UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16 OF
THE SECURITIES EXCHANGE ACT OF 1934

For the month of September 2024

Commission File No. 0001-34184

SILVERCORP METALS INC.
(Translation of registrant’s name into English)

Suite 1750 - 1066 West Hastings Street
Vancouver, BC Canada V6E 3X1
(Address of principal executive office)

[Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F]

Form 20-F [   ] Form 40-F [ X ]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1) [   ]

Note: Regulation S-T Rule 101(b)(1) only permits the submission in paper of a Form 6-K if submitted solely to provide an attached annual report to security holders.

Indicate by check mark if the registrant is “submitting” the Form 6-K in paper as permitted by Regulation S-T “Rule” 101(b)(7) [   ]

Note: Regulation S-T Rule 101(b)(7) only permits the submission in paper of a Form 6-K if submitted to furnish a report or other document that the registrant foreign private issuer must furnish and make public under the laws of the jurisdiction in which the registrant is incorporated, domiciled or legally organized (the registrant's “home country”), or under the rules of the home country exchange on which the registrant’s securities are traded, as long as the report or other document is not a press release, is not required to be and has not been distributed to the registrant’s security holders, and, if discussing a material event, has already been the subject of a Form 6-K submission or other Commission filing on EDGAR.

Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes [   ] No [ X ]

If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b):

1





SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Dated: September 19, 2024 SILVERCORP METALS INC.
 

/s/ Jonathan Hoyles

 

Jonathan Hoyles

 

General Counsel and Corporate Secretary

 

2





EXHIBIT INDEX

EXHIBIT DESCRIPTION OF EXHIBIT

 

99.1 Technical Report
99.2 Consent of Qualified Person - Lanliang Niu
99.3 Consent of Qualified Person - Nan Xue
99.4 Consent of Qualified Person - Tzuhsuan Chuang
99.5 Consent of Qualified Person - Yangfang Zhao
99.6 Consent of Qualified Person - Falong Hu
99.7 Consent of Qualified Person - Mark Wanless

3




Exhibit 99.1

 

 

 

 

FINAL

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China

 

Gaocheng Project, Guangdong Province, People's Republic of China

Guangdong Found Mining Co., Ltd.  

 

 

 

 

 

 

 

 

 

 

 

SRK Consulting China Ltd. SCN845 20 July 2024 Effective Date: 30 June 2024

 

 

 

   

 

 

 

FINAL

 

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong

Province, China

 

Gaocheng Project, Guangdong Province, People's Republic of China

 

 

Prepared for:

Guangdong Found Mining Co., Ltd.

Gaocun Township, Yun'an District

Yunfu City, Guangdong Province , 527523

China

+86 186 8857 9808

www.silvercorpmetals.com

 

Prepared by:

SRK Consulting China Ltd.

B1301 COFCO Plaza, No. 8 Jianguomennei Dajie

Dongcheng District, Beijing, China

100005

 

+86 10 6511 1000

www.srk.com

 

Reg. No. 91110101771550334A

 

 

 

 

Lead Author: Mark Wanless, Falong Hu Initials: MW, FH
Author: Yanfang Zhao, Lanliang Niu, Nan Xue, Tzuhsuan Chuang, Hongchen Huang Initials: YZ, LN, NX, TC, HH
Reviewer: Alexander Thin Initials: AT

 

File Name:

SCN845 ITR on GC Mine NI43101_20240721_630_Final.docx

 

Suggested Citation:

SRK Consulting China Ltd. Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China. FINAL. Prepared for Guangdong Found Mining Co., Ltd.: Yunfu City, Guangdong Province. Project number: SCN845. Issued 20 July 2024. Effective Date: 30 June 2024.

 

Cover Image(s):

Mine Site Overview

 

Copyright © 2024

  

 

 

SRK Consulting China Ltd. SCN845 20 July 2024 Effective Date: 30 June 2024

   

 

 

 

Acknowledgments

 

SRK would like to acknowledge the support and collaboration provided by Gaocheng Mine and Sivercorp Metal Inc personnel for this assignment, who are Guoliang Ma, P.Geo, (Geologist), Yongwei Li (Geologist), Bingfei Lu (Geologist), Baofu Mo (Mining), Haijun Xie (Mining), Mingshu Ma (Processing), Yunqiang Huang (Finance) and Yanlong Wang (General Manager). Their collaboration was greatly appreciated and instrumental to the success of this project.

 

 

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

 

 

Contents

 

Useful Definitions xiv
       
1 Summary xx
1.1 Introduction xx
1.2 Overview xxi
1.3 Property Description and Ownership xxii
1.4 Geology and Mineralization xxiii
1.4.1 History xxiii
1.4.2 Geological Setting and Mineralisation xxiii
1.4.3 Deposit Types xxiv
1.4.4 Exploration and Data Management xxiv
1.5 Mineral Resource and Mineral Reserve Estimates xxv
1.6 Development and Operations xxvi
1.6.1 Geotechnical and Hydrogeological Considerations xxvi
1.6.2 Mining Method xxvi
1.6.3 Recovery Method xxviii
1.6.4 Operation xxix
1.7 Environmental Studies, Permitting and Social or Community Impact xxix
1.8 Capital Cost and Operating Cost xxx
1.9 Technical-Economic Analysis xxxi
1.10 Conclusions and Recommendations xxxi
       
2 Introduction 34
2.1 Purpose of the Report 34
2.2 Scope of Work 34
2.3 Work Program 35
2.4 Basis of Technical Report 36
2.5 Qualifications of SRK and SRK Team 36
2.6 Site Visit 37
2.7 Effective Date 38
2.8 Currency, Units and Year 38
2.9 Limitations, Declaration and Consent 38
2.9.1 Limitations 38
2.9.2 Legal Matters 38
2.9.3 Consent 39
       
3 Reliance on Other Experts 40
       
4 Property Description and Location 41
4.1 Ownership and Mining Permit 41
4.2 Permits and Authorization 42
4.3 Location 42
4.4 Environmental Considerations 44
4.5 Taxes and Royalties 44
       
5 Accessibility, Climate, Local Resources, Infrastructure, and Physiography 45
       
6 History 46
6.1 Ownership History 46
6.2 Exploration History 46

  

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT iv

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

  

6.3 Production 46
6.4 Previous Mineral Resource Estimates 47
     
7 Geological Setting and Mineralisation 48
7.1 Regional Geology 48
7.2 Property Geology 49
7.3 Mineralization 51
     
8 Deposit Types 59
     
9 Exploration 60
9.1 Surface Works 60
9.2 Underground Works 61
       
10 Drilling 62
10.1 Historical Drilling (Pre-2008) 62
10.2 Silvercorp Drilling (2008 – 2023) 62
10.3 Bulk Density 66
       
11 Sample Preparation, Analyses, and Security 67
11.1 Sampling 67
11.2 Sample Preparation and Analysis 69
11.2.1 ALS Guangzhou 69
11.2.2 Gaocheng Mine Laboratory 70
11.2.3 SGS Laboratory 70
11.3 Sample Shipment and Security 71
11.4 QA/QC 72
11.4.1 Monitoring Program 72
11.4.2 Certified Reference Material 72
11.4.3 Blank Samples 81
11.4.4 Duplicate Samples 84
11.4.5 Check (Umpire) Samples 87
       
12 Data Verification 97
12.1 Site Visit 97
12.2 Assay Validation 98
12.2.1 Pulp Duplicates Verification 98
12.2.2 Umpire Samples 99
12.2.3 Core Samples & Drive Samples 101
12.3 Data Entry Checks 103
12.4 Summary 103
       
13 Mineral Processing and Metallurgical Testing 105
13.1 Introduction 105
13.2 Test Samples 105
13.3 Mineralogy 105
13.3.1 Chemical Components and Mineral Composition 105
13.3.2 Occurrence State 106
13.4 Processing Test 110
13.4.1 Lead-Zinc-Sulphur Sequential Flotation Test 110
13.4.2 Copper-Lead Separation Exploratory Test 112
13.4.3 Tin Recovery Test 112
13.5 Ore Pre-Sorting Test 112

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT v

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

  

13.6 Conclusions of Testing 113
       
14 Mineral Resource Estimates 114
14.1 Introduction 114
14.2 Estimation Procedures 114
14.3 Database 115
14.4 Domain Modelling 116
14.5 Specific Gravity 118
14.6 Compositing 118
14.7 Evaluation of Outliers 121
14.8 Block Model and Grade Estimation 124
14.9 Model Validation 125
14.10 Mineral Resource Classification 140
14.11 Mining Depletion 142
14.12 Mineral Resource Statement 145
14.13 Grade Sensitivity Analysis 146
14.14 Previous Mineral Resource Estimate 148
       
15 Mineral Reserve Estimates 149
15.1 Introduction 149
15.2 Summary of Technical Study and Operation 150
15.3 Cut-off Grades 150
15.4 Modifying Factor 152
15.4.1 Mine Design Scope 152
15.4.2 Stopes Design 152
15.4.3 Dilution and Loss Summary 154
15.5 Mineral Reserve Estimates 154
15.6 Mineral Reserve Statement 156
15.7 Discussion on Potentially Impacts to Mineral Reserve Estimates 156
       
16 Mining Methods 157
16.1 Introduction 157
16.2 Operation and Product Rate 157
16.3 Geotechnical and Hydrogeology Considerations 158
16.4 Mine Design 158
16.4.1 Vertical Access 159
16.4.2 Horizontal Access 160
16.4.3 Expansion Plan for the Third Stage 161
16.5 Material Movement 161
16.6 Stoping Method 162
16.6.1 Shrinkage Stoping 162
16.6.2 Resue Stoping 163
16.6.3 Overhand Cut and Fill 165
16.6.4 Stope Management and Grade Control 166
16.7 Mine Services 168
16.7.1 Ventilation 168
16.7.2 Water Supply 170
16.7.3 Dewatering 170
16.7.4 Power Supply 171
16.7.5 Compressed Air 171
16.7.6 Communications 172
16.7.7 Explosive Magazine 172

  

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT vi

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

  

16.7.8 Maintenance Workshop 172
16.8 Mine Equipment and Machinery 173
16.9 Mine Safety 175
16.9.1 Fire Prevention 175
16.9.2 Mine Rescue 176
16.9.3 Emergency Egress 176
16.9.4 Mine Refuge Stations 176
16.10 Mine Personnel 177
16.11 Life of Mine (“LOM”) Plan 178
       
17 Recovery Method 182
17.1 Introduction 182
17.2 Production Process 182
17.3 Processing Equipment 186
17.4 Production Records 187
17.5 Consumptions and Services 188
17.5.1 Reagent and Material Consumptions 188
17.5.2 Water Supply 189
17.5.3 Laboratory 190
17.5.4 Machine Maintenance 191
       
18 Project Infrastructure 192
18.1 Introduction 192
18.2 Tailings Storage Facility 192
18.2.1 Overview 192
18.2.2 Tailings Dam and Tailings Discharge 193
18.2.3 Flood Control and Drainage System and Return Water System 194
18.3 Waste Rock Dump 195
18.4 Backfill Plant 195
18.5 Power Supply 196
18.6 Access Road 197
18.7 Water Supply 197
18.8 Sewage Treatment 197
18.9 Water Treatment Facility 197
18.10 Site Communication 197
18.11 Dams and Tunnels 198
18.12 Surface Maintenance Workshop 198
18.13 Explosive Magazine 198
18.14 Fuel Farm 199
18.15 Camp and Building 199
18.16 Security and Gate House 199
       
19 Market Studies and Contracts 200
19.1 Commodity Prices 200
19.2 Concentrate Marketing 201
19.3 Operational Contracts 202
       
20 Environmental Studies, Permitting, and Social or Community Impact 203
20.1 Review Objective 203
20.2 Review Process, Scope, and Standards 203
20.3 Permitting 203
20.3.1 Safety Production Permit 203
20.3.2 Water Use Permit 204

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT vii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

 

20.3.3 Site Discharge Permit 204
20.4 Status of Environmental Approvals 204
20.5 Environmental and Social Aspects 205
  20.5.1 Flora and Fauna 205
  20.5.2 Water Management 206
  20.5.3 Waste Rock and Tailings Management 207
  20.5.4 Noise and Dust Emissions 207
  20.5.5 Hazardous Substances Management 208
  20.5.6 Occupational Health and Safety 208
  20.5.7 Mine Closure and Rehabilitation 208
  20.5.8 Social Considerations 209
       
21 Capital and Operating Costs 210
21.1 Capital Cost 210
  21.1.1 Summary 210
  21.1.2 Exploration Drilling 211
  21.1.3 Capitalized Development 212
  21.1.4 Processing and Infrastructure Updates 212
  21.1.5 Closure & Reclamation Capex 213
21.2 Operating Costs 214
  21.2.1 Summary 214
  21.2.2 Mining 215
  21.2.3 Backfill Costs 218
  21.2.4 Processing 218
  21.2.5 Tailings Filtration 219
  21.2.6 Selling, General and Administrative 219
  21.2.7 Corporate Social Responsibility Opex 220
       
22 Economic Analysis 221
22.1 Principal Assumptions 221
  22.1.1 LOM Physical 221
  22.1.2 Pricing Assumptions 222
  22.1.3 Payment Scales 222
  22.1.4 Tax and Royalties 223
  22.1.5 Depreciation 224
  22.1.6 Working Capital 224
22.2 DCF Projection 224
22.3 Sensitivity Analysis 227
     
23 Adjacent Properties 230
     
24 Other Relevant Data and Information 231
       
25 Interpretation and Conclusions 232
25.1 Geology 232
25.2 Data verification 232
25.3 Mineral Resource Estimation 232
25.4 Mining Method 233
25.5 Recovery Method 233
25.6 Environmental Studies, Permitting, and Social or Community Impact 234
25.7 Capital and Operating Costs 234
25.8 Economic Analysis 235

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT viii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

 

26 Recommendations 236
26.1 Geology 236
26.2 Mining 236
       
27 References 238

  

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT ix

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

 

Tables

Table 1.1: Mineral Resource Statement for GC Project, as of 30 June 2024 xxi
Table 1.2: Mineral Reserve Statement for GC Mine, as of 30 June 2024 xxii
Table 1.3: Key Operational Licences and Permits xxiii
Table 1.4: Summary of LOM Schedule xxvii
Table 1.5: Operation Records from FY2022 to FY2025 Q1 xxix
Table 1.6: Summary of Capex for GC Mine xxx
Table 1.7: Summary of Opex Historical & Forecasted for GC Mine xxx
Table 2.1: SRK Team Contributed to This Report 36
Table 4.1: Mining Permit Corner Points of Property 41
Table 4.2: Information of Mining Permit for GC Mine 42
Table 6.1: Details of Historical Underground Workings 46
Table 6.2: Historical Mineral Resource Estimates 47
Table 7.1: Dimensions and Occurrences of the Mineralized Veins 52
Table 9.1: Surface Exploration Programs Completed in 2008 60
Table 9.2: Record of Drilling 2001 – 2008 61
Table 9.3: Summary of Underground Tunnelling Works between 2012 and 2023 61
Table 10.1: Drilling Program Summary 63
Table 11.1: ALS Chemex Lab Method and Detection Limits 69
Table 11.2: Silvercorp GC Lab Detection Limits 70
Table 11.3: SGS Laboratory Detection Limits 70
Table 11.4: GC Project QA/QC Samples by Year 72
Table 11.5: Summary of CRMS 73
Table 11.6: Summary of GC CRM Results (2011 - 2023) 73
Table 11.7: GC Blank Fail Criteria 82
Table 11.8: Summary of GC Blanks Results (2011 - 2023) 82
Table 11.9: Gaocheng Check (Umpire) Laboratories Used 2011 - 2023 88
Table 11.10: Results of Check Samples 88
Table 12.1: Data Verification Results of Pulp Samples 98
Table 12.2: Umpire Check Samples Summary 100
Table 12.3: Historical Database Summary 103
Table 13.1: Chemical Multi-Element Analysis Results of the Test Samples 105
Table 13.2: Main Mineral Composition of the Test Samples 106
Table 13.3: Phase Analysis Results of Silver 107
Table 13.4: Phase Analysis of Tin 107
Table 13.5: Results of the Lead-Zinc-Sulphur Flotation Closed-Circuit Process Test 111
Table 13.6: Intelligent Pre-Sorting Test Results 113
Table 14.1: Summary of Resource Database 116
Table 14.2: Composites (Declustered Length Weighted) Statistics of the Selected 10 Veins 120
Table 14.3: Statistics of Capping Data for the Selected 10 Veins 121
Table 14.4: Block Model Summary 124
Table 14.5: Specific Search Parameters 125
Table 14.6: RPEEE Assumptions 145
Table 14.7: Mineral Resource Statement for GC Project, as of 30 June 2024 146
Table 14.8: Global Block Model Quantities and Grade Estimates for Measured and Indicated Category, GC Project at Various cut-off Grades 146
Table 14.9: Global Block Model Quantities and Grade Estimates for Inferred Category, GC Project at Various Cut-off Grades 147
Table 14.10: Mineral Resources as of 31 December 2020 (at a cut-off of 105g/t AgEq) 148
Table 15.1: Estimates for COGs 150

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT x

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

 

Table 15.2: Estimates for Payable Factors 151
Table 15.3: Estimates for Equivalent Factors of Pb and Zn to Ag 152
Table 15.4: Dilution and Loss Summary 154
Table 15.5: Summary of Mineral Reserve Conversion Process 154
Table 15.6: Mineral Reserve Statement for GC Mine, as of 30 June 2024 156
Table 16.1: Operation Records from FY2020 to FY2025 Q1 158
Table 16.2: Summary of General Details for Mine Access 160
Table 16.3: ROM Percentage per Stoping Method 162
Table 16.4: Mining Contractor Typical Key Equipment Summary 173
Table 16.5: GC Mine’s Fixed Equipment Summary 174
Table 16.6: Summary of LOM Schedule 179
Table 17.1: Main Processing Equipment of GC Processing Plant 186
Table 17.2: Production Records of GC Processing Plant 188
Table 17.3: Reagent and Material Consumptions in GC Processing Plant 189
Table 18.1: Operation Record of Backfill Plant 196
Table 19.1: Long-Term Commodities Prices Applied to Estimates 200
Table 20.1: Details of the Safety Production Permits for the GC Mine 203
Table 20.2: Details of the Water Use Permit for the GC Mine 204
Table 20.3: Details of the EIA Report and Approval for the GC Mine 205
Table 20.4: Details of the WSCP Report and Approval for the GC Mine 205
Table 21.1: Summary of LOM Capex for GC Mine 210
Table 21.2: Exploration Drilling Capex over Last 3 Years 211
Table 21.3: Processing and Infrastructure Updates Capex 213
Table 21.4: Closure & Reclamation Capex over Last 3 Years 213
Table 21.5: Summary of Opex Historical & Forecasted for GC Mine 214
Table 21.6: Detailed Opex from Mining Contracts 215
Table 21.7: Detailed Opex from Development Contracts (in USD/m) 216
Table 21.8: Breakdown of Mining Opex (in USD/t ROM) 217
Table 21.9: Breakdown of Backfill Opex (in USD/t ROM) 218
Table 21.10: Breakdown of Processing Opex (in USD/t Feed) 219
Table 21.11: Breakdown of Taillings Filtration Opex (in USD/t Feed) 219
Table 21.12: Breakdown of S&GA Opex (in USD/t Feed) 220
Table 22.1: LOM Physical Inputs for Economic-Analysis 222
Table 22.2: Pricing Assumptions for Economic Analysis 222
Table 22.3: Pb Concentrate Payment Scales 223
Table 22.4: Zn Concentrate Payment Scales 223
Table 22.5: LOM Profit, Loss & Cash Flow Forecasting 224
Table 22.6: LOM Production and Cash Flow Forecast 227
Table 22.7: Sensitivity Analysis Result (@8% Discount Rate) 228

 

Figures

Figure 4.1: General Location Map of the Project 43
Figure 7.1: Tectonic Geology Map of Southern China 48
Figure 7.2: Regional Geological Map 49
Figure 7.3: Property Geology Map 50
Figure 7.4: The Distribution of Mineralized Veins and Faults Zone (Level -100 m) 51
Figure 7.5: Ag-Zn-Pb Veins of the GC Project (Level 0 m) 52
Figure 10.1: Surface Drilling Location Map 63
Figure 10.2: Location of Drillhole and Underground Samples (Level 0m) 64
Figure 10.3: View of Drillhole and Underground Samples (Looking North) 65
Figure 10.4: Underground Diamond Drilling Programme 65

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xi

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

 

