Table of Contents


UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
 _________________________________________________
FORM 10-K
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934
For the Fiscal Year Ended December 31, 2014

Commission
File Number
 
Names of Registrants, State of Incorporation,
Address and Telephone Number
 
I.R.S. Employer
Identification No.
001-32462
 
PNM Resources, Inc.
(A New Mexico Corporation)
414 Silver Ave. SW
Albuquerque, New Mexico 87102-3289
(505) 241-2700
 
85-0468296
001-06986
 
Public Service Company of New Mexico
(A New Mexico Corporation)
414 Silver Ave. SW
Albuquerque, New Mexico 87102-3289
(505) 241-2700
 
85-0019030
002-97230
 
Texas-New Mexico Power Company
(A Texas Corporation)
577 N. Garden Ridge Blvd.
Lewisville, Texas 75067
(972) 420-4189
 
75-0204070
Securities Registered Pursuant To Section 12(b) Of The Act:
Registrant
 
Title of Each Class
 
Name of Each Exchange
on Which Registered
PNM Resources, Inc.
 
Common Stock, no par value
 
New York Stock Exchange
Securities Registered Pursuant To Section 12(g) Of The Act:
Registrant
 
Title of Each Class                 
Public Service Company of New Mexico
 
1965 Series, 4.58% Cumulative Preferred Stock
 
 
($100 stated value without sinking fund)
Indicate by check mark whether each registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
PNM Resources, Inc. (“PNMR”)
 
YES   ü
 
NO      
Public Service Company of New Mexico (“PNM”)
 
YES      
 
NO  ü
Texas-New Mexico Power Company (“TNMP”)
 
YES      
 
NO  ü

Indicate by check mark if each registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
PNMR
 
YES      
 
NO  ü
PNM
 
YES      
 
NO  ü
TNMP
 
YES   ü
 
NO      



Table of Contents



Indicate by check mark whether each registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports) and (2) has been subject to such filing requirements for the past 90 days.
 
PNMR
  
YES   ü
 
NO      
PNM
  
YES   ü
 
NO      
TNMP
  
YES      
 
NO   ü
(NOTE: As a voluntary filer, not subject to the filing requirements, TNMP filed all reports under Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months.)
Indicate by check mark whether each registrant has submitted electronically and posted on its corporate Website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
 
PNMR
  
YES    ü
 
NO      
PNM
  
YES   ü
 
NO      
TNMP
  
YES   ü
 
NO      
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S–K is not contained herein, and will not be contained, to the best of registrants’ knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.     ü
Indicate by check mark whether registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer or a smaller reporting company (as defined in Rule 12b-2 of the Act).
 
 
 
Large accelerated
filer
Accelerated
filer
 
Non-accelerated
filer
 
Smaller Reporting
Company
PNMR
 
ü

   
 
__
    
   
PNM
 
__
   
 
ü
 
   
TNMP
 
__
   
 
ü
 
   
Indicate by check mark whether the registrants are a shell company (as defined in Rule 12b-2 of the Exchange Act). YES           NO   ü
As of February 20, 2015 , shares of common stock outstanding were:
 
PNMR
79,653,624

PNM
39,117,799

TNMP
6,358

On June 30, 2014, the aggregate market value of the voting common stock held by non-affiliates of PNMR as computed by reference to the New York Stock Exchange composite transaction closing price of $29.33 per share reported by The Wall Street Journal, was $2,336,240,792. PNM and TNMP have no common stock held by non-affiliates.
PNM AND TNMP MEET THE CONDITIONS SET FORTH IN GENERAL INSTRUCTIONS (I) (1) (a) AND (b) OF FORM 10-K AND ARE THEREFORE FILING THIS FORM WITH THE REDUCED DISCLOSURE FORMAT PURSUANT TO GENERAL INSTRUCTION (I) (2).
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the following document are incorporated by reference into Part III of this report:
Proxy Statement to be filed by PNMR with the SEC pursuant to Regulation 14A relating to the annual meeting of stockholders of PNMR to be held on May 12, 2015.
This combined Form 10-K is separately filed by PNMR, PNM, and TNMP.  Information contained herein relating to any individual registrant is filed by such registrant on its own behalf.  Each registrant makes no representation as to information relating to the other registrants.  When this Form 10-K is incorporated by reference into any filing with the SEC made by PNMR, PNM, or TNMP, as a registrant, the portions of this Form 10-K that relate to each other registrant are not incorporated by reference therein.

ii

Table of Contents


PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
INDEX  
 
 
 
Page
 
 
PART I
 
ITEM 1. BUSINESS
OPERATIONS  AND REGULATION
 
EMPLOYEES
ITEM 1A. RISK FACTORS
ITEM 1B. UNRESOLVED STAFF COMMENTS
ITEM 2. PROPERTIES
ITEM 3. LEGAL PROCEEDINGS
ITEM 4. MINE SAFETY DISCLOSURES
PART II
 
ITEM 5. MARKET FOR PNMR’S COMMON EQUITY, RELATED STOCKHOLDER 
 MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
 
ITEM 6. SELECTED FINANCIAL DATA
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURE ABOUT MARKET RISK
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING
AND FINANCIAL DISCLOSURE
 
ITEM 9A. CONTROLS AND PROCEDURES
ITEM 9B. OTHER INFORMATION
PART III
 
ITEM 10. DIRECTORS, EXECUTIVE OFFICERS, AND CORPORATE GOVERANCE
ITEM 11. EXECUTIVE COMPENSATION
ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT
AND RELATED STOCKHOLDER MATTERS
 
ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR
INDEPENDENCE
 
ITEM 14. PRINCIPAL ACCOUNTING FEES AND SERVICES
PART IV
 
ITEM 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES
 

iii

Table of Contents


GLOSSARY
 
Definitions:
  
 
ABO
  
Accumulated Benefit Obligation
Afton
  
Afton Generating Station
AFUDC
 
Allowance for Funds Used During Construction
ALJ
  
Administrative Law Judge
AMS
 
Advanced Meter System
AOCI
  
Accumulated Other Comprehensive Income
APBO
  
Accumulated Postretirement Benefit Obligation
APS
  
Arizona Public Service Company, the operator and a co-owner of PVNGS and Four Corners
ARO
  
Asset Retirement Obligation
ASU
 
Accounting Standards Update
BACT
  
Best Available Control Technology
BART
  
Best Available Retrofit Technology
BDT
 
Balanced Draft Technology
BHP
  
BHP Billiton, Ltd, the parent of SJCC
Board
  
Board of Directors of PNMR
BTU
  
British Thermal Unit
CAA
 
Clean Air Act
CCB
  
Coal Combustion Byproducts
CCN
 
Certificate of Convenience and Necessity
CO 2
  
Carbon Dioxide
CTC
  
Competition Transition Charge
D.C. Circuit
 
United States Court of Appeals for the District of Columbia Circuit
Delta
  
Delta-Person Generating Station
DOE
  
United States Department of Energy
DOI
  
United States Department of Interior
EGU
 
Electric Generating Unit
EIB
  
New Mexico Environmental Improvement Board
EIP
  
Eastern Interconnection Project
EIS
 
Environmental Impact Study
EPA
  
United States Environmental Protection Agency
EPE
  
El Paso Electric
ERCOT
  
Electric Reliability Council of Texas
ESA
 
Endangered Species Act
Exchange Act
 
Securities Exchange Act of 1934
FASB
  
Financial Accounting Standards Board
FERC
  
Federal Energy Regulatory Commission
FIP
  
Federal Implementation Plan
First Choice
  
FCP Enterprises, Inc. and Subsidiaries
Four Corners
  
Four Corners Power Plant
FPL
  
FPL Energy New Mexico Wind, LLC
FPPAC
  
Fuel and Purchased Power Adjustment Clause
GAAP
  
Generally Accepted Accounting Principles in the United States of America
Gallup
 
City of Gallup, New Mexico
GHG
  
Greenhouse Gas Emissions
GWh
  
Gigawatt hours
IBEW
  
International Brotherhood of Electrical Workers
IRP
 
Integrated Resource Plan
IRS
  
Internal Revenue Service

iv

Table of Contents


ISFSI
 
Independent Spent Fuel Storage Installation
KW
  
Kilowatt
KWh
  
Kilowatt Hour
LIBOR
  
London Interbank Offered Rate
Lightning Dock Geothermal
 
Lightning Dock geothermal power facility, also known as the Dale Burgett Geothermal Plant
Lordsburg
  
Lordsburg Generating Station
Luna
  
Luna Energy Facility
MD&A
  
Management’s Discussion and Analysis of Financial Condition and Results of Operations
MMBTU
  
Million BTUs
Moody’s
  
Moody’s Investor Services, Inc.
MW
  
Megawatt
MWh
  
Megawatt Hour
NAAQS
 
National Ambient Air Quality Standards
Navajo Acts
  
Navajo Nation Air Pollution Prevention and Control Act, Navajo Nation Safe Drinking Water Act, and Navajo Nation Pesticide Act
NDT
  
Nuclear Decommissioning Trusts for PVNGS
NEC
 
Navopache Electric Cooperative, Inc.
NEPA
 
National Environmental Policy Act
NERC
  
North American Electric Reliability Council
New Mexico Wind
 
New Mexico Wind Energy Center
Ninth Circuit
  
United States Court of Appeals for the Ninth Circuit
NMAG
  
New Mexico Attorney General
NMED
  
New Mexico Environment Department
NMIEC
  
New Mexico Industrial Energy Consumers Inc.
NMPRC
  
New Mexico Public Regulation Commission
NOx
  
Nitrogen Oxides
NOPR
 
Notice of Proposed Rulemaking
NRC
  
United States Nuclear Regulatory Commission
NSPS
  
New Source Performance Standards
NSR
  
New Source Review
OCI
  
Other Comprehensive Income
OPEB
  
Other Post Employment Benefits
Optim Energy
  
Optim Energy, LLC, a limited liability company, formerly known as EnergyCo, LLC
OSM
 
United States Office of Surface Mining Reclamation and Enforcement
PBO
  
Projected Benefit Obligation
PCRBs
  
Pollution Control Revenue Bonds
PG&E
  
Pacific Gas and Electric Co.
PNM
  
Public Service Company of New Mexico and Subsidiaries
PNM 2013 Term Loan Agreement
 
PNM’s $75.0 Million Unsecured Term Loan
PNM 2014 Term Loan Agreement
 
PNM’s $175.0 Million Unsecured Term Loan
PNM Multi-draw Term Loan
 
PNM’s $125.0 Million Unsecured Multi-draw Term Loan Facility
PNM New Mexico Credit Facility
 
PNM’s $50.0 Million Unsecured Revolving Credit Facility
PNM Revolving Credit Facility
 
PNM’s $400.0 Million Unsecured Revolving Credit Facility
PNMR
  
PNM Resources, Inc. and Subsidiaries
PNMR Development
 
PNMR Development and Management Company, an unregulated wholly-owned subsidiary of PNMR

v

Table of Contents


PNMR Revolving Credit Facility
 
PNMR’s $300.0 Million Unsecured Revolving Credit Facility
PNMR Term Loan Agreement
  
PNMR’s $100.0 Million Unsecured Term Loan
PPA
  
Power Purchase Agreement
PSD
  
Prevention of Significant Deterioration
PUCT
  
Public Utility Commission of Texas
PV
  
Photovoltaic
PVNGS
  
Palo Verde Nuclear Generating Station
RCRA
  
Resource Conservation and Recovery Act
RCT
  
Reasonable Cost Threshold
REA
 
New Mexico’s Renewable Energy Act of 2004
REC
  
Renewable Energy Certificates
Red Mesa Wind
 
Red Mesa Wind Energy Center
REP
  
Retail Electricity Provider
Rio Bravo
 
Rio Bravo Generating Station, formerly know as Delta
RMC
  
Risk Management Committee
ROE
 
Return on Equity
RPS
  
Renewable Energy Portfolio Standard
RSIP
 
Revised State Implementation Plan
SCE
  
Southern California Edison Company
SCPPA
  
Southern California Public Power Authority
SCR
 
Selective Catalytic Reduction
SEC
  
United States Securities and Exchange Commission
SIP
  
State Implementation Plan
SJCC
  
San Juan Coal Company
SJGS
  
San Juan Generating Station
SJPPA
 
San Juan Project Participation Agreement
SNCR
 
Selective Non-Catalytic Reduction
SO 2
  
Sulfur Dioxide
SPS
  
Southwestern Public Service Company
SRP
  
Salt River Project
S&P
  
Standard and Poor’s Ratings Services
TCEQ
  
Texas Commission on Environmental Quality
TECA
  
Texas Electric Choice Act
Tenth Circuit
 
United States Court of Appeals for the Tenth Circuit
TNMP
  
Texas-New Mexico Power Company and Subsidiaries
TNMP 2011 Term Loan Agreement
 
TNMP’s $50.0 Million Secured Term Loan
TNMP Revolving Credit Facility
  
TNMP’s $75.0 Million Secured Revolving Credit Facility
TNP
  
TNP Enterprises, Inc. and Subsidiaries
Tri-State
  
Tri-State Generation and Transmission Association, Inc.
Tucson
  
Tucson Electric Power Company
UAMPS
  
Utah Associated Municipal Power System
Valencia
  
Valencia Energy Facility
VaR
  
Value at Risk
WACC
  
Weighted Average Cost of Capital
WEG
 
WildEarth Guardians
WSPP
  
Western Systems Power Pool
 

vi

Table of Contents


PART I
 
ITEM 1.
BUSINESS

THE COMPANY
Overview
PNMR is an investor-owned holding company with two regulated utilities providing electricity and electric services in New Mexico and Texas. PNMR’s electric utilities are PNM and TNMP. PNMR is focused on achieving the following strategic goals:
 
Earning authorized returns on its regulated businesses
Continuing to improve credit ratings
Providing a top quartile total return to investors

PNMR’s success in accomplishing these strategic goals is highly dependent on continued favorable regulatory treatment for its regulated utilities. Both PNM and TNMP seek cost recovery for their investments through general rate cases and various rate riders. PNM filed a general rate case with the NMPRC in December 2014. Additional information about rate filings is provided in Operations and Regulation below and in Note 17.

PNMR’s common stock trades on the New York Stock Exchange under the symbol PNM. PNMR was incorporated in the State of New Mexico in 2000.

Other Information

These filings for PNMR, PNM, and TNMP include disclosures for each entity. For discussion purposes, this report uses the term “Company” when discussing matters of common applicability to PNMR, PNM, and TNMP. Discussions regarding only PNMR, PNM, or TNMP are so indicated. A reference to “MD&A” in this report refers to Part II, Item 7. –Management’s Discussion and Analysis of Financial Condition and Results of Operations. A reference to a “Note” refers to the accompanying Notes to Consolidated Financial Statements.

Financial information relating to amounts of revenue, net income, and total assets of reportable segments is contained in MD&A and Note 2.

WEBSITES
The PNMR website, www.pnmresources.com , is an important source of Company information. New or updated information for public access is routinely posted.  PNMR encourages analysts, investors, and other interested parties to register on the website to automatically receive Company information by e-mail. This information includes news releases, notices of webcasts, and filings with the SEC. Participants can unsubscribe at any time and will not receive information that was not requested.
Our corporate Internet addresses are:

PNMR: www.pnmresources.com
PNM: www.pnm.com
TNMP: www.tnmp.com

In addition to the corporate websites, PNM established a website, www.PowerforProgress.com, dedicated to showing how it balances delivering reliable power at affordable prices and protecting the environment. This website is designed to be a resource for the facts about PNM's operations and support efforts, including plans for building a sustainable energy future for New Mexico. The contents of these websites are not a part of this Form 10-K. The SEC filings of PNMR, PNM, and TNMP, including annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act, are accessible free of charge on the PNMR website as soon as reasonably practicable after they are filed with, or furnished to, the SEC. These reports are also available in print upon request from PNMR free of charge.


A- 1

Table of Contents


Also available on the Company’s website at http://www.pnmresources.com/corporate-governance.aspx and in print upon request from any shareholder are our:

Corporate Governance Principles
Code of Ethics ( Do the Right Thing Principles of Business Conduct )
Charters of the Audit and Ethics Committee, Nominating and Governance Committee, Compensation and Human Resources Committee, and Finance Committee

The Company will post amendments to or waivers from its code of ethics (to the extent applicable to the Company’s executive officers and directors) on its website.

OPERATIONS AND REGULATION
Regulated Operations
PNM

PNM is an electric utility that provides electric generation, transmission, and distribution service to its rate-regulated customers. In New Mexico, the utility’s retail electric service territory covers a large area of north central New Mexico, including the cities of Albuquerque, Rio Rancho, and Santa Fe, and certain areas of southern New Mexico. PNM also provides electricity to firm-requirements wholesale customers in New Mexico and Arizona. Service to retail electric customers is subject to the jurisdiction of the NMPRC. Service to wholesale customers is regulated by FERC. Regulation encompasses the utility’s electric rates, service, accounting, issuances of securities, construction of major new generation, types of generation resources, transmission and distribution facilities, and other matters.

Other services provided by PNM include transmission services to third parties as well as the generation and sale of electricity into the wholesale market, which services are regulated by FERC. PNM owns or leases transmission lines, interconnected with other utilities in New Mexico, Texas, Arizona, Colorado, and Utah. The largest retail electric customer served by PNM accounted for 3.4% of the utility’s revenues for the year ended December 31, 2014 . PNM was incorporated in the State of New Mexico in 1917.

NMPRC Regulated Retail Rate Proceedings

Customer rates for retail electric service are set by the NMPRC. PNM filed a general rate case with the NMPRC in December 2014. PNM’s application proposes a revenue increase of $107.4 million, effective January 1, 2016, based on a calendar 2016 future year test and a ROE of 10.5%. PNM requested this increase to account for infrastructure investments made since its last rate case and investments needed in the next two years to provide reliable service to PNM’s retail customers, as well as to reflect declining sales growth in PNM’s service territory. PNM is proposing several changes to rate design to establish fair and equitable pricing across rate classes and to better align cost recovery with cost causation, including an access charge to customers installing photovoltaic systems after December 31, 2015. See Note 17 for additional information concerning this filing.

PNM’s previous general rate case filing was made in June 2010. In August 2011, the NMPRC issued a final order that included, among other things, a $72.1 million increase in annual non-fuel revenues for New Mexico retail customers. As permitted by that order, PNM filed an application in January 2012 for a rate rider to collect costs for renewable energy procurements incurred after December 31, 2010 that are not otherwise being collected in rates. The rider will terminate upon a final order in PNM’s next general rate case unless that order authorizes a continuation of the rider. As a separate component of the rider, if PNM’s earned return on jurisdictional equity in a calendar year, adjusted for weather and other items not representative of normal operation, exceeded 10.5%, it would refund to customers during May through December of the following year the amount over 10.5%. PNM’s earned return on jurisdictional equity did not exceed 10.5% in 2013 or 2014.

FERC Regulated Wholesale Operations
In October 2010, PNM filed a notice with FERC to increase its wholesale electric transmission rates for all of PNM’s wholesale electric transmission service customers, which include other utilities, electric cooperatives, and entities that use PNM’s transmission system to transmit power at the wholesale level.  The proposed rates were implemented on June 1, 2011, subject to refund. On January 2, 2013, FERC approved a settlement among the parties providing for an increase in transmission service revenues of $2.9 million annually.
In December 2012, PNM filed a notice with FERC to increase its wholesale electric transmission rates for all of its transmission customers. The filing represents a formula based rate as contemplated by the approved settlement in the case described

A- 2

Table of Contents


above. The proposed increase of $1.3 million, as updated, went into effect, subject to refund, on August 2, 2013. On May 1, 2014, PNM updated its formula rate incorporating 2013 data resulting in a  $0.5 million  rate increase over the then current rates. The updated rate request went into effect on May 30, 2014, subject to refund. The parties have engaged in settlement negotiations and PNM anticipates that a settlement will be filed with FERC in the near future. There is no required time frame for FERC to act upon a settlement. PNM is unable to predict the outcome of this proceeding.

PNM has entered into firm-requirements wholesale contracts to provide electricity to various customers. These contracts contain both capacity charges and energy charges. Capacity charges are monthly payments for a commitment of resources to service the contract requirements. Energy charges are payments based on the amount of electricity delivered to the customer and are intended to compensate for the variable costs incurred to provide the energy. The average billing demands for PNM’s firm-requirements wholesale customers aggregate approximately 62 MW, excluding the contract with Gallup that expired in 2014. No firm-requirements customer of PNM accounted for more than 2.5% of PNM’s revenues for the year ended December 31, 2014 .

In September 2011, PNM filed with FERC to increase rates for electric service and ancillary services provided to NEC, PNM’s largest firm-requirements wholesale customer. PNM also requested a traditional FPPAC and full recovery of certain third-party transmission charges. FERC issued an order allowing the increased rates to be collected beginning April 14, 2012, subject to refund. The parties agreed to a settlement providing for an increase in rates of $5.3 million and an extension of the contract for 10 years through December 31, 2035. FERC approved the settlement in April 2013. PNM provided both energy and power services to Gallup, which was its second largest firm-requirements wholesale customer, under an electric service agreement that expired on June 30, 2014. PNM’s recently filed general rate case discussed above includes a reallocation of costs among regulatory jurisdictions reflecting the termination of the contract to serve Gallup. See Results of Operations in MD&A and Note 17. 

PNM also provides electricity at wholesale to the City of Aztec, New Mexico under a contract that expires on June 30, 2016. In 2014, PNM entered into a contract with the Jicarilla Apache Nation to provide electricity at wholesale through May 8, 2016, which date can be extended through May 8, 2019, if approved by the NMPRC.

PNM’s current authorization under FERC regulation requires that revenue requirements for sales of electricity at wholesale are to be based on PNM’s costs of providing such service. In August 2014, PNM filed an application with FERC to allow PNM to enter into arrangements to sell electricity at wholesale prices within PNM’s balancing authority area using rates that are based on market conditions. There is no statutory requirement for FERC to act upon this application within a specified period of time. PNM cannot predict if FERC will grant the request to sell at market-based rates.

Operational Information

Weather-normalized retail electric KWh sales decreased by 1.7% in 2014 and 1.8% in 2013. The system peak demands for retail and firm-requirements customers decreased in 2014 and increased in 2013. The system peak demands were as follows:

System Peak Demands
 
2014
 
2013
 
2012
 
(Megawatts)
Summer
1,878

 
2,008

 
1,948

Winter
1,471

 
1,576

 
1,523


PNM holds long-term, non-exclusive franchise agreements for its electric retail operations, with varying expiration dates. These franchise agreements allow the utility to access public rights-of-way for placement of its electric facilities. Franchise agreements have expired in some areas PNM serves, including Albuquerque, Rio Rancho, and Santa Fe. Because PNM remains obligated under New Mexico state law to provide service to customers in these areas, the expirations should not have a material adverse impact. The Albuquerque, Rio Rancho, and Santa Fe metropolitan areas accounted for 48.0%, 10.5%, and 9.6% of PNM’s 2014 revenues and no other franchise area represents more than 5%. Although PNM is not required to collect or pay franchise fees in some areas it serves, the utility continues to collect and pay such fees in certain parts of its service territory, including Albuquerque, Rio Rancho, and Santa Fe.

As discussed in Note 16, the County Commission of Bernalillo County, New Mexico passed an ordinance on January 28, 2014 that would require PNM and other utilities to enter into a use agreement and pay a yet to be determined fee as a condition for installing, maintaining, and operating facilities on county rights-of-way. PNM and other utilities have filed complaints in federal and state courts challenging the validity of the ordinance. If the challenge to the ordinance is unsuccessful, PNM believes

A- 3

Table of Contents


any fees paid pursuant to the ordinance would be considered franchise fees and would be recoverable from customers. PNM is unable to predict the outcome of this matter.

PNM owns or leases 3,197 circuit miles of electric transmission lines that interconnect with other utilities in New Mexico, Arizona, Colorado, Texas, and Utah. There has been little development of new transmission facilities in recent years. Therefore, most of the capacity on PNM’s transmission system is fully committed during peak hours, with very little to no additional access available on a firm commitment basis. These factors result in physical constraints on the system and limit the ability to wheel power into PNM’s service area from outside of New Mexico.

PNM also generates and sells electricity into the wholesale market. Because PNM’s 134 MW share of Unit 3 at PVNGS currently is excluded from retail rates, that unit’s power is being sold in the wholesale market and any earnings or losses are realized by shareholders. PNM has contracted to sell 100% of PVNGS Unit 3 output through 2015, at market price plus a premium.  Through hedging arrangements that are accounted for as economic hedges, PNM has established fixed rates for substantially all of these sales. As discussed in Note 16, PNM has requested NMPRC approval to include PVNGS Unit 3 as a jurisdictional resource to serve New Mexico retail customers beginning in 2018 as part of the revised plan to comply with the regional haze requirements of the CAA. Beyond the PVNGS contracts, PNM also engages in activities to optimize its existing jurisdictional assets and long-term power agreements through spot market, hour ahead, day ahead, week ahead, and other sales of any excess generation not required to fulfill retail load and contractual commitments. Ninety percent of the margins from these optimization sales are credited to retail customers through the FPPAC.

Use of Future Test Year

Under New Mexico law, the NMPRC must set rates using the test period, including a future test year, that best reflects the conditions the utility will experience when new rates are anticipated to go into effect. In addition, the NMPRC must include certain construction work in progress (“CWIP”) for environmental improvement, generation, and transmission projects in rate base. These provisions are designed to promote more timely recovery of reasonable costs of providing utility service.

The use of a future test year should help PNM mitigate the adverse effects of regulatory lag, which is inherent when using a historical test year. Accordingly, the utility’s earnings should more closely reflect the rate of return allowed by the NMPRC. PNMR believes that achieving earnings that approximate its allowed rate of return is an important factor in attracting equity investors, as well as being considered favorably by credit rating agencies and financial analysts.

As discussed above, in December 2014, PNM filed a request for a general rate increase with the NMPRC, which is based on a 2016 future test year. As with any forward looking financial information, utilizing a future test year in a rate filing presents challenges that exist in the forecasting process. These include forecasts of both operating and capital expenditures that necessitate reliance on many assumptions concerning future conditions and operating results. In the rate making process, PNM’s assumptions are subject to challenge by regulators and intervenors who may assert different interpretations or assumptions.

Renewable Portfolio Standard

The REA was enacted to encourage the development of renewable energy in New Mexico. The act establishes a mandatory RPS requiring a utility to acquire a renewable energy portfolio equal to 10% by 2011, 15% by 2015, and 20% by 2020. The act provides for streamlined proceedings for approval of utilities’ renewable energy procurement plans, assures utilities recovery of costs incurred consistent with approved procurement plans, and requires the NMPRC to establish a RCT for the procurement of renewable resources to prevent excessive costs being added to rates. PNM files required renewable energy plans with the NMPRC annually and makes procurements consistent with the plans approved by the NMPRC. See Note 17.

TNMP

TNMP is a regulated utility operating in Texas. TNMP’s predecessor was organized in 1925. TNMP is incorporated in the State of Texas.

TNMP provides transmission and distribution services in Texas under the provisions of TECA and the Texas Public Utility Regulatory Act. TNMP is subject to traditional cost-of-service regulation with respect to rates and service under the jurisdiction of the PUCT and certain municipalities. Because its transmission and distribution activities are solely within ERCOT, TNMP is not subject to traditional rate regulation by FERC. TNMP serves a market of small to medium sized communities, most of which have populations of less than 50,000. TNMP is the exclusive provider of transmission and distribution services in most areas it serves.


A- 4

Table of Contents


TNMP’s service territory consists of three non-contiguous areas. One portion of this territory extends from Lewisville, which is approximately 10 miles north of the Dallas-Fort Worth International Airport, eastward to municipalities near the Red River, and to communities north, west, and south of Fort Worth. The second portion of its service territory includes the area along the Texas Gulf Coast between Houston and Galveston, and the third portion includes areas of far west Texas between Midland and El Paso. ERCOT is the independent system operator that is responsible for maintaining reliable operations for the bulk electric power supply system in its region.

TNMP provides transmission and distribution services at regulated rates to various REPs that, in turn, provide retail electric service to consumers within TNMP’s service area. TNMP experienced increases in weather-normalized retail KWh sales of 3.2% in 2014 and 2.6% in 2013. As of December 31, 2014 , 94 active REPs receive transmission and distribution services from TNMP. The acquirer of First Choice, including the former First Choice operations, accounted for 15% of TNMP’s revenues in 2014 . Two other unaffiliated customers of TNMP accounted for operating revenues of 15% and 11% in 2014 . No other customer accounted for more than 10% of revenues.

Regulatory Activities

In July 2011, the PUCT approved a settlement and authorized an AMS deployment plan that permits TNMP to collect $113.4 million in deployment costs through a surcharge over a 12 -year period. TNMP began collecting the surcharge on August 11, 2011. Deployment of smart meters began in September 2011 and is scheduled to be completed over a 5 -year period.

The PUCT approved interim adjustments to TNMP’s transmission rates of $2.5 million on September 27, 2012, $2.9 million on March 20, 2013, $2.8 million on September 17, 2013, $2.9 million on March13, 2014, and $4.2 million on September 8, 2014. On January16, 2015, TNMP filed an application to further update its transmission rates, which would increase revenues by $4.4 million annually. The application is pending before the PUCT.

Franchise Agreements

TNMP holds long-term, non-exclusive franchise agreements for its electric transmission and distribution services. These agreements have varying expiration dates and some have expired. TNMP intends to negotiate and execute new or amended franchise agreements with municipalities where the agreements have expired or will be expiring. Since TNMP is the exclusive provider of transmission and distribution services in most areas that it serves, the need to renew or renegotiate franchise agreements should not have a material adverse impact. TNMP also earns revenues from service provided to facilities in its service area that lie outside the territorial jurisdiction of the municipalities with which TNMP has franchise agreements.

Corporate and Other

The Corporate and Other segment includes PNMR holding company activities, primarily related to corporate level debt and PNMR Services Company. PNMR Services Company provides corporate services through shared services agreements to PNMR and all of PNMR’s business units, including PNM and TNMP. These services are charged and billed at cost on a monthly basis to the business units.

SOURCES OF POWER
PNM
Generation Capacity

As of December 31, 2014 , the total net generation capacity of facilities owned or leased by PNM was 2,397 MW. PNM also obtains power under a long-term PPA for the power produced by New Mexico Wind, which has a capacity of 204 MW, and the output of the Lightning Dock Geothermal facility, which currently has a capacity of 4 MW. On January 1, 2015, PNM began obtaining the power output of Red Mesa Wind, which has a capacity of 102 MW.


A- 5

Table of Contents


PNM’s capacity in electric generating facilities, which are owned, leased, or under PPAs, in commercial service as of January 1, 2015 is:
 
 
 
 
 
 
Generation
 
 
 
 
 
 
Capacity
Type
 
Name
 
Location
 
(MW)
Coal
 
SJGS
 
Waterflow, New Mexico
 
783

Coal
 
Four Corners
 
Fruitland, New Mexico
 
200

Gas
 
Reeves Station
 
Albuquerque, New Mexico
 
154

Gas
 
Afton (combined cycle)
 
La Mesa, New Mexico
 
230

Gas
 
Lordsburg
 
Lordsburg, New Mexico
 
80

Gas
 
Luna (combined cycle)
 
Deming, New Mexico
 
185

Gas/Oil
 
Rio Bravo, formerly known as Delta
 
Albuquerque, New Mexico
 
138

Gas
 
Valencia
 
Belen, New Mexico
 
158

Nuclear
 
PVNGS
 
Wintersburg, Arizona
 
402

Solar
 
PNM-owned solar
 
Eleven sites in New Mexico
 
67

Wind
 
New Mexico Wind
 
House, New Mexico
 
204

Wind
 
Red Mesa Wind
 
Seboyeta, New Mexico
 
102

Geothermal
 
Lightning Dock Geothermal
 
Lordsburg, New Mexico
 
4

 
 
 
 
 
 
2,707


Fossil‑Fueled Plants

SJGS consists of four units operated by PNM. Units 1, 2, 3, and 4 at SJGS have net rated capacities of 340 MW, 340 MW, 497 MW and 507 MW. SJGS Units 1 and 2 are owned on a 50% shared basis with Tucson. SJGS Unit 3 is owned 50% by PNM, 41.8% by SCPPA, and 8.2% by Tri‑State. SJGS Unit 4 is owned 38.457% by PNM, 28.8% by MSR Public Power Agency, 10.04% by the City of Anaheim, California, 8.475% by the City of Farmington, New Mexico, 7.2% by the County of Los Alamos, New Mexico, and 7.028% by UAMPS. See Note 16 for additional information about SJGS, including the proposal to shut down Units 2 and 3 on December 31, 2017 and the restructuring of the ownership interests in SJGS.

Four Corners Units 4 and 5 are 13% owned by PNM. Units 4 and 5 at Four Corners are jointly owned with APS, SRP, Tucson, and EPE and are operated by APS. PNM had no ownership interest in Four Corners Units 1, 2, or 3, which were shutdown by APS on December 30, 2013. The Four Corners plant site is leased from the Navajo Nation and is also subject to an easement from the federal government. APS, on behalf of the Four Corners participants, negotiated amendments to an existing facility lease with the Navajo Nation, which extends the Four Corners leasehold interest from 2016 to 2041. The Navajo Nation approved these amendments in March 2011. The effectiveness of the amendments also requires the approval of the DOI, as does a related federal rights-of-way grant, which the Four Corners participants are pursuing. A federal environmental review is underway as part of the DOI review process. PNM cannot predict whether the federal approvals will be granted, and if so on a timely basis, or whether any conditions that may be attached to them will be acceptable to PNM and the other Four Corners owners .   See Note 16 for additional information about Four Corners.

PNM owns 100% of Reeves, Afton, Rio Bravo, and Lordsburg and one-third of Luna . The remaining interests in Luna are owned equally by Tucson and Samchully Power & Utilities 1, LLC. Prior to July 17, 2014 when PNM closed on the purchase of Rio Bravo, PNM was entitled to its energy and capacity under a PPA. PNM has a PPA that entitles it to the entire output of Valencia . Valencia is a variable interest entity and is consolidated by PNM as required by GAAP. Therefore, Valencia is reflected in the above table as if it were owned. Reeves, Lordsburg, Rio Bravo, and Valencia are used primarily for peaking power and transmission support. See Note 9 for additional information about Rio Bravo and Valencia, including the potential purchase of 50% of Valencia.

Nuclear Plant

PNM is participating in the three units of PVNGS , also known as the Arizona Nuclear Power Project, with APS (the operating agent), SRP, EPE, SCE, SCPPA, and the Department of Water and Power of the City of Los Angeles. PNM is entitled to 10.2% of the power and energy generated by PVNGS. PNM has ownership interests of 2.3% in Unit 1, 4.6% in Unit 2, and 10.2% in Unit 3 and has leasehold interests of 7.9% in Unit 1 and 5.6% in Unit 2. The lease payments for the leased portions of

A- 6

Table of Contents


PVNGS are recovered through retail rates approved by the NMPRC. See Note 7 for additional information concerning the PVNGS leases, including agreements with the lessors of the PVNGS Unit 1 leases and one of the PVNGS Unit 2 leases for PNM to renew those leases and agreements with the lessors of the other three Unit 2 leases for PNM to exercise its fair market purchase options to purchase the assets underlying those leases. See Note 16 for information on other PVNGS matters, including PNM’s proposal to include PVNGS Unit 3 as a jurisdictional resource to serve New Mexico retail customers.

On March 11, 2011, a 9.0 magnitude earthquake occurred off the northeastern coast of Japan. The earthquake produced tsunamis that caused significant damage to the Fukushima Daiichi Nuclear Power Station in Japan. Following these events, the NRC established a task force to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system. In March 2012, the NRC issued the first regulatory requirements based on the recommendations of the task force. With respect to PVNGS, the NRC issued two orders requiring safety enhancements regarding: (1) mitigation strategies to respond to extreme natural events resulting in the loss of power at plants; and (2) enhancement of spent fuel pool instrumentation. The NRC has issued a number of guidance documents regarding implementation of these requirements. Due to the developing nature of these requirements, PNM cannot predict the financial or operational impacts on PVNGS. However, PVNGS expects to spend approximately $40 million for capital enhancements to the plant over the next two years in addition to the approximately $80 million that has already been spent on capital enhancements as of December 31, 2014. PNM’s share of these enhancements would be 10.2%, substantially all of which are included in PNM’s current projection of capital expenditures.

Solar

In 2011, PNM completed its first major utility-owned renewable energy project aggregating 22 MW when five utility-scale solar facilities in New Mexico went online. In addition to these facilities, PNM completed its solar-storage demonstration project in Albuquerque, which has a generation capacity of 0.5 MW and is included in the above table. In 2013, PNM completed the installation of an additional 21.5 MW of utility-owned solar capacity at four sites, including expansion of capacity at two of the existing sites. In 2014, PNM completed construction of an additional 23 MW of PNM-owned solar PV facilities at three additional sites. PNM’s 2015 renewable energy procurement includes the construction by December 31, 2015 of an additional 40 MW of PNM-owned solar PV facilities.

Plant Operating Statistics

Equivalent availability of PNM’s major base-load generating stations was:
Plant
 
Operator
 
2014
 
2013
 
2012
SJGS
 
PNM
 
76.5%
 
77.6%
 
81.7%
Four Corners
 
APS
 
68.1%
 
72.9%
 
83.5%
PVNGS
 
APS
 
91.8%
 
89.4%
 
90.6%

Joint Projects

SJGS, PVNGS, Four Corners, and Luna are joint projects each owned or leased by several different entities. Some participants in the joint projects are investor-owned entities, while others are municipally or co-operatively owned. Furthermore, participants in SJGS have varying percentage interests in different generating units within the project. The primary operating or participation agreements for the joint projects expire in July 2016 for Four Corners, July 2022 for SJGS, December 2046 for Luna, and November 2047 for PVNGS. In addition, SJGS and Four Corners are coal-fired generating plants that obtain their coal requirements from mines near the plants. The agreement for coal supply for SJGS expires on December 31, 2017. In late December 2013, the coal supply arrangement for Four Corners was extended through 2031. As described above, Four Corners is situated on land under a lease from the Navajo Nation. Portions of PNM’s interests in PVNGS Units 1 and 2 are leased. See Nuclear Plant above and Note 7 regarding PNM’s actions related to options under these leases. Several of the participants in the joint projects are located in California. There are legislative and regulatory mandates in California that may prohibit utilities from entering into new, or extending existing, arrangements for coal-fired generation. It is also possible that the participants in the joint projects have changed circumstances and objectives from those existing at the time of becoming participants. The status of these joint projects is further complicated by the uncertainty surrounding the form of potential legislation and/or regulation of CCBs, GHG, and other air emissions, as well as the impacts of the costs of compliance and operational viability of all or certain units within the joint projects. It is unclear how these factors will enter into discussion and negotiations concerning the status of the joint projects as the expiration of basic operational agreements approaches. PNM can provide no assurance that its participation in the joint projects will continue in the manner that currently exists. See Note 16 for a discussion of potential restructuring of SJGS ownership and developments with respect to Four Corners.

A- 7

Table of Contents



PPAs

In addition to generating its own power, PNM purchases power under long-term PPAs. PNM also purchases power in the forward, day-ahead, and real-time markets.

In 2002, PNM entered into an agreement with FPL to develop New Mexico Wind. PNM began receiving power from the project in June 2003. FPL owns and operates New Mexico Wind, which consists of 136 wind-powered turbines having an aggregate capacity of 204 MW on a site in eastern New Mexico. PNM has a contract to purchase all the power and RECs generated by New Mexico Wind for 25 years. The NMPRC has approved a voluntary tariff that allows PNM retail customers to buy renewable electricity for a small monthly premium. Power from New Mexico Wind is used to service load under the voluntary tariff and as part of PNM’s electric supply mix for meeting retail load.

PNM has a 20-year agreement to purchase energy and RECs from the Lightning Dock Geothermal facility built near Lordsburg. The facility, which is the first geothermal project for the PNM system, began providing limited power to PNM on January 1, 2014. The current capacity of the facility is 4 MW and future expansion may result in up to 10 MW of generation capacity.

In June 2013, PNM entered into a 20 year PPA with Red Mesa Wind, LLC, a subsidiary of NextEra Energy Resources, LLC, to purchase all of the power and RECs produced by Red Mesa Wind beginning on January 1, 2015. Red Mesa Wind, LLC owns and operates the facility, which consists of 64 wind-powered turbines having an aggregate capacity of 102 MW on a site west of Albuquerque.

A summary of purchased power, excluding Rio Bravo and Valencia, is as follows:
 
Year Ended December 31,
 
2014
 
2013
 
2012
Purchased under long-term PPAs
 
 
 
 
 
MWh
492,906

 
490,539

 
546,321

Cost per MWh
$
27.82

 
$
27.25

 
$
27.25

Other purchased power
 
 
 
 
 
Total MWh
1,023,744

 
1,061,514

 
948,911

Cost per MWh
$
40.30

 
$
35.64

 
$
27.30

TNMP
TNMP provides only transmission and distribution services and does not sell power.

FUEL AND WATER SUPPLY
PNM
The percentages of PNM’s generation of electricity (on the basis of KWh), including Valencia and Rio Bravo, fueled by coal, nuclear fuel, and gas and oil, and the average costs to PNM of those fuels per MMBTU were as follows:
 
Coal
 
Nuclear
 
Gas and Oil
 
Percent of
Generation
 
Average
Cost
 
Percent of
Generation
 
Average
Cost
 
Percent of
Generation
 
Average
Cost
2014
56.7
%
 
$
3.00

 
32.0
%
 
$
0.83

 
10.3
%
 
$
4.26

2013
56.8
%
 
$
2.62

 
30.4
%
 
$
0.88

 
12.2
%
 
$
4.12

2012
59.2
%
 
$
2.99

 
31.3
%
 
$
0.88

 
9.0
%
 
$
3.25


In 2014 , 2013, and 2012, 1.0%, 0.6%, and 0.5% of PNM’s generation was from utility owned solar, which has no fuel cost. The generation mix for 2015 is expected to be 56.7% coal, 30.7% nuclear, 11.0% gas and oil, and 1.6% utility owned solar. Due to locally available natural gas and oil supplies, the utilization of locally available coal deposits, and the generally adequate supply of nuclear fuel, PNM believes that adequate sources of fuel are available for its generating stations into the foreseeable future. See Sources of Power – PNM – PPAs for information concerning the cost of purchased power.


A- 8

Table of Contents


Coal

The coal supply contract that provides fuel for SJGS expires on December 31, 2017. Coal supply has not been arranged for periods after the existing contract expires although negotiations are ongoing. PNM believes there is adequate availability of coal resources to continue to operate SJGS although an extended or new contract could result in higher prices. In late December 2013, the expiration date of the coal supply contract for Four Corners was extended from 2016 to 2031. Coal costs are anticipated to increase approximately 30% at the inception of the new contract. The contract provides for pricing adjustments over its term based on economic indices. See Note 16 for additional information about PNM’s coal supply.
Natural Gas
The natural gas used as fuel for the electric generating plants is procured on the open market and delivered by third party transportation providers. The supply of natural gas can be subject to disruptions due to extreme weather events and/or pipeline or facility outages. PNM has contracted for firm gas transmission capacity to minimize the potential for disruptions due to extreme weather events. PNM’s natural gas plants are generally used as peaking resources that are highly relied upon during periods of extreme weather, which also may be the times natural gas has the highest demand from other users.
Nuclear Fuel and Waste
PNM is one of several participants in PVNGS. The PVNGS participants are continually identifying their future nuclear fuel resource needs and negotiating arrangements to fill those needs. The PVNGS participants have contracted for all of PVNGS’s requirements for uranium concentrates and conversion services through 2018 and 45% of its requirements in 2019-2020. The participants have also contracted for 100% of PVNGS’s enrichment services through 2020. All of PVNGS’s fuel assembly fabrication services are contracted through 2022.
The Nuclear Waste Policy Act of 1982 required the DOE to begin to accept, transport, and dispose of spent nuclear fuel and high level waste generated by the nation’s nuclear power plants by 1998. The DOE’s obligations are reflected in a contract with each nuclear power plant. The DOE failed to begin accepting spent nuclear fuel by 1998. APS (on behalf of itself and the other PVNGS participants) has pursued legal actions. See Note 16 for information concerning these actions.
The DOE had planned to meet its disposal obligations by designing, licensing, constructing, and operating a permanent geologic repository at Yucca Mountain, Nevada. In March 2010, the DOE filed a motion to dismiss with prejudice its Yucca Mountain construction authorization application that was pending before the NRC. Several interested parties have intervened in the NRC proceeding. Additionally, a number of interested parties have filed a variety of lawsuits in different jurisdictions around the country challenging the DOE’s authority to withdraw the Yucca Mountain construction authorization application. None of these lawsuits has been conclusively decided by the courts. However, in August 2013, the D.C. Circuit ordered the NRC to resume its review of the application with available appropriated funds.

On October 16, 2014, the NRC issued Volume 3 of the safety evaluation report developed as part of the Yucca Mountain construction authorization application. This volume addresses repository safety after permanent closure, and its issuance is a key milestone in the Yucca Mountain licensing process. Volume 3 contains the staff’s finding that the DOE’s repository design meets the requirements that apply after the repository is permanently closed, including but not limited to the post-closure performance objectives in NRC’s regulations. On December 18, 2014, the NRC issued Volume 4 of the safety evaluation report developed as part of the Yucca Mountain construction authorization application. This volume covers administrative and programmatic requirements for the repository. It documents the staff’s evaluation of whether the DOE’s research and development and performance confirmation programs, as well as other administrative controls and systems, meet applicable NRC requirements. Volume 4 contains the staff’s finding that most administrative and programmatic requirements in NRC regulations are met, except for certain requirements relating to ownership of land and water rights. Publication of Volumes 3 and 4 does not signal whether or when the NRC might authorize construction of the repository.
All spent nuclear fuel from PVNGS is being stored on-site. PVNGS has sufficient capacity at its on-site ISFSI to store all of the nuclear fuel that will be irradiated during the initial operating license periods, which end in November 2027. Additionally, PVNGS has sufficient capacity at its on-site ISFSI to store a portion of the fuel that will be irradiated during the extended license periods, which end in November 2047. If uncertainties regarding the United States government’s obligation to accept and store spent fuel are not favorably resolved, the PVNGS participants will evaluate alternative storage solutions. These may obviate the need to expand the ISFSI to accommodate all of the fuel that will be irradiated during the extended license periods.
Water Supply

See Note 16 for information about PNM’s water supply.

A- 9

Table of Contents



ENVIRONMENTAL MATTERS

Electric utilities are subject to stringent laws and regulations for protection of the environment by local, state, federal, and tribal authorities. In addition, PVNGS is subject to the jurisdiction of the NRC, which has the authority to issue permits and licenses and to regulate nuclear facilities in order to protect the health and safety of the public from radioactive hazards and to conduct environmental reviews pursuant to NEPA. The liabilities under these laws and regulations can be material. In some instances, liabilities may be imposed without regard to fault, or may be imposed for past acts, whether or not such acts were lawful at the time they occurred. The construction expenditure projection includes environmental upgrades at SJGS and Four Corners aggregating $72.1 million in 2015 and $78.6 million in 2016 through 2019, as discussed in Note 16. See MD&A – Other Issues Facing the Company – Climate Change Issues for information on GHG. In addition, Note 16 contains information related to the following matters, incorporated in this item by reference:

PVNGS Decommissioning Funding
Nuclear Spent Fuel and Waste Disposal
Environmental Matters under the caption “The Clean Air Act”
WEG v. OSM NEPA Lawsuit
Navajo Nation Environmental Issues
Cooling Water Intake Structures
Effluent Limitation Guidelines
Santa Fe Generating Station
Environmental Matters under the caption “Coal Combustion Byproducts Waste Disposal”
Hazardous Air Pollutants (“HAPs”) Rulemaking
COMPETITION

Regulated utilities are generally not subject to competition from other utilities in areas that are under the jurisdiction of state regulatory commissions. In New Mexico, PNM does not have direct competition for services provided to its retail electric customers. In Texas, TNMP is not currently in any direct retail competition with any other regulated electric utility. However, PNM and TNMP are subject to customer conservation and energy efficiency activities as well as initiatives to utilize alternative energy sources, including self-generation, or otherwise bypass the PNM and TNMP systems.

PNM is subject to varying degrees of competition in certain territories adjacent to or within the areas it serves. This competition comes from other utilities in its region as well as rural electric cooperatives and municipal utilities.  PNM is involved in the generation and sale of electricity into the wholesale market.  It is subject to competition from regional utilities and merchant power suppliers with similar opportunities to generate and sell energy at market-based prices and larger trading entities that do not own or operate generating assets.

EMPLOYEES
The following table sets forth the number of employees of PNMR, PNM, and TNMP as of December 31, 2014 :
 
PNMR
 
PNM
 
TNMP
Corporate (1)
433

 

 

PNM
1,093

 
1,093

 

TNMP
355

 

 
355

   Total
1,881

 
1,093

 
355


(1) Represents employees of PNMR Services Company.
As of December 31, 2014 , PNM had 593 employees in its power plant and operations areas that are currently covered by a collective bargaining agreement with the IBEW Local 611 that was entered into in July 2012 and expires April 30, 2015. Negotiations for a new agreement with the IBEW began in January 2015.  While the Company is optimistic that a timely agreement will be reached, PNM cannot, at this time, predict the outcome of the negotiations.  PNM is currently working on contingency planning for certain scenarios that may occur as a result of negotiations. The wages and benefits for all PNM employees who are members of the IBEW are typically included in the rates charged to electric customers, subject to approval of the NMPRC.
On March 25, 2013, a petition was filed by IBEW Local 66 with the National Labor Relations Board seeking to certify a union at TNMP for utility workers. On April 12, 2013, a second petition was filed by IBEW Local 66 with the National Labor Relations Board seeking to certify a union at TNMP for meter technicians, who were not included in the original petition.

A- 10

Table of Contents


Approximately 200 employees were covered by the petitions. Elections to determine whether the IBEW would represent the employees were held in May 2013.  The employees voted to unionize through both petitions and contract negotiations began. Subsequently, on June 25, 2013, a third petition was filed by IBEW Local 66 with the National Labor Relations Board seeking to include a group of three relay technicians, who were not included in the original petition. In August 2013, the relay technicians voted to unionize. As of December 31, 2014 , TNMP had 195 employees represented by IBEW Local 66. In January 2015, a decertification election was held for those employees covered by the original petition. The employees voted to retain union representation. The parties have reached a tentative agreement on a collective bargaining agreement. A vote of the union members on whether to ratify the agreement is in process.

DISCLOSURE REGARDING FORWARD LOOKING STATEMENTS

Statements made in this filing that relate to future events or PNMR’s, PNM’s, or TNMP’s expectations, projections, estimates, intentions, goals, targets, and strategies are made pursuant to the Private Securities Litigation Reform Act of 1995. Readers are cautioned that all forward-looking statements are based upon current expectations and estimates. PNMR, PNM, and TNMP assume no obligation to update this information.
 
Because actual results may differ materially from those expressed or implied by these forward-looking statements, PNMR, PNM, and TNMP caution readers not to place undue reliance on these statements. PNMR’s, PNM’s, and TNMP’s business, financial condition, cash flows, and operating results are influenced by many factors, which are often beyond their control, that can cause actual results to differ from those expressed or implied by the forward-looking statements. These factors include:

The ability of PNM and TNMP to recover costs and earn allowed returns in regulated jurisdictions, including treatment of SJGS Units 2 and 3 at the date of their proposed early retirement
Uncertainty surrounding the status of PNM’s participation in jointly-owned generation projects resulting from the scheduled expiration of the operational agreements for SJGS and Four Corners, as well as the fuel supply agreement for SJGS, including potential restructuring and approval issues at SJGS and Four Corners necessary for operational and potential future environmental compliance matters
The impacts on the electricity usage of customers and consumers due to performance of state, regional, and national economies and mandatory energy efficiency measures, weather, seasonality, alternative sources of power, and other changes in supply and demand
State and federal regulation or legislation relating to environmental matters, including the RSIP for SJGS’s compliance with the CAA, the resultant costs of compliance, and other impacts on the operations and economic viability of PNM’s generating plants
The ability of the Company to successfully forecast and manage its operating and capital expenditures
Physical and operational risks related to climate change and potential financial risks resulting from climate change litigation and legislative and regulatory efforts to limit GHG
Uncertainty regarding the requirements and related costs of decommissioning power plants and coal mines supplying certain power plants, as well as the ability to recover decommissioning costs from customers
The performance of generating units, transmission systems, and distribution systems, which could be negatively affected by operational issues, fuel quality, unplanned outages, extreme weather conditions, terrorism, cybersecurity breaches, and other catastrophic events
Variability of prices and volatility and liquidity in the wholesale power and natural gas markets
Changes in price and availability of fuel and water supplies, including the ability of the mines supplying coal to PNM’s coal-fired generating units and the companies involved in supplying nuclear fuel to provide adequate quantities of fuel
State and federal regulatory, legislative, and judicial decisions and actions on ratemaking, tax, and other matters
The risks associated with completion of generation, transmission, distribution, and other projects
Regulatory, financial, and operational risks inherent in the operation of nuclear facilities, including spent fuel disposal uncertainties
The Company’s ability to access the financial markets, including disruptions in the credit markets, actions by ratings agencies, and fluctuations in interest rates
The potential unavailability of cash from PNMR’s subsidiaries due to regulatory, statutory, or contractual restrictions
The risk that FERC rulemakings may negatively impact the operation of PNM’s transmission system
The impacts of decreases in the values of marketable equity securities maintained to provide for decommissioning, reclamation, pension benefits, and other postretirement benefits
Employee workforce factors, including issues arising out of collective bargaining agreements and labor negotiations with union employees
Commodity and counterparty credit risk transactions and the effectiveness of risk management

A- 11

Table of Contents


The outcome of legal proceedings, including the extent of insurance coverage
Changes in applicable accounting principles or policies

For information about the risks associated with the use of derivative financial instruments see Part II, Item 7A. “Quantitative and Qualitative Disclosures About Market Risk.”

SECURITIES ACT DISCLAIMER
Certain securities described in this report have not been registered under the Securities Act of 1933, as amended, or any state securities laws and may not be reoffered or sold in the United States absent registration or an applicable exemption from the registration requirements of the Securities Act of 1933 and applicable state securities laws. This Form 10-K does not constitute an offer to sell or the solicitation of an offer to buy any securities.  

ITEM 1A.      RISK FACTORS
 
The business and financial results of PNMR, PNM, and TNMP are subject to a number of risks and uncertainties, including those set forth below and in MD&A, Note 16, and Note 17. TNMP provides transmission and distribution services to REPs that provide electric service to consumers in TNMP’s service territories. References to customers in the risk factors discussed below also encompass the customers of these REPs who are the ultimate consumers of electricity transmitted and distributed through TNMP’s facilities.
 
Regulatory Factors
 
The profitability of PNMR’s utilities depends on being able to recover their costs through regulated rates and earn a fair return on invested capital. PNM and TNMP are in a period of significant capital expenditures. While increased capital investments and other costs are placing upward pressure on rates, energy efficiency and a sluggish New Mexico economy are reducing usage by customers.
 
The rates PNM charges its customers are regulated by the NMPRC and FERC. TNMP is regulated by the PUCT. The Company is in a period requiring significant capital investment and is projecting total construction expenditures for the years 2015-2019 to be $2,207.3 million. See Note 14. PNM and TNMP anticipate a trend toward increasing costs, for which it will have to seek regulatory recovery. These costs include or are related to:
 
Environmental compliance expenditures
The proposed early retirement of SJGS Units 2 and 3 as part of a revised plan to comply with the regional haze provisions of the CAA, including treatment of their net book value at the date of retirement and costs of generation capacity to replace those units
New asset construction related to generation, transmission, and distribution systems necessary to provide electric service
The regulatory mandate to acquire power from renewable resources
Increased regulation related to nuclear safety
Fuel costs
Increased interest costs to finance capital investments
Depreciation
 
At the same time costs are increasing, there are factors placing downward pressures on the demand for power, thereby reducing load growth and customer usage. These factors include:

Changing customer behaviors, including increased emphasis on energy efficiency measures and utilization of alternative sources of power
Reduced new sources of demand
Reductions in costs of energy efficient technology
Unpredictable weather patterns
Adverse economic conditions

In 2014 and 2013, PNM experienced decreases in weather-normalized retail sales of 1.7% and 1.8%. The sales decreases reflect a continued sluggish economy in New Mexico. In particular, the Albuquerque metropolitan area continues to lag the nation in economic recovery. After several years of being relatively flat, New Mexico’s employment showed modest growth in 2014 and

A- 12

Table of Contents


only modest growth is anticipated in the near future. Also, low population growth will result in low growth in the number of customers. In Texas, the drop in oil prices has impacted the economy although it remains relatively strong.

The combination of costs increasing relatively rapidly and the slowing of customer usage places upward pressure on the per unit prices that must be charged to recover costs. This upward pressure on unit prices could result in additional efforts by customers to reduce consumption through energy efficiency or to pursue self-generation or other alternative sources of power. Without timely cost recovery and the authorization to earn a reasonable return on invested capital, the Company’s liquidity and results of operations could be negatively impacted.
  
Under New Mexico law, utilities may propose the use of a future test year in establishing rates. As with any forward looking financial information, a future test year presents challenges that are inherent in the forecasting process. Forecasts of both operating and capital expenditures necessitate reliance on many assumptions concerning future conditions and operating results. Accordingly, if rate requests based on a future test year cannot be successfully supported, cash flows and results of operations may be negatively impacted. This could result from not being able to withstand challenges from regulators and intervenors regarding the utility’s capability to make reasonable forecasts.
 
The coal supply contract that currently provides fuel for SJGS expires on December 31, 2017. Negotiations for a new coal supply contract, which are in process, could result in higher prices. In late December 2013, the expiration date of the coal supply contract for Four Corners was extended from 2016 to 2031. Coal costs are anticipated to increase approximately 30% at the inception of the new contract. The contract provides for pricing adjustments over its term based on economic indices. PNM currently recovers the cost of fuel for its generation facilities through its FPPAC. Although PNM believes costs under new coal supply arrangements would continue to be recovered through the FPPAC, there can be no assurance that full recovery would be allowed.
 
PNMR’s utilities are subject to numerous federal, state, and local environmental laws and regulations that may significantly limit or affect their operations and financial results.
 
Compliance with federal, state, and local environmental laws and regulations, including those addressing climate change, air quality, CCBs, discharges of wastewater originating from fly ash and bottom ash handling facilities, cooling water, and other matters, may result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emission obligations. These costs could include remediation, containment, civil liability, and monitoring expenses. The Company cannot predict how they would be affected if existing environmental laws and regulations were to be revised or reinterpreted, or if new environmental statutes and rules were to be adopted. See Note 16 and the Climate Change Issues subsection of the Other Issues Facing the Company section of MD&A.
 
EPA, environmental advocacy groups, other organizations, and some other federal and state agencies are predicted to focus considerable attention on GHG from power generation facilities, including the role of those facilities in climate change. PNM depends on fossil-fueled generation for a significant share of its electricity. Therefore, it could be exposed to possible future GHG regulations imposed by New Mexico and/or the federal government. For example, as discussed in the Climate Change Issues subsection of the Other Issues Facing the Company section of MD&A, EPA has proposed its GHG NSPS rules for new sources, as well as modified and existing EGU’s. Any such proposals that become regulations could result in additional operating restrictions on facilities and increased generation and compliance costs.
 
CCBs from the operation of SJGS are currently being used in the reclamation of a surface coal mine. These CCBs consist of fly ash, bottom ash, and gypsum. Any new regulation that would affect the reclamation process, including mine use of CCBs being classified as hazardous waste by EPA, could significantly increase the costs of the disposal of CCBs and the costs of mine reclamation. See Note 16.
 
A regulatory body may identify a site requiring environmental cleanup and designate PNM or TNMP as a responsible party. There is also uncertainty in quantifying exposure under environmental laws that impose joint and several liability on all potentially responsible parties. Failure to comply with environmental laws and regulations, even if caused by factors beyond PNM’s or TNMP’s control, may result in the assessment of civil or criminal penalties and fines.
 
BART determinations have been made for both SJGS and Four Corners under the program to address regional haze in the “four corners” area, which would reduce the levels of NOx emitted at both plants. Significant capital expenditures will be required for the installation of control technology at both generating stations and operating costs would increase.PNMR and its operating subsidiaries may underestimate the costs of environmental compliance, liabilities, and litigation due to the uncertainty inherent in these matters. Although there is uncertainty about the timing and form of regulations regarding climate change, CCBs, and other power plant emissions, such regulations could have a material impact on operations. Timely regulatory recovery of

A- 13

Table of Contents


costs associated with any environmental-related regulations would be needed to maintain a strong financial and operational profile. The above factors could adversely affect the Company’s business, financial position, results of operations, and liquidity.

PNM has a case pending before the NMPRC requesting regulatory approvals necessary for PNM to comply with the regional haze requirements of the CAA pertaining to SJGS. Failure to obtain the approval of the NMPRC in this matter could impact PNM’s ability to efficiently operate SJGS, which could have a negative impact on PNM’s business, financial condition, results of operations, and cash flows.

SJGS, which currently comprises 28.9% of PNM’s owned and leased generation capacity and is its largest generation resource, is subject to the CAA. In February 2013, PNM, NMED, and EPA agreed to pursue a revised plan regarding SJGS. In October 2014, EPA published its approval of NMED’s RSIP, which requires the installation of SNCRs on SJGS Units 1 and 4 combined with the shutdown of SJGS Units 2 and 3. PNM believes significant progress is being made towards implementation of the RSIP. In order to retire San Juan Units 2 and 3, final binding agreements must be reached among the SJGS owners on a revised ownership structure of SJGS, as well as addressing continuing liabilities for reclamation, decommissioning, environmental, and other matters. The participants are attempting to agree on these items and are engaged in ongoing mediated negotiations, but binding agreements have not been reached.

The coal supply contract that currently provides fuel for SJGS expires on December 31, 2017. Coal supply has not been arranged for periods after the existing contract expires. In order for the participants to approve the restructuring of ownership in SJGS, they have indicated they need to obtain greater certainty regarding fuel supply for SJGS for the period after December 31, 2017. The remaining participants in SJGS are in the process of negotiating agreements concerning future fuel supply for SJGS. The date for negotiation of a transaction has been extended until May 1, 2015. However, it is possible that the participants may not be able to negotiate a new contract for coal supply or that a new contract for coal could result in higher prices, either of which could impact the restructuring process.

PNM has a filing pending before the NMPRC that requests the regulatory approvals required to effectuate the RSIP. A public hearing on PNM’s requests was held in January 2015 and PNM believes it justified that its requests provide the best alternative for New Mexico retail ratepayers in order to comply with the requirements of the CAA. Final approvals from the NMPRC are necessary to implement the RSIP. PNM believes that for the NMPRC to approve PNM’s requests, the SJGS participants will have to reach binding agreements regarding restructuring ownership in SJGS. In the NMPRC proceeding, PNM has committed to reaching binding agreements on restructuring by May 1, 2015. For the participants to reach such agreements, it is likely that the remaining participants in SJGS will need to have completed negotiations regarding the coal supply for SJGS for periods after December 31, 2017.

Additional information regarding the RSIP, the restructuring negotiations, the request for NMPRC approvals, and coal supply is discussed in Note 16.

PNM can provide no assurance that these requirements will be accomplished or that the NMPRC will approve PNM’s requests. If NMPRC approval is not obtained, PNM may not be able to implement the RSIP. If the RSIP requirements ultimately are not implemented due to adverse or alternative regulatory, legislative, legal, or restructuring developments or other factors, PNM would need to pursue other alternatives to address compliance with the CAA. In such circumstances, PNM could be forced to temporarily or permanently cease operation of some or all of the SJGS units. If a shutdown was required, PNM would then have to acquire replacement power through short-term or open-market purchases in order to serve the needs of its customers. There can be no assurance that sufficient replacement power will be available to serve PNM’s needs or, if available, what costs would be incurred. To the extent any additional costs incurred are not allowed to be recovered from customers through the ratemaking process, PNM’s financial condition, results of operation, and cash flows could be negatively impacted.

It is also possible that failure to reach a satisfactory agreement to restructure SJGS ownership, requirements to comply with the final BART determinations, the financial impact of possible future climate change regulation or legislation, if any, other environmental regulations, the result of litigation, the adequacy and timeliness of cost recovery mechanisms, and other business considerations, could jeopardize the economic viability of the plant or the ability of individual participants to continue participation in SJGS.

PNMR, PNM, and TNMP are subject to complex government regulation unrelated to the environment, which may have a negative impact on their businesses, financial position and results of operations.
 
To operate their businesses, PNMR, PNM, and TNMP are required to have numerous permits and approvals from a variety of regulatory agencies. Regulatory bodies with jurisdiction over the utilities include the NMPRC, NMED, PUCT, TCEQ, ERCOT,

A- 14

Table of Contents


FERC, NRC, EPA, and NERC. Oversight by these agencies covers many aspects of the Company’s utility operations including: location, construction, and operation of facilities; the purchase of power under long-term contracts; conditions of service; the issuance of securities; and rates charged to customers. FERC has issued a number of rules pertaining to preventing undue discrimination in transmission services and electric reliability standards.
 
PNMR and its subsidiaries are unable to predict the impact on their business and operating results from future actions of any agency regulating the Company. Changes in existing regulations or the adoption of new ones could result in additional expenses and/or changes in business operations. In turn, operating results could be adversely impacted. 
 
Operational Factors
 
Customer electricity usage could be reduced by increases in prices charged and other factors.  This could result in underutilization of PNM’s generating capacity, as well as the capacities of PNM’s and TNMP’s transmission and distribution systems.  Should this occur, operating and capital costs might not be fully recovered, and financial performance could be negatively impacted.

A number of factors influence customers’ electricity purchases.  These factors include, but are not limited to:

Rates charged by PNM and TNMP
Rates charged by REPs utilizing TNMP’s facilities to deliver power
Energy efficiency initiatives
Availability and cost of alternative sources of power
National, regional, or local economic conditions

These factors and others may prompt customers to institute additional energy efficiency measures or take other actions that would result in lower power consumption. If customers bypass or underutilize PNM’s and TNMP’s facilities through self-generation, renewable or other energy resources, technological change, or other measures, revenues would be negatively impacted.

PNM’s and TNMP’s service territories include several military bases and federally funded national laboratories, as well as large industrial customers that have significant direct and indirect impacts on the local economies where they operate.  The Company does not directly provide service to any of the military bases or national laboratories, but does provide service to large industrial customers. The Company’s business could be hurt from the impacts on the local economies associated with these customer groups, as well as directly from the large industrial customers, for a number of reasons, including:

Federally-mandated base closures or significant curtailment of the activities at the bases or national laboratories
Closure of industrial facilities or significant curtailment of their activities
 
Another factor that could negatively impact the Company is that proposals are periodically advanced in various localities to municipalize, or otherwise take over PNM’s facilities, which PNM believes would require state legislative action to implement, or to establish new municipal utilities in areas currently served by PNM.  For example, officials in the City of Santa Fe, New Mexico have indicated a desire to reduce the carbon footprint of the city, which could include exploring renewable resources dedicated to serve the city, a partnership with existing utilities, or the feasibility of a city-owned municipal electric utility. PNM is monitoring that situation. If any such initiative is successful, the result could be a material reduction in the usage of the facilities, a reduction in rate base, and reduced earnings.

Should any of the above factors result in facilities being underutilized, the Company’s financial position, operational results, and cash flows could be significantly impacted.

Costs of decommissioning, remediation, and restoration of nuclear and fossil-fueled power plants, as well as related coal mines, could exceed the estimates of PNMR and PNM, which could negatively impact results of operations and liquidity.

PNM has interests in a nuclear power plant, two coal-fired power plants, and several natural gas-fired power plants. PNM is obligated to pay for the costs of decommissioning its share of the power plants. PNM is also obligated to pay for its share of the costs of decommissioning the mines that supply coal to the coal-fired power plants. Likewise, other owners or participants are responsible for their shares of the decommissioning obligations and it is important to PNM that those parties fulfill their obligations. Rates charged by PNM to its customers, as approved by the NMPRC, include a provision for recovery of certain costs of decommissioning, remediation, and restoration. The NMPRC has established a cap on the amount of decommissioning costs for the surface coal mines that may be recovered from customers. PNM records estimated liabilities for its share of the legal

A- 15

Table of Contents


obligations for decommissioning and reclamation. These estimates include many assumptions about future events and are inherently imprecise. In the event any of these costs exceed current estimates, results of operations could be negatively impacted.

The financial performance of PNMR, PNM, and TNMP may be adversely affected if power plants and transmission and distribution systems do not operate reliably and efficiently.
 
The Company’s financial performance depends on the successful operation of PNM’s generation assets, as well as the transmission and distribution systems of PNM and TNMP. Unscheduled or longer than expected maintenance outages, breakdown or failure of equipment or processes due to aging infrastructure, temporary or permanent shutdowns to achieve environmental compliance, other performance problems with the electric generation assets, severe weather conditions, accidents and other catastrophic events, acts of war or terrorism, disruptions in the supply, quality, and delivery of fuel and water supplies, and other factors could result in PNM’s load requirements being larger than available system generation capacity. Assured supplies of water are important for PNM’s generating plants. Water in the southwestern United States is limited and there are conflicting claims regarding water rights. In addition, the “four corners” region where two of PNM’s power plants are located is prone to drought conditions, which could potentially affect the plants’ water supplies. In addition, unplanned outages of generating units and extensions of scheduled outages occur from time to time and are an inherent risk of the Company’s business. If these were to occur, PNM would be required to purchase electricity in either the wholesale market or spot market at the then-current market price. There can be no assurance that sufficient electricity would be available at reasonable prices, or available at all. The failure of transmission or distribution facilities may also affect PNM’s and TNMP’s ability to deliver power. These potential generation, distribution, and transmission problems, and any service interruptions related to them, could result in lost revenues and additional costs.

PNMR, PNM, and TNMP are subject to information security breaches and risks of unauthorized access to their information and operational technology systems as well as physical threats to assets.
 
The Company faces the risk of physical and cyber attacks, both threatened and actual, against generation facilities, transmission and distribution infrastructure used to transport power, and information technology systems and network infrastructure, which could negatively impact the ability of the Company to generate, transport, and deliver power, or otherwise operate facilities in the most efficient manner or at all.

The Company functions in a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure, some of which are deemed to be critical infrastructure under NERC guidelines. Certain of the Company’s systems are interconnected with external networks. In the regular course of business, the utilities handle a range of sensitive security and customer information. PNM and TNMP are subject to the rules of various agencies concerning safeguarding and maintaining the confidentiality of this information.

In the event a party desires to disrupt the bulk power or transmission systems in the United States, the Company’s computer and operating systems could be subject to physical or cyber attack.  Although the Company has implemented security measures, critical infrastructure, including information and operational technology systems, are vulnerable to disability, failures, or unauthorized access.  A successful physical or cyber attack or other similar failure of the systems could impact the reliability of PNM’s generation and PNM’s and TNMP’s transmission and distribution systems, including the possible unauthorized shutdown of facilities. Such an event could lead to significant disruptions of business operations, including the Company’s ability to generate, transport, and deliver power to serve customers, to bill customers, and to process other financial information. A major physical or cyber incident could lead to increased regulatory oversight, litigation, fines, other remedial action, and reputational damage. The costs incurred to investigate and remediate a physical or cyber security attack could be significant. If the Company’s systems were to fail or be breached and not recovered in a timely way, critical business functions could be impaired and sensitive or confidential data could be compromised. A physical or cyber attack on the Company’s critical infrastructure could have a material adverse impact on the operations and financial condition of PNMR, PNM, and TNMP.
 
There are inherent risks in the ownership and operation of nuclear facilities.
 
PNM has a 10.2% undivided interest in PVNGS, including interests in Units 1 and 2 held under leases. PVNGS represents 16.8% of PNM’s total owned and leased generating capacity. PVNGS is subject to environmental, health, and financial risks, including, but not limited to:
 
The ability to obtain adequate supplies of nuclear fuel and water
The ability to dispose of spent nuclear fuel
Decommissioning of the plant


A- 16

Table of Contents


Securing the facilities against possible terrorist attacks
Unscheduled outages due to equipment failures
 
PNM maintains trust funds designed to provide adequate financial resources for decommissioning at the end of the expected life of the PVNGS units. However, if the units are decommissioned before their planned date, these funds may prove to be insufficient. PNM also has external insurance coverage to minimize its financial exposure to some risks. However, it is possible that liabilities associated with nuclear operations could exceed the amount of insurance coverage. See Note 16.
 
The NRC has broad authority under federal law to impose licensing and safety-related requirements for the operation of nuclear generation facilities. Events at nuclear facilities of other operators or impacting the industry generally may lead the NRC to impose additional requirements and regulations on all nuclear generation facilities, including PVNGS. As a result of the March 2011 earthquake and tsunamis that caused significant damage to the Fukushima Daiichi Nuclear Power Plant in Japan, various industry organizations are working to analyze information from the Japan incident and develop action plans for nuclear power plants in the United States. Additionally, the NRC has been performing its own independent review of the events at Fukushima Daiichi, including a review of the agency’s processes and regulations in order to determine whether the agency should promulgate additional regulations and possibly make more fundamental changes to the NRC’s system of regulation. PNM cannot predict when or if the NRC will complete its formal actions as a result of its review. However, PVNGS expects to spend approximately $40 million for capital enhancements to the plant over the next two years in addition to the approximately $80 million that has already been spent on capital enhancements as of December 31, 2014. PNM’s share of these enhancements would be 10.2%, substantially all of which are included in PNM’s current projection of capital expenditures. PNM cannot predict whether these amounts will increase or whether additional financial and/or operational requirements on PVNGS may be imposed.
In the event of noncompliance with its requirements, the NRC has the authority to impose a progressively increased inspection regime that could ultimately result in the shut down of a unit or civil penalties, or both, depending upon the NRC’s assessment of the severity of the situation, until compliance is achieved. Increased costs resulting from penalties, a heightened level of scrutiny, and/or implementation of plans to achieve compliance with NRC requirements could adversely affect the financial condition, results of operations, and cash flows of PNMR and PNM. Although PNM has no reason to anticipate a serious nuclear incident at PVNGS, if an incident did occur, it could materially and adversely affect PNM’s results of operations and financial condition.  A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit and to promulgate new regulations that could require significant capital expenditures and/or increase operating costs.
 
Demand for power could exceed supply capacity, resulting in increased costs for purchasing capacity in the open market or building additional generation facilities.

PNM is obligated to supply power to retail customers and certain wholesale customers. At peak times, power demand could exceed PNM’s available generation capacity. Market forces, competitive forces, or adverse regulatory actions may require PNM to purchase capacity on the open market or build additional generation capabilities. Regulators or market conditions may not permit PNM to pass all of these purchases or construction costs on to customers. If that occurs, PNM may not be able to fully recover these costs. Or, there may be a lag between when costs are incurred and when regulators permit recovery in customers’ rates. These situations could have negative impacts on results of operations and cash flows.

General Economic and Weather Factors
General economic conditions of the nation and/or specific areas can affect the Company’s customers and suppliers. Economic recession or downturn may result in decreased consumption by customers and increased bad debt expense, and could also negatively impact suppliers, all of which could negatively impact the Company.
Economic activity is a key factor in PNMR subsidiaries’ performance. Decreased economic activity can lead to declines in energy consumption, which could adversely affect future revenues, earnings, and growth.  Higher unemployment rates, both in the Company’s service territories and nationwide, could result in commercial customers ceasing operations and lower levels of income for residential customers. These customers might then be unable to pay their bills on time, which could increase bad debt expense and negatively impact results of operations and cash flows. Economic conditions also impact the supply and/or cost of commodities and materials needed to construct or acquire utility assets or make necessary repairs.
 

A- 17

Table of Contents


The operating results of PNMR and its operating subsidiaries fluctuate on a seasonal and quarterly basis as well as being affected by weather conditions, including regional drought.
Electric generation, transmission, and distribution are generally seasonal businesses that vary with the demand for power. With power consumption typically peaking during the hot summer months, revenues traditionally peak during that period. As a result, quarterly operating results of PNMR and its operating subsidiaries vary throughout the year. In addition, PNMR and its operating subsidiaries have historically had lower revenues resulting in lower earnings when weather conditions are milder. Unusually mild weather in the future could reduce the revenues, net earnings, and cash flows of the Company.
Drought conditions in New Mexico, especially in the “four corners” region, where SJGS and Four Corners are located, may affect the water supply for PNM’s generating plants.  If inadequate precipitation occurs in the watershed that supplies that region, PNM may have to decrease generation at these plants. This would require PNM to purchase power to serve customers and/or reduce the ability to sell excess power on the wholesale market and reduce revenues. Drought conditions or actions taken by regulators or legislators could limit PNM’s supply of water, which would adversely impact PNM’s and PNMR’s business. Although PNM has in place supplemental contracts and voluntary shortage sharing agreements with tribes and other water users in the “four corners” region, PNM cannot be certain these contracts will be enforceable in the event of a major drought or that it will be able to renew these contracts in the future.
TNMP’s service areas are exposed to extreme weather, including high winds, drought, flooding, and periodic hurricanes. Extreme weather conditions, particularly high winds and severe thunderstorms, also occur periodically in PNM’s service areas. These severe weather events can physically damage TNMP’s and PNM’s owned facilities. Any such occurrence both disrupts the ability to deliver energy and increases costs. Extreme weather can also reduce customers’ usage and demand for energy. These factors could negatively impact results of operations and cash flows.
Financial Factors
PNMR may be unable to meet its ongoing and future financial obligations and to pay dividends on its common stock if its subsidiaries are unable to pay dividends or distributions to PNMR.
PNMR is a holding company and has no operations of its own. PNMR’s ability to meet its financial obligations and to pay dividends on its common stock primarily depends on the net income and cash flows of PNM and TNMP and their capacity to pay upstream dividends or distributions. Prior to providing funds to PNMR, PNM and TNMP have financial and regulatory obligations that must be satisfied, including among others, debt service and, in the case of PNM, preferred stock dividends.
The NMPRC has placed certain restrictions on the ability of PNM to pay dividends to PNMR, including that PNM cannot pay dividends that cause its debt rating to fall below investment grade. The NMPRC has also restricted PNM from paying dividends in any year, as determined on a rolling four-quarter basis, in excess of net earnings without prior NMPRC approval. PNM is permitted to pay dividends to PNMR from prior equity contributions made by PNMR. Additionally, PNM has various financial covenants that limit the transfer of assets, through dividends or other means.
Further, the ability of PNMR to declare dividends depends upon:

The extent to which cash flows will support dividends
The Company’s financial circumstances and performance
NMPRC’s and PUCT’s decisions in various regulatory cases currently pending and which may be docketed in the future
Conditions imposed by the NMPRC or PUCT
The effect of federal regulatory decisions and legislative acts
Economic conditions in the United States and in the Company’s service areas
Future growth plans and the related capital requirements
Other business considerations


A- 18

Table of Contents


Disruption in the credit and capital markets may impact the Company’s strategy and ability to raise capital.
PNMR and its subsidiaries rely on access to both short-term and longer-term capital markets as sources of liquidity for any capital requirements not satisfied by cash flow from operations, including energy infrastructure investments and new projects. In general, the Company relies on its short-term credit facilities as the initial source to finance construction expenditures. This results in increased borrowings under the facilities over time. The Company is currently projecting total construction expenditures for the years 2015-2019 to be $2,207.3 million. If PNMR or its operating subsidiaries are not able to access capital at competitive rates, or at all, PNMR’s ability to finance capital requirements and implement its strategy will be limited. Disruptions in the credit markets, which could negatively impact the Company’s access to capital, could be caused by:
 
An economic recession
Declines in the health of the banking sector generally, or the failure of specific banks who are parties to the Company’s credit facilities
Deterioration in the overall health of the utility industry
The bankruptcy of an unrelated energy company
War, terrorist or cybersecurity attacks, or threatened attacks
 
If the Company’s cash flow and credit and capital resources are insufficient to fund capital expenditure plans, the Company may be forced to delay important capital investments, sell assets, seek additional equity or debt capital, or restructure debt. In addition, insufficient cash flows and capital resources may result in reductions of credit ratings. This could negatively impact the Company’s ability to incur additional indebtedness on acceptable terms and would result in an increase in the interest rates applicable under the Company’s credit facilities. The Company’s cash flow and capital resources may be insufficient to pay interest and principal on debt in the future. If that should occur, the Company’s capital raising or debt restructuring measures may be unsuccessful or inadequate to meet scheduled debt service obligations. This could cause the Company to default on its obligations and further impair liquidity.
Reduction in credit ratings or changing rating agency requirements could materially and adversely affect the Company’s growth, strategy, business, financial position, results of operations, and liquidity.
 
PNMR, PNM, and TNMP cannot be sure that any of their current ratings will remain in effect for any given period of time or that a rating will not be put under review for a downgrade, lowered, or withdrawn entirely by a rating agency. Downgrades or changing requirements could result in increased borrowing costs due to higher interest rates in future financings, a smaller potential pool of investors, and decreased funding sources. Such conditions also could require the provision of additional support in the form of letters of credit and cash or other collateral to various counterparties.

Declines in values of marketable securities held in trust funds for pension and other postretirement benefits and in the NDT could result in sustained increases in costs and funding requirements for those obligations, which may affect operational results.

The Company targets 21% of its pension trust funds and 70% of its trust funds for other postretirement benefits to be invested in marketable equity securities. Over one-half of funds held in the NDT are typically invested in marketable equity securities. Declines in market values could result in increased funding of the trusts as well as the recognition of losses as impairments for the NDT and additional expense for the benefit plans.

Impairments of goodwill and long-lived assets of PNMR, PNM, and TNMP could adversely affect the Company’s business, financial position, liquidity, and results of operations.
 
PNMR, PNM, and TNMP annually evaluate their recorded goodwill for impairment. They also assess long-lived assets whenever indicators of impairment exist. Factors that affect the long-term value of these assets as well as other economic and market conditions could result in impairments. Significant impairments could adversely affect the Company’s business, financial position, liquidity, and results of operations.

PNM’s PVNGS leases describe certain events, including “Events of Loss” and “Deemed Loss Events”, the occurrence of which could require PNM to take ownership of the underlying assets and pay the lessors for the assets.
 
The “Events of Loss” generally relate to casualties, accidents, and other events at PVNGS, including the occurrence of specified nuclear events, which would severely adversely affect the ability of the operating agent, APS, to operate, and the ability of PNM to earn a return on its interests in PVNGS.  The “Deemed Loss Events” consist primarily of legal and regulatory changes (such as issuance by the NRC of specified violation orders, changes in law making the sale and leaseback transactions illegal, or

A- 19

Table of Contents


changes in law making the lessors liable for nuclear decommissioning obligations). PNM believes that the probability of such “Events of Loss” or “Deemed Loss Events” occurring is remote for the following reasons: (1) to a large extent, prevention of “Events of Loss” and some “Deemed Loss Events” is within the control of the PVNGS participants through the general PVNGS operational and safety oversight process; and (2) other “Deemed Loss Events” would involve a significant change in current law and policy. PNM is unaware of any proposals pending or being considered for introduction in Congress, or in any state legislative or regulatory body that, if adopted, would cause any of those events. See Note 7.
 
Governance Factors
 
Provisions of PNMR’s organizational documents, as well as several other statutory and regulatory factors, will limit another party’s ability to acquire PNMR and could deprive PNMR’s shareholders of the opportunity to receive a takeover premium for shares of PNMR’s common stock.
 
PNMR’s restated articles of incorporation and by-laws include a number of provisions that may have the effect of discouraging persons from acquiring large blocks of PNMR’s common stock, or delaying or preventing a change in control of PNMR. The material provisions that may have such an effect include:
 
Authorization for the Board to issue PNMR’s preferred stock in series and to fix rights and preferences of the series (including, among other things, voting rights and preferences with respect to dividends and other matters)
Advance notice procedures with respect to any proposal other than those adopted or recommended by the Board
Provisions specifying that only a majority of the Board, the chairman of the Board, the chief executive officer, or holders of at least one-tenth of all of PNMR’s shares entitled to vote may call a special meeting of stockholders
 
Under the New Mexico Public Utility Act, NMPRC approval is required for certain transactions that may result in PNMR’s change in control or exercise of control, including ownership of 10% or more of PNMR’s voting stock. Certain acquisitions of PNMR’s outstanding voting securities also require FERC approval.

ITEM 1B.
UNRESOLVED STAFF COMMENTS
None.

ITEM 2.
PROPERTIES
PNMR
The significant properties owned by PNMR include those owned by PNM and TNMP and are disclosed below.
PNM
See Sources of Power in Part I, Item. 1 Business above for information on PNM’s owned and leased capacity in electric generating stations. As of December 31, 2014 , PNM owned, jointly owned, or leased, 3,197 circuit miles of electric transmission lines (including the EIP), 5,851 miles of distribution overhead lines, 5,715 cable miles of underground distribution lines (excluding street lighting), and 280 substations. PNM’s electric transmission and distribution lines are generally located within easements and rights-of-way on public, private, and Native American lands. The EIP line is a 223 mile, 345 kilovolt line with a capacity of 200 MW. PNM leases interests in PVNGS Units 1 and 2 and related property, EIP and associated equipment, data processing, communication, office and other equipment, office space, vehicles, and real estate. PNM also owns and leases service and office facilities in Albuquerque and in other areas throughout its service territory. See Note 7 for additional information concerning leases, including notices given to the lessors under the PVNGS leases that PNM would renew certain of the leases and would exercise its option to purchase the assets underlying certain other leases at the expiration of the original lease terms. As discussed in Note 7, PNM agreed to exercise its option to purchase the leased portion of the EIP at expiration of the lease at fair market value. See Note 9 for additional information about Valencia, including the potential purchase of 50% of Valencia.
TNMP
TNMP’s facilities consist primarily of transmission and distribution facilities located in its service areas. TNMP also owns and leases service and office facilities in other areas throughout its service territory. As of December 31, 2014 , TNMP owned 966 circuit miles of overhead electric transmission lines, 7,085 pole miles of overhead distribution lines, 1,152 circuit miles of underground distribution lines, and 109 substations. Substantially all of TNMP’s property is pledged to secure its first mortgage bonds. See Note 6.


A- 20

Table of Contents


ITEM 3.
LEGAL PROCEEDINGS
See Note 16 and Note 17 for information related to the following matters for PNMR, PNM, and TNMP, incorporated in this item by reference.
Note 16

The Clean Air Act – Regional Haze – SJGS
The Clean Air Act – Regional Haze – Four Corners
The Clean Air Act – Four Corners BART FIP Challenge
The Clean Air Act – Regional Haze Challenges
The Clean Air Act – Citizen Suit Under the Clean Air Act
The Clean Air Act – Four Corners Clean Air Act Lawsuit
WEG v. OSM NEPA Lawsuit
Navajo Nation Environmental Issues
Santa Fe Generating Station
Coal Combustion Byproducts Waste Disposal – Sierra Club Consent Decree
Continuous Highwall Mining Royalty Rate
SJCC Arbitration
Four Corners Severance Tax Assessment
PVNGS Water Supply Litigation
San Juan River Adjudication
Rights-of-Way Matter
Complaint Against Southwestern Public Service Company
Navajo Nations Allottee Matters
Note 17

PNM – 2014 Electric Rate Case
PNM – Renewable Portfolio Standard
PNM – Renewable Energy Rider
PNM – Energy Efficiency and Load Management
PNM – FPPAC Continuation Application
PNM – Integrated Resource Plan
PNM – San Juan Generating Station Units 2 and 3 Retirement
PNM – Transmission Rate Case
PNM – Formula Transmission Rate Case
TNMP – Advanced Meter System Deployment
TNMP – Remand of ERCOT Transmission Rates for 1999 and 2000
TNMP – Energy Efficiency
TNMP – Transmission Cost of Service Rates

ITEM 4.
MINE SAFETY DISCLOSURES
Not Applicable.


A- 21

Table of Contents


SUPPLEMENTAL ITEM – EXECUTIVE OFFICERS OF PNM RESOURCES, INC.
All officers are elected annually by the Board of PNMR. Executive officers, their ages as of February 20, 2015 and offices held with PNMR for the past five years, or other companies if less than five years with PNMR, are as follows:
Name
 
Age
 
Office
 
Initial Effective Date
P. K. Collawn
 
56
 
Chairman, President, and Chief Executive Officer
 
January 2012
 
 
 
 
President and Chief Executive Officer
 
March 2010
 
 
 
 
President and Chief Operating Officer
 
August 2008
 
 
 
 
 
 
 
C. N. Eldred
 
61
 
Executive Vice President and Chief Financial Officer
 
July 2007
 
 
 
 
 
 
 
P. V. Apodaca
 
63
 
Senior Vice President, General Counsel and Secretary
 
January 2010
 
 
 
 
University Counsel, University of New Mexico
 
May 2006
 
 
 
 
 
 
 
R. E. Talbot
 
54
 
Senior Vice President and Chief Operating Officer
 
January 2012
 
 
 
 
Chief Operating Officer, Power Supply and Power Delivery – Indianapolis Power and Light Company
 
June 2011
 
 
 
 
Senior Vice President, Power Supply – Indianapolis Power and Light Company
 
February 2007
 
 
 
 
 
 
 
R. N. Darnell
 
57
 
Senior Vice President, Public Policy
 
January 2012
 
 
 
 
Vice President, Regulatory Affairs
 
April 2008
 
 
 
 
 
 
 
T. G. Sategna (1)
 
61
 
Vice President and Corporate Controller
 
October 2003
(1) On December 9, 2014, T. G. Sategna notified the Company that he intends to retire as the Company’s principal accounting officer effective as of March 31, 2015. Mr. Sategna has agreed to continue employment with PNMR Services Company through December 31, 2015 to (among other things) assist the Company and his successor in the transition process. On December 11, 2014, the Company appointed J. D. Tarry as its Vice President and Controller (and principal accounting officer), effective as of April 1, 2015. His appointment was approved by the Board on February 26, 2015. Mr. Tarry, 44, joined the Company in 1996 and has served as Vice President, Customer Service and Chief Information Officer since May 2012. From January 1, 2010 through May 2012, he served as Executive Director of Financial Planning and Business Analysis.

A- 22

Table of Contents


PART II
 
ITEM 5.
MARKET FOR PNMR’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS, AND ISSUER PURCHASES OF EQUITY SECURITIES

PNMR’s common stock is traded on the New York Stock Exchange (Symbol: PNM). Ranges of sales prices of PNMR’s common stock, reported as composite transactions, and dividends declared on the common stock for 2014 and 2013 , by quarters, are as follows:
Quarter Ended
Range of
Sales Prices
 
Dividends Declared Per Share
 
High
 
Low
 
2014
 
 
 
 
 
March 31
$
27.15

 
$
23.53

 
$
0.185

June 30
29.33

 
26.28

 
0.185

September 30
29.80

 
24.27

 
0.185

December 31
31.39

 
25.18

 
0.200

Fiscal Year
31.39

 
23.53

 
0.755

2013
 
 
 
 
 
March 31
$
23.29

 
$
20.28

 
$
0.165

June 30
24.01

 
21.35

 
0.165

September 30
24.29

 
21.25

 
0.165

December 31
24.28

 
22.21

 
0.185

Fiscal Year
24.29

 
20.28

 
0.680


Dividends on PNMR’s common stock are declared by its Board. The timing of the declaration of dividends is dependent on the timing of meetings and other actions of the Board. This has historically resulted in dividends considered to be attributable to the second quarter of each year being declared through actions of the Board during the third quarter of the year. The Board declared dividends on common stock considered to be for the second quarter of $0.165 per share in July 2013 and $0.185 per share in July 2014 , which are reflected as being in the second quarter above. The Board declared dividends on common stock considered to be for the third quarter of $0.165 per share in September 2013 and $0.185 per share in September 2014 , which are reflected as being in the third quarter above. On February 26, 2015, the Board declared a quarterly dividend of $0.20 per share. PNMR targets a long-term dividend payout ratio of 50% to 60% of consolidated earnings. During the period it was outstanding, PNMR’s Series A convertible preferred stock was entitled to receive dividends equivalent to any dividends paid on PNMR common stock as if the preferred stock had been converted into common stock.
On February 20, 2015 , there were 10,283 holders of record of PNMR’s common stock. All of the outstanding common stock of PNM and TNMP is held by PNMR.
See Note 5 for a discussion on limitations on the payments of dividends and the payment of future dividends, as well as dividends paid by PNM and TNMP.
See Part III, Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters.
Preferred Stock
PNM is not aware of any active trading market for its cumulative preferred stock. Quarterly cash dividends were paid on PNM’s outstanding cumulative preferred stock at the stated rates during 2014 and 2013 . PNMR and TNMP do not have any preferred stock outstanding.
Sales of Unregistered Securities
None.


A- 23

Table of Contents


ITEM 6.
SELECTED FINANCIAL DATA
The selected financial data and comparative operating statistics for PNMR should be read in conjunction with the Consolidated Financial Statements and Notes thereto and MD&A. PNMR sold First Choice on November 1, 2011. First Choice is included in the following information through October 31, 2011. PNMR fully impaired its equity method investment in Optim Energy in 2010 and recorded no income or loss for that investment through September 23, 2011, when Optim Energy was restructured reducing PNMR’s ownership to 1%.
PNM RESOURCES, INC. AND SUBSIDIARIES
 
2014
 
2013
 
2012
 
2011
 
2010
 
(In thousands except per share amounts and ratios)
Total Operating Revenues
$
1,435,853

 
$
1,387,923

 
$
1,342,403

 
$
1,700,619

 
$
1,673,517

Net Earnings (Loss)
$
130,909

 
$
115,556

 
$
120,125

 
$
190,934

 
$
(31,124
)
Net Earnings (Loss) Attributable to PNMR
$
116,254

 
$
100,507

 
$
105,547

 
$
176,359

 
$
(45,215
)
Net Earnings (Loss) Attributable to PNMR per Common Share
 
 
 
 
 
 
 
 
 
Basic
$
1.46

 
$
1.26

 
$
1.32

 
$
1.98

 
$
(0.49
)
Diluted
$
1.45

 
$
1.25

 
$
1.31

 
$
1.96

 
$
(0.49
)
Cash Flow Data
 
 
 
 
 
 
 
 
 
Net cash flows from operating activities
$
414,876

 
$
386,587

 
$
281,349

 
$
292,240

 
$
287,352

Net cash flows from investing activities
$
(485,329
)
 
$
(331,446
)
 
$
(285,895
)
 
$
19,778

 
$
(275,906
)
Net cash flows from financing activities
$
96,194

 
$
(61,593
)
 
$
(1,560
)
 
$
(312,331
)
 
$
(10,683
)
Total Assets
$
5,829,325

 
$
5,500,210

 
$
5,372,583

 
$
5,204,613

 
$
5,225,083

Long-Term Debt, including current installments
$
1,975,090

 
$
1,745,420

 
$
1,672,290

 
$
1,674,013

 
$
1,565,847

Common Stock Data
 
 
 
 
 
 
 
 
 
Market price per common share at year end
$
29.63

 
$
24.12

 
$
20.51

 
$
18.23

 
$
13.02

Book value per common share at year end
$
21.61

 
$
21.01

 
$
20.19

 
$
19.76

 
$
17.90

Tangible book value per share at year end
$
18.12

 
$
17.52

 
$
16.70

 
$
16.27

 
$
14.10

Average number of common shares outstanding – diluted
80,279

 
80,431

 
80,417

 
89,757

 
91,557

Dividends declared per common share
$
0.755

 
$
0.680

 
$
0.580

 
$
0.500

 
$
0.500

Capitalization
 
 
 
 
 
 
 
 
 
PNMR common stockholders’ equity
46.4
%
 
48.8
%
 
48.9
%
 
48.3
%
 
47.8
%
Convertible preferred stock

 

 

 

 
3.1

Preferred stock of subsidiary, without mandatory redemption requirements
0.3

 
0.3

 
0.3

 
0.3

 
0.4

Long-term debt
53.3

 
50.9

 
50.8

 
51.4

 
48.7

 
100.0
%
 
100.0
%
 
100.0
%
 
100.0
%
 
100.0
%

Note: The book value per common share at year end, tangible book value per share at year end, average number of common shares outstanding, and return on average common equity reflect the 477,800 shares of PNMR Series A convertible preferred stock as if it was converted into common stock through September 23, 2011, when it was retired by PNMR.
 

A- 24

Table of Contents


PNM RESOURCES, INC. AND SUBSIDIARIES
COMPARATIVE OPERATING STATISTICS
 
2014
 
2013
 
2012
 
2011
 
2010
 
(In thousands)
PNM Revenues
 
 
 
 
 
 
 
 
 
Residential
$
411,412

 
$
411,579

 
$
409,005

 
$
390,380

 
$
355,905

Commercial
428,085

 
415,621

 
413,332

 
386,383

 
355,699

Industrial
73,002

 
74,552

 
78,637

 
73,742

 
65,358

Public authority
25,278

 
25,745

 
25,495

 
23,970

 
21,302

Economy service
39,123

 
32,909

 
25,354

 
21,141

 
20,218

Transmission
38,284

 
38,228

 
39,373

 
43,637

 
38,667

Firm-requirements wholesale
38,313

 
42,370

 
39,390

 
34,127

 
31,870

Other sales for resale
82,508

 
67,538

 
47,321

 
69,318

 
121,729

Mark-to-market activity
5,996

 
293

 
892

 
4,214

 
(3,599
)
Other
5,913

 
7,477

 
13,465

 
10,377

 
9,979

Total PNM Revenues
$
1,147,914

 
$
1,116,312

 
$
1,092,264

 
$
1,057,289

 
$
1,017,128

TNMP Revenues
 
 
 
 
 
 
 
 
 
Residential
$
114,826

 
$
111,373

 
$
103,255

 
$
100,290

 
$
83,645

Commercial
99,701

 
95,098

 
88,258

 
84,896

 
77,474

Industrial
15,049

 
13,084

 
13,405

 
13,065

 
12,342

Other
58,362

 
52,056

 
45,222

 
39,607

 
39,127

Total TNMP Revenues
$
287,938

 
$
271,611

 
$
250,140

 
$
237,858

 
$
212,588

First Choice Revenues
 
 
 
 
 
 
 
 
 
Residential
$

 
$

 
$

 
$
260,161

 
$
305,834

Commercial

 

 

 
166,498

 
159,785

Trading gains (losses)

 

 

 

 
(4
)
Other

 

 

 
12,791

 
17,588

Total First Choice Revenues
$

 
$

 
$

 
$
439,450

 
$
483,203


Notes: Under TECA, consumers in Texas can choose any REP to provide energy. TNMP delivers energy to consumers within its service area regardless of the REP chosen. Therefore, TNMP earns revenue for energy delivery and REPs earn revenue on the usage of that energy by its customers. The revenues reported above for TNMP include $33.8 million and $39.1 million received from First Choice in 2011 and 2010 .     

