840

    

444,301

    

185,179

    

78,360

    

Outstanding, December 31, 2022

 

443,267

 

 

262,738

 

126,812

 

53,717

Restricted Share Units (“RSUs”) are valued based on the closing price of the Company’s common shares on the trading day immediately prior to award. Certain RSUs may be settled in cash at the option of the Company.

During the year ended December 31, 2022, the Company elected to settle 365,935 RSUs in cash for $1,732,000 (2021 — nil). At December 31, 2022, management expects that 94,063 RSU’s maturing in 2023 will likely be cash settled. Consequently, those RSU’s with a fair value of C$476,394 ($351,738) are presented as a current liability.

Page 40

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(c)Deferred Share Units

The Deferred Share Units (DSUs) awarded by the Company to directors vest immediately but are not settled until the end of the directors tenure. They may be settled in cash or common shares at the option of the Company.

    

Number of DSUs outstanding:

    

2022

    

2021

Outstanding, January 1

 

707,028

 

644,525

Awarded and vested immediately

 

69,290

 

62,503

Awarded and vested immediately

(216,593)

Outstanding, December 31

 

559,725

 

707,028

DSUs are valued based on the closing price of the Company’s common shares immediately prior to award.

During the year ended December 31, 2022, the Company elected to settle 104,759 DSUs in cash for $330,000 (2021 — nil). No further cash settlements are expected.

(d)Bonus shares

During 2017, the Board of Directors awarded 500,000 common shares to the non‐executive Chairman of the Company as bonus shares. The bonus shares were subject to a vesting period from June 19, 2017, to June 18, 2020 (the “Eligibility Period”). The bonus shares will become issuable (1) after the Eligibility Period on the date that the non‐executive Chairman ceases to act as a director of the Company, or (2) upon a change of control of the Company.

Number of bonus shares outstanding:

    

Year 2022

    

Year 2021

Outstanding, December 31

 

500,000

 

500,000

Vested, December 31

 

500,000

 

500,000

29.RELATED PARTY TRANSACTIONS

The Company’s related parties include:

Related party

   

Nature of the relationship

Key management personnel

Key management personnel are the Chief Executive Officer, the Chief Operating Officer, the Chief Financial Officer, Chief Sustainability Officer, the Senior Vice President Exploration, and members of the Board of Directors of the Company.

(a)Key Management Personnel

Compensation to key management personnel was as follows:

Years ended December 31

    

2022

    

2021

Salaries and short term incentives paid

$

3,871

$

1,580

Directors’ fees

 

291

 

183

Share based payments

 

1,987

 

1,750

$

6,149

$

3,513

(b)Transactions

The Company had no other material transactions with related parties other than key management personnel during the years ended December 31, 2022, and 2021.

Page 41

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(c)Outstanding balances at the Reporting Date

At December 31, 2022, estimated accrued short term incentive compensation totaled $1,147,000 and is included in accrued liabilities (December 31, 2021 – $783,000).

30.SUPPLEMENTAL CASH FLOW INFORMATION

(a)Cash and cash equivalents

Cash and cash equivalents consists of bank current accounts and cash on hand.

(b)Changes in non-cash working capital

    

Years ended December 31

2022

    

2021

Accounts receivable and prepaid expenses

$

(47)

$

(604)

Inventory

(9,177)

(10,846)

Value added taxes recoverable

(8,044)

Trade and other payables

3,378

3,335

Accrued liabilities

(1,891)

1,470

Changes in non-cash working capital

$

(15,781)

$

(6,645)

(c)Non-cash investing and financing activities

Years ended December 31

    

2022

    

2021

Financing activities

 

  

 

  

Stock options exercised, credited to share capital with an offset to reserves

 

$

3,033

 

$

277

Warrants exercised, credited to share capital with an offset to reserves

 

5,143

 

2,140

Common shares issued on maturity of RSUs, credited to share capital with an offset to reserves

 

541

 

487

Common shares issued on maturity of DSUs, credited to share capital with an offset to reserves

 

324

 

Fresnillo obligation, credited, with an offset to mineral properties

 

 

37,800

Investing activities

 

 

  

Common shares issued upon acquisition of Gold Standard, credited to share capital with an offset to the assets acquired and liabilities assumed (note 13)

 

149,363

 

Replacement options issued upon acquisition of Gold Standard, credited to reserves with an offset to the assets acquired and liabilities assumed (note 13)

1,647

Initial recognition of right of use assets with an offset to lease obligation

 

2,300

 

1,769

31.SEGMENT INFORMATION

(a)Reportable segments

The operating and reportable segments of the Company are based on the reports which are reviewed by the chief operating decision maker (“CODM”) in making strategic resource allocation decisions. These operating segments are (1) the Mexican project, (2) the Panamanian project, (3) the Nevada projects and (4) the corporate office. The operating segments other than corporate office are each managed by a dedicated General Manager and management team. The corporate office oversees the plans and activities of early stage exploration projects.

During the year ended December 31, 2022, the prior year segment information was reclassified to conform with the current year presentation. The Company acquired Gold Standard Ventures Corp. (note 13), which holds the South Railroad and Lewis

Page 42

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

projects. For segment reporting, these two projects were combined with the existing Monitor Gold Project and form a new reportable segment called the Nevada projects.