Figure 10.5: Measured Density vs Density Estimated by Linear Regression with Pb, Zn, Ag 66
Figure 11.1: Drill Core Cut in Half 67
Figure 11.2: Underground Sampling 68
Figure 11.3: Core Tray Storage 71
Figure 11.4: CRMs Performances 76
Figure 11.5: Coarse Marble Blanks Performances 83
Figure 11.6: Pulp Blanks Performances 84
Figure 11.7: Scatter and HARD Plot of Field Duplicates 85
Figure 11.8: Scatter and HARD Plot of Coarse Duplicates 86
Figure 11.9: Scatter and HARD Plot of Pulp Duplicates 87
Figure 11.10: Scatter and Hard Plot of Umpire Samples from 2011 to 2023 89
Figure 11.11: Scatter and QQ Plot (Original Samples from ALS, Umpire Samples from Inner Mongolia Laboratories) 90
Figure 11.12: Scatter and QQ Plot (Original Samples from ALS, Umpire Samples GC Laboratories) 91
Figure 11.13: Scatter and QQ Plot (Original Samples from ALS, Umpire Samples from Chengde Huakan) 92
Figure 11.14: Scatter and QQ Plot (Original Samples from GC, Umpire Samples from SGS Laboratories) 93
Figure 11.15: Scatter and QQ Plot (Original Samples from GC, Umpire Samples from ALS Laboratories) 94
Figure 11.16: Scatter and QQ Plot (Original Samples from GC, Umpire Samples from Chengde Huakan) 95
Figure 12.1: Tunnel Sampling and Core Store Shed of GC Mine 97
Figure 12.2: Site Laboratory of GC Mine 98
Figure 12.3: Scatter and Hard Plot of Pulp Duplicates Verification Samples 99
Figure 12.4: Scatter and Hard Plot of Umpire Sample 100
Figure 12.5: QQ Plot of Umpire Sample 101
Figure 12.6: Comparison between the Core Samples and the Drive Samples 102
Figure 13.1: Disseminated Grain Size of Galena, Sphalerite and Cassiterite 109
Figure 13.2: Lead-Zinc-Sulphur Flotation Closed-Circuit Test Flowsheet 111
Figure 14.1: Drillholes and Underground Sampling Location 115
Figure 14.2: Mineralized Veins Section 117
Figure 14.3: Plan View of Mineralized Veins Display at Level 0 m (Red: Biggest 10 Veins) 118
Figure 14.4: Sampling Interval Histogram 119
Figure 14.5: Scatter Plot of Ag Mean Grade 119
Figure 14.6: Scatter Plot of Pb Mean Grade 120
Figure 14.7: Scatter Plot of Zn Mean Grade 120
Figure 14.8: Probability Plots for the Selected 10 Veins 122
Figure 14.9: Swath Plot of Ag for the Selected 10 Veins 125
Figure 14.10: Swath Plot of Pb for the Selected 10 Veins 130
Figure 14.11: Swath Plot of Zn for the Selected 10 Veins 135
Figure 14.12: Resource Classification for the Selected 10 Veins 141
Figure 14.13: Mining Depletion for the Selected 10 Veins 142
Figure 14.14: Plan View of Mined-Out Stopes (Purple) and Written-Off Shapes (Yellow) 145
Figure 14.15: Grade-Tonnage Curve for Measured and Indicated Category, at Various Cut-off Grades 147
Figure 14.16: Grade-Tonnage Curve for Inferred Category, at Various Cut-off Grades 147
Figure 15.1: Relationship Between Mineral Reserves and Mineral Resources 149
Figure 15.2: Measured and Indicated Mineral Resources including Dilution Material per Vertical Interval 153
Figure 15.3: Waterfall Chart of Mineral Reserve Conversion - Tonne 155
Figure 15.4: Waterfall Chart of Mineral Reserve Conversion - Contained Equivalent Silver 155
Figure 16.1: Mine Design for GC Mine 159
Figure 16.2: Planning View of Development and Veins - 150m RL 161
Figure 16.3: Underground Access and Level Drive of GC Mine 162
Figure 16.4: Typical Shrinkage Stope Layout 163
Figure 16.5: Typical Resuing Stope Layout 165
Figure 16.6: Typical OCAF Stope Layout 166

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Contents  
■  FINAL

 

Figure 16.7: Operation of OCAF Stope 166
Figure 16.8: Stoping Management and Blasting Holes 168
Figure 16.9: Pump and Power Stations at - 300mRL 171
Figure 16.10: Surface and Underground Workshops 173
Figure 16.11: Permanent Refuge Station at -300mRL 177
Figure 16.12: GC Mine Employees over Years 178
Figure 16.13: ROM Schedule over LOM 180
Figure 16.14: Development Schedule over LOM 180
Figure 17.1: Photo of GC Processing Plant 182
Figure 17.2: Production Process Flowsheet of GC Processing Plant 184
Figure 17.3: Main Production Workshop Photos of GC Processing Plant 185
Figure 17.4: New Water Intake, Pumping and Purification Processing Facilities 190
Figure 17.5: Photos of the GC Laboratory 191
Figure 18.1: Part of Facilities of GC Mine 192
Figure 18-2: Photos of Tailings Storage Facility 193
Figure 18.3: Flowsheet of Backfill Plant 195
Figure 19.1: Outlook for Silver, Lead and Zinc Prices by CMF 200
Figure 21.1: Capex Investment Plan over LOM 211
Figure 21.2: Capitalized Development over the LOM 212
Figure 21.3: Pie Chat of Percentage for GC Mine Opex 214
Figure 21.4: Opex for Historical Three-Year (in USD k) 215
Figure 22.1: Cash Flow Profile 225
Figure 22.2: GC Mine NPV versus Discount Rate 225
Figure 22.3: Sensitivity Spider Chart (8% Discount Rate) 228
Figure 23.1: Zonation of Mineralization in the Daganshan Mineralization Field 230

 

Appendices

Appendix A Mining Permit
Appendix B Business License
Appendix C High-Tech Enterprise Certificate
Appendix D Water Use Permit
Appendix E Safety Production Permits

  

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xiii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Useful Definitions  
■  FINAL

 

Useful Definitions

This list contains definitions of symbols, units, abbreviations, and terminology that may be unfamiliar to the reader.

 

Abbreviation Terminology
% Percent/percentage
/ Per
Minute of arc
° Degree(s) of arc
°C Degree(s) Centigrade
3D Three-dimensional
AAS Atomic absorption spectroscopy
AER Annual Environmental Report
Ag The chemical symbol for silver
AgEq Equivalent Ag grade, considered Pb and Zn grades after applying the equivalent factors.
ALS ALS Chemical Assaying Laboratory in Guangzhou, China
AMC AMC Mining Consultants (Canada) Ltd.
ARD Acid rock drainage
As The chemical symbol for arsenic
ASL Above sea level
Au The chemical symbol for gold
AusIMM Australasian Institute of Mining and Metallurgy
B.Eng. Bachelor of Engineering
B×H Breadth × height
BD Bulk density
Bi The chemical symbol for bismuth
BVI British Virgin Island
Canadian NI 43-101 National Instrument 43-101, which is a national instrument for the (Canadian) Standards of Disclosure for Mineral Projects, including Companion Policy 43-101 as amended from time to time.
Capex Capital expenditure and/or cost
CIM Canadian Institute of Mining, Metallurgy and Petroleum
CIM Definition Standards The Definition Standards on Mineral Resources and Mineral Reserves adopted by CIM
cm Centimetre(s)
CMF Consensus Market Forecasts
CMP Composite(s)
COG Cut-off grade, the grade threshold above which a mineral material is considered potentially economic and is selectively mined and processed as ore
Conc. Concentrate

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xiv

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Useful Definitions  
■  FINAL

 

CoV Coefficient of Variation
CP Competent Person
CPR Competent Person’s Report
CSA Compensations for sulfuric acid
CSR Corporate social responsibility costs
CSV Comma-separated values
Cu The chemical symbol for copper
DA Depreciation and amortisation
DCF Discounted cash flow
DNR of Guandong Department of Natural Resources of Guangdong Province
Dr Doctor of Philosophy
ECAP Environmental Corrective Action Plan
EIA The Environmental Impact Assessment
EPMP Environmental Protection and Management Plan
ESHS Environmental, Social, Health and Safety
etc. et cetera (= and so on)
FA Fire Assay
FAusIMM Fellow of the AusIMM
FS Feasibility study
g Gram(s)
g/t Gram(s) per tonne
GC Gaocheng
GMADI Guangdong Metallurgical & Architectural Design Institute
GPS global positioning system
H1 2024 the first half of 2024
H2 2024 the second half of 2024
ha hectare(s)
HQ core core diameter of 63.5 mm
i.e. id Est (= that is)
ICP Inductively coupled plasma
ICP-OES Inductively Coupled Plasma - Optical Emission Spectrometer
ID3 inverse distance power of 3
IDW inverse distance squared
IFC International Finance Corporation
Indicated Mineral Resource

An Indicated Mineral Resource is that part of a mineral resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xv

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Useful Definitions  
■  FINAL

 

  geological and/or grade continuity but are spaced closely enough for continuity to be assumed
Inferred Mineral Resource, INF An Inferred Mineral Resource is that part of a mineral resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings, and drill holes which may be limited or of uncertain quality and reliability
Intertek Intertek Laboratory in Beijing
IP Induced Polarisation, which is an exploration technique whereby an electrical current is pulsed through the ground and the response from the sub surface measured in order to identify minerals of interest. Strong IP responses may be a result of sulphide which may be associated with gold mineralisation
IPO Initial Public Offering
IRR internal rate of return
JORC Code Australasian Code for Reporting of Exploration Results, Mineral Resources and Mineral Reserves, 2012 edition, as published by the Joint Mineral Reserves Committee.
JORC Committee Joint Mineral Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia
kg kilogram(s), equivalent to 1,000 grams
kg/t kilogram(s) per tonne
km kilometre(s), equivalent to 1,000 metres
km2 square kilometre(s)
koz 1,000 troy ounces
kt kiloton(s)
ktpa kiloton(s) per annum
kV kilovolt(s)
kW kilowatt(s)
kWh/t kilowatt(s) hour per tonne
L×B×H length × breadth × height
LHD load-haul-dump machine
LOM life of mine
m metre(s)
M Million(s)
m ASL metre(s) above sea level
M.Eng. Master of Engineering
M.Sc. Master of Science
m/kt metre(s) per kiloton
m/s metre(s) per second
m2 square metre(s)
m3 cubic metre(s)

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xvi

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Useful Definitions  
■  FINAL

 

m3/d cubic metre(s) per day
m3/s cubic metre(s) per second
m3/t cubic metre(s) per tonne
m3/year cubic metre(s) per year
MAusIMM Member of the AusIMM
Measured Mineral Resource A Measured Resource is that part of a mineral resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes
mg/l milligram(s) per litre
mg/m3 milligram(s) per cubic metre
MI Measured + Indicated Categories Mineral Resources
Mineral Reserve The economically mineable part of a measured and/or indicated mineral resource. It includes diluting materials and allowances for losses which may occur when the material is mined. Appropriate assessments and studies have been carried out and include consideration of and modification by realistically assumed mining, metallurgical, economic, marketing, legal, environmental, and social and government factors, as defined in the CIM Definition Standards. These assessments demonstrate at the time of reporting that extraction could reasonably be justified. Mineral Reserves are sub-divided in order of increasing confidence into Probable Mineral Reserves and Proven Mineral Reserves.
Mineral Resources A concentration or occurrence of material of intrinsic economic interest in or on the earth’s crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction, as defined in the CIM Definition Standards. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge
mm millimetre(s)
Mo The chemical symbol for molybdenum
Moz Million ounce(s)
Mr Mister
mRL Meter(s) relative level to sea level
MW Megawatt(s), equivalent to 1,000,000 watts
NCF net cash flow
NI 43-101 Canadian National Instrument 43-101
NPV net present value
NQ core core diameter of 47.6 mm
O.K. Ordinary Kriging
OHS occupational health and safety
Opex operating cost
oz ounce
Pb The chemical symbol for lead
PEA Preliminary Assessment Technical Report
pH potential of hydrogen

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xvii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Useful Definitions  
■  FINAL

 

Ph.D. Doctor of Philosophy
ppb part(s) per billion
PRC People’s Republic of China
Probable Mineral
Reserve
A Probable Mineral Reserve is the economically mineable part of an Indicated, and in some circumstances Measured Resource. It includes diluting materials and allowances for losses which may occur when the material is mined. Appropriate assessments, which may include feasibility studies, have been carried out, and include consideration of and modification by realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. These assessments demonstrate at the time of reporting that extraction could reasonably be justified
Proven Mineral
Reserves
A Proven Mineral Reserve is the economically mineable part of a Measured Resource. It includes diluting materials and allowances for losses which may occur when the material is mined. Appropriate assessments, which may include feasibility studies, have been carried out, and include consideration of and modification by realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. These assessments demonstrate at the time of reporting that extraction could reasonably be justified.
QA/QC Quality Assurance / Quality Control
QMS Quality Management System
QP Qualified Person
QPR Qualified Person’s Report
RMB Renminbi, which is the official currency of the People’s Republic of China.
ROM run-of-mine
RTK real-time kinematic
S The chemical symbol for Sulphur
SBX Sodium butyl xanthate
SD standard deviations
SG specific gravity
SGS Tianjin SGS Laboratory in Tianjin, China
Silvercorp Silvercorp Metals Inc
Sn The chemical symbol for Tin
SRK ZA SRK Consulting (South Africa) (Pty) Ltd.
SRK, SRK CN SRK Consulting China Ltd. trading as SRK Consulting
Stock Exchange, HKEX The Stock Exchange of Hong Kong Limited
t tonne(s), equivalent to 1,000kg
t/h tonne(s) per hour
t/m3 tonne(s) per cubic metre
tpa tonne(s) per annum
tpd tonne(s) per day
tph tonne(s) per hour
TSF tailings storage facility

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xviii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Useful Definitions  
■  FINAL

 

TSX Toronto Stock Exchange
TSXV TSX Venture Exchange
USc United States cent
USD, US$ United States Dollar
USGS United States Geological Survey
Valmin Code Code for Technical Assessment and Valuation of Mineral and Petroleum Assets and Securities for Independent Expert Reports
VAT value-added tax
W The chemical symbol for tungsten
WRD waste rock dump
WSCP Water and Soil Conservation Plan
Zn The chemical symbol for zinc
μm micron(s), 1/1,000 of a millimetre

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xix

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

1  Summary

 

1.1  Introduction

SRK Consulting China Ltd. (“SRK”) was requested by Guangdong Found Mining Co., Ltd. (“GC Mine”) to prepare a Qualified Person’s Report (“QPR” or Competent Person’s Report, “CPR”) for Gaocheng (“GC”) Silver-Lead-Zinc Project, located in Yunfu City of Guangdong Province, People’s Republic of China (the “PRC” or “China”) in compliance with the requirements of Canadian National Instrument 43-101 (the “NI 43-101”) and the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited (the “Listing Rules”) for the listing by Silvercorp Metals Inc (“Silvercorp”), who indirectly owns 99% of GC Mine.

This QPR or CPR is an independent review of the GC Project’s geology, exploration, Mineral Resources, Mineral Reserves, mining, mineral processing, capital investment, operating cost, and environmental and social aspects.

The scope of work includes the review the Mineral Resources estimates, modifying factors for Mineral Reserve conversion, operation records and mining operations for the GC Mine as of the effective date of the report, conducting site visit by the Qualified Persons, and preparation of the QPR in compliance with the NI 43-101 and the Listing Rules.

The Mineral Resource statement reported herein is a collaborative effort between GC Mine, Silvercorp and SRK personnel.

The exploration database was compiled and maintained by GC Mine and was reviewed by SRK. The geological model and wireframes defining the mineralisation, the statistical analysis and block model(s) were constructed by Silvercorp, between April and July 2024. In SRK’s opinion, the geological model is a reasonable representation of the distribution of the targeted mineralisation at the current level of sampling.

Based on the Mineral Resource estimates and model(s), the mine plan and operation practices, GC Mine converted the qualified Mineral Resources into Mineral Reserves and scheduled the productions of the mine under the SRK’s review. SRK updated the technical-economic analysis to demonstrate the project economic viability for perspective operation.

After reviewed the Mineral Resource Estimates and the mine plan as of 31 March 2024, SRK was requested to conduct a further review to the update data as of 30 June 2024. This report is combined the initial review and the update. The update is mainly on the following:

Update production data or record of Q1 2025;
Update the Mineral Resource according to the mined-out voids;
Update the mine plan which starts from the Q2 2025;
Update the metal prices for technical- economic analysis; and
Update the Mineral Resource and Mineral Reserve Statement.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xx

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

1.2  Overview

GC Mine, 99% owned by Silvercorp, in the vicinity of Gaocheng village, Gaocun Township, Yun’an District, Yunfu City, Guangdong Province, which is accessed from Guangzhou that is the capital of Guangdong Province, is via 178 km of four-lane express highway to Yunfu, then 48 km of paved road to the Project site.

The poly-metallic mineralization of the GC deposits belongs to the mesothermal vein infill style of deposit, with silver, lead and zinc elements for commercial extraction.

The Mine is an operating underground mine (“UG”), with related facilities and infrastructure that are suitable and constructed for supporting the operation, and necessary regulation permits and licenses.

The GC Mine is a producing UG Mine applying decline (ramp) and shaft hybrid access method and shrinkage, resuing and overhand cut and fill mining methods, to produce plant feed ore since Q2 2014. The GC processing plant has a nominate capacity of 330 thousand tonnes per annual (“ktpa”) feed ore to produce commercial lead concentrate and zinc concentrate.

SRK has worked on the GC Project since April 2024, conducted data verification programs and carried out quality assurance and quality control programs on drill hole information. SRK reviewed the active database and economic and technical parameters provided by GC Mine and Silvercorp, and opined the estimation of Mineral Resources is reasonable.

The Mineral Resource statements for GC Mine are shown in Table 1.1.

 

Table 1.1:Mineral Resource Statement for GC Project, as of 30 June 2024

 

Resource
Classification
Tonnes       Contained Metal
(Mt) Ag (g/t) Pb (%) Zn (%) Ag (koz) Pb(kt) Zn(kt)
Measured 5.87 88 1.30 3.11 16,542 76 183
Indicated 5.62 80 1.05 2.57 14,507 59 144
Measured+Indicated 11.49 84 1.18 2.85 31,049 136 327
Inferred 9.57 85 1.23 2.44 26,194 117 234

Sources: GC Mine, SRK summarized

Notes:

1 Mineral Resource Statement as of 30 June 2024.

2 Source: Silvercorp Metals Inc, Verified by SRK

3 Mineral Resource are reported at a cut-off grade of 120 g/t AgEq.

4 The totals may not compute exactly due to rounding.

5 The veins within the sub-surface/ 5m below surface are not included in the Mineral Resource estimate

The mine plan prepared by GC Mine is based on the eligible Mineral Resource, that are Measure and Indicated categories (“MI”), and generates a 14-year life of mine (“LOM”) for GC Mine at a production rate of about 361 ktpa run of mine (“ROM”), which was converted to Mineral Reserve after considering the modifying factors.

The capital costs and operating costs provided to SRK, were matched production capacity and the current economic conditions. The economic analysis results demonstrate the economic viability of GC Mine.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxi

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

Based on the SRK’s review and projection using discount cash flow modelling, the GC Mine has a net present value (the “NPV”) of US Dollar (the “USD”) 63.1 million at a discount rate of 8%.

The economically mineable parts of the Measured and Indicated Mineral Resources within the designed stopes, including diluting materials and allowance for losses, were classified as Proven and Probable Mineral Reserves, respectively. The Mineral Reserve is estimated based on the reference point being the primary crusher or temporary stockpile at the crusher feed. The Mineral Reserve statement for GC Mine is shown in Table 1.2.

 

Table 1.2: Mineral Reserve Statement for GC Mine, as of 30 June 2024

 

Category Tonnes Ag Pb Zn Contained Metal  
Unit (Mt) (g/t) (%) (%) Ag (koz) Pb(kt) Zn(kt)
Proven 2.73 81 1.26 2.95 7,142 34 81
Probable 2.23 81 1.15 2.71 5,791 26 61
2P Total 4.97 81 1.21 2.84 12,933 60 141

Sources: GC Mine, SRK summarized

Notes:

1 Any differences between totals and sum of components are due to rounding.

2 150 g/t AgEq and 200 g/t AgEq COG was applied to Shrinkage (including overhand cut & fill) and resuing stopes, respectively.

3 The COG estimates are based on the forecast prices 22 USD/oz silver, 2,050 USD/t lead, and 2,650 USD/t zinc.

4 The Mineral Reserves are reported on a metric dry tonne basis.

5 The Mineral Reserves are reported at the reference point of ROM stockpile before crushing or directly crushing.

6 The Mineral Reserves are reported inclusive of Mineral Resources.

7 The Mineral Reserves are effective as of 30 June 2024.

 

1.3  Property Description and Ownership

The GC mine is located in the vicinity of Gaocheng Village of Gaocun Township, Yun’an District, Yunfu City, Guangdong Province, China. Altitudes in the region range from 78 to 378 m above sea level (“ASL”), usually 150 to 250 m ASL, with relative differences of 50 to 150 m. Vegetation is in the form of secondary forests of pine and hardwoods, bushes, and grasses. Topsoil covers most of the ground. Outcrops of bedrocks can only be observed in valleys.

The region belongs to a sub-tropical monsoon climate zone with average annual temperature of 20 – 22°C. Rainfall is mainly concentrated in spring and summer from March to August. Winters feature short periods of frosting. The GC Project is able to operate year-round.

In 2008, Silvercorp acquired 100% of the shares of Yangtze Gold Ltd. (Yangtze Gold), a private British Virgin Island (“BVI”) company, which in turn wholly owns Yangtze Mining Ltd. (Yangtze Mining).

Guangdong Found Mining Co. Ltd. (China), (Guangdong Found), is the designated joint venture operating company of the GC Mine. Yangtze Mining (H.K.) Ltd., a wholly owned subsidiary of Yangtze Mining, owns 95% of Guangdong Found.

In October 2018, Silvercorp Metals (China) Inc., a wholly owned subsidiary of Silvercorp, acquired an additional 4% equity interest in Guangdong Found, and as a result, the Silvercorp now beneficially owns a 99% interest in Guangdong Found, who has a 100% beneficial interest in the GC Mine.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

GRT Mining Investment (Beijing) Co., Ltd. is a 1% equity interest holder of Guangdong Found.

Table 1.3 summarises the status of key operational licences and permits for the GC Mine. SRK has reviewed the information provided and is satisfied that the extent of the properties described in the various rights are consistent with the maps and diagrams received from GC Mine.

 

Table 1.3: Key Operational Licences and Permits

 

 

Holder

Business
Licence
Mining
Licences
Safety
Production
Permits
Land/Forest
Use Permit
Water Use
Permit
Site Discharge
Permit
GC Mine Y Y Y Y Y Y

Notes: “Y” denotes the licence/permit is granted and has been sighted by SRK.

 

1.4  Geology and Mineralization

 

1.4.1  History

Prior to Yangtze Mining Ltd. acquiring the then project in 2005, illegal mining activity resulted in the excavation of several tunnels and small-scale mining of veins. In 2008, Silvercorp acquired a 100% interest in the shares of Yangtze Gold Ltd. which in turn wholly owned the entirety of Yangtze Mining.