First Choice is included through October 31, 2011, when it was sold by PNMR.




A- 25

Table of Contents


PNM RESOURCES, INC. AND SUBSIDIARIES
COMPARATIVE OPERATING STATISTICS
 
2014
 
2013
 
2012
 
2011
 
2010
PNM MWh Sales
 
 
 
 
 
 
 
 
 
Residential
3,169,071

 
3,304,350

 
3,323,544

 
3,402,842

 
3,361,472

Commercial
3,874,292

 
3,954,774

 
4,022,184

 
4,043,796

 
4,015,999

Industrial
984,130

 
1,041,160

 
1,136,011

 
1,132,110

 
1,073,475

Public authority
251,187

 
266,368

 
279,169

 
282,062

 
263,424

Economy service
758,629

 
719,342

 
635,305

 
428,757

 
376,458

Firm-requirements wholesale
527,597

 
654,135

 
651,972

 
650,356

 
677,508

Other sales for resale
2,271,480

 
2,061,851

 
1,652,225

 
2,076,869

 
2,203,787

Total PNM MWh Sales
11,836,386

 
12,001,980

 
11,700,410

 
12,016,792

 
11,972,123

TNMP MWh Sales
 
 
 
 
 
 
 
 
 
Residential
2,802,768

 
2,796,661

 
2,714,511

 
2,862,337

 
2,699,601

Commercial
2,564,751

 
2,451,299

 
2,353,135

 
2,360,998

 
2,260,505

Industrial
2,727,064

 
2,598,442

 
2,727,126

 
2,578,877

 
2,241,452

Other
102,118

 
104,516

 
103,856

 
108,664

 
103,341

Total TNMP MWh Sales
8,196,701

 
7,950,918

 
7,898,628

 
7,910,876

 
7,304,899

First Choice MWh Sales
 
 
 
 
 
 
 
 
 
Residential

 

 

 
2,006,437

 
2,267,836

Commercial

 

 

 
1,538,203

 
1,363,746

Total First Choice MWh Sales

 

 

 
3,544,640

 
3,631,582


Notes:
The MWh reported above for TNMP include 836,599 and 1,012,842 MWh for 2011 and 2010 , used by consumers who chose First Choice as their REP. These MWh are also included in the First Choice MWh sales.

First Choice is included through October 31, 2011, when it was sold by PNMR.
    


A- 26

Table of Contents


PNM RESOURCES, INC. AND SUBSIDIARIES
COMPARATIVE OPERATING STATISTICS
 
2014
 
2013
 
2012
 
2011
 
2010
PNM Customers
 
 
 
 
 
 
 
 
 
Residential
455,907

 
453,218

 
450,507

 
448,979

 
447,789

Commercial
55,853

 
55,447

 
54,953

 
54,468

 
54,005

Industrial
249

 
251

 
250

 
251

 
259

Economy service
1

 
1

 
1

 
1

 
1

Other sales for resale
39

 
34

 
36

 
28

 
46

Other
911

 
928

 
952

 
983

 
1,003

Total PNM Customers
512,960

 
509,879

 
506,699

 
504,710

 
503,103

TNMP Consumers
 
 
 
 
 
 
 
 
 
Residential
199,963

 
196,799

 
193,550

 
192,356

 
190,809

Commercial
38,033

 
37,460

 
36,819

 
37,208

 
37,356

Industrial
70

 
70

 
70

 
73

 
72

Other
2,044

 
2,070

 
2,037

 
2,092

 
2,099

Total TNMP Consumers
240,110

 
236,399

 
232,476

 
231,729

 
230,336

First Choice Customers
 
 
 
 
 
 
 
 
 
Residential

 

 

 
176,577

 
172,506

Commercial

 

 

 
44,485

 
41,695

Total First Choice Customers

 

 

 
221,062

 
214,201

PNMR Generation Statistics
 
 
 
 
 
 
 
 
 
Net Capability – MW, including PPAs
2,707

 
2,572

 
2,537

 
2,547

 
2,631

Coincidental Peak Demand – MW
1,878

 
2,008

 
1,948

 
1,938

 
1,973

Average Fuel Cost per MMBTU
$
2.415

 
$
2.237

 
$
2.308

 
$
2.267

 
$
2.064

BTU per KWh of Net Generation
10,422

 
10,308

 
10,289

 
10,441

 
10,237


Notes:
The consumers reported above for TNMP include 64,732 and 70,366 consumers for 2011 and 2010 , who chose First Choice as their REP. These TNMP customers are also included in the First Choice customers.
    
First Choice is as of October 31, 2011, when it was sold by PNMR.

A- 27

Table of Contents


ITEM 7.
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations for PNMR is presented on a combined basis, including certain information applicable to PNM and TNMP. The MD&A for PNM and TNMP is presented as permitted by Form 10-K General Instruction I (2). A reference to a “Note” in this Item 7 refers to the accompanying Notes to Consolidated Financial Statements included in Part II, Item 8, unless otherwise specified. Certain of the tables below may not appear visually accurate due to rounding.
MD&A FOR PNMR
EXECUTIVE SUMMARY
Overview and Strategy
    
PNMR is a holding company with two regulated utilities serving approximately 753,000 residential, commercial, and industrial customers and end-users of electricity in New Mexico and Texas. PNMR’s electric utilities are PNM and TNMP.
Strategic Goals
PNMR is focused on achieving the following strategic goals:

Earning authorized returns on its regulated businesses
Continuing to improve credit ratings
Providing a top-quartile total return to investors

In conjunction with these goals, PNM and TNMP are dedicated to:

Achieving industry-leading safety performance
Maintaining strong plant performance and system reliability
Delivering a superior customer experience
Environmental leadership in its business operations

Earning Authorized Returns on Regulated Businesses

PNMR’s success in accomplishing its strategic goals is highly dependent on continued favorable regulatory treatment for its utilities and their strong operating performance. The Company has multiple strategies to achieve favorable regulatory treatment, all of which have as their foundation a focus on the basics: safety, operational excellence, and customer satisfaction, while engaging stakeholders to build productive relationships.

Both PNM and TNMP seek cost recovery for their investments through general rate cases and various rate riders. PNM filed a general rate case with the NMPRC in December 2014. PNM’s application proposes a revenue increase of $107.4 million, effective January 1, 2016, based on a calendar 2016 future year test and a ROE of 10.5%. PNM requested this increase to account for infrastructure investments made since its last rate case and investments needed in the next two years to provide reliable service to PNM’s retail customers, as well as to reflect declining sales growth in PNM’s service territory. The infrastructure investments account for approximately 92% of the rate increase. PNM’s success with energy efficiency programs is a contributing factor to the decline in sales growth and accounts for the balance of the rate increase after offsetting cost reductions. PNM is proposing several changes to rate design to establish fair and equitable pricing across rate classes and to better align cost recovery with cost causation, including an access charge to customers installing photovoltaic systems after December 31, 2015.

The PUCT has approved mechanisms that allow TNMP to recover capital invested in transmission and distribution projects without having to file a general rate case, which allows for more timely recovery. The NMPRC has approved rate riders for renewable energy and energy efficiency that also allow for more timely recovery of investments and improve the ability to earn authorized returns from PNM’s retail customers.

In 2012, PNM completed rate proceedings for all of its FERC regulated transmission customers and for NEC, its largest generation services customer, which improved PNM’s returns for providing those services. However, the contract to provide power to Gallup, PNM’s second largest customer for wholesale generation services, ended on June 29, 2014. PNM’s recently filed general rate case discussed above includes a reallocation of costs among regulatory jurisdictions reflecting the termination of the contract to serve Gallup. PNM currently has a pending case before FERC in which it is requesting an increase in rates charged to transmission customers based on a formula rate mechanism. The parties have engaged in settlement negotiations and

A- 28

Table of Contents


PNM anticipates that a settlement will be filed with FERC in near future. There is no required time frame for FERC to act upon a settlement. Additional information about rate filings is provided in Note 17.

Fair and timely rate treatment from regulators is crucial to PNM and TNMP earning their allowed returns, which is critical for PNMR’s ability to achieve its strategic goals. PNMR believes that if the utilities earn their allowed returns, it would be viewed positively by credit rating agencies and would further improve the Company’s ratings, which could lower costs to utility customers. Also, earning allowed returns should result in increased earnings for PNMR, which would lead to increased total returns to investors.

Currently, PNM's 134 MW interest in PVNGS Unit 3 is excluded from NMPRC jurisdictional rates. The power generated from that interest is currently sold into the wholesale market and any earnings or losses are realized by shareholders. While PVNGS Unit 3’s financial results are not included in the authorized returns on its regulated business, it impacts PNM’s earnings and has been demonstrated to be a valuable asset. As part of compliance with the requirements for BART at SJGS discussed below, PNM has requested NMPRC approval to include PVNGS Unit 3 as a jurisdictional resource in the determination of rates charged to customers in New Mexico beginning in 2018.

Continuing to Improve Credit Ratings
PNM is committed to improving its credit ratings. See the subheading Liquidity included in the full discussion of Liquidity and Capital Resources below for the specific credit ratings for PNMR, PNM, and TNMP. On January 30, 2014, Moody’s raised the credit ratings for PNMR, PNM and TNMP by one notch, while maintaining the positive outlook. On April 30, 2014, S&P changed the outlook for PNMR, PNM, and TNMP to positive from stable. Currently, all of the credit ratings issued by both Moody’s and S&P on the Company’s debt are investment grade.
Providing Top-Quartile Total Returns to Investors
PNMR’s strategic goal to provide top quartile total return to investors over the 2012 to 2016 period is based on five-year ongoing earnings per share growth plus five-year average dividend yield from a group of regulated electric utility companies with similar market capitalization. Top quartile total return currently is equal to an average annual rate of 10% to 13%. Ongoing earnings, which is a non-GAAP financial measure, excludes certain non-recurring, infrequent, and other items from earnings determined in accordance with GAAP.

PNMR targets a dividend payout ratio of 50% to 60% of its ongoing earnings. The annual common stock dividend was raised by 16% in February 2012, 14% in February 2013, 12% in December 2013, and 8% in December 2014. PNMR expects to provide above-average dividend growth in the near-term and to manage the payout ratio to meet its long-term target. The Board will continue to evaluate the dividend on an annual basis, considering sustainability and growth, capital planning, and industry standards.

Business Focus

In addition to its strategic goals, PNMR’s strategy and decision-making are focused on safely providing reliable, affordable, and environmentally responsible power to create enduring value for customers, communities, and stockholders. To accomplish this, PNMR works closely with customers, stakeholders, legislators, and regulators to ensure that resource plans and infrastructure investments benefit from robust public dialogue and balance the diverse needs of our communities.

Reliable and Affordable Power
PNMR and its utilities are aware of the important roles they play in enhancing economic vitality in their New Mexico and Texas service territories. Management believes that maintaining strong and modern electric infrastructure is critical to ensuring reliability and economic growth. When considering expanding or relocating to other communities, businesses consider energy affordability and reliability to be important factors. PNM and TNMP strive to balance service affordability with infrastructure investment to maintain a high level of electric reliability and to deliver a superior customer experience. The utilities also work to ensure that rates reflect actual costs of providing service.
Investing in PNM’s and TNMP’s infrastructure is critical to ensuring reliability and meeting future energy needs. Both utilities have long-established records of providing customers with reliable electric service.
In September 2011, TNMP began its deployment of smart meters in homes and businesses across its Texas service area. Through the end of 2014, TNMP had completed installation of more than 184,000 smart meters, which is approximately 80% of the anticipated total. TNMP’s deployment is expected to be completed in 2016.

A- 29

Table of Contents


As part of the State of Texas’ long-term initiative to create a smart electric grid, installation of smart meters will ultimately give consumers more data about their energy consumption and help them make more informed decisions. TNMP is currently installing a new outage management system that will leverage capabilities of the smart meters to enhance TNMP’s responsiveness to outages.

During the 2012 to 2014 period, PNM and TNMP together invested $1,062.8 million in utility plant, including substations, power plants, nuclear fuel, and transmission and distribution systems. In 2012, PNM announced plans for the 40 MW natural gas-fired La Luz peaking generating station, to be located near Belen, New Mexico. The facility is expected to go into service in late 2015. On July 17, 2014, PNM completed the purchase of Rio Bravo, formerly known as Delta, a 132 MW gas-fired peaking facility, which has served PNM jurisdictional needs under a 20-year PPA since 2000.

NMPRC rules require that investor owned utilities file an IRP every three years. The IRP is required to cover a 20-year planning period and contain an action plan covering the first four years of that period. PNM filed its 2014 IRP on July 1, 2014. The four-year action plan was consistent with the replacement resources identified in PNM’s application to retire SJGS Units 2 and 3 discussed below. PNM indicated that it planned to meet its anticipated long-term load growth with a combination of additional renewable energy resources, energy efficiency, and natural gas-fired facilities.
Environmentally Responsible Power
PNMR has a long-standing record of environmental stewardship. PNM’s environmental focus has been in three key areas:

Developing strategies to meet regional haze rules at the coal-fired SJGS as cost-effectively as possible while providing broad environmental benefits that also demonstrate progress in addressing proposed new federal regulations for CO 2 emissions from existing power plants
Preparing to meet New Mexico’s increasing renewable energy requirements as cost-effectively as possible
Increasing energy efficiency participation

Another area of emphasis is the reduction of the amount of fresh water used during electricity generation at PNM’s power plants. The fresh water used per MWh generated has dropped by 25% since 2002, primarily due to the growth of renewable energy sources, the expansion of Afton to a combined-cycle plant that has both air and water cooling systems, and the use of gray water for cooling at Luna. As discussed below, PNM has requested approval to shut down SJGS Units 2 and 3, which would reduce water consumption at that plant by about 50%. In addition to the above areas of focus, the Company is working to reduce the amount of solid waste going to landfills through increased recycling and reduction of waste. The Company has performed well in this area in the past and expects to continue to do so in the future.
Renewable Energy
PNM’s 2013 renewable procurement strategy almost doubled PNM’s existing solar capacity with the addition of 21.5 MW of utility-owned solar capacity. In addition to the solar expansion, the 2013 plan included a 20-year agreement to purchase energy from a geothermal facility built near Lordsburg, New Mexico. The facility began providing power to PNM in January 2014. The current capacity of the facility is 4 MW and future expansion may result in up to 10 MW of generation capacity. PNM’s 2014 renewable procurement strategy included the construction of an additional 23 MW of utility-owned solar capacity, a 20 year PPA for the output of an existing 102 MW wind energy center beginning in 2015, and the purchase of RECs in 2014 and 2015 to meet the RPS. PNM’s 2015 renewable energy procurement plan meets RPS and diversity requirements within the RCT in 2015 and 2016. PNM’s proposed new procurements include the construction of 40 MW of PNM-owned solar PV facilities in 2015, which are contemplated in PNM’s application to retire SJGS Units 2 and 3 discussed below.
In addition to PNM’s utility-owned PV solar facilities, PNM owns the 500 KW PNM Prosperity Energy Storage Project, which uses advanced batteries to store solar power and dispatch the energy either during high-use periods or when solar production is limited. The project features one of the largest combinations of battery storage and PV energy in the nation and involves extensive research and development of smart grid concepts. The facility was the nation’s first solar storage facility fully integrated into a utility’s power grid.
PNM has a PPA for the output from a 204 MW wind facility and purchases power from a customer-owned distributed solar generation program that had an installed capacity of 39 MW at the end of 2014. These renewable resources are key means for PNM to meet the RPS and related regulations, which require PNM to achieve prescribed levels of energy sales from renewable sources, if that can be accomplished without exceeding the RCT cost limit set by the NMPRC.
PNM makes renewable procurements consistent with the plans approved by the NMPRC. PNM believes its currently planned resources will enable it to comply with the NMPRC’s diversity requirements. PNM will continue to procure renewable resources while balancing the bill impact to customers in order to meet New Mexico’s escalating RPS requirements.

A- 30

Table of Contents


SJGS
PNM continues its efforts to comply with the EPA regional haze rule in a manner that minimizes the cost impact to customers while still achieving broad environmental benefits. Additional information about BART at SJGS is contained in Note 16.
In August 2011, EPA issued a FIP for regional haze that would have required the installation of SCRs on all four units at SJGS by September 2016. Following approval by the majority of the other SJGS owners, PNM, NMED, and EPA agreed on February 15, 2013 to pursue a revised plan that could provide a new BART path to comply with federal visibility rules at SJGS. The terms of the non-binding agreement would result in the retirement of SJGS Units 2 and 3 by the end of 2017 and the installation of SNCRs on Units 1 and 4 by the later of January 31, 2016 or 15 months after EPA approval of a RSIP from the State of New Mexico. The RSIP has been approved by the EIB and EPA.

The RSIP would achieve similar visibility improvements as the installation of SCRs on all four units at SJGS at a lower cost to PNM customers. It has the added advantage of reducing other emissions beyond NOx, including SO 2 , particulate matter, CO 2 , and mercury, as well as reducing water usage.

In December 2013, PNM made a filing with the NMPRC requesting certain approvals necessary to effectuate the RSIP. On October 1, 2014, PNM filed a stipulation with the NMPRC that, if approved, would settle this case. The stipulation is supported to by the staff of the NMPRC, the NMAG, and NMIEC. The stipulation is opposed by other intervenors.
Under the terms of the stipulation, PNM would:

Retire SJGS Units 2 and 3 at December 31, 2017 and recover over 20 years 50% of their undepreciated net book value at that date, after transferring $26 million to SJGS Unit 4, and earn a regulated return on those costs
Acquire an additional 132 MW of SJGS Unit 4
Include PNM’s ownership of PVNGS Unit 3 as a resource to serve New Mexico retail customers effective January 1, 2018 at a value of $221.1 million ($1,650 per KW)
File for recovery of up to $90.6 million of costs for the installation of SNCR equipment and the additional equipment to comply with NAAQS requirements on SJGS Units 1 and 4
Not recover approximately $20 million of increased operations and maintenance expenses and other costs incurred in connection with CAA compliance

There would be no initial cost for PNM to acquire the additional 132 MW of SJGS Unit 4 although PNM’s share of capital improvements, including the costs of installing SNCRs, and operating expenses would increase to reflect the increased ownership.

A public hearing in the NMPRC case was held in January 2015. PNM expects a decision from the NMPRC in the second quarter of 2015. PNM is unable to predict if the NMPRC will approve the stipulation. If the stipulation is approved as filed, PNM anticipates that upon approval it would incur a regulatory disallowance, which would include the write-off of 50% of the undepreciated investment in SJGS Units 2 and 3, an offset to the regulatory disallowance to reflect including the investment in PVNGS Unit 3 in the ratemaking process at the stipulated value, and other impacts of the stipulation. PNM currently estimates the net pre-tax regulatory disallowance would be between $60 million and $70 million. See Note 16.

The December 20, 2013 filing also identified a new 177 MW natural gas fired generation source and 40 MW of new utility-scale solar generation to replace a portion of PNM’s share of the reduction in generating capacity due to the retirement of SJGS Units 2 and 3. The additional solar capacity is included in PNM’s 2015 renewable procurement strategy (Note 17). Specific approval for the additional gas facility and the treatment of associated costs will be addressed in future filings.

In connection with the implementation of the revised plan and the proposed retirement of SJGS Units 2 and 3, some of the SJGS participants have expressed a desire to exit their ownership in the plant. As a result, the SJGS participants are attempting to negotiate a restructuring of the ownership in SJGS, as well as addressing the obligations of the exiting participants for plant decommissioning, mine reclamation, environmental matters, and certain ongoing operating costs, among other items.

The non-binding resolution, approved by the SJGS Coordination Committee on June 26, 2014, identifies the participants who would be exiting active participation in SJGS effective December 31, 2017, and participants, including PNM, who would retain an interest in the ongoing operation of one or more units of SJGS. The non-binding resolution provides the essential terms of restructured ownership of SJGS between the exiting participants and the remaining participants and addresses other related matters. Also, on June 26, 2014, a non-binding term sheet was approved by all of the remaining participants that provides the essential terms of restructured ownership of SJGS among the remaining participants. The non-binding resolution and term sheet recognize that prior to executing a binding restructuring agreement, the remaining participants will need to have greater certainty

A- 31

Table of Contents


in regard to the economic cost and availability of fuel for SJGS for the period after December 31, 2017. See Coal Supply in Note 16, for additional information. In September 2014, the SJGS participants executed a binding Fuel and Capital Funding Agreement to implement certain provisions of the above resolution. The Fuel and Capital Funding Agreement was approved by FERC on November 13, 2014. On January 7, 2015, one of the participants in SJGS Unit 4 notified the other participants that it will not acquire additional MWs in Unit 4, leaving 65 MWs unsubscribed in that unit. PNM has indicated that it will not acquire any of the unsubscribed MWs. However, a scenario is being evaluated in which PNMR Development would acquire the 65 MWs. The participant’s action was taken under the Fuel and Capital Funding Agreement and has the impact of negating certain provisions of that agreement. Accordingly, on February 3, 2015, PNM informed the participants in the Fuel and Capital Funding Agreement that the agreement would terminate by its terms no later than February 6, 2015. The continuing participants in SJGS have indicated that they remain committed to on-going ownership in SJGS and mediated discussions regarding remaining issues have continued. Other definitive agreements among the participants are being negotiated. PNM cannot predict if final agreements will be executed.

A number of regulatory approvals are required to implement the proposed ownership restructuring of SJGS. Final binding agreements relating to the ownership restructuring are subject to the approval of each participant’s board or other decision-making body and are subject to required regulatory approvals. PNM is unable to predict the outcome of the negotiations, whether definitive agreements will be reached among the owners, or whether required approvals will be obtained.

PNM, as the SJGS operating agent, presented the SNCR project to the participants in Unit 1 and Unit 4 for approval in late October 2013. The project was approved for Unit 1, but the Unit 4 project did not obtain the required percentage of votes for approval. Other capital projects related to Unit 4 were also not approved by the participants. PNM is authorized and obligated under the SJPPA to take reasonable and prudent actions necessary for the successful and proper operation of SJGS pending resolution by the participants. In March 2014, June 2014, and January 2015, PNM requested that the owners of Unit 4 approve expenditures critical to being able to comply with the time frame in the RSIP with respect to Unit 4 project. The Unit 4 owners did not approve the requests. On March 10, 2014 and July 14, 2014, PNM issued “Prudent Utility Practice” notices that, under the SJPPA, PNM was continuing certain critical activities to keep the Unit 4 project on schedule.
In addition to the regional haze rule, SJGS is required to comply with other rules currently being developed or implemented that affect coal-fired generating units, including recently proposed rules regarding GHG under Section 111(d) of the CAA. Because of environmental upgrades completed in 2009, SJGS is well positioned to outperform the mercury limit imposed by EPA in the 2011 Mercury and Air Toxics Standards. The major environmental upgrades on each of the four units at SJGS have significantly reduced emissions of NOx, SO 2 , particulate matter, and mercury. Since 2006, SJGS has reduced NOx emissions by 42%, SO 2 by 67%, particulate matter by 71%, and mercury by 95%.
Energy Efficiency
    
Energy efficiency also plays a significant role in helping to keep customers' electricity costs low while continuing to meet their energy needs. PNM’s and TNMP’s energy efficiency and load management portfolios continue to achieve robust results. In 2014, annual energy saved as a result of PNM’s portfolio of energy efficiency programs was approximately 70 GWh. This is equivalent to the annual consumption of approximately 9,700 homes in PNM’s service territory. PNM’s load management and energy efficiency programs also help lower peak demand requirements. TNMP’s energy efficiency programs in 2014 resulted in energy savings totaling an estimated 17 GWh. This is equivalent to the annual consumption of approximately 1,600 homes in TNMP’s service territory.
Creating Value for Customers and Communities

The Company strives to deliver a superior customer experience by understanding the dynamic needs of its customers through ongoing market research, identifying and establishing best-in-class services and programs, and proactively communicating and engaging with customers at a regional and community level. Beginning in 2013, PNM refocused its efforts to improve the customer experience through an integrated marketing and communications strategy that encompassed brand repositioning and advertising, customer service improvements, including billing and payment options, and strategic customer and stakeholder engagement. As part of this effort, in February 2014, PNM launched an updated website that provides an increase in self-service options for customers, as well as a mobile platform.
Recognizing the importance of environmental stewardship to customers and other stakeholders, PNM expanded engagement with environmental stakeholders to promote ongoing dialogue and input. Similarly, PNM also proactively communicated with communities about its efforts and plans related to environmental stewardship. Customers took note of PNM’s efforts in this area. A nationally recognized customer satisfaction benchmark revealed gains in awareness of PNM’s efforts to improve environmental impact, as well as customer perceptions around the commitment to preserving the environment now and for future generations.

A- 32

Table of Contents


PNM continues to expand its environmental stakeholder outreach, piloting small environmental stakeholder dialogue groups on key issues such as renewable energy and energy efficiency planning. PNM also employed proactive stakeholder outreach in two key projects the development of PNM’s renewable energy procurement plans that involved distributed solar energy developers early in the conversation and the siting of the gas-fired La Luz peaking generation facility near Belen, New Mexico, which featured in-depth community involvement and education early in the planning stages of the project. In both cases highly favorable outcomes were achieved, and controversial negative media coverage was avoided.

PNM expanded its integrated communication efforts with the launch of a new customer information website focused on PNM’s major regulatory filings, including the stipulated settlement agreement regarding BART at SJGS and PNM’s general rate case. The website, www.PowerforProgress.com, provides the details of current requests, as well as the background on PNM’s efforts to maintain reliability, keep prices affordable, and protect the environment. The website is designed to be a resource for the facts about PNM's operations and community support efforts, including plans for building a sustainable energy future for New Mexico.
Through outreach, collaboration, and various community-oriented programs, PNMR has a demonstrated commitment to build productive relationships with stakeholders, including customers, regulators, legislators, and intervenors.
Building off work that began in 2008, PNM has continued outreach efforts to connect low-income customers with nonprofit community service providers offering support and help with such needs as utility bills, food, clothing, medical programs, services for seniors, and weatherization. In 2014, PNM hosted 31 community events throughout its service territory to assist low-income customers. Furthermore, the PNM Good Neighbor Fund provided $0.3 million of assistance with utility bills to 3,153 families in 2014. In 2014, PNM committed funding of $0.4 million to the PNM Good Neighbor Fund.
The PNM Resources Foundation helps nonprofits become more energy efficient through Reduce Your Use grants. In 2013, PNMR committed funding of $3.5 million to the PNM Resources Foundation. For 2014, the foundation awarded $0.2 million to support 54 projects in New Mexico to provide shade structure installations, window replacements, and efficient appliance purchases. Since the program’s inception in 2008, Reduce Your Use grants have provided nonprofit agencies in New Mexico with a total of $1.6 million of support. In 2014, the PNM Resources Foundation launched a new grant program designed to help nonprofit organizations build more vibrant communities.  Power Up Grants in the aggregate amount of $0.5 million were awarded to 24 nonprofits in New Mexico and Texas for projects ranging from creating community gathering spaces to revitalizing neighborhood parks to building a youth sports field.
In Texas, community outreach is centered first on local relationships, specifically with community leaders, nonprofit organizations and key customers in areas served by TNMP. Community liaisons serve in each of TNMP's three geographic business areas, reaching out and ensuring productive lines of communication between TNMP and its customer base.

TNMP maintains long-standing relationships with several key nonprofit organizations, including agencies that support children and families in crisis, food banks, environmental organizations, and educational nonprofits, through employee volunteerism and corporate support. TNMP also actively participates in safety fairs and demonstrations in addition to supporting local chambers of commerce in efforts to build their local economies.

TNMP's energy efficiency program provides unique offers to multiple customer groups, including residential, commercial, government, education, and nonprofit customers. These programs not only enable peak load and consumption reductions, particularly important when extreme weather affects Texas' electric system, but they also demonstrate TNMP's commitment to more than just delivering electricity by partnering with customers to optimize their energy usage.

Economic Factors
    
In 2014 and 2013, PNM experienced decreases in weather-normalized retail load of 1.7% and 1.8%. New Mexico’s economy still lags the nation in post-recession recovery. TNMP experienced increases in weather-normalized retail load of 3.2% in 2014 and 2.6% in 2013. In recent years, New Mexico and Texas have fared better than the national average in unemployment although the unemployment rate in New Mexico exceeded the national average in the latter part of 2014. Employment growth is a stronger predictor of load. Texas’ employment growth rates are well above the national rate, while New Mexico’s employment showed modest growth in 2014 after several years of being relatively flat.


A- 33

Table of Contents


Results of Operations

A summary of net earnings attributable to PNMR is as follows:
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
(In millions, except per share amounts)
 
 
 
 
 
 
Net earnings
$
116.3

 
$
100.5

 
$
105.5

 
$
15.8

 
$
(5.0
)
Average diluted common and common equivalent shares
80.3

 
80.4

 
80.4

 
(0.1
)
 

Net earnings per diluted share
$
1.45

 
$
1.25

 
$
1.31

 
$
0.20

 
$
(0.06
)

The components of the changes in earnings from continuing operations attributable to PNMR by segment are:
 
Change
 
2014/2013
 
2013/2012
 
(In millions)
PNM
$
(0.8
)
 
$
(3.4
)
TNMP
8.7

 
2.4

Corporate and Other
7.8

 
(4.0
)
  Net change
$
15.8

 
$
(5.0
)
PNMR’s operational results were affected by the following:

Rate increases for PNM and TNMP; additional information about these rate increases is provided in Note 17
Lower retail load at PNM, partially offset by higher retail load in at TNMP
Milder weather
Higher prices for sales of power from PVNGS Unit 3
Net unrealized gains and losses on mark-to-market economic hedges for sales and fuel costs not recoverable under PNM’s FPPAC
Increased income tax expense due to impairments of state tax credits and state net operating loss carryforwards, as well as a tax rate change in New Mexico Note 11
Other factors impacting results of operation for each segment are discussed under Results of Operations below

Liquidity and Capital Resources
PNMR has a $300.0 million revolving credit facility and PNM has a $400.0 million revolving credit facility, both of which expire in October 2019 and can be extended for one year upon approval by the lenders. Both facilities provide capacities for short-term borrowing and letters of credit. In addition, PNM has a $50.0 million revolving credit facility, which expires in January 2018, with banks having a significant presence in New Mexico and TNMP has a $75.0 million revolving credit facility, which expires in September 2018. Total availability for PNMR on a consolidated basis was $768.2 million at February 20, 2015. The Company utilizes these credit facilities and cash flows from operations to provide funds for both construction and operational expenditures. PNMR also has intercompany loan agreements with each of its subsidiaries.
The Company projects that its total capital requirements, consisting of construction expenditures and dividends, will total $2,528.5 million for 2015-2019. The construction expenditures include estimated amounts related to environmental upgrades at SJGS to address regional haze and the identified sources of replacement capacity under the revised plan for compliance described in Note 16. The construction expenditures also include additional renewable resources anticipated to be required to meet the RPS, additional peaking resources needed to meet needs outlined in PNM’s current IRP, environmental upgrades at Four Corners, the purchase of the leased portion of the EIP, and the purchase of the assets underlying three of the PVNGS Unit 2 leases at the expiration of those leases. In addition to internal cash generation, the Company anticipates that it will be necessary to obtain additional long-term financing in the form of debt refinancing, new debt issuances, and/or new equity in order to fund its capital requirements during the 2015-2019 period. The Company currently believes that its internal cash generation, existing credit arrangements, and access to public and private capital markets will provide sufficient resources to meet the Company’s capital requirements.

A- 34



RESULTS OF OPERATIONS
Segment Information
The following discussion is based on the segment methodology that PNMR’s management uses for making operating decisions and assessing performance of its various business activities. See Note 2 for more information on PNMR’s operating segments.

The following discussion and analysis should be read in conjunction with the Consolidated Financial Statements and Notes thereto. Trends and contingencies of a material nature are discussed to the extent known. Refer also to Disclosure Regarding Forward Looking Statements in Part I, Item 1 and to Part II, Item 7A. Risk Factors.
PNM
The table below summarizes operating results for PNM:
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
(In millions)
Electric operating revenues
$
1,147.9

 
$
1,116.3

 
$
1,092.3

 
$
31.6

 
$
24.0

Cost of energy
403.6

 
374.7

 
353.6

 
28.9

 
21.1

Margin
744.3

 
741.6

 
738.6

 
2.7

 
3.0

Operating expenses
422.1

 
428.6

 
435.4

 
(6.5
)
 
(6.8
)
Depreciation and amortization
109.5

 
103.8

 
97.3

 
5.7

 
6.5

Operating income
212.7

 
209.2

 
205.9

 
3.5

 
3.3

Other income (deductions)
20.8

 
21.5

 
26.5

 
(0.7
)
 
(5.0
)
Interest charges
(79.4
)
 
(79.2
)
 
(76.1
)
 
(0.2
)
 
(3.1
)
Segment earnings before income taxes
154.1

 
151.5

 
156.3

 
2.6

 
(4.8
)
Income (taxes)
(52.6
)
 
(48.8
)
 
(50.7
)
 
(3.8
)
 
1.9

Valencia non-controlling interest
(14.1
)
 
(14.5
)
 
(14.1
)
 
0.4

 
(0.4
)
Preferred stock dividend requirements
(0.5
)
 
(0.5
)
 
(0.5
)
 

 

Segment earnings
$
86.8

 
$
87.6

 
$
91.0

 
$
(0.8
)
 
$
(3.4
)

The table below summarizes the significant changes to total revenues, cost of energy, and margin:
 
2014/2013 Change
 
2013/2012 Change
 
Total
Revenues
 
Cost of
Energy
 

Margin
 
Total
Revenues
 
Cost of
Energy
 

Margin
 
(In millions)
Customer usage/load
$
(10.9
)
 
$

 
$
(10.9
)
 
$
(8.6
)
 
$

 
$
(8.6
)
Weather
(11.0
)
 

 
(11.0
)
 
(3.3
)
 

 
(3.3
)
Transmission
2.0

 
0.9

 
1.1

 
(1.6
)
 
1.0

 
(2.6
)
FPPAC
23.0

 
23.0

 

 
6.8

 
6.8

 

Economy energy service
6.2

 
6.0

 
0.2

 
7.6

 
7.3

 
0.3

Wholesale contracts
(1.2
)
 
(1.6
)
 
0.4

 
2.9

 

 
2.9

Rio Bravo purchase

 
(3.3
)
 
3.3

 

 

 

Unregulated margins
5.3

 
(1.8
)
 
7.1

 
2.8

 
(2.7
)
 
5.5

Energy efficiency rider
3.8

 

 
3.8

 
(2.1
)
 

 
(2.1
)
Renewable energy rider
10.2

 
3.7

 
6.5

 
14.7

 
6.3

 
8.4

Net unrealized economic hedges
5.7

 
1.1

 
4.6

 
(0.6
)
 
(0.9
)
 
0.3

Other
(1.5
)
 
0.9

 
(2.4
)
 
5.4

 
3.3

 
2.2

Net change
$
31.6

 
$
28.9

 
$
2.7

 
$
24.0

 
$
21.1

 
$
3.0


A- 35




The following table shows PNM operating revenues by customer class and average number of customers:
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
(In millions, except customers)
Residential
$
411.4

 
$
411.6

 
$
409.0

 
$
(0.2
)
 
$
2.6

Commercial
428.1

 
415.6

 
413.3

 
12.5

 
2.3

Industrial
73.0

 
74.6

 
78.6

 
(1.6
)
 
(4.0
)
Public authority
25.3

 
25.7

 
25.5

 
(0.4
)
 
0.2

Economy energy service
39.1

 
32.9

 
25.4

 
6.2

 
7.5

Transmission
38.3

 
38.2

 
39.4

 
0.1

 
(1.2
)
Firm-requirements wholesale
38.3

 
42.4

 
39.4

 
(4.1
)
 
3.0

Other sales for resale
82.5

 
67.5

 
47.4

 
15.0

 
20.1

Mark-to-market activity
6.0

 
0.3

 
0.9

 
5.7

 
(0.6
)
Other
5.9

 
7.5

 
13.4

 
(1.6
)
 
(5.9
)
 
$
1,147.9

 
$
1,116.3

 
$
1,092.3

 
$
31.6

 
$
24.0

Average retail customers (thousands)
511.2

 
508.2

 
505.6

 
3.0

 
2.6


The following table shows PNM GWh sales by customer class:
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
(Gigawatt hours)
Residential
3,169.1

 
3,304.3

 
3,323.5

 
(135.2
)
 
(19.2
)
Commercial
3,874.3

 
3,954.8

 
4,022.2

 
(80.5
)
 
(67.4
)
Industrial
984.1

 
1,041.2

 
1,136.0

 
(57.1
)
 
(94.8
)
Public authority
251.2

 
266.4

 
279.2

 
(15.2
)
 
(12.8
)
Economy energy service
758.6

 
719.3

 
635.3

 
39.3

 
84.0

Firm-requirements wholesale
527.6

 
654.1

 
652.0

 
(126.5
)
 
2.1

Other sales for resale
2,271.5

 
2,061.9

 
1,652.2

 
209.6

 
409.7

 
11,836.4

 
12,002.0

 
11,700.4

 
(165.6
)
 
301.6


In 2014, retail sales were lower compared to 2013 reflecting a continued sluggish economy in New Mexico. In particular, the Albuquerque metropolitan area continues to lag the nation in economic recovery. PNM's weather normalized retail KWh sales were lower in 2014 by 1.7%, which decreased revenues and margins $10.9 million compared to 2013. Milder weather in New Mexico decreased revenues and margin $11.0 million in 2014 as cooling degree days were 7.4% lower and heating degree days were 12.7% lower in 2014 compared to 2013. In spite of the economic pressures, PNM experienced growth in average retail customers of 0.6% in 2014 compared to 2013. For 2013, PNM's weather normalized and leap-year adjusted retail KWh sales were lower in 2013 by 1.8%, which decreased margin $8.6 million compared to 2012 primarily due to the sluggish economy. PNM experienced growth in average retail customers of 0.5% in 2013 compared to 2012. Weather negatively impacted revenues and margin by $3.3 million in 2013 as cooling degree days were 10.7% lower in 2013 compared to 2012.

Transmission rate increases in August 2013 and May 2014 increased revenues and margin $1.3 million in 2014 compared to 2013. See Note 17. In 2013, lower transmission revenues as a result of expiration of contracts combined with higher third-party transmission expenses incurred to deliver power to retail customers reduced margins by $2.6 million.

As discussed in Note 17, the NMPRC approved the continuation of PNM’s FPPAC and authorized PNM to recover the remaining under-collected balance in its FPPAC balancing account over 18 months effective July 1, 2014. As a result PNM’s revenues increased in 2014 compared to 2013. These revenues were offset in cost of energy with no impact on margin.

PNM provides “economy energy services” to a major customer. Under this contract, PNM purchases energy on the customer’s behalf and delivers the energy to the customer’s location through PNM’s transmission system. PNM charges the

A- 36



customer for the cost of the energy as a direct pass through to the customer with no impact to PNM’s margin. Although KWh sales to this customer increased in both 2014 and 2013 compared to the previous year, there is only a minor impact in margin resulting from providing ancillary services.

Unregulated revenues and margins are primarily associated with PVNGS Unit 3. In 2014, higher market prices combined with higher available generation increased revenues by $5.3 million. In addition, gas imbalance settlements lowered cost of energy $2.1 million in 2014 compared to 2013. In 2013, higher market power prices on sales offset by lower available generation increased revenue and margin $2.8 million. In addition, PNM incurred cost of energy for gas imbalance settlements of $2.0 million in 2012 that did not recur in 2013.

PNM’s contract with Gallup, its second largest wholesale generation customer, expired on June 29, 2014.  In 2014, decreases in revenues for the Gallup contract of $5.6 million were partially offset by increases in off-system sales of $3.3 million for power that would have otherwise been used to serve Gallup and lower fuel expense of $1.0 million. In addition, in May 2014, PNM entered into a new wholesale contract with the Jicarilla Apache Nation, which increased revenues and margin $1.0 million. PNM’s recently filed general rate case includes a reallocation of costs among regulatory jurisdictions reflecting the termination of the contract to serve Gallup. See Note 17.  PNM implemented new rates for NEC, its largest wholesale firm-requirements customer, in April 2012 and for Gallup in July 2013. These increases improved revenues and margins $2.9 million in 2013.

PNM closed on the acquisition of Rio Bravo, formerly known as Delta, on July 17, 2014. Prior to acquiring Rio Bravo, PNM had a 20 year PPA covering all of the output of the facility, which PNM accounted for as an operating lease and recorded fixed and variable costs in cost of energy. As a result of the Rio Bravo acquisition, cost of energy decreased and margin increased $3.3 million for 2014 compared to 2013. The increase in margin is partially offset by increases in operating and depreciation expenses.

PNM offers several energy efficiency programs and initiatives to its retail customers regulated by the NMPRC. In addition, PNM is allowed to earn incentives on these programs based on authorized calculations. See Note 17. PNM recovers the energy efficiency program costs and incentives via a rate rider. Changes in energy efficiency revenues are offset by changes in operating expenses. In 2014, revenues and margins from the energy efficiency rider were higher by $3.8 million compared to 2013, due to an increase in the recovery rate for program costs and higher authorized incentives. In 2013, revenues and margins from the energy efficiency rider were lower by $2.1 million compared to 2012 due to lower KWh sales and a decrease in the recovery rate.

In August 2012, PNM implemented its renewable energy rider, which recovers renewable energy procurement costs to meet the RPS, including PNM-owned solar PV facilities. In January 2014, PNM increased the rate charged under the rider to include additional PNM-owned solar PV facilities completed in 2013. See Note 17. For 2014, this rider increased revenues by $10.2 million compared to 2013. These revenues include a return on investment increase of $1.9 million for 2014 compared to 2013. Cost of energy, reflecting purchase of RECs and purchase of geothermal power, increased $3.7 million for 2014 compared to 2013. Revenues under this rider increased by $14.7 million for 2013 compared to 2012. Cost of energy, reflecting the purchase cost of RECs, increased by an additional $6.3 million in 2013. Revenue increased due to the earned return component on investment of $1.8 million in 2013 compared to $1.2 million for 2012. The remaining revenues from this rider recover renewable energy operating, depreciation, and interest expenses.

Changes in unrealized mark-to-market gains and losses result from economic hedges for sales and fuel costs not covered under the FPPAC, primarily associated with PVNGS Unit 3. Unrealized gains of $6.5 million in 2014 compared to unrealized gains of $1.9 million for 2013 increased margin by $4.6 million, primarily due to PVNGS Unit 3 hedge gains of $5.7 million offset by losses on purchase power contracts of $1.1 million. Unrealized gains of $1.9 million in 2013 compared to unrealized gains of $1.6 million for 2012 increased margin by $0.3 million, primarily due to gains on purchase power contracts of $0.8 million and gains on retail hedges of $0.1 million offset by PVNGS Unit 3 hedge losses of $0.6 million.

Changes in revenue, cost of energy, and margin shown as “other” in the table above include the following items. In 2014, PNM recorded a $1.7 million increase in cost of energy and decrease in margin related to the resolution of issues covered by the arbitration with SJCC discussed in Note 16. As part of the approval of the continuation of PNM’s FPPAC, PNM retains 10% of the revenue from off-system sales that would otherwise be passed through the FPPAC, effective as of July 1, 2013. PNM recorded revenue of $1.7 million for its 10% share of off-system sales from the effective date through December 31, 2014. Lower cost of nuclear fuel handling due to discontinuance of the DOE one-mill fees decreased cost of energy and increased margins by $1.0 million in 2014 compared to 2013. Other also includes the impacts of off-system purchases and sales that are not passed through PNM’s FPPAC. Other sales for resale revenues and KWh volumes increased in 2013 compared to 2012, primarily due to reduced off-system sales at SJGS in 2012 resulting from the fire incident at the mine providing coal to SJGS. See Note 16 for more discussion on the SJGS mine fire incident. Lower cost of energy associated with coal mine decommissioning of $1.9 million increased margins in 2013 compared to 2012.

A- 37




In 2014, operating expenses decreased $6.5 million compared to 2013. Increases in plant maintenance costs at Four Corners, Palo Verde, and PNM’s natural gas plants of $2.4 million, $1.5 million, and $2.8 million were offset by lower maintenance costs at SJGS of $0.6 million. Higher energy efficiency rider program costs and higher renewable rider costs of $3.2 million and $0.4 million, which are offset in revenues, increased operating expenses. Higher property taxes of $2.4 million due to increased plant in service and higher assessed values, as well as higher bad debt expense of $0.4 million further increased operating expenses in 2014 compared to 2013. In 2014, PNM undertook process improvement initiatives designed to decrease future operating expenses. In connection with those initiatives, PNM incurred $1.9 million of costs, primarily related to severances, in 2014. These increases in costs were offset by lower labor and employee benefit costs of $2.4 million and $0.6 million in 2014 compared to 2013. Lower property and casualty claims reduced operating expenses by $1.0 million for 2014 compared to 2013. Capitalization of administrative and general expenses increased by $2.7 million due to higher capital spending also reduced operating expenses in 2014 compared to 2013, as did the $3.3 million allocation to contributions to the PNM Resources Foundation and additional financial support to the PNM Good Neighbor Fund in 2013, which did not occur in 2014. PNM concluded that certain costs that were being deferred as regulatory assets were no longer probable of recovery through the ratemaking process and recorded regulatory disallowances of $1.1 million in 2014 and $12.2 million in 2013, resulting in a decrease in operating expenses of $11.1 million in 2014. The 2013 disallowance includes $10.5 million of the under-collected balance of the FPPAC pursuant to a settlement in the FPPAC continuation matter discussed in Note 17.

In 2013, operating expenses decreased $6.8 million compared to 2012 due to lower maintenance expenses related to planned outages at SJGS of $8.8 million and unplanned outages at SJGS, PVNGS, and PNM’s natural gas plants of $0.9 million, $0.6 million, and $2.1 million, partially offset by increased maintenance expense for unplanned outages at Four Corners of $2.3 million. Lower healthcare claims and lower pension and retiree medical expenses reduced operating expense by $2.3 million in 2013. In addition, capitalized administrative and general expenses increased $3.0 million in 2013 due to increased capital spending, resulting in lower operating expenses compared to 2012. Also, lower energy efficiency expenses of $2.6 million, which are offset in revenues, reduced operating expenses. The allocation of corporate expenses in 2012 included $2.3 million related to business restructuring, which did not recur in 2013. Improved collection experience in 2013 decreased bad debt expense by $0.5 million further decreasing operating expenses. Higher incentive compensation expenses of $2.8 million increased operating expense in 2013. Property taxes increased $1.8 million due to increased plant in service and higher assessed values and a $0.7 million increase in regulatory, payroll, and gross receipts taxes increased operating expenses in 2013 compared to 2012. Donation allocations and regulatory disallowances in 2013, discussed above, increased operating expense in 2013. In addition, PNM recorded a lease abandonment loss of $6.2 million in operating expenses in 2012, which did not recur in 2013.

Depreciation and amortization expense increased in 2014 and 2013 due to additions to utility plant in service, including PNM-owned solar PV facilities and the Rio Bravo purchase. Depreciation on the PNM-owned solar PV facilities is recovered through the renewable energy rate rider as discussed above.

For 2014, other income (deductions) decreased $0.7 million compared to 2013, primarily due to lower interest income on the PVNGS lessor notes of $1.8 million due to lower outstanding balances. In addition, gains of $0.7 million on the disposition of property in 2013 decreased other income (deductions) for 2014. These decreases were offset by income from the pre-treatment of coal of $0.5 million in 2014 and PNM’s commitments in 2013 of $1.0 million to support employment and other economic activities in the “four corners” area, including the Navajo nation. Other income (deductions) also reflects the performance of the NDT and the trust for coal mine reclamation, including investment income, gains or losses on sales of investments, management expenses, and taxes paid by the trusts. Pre-tax gains on available-for-sale securities decreased $0.1 million in 2014 compared to 2013. For 2013, other income (deductions) was $5.0 million lower than 2012, primarily related to $2.4 million lower gains on available-for-sale securities and $2.3 million lower interest income on the PVNGS lessor notes. PNM commitments of $1.0 million to support the "four corners" area further decreased earnings. These decreases were partially offset by higher equity AFUDC of $0.4 million.

Interest expense increased $0.2 million and $3.1 million in 2014 and 2013 primarily due to the regulatory deferral in2012 of interest costs associated with the construction of PNM-owned solar PV facilities, which are now being amortized as interest income and recovered through the renewable energy rate rider.

As discussed in Note 11, the Company settled an IRS examination in 2014, which resulted in PNM recording an additional income tax expense of $1.1 million. An income tax benefit of $1.3 million reflected in the Corporate and Other segment offsets this amount. In addition, income tax expense for PNM was impacted by an impairment of New Mexico net operating loss carryforwards resulting in additional income tax expense of $2.1 million in 2014.


A- 38



TNMP
The table below summarizes the operating results for TNMP:
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
(In millions)
Electric operating revenues
$
287.9

 
$
271.6

 
$
250.1

 
$
16.3

 
$
21.5

Cost of energy
67.9

 
57.6

 
46.2

 
10.3

 
11.4

Margin
220.0

 
214.0

 
203.9

 
6.0

 
10.1

Operating expenses
84.4

 
91.6

 
87.1

 
(7.2
)
 
4.5

Depreciation and amortization
50.1

 
50.2

 
49.3

 
(0.1
)
 
0.9

Operating income
85.6

 
72.2

 
67.5

 
13.4

 
4.7

Other income (deductions)
2.1

 
1.9

 
2.7

 
0.2

 
(0.8
)
Interest charges
(27.4
)
 
(27.4
)
 
(28.2
)
 

 
0.8

Segment earnings before income taxes
60.3

 
46.7

 
42.1

 
13.6

 
4.6

Income (taxes)
(22.5
)
 
(17.6
)
 
(15.4
)
 
(4.9
)
 
(2.2
)
Segment earnings
$
37.8

 
$
29.1

 
$
26.7

 
$
8.7

 
$
2.4


The table below summarizes the significant changes to total revenues, cost of energy, and margin:
 
2014/2013 Change
 
2013/2012 Change
 
Total
Revenues
 
Cost of
Energy
 

Margin
 
Total
Revenues
 
Cost of
Energy
 

Margin
 
(In millions)
Rate increases
$
6.3

 
$

 
$
6.3

 
$
4.8

 
$

 
$
4.8

Customer usage/load
0.9

 

 
0.9

 
2.0

 

 
2.0

Customer growth
1.7

 

 
1.7

 
1.5

 

 
1.5

Demand based customers
(0.4
)
 

 
(0.4
)
 
3.6

 

 
3.6

Weather
(2.0
)
 

 
(2.0
)
 
(0.7
)
 

 
(0.7
)
Recovery of third-party transmission costs
10.3

 
10.3

 

 
11.8

 
11.4

 
0.4

AMS surcharge
4.0

 

 
4.0

 
2.7

 

 
2.7

CTC surcharge
0.3

 

 
0.3

 
(3.4
)
 

 
(3.4
)
Hurricane Ike surcharge
(4.8
)
 

 
(4.8
)
 
(0.6
)
 

 
(0.6
)
Energy efficiency incentive
0.8

 

 
0.8

 
0.5

 

 
0.5

1999 rate settlement

 

 

 
(1.6
)
 

 
(1.6
)
Other
(0.8
)
 

 
(0.8
)
 
0.9

 

 
0.9

Net change
$
16.3

 
$
10.3

 
$
6.0

 
$
21.5

 
$
11.4

 
$
10.1



A- 39



The following table shows TNMP operating revenues by retail tariff consumer class, including intersegment revenues, and average number of consumers:
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
(In millions, except customers)
Residential
$
114.8

 
$
111.3

 
$
103.3

 
$
3.5

 
$
8.0

Commercial
99.7

 
95.1

 
88.3

 
4.6

 
6.8

Industrial
15.0

 
13.1

 
13.4

 
1.9

 
(0.3
)
Other
58.4

 
52.1

 
45.1

 
6.3

 
7.0

 
$
287.9

 
$
271.6

 
$
250.1

 
$
16.3

 
$
21.5

Average consumers (thousands) (1)
238.2

 
235.1

 
233.0

 
3.1

 
2.1

 
(1)  
TNMP provides transmission and distribution services to REPs that provide electric service to customers in TNMP’s service territories. The number of consumers above represents the customers of these REPs. Under TECA, consumers in Texas have the ability to choose any REP to provide energy.
The following table shows TNMP GWh sales by retail tariff consumers class:
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
(Gigawatt hours)
Residential
2,802.8

 
2,796.7

 
2,714.5

 
6.1

 
82.2

Commercial
2,564.8

 
2,451.3

 
2,353.1

 
113.5

 
98.2

Industrial
2,727.1

 
2,598.4

 
2,727.1

 
128.7

 
(128.7
)
Other
102.1

 
104.5

 
103.9

 
(2.4
)
 
0.6

 
8,196.7

 
7,950.9

 
7,898.6

 
245.9

 
52.3


Implementation of rate increases in March 2013, September 2013, March 2014, and September 2014 increased revenues and margins by $6.3 million in 2014 compared to 2013. See Note 17. Higher weather normalized load increased revenues and margin by $0.9 million in 2014 compared to 2013. TNMP's weather normalized retail KWh sales increased 3.2% for the year ended 2014 compared to 2013. Milder weather in 2014 compared to 2013, decreased revenues and margins by $2.0 million. Cooling degree days were 2.2% lower than 2013 and heating degree days were 2.0% higher than in 2013. Due to the climate in TNMP’s service territories, variances in cooling degree days have a much larger impact than variances in heating degree days. TNMP experienced average customer growth of 1.3% in 2014, increasing revenues and margins by $1.7 million. Rate increases implemented in September 2012, March 2013, and September 2013 increased revenues and margins by $4.8 million in 2013 compared to 2012. Higher weather normalized and leap-year adjusted usage per customer increased margin $2.0 million in 2013. TNMP's weather normalized and leap-year adjusted retail KWh sales increased 2.6% in 2013. Customer growth in TNMP’s service areas increased revenues and margin $1.5 million in 2013. Milder weather in 2013 compared to 2012, decreased revenues and margins by $0.7 million.

Differences between revenues and costs charged by third-party transmission providers are deferred and recovered through a transmission cost recovery factor. Higher transmission cost of energy resulting from rate increases from other transmission service providers within ERCOT increased cost of energy $10.3 million in 2014 and $11.4 million in 2013. These increases in cost of energy resulted in TNMP rate increases for the recovery of third party transmission costs increasing revenue $10.3 million in 2014 and $11.8 million in 2013.

On August 11, 2011, TNMP implemented a surcharge for its AMS deployment. The surcharge will recover TNMP’s investment in AMS over a 12 year period. The surcharge has a true-up mechanism, which allows TNMP to match revenues collected against the expenses incurred and allows for a return to be earned on its investments. AMS revenues increased by $4.0 million in 2014 and $2.7 million in 2013, which offset increases in operating expenses and depreciation.


A- 40



Increased revenues and margins from demand based customers of $3.6 million in 2013 compared to 2012 primarily resulting from TNMP, under a PUCT approved tariff, lowering the power factor billing threshold from 700 KW to 300 KW. Such revenues and margins decreased slightly in 2014. In 2012, TNMP received a $1.6 million settlement related to ERCOT transmission rates charged from the fourth quarter of 1999, which did not recur in 2014 or 2013.

TNMP earned energy efficiency incentive bonuses for having achieved demand savings for the 2013 and 2012 program years that exceeded its goals. These incentives were approved by the PUCT on September 11, 2014 for the 2013 program year and November 4, 2013 for the 2012 program year, which increased revenues and margin by $0.8 million in 2014 and $0.5 million in 2013.

The CTC surcharge increased revenues and margin by $0.3 million in 2014 compared to 2013, but decreased $3.4 million in 2013 compared to 2012 due to a rate rider decrease implemented in January 2013. The Hurricane Ike surcharge decreased revenues and margin by $4.8 million in 2014 and $0.6 in 2013. The Hurricane Ike surcharge was terminated in November of 2013 due to full recovery of costs associated with this item. Other changes in revenue include recovery of current energy efficiency program costs collected through the energy efficiency cost recovery factor surcharge and rate case expenses collected through the rate case expense surcharge. Changes in revenues and margins from these surcharges are offset by changes in operating expenses and depreciation and amortization.

Operating expenses decreased $7.2 million in 2014 compared to 2013. Lower employee healthcare claims of $2.1 million decreased operating expense in 2014. Higher capitalization of administrative and general expenses related to higher levels of construction expenditures decreased operating expenses by $2.9 million further decrease operating expenses in 2014. Lower energy efficiency program expenses of $0.3 million and lower rate case expense amortization of $0.7 million decreased operating expense in 2014, which amounts are offset by decreases in revenue under TNMP’s energy efficiency and rate case expense surcharges. Other decreases to operating expenses include both a $0.5 million write-off of costs incurred in exploring the possibility of securitizing the remaining CTC costs and the allocation of the contributions to the PNM Resources Foundation of $0.7 million in 2013, which did not recur in 2014.

Operating expenses increased $4.5 million in 2013 compared to 2012. Higher energy efficiency program costs of $1.5 million increased operating expenses, which are offset by increases in revenue under TNMP’s energy efficiency cost recovery factor. Increased property and sales taxes of $1.1 million, primarily due to increased utility plant in service and higher assessed values, higher expenses for incentive compensation of $0.9 million, higher employee healthcare claims of $0.8 million and higher pension and retiree medical expense of $0.8 million increased operating expenses in 2013 compared to 2012. These increases and the increases due CTC securitization and allocated contributions discussed above were offset by lower vegetation management expenses of $1.1 million in 2013 due to additional vegetation management expenditures in 2012 and the 2012 lease abandonment loss of $1.2 million, which did not recur in 2013.

Depreciation expense associated with AMS deployment, which is recovered through the AMS surcharge, increased $2.2 million in 2014. Increases in utility plant in service and amortization expense associated with the CTC regulatory asset increased depreciation and amortization $1.6 million and $0.7 million in 2014. These increases were offset by lower amortization of Hurricane Ike costs of $4.7 million compared to 2013. In 2013, depreciation and amortization expense increased due to higher utility plant in service and AMS deployment, which was partially offset by lower amortization of the CTC regulatory asset.

Other income (deductions) increased in 2014 primarily due to an increase in contributions in aid of construction. Other income (deductions) decreased in 2013 due to higher AFUDC on equity funds of $0.6 million in 2012 and a gain on the sale of property of $0.3 million in 2012, which did not recur in 2013.

Interest charges were flat in 2014 compared to 2013. The issuance of $80.0 million of long-term debt under the TNMP 2013 Bond Purchase Agreement on June 27, 2014 increased interest charges $2.0 million, which is offset by lower interest charges due to the maturity of $50.0 million of debt under the TNMP 2011 Term Loan Agreement and the April 2013 exchange of $93.2 million of TNMP’s 9.5% First Mortgage Bonds for an equal amount of a new series of 6.95% First Mortgage Bonds. Interest charges in 2013 decreased compared to 2012 primarily due to this First Mortgage Bond exchange.




A- 41



Corporate and Other
The table below summarizes the operating results for Corporate and Other:
 
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
 
 
(In millions)
 
 
Electric operating revenues
$

 
$

 
$

 
$

 
$

Cost of energy

 

 

 

 

Margin

 

 

 

 

Operating expenses
(14.5
)
 
(18.3
)
 
(17.9
)
 
3.8

 
(0.4
)
Depreciation and amortization
13.1

 
12.8

 
17.5

 
0.3

 
(4.7
)
Operating income
1.4

 
5.5

 
0.3

 
(4.1
)
 
5.2

Gain on sale of First Choice

 

 
1.0

 

 
(1.0
)
Other income (deductions)
(2.4
)
 
(13.7
)
 
(8.1
)
 
11.3

 
(5.6
)
Interest charges
(12.8
)
 
(14.9
)
 
(16.6
)
 
2.1

 
1.7

Segment earnings (loss) before income taxes
(13.8
)
 
(23.1
)
 
(23.4
)
 
9.3

 
0.3

Income (taxes) benefit
5.4

 
6.9

 
11.2

 
(1.5
)
 
(4.3
)
Segment earnings (loss)
$
(8.4
)
 
$
(16.2
)
 
$
(12.2
)
 
$
7.8

 
$
(4.0
)
Corporate and Other operating expenses shown above are net of amounts allocated to PNM and TNMP under shared services agreements. The amounts allocated include certain expenses shown as depreciation and amortization and other income (deductions) in the table above. The operating income (loss) of $5.5 million in 2013 reflects the allocation of $4.0 million of the Company’s contributions to the PNM Resources Foundation and financial support to the PNM Good Neighbor Fund, recorded in other income (deductions), which were allocated to PNM and TNMP reducing operating expenses. Such contributions did not occur in 2014 or 2012.

Depreciation expense decreased in 2013 from 2012 due to accelerated amortization of leasehold improvements for a portion of the Company’s corporate headquarters abandoned during 2012. PNM and TNMP deferred their allocations of the accelerated amortization of related leasehold improvements as regulatory assets to be recovered through rates. Substantially all depreciation and amortization expense is offset in operating expenses as a result of allocation of these costs to other business segments.
The year-over-year changes in other income (deductions) are primarily due to losses of $3.3 million recognized in 2013 on the repurchase of $23.8 million of PNMR’s 9.25% senior unsecured notes (Note 6), the $4.0 million in contributions discussed above, and a $3.6 million decrease in amortization related to corporate investments that became fully amortized in 2013.
Interest charges decreased year-over-year in 2014 and 2013 primarily due to the repurchase of 9.25% senior unsecured notes. In addition, interest charges decreased due to lower borrowings and lower interest rates on short-term borrowings.

In 2014 and 2013, income tax benefits were reduced by $1.9 million and $3.9 million due to impairments of net operating loss carryforwards and New Mexico wind energy production tax credit carryforwards. The impaired carryforwards are not expected to be utilized prior to their expiration due to the Company’s net operating loss position and the extension of fifty percent bonus depreciation. Additional income tax expense of $0.2 million and $1.2 million was recognized in 2014 and 2013 due to reductions in Corporate and Other’s deferred tax assets resulting from legislation, which reduced future New Mexico corporate income tax rates. The settlement of an IRS examination in 2014 resulted in an income tax benefit of $1.3 million in Corporate and Other. An additional income tax expense of $1.1 million reflected in the PNM segment offsets this amount. See Note 11.



A- 42



LIQUIDITY AND CAPITAL RESOURCES
Statements of Cash Flows
The information concerning PNMR’s cash flows is summarized as follows:
 
Year Ended December 31,
 
Change
 
2014
 
2013
 
2012
 
2014/2013
 
2013/2012
 
(In millions)
Net cash flows from:
 
Operating activities
$
414.9

 
$
386.6

 
$
281.3

 
$
28.3

 
$
105.2

Investing activities
(485.3
)
 
(331.4
)
 
(285.9
)
 
(153.9
)
 
(45.6
)
Financing activities
96.2

 
(61.6
)
 
(1.6
)
 
157.8

 
(60.0
)
Net change in cash and cash equivalents
$
25.7

 
$
(6.5
)
 
$
(6.1
)
 
$
32.2

 
$
(0.3
)

The changes in PNMR’s cash flows from operating activities primarily relate to income tax refunds received of $2.6 million in 2014 compared to refunds received of $95.3 million in 2013 and income taxes paid of $5.3 million in 2012 and rate increases at TNMP and PNM. Contributions to the PNM and TNMP pension and other postretirement benefit plans of $5.4 million in 2014 compared to $66.5 million in 2013 and $88.5 million in 2012 also contributed to operating cash flow changes. In addition, changes in assets and liabilities resulting from normal operations impact operating cash flows. These increases were offset by refunds of $15.2 million made to customers related to the settlement of PNM’s transmission rate case in 2013, as well as governmental grants received by PNM of $21.6 million in 2012 and lower retail load at PNM in 2014 and 2013.

Cash flows from investing activities were driven primarily by increases in plant additions of $112.6 million in 2014 compared to 2013 and $39.1 million in 2013 compared to 2012. At PNM, total utility plant additions were $76.9 million higher in 2014 compared to 2013, including increases in generation additions of $40.0 million, transmission and distribution additions of $33.5 million and nuclear fuel purchases of $4.8 million offset by a decrease in renewable additions of $1.4 million. PNM utility plant additions were $43.1 million higher in 2013 compared to 2012, including $35.7 million related to solar projects and increases in transmission and distribution additions of $22.7 million, offset by lower generation additions of $9.5 million and lower nuclear fuel purchases of $5.8 million. TNMP utility plant additions increased by $38.1 million in 2014 compared to 2013, including increases in distribution additions of $18.7 million, transmission additions of $17.8 million, and AMS additions of $1.6 million. TNMP utility plant additions decreased $3.9 million in 2013 compared to 2012, including an increase in AMS additions of $2.5 million, offset by a decrease in other transmission and distribution additions of $6.4 million. Cash flows from investing activities were also affected by the $36.2 million acquisition of Rio Bravo in 2014 as discussed in Note 9 and proceeds from the sale of First Choice of $4.0 million in 2012.

The changes in PNMR’s cash flows from financing activities include reductions in net short-term borrowings of $34.1 million in 2014 compared to 2013 and $85.5 million in 2013 compared to 2012. Long-term borrowings in 2014 include the $175.0 million PNM 2014 Term Loan agreement and $100.0 million of the $125.0 million PNM Multi-draw Term Loan, which were used to repay amounts under the existing PNM 2013 Term Loan Agreement and other short-term borrowings. In addition, 2014 includes the issuance of $80.0 million in long-term debt at TNMP, which was used to repay amounts under the existing TNMP 2011 Term Loan Agreement and other short-term borrowings. Long-term borrowings in 2013 include the $75.0 million PNM 2013 Term Loan Agreement. In 2013, $13.0 million was paid in connection with TNMP’s debt exchange and $26.9 million was paid by PNMR to repurchase $23.8 million of its outstanding 9.25% Senior Unsecured Notes, Series A, due 2015. Borrowings in 2012 include the $100.0 million PNMR Term Loan Agreement, which was used to repay borrowings under the PNMR Revolving Credit Facility. PNM also refinanced $20.0 million of PCRBs in 2012.
Financing Activities
See Note 6 for additional information concerning the Company’s financing activities. PNM must obtain NMPRC approval for any financing transaction having a maturity of more than 18 months. In addition, PNM files its annual short-term financing plan with the NMPRC. The Company’s ability to access the credit and capital markets at a reasonable cost is largely dependent upon its:
Ability to earn a fair return on equity
Results of operations
Ability to obtain required regulatory approvals


A- 43



Conditions in the financial markets
Credit ratings

The $100.0 million PNMR Term Loan Agreement, the $175.0 million PNM 2014 Term Loan Agreement, and the $125.0 million PNM Multi-draw Term Loan, as well as the credit facilities discussed under Liquidity below, each contain one financial covenant that requires the maintenance of debt-to-capital ratios of less than or equal to 65%.  For PNMR and PNM, these ratios reflect the present value of payments under the PVNGS leases as debt. At December 31, 2014, interest rates on outstanding borrowings were 1.02% for the PNMR Term Loan Agreement, 1.11% for the PNM 2014 Term Loan Agreement, and 0.75% for the PNM Multi-draw Term Loan.
Capital Requirements
Total capital requirements consist of construction expenditures and cash dividend requirements for PNMR common stock and PNM preferred stock. Key activities in PNMR’s current construction program include:
Upgrading generation resources, including expenditures for compliance with environmental requirements and for renewable energy resources
Expanding the electric transmission and distribution systems
Purchasing nuclear fuel
Projected capital requirements for 2015-2019 are:    
 
2015
 
2016-2019
 
Total
 
(In millions)
Construction expenditures
$
569.2

 
$
1,638.1

 
$
2,207.3

Dividends on PNMR common stock
63.7

 
254.9

 
318.6

Dividends on PNM preferred stock
0.5

 
2.1

 
2.6

Total capital requirements
$
633.4

 
$
1,895.1

 
$
2,528.5


The construction expenditure estimates are under continuing review and subject to ongoing adjustment, as well as to Board review and approval. The construction expenditures above include estimated amounts of $70.7 million related to environmental upgrades at SJGS to address regional haze and $268.4 million related to the identified sources of replacement capacity under the revised plan for compliance described in Note 16. The above construction expenditures also include additional renewable resources anticipated to be required to meet the RPS, additional peaking resources to meet needs outlined in PNM’s current IRP, environmental upgrades at Four Corners of $80.0 million, and the purchase of the leased portion of the EIP, and the purchase of the assets underlying three of the PVNGS Unit 2 leases at the expiration of those leases. Expenditures for the SJGS and Four Corners environmental upgrades are estimated to be $72.1 million in 2015. See Note 16 and Commitments and Contractual Obligations below. The ability of PNMR to pay dividends on its common stock is dependent upon the ability of PNM and TNMP to be able to pay dividends to PNMR. Note 5 describes regulatory and contractual restrictions on the payment of dividends by PNM and TNMP.
During the year ended December 31, 2014 , PNMR met its capital requirements and construction expenditures through cash generated from operations, as well as its liquidity arrangements and borrowings under term loans and the TNMP 2013 Bond Purchase Agreement.

In addition to the capital requirements for construction expenditures and dividends, the Company has long-term debt that must be paid or refinanced at maturity. PNMR’s 9.25% senior unsecured notes mature on May 15, 2015; $39.3 million of PNM’s senior unsecured notes, pollution control revenue bonds, are subject to mandatory tender for remarketing on June 1, 2015; and the $175.0 million PNM 2014 Term Loan Agreement matures on September 4, 2015. Note 6 contains additional information about the maturities of long-term debt. Also, the $100.0 million PNMR Term Loan Agreement matures on December 21, 2015 and the $125.0 million PNM Multi-draw Term Loan matures on June 21, 2016. PNMR and PNM anticipate that funds to repay the long-term debt maturities and term loans will come from entering into new arrangements similar to the existing agreements, borrowing under their revolving credit facilities, issuance of new long-term debt, or a combination of these sources. The Company has from time to time refinanced or repurchased portions of its outstanding debt before scheduled maturity. Depending on market conditions, the Company may refinance other debt issuances or make additional debt repurchases in the future.
Liquidity
PNMR’s liquidity arrangements include the PNMR Revolving Credit Facility and the PNM Revolving Credit Facility that both currently expire in October 2019 and the TNMP Revolving Credit Facility that expires in September 2018. The PNMR

A- 44



Revolving Credit Facility and the PNM Revolving Credit Facility provide for an additional one -year extension option for each facility, subject to approval by a majority of the lenders. The PNMR Revolving Credit Facility has a financing capacity of $300.0 million , the PNM Revolving Credit Facility has a financing capacity of $400.0 million , and the TNMP Revolving Credit Facility has a financing capacity of $75.0 million. On January 8, 2014, PNM entered into the $50.0 million PNM New Mexico Credit Facility, which expires on January 8, 2018. The Company believes the terms and conditions of these facilities are consistent with those of other investment grade revolving credit facilities in the utility industry.
The revolving credit facilities and the PNM New Mexico Credit Facility provide short-term borrowing capacity. The revolving credit facilities also allow letters of credit to be issued. Letters of credit reduce the available capacity under the facilities. The Company utilizes these credit facilities and cash flows from operations to provide funds for both construction and operational expenditures. The Company’s business is seasonal with more revenues and cash flows from operations being generated in the summer months. In general, the Company relies on the credit facilities to be the initial funding source for construction expenditures. Accordingly, borrowings under the facilities may increase over time. Depending on market and other conditions, the Company will periodically sell long-term debt and use the proceeds to reduce the borrowings under the credit facilities. Borrowings under the PNMR Revolving Credit Facility ranged from zero to $21.1 million during the year ended December 31, 2014, zero to $84.0 million during the year ended December 31, 2013, and $14.0 million to $141.0 million during the year ended December 31, 2012. Such borrowings ranged from zero to $0.6 million during the three months ended December 31, 2014. Borrowings under the PNM Revolving Credit Facility ranged from zero to $82.0 million during the year ended December 31, 2014, zero to $130.8 million during the year ended December 31, 2013, and zero to $168.0 million during the year ended December 31, 2012. Such borrowings ranged from zero to $45.0 million during the three months ended December 31, 2014. Borrowings under the PNM New Mexico Credit Facility ranged from zero to $25.0 million during the year ended December 31, 2014 and zero to $15.0 million during the three months ended December 31, 2014. There were no such borrowings in 2013 and 2012. Borrowings under the TNMP Revolving Credit Facility ranged from zero to $30.0 million during the year ended December 31, 2014 and from zero to $40.0 million during the year ended December 31, 2013. There were no such borrowings in 2012. Such borrowings ranged from zero to $5.0 million during the three months ended December 31, 2014. At December 31, 2014, the interest rates on outstanding borrowings were 1.67% for the PNMR Revolving Credit Facility and 1.17% for the TNMP Revolving Credit Facility. The PNM Revolving Credit Facility and the PNM New Mexico Credit Facility had no borrowings outstanding at December 31, 2014.
The Company currently believes that its capital requirements can be met through internal cash generation, existing or new credit arrangements, and access to public and private capital markets. To cover the difference in the amounts and timing of internal cash generation and cash requirements, the Company intends to use short-term borrowings under its current and future liquidity arrangements. However, if difficult market conditions experienced during the recent recession return, the Company may not be able to access the capital markets or renew credit facilities when they expire. Should that occur, the Company would seek to improve cash flows by reducing capital expenditures and exploring other available alternatives. Also, PNM could consider seeking authorization for the issuance of first mortgage bonds to improve access to the capital markets.
In addition to its internal cash generation, the Company anticipates that it will be necessary to obtain additional long-term financing to fund its capital requirements during the 2015-2019 period. This could include new debt issuances and/or new equity.
On January 30, 2014, Moody’s raised the senior unsecured rating for PNMR, the senior unsecured and issuer ratings for PNM, and the senior secured and issuer ratings for TNMP. Moody’s continued to maintain the ratings outlook for PNMR, PNM, and TNMP as positive. On April 30, 2014, S&P changed the corporate credit ratings outlook to positive from stable for PNMR, PNM, and TNMP. Currently, all of the credit ratings issued by both Moody’s and S&P on the Company’s debt are investment grade. As of February 20, 2015 , ratings on the Company’s securities were as follows:
 
PNMR
 
PNM
 
TNMP
S&P
 
 
 
 
 
Senior secured debt
*
 
*
 
A-
Senior unsecured debt
BBB-
 
BBB
 
*
Preferred stock
*
 
BB+
 
*
Moody’s
 
 
 
 
 
Senior secured debt
*
 
*
 
A2
Senior unsecured debt
Baa3
 
Baa2
 
*
* Not applicable
 
 
 
 
 
Investors are cautioned that a security rating is not a recommendation to buy, sell or hold securities, that it is subject to revision or withdrawal at any time by the assigning rating organization, and that each rating should be evaluated independently of any other rating.

A- 45



A summary of liquidity arrangements as of February 20, 2015 is as follows:
 
PNMR
Separate
 
PNM
Separate
 
TNMP
Separate
 
PNMR
Consolidated
 
 
 
(In millions)
 
 
Financing capacity:
 
 
 
 
 
 
 
Revolving credit facility
$
300.0

 
$
400.0

 
$
75.0

 
$
775.0

PNM New Mexico Credit Facility

 
50.0

 

 
50.0

Total financing capacity
$
300.0

 
$
450.0

 
$
75.0

 
$
825.0

Amounts outstanding as of February 20, 2015:
 
 
 
 
 
 
 
Revolving credit facility
$
0.8

 
$
10.0

 
$
20.0

 
$
30.8

PNM New Mexico Credit Facility

 
15.0

 

 
15.0

Letters of credit
7.7

 
3.2

 
0.1

 
11.0

Total short term-debt and letters of credit
8.5

 
28.2

 
20.1

 
56.8

Remaining availability as of February 20, 2015
$
291.5

 
$
421.8

 
$
54.9

 
$
768.2

Invested cash as of February 20, 2015
$
1.9

 
$
42.5

 
$

 
$
44.4

The above table excludes intercompany debt. The remaining availability under the revolving credit facilities at any point in time varies based on a number of factors, including the timing of collections of accounts receivables and payments for construction and operating expenditures. The availability amounts do not include remaining capacity of $25.0 million available under the PNM Multi-draw Term Loan at February 20, 2015.
PNMR can offer new shares of common stock through the PNM Resources Direct Plan under a SEC shelf registration statement that expires in August 2015. PNM has a shelf registration statement for up to $500.0 million of senior unsecured notes that expires in May 2017.
Off-Balance Sheet Arrangements
PNMR’s off-balance sheet arrangements include PNM’s operating leases for portions of PVNGS Units 1 and 2 and the EIP transmission line.
In 1985 and 1986, PNM consummated sale and leaseback transactions for its interest in PVNGS Units 1 and 2. The original purpose of the sale-leaseback financing was to lower revenue requirements and to levelize the ratemaking impact of PVNGS being placed in-service. The lease payments reflected lower capital costs as the equity investors were able to capitalize the investment with greater leverage than PNM and because the sale transferred tax benefits that PNM could not fully utilize. Under traditional ratemaking, the capital costs of ownership of a major rate base addition, such as a nuclear plant, are front-end loaded. The revenue requirements are high in the initial years and decline over the life of the plant as depreciation occurs. By contrast, the lease payments are level over the lease term. The leases, which were scheduled to expire in 2015 and 2016, contained options to renew the leases at a fixed price or to purchase the property for fair market value.
As discussed in Note 7, PNM and the lessors under each of the PVNGS Unit 1 leases entered into amendments to those leases that renew the leases from their original expiration on January 15, 2015 through January 15, 2023. In addition, PNM entered into an amendment with the lessor under one of the PVNGS Unit 2 leases that extended that lease from its original expiration on January 15, 2016 through January 15, 2024. PNM has entered into agreements with the lessors under the other three PVNGS Unit 2 leases under which PNM will exercise its option to purchase the assets underlying the leases at the agreed to fair market values aggregating $163.3 million at the expiration of the leases on January 15, 2016. The semiannual renewal payments aggregate $8.3 million under the PVNGS Unit 1 leases and are $0.8 million for the one renewed PVNGS Unit 2 lease. See Sources of Power in Part I, Item 1, Investments in Note 1, and Note 7 for additional information.

A- 46



The future lease payments shown below for the PVNGS leases have been reduced by amounts that will be returned to PNM through its ownership in related lessor notes and include the renewals described above.
 
PVNGS
Units 1&2
 
(In thousands)
2015
$
25,319

2016
20,589

2017
18,139

2018
18,139

2019
18,139

Thereafter
65,124

Total
$
165,449

For reasons similar to the PVNGS sale and leaseback transactions, PNM built the EIP transmission line and sold it in sale and leaseback transactions in 1985. PNM currently owns 60% and operates the other 40% of the EIP line under the terms of a lease agreement. The lease expires on April 1, 2015 and contained fixed-rate and fair market value renewal options and a fair market value purchase option. PNM has agreed to exercise its option to purchase the leased assets at expiration of the lease at the agreed to fair market value of $7.7 million. See Note 7.
Commitments and Contractual Obligations
The following table sets forth PNMR’s long-term contractual obligations as of December 31, 2014 . See Note 7 for further details about the Company’s significant leases:
 
 
Payments Due
Contractual Obligations
 
2015
 
2016-2017
 
2018-2019
 
2020 and Thereafter
 
Total
 
 
(In thousands)
Long-term debt (a)
 
$
333,066

 
$
157,000

 
$
622,327

 
$
842,743

 
$
1,955,136

Interest on long-term debt (b)
 
107,233

 
200,081

 
124,432

 
637,984

 
1,069,730

Operating leases (c)
 
36,350

 
54,077

 
50,397

 
134,068

 
274,892

Transmission reservation payments
 
14,422

 
23,922

 
21,073

 
31,935

 
91,352

Coal contracts (d)
 
89,740

 
172,087

 
55,456

 
392,171

 
709,454

Coal mine decommissioning (e)
 
2,627

 
2,685

 
1,039

 
144,408

 
150,759

Nuclear decommissioning funding requirements (f)
 
2,637

 
5,274

 
5,274

 

 
13,185

Outsourcing
 
5,325

 
6,861

 
1,380

 

 
13,566

Pension and retiree medical (g)
 
35,463

 
23,435

 
20,218

 

 
79,116

Construction expenditures (h)
 
569,203

 
957,910

 
680,177

 

 
2,207,290

Total (i)
 
$
1,196,066

 
$
1,603,332

 
$
1,581,773

 
$
2,183,309

 
$
6,564,480


(a)
Represents total long-term debt, excluding unamortized discounts of $1.9 million and unamortized premiums of $21.9 million
(b)
Represents interest payments during the period
(c)
The operating lease amounts include payments under the PVNGS leases through the expiration of the leases, including renewal periods for leases for which PNM has agreed to renew; the amounts in the above table are net of amounts to be returned to PNM as payments on its investments in related PVNGS lessor notes; see Off-Balance Sheet Arrangements above, Investments in Note 1, Note 7, and Note 9
(d)
Represents only certain minimum payments that may be required under the coal contracts if no deliveries are made
(e)
Includes funding of the trust established for post-term reclamation related to the mines serving SJGS (Note 16)
(f)
These obligations represent funding based on the current rate of return on investments
(g)
The Company only forecasts funding for its pension and retiree medical plans for the next five years

A- 47



(h)
Represents forecasted construction expenditures, including nuclear fuel, under which substantial commitments have been made (Note 14); the Company only forecasts capital expenditures for the next five years; the construction expenditures include the purchase of the leased portion of the EIP and the assets underlying three of the PVNGS Unit 2 leases at the expiration of those leases; see Capital Requirements above and Note 7
(i)
PNMR is unable to reasonably estimate the timing of liability for uncertain income tax positions (Note 11) in individual years due to uncertainties in the timing of the effective settlement of tax positions. Therefore, PNMR’s liability of $15.0 million is not reflected in this table. Amounts PNM is obligated to pay Valencia are not included above since Valencia is consolidated by PNM in accordance with GAAP. See Note 9. No amounts are included above for the New Mexico Wind, Lightning Dock Geothermal, and Red Mesa Wind PPAs since there are no minimum payments required under those agreements.

Contingent Provisions of Certain Obligations
PNMR, PNM, and TNMP have a number of debt obligations and other contractual commitments that contain contingent provisions. Some of these, if triggered, could affect the liquidity of the Company. In the unlikely event that the contingent requirements were to be triggered, PNMR, PNM, or TNMP could be required to provide security, immediately pay outstanding obligations, or be prevented from drawing on unused capacity under certain credit agreements. The most significant consequences resulting from these contingent requirements are detailed in the discussion below.
The PNMR Revolving Credit Facility, PNM Revolving Credit Facility, PNM New Mexico Credit Facility, and TNMP Revolving Credit Facility contain “ratings triggers,” for pricing purposes only. If PNMR, PNM, or TNMP is downgraded or upgraded by the ratings agencies, the result would be an increase or decrease in interest cost. In addition, these facilities, as well as the PNMR Term Loan Agreement, PNM 2014 Term Loan Agreement, and PNM Multi-draw Term Loan each contain a covenant requiring the maintenance of debt-to-capital ratios of not more than 65%. For PNMR and PNM, the present value of payments under the PVNGS leases are considered debt. If that ratio were to exceed 65%, the entity could be required to repay all borrowings under its facility, be prevented from borrowing on the unused capacity under the facility, and be required to provide collateral for all outstanding letters of credit issued under the facility.
If a contingent requirement were to be triggered under the PNM facilities resulting in an acceleration of the repayment of outstanding loans, a cross-default provision in the PVNGS leases could occur if the accelerated amount is not paid. If a cross-default provision is triggered, the PVNGS lessors have the ability to accelerate their rights under the leases, including acceleration of all future lease payments. The Company’s revolving credit facilities and term loan agreements also include cross-default provisions.
PNM’s standard purchase agreement for the procurement of gas for its fuel needs contains a contingent requirement that could require PNM to provide collateral for its gas purchase obligations if the seller were to reasonably believe that PNM was unable to fulfill its payment obligations under the agreement.
The master agreement for the sale of electricity in the WSPP contains a contingent requirement that could require PNM to provide collateral if the credit ratings on its debt falls below investment grade. The WSPP agreement also contains a contingent requirement, commonly called a material adverse change provision, which could require PNM to provide collateral if a material adverse change in its financial condition or operations were to occur. Additionally, PNM utilizes standard derivative contracts to financially hedge and trade energy. These agreements contain contingent requirements that require PNM to provide security if the credit rating on its debt falls below investment grade.

No conditions have occurred that would result in any of the above contingent provisions being implemented.


A- 48



Capital Structure
The capitalization tables below include the current maturities of long-term debt, but do not include short-term debt and do not include operating lease obligations as debt.
 
December 31,
PNMR
2014
 
2013
PNMR common equity
46.4
%
 
48.8
%
Preferred stock of subsidiary
0.3
%
 
0.3
%
Long-term debt
53.3
%
 
50.9
%
Total capitalization
100.0
%
 
100.0
%
PNM
 
 
 
PNM common equity
45.7
%
 
48.2
%
Preferred stock
0.4
%
 
0.4
%
Long-term debt
53.9
%
 
51.4
%
Total capitalization
100.0
%
 
100.0
%
TNMP
 
 
 
Common equity
58.9
%
 
59.9
%
Long-term debt
41.1
%
 
40.1
%
Total capitalization
100.0
%
 
100.0
%

OTHER ISSUES FACING THE COMPANY
Climate Change Issues

Background
According to EPA, gases that trap heat in the atmosphere are called greenhouse gases. The four primary greenhouse gases are CO 2 , methane, nitrous oxide, and fluorinated gases, including chlorofluorocarbons such as Freon. In 2014, GHG associated with PNM’s interests in its generating plants were approximately 6.8 million metric tons of CO 2 , which comprises the vast majority of PNM’s GHG.  By comparison, the total GHG in the United States in 2012, the latest year for which EPA has published this data, were approximately 6.5 billion metric tons, of which approximately 5.4 billion metric tons were CO 2
PNM has several programs underway to reduce or offset GHG from its resource portfolio, thereby reducing its exposure to climate change regulation. See Note 17. In 2011, PNM completed construction of 22 MW of utility-scale solar generation located at five sites on PNM’s system throughout New Mexico. In 2013, PNM expanded its renewable energy portfolio by constructing 21.5 MW of utility-scale solar generation. In 2014, PNM added an additional 23 MW of utility-scale solar generation. PNM’s 2015 renewable energy procurement includes the construction of an additional 40 MW of PNM-owned solar PV facilities by December 31, 2015. Since 2003, PNM has purchased the entire output of New Mexico Wind, which has an aggregate capacity of 204 MW, and began purchasing the full output of Red Mesa Wind, which has an aggregate capacity of 102 MW, in January 2015. PNM has signed a 20-year PPA for the output of Lightning Dock Geothermal, which began providing power to PNM in January 2014. The current capacity of the facility is 4 MW and future expansion may result in up to 10 MW of generation capacity. Additionally, PNM has a customer distributed solar generation program that represented 39 MW at the end of 2014 and is expected to grow to over 45 MW by the end of 2015. Once fully subscribed, the distributed solar programs will reduce PNM’s annual production from fossil-fueled electricity generation by about 120 GWh. PNM offers its customers a comprehensive portfolio of energy efficiency and load management programs, with a 2014 budget of $22.5 million and anticipated program costs of $25.8 million for the program year beginning in June 2015. PNM estimates these programs saved approximately 75 GWh of electricity in 2014. Over the next 20 years, PNM projects the expanded energy efficiency and load management programs will provide the equivalent of approximately 13,000 GWh of electricity, which will avoid at least 6.5 million metric tons of CO 2 based upon projected emissions from PNM’s system-wide resources. These estimates are subject to change because of the high uncertainty of many of the underlying variables, including changes in demand for electricity, and complex interrelationships between those variables.
Management periodically updates the Board on implementation of the corporate environmental policy and the Company’s environmental management systems, promotion of energy efficiency, and use of renewable resources.  The Board is also advised of the Company’s practices and procedures to assess the sustainability impacts of operations on the environment.  The Board

A- 49



considers associated issues around climate change, the Company’s GHG exposures, and financial consequences that might result from potential federal and/or state regulation of GHG.
As of December 31, 2014, approximately 71.2% of PNM’s generating capacity, including resources owned, leased, and under PPAs, all of which is located within the United States, consisted of coal or gas-fired generation that produces GHG. Based on current forecasts, the Company does not expect its output of GHG from existing sources to increase significantly in the near-term. Many factors affect the amount of GHG emitted. For example, if new natural gas-fired generation resources are added to meet increased load as anticipated in PNM’s current IRP, GHG would be incrementally increased. In addition, plant performance could impact the amount of GHG emitted. If PVNGS experienced prolonged outages, PNM might be required to utilize other power supply resources such as gas-fired generation, which could increase GHG. As described in Note 16, on February 15, 2013, PNM, NMED, and EPA agreed to pursue a strategy to address the regional haze requirements of the CAA at the coal-fired SJGS, which would include the shutdown of SJGS Units 2 and 3. The shutdown of Units 2 and 3 would result in a reduction of GHG of approximately 50% at SJGS. That agreement also contemplates that gas-fired generation would be built to partially replace the retired capacity. Although replacement power strategies include some gas-fired generation, the reduction in GHG from the retirement of the coal-fired generation would be far greater than the increase in GHG from replacement generation. In September 2013, the EIB approved a RSIP submitted by NMED that encompassed the February 15, 2013 agreement and the RSIP was submitted to EPA for approval on October 18, 2013. Final rules approving the RSIP and withdrawing the FIP were published in the Federal Register on October 9, 2014 and became effective on November 10, 2014. Because of PNM’s dependence on fossil-fueled generation, any legislation or regulation that imposes a limit or cost on GHG could impact the cost at which electricity is produced. While PNM expects to recover any such costs through rates, the timing and outcome of proceedings for cost recovery are uncertain. In addition, to the extent that any additional costs are recovered through rates, customers may reduce their usage, relocate facilities to other areas with lower energy costs, or take other actions that ultimately will adversely impact PNM.
Given the geographic location of its facilities and customers, PNM generally has not been exposed to the extreme weather events and other physical impacts commonly attributed to climate change, with the exception of periodic drought conditions. PNM’s service areas also experience high winds, forest fires, and severe thunderstorms periodically. Climate changes are generally not expected to have material consequences in the near-term. Drought conditions in northwestern New Mexico could impact the availability of water for cooling coal-fired generating plants. Water shortage sharing agreements have been in place since 2004, although no shortage has been declared due to sufficient precipitation in the San Juan River basin. PNM also has a supplemental water contract in place with the Jicarilla Apache Nation to help address any water shortages from primary sources. The contract expires on December 31, 2016.  TNMP has operations in the Gulf Coast area of Texas, which experiences periodic hurricanes and drought conditions. In addition to potentially causing physical damage to TNMP-owned facilities, which disrupt the ability to transmit and/or distribute energy, hurricanes can temporarily reduce customers’ usage and demand for energy.

EPA Regulation
In April 2007, the United States Supreme Court held that EPA has the authority to regulate GHG under the CAA.  This decision heightened the importance of this issue for the energy industry.  In December 2009, EPA released its endangerment finding stating that the atmospheric concentrations of six key greenhouse gases (CO 2 , methane, nitrous oxides, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride) endanger the public health and welfare of current and future generations. In May 2010, EPA released the final PSD and Title V Greenhouse Gas Tailoring Rule (the “Tailoring Rule”) to address GHG from stationary sources under the CAA permitting programs. The purpose of the rule was to “tailor” the applicability of two programs, PSD and Title V operating permit programs, to avoid impacting millions of small GHG emitters. The rule focused on the largest sources of GHG, including fossil-fueled electric generating units. This program covered new construction projects that emit GHG of at least 100,000 tons per year (even if PSD is not triggered for other pollutants). In addition, modifications at existing facilities that increase GHG by at least 75,000 tons per year would be subject to PSD permitting requirements, even if they did not significantly increase emissions of any other pollutant. As a result, PNM’s fossil-fueled generating plants were more likely to trigger PSD permitting requirements because of the magnitude of GHG. However as discussed below, a recent court case has now limited the extent of the Tailoring Rule.
On June 26, 2012, the D.C. Circuit rejected challenges to EPA’s 2009 GHG endangerment finding, GHG standards for light-duty vehicles, PSD Interpretive Memorandum (EPA’s so-called GHG “Timing Rule”), and the Tailoring Rule. The Court found that EPA’s endangerment finding and its light-duty vehicle rule “are neither arbitrary nor capricious,” that “EPA’s interpretation of the governing CAA provisions is unambiguously correct,” and that “no petitioner has standing to challenge the Timing and Tailoring Rules.” On October 15, 2013, the United States Supreme Court granted a petition for a Writ of Certiorari regarding the permitting of stationary sources that emit GHG. The Supreme Court limited the question that it would review to: “Whether EPA permissibly determined that its regulation of greenhouse gas emissions from new motor vehicles triggered permitting requirements under the Clean Air Act for stationary sources that emit greenhouse gases.” Specifically, the case dealt with whether EPA’s determination that regulation of GHG from motor vehicles required EPA to regulate stationary sources under the PSD and

A- 50



Title V permitting programs. The petitioners argued that EPA’s determination that it was required to regulate GHG under the PSD and Title V Programs was unlawful as it violates Congressional intent.

On June 23, 2014, the United States Supreme Court issued its opinion on the above case. The Supreme Court largely reversed the D.C. Circuit. First, the Supreme Court found the CAA does not compel or permit EPA to adopt an interpretation of the act that requires a source to obtain a PSD or Title V permit on the sole basis of its potential GHG. Second, EPA had argued that even if it was not required to regulate GHGs under the PSD and Title V programs, the Tailoring Rule was nonetheless justified on the grounds that it was a reasonable interpretation of the CAA. The Supreme Court rejected this argument. Third, the Supreme Court found EPA lacked authority to "tailor" the CAA's unambiguous numerical thresholds of 100 or 250 tons per year. Fourth, the Supreme Court found that it would be reasonable for EPA to interpret the CAA to limit the PSD program for GHGs to "anyway" sources – those sources that have to comply with the PSD program for other non-GHG pollutants. The Supreme Court said that EPA needed to establish a de minimis level below which BACT would not be required for "anyway" sources.

On March 27, 2012, EPA issued its proposed carbon pollution standards, under Section 111(b) of the CAA, for GHG from new fossil-fueled EGUs larger than 25 MW. The proposed limit was based on the performance of natural gas combined cycle technology. Therefore, coal-fired power plants would only be able to comply with the standard by using carbon capture and sequestration technology. The proposed rule included an exemption for new simple cycle EGUs. EPA accepted comment on the proposed rule through June 25, 2012, during which EPA received over 2.5 million comments. As a result of the comments, EPA reproposed the EGU NSPS as discussed below.

On June 25, 2013, President Obama announced the President’s Climate Action Plan which outlines how his administration plans to cut GHG in the United States, prepare the country for the impacts of climate change, and lead international efforts to combat and prepare for global warming. The plan proposes actions that would lead to the reduction of GHG by 17% below 2005 levels by 2020. The President also issued a Presidential Memorandum to EPA to continue development of the GHG NSPS regulations for electric generators. The Presidential Memorandum establishes a timeline for the reproposal and issuance of a GHG NSPS for new sources and a timeline for the proposal and final rule for developing carbon pollution standards, regulations, or guidelines for GHG reductions from existing sources under Section 111(d) of the CAA.

The Presidential Memorandum further directs EPA to allow the use of “market-based instruments” and “other regulatory flexibilities” to ensure standards will allow for continued reliance on a range of energy sources and technologies and that they are developed and implemented in a manner that provides for reliable and affordable energy and to undertake the rulemaking through direct engagement with states, “as they will play a central role in establishing and implementing standards for existing power plants,” and with utility leaders, labor leaders, non-governmental organizations, tribal officials, and other stakeholders.

EPA met the President’s timeline for the reproposal of the GHG NSPS for new sources (under Section 111(b) of the CAA) by releasing the draft rule on September 20, 2013. In accordance with the Presidential Memorandum, EPA will issue a final rule in “a timely fashion thereafter.”
EPA’s reproposed GHG NSPS for new sources applies only to new fossil-fired EGUs. The reproposed standards, based on the size of the unit, would revise requirements for new fossil-fired utility boilers, integrated gasification combined cycle units, combined and simple cycle turbines, and new sources meeting certain other criteria. New coal-fired facilities would only be able to meet the standard by using partial carbon capture and sequestration technology. The reproposed GHG NSPS removed the blanket exemption for simple-cycle turbines and instead provided an exemption for units that sell to the transmission grid less than one-third of their potential electric output over a three-year rolling average.