During the year ended December 31, 2022, Camino Rojo declared commercial production, while the Cerro Quema Project in Panama, and the exploration projects in Nevada were focused on the exploration and evaluation of its mineral properties.

(b)Geographic segments

We conduct our activities in four geographic areas: Mexico, Panama, Nevada USA, and Canada (Corporate).

(i)Income (loss) for the period by segment

    

Mexico

    

Panama

    

Nevada

    

Corporate

    

Total

Year ended December 31, 2022

Revenue (note 5)

$

193,109

$

$

$

121

$

193,230

Cost of sales

(65,320)

(49)

(65,369)

Earnings from mining operations

127,789

72

127,861

Exploration and evaluation expenses (note 9)

(3,765)

(7,176)

(7,616)

(382)

(18,939)

General and administrative expenses (note 8)

 

 

 

 

(10,913)

 

(10,913)

Depreciation

 

(23)

 

(15)

 

(45)

 

(194)

 

(277)

Share based payments (note 28)

 

(37)

 

(70)

 

 

(2,340)

 

(2,447)

Interest income

 

1,844

 

 

 

323

 

2,167

Interest and accretion expense

 

(2,315)

 

 

(35)

 

(6,540)

 

(8,890)

Loss on early settlement of project loan (note 20)

 

 

 

 

(13,219)

 

(13,219)

Foreign exchange gain

(778)

37

3,755

3,014

Other

39

2

41

Income taxes

(29,478)

(3,150)

(32,628)

Income (loss) for the period

$

93,237

$

(7,261)

$

(7,620)

$

(32,586)

$

45,770

    

Mexico

    

Panama

    

Nevada

    

Corporate

    

Total

Year ended December 31, 2021

Revenue (note 5)

$

4,124

$

$

$

$

4,124

Cost of sales

 

(1,391)

 

 

 

 

(1,391)

Earnings from mining operations

 

2,733

 

 

 

 

2,733

Exploration and evaluation expenses (note 9)

 

(9,908)

 

(4,771)

 

(366)

 

(63)

 

(15,108)

General and administrative expenses (note 8)

 

 

 

 

(7,207)

 

(7,207)

Depreciation

 

 

(36)

 

 

(118)

 

(154)

Share based payments (note 28)

(89)

(51)

(2,189)

(2,329)

Interest and finance costs

(1,406)

110

(1,296)

Foreign exchange

(3,956)

230

(3,726)

Other

220

589

809

Income (loss) for the period

$

(12,406)

$

(4,858)

$

(366)

$

(8,648)

$

(26,278)

Page 43

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(ii)Assets by segment

    

Mexico

    

Panama

    

Nevada

    

Corporate

    

Total

At December 31, 2022

 

  

 

  

 

  

 

  

 

  

Property, plant and equipment

$

222,767

$

39

$

577

$

1,033

$

224,416

Exploration and evaluation properties

 

 

82,429

 

160,314

 

 

242,743

Total assets

348,390

83,291

163,857

18,278

613,816

    

Mexico

    

Panama

    

Nevada

    

Corporate

    

Total

At December 31, 2021

 

  

 

  

 

  

 

  

 

  

Equipment

$

7,466

$

37

$

$

132

$

7,635

Mineral properties under construction

213,749

213,749

Exploration and evaluation properties

 

 

82,429

 

314

 

 

82,743

Total assets

267,403

83,162

314

14,016

364,895

32.CAPITAL MANAGEMENT

(a)

Objectives

Our objectives when managing capital are to safeguard the Company’s ability to continue as a going concern to pursue the exploration, evaluation, development, and exploitation of our mineral properties and to maintain a flexible capital structure.

We manage our capital structure and adjust it considering changes in economic conditions and the risk characteristics of the underlying assets. To maintain or adjust the Company’s capital structure, we may issue new shares, take on additional debt or repay outstanding debt, or acquire or dispose of assets. We currently do not pay regular dividends.

Our ability to carry out our long-range strategic objectives in future periods depends on our ability to generate positive cash flows from our mining operations and to raise financing from lenders, shareholders, and new investors. We regularly review and consider financing alternatives to fund the Company’s ongoing operational, exploration and development activities.

(b)Investment policy

Our investment policy is to invest the Company’s excess cash in low-risk financial instruments such as demand deposits and savings accounts with major Canadian banks. By using this strategy, the Company preserves its cash resources and can marginally increase these resources with low risk through the yields on these investments. Our financial instruments are exposed to certain financial risks, which include currency risk, credit risk, and liquidity risk.

(c)Credit facility

On April 28, 2022, the Company entered into a Credit Facility which includes a $100 million term facility and a $50 million revolving facility pursuant to which we have drawn $30 million as of December 31, 2022. The agreement includes covenants customary for a facility of this nature, including compliance with customary restrictive covenants and financial covenants related to maintaining a leverage ratio at less than or equal to 3.00, an interest service coverage ratio at greater than or equal to 4, a tangible net worth greater than or equal to $151.6 million and minimum liquidity in an amount greater than or equal to $15 million. Furthermore, the Company is prohibited from declaring, paying or setting aside for payment any dividend on the Common Shares unless certain financial covenants and ratios are met. As at December 31, 2022, the Company was in compliance with all covenants.