The Project (subsequently the GC Project) was discovered in 1959 by traditional prospecting methods. From 1959 to 2007, Geophysical Survey Brigade of Guangdong Bureau of Geology and Mineral Resources and Guangdong Provincial Institute of Geological Survey (“GIGS”) conducted the exploration work on the GC Project, and Silvercorp started the exploration work from 2008, while detailed systematic drilling commenced in 2011 and has been on-going.

Prior to Yangtze Mining acquiring the Property, illegal mining activity resulted in the excavation of several tunnels and small-scale mining of veins V2, V2-2, V3, V4, V5, V6, and V10. GIGS reported that a total of 1,398 m of excavation comprised of 10 adits and tunnels had been completed on the Property through the illegal activity.

Since 2008, six Mineral Resource estimates for the GC project have been documented by AMC Mining Consultants (Canada) Ltd. (“AMC”) following the CIM Definition Standards.

 

1.4.2  Geological Setting and Mineralisation

The Property is located on the east margin of the Luoding basin, east of the Wuchuan – Sihui major fault within the north portion of the Yunkai uplift of the South China Orogenic Belt. Basement geology in the area comprises late Proterozoic Sinian sedimentary clastics and carbonate rocks; Palaeozoic (Ordovician, Silurian, Devonian, Carboniferous) sedimentary clastics and carbonate rocks; and Mesozoic (Triassic) coal-bearing clastic rocks and Cretaceous red clastic rocks. Ag-Pb-Zn polymetallic deposits occur within late Proterozoic rocks. Cu-Pb-Zn, Mn, and Au-Ag deposits occur within Paleozoic rocks.

The majority of Ag-Zn-Pb mineralization is hosted by the Mesozoic granite. The granite dips south and strikes west north-west, parallel to the majority of mineralized veins on the GC property.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxiii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

Ag-Pb-Zn mineralization at the GC deposit can be divided into two types: primary and oxidized. The primary mineralization is mainly composed of galena-sphalerite-silver minerals, which occur sparsely, as disseminations, veinlets, and lumps. Primary mineralization accounts for 95% of the entire Mineral Resource. Oxide mineralization occurs on and near the surface. Alteration minerals associated with the GC vein systems include quartz, sericite, pyrite, and chlorite, together with clay minerals and limonite. Silicification commonly occurs near the centre of the veins. Chlorite and sericite occur near and slightly beyond the vein margins.

 

1.4.3  Deposit Types

The poly-metallic mineralization of the GC deposit belongs to the mesothermal vein infill style of deposit.

 

1.4.4  Exploration and Data Management

Various state-sponsored Chinese Geological Brigades and companies have conducted geological and exploration work in the Project area.

During 2001 and 2002, and again in 2004 and 2005, GIGS conducted general prospecting at the GC Project area, and defined some mineralized bodies and estimated Mineral Resources for the GC deposit.

From 2006 to 2007, GIGS conducted detailed prospecting at the GC Project area, and completed a 36-hole, 11,470 m surface diamond drilling program and 1,964 m3 of trenching and surface stripping to update and upgrade the Mineral Resources of the GC deposit.

In 2008, Silvercorp completed a surface exploration program including soil sampling, geological mapping, and trenching. After 2008 Silvercorp continued the underground tunnelling and sampling at the Property Area.

All Silvercorp drilling from 2008 to 2023 was conducted using NQ-sized core (47.6 mm diameter core), with all drill programs managed by Silvercorp. Drillhole collars were surveyed using a total station, and downhole surveys were completed every 50 m using a Photographical Inclinometer manufactured by Beizheng Weiye Science and Technology Co. Ltd. (Chinese equivalent of the Sperry-Sun downhole survey tool). After the completion of drilling, surface drillhole collars were cemented, and the locations were marked with concrete blocks measuring 50 x 30 x 20 cm. Core recoveries from Silvercorp's drilling programs ranged from 35.66% to 100.00%, with an average recovery rate of 99.36%. A review of the relationship between grade and core recovery showed no bias.

From 2008, Silvercorp continued the underground tunnelling and sampling at the Property Area. Details of drill programs completed between 2008 and 2023 are presented in Section 5 of this report.

Channel sampling was conducted at 5 m intervals across mineralized vein structures in the adits, with wider spacing (15 or 25 m) in non-mineralized sections. Each channel comprised multiple chip samples taken across the mineralization and wallrocks.

All data for the GC project is stored within a central Microsoft Access Database, which is managed by two designated database administrators. Drillhole data is collected in Microsoft Excel and

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxiv

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

imported into the Access database. Underground mapping is recorded on grid paper and in Excel and then imported into Access or Micromine 3D software.

Silvercorp has established QA/QC procedures which cover sample collection and processing at the GC Property. These QA/QC protocols have been progressively refined since 2011. Certified Reference Materials (CRMs) and coarse blanks have been included with drilling samples since 2011, and with underground samples since 2014. Field duplicates have been included with drilling samples since 2012 and with underground samples since 2014. Check (umpire) samples (pulp duplicates) have been sent to a separate ‘umpire’ laboratory since 2012.

In 2018, Silvercorp further improved their QA/QC protocols to include regular and more frequent submission of CRMs, coarse blanks, and field duplicates with drilling and underground samples. Coarse reject duplicates and pulp duplicates were also incorporated into drill sampling programs. The proportion of check samples, sent to a different laboratory was also increased. In 2019, Silvercorp initiated real-time monitoring of QA/QC protocols.

SRK has reviewed QA/QC data collected to date. Except for a small portion of data missing, all the data collected shows reasonable analytical accuracy and precision. SRK considers the GC Mineral Resource database acceptable for Mineral Resource estimation.

 

1.5  Mineral Resource and Mineral Reserve Estimates

The Mineral Resource estimation work was completed by Mr Yongwei Li, Resource Geologist of Silvercorp under the supervision of Guoliang Ma, who is the QP of Silvercorp. Mr Mark Wanless, Principal Geologist of SRK ZA (FGSSA, Pr.Sci.Nat) and Ms Yanfang Zhao, Principal Geologists of SRK (MAusIMM) have reviewed the database, estimation methodologies and models used to prepare the Mineral Resource estimate using Isatis.Neo software. After some adjustment to the compositing, capping and search parameters, Mr Mark Wanless and Ms Yanfang Zhao are satisfied that they comply with reasonable industry practice.

The Qualified Person responsible for the Mineral Resources is Mr Mark Wanless, who is a full time employee of SRK Consulting (South Africa) (Pty) Ltd. (SRK ZA) and Registered with the South African Council for Natural Scientific Professionals as Pr.Sci. Nat, 400178/05, Fellow of the Geological Society of South Africa, Member of the Geostatistical Association of South Africa. Mr Mark Wanless visited the project between the 23 and 26 of April 2024.

The estimates are based on drilling samples and underground samples information available up to 2024. With respect to drilling and underground sample information available for the March 2024 Mineral Resource estimates, SRK believes the current drilling and channel sampling information is sufficiently reliable to interpret with confidence the boundaries for GC deposits and that the assay data is sufficiently reliable to support the Mineral Resource estimation.

The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated, or interpreted from specific geological evidence and knowledge, including sampling. SRK considers that the majority of the GC Project is amenable for underground mining.

Within the current mining License area, as of 30 June 2024, the GC Mine, above a cut-off grade (“COG”) of 120g/ t AgEq, there are 11.49 million tonnes (“Mt”) of Measured and Indicated Mineral Resources at an average grade of 84g/t Ag, 1.18% Pb, 2.85% Zn; and 9.57 Mt of Inferred Mineral

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxv

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

Resources at an average grade of 85g/t Ag, 1.23% Pb, 2.44% Zn. The estimated Mineral Resources are shown in Table 1.1.

The Mineral Reserve estimation work was completed by Falong Hu, Principal Mining Engineer of SRK based on the review of modifying factors supplied by GC Mine and the mine plan by Mr Haijun Xie, Mining Engineer of GC Mine, under the supervision of Alexander Thin, who is a Principal Mining Engineer of SRK.

The modifying factors relevant to metallurgical and processing are relied on the opinions from Mr. Lanliang Niu, Principal Processing Engineer of SRK; the modifying factors relevant to environmental permitting, and social impact are relied on the opinions from Mr. Nan Xue, Principal Environmental Scientist and Hongchen Huang, Environmental Scientist, of SRK; the modifying factors relevant to costings and technical-economic analysis are relied on the opinions from Ms. TzuHsuan Chuang, Senior Mining Engineer of SRK. Mr Falong Hu and engineers or scientists he reliance on are satisfied that they comply with reasonable industry practice.

The Qualified Person responsible for the Mineral Reserve is Mr Falong Hu, who is a full-time employee of SRK Consulting (China) Ltd. and, Fellow of the Australasian Institute of Mining and Metallurgy (“AusIMM”). Mr Falong Hu visited the project between the 23 and 26 of April 2024.

Within the current mining License area and mine plan scope, as of 30 June 2024, the GC Mine, by applying the Modifying Factors, the economically mineable parts of the Measured and Indicated Mineral Resources within the designed stopes, including diluting materials and allowance for losses, were classified as Proven and Probable Mineral Reserves, respectively. The feed ore is estimated based on the reference point being the primary crusher or temporary stockpile at the crusher feed. Around 44% Measured and Indicated Mineral Resources are converted into Proven and Probable Mineral Reserves in terms of tonnes, and about 43% contained metal converted when considering equivalent silver.

Above a COG of 150 g/t AgEq and 200 g/t AgEq applied to Shrinkage (including overhand cut and fill (“OCAF”)) and resuing stopes, respectively, there are 4.97 Mt of Proven and Probable Mineral Reserve at an average grade of 81g/t Ag, 1.20% Pb, 2.84% Zn. The estimated Mineral Reserves are shown in Table 1.2.

 

1.6  Development and Operations

 

1.6.1  Geotechnical and Hydrogeological Considerations

The rock mass condition is categorized as Fair to Good and it is anticipated that the vein and host rocks in the mine area will continue to be largely competent and require minimal ground support other than in weaker ground areas. For AMC’s preliminary geotechnical assessments, minor water inflows (less than five litres per minute locally) were assumed. SRK notes that operating experience to date indicates that the assumption of minor water inflows is reasonable.

 

1.6.2  Mining Method

UG mining to date has been conducted in two stages, and designing the third stage, which are horizontally defined by mine sections and vertically by elevations:

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxvi

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

Stage 1 targeted bringing the project into production as soon as practicable using mobile, rubber- tired, diesel-powered equipment (development jumbo, loader, and truck) with surface declines access down to -50 mRL.
Stage 2 development from -50 mRL down to -300 mRL employs conventional tracked equipment (battery powered locomotives, rail cars, electric rocker shovels and pneumatic hand-held drills) via a surface shaft access and surface decline extension.
Stage 3 is on design, which mines the Mineral Resources occurred between -300 mRL and - 500 mRL.

The mining method employed by the mine were traditional shrinkage and resuing stoping methods, prior to 2021. Overhand cut and fill method has been introduced as the backfill plant finished construction.

The underground infrastructure, including water supplier and dewatering system, hoisting system, ventilation, power supply, compressed air supply, are well constructed for the first 2 stages of mining.

The mine is scheduled to operate 8 hours per shift, 3 shifts per day, 330 days per year. The nominate capacity is to be 330 ktpa plant feed.

Annual ore production is projected to rise from the current level of around 313 kt to 363 kt by FY2026 till the remainder of its envisaged mine life. The key reason of production ramp up is due to the third stage development and more stopes employing mobile equipment. The key target of the mine plan is to achieve the planned grade, mining more efficiently and lower the cost base. The life of mine schedule summarized in Table 1.4 below.

 

Table 1.4:Summary of LOM Schedule

 

Fiscal Year ROM AgEq Ag Pb Zn
Unit kt g/t g/t % %
FY2025 Q2-Q4 257 238 71 1.12 3.02
FY2026 363 256 77 1.23 3.08
FY2027 362 251 83 1.35 2.69
FY2028 362 251 85 1.10 2.91
FY2029 362 253 90 1.10 2.84
FY2030 362 252 81 1.08 3.06
FY2031 363 248 87 1.16 2.72
FY2032 362 249 81 1.27 2.77
FY2033 362 248 77 1.17 2.94
FY2034 363 247 89 1.13 2.68
FY2035 363 249 81 1.39 2.62
FY2036 363 246 82 1.42 2.52
FY2037 362 248 81 1.19 2.86
FY2038 359 236 65 1.15 2.99
LOM total 4,965 248 81 1.21 2.83

Source: GC Mine, summarized by SRK

Notes:

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxvii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

1 Fiscal yare is from 1st April to 31st March of the next year. FY2025 is from 1 April of 2024 to 31 March of 2025;

2 ROM stands for run of mine, which includes mining dilution and ore loss.

3 AgEq accumulated by factored Ag, Pb and Zn grade, which is 1, 44.83 and 40.02, respectively.

4 Inferred Mineral Resources are not included.

  5 ROM is considered feed the GC processing plant directly or rehandled from the temporary stockpile. Therefore, the processing plan is the same as mine schedule.

 

1.6.3  Recovery Method

The GC Mine contains silver-lead-zinc polymetallic ore, with minor quantities of copper and tin available for comprehensive recovery. The processing test work conducted by the Hunan Research Institute for Nonferrous Metals in 2009 employed a preferential flotation process, sequentially yielding lead, zinc, and sulfur concentrates with favourable results, providing technical support for the design of the GC processing plant. An exploratory test on tin recovery from tailings was undertaken, achieving a recovery rate of 34% through gravity separation using classified shaking tables, which can be used as reference for the design of tin recovery facilities at the plant. Additionally, a copper- lead separation flotation test was performed on the lead concentrate, successfully producing copper concentrate.

The GC processing plant is designed with a processing capacity of 1,600 tonnes per day (tpd), and the grinding and flotation system consists of two parallel circuits. The original lead-zinc-sulphur sequential preferential flotation process was modified in 2013 to a lead preferential flotation, a zinc- sulphur mixed flotation and then zinc-sulphur separation flotation process. The actual capacity of each circuit has reached between 900 and 950 tpd. Historical production indicators are positive, with the lead concentrate averaging a lead grade of 45%, a lead recovery rate of 90%, and containing 1,500 g/t of silver with a silver recovery rate of 60%, and a zinc content of 6%. The zinc concentrate has a zinc grade of 44%, a zinc recovery rate of 89%, and contains 290 g/t of silver with a silver recovery rate of 23%. The sulphur concentrate has a sulphur grade of 45% and a sulphur recovery rate of 49%.

In 2023, the newly implemented intelligent pre-sorting system replaced the manual hand-sorting methodology, allowing for the preliminary removal of waste rock and enhancing the grade of ore fed into the mill. This advancement is particularly beneficial for the processing of low-grade ores. The system is currently undergoing continuous optimization, and it is anticipated to significantly contribute to the efficient pre-discarding of tailings, thereby yielding improved economic benefits.

The GC tailings storage facility (“TSF”) is a dry-stacking tailings dam, located in a valley on the south side of the GC processing plant, 200 m away from the GC processing plant in a straight line. Between the GC processing plant and the TSF are the tailings dewatering station and the paste filling station. The tailings from the GC processing plant is pumped to the deep cone thickener for thickening, after which it is primarily used for the underground paste filling needs, and the remaining part is pressed and filtrated in the tailings press filter workshop, and the filter cake is transported to the TSF by the belt conveyor, which will be levelled and compacted by bulldozers and excavators. The total designed dam height of the TSF is 99.5 m (elevation of 233m), and the total storage capacity is 2,989,300 m3. As of April 2024, the tailings stacking height is 63m (elevation of 196.3m) with the tailings stacking stock of about 1,180,000 m3 (39% of capacity), and the remaining storage capacity is 1,809,300 m3 corresponding to a tailings stacking volume of 3,160 kt according to a tailings stacking specific gravity of 1.75t/ m3.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxviii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

The GC TSF is a third-class dam with a number of displacement monitoring facilities and phreatic line monitoring systems installed to monitor the safety of the dam body and obtained the latest “Safety Production Permit” on 31 August 2023, valid until 30 August 2026.

 

1.6.4  Operation

GC Mine has been commercial operated since Q2 2014. GC Mine operates mainly using contractors for mine development, production, ore transportation, and exploration. GC mine provides its own management, technical services, and supervisory staff to manage the mine operations. The operation records for the last 3 years are presented in Table 1.5.

 

Table 1.5:Operation Records from FY2022 to FY2025 Q1

 

Year Unit FY2022 FY2023 FY2024 FY2025 (Q1)
Ore Mined dry tonne 314,882 299,959 290,006 83,139
Moisture % 3.07 2.97 2.67 3.13
Processed dry tonne 318,042 299,597 290,050 83,745
Head Grades          
Ag g/t 75 75 69 64
Pb % 1.53 1.32 1.19 0.94
Zn % 3.19 2.75 2.64 2.38

Sources: GC Mine processing annually report

 

 

1.7  Environmental Studies, Permitting and Social or Community Impact

The GC Mine has obtained the main environmental protection-related permits required for operation, including the safety production permit, water use permit, and site discharge permit. An environmental impact assessment report for the project was prepared by Guangdong Heli Engineering Survey Institute in March 2020. Guangdong Province Environmental Protection Bureau issued aforementioned EIA approval on 13 June 2010. The EIA report covers the main production facilities including mine site, GC processing plant and TSF.

Some treated dewatering water is reused to supplement fresh water for underground mining operations and GC processing plant production, while the remaining portion is discharged. All processing wastewater is internally recycled and not discharged externally. The project conducts comprehensive environmental monitoring every quarter, which includes water quality monitoring, noise emission and dust emission. Additionally, surface water and groundwater monitoring are conducted annually, separately during the first and second halves of the year.

The GC Mine does not cover any nature reserves, scenic spots, or cultural relics. The general project area does not include any cultural minority groups. The project area consists mostly of secondary forest land, with a few hillsides cleared for farmland. The company actively participates in a range of social welfare and charitable initiatives, such as community development, support for vulnerable groups, educational assistance, and contributions to foundations. Moreover, it offers a variety of employment opportunities for working-age residents in the local area.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxix

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

1.8  Capital Cost and Operating Cost

Forecasting of capital expenditure (“Capex”) and record of operating cost (“Opex”) for the last 3 fiscal years have been provided to SRK. The associated Capex for expansion development (deepening the mine) are estimated by the Mine. The other sustainable Capex such as mine closure, facilities updates, and capital maintenance are also estimated. The summary of Capex is presented in Table 1.6 below.

 

Table 1.6:Summary of Capex for GC Mine

 

Item Unit LOM Total
Exploration Drillings USD Million 34.6
Mine Capex Development USD Million 23.6
Processing Updates USD Million 2.4
Infrastructure Updates USD Million 0.2
Mine Closure & Reclamation USD Million 1.8
Total USD Million 62.5

Sources: GC Mine, summarized by SRK

Notes: Any differences between totals and sum of components are due to rounding

GC Mine has a relative stable operation which addresses the Opex forecasting via their historic production records. The Opex is forecasted from the historical operation records of the past 3 years, which is USD58.3 /t. The operating costs are categorized into mining, processing, backfill, tailings and filtration, sale, general and administrative, (“S&GA”), and corporate social responsibility costs (“CSR”). Table 1.7 presented the summary of unit costs for the last 3 year and the weighted average parameters.

 

Table 1.7:Summary of Opex Historical & Forecasted for GC Mine

 

Item Unit FY2022 FY2023 FY2024 Weighted Average
as Forecasted
Mining USD/t ROM 26.5 31.9 36.6 31.7
Plant USD/t Feed 13.2 15.6 16.3 15.0
Backfill USD/t ROM 3.2 3.1 2.9 3.1
Tailings filtration USD/t Feed 0.4 0.5 0.3 0.4
S&GA USD/t Feed 7.0 8.2 8.9 8.0
CSR USD/t Feed 0.2 0.1 0.1 0.1
Total Cash Unit Cost USD/t 50.5 59.4 65.0 58.3
Mine ROM kt 315 300 290  
Plant Feed kt 318 300 290  

Sources: GC Mine, summarized by SRK

Notes: Mining and backfill costs are united by mine ROM and the others are united by plant feed.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxx

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

1.9  Technical-Economic Analysis

The technical-economic analysis was conducted using conventional Discounted Cash Flow (“DCF”) techniques. The Net Present Value (“NPV”) was determined from the project's cash flow using an 8% discount rate.

The cash flow estimate includes only the revenue, costs, taxes, and other factors directly associated with GC Mine. The assumptions are as follows:

The ROM and finial products of GC Mine, which are lead and zinc concentrates, are based on the LOM schedule.
The local currency for the Project is RMB, while US dollars are used for technical-economic analysis. The exchange rate is set statically at USD1 = RMB7.22
Annual gross revenue is calculated by applying the forecasted metal prices and payable metal percentages from contracts to the annual recovered metal for each operating year.
SRK does not consider future inflation or currency and cost fluctuations; the cost remains constant over the LOM.
Financing is assumed to be on a 100% equity basis; no debt or related financing costs have been included in the technical-economic analysis.
Corporate obligations and financing costs are not considered.
Exploration Capex, which is aimed at discovering additional Mineral Resources that are currently outside the Mineral Reserves estimates, is not considered during this analysis.
No salvage value has been included in the technical-economic analysis.
Working capital will be fully recovered at the end of LOM.
The reference date or effective date is 30 June 2024.

The projection for Project operation shows a positive economic prospect. At a discount rate of 8%, the NPV of the Project is USD 63.1 million. The NPVs at various discount rates are also presented.

SRK conducted a single-factor sensitivity analysis for the Project. The analysis focused on metal prices, Capex, and Opex, each tested within a ±30% range, exploration Capex, and corporate income tax rate. The results showed that the Project is most sensitive to changes in metal prices. The break-even prices (NPV=0, at 8% discount rate) are around a change of -27.3% simultaneously of silver, lead and zinc, from the base scenario prices used in the model. In other words, all the 3 metal prices drops to about 72.7% of the forecasting prices, the Project NPV will become negative.