The Presidential Memorandum directed EPA to issue the proposed GHG NSPS for modified and existing EGUs by June 1, 2014 and to issue the final rule by June 1, 2015. On June 2, 2014, EPA released the proposed rule under Section 111(d) of the CAA to establish GHG performance standards for existing EGUs. The proposed existing source rule would require state-specific CO 2 emission reduction goals based on EPA’s finding of the best system of emissions reductions (“BSER”). States would be required to meet both an interim goal from 2020 to 2029 and a final goal beginning in 2030. The proposed BSER is based on four “building blocks”: 1) a 6% heat rate improvement to coal-fired generation units; 2) a shift in electrical generation from coal-fired and oil/gas-fired EGUs to natural gas combined cycle units (“NGCCs”) such that the NGCCs are at a 70% utilization rate; 3) substitution of fossil fuel generation with renewable resources and new nuclear facilities, and extension of life of about 6% of existing nuclear plants that may be retired; and 4) increases to demand-side energy efficiency programs. States would be required to develop SIPs to reach the CO 2 emission reduction goals. The SIPs would need to include enforceable CO 2 emission limits that apply to the affected EGUs within the state. EPA is proposing to allow flexibility in how each state achieves the goal including an option to use either a rate-based or mass-based standard and to develop multi-state compliance plans. State SIPs would be due thirteen months after the date that the final rule is published in the Federal Register with the possibility of a one year extension if a state needs additional time or a two year extension if states choose to enter a multi-state approach. Comments on the proposed

A- 51



rule were originally due on or before October 16, 2014, which was extended to December 1, 2014. PNM submitted comments by the deadline.

Also on June 2, 2014, EPA proposed carbon pollution standards for modified and reconstructed EGUs. Under the proposed rule there are two alternatives for EGUs: 1) a CO 2 emission limit based on the unit’s best historic annual CO 2 emissions plus an additional 2% reduction or 2) an emission limit dependent on when the unit is modified. Sources modified before becoming subject to a section 111(d) plan would be required to meet an emission limit determined by the unit’s best historical annual CO 2 emission rate plus an additional 2% emission reduction. Units modified after becoming subject to a section 111(d) plan would be required to meet a unit-specific emission limit determined by the section 111(b) implementing authority.

On October 28, 2014, EPA issued a supplemental rule proposing CO 2 emission rates for U.S. territories and areas of Indian country with existing fossil fuel-fired EGUs, as well as guidelines for plans to achieve those rates.  The supplemental proposal would apply to Four Corners, which is located on the Navajo Nation.  With respect to this plant, EPA applied the four building blocks described in its June 18, 2014 CAA Section 111(d) proposal to establish interim and final goals, expressed as CO 2 emission rates.  APS has indicated that if the rule is finalized as proposed, it is unlikely that additional emission reductions would be required as a result of the plant’s past and future actions to comply with the requirements for BART.

On January 7, 2015, EPA announced their intention to propose a federal plan to meet the requirements of the section 111(d) rule, to be released in the summer of 2015 and finalized in summer 2016.  EPA also announced changes to the schedule for issuing the final GHG rule regulations for new, modified/reconstructed, and existing EGUs in "Summer 2015."  As a result, deadlines for compliance in subsequent years for section 111(d) actions will shift from “June” to “Summer.”  EPA initially proposed to issue a final rule for new EGUs by January 8, 2015 and had previously planned to finalize its modified/reconstructed and existing source rules in June 2015. 
EPA regulation of GHG from large stationary sources will impact PNM’s fossil-fueled EGUs. Impacts could involve investments in additional renewables, efficiency improvements, and/or control technologies at the fossil-fueled EGUs. In setting existing source standards, EPA has historically used technology-based performance standards on emission rates. The only end-of-pipe emission control technology for coal and gas fired power plants available for GHG reduction is carbon capture and sequestration, which is not yet a commercially demonstrated technology. There are limited efficiency enhancement measures that may be available to a subset of the existing EGUs; however, such measures would provide only marginal GHG improvements. Additional GHG control technologies for existing EGUs may become viable in the future. The costs of such improvements or technologies could impact the economic viability of some plants.
The ultimate impact of EPA’s regulation of GHG to PNM is unknown because the regulatory requirements, including NSPS requirements, are in draft form and existing power plants will be regulated by state plans that will not be finalized for several years. PNM estimates that implementation of the RSIP for BART at SJGS, which requires the installation of SNCRs on Units 1 and 4 by the later of January 2016 or 15 months after EPA approval of the RSIP and the retirement of SJGS Units 2 and 3 by the end of 2017, should provide a significant step towards compliance with Section 111(d). PNM is currently reviewing the proposed Section 111(d) rule and is unable to predict the impact of this rule on its fossil fueled generation.

Federal Legislation
Prospects for enactment of legislation imposing a new or enhanced regulatory program to address climate change in Congress are unlikely in 2015.  Instead, EPA continues to be the primary venue for GHG regulation in the near future, especially for coal-fired EGUs. PNM has assessed, and continues to assess, the impacts of potential climate change legislation or regulation on its business.  This assessment is ongoing and future changes arising out of the legislative or regulatory process could impact the assessment significantly.  PNM’s assessment includes assumptions regarding the specific GHG limits, the timing of implementation of these limits, the possibility of a cap and trade or tax program including the associated costs and the availability of offsets, the development of technologies for renewable energy and to reduce emissions, and provisions for cost containment. Moreover, the assessment assumes various market reactions such as the price of coal and gas and regional plant economics.  These assumptions, at best, are preliminary and speculative. However, based upon these assumptions, the enactment of climate change legislation could, among other things, result in significant compliance costs, including large capital expenditures by PNM, and could jeopardize the economic viability of certain generating facilities. See Note 16.  In turn, these consequences could lead to increased costs to customers and affect results of operations, cash flows, and financial condition if the incurred costs are not fully recovered through regulated rates. Higher rates could also contribute to reduced usage of electricity.  PNM’s assessment process is ongoing, but too preliminary and speculative at this time for the meaningful prediction of financial impact.


A- 52



State and Regional Activity
Pursuant to New Mexico law, each utility must submit an IRP to the NMPRC every three years to evaluate renewable energy, energy efficiency, load management, distributed generation, and conventional supply-side resources on a consistent and comparable basis.  The IRP is required to take into consideration risk and uncertainty of fuel supply, price volatility, and costs of anticipated environmental regulations when evaluating resource options to meet supply needs of the utility’s customers.  The NMPRC requires that New Mexico utilities factor a standardized cost of carbon emissions into their IRPs using prices ranging between $8 and $40 per metric ton of CO 2 emitted and escalating these costs by 2.5% per year.  Under the NMPRC order, each utility must analyze these standardized prices as projected operating costs.  Reflecting the developing nature of this issue, the NMPRC order states that these prices may be changed in the future to account for additional information or changed circumstances.  However, PNM is required to use these prices for purposes of its IRP, and the prices may not reflect the costs that it ultimately will incur.  PNM’s IRP filed with the NMPRC on July 1, 2014 showed that consideration of carbon emissions costs impacted the projected in-service dates of some of the identified resources.  
In recent years, New Mexico adopted regulations, which have since been repealed, that would directly limit GHG from larger sources, including EGUs, through a regional GHG cap and trade program and that would cap GHG from larger sources such as EGUs. Although these rules have been repealed, PNM cannot rule out future state legislative or regulatory initiatives to regulate GHG.

On August 2, 2012, thirty-three New Mexico organizations representing public health, business, environmental, consumers, Native American, and other interested parties filed a petition for rulemaking with the NMPRC. The petition asked the NMPRC to issue a NOPR regarding the implementation of an Optional Clean Energy Standard for electric utilities located in New Mexico. The proposed standard would have utilities that elect to participate reduce their CO 2 emissions by 3% per year. Utilities that opt into the program would be assured recovery of their reasonable compliance costs. On October 4, 2012, the NMPRC held a workshop to discuss the proposed standard and whether it has authority to proceed with the NOPR. On August 28, 2013, the petitioners amended the August 2, 2012 petition and requested that the NMPRC issue a NOPR to implement a “Carbon Risk Reduction Rule” for electric utilities in New Mexico. The proposed rule would require affected utilities to demonstrate a 3% per year CO 2 emission reduction from a three-year average baseline period between 2005 and 2012. The proposed rule would use a credit system that provides credits for electricity production based on how much less than one metric ton of CO 2 per MWh the utility emits. Credits would be retired such that 3% per year reductions are achieved from the baseline year until 2035 unless a participating utility elects to terminate the program at the end of 2023. Credits would not expire and could be banked. An advisory committee of interested stakeholders would monitor the program. In addition, utilities would be allowed to satisfy their obligations by funding NMPRC approved energy efficiency programs. There has been no further action on this matter at the NMPRC.

International Accords

The United Nations Framework Convention on Climate Change (“UNFCCC”) is an international environmental treaty that was produced at the United Nations Conference on Environment and Development (informally known as the Earth Summit). Since the UNFCCC entered into force in March 1994, the parties, including the United States, have been meeting annually in Conferences of the Parties (“COP”) to assess progress in dealing with climate change and, beginning in the mid-1990s, to negotiate the Kyoto Protocol to establish legally binding obligations for developed countries to reduce their GHG. Specifically, the objective is to “stabilize greenhouse gas concentrations in the atmosphere at a level that would prevent dangerous anthropogenic interference with the climate system.” The Company monitors the proceedings of the UNFCCC, including the annual COP meetings, to determine potential impacts to its business activities.  At the COP meeting in 2011, participating nations, including the United States, agreed that in 2015, they would sign an international treaty requiring all nations to begin reducing carbon emissions by 2020. Known as the Durban Platform for Enhanced Action, the new treaty would supplant the Kyoto Protocol, which was adopted in 1997, that targeted only industrialized nations for mandatory climate emission reductions. The Obama administration released its goals in November of 2014 and other nations are expected to release their proposed goals in the first half of 2015. The 2015 COP will be held in December. The objective of the conference is to achieve a legally binding agreement on climate from all nations. PNM will continue to monitor the United States participation in international accords. However, the Company believes that the Obama administration’s target for the electric utility industry will be based on EPA’s current proposals to regulate carbon and that implementation of the RSIP for BART at SJGS should provide a significant step towards compliance with the requirements.

Transmission Issues

At any given time, FERC has various notices of inquiry and rulemaking dockets related to transmission issues pending. Such actions may lead to changes in FERC administrative rules or ratemaking policy, but have no time frame in which action must be taken or a docket closed with no further action. Further, such notices and rulemaking dockets do not apply strictly to PNM, but will have industry-wide effects in that they will apply to all FERC-regulated entities. PNM monitors and often submits

A- 53



comments taking a position in such notices and rulemaking dockets or may join in larger group responses. PNM often cannot determine the full impact of a proposed rule and policy change until the final determination is made by FERC and PNM is unable to predict the outcome of these matters.
On November 24, 2009, FERC issued Order 729 approving two Modeling, Data, and Analysis Reliability Standards (“Reliability Standards”) submitted by NERC MOD-001-1 (Available Transmission System Capability) and MOD-029-1 (Rated System Path Methodology). Both MOD-001-1 and MOD-029-1 require a consistent approach, provided for in the Reliability Standards, to measuring the total transmission capability (“TTC”) of a transmission path. The TTC level established using the two Reliability Standards could result in a reduction in the available transmission capacity currently used by PNM to deliver generation resources necessary for its jurisdictional load and for fulfilling its obligations to third-party users of the PNM transmission system.
During the first quarter of 2011, at the request of PNM and other southwestern utilities, NERC advised all transmission owners and transmission service providers that the implementation of portions of the MOD-029 methodology for “Flow Limited” paths has been delayed until such time as a modification to the standard can be developed that will mitigate the technical concerns identified by the transmission owners and transmission service providers. PNM and other western utilities filed a Standards Action Request with NERC in the second quarter of 2012.
NERC initiated an informal development process to address directives in Order No. 729 to modify certain aspects of the MOD standards, including MOD-001 and MOD-029. The modifications to this standard would retire MOD-029 and require each transmission operator to determine and develop methodology for TTC values for MOD-001.
A final ballot for MOD-001-2 concluded on December 20, 2013 and received sufficient affirmative votes for approval. On February 10, 2014, NERC filed with FERC a petition for approval of MOD-001-2 and retirement of reliability standards MOD-001-1a, MOD-004-1, MOD-008-1, MOD-028-2, MOD-029-1a, and MOD-030-2. On June 19, 2014, FERC issued a NOPR to approve a new reliability standard. The MOD-001-2 standard will become effective on the first day of the calendar quarter that is 18 months after the date the standard is approved by FERC. MOD-001-2 will replace multiple existing reliability standards and will remove the risk of reduced TTC for PNM and other western utilities.
In July 2011, FERC issued Order 1000 adopting new requirements for transmission planning, cost allocation, and development.  Order 1000 calls for significant changes to the transmission process of WestConnect, an organization of utility companies providing transmission of electricity in the western region that includes PNM.  On October 11, 2012, PNM and other WestConnect participants filed modified versions of Attachment K to their transmission tariffs to meet Order 1000 regional compliance requirements. Thirteen intervention motions were filed, with several objecting to and/or protesting various provisions of the filings submitted by the WestConnect participants. On December 17, 2012, the WestConnect participants filed responses to the issues raised by the intervenors. On March 22, 2013, FERC issued its order regarding PNM’s and six other WestConnect FERC jurisdictional utilities compliance filings. FERC partially accepted many aspects of the filings including the governance structure that gives the transmission owners a veto authority over the regional plan and cost allocations. A major change directed by FERC is the requirement that the cost allocations be binding on identified beneficiaries and that a process be created that will result in a qualified developer being selected. PNM and the other WestConnect FERC jurisdictional entities submitted their regional compliance filings on September 20, 2013 to address and comply with the March 22, 2013 FERC order. On July 11, 2013, the WestConnect participants submitted their cost allocation and inter-regional coordination plan compliance filing between WestConnect and other regions.

On September 18, 2014, PNM along with the other WestConnect FERC jurisdictional entities received a FERC order on their respective September 20, 2013 compliance filings with respect to FERC Order 1000 concerning regional planning and cost allocation. The FERC order required the West Connect entities to make another compliance filing to change certain aspects of their respective Attachment K of their respective transmission tariffs and to hold a single year “abbreviated planning process for year 2015.” The order also required the WestConnect entities to file the WestConnect “Planning Participation Agreement.” Of significant concern to the FERC jurisdictional entities in this most recent order was FERC’s ruling that the non-jurisdictional entities would not be required to participate in cost allocation on regional projects, which the jurisdictional entities believed does not comport with FERC’s Order 1000 position on the “cost causation principle” and could create a “free rider-ship” issue for certain participants in the planning process.

The jurisdictional entities filed compliance filings regarding the September 18, 2014 FERC order on November 17, 2014, making several adjustments to the language in their respective Attachment K. The jurisdictional entities also filed, as a separate document an unsigned version of the proposed final version of the Planning Participation Agreement on November 17, 2014. Several entities have intervened and some have protested aspects of these filings.


A- 54



The jurisdictional entities jointly filed a request for re-hearing or clarification of the FERC order on October 20, 2014, specifically citing the cost allocation issue. Filings to preserve rights to appeal have been made at the United States Court of Appeals for the Fifth Circuit and at the Federal District Court level on behalf of the jurisdictional entities.

On December 18, 2014, FERC issued an order conditionally accepting the WestConnect jurisdictional entities May 10, 2013 compliance filings regarding transmission coordination and cost allocation planning process at the inter-regional transmission level. The order will require some minor changes to each of the WestConnect jurisdictional entities respective Attachment K language, to comply with requirements of the December 18, 2014 FERC order.

Financial Reform Legislation

The Dodd-Frank Wall Street Reform and Consumer Protection Act (“Dodd-Frank Reform Act”), enacted in July 2010, includes provisions that will require certain over-the-counter derivatives, or swaps, to be centrally cleared and executed through an exchange or other approved trading facility. It also includes provisions related to swap transaction reporting and record keeping and may impose margin requirements on swaps that are not centrally cleared. The United States Commodity Futures Trading Commission (“CFTC”) has published final rules defining several key terms related to the act and has set compliance dates for various types of market participants. The Dodd-Frank Reform Act provides exemptions from certain requirements, including an exception to the mandatory clearing and swap facility execution requirements for commercial end-users that use swaps to hedge or mitigate commercial risk.  PNM expects to qualify for this exception. PNM also expects to be in compliance with the Dodd-Frank Reform Act and related rules within the time frames required by the CFTC. However, as a result of implementing and complying with the Dodd-Frank Reform Act and related rules, PNM’s swap activities could be subject to increased costs, including from higher margin requirements. At this time, PNM cannot predict the ultimate impact the Dodd-Frank Reform Act may have on PNM’s financial condition, results of operations, cash flows, or liquidity.

Other Matters
See Notes 16 and 17 for a discussion of commitments and contingencies and rate and regulatory matters. See Note 1 for a discussion of accounting pronouncements that have been issued, but are not yet effective and have not been adopted by the Company.

CRITICAL ACCOUNTING POLICIES AND ESTIMATES
The preparation of financial statements in accordance with GAAP requires management to apply accounting policies and to make estimates and judgments that best provide the framework to report the results of operations and financial position for PNMR, PNM, and TNMP. As a result, there exists the likelihood that materially different amounts would be reported under different conditions or using different assumptions. Management has identified the following accounting policies that it deems critical to the portrayal of the financial condition and results of operations and that involve significant subjectivity. The following discussion provides information on the processes utilized by management in making judgments and assumptions as they apply to its critical accounting policies.
Unbilled Revenues
The Company records unbilled revenues representing management’s assessment of the estimated amount of revenue earned from customers for services rendered between the meter-reading dates in a particular month and the end of that month. Management estimates unbilled revenues based on daily generation volumes, estimated customer usage by class, weather factors, line losses, and applicable customer rates reflecting historical trends and experience. The estimate requires the use of various judgments and assumptions; significant changes to these judgments and assumptions could have a material impact to the Company’s results of operations.
Regulatory Accounting
The Company is subject to the provisions of GAAP for rate-regulated enterprises and records assets and liabilities resulting from the effects of the ratemaking process, which would not be recorded under GAAP for non-regulated entities. Additional information concerning regulatory assets and liabilities is contained in Note 4.
The Company continually evaluates the probability that regulatory assets and liabilities will impact future rates and makes various assumptions in those analyses. The expectations of future rate impacts are generally based on orders issued by regulatory commissions or historical experience, as well as discussions with applicable regulatory authorities. If future recovery or refund ceases to be probable, the Company would be required to write-off the portion that is not recoverable or refundable in current period earnings.

A- 55



The Company has made adjustments to regulatory assets and liabilities that affected its results of operations in the past due to changes in various factors and conditions impacting future cost recovery. Based on its current evaluation, the Company believes that future recovery of its regulatory assets are probable.

Impairments
Tangible long-lived assets are evaluated for impairment when events and circumstances indicate that the assets might be impaired in accordance with GAAP. These potential impairment indicators include management’s assessment of fluctuating market conditions as a result of planned and scheduled customer purchase commitments; future market penetration; changing environmental requirements; fluctuating market prices resulting from factors including changing fuel costs and other economic conditions; weather patterns; and other market trends. The amount of impairment recognized, if any, is the difference between the fair value of the asset and the carrying value of the asset and would reduce both the asset and current period earnings. Variations in the assessment of potential impairment or in the assumptions used to calculate an impairment could result in different outcomes, which could lead to significant effects on the Consolidated Financial Statements.
Goodwill is evaluated for impairment at least annually, or more frequently if events and circumstances indicate that the goodwill might be impaired. GAAP allows impairment testing to be performed based on either a qualitative analysis or quantitative analysis. Note 21 contains information on the impairment testing performed by the Company on goodwill. For 2014, the Company utilized a qualitative analysis for the TNMP reporting unit and a quantitative analysis for the PNM reporting unit. No impairments were indicated in the Company’s annual goodwill testing, which was performed as of April 1, 2014 . Since the annual evaluation, there have been no indications that the fair values of the reporting units with recorded goodwill have decreased below the carrying values. The annual testing was based on certain critical estimates and assumptions. Changes in the estimates or the use of different assumptions could affect the determination of fair value and the conclusion of impairment for each reporting unit.
Application of the qualitative goodwill impairment test requires evaluating various events and circumstances to determine whether it is not more likely than not that the fair value of a reporting unit is less than its carrying amount. As a part of the Company’s goodwill qualitative testing process for a reporting unit, various factors that are specific to the reporting unit as well as industry and macroeconomic factors are evaluated in order to determine whether these factors are reasonably likely to have a material impact on the fair value of the reporting unit. Examples of the factors that were considered in the qualitative testing of the goodwill include the results of the most recent quantitative impairment test, current and long-term forecasted financial results, regulatory environment, credit rating, changes in the interest rate environment, and operating strategy for the reporting unit. Based on the qualitative analysis performed in 2014 for the TNMP reporting unit, the Company concluded that there were no changes that were reasonably likely to cause the fair value of the reporting unit to be less than the carrying value and determined that there was no impairment of goodwill. Although the Company believes all relevant factors were considered in the qualitative impairment analysis to reach the conclusion that goodwill is not impaired, significant changes in any one of the assumptions could produce a significantly different result potentially leading to the recording of an impairment that could have significant impacts on the results of operations and financial position of the Company.
Application of the quantitative impairment test requires judgment, including assignment of assets and liabilities to reporting units and the determination of the fair value of a reporting unit. A discounted cash flow methodology is primarily used by the Company to estimate the fair value of a reporting unit. This analysis requires significant judgments, including estimation of future cash flows, which is dependent on internal forecasts, estimation of long-term growth rates for the business and determination of appropriate WACC for each reporting unit.
In determining the fair value of a reporting unit under the quantitative approach, the WACC is a significant factor. The Company considers many factors in selecting a WACC, including the market view of risk for each individual reporting unit, the appropriate capital structure based on that used in the ratemaking process, and the borrowing rate appropriate for a reporting unit. The Company considers available market-based information and may consult with third parties to help determine the WACC. The selection of a WACC is subjective and modifications to this rate could significantly increase or decrease the fair value of a reporting unit.
The other primary factor impacting the determination of the fair value of a reporting unit is the estimation of future cash flows. The Company considers budgets, long-term forecasts, historical trends, and expected growth rates in order to estimate future cash flows. Any forecast contains a degree of uncertainty and modifications to these cash flows could significantly increase or decrease the fair value of a reporting unit. For the PNM and TNMP reporting units, which are subject to rate-regulation, a fair recovery of and return on costs prudently incurred to serve customers is assumed. Should the regulators not allow recovery of certain costs or not allow these reporting units to earn a fair rate of return on invested capital, the fair value of the reporting units could decrease.

A- 56



The Company believes that the WACC and cash flow projections utilized in the 2014 quantitative testing appropriately reflected the fair value of the PNM reporting unit. Since any cash flow projection contains uncertainty, the WACC used by the Company was adjusted to reflect that uncertainty. The Company does not believe that there are indications of goodwill impairment in any of its reporting units, but this analysis is highly subjective. As of the impairment testing for April 1, 2014 , the fair value of the PNM reporting unit, which had goodwill of $51.6 million, exceeded its carrying value by approximately 30%. An increase of 0.5% in the expected return on equity capital utilized in calculating the WACC used to discount the forecasted cash flows, would have reduced the excess of PNM’s fair value over carrying value to approximately 23% at April 1, 2014. The April 1, 2012 quantitative evaluation of fair value of the TNMP reporting unit, which had goodwill of $226.7 million, exceeded its carrying value by approximately 26%. Due to the subjectivity and sensitivities of the assumptions and estimates underlying the impairment analysis, there can be no assurance that future analyses, which will be based on the appropriate assumptions and estimates at that time, will not result in impairments.
Decommissioning and Reclamation Costs
Accounting for decommissioning costs for nuclear and fossil-fuel generation involves significant estimates related to costs to be incurred many years in the future after plant closure. Decommissioning costs are based on site-specific estimates, which are updated periodically and involve numerous judgments and assumptions, including estimates of future decommissioning costs at current price levels, inflation rates, and discount rates. Changes in these estimates could significantly impact PNMR’s and PNM’s financial position, results of operations and cash flows. PNM owns and leases nuclear and fossil-fuel generation facilities. In accordance with GAAP, PNM is only required to recognize and measure decommissioning liabilities for tangible long-lived assets for which a legal obligation exists. Nuclear decommissioning costs are based on estimates of the costs for removing all radioactive and other structures at PVNGS. AROs, including nuclear decommissioning costs, are discussed in Note 15. Nuclear decommissioning costs represent approximately 84% of PNM’s ARO liability. A 10% increase in the estimates of future decommissioning costs at current price levels would have increased the ARO liability by $9.4 million at December 31, 2014. PVNGS Units 1 and 2 are included in PNM’s retail rates while PVNGS Unit 3 is excluded although PNM has requested Unit 3 be included. PNM collects a provision for ultimate decommissioning of PVNGS Units 1 and 2 and its fossil-fuel generation facilities in its rates and recognizes a corresponding expense and liability for these amounts. PNM believes that it will continue to be able to collect in rates for its legal asset retirement obligations for nuclear generation activities included in the ratemaking process.
In connection with both the SJGS coal agreement and the Four Corners fuel agreement, the owners are required to reimburse the mining companies for the cost of contemporaneous reclamation as well as the costs for final reclamation of the coal mines.  The reclamation costs are based on periodic site-specific studies that estimate the costs to be incurred in the future and are dependent upon numerous assumptions, including estimates of future reclamation costs at current price levels, inflation rates, and discount rates. A 10% increase in the estimates of future reclamation costs at current price levels would have increased the mine reclamation liability by $3.4 million at December 31, 2014. PNM considers the contemporaneous reclamation costs part of the cost of its delivered coal costs.  The NMPRC has capped the amount that can be collected from ratepayers for final reclamation of the surface mines. If future estimates increase the liability for surface mine reclamation, the excess would be expensed at that time. See Note 16 for discussion of the final reclamation costs.
Derivatives
The Company follows the provisions set forth in GAAP to account for derivatives. These provisions establish accounting and reporting standards requiring derivative instruments to be recorded in the balance sheet as either an asset or liability measured at their fair value. GAAP also requires that changes in the derivatives’ fair value be recognized currently in earnings unless specific hedge accounting or normal purchase and sale criteria are met. Fair value is based on current market quotes as available and is supplemented by modeling techniques and assumptions made by the Company to the extent quoted market prices or volatilities are not available. External pricing input availability varies based on commodity location market liquidity, and term of the agreement. Although the Company uses its best judgment in estimating the fair value of these instruments, there are inherent limitations in any estimate technique. Changes in the assumptions used in the fair value determinations could have significant impacts on the results of operations and financial position of the Company. Note 8 contains additional information on commodity derivatives, including the volumes covered by derivative contracts.

Pension and Other Postretirement Benefits
The Company maintains qualified defined benefit pension plans, postretirement benefit plans providing medical and dental benefits, and executive retirement programs. The net periodic benefit cost or income and the calculation of the projected benefit obligations are recognized in the Company’s financial statements and depend on expected investment performance, the level of contributions made to the plans, and employee demographics. They both require the use of a number of actuarial assumptions and estimates. The most critical of the actuarial assumptions are the expected long-term rate of return, the discount rate, and

A- 57



projected health care cost trend rates. The Company reviews and evaluates its actuarial assumptions annually and adjusts them as necessary. Changes in the pension and OPEB assets and liabilities associated with these factors are not immediately recognized as net periodic benefit cost or income in results of operations, but are recognized in future years, generally, over the remaining life of the plan. However, these factors could have a significant impact on the financial position of the company. Note 12 contains additional information about pension and OPEB obligations, including assumptions utilized in the calculations and impacts of changes in certain of those assumptions.
Accounting for Contingencies
The financial results of the Company may be affected by judgments and estimates related to loss contingencies. Contingencies related to litigation and claims, as well as environmental and regulatory matters, also require the use of significant judgment and estimation. The Company attempts to take into account all known factors regarding the future outcome of contingent events and records an accrual for any contingent events that are both probable and reasonably estimated based upon current available information. However the actual outcomes can vary from any amounts accrued which could have a material effect on the results of operations and financial position of the Company. See Note 16 and Note 17.
Income Taxes
The Company’s income tax expense and related balance sheet amounts involve significant judgment and use of estimates. Amounts of deferred income tax assets and liabilities, current and noncurrent accruals, and determination of uncertain tax positions involve judgment and estimates related to timing and probability of the recognition of income and deductions by taxing authorities. In addition, some temporary differences are accorded flow-through treatment by the Company’s regulators and impact the Company’s effective tax rate. In assessing the likelihood of the realization of deferred tax assets, management considers the estimated amount and character of future taxable income. Significant changes in these judgments and estimates could have a material impact on the results of operations and financial position of the Company. Actual income taxes could vary from estimated amounts due to the future impacts of various items, including changes in income tax laws, the Company’s forecasted financial condition and results of operations in future periods, and the final review from taxing authorities. See Note 11.
Market Risk
See Part II, Item 7A. Quantitative and Qualitative Disclosure About Market Risk for discussion regarding the Company’s accounting policies and sensitivity analysis for the Company’s financial instruments and derivative energy and other derivative contracts.
MD&A FOR PNM
RESULTS OF OPERATIONS
PNM operates in only one reportable segment, as presented above in Results of Operations for PNMR.
MD&A FOR TNMP
RESULTS OF OPERATIONS
TNMP operates in only one reportable segment, as presented above in Results of Operations for PNMR.

ITEM 7A.
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
The Company manages the scope of its various forms of risk through a comprehensive set of policies and procedures with oversight by senior level management through the RMC. The Board’s Finance Committee sets the risk limit parameters. The RMC has oversight over the risk control organization. The RMC is assigned responsibility for establishing and enforcing the policies, procedures and limits and evaluating the risks inherent in proposed transactions on an enterprise-wide basis. The RMC’s responsibilities include:
Establishing policies regarding risk exposure levels and activities in each of the business segments
Approving of the types of derivatives entered into for hedging
Reviewing and approving hedging risk activities
Establishing policies regarding counterparty exposure and limits
Authorizing and delegating transaction limits
Reviewing and approving controls and procedures for derivative activities



A- 58

Table of Contents


Reviewing and approving models and assumptions used to calculate mark-to-market and market risk exposure
Proposing risk limits to the Board’s Finance Committee for its approval
Quarterly reporting to the Board’s Audit and Finance Committees on these activities.
To the extent an open position exists, fluctuating commodity prices, interest rates, equity prices, and economic conditions can impact financial results and financial position, either favorably or unfavorably. As a result, the Company cannot predict with certainty the impact that its risk management decisions may have on its businesses, operating results, or financial position.
Commodity Risk
Information concerning accounting for derivatives and the risks associated with commodity contracts is set forth in Note 8, including a summary of the fair values of mark-to-market energy related derivative contracts included in the Consolidated Balance Sheets. At December 31, 2014 and 2013 , PNMR and PNM had no commodity derivative instruments designated as cash flow hedging instruments.

Commodity contracts, other than those that do not meet the definition of a derivative under GAAP and those derivatives designated as normal purchases and normal sales, are recorded at fair value on the Consolidated Balance Sheet. The following table details the changes in the net asset or liability balance sheet position for mark-to-market energy transactions.

 
 
Economic Hedges
 
PNMR and PNM
 
(In thousands)
Sources of fair value gain (loss):
 
Net fair value at December 31, 2012
$
1,204

Amount realized on contracts delivered during period
(970
)
Changes in fair value
2,836

Net mark-to-market change recorded in earnings
1,866

Net change recorded as regulatory liability
203

Net fair value at December 31, 2013
3,273

Amount realized on contracts delivered during period
1,420

Changes in fair value
5,084

Net mark-to-market change recorded in earnings
6,504

Net change recorded as regulatory liability
(231
)
Net fair value at December 31, 2014
$
9,546


The following table provides the maturity of the net assets (liabilities), giving an indication of when these mark-to-market amounts will settle and generate (use) cash.
Fair Value of Mark-to-Market Instruments at December 31, 2014
 
Settlement Dates
 
2015
 
2016
PNMR and PNM
(In thousands)
Economic hedges
 
 
 
Prices actively quoted
$

 
$

Prices provided by other external sources
10,023

 
(477
)
Prices based on models and other valuations

 

Total
$
10,023

 
$
(477
)

PNM measures the market risk of its long-term contracts and wholesale activities using a Monte Carlo VaR simulation model to report the possible loss in value from price movements. VaR is not a measure of the potential accounting mark-to-market

A- 59

Table of Contents


loss. The quantitative risk information is limited by the parameters established in creating the model. The Monte Carlo VaR methodology employs the following critical parameters: historical volatility estimates, market values of all contractual commitments, a three-day holding period, seasonally adjusted and cross-commodity correlation estimates, and a 95% confidence level. The instruments being evaluated may trigger a potential loss in excess of calculated amounts if changes in commodity prices exceed the confidence level of the model used.
PNM measures VaR for the positions in its wholesale portfolio (not covered by the FPPAC).  For the year ended December 31, 2014 , the high, low, and average VaR amounts were $2.1 million, $0.6 million, and $0.9 million. For the year ended December 31, 2013 , the high, low and average VaR amounts were $1.4 million, $0.6 million, and $0.9 million. At December 31, 2014 and December 31, 2013 , the VaR amounts for the PNM wholesale portfolio were $1.3 million and $0.6 million.
The VaR limits, which were not exceeded during 2014 or 2013 , represent an estimate of the potential gains or losses that could be recognized on the Company’s portfolios, subject to market risk, given current volatility in the market, and are not necessarily indicative of actual results that may occur, since actual future gains and losses will differ from those estimated. Actual gains and losses may differ due to actual fluctuations in market prices, operating exposures, and the timing thereof, as well as changes to the underlying portfolios during the year.
Credit Risk
The Company is exposed to credit risk from its retail and wholesale customers, as well as the counterparties to derivative instruments. The Company conducts counterparty risk analysis across business segments and uses a credit management process to assess the financial conditions of counterparties. The following table provides information related to credit exposure by the credit worthiness (credit rating) and concentration of credit risk for counterparties to derivative transactions. All credit exposures at December 31, 2014 will mature in less than two years.

Schedule of Credit Risk Exposure
December 31, 2014
Rating (1)
 
Credit
Risk
Exposure (2)
 
Number of
Counter-parties >10%
 
Net Exposure of
Counter-parties >10%
 
 
(Dollars in thousands)
PNMR and PNM
 
 
 
 
 
 
External ratings:
 
 
 
 
 
 
Investment grade
 
$
6,290

 
2

 
$
5,131

Non-investment grade
 

 

 

Internal ratings:
 
 
 
 
 
 
Investment grade
 
1,003

 

 

Non-investment grade
 
781

 

 

Total
 
$
8,074

 
 
 
$
5,131


(1)  
The rating “Investment Grade” is for counterparties, or a guarantor, with a minimum S&P rating of BBB- or Moody’s rating of Baa3. The category “Internal Ratings – Investment Grade” includes those counterparties that are internally rated as investment grade in accordance with the guidelines established in the Company’s credit policy.

(2)  
The Credit Risk Exposure is the gross credit exposure, including long-term contracts (other than firm-requirements wholesale customers), forward sales, and short-term sales. The exposure captures the amounts from receivables/payables for realized transactions, delivered and unbilled revenues, and mark-to-market gains/losses. Gross exposures can be offset according to legally enforceable netting arrangements but are not reduced by posted credit collateral. At December 31, 2014 , PNMR and PNM held $0.2 million of cash collateral to offset their credit exposure.

Net credit risk for PNMR’s and PNM’s largest counterparty as of December 31, 2014 was $7.2 million, which is due from a firm-requirements wholesale customer.

The PVNGS lessor notes are not exposed to credit risk, since the notes are repaid as PNM makes payments on the underlying leases. Other investments have no significant counterparty credit risk.

A- 60

Table of Contents


Interest Rate Risk
The majority of the Company’s long-term debt is fixed-rate debt and does not expose earnings to a major risk of loss due to adverse changes in market interest rates. However, the fair value of long-term debt instruments for PNMR, PNM, and TNMP would increase by 1.9%, 1.4%, and 4.0%, if interest rates were to decline by 50 basis points from their levels at December 31, 2014 . In general, an increase in fair value would impact earnings and cash flows to the extent not recoverable in rates if all or a portion of debt instruments were acquired in the open market prior to their maturity. At February 20, 2015 , PNMR, PNM, and TNMP had $0.8 million, $10.0 million, and $20.0 million of short-term debt outstanding under their revolving credit facilities, which allow for a maximum aggregate borrowing capacity of $300.0 million for PNMR, $400.0 million for PNM, and $75.0 million for TNMP. PNM also had borrowings of $15.0 million under the $50.0 million PNM New Mexico Credit Facility at February 20, 2015 . The revolving credit facilities, the PNM New Mexico Credit Facility, the $175.0 million PNM 2014 Term Loan, the $125.0 million PNM Multi-draw Term Loan, and the $100.0 million PNMR Term Loan Agreement bear interest at variable rates. On February 20, 2015 , interest rates on borrowings averaged 1.67% for the PNMR Revolving Credit Facility, 1.02% for the PNMR 2014 Term Loan Agreement, 0.75% for the PNM Multi-draw Term Loan, 1.42% for the PNM Revolving Credit Facility, 1.42% for the PNM New Mexico Credit Facility, 1.12% for the PNM Term Loan, and 1.17% for the TNMP Revolving Credit Facility. The Company is exposed to interest rate risk to the extent of future increases in variable interest rates.
The investments held by PNM in trusts for decommissioning, reclamation, pension benefits, and other post-employment benefits had an estimated fair value of $917.3 million at December 31, 2014 , of which 57.6% were fixed-rate debt securities that subject PNM to risk of loss of fair value with movements in market interest rates. If interest rates were to increase by 50 basis points from their levels at December 31, 2014 , the decrease in the fair value of the fixed-rate securities would be 5.8%, or $30.6 million. The securities held by TNMP in trusts for pension and other post-employment benefits had an estimated fair value of $79.4 million at December 31, 2014 , of which 59.6% were fixed-rate debt securities that subject TNMP to risk of loss of fair value with movements in market interest rates. If interest rates were to increase by 50 basis points from their levels at December 31, 2014 , the decrease in the fair value of the fixed-rate securities would be 6.4%, or $3.0 million.
PNM and TNMP do not directly recover or return through rates any losses or gains on the securities, including equity and alternative investments discussed below, in the trusts for decommissioning, reclamation, pension benefits, and other post-employment benefits. However, the overall performance of these trusts does enter into the periodic determinations of expense and funding levels, which are factored into the rate making process to the extent applicable to regulated operations. PNM and TNMP are at risk for shortfalls in funding of obligations due to investment losses, including those from the equity market and alternatives investment risks discussed below to the extent not ultimately recovered through rates charged to customers.
Equity Market Risk
The investments held by PNM in trusts for decommissioning and reclamation and trusts established for PNM’s and TNMP’s pension and post-employment benefits plans include certain equity securities at December 31, 2014 . These equity securities expose PNM and TNMP to losses in fair value should the market values of the underlying securities decline. Equity securities comprised 32.8% and 25.5% of the securities held by the various PNM and TNMP trusts as of December 31, 2014 . A hypothetical 10% decrease in equity prices would reduce the fair values of these funds by $30.1 million for PNM and $2.0 million for TNMP.
Alternatives Investment Risk
The Company had 11.4% of its pension assets invested in the alternatives asset class as of December 31, 2014 . The Company has changed the target for this class to 14%. This includes real estate, private equity, and hedge funds. These investments are limited partner structures that are multi-manager multi-strategy funds. This investment approach gives broad diversification and minimizes risk compared to a direct investment in any one component of the funds. The general partner oversees the selection and monitoring of the underlying managers. The Company’s Corporate Investment Committee, assisted by its investment consultant, monitors the performance of the funds and general partner’s investment process. There is risk associated with these funds due to the nature of the strategies and techniques and the use of investments that do not have readily determinable fair value. A hypothetical 10% decrease in equity prices would reduce the fair values of these funds by $7.5 million.

A- 61

Table of Contents


ITEM 8.
FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
INDEX
 
   
  
Page
  
  
  
 
PNM Resources, Inc. and Subsidiaries
  
 
  
  
  
  
  
Public Service Company of New Mexico and Subsidiaries
  
 
  
  
  
  
  
Texas-New Mexico Power Company and Subsidiaries
  
 
  
  
  
  
  
  
Supplementary Data:
  
 
  
  
  


B- 1

Table of Contents


MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING
Management of PNM Resources, Inc. and subsidiaries (“PNMR”) is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rule 13a-15(f) under the Securities Exchange Act of 1934, as amended.
Management assessed the effectiveness of PNMR’s internal control over financial reporting based on the Internal Control – Integrated Framework (1992) set forth by the Committee of Sponsoring Organizations of the Treadway Commission. Based on the assessment performed, management concludes that PNMR’s internal control over financial reporting was effective as of December 31, 2014 .
KPMG LLP, an independent registered public accounting firm, has issued an attestation report on PNMR’s internal control over financial reporting which is included herein.

/s/ Patricia K. Collawn
Patricia K. Collawn,
Chairman, President, and Chief Executive Officer
 
/s/ Charles Eldred
Charles Eldred
Executive Vice President and
Chief Financial Officer


B- 2

Table of Contents


MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING
 
Management of Public Service Company of New Mexico and subsidiaries (“PNM”) is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rule 13a-15(f) under the Securities Exchange Act of 1934, as amended.
Management assessed the effectiveness of PNM’s internal control over financial reporting based on the Internal Control – Integrated Framework (1992) set forth by the Committee of Sponsoring Organizations of the Treadway Commission. Based on the assessment performed, management concludes that PNM’s internal control over financial reporting was effective as of December 31, 2014 .

/s/ Patricia K. Collawn
Patricia K. Collawn,
President and Chief Executive Officer
 
/s/ Charles Eldred
Charles Eldred
Executive Vice President and
Chief Financial Officer


B- 3

Table of Contents


MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING
 
Management of Texas-New Mexico Power Company and subsidiaries (“TNMP”) is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rule 13a-15(f) under the Securities Exchange Act of 1934, as amended.
Management assessed the effectiveness of TNMP’s internal control over financial reporting based on the Internal Control – Integrated Framework (1992) set forth by the Committee of Sponsoring Organizations of the Treadway Commission. Based on the assessment performed, management concludes that TNMP’s internal control over financial reporting was effective as of December 31, 2014 .

/s/ Patricia K. Collawn
Patricia K. Collawn,
Chief Executive Officer
 
/s/ Thomas G. Sategna
Thomas G. Sategna
Vice President and Controller

B- 4

Table of Contents



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

The Board of Directors and Stockholders
PNM Resources, Inc:
We have audited PNM Resources, Inc and subsidiaries (the Company) internal control over financial reporting as of December 31, 2014, based on criteria established in Internal Control - Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management’s Annual Report on Internal Control over Financial Reporting . Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit.
We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audit also included performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
In our opinion, PNM Resources, Inc and subsidiaries maintained, in all material respects, effective internal control over financial reporting as of December 31, 2014, based on criteria established in Internal Control - Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheets of the Company as of December 31, 2014 and 2013, the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014, and our report dated February 27, 2015 expressed an unqualified opinion on those consolidated financial statements.
 

/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015


B- 5




REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

The Board of Directors and Stockholders
PNM Resources, Inc:
We have audited the accompanying consolidated balance sheets of PNM Resources, Inc and subsidiaries (the Company) as of December 31, 2014 and 2013, and the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014. These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits.
We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.
In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of PNM Resources, Inc and subsidiaries as of December 31, 2014 and 2013, and the results of their operations and their cash flows for each of the years in the two-year period ended December 31, 2014, in conformity with U.S. generally accepted accounting principles.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the Company’s internal control over financial reporting as of December 31, 2014, based on criteria established in Internal Control - Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO), and our report dated February 27, 2015 expressed an unqualified opinion on the effectiveness of the Company’s internal control over financial reporting.

/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015


B- 6



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Board of Directors and Stockholders of
PNM Resources, Inc.
Albuquerque, New Mexico

We have audited the accompanying consolidated statements of earnings, comprehensive income, changes in equity, and cash flows of PNM Resources, Inc. and subsidiaries (the "Company") for the year ended December 31, 2012. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audit.
We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.
In our opinion, such consolidated financial statements present fairly, in all material respects, the results of operations and cash flows of PNM Resources, Inc. and subsidiaries for the year ended December 31, 2012, in conformity with accounting principles generally accepted in the United States of America.

/s/ DELOITTE & TOUCHE LLP
Phoenix, Arizona
March 1, 2013


B- 7




REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

The Board of Directors and Stockholders
Public Service Company of New Mexico:
We have audited the accompanying consolidated balance sheets of Public Service Company of New Mexico and subsidiaries (the Company) as of December 31, 2014 and 2013, and the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014. These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits.
We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.
In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of the Company as of December 31, 2014 and 2013, and the results of their operations and their cash flows for each of the years in the two-year period ended December 31, 2014, in conformity with U.S. generally accepted accounting principles.

/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015


B- 8



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Stockholders of
Public Service Company of New Mexico
Albuquerque, New Mexico

We have audited the accompanying consolidated statements of earnings, comprehensive income, changes in equity, and cash flows of Public Service Company of New Mexico and subsidiaries (the "Company") for the year ended December 31, 2012. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audit.
We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. Our audit included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion . An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.
In our opinion, such consolidated financial statements present fairly, in all material respects, the results of operations and cash flows of Public Service Company of New Mexico and subsidiaries for the year ended December 31, 2012, in conformity with accounting principles generally accepted in the United States of America.

/s/ DELOITTE & TOUCHE LLP
Phoenix, Arizona
March 1, 2013


B- 9




REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

The Board of Directors and Stockholder
Texas-New Mexico Power Company:
We have audited the accompanying consolidated balance sheets of Texas-New Mexico Power Company and subsidiaries (the Company) as of December 31, 2014 and 2013, and the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in common stockholder’s equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014. These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits.
We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.
In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of the Company as of December 31, 2014 and 2013, and the results of their operations and their cash flows for each of the years in the two-year period ended December 31, 2014, in conformity with U.S. generally accepted accounting principles.

/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015


B- 10



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Stockholder of
Texas-New Mexico Power Company
Lewisville, Texas
We have audited the accompanying consolidated statements of earnings, comprehensive income, changes in common stockholder’s equity, and cash flows of Texas-New Mexico Power Company and subsidiaries (the "Company") for the year ended December 31, 2012. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audit.
We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. Our audit included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion . An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audit provides a reasonable basis for our opinion.
In our opinion, such consolidated financial statements present fairly, in all material respects, the results of operations and cash flows of Texas-New Mexico Power Company and subsidiaries for the year ended December 31, 2012, in conformity with accounting principles generally accepted in the United States of America.

/s/ DELOITTE & TOUCHE LLP
Phoenix, Arizona
March 1, 2013


B- 11




PNM RESOURCES, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF EARNINGS
 
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands, except per share amounts)
Electric Operating Revenues
$
1,435,853

 
$
1,387,923

 
$
1,342,403

Operating Expenses:
 
 
 
 
 
Cost of energy
471,556

 
432,316

 
399,850

Administrative and general
171,111

 
179,210

 
187,740

Energy production costs
185,638

 
175,819

 
185,417

Regulatory disallowances
1,062

 
12,235

 

Depreciation and amortization
172,634

 
166,881

 
164,173

Transmission and distribution costs
66,571

 
70,124

 
71,125

Taxes other than income taxes
67,584

 
64,496

 
60,377

Total operating expenses
1,136,156

 
1,101,081

 
1,068,682

Operating income
299,697

 
286,842

 
273,721

Other Income and Deductions:
 
 
 
 
 
Interest income
8,483

 
10,043

 
13,072

Gains on available-for-sale securities
10,527

 
10,612

 
12,965

Other income
12,048

 
10,572

 
12,746

Gain on sale of First Choice

 

 
1,012

Other (deductions)
(10,481
)
 
(21,552
)
 
(17,636
)
Net other income and deductions
20,577

 
9,675

 
22,159

Interest Charges
119,627

 
121,448

 
120,845

Earnings before Income Taxes
200,647

 
175,069

 
175,035

Income Taxes
69,738

 
59,513

 
54,910

Net Earnings
130,909

 
115,556

 
120,125

(Earnings) Attributable to Valencia Non-controlling Interest
(14,127
)
 
(14,521
)
 
(14,050
)
Preferred Stock Dividend Requirements of Subsidiary
(528
)
 
(528
)
 
(528
)
Net Earnings Attributable to PNMR
$
116,254

 
$
100,507

 
$
105,547

Net Earnings Attributable to PNMR per Common Share:
 
 
 
 
 
Basic
$
1.46

 
$
1.26

 
$
1.32

Diluted
$
1.45

 
$
1.25

 
$
1.31

The accompanying notes, as they relate to PNMR, are an integral part of these consolidated financial statements.

B- 12

Table of Contents



PNM RESOURCES, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Net Earnings
$
130,909

 
$
115,556

 
$
120,125

Other Comprehensive Income:
 
 
 
 
 
Unrealized Gain on Available-for-Sale Securities:
 
 
 
 
 
Unrealized holding gains arising during the period, net of income tax (expense) of $(6,812), $(10,855), and $(15,262)
10,661

 
16,564

 
23,286

Reclassification adjustment for (gains) included in net earnings, net of income tax expense of $5,461, $4,734, and $14,755
(8,401
)
 
(7,222
)
 
(22,514
)
Pension Liability Adjustment:
 
 
 
 
 
Experience gain (loss), net of income tax (expense) benefit of $6,024, $(6,781) and $11,910
(9,258
)
 
10,355

 
(18,174
)
Reclassification adjustment for amortization of experience (gain) loss recognized as net periodic benefit cost, net of income tax expense (benefit) of $(2,032), $(2,524) and $(1,825)
3,120

 
3,840

 
2,786

Fair Value Adjustment for Designated Cash Flow Hedges:
 
 
 
 
 
Change in fair market value, net of income tax (expense) benefit of $53, $98, and $153
(100
)
 
(181
)
 
(275
)
Reclassification adjustment for (gains) losses included in net earnings, net of income tax expense (benefit) of $(195), $(73), and $(65)
363

 
134

 
117

Total Other Comprehensive Income (Loss)
(3,615
)
 
23,490

 
(14,774
)
Comprehensive Income
127,294

 
139,046

 
105,351

Comprehensive (Income) Attributable to Valencia Non-controlling Interest
(14,127
)
 
(14,521
)
 
(14,050
)
Preferred Stock Dividend Requirements of Subsidiary
(528
)
 
(528
)
 
(528
)
Comprehensive Income Attributable to PNMR
$
112,639

 
$
123,997

 
$
90,773

The accompanying notes, as they relate to PNMR, are an integral part of these consolidated financial statements.

B- 13

Table of Contents


PNM RESOURCES, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Cash Flows From Operating Activities:
 
 
 
 
 
Net earnings
$
130,909

 
$
115,556

 
$
120,125

Adjustments to reconcile net earnings to net cash flows from operating activities:
 
 
 
 
 
  Depreciation and amortization
209,867

 
208,173

 
206,499

Deferred income tax expense
72,481

 
60,430

 
56,243

(Gain) on sale of First Choice

 

 
(1,012
)
Net unrealized (gains) on derivatives
(6,504
)
 
(1,866
)
 
(1,598
)
Realized (gains) on available-for-sale securities
(10,527
)
 
(10,612
)
 
(12,965
)
Loss on reacquired debt

 
3,253

 

Abandonment of leased premises

 

 
7,411

Stock based compensation expense
5,931

 
5,320

 
3,585

Regulatory disallowances
1,062

 
12,235

 

Other, net
(1,518
)
 
(1,647
)
 
(798
)
Changes in certain assets and liabilities:
 
 
 
 
 
Accounts receivable and unbilled revenues
(4,975
)
 
(7,562
)
 
(2,547
)
Materials, supplies, and fuel stock
5,504

 
(7,580
)
 
(5,412
)
Other current assets
(30,436
)
 
8,577

 
(2,598
)
Other assets
290

 
(12,801
)
 
(30,778
)
Accounts payable
(2,311
)
 
4,484

 
14,020

Accrued interest and taxes
2,040

 
91,537

 
255

Other current liabilities
(2,453
)
 
(19,648
)
 
(19,905
)
Proceeds from governmental grants

 

 
21,567

Other liabilities
45,516

 
(61,262
)
 
(70,743
)
Net cash flows from operating activities
414,876

 
386,587

 
281,349

Cash Flows From Investing Activities:
 
 
 
 
 
Additions to utility and non-utility plant
(460,658
)
 
(348,039
)
 
(308,909
)
Proceeds from sales of available-for-sale securities
117,989

 
271,140

 
167,330

Purchases of available-for-sale securities
(127,016
)
 
(282,000
)
 
(176,748
)
Proceeds from sale of First Choice

 

 
4,034

Return of principal on PVNGS lessor notes
20,758

 
23,357

 
23,455

Purchase of Rio Bravo
(36,235
)
 

 

Other, net
(167
)
 
4,096

 
4,943

Net cash flows from investing activities
(485,329
)
 
(331,446
)
 
(285,895
)
The accompanying notes, as they relate to PNMR, are an integral part of these consolidated financial statements.


B- 14

Table of Contents


PNM RESOURCES, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Cash Flows From Financing Activities:
 
 
 
 
 
Short-term loan

 

 
100,000

Revolving credit facilities borrowings (repayments), net
(43,600
)
 
(9,500
)
 
(24,000
)
Long-term borrowings
355,000

 
75,000

 
20,000

Repayment of long-term debt
(125,000
)
 
(29,468
)
 
(22,387
)
Cash paid in debt exchange

 
(13,048
)
 

Proceeds from stock option exercise
6,999

 
4,618

 
11,684

Purchases to satisfy awards of common stock
(17,319
)
 
(13,807
)
 
(25,168
)
Dividends paid
(59,468
)
 
(51,508
)
 
(45,137
)
Valencia’s transactions with its owner
(17,610
)
 
(18,335
)
 
(15,630
)
  Other, net
(2,808
)
 
(5,545
)
 
(922
)
Net cash flows from financing activities
96,194

 
(61,593
)
 
(1,560
)
Change in Cash and Cash Equivalents
25,741

 
(6,452
)
 
(6,106
)
Cash and Cash Equivalents at Beginning of Year
2,533

 
8,985

 
15,091

Cash and Cash Equivalents at End of Year
$
28,274

 
$
2,533

 
$
8,985

Supplemental Cash Flow Disclosures:
 
 
 
 
 
Interest paid, net of amounts capitalized
$
108,741

 
$
110,768

 
$
113,265

Income taxes paid (refunded), net
$
(2,597
)
 
$
(95,327
)
 
$
5,302

 
 
 
 
 
 
Supplemental schedule of noncash investing and financing activities:
 
 
 
 
 
Changes in accrued plant additions
$
3,089

 
$
6,006

 
$
(17,983
)
Premium on long-term debt incurred in connection with debt exchange
 
 
$
36,297

 
 
The accompanying notes, as they relate to PNMR, are an integral part of these consolidated financial statements.




B- 15

Table of Contents



PNM RESOURCES, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS

 
December 31,
 
2014
 
2013
 
(In thousands)
ASSETS
 
 
 
Current Assets:
 
 
 
Cash and cash equivalents
$
28,274

 
$
2,533

Accounts receivable, net of allowance for uncollectible accounts of $1,466 and $1,423
87,038

 
90,251

Unbilled revenues
63,719

 
58,806

Other receivables
39,857

 
53,909

Materials, supplies, and fuel stock
63,628

 
67,223

Regulatory assets
47,855

 
24,416

Commodity derivative instruments
11,232

 
4,064

Income taxes receivable
6,360

 
7,066

Current portion of accumulated deferred income taxes
26,383

 
58,681

Other current assets
58,471

 
34,590

Total current assets
432,817

 
401,539

Other Property and Investments:
 
 
 
Investment in PVNGS lessor notes
9,538

 
32,200

Available-for-sale securities
250,145

 
226,855

Other investments
1,762

 
1,835

Non-utility property
3,406

 
4,353

Total other property and investments
264,851

 
265,243

Utility Plant:
 
 
 
Plant in service and plant held for future use
5,941,581

 
5,563,061

Less accumulated depreciation and amortization
1,939,760

 
1,838,832

 
4,001,821

 
3,724,229

Construction work in progress
190,389

 
132,080

Nuclear fuel, net of accumulated amortization of $44,507 and $47,347
77,796

 
77,602

Net utility plant
4,270,006

 
3,933,911

Deferred Charges and Other Assets:
 
 
 
Regulatory assets
491,007

 
523,955

Goodwill
278,297

 
278,297

Commodity derivative instruments

 
3,002

Other deferred charges
92,347

 
94,263

Total deferred charges and other assets
861,651

 
899,517

 
$
5,829,325

 
$
5,500,210

The accompanying notes, as they relate to PNMR, are an integral part of these consolidated financial statements.





B- 16

Table of Contents


PNM RESOURCES, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
 
December 31,
 
2014
 
2013
 
(In thousands, except share
information)
LIABILITIES AND STOCKHOLDERS’ EQUITY
 
 
 
Current Liabilities:
 
 
 
Short-term debt
$
105,600

 
$
149,200

Current installments of long-term debt
333,066

 
75,000

Accounts payable
110,029

 
109,666

Customer deposits
12,555

 
13,456

Accrued interest and taxes
53,863

 
49,600

Regulatory liabilities
1,703

 
1,081

Commodity derivative instruments
1,209

 
2,699

Dividends declared
16,063

 
14,864

Other current liabilities
70,194

 
77,105

Total current liabilities
704,282

 
492,671

Long-term Debt
1,642,024

 
1,670,420

Deferred Credits and Other Liabilities:
 
 
 
Accumulated deferred income taxes
891,111

 
827,263

Regulatory liabilities
466,143

 
460,649

Asset retirement obligations
104,170

 
96,135

Accrued pension liability and postretirement benefit cost
110,738

 
80,046

Commodity derivative instruments
477

 
1,094

Other deferred credits
103,759

 
109,805

Total deferred credits and other liabilities
1,676,398

 
1,574,992

Total liabilities
4,022,704

 
3,738,083

Commitments and Contingencies (See Note 16)

 

Cumulative Preferred Stock of Subsidiary
 
 
 
without mandatory redemption requirements ($100 stated value; 10,000,000 shares authorized; issued and outstanding 115,293 shares)
11,529

 
11,529

Equity:
 
 
 
PNMR common stockholders’ equity:
 
 
 
Common stock (no par value; 120,000,000 shares authorized; issued and outstanding 79,653,624 shares)
1,173,845

 
1,178,369

Accumulated other comprehensive income (loss), net of income taxes
(61,755
)
 
(58,140
)
Retained earnings
609,456

 
553,340

Total PNMR common stockholders’ equity
1,721,546

 
1,673,569

Non-controlling interest in Valencia
73,546

 
77,029

Total equity
1,795,092

 
1,750,598

 
$
5,829,325

 
$
5,500,210

The accompanying notes, as they relate to PNMR, are an integral part of these consolidated financial statements.


B- 17

Table of Contents



PNM RESOURCES, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
 
 
Attributable to PNMR

 
Non-
controlling
Interest
in Valencia
 
 
 
 
PNMR Common Stockholders’ Equity
 
 
 
 
 
Common
Stock
 
AOCI
 
Retained
Earnings
 
Total
 
 
Total
Equity
 
 
(In thousands)
Balance at December 31, 2011
 
$
1,193,191

 
$
(66,856
)
 
$
447,650

 
$
1,573,985

 
$
82,423

 
$
1,656,408

Proceeds from stock option exercise
 
11,684

 

 

 
11,684

 

 
11,684

Purchases to satisfy awards of common stock
 
(25,168
)
 

 

 
(25,168
)
 

 
(25,168
)
Excess tax (shortfall) from stock-based payment arrangements
 
(473
)
 

 

 
(473
)
 

 
(473
)
Stock based compensation expense
 
3,585

 

 

 
3,585

 

 
3,585

Valencia’s transactions with its owner
 

 

 

 

 
(15,630
)
 
(15,630
)
Net earnings before subsidiary preferred stock dividends
 

 

 
106,075

 
106,075

 
14,050

 
120,125

Subsidiary preferred stock dividends
 

 

 
(528
)
 
(528
)
 

 
(528
)
Total other comprehensive income (loss)
 

 
(14,774
)
 

 
(14,774
)
 

 
(14,774
)
Dividends declared on common stock
 

 

 
(46,199
)
 
(46,199
)
 

 
(46,199
)
Balance at December 31, 2012
 
1,182,819

 
(81,630
)
 
506,998

 
1,608,187

 
80,843

 
1,689,030

Proceeds from stock option exercise
 
4,618

 

 

 
4,618

 

 
4,618

Purchases to satisfy awards of common stock
 
(13,807
)
 

 

 
(13,807
)
 

 
(13,807
)
Excess tax (shortfall) from stock-based payment arrangements
 
(581
)
 

 

 
(581
)
 

 
(581
)
Stock based compensation expense
 
5,320

 

 

 
5,320

 

 
5,320

Valencia’s transactions with its owner
 

 

 

 

 
(18,335
)
 
(18,335
)
Net earnings before subsidiary preferred stock dividends
 

 

 
101,035

 
101,035

 
14,521

 
115,556

Subsidiary preferred stock dividends
 

 

 
(528
)
 
(528
)
 

 
(528
)
Total other comprehensive income
 

 
23,490

 

 
23,490

 

 
23,490

Dividends declared on common stock
 

 

 
(54,165
)
 
(54,165
)
 

 
(54,165
)
Balance at December 31, 2013
 
1,178,369

 
(58,140
)
 
553,340

 
1,673,569

 
77,029

 
1,750,598

Proceeds from stock option exercise
 
6,999

 

 

 
6,999

 

 
6,999

Purchases to satisfy awards of common stock
 
(17,319
)
 

 

 
(17,319
)
 

 
(17,319
)
Excess tax (shortfall) from stock-based payment arrangements
 
(135
)
 

 

 
(135
)
 

 
(135
)
Stock based compensation expense
 
5,931

 

 

 
5,931

 

 
5,931

Valencia’s transactions with its owner
 

 

 

 

 
(17,610
)
 
(17,610
)
Net earnings before subsidiary preferred stock dividends
 

 

 
116,782

 
116,782

 
14,127

 
130,909

Subsidiary preferred stock dividends
 

 

 
(528
)
 
(528
)
 

 
(528
)
Total other comprehensive income
 

 
(3,615
)
 

 
(3,615
)
 

 
(3,615
)
Dividends declared on common stock
 

 

 
(60,138
)
 
(60,138
)
 

 
(60,138
)
Balance at December 31, 2014
 
$
1,173,845

 
$
(61,755
)
 
$
609,456

 
$
1,721,546

 
$
73,546

 
$
1,795,092

The accompanying notes, as they relate to PNMR, are an integral part of these consolidated financial statements.

B- 18

Table of Contents



PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF EARNINGS

 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Electric Operating Revenues
$
1,147,914

 
$
1,116,312

 
$
1,092,264

Operating Expenses:
 
 
 
 
 
Cost of energy
403,626

 
374,710

 
353,649

Administrative and general
152,645

 
157,144

 
169,285

Energy production costs
185,638

 
175,819

 
185,403

Regulatory disallowances
1,062

 
12,235

 

Depreciation and amortization
109,524

 
103,826

 
97,291

Transmission and distribution costs
43,128

 
45,936

 
46,039

Taxes other than income taxes
39,578

 
37,457

 
34,715

Total operating expenses
935,201

 
907,127

 
886,382

Operating income
212,713

 
209,185

 
205,882

Other Income and Deductions:
 
 
 
 
 
Interest income
8,557

 
10,182

 
13,243

Gains on available-for-sale securities
10,527

 
10,612

 
12,965

Other income
8,949

 
7,650

 
8,126

Other (deductions)
(7,218
)
 
(6,974
)
 
(7,801
)
Net other income and deductions
20,815

 
21,470

 
26,533

Interest Charges
79,442

 
79,175

 
76,101

Earnings before Income Taxes
154,086

 
151,480

 
156,314

Income Taxes
52,633

 
48,804

 
50,713

Net Earnings
101,453

 
102,676

 
105,601

(Earnings) Attributable to Valencia Non-controlling Interest
(14,127
)
 
(14,521
)
 
(14,050
)
Net Earnings Attributable to PNM
87,326

 
88,155

 
91,551

Preferred Stock Dividends Requirements
(528
)
 
(528
)
 
(528
)
Net Earnings Available for PNM Common Stock
$
86,798

 
$
87,627

 
$
91,023

The accompanying notes, as they relate to PNM, are an integral part of these consolidated financial statements.

B- 19

Table of Contents


PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Net Earnings
$
101,453

 
$
102,676

 
$
105,601

Other Comprehensive Income:
 
 
 
 
 
Unrealized Gain on Available-for-Sale Securities:
 
 
 
 
 
Unrealized holding gains arising during the period, net of income tax (expense) of $(6,812), $(10,855), and $(15,262)
10,661

 
16,564

 
23,286

Reclassification adjustment for (gains) included in net earnings, net of income tax expense of $5,461, $4,734, and $14,755
(8,401
)
 
(7,222
)
 
(22,514
)
Pension Liability Adjustment:
 
 
 
 
 
Experience gain (loss), net of income tax (expense) benefit of $6,024, $(6,781) and $11,910
(9,258
)
 
10,355

 
(18,174
)
Reclassification adjustment for amortization of experience (gain) loss recognized as net periodic benefit cost, net of income tax expense (benefit) of $(2,032), $(2,524) and $(1,825)
3,120

 
3,840

 
2,786

Total Other Comprehensive Income (Loss)
(3,878
)
 
23,537

 
(14,616
)
Comprehensive Income
97,575

 
126,213

 
90,985

Comprehensive (Income) Attributable to Valencia Non-controlling Interest
(14,127
)
 
(14,521
)
 
(14,050
)
Comprehensive Income Attributable to PNM
$
83,448

 
$
111,692

 
$
76,935


The accompanying notes, as they relate to PNM, are an integral part of these consolidated financial statements.


B- 20

Table of Contents


PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF CASH FLOWS

 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Cash Flows From Operating Activities:
 
 
 
 
 
Net earnings
$
101,453

 
$
102,676

 
$
105,601

Adjustments to reconcile net earnings to net cash flows from operating activities:

 

 

Depreciation and amortization
143,303

 
136,732

 
129,514

Deferred income tax expense
55,787

 
50,043

 
65,479

Net unrealized (gains) losses on derivatives
(6,504
)
 
(1,866
)
 
(1,598
)
Realized (gains) on available-for-sale securities
(10,527
)
 
(10,612
)
 
(12,965
)
Regulatory disallowances
1,062

 
12,235

 

Other, net
(1,391
)
 
(1,614
)
 
(170
)
Changes in certain assets and liabilities:

 

 

Accounts receivable and unbilled revenues
(5,919
)
 
(3,021
)
 
(4,756
)
Materials, supplies, and fuel stock
5,570

 
(7,730
)
 
(5,268
)
Other current assets
(29,146
)
 
8,556

 
(3,014
)
Other assets
7,150

 
(13,363
)
 
(27,338
)
Accounts payable
212

 
2,807

 
11,028

Accrued interest and taxes
(3,599
)
 
72,740

 
47,666

Other current liabilities
(659
)
 
(27,376
)
 
(2,539
)
Proceeds from governmental grants

 

 
21,567

Other liabilities
42,325

 
(59,753
)
 
(54,787
)
Net cash flows from operating activities
299,117

 
260,454

 
268,420

Cash Flows From Investing Activities:
 
 
 
 
 
Utility plant additions
(316,800
)
 
(239,906
)
 
(196,800
)
Proceeds from sales of available-for-sale securities
117,989

 
271,140

 
167,330

Purchases of available-for-sale securities
(127,016
)
 
(282,000
)
 
(176,748
)
Return of principal on PVNGS lessor notes
20,758

 
23,357

 
23,455

Purchase of Rio Bravo
(36,235
)
 

 

Other, net
(363
)
 
3,843

 
2,406

Net cash flows from investing activities
(341,667
)
 
(223,566
)
 
(180,357
)

The accompanying notes, as they relate to PNM, are an integral part of these consolidated financial statements.


B- 21

Table of Contents


PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF CASH FLOWS

 
Year ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Cash Flows From Financing Activities:
 
 
 
 
 
Short-term borrowings (repayments), net
(49,200
)
 
28,100

 
(44,900
)
Short-term borrowings (repayments) - affiliate, net
(32,500
)
 
32,500

 

Long-term borrowings
275,000

 
75,000

 
20,000

Repayment of long-term debt
(75,000
)
 

 
(20,000
)
Valencia’s transactions with its owner
(17,610
)
 
(18,335
)
 
(15,630
)
Dividends paid
(30,791
)
 
(155,556
)
 
(34,961
)
Other, net
(1,890
)
 
(2,534
)
 
(921
)
Net cash flows from financing activities
68,009

 
(40,825
)
 
(96,412
)
 
 
 
 
 
 
Change in Cash and Cash Equivalents
25,459

 
(3,937
)
 
(8,349
)
Cash and Cash Equivalents at Beginning of Year
21

 
3,958

 
12,307

Cash and Cash Equivalents at End of Year
$
25,480

 
$
21

 
$
3,958

 
 
 
 
 
 
Supplemental Cash Flow Disclosures:
 
 
 
 
 
Interest paid, net of amounts capitalized
$
73,787

 
$
71,306

 
$
73,036

Income taxes paid (refunded), net
$
(228
)
 
$
(77,434
)
 
$
(63,113
)
 
 
 
 
 
 
Supplemental schedule of noncash investing activities:
 
 
 
 
 
Changes in accrued plant additions
$
1,616

 
$
7,921

 
$
(19,732
)

The accompanying notes, as they relate to PNM, are an integral part of these consolidated financial statements.

B- 22

Table of Contents



PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED BALANCE SHEETS
 
December 31,
 
2014
 
2013
 
(In thousands)
ASSETS
 
 
 
Current Assets:
 
 
 
Cash and cash equivalents
$
25,480

 
$
21

Accounts receivable, net of allowance for uncollectible accounts of $1,466 and $1,423
67,622

 
70,126

Unbilled revenues
54,140

 
48,992

Other receivables
37,622

 
52,964

Affiliate receivables
8,853

 
10,054

Materials, supplies, and fuel stock
60,859

 
64,520

Regulatory assets
43,980

 
19,394

Commodity derivative instruments
11,232

 
4,064

Income taxes receivable
6,105

 
4,030

Current portion of accumulated deferred income taxes
12,418

 
43,827

Other current assets
53,095

 
30,510

Total current assets
381,406

 
348,502

Other Property and Investments:
 
 
 
Investment in PVNGS lessor notes
9,538

 
32,200

Available-for-sale securities
250,145

 
226,855

Other investments
397

 
445

Non-utility property
96

 
976

Total other property and investments
260,176

 
260,476

Utility Plant:
 
 
 
Plant in service and plant held for future use
4,581,066

 
4,314,016

Less accumulated depreciation and amortization
1,486,406

 
1,402,531

 
3,094,660

 
2,911,485

Construction work in progress
169,673

 
107,344

Nuclear fuel, net of accumulated amortization of $44,507 and $47,347
77,796

 
77,602

Net utility plant
3,342,129

 
3,096,431

Deferred Charges and Other Assets:
 
 
 
Regulatory assets
357,045

 
384,217

Goodwill
51,632

 
51,632

Commodity derivative instruments

 
3,002

Other deferred charges
81,264

 
83,356

Total deferred charges and other assets
489,941

 
522,207

 
$
4,473,652

 
$
4,227,616

The accompanying notes, as they relate to PNM, are an integral part of these consolidated financial statements.

 






B- 23

Table of Contents


PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED BALANCE SHEETS
 
December 31,
 
2014
 
2013
 
(In thousands, except share
information)
LIABILITIES AND STOCKHOLDER’S EQUITY
 
 
 
Current Liabilities:
 
 
 
Short-term debt
$

 
$
49,200

Short-term debt - affiliate

 
32,500

Current installments of long-term debt
214,300

 
75,000

Accounts payable
86,055

 
84,643

Affiliate payables
18,232

 
20,498

Customer deposits
12,555

 
13,456

Accrued interest and taxes
29,298

 
27,665

Regulatory liabilities
1,703

 
1,081

Commodity derivative instruments
1,209

 
2,699

Dividends declared
132

 
132

Other current liabilities
52,053

 
50,392

Total current liabilities
415,537

 
357,266

Long-term Debt
1,276,357

 
1,215,618

Deferred Credits and Other Liabilities:
 
 
 
Accumulated deferred income taxes
715,814

 
677,094

Regulatory liabilities
425,481

 
414,611

Asset retirement obligations
103,182

 
95,225

Accrued pension liability and postretirement benefit cost
102,850

 
76,611

Commodity derivative instruments
477

 
1,094

Other deferred credits
86,023

 
91,340

Total deferred credits and liabilities
1,433,827

 
1,355,975

Total liabilities
3,125,721

 
2,928,859

Commitments and Contingencies (See Note 16)

 

Cumulative Preferred Stock
 
 
 
without mandatory redemption requirements ($100 stated value; 10,000,000 shares authorized; issued and outstanding 115,293 shares)
11,529

 
11,529

Equity:
 
 
 
PNM common stockholder’s equity:
 
 
 
Common stock (no par value; 40,000,000 shares authorized; issued and outstanding 39,117,799 shares)
1,061,776

 
1,061,776

Accumulated other comprehensive income (loss), net of income tax
(61,755
)
 
(57,877
)
Retained earnings
262,835

 
206,300

Total PNM common stockholder’s equity
1,262,856

 
1,210,199

Non-controlling interest in Valencia
73,546

 
77,029

Total equity
1,336,402

 
1,287,228

 
$
4,473,652

 
$
4,227,616

The accompanying notes, as they relate to PNM, are an integral part of these consolidated financial statements.


B- 24

Table of Contents


PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
 
Attributable to PNM
 
 
 
 
 
Common
Stock
 
AOCI
 
Retained
Earnings
 
Total PNM
Common
Stockholder’s
Equity
 
Non-
controlling
Interest
in Valencia
 
Total
Equity
 
(In thousands)
Balance at December 31, 2011
$
1,061,776

 
$
(66,798
)
 
$
217,111

 
$
1,212,089

 
$
82,423

 
$
1,294,512

Valencia’s transactions with its owner

 

 

 

 
(15,630
)
 
(15,630
)
Net earnings

 

 
91,551

 
91,551

 
14,050

 
105,601

Total other comprehensive income (loss)

 
(14,616
)
 

 
(14,616
)
 

 
(14,616
)
Dividends declared on preferred stock

 

 
(528
)
 
(528
)
 

 
(528
)
Dividends declared on common stock

 

 
(34,433
)
 
(34,433
)
 

 
(34,433
)
Balance at December 31, 2012
1,061,776

 
(81,414
)
 
273,701

 
1,254,063

 
80,843

 
1,334,906

Valencia’s transactions with its owner

 

 

 

 
(18,335
)
 
(18,335
)
Net earnings

 

 
88,155

 
88,155

 
14,521

 
102,676

Total other comprehensive income

 
23,537

 

 
23,537

 

 
23,537

Dividends declared on preferred stock

 

 
(528
)
 
(528
)
 

 
(528
)
Dividends declared on common stock

 

 
(155,028
)
 
(155,028
)
 

 
(155,028
)
Balance at December 31, 2013
1,061,776

 
(57,877
)
 
206,300

 
1,210,199

 
77,029

 
1,287,228

Valencia’s transactions with its owner

 

 

 

 
(17,610
)
 
(17,610
)
Net earnings

 

 
87,326

 
87,326

 
14,127

 
101,453

Total other comprehensive income (loss)

 
(3,878
)
 

 
(3,878
)
 

 
(3,878
)
Dividends declared on preferred stock

 

 
(528
)
 
(528
)
 

 
(528
)
Dividends declared on common stock

 

 
(30,263
)
 
(30,263
)
 

 
(30,263
)
Balance at December 31, 2014
$
1,061,776

 
$
(61,755
)
 
$
262,835

 
$
1,262,856

 
$
73,546

 
$
1,336,402


The accompanying notes, as they relate to PNM, are an integral part of these consolidated financial statements.


B- 25

Table of Contents



TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF EARNINGS
 

 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
 
 
 
 
 
 
Electric Operating Revenues
$
287,939

 
$
271,611

 
$
250,140

Operating Expenses:
 
 
 
 
 
Cost of energy
67,930

 
57,606

 
46,201

Administrative and general
36,982

 
44,635

 
40,775

Depreciation and amortization
50,056

 
50,219

 
49,340

Transmission and distribution costs
23,443

 
24,188

 
25,086

Taxes other than income taxes
23,940

 
22,778

 
21,218

Total operating expenses
202,351

 
199,426

 
182,620

Operating income
85,588

 
72,185

 
67,520

Other Income and Deductions:
 
 
 
 
 
Interest income

 

 
1

Other income
2,865

 
2,377

 
4,698

Other (deductions)
(727
)
 
(458
)
 
(1,959
)
Net other income and deductions
2,138

 
1,919

 
2,740

Interest Charges
27,396

 
27,393

 
28,161

Earnings Before Income Taxes
60,330

 
46,711

 
42,099

Income Taxes
22,523

 
17,621

 
15,352

Net Earnings
$
37,807

 
$
29,090

 
$
26,747

The accompanying notes, as they relate to TNMP, are an integral part of these consolidated financial statements.

B- 26

Table of Contents



TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
 
 
 
 
 
 
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Net Earnings
$
37,807

 
$
29,090

 
$
26,747

Other Comprehensive Income (Loss):
 
 
 
 
 
Fair Value Adjustment for Designated Cash Flow Hedge:
 
 
 
 
 
Change in fair value, net of income tax (expense) benefit of $53, $98, and $153
(100
)
 
(181
)
 
(275
)
Reclassification adjustment for losses included in net earnings, net of income tax expense (benefit) of $(195), $(73), and $(65)
363

 
134

 
117

Total Other Comprehensive Income (Loss)
263

 
(47
)
 
(158
)
Comprehensive Income
$
38,070

 
$
29,043

 
$
26,589


The accompanying notes, as they relate to TNMP, are an integral part of these consolidated financial statements.

B- 27

Table of Contents



TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Cash Flows From Operating Activities:
 
 
 
 
 
Net earnings
$
37,807

 
$
29,090

 
$
26,747

Adjustments to reconcile net earnings to net cash flows from operating activities:
 
 
 
 
 
Depreciation and amortization
52,847

 
54,395

 
54,396

Deferred income tax expense
20,549

 
20,662

 
4,378

Other, net
(10
)
 
(30
)
 
(889
)
Changes in certain assets and liabilities:
 
 
 
 
 
Accounts receivable and unbilled revenues
944

 
(4,542
)
 
2,208

Materials and supplies
(66
)
 
150

 
(143
)
Other current assets
380

 
(1,137
)
 
(3,515
)
Other assets
(6,607
)
 
941

 
(3,145
)
Accounts payable
2,514

 
3,709

 
(666
)
Accrued interest and taxes
4,796

 
(6,713
)
 
9,825

Other current liabilities
(203
)
 
(3,197
)
 
(2,106
)
Other liabilities
3,112

 
460

 
4,311

Net cash flows from operating activities
116,063

 
93,788

 
91,401

Cash Flows From Investing Activities:
 
 
 
 
 
Utility plant additions
(127,191
)
 
(89,117
)
 
(92,973
)
Net cash flows from investing activities
(127,191
)
 
(89,117
)
 
(92,973
)
The accompanying notes, as they relate to TNMP, are an integral part of these consolidated financial statements.


B- 28

Table of Contents


 
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
 
 
 
 
 
 
Cash Flow From Financing Activities:
 
 
 
 
 
Short-term borrowings (repayments), net
5,000

 

 

Short-term borrowings (repayments) – affiliate, net
(6,700
)
 
1,100

 
27,600

Long-term borrowings
80,000

 

 

Repayment of long-term debt
(50,000
)
 

 

Cash paid in debt exchange

 
(13,048
)
 

Equity contribution from parent

 
13,800

 

Dividends paid
(16,336
)
 
(3,726
)
 
(26,028
)
Other, net
(836
)
 
(2,797
)
 

Net cash flows from financing activities
11,128

 
(4,671
)
 
1,572

Change in Cash and Cash Equivalents

 

 

Cash and Cash Equivalents at Beginning of Year
1

 
1

 
1

Cash and Cash Equivalents at End of Year
$
1

 
$
1

 
$
1

Supplemental Cash Flow Disclosures:
 
 
 
 
 
Interest paid, net of amounts capitalized
$
22,803

 
$
25,436

 
$
25,360

Income taxes paid, (refunded) net
$
(355
)
 
$
4,484

 
$
1,848

 
 
 
 
 
 
Supplemental schedule of noncash investing and financing activities:
 
 
 
 
 
Changes in accrued plant additions
$
(854
)
 
$
141

 
$
(2,749
)
 
 
 
 
 
 
Premium on long-term debt incurred in connection with debt exchange
 
 
$
36,297

 
 
 
 
 
 
 
 
 
 
 
 
 
 
The accompanying notes, as they relate to TNMP, are an integral part of these consolidated financial statements.

B- 29

Table of Contents



TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED BALANCE SHEETS

 
December 31,
 
2014
 
2013
 
(In thousands)
ASSETS
 
 
 
Current Assets:
 
 
 
Cash and cash equivalents
$
1

 
$
1

Accounts receivable
19,416

 
20,125

Unbilled revenues
9,579

 
9,814

Other receivables
2,063

 
1,246

Materials and supplies
2,769

 
2,703

Regulatory assets
3,875

 
5,022

Current portion of accumulated deferred income taxes
6,398

 
6,501

Other current assets
938

 
980

Total current assets
45,039

 
46,392

Other Property and Investments:
 
 
 
Other investments
242

 
245

Non-utility property
2,240

 
2,240

Total other property and investments
2,482

 
2,485

Utility Plant:
 
 
 
Plant in service and plant held for future use
1,182,112

 
1,074,193

Less accumulated depreciation and amortization
375,407

 
352,105

 
806,705

 
722,088

Construction work in progress
16,538

 
16,790

Net utility plant
823,243

 
738,878

Deferred Charges and Other Assets:
 
 
 
Regulatory assets
133,962

 
139,738

Goodwill
226,665

 
226,665

Other deferred charges
8,850

 
8,273

Total deferred charges and other assets
369,477

 
374,676

 
$
1,240,241

 
$
1,162,431

The accompanying notes, as they relate to TNMP, are an integral part of these consolidated financial statements.


B- 30

Table of Contents


TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED BALANCE SHEETS
 
December 31,
 
2014
 
2013
 
(In thousands, except share
information)
LIABILITIES AND STOCKHOLDER’S EQUITY
 
 
 
Current Liabilities:
 
 
 
Short-term debt
$
5,000

 
$

Short-term debt – affiliate
22,700

 
29,400

Accounts payable
14,203

 
12,543

Affiliate payables
2,469

 
3,181

Accrued interest and taxes
28,574

 
23,778

Other current liabilities
2,271

 
8,999

Total current liabilities
75,217

 
77,901

Long-term Debt
365,667

 
336,036

Deferred Credits and Other Liabilities:
 
 
 
Accumulated deferred income taxes
217,945

 
190,197

Regulatory liabilities
40,662

 
46,038

Asset retirement obligations
848

 
782

Accrued pension liability and postretirement benefit cost
7,888

 
3,435

Other deferred credits
7,349

 
5,111

Total deferred credits and other liabilities
274,692

 
245,563

Total liabilities
715,576

 
659,500

Commitments and Contingencies (See Note 16)


 


Common Stockholder’s Equity:
 
 
 
Common stock ($10 par value; 12,000,000 shares authorized;
issued and outstanding 6,358 shares)
64

 
64

Paid-in-capital
404,166

 
404,166

Accumulated other comprehensive income (loss), net of income tax

 
(263
)
Retained earnings
120,435

 
98,964

Total common stockholder’s equity
524,665

 
502,931

 
$
1,240,241

 
$
1,162,431

The accompanying notes, as they relate to TNMP, are an integral part of these consolidated financial statements.

B- 31

Table of Contents


TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
CONSOLIDATED STATEMENTS OF CHANGES IN COMMON STOCKHOLDER’S EQUITY
 
 
Common
Stock
 
Paid-in
Capital
 
AOCI
 
Retained
Earnings
 
Total
Common
Stockholder’s
Equity
 
 
 
 
 
(In thousands)
 
 
 
 
Balance at December 31, 2011
$
64

 
$
416,394

 
$
(58
)
 
$
46,853

 
$
463,253

Net earnings

 

 

 
26,747

 
26,747

Total other comprehensive income (loss)

 

 
(158
)
 

 
(158
)
Dividends declared on common stock

 
(26,028
)
 

 

 
(26,028
)
Balance at December 31, 2012
64

 
390,366

 
(216
)
 
73,600

 
463,814

Net earnings

 

 

 
29,090

 
29,090

Total other comprehensive income (loss)

 

 
(47
)
 

 
(47
)
Equity contributions from parent

 
13,800

 

 

 
13,800

Dividends declared on common stock

 

 

 
(3,726
)
 
(3,726
)
Balance at December 31, 2013
64

 
404,166

 
(263
)
 
98,964

 
502,931

Net earnings

 

 

 
37,807

 
37,807

Total other comprehensive income

 

 
263

 

 
263

Dividends declared on common stock

 

 

 
(16,336
)
 
(16,336
)
Balance at December 31, 2014
$
64

 
$
404,166

 
$

 
$
120,435

 
$
524,665


The accompanying notes, as they relate to TNMP, are an integral part of these consolidated financial statements.

B- 32

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012


(1)
Summary of the Business and Significant Accounting Policies
Nature of Business
PNMR is an investor-owned holding company of energy and energy-related businesses. PNMR’s primary subsidiaries are PNM and TNMP. PNM is a public utility with regulated operations primarily engaged in the generation, transmission, and distribution of electricity. TNMP is a wholly owned subsidiary of TNP, which is a holding company that is wholly owned by PNMR. TNMP provides regulated transmission and distribution services in Texas. PNMR’s common stock trades on the New York Stock Exchange under the symbol PNM.
Financial Statement Preparation and Presentation
The preparation of financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of the financial statements, and the reported amounts of revenues and expenses during the reporting period. Actual results could ultimately differ from those estimated.
The Notes to Consolidated Financial Statements include disclosures for PNMR, PNM, and TNMP. For discussion purposes, this report uses the term “Company” when discussing matters of common applicability to PNMR, PNM, and TNMP. Discussions regarding only PNMR, PNM, or TNMP are so indicated.
Certain amounts in the 2013 and 2012 Consolidated Financial Statements and Notes thereto have been reclassified to conform to the 2014 financial statement presentation.
GAAP defines subsequent events as events or transactions that occur after the balance sheet date but before financial statements are issued or are available to be issued. Based on their nature, magnitude, and timing, certain subsequent events may be required to be reflected at the balance sheet date and/or required to be disclosed in the financial statements. The Company has evaluated subsequent events as required by GAAP.
Principles of Consolidation
The Consolidated Financial Statements of each of PNMR, PNM, and TNMP include their accounts and those of subsidiaries in which that entity owns a majority voting interest. PNM also consolidates the PVNGS Capital Trust and Valencia (Note 9). PNM owns undivided interests in several jointly-owned power plants and records its pro-rata share of the assets, liabilities, and expenses for those plants.
PNMR shared services’ administrative and general expenses, which represent costs that are primarily driven by corporate level activities, are charged to the business segments. These services are billed at cost. Other significant intercompany transactions between PNMR, PNM, and TNMP include interest and income tax sharing payments, as well as equity transactions. All intercompany transactions and balances have been eliminated. See Note 18.
 
Accounting for the Effects of Certain Types of Regulation
The Company maintains its accounting records in accordance with the uniform system of accounts prescribed by FERC and adopted by the NMPRC and PUCT.
Certain of the Company’s operations are regulated by the NMPRC, PUCT, and FERC and the provisions of GAAP for rate-regulated enterprises are applied to the regulated operations. Regulators may assign costs to accounting periods that differ from accounting methods applied by non-regulated utilities.  When it is probable that regulators will permit recovery of costs through future rates, costs that otherwise would be expensed are deferred as regulatory assets.  Likewise, regulatory liabilities are recognized when it is probable that regulators will require refunds through future rates or when revenue is collected for expenditures that have not yet been incurred.  Regulatory assets and liabilities are amortized into earnings over the authorized recovery period. Accordingly, the Company has deferred certain costs and recorded certain liabilities pursuant to the rate actions of the NMPRC, PUCT, and FERC. Information on regulatory assets and regulatory liabilities is contained in Note 4.

B- 33

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

In some circumstances, regulators allow a requested increase in rates to be implemented, subject to refund, before the regulatory process has been completed and a decision rendered by the regulator. When this occurs, the Company assesses the possible outcomes of the rate proceeding. The Company records a provision for refund to the extent the amounts being collected, subject to refund, exceed the amount the Company determines is probable of ultimately being allowed by the regulator.

Competition Transition Charge
In connection with the adoption of Senate Bill 7 by the Texas Legislature in 1999 that deregulated electric utilities operating within ERCOT, TNMP was allowed to recover its stranded costs through the CTC and to also recover a carrying charge on the CTC. The amounts yet to be collect are recorded as regulatory assets by TNMP. TNMP’s calculation of allowable carrying charges on stranded costs recoverable from its transmission and distribution customers is based on a Texas Supreme Court ruling and the PUCT’s application of that ruling.
Cash and Cash Equivalents
Investments in highly liquid investments with original maturities of three months or less at the date of purchase are considered cash equivalents.
Utility Plant
Utility plant is stated at cost, which includes capitalized payroll-related costs such as taxes, pension, and other fringe benefits, administrative costs, and AFUDC where authorized by rate regulation.
Repairs, including major maintenance activities, and minor replacements of property are expensed when incurred, except as required by regulators for ratemaking purposes. Major replacements are charged to utility plant. Gains or losses resulting from retirements or other dispositions of regulated property in the normal course of business are credited or charged to accumulated depreciation.
Allowance for Funds Used During Construction
As provided by the FERC uniform systems of accounts, AFUDC is charged to regulated utility plant for construction projects. This allowance is a non-cash item designed to enable a utility to capitalize financing costs during periods of construction of property subject to rate regulation. It represents the cost of borrowed funds (allowance for borrowed funds used during construction) and a return on other funds (allowance for equity funds used during construction). The allowance for borrowed funds used during construction is recorded in interest charges and the allowance for equity funds used during construction is recorded in other income on the Consolidated Statements of Earnings.
For the years ended December 31, 2014 , 2013 , and 2012 , PNM recorded $4.2 million , $3.3 million , and $3.5 million of allowance for borrowed funds used during construction and $5.6 million , $4.4 million , and $3.8 million of allowance for equity funds used during construction. TNMP recorded $0.5 million , $0.4 million , and $0.7 million of allowance for borrowed funds used during construction and zero , zero , and $0.6 million of allowance for equity funds used during construction.
Capitalized Interest
The Company capitalizes interest on its construction projects and major computer software projects not subject to the computation of AFUDC. Interest was capitalized at the overall weighted average borrowing rate of 6.6% , 6.9% , and 6.6% for 2014 , 2013 , and 2012 . In 2014 , 2013 , and 2012 , capitalized interest was $1.6 million , $1.5 million , and $1.2 million for PNMR consolidated; $1.1 million , $1.1 million , and $0.8 million for PNM; and $0.1 million , zero , and zero for TNMP.  
Materials, Supplies, and Fuel Stock
Materials and supplies relate to transmission, distribution, and generating assets. Materials and supplies are charged to inventory when purchased and are expensed or capitalized as appropriate when issued. Materials and supplies are valued using an average costing method.
Coal is valued using a rolling weighted average costing method that is updated based on the current period cost per ton. Periodic aerial surveys are performed on the coal piles and adjustments are made.

B- 34

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Inventories consisted of the following at December 31 :
 
 
PNMR
 
PNM
 
TNMP
 
2014
 
2013
 
2014
 
2013
 
2014
 
2013
 
(In thousands)
Coal
$
17,525

 
$
24,872

 
$
17,525

 
$
24,872

 
$

 
$

Materials and supplies
46,103

 
42,351

 
43,334

 
39,648

 
2,769

 
2,703

 
$
63,628

 
$
67,223

 
$
60,859

 
$
64,520

 
$
2,769

 
$
2,703


Investments
In 1985 and 1986, PNM entered into eleven operating leases for interests in certain PVNGS generation facilities (Note 7). The 10.3% and 10.15% lessor notes that were issued by the owners of the assets subject to these leases were subsequently purchased and held by the PVNGS Capital Trust, which is consolidated by PNM. Eight leases continue and are classified as operating leases. The PVNGS Capital Trust held certain of the lessor notes to their maturity in January 2015 and intends to hold the other lessor notes until their maturity in 2016. The PVNGS lessor notes are carried at amortized cost. Similarly, in 1985, PNM entered into two operating leases for the EIP transmission line for which the owners had issued lessor notes. In 2003, PNM acquired a 60% ownership interest in the EIP, collapsing the lease relating to it. In 2004, PNM purchased the outstanding lessor note relating to the remaining 40% interest. The remaining EIP lessor note bore interest at 10.25% and matured in 2012.
PNM holds investment securities in the NDT for the purpose of funding its share of the decommissioning costs of PVNGS and, beginning in August 2012, a trust for PNM’s share of post-term reclamation costs related to the coal mines serving SJGS (Note 16). All of these investments are classified as available-for-sale. PNM evaluates the securities for impairment on an on-going basis. Since third party investment managers have sole discretion over the purchase and sales of the securities, PNM records a realized loss as an impairment for any security that has a market value that is less than cost at the end of each quarter. For the years ended December 31, 2014 , 2013 , and 2012 , PNM recorded impairment losses on the available-for-sale securities held in the NDT and coal mine reclamation trust of $4.8 million , $3.5 million , and $4.8 million . No gains or losses are deferred as regulatory assets or liabilities. Unrealized gains on these investments, net of related tax effects, are included in OCI and AOCI. The available-for-sale securities are primarily comprised of international, United States, state, and municipal government obligations and corporate debt and equity securities. All investments are held in PNM’s name and are in the custody of major financial institutions. The specific identification method is used to determine the cost of securities disposed of, with realized gains and losses reflected in other income and deductions.  
Goodwill
Under GAAP, the Company does not amortize goodwill. Goodwill is evaluated for impairment annually, or more frequently if events and circumstances indicate that the goodwill might be impaired. See Note 21.
Asset Impairment
Tangible long-lived assets are evaluated in relation to the estimated future undiscounted cash flows to assess recoverability when events and circumstances indicate that the assets might be impaired.
Revenue Recognition
Electric operating revenues are recorded in the period of energy delivery, which includes estimated amounts for service rendered but unbilled at the end of each accounting period. The determination of the energy sales to individual customers is based on the reading of their meters, which occurs on a systematic basis throughout the month. At the end of each month, amounts of energy delivered to customers since the date of the last meter reading and the corresponding unbilled revenue are estimated. Unbilled electric revenue is estimated based on the daily generation volumes, estimated customer usage by class, weather factors, line losses, and applicable customer rates reflecting historical trends and experience.
PNM’s wholesale electricity sales are recorded as electric operating revenues and the wholesale electricity purchases are recorded as costs of energy sold. In accordance with GAAP, derivative contracts that are net settled or “booked-out” are recorded

B- 35

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

net in earnings. A book-out is the planned or unplanned netting of off-setting purchase and sale transactions. A book-out is a transmission mechanism to reduce congestion on the transmission system or administrative burden. For accounting purposes, a book-out is the recording of net revenues upon the settlement of a derivative contract.
Unrealized gains and losses on contracts that do not qualify for the normal purchases or normal sales exception or are not designated for hedge accounting are classified as economic hedges. Economic hedges are defined as derivative instruments, including long-term power and fuel supply agreements, used to hedge generation assets and purchased power costs. Changes in the fair value of economic hedges are reflected in results of operations, with changes related to economic hedges on sales included in operating revenues and changes related to economic hedges on purchases included in cost of energy sold.
Accounts Receivable and Allowance for Uncollectible Accounts
Accounts receivable consists primarily of trade receivables from customers. In the normal course of business, credit is extended to customers on a short-term basis. The Company calculates the allowance for uncollectible accounts based on historical experience and estimated default rates. The accounts receivable balances are reviewed monthly and adjustments to the allowance for uncollectible accounts and bad debt expense are made as necessary. Amounts that are deemed uncollectible are written off.
Depreciation and Amortization
PNM’s provision for depreciation and amortization of utility plant, other than nuclear fuel, is based upon composite straight-line rates approved by the NMPRC. Amortization of nuclear fuel is based on units-of-production. TNMP’s provision for depreciation and amortization of utility plant is based upon straight-line rates approved by the PUCT. Depreciation of non-utility property is computed based on the straight-line method. The provision for depreciation of certain equipment is allocated between operating expenses and construction projects based on the use of the equipment. Average straight-line rates used were as follows:
 
Year ended December 31
 
2014
 
2013
 
2012
PNM
 
 
 
 
 
Electric plant
2.26
%
 
2.27
%
 
2.25
%
Common, intangible, and general plant
4.64
%
 
4.87
%
 
5.35
%
TNMP
3.59
%
 
3.66
%
 
3.56
%
Amortization of Debt Acquisition Costs
Discount, premium, and expense related to the issuance of long-term debt are amortized over the lives of the respective issues. Gains and losses incurred upon the early retirement of long-term debt are recognized in other income or other deductions, except for amounts attributable to NMPRC, FERC, or PUCT regulation, which are recorded as regulatory assets or liabilities and amortized over the lives of the respective issues.
Derivatives
The Company records derivative instruments, including energy contracts, other than those designated as normal purchases or normal sales, in the balance sheet as either an asset or liability measured at their fair value. GAAP requires that changes in the derivatives’ fair value be recognized currently in earnings unless specific hedge accounting or normal purchase or normal sale criteria are met. Normal purchases and normal sales are not marked to market and are reflected in results of operations when the underlying transactions settle. For qualifying hedges, an entity must formally document, designate, and assess the effectiveness of transactions that receive hedge accounting. GAAP provides that the effective portion of the gain or loss on a derivative instrument designated and qualifying as a cash flow hedging instrument be reported as a component of AOCI and be reclassified into earnings in the period during which the hedged forecasted transaction affects earnings. The results of hedge ineffectiveness and the portion of the change in fair value of a derivative that an entity has chosen to exclude from hedge effectiveness are required to be presented in current earnings. See Note 8.
The Company treats all forward electric purchases and sales contracts subject to unplanned netting or book-out by the transmission provider as derivative instruments subject to mark-to-market accounting, unless the contract qualifies for the normal exception by meeting the definition of a capacity contract. Under this definition, the contract cannot permit net settlement, the

B- 36

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

seller must have the resources to serve the contract, and the buyer must be a load serving entity. GAAP provides guidance on whether realized gains and losses on derivative contracts not held for trading purposes should be reported on a net or gross basis and concludes such classification is a matter of judgment that depends on the relevant facts and circumstances. 
Decommissioning and Reclamation Costs
PNM owns and leases nuclear and fossil-fuel generating facilities. In accordance with GAAP, PNM is only required to recognize and measure decommissioning liabilities for tangible long-lived assets for which a legal obligation exists. Nuclear decommissioning costs and related accruals are based on periodic site-specific estimates of the costs for removing all radioactive and other structures at PVNGS and are dependent upon numerous assumptions, including estimates of future decommissioning costs at current price levels, inflation rates, and discount rates. PNM’s accruals for PVNGS Units 1, 2, and 3, including portions held under leases, have been made based on such estimates, the guidelines of the NRC, and the extended PVNGS license periods. PVNGS Units 1 and 2 are included in PNM’s retail rates while PVNGS Unit 3 is currently excluded. PNM collects a provision for ultimate decommissioning of PVNGS Units 1 and 2 and its fossil-fueled generation facilities in its rates and recognizes a corresponding expense and liability for these amounts. See Note 15 and Note 16.
In connection with both the SJGS coal agreement and the Four Corners fuel agreement, the owners are required to reimburse the mining companies for the cost of contemporaneous reclamation, as well as the costs for final reclamation of the coal mines. The reclamation costs are based on periodic site-specific studies that estimate the costs to be incurred in the future and are dependent upon numerous assumptions, including estimates of future reclamation costs at current price levels, inflation rates, and discount rates. PNM considers the contemporaneous reclamation costs part of the cost of its delivered coal costs. See Note 16 for a discussion of the final reclamation costs.
Environmental Costs
The normal operations of the Company involve activities and substances that expose the Company to potential liabilities under laws and regulations protecting the environment. Liabilities under these laws and regulations can be material and in some instances may be imposed without regard to fault, or may be imposed for past acts, even though the past acts may have been lawful at the time they occurred.
The Company records its environmental liabilities when site assessments or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. The Company reviews its sites and measures the liability by assessing a range of reasonably likely costs for each identified site using currently available information and the probable level of involvement and financial condition of other potentially responsible parties. These estimates are based on assumptions regarding the costs for site investigations, remediation, operations and maintenance, monitoring, and site closure. The ultimate cost to clean up the Company’s identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process. Amounts recorded for environmental expense in the years ended December 31, 2014 , 2013 , and 2012 , as well as the amounts of environmental liabilities at December 31, 2014 and 2013 were insignificant.
Pension and Other Postretirement Benefits
See Note 12 for a discussion of pension and postretirement benefits expense, including a discussion of the actuarial assumptions.
Stock-Based Compensation
See Note 13 for a discussion of stock-based compensation expense.
Income Taxes
Income taxes are recognized using the asset and liability method of accounting for income taxes. Deferred tax assets and liabilities are recognized for the estimated future tax consequences attributable to differences between the financial statement carrying value of existing assets and liabilities and their respective tax basis. Current NMPRC, FERC, and PUCT approved rates include the tax effects of the majority of these differences. GAAP requires that rate-regulated enterprises record deferred income taxes for temporary differences accorded flow-through treatment at the direction of a regulatory commission. The resulting deferred tax assets and liabilities are recorded at the expected cash flow to be reflected in future rates. Because the NMPRC, FERC, and

B- 37

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

the PUCT have consistently permitted the recovery of tax effects previously flowed-through earnings, the Company has established regulatory liabilities and assets offsetting such deferred tax assets and liabilities. The Company recognizes only the impact of tax positions that, based on their merits, are more likely than not to be sustained upon an IRS audit. The Company defers investment tax credits related to rate regulated assets and amortizes them over the estimated useful lives of those assets. See Note 11.