Page 44

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

33.FINANCIAL INSTRUMENTS

(a)Fair value hierarchy

To provide an indication of the reliability of the inputs used in determining fair value, we classify our financial instruments into the three levels prescribed by the accounting standards.

Level 1

The fair value of financial instruments traded in active markets (such as publicly traded equity securities) is based on quoted (unadjusted) market prices as at the reporting date. The quoted market price used for financial assets held by the Company is the closing trading price on the reporting date. Such instruments are included in Level 1.

Level 2

The fair value of financial instruments that are not traded in an active market is determined using valuation techniques. These valuation techniques maximize the use of observable market data where it is available and rely as little as possible on entity specific estimates. If all significant inputs required to fair value an instrument are observable, we include that instrument in Level 2.

Level 3

If one or more of the significant inputs is not based on observable market data, the instrument is included in Level 3.

The carrying value of cash and cash equivalents, accounts receivable, restricted cash, trade payables and accrued liabilities approximates the fair value due to the short-term nature of the instruments. The fair value of the RSUs expected to be cash settled is determined using the market value of the underlying shares at the end of the reporting period. The fair value of the Credit Facility and Fresnillo obligation is determined using discounted cash flows based on the expected amounts and timing of the cash flows discounted using a market rate of interest adjusted for appropriate credit risk.

The fair value of the Credit facility at December 31, 2022 was estimated at $124.5 million using a discount rate of 7.5%. The fair value of the Fresnillo obligation at December 31, 2022 was estimated at $22.3 million (December 31, 2021 – $37.8 million) using a discount rate of 7.5% (December 31, 2021 – 5.0%).

At December 31, 2022, the carrying values and fair values of our financial instruments by category were as follows:

Fair value

Carrying

Short term

Total

Classification

    

value

    

Level 1

    

Level 2

    

Level 3

    

nature

    

fair value

Financial assets

    

  

    

  

    

  

    

  

    

  

    

  

    

  

Cash and cash equivalents

FVTPL

$

96,278

$

96,278

$

$

$

$

96,278

Accounts receivable

Amortized cost

317

21

296

317

Restricted cash

Amortized cost

3,432

3,432

3,432

 

  

$

100,027

 

$

99,731

$

$

$

296

$

100,027

 

  

 

 

  

 

  

 

  

 

 

  

Financial liabilities

 

  

 

  

 

  

 

  

 

  

 

  

 

  

Trade and other payables

 

Amortized cost

$

8,851

$

$

$

$

8,851

$

8,851

Accrued liabilities

Amortized cost

7,967

352

7,615

7,967

Lease obligation

 

Amortized cost

 

3,173

 

 

3,173

 

 

 

3,173

Credit facility

 

Amortized cost

 

122,995

 

 

 

124,450

 

 

124,450

Fresnillo obligation

 

Amortized cost

 

22,800

 

 

 

22,296

 

 

22,296

 

  

$

165,786

$

352

$

3,173

$

146,746

$

16,466

$

166,737

Page 45

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

At December 31, 2021, the carrying values and fair values of our financial instruments by category were as follows:

Fair value

Quoted

prices in 

Approximate

active

Significant

fair value

market for 

other

Significant

due to short 

identical

observable

unobservable

term nature 

Carrying

assets

inputs

inputs

of the

Total

    

Classification

    

value

    

(Level 1)

    

(Level 2)

    

(Level 3)

    

instrument

    

Fair Value

Financial assets

 

  

 

  

 

  

 

  

 

  

 

  

 

  

Cash and cash equivalents

 

FVTPL

$

20,516

$

20,516

$

$

$

$

20,516

Accounts receivable

 

Amortized cost

 

299

 

16

 

 

 

283

 

299

Restricted cash

 

Amortized cost

 

3,680

 

 

3,680

 

 

 

3,680

 

  

$

24,495

 

20,532

$

3,680

$

$

283

$

24,495

 

  

 

  

 

  

 

  

 

  

 

  

 

  

Financial liabilities

 

  

 

  

 

  

 

  

 

  

 

  

 

  

Trade payables

 

Amortized cost

$

5,966

$

$

$

$

5,966

$

5,966

Accrued liabilities

Amortized cost

5,659

5,659

5,659

Lease obligation

 

Amortized cost

 

1,401

 

 

1,401

 

 

 

1,401

Camino Rojo project loan

 

Amortized cost

 

113,260

 

 

137,746

 

 

 

137,746

Newmont loan

 

Amortized cost

 

10,293

 

 

10,533

 

 

 

10,533

Fresnillo obligation

Amortized cost

37,800

37,800

37,800

 

  

$

174,379

$

$

187,480

$

$

11,625

$

199,105

Our policy is to determine whether transfers have occurred between levels in the hierarchy by re-assessing categorization at the end of the reporting period.

(b)Financial Risk Management
(i)Credit risk

Credit risk is the risk of an unexpected loss if a customer or third party to financial instruments fails to meet its contractual obligations. The Company’s exposure to credit risk is limited to cash and environmental bonding.