 

1.10 Conclusions and Recommendations
The data verification shows reasonable analytical accuracy and precision. The QP considers the GC Mineral Resource database acceptable for Mineral Resource estimation.
SRK believes the current drilling and channel sampling information is sufficiently reliable to interpret with confidence the boundaries for GC deposits and that the assay data is sufficiently reliable to support Mineral Resource estimation.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxxi

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

The mine is operating at industrial good practice and with a reasonable perspective feasible extraction of the eligible Mineral Resources.
The production process and operating parameters of the GC processing plant are suitable for the ore properties of the GC Mine. The historical performance shows that the targets of producing commercial lead concentrate and zinc concentrate have been achieved, and the recovery rates of silver, lead and zinc have also reached the design value.
The GC Mine has obtained the main environmental protection-related permits required for operation, including the safety production permit, water use permit, and site discharge permit. An environmental impact assessment report for the project was prepared by Guangdong Heli Engineering Survey Institute in March, 2020. Guangdong Province Environmental Protection Bureau issued aforementioned EIA approval on 13 June 2010. The EIA report basically covers the main production facilities including mine site, GC processing plant and TSF.
The associated Capex for development associated with the deepening of the mine are estimated by GC Mine. The other sustainable Capex such as mine closure, facilities updates and capital maintenance are also estimated. GC Mine has a relative stable operation which addresses the Opex forecasting via their practice records.
The economic analysis demonstrates the project could be economic viable operated according to the principal assumptions.
As reviewed by SRK from the geology, exploration, data management and Mineral Resource estimation, the QP recommendations for the GC mine are indicated below:
Regarding the sample database and QA/QC samples, SRK recommends ensuring that all records, including drillhole and channel samples, are assigned a consistent year between the collar and assay files. This will help reduce reporting discrepancies.
Additional bulk density measurements should be conducted on representative samples with varying base metal and pyrite content.
Bulk density measurements should also be taken from samples of the surrounding waste material.
Most umpire (check) samples show slightly bias results compared to the original samples in the higher end of the assay range. This phenomenon has occurred in both the ALS Laboratory and GC laboratories (“GC Lab”), which are the principal laboratories. It is recommended that it be assessed whether the storage of samples leads to this situation, which may be related to swelling and caking during oxidation.
In the site underground channel sampling observed, only the larger blocks on the plastic sheet were taken, all the fines were discarded, and the sampling was biased against the hanging wall and footwall units, with a larger proportion of the mineralization zone (Figure 6.2) chipped. Although SRK recognises that channel sampling is challenging due to the variable hardness of the rock units and uneven surface for sampling, SRK recommends that the chip sampling can be improved using a diamond saw to cut a channel for the chipping, which will also reduce the volume of sample and allow the full sample of coarse and fine material to be collected.
The umpire samples from 2021 to 2023 were observed to have some swelling and caking, especially in the samples for 2021 and 2022, which may result in mass change or oxidation, which may affect the results.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxxii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Summary  
■  FINAL

 

Based on the site visit and review of available technical information, and Mineral Reserve estimates, the QP recommendations for the GC mine are indicated below:
Conducting technical studies on long-hole stoping method for the relative wider veins, and well recording the test stope data, for the improvement of mining efficiency and cost reduction.
Conducting reconciliation on not only Mineral Resources versus Processed Feed, but also on the mineral flows, from the Mineral Resource model, grade control results, mining, then processing.
Conducting reconciliation on exploration investment versus Mineral Resources updates to demonstrate the Capex efficiency.
Considering utilising commercial mine planning software for mine scheduling, more efficient for modifying.
As part of ongoing operations at the mine, geotechnical and ground support aspects should be continuously reviewed in a formal and recordable manner, bearing in mind previous recommendations, local and mine-wide operating experience in all rock types encountered, any advisable data collection, and looking to future mining development.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT xxxiii

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Introduction  
■  FINAL

 

2   Introduction

In April 2024, SRK Consulting China Ltd. (“SRK”) was requested by Guangdong Found Mining Co., Ltd. (“GC Mine”) to prepare an independent technical review report on Gaocheng Silver-Lead-Zinc Project, located in Yunfu City of Guangdong province, China. The deliverable of this project is an independent technical review report which will enable potential equity investors and possible future shareholders to review the Project’s operations.

 

2.1  Purpose of the Report

The purpose of this Report is to provide an independent technical assessment for inclusion in a prospectus to be issued by Silvercorp Metal Inc, who is 99% owned GC Mine, to support the proposed listing on the Stock Exchange of Hong Kong Limited (“HKEX”).

Silvercorp is a Canadian mining company producing silver, gold, lead, zinc, and other metals with a long history of profitability and growth potential. Silvercorp operates several silver-lead-zinc mines at the Ying Mining District in Henan Province, China and the GC silver-lead-zinc mine in Guangdong Province, China. The Company’s common shares are traded on the Toronto Stock Exchange (“TSX”) and NYSE American under the symbol “SVM”.

SRK was advised that the report will be included in the listing and/or disclosure documents that the company plans to submit to the TSX and NYSE American, the report is in accordance with NI 43- 101 Standards of Disclosure for Mineral Projects ("NI 43-101") format and Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Standard Definition.

 

2.2  Scope of Work

The scope of work, as defined in the engagement includes the preparation of an independent technical report in compliance with NI 43-101 and Form 43-101F1 guidelines. This work typically involves the assessment of the following key aspects of this project:

Mineral Resource Estimates (“MRE”) inputs, workflow, and the results which are used and or applied by GC Mine expert(s).
Mineral Reserve conversion review, including the mining modifying factors applied by GC Mine expert(s).
Review of Modifying Factors of relevant disciplines, such as processing recovery method and associated infrastructure.
Review of Modifying Factors of relevant environmental-management activities, and permitting- compliance status, environmental impact assessments (“EIA”) approval, mining license, reclamation, mine safety operation license, as well as the potential impact on the Project.
Review of Modifying Factors of relevant technical-economic parameters, such as Capex and Opex.
Review of the any updates data by the Client operation.
Review of the LOM for the GC Mine based on the reviewed input parameters.
Update technical-economic model and conduct analysis for the GC Mine.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT34

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Introduction  
■  FINAL

 

SRK team conducted a site visit of the GC Mine.
SRK gave recommendation on data verification procedures, all assays have been gathered and examined by independent credible entities and that the results are accessible to industry best practices.
Summarized all findings and compile an ITR in accordance with NI 43-101 format.

SRK’s scope excludes any work relating to the marketing, commodity price and exchange rate assumptions, inflation rates and financial analysis (including discount rate) adopted in the technical economic model.

 

2.3  Work Program

The Mineral Resource statement reported herein is a collaborative effort between GC Mine and SRK personnel. The exploration database was compiled and is maintained by GC Mine and was audited by SRK.

The geological model and outlines for the silver, lead and zinc mineralization were constructed by GC Mine from a two-dimensional geological interpretation. In the opinion of SRK, the geological model is a reasonable representation of the distribution of the targeted mineralization at the current level of sampling. The geostatistical analysis, variography and grade models were completed by GC Mine during the 2 months (April and May 2024). The Mineral Resource statement was updated to the date of 31 March 2024.

The Mineral Reserve estimate was prepared by GC Mine based on the stated Mineral Resource model and validation/consideration of the modifying factors as outlined in the engineering design for the mine and during the operation practice since 2014 to date. A technical assessment and an economic analysis was performed by SRK and indicates the Project is both technically feasible and economically viable. The Mineral Reserve statement was updated to the date of 31 March 2024.

The Mineral Resource and Mineral Reserve Statement reported herein was prepared in conformity with the generally accepted CIM Exploration Best Practices Guidelines and CIM Estimation of Mineral Resource and Mineral Reserves Best Practices Guidelines. This technical report was prepared following the guidelines of the Canadian Securities Administrators’ NI 43-101 and Form 43- 101F1.

The technical report was compiled in the SRK Beijing Office during the 3 months of April and July, 2024.

After reviewed the Mineral Resource Estimates and the mine plan as of 31 March 2024, SRK was requested to conduct a further review to the update data as of 30 June 2024. The update is mainly on the following:

Update production data or record of Q1 2025;
Update the Mineral Resource according to the mined-out voids;
Update the mine plan starting from the Q2 2025;
Update the metal prices for technical- economic analysis; and
Update the Mineral Resource and Mineral Reserve Statement as of 30 June 2024.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT35

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Introduction  
■  FINAL

 

2.4  Basis of Technical Report

This report is based on information collected by SRK during a site visit performed and on additional information provided by GC Mine throughout the course of SRK’s investigations. SRK has no reason to doubt the reliability of the information provided by GC Mine. Other information was obtained from the public domain. This technical report is based on the following sources of information:

Discussions with GC Mine personnel
Inspection of the GC project area, including outcrop and drill core
Review of exploration data collected
Information, models, reports and recorded data provided to SRK by GC Mine
Additional information from public domain sources

 

2.5  Qualifications of SRK and SRK Team

The SRK Group comprises more than 1,800 professionals, offering expertise in a wide range of resource engineering disciplines. The independence of the SRK Group is ensured by the fact that it holds no equity in any project it investigates and that its ownership rests solely with its staff. These facts permit SRK to provide its clients with conflict-free and objective recommendations. SRK has a proven track record in undertaking independent assessments of Mineral Resources and Mineral Reserves, project evaluations and audits, technical reports and independent feasibility evaluations to bankable standards on behalf of exploration and mining companies, and financial institutions worldwide. Through its work with a large number of major international mining companies, the SRK Group has established a reputation for providing valuable consultancy services to the global mining industry. Table 2.1 below indicates SRK team who prepared or contributed to the independent technical review.

 

Table 2.1:SRK Team Contributed to This Report

 

Contributor Position Discipline Professional
Designation
Role Site
Visit
Falong Hu Principal Consultant Mining FAusIMM, PMP Project Management, Mining and Mineral Reserve Review Yes
Yanfang Zhao (Bonnie) Principal Consultant Geology MAusIMM Geology and Mineral Resource Review Yes
Mark Wanless Principal Consultant Geology Pr.Sci.Nat Geology and Mineral Resource Review Yes
TzuHsuan Chuang (Shan) Senior Consultant Mining MAusIMM Costs and Technical-Economic Review No

 

Lanliang Niu

Principal Consultant

 

Processing

 

MAusIMM

Metallurgical Test, Processing Plant, and Infrastructure Review

 

Yes

Nan Xue Principal Consultant Environment MAusIMM Environmental and Permitting Review No
Hongchen Huang (Cynthia) Consultant Environment N/A Technical Support Yes

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT36

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Introduction  
■  FINAL

 

Contributor Position Discipline Professional
Designation
Role Site
Visit
Alexander Thin (Alex) Principal Consultant Mining FAusIMM; FIMMM; FSAIMM Internal Review No

Sources: SRK

 

The Mineral Resource and Mineral Reserve evaluation review work and the compilation of this technical report was completed by Mark Wanless, Pr.Sci.Nat (400178/05) and Falong Hu, FAusIMM (313608). By virtue of their education, membership to a recognized professional association and relevant work experience, Mark and Falong are independent Qualified Persons as this term is defined by NI 43-101. Falong is the project manager and the chief compiler of this report who takes overall responsibility.

Alexander (Alex) Thin, FAusIMM (CP) (227503), FIMMM (C.Eng) (47860), FSAIMM (702076), RPEQ (26347), a Principal Consultant (Mining and Evaluation) with SRK, reviewed drafts of this technical report prior to their delivery to GC Mine and/or Silvercorp as per SRK internal quality management procedures. Alex did not visit the project.

Neither SRK, nor any of the authors of this Report, has any material present or contingent interest in the outcome of this Report, nor any pecuniary or other interest that could be reasonably regarded as capable of affecting their independence or that of SRK.

SRK had prior involvement with GC Mine that is the subject of the Technical Report, in that SRK assisted the independent valuer with SRK Australian team to review the mining method recovery method as well as environment assessment, with respect to an independent technical valuation service, in 2023.

SRK has no beneficial interest in the outcome of the technical assessment capable of affecting its independence.

SRK’s estimated fee for completing this Report is based on its normal professional daily rates plus reimbursement of incidental expenses. The fees are agreed based on the complexity of the assignment, SRK’s knowledge of the assets and availability of data. The fee payable to SRK for this engagement is estimated based on the working hours and rates of the consultants assigned to complete the project. The payment of this professional fee is not contingent upon the outcome of this Report.

 

2.6  Site Visit

In accordance with NI 43-101 guidelines, Mark Wanless (Geology), Yanfang Zhao (Geology), Falong Hu (Mining), Langliang Niu (Processing), and Hongchen Huang (Environmental) visited the GC Mine from April 23 to 26, 2024 accompanied by Guoliang Ma P.Geo of Silvercorp.

The purpose of the site visit was to review the digitalization of the exploration database and validation procedures, review exploration procedures, define geological modelling procedures, examine drill core, interview project personnel, and collect all relevant information for the preparation of a revised Mineral Resource model and the compilation of a technical report. During the site visit, particular attention was given to the treatment and validation of historical drilling data.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT37

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Introduction  
■  FINAL

 

The site visits also aimed at investigating the geological and structural controls on the distribution of the mineralization, also aimed at investigating the infrastructure of the mine constructed and the operation performed by the management.

SRK was given full access to relevant data and conducted interviews with GC Mine personnel to obtain information on the past exploration work, to understand procedures used to collect, record, store and analyse historical and current exploration data, as well the operation data and costing data.

 

2.7  Effective Date

The conclusions expressed in this report are appropriate as of 30 June 2024. The report and associated technical-economic analysis are only appropriate for this date and may change in time in response to variations in economic, market, legal or political factors, in addition to ongoing exploration results.

Based on the information provided by GC Mine, there are no events that have occurred since the Effective Date that are likely to have a material impact on the Mineral Resource and Mineral Reserve statements for GC Mine, at the date of publication of this QPR.

 

2.8  Currency, Units and Year

All monetary values outlined in this assessment are expressed in United States Dollars (“US$ or USD”), unless otherwise stated.

Quantities are generally stated in Système international d’unités (“SI”) metrics units, the standard Canadian and international practices, including metric tonne (“tonne”, “t”) for weight, and kilometre (“km”) or metre (“m”) for distances.

Fiscal year (“FY”) is stated in the report which start from the Q2 of last year till Q1 of this year. For example, FY2024 is from the 1 April of 2023 to 31 March 2024.

 

2.9  Limitations, Declaration and Consent

 

2.9.1  Limitations

SRK’s opinion contained herein is based on information provided to SRK by GC Mine throughout the course of SRK’s investigations as described in this Report, which in turn reflects various technical and economic conditions at the time of writing. Such information as provided by GC Mine was taken in good faith by SRK. SRK has not verified Mineral Resource or Mineral Reserve estimates by means of recalculation.

This report includes technical information, which requires subsequent calculations to derive subtotals, totals, averages and weighted averages. Such calculations may involve a degree of rounding. Where such rounding occurs, SRK does not consider them to be material.

 

2.9.2  Legal Matters

SRK has not been engaged to comment on any legal matters.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT38

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Introduction  
■  FINAL

 

SRK notes that it is not qualified to make legal representations as to the ownership and legal standing of the mineral tenements that are the subject of this review. SRK has not attempted to confirm the legal status of the tenements with respect to joint venture agreements, local heritage or potential environmental or land access restrictions.

 

2.9.3  Consent

SRK consents to this Report being included, in full, in Silvercorp’s offer document in connection with the HKEX listing and Silvercorp’s documents in the form and context in which the technical assessment is provided, disclosure documents that the company plans to submit to the TSX and NYSE American, and not for any other purpose. SRK provides this consent on the basis that the technical assessment expressed in the Summary and in the individual sections of this Report is considered with, and not independently of, the information set out in the complete report.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT39

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Reliance on Other Experts  
■  FINAL

 

3  Reliance on Other Experts

In preparing this technical report, SRK has relied upon input from GC Mine. Standard professional review procedures were also used by SRK in preparation of this report.

SRK trusts the information from GC Mine regarding mine ownership, legal and financial liability. SRK did not carry out independent verification of the information regarding licenses and permits of the Project as summarized in Section 4 of this Report. SRK did not verify the legality of any underlying agreement(s) that may exist concerning the permits or other agreement(s) between third parties but has relied on the Client. A copy of the original mining license is provided in Appendix A. The reliance applies solely to the legal status of the rights disclosed in Section 4.1.

SRK was informed by GC Mine that there are no known litigations potentially affecting the GC Mine.

GC Mine provided the digital database used for geological modelling, and the geological and grade block models. SRK verified this database and reviewed the estimation. It is SRK’s opinion that the database used for the Mineral Resource estimation has been validated and was collected and built in a professional manner.

The topography used in estimating the Mineral Resource statement in this report relies on the topographic survey map from the geological report prepared by GC Mine. SRK trusts the results of this survey. SRK also relied on the geological reports approved by related governmental authorities which were compiled by various Chinese geological brigades.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT40

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Property Description and Location  
■  FINAL

 

4  Property Description and Location

 

4.1  Ownership and Mining Permit

Silvercorp is the sole shareholder of Fortune Mining Limited (“Fortune”) which was incorporated under the laws of BVI on August 23, 2002, to be the holding company of several other subsidiaries which are parties to agreements relating to mineral properties in China. Fortune owns 100% of Yangtze Mining Ltd. (“Yangtze Mining”), which was incorporated on February 11, 2002, under the laws of the BVI. It holds a 100% equity interest in Yangtze Mining (H.K.) Ltd. (“Yangtze Mining HK”).

Yangtze Mining HK holds a 95% equity interest in Guangdong Found Mining Co. Ltd. (“Guangdong Found”), a company incorporated on October 26, 2008, under the laws of the PRC, that holds a 100% interest in the silver-lead-zinc exploration mine in Gaocheng (the “GC Mine”,) in Guangdong Province.

In October 2018, Silvercorp Metals (China) Inc., a wholly owned subsidiary of the Company, acquired an additional 4% equity interest in Guangdong Found, and as a result, the Company now beneficially owns a 99% interest in Guangdong Found.

GRT Mining Investment (Beijing) Co., Ltd. is a 1% equity interest holder of Guangdong Found.

The boundaries of the mining permit were surveyed, and the boundary markers were staked in the ground by the Bureau of Land and Resources of Guangdong Province before issuing the mining permit to Guangdong Found in 2010.

On 14 June 2010 Silvercorp announced that it had been issued an Environmental Permit for the Project from the Department of Environmental Protection of Guangdong Province, an essential document required for a mining permit application.

A Mining Permit was issued to Anhui Yangtze by the Ministry of Land and Resources of China on 24 November 2010. The permit is valid for 30 years to 24 November 2040, covers the entire 5.5238 km2 area of the GC Mine and permits mining from 315 mRL to minus 530 mRL. The permit was issued on the terms applied for and allows for the operation of an underground mine to produce silver, lead, and zinc. In June 2012, Anhui Yangtze transferred the mining permit to Guangdong Found, and a new mining permit was issued to Guangdong Found by the Ministry of Land and Resources of China on 6 June 2012.

SRK relies on the information provided by GC Mine, and SRK did not conduct a legal due diligence review of the Project since such work is outside the scope of SRK’s technical review. Mining Permit Corner Points of the Property are as shown below in Table 4.1.

 

Table 4.1: Mining Permit Corner Points of Property

 

Point Gauss Coordinates Xi’an Geodetic Coordinate System 1980
  X Y
1 2536958.82 37591830.45
2 2536977.34 37594822.59
3 2535131.42 37594834.19
4 2535112.9 37591841.69

Sources: The Copy of Mining Permit of GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT41

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Property Description and Location  
■  FINAL

 

The grid system used for the GC Project is the Xi’an Geodetic Coordinate System 1980. Altitude is referred to the Yellow Sea 1956 Elevation System. The project survey control points were generated from three nearby national survey control points. Details of the mining permit for the Project are presented in Table 4.2.

 

Table 4.2: Information of Mining Permit for GC Mine

 

Owner Guangdong Found Mining Co. Ltd.
Project Name GC Lead and Zinc Mine of Guangdong Found Mining Co. Ltd.
License No. No. C1000002010113210083333
Business Category Sino-foreign cooperative enterprise
Types Of Ore Mined Zinc, lead, and silver ore
Mining Method Underground mining
Mining Depth From 315m to -530m
Production Capacity 330,000 tonne/year
Mine Area 5.5238 km2
Valid Period 6 June 2012 to 24 November 2040
Issued Date* 6 June 2012

Sources: The Copy of Mining Permit of GC Mine

 

 

4.2  Permits and Authorization

Apart from the mining permit, other operational permits are required for the Project according to the relevant Chinese laws and regulations. These operational permits include:

Business License,
Safety Production Permit,
Land/forest Use Permit,
Water Use Permit, and
Site Discharge Permit

 

4.3  Location

The Property is located in the vicinity of Gaocheng village, Gaocun Township, Yun’an District, Yunfu City, Guangdong Province, People’s Republic of China (Figure 4.1).

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT42

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Property Description and Location  
■  FINAL

 

  Figure 4.1:   General Location Map of the Project

 

 

Sources: GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT43

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Property Description and Location  
■  FINAL

 

4.4  Environmental Considerations

Environmental liabilities associated with the project operation are mainly from underground mining, waste rock dumps, processing plant, TSF and other auxiliary facilities. The significant inherent environmental risks for the project consist of environmental approvals, water management and tailings management. Additional details on environmental approvals, water management and tailings/ TSF management are provided in Sections 20 of this Technical Report.

 

4.5  Taxes and Royalties

Based on the information provided by and discussions with GC Mine, the Mine has the following tax obligations.