The Company makes an estimate of its anticipated effective tax rate for the year as of the end of each quarterly period within its fiscal year. Year-to-date income tax expense is then calculated by applying the anticipated annual effective tax rate to year-to-date earnings before taxes, which includes the earnings attributable to the Valencia non-controlling interest. GAAP also provides that certain unusual or infrequently occurring items, as well as adjustments due to enactment of new tax laws, be excluded from the estimated annual effective tax rate calculation.
Excise Taxes

The Company pays certain fees or taxes which are either considered to be an excise tax or similar to an excise tax. Substantially all of these taxes are recorded on a net basis in the Consolidated Statements of Earnings.

New Accounting Pronouncements

Information concerning recently issued accounting pronouncements that have not been adopted by the Company is presented below.
Accounting Standards Update 2014-09 Revenue from Contracts with Customers (Topic 606)
On May 28, 2014, the FASB issued ASU No. 2014-09. The core principle of the guidance is that an entity should recognize revenue to depict the transfer of promised goods or services to customers in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods or services. The new standard will replace most existing revenue recognition guidance in GAAP when it becomes effective. The new standard is effective for the Company beginning on January 1, 2017. Early adoption is not permitted. The standard permits the use of either the retrospective or cumulative effect transition method. The Company is analyzing the impacts this new standard will have on its consolidated financial statements and related disclosures. The Company has not yet selected a transition method nor has it determined the effect of the standard on its ongoing financial reporting.

Accounting Standards Update 2014-15 Presentation of Financial Statements Going Concern (Subtopic 205-40): Disclosure of Uncertainties about an Entity’s Ability to Continue as a Going Concern

On August 27, 2014, the FASB issued ASU No. 2014-15, which requires management to evaluate whether there is substantial doubt about a company’s ability to continue as a going concern in connection with the preparation of financial statements for each annual and interim reporting period. Disclosure requirements associated with management’s evaluation are also outlined in the new guidance. The new standard is effective for the Company for reporting periods ending after December 15, 2016, with early adoption permitted. The Company is in the process of analyzing the impacts of this new standard.
 
(2)
Segment Information
The following segment presentation is based on the methodology that management uses for making operating decisions and assessing performance of its various business activities. A reconciliation of the segment presentation to the GAAP financial statements is provided.
PNM
PNM includes the retail electric utility operations of PNM that are subject to traditional rate regulation by the NMPRC. PNM provides integrated electricity services that include the generation, transmission, and distribution of electricity for retail electric customers in New Mexico. PNM also includes the generation and sale of electricity into the wholesale market, as well as providing transmission services to third parties. The sale of electricity includes the asset optimization of PNM’s jurisdictional assets as well as the capacity excluded from retail rates. FERC has jurisdiction over wholesale and transmission rates.

B- 38

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

TNMP
TNMP is an electric utility providing regulated transmission and distribution services in Texas under the TECA. TNMP’s operations are subject to traditional rate regulation by the PUCT.
Corporate and Other
The Corporate and Other segment includes PNMR holding company activities, primarily related to corporate level debt and PNMR Services Company.

The following tables present summarized financial information for PNMR by segment. PNM and TNMP each operate in only one segment. Therefore, tabular segment information is not presented for PNM and TNMP.
PNMR SEGMENT INFORMATION
 
2014
PNM
 
TNMP
 
Corporate
and Other
 
Consolidated
 
(In thousands)
Electric operating revenues
$
1,147,914

 
$
287,939

 
$

 
$
1,435,853

Cost of energy
403,626

 
67,930

 

 
471,556

Margin
744,288

 
220,009

 

 
964,297

Other operating expenses
422,051

 
84,365

 
(14,450
)
 
491,966

Depreciation and amortization
109,524

 
50,056

 
13,054

 
172,634

Operating income
212,713

 
85,588

 
1,396

 
299,697

Interest income
8,557

 

 
(74
)
 
8,483

Other income (deductions)
12,258

 
2,138

 
(2,302
)
 
12,094

Interest charges
(79,442
)
 
(27,396
)
 
(12,789
)
 
(119,627
)
Segment earnings (loss) before income taxes
154,086

 
60,330

 
(13,769
)
 
200,647

Income taxes (benefit)
52,633

 
22,523

 
(5,418
)
 
69,738

Segment earnings (loss)
101,453

 
37,807

 
(8,351
)
 
130,909

Valencia non-controlling interest
(14,127
)
 

 

 
(14,127
)
Subsidiary preferred stock dividends
(528
)
 

 

 
(528
)
Segment earnings (loss) attributable to PNMR
$
86,798

 
$
37,807

 
$
(8,351
)
 
$
116,254

 
 
 
 
 
 
 
 
Gross property additions
$
316,800

 
$
127,191

 
$
16,667

 
$
460,658

At December 31, 2014:
 
 
 
 
 
 
 
Total Assets
$
4,473,652

 
$
1,240,241

 
$
115,432

 
$
5,829,325

Goodwill
$
51,632

 
$
226,665

 
$

 
$
278,297


B- 39

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

2013
PNM
 
TNMP
 
Corporate
and Other
 
Consolidated
 
 
 
 
 
 
 
 
Electric operating revenues
$
1,116,312

 
$
271,611

 
$

 
$
1,387,923

Cost of energy
374,710

 
57,606

 

 
432,316

Margin
741,602

 
214,005

 

 
955,607

Other operating expenses
428,591

 
91,601

 
(18,308
)
 
501,884

Depreciation and amortization
103,826

 
50,219

 
12,836

 
166,881

Operating income
209,185

 
72,185

 
5,472

 
286,842

Interest income
10,182

 

 
(139
)
 
10,043

Other income (deductions)
11,288

 
1,919

 
(13,575
)
 
(368
)
Interest charges
(79,175
)
 
(27,393
)
 
(14,880
)
 
(121,448
)
Segment earnings (loss) before income taxes
151,480

 
46,711

 
(23,122
)
 
175,069

Income taxes (benefit)
48,804

 
17,621

 
(6,912
)
 
59,513

Segment earnings (loss)
102,676

 
29,090

 
(16,210
)
 
115,556

Valencia non-controlling interest
(14,521
)
 

 

 
(14,521
)
Subsidiary preferred stock dividends
(528
)
 

 

 
(528
)
Segment earnings (loss) attributable to PNMR
$
87,627

 
$
29,090

 
$
(16,210
)
 
$
100,507

 
 
 
 
 
 
 
 
Gross property additions
$
239,906

 
$
89,117

 
$
19,016

 
$
348,039

At December 31, 2013:
 
 
 
 
 
 
 
Total Assets
$
4,227,616

 
$
1,162,431

 
$
110,163

 
$
5,500,210

Goodwill
$
51,632

 
$
226,665

 
$

 
$
278,297



B- 40

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

2012
PNM
 
TNMP
 
Corporate
and Other
 
Consolidated
 
 
 
 
 
 
 
 
Electric operating revenues
$
1,092,264

 
$
250,140

 
$
(1
)
 
$
1,342,403

Cost of energy
353,649

 
46,201

 

 
399,850

Margin
738,615

 
203,939

 
(1
)
 
942,553

Other operating expenses
435,442

 
87,079

 
(17,862
)
 
504,659

Depreciation and amortization
97,291

 
49,340

 
17,542

 
164,173

Operating income
205,882

 
67,520

 
319

 
273,721

Interest income
13,243

 
1

 
(172
)
 
13,072

Gain on sale of First Choice

 

 
1,012

 
1,012

Other income (deductions)
13,290

 
2,739

 
(7,954
)
 
8,075

Interest charges
(76,101
)
 
(28,161
)
 
(16,583
)
 
(120,845
)
Segment earnings (loss) before income taxes
156,314

 
42,099

 
(23,378
)
 
175,035

Income taxes (benefit)
50,713

 
15,352

 
(11,155
)
 
54,910

Segment earnings (loss)
105,601

 
26,747

 
(12,223
)
 
120,125

Valencia non-controlling interest
(14,050
)
 

 

 
(14,050
)
Subsidiary preferred stock dividends
(528
)
 

 

 
(528
)
Segment earnings (loss) attributable to PNMR
$
91,023

 
$
26,747

 
$
(12,223
)
 
$
105,547

 
 
 
 
 
 
 
 
Gross property additions
$
196,800

 
$
92,973

 
$
19,136

 
$
308,909

At December 31, 2012:
 
 
 
 
 
 
 
Total Assets
$
4,163,907

 
$
1,086,229

 
$
122,447

 
$
5,372,583

Goodwill
$
51,632

 
$
226,665

 
$

 
$
278,297

Major Customers
No individual customer accounted for more than 10% of the electric operating revenues of PNMR or PNM. The acquiror of First Choice, including the former First Choice operations, accounted for 15% and 17% of TNMP’s electric operating revenues in 2014 and 2013 . Two other unaffiliated customers of TNMP accounted for revenues of 15% in 2014 , 16% in 2013 , and 17% in 2012 and 11% in 2014 , 10% in 2013 , and 10% in 2012 .
 
(3)
Sale of First Choice
PNMR completed the sale of First Choice, which was also a subsidiary of TNP, on November 1, 2011. First Choice was a competitive REP operating in Texas. The amount received was subject to adjustment based on the actual amounts of the components of working capital at October 31, 2011. In 2012, PNMR received an additional amount and recorded a pre-tax gain of $ 1.0 million , which is included in Other income in the Consolidated Statements of Earnings. PNMR Services Company continued to provide certain services at cost to First Choice for a transitional period through August 1, 2012. Because PNMR continues to have direct cash flows resulting from transmission and distribution services provided by TNMP to First Choice, First Choice is not reflected as discontinued operations.

(4)
    Regulatory Assets and Liabilities
The operations of PNM and TNMP are regulated by the NMPRC, PUCT, and FERC and the provisions of GAAP for rate-regulated enterprises are applied to its regulated operations. Regulatory assets represent probable future recovery of previously incurred costs that will be collected from customers through the ratemaking process. Regulatory liabilities represent probable future reductions in revenues associated with amounts that are to be credited to customers through the ratemaking process. Regulatory assets and liabilities reflected in the Consolidated Balance Sheets are presented below.  

B- 41

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

PNM
 
 
December 31,
 
2014
 
2013
Assets:
(In thousands)
Current:
 
 
 
FPPAC
$
43,980

 
$
19,394

Non-Current:
 
 
 
Coal mine reclamation costs
34,224

 
40,144

Deferred income taxes
63,645

 
61,850

Loss on reacquired debt
25,439

 
27,490

Pension and OPEB
222,545

 
206,691

FPPAC

 
25,386

Renewable energy costs
5,263

 
13,311

Other
5,929

 
9,345

 
357,045

 
384,217

Total regulatory assets
$
401,025

 
$
403,611

Liabilities:
 
 
 
Current:
 
 
 
Other
$
(1,703
)
 
$
(1,081
)
Non-Current:
 
 
 
Cost of removal
(277,148
)
 
(266,075
)
Deferred income taxes
(75,941
)
 
(80,495
)
AROs
(35,834
)
 
(37,567
)
Renewable energy tax benefits
(24,854
)
 
(26,011
)
Other
(11,704
)
 
(4,463
)
 
(425,481
)
 
(414,611
)
Total regulatory liabilities
$
(427,184
)
 
$
(415,692
)

B- 42

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

TNMP
 
December 31,
 
2014
 
2013
Assets:
(In thousands)
Current:
 
 
 
Transmission cost recovery factor
$
2,482

 
$
4,250

Other
1,393

 
772

 
3,875

 
5,022

Non-Current:
 
 
 
CTC, including carrying charges
55,292

 
63,606

Deferred income taxes
10,556

 
10,868

Pension
23,803

 
19,938

Loss on reacquired debt
36,703

 
38,616

AMS retirement costs
6,453

 
5,083

Other
1,155

 
1,627

 
133,962

 
139,738

Total regulatory assets
$
137,837

 
$
144,760

Liabilities:
 
 
 
Non-Current:
 
 
 
Cost of removal
$
(29,391
)
 
$
(30,863
)
Deferred income taxes
(3,923
)
 
(4,563
)
AMS surcharge
(5,227
)
 
(7,251
)
OPEB
(2,121
)
 
(3,361
)
Total regulatory liabilities
$
(40,662
)
 
$
(46,038
)

The Company’s regulatory assets and regulatory liabilities are reflected in rates charged to customers or have been addressed in a regulatory proceeding. The Company does not receive or pay a rate of return on the following regulatory assets and regulatory liabilities (and their remaining amortization periods): coal mine reclamation costs (through 2020); deferred income taxes (over the remaining life of the taxable item, up to the remaining life of utility plant); pension and OPEB costs (through 2033); and AROs (to be determined in a future regulatory proceeding). In addition, TNMP does not receive a return on substantially all of its loss on reacquired debt (through 2043).
The Company is permitted, under rate regulation, to accrue and record a regulatory liability for the estimated cost of removal and salvage associated with certain of its assets through depreciation expense. Under GAAP, actuarial losses and prior service costs for pension plans are required to be recorded in AOCI; however, to the extent authorized for recovery through the regulatory process these amounts are recorded as regulatory assets or liabilities. Based on prior regulatory approvals, the amortization of these amounts will be included in the Company’s rates.
Based on a current evaluation of the various factors and conditions that are expected to impact future cost recovery, the Company believes that future recovery of its regulatory assets are probable.

(5)
Stockholders’ Equity
Common Stock and Equity Contributions
PNMR, PNM, and TNMP did not issue any common stock during the three year period ended December 31, 2014 . PNMR funded a cash equity contribution of $13.8 million to TNMP in 2013. PNMR offers shares of PNMR common stock through the PNMR Direct Plan. PNMR utilizes shares of its common stock purchased on the open market, by an independent agent, rather than issuing additional shares to satisfy subscriptions under the PNMR Direct Plan. The shares of PNMR common stock utilized in the PNMR Direct Plan are offered under a SEC shelf registration statement that expires in August 2015.

B- 43

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Dividends on Common Stock
The declaration of common dividends by PNMR is dependent upon a number of factors, including the ability of PNMR’s subsidiaries to pay dividends. PNMR’s primary sources of dividends are its operating subsidiaries.
PNM declared and paid cash dividends to PNMR of $30.3 million , $155.0 million , and $34.4 million in 2014 , 2013 , and 2012 . TNMP paid cash dividends to PNMR of $16.3 million , $3.7 million , and $26.0 million in 2014 , 2013 , and 2012 . TNMP recorded dividends paid in 2012 as reductions of paid-in-capital.
The NMPRC has placed certain restrictions on the ability of PNM to pay dividends to PNMR, including the restriction that PNM cannot pay dividends that cause its debt rating to fall below investment grade. The NMPRC provisions allow PNM to pay dividends from equity contributions previously made by PNMR and current earnings, determined on a rolling four quarter basis, without prior NMPRC approval. The Federal Power Act also imposes certain restrictions on dividends by public utilities. Each of the PNMR Revolving Credit Facility, PNMR Term Loan Agreement, PNM Revolving Credit Facility, PNM New Mexico Credit Facility, PNM 2014 Term Loan Agreement, PNM Multi-draw Term Loan, and TNMP Revolving Credit Facility contain a covenant requiring the maintenance of debt-to-capital ratios of not more than 65% , which could limit amounts of dividends that could be paid. For PNMR and PNM, these ratios reflect the present value of payments under the PVNGS leases as debt. PNM also has other financial covenants that limit the transfer of assets, through dividends or other means, including a requirement to obtain approval of certain financial counterparties to transfer more than five percent of PNM’s assets. As of December 31, 2014 , none of the numerical tests would restrict the payment of dividends from the retained earnings of PNMR, PNM, or TNMP, except that PNM would not be able to distribute amounts in excess of approximately $223 million and TNMP would not be able to distribute amounts in excess of approximately $203 million without approval of regulators or financial counterparties.
 
In addition, the ability of PNMR to declare dividends is dependent upon the extent to which cash flows will support dividends, the availability of retained earnings, financial circumstances and performance, current and future regulatory decisions, Congressional and legislative acts, and economic conditions. Conditions imposed by the NMPRC or PUCT, future growth plans and related capital requirements, and business considerations may also affect PNMR’s ability to pay dividends.
Preferred Stock
PNM’s cumulative preferred shares outstanding bear dividends at 4.58%  per annum. PNM preferred stock does not have a mandatory redemption requirement but may be redeemed, at PNM’s option, at 102% of the stated value plus accrued dividends. The holders of the PNM preferred stock are entitled to payment before the holders of common stock in the event of any liquidation or dissolution or distribution of assets of PNM. In addition, PNM’s preferred stock is not entitled to a sinking fund and cannot be converted into any other class of stock of PNM.
PNMR and TNMP have no preferred stock outstanding. The authorized shares of PNMR and TNMP preferred stock are 10 million shares and 1 million shares.

(6)
Financing
Financing Activities
PNMR

In the year ended December 31, 2013, PNMR purchased $23.8 million aggregate principal amount of its outstanding 9.25% Senior Unsecured Notes, Series A, due 2015, through several open-market purchases, for $26.9 million plus accrued and unpaid interest. PNMR recognized losses of $3.3 million on these purchases, including transaction costs and write-off of the proportionate amount of the deferred costs of the original issuance of the notes, which are included in Other deductions on the Consolidated Statements of Earnings.

On December 14, 2012, PNMR entered into a $100.0 million Term Loan Agreement (as amended and restated, the “PNMR Term Loan Agreement”) among PNMR, the lenders identified therein, and JPMorgan Chase Bank, N.A., as Administrative Agent. On December 27, 2012, PNMR borrowed $100.0 million under the agreement and used the funds to repay $100.0 million in borrowings made under the PNMR Revolving Credit Facility. On December 27, 2013, PNMR entered into an agreement that amended and restated the PNMR Term Loan Agreement extending the maturity date to December 26, 2014 from December 27,

B- 44

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

2013. On December 22, 2014, PNMR entered into another agreement that amends and restates the PNMR Term Loan Agreement extending the maturity date to December 21, 2015. The PNMR Term Loan Agreement includes customary covenants, including requirements to not exceed a maximum consolidated debt-to-consolidated capitalization ratio, and customary events of default. The PNMR Term Loan Agreement has a cross default provision and a change of control provision.
PNM
In September 2012, PNM participated in the issuance of $20.0 million of new PCRBs by the City of Farmington, New Mexico, which bear interest at 2.54% and mature September 1, 2042, with a mandatory tender on June 1, 2017. The new PCRBs refunded a $20.0 million series of PCRBs, which bore interest at 5.15% and matured in 2037, that were redeemed at par and retired.
On April 22, 2013, PNM entered into a $75.0 million Term Loan Agreement (the “PNM 2013 Term Loan Agreement”) among PNM, the lenders identified therein, and Union Bank, N.A., as Administrative Agent. Funding of the PNM 2013 Term Loan Agreement occurred on April 22, 2013, at which time the funds were used to repay $75.0 million in borrowings made under the PNM Revolving Credit Facility.

On March 5, 2014, PNM entered into a new $175.0 million Term Loan Agreement (the “PNM 2014 Term Loan Agreement”) among PNM and The Bank of Tokyo-Mitsubishi UFJ, Ltd., as Lender and Administrative Agent. On March 5, 2014, PNM used a portion of the funds borrowed under the PNM 2014 Term Loan Agreement to repay all amounts outstanding under the PNM 2013 Term Loan Agreement. PNM also used the funds to repay other short-term amounts outstanding. The PNM 2013 Term Loan Agreement would otherwise have terminated on October 21, 2014. There were no prepayment penalties paid in connection with the termination of the PNM 2013 Term Loan Agreement. The PNM 2014 Term Loan Agreement bears interest at a variable rate, which was 1.11% at December 31, 2014, must be repaid on or before September 4, 2015, and is reflected in current maturities of long-term debt on the Consolidated Balance Sheets. The PNM 2014 Term Loan Agreement includes customary covenants, including requirements to not exceed a maximum consolidated debt-to-capital ratio and customary events of default. The PNM 2014 Term Loan Agreement has a cross default provision and a change of control provision.

On December 22, 2014, PNM entered into a new multi-draw term loan facility (the “PNM Multi-draw Term Loan”) with JPMorgan Chase Bank, N.A., as Lender and Administrative Agent. The $125.0 million facility has a maturity date of June 21, 2016. At December 31, 2014, outstanding borrowings under the PNM Multi-draw Term Loan were $100.0 million and remaining capacity was $25.0 million . The PNM Multi-draw Term Loan bears interest at a variable rate, which was 0.75% at December 31, 2014. The PNM Multi-draw Term Loan includes customary covenants, including requirements to not exceed a maximum consolidated debt-to-consolidated capitalization ratio and customary events of default. The PNM Multi-draw Term Loan Agreement has a cross default provision and a change of control provision.
PNM has a shelf registration statement for the issuance of up to $500.0 million of senior unsecured notes that will expire in May 2017.
TNMP
On September 30, 2011, TNMP entered into the TNMP 2011 Term Loan Agreement and borrowed $50.0 million under it. Borrowings under the TNMP 2011 Term Loan Agreement were due by June 30, 2014. TNMP entered into hedging agreements whereby it effectively established fixed interest rates for such borrowing over the life of the debt. This hedge was accounted for as a cash-flow hedge and had a fair value loss of $0.2 million at December 31, 2013, using Level 2 inputs under GAAP determined using forward LIBOR curves under the mid-market convention to discount cash flows over the remaining term of the swap agreements.
On March 6, 2013, TNMP commenced an offer to exchange any and all of TNMP’s $265.5 million aggregate principal amount outstanding 9.50% First Mortgage Bonds, due 2019, Series 2009A, for a new series of 6.95% First Mortgage Bonds, due 2043, Series 2013A, and up to $140 in cash for each $1,000 of bonds exchanged. Settlement of the exchange offer occurred on April 3, 2013. Upon settlement, TNMP issued $93.2 million of 6.95% First Mortgage Bonds and paid an aggregate of $13.0 million in cash in exchange for $93.2 million of 9.50% First Mortgage Bonds, in addition to payment of accrued and unpaid interest on the exchanged bonds. The exchange resulted in a premium on the 6.95% First Mortgage Bonds reflecting the contractual interest rate being in excess of the market rate of interest on the date of the exchange. The premium amounted to $23.2 million , after reduction for the cash paid in the exchange. A regulatory asset was recorded offsetting the premium, including the cash consideration paid in the exchange.

B- 45

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

On December 9, 2013, TNMP entered into an agreement (the “TNMP 2013 Bond Purchase Agreement”), which provided that TNMP would issue $80.0 million aggregate principal amount of 4.03% first mortgage bonds, due 2024 (the “Series 2014A Bonds”) on or about June 27, 2014, subject to satisfaction of certain conditions. TNMP issued the Series 2014A Bonds on June 27, 2014. TNMP used $50.0 million of the proceeds to repay the full outstanding amount of the TNMP 2011 Term Loan Agreement and used the remaining $30.0 million of proceeds to reduce short-term debt. In accordance with GAAP, borrowings under the TNMP 2011 Term Loan Agreement were reflected as being long-term in the Consolidated Balance Sheet at December 31, 2013 since the TNMP 2013 Bond Purchase Agreement demonstrated TNMP’s ability and intent to re-finance the TNMP 2011 Term Loan Agreement on a long-term basis.
Short-term Debt
The PNMR Revolving Credit Facility has a financing capacity of $300.0 million and the PNM Revolving Credit Facility has a financing capacity of $400.0 million . In December 2014, both of these facilities were amended to extend their maturity from October 31, 2018 to October 31, 2019. In addition, the amendments provide for an additional one -year extension option for each facility, subject to approval by a majority of the lenders. The TNMP Revolving Credit Facility is a $75.0 million revolving credit facility secured by $75.0 million aggregate principal amount of TNMP first mortgage bonds. The TNMP Revolving Credit Facility matures on September 18, 2018. Each of these facilities contains one financial covenant that requires the maintenance of debt-to-capital ratios of less than or equal to 65% .  For PNMR and PNM, these ratios reflect the present value of payments under the PVNGS leases as debt.
On January 8, 2014, PNM entered into a new $50.0 million unsecured revolving credit facility (the “PNM New Mexico Credit Facility”) by and among PNM, the lenders identified therein, U.S. Bank National Association, as Administrative Agent, and BOKF, NA dba Bank of Albuquerque, as Syndication Agent. The nine participating lenders are all banks that have a significant presence in New Mexico and PNM’s service territory or are headquartered in New Mexico. The PNM New Mexico Credit Facility expires on January 8, 2018 and contains covenants and conditions similar to those in the PNM Revolving Credit Facility.
At December 31, 2014 , interest rates on outstanding borrowings were 1.02% for the PNMR Term Loan Agreement (discussed under Financing Activities above), 1.67% for the PNMR Revolving Credit Facility, and 1.17% for the TNMP Revolving Credit Facility. The PNM Revolving Credit Facility and the PNM New Mexico Credit Facility had no borrowings outstanding at December 31, 2014 . Short-term debt outstanding consists of:
 
 
December 31,
Short-term Debt
 
2014
 
2013
 
 
(In thousands)
PNM:
 
 
 
 
Revolving Credit Facility
 
$

 
$
49,200

PNM New Mexico Credit Facility
 

 

TNMP Revolving Credit Facility
 
5,000

 

PNMR
 
 
 
 
Revolving Credit Facility
 
600

 

PNMR Term Loan Agreement
 
100,000

 
100,000

 
 
$
105,600

 
$
149,200

In addition to the above borrowings, PNMR, PNM, and TNMP had letters of credit outstanding of $7.7 million , $3.2 million , and $0.1 million at December 31, 2014 that reduce the available capacity under their respective revolving credit facilities.

At February 20, 2015 , PNMR, PNM, and TNMP had $291.5 million , $386.8 million , and $54.9 million of availability under their respective revolving credit facilities, including reductions of availability due to outstanding letters of credit, and PNM had $35.0 million of availability under the PNM New Mexico Credit Facility. Total availability at February 20, 2015 , on a consolidated basis, was $768.2 million for PNMR. At February 20, 2015 , PNMR had invested cash of $1.9 million , PNM had invested cash of $42.5 million , and TNMP had no invested cash. The above availability does not include remaining capacity of $25.0 million available under the PNM Multi-draw Term Loan at February 20, 2015.

B- 46

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Long-Term Debt
Information concerning long-term debt outstanding is as follows:
 
 
December 31,
Long-term Debt
 
2014
 
2013
 
 
(In thousands)
PNM Debt
 
 
 
 
Senior Unsecured Notes, Pollution Control Revenue Bonds:
 
 
 
 
4.875% due 2033
 
$
146,000

 
$
146,000

6.25% due 2038
 
36,000

 
36,000

4.75% due 2040, mandatory tender at June 1, 2017
 
37,000

 
37,000

5.20% due 2040, mandatory tender at June 1, 2020
 
40,045

 
40,045

5.90% due 2040
 
255,000

 
255,000

6.25% due 2040
 
11,500

 
11,500

2.54% due 2042, mandatory tender at June 1, 2017
 
20,000

 
20,000

4.00% due 2043, mandatory tender at June 1, 2015
 
39,300

 
39,300

5.20% due 2043, mandatory tender at June 1, 2020
 
21,000

 
21,000

Senior Unsecured Notes:
 
 
 
 
7.95% due 2018
 
350,000

 
350,000

7.50% due 2018
 
100,025

 
100,025

5.35% due 2021
 
160,000

 
160,000

PNM Term Loan Agreement due 2014
 

 
75,000

PNM Term Loan Agreement due 2015
 
175,000

 

PNM Multi-draw Term Loan due 2016
 
100,000

 

Unamortized premiums (discounts)
 
(213
)
 
(252
)
 
 
1,490,657

 
1,290,618

Less current maturities
 
214,300

 
75,000

 
 
1,276,357

 
1,215,618

TNMP Debt
 
 
 
 
First Mortgage Bonds:
 
 
 
 
2011 Term Loan Agreement, due 2014
 

 
50,000

9.50% due 2019, Series 2009A
 
172,302

 
172,302

6.95% due 2043, Series 2013A
 
93,198

 
93,198

4.03% due 2024, Series 2014A

 
80,000

 

Unamortized premiums (discounts)
 
20,167

 
20,536

 
 
365,667

 
336,036

Less current maturities
 

 

 
 
365,667

 
336,036

PNMR Debt
 
 
 
 
Senior unsecured notes, 9.25% due 2015
 
118,766

 
118,766

Less current maturities
 
118,766

 

 
 

 
118,766

Total Consolidated PNMR Debt
 
1,975,090

 
1,745,420

Less current maturities
 
333,066

 
75,000

 
 
$
1,642,024

 
$
1,670,420


B- 47

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Reflecting mandatory tender dates, long-term debt matures as follows:
 
PNMR
 
PNM
 
TNMP
 
PNMR Consolidated
 
(In thousands)
2015
$
118,766

 
$
214,300

 
$

 
$
333,066

2016

 
100,000

 

 
100,000

2017

 
57,000

 

 
57,000

2018

 
450,025

 

 
450,025

2019

 

 
172,302

 
172,302

Thereafter

 
669,545

 
173,198

 
842,743

   Total
$
118,766

 
$
1,490,870

 
$
345,500

 
$
1,955,136

Borrowing Arrangements Between PNMR and its Subsidiaries
PNMR has one-year intercompany loan agreements with its subsidiaries. Individual subsidiary loan agreements vary in amount up to $100.0 million and have either reciprocal or non-reciprocal terms. Interest charged to the subsidiaries is equivalent to interest paid by PNMR on its short-term borrowings. As of December 31, 2014 and 2013 , PNM had outstanding borrowings of zero and $32.5 million and TNMP had outstanding borrowings of $22.7 million and $29.4 million from PNMR. At February 20, 2015 , PNM and TNMP had borrowings of zero and $17.3 million from PNMR.

(7)
Lease Commitments
The Company leases office buildings, vehicles, and other equipment under operating leases. In addition, PNM leases interests in Units 1 and 2 of PVNGS and an interest in the EIP transmission line. Many of PNM’s electric transmission and distribution facilities are located on lands that require the grant of rights-of-way from governmental entities, Native American tribes, or private parties. PNM has completed several renewals of rights-of-way, the largest of which is a renewal with the Navajo Nation, and has no significant rights-of-way that will expire within the next five years. PNM is obligated to pay the Navajo Nation annual payments of $6.0 million , subject to adjustment each year based on the Consumer Price Index, through 2029. All of the Company’s leases, including the Navajo Nation rights-of-way agreement, are accounted for as operating leases.

The PVNGS leases were entered into in 1985 and 1986 and were scheduled to expire on January 15, 2015 for the four Unit 1 leases and January 15, 2016 for the four Unit 2 leases. Each of the leases provided PNM with an option to purchase the leased assets at fair market value at the end of the leases, but PNM does not have a fixed price purchase option. In addition, the leases provided PNM with options to renew the leases at fixed rates set forth in each of the leases for two years beyond the termination of the original lease terms. The option periods on certain leases could be further extended for up to an additional six years (the “Maximum Option Period”) if the appraised remaining useful lives and fair value of the leased assets are greater than parameters set forth in the leases. The rental payments during the fixed renewal option periods would be 50% of the amounts during the original terms of the leases. Gross annual lease payments, before considering the impacts of amounts returned to PNM through ownership of the lessor notes, aggregate $33.0 million for the Unit 1 leases and $23.7 million for the Unit 2 leases. For leases that are extended, the leases provide PNM with the option to purchase the leased assets at fair market value at the end of the extended lease terms.

Each lease provided that no later than three years prior to the expiration of the lease, PNM was required to give notice to the lessor if it would “retain” the leased assets (but without specifying whether it would purchase the leased assets or extend the lease) or “return” the leased assets to the lessor. Furthermore, each lease provided that, if PNM gave notice to “retain” the leased assets, PNM was required to give notice as to which of the purchase or renewal options it would exercise no later than two years prior to the expiration of the lease. The election made under each of the leases was independent of the elections made under the other leases.

Following procedures set forth in the PVNGS leases, PNM notified each of the lessors under the Unit 1 leases that it would elect to renew those leases for the Maximum Option Period on the expiration date of the original leases. In addition, PNM notified

B- 48

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

the lessor under the one Unit 2 lease containing the Maximum Option Period provision that it would elect to renew that lease for the Maximum Option Period on the expiration date of the original lease. On December 11, 2013, PNM and each of the Unit 1 lessors entered into amendments to each of the Unit 1 leases setting forth the terms and conditions that will implement the extension of the term of the lease through the agreed upon Maximum Option Period expiring on January 15, 2023. Similarly, on March 18, 2014, PNM and the lessor under the one Unit 2 lease containing the Maximum Option Period provision entered into an amendment to that lease setting forth the terms and conditions that will implement the extension of the term of the lease through the agreed upon Maximum Option Period expiring January 15, 2024. The annual payments during the renewal periods aggregate $16.5 million for the PVNGS Unit 1 leases and $1.6 million for the Unit 2 lease. The table of future lease payments as of December 31, 2014 shown below includes payments during the renewal periods for those leases that will be extended at the end of their original terms.
For the three PVNGS Unit 2 leases which do not contain the Maximum Option Period provisions, PNM, following procedures set forth in the leases, notified each of the lessors that PNM would elect to purchase the assets underlying those leases on the expiration date of the original leases. On February 25, 2014, PNM and the lessor under one of the Unit 2 leases entered into a letter agreement that establishes that the purchase price, representing the fair market value, to be paid by PNM for the assets underlying that lease will be $78.1 million on January 15, 2016. This lease is for 31.25 MW of the entitlement from PVNGS Unit 2. The lease remains in existence and PNM will record the purchase at the termination of the lease on January 15, 2016.
On May 1, 2014, PNM and the trusts that are the lessors under the other two PVNGS Unit 2 leases signed a letter agreement that establishes a binding agreement regarding the purchase price, representing the fair market value, to be paid by PNM for the assets underlying those leases of $85.2 million on January 15, 2016. These leases are for 32.76 MW of the entitlement from PVNGS Unit 2. PNMR Development is also a party to the letter agreement, which constitutes a letter of intent providing PNMR Development with the option, subject to approval by the Board and negotiation of definitive documents, to acquire the entities that own the leased assets at any time from June 1, 2014 through January 14, 2016. The early purchase price would be equal to the January 15, 2016 purchase price discounted to the actual purchase date. The early purchase amount was $79.9 million on June 1, 2014, $81.8 million on December 31, 2014, and escalates to $85.2 million on January 14, 2016. The consideration paid to the lessor on an early purchase would include an additional amount equal to the discounted value of the lessors’ equity return portion of the future lease payments. Such additional consideration was $5.8 million on June 1, 2014, $4.5 million on December 31, 2014, and declines to $1.2 million on January 14, 2016. PNMR and PNM are unable to predict whether or not the early purchase will occur.
Covenants in PNM’s PVNGS Units 1 and 2 lease agreements limit PNM’s ability, without consent of the owner participants in the lease transactions, (i) to enter into any merger or consolidation, or (ii) except in connection with normal dividend policy, to convey, transfer, lease or dividend more than 5% of its assets in any single transaction or series of related transactions. PNM is exposed to losses under the PVNGS lease arrangements upon the occurrence of certain events that PNM does not consider to be reasonably likely to occur. Under certain circumstances (for example, the NRC issuing specified violation orders with respect to PVNGS or the occurrence of specified nuclear events), PNM would be required to make specified payments to the equity participants, and take title to the leased interests. If such an event had occurred as of December 31, 2014 , PNM could have been required to pay the equity participants up to approximately $122.2 million on January 15, 2015 in addition to the scheduled lease payments due on January 15, 2015. In such event, PNM would record the acquired assets at the lower of their fair value or the aggregate of the amount paid and PNM’s carrying value of its investment in PVNGS lessor notes. Exercise of renewal options under the leases requires that amounts payable to equity participants under the circumstances described above would increase to the fair market value as of the renewal date. Reflecting the lease renewals that were effective on January 15, 2015, if such an event were to occur, amounts payable to equity participants under the circumstances described above would be up to $217.3 million on July 15, 2015 in addition to the scheduled lease payments due on July 15, 2015.
PNM owns 60% of the EIP and leases the other 40% , under a lease that expires on April 1, 2015. The lease provides PNM the option, with 24 months advance notice, of purchasing the leased assets at the end of the lease for fair market value, as well as options to renew the lease. On November 1, 2012, PNM and the lessor entered into a definitive agreement for PNM to exercise the option to purchase on April 1, 2015 the leased capacity at fair market value, which the parties agreed would be $7.7 million . The lease remains in existence and PNM will record the purchase at the termination of the lease on April 1, 2015. The definitive agreement sets forth the terms and conditions under which PNM would also assume responsibility for scheduling long-term transmission service on the leased capacity.

PNMR leases a building that was used as part of its corporate headquarters, as well as housing certain support functions for the utility operations of PNM and TNMP. The lease expires on November 30, 2015 and provides for annual rents of $1.9

B- 49

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

million , which are included in the tables below. PNMR is also obligated to pay taxes, insurance, and utilities applicable to the building. In November 2011, PNMR notified the lessor of its intent to vacate the building by the end of 2012 and made a settlement offer to terminate the lease. A termination agreement was not reached with the lessor. As of December 31, 2012, PNMR completed the abandonment of this building, as well as the partial abandonment of another leased building. In accordance with GAAP, PNMR recorded an abandonment expense of $7.4 million at December 31, 2012. PNM was allocated $6.2 million and TNMP was allocated $1.2 million of the abandonment expense for the period ended December 31, 2012, which is reflected as administrative and general expense.

Operating lease expense, including the PVNGS and EIP leases, was:
 
PNMR
 
PNM
 
TNMP
 
(In thousands)
2014
$
82,756

 
$
76,745

 
$
3,932

2013
$
82,882

 
$
78,306

 
$
2,663

2012
$
84,794

 
$
78,483

 
$
2,871


As discussed under Investments in Note 1, the PVNGS Capital Trust, which is consolidated by PNM, acquired the lessor notes that were issued by the PVNGS lessors. Future minimum operating lease payments at December 31, 2014 shown below have been reduced by payments on the PVNGS lessor notes of $24.0 million in 2015 and $9.0 million in 2016 that will be returned in cash to PNM:

 
PNMR
 
PNM
 
TNMP
 
(In thousands)
2015
$
36,350

 
$
33,144

 
$
1,186

2016
28,892

 
27,986

 
636

2017
25,185

 
24,907

 

2018
25,194

 
24,907

 

2019
25,203

 
24,907

 

Later years
134,068

 
133,842

 

   Total minimum lease payments
$
274,892

 
$
269,693

 
$
1,822


 
(8)
Fair Value of Derivative and Other Financial Instruments
Energy Related Derivative Contracts
Overview
The primary objective for the use of derivative instruments, including energy contracts, options, and futures, is to manage price risk associated with forecasted purchases of energy and fuel used to generate electricity, as well as managing anticipated generation capacity in excess of forecasted demand from existing customers. The Company’s energy related derivative contracts manage commodity risk. PNM is required to meet the demand and energy needs of its retail and firm-requirements wholesale customers. PNM is exposed to market risk for its share of PVNGS Unit 3. PNM’s operations are managed primarily through a net asset-backed strategy, whereby PNM’s aggregate net open forward contract position is covered by its forecasted excess generation capabilities or market purchases. PNM could be exposed to market risk if its generation capabilities were to be disrupted or if its load requirements were to be greater than anticipated. If all or a portion of load requirements were required to be covered as a result of such unexpected situations, commitments would have to be met through market purchases.
Commodity Risk
Marketing and procurement of energy often involve market risks associated with managing energy commodities and establishing open positions in the energy markets, primarily on a short-term basis. PNM routinely enters into various derivative

B- 50

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

instruments such as forward contracts, option agreements, and price basis swap agreements to economically hedge price and volume risk on power commitments and fuel requirements and to minimize the effect of market fluctuations in wholesale portfolios. PNM monitors the market risk of its commodity contracts using VaR calculations to maintain total exposure within management-prescribed limits in accordance with approved risk and credit policies.
Accounting for Derivatives
Under derivative accounting and related rules for energy contracts, the Company accounts for its various derivative instruments for the purchase and sale of energy based on the Company’s intent. During the years ended December 31, 2014 and 2013 , the Company was not hedging its exposure to the variability in future cash flows from commodity derivatives through designated cash flows hedges. The contracts recorded at fair value that do not qualify or are not designated for cash flow hedge accounting are classified as economic hedges. Economic hedges are defined as derivative instruments, including long-term power agreements, used to economically hedge generation assets, purchased power and fuel costs, and customer load requirements. Changes in the fair value of economic hedges are reflected in results of operations and are classified between operating revenues and cost of energy according to the intent of the hedge. The Company has no trading transactions.
Fair value is defined under GAAP as the price that would be received for an asset or paid to transfer a liability (an exit price) in the principal or most advantageous market for the asset or liability in an orderly transaction between market participants on the measurement date. Fair value is based on current market quotes as available and is supplemented by modeling techniques and assumptions made by the Company to the extent quoted market prices or volatilities are not available. External pricing input availability varies based on commodity location, market liquidity, and term of the agreement. Valuations of derivative assets and liabilities take into account nonperformance risk including the effect of counterparties’ and the Company’s credit risk. The Company regularly assesses the validity and availability of pricing data for its derivative transactions. Although the Company uses its best judgment in estimating the fair value of these instruments, there are inherent limitations in any estimation technique.
 
Commodity Derivatives
Commodity derivative instruments that are recorded at fair value, all of which are accounted for as economic hedges, are summarized as follows:  
 
Economic Hedges
 
December 31,
 
2014
 
2013
 
(In thousands)
PNM and PNMR
 
 
 
Current assets
$
11,232

 
$
4,064

Deferred charges

 
3,002

 
11,232

 
7,066

Current liabilities
(1,209
)
 
(2,699
)
Long-term liabilities
(477
)
 
(1,094
)
 
(1,686
)
 
(3,793
)
Net
$
9,546

 
$
3,273

Included in the above table are $3.0 million of current assets at December 31, 2014 and $3.0 million of current assets and $3.0 million of deferred charges at December 31, 2013 related to contracts, which were entered into in July 2013, for the sale of energy from PVNGS Unit 3 for 2014 and 2015 at market price plus a premium. Certain of PNM’s commodity derivative instruments in the above table are subject to master netting agreements whereby assets and liabilities could be offset in the settlement process. The Company does not offset fair value, cash collateral, and accrued payable or receivable amounts recognized for derivative instruments under master netting arrangements and the above table reflects the gross amounts of assets and liabilities. The amounts that could be offset under master netting agreements were immaterial at December 31, 2014 and 2013 .
At December 31, 2014 and 2013 , PNMR and PNM had no amounts recognized for the legal right to reclaim cash collateral. In addition, at December 31, 2014 and 2013 , amounts posted as cash collateral under margin arrangements were $3.8 million and

B- 51

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

$2.8 million for both PNMR and PNM. At December 31, 2014 and 2013 , obligations to return cash collateral were $0.2 million and $0.2 million for both PNMR and PNM. Cash collateral amounts are included in other current assets and other current liabilities on the Consolidated Balance Sheets.

PNM has a NMPRC approved hedging plan to manage fuel and purchased power costs related to customers covered by its FPPAC. The table above includes $0.4 million of current assets and $0.1 million of current liabilities at December 31, 2013 related to this plan. The offsets to these amounts are recorded as regulatory assets and liabilities on the Consolidated Balance Sheets. At December 31, 2014 , there were no hedges in place under this plan.
 
The following table presents the effect of mark-to-market commodity derivative instruments on earnings, excluding income tax effects. Commodity derivatives had no impact on OCI for the periods presented.
 
Economic
Hedges
 
Year Ended
December 31,
 
2014
 
2013
 
2012
 
(In thousands)
PNMR and PNM
 
 
 
 
 
Electric operating revenues
$
4,491

 
$
1,727

 
$
6,168

Cost of energy
593

 
1,109

 
(460
)
Total gain
$
5,084

 
$
2,836

 
$
5,708

Commodity contract volume positions are presented in MMBTU for gas related contracts and in MWh for power related contracts. The table below presents PNMR’s and PNM’s net buy (sell) volume positions:
 
Economic Hedges
 
MMBTU
 
MWh
December 31, 2014
 
 
 
PNMR and PNM
650,000

 
(1,919,000
)
December 31, 2013
 
 
 
PNMR and PNM
905,000

 
(3,343,783
)

In connection with managing its commodity risks, the Company enters into master agreements with certain counterparties. If the Company is in a net liability position under an agreement, some agreements provide that the counterparties can request collateral from the Company if the Company’s credit rating is downgraded; other agreements provide that the counterparty may request collateral to provide it with “adequate assurance” that the Company will perform; and others have no provision for collateral.
The table below presents information about the Company’s contingent requirements to provide collateral under commodity contracts having an objectively determinable collateral provision that are in net liability positions and are not fully collateralized with cash. Contractual liability represents commodity derivative contracts recorded at fair value on the balance sheet, determined on an individual contract basis without offsetting amounts for individual contracts that are in an asset position and could be offset under master netting agreements with the same counterparty. The table only reflects cash collateral that has been posted under the existing contracts and does not reflect letters of credit under the Company’s revolving credit facilities that have been issued as collateral. Net exposure is the net contractual liability for all contracts, including those designated as normal purchases and normal sales, offset by existing cash collateral and by any offsets available under master netting agreements, including both asset and liability positions.

B- 52

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Contingent Feature –
Credit Rating Downgrade
 
Contractual
Liability
 
Existing Cash
Collateral
 
Net Exposure
 
 
(In thousands)
December 31, 2014
 
 
 
 
 
 
PNMR and PNM
 
$
1,686

 
$

 
$
167

December 31, 2013
 
 
 
 
 
 
PNMR and PNM
 
$
2,398

 
$

 
$
2,152

Sale of Power from PVNGS Unit 3
Because PNM’s 134 MW share of Unit 3 at PVNGS is not currently included in retail rates, that unit’s power is being sold in the wholesale market. Since January 1, 2011, PNM has been selling power from its interest in PVNGS Unit 3 at market prices. As of December 31, 2014, PNM had contracted to sell 100% of PVNGS Unit 3 output through 2015, at market price plus a premium.  Through hedging arrangements that are accounted for as economic hedges, PNM has established fixed rates, which average approximately $37 per MWh, for substantially all of these sales.
Non-Derivative Financial Instruments
The carrying amounts reflected on the Consolidated Balance Sheets approximate fair value for cash, receivables, and payables due to the short period of maturity. Available-for-sale securities are carried at fair value. Available-for-sale securities for PNMR and PNM consist of PNM assets held in the NDT for its share of decommissioning costs of PVNGS and, beginning in August 2012, a trust for PNM’s share of post-term reclamation costs related to the coal mines serving SJGS (Note 16). The fair value and gross unrealized gains of investments in available-for-sale securities are presented in the following table. At December 31, 2014 and 2013, the fair value of available-for-sale securities included $244.6 million and $222.5 million for the NDT and $5.5 million and $4.4 million for the mine reclamation trust.
 
December 31, 2014
 
December 31, 2013
 
Unrealized
 Gains
 
Fair Value
 
Unrealized
 Gains
 
Fair Value
PNMR and PNM
 
 
(In thousands)
 
 
Cash and cash equivalents
$

 
$
8,276

 
$

 
$
3,356

Equity securities:
 
 
 
 
 
 
 
Domestic value
17,418

 
45,340

 
14,523

 
39,460

Domestic growth
21,354

 
74,053

 
25,656

 
76,292

International and other
156

 
16,599

 
1,040

 
16,633

Fixed income securities:
 
 
 
 
 
 
 
U.S. Government
903

 
22,563

 
158

 
21,941

Municipals
5,851

 
68,973

 
1,018

 
58,568

Corporate and other
666

 
14,341

 
207

 
10,605

 
$
46,348

 
$
250,145

 
$
42,602

 
$
226,855


The proceeds and gross realized gains and losses on the disposition of available-for-sale securities for PNMR and PNM are shown in the following table. Realized gains and losses are determined by specific identification of costs of securities sold . Gross realized losses shown below exclude the change in realized impairment losses of $(0.7) million , $0.6 million , and $5.2 million .

B- 53

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Proceeds from sales
$
117,989

 
$
271,140

 
$
167,330

Gross realized gains
$
15,162

 
$
14,308

 
$
15,907

Gross realized (losses)
$
(3,964
)
 
$
(4,298
)
 
$
(8,170
)
Held-to-maturity securities are those investments in debt securities that the Company has the ability and intent to hold until maturity. Held-to-maturity securities consist of the investment in PVNGS lessor notes and certain items within other investments.
The Company has no available-for-sale or held-to-maturity securities for which carrying value exceeds fair value. There are no impairments considered to be “other than temporary” that are included in AOCI and not recognized in earnings.
At December 31, 2014 , the available-for-sale and held-to-maturity debt securities had the following final maturities:
 
Fair Value
 
Available-for-Sale
 
Held-to-Maturity
 
PNMR and PNM
 
PNMR
 
PNM
 
(In thousands)
Within 1 year
$
3,946

 
$
8,019

 
$
8,019

After 1 year through 5 years
20,275

 
25,430

 
24,817

After 5 years through 10 years
13,422

 

 

After 10 years through 15 years
10,367

 

 

After 15 years through 20 years
11,539

 

 

After 20 years
46,328

 

 

 
$
105,877

 
$
33,449

 
$
32,836

Fair Value Disclosures
The Company determines the fair values of its derivative and other financial instruments based on the hierarchy established in GAAP, which requires an entity to maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value. GAAP describes three levels of inputs that may be used to measure fair value. Level 1 inputs are quoted prices (unadjusted) in active markets for identical assets or liabilities that the reporting entity has the ability to access at the measurement date. Level 2 inputs are inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly. Level 3 inputs are unobservable inputs for the asset or liability. Level 3 inputs used in determining fair values for the Company consist of internal valuation models. The Company records any transfers between fair value hierarchy levels as of the end of each calendar quarter. There were no transfers between levels during the years ended December 31, 2014 and 2013 .
For available-for-sale securities, Level 2 fair values are provided by the trustee utilizing a pricing service. The pricing provider predominantly uses the market approach using bid side market value based upon a hierarchy of information for specific securities or securities with similar characteristics. For commodity derivatives, Level 2 fair values are determined based on market observable inputs, which are validated using multiple broker quotes, including forward price, volatility, and interest rate curves to establish expectations of future prices. Credit valuation adjustments are made for estimated credit losses based on the overall exposure to each counterparty. For the Company’s long-term debt, Level 2 fair values are provided by an external pricing service. The pricing service primarily utilizes quoted prices for similar debt in active markets when determining fair value. For investments categorized as Level 3, primarily the PVNGS lessor notes and certain items in other investments, fair values were determined by discounted cash flow models that take into consideration discount rates that are observable for similar types of assets and liabilities. Management of the Company independently verifies the information provided by pricing services.

B- 54

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Items recorded at fair value on the Consolidated Balance Sheets are presented below by level of the fair value hierarchy. There were no Level 3 fair value measurements at December 31, 2014 and 2013 for items recorded at fair value.
 
 
 
GAAP Fair Value Hierarchy
 
Total
 
Quoted Prices in Active Market for Identical Assets (Level 1)
 
Significant Other Observable Inputs
(Level 2)
December 31, 2014
 
 
(In thousands)
PNMR and PNM
 
 
 
 
 
Available-for-sale securities
 
 
 
 
 
Cash and cash equivalents
$
8,276

 
$
8,276

 
$

Equity securities:
 
 
 
 
 
Domestic value
45,340

 
45,340

 

Domestic growth
74,053

 
74,053

 

International and other
16,599

 
16,599

 

Fixed income securities:

 
 
 
 
U.S. Government
22,563

 
20,808

 
1,755

Municipals
68,973

 

 
68,973

Corporate and other
14,341

 
4,843

 
9,498

 
$
250,145

 
$
169,919

 
$
80,226

 
 
 
 
 
 
Commodity derivative assets
$
11,232

 
$

 
$
11,232

Commodity derivative liabilities
(1,686
)
 

 
(1,686
)
Net
$
9,546

 
$

 
$
9,546

 
 
 
GAAP Fair Value Hierarchy
 
Total
 
Quoted Prices in Active Market for Identical Assets (Level 1)
 
Significant Other Observable Inputs
(Level 2)
December 31, 2013
 
 
(In thousands)
PNMR and PNM
 
 
 
 
 
Available-for-sale securities
 
 
 
 
 
Cash and cash equivalents
$
3,356

 
$
3,356

 
$

Equity securities:
 
 
 
 
 
Domestic value
39,460

 
39,460

 

Domestic growth
76,292

 
76,292

 

International and other
16,633

 
16,633

 

Fixed income securities:
 
 
 
 
 
U.S. Government
21,941

 
20,194

 
1,747

Municipals
58,568

 

 
58,568

Corporate and other
10,605

 
2,245

 
8,360

 
$
226,855

 
$
158,180

 
$
68,675

 
 
 
 
 
 
Commodity derivative assets
$
7,066

 
$

 
$
7,066

Commodity derivative liabilities
(3,793
)
 

 
(3,793
)
Net
$
3,273

 
$

 
$
3,273

 

B- 55

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The carrying amounts and fair values of investments in PVNGS lessor notes, other investments, and long-term debt are presented below:
 
 
 
 
 
GAAP Fair Value Hierarchy
 
Carrying
Amount
 
Fair Value
 
Level 1
 
Level 2
 
Level 3
December 31, 2014
(In thousands)
PNMR
 
 
 
 
 
 
 
 
 
Long-term debt
$
1,975,090

 
$
2,173,117

 
$

 
$
2,173,117

 
$

Investment in PVNGS lessor notes
$
31,232

 
$
32,836

 
$

 
$

 
$
32,836

Other investments
$
1,762

 
$
2,375

 
$
639

 
$

 
$
1,736

PNM
 
 
 
 
 
 
 
 
 
Long-term debt
$
1,490,657

 
$
1,624,222

 
$

 
$
1,624,222

 
$

Investment in PVNGS lessor notes
$
31,232

 
$
32,836

 
$

 
$

 
$
32,836

Other investments
$
397

 
$
397

 
$
397

 
$

 
$

TNMP
 
 
 
 
 
 
 
 
 
Long-term debt
$
365,667

 
$
427,356

 
$

 
$
427,356

 
$

Other investments
$
242

 
$
242

 
$
242

 
$

 
$

 
 
 
 
 
 
 
 
 
 
December 31, 2013
 
 
 
 
 
 
 
 
 
PNMR
 
 
 
 
 
 
 
 
 
Long-term debt
$
1,745,420

 
$
1,905,230

 
$

 
$
1,905,230

 
$

Investment in PVNGS lessor notes
$
52,958

 
$
57,279

 
$

 
$

 
$
57,279

Other investments
$
1,835

 
$
3,196

 
$
690

 
$

 
$
2,506

PNM
 
 
 
 
 
 
 
 
 
Long-term debt
$
1,290,618

 
$
1,382,938

 
$

 
$
1,382,938

 
$

Investment in PVNGS lessor notes
$
52,958

 
$
57,279

 
$

 
$

 
$
57,279

Other investments
$
445

 
$
445

 
$
445

 
$

 
$

TNMP
 
 
 
 
 
 
 
 
 
Long-term debt
$
336,036

 
$
390,814

 
$

 
$
390,814

 
$

Other investments
$
245

 
$
245

 
$
245

 
$

 
$



Investments Held by Employee Benefit Plans
As discussed in Note 12, PNM and TNMP have trusts that hold investment assets for their pension and other postretirement benefit plans. The fair value of the assets held by the trusts impacts the determination of the funded status of each plan, but the assets are not reflected on the Company’s Consolidated Balance Sheets. Both the PNM Pension Plan and the TNMP Pension Plan hold units of participation in the PNM Resources, Inc. Master Trust (the “PNMR Master Trust”), which was established for the investment of assets of the pension plans. Level 2 and Level 3 fair values are provided by fund managers utilizing a pricing service. For level 2 fair values, the pricing provider predominately uses the market approach using bid side market value based upon a hierarchy of information for specific securities or securities with similar characteristics. Level 2 investments in mutual funds are measured at net asset value as year-end. Level 3 investments are comprised of alternative investments, which are measured at net asset value at year-end and include private equity funds, hedge funds, and real estate funds. The private equity funds are not voluntarily redeemable. These investments are realized through periodic distributions occurring over a 10 to 15-year term after the initial investment. The real estate funds and hedge funds may be voluntarily redeemed, but are subject to redemption provisions that may result in the funds not being able to be redeemed in the near term. Audited financial statements are received for each fund and are reviewed by the Company annually.

B- 56

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The valuation of alternative investments requires significant judgment by the pricing provider due to the absence of quoted market values, changes in market conditions, and the long-term nature of the assets. The significant unobservable inputs include the trading multiples of public companies that are considered comparable to the company being valued, company specific issues, estimates of liquidation value, current operating performance and future expectations of performance, changes in market outlook and the financing environment, capitalization rates, discount rates and cash flows. The fair values of investments held by the employee benefit plans are as follows:
 
 
 
GAAP Fair Value Hierarchy
 
Total
 
Quoted Prices in Active Market for Identical Assets
(Level 1)
 
Significant
Other
Observable
Inputs
(Level 2)
 
Significant
Unobservable
Inputs
(Level 3)
December 31, 2014
 
 
(In thousands)
 
 
PNM Pension Plan
 
 
 
 
 
 
 
Participation in PNMR Master Trust Total Plan Investments
$
588,112

 
$
123,668

 
$
398,819

 
$
65,625

TNMP Pension Plan
 
 
 
 
 
 
 
Participation in PNMR Master Trust Total Plan Investments
$
69,207

 
$
14,823

 
$
44,425

 
$
9,959

PNM OPEB Plan
 
 
 
 
 
 
 
Cash and cash equivalents
$
1,242

 
$
1,242

 
$

 
$

Equity securities:
 
 
 
 
 
 
 
International funds
10,332

 

 
10,332

 

Domestic value
8,365

 
8,365

 

 

Domestic growth
5,960

 
5,960

 

 

Other funds
30,997

 

 
30,997

 

Fixed income securities:
 
 
 
 
 
 
 
Mutual funds
22,122

 
22,122

 

 

 
$
79,018

 
$
37,689

 
$
41,329

 
$

TNMP OPEB Plan
 
 
 
 
 
 
 
Cash and cash equivalents
$
168

 
$
168

 
$

 
$

Equity securities:
 
 
 
 
 
 
 
International funds
1,277

 

 
1,277

 

Domestic value
403

 
403

 

 

Domestic growth
1,024

 
1,024

 

 

Other funds
3,790

 

 
3,790

 

Fixed income securities:
 
 
 
 
 
 
 
Mutual funds
3,549

 
3,549

 

 

 
$
10,211

 
$
5,144

 
$
5,067

 
$


B- 57

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

 
 
 
GAAP Fair Value Hierarchy
 
Total
 
Quoted Prices in Active
Market for Identical Assets
(Level 1)
 
Significant
Other
Observable
Inputs
(Level 2)
 
Significant
Unobservable
Inputs
(Level 3)
December 31, 2013
(In thousands)
PNM Pension Plan
 
 
 
 
 
 
 
Participation in PNMR Master Trust
$
557,258

 
$
145,364

 
$
330,903

 
$
80,991

TNMP Pension Plan
 
 
 
 
 
 
 
Participation in PNMR Master Trust
$
66,285

 
$
18,657

 
$
32,620

 
$
15,008

PNM OPEB Plan
 
 
 
 
 
 
 
Cash and cash equivalents
$
1,152

 
$
1,152

 
$

 
$

Equity securities:
 
 
 
 
 
 
 
International funds
11,634

 

 
11,634

 

Domestic value
6,388

 
6,388

 

 

Domestic growth
24,135

 
7,094

 
17,041

 

Other funds
14,028

 

 
14,028

 

Fixed income securities:
 
 

 
 
 
 
Mutual funds
16,796

 
16,796

 

 

 
$
74,133

 
$
31,430

 
$
42,703

 
$

TNMP OPEB Plan
 
 
 
 
 
 
 
Cash and cash equivalents
$
302

 
$
302

 
$

 
$

Equity securities:
 
 
 
 
 
 
 
International funds
1,334

 

 
1,334

 

Domestic value
381

 
381

 

 

Domestic growth
4,171

 
1,848

 
2,323

 

Other funds
1,844

 

 
1,844

 

Fixed income securities:
 
 
 
 
 
 
 
Mutual funds
1,702

 
1,702

 

 

 
$
9,734

 
$
4,233

 
$
5,501

 
$



B- 58

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The fair values of investments in the PNMR Master Trust are as follows:
 
 
 
GAAP Fair Value Hierarchy
 
Total
 
Quoted Prices in
Active Market for
Identical Assets
(Level 1)
 
Significant
Other
Observable
Inputs
(Level 2)
 
Significant
Unobservable
Inputs
(Level 3)
December 31, 2014
(In thousands)
PNMR Master Trust
 
 
 
 
 
 
 
Cash and cash equivalents
$
15,645

 
$
15,645

 
$

 
$

Equity securities:
 
 
 
 
 
 
 
International
23,282

 

 
23,282

 

Domestic value
41,778

 
41,778

 

 

Domestic growth
28,370

 
28,370

 

 

Other funds
29,719

 

 
29,719

 

Fixed income securities:
 
 
 
 
 
 
 
Corporate
242,742

 

 
242,015

 
727

U.S. Government
106,634

 
52,537

 
54,097

 

Municipals
20,156

 

 
20,156

 

Other funds
74,136

 
161

 
73,975

 

Alternative investments:
 
 
 
 
 
 
 
Private equity funds
37,220

 

 

 
37,220

Hedge funds
23,876

 

 

 
23,876

Real estate funds
13,761

 

 

 
13,761

 
$
657,319

 
$
138,491

 
$
443,244

 
$
75,584

December 31, 2013
 
PNMR Master Trust
 
 
 
 
 
 
 
Cash and cash equivalents
$
16,281

 
$
16,281

 
$

 
$

Equity securities:
 
 
 
 
 
 
 
International
24,471

 
24,471

 

 

Domestic value
41,451

 
41,451

 

 

Domestic growth
36,805

 
36,805

 

 

Other funds
22,522

 

 
22,522

 

Fixed income securities:
 
 
 
 
 
 
 
Corporate
202,897

 
363

 
202,358

 
176

U.S. Government
99,748

 
44,541

 
55,207

 

Municipals
17,259

 

 
17,259

 

Other funds
66,286

 
109

 
66,177

 

Alternative investments:
 
 
 
 
 
 
 
Private equity funds
39,122

 

 

 
39,122

Hedge funds
34,912

 

 

 
34,912

Real estate funds
21,789

 

 

 
21,789

 
$
623,543

 
$
164,021

 
$
363,523

 
$
95,999



B- 59

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

A reconciliation of the changes in Level 3 fair value measurements is as follows:
 
Year Ended December 31,
 
2014
 
2013
Level 3 Fair Value Assets and Liabilities
(In thousands)
PNM Pension
Master
Trust
 
Master
Trust
Balance at beginning of period
$
80,991

 
$
79,017

Actual return on assets sold during the period
10,376

 
3,303

Actual return on assets still held at period end
(5,731
)
 
3,361

Purchases
8,832

 
15,110

Sales
(28,843
)
 
(19,800
)
Balance at end of period
65,625

 
80,991

TNMP Pension
 
 
 
Balance at beginning of period
$
15,008

 
$
14,171

Actual return on assets sold during the period
3,409

 
1,400

Actual return on assets still held at period end
(1,883
)
 
1,425

Purchases
2,902

 
6,408

Sales
(9,477
)
 
(8,396
)
Balance at end of period
9,959

 
15,008

Total
$
75,584

 
$
95,999

Additional information concerning changes in Level 3 fair value measurements for the PNMR Master Trust is as follows:
Level 3 Fair Value Assets and Liabilities
PNMR Master Trust
Private
equity
funds
 
Hedge
funds
 
Real
estate
funds
 
Fixed income - corporate
 
Total
 
 
 
(In thousands)
 
 
 
 
Balance at December 31, 2012
$
38,212

 
$
31,277

 
$
23,699

 
$

 
$
93,188

Actual return on assets sold during the period
4,677

 
135

 
(109
)
 
1

 
4,704

Actual return on assets still held at period end
1,162

 
3,500

 
123

 

 
4,785

Purchases
3,117

 
16,151

 
2,076

 
175

 
21,519

Sales
(8,046
)
 
(16,151
)
 
(4,000
)
 

 
(28,197
)
Balance at December 31, 2013
39,122

 
34,912

 
21,789

 
176

 
95,999

Actual return on assets sold during the period
5,355

 
8,667

 
(236
)
 

 
13,786

Actual return on assets still held at period end
(296
)
 
(7,536
)
 
237

 
(20
)
 
(7,615
)
Purchases
3,656

 
5,500

 
1,971

 
608

 
11,735

Sales
(10,617
)
 
(17,667
)
 
(10,000
)
 
(37
)
 
(38,321
)
Balance at December 31, 2014
$
37,220

 
$
23,876

 
$
13,761

 
$
727

 
$
75,584

 



B- 60

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

(9)
Variable Interest Entities
GAAP determines how an enterprise evaluates and accounts for its involvement with variable interest entities, focusing primarily on whether the enterprise has the power to direct the activities that most significantly impact the economic performance of a variable interest entity. GAAP also requires continual reassessment of the primary beneficiary of a variable interest entity.
 
Valencia

PNM has a PPA to purchase all of the electric capacity and energy from Valencia, a 158 MW natural gas-fired power plant near Belen, New Mexico, through May 2028. A third-party built, owns, and operates the facility while PNM is the sole purchaser of the electricity generated. The total construction cost for the facility was $90.0 million . PNM estimates that the plant will typically operate during peak periods of energy demand in summer. PNM is obligated to pay fixed operations and maintenance and capacity charges in addition to variable operation and maintenance charges under this PPA. For the years ended December 31, 2014 , 2013 , and 2012 , PNM paid $19.1 million , $18.9 million , and $18.8 million for fixed charges and $1.2 million , $1.2 million , and $0.9 million for variable charges. PNM does not have any other financial obligations related to Valencia. The assets of Valencia can only be used to satisfy obligations of Valencia and creditors of Valencia do not have any recourse against PNM’s assets.
PNM sources fuel for the plant, controls when the facility operates through its dispatch, and receives the entire output of the plant, which factors directly and significantly impact the economic performance of Valencia. Therefore, PNM has concluded that the third party entity that owns Valencia is a variable interest entity and that PNM is the primary beneficiary of the entity under GAAP since PNM has the power to direct the activities that most significantly impact the economic performance of Valencia and will absorb the majority of the variability in the cash flows of the plant. As the primary beneficiary, PNM consolidates the entity in its financial statements. Accordingly, the assets, liabilities, operating expenses, and cash flows of Valencia are included in the consolidated financial statements of PNM although PNM has no legal ownership interest or voting control of the variable interest entity. The assets and liabilities of Valencia set forth below are immaterial to PNM and, therefore, not shown separately on the Consolidated Balance Sheets. The owner’s equity and net income of Valencia are considered attributable to non-controlling interest.
Summarized financial information for Valencia is as follows:
Results of Operations
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Operating revenues
$
20,247

 
$
20,166

 
$
19,585

Operating expenses
(6,120
)
 
(5,645
)
 
(5,535
)
Earnings attributable to non-controlling interest
$
14,127

 
$
14,521

 
$
14,050

 
Financial Position
 
December 31,
 
2014
 
2013
 
(In thousands)
Current assets
$
2,513

 
$
2,658

Net property, plant and equipment
72,321

 
75,137

Total assets
74,834

 
77,795

Current liabilities
1,288

 
766

Owners’ equity – non-controlling interest
$
73,546

 
$
77,029


During the term of the PPA, PNM has the option to purchase and own up to 50% of the plant or the variable interest entity. The PPA specifies that the purchase price would be the greater of (i) 50% of book value reduced by related indebtedness or (ii)

B- 61

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

50% of fair market value. On October 8, 2013, PNM notified the owner of Valencia that PNM may exercise the option to purchase 50% of the plant. As provided in the PPA, an appraisal process was initiated since the parties failed to reach agreement on fair market value within 60 days. Under the PPA, results of the appraisal process established the purchase price after which PNM was to determine in its sole discretion whether or not to exercise its option to purchase the 50% interest. The PPA also provides that the purchase price may be adjusted to reflect the period between the determination of the purchase price and the closing. The appraisal process determined the purchase price as of October 8, 2013 to be $85.0 million , prior to any adjustment to reflect the period through the closing date. Approval of the NMPRC and FERC would be required, which process could take up to 15 months. On May 30, 2014, after evaluating its alternatives with respect to Valencia, PNM notified the owner of Valencia that PNM intended to purchase 50% of the plant, subject to certain conditions. PNM’s conditions include: agreeing on the purchase price, adjusted to reflect the period between October 8, 2013 and the closing; approval of the NMPRC, including specified ratemaking treatment, and FERC; approval of the Board and PNM’s board of directors; receipt of other necessary approvals and consents; and other customary closing conditions. PNM received a letter dated June 30, 2014 from the owner of Valencia suggesting that the conditions set forth in PNM’s notification raise issues under the PPA. PNM is discussing these issues with the owner of Valencia. PNM cannot predict whether or not it will reach agreement with the owner of Valencia, if required regulatory and other approvals will be received, or if the purchase will be completed.

PVNGS Leases

PNM is leasing portions of its interests in Units 1 and 2 of PVNGS. There are currently eight separate lease agreements with eight different trusts whose beneficial owners are five different institutional investors. PNM is not the legal or tax owner of the leased assets. The beneficial owners of the trusts possess all of the voting control and pecuniary interests in the trusts. The leases provide PNM with an option to purchase the leased assets at appraised value at the end of the leases, but PNM does not have a fixed price purchase option and does not provide residual value guarantees. The leases also provide PNM with options to renew the leases at fixed rates set forth in the leases for 2 years beyond the termination of the original lease terms. The option periods on certain leases may be further extended for up to an additional 6 years if the appraised remaining useful lives and fair value of the leased assets are greater than parameters set forth in the leases. See Note 7 for additional information regarding the leases and actions PNM has taken with respect to its renewal and purchase options. Under GAAP, these renewal options are considered to be variable interests in the trusts and result in the trusts being considered variable interest entities. PNM is only obligated to make payments to the trusts for the scheduled semi-annual lease payments, which, net of amounts that will be returned to PNM through its ownership in related lessor notes and the Unit 2 beneficial trust, aggregate $20.3 million over the remaining original terms of the leases and $145.2 million during the renewal terms of the leases that PNM has elected to renew. Other than as discussed in Note 7, PNM has no other financial obligations or commitments to the trusts or the beneficial owners. Creditors of the trusts have no recourse to PNM’s assets other than with respect to the contractual lease payments. PNM has no additional rights to the assets of the trusts other than the use of the leased assets. PNM has no assets or liabilities recorded on its Consolidated Balance Sheets related to the trusts other than accrued lease payments of $26.0 million at December 31, 2014 and 2013 , which are included in other current liabilities on the Consolidated Balance Sheets.
PNM has evaluated the PVNGS lease arrangements, including the notices, amendments, and agreements referred to above, and concluded that it does not have the power to direct the activities that most significantly impact the economic performance of the trusts and, therefore, is not the primary beneficiary of the trusts under GAAP. The significant factors considered in reaching this conclusion are: the periods covered by fixed price renewal options are significantly shorter than the anticipated remaining useful lives of the assets, particularly since the operating licenses for the plants have been extended for twenty years through 2045 for Unit 1 and 2046 for Unit 2 ; PNM’s only financial obligation to the trusts is to make the fixed lease payments and the payments do not vary based on the output of the plants or their performance; during the lease terms, the economic performance of the trusts is substantially fixed due to the fixed lease payments; PNM is only one of several participants in PVNGS and is not the operating agent for the plants, so does not significantly influence the day-to-day operations of the plants; furthermore, the operations of the plants, including plans for their decommissioning, are highly regulated by the NRC, leaving little room for the participants to operate the plants in a manner that impacts the economic performance of the trusts; the economic performance of the trusts at the end of the lease terms is dependent upon the fair value and remaining lives of the plants at that time, which are determined by factors such as power prices, outlook for nuclear power, and the impacts of potential carbon legislation or regulation, all which are outside of PNM’s control; and while PNM has some benefit from its renewal options, the vast majority of the value at the end of the leases will accrue to the beneficial owners of the trusts, particularly given increases in the value of existing nuclear generating facilities, which have no GHG, resulting from potential carbon legislation or regulation.

B- 62

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Rio Bravo, formerly known as Delta
PNM had a 20 -year PPA expiring in 2020 covering the entire output of Delta, which was a variable interest under GAAP. PNM also controlled the dispatch of the generating plant, which impacted the variable payments made under the PPA and impacted the economic performance of the entity that owned Delta. This arrangement was entered into prior to December 31, 2003 and PNM was unsuccessful in obtaining the information necessary to determine if it was the primary beneficiary of the entity that owned Delta, or to consolidate that entity if it were determined that PNM was the primary beneficiary. Accordingly, PNM was unable to make those determinations and, as provided in GAAP, accounted for this PPA as an operating lease.
In December 2012, PNM entered into an agreement with the owners of Delta under which PNM would purchase the entity that owned Delta. FERC approved the purchase on February 26, 2013 and the NMPRC approved the purchase on June 26, 2013. Closing was subject to the seller remedying specified operational, NERC compliance, and environmental issues, as well as other customary closing conditions. PNM closed on the purchase on July 17, 2014 and recorded the purchase as of that date. At closing, PNM made a cash payment of $22.8 million , which reflected an adjustment for working capital compared to a targeted working capital and included amounts placed in escrow. Delta had project financing debt, amounting to $14.6 million at closing, which PNM retired. PNM changed the name of the facility to Rio Bravo.
PNM recorded the acquisition as a business combination and reflected the requirements of the FERC Uniform System of Accounts since the purchased assets are subject to traditional rate regulation by the NMPRC and FERC. Accordingly, as of the acquisition date, PNM recorded plant in service of $58.1 million and accumulated depreciation of $23.5 million , reflecting the original cost of the facilities and the estimated economic life to PNM. PNM also recorded current assets of $3.6 million , deferred charges of $3.4 million , current liabilities of $0.3 million , and non-current regulatory liabilities of $3.4 million .
PNM made fixed and variable payments to Delta under the PPA. For the period from January 1, 2014 through July 17, 2014, PNM incurred fixed capacity charges of $3.5 million and variable energy charges of $0.6 million under the PPA. For the years ended December 31, 2013 and 2012, PNM incurred fixed capacity charges of $6.4 million , and $6.2 million and variable energy charges of $1.8 million , and $0.8 million under the PPA. PNM recovered the variable energy charges through its FPPAC.
PNM began consolidating Rio Bravo at the date of the acquisition. Prior to the acquisition, consolidation of Delta would have been immaterial to the Consolidated Balance Sheets of PNMR and PNM. Since all of Delta’s revenues and expenses were attributable to its PPA arrangement with PNM, the primary impact of consolidating Delta to the Consolidated Statements of Earnings of PNMR and PNM would have been to reclassify Delta’s net earnings from operating expenses and reflect such amount as earnings attributable to a non-controlling interest, without any impact to net earnings attributable to PNMR and PNM.  
 

B- 63

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

(10)
Earnings and Dividends Per Share
In accordance with GAAP, dual presentation of basic and diluted earnings per share has been presented in the Consolidated Statements of Earnings of PNMR. Information regarding the computation of earnings per share and dividends per share is as follows:
 
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands, except per share amounts)
Earnings Attributable to PNMR
$
116,254

 
$
100,507

 
$
105,547

Average Number of Common Shares:
 
 
 
 
 
Outstanding during year
79,654

 
79,654

 
79,654

Vested awards of restricted stock
134

 
191

 
145

Average Shares – Basic
79,788

 
79,845

 
79,799

Dilutive Effect of Common Stock Equivalents (1) :
 
 
 
 
 
Stock options and restricted stock
491

 
586

 
618

Average Shares – Diluted
80,279

 
80,431

 
80,417

Net Earnings Per Share of Common Stock:
 
 
 
 
 
Basic
$
1.46

 
$
1.26

 
$
1.32

Diluted
$
1.45

 
$
1.25

 
$
1.31

Dividends Declared per Common Share
$
0.755

 
$
0.680

 
0.580


(1)  
Excludes out-of-the-money options for 254,050 shares of common stock at December 31, 2014 . See Note 13.
 
(11)
Income Taxes
PNMR
PNMR’s income taxes consist of the following components:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Current federal income tax
$
(2,015
)
 
$

 
$
(1,296
)
Current state income tax
(728
)
 
(917
)
 
(37
)
Deferred federal income tax
59,814

 
50,044

 
51,559

Deferred state income tax
14,831

 
12,578

 
6,921

Amortization of accumulated investment tax credits
(2,164
)
 
(2,192
)
 
(2,237
)
Total income taxes
$
69,738

 
$
59,513

 
$
54,910



B- 64

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

PNMR’s provision for income taxes differed from the federal income tax computed at the statutory rate for each of the years shown. The differences are attributable to the following factors:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Federal income tax at statutory rates
$
70,226

 
$
61,274

 
$
61,262

Amortization of accumulated investment tax credits
(2,164
)
 
(2,192
)
 
(2,237
)
Flow-through of depreciation items
1,344

 
1,132

 
1,284

Earnings attributable to non-controlling interest in Valencia
(4,945
)
 
(5,082
)
 
(4,918
)
State income tax, net of federal benefit
5,723

 
3,818

 
4,646

Impairment of state net operating loss carryforwards
3,129

 

 

Impairment of state production tax credits, net of federal benefit
894

 
3,880

 
718

Other
(4,469
)
 
(3,317
)
 
(5,845
)
Total income taxes
$
69,738

 
$
59,513

 
$
54,910

Effective tax rate
34.76
%
 
33.99
%
 
31.37
%

The components of PNMR’s net accumulated deferred income tax liability were:
 
December 31,
 
2014
 
2013
 
(In thousands)
Deferred tax assets:
 
 
 
Net operating loss
$
153,858

 
$
134,418

Regulatory liabilities related to income taxes
78,858

 
83,838

Federal tax credit carryforwards
54,748

 
40,708

Other
68,566

 
75,832

Total deferred tax assets
356,030

 
334,796

Deferred tax liabilities:
 
 
 
Depreciation and plant related
(914,926
)
 
(814,671
)
Investment tax credit
(36,790
)
 
(25,855
)
Regulatory assets related to income taxes
(67,910
)
 
(66,352
)
CTC
(19,352
)
 
(22,262
)
Pension
(66,498
)
 
(58,780
)
Other
(115,282
)
 
(115,458
)
Total deferred tax liabilities
(1,220,758
)
 
(1,103,378
)
Net accumulated deferred income tax liabilities
(864,728
)
 
(768,582
)
Current accumulated deferred income tax (asset) liability
(26,383
)
 
(58,681
)
Non-current accumulated deferred income tax liability
$
(891,111
)
 
$
(827,263
)


B- 65

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The following table reconciles the change in PNMR’s net accumulated deferred income tax liability to the deferred income tax benefit included in the Consolidated Statement of Earnings:
 
Year Ended
 
December 31, 2014
 
(In thousands)
Net change in deferred income tax liability per above table
$
96,146

Change in tax effects of income tax related regulatory assets and liabilities
(6,538
)
Tax effect of mark-to-market adjustments
(1,612
)
Tax effect of excess pension liability
3,993

Adjustment for uncertain income tax positions
(4,858
)
Reclassification of unrecognized tax benefits
(15,031
)
Other
381

Deferred income taxes
$
72,481

 
PNM
PNM’s income taxes consist of the following components:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Current federal income tax
$
(2,175
)
 
$
(479
)
 
$
(12,951
)
Current state income tax
(979
)
 
(760
)
 
(1,815
)
Deferred federal income tax
45,890

 
42,806

 
56,194

Deferred state income tax
12,061

 
9,429

 
11,522

Amortization of accumulated investment tax credits
(2,164
)
 
(2,192
)
 
(2,237
)
Total income taxes
$
52,633

 
$
48,804

 
$
50,713


PNM’s provision for income taxes differed from the federal income tax computed at the statutory rate for each of the years shown. The differences are attributable to the following factors:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Federal income tax at statutory rates
$
53,930

 
$
53,018

 
$
54,710

Amortization of accumulated investment tax credits
(2,164
)
 
(2,192
)
 
(2,237
)
Flow-through of depreciation items
1,325

 
1,115

 
1,268

Earnings attributable to non-controlling interest in Valencia
(4,945
)
 
(5,082
)
 
(4,918
)
State income tax, net of federal benefit
5,522

 
6,202

 
6,500

Impairment of state net operating loss carryforwards
2,145

 

 

Other
(3,180
)
 
(4,257
)
 
(4,610
)
Total income taxes
$
52,633

 
$
48,804

 
$
50,713

Effective tax rate
34.16
%
 
32.22
%
 
32.44
%


B- 66

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The components of PNM’s net accumulated deferred income tax liability were:
 
December 31,
 
2014
 
2013
 
(In thousands)
Deferred tax assets:
 
 
 
Net operating loss
$
108,505

 
$
99,247

Regulatory liabilities related to income taxes
74,293

 
78,849

Federal tax credit carryforwards
35,259

 
22,509

Other
35,681

 
37,008

Total deferred tax assets
253,738

 
237,613

Deferred tax liabilities:
 
 
 
Depreciation and plant related
(733,519
)
 
(661,239
)
Investment tax credit
(36,790
)
 
(25,855
)
Regulatory assets related to income taxes
(57,637
)
 
(55,844
)
Pension
(58,474
)
 
(52,104
)
Other
(70,714
)
 
(75,838
)
Total deferred tax liabilities
(957,134
)
 
(870,880
)
Net accumulated deferred income tax liabilities
(703,396
)
 
(633,267
)
Current accumulated deferred income tax (asset) liability
(12,418
)
 
(43,827
)
Non-current accumulated deferred income tax liability
$
(715,814
)
 
$
(677,094
)

The following table reconciles the change in PNM’s net accumulated deferred income tax liability to the deferred income tax benefit included in the Consolidated Statement of Earnings:
 
Year Ended
 
December 31, 2014
 
(In thousands)
 
 
Net change in deferred income tax liability per above table
$
70,129

Change in tax effects of income tax related regulatory assets and liabilities
(6,349
)
Tax effect of mark-to-market adjustments
(1,470
)
Tax effect of excess pension liability
3,993

Adjustment for uncertain income tax positions
1,155

Reclassification of unrecognized tax benefits
(12,228
)
Other
557

Deferred income taxes
$
55,787


B- 67

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

TNMP
TNMP’s income taxes consist of the following components:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Current federal income tax
$
35

 
$
(4,957
)
 
$
9,152

Current state income tax
1,939

 
1,916

 
1,822

Deferred federal income tax
20,577

 
20,688

 
4,406

Deferred state income tax
(28
)
 
(26
)
 
(28
)
Total income taxes
$
22,523

 
$
17,621

 
$
15,352

 
TNMP’s provision for income taxes differed from the federal income tax computed at the statutory rate for each of the periods shown. The differences are attributable to the following factors:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Federal income tax at statutory rates
$
21,115

 
$
16,349

 
$
14,735

State income tax, net of federal benefit
1,257

 
1,247

 
1,185

Other
151

 
25

 
(568
)
Total income taxes
$
22,523

 
$
17,621

 
$
15,352

Effective tax rate
37.33
%
 
37.72
%
 
36.47
%

The components of TNMP’s net accumulated deferred income tax liability at December 31, were:
 
December 31,
 
2014
 
2013
 
(In thousands)
Deferred tax assets:
 
 
 
Regulatory liabilities related to income taxes
$
4,565

 
$
4,988

Other
13,429

 
23,479

Total deferred tax assets
17,994

 
28,467

Deferred tax liabilities:
 
 
 
Depreciation and plant related
(174,510
)
 
(151,581
)
CTC
(19,352
)
 
(22,262
)
Regulatory assets related to income taxes
(10,197
)
 
(10,509
)
Loss on reacquired debt
(12,846
)
 
(13,516
)
Other
(12,636
)
 
(14,295
)
Total deferred tax liabilities
(229,541
)
 
(212,163
)
Net accumulated deferred income tax liabilities
(211,547
)
 
(183,696
)
Current accumulated deferred income tax (asset)
(6,398
)
 
(6,501
)
Non-current accumulated deferred income tax liability
$
(217,945
)
 
$
(190,197
)


B- 68

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The following table reconciles the change in TNMP’s net accumulated deferred income tax liability to the deferred income tax benefit included in the Consolidated Statement of Earnings:
 
Year Ended
 
December 31, 2014
 
(In thousands)
Net change in deferred income tax liability per above table
$
27,851

Change in tax effects of income tax related regulatory assets and liabilities
(111
)
Adjustment for uncertain tax positions
(6,796
)
Other
(395
)
Deferred income taxes
$
20,549

 
Other Disclosures

GAAP requires that the Company recognize only the impact of tax positions that, based on their technical merits, are more likely than not to be sustained upon an audit by the taxing authority. A reconciliation of unrecognized tax benefits (expenses) is as follows:
 
PNMR
 
PNM
 
TNMP
 
(In thousands)
Balance at December 31, 2011
$
19,580

 
$
10,752

 
$
7,701

Additions based on tax positions related to 2012
2,046

 
1,152

 

Reductions for tax positions of prior years
(2,428
)
 
(1,522
)
 
(905
)
Settlement payments

 

 

Balance at December 31, 2012
19,198

 
10,382

 
6,796

Additions based on tax positions related to 2013
(54
)
 
(54
)
 

Additions for tax positions of prior years
745

 
745

 

Settlement payments

 

 

Balance at December 31, 2013
19,889

 
11,073

 
6,796

Additions based on tax positions related to 2014
623

 
623

 

Additions (reductions) for tax positions of prior years
(5,481
)
 
532

 
(6,796
)
Settlement payments

 

 

Balance at December 31, 2014
$
15,031

 
$
12,228

 
$


Included in the balance at December 31, 2014 are $4.7 million and $1.9 million of unrecognized tax benefits that, if recognized, would affect the effective tax rate for PNMR and PNM. The Company does not anticipate that any unrecognized tax expenses or unrecognized tax benefits will be reduced or settled in 2015 .
Estimated interest income related to refunds the Company expects to receive is included in Other Income and estimated interest expense and penalties related to potential cash settlements are included in interest expense in the Consolidated Statements of Earnings (Loss). Interest income (expense) related to income taxes is as follows:
 
PNMR
 
PNM
 
TNMP
 
(In thousands)
2014
$
146

 
$
148

 
$
(2
)
2013
$
242

 
$
251

 
$
(2
)
2012
$
243

 
$
244

 
$
(3
)

B- 69

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Accumulated accrued interest receivable (payable) related to income taxes is as follows:
 
PNMR
 
PNM
 
TNMP
 
(In thousands)
December 31, 2014:
 
 
 
 
 
Accumulated accrued interest receivable
$
3,569

 
$
3,569

 
$

Accumulated accrued interest payable
$
(1,120
)
 
$
(24
)
 
$
(120
)
December 31, 2013:
 
 
 
 
 
Accumulated accrued interest receivable
$
4,048

 
$
4,048

 
$

Accumulated accrued interest payable
$
(1,118
)
 
$
(24
)
 
$
(118
)

The Company files a federal consolidated and several consolidated and separate state income tax returns. The tax years prior to 2011 are closed to examination by either federal or state taxing authorities other than Arizona. The tax years prior to 2009 are closed to examination by Arizona taxing authorities. Other tax years are open to examination by federal and state taxing authorities. At December 31, 2014 , the Company has $405.7 million of federal net operating loss carryforwards that expire beginning in 2030 and $54.7 million of federal tax credit carryforwards that expire beginning in 2023. State net operating losses expire beginning in 2015 and vary from federal due to differences between state and federal tax law.

PNMR has New Mexico wind energy production tax credit carry forwards with statutory expiration dates beginning in 2014. In 2012, PNMR impaired $0.7 million , after federal tax benefit, of the New Mexico wind energy production tax credit carry forwards that were not expected to be utilized prior to their expiration due to the Company’s net operating loss position. The impairment is reflected in PNMR’s Corporate and Other segment.

On January 3, 2013, the American Taxpayer Relief Act of 2012, which extended fifty percent bonus depreciation for 2013, was signed into law.  Due to provisions in the act, taxes payable to the State of New Mexico for 2013 were reduced, which resulted in an impairment of New Mexico wind energy production tax credits. In accordance with GAAP, PNMR was required to record this impairment, which after federal income tax benefit, amounted to $1.5 million as additional income tax expense during the year ended December 31, 2013. The impairment is reflected in PNMR’s Corporate and Other segment.

On April 4, 2013, New Mexico House Bill 641 was signed into law. One of the provisions of the bill was to reduce the New Mexico corporate income tax rate from 7.6% to 5.9% . The rate reduction is being phased in from 2014 to 2018. In accordance with GAAP, PNMR and PNM adjusted accumulated deferred income taxes to reflect the tax rate at which the balances are expected to reverse during the period that includes the date of enactment, which was in the year ended December 31, 2013. At that time, the portion of the adjustment related to PNM's regulated activities was recorded as a reduction in deferred tax liabilities, which was offset by an increase in a regulatory liability, on the assumption that PNM will be required to return the benefit to customers over time. The increase in the regulatory liability was $23.9 million . In addition, the portion of the adjustment that is not related to PNM's regulated activities was recorded in PNMR’s Corporate and Other segment as a reduction in deferred tax assets and an increase in income tax expense of $1.2 million during the year ended December 31, 2013. Changes in the estimated timing of reversals of deferred tax assets and liabilities will result in refinements of the impacts of this change in tax rates being recorded periodically until 2018, when the rate reduction is fully phased in. In the year ended December 31, 2014, PNM’s deferred tax liabilities were increased by $4.6 million , which reduced regulatory liabilities. Additionally, deferred tax assets not related to PNM’s regulatory activities were increased by $0.1 million , of which $0.2 million increased income tax expense in PNMR's Corporate and Other segment and $0.3 million decreased income tax expense in PNM.

The future reduction in taxes payable to the State of New Mexico resulting from the rate reduction in House Bill 641 and revisions in estimates of future taxable income resulted in a further impairment of New Mexico wind energy production tax credits. In accordance with GAAP, PNMR was required to record this impairment, which after federal income tax benefit, amounted to $2.4 million as additional income tax expense during the year ended December 31, 2013. This impairment is reflected in PNMR's Corporate and Other segment.

On December 19, 2014, the Tax Increase Prevention Act of 2014, which retroactively extended fifty percent bonus tax depreciation for 2014, was signed into law.  Due to provisions in the act, taxes payable to the State of New Mexico for 2014 were reduced, which resulted in an impairment of New Mexico wind energy production tax credits, which after federal income tax

B- 70

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

benefit, amounted to $0.9 million . The impairment is reflected in PNMR’s Corporate and Other segment. Additionally, the act resulted in an impairment of New Mexico net operating loss carryforwards, which after federal income tax benefit, amounted to $3.1 million . Of this amount, $2.1 million is reflected in PNM and $1.0 million is reflected in PNMR’s Corporate and Other segment. In accordance with GAAP, these impairments were recorded as additional income tax expense during the year ended December 31, 2014. The impairment of the New Mexico net operating loss carryforward is reflected as a valuation allowance against deferred tax assets. No such impairments occurred in prior years. TNMP had no such impairment.

The impairments of the New Mexico wind energy production tax credits discussed above are reflected as a valuation allowance against deferred tax assets. At December 31, 2014, PNMR had a total valuation allowance for these credits of $5.5 million . During the years ended December 31, 2014, 2013, and 2012, the valuation allowance for these credits increased by $0.9 million , $3.9 million , and $0.7 million . PNM and TNMP have no such valuation allowances.

In April 2013, the IRS issued Revenue Procedure 2013-24, which provides a safe harbor method of accounting that taxpayers may use to determine repair costs for electric generation property.  Adoption of the safe harbor method is elective for years ending on or after December 31, 2012.  On July 11, 2013, the IRS issued a directive that suspends most current examination activity related to generation repairs methodology for any company that is eligible for the safe harbor. PNM is evaluating the possible effects of adopting the safe harbor method and the ultimate outcome cannot be determined at this time although the effects are not expected to be material due to PNMR’s net operating loss carryforward position.

In September 2013, the IRS issued final regulations addressing the recovery of amounts paid to acquire, produce, or improve tangible personal property and the accounting for and retirement of depreciable property. Also issued were proposed regulations addressing dispositions of property. Repairs of electric transmission and distribution property and repairs of electric generation property are specifically addressed in other Revenue Procedures issued by the IRS. The effects of the remainder of regulations are being evaluated by the Company and cannot be determined at this time. However, due to PNMR's net operating loss carryforward position for income tax purposes, the effects are not expected to be material.

In May 2013, PNMR received a refund of federal income taxes paid in prior years, which primarily was due to bonus tax depreciation and changes in the Company's method of accounting for repairs expense for income tax purposes. The total refund was $96.2 million of which $77.4 million was attributable to PNM.

In 2013, the FASB issued Accounting Standards Update 2013-11, which requires entities to present liabilities for uncertain tax positions as a reduction to a deferred tax asset for a net operating loss carryforward, a similar tax loss, or a tax credit carryforward if such carryforward could be used to offset those liabilities upon settlement.  The Company adopted the change for 2014.  Had the Company applied the update at December 31, 2013, the effect would have been decreases in net operating loss deferred tax assets of $19.9 million for PNMR, $11.2 million for PNM, and $6.8 million for TNMP, along with the elimination of the corresponding assets and liabilities associated with uncertain tax positions. There was no impact to earnings from adopting the update.