Our cash is held at large financial institutions in interest bearing accounts. Our reclamation deposits are held with government regulatory authorities in the countries where they have been lodged. We believe that the credit risk related to our cash and reclamation deposits is low.

The Company’s maximum exposure to credit risk is the carrying value of cash and restricted funds.

(ii)Liquidity risk

Liquidity risk is the risk that the Company will encounter difficulty in meeting obligations associated with its financial liabilities.

Page 46

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

At December 31, 2022, our financial liabilities had expected maturity dates as follows:

    

    

Between

    

Between

    

    

Less than

3 months and

1 year and

More than

3 months

    

1 year

3 years

3 years

Total

Financial liabilities

 

  

 

  

 

  

 

  

 

  

Trade and other payables

$

8,851

$

$

$

$

8,851

Accrued liabilities

 

7,967

 

 

 

 

7,967

Lease obligation

 

248

 

743

 

1,310

 

1,226

 

3,527

Credit facility

7,810

22,868

85,566

29,762

146,006

Fresnillo obligation

 

285

 

23,563

 

 

 

23,848

$

25,161

$

47,174

$

86,876

$

30,988

$

190,199

At December 31, 2021, our financial liabilities had expected maturity dates as follows:

Between

Between

Less than

3 months and

1 year and

More than

 

    

3 months

    

1 year

    

3 years

    

3 years

    

Total

Financial liabilities

Trade payables

$

5,966

$

$

$

$

5,966

Accrued liabilities

5,659

5,659

Lease obligation

 

114

 

289

 

494

 

520

 

1,417

Camino Rojo project loan

 

2,750

 

8,250

 

146,083

 

 

157,083

Newmont loan

 

 

10,662

 

 

 

10,662

Fresnillo obligation

473

16,357

23,848

40,678

$

14,962

$

35,558

$

170,425

$

520

$

221,465

We manage liquidity by anticipating and maintaining adequate cash balances to meet liabilities as they become due. We review cash forecasts on a regular basis to determine whether the Company will have sufficient cash to meet future working capital needs.

(iii)Market risk

Market risk is the risk that the fair value of the Company’s financial instruments will fluctuate due to changes in market prices. The market risks to which the Company’s financial instruments are exposed are commodity price risk, currency risk and interest rate risk.

Commodity price risk

Commodity price risk is the risk of fluctuations in prevailing market commodity prices. Revenues from mining operation, net income, and the fair value of derivative financial instruments and trade receivables may be affected by changes in commodity prices.

As at December 31, 2022, there were no derivative financial instruments or trade receivables subject to provision pricing and consequently no exposure to changes resulting from fluctuations in commodity prices.

Had gold prices been 10% greater than actual, our revenues would have increased by $19,323,000 (2021— $409,000).

Currency risk

The Company is exposed to currency risk to the extent that monetary assets and liabilities held by the Company are not denominated in United States dollars.

Page 47

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

Our financial instruments are held in Canadian dollars, US dollars, and Mexican pesos. As such, our Canadian- and Mexican-currency denominated accounts and balances are subject to fluctuations against the US dollar. Our financial instruments were denominated in the following currencies as at December 31, 2022:

    

Canadian

    

    

dollars

US dollars

Mexican pesos

(thousands)

(thousands)

(thousands)

Cash

$

15,498

$

84,771

$

1,250

Accounts receivable

 

28

 

29

 

5,475

Restricted funds

 

70

 

3,380

 

Trade payables

 

(337)

 

(6,104)

 

(87,298)

Accrued liabilities

 

(2,972)

 

(4,447)

 

(25,679)

Lease obligations

 

(1,323)

 

(1,103)

 

(21,158)

Credit facility

(122,995)

Fresnillo obligation

 

 

(22,800)

 

Total foreign currency

10,964

(69,269)

(127,410)

Exchange rate

 

1.3544

 

1.0000

 

19.3615

Equivalent US dollars

$

8,095

$

(69,269)

$

(6,581)

Our financial instruments were denominated in the following currencies as at December 31, 2021:

    

Canadian 

    

    

dollars

US dollars

Mexican pesos

(thousands)

(thousands)

(thousands)

Cash

$

7,583

$

12,061

$

50,923

Accounts receivable

 

20

 

4

 

5,733

Restricted funds

 

155

 

509

 

62,745

Trade payables

(128)

(2,642)

(66,350)

Accrued liabilities

 

(1,637)

 

(2,226)

 

(44,070)

Lease obligations

 

(74)

 

(520)

 

(16,935)

Camino Rojo project loan

 

 

(113,260)

 

Newmont loan

 

 

 

(211,881)

Fresnillo obligation

(37,800)

Total foreign currency

 

5,919

 

(143,874)

 

(219,835)

Exchange rate

 

1.2678

 

1.0000

 

20.5835

Equivalent US dollars

$

4,669

$

(143,874)

$

(10,680)

Based on the above net exposures as at December 31, 2022, and assuming that all other variables remain constant:

a 10% appreciation of the US dollar against the Canadian dollar would increase profit by $4.5 million (2021 increase loss by $12.2 million) and
a 10% appreciation of the US dollar against the Mexican peso would increase profit by $0.6 million (2021 increase loss by $4.2 million)

Interest rate risk

Interest rate risk is the risk that the fair value or the future cash flows of a financial instrument will fluctuate because of changes in market interest rates. Our interest rate exposure mainly relates to interest paid on the SOFR-based debt and interest earned on cash and term deposits as the Fresnillo obligation has a fixed interest rate of 5.00%.