Enterprise Income Tax: In China the normal enterprise income tax is 25% of the taxable income. GC Mine has advised SRK that as a Hi-New tech enterprise, the subsidiary entities operating the GC project are subject to an enterprise income tax rate of 15% of taxable income for three years term, which is renewable.

Resource Tax:

3% of the net amount of sales from lead (Pb) and zinc (Zn) mineral products
2% of the net amount of sales from silver (Ag)mineral products
No resource tax for gold (Au) and copper (Cu), since they are by-products

Value Added Tax (received):

13% of the net revenue of sales, excluding the revenue from gold (Au)

Surtax/Surcharge:

City construction fee: 7% of VAT Payable
Education surtax: 5% of VAT Payable

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT44

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Accessibility, Climate, Local Resources, Infrastructure, and Physiography  
■  FINAL

 

5  Accessibility, Climate, Local Resources,
Infrastructure, and Physiography

The GC mine is located in the vicinity of Gaocheng Village of Gaocun Township, Yun’an District, Yunfu City, Guangdong Province, China. Altitudes in the region range from 78 to 378 m ASL, usually 150 to 250 m ASL, with relative differences of 50 to 150 m. Vegetation is in the form of secondary forests of pine and hardwoods, bushes, and grasses. Topsoil covers most of the ground. Outcrops of bedrocks can only be observed in valleys.

The mine is located west of the metropolitan city of Guangzhou, the capital of Guangdong Province. Guangzhou is located about 120 kilometres (km) north-west of Hong Kong and has a population of about 14 million people. It is serviced by rail and daily flights from many of China’s larger population centres. Access to the mine from Guangzhou is via 178 km of four-lane express highway to Yunfu, then 48 km of paved road to the Project site. A railway connection from Guangzhou to Yunfu is also available.

The region belongs to a sub-tropical monsoon climate zone with average annual temperature of 20 – 22°C. Rainfall is mainly concentrated in spring and summer from March to August. Winters feature short periods of frosting. The GC Project is able to operate year-round.

Streams are well developed in the district, with the Hashui Creek flowing in the Gaocheng mine area. There is a reservoir upstream of the mine. Small hydropower stations are developed in the region that are connected to the provincial electrical grid. There is a 10 kilovolts (kV) power line that crosses through the Project area.

A power supply system consisting of a 5.8 km power line, a 110 kV substation, and a 10 kV safety backup-circuit was completed in 2013. This system has sufficient capacity to support the current production and any envisaged future production expansion.

The economy of Yun’an District mainly relies upon agriculture and some small township industrial enterprises. Labour is locally available, and technical personnel are available in Yunfu and nearby cities. The Gaocheng village is located within the Gaocheng mine area.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT45

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
History  
■  FINAL

 

6  History
6.1  Ownership History

Prior to Yangtze Mining Ltd. acquiring the project area in 2005, illegal mining activity resulted in the excavation of several adits/ tunnels and small-scale mining of veins.

In 2008, Silvercorp acquired a 100% interest in the shares of Yangtze Gold Ltd. which in turn wholly owned the entirety of Yangtze Mining HK, who owns a 95% equity interest in GC Mine. In October 2018, Silvercorp Metals (China) Inc., a wholly owned subsidiary of Silvercorp, acquired an additional 4% equity interest in Guangdong Found, and as a result, Silvercorp now beneficially owns a 99% interest in Guangdong Found.

 

6.2  Exploration History

GC Project was discovered in 1959 by traditional prospecting methods. Follow-up exploration in the region has included soil surveying, hydrogeological survey, geological mapping, rock chip sampling and diamond drilling.

All exploration work on the GC Project from 1959 to 2007 was completed by Geophysical Survey Brigade of Guangdong Bureau of Geology and Mineral Resources and Guangdong Provincial Institute of Geological Survey (“GIGS”).

Silvercorp completed its first phase of exploration work in 2008, Based on the soil geochemical and surface mapping, Silvercorp conducted trenching, pitting, and drilling programs on the Property. The program exposed additional mineralized veins. Detailed systematic drilling commenced on the Property in 2011 and has been ongoing.

 

6.3  Production

Prior to Yangtze Mining acquiring the Property, illegal mining activity resulted in the excavation of several adits/ tunnels and small-scale mining of veins V2, V2-2, V3, V4, V5, V6, and V10. GIGS reported that a total of 1,398 m of excavation comprising 10 adits/ tunnels had been completed on the Property through the illegal activity.

In 2002, GIGS developed 66 m of tunnel to crosscut veins V5 and V5-1. GIGS sampled and mapped adits ML1 to ML5, ML6, ML7, ML9, and PD12.

Yangtze Mining, after its purchase of the Property in 2005, mapped and sampled the accessible tunnels ML5 and ML8. Tunnel ML5 had exposure to vein V10 and tunnel ML8 had exposure to vein V2-2. Assay results of tunnel samples were used in Mineral Resource estimation. Table 6.1 details the underground workings and work completed at this time. However, there are no detailed reconciliation data available for any of the mineralization extracted.

 

Table 6.1:Details of Historical Underground Workings

 

Tunnel /
Adit
Length of Tunnel / Adit
(m)
Vein Intersected No. Samples
Collected
Mapped and
Sampled by
ML1 156 V4 12 GIGS

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT46

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
History  
■  FINAL

 

Tunnel /
Adit
Length of Tunnel / Adit
(m)
Vein Intersected No. Samples
Collected
Mapped and
Sampled by
ML2 70 V3 1 GIGS
ML3 2 V4 6 GIGS
ML4 41 V4 3 GIGS
ML5 324 V10 13 Yangtze
ML6 438 V2 25 GIGS
ML7 45

Not named, parallel to

V4

  GIGS
ML8 246 V2-2 19 Yangtze
ML9 46 V4   GIGS
PD12 28 V6 3 GIGS
PD4401 66 V5 5 GIGS

Sources: 2021 AMC report

 

 

6.4  Previous Mineral Resource Estimates

During 2001 and 2002, and again in 2004 and 2005, GIGS conducted general prospecting and prepared a resource estimate for the GC project, using the old Chinese classification standard system for mineral resources/ reserves, which differs from the CIM Definition Standards.

Since 2008, six Mineral Resource estimates for the GC project have been documented, details are summarised in Table 6.2.

 

Table 6.2: Historical Mineral Resource Estimates

 

Title Consultant Date
Technical Report on Gaocheng Ag-Zn-Pb Project and Shimentou Au-Ag- Zn-Pb Project, Guangdong Province, People’s Republic of China SRK Consulting April 2008
NI 43-101 Technical Report Update on the GC Ag-Zn-Pb Project in Guangdong Province, People’s Republic of China AMC

18 June

2009

NI 43-101 Technical Report on the GC Ag-Zn-Pb Project in Guangdong Province, People’s Republic of China’ AMC

31

December 2011

NI 43-101 Technical Report Update on the Gaocheng Ag-Zn Pb Project in Guangdong Province, People’s Republic of China AMC

30 June

2018

NI 43-101 Technical Report Update on the Gaocheng Ag-Zn-Pb Project in Guangdong Province, People’s Republic of China AMC

30 June

2019

NI 43-101 Technical Report Update on the Gaocheng Ag-Zn-Pb Project in Guangdong Province, People’s Republic of China AMC

31 March

2021

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT47

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

 

7  Geological Setting and Mineralisation

The contents of this section are mainly sourced from the 2008 SRK Technical Report and the technical report prepared by AMC in 2020 and 2021.

 

7.1  Regional Geology

The Property is located on the east margin of the Luoding basin, east of the Wuchuan – Sihui major fault within the north portion of the Yunkai uplift of the South China Orogenic Belt (Figure 7.1). Northeast striking structures and arc structures form the basic geological framework of the region. Deposits on the Property occur at the intersection of a north-easterly striking fault zone and a near east westerly striking fault zone.

 

Figure 7.1: Tectonic Geology Map of Southern China

 

Sources: 2021 AMC report

 

Basement geology in the area comprises late Proterozoic Sinian sedimentary clastic and carbonate rocks; Palaeozoic (Ordovician, Silurian, Devonian, Carboniferous) sedimentary clastic and carbonate rocks; and Mesozoic (Triassic) coal-bearing clastic rocks and Cretaceous red clastic rocks. Ag-Pb-Zn poly-metallic deposits occur within late Proterozoic rocks. Cu-Pb-Zn, Mn, and Au-Ag deposits occur within Palaeozoic rocks.

Three prominent sets of structures occur within the region:

North-easterly striking structures comprising a series of folds and faults that host some mineralized bodies.
Approximately east-westerly striking structures which dip steeply and contain structural breccias and quartz infill within the fault zones. Prominent alteration zones occur along both sides of these structures.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT48

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

 

Arc or ring structures which include folds and faults surrounding the Daganshan granite body. The Pb-Zn-Ag-Sn deposits, mineralization showings, and Au-Ag-Pb-Zn geochemical anomalies occur in the arc/ ring structural zone.

Palaeozoic granite batholiths and Mesozoic granite stocks and dykes occur commonly within the arc/ ring structure. These intrusions are closely related with Pb-Zn-Ag poly-metallic mineralization in the region. The Regional geological map is shown in Figure 7.2.

 

Figure 7.2:Regional Geological Map

 

Sources: 2021 AMC report

 

7.2  Property Geology

The GC project is located at the intersection between the Wuchuan-Sihui Deep Fault zone and Daganshan Arc-ring structural zone.

 

Basement rocks within the Property encompass quartz sandstone, meta-carbonaceous siltstone, carbonaceous phyllite, calcareous quartzite, and argillaceous limestone of the Sinian Daganshan Formation; quartz sandstone and shale of the Triassic Xiaoyunwushan Formation, and sandy conglomerate and conglomerate of the Cretaceous Luoding Formation. These rocks are intruded by Palaeozoic medium-grained biotite granite, and Mesozoic fine- to medium-grained adamellite, brownish, fine-grained, biotite mylonite, granite porphyry, quartz porphyry, diabase, and aplite. The Mesozoic intrusive rocks intruded along the south and south-west contacts of the Palaeozoic

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT49

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

 

granites. The majority of Ag-Zn-Pb mineralization is hosted by the Mesozoic granite. The granite dips south and strikes approximately west north-west, parallel to many of the mineralized veins on the Property. The Property geological map is shown in Figure 7.3.

 

Figure 7.3: Property Geology Map

 

Sources: 2021 AMC report, modified by SRK

 

The project area is located in the southwest part of the Daganshan uplift, characterized by several fault zones, including the NWW-EW striking Gaocheng Fault zone, the NE striking Baimei Fault zone, and the Songgui Fault zone.

 

Mineralization at GC is primarily hosted within a WNW-ENE trending fault zone that is 4.8 km long and 2 km wide. This zone contains numerous veins with the more common WNW veins generally striking between 90° and 150° and dipping between 55° to sub-vertical to the S and SW. The average thickness of these WNW-ENE veins is 0.76 meters (m).

 

East-west striking veins generally strike between 50° and 130° and dip between 65° and sub-vertical to the SE and SSW. The average thickness of these veins is 0.77 m.

 

NE-striking faults cut through the NWW-striking structures with no or minor displacement. Mineralized veins in this trend are sub-parallel to the major NE striking faults F25 and F27, generally striking between 10° and 80° and dipping between 60° and 75° to the SE. The average thickness of these veins is 0.76 m.

 

Figure 7.4 shows the distribution of mineralized veins and the faults zone.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT50

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

 

Figure 7.4: The Distribution of Mineralized Veins and Faults Zone (Level -100 m)

 

Sources: SRK

 

  

7.3  Mineralization

The Ag-Zn-Pb mineralization at the GC deposit can be categorized into primary and oxidized types. Primary mineralization, which constitutes 95% of the total Mineral Resource, is mainly composed of galena, sphalerite, and silver minerals, appearing sparsely, as disseminations, veinlets, and lumps. Oxide mineralization occurs near the surface, primarily within fault-breccia zones that are oxidized down to about 40 m. These veins display open space and boxwork lattice textures due to sulphide mineral oxidation, with secondary minerals like kaolinite, hematite, and limonite present.

Pyrite is the dominant sulphide mineral, making up a few percent to 13% of the veins. Other minerals include sphalerite, galena, pyrrhotite, arsenopyrite, magnetite, and trace amounts of chalcopyrite and cassiterite. Metallic minerals, found in smaller quantities, include argentite, native silver, bornite, wolframite, scheelite, and antimonite. These occur in narrow bands, veinlets, or as disseminations within the gangue, which consists of chlorite, quartz, fluorite, feldspar, mica, hornblende, and minor or trace amounts of kaolinite, tremolite, actinolite, chalcedony, garnet, zoisite, apatite, and tourmaline.

Alteration minerals associated with the GC veins (Figure 7.5) include quartz, sericite, pyrite, chlorite, clay minerals, and limonite. Silicification is common near the centre of the veins, while chlorite and sericite are found near and slightly beyond the vein margins. Quartz, pyrite, fluorite, and chlorite are closely related to the mineralization.

In addition, the GC deposit exhibits several notable mineralization features:

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT51

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

  

High-grade Ag-Zn-Pb mineralization tends to occur at the intersections of NWW and east-west striking faults, leading to east plunging shoots of high-grade mineralization.
Fault breccia zones host the most intense, continuous, and wide mineralization of Ag-Zn-Pb.
Grade contours indicate that Zn mineralization is more continuous across the veins, whereas Ag and Pb are more locally concentrated.

Figure 7.5: Ag-Zn-Pb Veins of the GC Project (Level 0 m)

Sources: SRK

The GC deposit consists of 256 mineralized Ag-Zn-Pb veins. Lithological domains were constructed for each vein. The vein domains were modelled in Micromine software. Table 7.1 presents a summary of the characteristics of the mineralized veins on the Property.

 

Table 7.1:Dimensions and Occurrences of the Mineralized Veins

 

 

Vein

Average
Thickness
(m)
Length
(m)

 

Elevation(m)

 

Strike (°)

Dip
Direction (°)
Average Dip
Angle (°)
NV1 0.51 324 -71-(216) 303 213 75
NV10 0.98 1032 -593-(269) 235 145 68
NV14 0.41 362 -114-(185) 283 193 69
NV2 0.58 1025 -262-(128) 296 206 79
NV28 1.20 297 -146-(137) 259 169 69
NV28_1 0.78 351 -260-(186) 280 190 63
NV28N 0.60 257 -197-(71) 247 157 81

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT52

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

 

 

Vein

Average
Thickness
(m)
Length
(m)

 

Elevation(m)

 

Strike (°)

Dip
Direction (°)
Average Dip
Angle (°)
NV3N 0.72 120 54-(219) 273 183 84
NV4 0.64 486 -127-(239) 300 210 74
NV5 0.46 197 -80-(167) 299 209 71
NV6 0.48 181 -64-(157) 237 147 70
NV7 0.52 385 -101-(153) 320 230 76
NV8 0.72 396 -105-(181) 276 186 69
NV9 0.58 366 -138-(166) 270 180 80
SV10 0.60 181 -227-(16) 253 163 61
V1_1 0.54 474 -216-(44) 114 24 37
V1_2 0.82 471 -636-(62) 287 197 76
V1_3 0.46 220 -256-(-29) 136 46 52
V1_4 0.58 136 -202-(-85) 216 126 65
V1_6 0.95 188 -599-(-261) 81 351 82
V10 1.16 1361 -531-(193) 241 151 61
V10_1 0.74 478 -468-(196) 228 138 66
V10_10 0.64 371 -189-(98) 230 140 69
V10_11 0.50 291 -149-(61) 244 154 60
V10_12 0.63 204 -283-(-91) 260 170 69
V10_15 0.50 217 -278-(-151) 227 137 65
V10_16 0.66 184 -237-(68) 249 159 67
V10_17 0.75 123 -244-(-95) 231 141 76
V10_2 0.82 356 -92-(208) 201 111 79
V10_3 0.69 320 -309-(-30) 221 131 67
V10_4 0.79 383 -350-(190) 240 150 70
V10_5 0.45 241 -218-(199) 21 291 72
V10W 0.67 312 -395-(-122) 237 147 63
V11A 0.63 415 -450-(90) 239 149 59
V11B 0.74 428 -280-(94) 244 154 60
V12 0.52 292 -334-(101) 215 125 72
V13 0.54 793 -376-(269) 209 119 70
V14 0.66 686 -365-(251) 240 150 68
V15 0.49 336 -146-(147) 240 150 70
V15N 0.55 645 -280-(129) 250 160 65
V15N_1 0.58 585 -283-(153) 238 148 66
V16 0.75 594 -399-(242) 268 178 70
V16_1 0.51 126 -88-(99) 225 135 65
V16_4 0.84 118 68-(202) 294 204 61
V16_5 0.66 221 -263-(61) 261 171 77
V17 0.67 484 -167-(198) 262 172 70
V17_1 0.73 349 -443-(143) 268 178 71
V18 0.77 562 -279-(245) 274 184 64
V18_1 0.59 490 -247-(191) 278 188 69
V18_2 0.60 263 -251-(39) 263 173 69

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT53

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

  

 

Vein

Average
Thickness
(m)
Length
(m)

 

Elevation(m)

 

Strike (°)

Dip
Direction (°)
Average Dip
Angle (°)
V18_3 0.56 194 -277-(77) 235 145 64
V19_1 0.51 450 -341-(213) 264 174 61
V19_12 0.52 134 74-(180) 249 159 70
V19_2 0.67 148 -119-(59) 279 189 70
V19_4 0.52 235 -240-(-9) 271 181 66
V19_7 0.58 175 -184-(-25) 261 171 58
V19_8 0.58 163 -253-(-113) 298 208 67
V19A 0.89 1046 -526-(181) 260 170 59
V19B 0.71 287 7-(181) 248 158 65
V1A 0.58 993 -275-(128) 153 63 27
V1B 0.70 552 -329-(-12) 142 52 42
V1N 0.54 188 -261-(-154) 132 42 45
V2_1 0.69 449 -430-(-37) 297 207 57
V2_11 0.61 190 -411-(-99) 58 328 61
V2_11E 0.52 188 -407-(-120) 66 336 64
V2_11S 0.60 147 -216-(-111) 67 337 63
V2_12 0.69 327 -436-(-219) 306 216 60
V2_3 1.02 253 -139-(129) 294 204 73
V2_4 1.31 211 -519-(-200) 275 185 65
V2_7 0.83 204 -505-(-244) 278 188 65
V2_7E 2.06 162 -329-(-221) 273 183 68
V2_9 0.67 201 -471-(-189) 284 194 74
V24 0.63 220 -227-(159) 259 169 74
V24N 0.87 313 -277-(171) 215 125 66
V24S 0.36 201 -97-(39) 50 320 79
V25 0.67 766 -494-(172) 212 122 69
V25_1 0.76 183 -7-(177) 214 124 74
V25_4 0.63 207 -574-(-311) 242 152 74
V26 0.89 127 -59-(125) 217 127 77
V26E 0.99 118 -31-(171) 288 198 84
V27 0.71 561 -354-(215) 325 235 38
V27_6 0.70 96 -121-(141) 213 123 84
V27W 0.96 490 -434-(-17) 206 116 88
V27W_1 0.87 139 -269-(-165) 211 121 59
V28 0.68 349 -131-(202) 215 125 57
V28_1 0.40 182 -175-(40) 320 230 73
V28_4A 0.86 403 -242-(259) 217 127 64
V28_4B 0.64 154 -89-(214) 230 140 68
V28_4C 0.64 382 -278-(198) 216 126 57
V29 0.85 275 -50-(186) 209 119 83
V29_1 0.78 892 -621-(138) 210 120 59
V29_2 0.51 128 -288-(-200) 206 116 60
V2E 1.48 617 -650-(138) 290 200 66

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT54

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

 

 

Vein

Average
Thickness
(m)
Length
(m)

 

Elevation(m)

 

Strike (°)

Dip
Direction (°)
Average Dip
Angle (°)
V2E_4E 0.67 444 -333-(115) 262 172 66
V2E_4S 0.55 266 -224-(102) 245 155 64
V2E_8 0.79 137 -37-(82) 358 268 86
V2E1 1.34 475 -631-(146) 262 172 64
V2E10 0.70 367 -239-(125) 298 208 73
V2E11 0.83 415 -708-(-195) 294 204 69
V2E12 0.73 452 -522-(152) 292 202 64
V2E13 0.81 542 -638-(154) 289 199 66
V2E14 0.76 226 -309-(-89) 284 194 65
V2E15 0.80 521 -731-(144) 284 194 65
V2E16 0.76 599 -835-(143) 284 194 65
V2E17 0.74 532 -547-(149) 284 194 65
V2E18 0.76 415 -587-(-71) 296 206 63
V2E19 0.67 343 -564-(32) 296 206 63
V2E2 0.95 124 -319-(-170) 264 174 67
V2E20 0.48 165 -152-(106) 292 202 67
V2E21 0.51 197 -266-(91) 149 59 88
V2E22 0.56 369 -312-(145) 299 209 83
V2E3 1.09 361 -534-(132) 281 191 66
V2E4 1.01 256 -561-(-250) 275 185 64
V2E5 0.80 349 -642-(-202) 288 198 67
V2E8 0.60 118 -208-(-98) 324 234 72
V2E9 0.78 121 -38-(151) 266 176 74
V2M 0.93 481 -568-(114) 116 26 87
V2M_11 0.38 197 -329-(-175) 235 145 61
V2M_13 0.55 124 -295-(-225) 255 165 48
V2M_14 0.36 104 -352-(-196) 232 142 77
V2M_2 0.83 263 -150-(70) 300 210 83
V2M_3 0.62 366 -350-(105) 289 199 75
V2M_6 0.56 304 -455-(-158) 267 177 81
V2M_7 0.85 218 -509-(-200) 118 28 86
V2M_8 0.66 171 -268-(-70) 258 168 66
V2M_9 0.45 70 -426-(-226) 86 356 85
V2N 2.44 518 -668-(42) 255 165 69
V2N_1 0.65 168 -356-(-47) 265 175 70
V2N_2 1.25 284 -396-(26) 266 176 74
V2N_3 0.79 277 -195-(100) 279 189 79
V2N_4 0.40 225 -371-(87) 260 170 85
V2N_4N 0.44 354 -372-(98) 261 171 82
V2N_5 0.47 500 -465-(125) 282 192 82
V2N_5S 0.66 255 -258-(110) 287 197 78
V2N_6 0.90 412 -539-(27) 266 176 69
V2N_8 1.09 420 -652-(-129) 262 172 63