In June 2014, the Company settled the IRS examination of income tax years 2003 and 2005 through 2008. As a result of the settlement, the Company received net federal tax refunds of $2.0 million . The IRS examination resulted in the settlement of certain issues for which the Company had previously reflected liabilities related to uncertain tax positions. The settlement of the IRS examination, including the uncertain tax position matters, resulted in PNMR recording an income tax benefit of $0.2 million on a consolidated basis in the year ended December 31, 2014. PNM recorded an income tax expense of $1.1 million , TNMP reflected no impact, and an income tax benefit of $1.3 million was recorded in PNMR’s Corporate and Other segment.


B- 71

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

(12)
Pension and Other Postretirement Benefits
PNMR and its subsidiaries maintain qualified defined benefit pension plans, postretirement benefit plans providing medical and dental benefits, and executive retirement programs (collectively, the “PNM Plans” and “TNMP Plans”). PNMR maintains the legal obligation for the benefits owed to participants under these plans. The periodic costs or income of the PNM Plans and TNMP Plans are included in regulated rates to the extent attributable to regulated operations. PNM receives a regulated return on the amount it has funded for its pension plan in excess of the periodic cost or income to the extent included in retail rates.
Participants in the PNM Plans include eligible employees and retirees of PNMR and other subsidiaries of PNMR. Participants in the TNMP Plans include eligible employees and retirees of TNMP. The PNM pension plan was frozen at the end of 1997 with regard to new participants, salary levels, and benefits. Through December 31, 2007, additional credited service could be accrued under the PNM pension plan up to a limit determined by age and service. The TNMP pension plan was frozen at December 31, 2005 with regard to new participants, salary levels, and benefits.
GAAP requires a plan sponsor to (a) recognize in its statement of financial position an asset for a plan’s overfunded status or a liability for a plan’s underfunded status; (b) measure a plan’s assets and its obligations that determine its funded status as of the end of the employer’s fiscal year; and (c) recognize changes in the funded status of a defined benefit postretirement plan in the year in which the changes occur.
GAAP requires unrecognized prior service costs and unrecognized gains or losses to be recorded in AOCI and subsequently amortized. The amortization of these incurred costs is included as pension and postretirement benefit periodic cost or income in subsequent years. To the extent the amortization of these items will ultimately be recovered in future rates, PNM and TNMP record the costs as a regulatory asset or regulatory liability.
For the PNM Plans and TNMP Plans, the Company has in place a policy that defines the investment objectives, establishes performance goals of asset managers, and provides procedures for the manner in which investments are to be reviewed. The plans implement investment strategies to achieve the following objectives:
 
Maximize the return on assets, commensurate with the risk that the Corporate Investment Committee deems appropriate to meet the obligations of the pension plans and OPEB plans, minimize the volatility of expense, and account for contingencies
Transition asset mix over time to a higher proportion of high quality fixed income investments as the plans’ funded statuses improve
Management is responsible for the determination of the asset target mix and the expected rate of return. The target asset allocations are determined based on consultations with external investment advisors. The expected long-term rate of return on pension and postretirement plan assets is calculated on the market-related value of assets. GAAP requires that actual gains and losses on pension and postretirement plan assets be recognized in the market-related value of assets equally over a period of not more than five years, which reduces year-to-year volatility. For the PNM Plans and TNMP Plans, the market-related value of assets is equal to the prior year’s market related value of assets adjusted for contributions, benefit payments and investment gains and losses that are within a corridor of plus or minus 4.0% around the expected return on market value. Gains and losses that are outside the corridor are amortized over five years.


B- 72

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Pension Plans
For defined benefit pension plans, including the executive retirement plans, the PBO represents the actuarial present value of all benefits attributed by the pension benefit formula to employee service rendered prior to that date using assumptions regarding future compensation levels. The ABO represents the PBO without considering future compensation levels. Since the plans are frozen, the PBO and ABO are equal. The following table presents information about the PBO, fair value of plan assets, and funded status of the plans:
 
PNM Plan
 
TNMP Plan
 
Year Ended December 31,
 
Year Ended December 31,
 
2014
 
2013
 
2014
 
2013
 
(In thousands)
PBO at beginning of year
$
599,537

 
$
675,549

 
$
66,159

 
$
76,640

Service cost

 

 

 

Interest cost
30,163

 
28,142

 
3,193

 
3,087

Plan amendment

 
(6,346
)
 

 

Actuarial (gain) loss
72,524

 
(56,533
)
 
8,466

 
(7,820
)
Benefits paid
(44,667
)
 
(41,275
)
 
(5,513
)
 
(5,748
)
PBO at end of year
657,557

 
599,537

 
72,305

 
66,159

Fair value of plan assets at beginning of year
556,353

 
518,095

 
66,118

 
66,540

Actual return on plan assets
76,223

 
19,533

 
8,572

 
4,326

Employer contributions

 
60,000

 

 
1,000

Benefits paid
(44,667
)
 
(41,275
)
 
(5,513
)
 
(5,748
)
Fair value of plan assets at end of year
587,909

 
556,353

 
69,177

 
66,118

Funded status – asset (liability) for pension benefits
$
(69,648
)
 
$
(43,184
)
 
$
(3,128
)
 
$
(41
)

Effective January 1, 2014, the PNM Pension Plan was amended to allow for all participants, terminating after the effective date, to elect a lump sum payment of benefits. This change is reflected in the above table as of December 31, 2013.

The following table presents pre-tax information about prior service cost and net actuarial (gain) loss in AOCI as of December 31, 2014 .
 
PNM Plan
 
TNMP Plan
 
December 31, 2014
 
December 31, 2014
 
Prior service
cost
 
Net actuarial
(gain) loss
 
Net actuarial
(gain) loss
 
(In thousands)
Amounts in AOCI not yet recognized in net periodic benefit cost (income) at beginning of year
$
(2,665
)
 
$
139,256

 
$

Experience loss (gain)

 
34,345

 
4,420

Regulatory asset (liability) adjustment

 
(19,920
)
 
(4,420
)
Amortization recognized in net periodic benefit cost (income)
405

 
(5,469
)
 

Amounts in AOCI not yet recognized in net periodic benefit cost (income) at end of year
$
(2,260
)
 
$
148,212

 
$

Amortization expected to be recognized in 2015
$
(405
)
 
$
6,224

 
$


B- 73

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The following table presents the components of net periodic benefit cost (income):
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
PNM Plan
 
 
 
 
 
Service cost
$

 
$

 
$

Interest cost
30,163

 
28,142

 
32,232

Expected return on plan assets
(38,044
)
 
(41,930
)
 
(41,301
)
Amortization of net (gain) loss
13,020

 
14,840

 
10,516

Amortization of prior service cost
(965
)
 
76

 
317

Net periodic benefit cost
$
4,174

 
$
1,128

 
$
1,764

TNMP Plan
 
 
 
 
 
Service cost
$

 
$

 
$

Interest cost
3,193

 
3,087

 
3,635

Expected return on plan assets
(4,526
)
 
(4,849
)
 
(5,324
)
Amortization of net (gain) loss
665

 
1,049

 
462

Amortization of prior service cost

 

 

Net periodic benefit cost (income)
$
(668
)
 
$
(713
)
 
$
(1,227
)

The following significant weighted-average assumptions were used to determine the PBO and net periodic benefit cost (income). Should actual experience differ from actuarial assumptions, the PBO and net periodic benefit cost (income) would be affected.
 
Year Ended December 31,
PNM Plan
2014
 
2013
 
2012
Discount rate for determining December 31 PBO
4.48
%
 
5.27
%
 
4.30
%
Discount rate for determining net periodic benefit cost (income)
5.27
%
 
4.30
%
 
5.67
%
Expected return on plan assets
7.20
%
 
7.65
%
 
8.25
%
Rate of compensation increase
N/A

 
N/A

 
N/A

TNMP Plan
 
 
 
 

Discount rate for determining December 31 PBO
4.39
%
 
5.06
%
 
4.19
%
Discount rate for determining net periodic benefit cost (income)
5.06
%
 
4.19
%
 
5.69
%
Expected return on plan assets
7.20
%
 
7.65
%
 
8.25
%
Rate of compensation increase
N/A

 
N/A

 
N/A

The assumed discount rate for determining the PBO was determined based on a review of long-term high-grade bonds and management’s expectations. Changes in discount rates resulted in an increase in the PNM PBO of $50.6 million at December 31, 2014 and a decrease of $60.9 million at December 31, 2013. Changes in discount rates resulted in an increase in the TNMP PBO of $5.1 million at December 31, 2014 and a decrease of $6.4 million at December 31, 2013 . Changes in demographic experience resulted in actuarial losses in the PNM PBO of $0.2 million and $4.4 million at December 31, 2014 and 2013 . Changes in demographic experience resulted in actuarial gains in the TNMP PBO of $0.4 million at December 31, 2014 and $1.4 million at December 31, 2013. Changes in other assumptions and experience resulted in actuarial gains in the PNM PBO of $0.2 million at December 31, 2014 and less than $0.1 million at December 31, 2013. Changes in other assumptions and experience resulted in actuarial losses in the TNMP PBO of $1.3 million and less than $0.1 million at December 31, 2014 and 2013. These changes are reflected as actuarial (gain) loss above.


B- 74

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

In late 2014, the Society of Actuaries issued revised mortality tables that include changes in assumptions to reflect increased life expectancy and the corresponding decrease in mortality rates.  This change impacts the Company’s pension plans, as the mortality assumptions are used as the basis for stating the pension obligation in financial statements, determining funding requirements, and making minimum lump-sum calculations.  The actuarial valuation performed as of December 31, 2014 incorporated the impacts of the revised mortality tables.  Utilizing the revised mortality tables increased the PNM PBO by $21.9 million and the TNMP PBO by $2.5 million , which are reflected as the actuarial losses above.
The expected long-term rate of return on plan assets reflects the average rate of earnings expected on the funds invested, or to be invested, to provide for the benefits included in the PBO. Factors that are considered include, but are not limited to, historic returns on plan assets, current market information on long-term returns (e.g., long-term bond rates) and current and target asset allocations between asset categories. If all other factors were to remain unchanged, a 1% decrease in the expected long-term rate of return would cause PNM’s and TNMP’s 2015 net periodic cost to increase $5.8 million and $0.6 million (analogous changes would result from a 1% increase). The actual rate of return for the PNM and TNMP pension plans was 14.3% and 13.5% for the year ended December 31, 2014 .

The Company’s long-term pension investment strategy is to invest in assets whose interest rate sensitivity is correlated with the pension liability. The Company has chosen to implement this strategy known as Liability Driven Investing (“LDI”) by increasing the liability matching investments as the funded status of the pension plans improves. These liability matching investments are currently fixed income securities. The pension plans current targeted asset allocation is 21% equities, 65% fixed income, and 14% alternative investments. Equity investments are primarily in domestic securities that include large, mid, and small capitalization companies. The pension plans have a 6% targeted allocation to equities of companies domiciled primarily in developed countries outside of the United States. This category includes actively managed international and domestic equity securities that are benchmarked against a variety of style indices. Fixed income investments are primarily corporate bonds of companies from diversified industries, and government securities. Alternative investments include investments in hedge funds, real estate funds, and private equity funds. The hedge funds and private equity funds are structured as multi-manager multi-strategy fund of funds to achieve a diversified position in these asset classes. The hedge funds pursue various absolute return strategies such as relative value, long-short equity, and event driven. Private equity fund strategies include mezzanine financing, buy-outs, and venture capital. The real estate investment is structured as an open-ended, commingled private real estate portfolio that invests in a diversified portfolio of assets including commercial property and multi-family housing. See Note 8 for fair value information concerning assets held by the pension plans.

The following pension benefit payments are expected to be paid:
 
PNM
Plan
 
TNMP
Plan
 
(In thousands)
2015
$
53,472

 
$
5,997

2016
53,468

 
5,667

2017
51,241

 
5,351

2018
49,640

 
5,585

2019
48,560

 
5,188

2020 – 2024
213,759

 
23,600

Due to declines during the recent recession in the general price levels of marketable equity securities held by the pension plans, PNM and TNMP have been making contributions to the pension plans since 2010. In January 2015, the Company made a contribution of to the PNM pension plan of $30.0 million . The Company does not anticipate making any additional contributions to the pension plans in 2015. Based on current law, including recent amendments to funding requirements, and estimates of portfolio performance, contributions to the pension plan trust for 2016-2019 are estimated to total $22.0 million for PNM and none for TNMP. These anticipated contributions were developed using current funding assumptions with discount rates of 4.8% to 5.5% . Actual amounts to be funded in the future will be dependent on the actuarial assumptions at that time, including the appropriate discount rate.

B- 75

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Other Postretirement Benefit Plans
For postretirement benefit plans, the APBO is the actuarial present value of all future benefits attributed under the terms of the postretirement benefit plan to employee service rendered to date.
The following table presents information about the APBO, the fair value of plan assets, and the funded status of the plans:
 
PNM Plan
 
TNMP Plan
 
Year Ended December 31,
 
Year Ended December 31,
 
2014
 
2013
 
2014
 
2013
 
(In thousands)
APBO at beginning of year
$
92,165

 
$
99,613

 
$
12,266

 
$
13,678

Service cost
181

 
260

 
237

 
299

Interest cost
4,630

 
4,113

 
619

 
566

Participant contributions
2,582

 
2,537

 
366

 
373

Actuarial (gain) loss
4,455

 
(4,566
)
 
1,639

 
(1,080
)
Benefits paid
(8,838
)
 
(9,792
)
 
(1,057
)
 
(1,570
)
APBO at end of year
95,175

 
92,165

 
14,070

 
12,266

Fair value of plan assets at beginning of year
73,565

 
64,464

 
9,601

 
8,643

Actual return on plan assets
7,334

 
12,780

 
841

 
1,813

Employer contributions
3,532

 
3,576

 
343

 
342

Participant contributions
2,582

 
2,537

 
366

 
373

Benefits paid
(8,838
)
 
(9,792
)
 
(1,057
)
 
(1,570
)
Fair value of plan assets at end of year
78,175

 
73,565

 
10,094

 
9,601

Funded status – asset (liability)
$
(17,000
)
 
$
(18,600
)
 
$
(3,976
)
 
$
(2,665
)
 
In the year ended December 31, 2014, actuarial losses of $2.8 million and $1.3 million were recorded in regulatory assets for the PNM Plan and TNMP Plan. There were no prior service costs recorded for the year ended December 31, 2014 .
The following table presents the components of net periodic benefit cost:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
PNM Plan
 
 
 
 
 
Service cost
$
181

 
$
260

 
$
217

Interest cost
4,630

 
4,113

 
5,293

Expected return on plan assets
(5,638
)
 
(5,043
)
 
(4,901
)
Amortization of net (gain) loss
2,225

 
4,242

 
3,888

Amortization of prior service credit
(1,343
)
 
(1,343
)
 
(1,343
)
Net periodic benefit cost
$
55

 
$
2,229

 
$
3,154

TNMP Plan
 
 
 
 
 
Service cost
$
237

 
$
299

 
$
244

Interest cost
619

 
566

 
624

Expected return on plan assets
(534
)
 
(503
)
 
(516
)
Amortization of net (gain) loss
(122
)
 

 
(209
)
Amortization of prior service cost
32

 
57

 
57

Net periodic benefit cost
$
232

 
$
419

 
$
200



B- 76

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The following significant weighted-average assumptions were used to determine the APBO and net periodic benefit cost. Should actual experience differ from actuarial assumptions, the APBO and net periodic benefit cost would be affected.
 
Year Ended December 31,
PNM Plan
2014
 
2013
 
2012
Discount rate for determining December 31 APBO
4.45
%
 
5.21
%
 
4.26
%
Discount rate for determining net periodic benefit cost
5.21
%
 
4.26
%
 
5.70
%
Expected return on plan assets
8.50
%
 
8.50
%
 
8.50
%
Rate of compensation increase
N/A

 
N/A

 
N/A

TNMP Plan
 
 
 
 
 
Discount rate for determining December 31 APBO
4.45
%
 
5.21
%
 
4.26
%
Discount rate for determining net periodic benefit cost
5.21
%
 
4.26
%
 
5.70
%
Expected return on plan assets
6.50
%
 
6.50
%
 
6.50
%
Rate of compensation increase
N/A

 
N/A

 
N/A

The assumed discount rate for determining the APBO was determined based on a review of long-term high-grade bonds and management’s expectations. Changes in the discount rates resulted in an increase in the PNM APBO of $6.7 million at December 31, 2014 and a decrease of $8.8 million at December 31, 2013 . Changes in discount rates resulted in an increase in the TNMP APBO of $1.1 million at December 31, 2014 and a decrease of $1.3 million at December 31, 2013 . Changes in claims, contributions, medical trends, and demographic experience resulted in an actuarial gain in the PNM plan of $5.4 million at December 31, 2014 and an actuarial loss of $4.2 million at December 31, 2013 . Changes in claims, contributions, and demographic experience resulted in actuarial losses in the TNMP plan of less than $0.1 million at December 31, 2014 and $0.2 million at December 31, 2013 . These changes are reflected as actuarial (gain) loss above.
The actuarial valuation performed as of December 31, 2014 incorporated the impacts of the revised mortality tables discussed above.  Utilizing the revised mortality tables increased the PNM APBO by $3.2 million and the TNMP APBO by $0.5 million , which are reflected as actuarial losses above.
The expected long-term rate of return on plan assets reflects the average rate of earnings expected on the funds invested, or to be invested, to provide for the benefits included in the APBO. Factors that are considered include, but are not limited to, historic returns on plan assets, current market information on long-term returns (e.g., long-term bond rates), and current and target asset allocations between asset categories. If all other factors were to remain unchanged, a 1% decrease in the expected long-term rate of return would cause PNM’s and TNMP’s 2015 postretirement benefit cost to increase $0.7 million and $0.1 million (analogous changes would result from a 1% increase). The actual rate of return for the PNM and TNMP postretirement benefit plans was 10.2% and 8.9% for the year ended December 31, 2014 .
The following table shows the assumed health care cost trend rates for the PNM postretirement benefit plan:  
 
PNM Plan
 
December 31,
 
2014
 
2013
Health care cost trend rate assumed for next year
7.0
%
 
7.5
%
Rate to which the cost trend rate is assumed to decline (the ultimate trend rate)
5.0
%
 
5.0
%
Year that the rate reaches the ultimate trend rate
2023

 
2019

 

B- 77

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The following table shows the impact of a one-percentage-point change in assumed health care cost trend rates:
 
PNM Plan
 
1-Percentage-
Point  Increase
 
1-Percentage-
Point  Decrease
 
(In thousands)
Effect on total of service and interest cost
$
350

 
$
(281
)
Effect on APBO
$
5,305

 
$
(4,622
)
TNMP’s exposure to cost increases in the postretirement benefit plan is minimized by a provision that limits TNMP’s share of costs under the plan. Costs of the plan in excess of the limit are wholly borne by the participants. TNMP reached the cost limit at the end of 2001. As a result, a one-percentage-point change in assumed health care cost trend rates would have no effect on either the net periodic expense or the year-end APBO.
The Company’s other postretirement benefit plans invest in a portfolio that is diversified by asset class and style strategies. The other postretirement benefit plans generally use the same pension fixed income and equity investment managers and utilize the same overall investment strategy as described above for the pension plans, except there is no allocation to alternative investments. The other postretirement benefit plans have a target asset allocation of 70% equities and 30% fixed income. See Note 8 for fair value information concerning assets held by the other postretirement benefit plans.
The following other postretirement benefit payments, which reflect expected future service, are expected to be paid:
 
PNM Plan
 
TNMP Plan
 
(In thousands)
2015
$
6,560

 
$
801

2016
6,635

 
822

2017
6,718

 
838

2018
6,875

 
860

2019
6,950

 
882

2020 - 2024
34,585

 
4,717

PNM expects to make contributions to the PNM postretirement benefit plan totaling $3.5 million in 2015 and $14.0 million for 2016-2019. TNMP expects to make contributions to the TNMP postretirement benefit plan totaling $0.3 million in 2015 and $1.4 million for 2016-2019 .
Executive Retirement Programs
For the executive retirement programs, the following table presents information about the PBO and funded status of the plans:
 
PNM Plan
 
TNMP Plan
 
Year Ended
December 31,
 
Year Ended
December 31,
 
2014
 
2013
 
2014
 
2013
 
(In thousands)
PBO at beginning of year
$
16,363

 
$
17,467

 
$
823

 
$
902

Service cost

 

 

 

Interest cost
822

 
720

 
39

 
36

Actuarial (gain) loss
2,040

 
(330
)
 
110

 
(21
)
Benefits paid
(1,495
)
 
(1,494
)
 
(94
)
 
(94
)
PBO at end of year – funded status
17,730

 
16,363

 
878

 
823

Less current liability
1,528

 
1,536

 
94

 
94

Non-current liability
$
16,202

 
$
14,827

 
$
784

 
$
729


B- 78

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

 
The following table presents pre-tax information about net actuarial loss in AOCI as of December 31, 2014 .
 
December 31, 2014
 
PNM Plan
 
TNMP Plan
 
(In thousands)
Amount in AOCI not yet recognized in net periodic benefit cost at beginning of year
$
1,833

 
$

Experience loss (gain)
2,040

 
(110
)
Regulatory asset (liability) adjustment
(1,183
)
 
110

Amortization recognized in net periodic benefit cost (income)
(88
)
 

Amount in AOCI not yet recognized in net periodic benefit cost at end of year
$
2,602

 
$

Amortization expected to be recognized in 2015
$
136

 
$

The following table presents the components of net periodic benefit:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
PNM Plan
 
 
 
 
 
Service cost
$

 
$

 
$

Interest cost
822

 
720

 
876

Amortization of net (gain) loss
210

 
232

 
83

Amortization of prior service cost

 

 

Net periodic benefit cost
$
1,032

 
$
952

 
$
959

TNMP Plan
 
 
 
 
 
Service cost
$

 
$

 
$

Interest cost
39

 
36

 
45

Amortization of net (gain) loss

 

 

Amortization of prior service cost

 

 

Net periodic benefit cost
$
39

 
$
36

 
$
45

The following significant weighted-average assumptions were used to determine the PBO and net periodic benefit cost. Should actual experience differ from actuarial assumptions, the PBO and net periodic benefit cost would be affected.
 
Year Ended December 31,
PNM Plan
2014
 
2013
 
2012
Discount rate for determining December 31 PBO
4.48
%
 
5.27
%
 
4.30
%
Discount rate for determining net periodic benefit cost
5.27
%
 
4.30
%
 
5.67
%
Long-term rate of return on plan assets
N/A

 
N/A

 
N/A

Rate of compensation increase
N/A

 
N/A

 
N/A

TNMP Plan
 
 
 
 
 
Discount rate for determining December 31 PBO
4.39
%
 
5.06
%
 
4.19
%
Discount rate for determining net periodic benefit cost
5.06
%
 
4.19
%
 
5.69
%
Long-term rate of return on plan assets
N/A

 
N/A

 
N/A

Rate of compensation increase
N/A

 
N/A

 
N/A

 
The assumed discount rate for determining the PBO was determined based on a review of long-term high-grade bonds and management’s expectations. The impacts of changes in assumptions or experience were not significant.

B- 79

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The following executive retirement plan payments, which reflect expected future service, are expected:
 
PNM
Plan
 
TNMP
Plan
 
(In thousands)
2015
$
1,528

 
$
93

2016
1,510

 
92

2017
1,490

 
91

2018
1,468

 
89

2019
1,445

 
86

2020 – 2024
6,722

 
384

Other Retirement Plans
PNMR sponsors a 401(k) defined contribution plan for eligible employees, including those of its subsidiaries. PNMR’s contributions to the 401(k) plan consist of a discretionary matching contribution equal to 75% of the first 6% of eligible compensation contributed by the employee on a before-tax basis. PNMR also makes a non-matching contribution ranging from 3% to 10% of eligible compensation based on the eligible employee’s age.
PNMR also provides executive deferred compensation benefits through an unfunded, non-qualified plan. The purpose of this plan is to permit certain key employees of PNMR who participate in the 401(k) defined contribution plan to defer compensation and receive credits without reference to the certain limitations on contributions. Eligible employees are allowed to save on an after-tax basis. This plan has been amended and the after-tax provision will be eliminated on June 30, 2015.
A summary of expenses for these other retirement plans is as follows:
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
PNMR
 
 
 
 
 
401(k) plan
$
16,703

 
$
16,785

 
$
16,185

Non-qualified plan
$
2,257

 
$
2,204

 
$
1,491

PNM
 
 
 
 
 
401(k) plan
$
12,745

 
$
12,952

 
$
12,427

Non-qualified plan
$
1,722

 
$
1,691

 
$
1,143

TNMP
 
 
 
 
 
401(k) plan
$
3,958

 
$
3,953

 
$
3,739

Non-qualified plan
$
535

 
$
513

 
$
327

 
(13)
Stock-Based Compensation Plans
PNMR has various stock-based compensation programs, including stock options, restricted stock, and performance shares granted under the Performance Equity Plan (“PEP”). Although certain PNM and TNMP employees participate in the PNMR plans, PNM and TNMP do not have separate employee stock-based compensation plans. In 2011, the Company changed its approach to awarding stock-based compensation. As a result, no stock options have been granted since 2010 and awards of restricted stock have increased. Certain restricted stock awards are subject to achieving performance or market targets and some of these awards also have time vesting requirements. Other awards of restricted stock are only subject to time vesting requirements.
 
Performance Equity Plan

The PEP provides for the granting of non-qualified stock options, restricted stock rights, performance shares, performance units, and stock appreciation rights to officers, key employees, and non-employee board members. Restricted stock under the

B- 80

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

PEP refers to awards of stock subject to vesting, performance, or market conditions rather than to shares with contractual post-vesting restrictions. Generally, the awards vest ratably over three years from the grant date of the award. However, certain awards with performance or market conditions vest upon satisfaction of those conditions. In addition, plan provisions provide that upon retirement, participants become 100% vested in certain stock awards. The total number of shares of PNMR common stock subject to all awards under the PEP, as approved by PNMR’s shareholders in May 2014, may not exceed 13.5 million shares, subject to adjustment and certain share counting rules set forth in the PEP. This current share pool is charged five shares for each share subject to restricted stock or other full value award. Re-pricing of stock options is prohibited unless specific shareholder approval is obtained.
Source of Shares
The source of shares for exercised stock options and vested restricted stock is shares acquired on the open market by an independent agent, rather than newly issued shares.
Accounting for Stock Awards
    
The stock-based compensation expense related to stock options and restricted stock awards without performance or market conditions is amortized to compensation expense over the requisite vesting period, which is generally three years. However, compensation expense for awards to participants that are retirement eligible on the grant date is recognized immediately at the grant date and is not amortized. Compensation expense for performance-based shares is recognized ratably over the performance period and is adjusted periodically to reflect the level of achievement expected to be attained. Compensation expense related to market-based shares is recognized ratably over the measurement period, regardless of the actual level of achievement, provided the employees meet their service requirements.
In June 2014, the FASB issued Accounting Standards Update 2014-12 Compensation – Stock Compensation (Topic 718) Accounting for Share-Based Payments When the Terms of an Award Provide That a Performance Target Could Be Achieved after the Requisite Service Period , which requires that a performance target that affects vesting and that could be achieved after the requisite service period be treated as a performance condition and should not be reflected in estimating the grant date fair value of the award. The FASB issued ASU 2012-12 to eliminate diversity in practice. The Company currently treats the performance targets covered by the standard as performance conditions, so this ASU has no impact on the Company.
Total compensation expense for stock-based payment arrangements recognized by PNMR for the years ended December 31, 2014 , 2013 , and 2012 was $5.9 million , $5.3 million , and $3.6 million . Stock compensation expense of $4.2 million , $3.8 million , and $2.7 million was charged to PNM and $1.7 million , $1.5 million , and $1.0 million was charged to TNMP.

PNMR receives a tax deduction for certain stock option exercises during the period the options are exercised, generally for the excess of the price at which the options are sold over the exercise prices of the options, and a tax deduction for the value of restricted stock at the vesting date.
At December 31, 2014 , PNMR had unrecognized compensation expense of $4.7 million related to restricted stock and performance-based shares and $1.8 million related to market-based shares, which are expected to be recognized over an average of 1.8 years.
The grant date fair value for restricted stock and stock awards with Company internal performance targets is determined based on the market price of PNMR common stock on the date of the agreements reduced by the present value of future dividends, which will not be received prior to vesting, applied to the total number of shares that are anticipated to vest, although the number of performance shares that ultimately vest cannot be determined until after the performance periods end. The grant date fair value of stock awards with market targets is determined using Monte Carlo simulation models, which provide grant date fair values that include an expectation of the number of shares to vest at the end of the measurement period.

B- 81

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The following table summarizes the weighted-average assumptions used to determine the awards grant date fair value:
 
 
Year Ended December 31,
Restricted Shares and Performance-Based Shares
 
2014
 
2013
 
2012
 
Expected quarterly dividends per share
 
$
0.185

 
$
0.165

 
$
0.145

 
Risk-free interest rate
 
0.62
%
 
0.34
%
 
1.22
%
 
 
 
 
 
 
 
 
 
Market-Based Shares
 
 
 
 
 
 
 
Dividend yield
 
2.82
%
 
2.86
%
 
3.45
%
 
Expected volatility
 
25.11
%
 
25.11
%
 
43.98
%
 
Risk-free interest rate
 
0.64
%
 
0.36
%
 
1.04
%
 
The following table summarizes activity in restricted stock awards, including performance-based and market-based shares, and stock options:
 
 
Restricted Stock
Stock Options
 
 
Shares
 
Weighted-Average Grant Date Fair Value
Shares
 
Weighted
Average
Exercise
Price
Outstanding at December 31, 2013
 
315,305

 
$
17.87

1,343,666

 
$
20.63

Granted
 
242,164

 
$
21.27


 
$

Exercised
 
(295,423
)
 
$
16.70

(345,426
)
 
$
20.04

Forfeited
 
(3,276
)
 
$
22.46

(17,151
)
 
$
26.43

Expired
 

 

(60,584
)
 
$
27.98

Outstanding at December 31, 2014
 
258,770

 
$
22.31

920,505

 
$
20.39

 
Included as restricted stock granted and exercised above are 112,864 shares that were based upon achieving performance or market targets for 2013. The Board approved these shares in February 2014 (based upon achieving market targets, weighted at 60% , at maximum levels, and performance targets, weighted at 40% , at below threshold levels for 2011 through 2013 performance period.

As of December 31, 2014, PNMR’s stock-based compensation program provides for performance and market targets through 2016. Excluded from the above table are 179,845 shares approved by the Board in February 2015 (based upon achieving market targets, weighted at 60% , at target levels and performance targets, weighted at 40% , at maximum levels for the 2012 through 2014 performance period), as well as maximums of 179,811 and 163,152 shares for the three-year performance periods ending in 2015 and 2016 that would be awarded if all performance and market criteria are achieved at maximum levels and all executives remain eligible.
 
In March 2012, the Company entered into a retention award agreement with its Chairman, President, and Chief Executive Officer under which she would receive 135,000 shares of PNMR’s common stock if PNMR meets specific market targets at the end of 2016 and she remains an employee of the Company. Under the agreement, she would receive 35,000 of the total shares if PNMR achieved specific market targets at the end of 2014. The specified market target was achieved at the end of 2014 and the Board approved her receiving the 35,000 shares in February 2015. The retention award was made under the PEP and was approved by the Board on February 28, 2012. The above table does not include any restricted stock shares under this retention award agreement.

Effective as of January 1, 2015, the Company entered into a retention award agreement with its Executive Vice President and Chief Financial Officer under which he would receive awards of restricted stock if PNMR meets specific performance targets at the end of 2016 and 2017 and he remains an employee of the Company. If PNMR achieves the specific performance target for

B- 82

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

the period from January 1, 2015 through December 31, 2016, he would receive $100,000 of PNMR common stock based on the market value per share on the grant date in early 2017. Similarly, if PNMR achieves the specific performance target for the period from January 1, 2015 through December 31, 2017, he would receive $275,000 of PNMR common stock based on the market value per share on the grant date in early 2018. If the target for the first performance period is not met, but the target for the second performance period is met, he would receive both awards, less any amount received previously under the agreement. The retention award was made under the PEP and was approved by the Board on December 9, 2014. The above table does not include any restricted stock shares under this retention award agreement.

At December 31, 2014 , the aggregate intrinsic value of stock options outstanding, all of which are exercisable, was $8.9 million with a weighted-average remaining contract life of 2.83 years. At December 31, 2014 , the exercise price of 254,050 outstanding stock options is greater than the closing price of PNMR common stock on that date; therefore those options have no intrinsic value.
The following table provides additional information concerning stock options, and restricted stock activity including performance-based and market-based shares:
 
 
Year Ended December 31,
Restricted Stock
 
2014
 
2013
 
2012
Weighted-average grant date fair value
 
$
21.27

 
$
20.03

 
$
16.75

Total fair value of restricted shares that vested (in thousands)
 
$
4,933

 
$
4,395

 
$
5,099

 
 
 
 
 
 
 
Stock Options
 
 
 
 
 
 
Weighted-average grant date fair value of options granted
 
$

 
$

 
$

Total fair value of options that vested (in thousands)
 
$

 
$
625

 
$
1,054

Total intrinsic value of options exercised (in thousands)
 
$
2,473

 
$
2,721

 
$
6,356

 
(14)
Construction Program and Jointly-Owned Electric Generating Plants
PNM is a participant in several jointly-owned power plant projects. The primary operating or participation agreements for the joint projects expire in July 2016 for Four Corners, July 2022 for SJGS, December 2046 for Luna, and November 2047 for PVNGS.
PNM’s expenditures for additions to utility plant were $316.8 million in 2014 , including expenditures on jointly-owned projects. TNMP does not participate in the ownership or operation of any generating plants, but incurred expenditures for additions to utility plant of $127.2 million during 2014 . On a consolidated basis, PNMR’s expenditures for additions to utility plant were $460.7 million in 2014 .
 
Joint Projects

Under the agreements for the jointly-owned projects, PNM has an undivided interest in each asset and liability of the project and records its pro-rata share of each item in the corresponding asset and liability account on PNM’s Consolidated Balance Sheets. Likewise, PNM records its pro-rata share of each item of operating and maintenance expenses for its jointly-owned plants within the corresponding operating expense account in its Consolidated Statements of Earnings. PNM is responsible for financing its share of the capital and operating costs of the joint projects.

B- 83

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

At December 31, 2014 , PNM’s interests and investments in jointly-owned generating facilities are:
Station (Fuel Type)
Plant in
Service
 
Accumulated
Depreciation
 
Construction
Work in
Progress
 
Composite
Interest
 
(In thousands)
SJGS (Coal)
$
1,009,378

 
$
(423,364
)
 
$
25,551

 
46.30
%
PVNGS (Nuclear) (1)
$
533,702

 
$
(152,273
)
 
$
42,334

 
10.20
%
Four Corners Units 4 and 5 (Coal)
$
162,111

 
$
(101,007
)
 
$
8,253

 
13.00
%
Luna (Gas)
$
66,169

 
$
(20,297
)
 
$
(136
)
 
33.33
%
 
(1)  
Includes interest in PVNGS Unit 3 , interest in common facilities for all PVNGS units, and owned interests in PVNGS Units 1 and 2 .
San Juan Generating Station
PNM operates and jointly owns SJGS. SJGS Units 1 and 2 are owned on a 50% shared basis with Tucson. SJGS Unit 3 is owned 50% by PNM, 41.8% by SCPPA, and 8.2% by Tri-State. SJGS Unit 4 is owned 38.457% by PNM, 28.8% by M-S-R Public Power Agency, 10.04% by the City of Anaheim, California, 8.475% by the City of Farmington, New Mexico, 7.2% by the County of Los Alamos, New Mexico, and 7.028% by UAMPS. See Note 16 for additional information about SJGS, including the potential restructuring of SJGS ownership.
Palo Verde Nuclear Generating Station
PNM is a participant in the three units of PVNGS, also known as the Arizona Nuclear Power Project, with APS (the operating agent), SRP, EPE, SCE, SCPPA, and The Department of Water and Power of the City of Los Angeles. PNM has a 10.2% undivided interest in PVNGS, with portions of its interests in Units 1 and 2 held under leases. See Note 7 for additional information concerning the PVNGS leases, including PNM’s notices that it will exercise its option to purchase the assets underlying certain of the leases at the expiration of the leases on January 15, 2016.
Operation of each of the three PVNGS units requires an operating license from the NRC. The NRC issued full power operating licenses for Unit 1 in June 1985, Unit 2 in April 1986, and Unit 3 in November 1987. The full power operating licenses were originally for a period of 40 years and authorize APS, as operating agent for PVNGS, to operate the three PVNGS units. On April 21, 2011, the NRC approved extensions in the operating licenses for the plants for 20 years through June 2045 for Unit 1, April 2046 for Unit 2, and November 2047 for Unit 3. In April 2010, APS entered into a Municipal Effluent Purchase and Sale Agreement that provides effluent water rights necessary for cooling purposes at PVNGS through 2050.
Four Corners Power Plant
PNM is a participant in two units of Four Corners with APS (the operating agent), EPE, SRP, and Tucson. PNM has a 13.0% undivided interest in Units 4 and 5 of Four Corners. The Four Corners plant site is leased from the Navajo Nation and is also subject to an easement from the federal government. APS, on behalf of the Four Corners participants, negotiated amendments to an existing facility lease with the Navajo Nation, which extends the Four Corners leasehold interest from 2016 to 2041. The Navajo Nation approved these amendments in March 2011. The effectiveness of the amendments also requires the approval of the DOI, as does a related federal rights-of-way grant, which the Four Corners participants are pursuing. A federal environmental review is underway as part of the DOI review process. In addition, installation of SCR control technology at Four Corners requires a PSD permit, which APS received in December 2014.  PNM cannot predict whether the federal approvals will be granted, and if so on a timely basis, or whether any conditions that may be attached to them will be acceptable to PNM and the other Four Corners owners . See Note 16 for additional information about Four Corners.
Luna Energy Facility
Luna is a combined-cycle power plant near Deming, New Mexico. Luna is owned equally by PNM, Tucson, and Samchully Power & Utilities 1, LLC. The operation and maintenance of the facility has been contracted to North American Energy Services.

B- 84

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Construction Program
The Company anticipates making substantial capital expenditures for the construction and acquisition of utility plant and other property and equipment. An unaudited summary of the budgeted construction expenditures, including expenditures for jointly-owned projects, and nuclear fuel, is as follows:
 
2015
 
2016
 
2017
 
2018
 
2019
 
Total
 
 
 
 
 
(In millions)
 
 
 
 
PNM
$
423.9

 
$
402.3

 
$
334.8

 
$
180.6

 
$
260.3

 
$
1,601.9

TNMP
121.3

 
92.8

 
93.3

 
105.9

 
105.0

 
518.3

Corporate and Other
24.0

 
19.3

 
15.4

 
13.7

 
14.7

 
87.1

Total PNMR
$
569.2

 
$
514.4

 
$
443.5

 
$
300.2

 
$
380.0

 
$
2,207.3

 
The construction expenditure estimates are under continuing review and subject to ongoing adjustment, as well as to Board review and approval. The construction expenditures above include estimated amounts of $70.7 million related to environmental upgrades at SJGS to address regional haze and $268.4 million related to the identified sources of replacement capacity under the revised plan for compliance described in Note 16. The above construction expenditures also include additional renewable resources anticipated to be required to meet the RPS, additional peaking resources needed to meet needs outlined in PNM’s current IRP, environmental upgrades at Four Corners estimated to be $80.0 million , the purchase of the leased portion of the EIP, and the purchase of the assets underlying three of the PVNGS Unit 2 leases at the expiration of those leases.

(15)
Asset Retirement Obligations
AROs are recorded based on the determination of underlying assumptions, such as discount rates, estimates of the future costs for decommissioning, and the timing of the removal activities to be performed. Any changes in these assumptions underlying the required calculations may require revisions to the estimated AROs when identified. A reconciliation of the ARO liability is as follows:
 
 
PNMR
 
PNM
 
TNMP
 
(In thousands)
Liability at December 31, 2011
$
79,233

 
$
78,425

 
$
699

Liabilities incurred

 

 

Liabilities settled
(25
)
 

 
(25
)
Accretion expense
6,685

 
6,617

 
58

Liability at December 31, 2012
85,893

 
85,042

 
732

Liabilities incurred

 

 

Liabilities settled
(79
)
 
(67
)
 
(12
)
Accretion expense
7,245

 
7,174

 
62

Revisions to estimated cash flows (1)
3,076

 
3,076

 

Liability at December 31, 2013
96,135

 
95,225

 
782

Liabilities incurred

 

 

Liabilities settled

 

 

Accretion expense
7,984

 
7,906

 
66

Revisions to estimated cash flows
51

 
51

 

Liability at December 31, 2014
$
104,170

 
$
103,182

 
$
848

 
(1)  
Based on studies to estimate the amount and timing of future ARO expenditures. PNM has an ARO for PVNGS that includes the obligations for nuclear decommissioning of that facility. In 2013, a new decommissioning study for PVNGS

B- 85

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

was implemented reflecting updated cash flow estimates, including the extended operating licenses. The new study resulted in an increase of $0.5 million to the ARO. In addition, a new decommissioning study for SJGS was implemented in 2013, resulting in a $2.5 million increase to the ARO.


(16)
Commitments and Contingencies

Overview
There are various claims and lawsuits pending against the Company. The Company also is subject to federal, state, and local environmental laws and regulations and periodically participates in the investigation and remediation of various sites. In addition, the Company occasionally enters into financial commitments in connection with its business operations. Also, the Company is involved in various legal and regulatory (Note 17) proceedings in the normal course of its business. It is not possible at this time for the Company to determine fully the effect of all litigation and other legal and regulatory proceedings on its financial position, results of operations, or cash flows.
With respect to some of the items listed below, the Company has determined that a loss is not probable or that, to the extent probable, cannot be reasonably estimated. In some cases, the Company is not able to predict with any degree of certainty the range of possible loss that could be incurred. Nevertheless, the Company assesses legal and regulatory matters based on current information and makes judgments concerning their potential outcome, giving due consideration to the nature of the claim, the amount and nature of damages sought, and the probability of success. Such judgments are made with the understanding that the outcome of any litigation, investigation, and other legal proceeding is inherently uncertain. In accordance with GAAP, the Company records liabilities for matters where it is probable a loss has been incurred and the amount of loss is reasonably estimable. The actual outcomes of the items listed below could ultimately differ from the judgments made and the differences could be material. The Company cannot make any assurances that the amount of reserves or potential insurance coverage will be sufficient to cover the cash obligations that might be incurred as a result of litigation or regulatory proceedings. Except as otherwise disclosed, the Company does not expect that any known lawsuits, environmental costs, and commitments will have a material effect on its financial condition, results of operations, or cash flows.

Commitments and Contingencies Related to the Environment

PVNGS Decommissioning Funding

PNM has a program for funding its share of decommissioning costs for PVNGS, including portions held under leases. The nuclear decommissioning funding program is invested in equities and fixed income instruments in qualified and non-qualified trusts. PNM funded $4.9 million , $4.9 million , and $2.6 million for the years ended December 31, 2014, 2013, and 2012 into the qualified and non-qualified trust funds. The estimated market value of the trusts at December 31, 2014 and 2013 was $244.6 million and $222.5 million .

Nuclear Spent Fuel and Waste Disposal
 
Nuclear power plant operators are required to enter into spent fuel disposal contracts with the DOE that require the DOE to accept and dispose of all spent nuclear fuel and other high-level radioactive wastes generated by domestic power reactors. Although the Nuclear Waste Policy Act required the DOE to develop a permanent repository for the storage and disposal of spent nuclear fuel by 1998, the DOE announced that it would not be able to open the repository by 1998 and sought to excuse its performance of these requirements. In November 1997, the D.C. Circuit issued a decision preventing the DOE from excusing its own delay, but refused to order the DOE to begin accepting spent nuclear fuel. Based on this decision and the DOE’s delay, a number of utilities, including APS (on behalf of itself and the other PVNGS owners, including PNM), filed damages actions against the DOE in the Court of Federal Claims. In 2010, the court ordered an award to the PVNGS owners for their damages claim for costs incurred through December 2006. APS filed a subsequent lawsuit, on behalf of itself and the other PVNGS owners, against DOE in the Court of Federal Claims on December 19, 2012. The lawsuit alleged that from January 1, 2007 through June 30, 2011, additional damages were incurred due to DOE’s continuing failure to remove spent nuclear fuel and high level waste from PVNGS. APS and DOE entered into a settlement agreement, and on October 7, 2014, APS received a settlement payment of $57.4 million for costs paid through June 30, 2011, for DOE’s failure to accept spent nuclear fuel generated at PVNGS. PNM’s share of the

B- 86

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

settlement is $5.9 million , substantially all of which is credited back to PNM’s customers. The settlement agreement also establishes a process for the payment of subsequent claims through December 30, 2016. Under the settlement agreement, APS must submit claims annually for payment of allowable costs. On October 31, 2014, APS submitted a $42.5 million claim for costs paid between July 1, 2011, and June 30, 2014. PNM’s share of the settlement would amount to $4.3 million , will be recorded when a final determination of the claim is made, which is anticipated to be in March 2015, and would primarily be credited back to PNM’s customers. The settlement agreement terminates upon payment of costs paid through December 31, 2016, unless extended by mutual written agreement.

PNM estimates that it will incur approximately $58.0 million (in 2013 dollars) for its share of the costs related to the on-site interim storage of spent nuclear fuel at PVNGS during the term of the operating licenses. PNM accrues these costs as a component of fuel expense as the fuel is consumed. At December 31, 2014 and 2013, PNM had a liability for interim storage costs of $12.3 million and $11.9 million included in other deferred credits.

On June 8, 2012, the D.C. Circuit issued its decision on a challenge by several states and environmental groups of the NRC’s rulemaking regarding temporary storage and permanent disposal of high level nuclear waste and spent nuclear fuel.  The petitioners had challenged the NRC’s 2010 update to the agency’s Waste Confidence Decision and temporary storage rule (“Waste Confidence Decision”).
 
The D.C. Circuit found that the Waste Confidence Decision update constituted a major federal action, which, consistent with NEPA, requires either an environmental impact statement or a finding of no significant impact from the NRC’s actions.  The D.C. Circuit found that the NRC’s evaluation of the environmental risks from spent nuclear fuel was deficient, and therefore remanded the Waste Confidence Decision update for further action consistent with NEPA.
 
On September 6, 2012, the NRC commissioners issued a directive to the NRC staff to proceed with development of a generic EIS to support an updated Waste Confidence Decision.  The NRC commissioners also directed the staff to establish a schedule to publish a final rule and environmental impact study within 24 months of September 6, 2012. 

In September 2013, the NRC issued its draft generic EIS to support an updated Waste Confidence Decision. On August 26, 2014, the NRC approved a final rule on the environmental effects of continued storage of spent nuclear fuel. The continued storage rule adopted the findings of the generic EIS regarding the environmental impacts of storing spent fuel at any reactor site after the reactor’s licensed period of operations. As a result, those generic impacts do not need to be re-analyzed in the environmental reviews for individual licenses. Although PVNGS had not been involved in any licensing actions affected by the D.C. Circuit’s June 8, 2012, decision, the NRC lifted its suspension on final licensing actions on all nuclear power plant licenses and renewals that went into effect when the D.C. Circuit issued its June 2012 decision. The August 2014 final rule has been subject to continuing legal challenges before the NRC and the United States Court of Appeals.

PVNGS has sufficient capacity at its on-site ISFSI to store all of the nuclear fuel that will be irradiated during the initial operating license period, which ends in December 2027.  Additionally, PVNGS has sufficient capacity at its on-site ISFSI to store a portion of the fuel that will be irradiated during the period of extended operation, which ends in November 2047.  If uncertainties regarding the United States government’s obligation to accept and store spent fuel are not favorably resolved, APS will evaluate alternative storage solutions that may obviate the need to expand the ISFSI to accommodate all of the fuel that will be irradiated during the period of extended operation.
 
In 2011, the National Association of Regulatory Utility Commissioners and the Nuclear Energy Institute challenged DOE’s 2010 determination of the adequacy of the one tenth of a cent per KWh fee (the “one-mill fee”) paid by the nation’s commercial nuclear power plant owners pursuant to their individual contracts with the DOE. In June 2012, the D.C. Circuit held that DOE failed to conduct a sufficient fee analysis in making the 2010 determination. The D.C. Circuit remanded the 2010 determination to the DOE with instructions to conduct a new fee adequacy determination within six months. In February 2013, upon completion of DOE’s revised one-mill fee adequacy determination, the court reopened the proceedings. On November 19, 2013, the D.C. Circuit ordered the DOE to notify Congress of DOE’s intention to suspend collecting annual fees for nuclear waste disposal from nuclear power plant operators. On January 3, 2014, the DOE notified Congress of its intention to suspend collection of the one-mill fee, subject to Congress’ disapproval. On May 16, 2014, the DOE adjusted the fee to zero . In 2013, the one-mill fee for PNM’s share of the output from all three units at PVNGS amounted to $3.0 million . The fee applicable to PVNGS Units 1 and

B- 87

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

2 is being recovered by PNM in its retail rates. PNM anticipates challenges to this action and is unable to predict its ultimate outcome.

The Clean Air Act
 
Regional Haze

In 1999, EPA developed a regional haze program and regional haze rules under the CAA. The rule directs each of the 50 states to address regional haze. Pursuant to the CAA, states have the primary role to regulate visibility requirements by promulgating SIPs. States are required to establish goals for improving visibility in national parks and wilderness areas (also known as Class I areas) and to develop long-term strategies for reducing emissions of air pollutants that cause visibility impairment in their own states and for preventing degradation in other states. States must establish a series of interim goals to ensure continued progress. The first planning period specifies setting reasonable progress goals for improving visibility in Class I areas by the year 2018. In July 2005, EPA promulgated its final regional haze rule guidelines for states to conduct BART determinations for certain covered facilities, including utility boilers, built between 1962 and 1977 that have the potential to emit more than 250 tons per year of visibility impairing pollution. If it is demonstrated that the emissions from these sources cause or contribute to visibility impairment in any Class I area, then BART must be installed by 2018.

SJGS
BART Determination Process SJGS is a source that is subject to the statutory obligations of the CAA to reduce visibility impacts. The State of New Mexico submitted its SIP on the regional haze and interstate transport elements of the visibility rules for review by EPA in June 2011. The SIP found that BART to reduce NOx emissions from SJGS is selective non-catalytic reduction technology (“SNCR”). Nevertheless, in August 2011, EPA published its FIP, stating that it was required to do so by virtue of a consent decree it had entered into with an environmental group in litigation concerning the interstate transport requirements of the CAA. The FIP included a regional haze BART determination for SJGS that required installation of selective catalytic reduction technology (“SCR”) on all four units by September 21, 2016. In November 2012, EPA approved all components of the SIP, except for the NOx BART determination for SJGS, which continued to be subject to the FIP.

PNM, the Governor of New Mexico, and NMED petitioned the Tenth Circuit to review EPA’s decision and requested EPA to reconsider its decision. The Tenth Circuit denied petitions to stay the effective date of the rule. These parties also formally asked EPA to stay the effective date of the rule. Several environmental groups intervened in support of EPA. The parties file periodic status reports with the Tenth Circuit, but proceedings are being held in abeyance as agreed to by the parties.

During 2012 and early 2013, PNM, as the operating agent for SJGS, engaged in discussions with NMED and EPA regarding an alternative to the FIP and SIP. Following approval by a majority of the other SJGS owners, PNM, NMED, and EPA agreed on February 15, 2013 to pursue a revised BART path to comply with federal visibility rules at SJGS. The terms of the non-binding agreement would result in the retirement of SJGS Units 2 and 3 by the end of 2017 and the installation of SNCRs on Units 1 and 4 by the later of January 31, 2016 or 15 months after EPA approval of a revised SIP.
 
In accordance with the revised plan, PNM submitted a new BART analysis to NMED on April 1, 2013, reflecting the terms of the non-binding agreement. NMED developed a RSIP and submitted it to the EIB for approval in May 2013. The EIB approved the RSIP in September 2013 and it was submitted to EPA for approval in October 2013. Final rules approving the RSIP and withdrawing the FIP were published in the Federal Register on October 9, 2014 and became effective on November 10, 2014.

Conversion of SJGS Units 1 and 4 to balanced draft technology (“BDT”) is included with the installation of SNCRs in the RSIP. The requirement to install BDT was made binding and enforceable in the NSR permit that accompanied the RSIP submitted to the EPA. EPA’s rule approving the RSIP specifically references the NSR permit by including a condition that requires “modification of the fan systems on Units 1 and 4 to achieve ‘balanced’ draft configuration ….”

Implementation Activities – Due to the compliance deadline set forth in the FIP, PNM took steps to commence installation of SCRs at SJGS. In October 2012, PNM entered into a contract with an engineering, procurement, and construction contractor to install SCRs on behalf of the SJGS owners. At the time PNM entered into the contract, PNM estimated the total cost to install SCRs on all four units of SJGS to be between approximately $824 million and $910 million . The costs for the project to install

B- 88

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

SCRs would encompass installation of BDT equipment to comply with the NAAQS requirements described below. The construction contract was terminated in December 2014 following approval of the RSIP by EPA.

Also, PNM had previously indicated it estimated the cost of SNCRs on all four units of SJGS to be between approximately $85 million and $90 million based on a conceptual design study. Along with the SNCR installation, additional BDT equipment would be required to be installed to meet the NAAQS requirements described below, the cost of which had been estimated to total between approximately $105 million and $110 million for all four units of SJGS.

The above estimates include gross receipts taxes, AFUDC, and other PNM costs. Based upon its current SJGS ownership interest, PNM’s share of the costs described above would be about 46.3% .

Following the February 2013 development of the alternative BART compliance plan, PNM began taking steps to prepare for the potential installation of SNCR and BDT equipment on Units 1 and 4 due to the long lead times on certain equipment purchases. In May 2013, PNM entered into an equipment and related services contract with a technology provider. In July 2014, PNM entered into a contract for management of the construction and in September 2014 entered into a construction and procurement contract.

NMPRC Filing On December 20, 2013, PNM made a filing with the NMPRC requesting certain approvals necessary to effectuate the RSIP. In this filing, PNM requested:

Permission to retire SJGS Units 2 and 3 at December 31, 2017 and to recover over 20 years their net book value at that date along with a regulated return on those costs
A CCN to include PNM’s ownership of PVNGS Unit 3, amounting to 134 MW, as a resource to serve New Mexico retail customers at a proposed value of $2,500 per KW, effective January 1, 2018
An order allowing cost recovery for PNM’s share of the installation of SNCR and BDT equipment to comply with NAAQS requirements on SJGS Units 1 and 4, not to exceed a total cost of $82 million
A CCN for an exchange of capacity out of SJGS Unit 3 and into SJGS Unit 4, resulting in ownership of an additional 78 MW in Unit 4 for PNM; the net impact of this exchange and the retirement of Units 2 and 3 would have been a reduction of 340 MW in PNM’s ownership of SJGS
The December 20, 2013 NMPRC filing identified a new 177 MW natural gas fired generation source and 40 MW of new utility-scale solar PV generation to replace a portion of PNM’s share of the reduction in generating capacity due to the retirement of SJGS Units 2 and 3. PNM received approval to construct the 40 MW of solar PV facilities in its 2015 Renewable Energy Plan. See Note 17. Specific approvals to acquire the gas facility and the treatment of associated costs will be made in future filings. PNM estimates the cost of these identified resources would be approximately $268.4 million . These amounts are included in PNM’s current construction expenditure forecast although approval of the plan remains subject to numerous conditions. Although operating costs would be reduced due to the retirement of SJGS Units 2 and 3, the operating costs for SJGS Units 1 and 4 would increase with the installation of SNCR and BDT equipment.

As discussed under SJGS Ownership Restructuring Matters below, the owners of SJGS are attempting to negotiate agreements concerning numerous matters, the resolution of which is necessary in order to facilitate the shutdown of SJGS Units 2 and 3 and comply with the RSIP. PNM’s requests in the December 20, 2013 NMPRC filing were based on the status of the negotiations among the SJGS owners at that time. In July 2014, PNM filed a notice with the NMPRC regarding the status of the negotiations among the SJGS participants, including that the SJGS participants reached non-binding agreements in principle on the ownership restructuring of SJGS and that PNM was proposing to acquire 132 MW of SJGS Unit 4 effective December 31, 2017, rather than exchanging 78 MW of capacity in SJGS Unit 3 for 78 MW in SJGS Unit 4 as contemplated in the December 20, 2013 NMPRC filing. Those agreements are memorialized in the resolution and term sheet described below.
On October 1, 2014, PNM, the staff of the NMPRC, the NMAG, New Mexico Independent Power Producers, Western Resource Advocates, and Renewable Energy Industries Association of New Mexico filed a stipulation with the NMPRC. NMIEC subsequently joined the agreement. New Mexico Independent Power Producers, Western Resource Advocates, and Renewable Energy Industries Association of New Mexico have since withdrawn support of the stipulation. Statements of opposition were filed by other intervenors.

B- 89

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Under the terms of the stipulation, PNM:
Would be authorized to abandon SJGS Units 2 and 3 effective December 31, 2017
Would be granted a CCN for an additional 132 MW of SJGS Unit 4 capacity as of January 1, 2018 with a rate base value of $26 million plus any reasonable and prudent investments made in Unit 4 prior to that date; PNM would reduce its carrying value of SJGS Unit 3 by this $26 million
Would recover 50% of the estimated $231 million undepreciated value in SJGS Units 2 and 3 at December 31, 2017; recovery would be over a twenty year period and would include a return on the unrecovered amount at PNM’s WACC; at December 31, 2014, PNM’s net book value of its current ownership share of SJGS Units 2 and 3 was approximately $282 million
Would be granted a CCN for 134 MW of PVNGS Unit 3 at a January 1, 2018 value of $221.1 million ( $1,650 per KW); PNM’s ownership share of PVNGS would also be subject to a capacity factor performance threshold of 75% for a seven year period beginning January 1, 2018; subject to certain exceptions, if the capacity factor is not achieved in any year, PNM would refund the cost of replacement power through its FPPAC; at December 31, 2014, PNM’s net book value of PVNGS Unit 3 was approximately $144 million
Would file for recovery of its reasonable and prudent costs of installation of the SNCR and BDT equipment requirements at SJGS Units 1 and 4 up to $90.6 million
Would not be allowed to recover a total of approximately $20 million of increased operations and maintenance costs associated with the agreement reached with the remaining SJGS participants, additional fuel handling expenses, and certain other costs incurred in efforts to comply with the CAA
A public hearing in the NMPRC case was held in January 2015. In connection with the hearing, PNM filed testimony indicating that:
PNM would not acquire the 65 MW of capacity in SJGS Unit 4 that was no longer anticipated to be acquired by the City of Farmington, as discussed under SJGS Ownership Restructuring Matters below
PNM would not enter into a coal supply agreement for SJGS that extends beyond 2022 without NMPRC approval
PNM would have an ownership restructuring agreement for SJGS in place by May 1, 2015
PNM expects a decision from the NMPRC in the second quarter of 2015. PNM is unable to predict if the NMPRC will approve the stipulation. If the stipulation is approved as filed, PNM anticipates it would incur a regulatory disallowance that would include the write-off of 50% of the undepreciated investment in SJGS Units 2 and 3, an offset to the regulatory disallowance to reflect including the investment in PVNGS Unit 3 in the ratemaking process at the stipulated value, and other impacts of the stipulation. Although PNM would record the regulatory disallowance upon approval by the NMPRC, the amount of the disallowance would be dependent on the provisions of the NMPRC’s final order, as well as PNM’s projections of the December 31, 2017 net book values of SJGS Units 2 and 3 and PVNGS Unit 3. The amount initially recorded would be subject to adjustment to reflect changes in the projected December 31, 2017 net book values of the plants. Based on the provisions of the stipulation as filed and PNM’s current projection of December 31, 2017 book values, PNM estimates the net pre-tax regulatory disallowance would be between $60 million and $70 million .

SJGS Ownership Restructuring Matters – SJGS is jointly owned by PNM and eight other entities, including three participants that operate in the State of California. Furthermore, each participant does not have the same ownership interest in each unit. The SJPPA that governs the operation of SJGS expires on July 1, 2022 and the contract with SJCC to supply the coal requirements of the plant expires on December 31, 2017. The California participants have indicated that, under California law, they may be prohibited from making significant capital improvements to SJGS. The California participants have stated they would be unable to fully fund the construction of either SCRs or SNCRs at SJGS and have expressed the intent to exit their ownership in SJGS no later than the expiration of the current SJPPA. One other participant also expressed a similar intent to exit ownership in the plant. The participants intending to exit ownership in SJGS currently own 50.0% of SJGS Unit 3 and 38.8% of SJGS Unit 4. PNM currently owns 50.0% of SJGS Unit 3 and 38.5% of SJGS Unit 4.


B- 90

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The SJGS participants have engaged in mediated negotiations concerning the implementation of the RSIP to address BART at SJGS. These negotiations initially included potential shifts in ownership among participants and between Units 3 and 4 that could have resulted in PNM acquiring additional ownership in Unit 4 prior to the shutdown of SJGS Units 2 and 3. The discussions among the SJGS participants regarding restructuring have also included, among other matters, the treatment of plant decommissioning obligations, mine reclamation obligations, environmental matters, and certain ongoing operating costs.

On June 26, 2014, a non-binding resolution (the “Resolution”) was unanimously approved by the SJGS Coordination Committee. The Resolution identifies the participants who would be exiting active participation in SJGS effective December 31, 2017, and participants, including PNM, who would retain an interest in the ongoing operation of one or more units of SJGS. The Resolution provides the essential terms of restructured ownership of SJGS between the exiting participants and the remaining participants and addresses other related matters. The Resolution includes provisions indicating that the exiting participants would remain obligated for their proportionate shares of environmental, mine reclamation, and certain other legacy liabilities that are attributable to activities that occurred prior to their exit, as well as outlining how their shares would be determined. Also, on June 26, 2014, a non-binding term sheet was approved by all of the remaining participants that provides the essential terms of restructured ownership of SJGS among the remaining participants. As part of the non-binding terms, PNM confirmed that it would acquire an additional 132 MW in SJGS Unit 4 effective December 31, 2017. There would be no initial cost for PNM to acquire the additional 132 MW although PNM’s share of capital improvements, including the costs of installing SNCR and BDT equipment, and operating expenses would increase to reflect the increased ownership. The acquisition of 132 MW of SJGS Unit 4 would result in PNM’s ownership share of SJGS Unit 4 being 64.5% and of SJGS Units 1 and 4 aggregating 58.7% . The Resolution and the non-binding term sheet recognize that prior to executing a binding restructuring agreement, the remaining participants will need to have greater certainty in regard to the economic cost and availability of fuel for SJGS for the period after December 31, 2017. As discussed under Coal Supply below, the remaining participants are in the process of negotiating agreements concerning future fuel supply for SJGS, the resolution of which is necessary for continued operation of SJGS after December 31, 2017. On September 2, 2014, the SJGS Coordination Committee adopted a non-binding supplement to the Resolution, which provides for allocation of future costs of decommissioning among current SJGS owners using a time-based sliding scale and outlines indemnification obligations.

In September 2014, the SJGS participants executed a binding Fuel and Capital Funding Agreement to implement certain provisions of the Resolution, including payment by the remaining participants of capital costs for the Unit 4 SNCR project starting July 1, 2014, and acquisition by PNM of the exiting participants’ coal inventory as of January 1, 2015. PNM filed the Fuel and Capital Funding Agreement with FERC on September 18, 2014, with a request for a retroactive effective date to July 1, 2014. FERC approved the request on November 13, 2014. The Fuel and Capital Funding Agreement provides that the SJGS participants will return to the prior arrangement if a binding restructuring agreement is not reached.

On January 7, 2015, the City of Farmington, New Mexico, which has an ownership interest in Unit 4, notified the other participants that it will not acquire additional MWs in Unit 4, leaving 65 MWs in that unit unsubscribed. As discussed under NMPRC Filing above, PNM has indicated that it will not acquire any of the unsubscribed MWs. However, a scenario is being evaluated in which PNMR Development would acquire the 65 MWs. The City of Farmington’s action was taken under the Fuel and Capital Funding Agreement and has the impact of negating certain provisions of that agreement, including the payment arrangement related to SNCRs and PNM’s acquisition of the exiting participants’ coal inventory described above, and reinstating the voting and capital improvement cost allocations under the current SJPPA. Accordingly, on February 3, 2015, PNM informed the participants in the Fuel and Capital Funding Agreement that the agreement would terminate by its terms no later than February 6, 2015. The City of Farmington and the other continuing participants in SJGS have indicated that they remain committed to on-going ownership in SJGS and mediated discussions regarding remaining issues have continued, including matters that were addressed in the Fuel and Capital Funding Agreement.

The participants continue to negotiate other definitive agreements that would formalize the matters contained in the Resolution, as amended. A number of regulatory approvals are required to implement the proposed ownership restructuring of SJGS. Any final binding agreements relating to the ownership restructuring are subject to the approval of each participant’s board or other decision-making body and are subject to required regulatory approvals. PNM is unable to predict the impact of the above developments on negotiations, whether definitive agreements will be reached among the owners, or whether required approvals will be obtained, but expects negotiations to proceed consistent with the time frames described in NMPRC Filing above.


B- 91

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Other Developments and Current Status – The SJPPA requires PNM, as operating agent, to obtain approval of capital improvement project expenditures from participants who have an ownership interest in the relevant unit or property common to more than one unit. As provided in the SJPPA, specified percentages of both the outstanding participant shares, based on MW ownership, and the number of participants in the unit or common property must be obtained in order for a capital improvement project to be approved. PNM presented the SNCR project, including NAAQS compliance requirements described below, to the SJGS participants in Unit 1 and Unit 4 for approval in late October 2013. The project was approved for Unit 1, but the Unit 4 project, which includes some of the California participants, did not obtain the required percentage of votes for approval. In addition, other capital projects related to Unit 4 were not approved by the participants. PNM subsequently requested that the owners of Unit 4 approve the expenditure of costs critical to being able to comply with the time frame in the RSIP with respect to the Unit 4 project of $1.9 million on March 10, 2014, $6.4 million on June 27, 2014, and total project expenses of $76.6 million (including the two prior requests) on January 22, 2015. The Unit 4 owners did not approve these requests.

PNM, in its capacity as operating agent of SJGS, is authorized and obligated under the SJPPA to take reasonable and prudent actions necessary for the successful and proper operation of SJGS pending the resolution, by arbitration or otherwise, of any inability or failure to agree by the participants. PNM must evaluate its responsibilities and obligations as operating agent under the SJPPA regarding the SJGS Unit 4 capital projects that were not approved by the participants and take reasonable and prudent actions as it deems necessary. Therefore, on March 10, 2014 and July 14, 2014, PNM, as operating agent for SJGS, issued “Prudent Utility Practice” notices under the SJPPA indicating PNM was undertaking certain critical activities to keep the Unit 4 SNCR project on schedule.

As discussed above, EPA approved the RSIP and withdrew the FIP on October 9, 2014 and those approvals became effective on November 10, 2014. PNM believes significant progress is being made towards implementation of the RSIP. However, the final implementation of the RSIP is still dependent upon PNM obtaining NMPRC approval to retire San Juan Units 2 and 3. Obtaining NMPRC approval will likely require that final binding agreements be reached among the SJGS owners on a revised ownership structure to facilitate the retirement of these two units. In turn, reaching agreement on ownership restructuring, will likely require that agreement be reached regarding the supply of coal for SJGS for periods after December 31, 2017. PNM can provide no assurance that these requirements will be accomplished. If the RSIP requirements ultimately are not implemented due to adverse or alternative regulatory, legislative, legal, or restructuring developments or other factors, PNM would need to pursue other alternatives to address compliance with the CAA. PNM will seek recovery from its ratepayers for costs that may be incurred as a result of the CAA requirements. PNM is unable to predict the ultimate outcome of these matters.

Although the additional equipment and other final requirements will result in additional capital and operating costs being incurred, PNM believes that its access to the capital markets is sufficient to be able to finance its share of the installation. It is possible that requirements to comply with the CAA, combined with the financial impact of possible future climate change regulation or legislation, if any, other environmental regulations, the result of litigation, and other business considerations, could jeopardize the economic viability of SJGS or the ability or willingness of individual participants to continue participation in the plant.

Four Corners

On August 6, 2012, EPA issued its final BART determination for Four Corners. The rule included two compliance alternatives. On December 30, 2013, APS notified EPA that the Four Corners participants selected the alternative that required APS to close permanently Units 1-3 by January 1, 2014 and install SCR post-combustion NOx controls on each of Units 4 and 5 by July 31, 2018. PNM owns a 13% interest in Units 4 and 5, but had no ownership interest in Units 1, 2, and 3, which were shut down by APS on December 30, 2013. For particulate matter emissions, EPA is requiring Units 4 and 5 to meet an emission limit of 0.015 lb/MMBTU and the plant to meet a 20% opacity limit, both of which are achievable through operation of the existing baghouses. Although unrelated to BART, the final BART rule also imposes a 20% opacity limitation on certain fugitive dust emissions from Four Corners’ coal and material handling operations.
SCE, a participant in Four Corners, indicated that certain California legislation may prohibit it from making emission control expenditures at Four Corners. APS and SCE entered into an asset purchase agreement, providing for the purchase by APS of SCE’s 48% interest in each of Units 4 and 5 of Four Corners. A principal condition to closing was the execution of a new coal supply contract for Four Corners on terms reasonably acceptable to APS. See Coal Supply below.
On December 30, 2013, APS announced the closing of its purchase of SCE’s 48% interest in each of Units 4 and 5 of Four Corners. Concurrently with the closing of the SCE transaction, the ownership of the coal supplier and operator of the mine that

B- 92

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

serves Four Corners was transferred to a company formed by the Navajo Nation to own the mine and develop other energy projects. Also occurring concurrently, the Four Corners co-owners executed a long term agreement for the supply of coal to Four Corners from July 2016, when the current coal supply agreement expires, through 2031.
APS, on behalf of the Four Corners participants, negotiated amendments to an existing facility lease with the Navajo Nation, which extends the Four Corners leasehold interest from 2016 to 2041.  The Navajo Nation approved these amendments in March 2011.  The effectiveness of the amendments also requires the approval of the DOI, as does a related federal rights-of-way grant, which the Four Corners participants are pursuing.  A federal environmental review is underway as part of the DOI review process.  In March 2014, APS received a draft of the EIS in connection with the DOI review process.  On June 19, 2014, PNM submitted comments on the draft EIS as owner and operator of two electric transmission lines that are part of the connected action for the EIS.  A final EIS is expected to be issued in March 2015. In addition, installation of SCR control technology at Four Corners requires a PSD permit, which APS received in December 2014. PNM cannot predict whether the federal approvals will be granted, and if so on a timely basis, or whether any conditions that may be attached to them will be acceptable to the Four Corners participants.

The Four Corners participants’ obligations to comply with EPA’s final BART determinations, coupled with the financial impact of possible future climate change regulation or legislation, other environmental regulations, and other business considerations, could jeopardize the economic viability of Four Corners or the ability of individual participants to continue their participation in Four Corners.
PNM is continuing to evaluate the impacts of EPA’s BART determination for Four Corners. PNM estimates its share of costs, including PNM’s AFUDC, to be up to $80.0 million for post-combustion controls at Four Corners Units 4 and 5. PNM would seek recovery from its ratepayers of all costs that are ultimately incurred. PNM is unable to predict the ultimate outcome of this matter.
Four Corners BART FIP Challenge
On October 22, 2012, WEG filed a petition for review in the Ninth Circuit challenging the Four Corners BART FIP.  In its petition, WEG alleges that the final BART rule results in more air pollution being emitted into the air than allowed by law and that EPA failed to follow the requirements of the ESA.  APS intervened in this matter and filed a motion to dismiss this lawsuit for lack of jurisdiction or alternatively to transfer the lawsuit to the Tenth Circuit. On February 25, 2013, the Ninth Circuit denied APS’ motion to dismiss, but granted the request to transfer the case to the Tenth Circuit. Oral argument was presented before the Tenth Circuit on January 23, 2014. On July 23, 2014, the Tenth Circuit issued a unanimous decision affirming EPA’s action and denying WEG’s petition for review. On September 15, 2014, the Tenth Circuit issued its mandate marking an official end to the case.

Regional Haze Challenges

On December 27, 2012, WEG filed a petition for review in the Tenth Circuit challenging the SO 2 and particulate matter emissions elements of EPA’s approval of New Mexico’s Regional Haze SIP.  On February 26, 2013, HEAL Utah and other environmental groups filed petitions in the Tenth Circuit challenging EPA’s final approval of the remaining elements of New Mexico’s Regional Haze SIP, as well as EPA’s approval of the Albuquerque/Bernalillo County Air Quality Control Board SIP. PNM was granted intervention in both matters and the Tenth Circuit consolidated the two matters based on the similarity of issues. Oral argument was heard before the Tenth Circuit on March 20, 2014. On October 21, 2014, the Tenth Circuit denied the petitions for review and affirmed EPA’s actions. On December 15, 2014, the Tenth Circuit issued its mandate marking an official end to the case.
 
National Ambient Air Quality Standards (“NAAQS”)
The CAA requires EPA to set NAAQS for pollutants considered harmful to public health and the environment. EPA has set NAAQS for certain pollutants, including NOx, SO 2 , ozone, and particulate matter. In 2010, EPA updated the primary NOx and SO 2 NAAQS to include a 1-hour maximum standard while retaining the annual standards for NOx and SO 2 and the 24-hour SO 2 standard. New Mexico is in attainment for the 1-hour NOx NAAQS. On May 13, 2014, EPA released the draft data requirements rule for the 1-hour SO 2 NAAQS, which directs state and tribal air agencies to characterize current air quality in areas with large SO 2 sources to identify maximum 1-hour SO 2 concentrations. The proposed rule also describes the process and timetable by which

B- 93

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

air regulatory agencies would characterize air quality around large SO 2 sources through ambient monitoring or modeling. This characterization will result in these areas being designated as attainment, nonattainment, or unclassified for compliance with the 1-hour SO 2 NAAQS. Although the determination process has not been finalized, PNM believes that compliance with the 1-hour SO 2 standard may require operational changes and/or equipment modifications at SJGS. On November 8, 2013, PNM received an amendment to its NSR air permit for SJGS, which would be required for the installation of either SCRs or SNCRs described above. The revised permit, requires the reduction of SO 2 emissions to 0.10 pound per MMBTU on SJGS Units 1 and 4 and continues to require the installation of BDT equipment modifications for the purpose of reducing fugitive emissions, including NOx, SO 2 , and particulate matter. These reductions will help SJGS meet the NAAQS. It is anticipated that the equipment modifications would be installed at the same time as the installation of regional haze BART controls, in order to most efficiently and cost effectively conduct construction activities at SJGS. See Regional Haze – SJGS above.

EPA finalized revisions to its NAAQS for fine particulate matter on December 14, 2012. PNM believes the equipment modifications discussed above will assist the plant in complying with the particulate matter NAAQS.
 
In January 2010, EPA announced it would strengthen the 8-hour ozone standard by setting a new standard in a range of 60 - 70 parts per billion (“ppb”). On December 17, 2014, EPA published a proposed rule that would revise the NAAQS for ground level ozone. The rule would reduce the current primary 8-hour ozone NAAQS from 75 ppb to between 70 and 65 ppb. EPA is proposing a secondary standard to provide protection against cumulative exposures that can damage plants and trees. To achieve this level of protection, EPA is proposing to set an 8-hour secondary standard at a level within the range of 65 to 70 ppb. According to EPA, 2011-2013 ozone ambient air monitoring data indicates that Bernalillo, Dona Ana, Eddy, and San Juan counties in New Mexico exceed a 70 ppb ozone concentration. In addition, Lea, Luna Santa Fe, and Valencia counties exceed the 65 ppb ozone concentration. Counties that exceed the ozone NAAQS would be designated as nonattainment for ozone. NMED would have responsibility for bringing the county into compliance and would look at all sources of NOx and volatile organic compounds since these are the pollutants that form ground-level ozone. As a result, SJGS could be required to install further controls to meet a new ozone NAAQS. PNM cannot predict the outcome of this matter, the impact of other potential environmental mitigations, or if additional controls would be required at any of its affected facilities as a result of ozone non-attainment designation. EPA is under a court order to finalize the ozone standard by October 1, 2015.
Citizen Suit Under the Clean Air Act
The operations of SJGS are covered by a Consent Decree with the Grand Canyon Trust and Sierra Club and with the NMED that includes stipulated penalties for non-compliance with specified emissions limits. Stipulated penalty amounts are placed in escrow on a quarterly basis pending review of SJGS’s emissions performance. In May 2011, PNM entered into an agreement with NMED and the plaintiffs to resolve a dispute over the applicable NOx emission limits under the Consent Decree. Under the agreement, so long as the NOx emissions limits imposed under the EPA FIP and the New Mexico SIP meet a specified emissions limit, and PNM does not challenge these limits, the parties’ dispute is deemed settled.

In May 2010, PNM filed a petition with the federal district court seeking a judicial determination on a dispute relating to PNM’s mercury controls. NMED and plaintiffs sought to require PNM to implement additional mercury controls. PNM estimates the implementation would increase annual mercury control costs for the entire station, which are currently $0.7 million , to a total of $6.6 million . On March 23, 2014, the court entered a stipulated order reflecting an agreement reached by the parties. Under the stipulated order, PNM was required to repeat the mercury study required under the Consent Decree using sorbent traps instead of the continuous emissions monitoring system used in the initial study. The results of the mercury study will establish the activated carbon injection rate that maximizes mercury removal at SJGS, as required under the Consent Decree. PNM completed stack testing and submitted the study report to NMED and the plaintiffs in December 2014. Based on PNM’s cost/benefit analysis, PNM recommended that the carbon injection not be increased from its current level. NMED and the plaintiffs are evaluating the study and PNM’s recommendation. PNM cannot predict the ultimate outcome of this matter.
Section 114 Request
In April 2009, APS received a request from EPA under Section 114 of the CAA seeking detailed information regarding projects at and operations of Four Corners. EPA has taken the position that many utilities have made physical or operational changes at their plants that should have triggered additional regulatory requirements under the NSR provisions of the CAA. APS has responded to EPA’s request. PNM is currently unable to predict the timing or content of EPA’s response, if any, or any resulting actions.

B- 94

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012


Four Corners Clean Air Act Lawsuit
In October 2011, Earthjustice, on behalf of several environmental organizations, filed a lawsuit in the United States District Court for the District of New Mexico against APS and the other Four Corners participants alleging violations of the NSR provisions of the CAA and NSPS violations. The parties have recently agreed on terms of a settlement. The terms of the settlement do not have a material impact on PNM.  PNM recorded the impact of its share of the proposed settlement in 2014. A final consent decree has not yet been executed.

WEG v. OSM NEPA Lawsuit

In February 2013, WEG filed a Petition for Review in the United States District Court of Colorado against OSM challenging federal administrative decisions affecting seven different mines in four states issued at various times from 2007 through 2012.  In its petition, WEG challenges several unrelated mining plan modification approvals, which were each separately approved by OSM.  Of the fifteen claims for relief in the WEG Petition, two concern SJCC’s San Juan mine.  WEG’s allegations concerning the San Juan mine arise from OSM administrative actions in 2008.  WEG alleges various NEPA violations against OSM, including, but not limited to, OSM’s alleged failure to provide requisite public notice and participation, alleged failure to analyze certain environmental impacts, and alleged reliance on outdated and insufficient documents.  WEG’s petition seeks various forms of relief, including a finding that the federal defendants violated NEPA by approving the mine plans, voiding, reversing, and remanding the various mining modification approvals, enjoining the federal defendants from re-issuing the mining plan approvals for the mines until compliance with NEPA has been demonstrated, and enjoining operations at the seven mines. SJCC intervened in this matter. The court granted SJCC’s motion to sever its claims from the lawsuit and transfer venue to the United States District Court for the District of New Mexico. Legal briefing is complete and the matter is ready for a ruling from the court. If WEG ultimately obtains the relief it has requested, such a ruling could require significant expenditures to reconfigure operations at the San Juan mine, impact the production of coal, and impact the economic viability of the San Juan mine and SJGS. PNM cannot currently predict the outcome of this matter or the range of its potential impact.
Navajo Nation Environmental Issues
Four Corners is located on the Navajo Reservation and is held under an easement granted by the federal government, as well as a lease from the Navajo Nation. The Navajo Acts purport to give the Navajo Nation Environmental Protection Agency authority to promulgate regulations covering air quality, drinking water, and pesticide activities, including those activities that occur at Four Corners. In October 1995, the Four Corners participants filed a lawsuit in the District Court of the Navajo Nation challenging the applicability of the Navajo Acts to Four Corners. In May 2005, APS and the Navajo Nation signed an agreement resolving the dispute regarding the Navajo Nation’s authority to adopt operating permit regulations under the Navajo Nation Air Pollution Prevention and Control Act. As a result of this agreement, APS sought, and the courts granted, dismissal of the pending litigation in the Navajo Nation Supreme Court and the Navajo Nation District Court, to the extent the claims relate to the CAA. The agreement does not address or resolve any dispute relating to other aspects of the Navajo Acts. PNM cannot currently predict the outcome of these matters or the range of their potential impacts.
Cooling Water Intake Structures
EPA issued its final cooling water intake structures rule on May 19, 2013, which establishes national standards for certain cooling water intake structures at existing power plants and other facilities under the Clean Water Act to protect fish and other aquatic organisms by minimizing impingement mortality (the capture of aquatic wildlife on intake structures or against screens) and entrainment mortality (the capture of fish or shellfish in water flow entering and passing through intake structures). The final rule was published on August 15, 2014 and became effective October 14, 2014.
The final rule allows multiple compliance options and considerations for site specific conditions and the permit writer is granted a significant amount of discretion in determining permit requirements, schedules, and conditions. To minimize impingement mortality, the rule provides operators of facilities, such as SJGS and Four Corners, seven options for meeting “best technology available” standards for reducing impingement. To minimize entrainment mortality, the permitting authority must establish the “best technology available” for entrainment on a site-specific basis, taking into consideration an array of factors, including social costs and benefits. Affected sources must submit source water baseline characterization data to the permitting authority to assist in the determination. Compliance deadlines under the rule are tied to permit renewal and will be subject to a

B- 95

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

schedule of compliance established by the permitting authority. The renewal date for the SJGS NPDES permit is March 31, 2016; however, additional time to submit the application may be allowed by the NPDES permit writer. APS is currently in discussions with EPA Region 9, the National Pollutant Discharge Elimination System permit writer for Four Corners, to determine the scope of the impingement and entrainment requirements, which will, in turn, determine APS’s costs to comply with the rule. APS has indicated that it does not expect such costs to be material. PNM is unable to predict the outcome of this matter or a range of the potential costs of compliance.

Effluent Limitation Guidelines

On June 7, 2013, EPA published proposed revised wastewater effluent limitation guidelines establishing technology-based wastewater discharge limitations for fossil fuel-fired electric power plants.  EPA’s proposal offers numerous options that target metals and other pollutants in wastewater streams originating from fly ash and bottom ash handling activities, scrubber activities, and non-chemical metal cleaning waste operations.  The preferred alternatives differ with respect to the scope of requirements that would be applicable to existing discharges of pollutants found in wastestreams generated at existing power plants. All four alternatives would establish a “zero discharge” effluent limit for all pollutants in fly ash transport water. However, requirements governing bottom ash transport water differ depending on which alternative EPA ultimately chooses and could range from effluent limits based on Best Available Technology Economically Achievable to “zero discharge” effluent limits. Depending on which alternative EPA finalizes, Four Corners may be required to change equipment and operating practices affecting boilers and ash handling systems, as well as change its waste disposal techniques. PNM has reviewed the proposed rule and continues to assess the potential impact to SJGS and Reeves Station, the only PNM-operated power plants that would be covered by the proposed rule. On April 9, 2014, several environmental groups agreed to allow EPA until September 30, 2015 to issue final effluent limits. Under the agreement, EPA will not seek any further extensions. PNM is unable to predict the outcome of this matter or a range of the potential costs of compliance.
Santa Fe Generating Station
PNM and the NMED are parties to agreements under which PNM installed a remediation system to treat water from a City of Santa Fe municipal supply well, an extraction well, and monitoring wells to address gasoline contamination in the groundwater at the site of the former Santa Fe Generating Station and service center. PNM believes the observed groundwater contamination originated from off-site sources, but agreed to operate the remediation facilities until the groundwater meets applicable federal and state standards or until the NMED determines that additional remediation is not required, whichever is earlier. The City of Santa Fe has indicated that since the City no longer needs the water from the well, the City would prefer to discontinue its operation and maintain it only as a backup water source. However, for PNM’s groundwater remediation system to operate, the water well must be in service. Currently, PNM is not able to assess the duration of this project or estimate the impact on its obligations if the City of Santa Fe ceases to operate the water well.
The Superfund Oversight Section of the NMED has conducted multiple investigations into the chlorinated solvent plume in the vicinity of the site of the former Santa Fe Generating Station. In February 2008, a NMED site inspection report was submitted to EPA, which states that neither the source nor extent of contamination has been determined and that the source may not be the former Santa Fe Generating Station. The NMED investigation is ongoing. In January 2013, NMED notified PNM that monitoring results from April 2012 showed elevated concentrations of nitrate in three monitoring wells and an increase in free-phase hydrocarbons in another well. None of these wells are routinely monitored as part of PNM’s obligations under the settlement agreement. In April 2013, NMED conducted the same level of testing on the wells as was conducted in April 2012, which produced similar results. PNM conducted similar site-wide sampling activities in April 2014 and obtained results similar to the 2013 data. As part of this effort, PNM also collected a sample of hydrocarbon product for “fingerprint” analysis from a monitoring well located on the northeastern corner of the property.  This analysis indicated that the hydrocarbon product was a mixture of newer and older fuels, and the location of the monitoring well suggests that the hydrocarbon product is likely from offsite sources. PNM does not believe the former generating station is the source of the increased levels of free-phase hydrocarbons, but no conclusive determinations have been made. It is possible that PNM’s prior activities to remediate hydrocarbon contamination, as conducted under an NMED-approved plan, may have resulted in increased nitrate levels.  Additional testing and analysis will need to be performed before conclusions can be reached regarding the cause of the increased nitrate levels or the method and cost of remediation.  PNM is unable to predict the outcome of these matters.

B- 96

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Coal Combustion Byproducts Waste Disposal
Regulation
CCBs consisting of fly ash, bottom ash, and gypsum from SJGS are currently disposed of in the surface mine pits adjacent to the plant. SJGS does not operate any CCB impoundments. The Mining and Minerals Division of the New Mexico Energy, Minerals and Natural Resources Department currently regulates mine placement of ash with federal oversight by the OSM. APS disposes of CCBs in ash ponds and dry storage areas at Four Corners and also sells a portion of its fly ash for beneficial uses, such as a constituent in concrete production.  Ash management at Four Corners is regulated by EPA and the New Mexico State Engineer’s Office. 
In June 2010, EPA published a proposed rule that included two options for waste designation of coal ash. One option was to regulate CCBs as a hazardous waste, which would allow EPA to create a comprehensive federal program for waste management and disposal of CCBs. The other option was to regulate CCBs as a non-hazardous waste, which would provide EPA with the authority to develop performance standards for waste management facilities handling the CCBs and would be enforced primarily by state authorities or through citizen suits. Both options allow for continued use of CCBs in beneficial applications. EPA’s proposal does not address the placement of CCBs in surface mine pits for reclamation. An OSM CCB rulemaking team is developing a proposed rule governing the placement of CCBs at coal mining and reclamation operations. 
On January 29, 2014, in a consolidated case in the D.C. Circuit involving several environmental groups, including Sierra Club, and industry group members, the court issued a consent decree directing EPA to publish its final action regarding whether or not to pursue the proposed non-hazardous waste option for CCBs by December 19, 2014.
 
On December 19, 2014, EPA issued its coal ash rule, including a non-hazardous waste determination for coal ash. Coal ash will be regulated as a solid waste under Subtitle D of RCRA. The rule does not cover mine placement of coal ash and OSM is expected to publish a rule covering mine placement in 2015. It is expected that OSM will be influenced by EPA’s rule. Because the rule is promulgated under Subtitle D, it does not require regulated facilities to obtain permits, does not require the states to adopt and implement the new rules, and is not within EPA’s enforcement jurisdiction. Instead, the rule’s compliance mechanism is for a state or citizen group to bring a RCRA citizen suit in federal district court against any facility that is alleged to be in non- compliance with the new requirements.

PNM is reviewing the rule to fully understand its implications. The rule’s preamble indicates EPA is still evaluating whether to reverse its original regulatory determination and regulate coal ash under RCRA Subtitle C, which means it is possible at some point in the future for EPA to review the new CCR rules. PNM would seek recovery from its ratepayers of all costs that are ultimately incurred. PNM cannot predict the outcome of OSM’s proposed rulemaking regarding CCB regulation, including mine placement of CCBs, or whether OSM’s actions will have a material impact on PNM’s operations, financial position, or cash flows. 
 
Sierra Club Consent Decree
In April 2010, the Sierra Club filed suit against PNMR, PNM, SJCC, and BHP in the United States District Court for the District of New Mexico. In the complaint, as amended, Sierra Club alleged that activities at SJGS and SJCC’s San Juan mine were causing imminent and substantial harm to the environment, including ground and surface water in the region, and that placement of CCBs at the San Juan mine constituted “open dumping” in violation of RCRA.  The suit also included claims against SJCC and BHP under the Surface Mine Control and Reclamation Act. The complaint requested judgment for injunctive relief, payment of civil penalties, and an award of plaintiffs’ attorney’s fees and costs.
On March 28, 2012, the parties filed an executed consent decree with the court, which was approved by the court on April 12, 2012, settling the litigation. Under the terms of the consent decree, the SJGS owners and SJCC will construct and operate a slurry wall and recovery trench, fund other environmental projects, and pay Sierra Club’s attorneys’ and experts’ fees. The total estimated cost of the settlement is $10.2 million , of which about $4.5 million is PNM’s share. Substantially all of the income statement impact related to this settlement was recorded in 2011. The consent decree also includes a release of claims and a covenant not to sue by Sierra Club. PNM is complying with the requirements of the consent decree.
  

B- 97

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Hazardous Air Pollutants (“HAPs”) Rulemaking
 
In December 2011, the EPA issued its final Mercury and Air Toxics Standards (“MATS”) to reduce emissions of heavy metals, including mercury, arsenic, chromium, and nickel, as well as acid gases, including hydrochloric and hydrofluoric gases, from coal and oil-fired electric generating units with a capacity of at least 25 MW. Existing facilities must comply with the MATS rule by April 16, 2015, unless the facility has been granted a 1-year extension under CAA section 112(i)(3). PNM has not requested an extension and will begin complying with the MATS rule by the date specified in the rule. PNM’s assessment of MATS indicates that the control equipment currently used at SJGS allows the plant to meet the emission standards set forth in the rule. With regard to mercury, stack testing performed for EPA during the MATS rulemaking process showed that SJGS achieved a mercury removal rate of 99% or greater. APS requested and received a 1-year extension until April 16, 2016 for Four Corners to comply with the MATS rule. However, APS has determined that no additional equipment will be required at Four Corners Units 4 and 5 to comply with the rule.
 
Other Commitments and Contingencies
Coal Supply
The coal requirements for SJGS are being supplied by SJCC, a wholly owned subsidiary of BHP. In addition to coal delivered to meet the current needs of SJGS, PNM prepays SJCC for certain coal mined but not yet delivered to the plant site. At December 31, 2014 and 2013, prepayments for coal, which are included in other current assets, amounted to $37.3 million and $12.3 million . SJCC holds certain federal, state, and private coal leases and has an underground coal sales agreement to supply processed coal for operation of SJGS through 2017. Under the coal sales agreement, SJCC is reimbursed for all costs for mining and delivering the coal, including an allocated portion of administrative costs, and receives a return on its investment. BHP Minerals International, Inc. has guaranteed the obligations of SJCC under the coal agreement. The coal agreement contemplates the delivery of coal that would supply substantially all the requirements of SJGS through December 31, 2017.
PNM and the other owners of SJGS are evaluating alternatives for the supply of coal after the expiration of the current coal sales agreement. As discussed under SJGS Ownership Restructuring Matters above, the Resolution and the non-binding term sheet approved by the SJGS Coordination Committee on June 26, 2014 recognize that prior to executing a binding restructuring agreement relating to the ownership of SJGS, the remaining participants will need to have greater certainty in regard to the cost and availability of fuel for SJGS for the period after December 31, 2017. The remaining participants are in the process of negotiating agreements concerning future fuel supply for SJGS. On October 1, 2014, the San Juan Fuels Committee approved a resolution authorizing an amendment to the coal sales agreement. The parties to the coal sales agreement and the amendment are SJCC, PNM, and Tucson. The amendment provided for the negotiation of a potential purchase transaction for the mine assets by one or more of the utilities, an affiliate, or another entity agreed to by the parties to be consummated on or before December 31, 2016. The amendment, which was effective as of October 2, 2014, also released the parties from the obligation to negotiate an extension of the coal sales agreement, but does not impact the utilities’ option to purchase the mining assets at the end of the current contract term if the purchase transaction is not completed. On February 12, 2015, the SJGS Coordination Committee approved a resolution authorizing the modification of the amendment to extend the date for negotiation of a transaction until May 1, 2015 and to allow for a direct sale of the SJCC mining operations by BHP to a third-party mining company. PNM anticipates that in connection with a consummated purchase transaction, the third-party mining company would enter into an agreement to supply coal to SJGS. The parties to the amendment also entered into an agreement in October 2014 providing the SJGS participants with access to data necessary to evaluate the mine assets and liabilities. This agreement has terminated and was not renewed in order to allow the parties to focus on the direct sales process. Currently, PNM cannot predict the outcome of these negotiations or if a transaction will be consummated.
APS purchased all of Four Corners’ coal requirements from a supplier that was also a subsidiary of BHP and had a long-term lease of coal reserves with the Navajo Nation. That contract was to expire on July 6, 2016 with pricing determined using an escalating base-price. On December 30, 2013, ownership of the mine was transferred to an entity owned by the Navajo Nation and a new coal supply contract for Four Corners, beginning in July 2016 and expiring in 2031, was entered into with that entity. The BHP subsidiary is to be retained as the mine manager and operator until December 2016. Coal costs are anticipated to increase approximately 30% at the inception of the new contract. The contract provides for pricing adjustments over its term based on economic indices. PNM anticipates that its share of the increased costs will be recovered through its FPPAC.

B- 98

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

In 2013, PNM updated its study of the final reclamation costs for both the surface mines that previously provided coal to SJGS and the current underground mine providing coal and revised its estimates of the final reclamation costs. This estimate reflects that, with the proposed shutdown of SJGS Units 2 and 3 described above, the mine providing coal to SJGS will continue to operate through 2053, the anticipated life of SJGS. The current estimate for decommissioning the Four Corners mine reflects the operation of the mine through 2031, the term of the new coal supply agreement. Based on the 2014 estimates, remaining payments for mine reclamation, in future dollars, are estimated to be $57.3 million for the surface mines at both SJGS and Four Corners and $93.3 million for the underground mine at SJGS as of December 31, 2014. At December 31, 2014 and 2013, liabilities, in current dollars, of $25.7 million and $23.8 million for surface mine reclamation and $8.6 million and $7.8 million for underground mine reclamation were recorded in other deferred credits. On June 1, 2012, the SJGS owners entered into a trust funds agreement to provide funding to compensate SJCC for post-term reclamation obligations under the coal sales agreement. The trust funds agreement requires each owner to enter into an individual trust agreement with a financial institution as trustee, create an irrevocable trust, and periodically deposit funding into the trust for the owner’s share of the mine reclamation obligation. Deposits, which are based on funding curves, must be made on an annual basis. PNM funded $1.0 million in 2014, $0.3 million in 2013, and $3.5 million in 2012. Future funding requirements are currently expected to approximate $0.6 million annually.
PNM collects a provision for surface and underground mine reclamation costs in its rates. The NMPRC has capped the amount that can be collected from ratepayers for final reclamation of the surface mines at $100.0 million . Previously, PNM recorded a regulatory asset for the $100.0 million (Note 4) and recovers the amortization of this regulatory asset in rates. If future estimates increase the liability for surface mine reclamation, the excess would be expensed at that time. In conjunction with the proposed shutdown of SJGS Units 2 and 3 to comply with the BART requirements of the CAA discussed under The Clean Air Act – Regional Haze – SJGS above, an updated coal mine reclamation study was requested by the SJGS participants. As discussed under Coal Combustion Byproducts Waste Disposal above, SJGS currently disposes of CCBs from the plant in the surface mine pits adjacent to the plant. The updated coal mine reclamation study, which was performed in 2013, indicates reclamation costs have increased, including significant increases due to the proposed shutdown of SJGS Units 2 and 3, although the timing of payments will be delayed. The shutdown of Units 2 and 3 would reduce the amount of CCBs generated over the remaining life of SJGS, which could result in a significant increase in the amount of fill dirt required to remediate the underground mine area thereby increasing the overall reclamation costs. The reclamation amounts discussed above reflect PNM’s estimates of its share of the revised costs. How costs would be divided among the owners of SJGS has not been finalized. Regulatory determinations made by the NMPRC may also affect the impact on PNM. PNM is currently unable to determine the outcome of these matters or the range of possible impacts.
San Juan Underground Mine Fire Incident
On September 9, 2011, a fire was discovered at the underground mine owned and operated by SJCC that provides coal for SJGS. The federal Mine Safety and Health Administration (“MSHA”) was notified of the incident. On September 12, 2011, SJCC informed PNM that the fire was extinguished. However, MSHA required sealing the incident area and confirmation of a noncombustible environment before allowing re-entry of the sealed area. SJCC regained entry into the sealed area of the mine in early March 2012. At that time, MSHA conducted a root cause analysis inspection of the incident area, but has not yet issued its report. SJCC completed inspection of the mine equipment and reported no significant damage. SJCC removed the equipment from the impacted mine panel and reassembled it at a new panel face. On May 4, 2012, SJCC received approval from MSHA and resumed longwall mining operations. Coal inventories have been restored to pre-incident levels and SJCC provided notice to PNM on September 23, 2014 that the mine has been restored to normal operations.
The costs of the mine recovery flowed through the cost-reimbursable component of the coal supply agreement. PNM included the portion of such costs allocable to its customers subject to New Mexico regulation in its FPPAC. PNM’s filings with the NMPRC reflected an estimate that this incident increased coal costs and the deferral of cost recovery under the FPPAC by between $17.4 million and $21.6 million . SJCC submitted an insurance claim regarding the costs it incurred due to the mine fire and informed PNM that it settled with its insurance carrier. PNM’s portion of the insurance recovery is $18.7 million . PNM has credited its FPPAC balancing account for the insurance proceeds allocable to PNM’s New Mexico jurisdictional customers. See Note 17.