A one percent increase in interest rates would result in a decrease of approximately $361,000 (2021 - decrease loss by $520,000) to the Company’s income for the year ended December 31, 2022.

Page 48

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

34.COMMITMENTS AND CONTINGENCIES

(a)Commitments

The Company has issued purchase orders for construction, equipment purchases, materials and supplies, and other services at Camino Rojo. At December 31, 2022, these outstanding purchase orders and contracts totaled approximately $2,019,000 (December 31, 2021 – $8,560,000), which we expect will be filled within the next 12 months.

The Company has a minimum commitment of $800,000 related to the South Railroad exploration and evaluation asset, which we expect will be filled within the next 24 months.

The Company is committed to making severance payments totalling approximately $3,700,000 (December 31, 2021 – $3,220,000) to certain officers and management in the event of a change in control. As the likelihood of these events occurring is not determinable, such amounts are not reflected in these consolidated financial statements.

We may, from time to time, be a party to legal proceedings, which arise in the ordinary course of our business. We are not aware of any pending or threatened litigation that, if resolved against us, would have a material adverse effect on our consolidated financial position, results of operations or cash flows.

(b)Discretionary mineral property-related commitments

As is customary in mineral exploration, some of the mineral properties held by the Company as exploration and evaluation assets have annual minimum work commitments and lease payments required to maintain these properties in good standing pursuant to their underlying agreements.

35.TAX EXPENSE

(a)Tax amounts recognized in profit or loss

Current income tax expense consists of three components - current income tax on taxable income, 7.5% special mining duty (“SMD”) on income subject to SMD, and withholding taxes attributable to interest charged on intercompany loans to the Mexican operating company.

Years ended December 31

    

2022

    

2021

Current income tax expense

$

22,512

$

Mexican 7.5% Special Mining Duty expense

9,371

Deferred income tax (recovery)

(2,698)

Deferred Mexican 7.5% Special Mining Duty expense

293

Withholding taxes

 

3,150

 

Tax expense

$

32,628

$

Page 49

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(b)Reconciliation of effective tax rate

Income tax expense differs from the amount that would be computed by applying the applicable Canadian statutory income tax rate to income before income taxes. The significant reasons for the differences are as follows:

    

2022

    

2021

 

Income (loss) before tax

$

78,398

$

(26,278)

Statutory income tax rate

 

26.8

%  

 

26.8

%

Expected income tax

$

21,036

$

(7,042)

Differences between Canadian and foreign tax rates

 

4,117

 

(744)

Items not deductible for tax purposes

 

4,508

 

2,850

Share based compensation

 

107

 

587

Change in unrecognized deductible temporary differences

 

(7,778)

 

6,208

True ups

1,901

(1,913)

Effect of changes in tax rates from prior years

 

 

(71)

Effect of changes in foreign exchange rates

 

(2,371)

 

393

Mexican Special Mining Duty

9,576

Inflationary adjustment and other

 

1,532

 

(268)

Total income taxes

 

32,628

 

 

 

  

Effective tax rate

 

41.6

%  

 

n/a

In 2022, the statutory income tax rate applicable to the Canadian parent entity was 26.8% (2021 – 26.8%).

(c)Unrecognized deductible temporary differences

We recognize tax benefits on losses or other deductible amounts generated in countries where the probable criteria for the recognition of deferred tax assets has been met. The Company’s unrecognized deductible temporary differences for which no deferred tax asset is recognized consist of the following amounts.

December 31

    

2022

    

2021

Mineral properties and exploration expenditures

$

30,467

$

55,548

Equipment

 

1,251

 

1,814

Site closure provisions

 

356

 

5,460

Long term debt

6,570

Share issue costs

 

3,452

 

5,724

Non capital losses

 

53,436

 

41,343

Intercompany debt

413

Other

154

5,202

Unrecognized deductible temporary differences

$

95,686

$

115,504

Page 50

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(d)Recognized deferred tax assets and liabilities

Recognized deferred tax assets and liabilities are comprised of the following:

December 31

    

2022

    

2021

Property, plant and equipment

$

(216)

$

(8,173)

Site closure provisions

2,363

Long term debt

 

 

(1,786)

Non capital losses

 

1,397

 

10,447

Intercompany debt

(1,619)

Other

 

480

 

(488)

Recognized deferred tax assets (liabilities)

$

2,405

$

Significant judgment is required in determining the deferred tax asset related to the Camino Rojo Oxide Mine. This includes the probability that there will be sufficient taxable income in the future against which the deferred tax asset can be utilized. Due to successful performance of the Camino Rojo Oxide Mine, the Company considers it highly probable that its Mexican operating subsidiary will have future taxable profits which will be available against which the deductible temporary differences can be used. Accordingly, during the year ended December 31, 2022, the Company recognized the previously unrecognized deferred tax asset relating to the Camino Rojo Oxide Mine.