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT55

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

  

 

Vein

Average
Thickness
(m)
Length
(m)

 

Elevation(m)

 

Strike (°)

Dip
Direction (°)
Average Dip
Angle (°)
V2W_0 0.76 204 -99-(39) 265 175 77
V2W_1 0.55 238 -335-(-90) 227 137 58
V2W_10 0.75 215 -640-(-273) 227 137 81
V2W_12 0.81 516 -655-(-89) 230 140 67
V2W_14 1.17 140 -384-(-165) 255 165 74
V2W_16 0.82 169 -368-(-162) 271 181 65
V2W_17 0.49 197 -535-(-379) 220 130 67
V2W_18 0.68 157 -317-(-148) 278 188 77
V2W_3 0.82 207 -221-(13) 264 174 58
V2W_4 0.89 389 -509-(180) 257 167 74
V2W_5 0.58 327 -438-(90) 289 199 67
V2W_7 0.74 203 -178-(-9) 257 167 52
V2W_8 0.80 355 -625-(-67) 291 201 83
V2W_9 0.77 249 -369-(-67) 262 172 72
V2WA 1.30 605 -671-(183) 253 163 72
V2WB 2.18 605 -671-(183) 253 163 72
V3 0.35 247 -146-(138) 108 18 85
V30 0.75 188 -95-(83) 286 196 73
V31 0.56 594 -278-(294) 233 143 67
V32 0.59 636 -481-(302) 237 147 67
V33 0.63 647 -321-(309) 248 158 63
V33_1 0.43 237 47-(248) 259 169 53
V33_2 0.45 156 52-(189) 221 131 62
V33E 0.69 709 -258-(230) 245 155 66
V34 0.71 186 -99-(198) 211 121 81
V37 0.64 405 -193-(209) 253 163 76
V37_1 0.67 457 -246-(118) 251 161 71
V38 0.57 574 -387-(155) 273 183 82
V39 1.02 463 -499-(153) 267 177 84
V4 1.17 1184 -421-(189) 288 198 76
V4_1 1.06 653 -604-(149) 294 204 73
V4_2 0.27 245 -114-(107) 113 23 70
V40 0.61 981 -656-(185) 261 171 84
V40_1 0.59 391 -151-(112) 257 167 81
V40S 0.59 287 -67-(104) 245 155 57
V40W 0.44 430 -114-(102) 56 326 41
V41 0.68 628 -331-(297) 227 137 69
V42 0.64 507 -229-(244) 237 147 63
V44 0.41 306 -110-(88) 172 82 52
V45 0.55 390 -141-(185) 219 129 58
V46 0.34 203 95-(202) 135 45 50
V47 0.67 201 -355-(128) 251 161 76
V49 0.87 364 -482-(-201) 29 299 63

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT56

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

  

 

Vein

Average Thickness (m) Length
(m)

 

Elevation(m)

 

Strike (°)

Dip
Direction (°)
Average Dip
Angle (°)
V49S 0.51 126 -541-(-243) 63 333 81
V5 0.61 431 -93-(207) 270 180 81
V5_1 0.50 84 26-(234) 264 174 78
V5_12 0.38 179 -121-(85) 206 116 61
V5_16 0.66 220 -286-(-103) 33 303 75
V5_17 0.51 154 10-(164) 271 181 55
V5_18 0.59 170 -287-(-114) 46 316 65
V5_19 0.65 201 -381-(-153) 236 146 59
V5_2 0.54 301 -366-(-81) 268 178 66
V5_20 0.57 336 -363-(-3) 209 119 65
V5_21 0.55 203 -274-(-190) 133 43 26
V5_24 0.54 185 -280-(-132) 228 138 65
V5_26 0.46 160 -237-(-104) 24 294 52
V5_28 0.65 132 -222-(-48) 71 341 69
V5_3 0.56 129 29-(112) 74 344 58
V5_4 0.79 455 -408-(119) 252 162 69
V5_5 0.70 394 -481-(136) 270 180 69
V5_7 0.56 148 -15-(137) 79 349 66
V5_9A 0.71 466 -384-(132) 227 137 50
V5_9B 0.69 351 -279-(105) 223 133 58
V51 0.84 167 -86-(67) 257 167 79
V52 0.52 213 -367-(269) 267 177 80
V52_2 0.72 377 -345-(270) 250 160 66
V52_2_1 0.69 354 -369-(109) 140 50 74
V52_3 0.57 163 -27-(251) 281 191 80
V52_5 0.66 345 -374-(-118) 244 154 78
V52_6 0.61 399 -396-(114) 237 147 79
V52_7 0.65 201 -3-(268) 242 152 78
V55 0.57 177 -297-(-39) 239 149 72
V58 0.56 350 -340-(-4) 75 345 68
V58S 0.40 472 -295-(-49) 56 326 37
V59 0.42 201 63-(241) 167 77 56
V7 0.73 568 -373-(147) 307 217 70
V7_1 0.84 447 -461-(242) 269 179 68
V7_1W 0.56 97 39-(192) 281 191 70
V7_2 0.56 344 -281-(150) 108 18 72
V7_3 0.63 458 -397-(234) 288 198 67
V7_4 0.61 227 -157-(161) 266 176 71
V7_5 0.69 329 -188-(239) 270 180 68
V7_7 0.85 144 -112-(117) 275 185 65
V7E 1.45 307 -496-(64) 325 235 72
V7E_1 0.73 113 -401-(-176) 294 204 72
V8 0.53 302 -479-(247) 265 175 77

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT57

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Geological Setting and Mineralisation  
■  FINAL

  

 

Vein

Average Thickness (m) Length
(m)

 

Elevation(m)

 

Strike (°)

Dip
Direction (°)
Average Dip
Angle (°)
V8_1 0.85 455 -476-(-72) 270 180 76
V8_1E 0.52 572 -320-(262) 271 181 81
V8_2 0.72 607 -476-(134) 267 177 69
V8_2E 0.54 537 -192-(174) 270 180 73
V8_3 0.61 360 -383-(-38) 257 167 74
V8_4 0.70 443 -393-(5) 241 151 68
V8_4N 0.55 300 -409-(-177) 267 177 75
V8_6 0.50 179 -93-(9) 281 191 58
V8_8 0.47 236 -306-(-28) 236 146 67
V9_1 0.61 233 -177-(180) 273 183 71
V9_10 1.23 111 -35-(125) 202 112 70
V9_11 0.86 310 -169-(244) 215 125 71
V9_2 0.72 310 -192-(91) 267 177 76
V9_2N 0.49 264 66-(191) 88 358 70
V9_2S 0.79 150 -115-(76) 242 152 64
V9_3 0.81 488 -189-(147) 275 185 69
V9_4 0.67 306 -411-(75) 273 183 68
V9_5A 0.81 484 -210-(181) 277 187 72
V9_5B 1.11 449 -542-(-50) 272 182 71
V9_6 0.88 358 -441-(-179) 82 352 70
V9_9 0.65 186 -18-(240) 251 161 67
V9W_2 0.80 716 -527-(259) 274 184 67
V9W_2E 0.47 294 -245-(314) 310 220 79
V9W_2N 0.45 106 -84-(50) 150 60 89
V9W_4 0.78 114 36-(225) 276 186 69
VH1 0.43 189 -127-(118) 66 336 81
VH1_1 0.77 93 -136-(155) 238 148 83
VH1_2 0.56 243 -267-(116) 237 147 78
VH1_3 0.45 212 -56-(193) 258 168 67
VH1_4 0.61 189 -140-(148) 274 184 80
VH1_5 0.44 179 -176-(116) 233 143 73
X1 0.80 293 -302-(83) 68 338 69
X2 0.93 321 -332-(93) 68 338 69
X4 0.70 335 -82-(62) 204 114 35

Sources: GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT58

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Deposit Types  
■  FINAL

 

8  Deposit Types

The poly-metallic mineralization at the GC deposit is characteristic of mesothermal vein infill deposits and exhibits the following features:

Mineralization occurs as structurally controlled veins within broader alteration zones, which can extend several meters along both the hangingwall and footwall of the faults.
The veins have sharp contacts with the host rocks and steeply dip at angles between 60° and 85°.

Ag-Zn-Pb mineralization generally follows the strike of the faults.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT59

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Exploration  
■  FINAL

  

9  Exploration

This section is a summary of the description of exploration chapter presented in the 2021 AMC Technical Report and new data from 2021 to 2023 provided by GC Mine.

 

9.1  Surface Works

Various state-sponsored Chinese Geological Brigades and companies have conducted geological and exploration work in the Project area.

During 2001 and 2002, and again in 2004 and 2005, GIGS conducted general prospecting at the GC Project area, and defined some mineralized bodies and estimated mineral resources for the GC deposit.

From 2006 to 2007, GIGS conducted detailed prospecting at the GC Project area, and completed a 36-hole, 11,470 m surface diamond drilling program and 1,964 m3 of trenching and surface sampling to update and upgrade the mineral resources of the GC deposit.

In 2008, Silvercorp completed a surface exploration program including soil sampling, geological mapping, and trenching (Table 9.1), and a 22-hole, 10,083 m drilling program, which resulted in the discovery of an additional 15 mineralized veins.

The details of the soil sampling, geological mapping, and trenching programme in 2008 are as follows:

In 2008, Silvercorp conducted a 1:10,000 scale soil geochemical survey on the southern portion of the Property. The survey involved collecting soil samples at 20m intervals along lines spaced 200m apart, covering an area of 2.22 km² that had not been previously drilled. A total of 535 soil samples were taken from C-horizon soils. These samples were analysed using aqua regia digestion and ICP analysis to detect concentrations of Au, Ag, Cu, Pb, Zn, Mo, and As. And Three significant Ag-Zn-Pb geochemical anomalies were identified.
Contracted by Yangtze Mining, The GIGS conducted 1:10,000, 1:5,000, and 1:2,000 geological mapping programs, and a 1: 2,000 topographic survey covering the GC Project area in 2008. The geological mapping programs established stratigraphic sequences and size and distributions of intrusions and faults, which was used as a framework for exploration targeting.
Based on the soil geochemical and surface mapping, Silvercorp conducted trenching and pitting programs on the Property. The program exposed the mineralized veins on the surface and at shallow depth. A total of seven pits and one trench were dug by Silvercorp exposing three veins.

 

Table 9.1:Surface Exploration Programs Completed in 2008

 

Program Unit Work Completed
Trenching (Pitting) m3 740
Soil Samples Samples 535
Line km 10

Sources: GC Mine

 

The record of drilling from 2001 to 2008 is shown in Table 9.2.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT60

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Exploration  
■  FINAL

 

Table 9.2: Record of Drilling 2001 – 2008

 

Year Drilled PQ (m) 85.0 mm HQ (m) 63.5 mm NQ (m) 47.6 mm Total (m)
2001 – 2005   1,994   1,994
2006 – 2007 420 5,180 5,870 11,470
2008     10,083 10,083
Total 420 7,174 15,953 23,547

Sources: GC Mine

 

 

9.2  Underground Works

From 2008, Silvercorp continued the underground tunnelling and sampling at the Property Area. Details of drill programs completed between 2008 and 2023 are presented in Section 10 of this report.

Channel sampling was conducted at 5m intervals along mineralized vein structures in the adits, with wider spacing (15 or 25m) in non-mineralized sections. Each channel comprised multiple chip samples taken across the mineralization and wall rocks. Detailed procedures and parameters for underground channel sampling are discussed in Section 11.

A breakdown of all underground tunnelling from 2012 to 2023 is provided in Table 9.3.

 

Table 9.3: Summary of Underground Tunnelling Works between 2012 and 2023

 

Underground
Works
Drift Metres Crosscut Metres Raise Metres Total Metres
2012 2,379     2,379
2013 5,321     5,321
2014 3,355 1,060   4,415
2015 6,734 2,286 1,038 10,058
2016 4,328 1,432 2,461 8,221
2017 5,286 2,514 2,668 10,467
2018 5,894 2,855 2,666 11,415
2019 7,581 3,912 3,752 15,245
2020 7,359 3,376 3,199 13,934
2021 5,965 2,521 2,743 11,229
2022 5,127 2,416 2,047 9,590
2023 4,153 4,079 1,113 9,345
Total 63,482 26,451 21,687 111,619

Notes: The records between 2012 and 2020 are from the 2021 AMC report, however the summary from 2021 to 2023 was made by SRK from the database provided by GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT61

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Drilling  
■  FINAL

 

10  Drilling
10.1  Historical Drilling (Pre-2008)

Between 2001 and 2007, prior to Silvercorp's acquisition of the Property, 43 diamond drillholes were completed, totalling 13,463.74m. The drilling began with PQ size in overburden, reduced to HQ size up to 100m depth, and continued with NQ size for the remainder, unless the hole exceeded 600m in length. Core recoveries ranged from 85% to 100%, with an average recovery of 99%. Drilling statistics for this period are detailed in Table 10.1.

 

10.2  Silvercorp Drilling (2008 – 2023)

All Silvercorp drilling from 2008 to 2023 was conducted using NQ-sized core, with all drill programs managed by Silvercorp. Drillhole collars were surveyed using a total station, and downhole surveys were completed every 50m using a Photographical Inclinometer manufactured by Beizheng Weiye Science and Technology Co. Ltd. (Chinese equivalent of the Sperry-Sun downhole survey tool). After the completion of drilling, surface drillhole collars were cemented, and the locations were marked with concrete blocks measuring 50 x 30 x 20 cm.

Core recoveries from Silvercorp's drilling programs ranged from 35.66% to 100.00%, with an average recovery rate of 99.36%. A review of the relationship between grade and core recovery showed no bias.

Silvercorp completed its first phase of diamond drilling on the Property in 2008, consisting of 22 surface holes, totalling 10,082.6m. This program led to the discovery of 15 mineralized veins.

In 2023, Silvercorp completed 5 surface holes within the license area. Figure 10.1 displays the locations of all surface drillholes drilled both before and after 2008.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT62

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Drilling  
■  FINAL

 

Figure 10.1: Surface Drilling Location Map

Sources: Silvercorp Metals Inc.

 

Detailed systematic drilling commenced on the GC project in 2011 and continued through to 2023. In 2011, most of the drilling was completed from the surface. As drill target depths increased, underground drilling was increasingly utilized. Since 2014, all diamond drilling has been completed using underground set-ups except 5 surface holes in 2023.

Table 10.1 presents drilling statistics by year for holes drilled from surface and underground set-ups.

 

Table 10.1: Drilling Program Summary

 

Year Metres Drilled Holes Completed
Underground Surface
2008-2011 28,413 0 123
2011 14,484 2 34
2012 27,450 109 27
2013 46,565 262 41
2014 19,332 121 0
2015 22,431 150 0
2016 11,944 129 0
2017 21,085 164 0
2018 24,993 189 0
2019 24,946 192 0
  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT63

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Drilling  
■  FINAL

 

Year Metres Drilled Holes Completed
Underground Surface
2020 34,953 346 0
2021 65,054 623 0
2022 65,871 560 0
2023 72,115 487 5
Total 479,637 3,334 230

Notes: The number of holes and meters drilled between 2008 and 2020 are from the 2021 AMC report, however the summary from 2021 to 2023 has been sourced by SRK from the database provided by GC Mine

Most drillholes are inclined to test multiple vein structures. Underground drilling is conducted using fan arrays, with multiple holes drilled from single setups. High-grade mineralized zones have been significantly exposed both at and below current production levels, and major mineralized zones have been extended along strike and down dip. The drillholes and underground samples are shown in Figure 10.2 and Figure 10.3.

 

  Figure 10.2: Location of Drillhole and Underground Samples (Level 0m)

 

Sources: SRK

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT64

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Drilling  
■  FINAL

 

  Figure 10.3: View of Drillhole and Underground Samples (Looking North)

 

 

Sources: SRK

 

The Photographs of underground diamond drilling is shown in Figure 10.4.

 

Figure 10.4: Underground Diamond Drilling Programme

 

 

Sources: GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT65

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Drilling  
■  FINAL

 

10.3  Bulk Density

In 2019, Silvercorp has collected 192 samples from V9-5, V9-3, V6M, V5-7, V2W, V2E, V28-6, V28- 4, V24, V19, V12, V10-1, V10, NV28-1 and NV10 which covers a range of mineralization styles.

AMC provided the density formula within mineralization wireframes of GC deposit based on the new samples and is a multiple linear regression model using lead, zinc, and silver grades, while barren rock is considered to have a density of 2.60.

DENSITY = 3.094919 + (0.040827 x Pb) + (0.034253 x Zn) + (0.000482 x Ag)

Figure 10.5 presents a scatterplot comparing the measured density with the density estimated using linear regression.

 

Figure 10.5: Measured Density vs Density Estimated by Linear Regression with Pb, Zn, Ag

 

Sources: 2021 AMC report

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT66

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

11  Sample Preparation, Analyses, and Security

The sample preparation and assaying of primary samples from GC resource drilling was undertaken by GC Mine, ALS and SGS laboratories.

The author considers that quality control measures adopted for assaying of the GC resource drilling have established that the assaying is representative and free of any biases or other factors that may materially impact the reliability of the analytical results. The author considers that the sample preparation, security and analytical procedures adopted for the GC drilling provide an adequate basis for the current Mineral Resource estimates.

 

11.1  Sampling

Drilling at the GC project uses NQ-sized (48 mm) diamond core, conducted from both surface and underground. Drill core is collected in wooden trays by drilling personnel, with Silvercorp geologists visiting the drill site daily to check drilling progress, core quality, and depth markings. The core is then transported to the surface core shack at the mine camp for further processing.

Silvercorp personnel handle all logging and sampling, which includes collecting core recovery data, detailed lithological, vein, and mineralization logging, core photography, and core sampling. Sample intervals, determined by the geologist based on veining and sulphide content, range from 5 cm to 2 m, averaging 1.1 m.

After photographing, the core to be sampled is cut in half with a rock saw (Figure 11.1). One half is placed into cotton bags for analysis, while the other half is returned to the core tray for archival storage. If a duplicate sample is needed, the core is quartered. Sample numbers are marked on the cotton bags, and a tear-off tag with the sample number is inserted into the bag. The corresponding interval is also marked on the retained core. The sealed sample bags are then placed into larger rice bags for shipment to the laboratory.

 

Figure 11.1: Drill Core Cut in Half

 

Sources: GC Mine

 

Underground samples are composites of chips collected from channels cut into tunnels, crosscuts, and trench bottoms. Tunnels are typically sampled along lines perpendicular to the mineralized vein structure at 5m intervals within mineralized zones, and at 15 to 25m intervals in non-mineralized

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT67

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

zones. Samples from crosscuts and trench bottoms are generally restricted to the thickness of the mineralized structure (Figure 11.2).

 

Figure 11.2: Underground Sampling

 

Sources: SRK Site visit, 2024

 

These samples include both vein material and associated wallrock. They are collected in cotton bags labelled with a unique sample number. The bags are then sealed, placed into larger rice bags, and secured for shipment to the laboratory.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT68

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

11.2  Sample Preparation and Analysis

Since 2008, Silvercorp has used three main laboratories for sample preparation and analysis. From 2008 to 2014, ALS Chemex (Guangzhou) Co., Ltd. (ALS Guangzhou or ALS), a part of ALS Global laboratory Group located in Guangdong Province, served as the primary laboratory. Since 2014, Silvercorp's GC Lab has taken over as the primary laboratory. From 2021 to 2023, SGS (Tianjin) Lab served as the umpire laboratory for GC project.

ALS Guangzhou is accredited by the International Standards Organization (ISO) with standards 9001:2015 and 17025:2007, as well as the China National Accreditation Service (CNAS). These accreditations cover the general requirements for the competence of testing and calibration laboratories.

The GC Lab, owned and operated by Silvercorp, is not certified by any standards association.

The SGS is accredited by China Metrology Certification/ China Inspection Body and Laboratory Mandatory Approval (CMA) and China National Accreditation Service for Conformity Assessment (CNAS).

 

11.2.1  ALS Guangzhou

From 2008 to 2014, Silvercorp used ALS Guangzhou as the primary laboratory for sample preparation and analysis of GC Mine samples. After 2014, ALS Guangzhou has served as an umpire laboratory. At ALS Guangzhou, the sample preparation process involves drying the samples, followed by crushing them to ensure more than 70% pass through a <2 mm sieve. The crushed samples are then split using a riffle splitter, and up to 250 grams are pulverized to achieve 85% passing 75 microns.

The prepared samples are analysed using ALS assay procedure OG62. This involves a four-acid digestion process where the samples are treated with nitric, perchloric, hydrofluoric, and hydrochloric acids, then evaporated. Afterward, hydrochloric acid and de-ionized water are added, and the samples are heated for a specified time. Once cooled, the samples are diluted to volume with de- ionized water, homogenized, and analysed using Inductively Coupled Plasma – Atomic Emission Spectrometry (“ICP-AES”) or Atomic Absorption Spectroscopy (“AAS”).

Detection ranges for the OG62 method are provided in Table 11.1.