B- 99

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Continuous Highwall Mining Royalty Rate

In August 2013, the DOI Bureau of Land Management (“BLM”) issued a proposed rulemaking that would retroactively apply the surface mining royalty rate of 12.5% to continuous highwall mining (“CHM”).  Comments regarding the rulemaking were due on October 11, 2013, and PNM submitted comments in opposition to the proposed rule. There is no legal deadline for adoption of the final rule.

SJCC utilized the CHM technique from 2000 to 2003 and, with the approval of the Farmington, New Mexico Field Office of BLM to reclassify the final highwall as underground reserves, applied the 8.0% underground mining royalty rate to coal mined using CHM and sold to SJGS.  In March 2001, SJCC learned that the DOI Minerals Management Service (“MMS”) disagreed with the application of the underground royalty rate to CHM.  In August 2006, SJCC and MMS entered into a settlement agreement tolling the statute of limitations on any administrative action to recover unpaid royalties until BLM issued a final, non-appealable determination as to the proper rate for CHM-mined coal.  The proposed BLM rulemaking has the potential to terminate the tolling provision of the settlement agreement, and underpaid royalties of approximately $5 million for SJGS would become due if the proposed BLM rule is adopted as proposed.  PNM’s share of any amount that is ultimately paid would be approximately 46.3% , none of which would be passed through PNM’s FPPAC. PNM is unable to predict the outcome of this matter.
SJCC Arbitration
The coal supply agreement for SJGS provides that the participants in SJGS have the right to audit the costs billed by SJCC. An independent accounting firm has been engaged to perform audits of the costs billed under the provisions of the contract. The audit for the period from 2006 through 2009 resulted in disagreements between the SJGS participants and SJCC. As provided in the contract, certain issues were submitted to a panel for binding arbitration. The issues were: 1) whether the SJGS participants owed SJCC unbilled mining costs of $5.2 million or whether SJCC owed the SJGS participants overbilled mining costs of $1.1 million , and 2) whether SJCC billed the SJGS participants $13.9 million as mining costs that SJCC should have considered to be capital costs, which were not billable under the mining contract.  PNM’s share of amounts subject to the arbitration was approximately 46.3% . A hearing before the arbitration panel on the remaining issues was held in May 2014. The arbitration panel found in favor of SJCC on both issues. Of PNM’s share of the costs, approximately 33% of the first issue was passed through PNM’s FPPAC and the rest impacted earnings in 2014. The amounts related to the second issue were recorded when billed in prior periods and had no impact in 2014.
Four Corners Severance Tax Assessment

On May 23, 2013, the New Mexico Taxation and Revenue Department (“NMTRD”) issued a notice of assessment for coal severance surtax, penalty, and interest totaling approximately $30 million related to coal supplied under the coal supply agreement for Four Corners. PNM’s share of any amounts paid related to this assessment would be approximately 9.4% , all of which would be passed through PNM’s FPPAC. For procedural reasons, on behalf of the Four Corners co-owners, including PNM, the coal supplier made a partial payment of the assessment and immediately filed a refund claim with respect to that partial payment in August 2013. On December 19, 2013, the coal supplier and APS, on its own behalf and as operating agent for Four Corners, filed a complaint in the New Mexico District Court contesting both the validity of the assessment and the refund claim denial. PNM cannot predict the timing or outcome of this litigation. However, PNM does not expect the outcome to have a material impact on its financial position, results of operations, or cash flows.

PVNGS Liability and Insurance Matters
Public liability for incidents at nuclear power plants is governed by the Price-Anderson Act, which limits the liability of nuclear reactor owners to the amount of insurance available from both private sources and an industry retrospective payment plan. In accordance with the Price-Anderson Act, the PVNGS participants have insurance for public liability exposure for a nuclear incident totaling $13.6 billion per occurrence. Commercial insurance carriers provide $375 million and $13.2 billion is provided through a mandatory industry-wide retrospective assessment program. If losses at any nuclear power plant covered by the program exceed the accumulated funds, PNM could be assessed retrospective premium adjustments. Based on PNM’s 10.2% interest in each of the three PVNGS units, PNM’s maximum potential retrospective premium assessment per incident for all three units is $38.9 million , with a maximum annual payment limitation of $5.7 million .


B- 100

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The PVNGS participants maintain “all risk” (including nuclear hazards) insurance for damage to, and decontamination of, property at PVNGS in the aggregate amount of $2.75 billion , a substantial portion of which must first be applied to stabilization and decontamination. These coverages are provided by Nuclear Electric Insurance Limited (“NEIL”). Effective April 1, 2014, a sublimit of $2.25 billion for non-nuclear property damage losses has been enacted to the primary policy offered by NEIL. If NEIL’s losses in any policy year exceed accumulated funds, PNM is subject to retrospective premium assessments of $4.8 million for each retrospective premium assessment declared by NEIL’s Board of Directors. The insurance coverages discussed in this and the previous paragraph are subject to policy conditions and exclusions.
Natural Gas Supply
 
PNM procures gas supplies for its power plants from third-party sources and contracts with third party transportation providers.

Water Supply
Because of New Mexico’s arid climate and periodic drought conditions, there is concern in New Mexico about the use of water, including that used for power generation. PNM has secured groundwater rights in connection with the existing plants at Reeves Station, Rio Bravo, Afton, Luna, and Lordsburg. Water availability is not an issue for these plants at this time. However, prolonged drought, ESA activities, and a Federal lawsuit by the State of Texas (suing the State of New Mexico over water allocations) could pose a threat of reduced water availability for these plants.
PNM, APS, and BHP have undertaken activities to secure additional water supplies for SJGS, Four Corners, and related mines to accommodate the possibility of inadequate precipitation in coming years. Since 2004, PNM has entered into agreements for voluntary sharing of the impacts of water shortages with tribes and other water users in the San Juan basin. This agreement has been extended through 2016. In addition, in the case of water shortage, PNM, APS, and BHP have reached agreement with the Jicarilla Apache Nation on a long-term supplemental contract relating to water for SJGS and Four Corners that runs through 2016. Although PNM does not believe that its operations will be materially affected by drought conditions at this time, it cannot forecast the weather or its ramifications, or how policy, regulations, and legislation may impact PNM should water shortages occur in the future.
In April 2010, APS signed an agreement on behalf of the PVNGS participants with five cities to provide cooling water essential to power production at PVNGS for forty years.
PVNGS Water Supply Litigation
In 1986, an action commenced regarding the rights of APS and the other PVNGS participants to the use of groundwater and effluent at PVNGS. APS filed claims that dispute the court’s jurisdiction over PVNGS’ groundwater rights and their contractual rights to effluent relating to PVNGS and, alternatively, seek confirmation of those rights. In 1999, the Arizona Supreme Court issued a decision finding that certain groundwater rights may be available to the federal government and Indian tribes. In addition, the Arizona Supreme Court issued a decision in 2000 affirming the lower court’s criteria for resolving groundwater claims. Litigation on these issues has continued in the trial court. No trial dates have been set in these matters. PNM does not expect that this litigation will have a material impact on its results of operation, financial position, or cash flows.
San Juan River Adjudication
In 1975, the State of New Mexico filed an action in New Mexico District Court to adjudicate all water rights in the San Juan River Stream System, including water used at Four Corners and SJGS. PNM was made a defendant in the litigation in 1976. In March 2009, President Obama signed legislation confirming a 2005 settlement with the Navajo Nation. Under the terms of the settlement agreement, the Navajo Nation’s water rights would be settled and finally determined by entry by the court of two proposed adjudication decrees.  The court issued an order in August 2013 finding that no evidentiary hearing was warranted in the Navajo Nation proceeding, and on November 1, 2013 issued a Partial Final Judgment and Decree of the Water Rights of the Navajo Nation approving the proposed settlement with the Navajo Nation. Several parties filed a joint motion for a new trial, which was denied by the court. A number of parties subsequently appealed to the New Mexico Court of Appeals. PNM has entered its appearance in the appellate case. No hearing dates or deadlines have been set at this time.

B- 101

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

PNM is participating in this proceeding since PNM’s water rights in the San Juan Basin may be affected by the rights recognized in the settlement agreement as being owned by the Navajo Nation, which comprise a significant portion of water available from sources on the San Juan River and in the San Juan Basin. PNM is unable to predict the ultimate outcome of this matter or estimate the amount or range of potential loss and cannot determine the effect, if any, of any water rights adjudication on the present arrangements for water at SJGS and Four Corners. Final resolution of the case cannot be expected for several years. An agreement reached with the Navajo Nation in 1985, however, provides that if Four Corners loses a portion of its rights in the adjudication, the Navajo Nation will provide, for an agreed upon cost, sufficient water from its allocation to offset the loss.
Rights-of-Way Matter

On January 28, 2014, the County Commission of Bernalillo County, New Mexico passed an ordinance requiring utilities to enter into a use agreement and pay a yet to be determined fee as a condition to installing, maintaining, and operating facilities on county rights-of-way. The fee is purported to compensate the county for costs of administering, maintaining, and capital improvements to the rights-of-way. On February 27, 2014, PNM and other utilities filed a Complaint for Declaratory and Injunctive Relief in the United States District Court for the District of New Mexico challenging the validity of the ordinance. The court denied the utilities’ motion for judgment. The court further granted the County’s motion to dismiss the state law claims. The utilities filed an amended complaint reflecting the two federal claims remaining before the federal court. The utilities also filed a complaint in Bernalillo County, New Mexico District Court reflecting the state law counts dismissed by the federal court. In subsequent briefing in federal court, the County filed a motion for judgment of one of the utilities’ claims, which was granted by the court, leaving a claim regarding telecommunications service as the remaining federal claim. This matter is ongoing in state court. The utilities and Bernalillo County reached a standstill agreement whereby the County would not take any enforcement action against the utilities pursuant to the ordinance during the pendency of the litigation, but not including any period for appeal of a judgment, or upon 30 days written notice by either the County or the utilities of their intention to terminate the agreement.  If the challenges to the ordinance are unsuccessful, PNM believes any fees paid pursuant to the ordinance would be considered franchise fees and would be recoverable from customers. PNM is unable to predict the outcome of this matter or its impact on PNM’s operations.
Complaint Against Southwestern Public Service Company
In September 2005, PNM filed a complaint under the Federal Power Act against SPS alleging SPS overcharged PNM for deliveries of energy through its fuel cost adjustment clause practices and that rates for sales to PNM were excessive. PNM also intervened in a proceeding brought by other customers raising similar arguments relating to SPS’ fuel cost adjustment clause practices and issues relating to demand cost allocation (the “Golden Spread Proceeding”). In addition, PNM intervened in a proceeding filed by SPS to revise its rates for sales to PNM (“SPS 2006 Rate Proceeding”). In 2008, FERC issued its order in the Golden Spread Proceeding affirming an ALJ decision that SPS violated its fuel cost adjustment clause tariffs, but shortening the refund period applicable to the violation of the fuel cost adjustment clause issues that had been ordered by the ALJ. FERC also reversed the decision of the ALJ, which had been favorable to PNM, on the demand cost allocation issues. PNM and SPS filed petitions for rehearing and clarification of the scope of the remedies that were ordered and seeking reversal of various rulings in the order. On August 15, 2013, FERC issued separate orders in the Golden Spread Proceeding and in the SPS 2006 Rate Proceeding. The order in the Golden Spread Proceeding determined that PNM was not entitled to refunds for SPS’ fuel cost adjustment clause practices. That order and the order in the SPS 2006 Rate Proceeding decided the demand cost allocation issues using the method that PNM had advocated.  PNM, SPS, and other customers of SPS have filed requests for rehearing of these orders and they are pending further action by FERC. PNM cannot predict the final outcome of the case at FERC or the range of possible outcomes.
Navajo Nation Allottee Matters
A putative class action was filed against PNM and other utilities in February 2009 in the United States District Court for the District of New Mexico. Plaintiffs claim to be allottees, members of the Navajo Nation, who pursuant to the Dawes Act of 1887, were allotted ownership in land carved out of the Navajo Nation and allege that defendants, including PNM, are rights-of-way grantees with rights-of-way across the allotted lands and are either in trespass or have paid insufficient fees for the grant of rights-of-way or both.  In March 2010, the court ordered that the entirety of the plaintiffs’ case be dismissed. The court did not grant plaintiffs leave to amend their complaint, finding that they instead must pursue and exhaust their administrative remedies before seeking redress in federal court.  In May 2010, plaintiffs filed a Notice of Appeal with the Bureau of Indian Affairs (“BIA”), which was denied by the BIA Regional Director. In May 2011, plaintiffs appealed the Regional Director’s decision to the DOI, Office of Hearings and Appeals, Interior Board of Indian Appeals. Following briefing on the merits, on August 20, 2013, that

B- 102

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

board issued a decision upholding the Regional Director’s decision that the allottees had failed to perfect their appeals, and dismissed the allottees’ appeals, without prejudice.  The allottees have not refiled their appeals. Although this matter was dismissed without prejudice, PNM considers the matter concluded. However, PNM continues to monitor this matter in order to preserve its interests regarding any PNM-acquired rights-of-way.
In a separate matter, in September 2012, 43 landowners claiming to be Navajo allottees filed a notice of appeal with the BIA appealing a March 2011 decision of the BIA Regional Director regarding renewal of a right-of-way for a PNM transmission line. The allottees, many of whom are also allottees in the above matter, generally allege that they were not paid fair market value for the right-of-way, that they were denied the opportunity to make a showing as to their view of fair market value, and thus denied due process. On January 6, 2014, PNM received notice that the BIA, Navajo Region, requested a review of an appraisal report on 58 allotment parcels. After review, the BIA concluded it would continue to rely on the values of the original appraisal. On March 27, 2014, while this matter was stayed, the allottees filed a motion to dismiss their appeal with prejudice.  On April 2, 2014, the allotees’ appeal was dismissed with prejudice concluding this matter. Subsequent to the dismissal, PNM received a letter from counsel on behalf of what appears to be a subset of the 43 landowner allottees involved in the appeal, notifying PNM that the specified allottees were revoking their consents for renewal of right of way on six specific allotments.  On January 22, 2015, PNM received a letter from the BIA Regional Director identifying ten allotments with rights-of-way renewals that were previously contested.  The letter indicated that the renewals were not processed because the necessary consent was not met.  It is the BIA Regional Director’s position that PNM must re-obtain consent from these landowners.  PNM is in the process of investigating the validity of this notice of revocation and its potential impact in light of the BIA’s position and the recent dismissal with prejudice of the appeal, and is therefore unable at this time to predict the likely outcome of this matter.

(17)
Regulatory and Rate Matters

The Company is involved in various regulatory matters, some of which contain contingencies that are subject to the same uncertainties as those described in Note 16.
PNM

2014 Electric Rate Case

On December 11, 2014, PNM filed an application for revision of electric retail rates based upon a calendar year 2016 future year test period. The application proposes a revenue increase of $107.4 million , effective January 1, 2016. PNM’s proposed ROE is 10.5% . The requested base rate increase, combined with other rate changes, represent an average bill increase of 7.69% . PNM requested this increase to account for infrastructure investments made since the last rate case and investments needed in the next two years to provide reliable service to PNM’s retail customers, as well as to reflect the declining sales growth in PNM’s service territory. The primary driver of PNM’s identified revenue deficiency, accounting for approximately 92% of the rate increase, is related to infrastructure investments and the recovery of those investment dollars, including depreciation. PNM’s success with energy efficiency programs is a contributing factor to the decline in PNM’s energy sales since the last rate case and accounts for the balance of the rate increase after accounting for offsetting cost reductions. PNM is proposing several changes to rate design to establish fair and equitable pricing across rate classes and to better align cost recovery with cost causation. Specific rate design proposals include increased customer and demand charges, a revenue decoupling pilot program applicable to residential and small power customers, an access charge to customers installing photovoltaic systems after December 31, 2015, a re-allocation of revenue among PNM’s customer classes, a new economic development rate, and continuation of PNM’s renewable energy rider. A public hearing on the rate case is expected to begin in July 2015 and an order from the NMPRC is expected in the fourth quarter of 2015.

Renewable Portfolio Standard
The REA establishes a mandatory RPS requiring a utility to acquire a renewable energy portfolio equal to 10% of retail electric sales by 2011, 15% by 2015, and 20% by 2020. The NMPRC requires renewable energy portfolios to be “fully diversified.” The current diversity requirements are 30% wind, 20% solar, 5% other, and 1.5% distributed generation, increasing to 3% in 2015, subject to the limitation of the RCT.

B- 103

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

The REA provides for streamlined proceedings for approval of utilities’ renewable energy procurement plans, assures utilities that they recover costs incurred consistent with approved procurement plans, and requires the NMPRC to establish a RCT for the procurement of renewable resources to prevent excessive costs being added to rates. Currently, the RCT is set at 3% of customers’ annual electric charges.
PNM’s renewable energy procurement plan for 2012 requested a variance from the RPS due to RCT limitations. The plan was diversity-compliant based on the reduced RPS, except for non-wind/non-solar resources, which were not available. In December 2011, the NMPRC approved PNM’s 2012 plan, but ordered PNM to spend an additional $0.9 million on renewable procurements in 2012. The NMPRC also required PNM to file its 2013 renewable energy procurement plan by April 30, 2012. The 2013 plan proposed procurements for 2013 and 2014 of 20 MW of PNM-owned solar PV facilities, at an estimated cost of $45.5 million , wind and solar REC purchases in 2013, and a PPA for the output of the Lightning Dock Geothermal facility. The plan also included an additional procurement of 2 MW of PNM-owned solar PV facilities at an estimated cost of $4.5 million to supply the energy sold under PNM’s voluntary renewable energy tariff. The plan enabled PNM to comply with the statutory RPS in 2013, but required a variance from the NMPRC’s diversity requirements in 2013 while the proposed geothermal facilities were being constructed. The NMPRC approved the plan in December 2012, but reduced the additional solar PV procurement from 2 MW to 1.5 MW. In 2013, PNM made renewable procurements consistent with the 2013 plan approved by the NMPRC. Construction of the solar PV facilities was completed in 2013 at a cost of $48.9 million . The geothermal facility began providing power to PNM in January 2014. The current output of the facility is 4 MW and future expansion may result in up to 10 MW of generation capacity.

PNM filed its 2014 renewable energy procurement plan on July 1, 2013. The plan meets RPS and diversity requirements within the RCT in 2014 and 2015. PNM’s procurements include 50,000 MWh of wind generated RECs in 2014, the construction by December 31, 2014 of 23 MW of PNM-owned solar PV facilities at a cost of $46.7 million , a 20 -year PPA for the output of Red Mesa Wind, an existing wind generator having an aggregate capacity of 102 MW, beginning January 1, 2015, at a first year cost estimated to be $5.8 million , and the purchase of 120,000 MWh of wind RECs in 2015. The NMPRC approved the plan on December 18, 2013.

PNM filed its 2015 renewable energy procurement plan on June 2, 2014. The plan meets RPS and diversity requirements within the RCT in 2015 and 2016. PNM’s proposed new procurements included the construction by December 31, 2015 of 40 MW of PNM-owned solar PV facilities at a cost of $79.3 million . The proposed 40 MW solar facilities are identified as being a cost-effective resource in PNM’s application to retire SJGS Units 2 and 3 (Note 16). On September 25, 2014, a stipulated settlement was filed by PNM, staff of the NMPRC, the NMAG, NMIEC, Coalition for Clean Affordable Energy, and Western Resource Advocates. The stipulation proposed approval of PNM’s procurement proposals; however, the costs for the 40 MW of solar would be included in base rates to be set in PNM’s next general rate case rather than through PNM’s renewable energy rider. Under the agreement, PNM would be required to make additional renewable energy procurements in the event that the prior year’s actual renewable energy procurements did not meet the RPS for that year based on actual retail sales and the actual RCT. The parties also agreed to have additional discussions to attempt to reach agreement on RPS and large customer adjustment calculations to be used in future PNM renewable procurement plans. A public hearing on the stipulation was held on October 27, 2014. On November 26, 2014, the NMPRC issued an order approving the stipulation with a modification that revised the not-to-exceed price from $4.25 per MWh to $3.00 per MWh for any additional necessary procurements to meet the RPS requirement in 2013 or 2014. In December 2014, PNM procured an additional 44,000 MWh of renewable resources to meet the 2013 RPS requirement at an average cost of $1.75 per MWh.
PNM is recovering certain renewable procurement costs from customers through a rate rider. See Renewable Energy Rider below.
Renewable Energy Rider
The NMPRC has authorized PNM to recover certain renewable procurement costs through a rate rider billed on a per KWh basis. The rider will terminate upon a final order in PNM’s next general rate case unless the NMPRC authorizes PNM to continue it. As a separate component of the rider, if PNM’s earned return on jurisdictional equity in a calendar year, adjusted for weather and other items not representative of normal operations, exceeds 10.5% , PNM would be required to refund the amount over 10.5% to customers during May through December of the following year. On April 1, 2014, PNM made a filing with the NMPRC demonstrating that it had not exceeded the 10.5% return for 2013. Preliminary calculations indicate PNM’s jurisdictional equity return did not exceed 10.5% in 2014.

B- 104

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012


PNM recorded revenues from the rider of $34.3 million , $23.7 million , and $6.4 million in 2014, 2013, and 2012. In PNM’s 2015 renewable energy procurement plan case, the NMPRC approved a rate, which is designed to collect $44.7 million in 2015.
Energy Efficiency and Load Management
Program Costs

Public utilities are required by the Efficient Use of Energy Act to achieve specified levels of energy savings and to obtain NMPRC approval to implement energy efficiency and load management programs. Costs to implement approved programs are recovered through a rate rider. In 2013, this act was amended to set an annual program budget equal to 3% of an electric utility’s annual revenue.

In October 2012, PNM filed an energy efficiency program application for programs proposed to be offered beginning in May 2013. The filing included proposed program costs of $22.5 million plus a proposed profit incentive. The NMPRC approved PNM’s program application, including the annual profit incentive discussed below, on November 6, 2013.

On October 6, 2014, PNM filed an energy efficiency program application for programs proposed to be offered beginning in June 2015. The filing included proposed program costs of $25.8 million plus a proposed profit incentive. The proposed energy efficiency budget and plan are consistent with the 2013 amendments to the Efficient Use of Energy Act. PNM and the NMPRC staff filed a stipulation on January 30, 2015. If approved, the stipulation would establish program budgets and incentive amounts, assuming a threshold level of energy savings are achieved, for 2015 and 2016. Two parties filed statements in opposition to the stipulation. A public hearing on the stipulation was held in February 2015.
Disincentives/Incentives
The Efficient Use of Energy Act requires the NMPRC to remove utility disincentives to implementing energy efficiency and load management programs and to provide incentives for such programs. In 2010, PNM began implementing a NMPRC rule that authorized electric utilities to collect rate adders to remove disincentives and to provide incentives for energy and demand savings related to energy efficiency and demand response programs. In November 2013, the NMPRC issued an order authorizing PNM to recover an incentive equal to 7.6% of annual program costs beginning with program implementation in December 2013. Based on PNM’s currently approved program costs, this equates to an estimated annual incentive of $1.7 million .
 
In June 2011, the NMPRC approved PNM-specific incentives for savings. PNM collected approximately $1.3 million , on an annual basis, in incentive revenues through November 2013 consistent with this order. On March 27, 2013, PNM filed its reconciliation for actual energy efficiency program costs, associated incentives, and actual collections for calendar year 2012. The reconciliation filing showed a net over-recovery of $0.2 million , composed of an over-recovery of $1.0 million of program costs and an under-recovery of incentives of $0.8 million . PNM subsequently revised the estimated incentive under-recovery to $0.5 million . PNM and the NMPRC staff filed a motion seeking to substitute the new reconciliation filing with a proposed effective date of May 28, 2013. On April 24, 2013, the NMPRC issued an order granting the motion. PNM implemented the new rate on May 28, 2013. In PNM’s 2014 energy efficiency program application, PNM proposed an energy efficiency incentive of $2.1 million . PNM’s proposed incentive was based upon a shared benefits methodology and is similar in amount to previous PNM incentives authorized by the NMPRC. Under the terms of the January 30, 2015 stipulation discussed above, the incentive amount would be $1.7 million in 2015 and $1.8 million in 2016 assuming threshold level of savings are achieved. A public hearing was held in February 2015. The NMPRC has not yet acted upon PNM’s application.

Energy Efficiency Rulemaking

On May 17, 2012, the NMPRC issued a NOPR that would have amended the NMPRC’s energy efficiency rule to authorize use of a decoupling mechanism to recover certain fixed costs of providing retail electric service as the mechanism for removal of disincentives associated with the implementation of energy efficiency programs. The proposed rule also addressed incentives associated with energy efficiency. On July 26, 2012, the NMPRC closed the proposed rulemaking and opened a new energy efficiency rulemaking docket that may address decoupling and incentives. Workshops to develop a proposed rule have been held, but no order proposing a rule has been issued. PNM is unable to predict the outcome of this matter.

B- 105

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

On October 2, 2013, the NMPRC issued a NOPR and a proposed rule to implement amendments to the New Mexico Efficient Use of Energy Act. Included in the proposed rule is a provision that would limit incentive awards to an amount equal to the utility’s WACC times its approved annual program costs. The NMPRC received comments and a public hearing was held on November 20, 2013. The NMPRC issued an order on October 8, 2014, adopting the proposed rule.
FPPAC Continuation Application
Pursuant to the rules of the NMPRC, public utilities are required to file an application to continue using their FPPAC every four years. On May 28, 2013, PNM filed the required continuation application and requested that its current FPPAC be modified to increase the reset frequency of the fuel factor from annually to quarterly, to allow PNM to retain 10% of its off-system sales margin, and to apply the same carrying charge rate to both over and under collections in the balancing account. On December 20, 2013, a stipulated agreement was filed to resolve this case. On April 23, 2014, the NMPRC approved the stipulation. The settlement allows PNM to retain 10% of off-system sales margin from July 1, 2013 through December 31, 2016, resolves all costs related to the mine fire incident discussed in Note 16, resolves the ratemaking treatment for coal pre-treatment at SJGS until the next rate case, required PNM to write-off $10.5 million of the under-collected balance in its FPPAC balancing account, and required PNM to extend the recovery of the remaining under-collected balance over 18 months beginning July 1, 2014. PNM recorded the $10.5 million write off as a regulatory disallowance in the fourth quarter of 2013.
The NMPRC approval of the amended stipulation in PNM’s 2010 Electric Rate Case limited the amount that could be recovered on an annual basis for fuel costs during certain years. Costs in excess of the limits were deferred, without carrying costs, for recovery in future periods. The fuel cost caps were $38.8 million for the FPPAC year beginning July 1, 2012 and $36.2 million for the FPPAC year beginning July 1, 2013. The fuel cost caps ended on June 30, 2014. The resulting under-recovery as of April 30, 2014 was $63.5 million . Consistent with the order approved in PNM’s FPPAC Continuation Application, PNM is recovering this under-collection, net of the write-off agreed to in the settlement, over an 18 month period beginning July 1, 2014.
Integrated Resource Plan
NMPRC rules require that investor owned utilities file an IRP every three years. The IRP is required to cover a 20 -year planning period and contain an action plan covering the first four years of that period. PNM filed its 2014 IRP on July 1, 2014. The four-year action plan was consistent with the replacement resources identified in PNM’s application to retire SJGS Units 2 and 3. PNM indicated that it planned to meet its anticipated long-term load growth with a combination of additional renewable energy resources, energy efficiency, and natural gas-fired facilities. Consistent with statute and NMPRC rule, PNM incorporated a public advisory process into the development of its 2014 IRP. On July 31, 2014, several parties requested the NMPRC not to accept the 2014 IRP as compliant with NMPRC rule because to do so could affect the pending proceeding on PNM’s application to abandon SJGS Units 2 and 3 and for CCNs for certain replacement resources (Note 16) and because they assert that the IRP does not conform to the NMPRC’s IRP rule. Certain parties also ask that further proceedings on the IRP be held in abeyance until the conclusion of the pending abandonment/CCN proceeding. The NMPRC issued an order in August 2014 that dockets a case to determine whether the IRP complies with applicable NMPRC rules. The order also holds the case in abeyance pending the issuance of final, non-appealable orders in PNM’s 2015 renewable energy procurement plan case and its application to retire SJGS Units 2 and 3.
San Juan Generating Station Units 2 and 3 Retirement
On December 20, 2013, PNM filed an application at the NMPRC to retire SJGS Units 2 and 3 on December 31, 2017. On October 1, 2014, PNM and certain parties to the case filed a stipulation with the NMPRC proposing a settlement of this case. Other parties are opposing the stipulated agreement. Additional information concerning the NMPRC filing, including a summary of the terms of the stipulation is set forth in Note 16. A public hearing in the NMPRC case was held in January 2015. PNM will also make an application at FERC to seek approval of the restructured SJGS participation agreements. PNM is unable to predict the outcome of these matters.


B- 106

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Four Corners Right of First Refusal

On February 17, 2015, PNM received notice from EPE that EPE has entered into an agreement to sell its 7% interest in Four Corners to APS, thereby triggering PNM’s ability to exercise its right of first refusal (“ROFR”) to acquire a portion of EPE’s interest in Four Corners. PNM intends to inform the NMPRC about receipt of the notice and advise the NMPRC that PNM does not intend to exercise its rights under the ROFR. If not exercised, the ROFR will expire 120 days from the date of the notice.

Transmission Rate Case
In October 2010, PNM filed a notice with FERC to increase its wholesale electric transmission revenues by $11.1 million annually, based on a return on equity of 12.25% . The filing also sought to revise certain Open Access Transmission Tariff provisions and bi-lateral contractual terms.  In December 2010, FERC issued an order accepting PNM’s filing and suspending the proposed tariff revisions for five months. The proposed rates were implemented on June 1, 2011, subject to refund. The rate increase applied to all of PNM’s wholesale electric transmission service customers, which include other utilities, electric cooperatives, and entities that use PNM’s transmission system to transmit power at the wholesale level.  The rate increase did not impact PNM’s retail customers. On January 2, 2013, FERC approved an unopposed settlement agreement, which increases transmission service revenues by $2.9 million annually. In addition, the parties agreed that if PNM files for a formula based rate change within one year from FERC’s approval of the settlement agreement, no party will oppose the general principle of a formula rate, although the parties may still object to particular aspects of the formula. PNM refunded amounts collected in excess of the settled rates in January 2013, concluding this matter.
Formula Transmission Rate Case
On December 31, 2012, PNM filed an application with FERC for authorization to move from charging stated rates for wholesale electric transmission service to a formula rate mechanism pursuant to which rates for wholesale transmission service are calculated annually in accordance with an approved formula. The proposed formula includes updating cost of service components, including investment in plant and operating expenses, based on information contained in PNM’s annual financial report filed with FERC, as well as including projected large transmission capital projects to be placed into service in the following year. The projections included are subject to true-up in the following year formula rate. Certain items, including changes to return on equity and depreciation rates, require a separate filing to be made with FERC before being included in the formula rate. As filed, PNM’s request would result in a $3.2 million wholesale electric transmission rate increase, based on PNM’s 2011 data and a 10.81% return on equity (“ROE”), and authority to adjust transmission rates annually based on an approved formula. The proposed $3.2 million rate increase would be in addition to the $2.9 million rate increase approved by the FERC on January 2, 2013.
On March 1, 2013, FERC issued an order (1) accepting PNM’s revisions to its rates for filing and suspending the proposed revisions to become effective August 2, 2013, subject to refund; (2) directing PNM to submit a compliance filing to establish its ROE using the median, rather than the mid-point, of the ROEs from a proxy group of companies; (3) directing PNM to submit a compliance filing to remove from its rate proposal the acquisition adjustment related to PNM’s 60% ownership of the EIP transmission line, which was acquired in 2003 ; and (4) setting the proceeding for hearing and settlement judge procedures. PNM would be allowed to make a separate filing related to recovery of the EIP acquisition adjustment. On April 1, 2013, PNM made the required compliance filing. In addition, PNM filed for rehearing of FERC’s order regarding the ROE. On June 3, 2013, PNM made additional filings incorporating final 2012 data into the formula rate request. The updated formula rate would result in a $1.3 million rate increase over the rates approved by FERC on January 2, 2013. The new rates apply to all of PNM’s wholesale electric transmission service customers. On June 10, 2013, FERC denied PNM’s motion for rehearing regarding FERC’s order requiring PNM to use the median, instead of the midpoint, to calculate its ROE for the formula rate case. On August 2, 2013, the new rates went into effect, subject to refund. On May 1, 2014, PNM updated its formula rate incorporating 2013 data resulting in a  $0.5 million  rate increase over the then current rates. PNM filed the updated rate request with FERC on May 30, 2014, at which time the new rates became effective, subject to refund. The parties have engaged in settlement negotiations and PNM anticipates that a settlement will be filed with FERC in the near future. There is no required time frame for FERC to act upon a settlement. PNM is unable to predict the outcome of this proceeding.

B- 107

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Firm-Requirements Wholesale Customers
Navopache Electric Cooperative, Inc. Rate Case
In September 2011, PNM filed an unexecuted amended sales agreement between PNM and NEC with FERC. The agreement proposed a cost of service based rate for the electric service and ancillary services PNM provides to NEC, which would result in an annual increase of $8.7 million or a 39.8% increase over existing rates. PNM also requested a FPPAC and full recovery of certain third-party transmission charges PNM incurs to serve NEC. NEC filed a protest to PNM’s filing with FERC. In November 2011, FERC issued an order accepting the filing, suspending the effective date to be effective April 14, 2012, subject to refund, and set the proceeding for settlement. The parties finalized a settlement agreement and PNM filed for the necessary FERC approval on December 6, 2012. The settlement agreement provided for an annual increase of $5.3 million and an extension of the contract for 10 years through December 31, 2035. On April 5, 2013, FERC approved the settlement agreement. PNM has refunded the amounts collected in excess of the settled rates concluding this matter.
City of Gallup, New Mexico Contract
PNM provided both energy and power services to Gallup, PNM’s second largest firm-requirements wholesale customer, under an electric service agreement that was to expire on June 30, 2013. On May 1, 2013, PNM and Gallup agreed to extend the term of the agreement to June 30, 2014 and to increase the demand and energy rates under the agreement. On May 1, 2013, PNM requested FERC approval of the amended agreement to be effective July 1, 2013. On June 21, 2013, FERC approved the amended agreement.
On September 26, 2013, Gallup issued a request for proposals for long-term power supply. PNM submitted a proposal in November 2013. On March 26, 2014, Gallup notified PNM that the contract for long-term power supply had been awarded to another utility. PNM’s contract with Gallup ended on June 29, 2014.  PNM’s revenues for power sold under the Gallup contract were $6.1 million in the six months ended June 30, 2014 and totaled $11.7 million during 2013.  PNM’s 2014 Electric Rate Case discussed above reflects a reallocation of costs among regulatory jurisdictions reflecting the termination of the contract to serve Gallup.
TNMP
Advanced Meter System Deployment
In July 2011, the PUCT approved a settlement and authorized an AMS deployment plan that permits TNMP to collect $113.4 million in deployment costs through a surcharge over a 12 -year period. TNMP began collecting the surcharge on August 11, 2011. Deployment of advanced meters began in September 2011 and is scheduled to be completed over a 5 -year period.
In February 2012, the PUCT opened a proceeding to consider the feasibility of an “opt-out” program for retail consumers that wish to decline receipt of an advanced meter. The PUCT requested comments and held a public meeting on various issues. However, various individuals filed a petition with the PUCT seeking a moratorium on any advanced meter deployment. The PUCT denied the petition and an appeal was filed with the Texas District Court on September 28, 2012.
On February 21, 2013, the PUCT filed a proposed rule to permit customers to opt-out of the AMS deployment. The PUCT adopted a rule on August 15, 2013 creating a non-standard metering service for retail customers choosing to decline standard metering service via an advanced meter. The cost of providing non-standard metering service will be borne by opt-out customers through an initial fee and ongoing monthly charge. All transmission and distribution utilities in ERCOT were required to initiate proceedings to establish these charges.
On September 30, 2013, TNMP filed an application to set the initial fee and monthly charges to be assessed for non-standard metering service provided to those retail customers who choose to decline the advanced meter necessary for standard metering service. TNMP’s filing sought recovery of $0.2 million through proposed initial fees ranging from $142.84 to $247.48 and an additional $0.5 million in annual ongoing expenses via a proposed monthly charge of $38.99 . On June 20, 2014, the PUCT approved a settlement among the parties permitting TNMP to recover $0.2 million in costs through initial fees ranging from $63.97 to $168.61 and ongoing annual expenses of $0.5 million collected through a $36.78 monthly fee. The settlement presumes up to 1,081 consumers will elect the non-standard meter service, but preserves TNMP’s rights to adjust the fees if the number of anticipated consumers differs from that estimate. TNMP notified all appropriate customers that they could elect non-standard

B- 108

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

metering. As of February 20, 2015, 89 customers have made the election. TNMP does not expect the implementation of non-standard metering service to have a material impact on its financial position, results of operations, or cash flows.
Remand of ERCOT Transmission Rates for 1999 and 2000
Following various appeals, the ERCOT transmission rates approved for the fourth quarter of 1999 and 2000 were remanded back to the PUCT. In October 2011, TNMP joined in a non-unanimous settlement relating to resettlement of the fourth quarter of 1999. In January 2012, the PUCT approved the non-unanimous settlement awarding TNMP $1.6 million . In June 2012, TNMP filed its transmission cost recovery factor filing (“TCRF”) seeking $3.2 million in additional transmission costs. The PUCT staff requested a hearing asserting the settlement proceeds from the 1999 remand settlement must be credited against the costs TNMP requested in its TCRF. After further discussion, PUCT staff agreed that no credit was required since TNMP had not recovered those costs in 1999. The PUCT staff agreed to interim rate relief permitting TNMP to add $1.6 million in uncontested costs to its existing TCRF. TNMP implemented the interim rates on September 1, 2012. On November 19, 2012, the PUCT ordered that the $1.6 million in interim rates were final and authorized TNMP to institute a surcharge in March 2013 to collect the additional $1.6 million in initially disputed costs plus interest.
Energy Efficiency
TNMP recovers the costs of its energy efficiency programs through an energy efficiency cost recovery factor, which includes projected program costs, under or over collected costs from prior years, rate case expenses, and performance bonuses (if the programs exceed expectations). In September 2011, the PUCT approved a settlement that allows TNMP to collect the estimated 2012 energy efficiency program costs of $3.4 million and a $0.3 million bonus for 2010. TNMP’s new rates were effective January 1, 2012. On August 28, 2012, the PUCT approved a settlement that permitted TNMP to collect an aggregate of $5.2 million effective January 1, 2013. On October 25, 2013, the PUCT approved a settlement that permits TNMP to collect an aggregate of $5.6 million , including a performance bonus for 2012 of $0.7 million , beginning March 1, 2014. On May 30, 2014, TNMP filed its 2015 energy efficiency cost recovery factor application with the PUCT requesting recovery of $5.7 million to be collected beginning March 1, 2015. The request included an incentive bonus of $1.5 million for having achieved demand savings for the 2013 program year that exceeded the goal. On August 6, 2014, the parties filed a stipulation resolving TNMP’s application. The PUCT approved the settlement on September 11, 2014 permitting TNMP to collect $5.7 million beginning March 1, 2015. TNMP recorded the $1.5 million incentive bonus for 2013 upon approval by the PUCT.
Transmission Cost of Service Rates
TNMP can update its transmission rates twice per year to reflect changes in its invested capital. Updated rates reflect the addition and retirement of transmission facilities, including appropriate depreciation, federal income tax and other associated taxes, and the approved rate of return on such facilities. The following sets forth TNMP’s most recent interim transmission cost rate increases:
Effective Date
 
Approved Increase in Rate Base
 
Annual Increase in Revenue
 
 
(in millions)
September 27, 2012
 
$
26.4

 
$
2.5

March 20, 2013
 
21.9

 
2.9

September 17, 2013
 
18.1

 
2.8

March 13, 2014
 
18.2

 
2.9

September 8, 2014
 
25.2

 
4.2

In January 2015, TNMP filed an application to further update its transmission rates to reflect an increase in total rate base of $27.1 million , which would increase revenues by $4.4 million annually. The application is pending before the PUCT.

B- 109

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

Periodic Distribution Rate Adjustment
In September 2011, the PUCT approved a new rule permitting interim rate adjustments to reflect changes in investments in distribution assets. The rule permits distribution utilities to file for a periodic rate adjustment between April 1 and April 8 of each year as long as the electric utility is not earning more than its authorized rate of return using weather-normalized data.
Consolidated Tax Savings Adjustment
On June 14, 2013, the Governor of Texas signed into law a bill eliminating the consolidated tax savings adjustment (“CTSA”) from electric utility ratemaking in Texas. Previously, the CTSA required electric utilities to artificially reduce their respective tax expenses due to the losses incurred by their affiliates. The bill became effective on September 1, 2013.

(18)
Related Party Transactions
PNMR, PNM, and TNMP are considered related parties as defined under GAAP. PNMR Services Company provides corporate services to PNMR and its subsidiaries in accordance with shared services agreements. These services are billed at cost on a monthly basis to the business units.
PNMR files a consolidated federal income tax return with its affiliated companies. A tax allocation agreement exists between PNMR and each of its affiliated companies. These agreements provide that the subsidiary company will compute its taxable income on a stand-alone basis. If the result is a net tax liability, such amount shall be paid to PNMR. If there are net operating losses and/or tax credits, the subsidiary shall receive payment for the tax savings from PNMR to the extent that PNMR is able to utilize those benefits.
 
See Note 6 for information on intercompany borrowing arrangements. The table below summarizes the nature and amount of related party transactions of PNMR, PNM and TNMP:    
 
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
 
 
(In thousands)
 
 
Services billings:
 
 
 
 
 
PNMR to PNM
$
86,871

 
$
92,597

 
$
99,986

PNMR to TNMP
28,349

 
28,937

 
29,110

PNM to TNMP
524

 
562

 
595

TNMP to PNMR
31

 
7

 
15

Income tax sharing payments:
 
 
 
 
 
PNMR to TNMP

 

 
1,951

PNMR to PNM

 
77,433

 
63,114

  TNMP to PNMR

 
3,643

 

Interest payments:
 
 
 
 
 
PNM to PNMR
65

 
4

 
1

TNMP to PNMR
309

 
481

 
137

 

B- 110

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

(19)
Accumulated Other Comprehensive Income (Loss)
AOCI reports a measure for accumulated changes in equity that result from transactions and other economic events other than transactions with shareholders. Information regarding AOCI is as follows:
 
Accumulated Other Comprehensive Income (Loss)
 
Unrealized Gain on Available-for-Sale Securities
 
Pension
Liability
Adjustment
 
Fair Value Adjustment for Cash Flow Hedges
 
Total
 
 
 
(In thousands)
 
 
   PNMR
 
 
 
 
 
 
 
Balance at December 31, 2011
$
15,634

 
$
(82,432
)
 
$
(58
)
 
$
(66,856
)
 Amounts reclassified from AOCI (pre-tax)
(37,269
)
 
4,611

 
182

 
(32,476
)
Income tax impact of amounts reclassified
14,755

 
(1,825
)
 
(65
)
 
12,865

 Other OCI changes (pre-tax)
38,548

 
(30,084
)
 
(428
)
 
8,036

Income tax impact of other OCI changes
(15,262
)
 
11,910

 
153

 
(3,199
)
Net change after income taxes
772

 
(15,388
)
 
(158
)
 
(14,774
)
Balance at December 31, 2012
16,406

 
(97,820
)
 
(216
)
 
(81,630
)
 Amounts reclassified from AOCI (pre-tax)
(11,956
)
 
6,364

 
207

 
(5,385
)
Income tax impact of amounts reclassified
4,734

 
(2,524
)
 
(73
)
 
2,137

 Other OCI changes (pre-tax)
27,419

 
17,136

 
(279
)
 
44,276

Income tax impact of other OCI changes
(10,855
)
 
(6,781
)
 
98

 
(17,538
)
Net change after income taxes
9,342

 
14,195

 
(47
)
 
23,490

Balance at December 31, 2013
25,748

 
(83,625
)
 
(263
)
 
(58,140
)
 Amounts reclassified from AOCI (pre-tax)
(13,862
)
 
5,152

 
558

 
(8,152
)
Income tax impact of amounts reclassified
5,461

 
(2,032
)
 
(195
)
 
3,234

 Other OCI changes (pre-tax)
17,473

 
(15,282
)
 
(153
)
 
2,038

Income tax impact of other OCI changes
(6,812
)
 
6,024

 
53

 
(735
)
Net change after income taxes
2,260

 
(6,138
)
 
263

 
(3,615
)
Balance at December 31, 2014
$
28,008

 
$
(89,763
)
 
$

 
$
(61,755
)
 

B- 111

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

 
Accumulated Other Comprehensive Income (Loss)
 
Unrealized Gain on Available-for-Sale Securities
 
Pension
Liability
Adjustment
 
Fair Value Adjustment for Cash Flow Hedges
 
Total
 
 
 
(In thousands)
 
 
PNM
 
 
 
 
 
 
 
Balance at December 31, 2011
$
15,634

 
$
(82,432
)
 
$

 
$
(66,798
)
 Amounts reclassified from AOCI (pre-tax)
(37,269
)
 
4,611

 

 
(32,658
)
Income tax impact of amounts reclassified
14,755

 
(1,825
)
 

 
12,930

 Other OCI changes (pre-tax)
38,548

 
(30,084
)
 

 
8,464

Income tax impact of other OCI changes
(15,262
)
 
11,910

 

 
(3,352
)
Net change after income taxes
772

 
(15,388
)
 

 
(14,616
)
Balance at December 31, 2012
16,406

 
(97,820
)
 

 
(81,414
)
 Amounts reclassified from AOCI (pre-tax)
(11,956
)
 
6,364

 

 
(5,592
)
Income tax impact of amounts reclassified
4,734

 
(2,524
)
 

 
2,210

 Other OCI changes (pre-tax)
27,419

 
17,136

 

 
44,555

Income tax impact of other OCI changes
(10,855
)
 
(6,781
)
 

 
(17,636
)
Net change after income taxes
9,342

 
14,195

 

 
23,537

Balance at December 31, 2013
25,748

 
(83,625
)
 

 
(57,877
)
 Amounts reclassified from AOCI (pre-tax)
(13,862
)
 
5,152

 

 
(8,710
)
Income tax impact of amounts reclassified
5,461

 
(2,032
)
 

 
3,429

 Other OCI changes (pre-tax)
17,473

 
(15,282
)
 

 
2,191

Income tax impact of other OCI changes
(6,812
)
 
6,024

 

 
(788
)
Net change after income taxes
2,260

 
(6,138
)
 

 
(3,878
)
Balance at December 31, 2014
$
28,008

 
$
(89,763
)
 
$

 
$
(61,755
)

B- 112

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

 
Accumulated Other Comprehensive Income (Loss)
 
Unrealized Gain on Available-for-Sale Securities
 
Pension
Liability
Adjustment
 
Fair Value Adjustment for Cash Flow Hedges
 
Total
 
 
 
(In thousands)
 
 
TNMP
 
 
 
 
 
 
 
Balance at December 31, 2011
$

 
$

 
$
(58
)
 
$
(58
)
 Amounts reclassified from AOCI (pre-tax)

 

 
182

 
182

Income tax impact of amounts reclassified

 

 
(65
)
 
(65
)
 Other OCI changes (pre-tax)

 

 
(428
)
 
(428
)
Income tax impact of other OCI changes

 

 
153

 
153

Net change after income taxes

 

 
(158
)
 
(158
)
Balance at December 31, 2012

 

 
(216
)
 
(216
)
 Amounts reclassified from AOCI (pre-tax)

 

 
207

 
207

Income tax impact of amounts reclassified

 

 
(73
)
 
(73
)
 Other OCI changes (pre-tax)

 

 
(279
)
 
(279
)
Income tax impact of other OCI changes

 

 
98

 
98

Net change after income taxes

 

 
(47
)
 
(47
)
Balance at December 31, 2013

 

 
(263
)
 
(263
)
 Amounts reclassified from AOCI (pre-tax)

 

 
558

 
558

Income tax impact of amounts reclassified

 

 
(195
)
 
(195
)
 Other OCI changes (pre-tax)

 

 
(153
)
 
(153
)
Income tax impact of other OCI changes

 

 
53

 
53

Net change after income taxes

 

 
263

 
263

Balance at December 31, 2014
$

 
$

 
$

 
$

Pre-tax amounts reclassified from AOCI related to Unrealized Gain on Available-for-Sale Securities are included in Gains on available-for-sale securities in the Consolidated Statements of Earnings. Pre-tax amounts reclassified from AOCI related to Pension Liability Adjustment are reclassified to Operating Expenses – Administrative and general in the Consolidated Statements of Earnings. For the years ended December 31, 2014 and 2013, approximately 24.4% and 18.7% of the amount reclassified were capitalized into construction work in process and approximately 2.0% and 3.0% were capitalized into other accounts. Pre-tax amounts reclassified from AOCI related to Fair Value Adjustment for Cash Flow Hedges are reclassified to Interest Charges in the Consolidated Statements of Earnings. An insignificant amount is then capitalized as AFUDC. The income tax impacts of all amounts reclassified from AOCI are included in Income Taxes in the Consolidated Statements of Earnings.

(20) Goodwill; Impairments
The excess purchase price over the fair value of the assets acquired and the liabilities assumed by PNMR for its 2005 acquisition of TNP was recorded as goodwill and was pushed down to the businesses acquired. In 2007, the TNMP assets that were included in its New Mexico operations, including goodwill, were transferred to PNM.
GAAP requires the Company to evaluate its goodwill for impairment annually at the reporting unit level or more frequently if circumstances indicate that the goodwill may be impaired. The Company evaluates goodwill impairment as of April 1st of each year. PNMR’s reporting units that have goodwill are PNM and TNMP. Application of the impairment test requires judgment, including the identification of reporting units, assignment of assets and liabilities to reporting units, and determination of the fair value of each reporting unit.
GAAP provides that in certain circumstances an entity may perform a qualitative analysis to conclude that the goodwill of a reporting unit is not impaired. Under a qualitative assessment an entity considers macroeconomic conditions, industry and market considerations, cost factors, overall financial performance, other relevant entity-specific events affecting a reporting unit,

B- 113

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

as well as whether a sustained decrease (both absolute and relative to its peers) in share price had occurred. An entity considers the extent to which each of the adverse events and circumstances identified could affect the comparison of a reporting unit’s fair value with its carrying amount. An entity places more weight on the events and circumstances that most affect a reporting unit’s fair value or the carrying amount of its net assets. An entity also considers positive and mitigating events and circumstances that may affect its determination of whether it is more likely than not that the fair value of a reporting unit is less than its carrying amount. An entity evaluates, on the basis of the weight of evidence, the significance of all identified events and circumstances in determining whether it is more likely than not that the fair value of a reporting unit is less than its carrying amount. If, after assessing the totality of events or circumstances, an entity determines that it is not more likely than not that the fair value of a reporting unit is less than its carrying amount, a quantitative analysis is not required.
In other circumstances, an entity may perform a quantitative analysis to reach the conclusion regarding impairment with respect to a reporting unit. The first step of the quantitative impairment test requires an entity to compare the fair value of the reporting unit with its carrying value, including goodwill. If as a result of this analysis, the entity concludes there is an indication of impairment in a reporting unit having goodwill, the entity is required to perform the second step of the impairment analysis, determining the amount of goodwill impairment to be recorded. The amount is calculated by comparing the implied fair value of the goodwill to its carrying amount. This exercise requires the entity to allocate the fair value determined in step one to the individual assets and liabilities of the reporting unit. Any remaining fair value would be the implied fair value of goodwill on the testing date. To the extent the recorded amount of goodwill of a reporting unit exceeds the implied fair value determined in step two, an impairment loss would be reflected in results of operations.
An entity may choose to perform a quantitative analysis without performing a qualitative analysis and may perform a qualitative analysis for certain reporting units, but a quantitative analysis for others. Prior to 2013, the Company performed qualitative analyses for all reporting units having goodwill. For the annual evaluations performed as of April 1, 2014 and 2013, PNMR utilized a qualitative analysis for the TNMP reporting unit and a quantitative analysis for the PNM reporting unit.
For the PNM reporting unit, a discounted cash flow methodology was primarily used in the quantitative analysis to estimate the fair value of the reporting unit. This analysis requires significant judgments, including estimation of future cash flows, which is dependent on internal forecasts, estimation of long-term growth rates for the business, and determination of appropriate weighted average cost of capital for each reporting unit. Changes in these estimates and assumptions could materially affect the determination of fair value and the conclusion of impairment.
The April 1, 2014 and 2013 quantitative evaluations indicated the fair value of the PNM reporting unit, which has goodwill of $51.6 million , exceeded its carrying value by approximately 30% and 27% . An increase of 0.5% in the expected return on equity capital utilized in discounting the forecasted cash flows, would have reduced the excess of PNM’s fair value over carrying value to approximately 23% and 20% at April 1, 2014 and 2013. The 2014 and 2013 qualitative analysis for the TNMP reporting unit, which has goodwill of $226.7 million , included the consideration of various reporting unit specific factors as well as industry and macroeconomic factors to determine whether these factors were reasonably likely to have a material impact on the fair value of the reporting unit. Factors considered included the results of the April 1, 2012 quantitative analysis, which indicated that fair value exceeded carrying value of the reporting unit by approximately 26% , current and long-term forecasted financial results, regulatory environment, credit rating, interest rate environment, absolute and relative price of PNMR’s common stock, and operating strategy. TNMP believes it is operating within a generally favorable regulatory environment, its historical and forecasted financial results are positive, and its credit is perceived positively. Based on the analysis of the relevant factors, PNMR concluded that it is more likely than not that the fair value of the TNMP reporting unit exceeds its carrying value. The annual evaluations performed as of April 1, 2014 and 2013 did not indicate impairments of the goodwill of any of PNMR’s reporting units. Since the April 1, 2014 annual evaluation, there have been no indications that the fair values of the reporting units with recorded goodwill have decreased below the carrying values.
Prior annual evaluations have not indicated impairments of any of PNMR’s reporting units, except in 2008. During 2008, the market capitalization of PNMR’s common stock was significantly below book value. In addition, First Choice, a PNMR reporting unit that was sold in 2011, was significantly impacted by depressed economic conditions and changes in the market in which it operated. As a result, goodwill impairments of $51.1 million for PNM, $34.5 million for TNMP, and an aggregate of $174.4 million for PNMR were recorded in 2008. Since 2008, the price of PNMR’s common stock has increased, improving the relationship between PNMR’s market capitalization and book value. In addition, improved regulatory treatment has been experienced by PNM in New Mexico and by TNMP in Texas. These factors resulted in more predictable earnings and increased fair values of the reporting units. Since 2008, the annual evaluations have not indicated that the fair values of the reporting units with recorded goodwill have decreased below their carrying values.
 

B- 114

Table of Contents
PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
December 31, 2014, 2013 and 2012

(21) Quarterly Operating Results (Unaudited)
Unaudited operating results by quarters for 2014 and 2013 are presented below. In the opinion of management of the Company, all adjustments (consisting of normal recurring accruals) necessary for a fair statement of the results of operations for such periods have been included.
 
Quarter Ended
 
March 31
 
June 30
 
September 30
 
December 31
 
(In thousands, except per share amounts)
PNMR
 
 
 
 
 
 
 
2014
 
 
 
 
 
 
 
Operating revenues
$
328,897

 
$
346,160

 
$
413,951

 
$
346,845

Operating income
48,753

 
71,296

 
116,799

 
62,849

Net earnings
16,131

 
33,181

 
59,486

 
22,111

Net earnings attributable to PNMR
12,468

 
29,141

 
55,653

 
18,992

Net Earnings Attributable to PNMR per Common Share:
 
 
 
 
 
 
 
Basic
0.16

 
0.37

 
0.70

 
0.24

Diluted
0.16

 
0.36

 
0.69

 
0.24

2013
 
 
 
 
 
 
 
Operating revenues
$
317,665

 
$
347,599

 
$
399,730

 
$
322,929

Operating income
50,704

 
77,867

 
117,739

 
40,532

Net earnings
13,962

 
31,383

 
58,814

 
11,397

Net earnings attributable to PNMR
10,626

 
27,678

 
54,555

 
7,648

Net Earnings Attributable to PNMR per Common Share:
 
 
 
 
 
 
 
Basic
0.13

 
0.35

 
0.68

 
0.10

Diluted
0.13

 
0.34

 
0.68

 
0.10

PNM
 
 
 
 
 
 
 
2014
 
 
 
 
 
 
 
Operating revenues
$
262,736

 
$
275,704

 
$
334,993

 
$
274,481

Operating income
31,304

 
49,806

 
90,615

 
40,988

Net earnings
11,205

 
24,254

 
49,052

 
16,942

Net earnings attributable to PNM
7,674

 
20,346

 
45,351

 
13,955

2013
 
 
 
 
 
 
 
Operating revenues
$
257,894

 
$
279,690

 
$
326,026

 
$
252,702

Operating income
37,239

 
58,302

 
95,217

 
18,427

Net earnings
14,773

 
29,697

 
51,950

 
6,256

Net earnings attributable to PNM
11,569

 
26,124

 
47,823

 
2,639

TNMP
 
 
 
 
 
 
 
2014
 
 
 
 
 
 
 
Operating revenues
$
66,161

 
$
70,456

 
$
78,958

 
$
72,364

Operating income
17,262

 
21,265

 
25,873

 
21,188

Net earnings
6,803

 
9,534

 
12,355

 
9,115

2013
 
 
 
 
 
 
 
Operating revenues
$
59,771

 
$
67,909

 
$
73,704

 
$
70,227

Operating income
13,054

 
19,667

 
22,254

 
17,210

Net earnings
3,726

 
8,339

 
10,106

 
6,919




B- 115

Table of Contents


REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM



The Board of Directors and Stockholders
PNM Resources, Inc:
We have reported separately herein on the consolidated balance sheets of PNM Resources, Inc and subsidiaries (the Company) as of December 31, 2014 and 2013, and the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014. In connection with our audits of the aforementioned consolidated financial statements, we also audited the related financial statement schedules as listed within Item 15. These financial statement schedules are the responsibility of the Company’s management. Our responsibility is to express an opinion on these financial statement schedules based on our audits.
In our opinion, such financial statement schedules, when considered in relation to the basic consolidated financial statements taken as a whole, present fairly, in all material respects, the information set forth therein.

/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015


B- 116



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM



The Board of Directors and Stockholders
Public Service Company of New Mexico:
We have reported separately herein on the consolidated balance sheets of Public Service Company of New Mexico and subsidiaries (the Company) as of December 31, 2014 and 2013, and the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014. In connection with our audits of the aforementioned consolidated financial statements, we also audited the related financial statement schedule as listed within Item 15. The financial statement schedule is the responsibility of the Company’s management. Our responsibility is to express an opinion on the financial statement schedule based on our audits.
In our opinion, such financial statement schedule, when considered in relation to the basic consolidated financial statements taken as a whole, presents fairly, in all material respects, the information set forth therein.

/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015

B- 117



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


The Board of Directors and Stockholder
Texas-New Mexico Power Company:
We have audited and reported separately herein on the consolidated balance sheets of Texas-New Mexico Power Company and subsidiaries (the Company) as of December 31, 2014 and 2013, and the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014. In connection with our audits of the aforementioned consolidated financial statements, we also audited the related financial statement schedule as listed within Item 15. The financial statement schedule is the responsibility of the Company’s management. Our responsibility is to express an opinion on the financial statement schedule based on our audits.
In our opinion, such financial statement schedule, when considered in relation to the basic consolidated financial statements taken as a whole, presents fairly, in all material respects, the information set forth therein.

/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015


B- 118



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Board of Directors and Stockholders of
PNM Resources, Inc.
Albuquerque, New Mexico
We have audited the consolidated financial statements of PNM Resources, Inc. and subsidiaries (the "Company") for the year ended December 31, 2012, and have issued our report thereon dated March 1, 2013; such consolidated financial statements and report are included elsewhere in this Form 10-K. Our audit also included the consolidated financial statement schedules for the year ended December 31, 2012 of the Company listed in Item 15. These consolidated financial statement schedules are the responsibility of the Company's management. Our responsibility is to express an opinion based on our audit. In our opinion, such consolidated financial statement schedules, when considered in relation to the basic consolidated financial statements taken as a whole, present fairly, in all material respects, the information set forth herein.

/s/ DELOITTE & TOUCHE LLP
Phoenix, Arizona
March 1, 2013
























B- 119



REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Board of Directors and Stockholders of
Public Service Company of New Mexico
Albuquerque, New Mexico

and

Texas-New Mexico Power Company
Lewisville, Texas

We have audited the consolidated financial statements of Public Service Company of New Mexico and subsidiaries and Texas-New Mexico Power Company and subsidiaries (the "Companies") for the year ended December 31, 2012, and have issued our reports thereon dated March 1, 2013; such consolidated financial statements and reports are included elsewhere in this Form 10-K. Our audits also included the consolidated financial statement schedules for the year ended December 31, 2012 of the Companies listed in Item 15 . These consolidated financial statement schedules are the responsibility of the Companies’ management. Our responsibility is to express an opinion based on our audits. In our opinion, such consolidated financial statement schedules, when considered in relation to the basic consolidated financial statements taken as a whole, present fairly, in all material respects, the information set forth herein.

/s/ DELOITTE & TOUCHE LLP
Phoenix, Arizona
March 1, 2013

B- 120



SCHEDULE I
PNM RESOURCES, INC.
CONDENSED FINANCIAL INFORMATION OF PARENT COMPANY
STATEMENTS OF EARNINGS
 
 
Year ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Operating Revenues
$

 
$

 
$

Operating Expenses
650

 
941

 
3,287

Operating income (loss)
(650
)
 
(941
)
 
(3,287
)
Other Income and Deductions:
 
 
 
 
 
Equity in earnings of subsidiaries
124,543

 
116,634

 
117,900

Other income
622

 
769

 
670

Other deductions
(13,650
)
 
(22,825
)
 
(20,904
)
Net other income (deductions)
111,515

 
94,578

 
97,666

Earnings Before Income Taxes
110,865

 
93,637

 
94,379

Income Tax Expense (Benefit)
(5,389
)
 
(6,870
)
 
(11,168
)
Net Earnings
$
116,254

 
$
100,507

 
$
105,547




B- 121

Table of Contents


SCHEDULE I
PNM RESOURCES, INC.
CONDENSED FINANCIAL INFORMATION OF PARENT COMPANY
STATEMENTS OF CASH FLOWS
 
 
Year Ended December 31,
 
2014
 
2013
 
2012
 
(In thousands)
Cash Flows From Operating Activities:
 
 
 
 
 
Net earnings
$
116,254

 
$
100,507

 
$
105,547

Adjustments to reconcile net earnings to net cash flows from operating activities:
 
 
 
 
 
Depreciation and amortization
680

 
4,192

 
5,000

Deferred income tax expense
(69,442
)
 
(51,820
)
 
(46,632
)
Equity in (earnings) of subsidiaries
(124,543
)
 
(116,634
)
 
(117,900
)
Loss on reacquired debt

 
3,253

 

Stock based compensation expense
5,931

 
5,320

 
3,585

Changes in certain assets and liabilities:
 
 
 
 
 
Other current assets
22,955

 
28,460

 
(43,638
)
Other assets
51,644

 
46,558

 
34,096

Accounts payable
(88
)
 
620

 
8

Accrued interest and taxes
(7,683
)
 
(9,266
)
 
(28,855
)
Other current liabilities
(1,668
)
 
(146
)
 
3,876

Other liabilities
28,704

 
(27,756
)
 
(29,601
)
Net cash flows from operating activities
22,744

 
(16,712
)
 
(114,514
)
Cash Flows From Investing Activities:
 
 
 
 
 
Utility plant additions
(474
)
 
(960
)
 
(7,524
)
Investments in subsidiaries

 
(13,800
)
 

Cash dividends from subsidiaries
46,599

 
158,772

 
61,406

Net cash flows from investing activities
46,125

 
144,012

 
53,882

Cash Flows From Financing Activities:
 
 
 
 
 
Short-term borrowings (repayments), net
600

 
(37,600
)
 
120,900

Repayment of long-term debt

 
(29,468
)
 
(2,387
)
Proceeds from stock option exercise
6,999

 
4,618

 
11,684

Purchases to satisfy awards of common stock
(17,319
)
 
(13,807
)
 
(25,168
)
Dividends paid
(58,940
)
 
(50,980
)
 
(44,609
)
Other, net
81

 

 

Net cash flows from financing activities
(68,579
)
 
(127,237
)
 
60,420

Change in Cash and Cash Equivalents
290

 
63

 
(212
)
Cash and Cash Equivalents at Beginning of Period
92

 
29

 
241

Cash and Cash Equivalents at End of Period
$
382

 
$
92

 
$
29

Supplemental Cash Flow Disclosures:
 
 
 
 
 
Interest paid
$
12,152

 
$
14,510

 
$
15,007

Income taxes paid (refunded), net
$
(2,014
)
 
$
22,378

 
$
1,501


B- 122

Table of Contents


SCHEDULE I
PNM RESOURCES, INC.
CONDENSED FINANCIAL INFORMATION OF PARENT COMPANY
BALANCE SHEETS
 
 
December 31,
 
2014
 
2013
 
(In thousands)
Assets
 
 
 
Cash and cash equivalents
$
382

 
$
92

Intercompany receivables
107,619

 
136,387

Income taxes receivable
29

 
14,989

Other, net
8,115

 
8,544

Total current assets
116,145

 
160,012

Property, plant and equipment, net of accumulated depreciation of $10,251 and $9,167
27,076

 
26,601

Investment in subsidiaries
1,757,650

 
1,683,321

Other long-term assets
70,939

 
53,892

Total long-term assets
1,855,665

 
1,763,814

 
$
1,971,810

 
$
1,923,826

Liabilities and Stockholders’ Equity
 
 
 
Short-term debt
$
100,600

 
$
100,000

Short-term debt-affiliate
8,819

 
8,819

Current maturities of long-term debt
118,766

 

Accrued interest and taxes
2,816

 
2,797

Other current liabilities
16,320

 
16,876

Total current liabilities
247,321

 
128,492

Long-term debt

 
118,766

Other long-term liabilities
2,943

 
2,999

Total liabilities
250,264

 
250,257

Common stock (no par value; 120,000,000 shares authorized; issued and outstanding 79,653,624 shares)
1,173,845

 
1,178,369

Accumulated other comprehensive income (loss), net of tax
(61,755
)
 
(58,140
)
Retained earnings
609,456

 
553,340

Total common stockholders’ equity
1,721,546

 
1,673,569

 
$
1,971,810

 
$
1,923,826


See Notes 6, 7, 14, and 16 for information regarding commitments, contingencies, and maturities of long-term debt.

B- 123

Table of Contents


SCHEDULE II
PNM RESOURCES, INC. AND SUBSIDIARIES
VALUATION AND QUALIFYING ACCOUNTS
 
 
 
 
 
 
Additions
 
Deductions
 
 
 
Description
 
Balance at
beginning of
year
 
Charged to
costs and
expenses
 
Charged to
other
accounts
 
Write-offs and other
 
Balance at
end of year
 
 
 
 
 
(In thousands)
 
 
 
Allowance for doubtful accounts, year ended December 31:
 
 
 
 
 
 
 
 
 
 
 
2012
 
$
1,778

 
$
3,367

 
$

 
$
3,394

 
$
1,751

 
2013
 
$
1,751

 
$
2,849

 
$

 
$
3,177

 
$
1,423

 
2014
 
$
1,423

 
$
3,267

 
$

 
$
3,224

 
$
1,466


 

B- 124

Table of Contents


SCHEDULE II
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARY
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
VALUATION AND QUALIFYING ACCOUNTS
 
 
 
 
 
 
Additions
 
Deductions
 
 
 
Description
 
Balance at
beginning of
year
 
Charged to
costs and
expenses
 
Charged to
other
accounts
 
Write-offs
 
Balance at
end of year
 
 
 
 
 
(In thousands)
 
 
 
Allowance for doubtful accounts, year ended December 31:
 
 
 
 
 
 
 
 
 
 
 
2012
 
$
1,778

 
$
3,384

 
$

 
$
3,411

 
$
1,751

 
2013
 
$
1,751

 
$
2,864

 
$

 
$
3,192

 
$
1,423

 
2014
 
$
1,423

 
$
3,275

 
$

 
$
3,232

 
$
1,466

 


B- 125

Table of Contents


SCHEDULE II
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES
A WHOLLY OWNED SUBSIDIARY OF PNM RESOURCES, INC.
VALUATION AND QUALIFYING ACCOUNTS
 
 
 
 
 
Additions
 
Deductions
 
 
Description
 
Balance at
beginning of
year
 
Charged to
costs and
expenses
 
Charged to
other
accounts
 
Write-offs
 
Balance at
end of year
 
 
 
 
(In thousands)
 
 
Allowance for doubtful accounts, year ended December 31:
 
 
 
 
 
 
 
 
 
 
2012
 
$

 
$
(17
)
 
$

 
$
(17
)
 
$

2013
 
$

 
$
(15
)
 
$

 
$
(15
)
 
$

2014
 
$

 
$
(8
)
 
$

 
$
(8
)
 
$




B- 126

Table of Contents


ITEM 9.
CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
None.
 
ITEM 9A.
CONTROLS AND PROCEDURES

PNMR
(a) Evaluation of disclosure controls and procedures.
As of the end of the period covered by this annual report, PNMR conducted an evaluation under the supervision and with the participation of its management, including the Chief Executive Officer and the Chief Financial Officer, of the effectiveness of the design and operation of the disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934). Based upon this evaluation, the Chief Executive Officer and the Chief Financial Officer concluded that the disclosure controls and procedures are effective.
(b) Management’s report on internal control over financial reporting.
“Management’s Annual Report on Internal Control Over Financial Reporting” appears on page B-2. This report is incorporated by reference herein. PNMR’s internal control over financial reporting as of December 31, 2014 has been audited by KPMG LLP, as an independent registered public accounting firm, as stated in their report which is included herein.
(c) Changes in internal controls.
There have been no changes in PNMR’s internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934) during the quarter ended December 31, 2014 that have materially affected, or are reasonably likely to materially affect, PNMR’s internal control over financial reporting.
PNM
(a) Evaluation of disclosure controls and procedures.
As of the end of the period covered by this annual report, PNM conducted an evaluation under the supervision and with the participation of its management, including the Chief Executive Officer and the Chief Financial Officer, of the effectiveness of the design and operation of the disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934). Based upon this evaluation, the Chief Executive Officer and the Chief Financial Officer concluded that the disclosure controls and procedures are effective.
(b) Management’s report on internal control over financial reporting.

“Management’s Annual Report on Internal Control Over Financial Reporting” appears on page B-3. This report is incorporated by reference herein.

(c) Changes in internal controls.

There have been no changes in PNM’s internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934) during the quarter ended December 31, 2014 that have materially affected, or are reasonably likely to materially affect, PNM’s internal control over financial reporting.

TNMP

(a) Evaluation of disclosure controls and procedures.
As of the end of the period covered by this annual report, TNMP conducted an evaluation under the supervision and with the participation of its management, including the Chief Executive Officer and the Chief Financial Officer, of the effectiveness of the design and operation of the disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934). Based upon this evaluation, the Chief Executive Officer and the Chief Financial Officer concluded that the disclosure controls and procedures are effective.

C- 1

Table of Contents


(b) Management’s report on internal control over financial reporting.

“Management’s Annual Report on Internal Control Over Financial Reporting” appears on page B-4. This report is incorporated by reference herein.

(c) Changes in internal controls.

There have been no changes in TNMP’s internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934) during the quarter ended December 31, 2014 that have materially affected, or are reasonably likely to materially affect, TNMP’s internal control over financial reporting.

ITEM 9B.
OTHER INFORMATION

On February 26, 2015, the Board approved an amendment to PNMR’s bylaws effective February 26, 2015. The amendment revised one of the qualifications for director candidates set forth in Article II, Section 9(f) of PNMR’s bylaws by deleting the requirement that candidates have an equity ownership interest in PNMR before commencing service on the Board. The bylaws retain the requirement that each director have an equity ownership in PNMR consistent with the approved director stock ownership guidelines. Disclosure of PNMR’s bylaw amendment is being made under this Item 9B of Form 10-K in lieu of Item 5.03(a) of Form 8-K.
 
PART III

ITEM 10.
DIRECTORS, EXECUTIVE OFFICERS, AND CORPORATE GOVERNANCE
Reference is hereby made to “Proposal 1: Elect Nine Directors” in PNMR’s Proxy Statement relating to the annual meeting of stockholders to be held on May 12, 2015 (the “ 2015 Proxy Statement”), to PART I, SUPPLEMENTAL ITEM – “EXECUTIVE OFFICERS OF THE COMPANY” in this Form 10-K, “Section 16(a) Beneficial Ownership Reporting Compliance”, “Code of Ethics,” and “Board Committees and Their Functions” – “Audit and Ethics Committee” in the 2015 Proxy Statement. The Company intends to satisfy the disclosure requirements of Form 8-K relating to amendments to the Company’s code of ethics applicable to its senior executive and financial officers by posting such information on its Internet website. Information about the Company’s website is included under Part I, Item 1 – “Websites.”
PNMR’s common stock is listed on the New York Stock Exchange. As a result, PNMR’s Chief Executive Officer is required to make an annual certification to the New York Stock Exchange stating that she was not aware of any violations by PNMR of the New York Stock Exchange corporate governance listing standards. PNMR’s Chief Executive Officer made the most recent certification to the New York Stock Exchange on June 3, 2014.
 
ITEM 11.
EXECUTIVE COMPENSATION
Reference is hereby made to “Executive Compensation”, and all subheadings thereunder from “Compensation Discussion and Analysis” to “Change in Control, Termination, Retirement, or Impaction”, “Director Compensation,” and “Board Committees and Their Functions – Compensation and Human Resources Committee – Interlocks and Insider Participation” in the 2015 Proxy Statement.

ITEM 12.
SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
Reference is hereby made to “Ownership of Our Common Stock – Five Percent Shareholders” and “ – Executive Officers and Directors” and “Equity Compensation Plan Information” in the 2015 Proxy Statement.
 
ITEM 13.
CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS AND DIRECTOR INDEPENDENCE
Reference is hereby made to “Information About Our Corporate Governance – Related Person Transaction Policy” and “ – Director Independence” in the 2015 Proxy Statement.
 
ITEM 14.
PRINCIPAL ACCOUNTING FEES AND SERVICES
Reference is hereby made to “Audit and Ethics Committee Report” and “Independent Auditor Fees” in the 2015 Proxy Statement. Independent auditor fees for PNM and TNMP are reported in the 2015 Proxy Statement for PNMR. All such fees are fees of PNMR. PNMR charges a management fee to PNM and TNMP that includes an allocation of independent auditor fees.

C- 2

Table of Contents


PART IV

ITEM 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES
(a) - 1.
 
See Index to Financial Statements under Part II, Item 8.
 
 
(a) - 2.
 
Financial Statement Schedules for the years 2014, 2013, and 2012 are omitted for the reason that they are not required or the information is otherwise supplied under Part II, Item 8.
 
 
(a) - 3-A.
 
Exhibits Filed:
 
 
 
 
Exhibit No
Description
 
 
 
 
3.4
 
PNMR
Bylaws of PNM Resources, Inc. with all amendments through February 26, 2015
 
 
 
 
10.1.1**
 
PNMR
2015 Director Compensation Summary
 
 
 
 
10.1.2**
 
PNMR
PNM Resources, Inc. Executive Savings Plan II, amended and restated effective as of January 1, 2015, executed as of December 29, 2014
 
 
 
 
10.2**
 
PNM
Employee Retention Agreement executed December 9, 2014 between PNM Resources, Inc. and Charles N. Eldred
 
 
 
 
10.3
 
PNM
Extension of LOI Deadline Under Amendment No. Six to Underground Coal Sales Agreement among SJCC, PNM and Tucson dated February 20, 2015
 
 
 
 
10.4.1**
 
PNMR
Acknowledgment Form for officer performance share awards granted under the Second Amended and Restated Omnibus Performance Equity Plan dated May 19, 2009, as amended
 
 
 
 
10.4.2**
 
PNMR
Acknowledgment Form for officer restricted stock rights awards granted under the PNM Resources, Inc. 2014 Performance Equity Plan dated May 15, 2014
 
 
 
 
10.4.3**
 
PNMR
Acknowledgment Form for director restricted stock rights awards granted under the PNM Resources, Inc. 2014 Performance Equity Plan dated May 15, 2014
 
 
 
 
10.4.4**
 
PNMR
Employee Retention Agreement executed December 9, 2014 between PNMR Services Company and Thomas G. Sategna
 
 
 
 
12.1
 
PNMR
Ratio of Earnings to Fixed Charges
 
 
 
12.2
 
PNM
Ratio of Earnings to Fixed Charges
 
 
 
12.3
 
TNMP
Ratio of Earnings to Fixed Charges
 
 
 
21
 
PNMR
Certain subsidiaries of PNM Resources, Inc.
 
 
 
23.1
 
PNMR
Consent of KPMG LLP for PNM Resources, Inc.
 
 
 
 
23.2
 
PNM
Consent of KPMG LLP for Public Service Company of New Mexico
 
 
 
 
23.3
 
PNMR
Consent of Deloitte & Touche LLP for PNM Resources, Inc.
 
 
 
23.4
 
PNM
Consent of Deloitte & Touche LLP for Public Service Company of New Mexico
 
 
 
31.1
 
PNMR
Chief Executive Officer Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 
 
 
31.2
 
PNMR
Chief Financial Officer Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 
 
 
31.3
 
PNM
Chief Executive Officer Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 
 
 
31.4
 
PNM
Chief Financial Officer Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 
 
 
31.5
 
TNMP
Chief Executive Officer Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 
 
 
31.6
 
TNMP
Chief Financial Officer Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 
 
 
32.1
 
PNMR
Chief Executive Officer and Chief Financial Officer Certification Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
 
 
 
32.2
 
PNM
Chief Financial Officer and Chief Financial Officer Certification Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
 
 
 
32.3
 
TNMP
Chief Executive Officer and Chief Financial Officer Certification Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

D- 1

Table of Contents


 
101.INS
PNMR
XBRL Instance Document
 
 
 
101.SCH
PNMR
XBRL Taxonomy Extension Schema Document
 
 
 
101.CAL
PNMR
XBRL Taxonomy Extension Calculation Linkbase Document
 
 
 
101.DEF
PNMR
XBRL Taxonomy Extension Definition Linkbase Document
 
 
 
101.LAB
 
PNMR
XBRL Taxonomy Extension Label Linkbase Document
 
 
 
 
101.PRE
 
PNMR
XBRL Taxonomy Extension Presentation Linkbase Document

(a) -3- B.
 
Exhibits Incorporated By Reference:
The documents listed below are being filed (as shown above) or have been previously filed on behalf of PNM Resources, PNM or TNMP and are incorporated by reference to the filings set forth below pursuant to Exchange Act Rule 12b-32 and Regulation S-K section 10, paragraph (d).


Exhibit No.
Description of Exhibit
 
Filed as Exhibit:
 
Registrant(s)
File No:
 
 
 
 
 
 
 
Articles of Incorporation and By-laws
3.1
 
Articles of Incorporation of PNM Resources, as amended to date (Certificate of Amendment dated October 27, 2008 and Restated Articles of Incorporation dated August 3, 2006)
 
3.1 to the Company’s Current Report on Form 8-K filed November 21, 2008
 
1-32462
PNMR
 
 
 
 
3.2
 
Restated Articles of Incorporation of PNM, as amended through May 31, 2002
 
3.1.1 to the Company’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2002
 
1-6986
PNM
 
 
 
 
3.3
 
Articles of Incorporation of TNMP, as amended through July 7, 2005
 
3.1.2 to the Company’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2005
 
2-97230
TNMP
 
 
 
 
3.4
 
Bylaws of PNM Resources, Inc. with all amendments to and including February 26, 2015
 
3.4 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2014
 
1-32462
PNMR
 
 
 
 
3.5
 
Bylaws of PNM with all amendments to and including May 31, 2002
 
3.1.2 to the Company’s Report on Form 10-Q for the fiscal quarter ended June 30, 2002
 
1-6986
PNM
 
 
 
 
3.6
 
Bylaws of TNMP with all amendments to and including June 18, 2013
 
3.6 to TNMP’s Current Report on Form 8-K filed June 20, 2013
 
2-97230
TNMP
 
 
 
 
 
 
 
Indentures‡
PNMR
4.1
 
Indenture, dated as of March 15, 2005, between PNMR and JPMorgan Chase Bank, N.A., as Trustee
 
10.2 to PNMR’s Current Report on Form 8-K filed March 31, 2005
 
1-32462
PNMR
 
 
 
 
4.2
 
Supplemental Indenture No. 1, dated as of March 30, 2005, between the Company and JPMorgan Chase Bank, N.A. as Trustee, with Form of Senior Note included as Exhibit A thereto
 
10.3 to PNMR’s Current Report on Form 8-K filed March 31, 2005
 
333-32170
PNMR
 
 
 
 
4.3
 
Supplemental Indenture No. 2, dated as of May 16, 2008 between PNMR and The Bank of New York Trust Company, N.A. (successor to JPMorgan Chase Bank, N.A.), as trustee
 
4.3 to PNMR’s Current Report on Form 8-K filed May 21, 2008
 
1-32462
PNMR
 
 
 
 
4.4
 
Agreement of Resignation, Appointment and Acceptance, effective as of June 1, 2011, among PNMR, The Bank of New York Mellon Trust Company, N.A. and Union Bank, N.A. (for March 15, 2005 PNMR Indenture)
 
4.1 to the Company’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2011
 
1-32462
PNMR
 
 
 
 
 
 
 

D- 2

Table of Contents


PNM
 
 
 
 
 
 
4.5
 
Indenture (for Senior Notes), dated as of March 11, 1998, between PNM and The Chase Manhattan Bank, as Trustee
 
4.4 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1998
 
1-6986
PNM
 
 
 
 
4.6
 
First Supplemental Indenture, dated as of March 11, 1998, supplemental to Indenture, dated as of March 11, 1998, Between PNM and The Chase Manhattan Bank, as Trustee
 
4.5 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1998
 
1-6986
PNM
 
 
 
 
4.7
 
Second Supplemental Indenture, dated as of March 11, 1998, supplemental to Indenture, dated as of March 11, 1998, Between PNM and The Chase Manhattan Bank, as Trustee
 
4.6 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1998
 
1-6986
PNM
 
 
 
 
 
 
4.8
 
Third Supplemental Indenture, dated as of October 1, 1999 to Indenture dated as of March 11, 1998, between PNM and The Chase Manhattan Bank, as Trustee
 
4.6.1 to PNM’s Annual Report on Form 10-K for the fiscal year ended December 31, 1999
 
1-6986
PNM
 
 
 
 
4.9
 
Fourth Supplemental Indenture, dated as of May 1, 2003 to Indenture dated as of March 11, 1998, between PNM and JPMorgan Chase Bank (formerly The Chase Manhattan Bank), as Trustee
 
4.6.2 to PNM’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2003
 
1-6986
PNM
 
 
 
 
4.10
 
Fifth Supplemental Indenture, dated as of May 1, 2003 to Indenture dated as of March 11, 1998, between PNM and JPMorgan Chase Bank, as Trustee
 
4.6.3 to PNM’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2003
 
1-6986
PNM
 
 
 
 
4.11
 
Sixth Supplemental Indenture, dated as of May 1, 2003 to Indenture dated as of March 11, 1998, between PNM and JPMorgan Chase Bank, as Trustee
 
4.6.4 to PNM’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2003
 
1-6986
PNM
 
 
 
 
4.12
 
Seventh Supplemental Indenture, dated as of June 1, 2007 to Indenture dated as of March 11, 1998, between PNM and The Bank of New York Trust Company, N.A. (successor to JPMorgan Chase Bank), as Trustee
 
4.23 to PNM’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2007
 
1-6986
PNM
 
 
 
 
4.13
 
Eighth Supplemental Indenture, dated as of June 1, 2010 to Indenture dated as of March 11, 1988, between PNM and The Bank of New York Mellon Trust Company (successor to JPMorgan Chase Bank), as Trustee
 
10.1 to PNM’s Current Report on Form 8-K/A filed July 29, 2010
 
1-6986
PNM
 
 
 
 
4.14
 
Ninth Supplemental Indenture, dated as of June 1, 2010 to Indenture dated as of March 11, 1988, between PNM and The Bank of New York Mellon Trust Company (successor to JPMorgan Chase Bank), as Trustee
 
10.2 to PNM’s Current Report on Form 8-K/A filed July 29, 2010
 
1-6986
PNM
 
 
 
 
 
 
 
4.15
 
Agreement of Resignation, Appointment and Acceptance effective as of May 1, 2011, among PNM, The Bank of New York Mellon Trust Company, N.A. and Union Bank, N.A. (for March 11, 1998 PNM Indenture)
 
4.2 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2011
 
1-6986
PNM
 
 
 
 
 
 
 
4.16
 
Tenth Supplemental Indenture, dated as of September 1, 2012, between PNM and Union Bank, N.A.(ultimate successor as trustee to The Chase Manhattan Bank), as Trustee
 
4.1 to PNM’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2012
 
1-6986
PNM
 
 
 
 
 
 
 
4.17
 
Indenture (for Senior Notes), dated as of August 1, 1998, between PNM and The Chase Manhattan Bank, as Trustee
 
4.1 to PNM’s Registration Statement No. 333-53367
 
333-53367
PNM
 
 
 
 
4.18
 
First Supplemental Indenture, dated August 1, 1998, supplemental to Indenture, dated as of August 1, 1998, between PNM and The Chase Manhattan Bank, as Trustee
 
4.3 to PNM’s Current Report on Form 8-K Dated August 7, 1998
 
1-6986
PNM
 
 
 
 
4.19
 
Second Supplemental Indenture, dated September 1, 2003, supplemental to Indenture, dated as of August 1, 1998, between PNM and JPMorgan Chase Bank (formerly, The Chase Manhattan Bank), as Trustee
 
4.7.1 to PNM’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2003
 
1-6986
PNM
 
 
 
 
 
 

D- 3

Table of Contents


4.20
 
Third Supplemental Indenture, dated as of May 13, 2008 between PNM and The Bank of New York Trust Company, N.A. as trustee
 
4.1 to PNM’s Current Report on Form 8-K filed May 15, 2008
 
1-6986
PNM
 
 
 
 
 
 
 
4.21
 
Agreement of Resignation, Appointment and Acceptance, effective as of June 1, 2011, among PNM, The Bank of New York Mellon Trust Company and Union Bank, N.A. (for August 1, 1998 PNM Indenture)
 
4.3 to the Company’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2011
 
1-6986
PNM
 
 
 
 
 
 
 
4.22
 
Fourth Supplemental Indenture, dated as of October 12, 2011, to the Indenture, dated as of August 1, 1998, between PNM and Union Bank, N.A. (ultimate successor as trustee to The Chase Manhattan Bank), as trustee
 
4.1 to PNM’s Current Report on Form 8-K filed October 12, 2011
 
1-6986
PNM
 
 
 
 
 
 
 
TNMP
4.23
 
The First Mortgage Indenture dated as of March 23, 2009, between TNMP and The Bank of New York Mellon Trust Company, N.A., as Trustee
 
4.1 to TNMP’s Current Report on Form 8-K filed March 27, 2009
 
2-97230
TNMP
 
 
 
 
4.24
 
The First Supplemental Indenture dated as of March 23, 2009, between TNMP and The Bank of New York Mellon Trust Company, N.A., as Trustee
 
4.2 to TNMP’s Current Report on Form 8-K filed March 27, 2009
 
2-97230
TNMP
 
 
 
 
4.25
 
The Second Supplemental Indenture dated as of March 25, 2009, between TNMP and The Bank of New York Mellon Trust Company, N.A., as Trustee
 
4.3 to TNMP’s Current Report on Form 8-K filed March 27, 2009
 
2-97230
TNMP
 
 
 
 
4.26
 
The Third Supplemental Indenture dated as of April 30, 2009 between TNMP and The Bank of New York Mellon Trust Company, N.A., as Trustee
 
4.1 to TNMP’s Current Report on Form 8-K filed May 6, 2009
 
2-97230
TNMP
 
 
 
 
4.27
 
First Amendment dated as of December 16, 2010 between TNMP and The Bank of New York Mellon Trust Company, N.A., as Trustee to The Third Supplemental Indenture dated as of April 30, 2009
 
4.1 to TNMP’s Current Report on Form 8-K filed December 17, 2010
 
2-97230
TNMP
 
 
 
 
 
 
 
4.28
 
Agreement of Resignation, Appointment and Acceptance, effective as of June 1, 2011, among TNMP, The Bank of New York Mellon Trust Company, N.A. and Union Bank, N.A. (for March 23, 2009 TNMP Indenture)
 
4.4 to TNMP’s Quarterly Report Form 10-Q for the quarter ended June 30, 2011
 
2-97230
TNMP
 
 
 
 
 
 
 
4.29
 
Fourth Supplemental Indenture dated as of September 30, 2011 between TNMP and Union Bank, N.A., as Trustee
 
4.1 to TNMP’s Current Report on Form 8-K filed October 6, 2011
 
2-97230
TNMP
 
 
 
 
 
 
 
4.30
 
Fifth Supplemental Indenture dated as of April 3, 2013 between TNMP and Union Bank, N.A., as Trustee
 
4.1 to TNMP’s Current Report on Form 8-K filed April 3, 2013
 
2-97230
TNMP
 
 
 
 
 
 
4.31
Sixth Supplemental Indenture dated as of June 27, 2014 between TNMP and Union Bank, N.A., as Trustee
 
4.1 to TNMP’s Current Report on Form 8-K filed June 27, 2014
 
2-97230
TNMP
 
 
 
 
 
 
Material Contracts
10.5
 
Credit Agreement, dated as of October 31, 2011, among PNM Resources, Inc., the lenders party thereto, Wells Fargo Bank, National Association, as Administrative Agent and Union Bank, N.A., as Syndication Agent
 
10.1 to the Company’s Current Report on Form 8-K filed October 31, 2011
 
1-32462
PNMR
 
 
 
 
 
 
 
10.6
 
First Amendment to Credit Agreement dated January 18, 2012 among PNMR, the lenders party thereto and Wells Fargo Bank, National Association, as Administrative Agent
 
10.1 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2011
 
1-32462
PNMR
 
 
 
 
 
 
 
10.7
 
Second Amendment to Credit Agreement dated October 31, 2013 among PNMR, the lenders party thereto and Wells Fargo Bank, National Association, as Administrative Agent
 
10.2 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2013
 
1-32462
PNMR
 
 
 
 
 
 
 
10.8
 
Third Amendment to Credit Agreement dated December 17, 2014 among PNMR, the lenders party thereto and Wells Fargo Bank, National Association, as Administrative Agent
 
10.1 to the Company’s Current Report on Form 8-K filed December 17, 2014
 
1-32462
PNMR
 
 
 
 
 
 
 

D- 4

Table of Contents


10.9
 
Second Amended and Restated Term Loan Agreement dated as of December 22, 2014 among PNMR, the lender parties (JPMorgan Chase Bank, N.A. and Union Bank, N.A.) and JPMorgan Chase Bank, N.A., as administrative agent
 
10.1 to PNMR’s to the Company’s Current Report on Form 10-K December 22, 2014
 
1-32462
PNMR
 
 
 
 
 
 
 
10.10
 
Credit Agreement, dated as of October 31, 2011, among PNM, the lenders party thereto, Wells Fargo Bank, National Association, as Administrative Agent and Union Bank, N.A., as Syndication Agent
 
10.2 to PNM’s Current Report on Form 8-K filed October 31, 2011
 
1-6986
PNM
 
 
 
 
 
 
 
10.11
 
First Amendment to Credit Agreement dated January 18, 2012 among PNM, the lenders party thereto, and Wells Fargo Bank, National Association, as Administrative Agent
 
10.2 to PNM’s Annual Report on Form 10-K for the year ended December 31, 2011
 
1-6986
PNM
 
 
 
 
 
 
 
10.12
 
Second Amendment to Credit Agreement executed December 17, 2014 and fully effective as of January 22, 2015
 
10.2 to the Company’s Current Report on Form 8-K filed December 17, 2014
 
1-6986
PNM
 
 
 
 
 
 
 
10.13
 
Credit Agreement, dated as of January 8, 2014, among PNM, the lenders identified therein, and U.S. Bank National Association, as Administrative Agent and BOKF, N.A. d/b/a Bank of Albuquerque, as Syndication Agent
 
10.1 to PNM’s Current Report on Form 8-K filed January 8, 2014
 
1-6986
PNM
 
 
 
 
 
 
 
10.14
Term Loan Agreement dated as of April 22, 2013, among PNM, the lenders identified therein and Union Bank, N.A. as administrative agent
 
10.1 to PNM’s Current Report on Form 8-K filed April 23, 2013
 
1-6986
PNM
 
 
 
 
 
 
 
10.15
 
Term Loan Agreement dated as of December 22, 2014 between PNM and JPMorgan Chase Bank, as lender and administrative agent
 
10.2 to PNM’s Current Report on Form 8-K filed December 22, 2014
 
1-6987
PNM
 
 
 
 
 
 
 
10.16
 
Second Amended and Restated Credit Agreement, dated as of September 18, 2013, among TNMP, the lenders identified therein and Key Bank National Association, as administrative agent
 
10.1 to TNMP’s Current Report on Form 8-K filed September 18, 2013
 
2-97230
TNMP
 
 
 
 
 
 
 
10.17
 
Term Loan Credit Agreement dated as of September 30, 2011, among TNMP, as borrower, the lenders identified therein, and JPMorgan Chase Bank, N.A., as administrative agent
 
10.1 to TNMP’s Current Report on Form 8-K filed October 6, 2011
 
2-97230
TNMP
 
 
 
 
 
 
 
10.18
 
Bond Purchase Agreement dated December 9, 2013 between TNMP and the purchasers named therein (for $80,000,000 4.03% First Mortgage Bonds, due 2024, Series 2014A)
 
10.1 to TNMP’s Current Report on Form 8-K filed December 10, 2013
 
2-97230
TNMP
 
 
 
 
 
 
 
10.19**


PNM Resources, Inc. 2014 Performance Equity Plan dated May 15, 2014

 
 
4.3 to PNMR’s Form S-8 Registration Statement filed May 15, 2014
333-195974
PNMR

 
 
 
 
10.20**
PNM Resources, Inc. Second Amended and Restated Omnibus Performance Equity Plan dated May 19, 2009
 
4.1 to PNM Resources’ Form S-8 Registration Statement filed May 20, 2009
 
333-159361
PNMR
 
 
 
 
 
 
10.21**
Amendment dated May 17, 2011 to PNMR’s Second Amended and Restated Omnibus Performance Equity Plan
 
10.1 to PNMR’s Current Report Form 8-K filed May 20, 2011
 
1-32462
PNMR
 
 
 
 
 
 
10.22**
Second Amendment executed March 28, 2012 to the PNMR Second Amended and Restated Omnibus Performance Equity Plan
 
10.6 to PNMR’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2012
 
1-32462
PNMR
 
 
 
 
 
 
10.23**
Third Amendment (approved by PNMR shareholders on May 15, 2012) to the PNMR Second Amended and Restated Omnibus Performance Equity Plan
 
10.1 to PNMR’s Current Report on Form 8-K filed May 17, 2012
 
1-32462
PNMR
 
 
 
 
 
 
10.24**
PNM Resources, Inc. 2014 Officer Annual Incentive Plan dated March 20, 2014
 
10.1 to PNMR’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2014
 
1-32462
PNMR

D- 5

Table of Contents


 
 
 
 
 
 
10.25**
PNM Resources, Inc. 2013 Officer Annual Incentive Plan dated March 29, 2013
 
10.1 to PNMR’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2013
 
1-32462
PNMR
 
 
 
 
 
 
10.26**
PNM Resources, Inc. 2014 Long-Term Incentive Plan dated March 20, 2014
 
10.2 to PNMR’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2014
 
1-32464
PNMR
 
 
 
 
 
 
10.27**
PNM Resources, Inc. 2013 Long-Term Incentive Plan dated March 29, 2013
 
10.2 to PNMR’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2013
 
1-32462
PNMR
 
 
 
 
 
 
10.28**
PNM Resources, Inc. 2012 Long-Term Incentive Plan dated March 28, 2012
 
10.2 to the Company Quarterly Report on Form 10-Q for the quarter ended March 31, 2012
 
1-32462
PNMR
 
 
 
 
 
 
10.29**
Acknowledgment Form for officer performance share awards granted under Second Amended Restated Omnibus Performance Equity Plan dated May 19, 2009, as amended
 
10.4.1 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2014
 
1-32462
PNMR
 
 
 
 
 
 
10.30**
Form of Stock Option Award Agreement for non-qualified stock options granted under performance equity plan in 2010
 
10.3 to PNMR’s Current Report on Form 8-K filed May 26, 2009
 
1-32462
PNMR
 
 
 
 
 
10.31**
Form of the award agreement for non- qualified stock options granted under performance equity plan in 2007-2009
 
10.2 to the Company’s Current Report on Form 8-K filed February 16, 2007
 
1-32462
PNMR
 
 
 
 
 
 
 
10.32**
Acknowledgement Forms for restricted stock rights awards granted under the Second Amended and Restated Omnibus Performance Equity Plan dated May 19, 2009, as amended
 
10.6 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2013
 
1-32462
PNMR
 
 
 
 
 
 
 
10.33**
Special Performance-Based Retention Award Agreement between PNMR and Patricia K. Collawn dated March 29, 2012
 
10.3 to the Company’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2012
 
1-32462
PNMR
 
 
 
 
 
 
 
10.34*
Employee Retention Agreement executed December 9, 2014 between PNMR and Charles N. Eldred
 
10.2 to PNMR’s Annual Report on For 10-K for the year ended December 31, 2014
 
1-32462
PNMR
 
 
 
 
 
 
 
10.35**
Acknowledgement Form for officer restricted stock rights awards granted under the PNM Resources, Inc. 2014 Performance Equity Plan dated May 15, 2014
 
10.4.2 to PNMR’s Annual Report on For 10-K for the year ended December 31, 2014
 
1-32462
PNMR
 
 
 
 
 
 
 
10.36**
2013 Director Compensation Summary (2014 annual retainer is the same as the 2013 annual retainer)
 
10.1 to PNMR’s Annual Report on Form 10-K for the year ended December 31, 2012
 
1-32462
PNMR
 
 
 
 
 
10.37**
2015 Director Compensation Summary
 
10.1.1 to PNMR’s Annual Report on Form 10-K for the year ended December 31, 2014
 
1-32462
PNMR
 
 
 
 
 
 
 
10.38**
Acknowledgement Forms for restricted stock rights and stock option awards granted to directors under the Second Amended and Restated Omnibus Performance Equity Plan dated May 19, 2009, as amended
 
10.3 to the Company’s Current Report on Form 8-K filed March 1, 2011
 
1-32462
PNMR
 
 
 
 
 
 
 
10.39**
Acknowledgment Form with attached Terms and Conditions for restricted stock rights awards granted to directors under the PNM Resources, Inc. 2014 Performance Equity Plan dated May 15, 2014
 
10.4.3 to PNMR’s Annual Report on Form 10-K for the year ended December 31, 2014
 
1-32462
PNMR
 
 
 
 
 
10.40**
PNM Resources, Inc. Executive Spending Account Plan (amended and restated effective January 1, 2011)
 
10.4 to the Company’s Current Report on Form 8-K filed March 1, 2011
 
1-32462
PNMR
 
 
 
 
 
 
 
10.41**
PNM Resources, Inc. Executive Savings Plan II (amended and restated effective January 1, 2015)
 
10.1.2 to PNMR’s Annual Report on Form 10-K for the year ended December 31, 2014
 
1-32462
PNMR
 
 
 
 
 
 
 

D- 6

Table of Contents


10.42**
PNM Resources, Inc. After-Tax Retirement Plan effective January 1, 2009
 
10.5 to PNMR’s Annual Report on Form 10-K for the fiscal year ended December 31, 2008
 
1-32462
PNMR
 
 
 
 
 
 
 
10.43**
First Amendment executed March 28, 2012 to the PNMR After-Tax Retirement Plan
 
10.5 to PNMR’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2012
 
1-32462
PNMR
 
 
 
 
 
 
 
10.44**
Second, Third and Fourth Amendments, each effective January 1, 2014, to the PNM Resources, Inc. After-Tax Retirement Plan
 
10.5 to PNMR’s Annual Report on Form 10-K for the year ended December 31, 2013
 
1-32462
PNMR
 
 
 
 
 
10.45**
Summary of Executive Time Off Policy Effective January 1, 2006
 
10.31 to the Company’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2005
 
1-32462
PNMR
 
 
 
 
 
 
 
10.46**
Amendment to Corporate Policy Absence from Work Policy 125 executed December 16, 2011
 
10.6 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2011
 
1-32462
PNMR
 
 
 
 
 
 
 
10.47**
PNM Resources, Inc. Annual Executive Physical Exam Program Wraparound Plan Document effective as of January 1, 2014
 
10.7 to PNMR’s Annual Report on Form 10-K for the fiscal year ended December 31, 2013
 
1-32462
PNMR
 
 
 
 
 
 
10.48**
PNM Resources, Inc. Non-Union Severance Pay Plan effective August 1, 2007 (amended and restated)
 
10.3 to the Company’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2007
 
1-32462
PNMR
 
 
 
 
 
10.49**
First Amendment to the PNM Resources Non-Union Severance Pay Plan executed November 20, 2008
 
10.3 to PNMR’s Annual Report on Form 10-K for the fiscal year ended December 31, 2008
 
1-32462
PNMR
 
 
 
 
 
 
 
10.50**
Second Amendment (executed March 27, 2012) to PNMR Non-Union Severance Pay Plan
 
10.8 to PNMR’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2012
 
1-32462
PNMR
 
 
 
 
 
10.51**
PNM Resources, Inc. Officer Retention Plan executed March 28, 2012 as amended and restated effective as of January 1, 2012
 
10.7 to the Company’s Quarterly Report in Form 10-Q for the quarter ended March 31, 2012
 
1-32462
PNMR
 
 
 
 
 
10.52**
PNM Resources, Inc. Director Retainer Plan, dated December 31, 2001
 
4.3 to PNM Resources, Inc. Post-Effective Amendment No. 1 to Form S-8 Registration Statement filed December 31, 2001
 
333-03289
PNMR
 
 
 
 
 
10.53**
First Amendment dated February 17, 2003 to PNM Resources, Inc. Director Retainer Plan
 
10.40.1 to the Company’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2003
 
333-32170
PNMR
 
 
 
 
 
10.54**
PNM Resources Officer Life Insurance Plan dated April 28, 2004
 
10.24.1 to the Company’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2004
 
333-32170
PNMR
 
 
 
 
 
10.55**
First Amendment to PNM Resources Officer Life Insurance Plan dated December 16, 2004
 
10.27 to the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2004.
 