(e)Temporary difference on investment in subsidiaries

The temporary differences associated with investments in subsidiaries for which a deferred income tax liability has not been recognized, aggregate to $62 million(December 31, 2021 - $5 million). The Company has determined that the taxable temporary difference will not reverse in the foreseeable future.

(f)Tax loss carryforwards

Our tax losses have the following expiry dates.

Tax losses

December 31

    

expire in years

    

2022

    

2021

Canada

 

2025 to 2042

$

61,214

$

46,354

Mexico

 

2027 to 2031

 

 

29,851

Panama

 

2023 to 2027

 

736

 

655

United States

 

indefinite

 

27,086

 

16

36.RECLASSIFICATIONS OF PRIOR PERIOD FIGURES

Certain of the prior year’s figures have been reclassified to conform to the presentation in the current year.  Such reclassifications were primarily the grouping and disaggregation of small balances.

Page 51

ORLA MINING LTD.

Notes to the Consolidated Financial Statements

Years ended December 31, 2022 and 2021

(United States dollars, unless otherwise stated. All currency figures in tables are in thousands, except per-share amounts)

(a)Income statement

    

2021

As previously presented

 

  

Interest income and finance costs

$

(1,296)

As currently presented

 

  

Interest income

$

341

Interest and accretion expense

 

(1,637)

$

(1,296)

Revenue

 

  

As previously presented

$

4,091

Refining and transportation reclassified to operating costs

 

33

As currently presented

$

4,124

Operating costs

 

  

As previously presented

$

1,247

Refining and transportation reclassified from revenue

 

33

As currently presented

$

1,280

(b)Statement of cash flows

    

2021

Operating activities – As previously presented

 

  

Other gains and losses

$

(211)

Exploration paid via issuance of common shares

 

150

Changes in site closure provision charged to exploration expense

 

84

$

23

Operating activities – As currently presented

 

  

Other

$

23

Financing activities – As previously presented

 

  

Proceeds from the issuance of common shares, net of issuance costs

$

34,442

Proceeds from the exercise of warrants

 

14,279

Proceeds from the exercise of stock options

 

475

Share issuance costs

 

(1,000)

$

48,196

Financing activities – As currently presented

 

  

Proceeds from the issuance of common shares, net of issuance costs

$

33,442

Proceeds from the issuance of stock options and warrants

 

14,754

$

48,196

37.EVENTS AFTER THE REPORTING PERIOD

(c)Share issuances

Subsequent to the reporting period, the Company issued common shares pursuant to the exercise of warrants (note 26(b)) and exercise of stock options (note 28(a)).

Page 52

Exhibit 99.4

CERTIFICATION

I, Jason Simpson, certify that:

1.

I have reviewed this annual report on Form 40-F of Orla Mining Ltd.;

2.

Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3.

Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the issuer as of, and for, the periods presented in this report;

4.

The issuer’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the issuer and have:

(a)

Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the issuer, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

(b)

Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

(c)

Evaluated the effectiveness of the issuer’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

(d)

Disclosed in this report any change in the issuer’s internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is reasonably likely to materially affect, the issuer’s internal control over financial reporting; and

5.

The issuer’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the issuer’s auditors and the audit committee of the issuer’s board of directors (or persons performing the equivalent functions):

(a)

All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the issuer’s ability to record, process, summarize and report financial information; and

(b)

Any fraud, whether or not material, that involves management or other employees who have a significant role in the issuer’s internal control over financial reporting.

Date: March 20, 2023

/s/ Jason Simpson

 

Jason Simpson

 

President and Chief Executive Officer


CERTIFICATION

I, Etienne Morin, certify that:

1.

I have reviewed this annual report on Form 40-F of Orla Mining Ltd.;

2.

Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3.

Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the issuer as of, and for, the periods presented in this report;

4.

The issuer’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the issuer and have:

(a)

Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the issuer, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

(b)

Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

(c)

Evaluated the effectiveness of the issuer’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

(d)

Disclosed in this report any change in the issuer’s internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is reasonably likely to materially affect, the issuer’s internal control over financial reporting; and

5.

The issuer’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the issuer’s auditors and the audit committee of the issuer’s board of directors (or persons performing the equivalent functions):

(a)

All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the issuer’s ability to record, process, summarize and report financial information; and

(b)

Any fraud, whether or not material, that involves management or other employees who have a significant role in the issuer’s internal control over financial reporting.

Date: March 20, 2023

/s/ Etienne Morin

 

Etienne Morin

 

Chief Financial Officer


Exhibit 99.5

CERTIFICATION PURSUANT TO

18 U.S.C. §1350,

AS ADOPTED PURSUANT TO

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002

In connection with the annual report of Orla Mining Ltd. (the “Company”) on Form 40-F for the period ended December 31, 2022 as filed with the Securities and Exchange Commission on the date hereof (the “Report”), I, Jason Simpson, President and Chief Executive Officer of the Company, certify, pursuant to 18 U.S.C. §1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that:

(1) the Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and

(2) the information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

 Date: March 20, 2023

/s/ Jason Simpson

 

Jason Simpson

 

President and Chief Executive Officer

A signed original of this written statement required by Section 906 has been provided to Orla Mining Ltd. and will be retained by Orla Mining Ltd. and furnished to the Securities and Exchange Commission or its staff upon request.