 

Table 11.1: ALS Chemex Lab Method and Detection Limits

 

Element ALS Method Units Lower Limit Upper Limit
Ag Ag-OG62 g/t 1 1,500
Pb Pb-OG62 % 0.001 20
Zn Zn-OG62 % 0.001 30

Sources: 2021 AMC report

 

Silver samples returning assays greater than 1,500 g/t Ag are subsequently analyzed by ALS fire assay (“FA”) (method AG GRA-21). This method has a lower detection limit of 5 g/t and an upper detection limit of 10,000 g/t.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT69

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

11.2.2  Gaocheng Mine Laboratory

Since 2014, Silvercorp's GC Lab has served as the primary facility for sample preparation and analysis of Gaocheng samples. At the GC Lab, samples undergo a drying process for 12 hours at temperatures between 75 and 80°C. They are then crushed to a size of 2 to 5 mm using a jaw crusher, followed by further crushing to 0.84 to 1.0 mm with a roll crusher. The crushed sample is split using a riffle splitter to obtain a 300-gram subsample, which is ground to 0.125 to 0.074 mm using a pulverizer made in Jiangxi, China. The pulverizer is regularly cleaned by grinding quartz sand and then with high-pressure air.For analysis, 0.5 grams of the prepared sample are digested using a two-acid digest. Ag, Pb and Zn are analysed using AAS method. When Pb and Zn concentrations exceed the upper detection limit of 3%, they are analysed using a separate titration method, which has a detection range of 2% to 60%. High-grade silver is analysed using FA, with an upper detection limit of 5,000 g/t Ag.

From July 2023, Ag, Pb, and Zn are analysed using ICP-OES method first. If Ag returned assays greater than 1,000 g/t, the Ag samples were subsequently analysed by AAS, and if Ag returned assays greater 2,000 g/t by AAS, the Ag samples were analysed by FA. This atomic absorption spectrometry and fire method for Ag has an upper limit of 2,000 g/t and 10,000 g/t respectively. If Pb and Zn returned assays greater than 3%, The Lead and Zinc samples were subsequently analysed by separate titration. This method has an upper limit of 60% for both Pb and Zn.

The Detection limits for the GC Lab's analytical processes are detailed in Table 11.2.

 

Table 11.2: Silvercorp GC Lab Detection Limits

 

Element Detection
Range
Over Limit Notes Over Limit Upper
Detection Limit
Ag 2/5 - 1,000 g/t

>1,000 g/t overlimit samples analysed by AAS,

>2,000 g/t overlimit samples analysed by FA

10,000 g/t
Pb 0.001 - 3% >3% overlimit samples analysed by separate titration 60%
Zn 0.001 - 3% >3% overlimit samples analysed by separate titration 60%

Sources: GC Mine

Notes: From July 2023, the lower detection range of Ag is changed to 2 g/t

 

11.2.3  SGS Laboratory

The SGS laboratory has been used as the umpire laboratory for GC sample analysis since 2023.

At the SGS laboratory, samples are dried at 95°C, crushed to 3 mm with a jaw crusher, then split through a riffle splitter resulting in a subsample of 500 g and is ground with a pulveriser to 0.074 mm. Ag, Pb, and Zn are analyzed using AAS method. This process has a lower detection limit of 0.002% and an upper detection limit of 2% for Pb and lower detection limit of 0.001% and an upper detection limit of 2% for Zn. The Detection range for Ag is 5 – 500 g/t. If Ag, Pb or Zn returned assays greater than upper detection limit, The samples were subsequently analysed by FA method for Ag and separate titration for Pb and Zn.

Detection limits for the SGS laboratory analytical process are presented in Table 11.3.

 

Table 11.3: SGS Laboratory Detection Limits

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT70

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Element Detection
Range
Over Limit Notes Over Limit Upper
Detection Limit
Ag     5 - 500 g/t >500 g/t overlimit samples analysed by FA >2,000 g/t
Pb 0.002 - 2% >2% overlimit samples analysed by separate titration 80%
Zn 0.001 - 2% >2% overlimit samples analysed by separate titration 80%

Sources: GC Mine

 

 

11.3  Sample Shipment and Security

Drill core is stored in a clean and well-maintained core shack in the GC camp complex (Figure 11.3). This core shack is locked when unattended and monitored by two security personnel 24 hours a day.

Samples are shipped to the laboratory in sample bags inside sealed poly-woven rice bags. Between 2008 and 2014, samples were transported by GC Mine personnel in a pickup truck and then couriered to the ALS laboratory in Guangzhou. Between 2014 and 2024 samples were transported to the GC lab by GC Mine personnel.

 

Figure 11.3:Core Tray Storage

 

Sources: SRK Site visit, 2024

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT71

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

11.4  QA/QC

 

11.4.1  Monitoring Program

Silvercorp has established QA/QC procedures which cover sample collection and processing at the GC Mine. These QA/QC protocols have been progressively refined since 2011. Certified Reference Materials (“CRMs”) and coarse blanks have been included with drilling samples since 2011, and with underground samples since 2014. Field duplicates have been included with drilling samples since 2012 and with underground samples since 2014. Check (umpire) samples (pulp duplicates) have been sent to a separate ‘umpire’ laboratory since 2012.

In 2018, Silvercorp further improved their QA/QC protocols to include regular and more frequent submission of CRMs, coarse blanks, and field duplicates with drilling and underground samples. Coarse reject duplicates and pulp duplicates were also incorporated into drill sampling programs. The proportion of check samples, sent to a different laboratory was also increased. In 2019, Silvercorp initiated real-time monitoring of QA/QC protocols.

A summary of QA/QC samples included in drilling and underground sampling programs since 2011 is provided in Table 11.4.

 

Table 11.4:GC Project QA/QC Samples by Year

 

  Drilling Underground Sampling
Year Drill
Samples
CRMs Blanks Duplicates Umpire
Samples
Channel
Samples
CRMs Blanks Duplicates Umpire
Samples
Field Coarse Pulp       Field Coarse Pulp  
Pre-2011.5 5,300 - - - - - - 102 - - -     -
2011 1,859 68 82 - - - 60 34 - - -     -
2012 4,707 98 133 94 - - 2,247 1,142 - - -     103
2013 7,235 105 132 106 - - 3,094 2,145 - - -     11
2014 1,617 44 50 44 - - 109 1,991 31 29 35     102
2015 1,729 45 48 41 - - 31 4,139 64 67 68     -
2016 1,974 82 81 80 - - 33 4,299 71 71 74     -
2017 4,150 150 153 155 - - 46 5,183 84 84 84     -
2018 5,178 178 184 184 60 60 303 5,786 281 289 289     976
2019 5,085 164 176 163 163 163 - 7,629 122 124 118     482
2020 9,473 331 407 331 331 327 467 6,961 136 141 138     382
2021 20,410 701 797 338 686 678 650 6,812 61 61 65     213
2022 16,955 590 679 598 596 593 517 5,097 35 42 43     149
2023 13,984 435 522 338 338 335 425 4,247 113 142 81 61 60 43
Total 99,656 2,991 3,444 2,472 2,174 2,156 7,982 55,567 998 1,050 995 61 60 2,461

Notes: Consistent with the historical summary,the samples before 2021 are from the 2021 AMC report, however the summary from 2021 to 2023 has been sourced by SRK from the database provided by GC Mine

 

11.4.2  Certified Reference Material

The monitoring of assay reliability of GC Mine included insertion of samples of CRMS prepared by The Institute of Geophysical and Geochemical Exploration and approved by the General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT72

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

CRMs with prefix “CDN” were sourced from CDN Resource Laboratories Ltd. in Langley, BC, Canada.

The CRMs have been included with drilling samples since 2011 and with underground samples since 2014, and the average insert rate is 3.0% for drillholes samples and 1.9 % for underground samples.

Details and performance of the CRMs used at the GC Project are presented in Table 11.5, Table 11.6 and Figure 11.4.

 

Table 11.5:Summary of CRMS

 

  Reference Value   2x Standard Deviation    
CRM ID             In Use Count of Sample
  Ag Pb Zn Ag Pb Zn    
CDN-FCM-7 220 2.17 4.26 10 0.07 0.15 2013-2020 534
GSO-2 148 5.13 13.90 6 0.08 0.2 2011-2018 381
GSO-4 64.7 0.629 3.85 4.1 0.042 0.19 2011-2013 76
GBW07173 92 2.14 6.06 11

1.97-

2.17

0.29 2011 5
CDN-ME-1801 108 3.08 7.43 6 0.1 0.3 2018-2020 336
CDN-ME-1206 274 0.801 2.38 14 0.044 0.15 2018-2021 186
CDN-ME-1807 327 2.34 2.43 20 0.1 0.08 2018-2024 387
CDN-ME-1306 104 1.6 3.17 7 0.07 0.15 2018-2022 692
CDN-ME-1604 299 4.83 0.72 15 0.15 0.03 2018-2024 727
CDN-ME-1410 69 0.248 3.682 3.8 0.012 0.084 2018-2024 492
CDN-ME-1201 37.6 0.465 4.99 3.4 0.032 0.29 2022-2024 140
CDN-ME-1403 53.9 0.414 1.34 5.4 0.018 0.06 2022-2023 128
CDN-ME-1404 59.1 0.381 2.08 2.7 0.018 0.07 2022-2024 87
CDN-ME-2001 582 0.78 1.5 19 0.031 0.05 2022-2023 72

Sources: Summarized by SRK from the database provided by GC Mine

 

 

Table 11.6:Summary of GC CRM Results (2011 - 2023)

 

 

  Statistics GSO-2 (Ag) GSO-2 (Pb) GSO-2 (Zn)
Project GC Project Sample Count 381.00 381.00 381.00
Data Series 2011-2018 CRM Expected Value 220.00 2.17 4.26
Data Type Underground & Core
Samples
2 Standard Deviation 10.00 0.07 0.15
Commodity Ag, Pb,Zn Data Mean 219.90 2.19 4.42
Laboratory GC&ALS Lab Outside 2StdDev 0 0 0
Analytical Method ICP-AES, ICP-AAS Below 2StdDev 6 20 1
Detection
Limit
1-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 16.00 7.00 14.00
    Statistics GSO-4 (Ag) GSO-4 (Pb) GSO-4 (Zn)
Project GC Project Sample Count 76 76 76
Data Series 2011-2013 CRM Expected Value 148.00 5.13 13.90

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT73

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Table 11.6:Summary of GC CRM Results (2011 - 2023)

 

Data Type Core Samples

2 Standard

Deviation

6.00 0.08 0.20
Commodity Ag, Pb,Zn Data Mean 154.57 4.94 13.69
Laboratory ALS Lab Outside 2StdDev 14% 34% 71%

Analytical

Method

ICP-AES, ICP-AAS

Below

2StdDev

0 20 5
Detection
Limit
1gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 11 6 49
    Statistics CDN-FCM-7
(Ag)
CDN-FCM-7
(Pb)
CDN-FCM-7
(Zn)
Project GC Project Sample Count 534 534 534
Data Series 2013-2020 CRM Expected Value 65.00 0.63 3.85
Data Type Underground & Core
Samples
2 Standard Deviation 4.00 0.04 0.19
Commodity Ag, Pb,Zn Data Mean 64.48 0.61 3.80
Laboratory GC&ALS Lab Outside 2StdDev 0% 1% 0%

Analytical

Method

ICP-AES, ICP-AAS

Below

2StdDev

0 5 1
Detection
Limit
1-5gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 0 0 0
    Statistics CDN-ME-
1206 (Ag)
CDN-ME-
1206 (Pb)
CDN-ME-
1206 (Zn)
Project GC Project Sample Count 186 186 186
Data Series 2018-2021 CRM Expected Value 274.00 0.80 2.38
Data Type Underground & Core
Samples
2 Standard Deviation 14.00 0.04 0.15
Commodity Ag, Pb,Zn Data Mean 274.54 0.81 2.39
Laboratory GC&ALS Lab Outside 2StdDev 0% 0% 0%
Analytical Method AAS Below 2StdDev 0 0 0
Detection
Limit
1-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 0 0 0
    Statistics CDN-ME-
1201 (Ag)
CDN-ME-
1201 (Pb)
CDN-ME-
1201 (Zn)
Project GC Project Sample Count 140 140 140
Data Series 2021-2023 CRM Expected Value 37.60 0.47 4.99
Data Type Underground & Core
Samples
2 Standard Deviation 3.40 0.03 0.29
Commodity Ag, Pb,Zn Data Mean 37.43 0.48 5.01
Laboratory GC Lab Outside 2StdDev 0% 1% 1%
Analytical Method ICP-OES, AAS Below 2StdDev 0 0 2

Detection

Limit

2-5 gpt (Ag); 0.001%

(Pb),0.001% (Zn)

Above

2StdDev

0 2 0
    Statistics CDN-ME-
1306 (Ag)
CDN-ME-
1306 (Pb)
CDN-ME-
1306 (Zn)
Project GC Project Sample Count 692 692 692
Data Series 2018-2022 CRM Expected Value 104.00 1.60 3.17
Data Type Underground & Core
Samples
2 Standard Deviation 7.00 0.07 0.15
Commodity Ag, Pb,Zn Data Mean 103.80 1.60 3.18
Laboratory GC&ALS Lab Outside 2StdDev 0% 0% 0%

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT74

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Table 11.6:Summary of GC CRM Results (2011 - 2023)

 

Analytical

Method

ICP-OES, AAS

Below

2StdDev

0 1 0
Detection
Limit
1-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 0 0 0
    Statistics CDN-ME-
1403 (Ag)
CDN-ME-
1403 (Pb)
CDN-ME-
1403 (Zn)
Project GC Project Sample Count 128 128 128
Data Series 2022-2023 CRM Expected Value 53.90 0.41 1.34
Data Type Underground & Core
Samples
2 Standard Deviation 5.40 0.02 0.06
Commodity Ag, Pb,Zn Data Mean 53.71 0.42 1.34
Laboratory GC Lab Outside 2StdDev 1% 0% 2%
Analytical Method ICP-OES, AAS Below 2StdDev 0 0 0
Detection
Limit
2-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 1 0 3
    Statistics CDN-ME-
1404 (Ag)
CDN-ME-
1404 (Pb)
CDN-ME-
1404 (Zn)
Project GC Project Sample Count 87 87 87
Data Series 2022-2023 CRM Expected Value 59.10 0.38 2.08
Data Type Underground & Core
Samples
2 Standard Deviation 2.70 0.02 0.07
Commodity Ag, Pb,Zn Data Mean 58.64 0.39 2.09
Laboratory GC Lab Outside 2StdDev 3% 9% 1%
Analytical Method ICP-OES, AAS Below 2StdDev 2 0 1

Detection

Limit

2-5 gpt (Ag); 0.001%

(Pb),0.001% (Zn)

Above

2StdDev

1 8 0
    Statistics CDN-ME-
1410 (Ag)
CDN-ME-
1410 (Pb)
CDN-ME-
1410 (Zn)
Project GC Project Sample Count 492 492 492
Data Series 2018-2023 CRM Expected Value 69.00 0.25 3.68
Data Type Underground & Core
Samples
2 Standard Deviation 3.80 0.01 0.08
Commodity Ag, Pb,Zn Data Mean 69.05 0.25 3.68
Laboratory GC&ALS Lab Outside 2StdDev 0% 4% 4%

Analytical

Method

ICP-OES, AAS

Below

2StdDev

0 1 15
Detection
Limit
1-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 2 17 3
    Statistics CDN-ME-
1604 (Ag)
CDN-ME-
1604 (Pb)
CDN-ME-
1604 (Zn)
Project GC Project Sample Count 727 727 727
Data Series 2018-2023 CRM Expected Value 299.00 4.83 0.72
Data Type Underground & Core
Samples
2 Standard Deviation 15.00 0.15 0.03
Commodity Ag, Pb,Zn Data Mean 299.20 4.81 0.72
Laboratory GC&ALS Lab Outside 2StdDev 0% 6% 1%
Analytical Method ICP-OES, AAS Below 2StdDev 1 46 5
Detection
Limit
1-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 2 0 1

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT75

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Table 11.6:Summary of GC CRM Results (2011 - 2023)

 

    Statistics

CDN-ME-

1807 (Ag)

CDN-ME-

1807 (Pb)

CDN-ME-

1807 (Zn)

Project GC Project Sample Count 387 387 387
Data Series 2018-2023 CRM Expected Value 327.00 2.34 2.43
Data Type Underground & Core
Samples
2 Standard Deviation 20.00 0.10 0.08
Commodity Ag, Pb,Zn Data Mean 325.39 2.34 2.44
Laboratory GC Lab Outside 2StdDev 0% 1% 1%

Analytical

Method

ICP-OES, AAS

Below

2StdDev

0 2 3
Detection
Limit
2-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 0 1 1
    Statistics CDN-ME-
1801 (Ag)
CDN-ME-
1801 (Pb)
CDN-ME-
1801 (Zn)
Project GC Project Sample Count 336 336 336
Data Series 2018-2020 CRM Expected Value 108.00 3.08 7.43
Data Type Underground & Core
Samples
2 Standard Deviation 6.00 0.10 0.30
Commodity Ag, Pb,Zn Data Mean 108.51 3.08 7.36
Laboratory GC&ALS Lab Outside 2StdDev 1% 0% 8%

Analytical

Method

ICP-OES, AAS

Below

2StdDev

1 0 26
Detection
Limit
1-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 3 0 0
    Statistics CDN-ME-
2001 (Ag)
CDN-ME-
2001 (Pb)
CDN-ME-
2001 (Zn)
Project GC Project Sample Count 72 72 72
Data Series 2022-2023 CRM Expected Value 582.00 0.78 1.50
Data Type Underground & Core
Samples
2 Standard Deviation 19.00 0.03 0.05
Commodity Ag, Pb,Zn Data Mean 585.57 0.79 1.51
Laboratory GC Lab Outside 2StdDev 1% 1% 1%
Analytical Method ICP-OES, AAS Below 2StdDev 1 0 0
Detection
Limit
2-5 gpt (Ag); 0.001%
(Pb),0.001% (Zn)
Above 2StdDev 0 1 1

 

Figure 11.4:CRMs Performances

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT76

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.4:CRMs Performances

 

 
       
   
       
   
       
   

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT77

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.4:CRMs Performances

 

       
   
       
   
       
   

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT78

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.4:CRMs Performances

 

       
   
       
   
       
   

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT79

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.4:CRMs Performances

 

       
   
       
   
       
   

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT80

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.4:CRMs Performances

 

 

       
 

 

 

 

       
 

 

   

 

11.4.3  Blank Samples

Silvercorp routinely included samples of un-mineralized rock collected from a quarry outside the GC area in assay batches, since 2011, for drillholes and since 2014 for underground samples. Blank assays described in this report include all results from the assay laboratories used for resource drilling and underground samples, including data from outside the resource area. The submission insert ratio of these samples averaged 3.7% for drillholes and 2.0% for underground samples.

Prior to 2018, Silvercorp's protocol considered blank samples with assay results exceeding 30 g/t Ag, 0.3% Pb, or 0.3% Zn as failures. This protocol was revised in 2018, reducing the failure thresholds to 8 g/t Ag, 0.1% Pb, and 0.1% Zn.

Blank samples were monitored on a real-time basis as the results of samples batches are received. Failed blank samples were investigated and sample batches where contamination is identified should be re-assayed.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT81

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

  

For assaying prior to 2023, the inserted blanks are coarse marble blanks. Starting in 2023, pulp blank samples have been inserted to monitor potential contamination during the grinding process. The generally accepted criterion is that 80% of coarse blanks should be less than three times the lower limit of analytical detection, and 90% of pulp blanks should be less than two times the lower limit of analytical detection.

Table 11.7 summarizes Silvercorp failure criteria and the generally accepted criteria for blank.

 

Table 11.7:GC Blank Fail Criteria

  

      Ag Pb Zn
Year Lab Detection
Limits

SVM Fail

Fail Limit

3 x LDL
Fail
Fail

SVM Fail

Fail Limit

3 x LDL
Fail
Fail Limit
SVM Fail
Fail Limit
3 x LDL
Fail
Fail Limit
      (g/t) (g/t) (g/t) (%) (%) (%)
2011   Ag LDL=1 g/t 30 3 0.3 0.003 0.3 0.003
2012 ALS Pb LDL=0.001% 30 3 0.3 0.003 0.3 0.003
2013   Zn LDL=0.001% 30 3 0.3 0.003 0.3 0.003
2014     30 15 0.3 0.003 0.3 0.003
2015     30 15 0.3 0.003 0.3 0.003
2016     30 15 0.3 0.003 0.3 0.003
2017   Ag LDL=2-5 g/t 30 15 0.3 0.003 0.3 0.003
2018 GC Pb LDL=0.001%8 15 0.1 0.003 0.1 0.003
2019

Zn LDL=0.001%

8 15 0.1 0.003 0.1 0.003
2020   8 15 0.1 0.003 0.1 0.003
2021   8 15 0.1 0.003 0.1 0.003
2022   8 15 0.1 0.003 0.1 0.003
2023   8 6 - 15 0.1 0.003 0.1 0.003

Notes:

1 SVM - Silvercorp, ALS - ALS Guangzhou, GC - Gaocheng site laboratory

2 The GC Lab Lower Detection Limit of Ag changed from 5g/t to 2g/t from July 2023 due to the update of analytical equipment

Table 11.8 and Figure 11.5 and Figure 11.6 show the performance of the blanks following the generally accepted criteria.