333-32170
PNMR
 
 
 
 
 
 
 
10.56**
Second Amendment to PNM Resources Officer Life Insurance Plan executed April 15, 2007
 
10.5 to the Company’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2007
 
1-32462
PNMR
 
 
 
 
 
10.57**
Third Amendment to the PNMR Officer Life Insurance Plan effective January 1, 2009
 
10.10 to PNMR’s Annual Report on Form 10-K for the fiscal year ended December 31, 2008
 
1-32462
PNMR
 
 
 
 
 

D- 7

Table of Contents


10.58**
Fourth Amendment to the PNMR Officer Life Insurance Plan effective January 1, 2009
 
10.15 to PNMR’s Annual Report on Form 10-K for the fiscal year ended December 31, 2008
 
1-32462
PNMR
 
 
 
 
 
 
 
10.59**
Fifth Amendment to the PNM Resources, Inc. Officer Life Insurance Plan executed December 16, 2011
 
10.5 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2011
 
1-32462
PNMR
 
 
 
 
 
10.60**
Executive Long Term Disability Plan effective January 1, 2003
 
10.88 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2002
 
333-32170
PNMR
 
 
 
 
10.61
 
Supplemental Indenture of Lease dated as of July 19, 1966 between PNM and other participants in the Four Corners Project and the Navajo Indian Tribal Council
 
4-D to PNM’s Registration Statement No. 2-26116
 
2-26116
PNM
 
 
 
 
10.62
 
Amendment and Supplement No. 1 to Supplemental and Additional Indenture of Lease dated April 25, 1985 between the Navajo Tribe of Indians and Arizona Public Service Company, El Paso Electric Company, Public Service Company of New Mexico, Salt River Project Agricultural Improvement and Power District, Southern California Edison Company, and Tucson Electric Power Company (refiled)
 
10.1.1 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1995
 
1-6986
PNM
 
 
 
 
 
 
 
10.63
 
Amendment and Supplement No. 2 to Supplemental and Additional Indenture of Lease with the Navajo Nation dated March 7, 2011
 
10.1 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2011
 
1-6986
PNM
 
 
 
 
 
 
 
10.64
 
Amendment and Supplement No. 3 to Supplemental and Additional Indenture of Lease with the Navajo Nation dated March 7, 2011
 
10.2 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2011
 
1-6986
PNM
 
 
 
 
 
 
 
10.65
 
Water Supply Agreement between the Jicarilla Apache Tribe and Public Service Company of New Mexico, dated July 20, 2000
 
10.5 to PNM’s Quarterly Report of Form 10-Q for the quarter ended September 30, 2001
 
1-6986
PNM
 
 
 
 
10.66
 
Arizona Nuclear Power Project Participation Agreement among PNM and Arizona Public Service Company, Salt River Project Agricultural Improvement and Power District, Tucson Gas & Electric Company and El Paso Electric Company, dated August 23, 1973
 
5-T to PNM’s Registration Statement No. 2-50338
 
2-50338
PNM
 
 
 
 
10.67
 
Amendments No. 1 through No. 6 to Arizona Nuclear Power Project Participation Agreement
 
10.8.1 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1991
 
1-6986
PNM
 
 
 
 
10.68
 
Amendment No. 7 effective April 1, 1982, to the Arizona Nuclear Power Project Participation Agreement (refiled)
 
10.8.2 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1991
 
1-6986
PNM
 
 
 
 
10.69
 
Amendment No. 8 effective September 12, 1983, to the Arizona Nuclear Power Project Participation Agreement (refiled)
 
10.58 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1993
 
1-6986
PNM
 
 
 
 
10.70
 
Amendment No. 9 to Arizona Nuclear Power Project Participation Agreement dated as of June 12, 1984 (refiled)
 
10.8.4 to PNM’s Annual Report of the Registrant on Form 10-K for fiscal year ended December 31, 1994
 
1-6986
PNM
 
 
 
 
10.71
 
Amendment No. 10 dated as of November 21, 1985 and Amendment No. 11 dated as of June 13, 1986 and effective January 10, 1987 to Arizona Nuclear Power Project Participation Agreement (refiled)
 
10.8.5 to PNM’s Annual Report of the Registrant on Form 10-K for fiscal year ended December 31, 1995
 
1-6986
PNM
 
 
 
 
10.72
 
Amendment No. 12 to Arizona Nuclear Power Project Participation Agreement dated June 14, 1988, and effective August 5, 1988
 
19.1 to PNM’s Quarterly Report on Form 10-Q for the quarter ended September 30, 1990
 
1-6986
PNM
 
 
 
 
10.73
 
Amendment No. 13 to the Arizona Nuclear Power Project Participation Agreement dated April 4, 1990, and effective June 15, 1991
 
10.8.10 to PNM’s Annual Report on Form 10-K for the fiscal year ended December 31, 1990
 
1-6986
PNM
 
 
 
 

D- 8

Table of Contents


10.74
 
Amendment No. 14 to the Arizona Nuclear Power Project Participation Agreement effective June 20, 2000
 
10.8.9 to PNM’s Annual Report on Form 10-K for the fiscal year ended December 31, 2000
 
1-6986
PNM
 
 
 
 
10.75
 
Amendment No. 15 to the Arizona Nuclear Power Project Participation Agreement dated November 29, 2010 and effective January 13, 2011
 
10.1 to PNM’s Current Report on Form 8-K filed March 1, 2011
 
1-6986
PNM
 
 
 
 
 
 
 
1076
 
Amendment No. 16, effective as of April 28, 2014, to the Arizona Nuclear Power Project Participation Agreement
 
10.3 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2014
 
1-6986
PNM
 
 
 
 
10.77
 
Underground Coal Sales Agreement, dated August 31, 2001 among San Juan Coal Company, PNM and Tucson Electric Power Company
 
10.85 to PNM’s Quarterly Report on Form 10-Q for the quarter ending September 30, 2001 (Confidential treatment was requested for portions of this exhibit, and such portions were omitted from this exhibit filed and were filed separately with the Securities and Exchange Commission)
 
1-6986
PNM
 
 
 
 
10.78
 
Amendment One to Underground Coal Sales Agreement dated December 15, 2003 among San Juan Coal Company, PNM and Tucson Electric Coal Company
 
10.9.1 to PNM’s Amended Report on Form 10-K for fiscal year ended December 31, 2003 (Confidential treatment was requested for portions of this exhibit, and such portions were omitted from this exhibit filed and were filed separately with the Securities and Exchange Commission)
 
1-6986
PNM
 
 
 
 
 
 
10.79
 
Amendment Two to Underground Coal Sales Agreement effective September 15, 2004 among San Juan Coal Company, PNM and Tucson Electric Coal Company
 
10.9.2 to PNM’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2004
 
1-6986
PNM
 
 
 
 
10.80
 
Amendment Three to Underground Coal Sales Agreement executed April 29, 2005 among San Juan Coal Company, PNM and Tucson Electric Coal Company (Confidential treatment was requested for portions of this exhibit, and such portions were omitted from this exhibit filed and were filed separately with the Securities and Exchange Commission)
 
10.86.1 to the Company’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2005
 
1-6986
PNM
 
 
 
 
10.81
 
Amendment Four to Underground Coal Sales Agreement effective March 7, 2007 among San Juan Coal Company, PNM and Tucson Electric Coal Company
 
10.89 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2007
 
1-6986
PNM
 
 
 
 
10.82
 
Amendment Five to Underground Coal Sales Agreement executed December 21, 2007 among San Juan Coal Company, PNM and Tucson Electric Power Company (Confidential treatment was requested for portions of this exhibit, and such portions were omitted from this exhibit filed and were filed separately with the Securities and Exchange Commission)
 
10.95 to PNM’s Annual Report on Form 10-K for the year ended December 31, 2007
 
1-6986
PNM
 
 
 
 
 
 
 
10.83
 
Amendment No. Six to Underground Coal Sales Agreement executed October 2, 2014 among San Juan Coal Company, PNM and Tucson Electric Power Company and acknowledged by San Juan Transportation Company
 
10.1 to PNM’s Quarterly Report on Form 10-Q for the quarter ended September 30, 2014
 
1-6986
PNM
 
 
 
 
 
 
 
10.83.1
 
Extension of LOI Deadline Under Amendment No. Six to Underground Coal Sales Agreement among SJCC, PNM and Tucson dated February 20, 2015
 
10.3 to the Company’s Annual Report on Form 10-K for the year ended December, 31 2014
 
1-6986
PNM
 
 
 
 
 
 
 

D- 9

Table of Contents


10.84
 
San Juan Generation Station Fuel and Capital Funding Agreement dated September 12, 2014 among PNM, Tucson Electric Power Company, The City of Farmington, New Mexico, M-S-R Public Power Agency, The Incorporated County of Los Alamos, New Mexico, Southern California Public Power Authority, City of Anaheim, Utah Associated Municipal Power Systems, and Tri-State Generation and Transmission Association, Inc.
 
10.2 to PNM’s Quarter Report on Form 10-Q for the quarter ended September 30, 2014
 
1-6986
PNM
 
 
 
 
 
 
 
10.85
 
Participation Agreement among PNM, Tucson Electric Power Company and certain financial institutions relating to the San Juan Coal Trust dated as of December 31, 1981 (refiled)
 
10.14 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1992
 
1-6986
PNM
 
 
 
 
 
 
 
10.86
 
Participation Agreement dated as of June 30, 1983 among Security Trust Company, as Trustee, PNM, Tucson Electric Power Company and certain financial institutions relating to the San Juan Coal Trust (refiled)
 
10.61 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1993
 
1-6986
PNM
 
 
 
 
10.87
 
Amended and Restated San Juan Project Participation Agreement dated as of March 23, 2006, among Public Service Company of New Mexico, Tucson Electric Power Company, The City of Farmington, New Mexico, M-S-R Public Power Agency, The Incorporated County of Los Alamos, New Mexico, Southern California Public Power Authority, City of Anaheim, Utah Associated Municipal Power System and Tri-State Generation and Transmission Association, Inc.
 
10.119 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 30, 2006
 
1-6986
PNM
 
 
 
 
10.88*
Facility Lease dated as of December 16, 1985 between The First National Bank of Boston, as Owner Trustee, and PNM (Unit 1 transaction) together with Amendments No. 1, 2 and 3 thereto (refiled)
 
10.18 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1995
 
1-6986
PNM
 
 
 
 
 
 
10.89*
Amendment No. 4 dated as of December 11, 2013 to Facility Lease dated as of December 16, 1985 as heretofore amended, between U.S. Bank National Association (ultimate successor to The First National Bank of Boston), as Owner Trustee, and PNM (Unit 1 transaction)
 
10.3 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 2013
 
1-6986
PNM
 
 
 
 
 
 
 
 
10.90
 
Facility Lease dated as of July 31, 1986, between the First National Bank of Boston, as Owner Trustee, and PNM (Unit 1 transaction) together with Amendments No. 1, 2 and 3 thereto (refiled)
 
10.19 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
 
 
 
 
10.91*
 
Facility Lease dated as of August 12, 1986, between The First National Bank of Boston, as Owner Trustee, and PNM (Unit 2 transaction) together with Amendments No. 1 and 2 thereto (refiled)
 
10.20 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
 
 
 
 
10.92
 
Amendment No. 2 dated as of April 10, 1987 to Facility Lease dated as of August 12, 1986 (Unit 2 transaction), as amended, between The First National Bank of Boston, not in its individual capacity, but solely as Owner Trustee under a Trust Agreement, dated as of August 12, 1986, with MFS Leasing Corp., Lessor and Public Service Company of New Mexico, Lessee (refiled)
 
10.20.2 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1998


 
1-6986
PNM
 
 
 
 
 
 
10.93
 
Facility Lease dated as of December 15, 1986, between The First National Bank of Boston, as Owner Trustee, and PNM (Unit 1 Transaction) together with Amendment No. 1 thereto (refiled)
 
10.21 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
 
 
 
 
 
 
 

D- 10

Table of Contents


10.94
 
Amendment No. 2 dated as of March 18, 2014, to the Facility Lease dated December 15, 1986, as heretofore amended, between U.S. Bank National Association, not in its individual capacity, but solely as Owner Trustee under a Trust Agreement ,dated as of December 15, 1986, with PV2-PNM December 35 Corporation, Lessor, and PNM, Lessee
 
10.1 to PNM’s Current Report on Form 8-K filed March 18, 2014
 
1-6986
PNM
 
 
 
 
 
 
 
10.95
 
Letter Agreement dated February 25, 2014, between Public Service Company of New Mexico and CGI Capital, Inc.
 
10.1 to PNM’s Current Report on Form 8-K filed February 28, 2014
 
1-6986
PNM
 
 
 
 
 
 
 
10.96
 
Letter Agreement dated May 1, 2014, among PNM, PNMR Development and Management Corporation, Cypress Verde LLC, and Cypress Second PV Partnership
 
10.4 to PNM’s Quarter Repot on Form 10-Q for the quarter ended March 31, 2014
 
1-6986
PNM
 
 
 
 
10.97
 
Facility Lease dated as of December 15, 1986, between The First National Bank of Boston, as Owner Trustee, and PNM (Unit 2 Transaction) together with Amendment No. 1 thereto (refiled)
 
10.22 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
 
 
 
 
10.98
 
Master Decommissioning Trust Agreement for Palo Verde Nuclear Generating Station dated March 15, 1996, between Public Service Company of New Mexico and Mellon Bank, N.A.
 
10.68 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1996
 
1-6986
PNM
 
 
 
 
10.99
 
Amendment Number One to the Master Decommissioning Trust Agreement for Palo Verde Nuclear Generating Station dated January 27, 1997, between Public Service Company of New Mexico and Mellon Bank, N.A.
 
10.68.1 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1997
 
1-6986
PNM
 
 
 
 
10.100
 
Amendment Number Two to the Master Decommissioning Trust Agreement for Palo Verde Nuclear Generating Station between Public Service Company of New Mexico and Mellon Bank, N.A.
 
10.68.2 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 2003
 
1-6986
PNM
 
 
 
 
10.101
 
PVNGS Capital Trust-Variable Rate Trust Notes-PVNGS Note Agreement dated as of July 31, 1998
 
10.76 to PNM’s Quarterly Report on Form 10-Q for the quarter ended September 30, 1998
 
1-6986
PNM
 
 
 
 
 
 
 
10.102
 
Stipulation in the matter of PNM’s transition plan Utility Case No. 3137, dated October 10, 2002 as amended by Amendment to Stipulated Agreement dated October 18, 2002
 
10.86 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2002
 
1-6986
PNM
 
 
 
 
10.103
 
Stipulation dated February 28, 2005 in NMPRC Case No. 04-00315-UT regarding the application of PNM Resources and TNMP for approval of the TNP acquisition
 
10.134 to the Company’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2005
 
1-32462
PNMR/
TNMP
 
 
 
 
10.104
 
Consent Decree entered into by PNM on March 9, 2005 relating to the citizen suit under the Clean Air Act and the excess emissions report matter for SJGS
 
10.135 to the Company’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2005
 
1-6986
PNM
 
 
 
 
 
 
 
 
 
 
Subsidiaries
21
 
Certain subsidiaries of PNM Resources
 
21 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2014
 
1-32462
PNMR
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

D- 11

Table of Contents


Additional Exhibits
 
 
 
 
99.1*
Participation Agreement dated as of December 16, 1985, among the Owner Participant named therein, First PV Funding Corporation, The First National Bank of Boston, in its individual capacity and as Owner Trustee (under a Trust Agreement dated as of December 16, 1985 with the Owner Participant), Chemical Bank, in its individual capacity and as Indenture Trustee (under a Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of December 16, 1985 with the Owner Trustee), and PNM (Unit 1 transaction), including Appendix A definitions, together with Amendment No. 1 dated July 15, 1986 and Amendment No. 2 dated November 18, 1986 (refiled)
 
99.2 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1995
 
1-6986
PNM
 
 
 
 
 
 
99.2*
 
Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of December 16, 1985, between the First National Bank of Boston, as Owner Trustee, and Chemical Bank, as Indenture Trustee together with Supplemental Indentures Nos. 1 and 2 (Unit 1 transaction) (refiled)
 
99.3 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1996
 
1-6986
PNM
 
 
 
 
99.3*
1996 Supplemental Indenture dated as of September 27, 1996 to Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of December 16, 1985 between State Street Bank and Trust Company, as Owner Trustee, and The Chase Manhattan Bank, as Indenture Trustee (Unit 1 transaction)
 
99.21 to PNM’s Quarterly Report on Form 10-Q for the quarter ended September 30, 1996
 
1-6986
PNM
99.4*
Assignment, Assumption and Further Agreement dated as of December 16, 1985, between Public Service Company of New Mexico and The First National Bank of Boston, as Owner Trustee (Unit 1 transaction)
 
28(c) to PNM’s Current Report on Form 8-K dated December 31, 1985
 
1-6986
PNM
 
 
 
 
99.5
 
Participation Agreement dated as of July 31, 1986, among the Owner Participant named herein, First PV Funding Corporation, The First National Bank of Boston, in its individual capacity and as Owner Trustee (under a Trust Agreement dated as of July 31, 1986, with the Owner Participant), Chemical Bank, in its individual capacity and as Indenture Trustee (under a Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of July 31, 1986, with the Owner Trustee), and Public Service Company of New Mexico, including Appendix A definitions together with Amendment No. 1 thereto (refiled)
 
99.5 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
 
 
 
 
99.6
 
Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of July 31, 1986, between The First National Bank of Boston, as Owner Trustee, and Chemical Bank, as Indenture Trustee together with Supplemental Indenture No. 1 thereto (refiled)
 
99.6 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
 
 
 
 
99.7
 
Assignment, Assumption, and Further Agreement dated as of July 31, 1986, between Public Service Company of New Mexico and The First National Bank of Boston, as Owner Trustee (refiled)
 
99.7 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
 
 
 
 
99.8*
 
Participation Agreement dated as of August 12, 1986, among the Owner Participant named therein, First PV Funding Corporation, The First National Bank of Boston, in its individual capacity and as Owner Trustee (under a Trust Agreement dated as of August 12, 1986, with the Owner Participant), Chemical Bank, in its individual capacity and as Indenture Trustee (under a Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of August 12, 1986, with the Owner Trustee), and PNM, including Appendix A definitions (Unit 2 transaction) (refiled)
 
99.8 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1997
 
1-6986
PNM
 
 
 
 
 
 

D- 12

Table of Contents


99.9*
Amendment No. 1 dated as of November 18, 1986, to Participation Agreement dated as of August 12, 1986 (Unit 2 transaction) (refiled)
 
99.8.1 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1997
 
1-6986
PNM
 
 
 
 
99.10*
Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of August 12, 1986, between the First National Bank of Boston, as Owner Trustee, and Chemical Bank, as Indenture Trustee together with Supplemental Indenture No. 1 thereto (refiled) (Unit 2 transaction)
 
99.9 to PNM’s Annual Report of the Registrant on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
99.11
1997 Supplemental Indenture, dated as of December 23, 1997, to Trust Indenture, Mortgage, Security Agreement and Assignment of Rents, dated as of August 12, 1986, between State Street Bank and Trust, as Owner Trustee, and The Chase Manhattan Bank, as Indenture Trustee
 
99.22 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2006
 
1-6986
PNM
 
 
 
 
99.12*
Assignment, Assumption, and Further Agreement dated as of August 12, 1986, between Public Service Company of New Mexico and The First National Bank of Boston, as Owner Trustee (Unit 2 transaction) (refiled)
 
99.10 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1997
 
1-6986
PNM
 
 
 
 
 
 
 
 
99.13
Participation Agreement dated as of December 15, 1986, among the Owner Participant named therein, First PV Funding Corporation, The First National Bank of Boston, in its individual capacity and as Owner Trustee (under a Trust Agreement dated as of December 15, 1986, with the Owner Participant), Chemical Bank, in its individual capacity and as Indenture Trustee (under a Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of December 15, 1986, with the Owner Trustee), and Public Service Company of New Mexico, including Appendix A definitions (Unit 1 Transaction) (refiled)
 
99.11 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1997
 
1-6986
PNM
 
 
 
 
99.14
 
Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of December 15, 1986, between The First National Bank of Boston, as Owner Trustee, and Chemical Bank, as Indenture Trustee (Unit 1 Transaction) (refiled)
 
99.12 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1997
 
1-6986
PNM
 
 
 
 
99.15
 
Assignment, Assumption and Further Agreement dated as of December 15, 1986, between Public Service Company of New Mexico and The First National Bank of Boston, as Owner Trustee (Unit 1 Transaction) (refiled)
 
99.13 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1997
 
1-6986
PNM
 
 
 
 
 
 
99.16
 
Participation Agreement dated as of December 15, 1986, among the Owner Participant named therein, First PV Funding Corporation, The First National Bank of Boston, in its individual capacity and as Owner Trustee (under a Trust Agreement dated as of December 15, 1986, with the Owner Participant), Chemical Bank, in its individual capacity and as Indenture Trustee (under a Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of December 15, 1986, with the Owner Trustee), and Public Service Company of New Mexico, including Appendix A definitions (Unit 2 Transaction) (refiled)
 
99.14 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1997
 
1-6986
PNM
 
 
 
 
99.17
 
Trust Indenture, Mortgage, Security Agreement and Assignment of Rents dated as of December 31, 1986, between the First National Bank of Boston, as Owner Trustee, and Chemical Bank, as Indenture Trustee (Unit 2 Transaction) (refiled)
 
99.15 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 1996
 
1-6986
PNM
 
 
 
 

D- 13

Table of Contents


99.18
 
Assignment, Assumption, and Further Agreement dated as of December 15, 1986, between Public Service Company of New Mexico and The First National Bank of Boston, as Owner Trustee (Unit 2 Transaction) (refiled)
 
99.16 to PNM’s Quarterly Report on Form 10-Q for the quarter ended March 31, 1997
 
1-6986
PNM
 
 
 
 
 
 
 
99.19
 
Agreement for the Sale and Purchase of Wastewater Effluent, dated November 13, 2000, among the City of Tolleson, Arizona Public Service Company and Salt River Project Agricultural Improvement and Power District
 
99.19 to PNM’s Annual Report on Form 10-K for fiscal year ended December 31, 2013
 
1-6986
PNM
 
 
 
 
99.20
 
Municipal Effluent Purchase and Sale Agreement dated April 23, 2010 between Cities of Phoenix, Mesa, Tempe, Scottsdale and Glendale, Arizona municipal corporations; and APS, SRP, acting on behalf of themselves and EPE, SCE, PNM, SCPPA, and Los Angeles Department of Water and Power
 
10.6 to the Company’s Quarterly Report on Form 10-Q for the quarter ended March 31, 2010
 
1-6986
PNM
 
 
 
 

* One or more additional documents, substantially identical in all material respects to this exhibit, have been entered into, relating to one or more additional sale and leaseback transactions. Although such additional documents may differ in other respects (such as dollar amounts and percentages), there are no material details in which such additional documents differ from this exhibit.
** Designates each management contract or compensatory plan or arrangement required to be identified pursuant to paragraph 3 of Item 15(a) of Form 10-K.
‡     Certain instruments defining the rights of holders of long-term debt of the registrants included in the financial statements of registrants filed herewith have been omitted because the total amount of securities authorized thereunder does not exceed 10% of the total assets of registrants. The registrants hereby agree to furnish a copy of any such omitted instrument to the SEC upon request.





D- 14

Table of Contents


SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
 
 
 
 
PNM RESOURCES, INC.
 
 
 
 
(Registrant)
 
 
 
 
Date:
February 27, 2015
By
 
/s/ P. K. Collawn
 
 
 
 
P. K. Collawn
 
 
 
 
Chairman, President, and
Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the Registrant and in the capacities and on the dates indicated.
Signature
  
Capacity
Date
 
 
 
/s/ P. K. Collawn
  
Principal Executive Officer and Director
February 27, 2015
P. K. Collawn
  
 
 
Chairman, President, and
  
 
 
Chief Executive Officer
  
 
 
 
 
 
/s/ C. N. Eldred
  
Principal Financial Officer
February 27, 2015
C. N. Eldred
  
 
 
Executive Vice President and
  
 
 
Chief Financial Officer
  
 
 
 
 
 
/s/ T. G. Sategna
  
Principal Accounting Officer
February 27, 2015
T. G. Sategna
  
 
 
Vice President and
  
 
 
Corporate Controller
  
 
 
 
 
 
/s/ A. E. Archuleta
  
Director
February 27, 2015
A. E. Archuleta
  
 
 
 
 
 
/s/ E. R. Conley
  
Director
February 27, 2015
E. R. Conley
  
 
 
 
 
 
/s/ A. J. Fohrer
 
Director
February 27, 2015
A. J. Fohrer
 
 
 
 
 
 
 
/s/ M. T. Mullarkey
  
Director
February 27, 2015
M. T. Mullarkey
  
 
 
 
 
 
/s/ R. R. Nordhaus
  
Director
February 27, 2015
R. R. Nordhaus
  
 
 
 
 
 
/s/ D. K. Schwanz
  
Director
February 27, 2015
D. K. Schwanz
  
 
 
 
 
 
/s/ B. W. Wilkinson
  
Director
February 27, 2015
B. W. Wilkinson
  
 
 
 
 
 
/s/ J. B. Woodard
  
Director
February 27, 2015
J. B. Woodard
  
 
 

E-1

Table of Contents


SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
 
 
 
 
PUBLIC SERVICE COMPANY OF NEW MEXICO
 
 
 
 
(Registrant)
 
 
 
 
Date:
February 27, 2015
By
 
/s/ P. K. Collawn
 
 
 
 
P. K. Collawn
 
 
 
 
President and
Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the Registrant and in the capacities and on the dates indicated.
 
Signature
  
Capacity
Date
 
 
 
/s/ P. K. Collawn
  
Principal Executive Officer and Chairman of the Board
February 27, 2015
P. K. Collawn
 
 
 
President and
  
 
 
Chief Executive Officer
  
 
 
 
 
 
/s/ C. N. Eldred
  
Principal Financial Officer and Director
February 27, 2015
C. N. Eldred
 
 
 
Executive Vice President and
  
 
 
Chief Financial Officer
  
 
 
 
 
 
/s/ T. G. Sategna
  
Principal Accounting Officer
February 27, 2015
T. G. Sategna
  
 
 
Vice President and
  
 
 
Corporate Controller
  
 
 
 
 
 
 
  
Director
 
R. N. Darnell
  
 
 
 
 
 
 
/s/ R. E. Talbot
  
Director
February 27, 2015
R. E. Talbot
  
 
 


E-2

Table of Contents


SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
 
 
 
 
TEXAS-NEW MEXICO POWER COMPANY
 
 
 
 
(Registrant)
 
 
 
 
Date:
February 27, 2015
By
 
/s/ P. K. Collawn
 
 
 
 
P. K. Collawn
 
 
 
 
Chief Executive Officer
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the Registrant and in the capacities and on the dates indicated.
 
Signature
  
Capacity
Date
 
 
 
/s/ P. K. Collawn
  
Principal Executive Officer and Chairman of the Board
February 27, 2015
P. K. Collawn
 
 
 
Chief Executive Officer
  
 
 
 
 
 
/s/ T. G. Sategna
  
Principal Financial Officer and Principal Accounting Officer
February 27, 2015
T. G. Sategna
 
 
 
Vice President and
  
 
 
Controller
  
 
 
 
 
 
 
  
Director
 
R. N. Darnell
  
 
 
 
 
 
/s/ C. N. Eldred
  
Director
February 27, 2015
C. N. Eldred
  
 
 
 
 
 
 
/s/ R. E. Talbot
  
Director
February 27, 2015
R. E. Talbot
  
 
 
 
 
 
 
/s/ J. N. Walker
  
Director
February 27, 2015
J. N. Walker
  
 
 


E-3

Exhibit 3.4




BYLAWS
OF
PNM RESOURCES, INC.







With all Amendments to and Including February 26, 2015




BYLAWS
OF
PNM RESOURCES, INC.

ARTICLE I
MEETINGS OF SHAREHOLDERS
Section 1. Meetings
The annual meeting of shareholders shall be held at the time and place set by resolution of the Board of Directors for the election of directors and the transaction of such other business as may properly come before the meeting.
Special meetings may be called by a majority of the Board of Directors, the Chairman of the Board, the Chief Executive Officer or by holders of not less than one-tenth of all the shares entitled to vote at the meeting.
Section 2. Notice
Written notice of any meeting stating the time and place, and if a special meeting, the purpose, of the meeting shall be mailed to each shareholder of record entitled to vote at the meeting at the address of the shareholder as it appears on the stock transfer books of the Corporation, except as otherwise provided by law. Notices of special meetings called by a majority of the Board of Directors, the Chairman of the Board or the Chief Executive Officer, and of annual meetings shall be mailed not less than ten (10) days nor more than fifty (50) days before the meeting. Notices of other special shareholder meetings shall be mailed not less than forty (40) days nor more than fifty (50) days before the date of the meeting.

1



Section 3. Adjournment
Whenever a quorum is not present at any meeting of the shareholders, or whenever it may be deemed desirable, a majority in interest of the shareholders present in person or by proxy may adjourn the meeting from time to time to any future date, without notice other than by announcement at the meeting. At any continuation of the adjourned meeting at which a quorum is present, any business may be transacted which might have been transacted at the meeting originally scheduled.
Section 4. Order of Business
(a) The Chairman of the Board, or in the absence of the Chairman, the Chief Executive Officer, or in their absence, a director designated by the Board of Directors, shall call meetings of the shareholders to order and shall act as Chairman of the meeting. The shareholders may appoint any shareholder or the proxy of any shareholder to act as Chairman of any meeting of the shareholders in the absence of the Chairman of the Board, Chief Executive Officer and a director designated by the Board to serve as Chairman of the meeting. The Secretary, or in the absence of the Secretary, an Assistant Secretary, shall act as Secretary at all meetings of the shareholders, but in the absence of the Secretary and Assistant Secretary at any meetings of the shareholders, the Chairman of the meeting may appoint any person to act as Secretary of the meeting.
(b) The Chairman of the meeting shall have the right to determine the order of business at the meeting, to prescribe the rules and procedures for the conduct of the meeting, and to do all things necessary or desirable for the proper conduct of the meeting, including maintenance of order and safety and limitations on the time allotted to questions or comments on the affairs of the Corporation.
    

2



(c) The only business that may be conducted at an annual meeting of shareholders is that business which has been brought before the meeting: (i) by or at the direction of the Chairman of the meeting; (ii) pursuant to the notice of the meeting; or (iii) by any shareholder who is a holder of record at the time of the giving of the notice of the meeting who is entitled to vote at the meeting and who complies with the procedures set forth in Section 4 (d) and any applicable rules of the Securities and Exchange Commission (“SEC”).
(d) For business, including nomination of director candidates or other proposals pursuant to rules promulgated by the SEC, to be properly brought before an annual meeting by a shareholder, the shareholder must have given timely notice of the proposal in proper written form to the Secretary of the Corporation. If a nomination of director candidates or other proposal is brought pursuant to SEC rules, a shareholder must comply with the rule’s requirements, as well as the requirements set forth in this Section 4(d). To be timely under this Section 4(d), a shareholder’s notice must be delivered to or mailed and received at the Secretary’s office at least one hundred twenty (120) days before: (a) the date on which the Notice of Internet Availability of Proxy Materials (“Eproxy Notice”) for the prior year’s annual meeting of shareholders was first mailed, or (b) if no such Eproxy Notice was mailed, the date on which the proxy materials for the prior year’s annual meeting of shareholders were first mailed. To be in proper written form, a shareholder’s notice to the Secretary shall set forth in writing as to each matter the shareholder proposes to bring before the annual meeting:
(i)
in the case of nomination of a director candidate, a description of the proposed candidate’s qualifications for the position, a brief summary of no more than five hundred (500) words providing reasons why the candidate is being

3



nominated, and the information required by subparts (iii), (iv), (v) and (vi) of this Section 4(d);
(ii)
in the case of business other than the nomination of a director candidate, a brief description of the business desired to be brought before the annual meeting, the reasons for conducting the business at the annual meeting and the information required by subparts (iii), (iv), (v) and (vi) of this Section 4(d);
(iii)
the name and address of the shareholder proposing the business and all persons or entities acting in concert with the shareholder;
(iv)
the class and number of shares of the Corporation which are beneficially owned by the shareholder and all persons or entities acting in concert with the shareholder;
(v)
the holding of any economic interest in the Corporation through derivative positions, including, swaps, options, and forwards, by the shareholder and all persons or entities acting in concert with the shareholder; and
(vi)
any material interest of the shareholder in the proposed business.
The notice requirements set forth in this Section 4(d) shall not be waived nor shall they be deemed to have been satisfied by virtue of the fact that the Corporation has initiated its own process for electing directors at the annual meeting or for considering other business properly before the annual meeting.
Section 5. Inspectors
At each meeting of the shareholders at which a vote by ballot is taken, the polls shall be opened and closed, the proxies and ballots shall be collected, and the validity of proxies and the acceptance or rejection of votes shall be decided by two inspectors. No person who is a

4



candidate for the office of director shall act as inspector of any election for directors. The inspectors shall be appointed by the Board of Directors before the meeting or, if no appointment has been made, then by the Chairman of the meeting. If for any reason any of the inspectors previously appointed fails to attend or refuses or is unable to serve, those inspectors not serving shall be replaced by inspectors appointed by the Chairman of the meeting.
Section 6. Voting
At meetings of shareholders, every shareholder having voting rights as provided for in the Articles of Incorporation shall be entitled to one (1) vote for each share of stock outstanding in the name of the shareholder on the books of the Corporation on the date on which shareholders entitled to vote are determined or as otherwise provided for in the Articles of Incorporation. Each shareholder may be represented and vote by a proxy or proxies appointed by an instrument in writing or other manner authorized by the Board of Directors to the extent permitted by law. If the instrument designates two (2) or more persons to act as proxies, a majority of the proxies present at the meeting may exercise all of the powers conferred by the instrument unless the instrument provides otherwise. No proxy shall be voted at any meeting or continuation of an adjourned meeting other than that for which the proxy is given.
In all elections for directors, voting shall be by written ballot, or by electronic, telephonic or other process as the Board of Directors may authorize, to the extent permitted by law.
The Board of Directors may fix a date in advance not exceeding fifty (50) days before the date of any meeting of shareholders as a record date for the determination of shareholders entitled to notice of and to vote at the meeting. Only shareholders of record on the date so fixed shall be entitled to notice of and to vote at the meeting.

5



ARTICLE II
DIRECTORS
Section 1. Number, Election and Terms
The business and property of the Corporation shall be managed under the direction of the Board of Directors. The Board of Directors shall, by resolution, fix the number of directors which shall be no less than five (5) and no more than twelve (12) in number who shall be elected annually.
Section 2. Compensation
Directors shall receive compensation for their services as directors as may be fixed by resolution of the Board of Directors, including reimbursement for expenses for Board related services.
Section 3. Meetings
The meetings of the Board of Directors shall be held at the times and places designated by the Board of Directors. The annual meeting of the Board of Directors for the election of officers and such other business as may properly come before the meeting shall be held immediately following the annual meeting of shareholders. Special meetings of the Board of Directors shall be held whenever called at the direction of the Chairman of the Board, the Chief Executive Officer, or any two (2) directors if there are less than nine (9) directors on the Board, or any three (3) directors if there are nine (9) or more directors on the Board.
Section 4. Notice
No notice shall be required of any annual or regular meeting of the Board of Directors unless the place has been changed from that last designated by the Board of Directors. Notice of any annual or regular meeting, when required, or of any special meeting, of the Board of

6



Directors shall be given to each director in writing or by telephone at least twenty-four (24) hours before the time fixed for the meeting. Notice may be waived by any director. Unless otherwise indicated in the notice, any and all business may be transacted at a special meeting. At any meeting at which every director is present, even without notice, any business may be transacted.
Section 5. Adjournments
Any annual, regular or special meeting of the Board of Directors may be adjourned from time to time by the members present whether or not a quorum is present, and no notice shall be required of any continuation of an adjourned meeting beyond the announcement at the adjourned meeting.
Section 6. Indemnification
Each person serving as a director or an officer of the Corporation, or, at the request of the Corporation, as a director or an officer of any other company in which the Corporation has a financial interest and regardless of whether or not the person is then in office, and the heirs, executors, administrators and personal representatives of the person, shall be indemnified by the Corporation to the full extent of the authority of the Corporation to so indemnify as authorized by New Mexico law.
Section 7. Committees
The Board of Directors may designate from among its members one (1) or more committees, to exercise the power and authority and perform the functions that the Board may determine, except as may be limited by law.

7



Section 8. General Board Attributes
Recognizing that the contribution of the Board will depend not only on the character and capabilities of the directors taken individually but also on their collective strengths, the Board shall be composed of:
a.
directors chosen with a view toward bringing to the Board a variety of experience and background relevant to the Company's business;
b.
directors who will form a balanced core of business executives with varied expertise including having accounting or related financial management expertise;
c.
directors who have substantial experience outside the business community ‑‑ in the public, academic or scientific communities, for example;
d.
directors who are financially literate and who satisfy the definition of audit committee financial expert promulgated by the New York Stock Exchange;
(e)
directors who will represent the balanced, best interests of the shareholders as a whole rather than special interest groups or constituencies; and
(f)
a majority of directors who are independent according to criteria established by the New York Stock Exchange.
Section 9. Director Qualifications
In addition to conformance to the general board attributes described above, candidates for election as directors should possess the following qualifications:
(a)
each director should be an individual of the highest character and integrity and have an inquiring mind, vision and the ability to work well with others and exercise good judgment;

8



(b)
each director should be free of any conflict of interest which would violate any applicable law or regulation or interfere with the proper performance of the responsibilities of a director;
(c)
each director should possess substantial and significant experience which would be of particular importance to the Company in the performance of the duties of a director;
(d)
each director should have sufficient time available to devote to the affairs of the Company in order to carry out the responsibilities of a director;
(e)
each director should have the capacity and desire to represent the balanced, best interests of the shareholders as a whole and not primarily a special interest group or constituency; and
(f)
each director should have an equity ownership interest in the Company consistent with the approved director stock ownership guidelines.
ARTICLE III
CONTRACTS AND NEGOTIABLE INSTRUMENTS
Section 1. Authority to Sign Contracts
Unless the Board of Directors shall otherwise specifically direct, all contracts, instruments, documents or agreements of the Corporation shall be executed in the name of the Corporation by the Chief Executive Officer, or any officer, or any other employee, if approved by the Chief Executive Officer by either administrative policy letter or other specific written designation. It shall not be necessary that the corporate seal be affixed to any contract.

9



Section 2. Authority to Sign Negotiable Instruments
Except as otherwise authorized by the Board of Directors, all checks, drafts, bills of exchange, promissory notes, electronic funds transfer documents, and other negotiable instruments shall be signed by the Chairman of the Board, Chief Executive Officer, Secretary, Treasurer or other officer. Facsimile signatures shall be sufficient to meet the requirements of this section.
Section 3. Approval by Shareholders
The Board of Directors in its discretion may submit any contract, or act, for approval or ratification at any annual meeting of the shareholders, or at any special meeting of the shareholders called for the purpose of considering the act or contract. Except as provided for in the Articles of Incorporation, any contract or act that shall be approved or ratified by the vote of the holders of a majority of the capital stock of the Corporation which is represented in person or by proxy at the meeting shall be valid and binding upon the Corporation.
ARTICLE IV
OFFICERS
Section 1. Number, Election and Term
The Corporation shall have such officers, with titles and duties as shall be stated in resolutions adopted by the Board of Directors, as the Board in its discretion deems necessary or appropriate to conduct the business activities of the Corporation. The officers shall be elected annually by the Board of Directors at the annual meeting and who shall hold office until the next annual meeting or until a successor is elected and qualifies. The Board of Directors shall designate from among the officers a Chief Executive Officer, a Chief Financial Officer, a Chief Accounting Officer or Controller, a Treasurer and a Secretary who shall have the duty to record

10



the proceedings of the meetings of the Board of Directors. The Board of Directors may elect one person to serve as both Chairman of the Board and Chief Executive Officer. The Board of Directors may from time to time appoint such additional officers as the interest of the Corporation may require and fix their terms and duties of office. A vacancy occurring in any office may be filled by the Board of Directors. All officers shall hold office at the discretion of the Board of Directors and shall be subject to removal at any time by the affirmative vote of a majority of the whole Board of Directors. Election of any person as an officer of the Corporation shall not of itself create contract rights. The Chairman of the Board shall have the authority to designate officers subject to election by the Board of Directors at its next meeting following the Chairman’s designation.
Section 2. Chairman of the Board of Directors
The Chairman of the Board shall be elected annually by the Board of Directors at the annual meeting and shall hold that office until a successor is elected and qualifies. In the event of the incapacity of the Chairman of the Board, the Board of Directors shall, by a majority vote of the Board of Directors, designate an Acting Chairman who shall, during the incapacity of the Chairman of the Board, assume and perform all functions and duties which the Chairman of the Board is authorized or required by law to do. The Chairman of the Board shall have the power to call special meetings of the shareholders and of the directors for any purpose. The Chairman of the Board shall preside at all meetings of the shareholders and of the Board of Directors unless the Chairman of the Board is absent or incapacitated. The Chairman of the Board, subject to the authority of the Board of Directors, shall generally do and perform all acts incident to the office of the Chairman of the Board and which are authorized or required by law.

11



Section 3. Chief Executive Officer
The Chief Executive Officer shall provide active management over all operations of the Corporation subject to control of the Board of Directors. The Chief Executive Officer shall have the power to appoint and discharge, subject to the general approval or review by the Board of Directors, employees and agents of the Corporation and to fix their compensation, to make and sign contracts and agreements in the name of and on behalf of the Corporation and direct the general management and control of the business and affairs of the Corporation. The Chief Executive Officer may delegate authority to officers of the Corporation as the Chief Executive Officer may determine. The Chief Executive Officer shall have the power to segregate the operations of the Corporation into areas of responsibility. The Chief Executive Officer shall see that the books, reports, statements and certificates required by law are properly kept, made, and filed, and shall generally do and perform all acts which are authorized or required by law. The Chief Executive Officer shall designate an officer who shall, during the absence or incapacity of the Chief Executive Officer, assume and perform all functions and duties which the Chief Executive Officer might lawfully do if present in person and not under any incapacity.
Section 4. Other Officers
Each officer shall be responsible for the areas and activities assigned by the Chief Executive Officer, shall be subject to the authority of the Chief Executive Officer and shall assist in the general control and management of the business and affairs of the Corporation.
Section 5. Secretary
The Secretary shall keep a record in the proper books provided for that purpose of meetings and proceedings of shareholders, the Board of Directors and Committees of the Board of Directors, and shall record all votes of the directors and shareholders in a book to be kept for

12



that purpose. The Secretary shall notify the directors and shareholders of meetings as required by law or by the Bylaws of the Corporation and shall perform other duties as may be required by law or the Bylaws of the Corporation, or which may be assigned from time to time by the Board of Directors, Chairman of the Board or Chief Executive Officer. The Secretary is authorized to appoint one or more assistants from time to time as the Secretary deems advisable, the assistant or assistants to serve at the pleasure of the Secretary, and to perform the duties that are delegated by the Secretary. An assistant shall not be an officer of the Corporation.
Section 6. Treasurer
The Treasurer shall have the custody of all the funds and securities of the Corporation, and shall have the power on behalf of the Corporation to sign checks, notes, drafts and other evidences of indebtedness, to borrow money for the current needs of the business of the Corporation and to make short‑term investments of surplus funds of the Corporation. The Treasurer shall render to the Board of Directors, the Chairman of the Board or the Chief Executive Officer, whenever requested, an account of all transactions performed as Treasurer and of the financial condition of the Corporation. The Treasurer shall perform other duties as may be assigned by the Board of Directors, the Chairman of the Board or the Chief Executive Officer. The Treasurer is authorized to appoint one or more assistants from time to time as the Treasurer deems advisable, the assistant or assistants to serve at the pleasure of the Treasurer, and to perform the duties that are delegated by the Treasurer. An assistant shall not be an officer of the Corporation .
Section 7. Controller
The Controller shall be the chief accounting officer of the Corporation and have full responsibility and control of the accounting practices of the Corporation. The Controller shall,

13



subject to the approval of the Board of Directors, the Chairman of the Board or the Chief Executive Officer, establish accounting policies. The Controller shall standardize and coordinate accounting practices, supervise all accounting records and the presentation of all financial statements and tax returns. The Controller shall have other powers and duties as, from time to time, may be conferred by the Board of Directors, the Chairman of the Board or the Chief Executive Officer. The Controller is authorized to appoint one or more assistants from time to time as the Controller deems advisable, the assistant or assistants to serve at the pleasure of the Controller, and to perform the duties that are delegated by the Controller. An assistant shall not be an officer of the Corporation.
Section 8. Form of Appointment
In making any appointments of assistants, the Secretary, Treasurer and Controller shall use the following form:
I, ________________ (Name), the duly elected _______________ (Title) of PNM Resources, Inc. do hereby appoint
(Name) to serve as Assistant              (Title) for the period of          (Date) to              (Date), unless this appointment is terminated earlier in writing, to assume or perform all functions and duties which I might require and, in my absence or incapacity, which I might lawfully do if present and not under any incapacity.
Any appointments of assistants by the Secretary, Treasurer or Controller and any terminations of appointments shall be maintained in the records of the Secretary’s office .

14



ARTICLE V
CAPITAL STOCK
Section 1. Certificates of Stock
The name of the person owning shares of the capital stock of the Corporation, together with the number of shares and the date of issue, shall be entered on the Corporation’s books. All certificates surrendered to the Corporation shall be canceled, and no new certificates shall be issued until a certificate or certificates aggregating the same number of shares of the same class have been surrendered or canceled. The Board of Directors may make proper provision, from time to time, for the issuance of new certificates in place of lost, destroyed or stolen certificates.

Section 2. Transfer Agents and Registrars
The Corporation shall, if and whenever the Board of Directors determines, maintain one or more transfer offices or agencies, each in charge of a transfer agent designated by the Board of Directors, where the shares of the capital stock of the Corporation will be directly transferable, and also one or more registry offices, each in charge of a registrar designated by the Board of Directors, where shares of stock will be registered, and no certificates for shares of the capital stock of the Corporation, in respect of which one or more transfer agents and registrars shall have been designated, shall be valid unless countersigned by one of such transfer agents and registered by one of such registrars. The Board of Directors may also make additional rules and regulations as it may deem expedient concerning the issue, transfer and registration of certificates for shares of the capital stock of the Corporation.

15



Section 3. Shares Held for Account
The Board of Directors may adopt by resolution a procedure whereby a shareholder of the Corporation may certify in writing to the Corporation that all or a portion of the shares registered in the name of the shareholder are held for the account of a specified person or persons as provided for by New Mexico law.
Section 4. Transfer of Shares
Transfers of shares shall be made only upon the books of the Corporation by the holder or by the holder’s attorney in fact upon surrender of certificates for a like number of shares.
Section 5. Lost, Destroyed or Stolen Certificates
A new certificate of stock may be issued in the place of any certificate previously issued by the Corporation, or any predecessor of the Corporation, alleged to have been lost, destroyed or stolen. The Board of Directors may, in its discretion, require the owner of the lost, destroyed or stolen certificate to give to the Corporation satisfactory evidence that the certificate was lost, destroyed or stolen. The Board of Directors may also require a bond sufficient to indemnify it and its transfer agent, against any claim that may be made on account of the alleged loss of the certificate or the issuance of any new certificate.
Section 6. Fixing of Record Dates
For the purpose of determining shareholders entitled to notice of any meeting of shareholders, or entitled to receive payment of any dividend, or in order to make a determination of shareholders for any other proper purpose, the Board of Directors may, by resolution, provide that the stock transfer books be closed for a stated period not to exceed fifty (50) days. If the stock transfer books are closed for the purpose of determining shareholders entitled to notice of a

16



meeting of shareholders, the books shall be closed for at least ten (10) days immediately prior to the meeting.
In lieu of closing the stock transfer books, the Board of Directors may, by resolution, fix in advance a date as the record date for any determination of shareholders, the date to be not more than fifty (50) days and, in case of a meeting of shareholders, not less than ten (10) days prior to the date on which the action requiring the determination of shareholders is to be taken.
Section 7. Uncertificated Shares
The Corporation and each transfer agent designated by the Board of Directors are authorized to issue, register and transfer shares of capital stock of the Corporation (including fractional shares) in uncertificated book-entry form, provided that, within a reasonable time after the issuance or transfer of uncertificated shares, the corporation shall send, or cause the transfer agent to send, to the registered owner thereof a written notice containing the information required by applicable law.
ARTICLE VI
MISCELLANEOUS PROVISIONS
Section 1. Books
The books of the Corporation, except as otherwise provided by law, may be kept outside of the State of New Mexico, at such place or places as may be designated by the Board of Directors. The Board of Directors shall determine whether and to what extent, and at what time and places, and under what conditions and regulations, the accounts and the books of the Corporation, or any of them, shall be open to the inspection of shareholders; and no shareholder shall have any right to inspect any book or account or document of the Corporation except as conferred by the statutes of New Mexico, or authorized by the Board of Directors.

17



Section 2. Corporate Seal
The common corporate seal is, and until otherwise ordered by the Board of Directors shall be, an impression circular in form upon paper or wax bearing the words “PNM Resources, Inc. Incorporated 2000.” The seal shall be in the charge of the Secretary. If and when directed by the Board of Directors, a duplicate of the seal may be kept and used by the Treasurer or by an Assistant Secretary or Assistant Treasurer.
Section 3. Fiscal Year
The fiscal year of the Corporation shall be as determined by the Board of Directors.
Section 4. Principal Office
The principal office shall be established and maintained at a place designated by the Board of Directors.







18



Exhibit 10.1.1
2015 Director Compensation Summary

Non-employee directors of PNM Resources, Inc. (the “Company”) receive their annual retainer in the form of cash and stock-based compensation as determined by the Company's Board of Directors (the “Board”). At the December 2014 Board meeting, the Board approved making the following changes to director compensation for 2015: increasing the annual cash retainer from $52,500 to $60,000, increasing the Finance Committee and Nominating and Governance Committee chair fees from $5,000 to $7,500, and increasing the market value of the annual award of restricted stock rights from $65,000 to $75,000. Thus, the 2015 annual retainer for non-employee directors is as follows:
 
 
 
 
Annual Retainer :
 
An annual cash retainer of $60,000 paid in quarterly installments and restricted stock rights* with a grant date market value of $75,000
Annual Presiding Lead Director Fee:
 
$20,000 paid in quarterly installments
Annual Committee Chair Fee :
 
$ 7,500 paid in quarterly installments (in addition to meeting attendance fees), except that the annual chair fee for the Audit and Ethics Committee and Compensation and Human Resources Committee is $10,000
Committee Meeting Attendance Fees :
 
$ 1,500 per Board Committee meeting

Directors are also reimbursed for any Board-related expenses, such as travel expenses incurred to attend Board and Board committee meetings and director educational programs. Further, directors are indemnified by the Company to the fullest extent permitted by law pursuant to the Company's bylaws and indemnification agreements between the Company and each director.

* The amount of the annual award of restricted stock rights is determined by dividing $75,000 by the closing price of the Company's stock on the New York Stock Exchange on the day of the grant. Restricted stock rights granted under the Company's Performance Equity Plan each vest in three equal annual installments beginning on the first anniversary of the grant date, subject to vesting acceleration upon retirement from the board. These awards are typically made at the annual meeting of directors, unless the meeting occurs during a black-out period for trading in the Company's securities as specified in the Company's Insider Trading Policy. As set forth under the Company's Equity Compensation Awards Policy, under those circumstances, the Board will either (a) schedule a special meeting after the expiration of the black-out period, (b) make awards pursuant to a unanimous written consent executed after the expiration of the black-out period, or (c) pre-approve the equity awards with an effective date after the expiration of the black-out period. The date of the awards is the date on which the Board approves the awards, unless (i) the approval date is a non-trading day, in which case the date is the immediately preceding trading date or (ii) in the case of pre-approval during a black-out period, in which case the grant date is the first trading date after the expiration of the black-out period.











062014

Exhibit 10.1.2
PNM RESOURCES, INC.
EXECUTIVE SAVINGS PLAN II



        

062014

PNM RESOURCES, INC.
EXECUTIVE SAVINGS PLAN II
PREAMBLE
Effective as of December 15, 2004, PNM Resources, Inc. (the “Company”) established the PNM Resources, Inc. Executive Savings Plan II (the “Plan”). The purpose of the Plan is to permit certain key employees of the Company and its Affiliates who participate in the PNM Resources, Inc. Retirement Savings Plan (the “RSP”) to defer compensation and receive credits under this Plan without reference to the limitations on contributions in the RSP or those imposed by the Internal Revenue Code of 1986, as amended (the “Code”). The Plan was previously amended and restated effective January 1, 2009 to satisfy the requirements of Section 409A of the Code. The 2009 restated Plan was amended on two previous occasions.
Except as noted below, this amended and restated Plan document is effective as of January 1, 2015 (the “Effective Date”).
ARTICLE I
DEFINITIONS
1.1      General . When a word or phrase appears in this Plan with the initial letter capitalized, and the word or phrase does not begin a sentence, the word or phrase shall generally be a term defined in this Article I. The following words and phrases used in the Plan with the initial letter capitalized shall have the meanings set forth in this Article I, unless a clearly different meaning is required by the context in which the word or phrase is used or the word or phrase is defined for a limited purpose elsewhere in this Plan document:
(a)      Account means the Discretionary Credit Account, Matching Credit Account, Standard Credit Account, Supplemental Credit Account, Supplemental Deferral Account or other account into which contributions are contributed by the Company on behalf of the Participant pursuant to this Plan.
(b)      Adopting Affiliate means any Affiliate of the Company that has been authorized by the Board of Directors to adopt the Plan and which has adopted the Plan in accordance with Section 2.5 ( Adoption by Affiliates ). All Affiliates that adopted the Plan prior to this amendment and restatement shall continue as Adopting Affiliates.
(c)      Affiliate means (1) a corporation which is a member of the same controlled group of corporations (within the meaning of Section 414(b) of the Code) as is the Company, and (2) any other trade or business (whether or not incorporated) controlling, controlled by, or under common control with the Company (within the meaning of Section 414(c) of the Code).
(d)      After-Tax Retirement Plan means the PNM Resources, Inc. After-Tax Retirement Plan, as it may be amended from time to time. The After-Tax Retirement Plan will terminate on June 30, 2015.

        

062014

(e)      Benefits Department means the organizational unit of PNMR Services Company with responsibility for administering benefit programs sponsored by PNM Resources and its Affiliates.
(f)      Benefits Governance Committee means the Benefits Governance Committee or its successor appointed by the Company.
(g)      Board or “ Board of Directors means the Board of Directors of the Company, or any authorized committee of the Board.
(h)      Change in Control shall have the meaning ascribed to that term in the Retention Plan in which the Participant participates ( i.e. , the Officer Retention Plan or the Employee Retention Plan).
(i)      Code means the Internal Revenue Code of 1986, as amended from time to time, and any regulations promulgated thereunder.
(j)      Company means PNM Resources, Inc., and, to the extent provided in Section 10.6 ( Successors ) below, any successor corporation or other entity resulting from a merger or consolidation into or with the Company or a transfer or sale of substantially all of the assets of the Company.
(k)      Company Stock means common stock, no par value, issued by the Company.
(l)      Company Stock Fund means the hypothetical Investment Fund described in Section 5.3 ( Special Company Stock Fund Provisions ).
(m)      Compensation for purposes of determining the Matching and Standard Credits, means the Participant’s base salary and other elements of compensation that are considered under the RSP (as it may be amended from time to time) for purposes of calculating the Participant’s RSP Employer and Matching Contributions, respectively. For purposes of determining the amount of a Participant’s permissible Supplemental Deferrals, “Compensation” means the Participant’s base salary and other elements of compensation that are considered under the RSP (as it may be amended from time to time) for purposes of calculating the Participant’s RSP Before Tax Contributions. For purposes of determining Compensation under this Plan, the limitations imposed by Section 401(a)(17) of the Code shall not apply.
(n)      Compensation and Human Resources Committee means the Compensation and Human Resources Committee of the Board or its successor.
(o)      Corporate Investment Committee means the Corporate Investment Committee or its successor appointed by the Company.
(p)      Disability ” or “ Disabled means that a Participant is, by reason of any medically determinable physical or mental impairment that can be expected to result in death or can be expected to last for a continuous period of not less than 12 months, receiving income replacement benefits for a period of not less than 3 months under the Company’s long term

2     

062014

disability plan. Any determination of Disability pursuant to the Plan is not an admission by the Company or the Adopting Affiliate that employs the Participant that a Participant is disabled under federal or state law.
(q)      Discretionary Credit Account means the account maintained under the Plan to record the amounts credited to a Participant in accordance with Section 3.5 ( Discretionary Credits ).
(r)      Discretionary Credits means the Discretionary Credits allocated to a Participant’s Discretionary Credit Account in accordance with Section 3.5 ( Discretionary Credits ).
(s)      Distribution Election Form means the election form by which a Participant elects the manner in which his Accounts shall be distributed pursuant to Section 6.2 ( Form of Distribution ).
(t)      Effective Date means January 1, 2015.
(u)      Eligible Officer means a Participant who (1) occupies the position of Senior Vice President or higher of the Company, (2) has completed at least three Months of Service, and (3) has been selected by the Plan Administrator with the advance consent of the Compensation and Human Resources Committee to receive a Supplemental Credit.
(v)      Employee Retention Plan means the PNM Resources, Inc. Employee Retention Plan, as it may be amended or replaced from time to time.
(w)      ERISA means the Employee Retirement Income Security Act of 1974, as amended from time to time, and any regulations promulgated thereunder.
(x)      ESP I means the PNM Resources, Inc. Executive Savings Plan.
(y)      Investment Fund means the hypothetical investment fund or funds established by the Plan Administrator pursuant to Article V ( Adjustment of Accounts ).
(z)      Matching Credit Account means the account maintained under the Plan to record the amounts credited to a Participant in accordance with Section 3.3(a) ( Matching and Standard Credits – Matching Credit ).
(aa)      Matching Credits means the Matching Credits allocated to a Participant’s Matching Credit Account in accordance with Section 3.3(a) ( Matching and Standard Credits – Matching Credit ).
(bb)      Month of Service means a calendar month during which a Participant performs services for the Company or an Adopting Affiliate on one or more days. If the Participant’s employment with the Company or an Adopting Affiliate includes a break in employment, then only the Months of Service in the last period of employment will be considered Months of Service.

3     

062014

(cc)      Normal Retirement Date means the date on which a Participant attains the age of 62 years.
(dd)      Officer Retention Plan means the PNM Resources, Inc. Officer Retention Plan, as it may be amended or replaced from time to time.
(ee)      Participant means an employee of the Company or any Adopting Affiliate who has been designated or selected for participation in the Plan pursuant to Section 2.2 ( Selection of Participants ) and who has not received all amounts to which he is entitled pursuant to the Plan. The Plan document occasionally distinguishes between Participants and “Active Participants.” When this distinction is made, the term “Active Participant” refers to a Participant who is currently employed by the Company or an Adopting Affiliate.
(ff)      Plan means the PNM Resources, Inc. Executive Savings Plan II, as set forth herein.
(gg)      Plan Administrator means the Company. Any action to be taken by the Plan Administrator may be taken by the Company’s senior human resources officer. In addition, the Company’s senior human resources officer may delegate such authority to the Benefits Department.
(hh)      Plan Year means the calendar year.
(ii)      Recordkeeper means the entity selected by the Company to keep Plan records and to adjust Accounts pursuant to Section 5.1 ( Adjustment of Accounts ) of the Plan.
(jj)      RSP means the PNM Resources, Inc. Retirement Savings Plan, as it may be amended from time to time.
(kk)      RSP Before Tax Contribution means “Before Tax Contributions,” as such term is defined in the RSP.
(ll)      RSP Employer Contribution means “Discretionary Contributions,” as such term is defined in the RSP.
(mm)      RSP Matching Contribution means “Matching Contributions,” as such term is defined in the RSP.
(nn)      Separation from Service means either (1) the termination of a Participant’s employment with the Company and all Affiliates due to death, retirement or other reasons, or (2) a permanent reduction in the level of bona fide services the Participant provides to the Company and all Affiliates to an amount that is 20% or less of the average level of bona fide services the Participant provided to the Company and all Affiliates in the immediately preceding 36 months, with the level of bona fide service calculated in accordance with Treas. Reg. § 1.409A‑1(h)(1)(ii).
A Participant’s employment relationship is treated as continuing while the Participant is on military leave, sick leave, or other bona fide leave of absence (if the period of

4     

062014

such leave does not exceed six months, or if longer, so long as the Participant’s right to reemployment with the Company or an Affiliate is provided either by statute or contract). If the Participant’s period of leave exceeds six months and the Participant’s right to reemployment is not provided either by statute or by contract, the employment relationship is deemed to terminate on the first day immediately following the expiration of such six-month period. Whether a termination of employment has occurred will be determined based on all of the facts and circumstances and in accordance with regulations issued by the United States Treasury Department pursuant to Section 409A of the Code.
(oo)      Specified Employee means certain officers and highly compensated employees of the Company as defined in Treas. Reg. § 1.409A-1(i). The identification date for determining whether any employee is a Specified Employee during any Plan Year shall be the September 1 preceding the commencement of such Plan Year.
(pp)      Standard Credit Account means the account maintained under the Plan to record the amounts credited to a Participant in accordance with Section 3.3(b) ( Matching and Standard Credits – Standard Credit ).
(qq)      Standard Credits means the Standard Credits allocated to a Participant’s Standard Credit Account in accordance with Section 3.3(b) ( Matching and Standard Credits – Standard Credit ).
(rr)      Supplemental Credit Account means the account maintained under the Plan to record the amounts credited to an Eligible Officer in accordance with Section 3.4 ( Supplemental Credits ).
(ss)      Supplemental Credits means the Supplemental Credits allocated to an Eligible Officer’s Supplemental Credit Account in accordance with Section 3.4 ( Supplemental Credits ).
(tt)      Supplemental Deferral Account means the account maintained under the Plan to record amounts deferred under Section 3.2 ( Supplemental Deferrals ) of the Plan.
(uu)      Supplemental Deferral Agreement means the written deferral agreement described in Section 3.1 ( Supplemental Deferral Agreement ) that is entered into by a Participant pursuant to this Plan.
(vv)      Supplemental Deferrals means the deferrals made by a Participant in accordance with Section 3.2 ( Supplemental Deferrals ).
(ww)      Valuation Date means each business day of the Plan Year.
1.2      Construction . The masculine gender, when appearing in the Plan, shall include the feminine gender (and vice versa), and the singular shall include the plural, unless the contract clearly states to the contrary. Headings and subheadings are for the purpose of reference only and are not to be considered in the construction of this Plan. If any provision of this Plan is determined to be for any reason invalid or unenforceable, the remaining provisions shall continue in full force and effect. All of the provisions of this Plan shall be construed and enforced

5     

062014

according to the laws of the State of New Mexico and shall be administered according to the laws of such state, except as otherwise required by ERISA, the Code, or other Federal law.
ARTICLE II     
ELIGIBILITY; ADOPTION BY AFFILIATES
2.1      The Eligible Class . The purpose of the Plan is to provide deferred compensation to a select group of management or highly compensated employees. This group of eligible employees is sometimes referred to as the “top hat group.”
2.2      Selection of Participants . Any employee who is classified as an “officer” of the Company shall be eligible to participate in the Plan for a particular Plan Year. For this purpose, an “officer” is someone who occupies the position of Vice President or higher. The Plan Administrator, in the exercise of its discretion, and with the concurrence of the Compensation and Human Resources Committee and/or the Board of Directors, also may designate any other employee of the Company or any Adopting Affiliate as eligible to participate in the Plan for a particular Plan Year if the Plan Administrator concludes that the employee is a member of the top hat group and should be allowed to participate in the Plan. As noted in Section 2.1 ( The Eligible Class ), this Plan is intended to provide benefits only to members of the top hat group. The Company has determined that all current officers are properly includible in the top hat group.
2.3      Election to Participate . In order to make Supplemental Deferrals and Matching Credits for a particular Plan Year, an otherwise eligible employee (as determined in accordance with Section 2.2 ( Selection of Participants ) must affirmatively elect to participate in the Plan for that Plan Year in accordance with such procedures as may be prescribed by the Plan Administrator. The election must be made at the same time as elections are made in accordance with Section 3.2(b) ( Supplemental Deferrals – Timing of Elections ).
2.4      Discontinuance of Participation . As a general rule, once an individual is a Participant, he will continue as a Participant (but not necessarily an Active Participant) for all future Plan Years until his retirement or other Separation from Service. In addition, prior to retirement or other Separation from Service, the Plan Administrator shall discontinue an individual’s participation in the Plan effective as of the first day of the Plan Year following the Plan Year during which the Plan Administrator concludes, in the exercise of its discretion, that the individual is no longer properly included in the top hat group. If an individual’s participation is discontinued, the individual will no longer be eligible to make deferrals or receive credits under this Plan. In addition, the individual will no longer be considered to be a Participant in this Plan. Rather, such individual’s rights to receive payments in the future will be deemed to be payable pursuant to a separate agreement the terms of which are identical to, but separate from, the terms of this Plan. The individual will not be entitled to receive a distribution pursuant to the terms of the separate agreement until the occurrence of another event ( e.g. , Separation from Service) that entitles the Participant to receive a distribution. The Participant’s Accounts under this separate agreement will continue to be adjusted to reflect hypothetical investment earnings or losses in accordance with Section 5.1 ( Adjustment of Accounts ) until the Accounts are distributed.

6     

062014

2.5      Adoption by Affiliates . An employee of an Affiliate may not become a Participant in the Plan unless the Affiliate has previously adopted the Plan. An Affiliate of the Company may adopt this Plan only with the approval of the Board. By adopting this Plan, the Affiliate shall be deemed to have agreed to assume the obligations and liabilities imposed upon it by this Plan, agreed to comply with all of the other terms and provisions of this Plan, delegated to the Plan Administrator, the Benefits Department, the Benefits Governance Committee, and the Compensation and Human Resources Committee the power and responsibility to administer this Plan with respect to the Affiliate’s employees, and delegated to the Company the full power to amend or terminate this Plan with respect to the Affiliate’s employees.
ARTICLE III     
DEFERRALS AND CREDITS
3.1      Supplemental Deferral Agreement . In order to make Supplemental Deferrals for a particular Plan Year, a Participant must affirmatively elect to participate in this Plan for the applicable Plan Year in accordance with Section 2.3 ( Election to Participate ) and must execute a Supplemental Deferral Agreement in the form prescribed by the Benefits Department from time to time. In the Supplemental Deferral Agreement, the Participant shall agree to reduce his Compensation in exchange for a Supplemental Deferral in the same amount. The Supplemental Deferral Agreement shall be delivered to the Benefits Department by the time specified in Section 3.2(b) ( Supplemental Deferrals – Timing of Elections ).
3.2      Supplemental Deferrals .
(a)      Amount . Any Participant who has elected to participate in this Plan for a particular Plan Year may elect to defer, pursuant to a Supplemental Deferral Agreement, the receipt of all or any portion (designated in whole percentages) of the Compensation otherwise payable to him or her by the Company or an Adopting Affiliate for the Plan Year. The amount deferred pursuant to this paragraph (a) shall be allocated to the Supplemental Deferral Account maintained for the Participant.
(b)      Timing of Elections . As a general rule, the Supplemental Deferral Agreement shall be signed by the Participant and delivered to the Benefits Department prior to the beginning of the Plan Year in which the Compensation to be deferred is otherwise payable to the Participant. The Supplemental Deferral Agreement will be effective only for a single Plan Year. A new Supplemental Deferral Agreement will be required if the Participant chooses to participate in this Plan for any later Plan Year. For the Plan Year in which a Participant first becomes eligible to participate in the Plan, the Participant may elect to participate in this Plan and to make Supplemental Deferrals of Compensation with respect to services to be performed subsequent to the date of the election by signing and delivering a Supplemental Deferral Agreement within 30 days after the date the Participant becomes eligible to participate in the Plan. An election made by a Participant shall be irrevocable with respect to the Plan Year covered by the election.
3.3      Matching and Standard Credits . The Recordkeeper shall allocate Matching and Standard Credits to the Participant’s Matching Credit Account and Standard Credit Account in accordance with the following provisions of this Section.

7     

062014

(a)      Matching Credit . If a Participant elects to make Supplemental Deferrals, the Participant will be entitled to a Matching Credit if the Participant has “Excess Compensation.” For this purpose, “Excess Compensation” is Compensation in excess of the limit imposed by Section 401(a)(17) of the Code for the relevant Plan Year. The Matching Credit shall be in an amount equal to 75% of the Participant’s Supplemental Deferrals, provided that the Matching Credit shall not exceed an amount equal to 75% of the first six percent of Excess Compensation. A Participant shall be eligible to receive a Matching Credit under this Plan only if such Participant has met the service requirements necessary to receive RSP Matching Contributions for that Plan Year.
(b)      Standard Credit . The Standard Credit shall be an amount equal to (i) the RSP Employer Contribution that would have been made on the Participant’s behalf to the RSP for the Plan Year if the contributions were not limited by the Code (including, particularly, the limitations imposed by Sections 401(a)(17) and 415 of the Code), reduced by (ii) the RSP Employer Contribution actually made to the RSP on behalf of the Participant for the Plan Year. A Participant shall be eligible to receive a Standard Credit under this Plan only if such Participant has met the service requirements necessary to receive RSP Employer Contributions for that Plan Year.
3.4      Supplemental Credits .
(a)      General Rule . The Plan Administrator shall instruct the Recordkeeper to allocate Supplemental Credits to an Eligible Officer’s Supplemental Credits Account as of December 1 of each Plan Year. The Supplemental Credit shall be an amount calculated by the Plan Administrator pursuant to Section 3.4(b). The purpose of the Supplemental Credit is to provide the Eligible Officer with retirement income approximately equal to a specified target percentage (the “Target Replacement Income Percentage”) of the Eligible Officer’s anticipated pre‑retirement income. The relevant Target Replacement Income Percentage will be determined by the Plan Administrator, with the advance advice and consent of the Compensation and Human Resources Committee, and will be set forth in a letter or other written instrument provided by the Plan Administrator to the Eligible Officer. The Target Replacement Income Percentage may be modified from time to time in the same manner. In determining the Target Replacement Income Percentage for a particular Eligible Officer, the Plan Administrator, and the Compensation and Human Resources Committee, will act in their discretion and will not be bound by the Target Replacement Income Percentage determined for any other current or former Eligible Officer.
(b)      Determination of Supplemental Credit . The Plan Administrator’s calculation of the Supplemental Credit shall be made on the basis of advice received by an actuarial or other consultant retained by the Plan Administrator and with the advice and consent of the Compensation and Human Resources Committee. In determining the amount of the Supplemental Credits necessary to achieve the desired Target Replacement Income Percentage, anticipated retirement income from the following sources shall be considered: (1) amounts attributable to Company credits to this Plan (including investment earnings on such amounts); (2) amounts attributable to Company contributions to the RSP (including investment earnings on such amounts); (3) benefits provided pursuant to the PNM Resources, Inc. Employees’ Retirement Plan; (4) benefits provided pursuant to the After-Tax Retirement Plan and any supplemental employee retirement plans or agreements (“SERPs”) entered into by the Eligible

8     

062014

Officer and the Company or an Affiliate; (5) benefits provided pursuant to the Social Security Act; and (6) amounts provided pursuant to other employers’ benefit plans. When determining the amount of the Supplemental Credits, the Plan Administrator shall use actuarial assumptions (interest and mortality), compensation assumptions, rate of return assumptions and such other assumptions as it deems appropriate. All interest and investment earnings calculations will be based on an assumed rate set by the Plan Administrator in the exercise of its discretion. No adjustments will be made to reflect the difference between the assumed rate set by the Plan Administrator and the actual rate of return on the Participant’s Accounts calculated pursuant to Section 5.2(f) ( Investment Direction – Rate of Return ). The Plan Administrator will review all of the assumptions periodically and may change the assumptions as it deems appropriate. The assumptions used will have a significant impact on the amount of the Supplemental Credits. Because these assumptions (and the Target Replacement Income Percentage) may be altered at any time as described above, no Eligible Officer will have a contractual or other right to any particular level or amount of Supplemental Credit for any Plan Year until such Supplemental Credit is actually declared and allocated to the Eligible Officer’s Supplemental Credit Account.
(c)      Termination During the Plan Year . An Eligible Officer must be employed on December 1 of the relevant Plan Year in order to receive the Supplemental Credit called for by Section 3.4 ( Supplemental Credits ) for that Plan Year. Notwithstanding the prior sentence, an Eligible Officer shall receive a pro-rata Supplemental Credit if the Eligible Officer incurs a Separation from Service before December 1 of any Plan Year under any of the following circumstances: (1) after reaching Normal Retirement Date; (2) under circumstances that entitle the Eligible Officer to receive benefits under the Officer Retention Plan; (3) due to Disability; or (4) due to the death of the Eligible Officer. The pro-rata Supplemental Credit shall be calculated based on the time elapsed between December 1 of the prior Plan Year and the date of the Eligible Officer’s Separation from Service as compared to 365 days and shall be credited to the Eligible Officer’s Supplemental Credit Account within thirty (30) days of the Eligible Officer’s Separation from Service. For example, if an Eligible Officer terminates employment on June 1, 2012 due to retirement, the Eligible Officer will receive 50% of the Supplemental Credits for the 2012 Plan Year and that amount will be credited to the Eligible Officer’s Supplemental Credit Account by July 1, 2012.
3.5      Discretionary Credits . In its sole and absolute discretion, the Compensation and Human Resources Committee may instruct the Recordkeeper to allocate Discretionary Credits to a Participant’s Discretionary Credit Account at any time during a Plan Year in any amount that the Compensation and Human Resources Committee deems appropriate and on such terms and conditions (including deferred vesting provisions) as the Compensation and Human Resources Committee deems appropriate.
3.6      Benefits Not Contingent . Deferrals and credits for any Participant under this Plan are not increased or decreased to the extent a Participant makes or does not make deferrals under the RSP.
3.7      Allocation Among Affiliates . Each Adopting Affiliate shall bear the costs and expenses of providing benefits accrued by its employee-Participants during periods while they are employed by that Adopting Affiliate. Such costs and expenses shall be allocated among the Adopting Affiliates in accordance with (a) agreements entered into between the Company and

9     

062014

any Adopting Affiliate, or (b) in the absence of such an agreement, procedures adopted by the Company.
ARTICLE IV     
VESTING
4.1      Vesting in the Supplemental Deferral Account, the Matching Credit Account and the Standard Credit Account . Each Participant shall at all times be fully vested in all amounts credited to or allocable to his Supplemental Deferral Account, Matching Credit Account, Standard Credit Account and (except as noted below) Discretionary Credit Account and his rights and interest therein shall not be forfeitable for any reason. Consistent with Section 3.5 ( Discretionary Credits ), the Compensation and Human Resources Committee, in the exercise of its discretion, may impose vesting conditions on all or part of the amounts credited to the Discretionary Credit Account.
4.2      Vesting in the Supplemental Credit Account . The Supplemental Credits for any Plan Year shall vest on a two-year cliff vesting schedule. For example, if a Supplemental Credit is allocated to a Participant’s Supplemental Credit Account on December 1, 2014, that amount will fully vest on December 1, 2016 and if a Supplemental Credit is allocated to a Participant’s Supplemental Credit Account on December 1, 2015, that amount will fully vest on December 1, 2017, and so on.
Notwithstanding the foregoing, each Eligible Officer shall be fully vested in all amounts credited to his Supplemental Credit Account on and after the first to occur of the following events:
(c)      The Eligible Officer attaining age 55 with two Years of Service;
(d)      The Eligible Officer’s Normal Retirement Date;
(e)      The Eligible Officer’s Disability;
(f)      The date of death of the Eligible Officer; or
(g)      The termination (other than for “Cause”) or “Constructive Termination” of the Eligible Officer’s employment by the Company following a Change in Control. For this purpose, the terms “Constructive Termination” and “Cause” shall have the meanings ascribed to them under the Officer Retention Plan.
If an Eligible Officer Separates from Service before becoming vested in his Supplemental Credits, the Eligible Officer’s Supplemental Credits under this Plan will be forfeited.
4.3      Acceleration of Vesting . In its sole and absolute discretion, the Compensation and Human Resources Committee may accelerate the vesting of any Participant’s Supplemental Credit Account.


10     

062014

ARTICLE V
ADJUSTMENT OF ACCOUNTS
5.1      Adjustment of Accounts . Except as otherwise provided elsewhere in the Plan, as of each Valuation Date, each Participant’s Accounts will be adjusted to reflect deferrals and credits under Article III ( Deferrals and Credits ) and the positive or negative rate of return on the Investment Funds selected by the Participant pursuant to Section 5.2(b) ( Investment Direction – Participant Directions ). The rate of return will be determined by the Recordkeeper pursuant to Section 5.2(f) ( Investment Direction – Rate of Return ) and will be credited or charged in accordance with written policies applied to all Participants. While the Accounts will be adjusted as of each Valuation Date, the Recordkeeper shall only post the adjustments as of the last business day of each month.
5.2      Investment Direction .
(d)      Investment Funds . Each Participant may direct the hypothetical investment of amounts credited to his Accounts in one or more of the Investment Funds. The Investment Funds shall include a Company Stock Fund and such other investment funds as may be available under the RSP. The Investment Funds may be changed from time to time by the Company’s Corporate Investment Committee, in its discretion.
(e)      Participant Directions . Each Participant may direct that all of the amounts attributable to his Accounts be invested in a single Investment Fund or may direct that fractional (percentage) increments of his Accounts be invested in such fund or funds as he shall desire in accordance with such procedures as may be established by the Company’s Corporate Investment Committee. Unless the Corporate Investment Committee prescribes otherwise, such procedures shall mirror the procedures established under the RSP for participant investment direction except that any limitations or caps imposed on investment in a company stock fund under the RSP shall not apply to investment in the Company Stock Fund under the Plan. A Participant’s ability to direct investments into or out of the Company Stock Fund shall be subject to such procedures as the Company’s General Counsel (or his delegate) may prescribe from time to time to assure compliance with Rule 16b-3 promulgated under Section 16(b) of the Securities Exchange Act of 1934, as amended, and other applicable requirements. Such procedures also may limit or restrict a Participant’s ability to make (or modify previously made) elections.
(f)      Changes and Intra-Fund Transfers . Participant investment directions may be changed, and amounts may be transferred from one hypothetical Investment Fund to another, in accordance with the procedures established by the Company’s Corporate Investment Committee (or, in the case of the Company Stock Fund, the Company’s General Counsel) pursuant to Section 5.2(b) ( Investment Direction – Participant Directions ). The designation will continue until changed by the timely submission of a new designation.
(g)      Default Selection . In the absence of any designation, a Participant will be deemed to have directed the investment of his Accounts in such Investment Funds as the Company’s Corporate Investment Committee, in its sole and absolute discretion, shall determine.

11     

062014

(h)      Impact of Election . The Participant’s selection of Investment Funds shall serve only as a measurement of the value of the Participant’s Accounts pursuant to Section 5.1 ( Adjustment of Accounts ) and this Section 5.2 and neither the Company nor the Plan Administrator are required to actually invest a Participant’s Accounts in accordance with the Participant’s selections.
(i)      Rate of Return . Accounts shall be adjusted on each Valuation Date to reflect investment gains and losses as if the Accounts were invested in the hypothetical Investment Funds selected by the Participants in accordance with this Section 5.2 and charged with any and all reasonable expenses related to the administration of the Plan including, but not limited to, the reasonable expenses of carrying out the hypothetical investment directions related to each account. The earnings and losses determined by the Recordkeeper in good faith and in its discretion pursuant to this Section shall be binding and conclusive on the Participant, the Participant’s beneficiary and all parties claiming through them.
(j)      Charges . The Plan Administrator may direct the Recordkeeper to charge each Participant’s accounts for the reasonable expenses of carrying out investment instructions directly related to such accounts.
5.3      Special Company Stock Fund Provisions .
(a)      General . A Participant’s interest in the Company Stock Fund shall be expressed in whole and fractional hypothetical units of the Company Stock Fund. As a general matter, the Company Stock Fund shall track an investment in Company Stock in the same manner as the RSP’s company stock fund. Accordingly, the value of a unit in the Plan’s Company Stock Fund shall be the same as the value of a unit in the RSP’s company stock fund.
(b)      Dividends and Stock Splits . If a cash dividend is declared on Company Stock, the hypothetical equivalent cash dividends attributable to the notional shares held in the Company Stock Fund shall be “reinvested” into the Company Stock Fund. If a stock dividend or share split is declared with respect to Company Stock, a hypothetical equivalent stock dividend or stock split attributable to the notional shares held in the Company Stock Fund, or any hypothetical securities issued with respect to the Company Stock Fund, shall be allocated to the Company Stock Fund. All such hypothetical dividends (cash or stock) or stock splits shall be reflected appropriately in the Participant’s Accounts.
5.4      Compliance with Securities Laws . Any election by a Participant to hypothetically invest any amount in the Company Stock Fund, and any elections to transfer amounts from or to the Company Stock Fund to or from any other Investment Fund, shall be subject to all applicable securities law requirements, including but not limited to Rule 16b-3 of the Securities Exchange Act of 1934, as amended, promulgated by the Securities Exchange Commission. To the extent that any election violates any securities law, rule or regulation, the election shall be void.




12     

062014

ARTICLE VI
DISTRIBUTIONS
6.1      Distribution Events . A Participant shall be entitled to a distribution of his Accounts on the earliest of the following to occur:
(k)      Separation from Service . Following a Participant’s Separation from Service for any reason other than death, the Participant’s vested interest in the Plan will be distributed to the Participant at the time and in the manner provided in Sections 6.4(a) ( Timing of Distributions – Separation from Service, Disability and Death ) and 6.2(a) ( Form of Distribution – Distributions on Separation from Service and Disability ).
(l)      Disability . A Participant shall be entitled to full distribution of his vested interest in the Plan, at the time and in the manner provided in Sections 6.4(a) ( Timing of Distributions – Separation from Service, Disability and Death ) and 6.2(a) ( Form of Distribution – Distributions on Separation from Service and Disability ), if the Participant becomes Disabled.
(m)      Death . If a Participant dies prior to receiving his entire interest in the Plan, the Participant’s Accounts will be distributed to the Participant’s beneficiary at the time and in the manner provided in Sections 6.4(a) ( Timing of Distributions – Separation from Service, Disability and Death ) and 6.2(b) ( Form of Distribution – Distributions on Death ).
(n)      Specified Date . A Participant shall be entitled to distribution of all or a portion of his vested interest in the Plan, at the time and in the manner provided in Sections 6.4(b) ( Timing of Distributions – Specified Date ) and 6.2(c) ( Form of Distribution – Distributions on Specified Date ). Notwithstanding the foregoing, a specified date distribution will not be available for amounts credited to a Participant’s Accounts for Plan Years beginning on or after January 1, 2015.
6.2      Form of Distribution .
(c)      Distributions on Separation from Service and Disability . Subject to Section 6.2(e) ( Form of Distribution – Distribution of Small Amounts ), upon a Participant’s Separation from Service or Disability as described in Section 6.1(a) ( Distribution Events – Separation from Service ) and 6.1(b) ( Distribution Events – Disability ), the Participant’s Accounts shall be distributed to the Participant in a single lump sum payment or installments over a specified period of time. Installment distributions shall be subject to such uniform rules and procedures as may be adopted by the Plan Administrator from time to time, which rules and procedures shall be reflected in the Distribution Election Form or other forms prescribed by the Benefits Department. Installment distributions shall be limited to a period of five (5) years or ten (10) years for amounts credited to a Participant’s Accounts for Plan Years beginning on or after January 1, 2015. At all times, the right to each installment payment made pursuant to this Section 6.2(a) shall be treated as the right to a series of separate payments within the meaning of Treas. Reg. § 1.409A-2(b)(2)(iii).
The method of payment and the timing of payment shall be selected by the Participant in the initial Distribution Election Form (which may be contained in and be a part of a Supplemental Deferral Agreement) submitted by the Participant to the Benefits Department on

13     

062014

entry into the Plan. A Participant may change his distribution election with respect to future years by filing a new Distribution Election Form with the Benefits Department prior to the first day of the first year to which the election relates. A Participant may change elections with respect to the current or a prior year in accordance with Section 6.2(f) ( Form of Distribution – Changes in Time and Form of Distribution ). If a revised Distribution Election Form is not honored because it was not timely filed, distributions shall be made pursuant to the most recent valid Distribution Election Form filed by the Participant. If no valid Distribution Election Form exists, the Participant’s Accounts will be distributed in a single lump sum.
(d)      Distributions on Death . In the event of a Participant’s death prior to Separation from Service, the Participant’s Accounts shall be distributed to the Participant’s beneficiary in a single lump sum payment. Similarly, if a Participant dies while receiving installment payments under this Plan or after Separation from Service but prior to the commencement of the Participant’s benefit payments, the balance of the Participant’s Accounts shall be paid to the Participant’s beneficiary in the form of a lump sum payment.
(e)      Distributions on Specified Date . If a Participant elects to receive all or a portion of his Accounts on a specified date as described in Section 6.1(d) ( Distribution Events – Specified Date ), the Participant’s Accounts shall be distributed to the Participant in a single lump sum payment or in substantially equal installments over a period not exceeding five years. Installment distributions shall be subject to such uniform rules and procedures as may be adopted by the Plan Administrator from time to time, which rules and procedures shall be reflected in the Distribution Election Form or other forms prescribed by the Benefits Department. At all times, the right to each installment payment made pursuant to this Section 6.2(c) shall be treated as the right to a series of separate payments within the meaning of Treas. Reg. § 1.409A-2(b)(2)(iii). If a Participant has commenced receiving all or a portion of his Accounts in installment payments pursuant to this Section 6.2(c) at the time of the Participant’s Separation from Service or Disability, the Participant will continue receiving such amounts in installment payments following the date of the Participant’s Separation from Service or Disability. The portion, if any, of the Participant’s Accounts which is not being distributed in installment payments pursuant to an election made pursuant to Section 6.1(d) ( Distribution Events – Specified Date ) shall be distributed in accordance with the remaining provisions of Section 6.1 ( Distribution Events ).
The method of payment and the timing of payment shall be selected by the Participant in the initial Distribution Election Form (which may be contained in and be a part of a Supplemental Deferral Agreement) submitted by the Participant to the Benefits Department on entry into the Plan. A Participant may change his distribution election with respect to future years by filing a new Distribution Election Form with the Benefits Department prior to the first day of the first year to which the election relates. A Participant may change elections with respect to the current or a prior year in accordance with Section 6.2(f) ( Form of Distribution – Changes in Time and Form of Distribution ). If a revised Distribution Election Form is not honored because it was not timely filed, distributions shall be made pursuant to the most recent valid Distribution Election Form filed by the Participant. If no valid Distribution Election Form exists, the Participant’s Accounts will be distributed in a single lump sum. Notwithstanding the foregoing, a specified date distribution will not be available for amounts credited to a Participant’s Accounts for Plan Years beginning on or after January 1, 2015.

14     

062014

(f)      Distributions of Company Stock Fund . The portion of a Participant’s Accounts that is allocated to the Company Stock Fund shall be distributed in the form of distribution ( e.g. , lump sum or installments) elected by the Participant pursuant to Section 6.2(a) ( Form of Distribution – Distributions on Separation from Service and Disability ) and/or Section 6.2(c) ( Form of Distribution – Distributions on Specified Date ) above in cash or in whole shares of Company Stock (with fractional shares paid for in cash) as elected by the Participant. Only amounts actually invested in the Company Stock Fund for the one-year period prior to the distribution, however, may be distributable in Company Stock. The election to receive cash or Company Stock shall be made at the time and in the manner provided in the form prescribed by the Benefits Department from time to time for that purpose. Any election made by a Participant pursuant to this Section with respect to a distribution from the Company Stock Fund shall be subject to all applicable securities law requirements, including, but not limited to, Rule 16b-3. Any election that may not be implemented due to the lack of any available exemption shall be void. The Benefits Department may then make the distribution in any fashion that will not result in a violation of any applicable securities law requirements. The Benefits Department also may delay the distribution if necessary. An exemption to the securities law requirements that is only available with the prior approval of the Board, the shareholders, or some other individual or individuals shall not be considered to be available unless such approval is actually granted in a timely manner.
(g)      Distribution of Small Amounts . Notwithstanding any provision in this Plan to the contrary, in the event that the amount credited to the Participant’s Accounts as of the date his or her payments commence is less than the applicable dollar amount under Section 402(g)(1)(B) of the Code ($17,500 for 2014), the Benefits Governance Committee may elect to pay the amount credited to the Participant’s Accounts in a lump sum payment. The Benefits Governance Committee must inform the Participant in writing on or before the date of a distribution pursuant to this Section that the Committee has elected to distribute the Participant’s Accounts pursuant to this Section. Any payment to a Participant pursuant to this Section must represent the complete liquidation of the Participant’s interest in the Plan.
(h)      Changes in Time and Form of Distribution . A new Distribution Election Form that changes the time or form of payment for amounts attributable to future years may be filed with the Benefits Department prior to the first day of the first year to which the election relates. A new Distribution Election Form that delays the time of a payment previously elected by a Participant or the form of payment previously selected by a Participant will be honored only if the following requirements are met:
(1)      The new form will not take effect until at least 12 months after the date on which the new form is filed with the Benefits Department; and
(2)      The election may not be made less than 12 months prior to the date of the first scheduled payment; and
(3)      In the case of an election related to a payment not related to the Participant’s Disability or death, the first payment with respect to which the election is made must be deferred for a period of not less than five years from the date such payment would otherwise be made.