This certification accompanies the annual report pursuant to §906 of the Sarbanes-Oxley Act of 2002 and shall not, except to the extent required by the Sarbanes-Oxley Act of 2002, be deemed filed by the Registrant for purposes of §18 of the Securities Exchange Act of 1934, as amended.


CERTIFICATION PURSUANT TO

18 U.S.C. §1350,

AS ADOPTED PURSUANT TO

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002

In connection with the annual report of Orla Mining Ltd. (the “Company”) on Form 40-F for the period ended December 31, 2022 as filed with the Securities and Exchange Commission on the date hereof (the “Report”), I, Etienne Morin, Chief Financial Officer of the Company, certify, pursuant to 18 U.S.C. §1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that:

(1) the Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and

(2) the information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

Date: March 20, 2023

/s/ Etienne Morin

 

Etienne Morin

 

Chief Financial Officer

A signed original of this written statement required by Section 906 has been provided to Orla Mining Ltd. and will be retained by Orla Mining Ltd. and furnished to the Securities and Exchange Commission or its staff upon request.

This certification accompanies the annual report pursuant to §906 of the Sarbanes-Oxley Act of 2002 and shall not, except to the extent required by the Sarbanes-Oxley Act of 2002, be deemed filed by the Registrant for purposes of §18 of the Securities Exchange Act of 1934, as amended.


Exhibit 99.6

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

We consent to the reference to our Firm under the caption “Interests of Experts”, and to the incorporation by reference in the Registration Statement (No. 333-252957) on Form F-10 of Orla Mining Ltd. and the use herein of our report dated March 19, 2023, with respect to the consolidated balance sheets as at December 31, 2022 and 2021 and the consolidated statements of income (loss) and comprehensive income (loss), changes in equity and cash flows for each of the years in the two year period ended December 31, 2022, included in this Annual Report on Form 40-F

/s/ Ernst & Young LLP

Chartered Professional Accountants
Vancouver, Canada

March 20, 2023


Exhibit 99.7

Graphic

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

We hereby consent to the reference to our name under the caption “Interests of Experts” and the incorporation by reference in the Annual Report on Form 40-F and to the incorporation by reference in the Registration Statement (No. 333-252957) on Form F-10 of Orla Mining Ltd. relating to our reports dated March 25, 2022, with respect to the effectiveness of internal control over financial reporting and to the consolidated statements of financial position as at December 31, 2021 and 2020, and the related consolidated statements of loss and comprehensive loss, cash flows, and changes in shareholders’ equity for the years ended December 31, 2021 and 2020, of Gold Standard Ventures Corp.

/s/ DAVIDSON & COMPANY LLP

Vancouver, Canada

Chartered Professional Accountants

March 20, 2023

Graphic


Exhibit 99.8

Consent of J. Andrew Cormier

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, J. Andrew Cormier, consent to the use of and reference to my name, including as an expert or "qualified person", and the inclusion and incorporation by reference in the Annual Report, of the information prepared by me, that I supervised the preparation of, or that was reviewed or approved by me that is of a scientific or technical nature and all other references to such information included or incorporated by reference in the Annual Report, including all information of a scientific or technical nature included or incorporated by reference in the Annual Report not otherwise covered by any other named expert therein.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ J. Andrew Cormier

J. Andrew Cormier, P.Eng.

Orla Mining Ltd.

Dated: March 20, 2023


Exhibit 99.9

Consent of Sylvain Guerard

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Sylvain Guerard, consent to the use of and reference to my name, including as an expert or "qualified person", and the inclusion and incorporation by reference in the Annual Report, of the information prepared by me, that I supervised the preparation of, or that was reviewed or approved by me that is of a scientific or technical nature and all other references to such information included or incorporated by reference in the Annual Report, including all information of a scientific or technical nature included or incorporated by reference in the Annual Report not otherwise covered by any other named expert therein.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Sylvain Guerard

Sylvain Guerard, P. Geo.

Orla Mining Ltd.

Dated: March 20, 2023


Exhibit 99.10

Consent of Carl E. Defilippi

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Carl E. Defilippi, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 11, 2021, entitled “Unconstrained Feasibility Study, NI 43-101 Technical Report on the Camino Rojo Gold Project Municipality of Mazapil, Zacatecas, Mexico” (the “Camino Rojo Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; (ii) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 18, 2022, entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” (together with the Camino Rojo Technical Report, the “Technical Reports”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (iii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Reports in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Carl E. Defilippi

Carl E. Defilippi, RM, SME

Dated: March 20, 2023


Exhibit 99.11

Consent of John J. Ward

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, John J. Ward, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 11, 2021, entitled “Unconstrained Feasibility Study, NI 43-101 Technical Report on the Camino Rojo Gold Project Municipality of Mazapil, Zacatecas, Mexico” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/John J. Ward

John J. Ward, C.P.G.