15     

062014

The provisions of this paragraph are intended to comply with Section 409A(a)(4)(C) of the Code and shall be interpreted in a manner consistent with the requirements of such section and any regulations, rulings or other guidance issued pursuant thereto. As provided in Section 6.8 ( Ban on Acceleration of Benefits ), distributions may not be accelerated.
6.3      Amount of Distribution . The amount distributed to a Participant shall equal the sum of the vested amounts credited to the Participant’s Accounts as of the quarterly Valuation Date preceding the date of the distribution. For purposes of this Plan, a “quarterly Valuation Date” is a Valuation Date that coincides with the last business day of a calendar quarter. If distributions are to be made in installments, the Participant’s Accounts will continue to be adjusted in accordance with Article V ( Adjustment of Accounts ) until the full Account balance has been distributed. Amounts invested in the Company Stock Fund that are distributed in cash shall be valued at the fair market value of the Company Stock on the relevant Valuation Date. Similarly, amounts that are distributed in the form of Company Stock shall be valued at the fair market value of the Company Stock on the relevant Valuation Date.
6.4      Timing of Distributions . Distributions will be made on the earliest of the following to occur:
(a)      Separation from Service, Disability and Death . As a general rule, funds will be distributed within ninety (90) days following (a) the Participant’s Separation from Service for any reason (including death) or Disability, or (b) in the case of a Participant who is a Specified Employee, the date which is six months after the Participant’s Separation from Service. The Participant may not elect the taxable year of the distribution. The six-month delay for a Specified Employee does not apply if the Specified Employee dies or becomes Disabled. Notwithstanding the foregoing, a Participant may elect to defer the distribution of funds in accordance with Section 6.2 ( Form of Distribution ).
(b)      Specified Date . A Participant shall be entitled to a distribution of all or a portion of his vested interest in the Plan on the specified date chosen in the Supplemental Deferral Agreement filed with the Plan Administrator in accordance with Section 3.1 ( Supplemental Deferral Agreement ) or in an election form filed with the Plan Administrator pursuant to Section 6.2(f) ( Form of Distribution – Changes in Time and Form of Distribution ), as the case may be. For amounts credited to a Participant’s Accounts on or after January 1, 2009, the specified date distribution chosen by a Participant may not be prior to the date that all amounts credited for the relevant Plan Year, including Supplemental Credits, if any, are fully vested.
Payment to a Participant who has chosen to receive a distribution on a specified date pursuant to Section 6.1(d) ( Distribution Events – Specified Date ) shall be made within ten (10) business days following the specified date chosen by the Participant. Any amounts which are credited to the Participant’s Accounts or become vested after the specified date chosen by the Participant will be distributed to the Participant upon the Participant’s Separation from Service as described in Section 6.1(a) ( Distribution Events – Separation from Service ), Disability as described in Section 6.1(b) ( Distribution Events – Disability ) or death as described in Section 6.1(c) ( Distribution Events – Death ). Notwithstanding the foregoing, a specified date

16     

062014

distribution will not be available for amounts credited to a Participant’s Accounts for Plan Years beginning on or after January 1, 2015.
6.5      Beneficiary Designation . If a Participant should die before receiving a full distribution of his or her Accounts, distribution shall be made to the beneficiary designated by the Participant. If a Participant has not designated a beneficiary, or if no designated beneficiary is living on the date of distribution, such amounts shall be distributed to those persons entitled to receive distributions of the Participant’s Accounts under the RSP. The distributions made under this Plan shall be made in a lump sum.
6.6      Withholding . All distributions will be subject to all applicable tax and withholding requirements.
6.7      Deductibility . All amounts distributed from the Plan are intended to be deductible by the Company or the appropriate Adopting Affiliate. If all or any portion of a distribution will not be deductible under Section 162(m) of the Code, the payment will be delayed until the first year in which it is deductible.
6.8      Ban on Acceleration of Benefits . Notwithstanding any other provision of this Plan to the contrary, neither the time nor the schedule of any payment under the Plan may be accelerated or subject to a further deferral except as provided in Treas. Reg. § 1.409A-3(j)(4).
6.9      Distributions Treated as Made Upon a Designated Event . If the Company or any Adopting Affiliate fails to make any distribution, either intentionally or unintentionally, within the time period specified in the Plan, but the payment is made within the same calendar year, such distribution will be treated as made within the time period specified in the Plan pursuant to Treas. Reg. § 1.409A-3(d). In addition, if a distribution is not made due to a dispute with respect to such distribution, the distribution may be delayed in accordance with Treas. Reg. § 1.409A-3(g).
ARTICLE VII
TRANSFERS FROM ESP I
7.1      Combination with ESP I . As of December 17, 2008, the ESP I was combined with the Plan, with the Plan being the surviving plan. As of December 17, 2008, all ESP I liabilities shall be transferred to and assumed by the Plan. All liabilities transferred from the ESP I shall be credited to the accounts established pursuant to this Plan in accordance with Section 7.2 ( Accounting ) of this Plan. As of December 17, 2008, any right, claim or other entitlement that an individual had pursuant to the ESP I shall be a right, claim or entitlement under this Plan and shall be paid in accordance with the terms and provisions of this Plan. As of December 17, 2008, no individual shall have any right, claim or other entitlement pursuant to the ESP I. Notwithstanding the foregoing, any distribution elections made pursuant to the ESP I shall remain in effect unless changed by the Participant pursuant to the terms of the Plan.
7.2      Accounting . Following the combination of ESP I with and into the Plan, the account balances transferred to this Plan from the ESP I were allocated to the appropriate Participants’ accounts in accordance with the following rules:

17     

062014

(a)      Participant supplemental deferrals made on behalf of a participant pursuant to ESP I were allocated to the Participant’s Supplemental Deferral Account under this Plan;
(b)      Any matching credits made on behalf of a participant pursuant to ESP I were allocated to the Participant’s Matching Credit Account under this Plan;
(c)      Any standard credits made on behalf of a participant pursuant to ESP I were allocated to the Participant’s Standard Credit Account under this Plan; and
(d)      Any discretionary credits made on behalf of a participant in the ESP I were allocated to the Participant’s Discretionary Credit Account under this Plan.
ARTICLE VIII
ADMINISTRATION OF THE PLAN
8.1      General Powers and Duties .
(e)      General . The Plan Administrator shall perform the duties and exercise the powers and discretion given to it in this Plan document and its decisions and actions shall be final and conclusive as to all persons affected thereby. The Company and the Adopting Affiliates shall furnish the Plan Administrator with all data and information that the Plan Administrator may reasonably require in order to perform its functions. The Plan Administrator may rely without question upon any such data or information.
(f)      Disputes . Any and all disputes that may arise involving Participants or beneficiaries shall be referred to the Plan Administrator and its decision shall be final. Furthermore, if any question arises as to the meaning, interpretation or application of any provisions of this Plan, the decision of the Plan Administrator shall be final.
(g)      Agents . The Plan Administrator may engage agents, including actuaries, to assist it and may engage legal counsel who may be counsel for the Company. The Plan Administrator shall not be responsible for any action taken or omitted to be taken on the advice of such counsel, including written opinions or certificates of any agent, counsel or actuary.
(h)      Insurance . At the Plan Administrator’s request, the Company shall purchase liability insurance to cover the Plan Administrator in its activities as the Plan Administrator.
(i)      Allocations . The Plan Administrator is given specific authority to allocate responsibilities to the Benefits Department and to revoke such allocations. When the Plan Administrator has allocated authority pursuant to this paragraph, the Plan Administrator is not to be liable for the acts or omissions of the party to whom such responsibility has been allocated.
(j)      Records . The Benefits Department shall supervise the establishment and maintenance of records by the Recordkeeper, the Company and each Adopting Affiliate containing all relevant data pertaining to any person affected hereby and his or her rights under this Plan. In addition, the Plan Administrator may, in its discretion, establish a system for

18     

062014

complete or partial electronic administration of the Plan and may replace any written documents described in this Plan with electronic counterparts as it deems appropriate.
(k)      Interpretations . The Plan Administrator, in its sole discretion, shall interpret and construe the provisions of the Plan (and any underlying documents or policies).
(l)      Accounts . The Plan Administrator (or Recordkeeper, as appropriate) shall combine the various Accounts of a Participant if it deems such action appropriate. Furthermore, the Plan Administrator (or Recordkeeper, as appropriate) shall divide a Participant’s Accounts into sub-accounts if it deems such action appropriate.
The foregoing list of powers and duties is not intended to be exhaustive, and the Plan Administrator shall, in addition, exercise such other powers and perform such other duties as it may deem advisable in the administration of the Plan, unless such powers or duties are assigned to another pursuant to the provisions of the Plan.
8.2      Claims .
(a)      Initial Claim . A claim for benefits by a Participant, beneficiary or any other person (all of whom are referred to in this Section as a “Claimant”) under this Plan must be submitted to the Benefits Department. The Benefits Department will notify the Claimant of the disposition of the claim within 90 days after the request is filed with the Benefits Department. The Benefits Department may have an additional period of up to 90 days to decide the claim if the Benefits Department determines that special circumstances require an extension of time to decide the claim and the Benefits Department advises the Claimant in writing of the need for an extension (including an explanation of the special circumstances requiring the extension) and the date on which it expects to decide the claim. If, following the review, the claim is denied, in whole or in part, the notice of disposition shall set forth:
(1)      the specific reason(s) for denial of the claim;
(2)      reference to the specific Plan provisions upon which the determination is based;
(3)      a description of any additional material or information necessary for the Claimant to perfect the claim and an explanation of why such material or information is necessary; and
(4)      an explanation of the Plan’s appeal procedures, and an explanation of the time limits applicable to the Plan’s appeal procedures, including a statement of the Claimant’s right to bring a civil action under Section 502(a) of ERISA.
(b)      Appeal of Adverse Benefit Determination .
(1)      Within 60 days after receiving the written notice of the disposition of the claim described in paragraph (a), the Claimant, or the Claimant’s authorized representative, may appeal such denied claim. The Claimant may submit a written statement of his claim (including any written comments, documents, records and other information relating to

19     

062014

the claim) and the reasons for granting the claim to the Benefits Governance Committee. The Benefits Governance Committee shall have the right to request of and receive from the Claimant such additional information, documents or other evidence as the Benefits Governance Committee may reasonably require. If the Claimant does not request an appeal of the denied claim within 60 days after receiving written notice of the disposition of the claim as described in paragraph (a), the Claimant shall be deemed to have accepted the disposition of the claim and such written disposition will be final and binding on the Claimant and anyone claiming benefits through the Claimant, unless the Claimant shall have been physically or mentally incapacitated so as to be unable to request review within the 60-day period. The appeal shall take into account all comments, documents, records and other information submitted by the Claimant relating to the claim, without regard to whether such documents, records or other information were submitted or considered in the initial benefit determination or the initial review.
(2)      A decision on appeal to the Benefits Governance Committee shall be rendered in writing by the Benefits Governance Committee ordinarily not later than 60 days after the Claimant requests review. A written copy of the decision shall be delivered to the Claimant. If special circumstances require an extension of the ordinary period, the Benefits Governance Committee shall so notify the Claimant of the extension with such notice containing an explanation of the special circumstances requiring the extension and the date by which the Benefits Governance Committee expects to render a decision. Any such extension shall not extend beyond 60 days after the ordinary period. The period of time within which a benefit determination on review is required to be made shall begin at the time an appeal is filed in accordance with the provisions of paragraph (b)(1) above, without regard to whether all the information necessary to make a decision on appeal accompanies the filing.
If the appeal to the Benefits Governance Committee is denied, in whole or in part, the decision on appeal referred to in the first sentence of this paragraph (2) shall set forth:
(i)      the specific reason(s) for denial of the claim;
(ii)      reference to the specific Plan provisions upon which the denial is based;
(iii)      a statement that the Claimant is entitled to receive, upon request and free of charge, reasonable access to, and copies of, all documents, records, and other information relevant to the Claimant’s claim for benefits; and
(iv)      a statement of the Claimant’s right to bring a civil action under Section 502(a) of ERISA.
(c)      Right to Examine Plan Documents and to Submit Materials . In connection with the determination of a claim, or in connection with review of a denied claim or appeal pursuant to this Section 8.2, the Claimant may examine this Plan and any other pertinent documents generally available to Participants relating to the claim and may submit written comments, documents, records and other information relating to the claim for benefits. The Claimant also will be provided, upon request and free of charge, reasonable access to, and copies

20     

062014

of, all documents, records, and other information relevant to the Claimant’s claim for benefits with such relevance to be determined in accordance with Section 8.2(d) ( Claims – Relevance ).
(d)      Relevance . For purpose of this Section 8.2, documents, records, or other information shall be considered “relevant” to a Claimant’s claim for benefits if such documents, records or other information:
(1)      were relied upon in making the benefit determination;
(2)      were submitted, considered, or generated in the course of making the benefit determination, without regard to whether such documents, records or other information were relied upon in making the benefit determination; or
(3)      demonstrate compliance with the administrative processes and safeguards required pursuant to this Section 8.2 regarding the making of the benefit determination.
(e)      Decisions Final; Procedures Mandatory . To the extent permitted by law, a decision on review or appeal shall be binding and conclusive upon all persons whomsoever. To the extent permitted by law, completion of the claims procedures described in this Section 8.2 shall be a mandatory precondition that must be complied with prior to commencement of a legal or equitable action in connection with the Plan by a person claiming rights under the Plan or by another person claiming rights through such a person. The Benefits Governance Committee may, in its sole discretion, waive these procedures as a mandatory precondition to such an action.
(f)      Time For Filing Legal Or Equitable Action . Any legal or equitable action filed in connection with the Plan by a person claiming rights under the Plan or by another person claiming rights through such a person must be commenced not later than the earlier of: (1) the expiration of the shortest applicable statute of limitations provided by law; or (2) two years from the date the written copy of the Benefits Governance Committee’s decision on review is delivered to the Claimant in accordance with Section 8.2(b) ( Claims – Appeal of Adverse Benefit Determination ).
ARTICLE IX
AMENDMENT
9.1      Amendment . The Company reserves the right to amend the Plan when, in the sole discretion of the Company, such amendment is advisable. Any such amendment shall be made pursuant to a resolution of the Board (or its delegate) and shall be effective as of the date of such resolution. Notwithstanding any provision of this Plan to the contrary, no amendment may be made if it will result in a violation of Section 409A of the Code and any such amendment shall at no time have any legal validity. Although this Plan has been designed to comply with the requirements of Section 409A of the Code, the Company specifically does not warrant such compliance.

21     

062014

9.2      Effect of Amendment . Any amendment of this Plan shall apply prospectively only and shall not directly or indirectly reduce the balance of any Plan account as of the effective date of such amendment.
9.3      Termination . It is the expectation of the Company that this Plan will be continued indefinitely. However, continuance of the Plan is not assumed as a contractual obligation of the Company and the right is reserved at any time to terminate this Plan. Except as otherwise determined by the Company in compliance with Section 409A, the termination of the Plan shall not result in an immediate payment to Plan Participants. Rather, payments shall only be made in accordance with the provisions of Article VI ( Distributions ).
ARTICLE X
GENERAL PROVISIONS
10.1      Participant’s Rights Unsecured . The Plan at all times shall be entirely unfunded and no provision shall at any time be made with respect to segregating any assets of the Company for payment of any distributions hereunder. The right of a Participant or his or her designated beneficiary to receive a distribution hereunder shall be an unsecured claim against the general assets of the Company, and neither the Participant nor a designated beneficiary shall have any rights in or against any specific assets of the Company. All amounts credited to a Participant’s Accounts shall constitute general assets of the Company and may be disposed of by the Company at such time and for such purposes as it may deem appropriate. Nothing in this Section shall preclude the Company from establishing a “Rabbi Trust,” but the assets in the Rabbi Trust must be available to pay the claims of the Company’s general creditors in the event of the Company’s insolvency.
10.2      No Guaranty of Benefits . Nothing contained in the Plan shall constitute a guaranty by the Company or any other person or entity that the assets of the Company will be sufficient to pay any benefit hereunder.
10.3      No Enlargement of Employee Rights . No Participant shall have any right to receive a distribution from the Plan except in accordance with the terms of the Plan. Establishment of the Plan shall not be construed to give any Participant the right to be retained in the service of the Company.
10.4      Spendthrift Provision . No interest of any person or entity in, or right to receive a distribution under, the Plan shall be subject in any manner to sale, transfer, assignment, pledge, attachment, garnishment, or other alienation or encumbrance of any kind; nor shall any such interest or right to receive a distribution be taken, either voluntarily or involuntarily, for the satisfaction of the debts of, or other obligations or claims against, such person or entity, including claims in bankruptcy proceedings. This Section shall not preclude arrangements for the withholding of taxes from deferrals, credits, or benefit payments, arrangements for the recovery of benefit overpayments, arrangements for the transfer of benefit rights to another plan, or arrangements for direct deposit of benefit payments to an account in a bank, savings and loan association or credit union (provided that such arrangement is not part of an arrangement constituting an assignment or alienation).

22     

062014

10.5      Incapacity of Participant . If the Benefits Department is served with a court order holding that a Participant is incapable of personally receiving and giving a valid receipt for such distribution, the Benefits Department shall postpone payment until such time as a claim therefore shall have been made by a duly appointed guardian or other legal representative of such person. The Benefits Department is under no obligation to inquire or investigate as to the competency of any Participant. Any payment to an appointed guardian or other legal representative under this Section shall be a payment for the account of the incapacitated person and a complete discharge of any liability of the Company and the Plan therefore.
10.6      Successors . This Plan shall be binding upon the successors and assigns of the Company and upon the heirs, beneficiaries and personal representatives of the individuals who become Participants hereunder.
10.7      Unclaimed Benefit . Each Participant shall keep the Benefits Department informed of his or her current address and the current address of his or her designated beneficiary. The Benefits Department shall not be obligated to search for the whereabouts of any person. If the location of a Participant is not made known to the Benefits Department within three years after the date on which payment of the Participant’s Supplemental Deferral and Supplemental Employer Accounts may first be made, payment may be made as though the Participant had died at the end of the three-year period. If, within one additional year after such three-year period has elapsed, or, within three years after the actual death of a Participant, the designated beneficiary of the Participant has not been located, then there shall be no further obligation to pay any benefit hereunder to such Participant or designated beneficiary and such benefit shall be irrevocably forfeited.
10.8      Limitations on Liability . Notwithstanding any of the preceding provisions of the Plan, neither the Plan Administrator, the Benefits Department, the Benefits Governance Committee, the Corporate Investment Committee, or the Compensation and Human Resources Committee, nor any individual acting as the Plan Administrator’s, the Benefits Department’s, the Benefits Governance Committee’s, the Corporate Investment Committee’s, the Compensation and Human Resources Committee’s, or the Company’s employee, agent, or representative shall be liable to any Participant, former Participant or other person for any claim, loss, liability or expense incurred in connection with the Plan.
10.9      Conflicts . If any person holds a position under this Plan through which he or she is charged with making a decision about his or her own (or any immediate family member’s) Plan participation, including, without limitation, eligibility, account valuation, or investments, then such person shall be recused and the decision shall be made by the Plan Administrator. If a decision is required regarding the senior human resources officer’s Plan participation, including without limitation, eligibility, account valuation or investments, such decision shall be made by the Company’s Chief Executive Officer.
10.10      Compliance with Section 409A . This Plan is intended to be administered in compliance with Section 409A of the Code and each provision of the Plan shall be interpreted, to the extent possible, to comply with Section 409A of the Code.

23     

062014

IN WITNESS WHEREOF , the Company has caused this Plan to be executed by its duly authorized officer as of the _ 29 th _ day of _ December ____________, 2014.
PNM RESOURCES, INC.
By:     /s/ Patrick V. Apodaca
Senior Vice President and General Counsel


24     

062014

TABLE OF CONTENTS
Page

ARTICLE I
DEFINITIONS
1.1
General                                      1
1.2
Construction                                      5
ARTICLE II
ELIGIBILITY; ADOPTION BY AFFILIATES
2.1
The Eligible Class                                  6
2.2
Selection of Participants                              6
2.3
Election to Participate                                  6
2.4
Discontinuance of Participation                          6
2.5
Adoption by Affiliates                                  7
ARTICLE III
DEFERRALS AND CREDITS
3.1
Supplemental Deferral Agreement                          7
3.2
Supplemental Deferrals                              7
3.3
Matching and Standard Credits                          7
3.4
Supplemental Credits                                  8
3.5
Discretionary Credits                                  9
3.6
Benefits Not Contingent                              9
3.7
Allocation Among Affiliates                              9
ARTICLE IV
VESTING
4.1
Vesting in the Supplemental Deferral Account, the Matching Credit Account and the Standard Credit Account                              10
4.2
Vesting in the Supplemental Credit Account                      10
4.3
Acceleration of Vesting                              10
ARTICLE V
ADJUSTMENT OF ACCOUNTS
5.1
Adjustment of Accounts                              11
5.2
Investment Direction                                  11
5.3
Special Company Stock Fund Provisions                      12
5.4
Compliance with Securities Laws                          12

i     

062014

TABLE OF CONTENTS
(continued)
Page

ARTICLE VI
DISTRIBUTIONS
6.1
Distribution Events                                  13
6.2
Form of Distribution                                  13
6.3
Amount of Distribution                              16
6.4
Timing of Distributions                              16
6.5
Beneficiary Designation                              17
6.6
Withholding                                      17
6.7
Deductibility                                      17
6.8
Ban on Acceleration of Benefits                          17
6.9
Distributions Treated as Made Upon a Designated Event              17
ARTICLE VII
TRANSFERS FROM ESP I
7.1
Combination with ESP I                              17
7.2
Accounting                                      17
ARTICLE VIII
ADMINISTRATION OF THE PLAN
8.1
General Powers and Duties                              18
8.2
Claims                                          19
ARTICLE IX
AMENDMENT
9.1
Amendment                                      21
9.2
Effect of Amendment                                  22
9.3
Termination                                      22
ARTICLE X
GENERAL PROVISIONS
10.1
Participant’s Rights Unsecured                          22
10.2
No Guaranty of Benefits                              22
10.3
No Enlargement of Employee Rights                          22
10.4
Spendthrift Provision                                  22
10.5
Incapacity of Participant                              23

ii     

062014

TABLE OF CONTENTS
(continued)
Page

10.6
Successors                                      23
10.7
Unclaimed Benefit                                  23
10.8
Limitations on Liability                              23
10.9
Conflicts                                      23
10.10
Compliance with Section 409A                          23



iii     
Exhibit 10.2

EMPLOYEE RETENTION AGREEMENT
THIS AGREEMENT is entered into by and between PNM Resources, Inc. (“PNMR”) and Charles N. Eldred (the “Employee”) (collectively, the “Parties”).
RECITALS:
To incentivize Employee to continue employment through December 31, 2017 and meet certain performance measures, PNMR is offering Employee the Retention Bonuses and the Restricted Stock Rights Awards as specified in this Agreement.
TERMS AND CONDITIONS:
1. Effective Date of Agreement .
This Agreement shall be effective on January 1, 2015 (the “Effective Date”).
2.      Scope of Agreement; At Will Employment .
All terms and conditions of Employee’s employment with PNMR Services Company (the “Company”) are unchanged and are determined pursuant to Company’s employment policies and practices unless otherwise specifically modified by this Agreement. For the avoidance of doubt, Employee remains eligible to participate in benefit plans and programs sponsored by PNMR and its affiliates that are generally available to officers of PNMR including but not limited to, the Officer Annual Incentive Plan, the Long-Term Incentive Plan and the Officer Retention Plan, subject to the terms and conditions of those plans. This Agreement is intended to supplement and not replace the benefit plans and programs sponsored by PNMR and its affiliates.
Employee acknowledges that Employee’s employment by Company remains “at-will” and that Employee or Company may terminate the employment relationship at any time for any reason. If the employment relationship ends during the term of this Agreement, this Agreement will only govern the terms of the payment of the Retention Bonuses and the Restricted Stock Rights Awards.
3.      Retention Bonus and Restricted Stock Rights Award .
Employee shall be entitled to the Retention Bonuses and the Restricted Stock Rights Awards set forth below if: (1) Employee remains employed by Company through the applicable Retention Dates; (2) Employee continues to devote substantially all of Employee’s undivided working time, attention, knowledge, and skills to Employee’s job assignment as determined by the Chief Executive Officer in her discretion; (3) Employee completes or satisfies the Performance Deliverables listed on Appendix A prior to the applicable Retention Dates; and (4) Employee executes and does not revoke the release in accordance with Section 9 ( Release ).
If Employee satisfies the Performance Deliverables, Employee shall receive the Retention Bonus and the Restricted Stock Rights in the amounts specified in the tables below. Shortly after each Retention Date, the Chief Executive Officer will assess and certify to the PNMR Compensation and Human Resources Committee (the “Committee”) whether Employee has satisfied the Performance Deliverables. Within 60 days of each Retention Date, the





Committee will consider the Chief Executive Officer’s certification and make the final determination of the satisfaction of the Performance Deliverables.
If Employee does not satisfy the Performance Deliverables for Retention Bonus 1 and Restricted Stock Rights Award 1, but satisfies the Performance Deliverables for Retention Bonus 2 and Restricted Stock Rights Award 2, Employee shall be entitled to receive Retention Bonuses 1 and 2 and Restricted Stock Rights Awards 1 and 2 at the time Retention Bonus 2 and Restricted Stock Rights 2 would otherwise be paid (less any amounts Employee has already received pursuant to this Agreement).
If Employee does not satisfy the Performance Deliverables, the Committee, in its discretion, may award Employee a Retention Bonus and/or a Restricted Stock Rights Award in such amount as it deems appropriate. In no event is Employee entitled to either a Retention Bonus or a Restricted Stock Rights Award if Employee does not satisfy the Performance Deliverables.
 
Retention Date
Amount
Retention Bonus 1
December 31, 2016
$175,000
Retention Bonus 2
December 31, 2017
$200,000
The Retention Bonus shall be “paid” by allocating Discretionary Credits to Employee under the PNM Resources, Inc. Executive Savings Plan II (the “ESP II”). The Discretionary Credits will be credited under the ESP II in accordance with Section 7 ( Discretionary Credits Allocated to ESP II ) below. Employee does not have the right to receive cash in lieu of a Discretionary Credit.
 
Retention Date
Restricted Stock Rights
Restricted Stock Rights Award 1
December 31, 2016
Restricted Stock Rights equal to $100,000/the Fair Market Value of one share of PNMR Stock as of the Grant Date.
Restricted Stock Rights Award 2
December 31, 2017
Restricted Stock Rights equal to $275,000/the Fair Market Value of one share of PNMR Stock as of the Grant Date.
The Restricted Stock Rights Awards are granted pursuant to the 2014 Performance Equity Plan (the “PEP”). The terms of the PEP are hereby incorporated by reference. Capitalized terms used in this Agreement not otherwise defined in this Agreement shall have the meanings given to such terms in the PEP.

2



The Grant Date for Restricted Stock Rights Awards shall be the date on which the Committee makes a final determination of the Performance Deliverables, which generally will be at the Committee’s first regularly scheduled meeting in 2017 and 2018. If the Committee makes a determination of the satisfaction of the Performance Deliverables during a blackout period, the Grant Date will be the first trading day after expiration of the blackout period, as determined in accordance with PNMR’s Equity Compensation Policy.
Restricted Stock Rights Award 1 shall be paid in the form of Stock of PNMR during the period beginning on January 1, 2017 and ending on March 15, 2017, provided Employee has executed and not revoked the release required by Section 9 ( Release ). Restricted Stock Rights Award 2 shall be paid in the form of Stock of PNMR during the period beginning on January 1, 2018 and ending on March 15, 2018, provided Employee has executed and not revoked the release required by Section 9 ( Release ).
4.      Termination of Employment .
(a)      Termination by Company without Cause . Company may terminate Employee’s employment without “Cause” prior to the Retention Date (including following a Change in Control). If Company terminates Employee’s employment without Cause pursuant to this Section, Employee will receive a Pro Rata Retention Bonus (as defined below). Employee also shall be eligible for a Pro Rata Restricted Stock Rights Award (as defined below). In order to receive the Pro Rata Retention Bonus and the Pro Rata Restricted Stock Rights Award, Employee must execute and not revoke the release required by Section 9 ( Release ) at the time specified in Section 9 ( Release ). In such instance, Employee also may be entitled to receive severance or retention benefits pursuant to the PNM Resources, Inc. Non-Union Severance Pay Plan or the PNM Resources, Inc. Officer Retention Plan if the requirements of the plans are met.
(b)      Termination by Company for Cause . If Company terminates Employee’s employment for “Cause” prior to a Retention Date, Employee will not be entitled to receive any Retention Bonus or any Restricted Stock Rights Award for any Retention Date after the date of Employee’s termination.
(c)      Termination by Employee . If Employee terminates employment for any reason prior to a Retention Date, Employee will not be entitled to receive any Retention Bonus or any Restricted Stock Rights Award for any Retention Date after the date of Employee’s termination.
5.      Disability .
If Employee becomes Disabled prior to the Retention Date, Employee will receive a Pro Rata Retention Bonus and a Pro Rata Restricted Stock Rights Award. As a condition to receiving the Pro Rata Retention Bonus and the Pro Rata Restricted Stock Rights Award, Employee must execute and not revoke the release required by Section 9 ( Release ) at the time specified in Section 9 ( Release ).
6.      Death .
If Employee dies prior to a Retention Date, Employee will receive a Pro Rata Retention Bonus and a Pro Rata Restricted Stock Rights Award.

3



7.      Discretionary Credits Allocated to ESP II .
If Employee satisfies the requirements of Section 3 ( Retention Bonus and Restricted Stock Rights Award ), Section 4(a) ( Termination of Employment – Termination by Company without Cause ), Section 5 ( Disability ) or Section 6 ( Death ), the Committee shall allocate Discretionary Credits equal to the applicable Retention Bonus or Pro Rata Retention Bonus to Employee’s Discretionary Credit Account in the ESP II as of the date set forth in Section 9 ( Release ). The Discretionary Credits shall be paid in the form of annual installments over five (5) years in accordance with the terms of the ESP II. If Employee dies before the expiration of the installment period, the remaining installment distributions will be paid in a single lump sum payment to Employee’s designated beneficiary. Distribution of the Discretionary Credits will begin on the earliest of Employee’s Separation from Service (as defined in ESP II), death or Disability (as defined in ESP II). If Employee is a Specified Employee (as defined in ESP II), distributions due to Separation from Service will begin on the date which is six months after Employee’s Separation from Service. Employee hereby agrees to the terms and provisions of the ESP II. Employee does not have the right to select the time and form of payment of the Discretionary Credits. If Employee does not execute the release as described in Section 9 ( Release ), such Discretionary Credits shall be forfeited.
8.      Definitions .
The following words and phrases shall have the meanings set forth in this Section 8, unless a clearly different meaning is required by the context in which the word or phrase is used in this Agreement:
(a)      Cause .” For purposes of this Agreement, “Cause” shall have the meaning set forth in the PNM Resources, Inc. Officer Retention Plan.
(b)      Change in Control .” For purposes of this Agreement, “Change in Control” shall have the meaning set forth in the PNM Resources, Inc. Officer Retention Plan.
(c)      Disability .” For purposes of this Agreement, “Disability” or “Disabled” shall have the meaning set forth in the ESP II.
(d)      Pro Rata Retention Bonus .” Employee shall be entitled to receive a Pro Rata Retention Bonus if Employee is terminated without Cause or Employee dies or becomes Disabled. The amount of the “Pro Rata Retention Bonus” will equal $375,000 less any portion of Retention Bonus 1 previously paid to Employee multiplied by the following fraction:
The numerator of the fraction is the number of days that elapse between January 1, 2015 and the date on which Employee is terminated by Company without Cause, dies or becomes Disabled. The denominator of the fraction is 1,095.
The Pro Rata Retention Bonus shall be allocated to the ESP II as a Discretionary Credit in accordance with Section 7 ( Discretionary Credits Allocated to ESP II ). The Pro Rata Retention Bonus will be credited to the ESP II as of the date of Employee’s termination without Cause, death or Disability. Employee does not have the right to receive cash in lieu of the Pro Rata Retention Bonus.

4



(e)      Pro Rata Restricted Stock Rights Award .” Employee shall be entitled to receive a Pro Rata Restricted Stock Rights Award if Employee is terminated without Cause or Employee dies or becomes Disabled. The Grant Date for the Pro Rata Restricted Stock Rights Award will be the date of Employee’s termination without Cause, death or Disability. The amount of the “Pro Rata Restricted Stock Rights Award” will equal Restricted Stock Rights Awards 1 and 2 less any portion of Restricted Stock Rights Award 1 previously paid to Employee multiplied by the following fraction:
The numerator of the fraction is number of days that elapse between January 1, 2015 and the date on which Employee is terminated by Company without Cause, dies or becomes Disabled. The denominator of the fraction is 1,095.
The Pro Rata Restricted Stock Rights Award shall be paid to Employee within sixty (60) days following the date of his termination of employment, death or Disability provided Employee has executed the release as required by Section 9 ( Release ). Payments of the Pro Rata Restricted Stock Rights Awards will be made in the form of Stock of PNMR.
9.      Release .
The Retention Bonus or Pro Rata Retention Bonus shall be allocated as Discretionary Credits to the ESP II as of the earliest of (1) the applicable Retention Date, (2) Employee’s termination by Company without Cause (including death), or (3) Employee’s Disability (the “Crediting Date”). As a condition to receiving the Retention Bonus or Pro Rata Retention Bonus and the Restricted Stock Rights Award or the Pro Rata Restricted Stock Rights Award, Employee must execute and not revoke a full and general release, releasing all claims that Employee may have against Company and any Affiliate of Company arising out of and related to Employee’s employment or termination of employment with Company or its Affiliates. Such release shall be prepared by Company. Employee shall receive the Release within five (5) days of the Crediting Date. Employee shall have until the later of (1) 21 days or (2) the date on which the Employee is informed of the level of satisfaction of the Performance Deliverables to review the Release and sign it and return it to Company. In no event may Employee return the Release after March 7 of the calendar year following the Retention Date. Employee shall have seven (7) days to revoke the Release. If Employee does not sign the Release within the required time period or if Employee revokes the Release, the Discretionary Credits credited to Employee’s ESP II Account shall be forfeited and Employee will not receive the Restricted Stock Rights or the Pro Rata Restricted Stock Rights Award. For the avoidance of doubt, a Release will not be required in the event of Employee’s death.
10.      Clawback .
The Retention Bonus and the Restricted Stock Rights Awards are subject to potential forfeiture or “clawback” to the fullest extent called for by applicable federal or state law or PNMR policy. Employee hereby agrees to return the full amount required by applicable law or PNMR policy.

5



11.      Binding Nature of Agreement .
This Agreement will be binding upon and inure to the benefit of Employee and PNMR, but neither this Agreement nor any rights arising hereunder may be assigned or pledged by Employee.
12.      Severability .
If any provision of this Agreement as applied to either party or to any circumstance is adjudged by a court of competent jurisdiction to be void or unenforceable for any reason, the same will in no way affect any other provision of this Agreement or the validity or enforceability of this Agreement.
13.      Amendment or Waiver .
No provision of this Agreement may be modified, waived or discharged unless such modification, waiver or discharge is agreed to in a writing signed by Employee and an authorized officer of PNMR. No waiver by either party hereto at any time of any breach by the other party hereto of any condition or provision of this Agreement to be performed by such other party will be deemed a waiver of any other condition or provision at any time.
14.      Governing Law .
This Agreement will be governed in all respects, whether as to validity, construction, capacity, performance, or otherwise, by the laws of the State of New Mexico.
15.      Entire Agreement .
This Agreement embodies the entire agreement of the Parties respecting the payment of a Retention Bonus and Restricted Stock Rights Award to Employee.
16.      Further Assurances .
Each party agrees to cooperate fully with the other party and to execute such further instruments, documents and agreements, and to give such further written assurances, as may be reasonably requested by the other party to evidence and reflect the transactions described herein and contemplated hereby and to carry into effect the intent and purposes of this Agreement.
17.      Counterparts .
This Agreement may be executed in counterparts, each of which shall be deemed an original, but all of which together will constitute one and the same instrument.
18.      Dispute Resolution .
Any dispute over this Agreement must first be submitted in writing to the Vice President, Human Resources of PNMR, within ten (10) days of Employee becoming aware of the dispute. The President and Chief Executive Officer will issue a written decision on the dispute within ten (10) days of receipt. If Employee disagrees with the decision, Employee may appeal to the

6



Committee within ten (10) days of receipt of the decision. The Committee will issue its decision on the appeal within ten (10) business days of receipt of the appeal. The decision of the Committee shall be final and binding on all Parties to this Agreement.
19.      Section 409A Compliance .
(a)      Ban on Acceleration or Deferral . Under no circumstances may the time or schedule of any payment made or benefit provided pursuant to this Agreement be accelerated or subject to a further deferral except as otherwise permitted or required pursuant to regulations and other guidance issued pursuant to Section 409A of the Code.
(b)      No Elections . Employee does not have any right to make any election regarding the time or form of any payment due under this Agreement other than the elections made in Section 7 ( Discretionary Credits Allocated to ESP II ), which elections are irrevocable.
(c)      Compliant Operation and Interpretation . This Agreement shall be administered in accordance with Section 409A or an exception thereto, and each provision of this Agreement shall be interpreted, to the extent possible, to comply with Section 409A or to qualify for an exception thereto. Although this Agreement has been designed to comply with Section 409A or to fit within an exception to the requirements of Section 409A, PNMR specifically does not warrant such compliance. Employee remains solely responsible for any adverse tax consequences imposed upon him by Section 409A.
IN WITNESS WHEREOF, PNMR and Employee have caused this Agreement to be executed as of the date set forth below.
PNM RESOURCES, INC
By: /s/ Patrick V. Apodaca    
Its: SVP and General Counsel
December 9, 2014    
Date
Charles N. Eldred    
Employee’s Name (printed)
/s/ Charles N. Eldred    
Employee’s Signature
December 9, 2014    
Date

7


Appendix A
Performance Deliverables for December 31, 2016 Retention Date
Achieve a six percent (6%) rate of earnings growth between 1/1/15 to 12/31/2016. The rate of earnings growth is the number, expressed as a percentage, determined by dividing the Incentive Earnings Per Share for calendar year 2016 by the Incentive Earnings Per Share for calendar year 2014 and then subtracting 1 from the quotient.

The following is an example of the calculation:
     The Incentive Earnings Per Share in calendar year 2014 is 1.10.
     The Incentive Earnings Per Share in calendar year 2016 is 1.17.
     Divide 1.17 by 1.10 and subtract the result by 1.
     The result is 6%.

Incentive Earnings Per Share shall be as defined in the Officer Annual Incentive Plan for the applicable year.



Performance Deliverables for December 31, 2017 Retention Date
Achieve a nine percent (9%) rate of earnings growth between 1/1/15 to 12/31/2017. The rate of earnings growth is the number, expressed as a percentage, determined by dividing the Incentive Earnings Per Share for calendar year 2017 by the Incentive Earnings Per Share for calendar year 2014 and then subtracting 1 from the quotient.

The following is an example of the calculation:
     The Incentive Earnings Per Share in calendar year 2014 is 1.10.
     The Incentive Earnings Per Share in calendar year 2017 is 1.20.
     Divide 1.20 by 1.10 and subtract the result by 1.
     The result is 9%.

Incentive Earnings Per Share shall be as defined in the Officer Annual Incentive Plan for the applicable year.


A-1
Exhibit 10.3

EXTENSION OF LOI DEADLINE
UNDER AMENDMENT NO. SIX TO
UNDERGROUND COAL SALES AGREEMENT

SAN JUAN COAL COMPANY, a Delaware corporation (“SJCC”), PUBLIC SERVICE COMPANY OF NEW MEXICO, a New Mexico corporation (“PNM”), and TUCSON ELECTRIC POWER COMPANY, an Arizona Corporation (“TEP” and together with PNM, the “Utilities”), all parties to that certain Amendment No. Six to Underground Coal Sales Agreement dated October 2, 2014 (“Amendment Six”), do hereby agree as follows.
RECITALS
A.
All capitalized terms used but not defined herein shall have the meaning set forth in Amendment Six.

B.
SJCC and the Utilities entered into Amendment Six.

C.
Amendment Six contemplated negotiation of a Transaction involving the acquisition by the Purchaser Parties of the assets or stock of SJCC and SJTC, with the Purchaser Parties including one or more of the Utilities, an entity directly or indirectly wholly owned exclusively by either or both of the Utilities, or such other entity agreed to by the Parties.

D.
Amendment Six includes an obligation to extend the LOI Deadline to a date no later than March 31, 2015, and pursuant to that obligation the Parties previously extended the LOI Deadline to January 31, 2015.

E.
Since entering into Amendment Six, the Utilities now desire for SJCC, SJTC and BBNMC to negotiate with one or more third parties, as agreed by the Parties, as potential Purchaser Parties (each a “Third Party” and collectively, “Third Parties”), to extend the LOI Deadline to May 1, 2015, and to conclude a Purchase Agreement with a Third Party by no later than May 1, 2015.

F.
SJCC, SJTC and BBNMC are willing to further extend the LOI Deadline until May 1, 2015 and to pursue negotiations of a Purchase Agreement with Third Parties identified by the Utilities under the terms and conditions set forth in this Agreement.
AGREEMENT
NOW THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereto agree as follows:




1.
The LOI Deadline under Amendment Six is extended until 5:00 p.m., Farmington, New Mexico time on May 1, 2015 under the following conditions:

a.
The LOI Deadline is now understood to contemplate execution of a Purchase Agreement between SJCC, SJTC and BBNMC and a Third Party, rather than an LOI between SJCC, SJTC and BBNMC and the Utilities.
b.
Purchaser Parties is understood to include Third Parties.
c.
If no Purchase Agreement is entered into by the LOI Deadline, then the Parties have no further obligations (including those contemplated by the second paragraph of Section 12.6(A) of the UG-CSA) to negotiate a Purchase Agreement beyond the LOI Deadline unless mutually agreed in writing by the Parties.
d.
In the sole judgment of BBNMC, SJCC and SJTC, for reasons, including, but not limited to, the consideration or other terms and conditions of the Purchase Agreement are unacceptable, BBNMC, SJCC and SJTC may elect not to continue with negotiations or enter into a Purchase Agreement. In addition, in the sole judgment of the Utilities, for reasons, including, but not limited to, the coal price under the proposed Coal Sales Agreement with a Third Party (“Coal Sales Agreement”) or other terms and conditions of the Coal Sales Agreement or Purchase Agreement are unacceptable, the Utilities may elect not to continue with negotiations or enter into a Coal Sales Agreement.

2.
To the extent of any conflict between the terms of the Amendment Six and this Agreement, this Agreement shall control.

[SIGNATURE PAGES FOLLOW]




IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed on their behalf by their respective officers, thereunto duly authorized.
Public Service Company of New Mexico

By:_ /s/ Charles N. Eldred ____________
Name:_ Charles N. Eldred ___________
Title:_ Executive Vice President _______
and Chief Financial Officer          Date:__ February 20, 2015 ___


Tucson Electric Power Company

By:_ /s/ Mark C. Mansfield ____________
Name:_ Mark C. Mansfield ___________
Title:___ VP Energy Resources _________                 Date:__ 20 Feb 2015 _________

San Juan Coal Company


By:_ /s/ Patrick Risner ______________
Name:_ Patrick Risner ______________
Title:___ President _________________                 Date:__ 18 Feb 2015 _________

San Juan Transportation Company and BHP Billiton New Mexico Coal, Inc. hereby acknowledge and agree to the terms of this Extension of LOI Deadline with the understanding that this commitment does not make these entities a party to the UG-CSA for any purpose:

San Juan Transportation Company

By:_ /s/ Patrick Risner ______________
Name:_ Patrick Risner ______________
Title:___ President _________________                 Date:__ 18 Feb 2015 _________


BHP Billiton New Mexico Coal, Inc.

By:_ /s/ Patrick Risner ______________
Name:_ Patrick Risner ______________
Title:___ President _________________                 Date:__ 18 Feb 2015 _________



Exhibit 10.4.1            
SHAREWORKS
Template Type Group: Grant Agreement
Template Type: Grant Agreement Template
Template Name: PNM Officer Performance Share Grant Agreement
Language (s): English
Label: Agreement
HTML:
Acknowledgment Form


###GRANT DATE###

###PARTICIPANT NAME###

Dear ###PARTICIPANT_ NAME###:

Pursuant to the PNM Resources, Inc. 20__ Long-Term Performance Plan (‘LTIP’), you have earned____ shares of stock of PNM Resources, Inc. as outlined below.

 
 
 
 
Employee ID:
_______________
 
Granted To:
_______________

 
Grant ID:
_______________

 
Grant Date:
_______________

 
Granted:
_______________

 
Grant Price:
$0.0000
 
 
 
 
Vesting Schedule
: 100% immediately

By my acceptance below, I hereby (1) accept delivery of the shares, which are being issued to me under the LTIP and the PNM Resources, Inc. Second Amended and Restated Omnibus Performance Equity Plan, as amended (the ‘Plan’) and (2) acknowledge my prior receipt of the LTIP and the Plan. If you need additional copies of the LTIP and the Plan, please contact Gail Vavruska-Marcum at 505-241-4631.

[I ACCEPT/ACCEPTANCE BUTTON]




Exhibit 10.4.2        
SHAREWORKS
Template Type Group: Grant Agreement
Template Type: Grant Agreement Template
Template Name: PNM Officer RSA Grant Agreement
Language (s): English
Label: Agreement
HTML:
Acknowledgment Form

###GRANT_DATE###

###PARTICIPANT NAME###

Dear ###PARTICIPANT_ NAME###:

Pursuant to the PNM Resources, Inc. 20__ Long-Term Incentive Plan (the ‘LTIP’), you have been granted a Restricted Stock Rights Award for ____ shares of stock of PNM Resources, Inc. as outlined below.

 
 
 
 
Employee ID:
_______________
 
Granted To:
_______________

 
Grant ID:
_______________

 
Grant Date:
_______________

 
Granted:
_______________

 
Grant Price:
$0.0000
 
 
 
 
Vesting Schedule:
One-third per year for 3 years
### on 3/_/__
### on 3/_/__
### on 3/_/__

By my acceptance below, I hereby (1) acknowledge receipt of this Grant on the date shown above, which has been issued to me under the LTIP and the attached PNM Resources, Inc. 2014 Performance Equity Plan (the ‘Plan’), (2) acknowledge my prior receipt of the Plan and the LTIP, and (3) agree to conform to all of the terms and conditions of the Grant set forth in the Plan and the LTIP. For an additional copy of the LTIP, please contact Gail Vavruska-Marcum at 505-341-4631.

[I ACCEPT/ACCEPTANCE BUTTON]



Exhibit 10.4.3            
SHAREWORKS
Template Type Group: Grant Agreement
Template Type: Grant Agreement Template
Template Name: PNM Director RSA Grant Agreement
Language (s): English
Label: Agreement
HTML:
Acknowledgment Form


###GRANT_DATE###

###PARTICIPANT NAME###

Dear ###PARTICIPANT_ NAME###:

Pursuant to the PNM Resources, Inc. 2014 Performance Equity Plan (the ‘Plan’), you have been granted a Restricted Stock Rights Award for ____ shares of stock of PNM Resources, Inc. as outlined below.

 
 
 
 
Employee ID:
_______________
 
Granted To:
_______________

 
Grant ID:
_______________

 
Grant Date:
_______________

 
Granted:
_______________

 
Grant Price:
$0.0000
 
 
 
 
Vesting Schedule:
One-third per year for 3 years
### on 5/__/__
### on 5/__/__
### on 5/__/__

By my acceptance below, I hereby (1) acknowledge receipt of this Grant on the date shown above, which has been issued to me under the attached Terms and Conditions and the Plan , (2) acknowledge receipt of the copy of the Plan and the Terms and Conditions of this Grant, and (3) agree to conform to all of the attached Terms and Conditions of the Grant and the Plan.

[I ACCEPT/ACCEPTANCE BUTTON]





Terms and Conditions of Restricted Stock Rights Award to Non-Employee Directors

Pursuant to the PNM Resources, Inc. 2014 Performance Equity Plan, you have been granted a Restricted Stock Rights Award for the number of shares specified on the Acknowledgment Form attached. The Acknowledgment Form and these Terms and Conditions are collectively referred to as the “Award Document.”

The Restricted Stock Rights Award is subject to all of the provisions set forth in the PNM Resources, Inc. 2014 Performance Equity Plan (the “Plan”) and this Award Document. Capitalized terms used in the Award Document that are not otherwise defined herein shall have the meanings given to such terms in the Plan.
1.
Vesting .
(a)
The Restricted Stock Rights Award shall vest in accordance with the vesting schedule on the Acknowledgment Form.
(b)
If you have a Termination of Service as a Nonemployee Director, any nonvested Restricted Stock Rights Award will vest pursuant to Section 9.4 of the Plan.
2.
Form and Timing of Delivery of Stock .
(a)
If the Restricted Stock Rights vest as described on the Acknowledgment Form, you will receive the Stock payable with respect to such vested Restricted Stock Rights Award within ninety (90) days following the dates on which the Restricted Stock Rights vest.
(b)
If any Restricted Stock Rights vest as described in Section 1(b), you will receive the Stock payable with respect to such Restricted Stock Rights within ninety (90) days following your Termination of Service.
3.
Dividend Equivalents . You will not be entitled to receive a dividend equivalent for any of the Restricted Stock Rights granted hereunder.
4.
Voting Rights . You will have no voting rights with respect to nonvested Restricted Stock Rights.
5.
Clawback . All or any portion of this Restricted Stock Rights Award is subject to recapture or “clawback” to the extent necessary to comply with Company policy or applicable law. By accepting this Award, you agree to be bound by, and comply with, the terms of any such recapture or clawback provisions and with any Company request or demand for a recapture or clawback.
6.
Waiver and Modification . The provisions of this Award Document may not be waived or modified unless such waiver or modification is in writing signed by the Company.


MANY OF THE PROVISIONS OF THIS AWARD DOCUMENT ARE SUMMARIES OF SIMILAR OR PERTINENT PROVISIONS OF THE PLAN. TO THE EXTENT THIS AWARD DOCUMENT IS SILENT ON AN ISSUE OR THERE IS A CONFLICT BETWEEN THE PLAN AND THIS AWARD DOCUMENT, THE PLAN PROVISIONS SHALL CONTROL


Exhibit 10.4.4

EMPLOYEE RETENTION AGREEMENT
THIS AGREEMENT is entered into by and between PNMR Services Company (the “Company”) and Thomas G. Sategna (the “Employee”) (collectively, the “Parties”).
RECITALS:
The Employee has provided notice to the Company that he wants to voluntarily retire. The Company wishes to have Employee continue providing his services and continue his employment through December 31, 2015. The parties agree that Employee may step down from his position of Vice President and Corporate Controller as of March 31, 2015 but will continue his employment through December 31, 2015.
To incentivize Employee to continue through the Retention Date, meet certain performance measures, and ensure that Employee will not provide services for a competing business in accordance with the terms hereof, Employee will be eligible for a “Retention Bonus” and a “Performance Bonus” as specified by this Agreement.
TERMS AND CONDITIONS:
1. Effective Date of Agreement .
This Agreement shall be effective on January 1, 2015 (the “Effective Date”).
2.      Scope of Agreement; At Will Employment .
Other than expressly set forth in this Agreement, all terms and conditions of the Employee’s employment are unchanged and are determined pursuant to Company’s employment policies and practices unless otherwise specifically modified by this Agreement.
During the term of this Agreement, Employee will continue to devote substantially all of Employee’s undivided working time, attention, knowledge, and skills to Employee’s current job assignment, or as may be assigned from time to time.
Employee acknowledges that Employee’s employment by the Company remains “at-will” and that Employee or the Company may terminate the employment relationship at any time for any reason. If the employment relationship between the parties ends during the term of this Agreement, this Agreement will only govern the terms of the payment of the Retention Bonus and the Performance Bonus.
3.      Retention Bonus and Performance Bonus .
Employee shall be entitled to a Retention Bonus of $222,000, if: (1) Employee remains employed by the Company through the Retention Date, (2) Employee continues to devote substantially all of Employee’s undivided working time, attention, knowledge, and skills to Employee’s job assignment as determined by management in its discretion, (3) Employee executes and does not revoke the release called for by Section 11 ( Release ) and (4) Employee complies with the terms of the Restrictive Covenant Agreement described in Section 12 ( Supplemental Restrictive Covenant Agreement ) and Appendix B.




Employee also shall be entitled to a Performance Bonus if (1) Employee remains employed by the Company through the Retention Date, (2) Employee continues to devote substantially all of Employee’s undivided working time, attention, knowledge, and skills to Employee’s job assignment as determined by management in its discretion, (3) Employee completes the Performance Deliverables listed on Appendix A prior to the Retention Date, (4) Employee executes and does not revoke the release in accordance with Section 11 ( Release ) and (5) Employee complies with the terms of the Supplemental Restrictive Covenant Agreement described in Section 12 ( Supplemental Restrictive Covenant Agreement ) and Appendix B.
If, in the discretion of the Company’s Chief Financial Officer, the Performance Deliverables are achieved at an exceptional level as determined by the Chief Financial Officer, the Performance Bonus shall be in an amount equal to $125,000. If, in the discretion of the Company’s Chief Financial Officer, the Performance Deliverables are achieved at an acceptable level as determined by the Chief Financial Officer, the Performance Bonus shall be in an amount equal to $75,000. If, in the discretion of the Chief Financial Officer, the Performance Deliverables are achieved, but at a less than acceptable level as determined by the Chief Financial Officer, the Chief Financial Officer has the full discretion and authority to reduce the Performance Bonus to an amount between $0 and $75,000.
The Retention Bonus and the Performance Bonus payments made pursuant to this Agreement shall be subject to withholding of applicable income and employment taxes. The Retention Bonus and the Performance Bonus will be classified for payroll and other purposes as Employee Recognition Awards (“ERA”).
4.      Termination of Employment .
(a)      Termination by Company without Cause . Company may terminate Employee’s employment without “Cause” prior to the Retention Date (including following a Change in Control), by providing Employee with 30 days advance written notice of termination. The notice of termination shall be accompanied by the release required by Section 11 ( Release ). Company may prohibit or restrict Employee’s access to Company premises during the 30-day notice period and may place Employee on a paid leave of absence during all or any portion of the notice period. Employee’s termination of employment will be effective on the last day of the notice period. If Company terminates Employee’s employment without Cause pursuant to this Section, Employee will receive a Pro Rata Bonus (as defined below) which shall be payable on Employee’s last day of employment, provided Employee executes and does not revoke the release required by Section 11 ( Release ) at the time specified in Section 11 ( Release ). In such instance, Employee will not be entitled to receive benefits pursuant to the PNM Resources, Inc. Non-Union Severance Pay Plan.
(b)      Termination by Company for Cause . If the Company terminates Employee’s employment for “Cause” prior to the Retention Date, Employee will not be entitled to receive the Retention Bonus or the Performance Bonus.
(c)      Termination by Employee . If Employee terminates employment for any reason prior to the Retention Date, the Employee will not be entitled to receive the Retention Bonus or the Performance Bonus.

2


5.      Disability .
If Employee becomes Disabled prior to the Retention Date, Employee will receive a Pro Rata Bonus. As a condition to receiving the Pro Rata Bonus, Employee must execute and not revoke the release required by Section 11 ( Release ) at the time specified in Section 11 ( Release ). If Employee becomes Disabled and entitled to a payment pursuant to this Section, the Company will not terminate Employee’s employment until at least 30 days following the effective date of Employee’s Disability.
6.      Death .
If Employee dies prior to the Retention Date, Employee shall receive a Pro Rata Bonus. In such instance, the Pro Rata Bonus will not be deferred into the ESP II pursuant to Section 7 ( Deferral into Executive Savings Plan II ) and instead will be paid in a single lump sum within thirty (30) days of the date of the Employee’s death.
7.      Deferral into Executive Savings Plan II
If Employee receives the Retention Bonus and Performance Bonus, or a Pro Rata Bonus, due to the events listed in Sections 3 ( Retention Bonus and Performance Bonus ), 4(a) ( Termination of Employment – Termination by Company without Cause ) or 5 ( Disability ), Employee hereby elects to defer 100% of the Retention Bonus and 100% of the Performance Bonus into the PNM Resources, Inc. Executive Savings Plan II (the “ESP II”) as a Supplemental Deferral. This Supplemental Deferral shall be referred to as Employee’s “Retention Bonus Supplemental Deferral.” Employee hereby elects to have his Retention Bonus Supplemental Deferral paid in the form of annual installments over five (5) years in accordance with the terms of the ESP II. If Employee dies before the expiration of the installment period, the remaining installment distributions will be paid in a single lump sum payment to Employee’s designated beneficiary. Distribution of Employee’s Retention Bonus Supplemental Deferral will begin on the earliest of Employee’s Separation from Service (as defined in ESP II), death or Disability (as defined in ESP II). If Employee is a Specified Employee (as defined in ESP II), distributions due to Separation from Service will begin on the date which is six months after Employee’s Separation from Service. Employee hereby agrees to the terms and provisions of the ESP II. Employee understands that his elections are irrevocable.
8.      Participation in Incentive Plans .
Notwithstanding anything in any incentive plan to the contrary, Employee acknowledges that he will not be eligible to participate in the PNM Resources, Inc. 2015 Annual Incentive Plan, the PNM Resources, Inc. 2015 Officer Annual Incentive Plan or the PNM Resources, Inc. 2015 Long-Term Incentive Plan. Employee also acknowledges that pursuant to the terms of the PNM Resources, Inc. 2014 Long-Term Incentive Plan (“2014 LTIP”), he is not eligible to receive any awards under the 2014 LTIP.
For the avoidance of doubt, Employee also acknowledges that he is not eligible under the terms of the PNM Resources, Inc. 2013 Long-Term Incentive Plan (the “2013 LTIP”) to receive a grant of time vested Restricted Stock Rights pursuant to the 2013 LTIP.

3


Employee shall be eligible to receive a grant of time vested Restricted Stock Rights pursuant to the PNM Resources, Inc. 2012 Long-Term Incentive Plan (the “2012 LTIP”), subject to the terms and conditions of the 2012 LTIP.
Employee shall be eligible to receive a Performance Share Award pursuant to the 2013 LTIP and the 2012 LTIP, subject to the terms and conditions of the 2013 LTIP and 2012 LTIP.
9.      Definitions .
The following words and phrases shall have the meanings set forth in this Section 9, unless a clearly different meaning is required by the context in which the word or phrase is used in this Agreement:
(a)      Cause .” For purposes of this Agreement, “Cause” shall have the meaning set forth in the PNM Resources, Inc. Officer Retention Plan.
(b)      Change in Control .” For purposes of this Agreement, “Change in Control” has the meaning ascribed to that term in the Retention Plan in which the Employee participates ( i.e. , the Officer Retention Plan or the Employee Retention Plan) at the time of the closing of a transaction or the occurrence of an event that results in the Change in Control.
(c)      Disability .” For purposes of this Agreement, “Disability” or “Disabled” shall have the meaning set forth in the ESP II.
(d)      Effective Date .” The “Effective Date” of this Agreement is January 1, 2015.
(e)      Pro Rata Bonus .” A Pro Rata Bonus will be paid to the Employee if he is terminated without Cause or the Employee dies or becomes Disabled. The amount of the “Pro Rata Bonus” will equal $297,000 multiplied by a fraction. The numerator of the fraction is the number of days that elapse between the April 1, 2015 and the date on which the Employee is terminated by the Company without Cause, dies or becomes Disabled. The denominator of the fraction is 275. If Employee terminates employment for any reason prior to April 1, 2015, Employee shall not be entitled to a Pro Rata Bonus.
(f)      Retention Date .” The “Retention Date” for purposes of this Agreement is December 23, 2015.
10.      Confidentiality .
Employee understands and agrees that the terms of this Agreement are to remain confidential and are to be made known only to his immediate family, attorneys, tax authorities upon request, and tax advisors and accountants for purposes of any tax preparation or reporting that may be required. Employee will not divulge or discuss, directly or indirectly, in any newspaper, electronic media, or other public or private forum, or with any third parties (including current or former employees of the Company or its affiliates) the terms of this Agreement unless specifically ordered to do so by a court of competent jurisdiction (in which case the Company will be first notified and given a reasonable opportunity to challenge the order or proposed court order). Furthermore, Employee will use all reasonable efforts to ensure that

4


his agents, other family members, friends, co-workers, former co-workers and acquaintances do not discover or publicize the terms of this Agreement. Employee understands and agrees that this confidentiality provision is a material term of this Agreement.
11.      Release .
As a condition to receiving the Retention Bonus and the Performance Bonus or a Pro Rata Bonus, Employee must execute and not revoke a full and general release, releasing all claims that Employee may have against the Company and any affiliate of the Company arising out of and related to Employee’s employment or termination of employment with the Company or its affiliates. Such release shall be prepared by the Company. In no event will a payment be made pursuant to this Agreement after March 31, 2016.
(a)      Voluntary Termination at the End of the Retention Period . If Employee remains employed through the Retention Date, Employee will receive the Release no later than November 23, 2015 and must sign the Release and return it to the Company on December 14, 2015. Employee shall have until 9:00 a.m. MST on December 22, 2015 to revoke the Release after execution. If Employee does not revoke the Release, Employee shall be eligible to “receive” the Retention Bonus and the Performance Bonus on December 23, 2015, but such Retention Bonus and Performance Bonus shall be deferred into the ESP II pursuant to Section 7 ( Deferral into Executive Savings Plan II ).
(b)      Termination by Company without Cause . If Employee’s employment is terminated by the Company without Cause prior to the Retention Date, Employee shall receive the Release at the time the notice of termination is provided to Employee. Employee shall have 21 calendar days to review the Release and sign it and return it to the Company. Employee shall have seven (7) calendar days to revoke the Release. If Employee does not revoke the Release, Employee shall be eligible to “receive” the Pro Rata Bonus on his last day of employment, but such Pro Rata Bonus shall be deferred into the ESP II pursuant to Section 7 ( Deferral into Executive Savings Plan II ).
(c)      Disability . If Employee becomes Disabled, Employee will receive the Release on the effective date of his Disability. Employee will have twenty-one (21) calendar days to consider the Release and return it to the Company. Employee shall have seven (7) calendar days to revoke the Release after execution. If Employee does not revoke the Release, Employee shall be eligible to “receive” the Pro Rata Bonus on the expiration of the Release revocation period, but such Pro Rata Bonus shall be deferred into the ESP II pursuant to Section 7 ( Deferral into Executive Savings Plan II ).
12.      Supplemental Restrictive Covenant Agreement .
In addition to satisfying the requirements of Section 3 ( Retention Bonus and Performance Bonus ), in order to be eligible for both the Retention Bonus and the Performance Bonus or a Pro Rata Bonus, Employee must comply with the terms and conditions of the Supplemental Restrictive Covenant Agreement, which is attached as Appendix B. If Employee violates the terms and conditions of the Supplemental Restrictive Covenant Agreement, a total of $50,000 of the Retention Bonus, the Performance Bonus, and/or the Pro Rata Bonus not yet paid to Employee will be forfeited and will be deemed to compensate the Company for some, but not all,

5


of the damages sustained by the Company. The parties acknowledge and agree that in the event Employee breaches the Supplemental Restrictive Covenant Agreement, the Company will sustain no less than $50,000 in damages. The parties further acknowledge and agree that this $50,000 is not intended to be, and is not to be construed as, liquidated damages and that, if Employee breaches the Supplemental Restrictive Covenant Agreement, the Company will also suffer irreparable harm that can only be remedied by injunctive relief prohibiting Employee from engaging in activities that would continue to breach the Supplemental Restrictive Covenant Agreement. The parties further acknowledge and agree that nothing herein is intended to restrict or otherwise modify the Company’s right to seek injunctive relief and/or additional monetary damages for a violation of the Supplemental Restrictive Covenant Agreement.
13.      Clawback .
The Retention Bonus and the Performance Bonus are subject to potential forfeiture or “clawback” to the fullest extent called for by applicable federal or state law or Company policy. The Employee hereby agrees to return the full amount required by applicable law or Company policy.
14.      Binding Nature of Agreement .
This Agreement will be binding upon and inure to the benefit of Employee and Company, but neither this Agreement nor any rights arising hereunder may be assigned or pledged by Employee.
15.      Severability .
If any provision of this Agreement as applied to either party or to any circumstances is adjudged by a court of competent jurisdiction to be void or unenforceable for any reason, the same will in no way affect any other provision of this Agreement or the validity or enforceability of this Agreement.
16.      Amendment or Waiver .
No provision of this Agreement may be modified, waived or discharged unless such modification, waiver or discharge is agreed to in a writing signed by Employee and an authorized officer of Company. No waiver by either party hereto at any time of any breach by the other party hereto of any condition or provision of this Agreement to be performed by such other party will be deemed a waiver of any other condition or provision at any time.
17.      Governing Law .
This Agreement will be governed in all respects, whether as to validity, construction, capacity, performance, or otherwise, by the laws of the State of New Mexico.
18.      Entire Agreement .
This Agreement embodies the entire agreement of the Parties respecting the payment of a Retention Bonus and a Performance Bonus to Employee, and the other terms expressly set forth in this Agreement.

6


19.      Further Assurances .
Each party agrees to cooperate fully with the other party and to execute such further instruments, documents and agreements, and to give such further written assurances, as may be reasonably requested by the other party to evidence and reflect the transactions described herein and contemplated hereby and to carry into effect the intent and purposes of this Agreement.
20.      Counterparts .
This Agreement may be executed in counterparts, each of which shall be deemed an original, but all of which together will constitute one and the same instrument.
21.      Dispute Resolution .
Any dispute over this Agreement must first be submitted in writing to the Vice President, Human Resources of the Company, within ten (10) days of the Employee becoming aware of the dispute. The Vice President, Human Resources will issue a written decision on the dispute within ten (10) days of receipt. If the Employee disagrees with the decision, the Employee may appeal to the PNM Resources, Inc. Benefits Governance Committee within ten (10) days of receipt of the decision. The Benefits Governance Committee will issue its decision on the appeal within ten (10) business days of receipt of the appeal. The decision of the PNM Resources, Inc. Benefits Governance Committee shall be final and binding on all parties to this Agreement.
22.      Section 409A Compliance .
(a)      Ban on Acceleration or Deferral . Under no circumstances may the time or schedule of any payment made or benefit provided pursuant to this Agreement be accelerated or subject to a further deferral except as otherwise permitted or required pursuant to regulations and other guidance issued pursuant to Section 409A of the Code.
(b)      No Elections . Employee does not have any right to make any election regarding the time or form of any payment due under this Agreement other than the elections made in Section 7 ( Deferral into Executive Savings Plan II ), which elections are irrevocable.
(c)      Compliant Operation and Interpretation . This Agreement shall be administered in accordance with Section 409A or an exception thereto, and each provision of this Agreement shall be interpreted, to the extent possible, to comply with Section 409A or to qualify for an exception thereto. Although this Agreement has been designed to comply with Section 409A or to fit within an exception to the requirements of Section 409A of the Code, the Company specifically does not warrant such compliance. Employee remains solely responsible for any adverse tax consequences imposed upon him by Section 409A.

7


IN WITNESS WHEREOF, the Company and Employee have caused this Agreement to be executed as of the date set forth below.
PNMR SERVICES COMPANY
By: /s/ CN Eldred    
Its: Chief Financial Officer and Executive VP
12-9-2014    
Date
Thomas G. Sategna    
Employee’s Name (printed)
/s/ Tom Sategna    
Employee’s Signature
12/9/2014    
Date


8


Appendix A
Performance Deliverable
1. Mentor named VP and Corporate Controller throughout Retention period and provide guidance as needed.

2. Review and discuss monthly financial statements with named VP and Corporate Controller, including variance analysis and write-up for CEO and CFO on results of operation.

3. Review quarterly results and attend quarterly variance meetings for income statement and balance sheet reviews in preparation for filing 1 st , 2 nd  and 3 rd  quarter 10-Q filings with the SEC.

4. Attend quarterly due diligence meetings in connection with 1 st , 2 nd , and 3 rd  quarter 10-Q filings.

5. Review and provide comments to the 1 st , 2 nd , and 3 rd  quarter 10-Q filings.

6. Work on year-end reporting issues/requirements with named VP and Corporate Controller in anticipation of 2015 year-end close and filing of the 2015 10-K.

7. Leverage regulatory experience in assisting with any of PNM’s regulatory filings, including reviewing testimony, participating in strategic decisions for filings, etc.

8. Leverage staff and intervener relationships regarding settlements of any regulatory proceedings before the NMPRC, as requested.

9. Work on special assignments from CFO as requested.

10. Attend and participate in VP and all officer meetings as appropriate.

11. Other duties as requested.

The Chief Financial Officer has the full discretion and authority to determine if each Performance Deliverable has been met by Employee. The Chief Financial Officer has the full discretion to increase or reduce the Performance Bonus based on the level of attainment of the Performance Deliverables, within the parameters described in Section 3 ( Retention Bonus and Performance Bonus ) of the Agreement.


A-1


Appendix B
SUPPLEMENTAL RESTRICTIVE COVENANT AGREEMENT
This Supplemental Restrictive Covenant Agreement (this “ Agreement ”), is entered into effective as of January 1, 2015 by and between PNMR Services Company (the “ Company ”) and Thomas G. Sategna (“ Employee ”).
RECITALS
In exchange for the Performance Bonus and the Retention Bonus or a Pro Rata Bonus described in the attached Agreement and other good and valuable consideration, the sufficiency of which is hereby acknowledged, Employee understands and agrees to the terms set forth in this Agreement.
The purpose of this Agreement is to supplement the existing Restrictive Covenant Agreement dated May 15, 2012.
AGREEMENT
NOW, THEREFORE, Company and Employee agree as follows:
1. NON-COMPETITION . Employee agrees that for the duration of the “Restricted Period” (as defined below) Employee will not, without the prior written consent of Company: (1) engage in a “Competing Business” (as defined below) in the “Restricted Territory” (as defined below).
For purposes of this Agreement, Employee shall be deemed to be engaged in a Competing Business if, in any capacity, including but not limited to, proprietor, shareholder, partner, officer, lender, guarantor of debts or obligations, director, employee, or agent, Employee engages or participates directly or indirectly in the operation, ownership or management of any proprietorship, partnership, corporation, limited liability company, or other business entity that engages in any Competing Business within the Restricted Territory. A “Competing Business” is any person or entity that has negotiated or will negotiate with PNM Resources, Inc. (“PNMR”), or otherwise has engaged or will engage in efforts, to acquire all or part of PNMR or any of its Affiliates, including but not limited to acquisition through the purchase of stock, assets, or any other type of direct or indirect acquisition of PNMR or any of its Affiliates, whether or not such acquisition is successful.
2. RESTRICTED TERRITORY DEFINED . For purposes of Section 1, Section 2, and Section 3 (collectively, the “Restrictive Covenants”), the term “Restricted Territory” shall mean the continent of North America.
3. RESTRICTED PERIOD DEFINED . For purposes of the Restrictive Covenants, the term “Restricted Period” shall mean the period during Employee’s employment with the Company and continuing for the 24-month period following the termination of such employment. In the event that a court of competent jurisdiction determines that the Restricted Period described in the preceding sentence is excessive, the parties agree that the Restricted

B-1


Period shall mean the period during Employee’s employment with the Company and continuing for the 18-month period following the termination of such employment. In the event that a court of competent jurisdiction determines that the Restricted Period as modified in the preceding sentence is still excessive, the parties agree that the Restricted Period shall mean the period during Employee’s employment with the Company and continuing for the 12-month period following the termination of such employment.
4. REMEDIES; REASONABLENESS . Employee acknowledges and agrees that a breach by Employee of the Restrictive Covenants of this Agreement will constitute irreparable damage to Company, the exact amount of which will be impossible to ascertain and, for that reason, agrees that Company will be entitled to an injunction to be issued by any court of competent jurisdiction restraining and enjoining Employee from violating the provisions of the Restrictive Covenants. If Employee violates the terms and conditions of this Agreement, a total of $50,000 of the Retention Bonus, the Performance Bonus, and/or the Pro Rata Bonus (pursuant to the Employee Retention Agreement) not yet paid to Employee will be forfeited and will be deemed to compensate the Company for some, but not all, of the damages sustained by the Company. The parties acknowledge and agree that in the event Employee breaches this Agreement, the Company will sustain no less than $50,000 in damages. The parties further acknowledge and agree that this $50,000 is not intended to be, and is not to be construed as, liquidated damages and that, if Employee breaches this Agreement, the Company will also suffer irreparable harm that can only be remedied by injunctive relief prohibiting Employee from engaging in activities that would continue to breach this Agreement. The parties further acknowledge and agree that nothing herein is intended to restrict or otherwise modify the Company’s right to seek injunctive relief and/or additional monetary damages for a violation of this Agreement.
Employee expressly acknowledges and agrees that: (1) the provisions of the Restrictive Covenants contained herein are reasonable as to time and geographical area and do not place an unreasonable burden upon Employee, (2) Employee will be able to continue earning a livelihood while still complying with the Restrictive Covenants, (3) the public will not be harmed as a result of enforcement of these Restrictive Covenants, and (4) Employee understands and hereby agrees to each and every term and condition of the Restrictive Covenants set forth in this Agreement.
5. CONFIDENTIAL INFORMATION .
(a) Proprietary Information . Employee and Company hereby acknowledge and agree that in connection with the performance of Employee’s services, Employee shall be provided with or shall otherwise be exposed to or receive certain proprietary information of Company. Such proprietary information shall include, without limitation, any written, oral, electronic or any other form of information including the following: (1) past, present and future customer lists, consultant lists, and customer information as compiled by Company, including proposals for services, pricing, customer contact information, customer lists, sale and contract terms and conditions, contract expirations, and other compiled customer information; (2) Company’s own internal practices, procedures, and strategies; (3) Company’s financial condition and financial results of operation; (4) credit information and technical environments concerning Company or Company’s clients; (5) supply of material information, including sources and costs; (6) information in any form relating to Trade Secrets (as defined below), Intellectual Property (as defined below), confidential information, ideas, designs, products, descriptions, parts, test data, reports, recommendations, the Company’s research

B-2


and development, strategic planning, finance, marketing, and promotional activities and strategies, whether now existing, or planned, developed, or made available anytime in the future to the Company; (7) acquisition plans and other strategic plans; (8) all information which is designated as confidential, which the Employee has a reasonable basis to consider confidential or which is treated by the Company as confidential, including confidential or proprietary information from third parties, Company Customers, or Company Vendors; and (9) any and all information that has independent economic value to the Company, that is not generally known to and not readily ascertainable by proper means by an individual or entity who can obtain economic value from its disclosure or use (all of the foregoing shall be deemed “Proprietary Information” for purposes of this Agreement). The term “Proprietary Information” does not include information which (1) becomes generally available to the public other than as a result of a disclosure by Employee contrary to the terms of this Agreement, (2) was available on a non-confidential basis prior to its disclosure, or (3) becomes available on a non-confidential basis from a source other than Employee, provided that such source is not contractually obligated to keep such information confidential. Employee hereby agrees that, without the prior written consent of Company, any and all Proprietary Information shall be and shall forever remain the property of Company, and that during and after the Employee’s employment with Company, Employee shall not in any way disclose or reveal the Proprietary Information other than to Company’s Employees, officers and other employees and agents in the normal course of Employee’s employment, or as required pursuant to an order issued by a court of competent jurisdiction or other governmental agency.
(b) Trade Secrets . Employee, prior to and during this Agreement, has had and will have access to and become acquainted with various trade secrets which are owned by Company and are regularly used in the operation of its business and which may give Company an opportunity to obtain an advantage over competitors who do not know or use such trade secrets. Employee agrees and acknowledges that Employee has been granted access to these valuable trade secrets only by virtue of the confidential relationship created by Employee’s employment with Company. Employee shall not disclose any of the aforesaid trade secrets, directly or indirectly, or use them in any way, either during the Employee’s employment with Company or at any time thereafter, except as required in the course of employment by Company and for its benefit, or as required pursuant to an order issued by a court of competent jurisdiction or other governmental agency.
(c) Intellectual Property . “Intellectual Property” shall include inventions (whether or not patentable), patents, copyrights, trademarks (together with the good will of the business symbolized by said trademarks), domain names, trade secrets, rights of publicity, database rights, works of authorship, mask works, moral rights, designs, discoveries, know-how, show-how, ideas and information made or conceived or reduced to practice and all related or other intellectual and industrial property rights of any sort throughout the world, including all improvements and/or derivative works growing out of or relating to the foregoing, in whole or in part, conceived, created, developed, discovered or reduced to practice during the term of employment with Company and, to the extent allowed by law, during the Restricted Period, so far as it (1) relates, directly or indirectly, to Company’s Business, (2) results from or are suggested by any work assigned to or performed by Employee for Company, or (3) is used to develop or improve any Company equipment, supplies, facility, product, software, service, or trade secret, whether or not such Intellectual Property is developed entirely on Employee’s own time and with or without use of Company property.

B-3


Employee acknowledges and agrees that all Intellectual Property, whether the same is derived from the use of Proprietary Information or otherwise developed or conceived of by Employee, shall be and shall remain the exclusive property of Company. Employee further agrees that for a period of 12 months after the employment period, there shall be an irrebuttable presumption that all Intellectual Property that relates to services rendered hereunder developed, formulated, created, or conceived by Employee were derived from the use of Proprietary Information or were otherwise developed, formulated, created, or conceived of by Employee during the Employee’s employment with Company, and, as such, the same shall be and shall remain the exclusive property of Company. Employee shall promptly disclose to Company all written and graphic materials, computer software, inventions, discoveries and improvements authored, prepared, conceived or made by, for or at the direction of Employee during the Employee’s employment with Company and which are related to the Intellectual Property or the business of Company, and shall execute all such documents and instruments, including but not limited to any assignments and invention disclosure documents, as Company may reasonably determine are necessary or desirable in order to give effect to the preceding sentence or to preserve, protect or enforce Company’s rights with respect to any such work and any Intellectual Property therein.
(d) Ownership of Documents . Company shall own all papers, records, books, drawings, documents, manuals, and anything of a similar nature (collectively, the “Documents”) prepared by Employee in connection with the Employee’s employment. The Documents shall be the property of Company and are not to be used on other projects except upon Company’s prior written consent. Upon termination of the Employee’s employment, or as may be requested earlier by the Company, Employee shall surrender to Company any and all Documents or other property of whatsoever kind now or hereafter in Employee’s possession, custody, or control which contain or reflect in any manner whatsoever Proprietary Information or information which in any way relates to Company’s business.
6. GENERAL PROVISIONS .
(a)      No Conflicting Agreements . Employee acknowledges that he has no commitments or obligations inconsistent with this Agreement and hereby agrees to indemnify and hold the Company harmless against any and all loss, damage, liability, or expense arising from any claim based upon circumstances alleged to be inconsistent with such acknowledgement.
(b)      Severability . In the event that a court of competent jurisdiction determines that any portion of this Agreement is in violation of any statute or public policy, then only the portions of this Agreement which violate such statute or public policy shall be stricken. All portions of this Agreement which do not violate any statute or public policy shall continue in full force and effect. Further, any court order striking any portion of this Agreement shall modify the stricken terms to give as much effect as possible to the intentions of the parties under this Agreement.
(c)      At-Will Employment . Nothing herein shall affect the “at-will” nature of Employee’s relationship with Company. As such, Employee may leave the Employee’s employment with Company at any time with or without notice or cause. In addition, Employee’s employment may be terminated by Company at any time with or without notice or cause.

B-4


(d)      Governing Law . The validity, interpretation, construction and performance of this Agreement shall be governed by the laws of the State of New Mexico.
(e)      Counterparts . This Agreement may be executed in several counterparts, each of which shall be deemed to be an original, but all of which together shall constitute one and the same instrument.
(f)      Survival of Terms . The terms and conditions set forth in this Agreement shall survive this Agreement and continue to be binding upon Employee after the expiration or termination of this Agreement, whether by passage of time or otherwise.
(g)      Entire Agreement . This Agreement embodies the entire agreement and understanding between the parties hereto with respect to the subject matter hereof and supersedes all prior oral or written agreements and understandings relating to the subject matter hereof. No statement, representation, warranty, covenant or agreement of any kind not expressly set forth in this Agreement shall affect, or be used to interpret, change or restrict, the express terms and provisions of the Agreement.
(h)      Interpretative Matters . No provision of this Agreement will be interpreted in favor of, or against, any of the parties hereto by reason of the extent to which any such party or its counsel participated in the drafting thereof or by reason of the extent to which any such provision is inconsistent with any prior draft hereof or thereof.
7. “COMPANY” INCLUDES AFFILIATES . For purposes of this Agreement, the term “Company” shall mean PNM Resources, Inc. and any Affiliate of PNM Resources, Inc. The term “Affiliate” shall be given the meaning ascribed to it in the PNM Resources, Inc. Executive Savings Plan II.
8. IMPACT ON PRIOR AGREEMENT . Employee previously executed a Restrictive Covenant Agreement dated May 15, 2012. This Agreement supplements and does not supersede the terms of the Restrictive Covenant Agreement dated May 15, 2012.
IN WITNESS WHEREOF, the parties have executed and sealed this Supplemental Restrictive Covenant Agreement to be signed by its duly authorized representative and Employee as of the 9 th day of December , 2014.
PNMR SERVICES COMPANY
By /s/ CN Eldred                    
Its: CFO and Executive Vice President
EMPLOYEE
Signature /s/ Tom Sategna                
Thomas G. Sategna                    
Printed Name

B-5


 
Exhibit 12.1
 
 
PNM RESOURCES, INC. AND SUBSIDIARIES
 
Ratio of Earnings to Fixed Charges
 
(In thousands, except ratio)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year Ended December 31,
 
 
 
 
2014
 
2013
 
2012
 
2011
 
2010
 
 
Fixed charges, as defined by the Securities and Exchange Commission:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Interest expensed and capitalized
 
$
117,337

 
$
118,880

 
$
125,379

 
$
122,998

 
$
123,633

 
 
Amortization of debt premium, discount, and expenses
 
4,194

 
3,716

 
4,023

 
3,695

 
4,627

 
 
Estimated interest factor of lease rental charges
 
4,686

 
5,847

 
5,585

 
6,665

 
6,888

 
 
Preferred dividend requirements of subsidiary
 
809

 
800

 
769

 
864

 
1,075

 
 
     Total Fixed Charges
 
$
127,026

 
$
129,243

 
$
135,756

 
$
134,222

 
$
136,223

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings, as defined by the Securities and Exchange Commission:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings (loss) from continuing operations before income taxes and non-controlling interest
 
$
200,647

 
$
175,069

 
$
175,035

 
$
321,469

 
$
(63,379
)
 
 
(Earnings) loss of equity investee
 

 

 

 

 
15,223

 
 
Earnings (loss) from continuing operations before income taxes, non-controlling interest, and investee earnings
 
200,647

 
175,069

 
175,035

 
321,469

 
(48,156
)
 
 
Fixed charges as above
 
127,026

 
129,243

 
135,756

 
134,222

 
136,223

 
 
Interest capitalized
 
(6,256
)
 
(5,209
)
 
(5,432
)
 
(2,697
)
 
(3,401
)
 
 
Non-controlling interest in earnings of Valencia
 
(14,127
)
 
(14,521
)
 
(14,050
)
 
(14,047
)
 
(13,563
)
 
 
Preferred dividend requirements of subsidiary
 
(809
)
 
(800
)
 
(769
)
 
(864
)
 
(1,075
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings Available for Fixed Charges
 
$
306,481

 
$
283,782

 
$
290,540

 
$
438,083

 
$
70,028

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Ratio of Earnings to Fixed Charges
 
2.41

1  
2.20

1  
2.14

 
3.26

2  
0.51

3  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1  Earnings (loss) from continuing operations before income taxes and non-controlling interest for the years ended December 31, 2014 and December 31, 2013 include pre-tax losses of $1.1 million and $12.2 million due to the write-off of regulatory disallowances at PNM. If those losses were excluded, the Ratio of Earnings to Fixed Charges would have been 2.42 for 2014 and 2.29 for 2013.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2  Earnings (loss) from continuing operations before income taxes and non-controlling interest for the year ended December 31, 2011 includes a pre-tax loss of $21.4 million due to the write-off of regulatory disallowances at PNM and TNMP. If those losses were excluded, the Ratio of Earnings to Fixed Charges would have been 3.42. In addition, 2011 includes a pre-tax gain on the sale of First Choice of $174.9 million. If that gain were also excluded, the Ratio of Earnings to Fixed Charges would have been 1.96.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3  The shortfall in the earnings available for fixed charges to achieve a ratio of earnings to fixed charges of 1.00 amounted to $66.2 million for the year ended December 31, 2010. Earnings (loss) from continuing operations before income taxes and non-controlling interest includes a pre-tax loss of $188.2 million due to the impairment of PNMR's investment in an equity investee. If that loss were excluded, the Ratio of Earnings to Fixed Charges would have been 1.90.




Exhibit 12.2
 
 
PUBLIC SERVICE COMPANY OF NEW MEXICO
 
Ratio of Earnings to Fixed Charges
 
(In thousands, except ratio)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year Ended December 31,
 
 
 
2014
 
2013
 
2012
 
2011
 
2010
 
Fixed charges, as defined by the Securities and Exchange Commission:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Interest expensed and capitalized
 
$
79,834

 
$
79,769

 
$
82,864

 
$
75,217

 
$
73,423

 
Amortization of debt premium, discount, and expenses
 
1,944

 
1,879

 
1,818

 
1,325

 
1,274

 
Estimated interest factor of lease rental charges
 
2,541

 
3,732

 
3,743

 
4,139

 
4,103

 
     Total Fixed Charges
 
$
84,319

 
$
85,380

 
$
88,425

 
$
80,681

 
$
78,800

 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings, as defined by the Securities and Exchange Commission:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings (loss) from continuing operations before income taxes and non-controlling interest
 
$
154,086

 
$
151,480

 
$
156,314

 
$
105,965

 
$
107,288

 
Fixed charges as above
 
84,319

 
85,380

 
88,425

 
80,681

 
78,800

 
Non-controlling interest in earnings of Valencia
 
(14,127
)
 
(14,521
)
 
(14,050
)
 
(14,047
)
 
(13,563
)
 
Interest capitalized
 
(5,211
)
 
(4,420
)
 
(4,314
)
 
(1,761
)
 
(2,811
)
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings Available for Fixed Charges
 
$
219,067

 
$
217,919

 
$
226,375

 
$
170,838

 
$
169,714

 
 
 
 
 
 
 
 
 
 
 
 
 
Ratio of Earnings to Fixed Charges
 
2.60

1  
2.55

1  
2.56

 
2.12

2  
2.15

 
 
 
 
 
 
 
 
 
 
 
 
 
1  Earnings (loss) from continuing operations before income taxes and non-controlling interest for the years ended December 31, 2104 and December 31, 2013 include pre-tax losses of $1.1 million and $12.2 million due to the write-off of regulatory disallowances. If those losses were excluded, the Ratio of Earnings to Fixed Charges would have been 2.61 for 2014 and 2.70 for 2013.
 
 
 
 
 
 
 
 
 
 
 
 
2  Earnings (loss) from continuing operations before income taxes and non-controlling interest for the year ended December 31, 2011 includes a pre-tax loss of $17.5 million due to the write-off of regulatory disallowances. If that loss were excluded, the Ratio of Earnings to Fixed Charges would have been 2.33.
 
 
 
 
 
 
 
 
 
 
 
 





Exhibit 12.3
 
TEXAS-NEW MEXICO POWER COMPANY
Ratio of Earnings to Fixed Charges
(In thousands, except ratio)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Year Ended December 31,
 
 
2014
 
2013
 
2012
 
2011
 
2010
Fixed charges, as defined by the Securities and Exchange Commission:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Interest expensed and capitalized
 
$
24,941

 
$
24,481

 
$
26,233

 
$
27,914

 
$
28,632

Amortization of debt premium, discount, and expenses
 
1,195

 
1,159

 
1,493

 
1,679

 
2,683

Estimated interest factor of lease rental charges
 
1,311

 
1,241

 
956

 
1,202

 
1,246

 
 
 
 
 
 
 
 
 
 
 
Total Fixed Charges
 
$
27,447

 
$
26,881

 
$
28,682

 
$
30,795

 
$
32,561

 
 
 
 
 
 
 
 
 
 
 
Earnings, as defined by the Securities and Exchange Commission:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings from continuing operations before income taxes
 
$
60,330

 
$
46,711

 
$
42,099

 
$
36,138

 
$
26,026

Fixed charges as above
 
27,447

 
26,881

 
28,682

 
30,795

 
32,561

Interest capitalized
 
(609
)
 
(361
)
 
(706
)
 
(593
)
 
(158
)
 
 
 
 
 
 
 
 
 
 
 
Earnings Available for Fixed Charges
 
$
87,168

 
$
73,231

 
$
70,075

 
$
66,340

 
$
58,429

 
 
 
 
 
 
 
 
 
 
 
Ratio of Earnings to Fixed Charges
 
3.18

 
2.72

 
2.44

 
2.15

1  
1.79

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1  Earnings from continuing operations before income taxes for the year ended December 31, 2011 includes a pre-tax loss of $3.9 million due to the write-off of regulatory disallowances. If that loss were excluded, the Ratio of Earnings to Fixed Charges would have been 2.28.





EXHIBIT 21
 
 
Subsidiaries of PNM Resources, Inc.
 
 
As of December 31, 2014, PNM Resources, Inc. directly or indirectly owns all of the voting securities of the following subsidiaries:
 
Public Service Company of New Mexico, a New Mexico corporation that does business under the names “Public Service Company of New Mexico” and “PNM”.
 
Texas-New Mexico Power Company, a Texas corporation that does business under the name “Texas-New Mexico Power Company” and “TNMP”.
 
TNP Enterprises, Inc., a Texas corporation that does business under its corporate name.

The remaining subsidiaries of PNM Resources, Inc. considered in the aggregate as a single subsidiary, do not constitute a "significant subsidiary" (as defined in Rule 1-02(w) of Regulation S-X) as of the end of the year covered by this report.
 






Exhibit 23.1

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

The Board of Directors
PNM Resources, Inc:
We consent to the incorporation by reference in the registration statement No. 333-183180 on Form S-3 and registration statement Nos. 333-76288, 333-139108, 333-129454, 333-03289-99, 333-88372, 333-121371, 333-125010, 333-141282, 333-156243, 333-159361, 333-159362, 333-168797 and 333-195974 on Form S-8 of PNM Resources, Inc and subsidiaries of our reports dated February 27, 2015, with respect to the consolidated balance sheets of PNM Resources, Inc and subsidiaries as of December 31, 2014 and 2013, and the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014, and all related financial statement schedules, and the effectiveness of internal control over financial reporting as of December 31, 2014, which reports appear herein.
/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015





Exhibit 23.2
CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
The Board of Directors
Public Service Company of New Mexico:
We consent to the incorporation by reference in the registration statement No. 333-195979 on Form S-3 of Public Service Company of New Mexico and subsidiaries of our reports dated February 27, 2015, with respect to the consolidated balance sheets of Public Service Company of New Mexico and subsidiaries as of December 31, 2014 and 2013, and the related consolidated statements of earnings, consolidated statements of comprehensive income, consolidated statements of changes in equity, and consolidated statements of cash flows for each of the years in the two-year period ended December 31, 2014, and the related financial statement schedule, which reports appear herein.
/s/ KPMG LLP
Albuquerque, New Mexico
February 27, 2015





Exhibit 23.3


CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
We consent to the incorporation by reference in Registration Statement No. 333-183180 on Form S-3 and Registration Statements Nos. 333-76288, 333-139108, 333-129454, 333-03289-99, 333-88372, 333-121371, 333-125010, 333-141282, 333-156243, 333-159361, 333-159362, 333-168797, and 333-195974 on Form S-8 of our reports dated March 1, 2013, relating to the consolidated financial statements and financial statement schedules of PNM Resources, Inc. and subsidiaries, appearing in this Annual Report on Form 10-K of PNM Resources, Inc. and subsidiaries for the year ended December 31, 2014.


/s/ DELOITTE & TOUCHE LLP
Phoenix, Arizona
February 27, 2015







Exhibit 23.4

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
We consent to the incorporation by reference in Registration Statement No. 333-195979 on Form S-3 of our reports dated March 1, 2013, relating to the consolidated financial statements and financial statement schedule of Public Service Company of New Mexico and subsidiaries appearing in this Annual Report on Form 10-K of Public Service Company of New Mexico and subsidiaries for the year ended December 31, 2014.

/s/ DELOITTE & TOUCHE LLP
Phoenix, Arizona
February 27, 2015







EXHIBIT 31.1
CERTIFICATION
I, Patricia K. Collawn, certify that:
1.
I have reviewed this Annual Report on Form 10-K of PNM Resources, Inc.;
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4.
The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
a)
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
b)
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
c)
Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d)
Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (each registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting;
5.
The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a)
All significant deficiencies and material weaknesses in the design or operation of internal controls over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b)
Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

Date:
February 27, 2015
 
By:
/s/ Patricia K. Collawn
 
 
 
 
 
Patricia K. Collawn
 
 
 
 
 
President and Chief Executive Officer
 
 
 
 
 
PNM Resources, Inc.
 






EXHIBIT 31.2
CERTIFICATION
I, Charles N. Eldred, certify that:
1.
I have reviewed this Annual Report on Form 10-K of PNM Resources, Inc.;
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4.
The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
a)
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
b)
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
c)
Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation;
d)
Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (each registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting;
5.
The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a)
All significant deficiencies and material weaknesses in the design or operation of internal controls over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b)
Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

Date:
February 27, 2015
 
By:
/s/ Charles N. Eldred
 
 
 
 
 
Charles N. Eldred
 
 
 
 
 
Executive Vice President and
 
 
 
 
 
Chief Financial Officer
 
 
 
 
 
PNM Resources, Inc.
 






EXHIBIT 31.3
CERTIFICATION
I, Patricia K. Collawn, certify that:
1.
I have reviewed this Annual Report on Form 10-K of Public Service Company of New Mexico;
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4.
The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
a)
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
b)
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
c)
Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d)
Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (each registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting;
5.
The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a)
All significant deficiencies and material weaknesses in the design or operation of internal controls over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b)
Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

Date:
February 27, 2015
 
By:
/s/ Patricia K. Collawn
 
 
 
 
 
Patricia K. Collawn
 
 
 
 
 
President and Chief Executive Officer
 
 
 
 
 
Public Service Company of New Mexico
 






EXHIBIT 31.4
CERTIFICATION
I, Charles N. Eldred, certify that:
1.
I have reviewed this Annual Report on Form 10-K of Public Service Company of New Mexico;
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4.
The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
a)
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
b)
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
c)
Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d)
Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (each registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting;
5.
The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a)
All significant deficiencies and material weaknesses in the design or operation of internal controls over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b)
Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

Date:
February 27, 2015
 
By:
/s/ Charles N. Eldred
 
 
 
 
 
Charles N. Eldred
 
 
 
 
 
Executive Vice President and
 
 
 
 
 
Chief Financial Officer
 
 
 
 
 
Public Service Company of New Mexico
 






EXHIBIT 31.5
CERTIFICATION
I, Patricia K. Collawn, certify that:
1.
I have reviewed this Annual Report on Form 10-K of Texas-New Mexico Power Company;
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary in order to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4.
The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
a)
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
b)
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
c)
Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d)
Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting;
5.
The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a)
All significant deficiencies and material weaknesses in the design or operation of internal controls over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b)
Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

Date:
February 27, 2015
 
By:
/s/ Patricia K. Collawn
 
 
 
 
 
Patricia K. Collawn
 
 
 
 
 
Chief Executive Officer
 
 
 
 
 
Texas-New Mexico Power Company
 






EXHIBIT 31.6
CERTIFICATION
I, Thomas G. Sategna, certify that:
1.
I have reviewed this Annual Report on Form 10-K of Texas-New Mexico Power Company;
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary in order to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4.
The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
a)
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
b)
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
c)
Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d)
Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting;
5.
The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a)
All significant deficiencies and material weaknesses in the design or operation of internal controls over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b)
Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

Date:
February 27, 2015
 
By:
/s/ Thomas G. Sategna
 
 
 
 
 
Thomas G. Sategna
 
 
 
 
 
Vice President and Controller
 
 
 
 
 
Texas-New Mexico Power Company
 






EXHIBIT 32.1

CERTIFICATION PURSUANT TO 18 U.S.C. § 1350, AS ADOPTED PURSUANT TO § 906 OF THE
SARBANES-OXLEY ACT OF 2002

In connection with the Annual Report on Form 10-K for the period ended December 31, 2014, for PNM Resources, Inc. (“Company”), as filed with the Securities and Exchange Commission on February 27, 2015 (“Report”), each of the undersigned officers of the Company certifies, pursuant to 18 U.S.C. §1350, as adopted pursuant to § 906 of the Sarbanes-Oxley Act of 2002, that:
(1)
the Report fully complies with the requirements of § 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended; and
(2)
the information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

Date:
February 27, 2015
 
By:
/s/ Patricia K. Collawn
 
 
 
 
 
Patricia K. Collawn
 
 
 
 
 
President and Chief Executive Officer
 
 
 
 
 
PNM Resources, Inc.
 
 
 
 
 
 
 
 
 
 
By:
/s/ Charles N. Eldred
 
 
 
 
 
Charles N. Eldred
 
 
 
 
 
Executive Vice President and
 
 
 
 
 
Chief Financial Officer
 
 
 
 
 
PNM Resources, Inc.
 






EXHIBIT 32.2

CERTIFICATION PURSUANT TO 18 U.S.C. § 1350, AS ADOPTED PURSUANT TO § 906 OF THE
SARBANES-OXLEY ACT OF 2002

In connection with the Annual Report on Form 10-K for the period ended December 31, 2014, for Public Service Company of New Mexico (“Company”), as filed with the Securities and Exchange Commission on February 27, 2015 (“Report”), each of the undersigned officers of the Company certifies, pursuant to 18 U.S.C. §1350, as adopted pursuant to § 906 of the Sarbanes-Oxley Act of 2002, that:
(1)
the Report fully complies with the requirements of § 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended; and
(2)
the information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

Date:
February 27, 2015
 
By:
/s/ Patricia K. Collawn
 
 
 
 
 
Patricia K. Collawn
 
 
 
 
 
President and Chief Executive Officer
 
 
 
 
 
Public Service Company of New Mexico
 
 
 
 
 
 
 
 
 
 
By:
/s/ Charles N. Eldred
 
 
 
 
 
Charles N. Eldred
 
 
 
 
 
Executive Vice President and
 
 
 
 
 
Chief Financial Officer
 
 
 
 
 
Public Service Company of New Mexico
 






EXHIBIT 32.3
CERTIFICATION PURSUANT TO 18 U.S.C. § 1350, AS ADOPTED PURSUANT TO § 906 OF THE
SARBANES-OXLEY ACT OF 2002

In connection with the Annual Report on Form 10-K for the period ended December 31, 2014, for Texas-New Mexico Power Company (“Company”), as filed with the Securities and Exchange Commission on February 27, 2015 (“Report”), each of the undersigned officers of the Company certifies, pursuant to 18 U.S.C. §1350, as adopted pursuant to § 906 of the Sarbanes-Oxley Act of 2002, that:
(1)
the Report fully complies with the requirements of § 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended; and
(2)
the information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

Date:
February 27, 2015
 
By:
/s/ Patricia K. Collawn
 
 
 
 
 
Patricia K. Collawn
 
 
 
 
 
Chief Executive Officer
 
 
 
 
 
Texas-New Mexico Power Company
 
 
 
 
 
 
 
 
 
 
By:
/s/ Thomas G. Sategna
 
 
 
 
 
Thomas G. Sategna
 
 
 
 
 
Vice President, Controller
 
 
 
 
 