Dated: March 20, 2023


Exhibit 99.12

Consent of Matthew D. Gray

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Matthew D. Gray, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 11, 2021, entitled “Unconstrained Feasibility Study, NI 43-101 Technical Report on the Camino Rojo Gold Project Municipality of Mazapil, Zacatecas, Mexico” (the “Camino Rojo Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; (ii) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 18, 2022, entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” (together with the Camino Rojo Technical Report, the “Technical Reports”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (iii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Reports in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Matthew D. Gray

Dr. Matthew D. Gray, Ph.D., C.P.G.

Dated: March 20, 2023


Exhibit 99.13

Consent of Michael G. Hester

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Michael Hester, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 11, 2021, entitled “Unconstrained Feasibility Study, NI 43-101 Technical Report on the Camino Rojo Gold Project Municipality of Mazapil, Zacatecas, Mexico” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; (ii) the inclusion and incorporation by reference in the Annual Report of the mineral reserve and mineral resource estimates for the Camino Rojo Oxide Mine as at December 31, 2022 (together with the Technical Report, the “Technical Disclosure”); and (iii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Disclosure in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Michael G. Hester

Michael G. Hester, FAusIMM

Dated: March 20, 2023


Exhibit 99.14

Consent of Sue Bird

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Sue Bird, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 18, 2022, entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Sue Bird

Sue Bird, P.Eng.

Dated: March 20, 2023


Exhibit 99.15

Consent of Jesse Aarsen

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Jesse Aarsen, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 18, 2022, entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Jesse Aarsen

Jesse Aarsen, P.Eng.

Dated: March 20, 2023


Exhibit 99.16

Consent of Denys Parra

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Denys Parra, consent to” (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 18, 2022, entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Denys Parra

Denys Parra, RM SME

Dated: March 20, 2023


Exhibit 99.17

Consent of Brent Johnson

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Brent Johnson, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 18, 2022, entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Brent Johnson

Brent Johnson, RM SME, P.G.

Dated: March 20, 2023


Exhibit 99.18

Consent of Lee Josselyn

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Lee Josselyn, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 18, 2022, entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Lee Josselyn

Lee Josselyn, P. E.

Dated: March 20, 2023


Exhibit 99.19

Consent of Wade Brunham

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Wade Brunham, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective January 18, 2022, entitled “Project Pre-Feasibility Updated NI 43-101 Technical Report on the Cerro Quema Project Province of Los Santos, Panama” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or "qualified person", and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Wade Brunham

Wade Brunham, M.Sc. PWS, R.P. Bio.

Dated: March 20, 2023


Exhibit 99.20

Consent of Jordan Anderson

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Jordan Anderson, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Jordan Anderson

Jordan Anderson, QP RM-SME

Dated: March 20, 2023


Exhibit 99.21

Consent of Benjamin Bermudez

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Benjamin Bermudez, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Benjamin Bermudez

Benjamin Bermudez, PE

Dated: March 20, 2023


Exhibit 99.22

Consent of Richard DeLong

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Richard DeLong, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Richard DeLong

Richard DeLong, QP MMSA, RG, PG

Dated: March 20, 2023


Exhibit 99.23

Consent of Thomas L. Dyer

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Thomas L. Dyer, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Thomas L. Dyer

Thomas L. Dyer, PE

Dated: March 20, 2023


Exhibit 99.24

Consent of Art S. Ibrado

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Art S. Ibrado, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Art S. Ibrado

Art S. Ibrado, PE

Dated: March 20, 2023


Exhibit 99.25

Consent of Michael S. Lindholm

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Michael S. Lindholm, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Michael S. Lindholm

Michael S. Lindholm, CPG

Dated: March 20, 2023


Exhibit 99.26

Consent of Kevin Lutes

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Kevin Lutes, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Kevin Lutes

Kevin Lutes, PE

Dated: March 20, 2023


Exhibit 99.27

Consent of Matthew Sletten

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Matthew Sletten, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Matthew Sletten

Matthew Sletten, PE

Dated: March 20, 2023


Exhibit 99.28

Consent of Gary L. Simmons

In connection with the Annual Report on Form 40-F, and any amendments and exhibits thereto, of Orla Mining Ltd. (the “Company”) for the year ended December 31, 2022 (collectively, the “Annual Report”), I, Gary L. Simmons, consent to: (i) the inclusion and incorporation by reference in the Annual Report of references to and information derived or summarized from the technical report dated effective February 23, 2022, entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” (the “Technical Report”), or portions thereof, that was prepared by me, that I supervised the preparation of and/or was reviewed and approved by me; and (ii) the use of and references to my name, including as an expert or “qualified person”, and my involvement in the preparation of the Technical Report in each case where used or incorporated by reference into the Annual Report.

I also consent to the use of my name in and the incorporation by reference of such information contained or incorporated by reference in the Annual Report and exhibits thereto into the Company’s Registration Statement on Form F-10 (File No. 333-252957), as amended.

/s/ Gary L. Simmons

Gary L. Simmons, QP MMSA

Dated: March 20, 2023