 

Table 11.8:Summary of GC Blanks Results (2011 - 2023)

Statistics Coarse
BLACK (Ag)
Coarse
BLACK (Pb)
Coarse
BLACK (Zn)
Project   Sample Count 4,051 4,051 4,051
Data Series 2011-2023 Blanks Lab Lower Detection Limit 5.000 0.001 0.001
Data Type Underground & Core
Samples
Samples Above (3x
Det. Lim.)
1 124 262
Commodity Ag,Pb,Zn Data Mean 2.935 0.002 0.004
Laboratory ALS/GC LAB Percentage Outside (3xDL) 0% 3% 6%
Analytical Method ICP-AES, AAS        

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT82

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Table 11.8:Summary of GC Blanks Results (2011 - 2023)

 

Detection Limit

1-5 gpt (Ag); 0.001%

(Pb),0.001% (Zn)

       
    Statistics Pulp Blank
(Ag)
Pulp Blank
(Pb)
Pulp Blank
(Zn)
Project   Sample Count 233 233 233
Data Series 2021-2023 Blanks Lab Lower Detection Limit 2-5 0.001 0.001
Data Type Pulp Blank Samples Above (3x
Det. Lim.)
0 1 1
Commodity Ag,Pb,Zn Data Mean 1.062 0.001 0.001
Laboratory GC LAB Percentage Outside (3xDL) 0% 0.4% 0.4%

Analytical

Method

ICP-AES, AAS        
Detection Limit 2-5 gpt (Ag); 0.001% (Pb),0.001% (Zn)        

  

Figure 11.5:Coarse Marble Blanks Performances

 

 
 

 

   

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT83

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.6:Pulp Blanks Performances

 

 
       
 

 

   

 

 

11.4.4   Duplicate Samples

Silvercorp’s current QA/QC protocols include the insertion of field duplicates, coarse reject duplicates, and pulp duplicates. Field duplicates have been included with drilling samples since 2012 and with underground samples since 2014. Coarse duplicates and pulp duplicates have been included in drillhole sample batches since 2018, while coarse duplicates and pulp duplicates have been included in underground sample batches since 2023. The duplicates comprise the following:

Total of 3,673 field duplicates, including 208 field duplicates assays by ALS Lab and 3,465 field duplicates assays by GC Lab,
2,266 coarse duplicates assays by GC Lab, and
2,246 pulp duplicates assays by GC Lab.

The field duplicates, coarse reject duplicates, and pulp duplicates are collected at a rate of 2.5%, 2.2%, 2.2% for drillholes samples and 1.9%, 1.4%, 1.4% for underground samples respectively.

The generally accepted criterion recommended by QP is as follows:

Field duplicates: 80% samples should have a half absolute relative difference (“HARD”) less than 30% for Ag, and less than 20% for Pb and Zn.
Coarse duplicates: 80% samples should have a HARD less than 20% for Ag, and 85% samples less than 15% for Pb and Zn.
Pulp duplicates: 90% samples should have a HARD less than 10% for Ag, Pb and Zn.

The Scatter and HARD plot of field duplicates, coarse duplicates and pulp duplicates are presented from Figure 11.7 to Figure 11.9.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT84

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

  

The reduced major axis (“RMA”) and ideal correlation within the Scatter plots shows an unbiased fit for the original samples and duplicates, and HARD Plots shows that about 90% of the field duplicates have a HARD value of less than 20%, while 90% coarse duplicates and pulp duplicates data pairs have a HARD value less than 10%.

 

Figure 11.7:Scatter and HARD Plot of Field Duplicates

 

 

    

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT85

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.8:Scatter and HARD Plot of Coarse Duplicates

 

 

 

Notes: Ag: g/t, Pb: %, Zn: %

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT86

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.9:Scatter and HARD Plot of Pulp Duplicates

 

 

 

Notes: Ag: g/t, Pb: %, Zn: %

 

11.4.5  Check (Umpire) Samples

Silvercorp regularly submits a portion of pulps to a third-party check (umpire) laboratory for independent analysis. Laboratories used for check analysis since 2012 have included the following:

GC site laboratory (when not used as the primary laboratory).
ALS Guangzhou (when not used as the primary laboratory).
Chengde Huakan (Chengde Huakan 514 Geology and Mineral Testing and Research Institute) in Chengde, Hebei Province.
The Analytical Laboratory of the Inner Mongolia Geological Exploration Bureau (Inner Mongolia) in Hohhot, Inner Mongolia.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT87

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

  

The SGS Laboratory in Tianjin from 2023.

Table 11.9 summarizes the number of drillhole and underground samples sent to the respective check laboratories between 2011 and 2023.

 

Table 11.9:Gaocheng Check (Umpire) Laboratories Used 2011 - 2023

 

Year Primary Laboratory Umpire
Laboratory
n Drillhole Check
Assays
n Underground Check
Assays
2011 ALS Chengde Huakan 60  
    GC 2,175  
2012 ALS Inner Mongolia 49 103
    Chengde Huakan 23  
    GC 2,969  
2013 ALS Inner Mongolia 74 11
    Chengde Huakan 51  
  ALS GC 71 101
2014 Inner Mongolia   1
  GC Chengde Huakan 38  
2015 GC Chengde Huakan 31  
2016 GC Chengde Huakan 33  
2017 GC Chengde Huakan 46  
2018 GC ALS 303 976
2019 GC ALS   482
2020 GC ALS 467 382
2021 GC ALS 650 213
2022 GC ALS 517 149
2023 GC SGS 425 43
Total     6,390 2,056

Notes:

1 n=number of samples

  2 The samples before 2021 are from the 2021 AMC report, however the summary from 2021 to 2023 are reported by SRK from on the database provided by GC Mine.

Table 11.10 presents the results of the major check sampling programs completed from 2011 to 2023.

 

Table 11.10:Results of Check Samples

 

 

YEAR

Mean of
Original
Sample Ag
(g/t)
Mean of
Check
Samples Ag
(g/t)
Mean of
Original
Sample Pb
(g/t)
Mean of
Check
Samples Pb
(g/t)
Mean of
Original
Sample Zn
(g/t)
Mean of
Check
Samples Zn
(g/t)
2011 9.78 8.93 0.16 0.17 0.42 0.38
2012 28.95 31.07 0.20 0.26 0.65 0.65
2013 42.46 42.18 0.36 0.36 1.15 1.13
2014 88.07 85.41 1.22 1.20 2.56 2.54
2015 68.39 64.46 1.04 0.95 2.35 2.17
2016 53.82 50.16 0.53 0.50 2.76 2.70
2017 34.22 32.71 0.65 0.62 2.56 2.60
2018 128.09 125.34 2.18 2.07 4.19 4.04
2019 147.96 148.64 1.83 1.79 4.46 4.49
2020 139.56 139.06 1.83 1.79 4.39 4.41
2021 77.16 77.63 1.23 1.28 3.14 3.15
2022 89.20 85.57 1.68 1.73 3.30 3.25

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT88

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

  

 

YEAR

Mean of
Original
Sample Ag
(g/t)
Mean of
Check
Samples Ag
(g/t)
Mean of
Original
Sample Pb
(g/t)
Mean of
Check
Samples Pb
(g/t)
Mean of
Original
Sample Zn
(g/t)
Mean of
Check
Samples Zn
(g/t)
2023 56.26 55.32 1.09 1.12 2.51 2.48
Grand Total 71.66 71.37 0.98 0.98 2.30 2.27

The check (umpire) samples are collected at an overall rate of 8.5% for drillholes samples and 4.4% for underground samples respectively from 2011 to 2023.

The Scatter and HARD plot of Ag, Pb and Zn for umpire samples are presented in Figure 11.10.

The RMA and ideal correlation within the Scatter plots show an unbiased fit for Ag of the original samples and umpire samples, and slight bias for Pb and Zn of the original samples and umpire samples.

The HARD plots show at about 78% and 85% of the umpire samples data pairs for Ag and Pb respectively have a HARD value of less than 20%, and about 88% of the umpire samples data pairs for Zn have a HARD value of less than 10%.

 

Figure 11.10:Scatter and Hard Plot of Umpire Samples from 2011 to 2023

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT89

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

  

Figure 11.10:Scatter and Hard Plot of Umpire Samples from 2011 to 2023

 

 

 

Notes: Ag: g/t, Pb: %, Zn: %  

 

To analyse the bias between the different Labs, The Scatter and QQ plots were applied for the primary lab and the umpire lab.

The Scatter and QQ plot of umpire samples between ALS and Inner Mongolia Lab is presented in Figure 11.11, the umpire check results returned slightly higher results than the original samples in the higher end of the assay range for Ag with slightly lower results that the original samples in the higher end of the assay range for Pb and Zn.

 

Figure 11.11:Scatter and QQ Plot (Original Samples from ALS, Umpire Samples from Inner Mongolia Laboratories)

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT90

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.11:Scatter and QQ Plot (Original Samples from ALS, Umpire Samples from Inner Mongolia Laboratories)

 

Notes: Ag: g/t, Pb: %, Zn: %

 

The Scatter and QQ plot of umpire samples between ALS and GC Lab are presented in Figure 11.12, the umpire check results returned slightly lower results than the original samples in the higher end of the assay range for Ag, an apparent positive bias for Pb grades between 1 and 4%, and no significant deviation for Zn.

 

Figure 11.12:Scatter and QQ Plot (Original Samples from ALS, Umpire Samples GC Laboratories)

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT91

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.12:Scatter and QQ Plot (Original Samples from ALS, Umpire Samples GC Laboratories)

 

Notes: Ag: g/t, Pb: %, Zn: %

 

The Scatter and QQ plot of umpire samples between ALS and Chengde Huakan are presented in Figure 11.13, the umpire check results returned slightly lower results than the original samples for Ag, Pb and Zn.

 

Figure 11.13:Scatter and QQ Plot (Original Samples from ALS, Umpire Samples from Chengde Huakan)

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT92

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.13:Scatter and QQ Plot (Original Samples from ALS, Umpire Samples from Chengde Huakan)

 

   

Notes: Ag: g/t, Pb: %, Zn: %

 

 

The Scatter and QQ plot of umpire samples between GC and SGS Laboratories are presented in Figure 11.14, the umpire check results returned lower results than the original samples for Ag and Zn and no significant deviation for Pb.

 

Figure 11.14:Scatter and QQ Plot (Original Samples from GC, Umpire Samples from SGS Laboratories)

 

   

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT93

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.14:Scatter and QQ Plot (Original Samples from GC, Umpire Samples from SGS Laboratories)

 

 

 

Notes: Ag: g/t, Pb: %, Zn: %

 

The Scatter and QQ plot of umpire samples between GC and ALS Laboratories are presented in Figure 11.15, the umpire check results returned slightly lower results than the original samples in the higher end of the assay range for Ag, Pb and Zn.

 

Figure 11.15:Scatter and QQ Plot (Original Samples from GC, Umpire Samples from ALS Laboratories)

 

  

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT94

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.15:Scatter and QQ Plot (Original Samples from GC, Umpire Samples from ALS Laboratories)

 

 

Notes: Ag: g/t, Pb: %, Zn: %

 

The Scatter and QQ plot of umpire samples between GC and Chengde Huakan are presented in Figure 11.16, the umpire check results returned slightly lower results than the original samples in the higher end of the assay range for Ag and Pb, and no significant deviation for Zn.

 

Figure 11.16:Scatter and QQ Plot (Original Samples from GC, Umpire Samples from Chengde Huakan)

 

   

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT95

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Sample Preparation, Analyses, and Security  
■  FINAL

 

Figure 11.16:Scatter and QQ Plot (Original Samples from GC, Umpire Samples from Chengde Huakan)

 

   

Notes: Ag: g/t, Pb: %, Zn: %

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT96

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Data Verification  
■  FINAL

 

12  Data Verification
12.1  Site Visit

SRK conducted the site inspections to the GC Mine from 23 to 26 April in 2024, The Principal Geologists Mark Wanless and Yanfang Zhao from SRK undertook the following verification steps

Site inspection of the project area.
Meeting with GC Mine representatives.
Discussions with geologists regarding sample collection, sample preparation, sample storage, QA/QC, geological interpretation, and underground mapping procedures.
Underground visit, review of the mineralization, tunnel sampling procedure (Figure 12.1).
Visit the drill core store and drill core intersections.
Visit on site sample preparation lab.

SRK visited the core tray storage (Figure 12.1), drill core store/ core tray storage of GC Mine (Figure 11.3) and site laboratory (Figure 12.2), to understand the company’s core storage protocols and procedures.

 

Figure 12.1:Tunnel Sampling and Core Store Shed of GC Mine

 

 

Sources: SRK site visit

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT97

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Data Verification  
■  FINAL

 

Figure 12.2:Site Laboratory of GC Mine

 

 

Sources: SRK site visit

 

12.2  Assay Validation

 

12.2.1  Pulp Duplicates Verification

The QP recommended that Silvercorp get pulps back from the laboratory and randomise the sample sequence of the pulps for a re-assay test to validate the GC Lab pulp duplicates as follows:

Request the pulps from three batches of samples back from the laboratory;
Record a list of original sample numbers, and then randomise the order; and
Assign new sequence of sample numbers and submit to laboratory, with CRMS inserted in the sequence.

The results of data verification are presented in Table 12.1 and Figure 12.3. The results show acceptable repeatability at the CG laboratory.

 

Table 12.1:Data Verification Results of Pulp Samples

 

Project Data Pairs
Count
  Relative Difference    
  <10%   10% - 20% > 20%  
Ag 48 41 85.4% 3 6.3% 4 8.3%
Pb 48 43 89.6% 2 4.2% 3 6.3%
Zn 48 44 91.7% - 0.0% 4 8.3%

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT98

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Data Verification  
■  FINAL

 

Figure 12.3: Scatter and Hard Plot of Pulp Duplicates Verification Samples

 

 

Notes: Ag: g/t, Pb: %, Zn: %

 

12.2.2  Umpire Samples

A total of 477 assays from pulp check samples from 2021 to 2023 were random selected by SRK to undertake a cross check, and included 25 blanks, 59 duplicates and 24 standards inserted. The assays were considered within mineralized wireframes comprising drillhole and underground samples. The umpire samples summary is listed in the Table 12.2.

The duplicates were collected and sent to SGS Tianjin Lab for assay using the AAS42S method in May 2024 and compared to the original assays by GC Lab.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT99

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Data Verification  
■  FINAL

 

Table 12.2:Umpire Check Samples Summary

 

Year Working Type Samples
  Tunnel/Drift/Cross-cut Samples 35
2021 Raise 7
Drill holes 120
  Sub Total 162
  Tunnel/Drift/Cross-cut Samples 71
2022 Raise 18
Drill holes 93
  Sub Total 182
  Tunnel/Drift/Cross-cut Samples 50
2023 Raise 8
Drill holes 75
  Sub Total 133
Grand Total   477

The Scatter plots, HARD plots and QQ plots for Ag, Pb and Zn for umpire samples are presented from Figure 12.4 to Figure 12.5.

The HARD plots show larger differences than ideal, where 90 % of the samples have the HARD values less than 17% for Ag, 8% for Zn and 30% for Pb.

The scatter plots show a number of samples with large errors which are close to mirror images around the 1:1 line (Unity); these may be due to swapped samples.

 

Figure 12.4: Scatter and Hard Plot of Umpire Sample

 

     

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT100

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Data Verification  
■  FINAL

 

Figure 12.4:Scatter and Hard Plot of Umpire Sample

 

   

Notes: Ag: g/t, Pb: %, Zn: %  

 

The Ag assays show evidence of a small bias, at lower values, (in the QQ plot) but with the GC Lab returning lower results than the Umpire lab. No bias is observed for Pb or Zn.

 

Figure 12.5:QQ Plot of Umpire Sample

 

   

Notes: Ag: g/t, Pb: %, Zn: %  

 

12.2.3  Core Samples & Drive Samples

 

During the underground site visit, tunnel sampling was observed. Samples are collected by chipping with a hammer and chisel, and these are collected on a large plastic sheet on the floor. The sample is mixed on the sheet, and a portion of the chips are bagged. Only the larger blocks on the plastic sheet were included in the collected sample, and all the fines were discarded. While it is not certain,

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT101

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Data Verification  
■  FINAL

  

this may result in a low bias in the chip sample results if the mineralization tends to form a larger proportion of the fines than the unmineralized units. The chip sampling observed was also biased towards collecting material from the mineralized zone compared to the harder waste units. As the unmineralized units are harder to chip, the collection of sampled material was biased towards the mineralized units, which may result in a high bias in the chip samples.

SRK’s comparison between the de-clustered mean of Core Samples and the de-clustered mean of Drive samples, presented in Figure 12.6. Each point in the scatter plot represents the mean values for a vein. Only the drive samples were considered for comparison, and not the raise samples, as the raise samples are more likely to be where the grade is high enough for them to design a stope, which may result in a high bias. The drive samples may also have a bias, as they will usually target the high-grade portions of the vein, but less bias than the raise samples.

The comparison shows quite a lot of variability, but on average, the chip samples in the drives are higher grade than the drill holes. This may be due to the chip sampling introducing a bias into the drive sampling results, but this is not conclusively demonstrated. Introducing a diamond saw into the chip sampling process, to cut a channel from which material can more consistently and evenly be chipped and collecting the entire sample and not just the coarse fraction, will reduce the possibility of bias from the issues above.

 

Figure 12.6:Comparison between the Core Samples and the Drive Samples

 

   

 Notes: Ag: g/t, Pb: %, Zn: %

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT102

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Data Verification  
■  FINAL

 

12.3  Data Entry Checks

Data entry checks undertaken by the author to confirm the validity of the database compiled for the Mineral Resource estimation include:

Checking for internal consistency between the database for primary assays and QC samples with the database table of 2021 AMC report for the data before 2021
Selection of some samples at random and comparison between the original and umpire assay entries with laboratory source files from 2021 to 2023 supplied by Silvercorp.

The resource database and the QC sample data supplied by GC Mine (Table 12.3) shows a slight deviation for the total original samples and QC samples, some larger deviations may be caused by differences in the years marked in the database and QC data missing, or adjustments and exclusions made by AMC.

 

Table 12.3: Historical Database Summary

 

  Drilling+Underground Sampling (Data 2024)   Drilling+Underground Sampling (2021 AMC Report)
  Duplicates   Duplicates  
Year Samples CRMs Blanks Field Coarse Pulp Umpire Samples Samples CRMs Blanks Field Coarse Pulp  Umpire Samples
Pre-2011 5 104 0 0 0 0 0 0 5,402 0 0 0 0 0 0
2011 34 68 82 0 0 0 76 1,893 68 82 0 0 0 60
2012 5,870 98 133 94 0 0 2,282 5,849 98 133 94 0 0 2,350
2013 15,748 105 132 106 0 0 2,553 9,380 105 132 106 0 0 3,105
2014 3,576 57 62 59 0 0 202 3,608 75 79 79 0 0 211
2015 6,762 76 81 75 0 0 31 5,868 109 115 109 0 0 31
2016 6,281 129 130 125 0 0 33 6,273 153 152 154 0 0 33
2017 9,329 238 119 239 0 0 46 9,333 234 237 239 0 0 46
2018 11,197 458 472 473 60 60 1,279 10,964 459 473 473 60 60 1,279
2019 12,703 287 300 281 163 163 302 12,714 286 300 281 163 163 482
2020 18,028 499 585 497 359 354 852 16,434 467 548 469 331 327 849
Total 89,632 2,015 2,096 1,949 582 577 7,656 87,718 2,054 2,251 2,004 554 550 8,446

  

12.4  Summary
SRK found that the procedures of core sampling, log and storage are standardized, and the analytical methods and processes are in line with good practice.
During the underground site visit, it was observed, only the larger blocks on the plastic sheet were taken, all the fines were discarded, and the sampling was biased against the hanging wall and footwall units, with a larger proportion of the mineralization zone (Figure 11.2) chipped. Although SRK recognises that channel sampling is challenging due to the variable hardness of the rock units and uneven surface for sampling, SRK recommends that the chip sampling can be improved using a diamond saw to cut a channel for the chipping, which will also reduce the volume of sample and allow the full sample of coarse and fine material to be collected.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT103

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Data Verification  
■  FINAL

 

The results of pulp duplicates verification are acceptable, and consistent with expectations for sufficient sample homogenisation, therefore supporting that the GC Lab assays have acceptable precision.
For the database validation, the consistency checks for random original and umpire assay samples between the data tables and original laboratory test reports show no significant issues. The available information indicates that the database and umpire assay table has in general been carefully compiled and validated and forms an appropriately reliable basis for resource estimation.
The resource database and the QC sample data supplied by Silvercorp shows slight deviation for the total original samples and QC samples, the historical (2011-2020) sample number difference between the resource database and the table in the 2021 AMC report is about 2%, and the sample number difference of QC data is below 9%. While not a material discrepancy, SRK recommends that the database management can be improved.
The umpire samples from 2021 to 2023 were observed to have some swelling and caking, especially in the samples for 2021 and 2022, which may result in mass change or oxidation, which may affect the results.
The umpire samples results show there are no major issues.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT104

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

 

13  Mineral Processing and Metallurgical Testing

 

13.1  Introduction

In May 2009, Hunan Research Institute for Nonferrous Metals (Hunan) completed the mineralogical study and processing test on ore samples of GC Mine and compiled the "Processing Test Report on the Comprehensive Recovery of Lead, Zinc, Silver, Tin and Sulphur for GC Lead-Zinc Mine". Although a processing laboratory is built at the mine, no systematic processing test has been carried out since then. This processing test report is the main basis for the feasibility study and engineering design of GC processing plant. The GC processing plant was completed and put into operation in 2014 and has continued in operation since that time.

In July 2020, to improve the head grade and reduce the processing costs, Beijing Honest Technology Co., Ltd. (Beijing Honest) conducted a pre-sorting test of ore and compiled the "Test Brief Report on X104 Intelligent Sorting System of Found Lead-Zinc Mine, Guangdong Province”. The pre-sorting system was built in 2022 and is still at the stage of optimization.

This chapter is a summary of the above two tests, to show the ore beneficiation at the GC Mine, although the actual production records can better illustrate the historical performance.

 

13.2  Test Samples

The test samples are the basic assay samples of drilling cores of 2008. They were crushed to a grain size of less than 2mm, and predominantly from Exploration Line 24 to Exploration Line 48. The total number of test samples is 152. The samples are mixed and used as samples for mineralogical study and processing test samples.

 

13.3  Mineralogy

 

13.3.1  Chemical Components and Mineral Composition

The chemical multi-element analysis results of the test samples are shown in Table 13.1. The mineral composition analysis results are shown in Table 13.2. The elements with high content in the ore are Si, Al, Ca, S and Fe. The elements with recovery value are Ag, Au, Zn, Pb, Cu, Sn, S and Fe. The harmful element is As. These elements exist in the ore in different minerals.

 

Table 13.1:Chemical Multi-Element Analysis Results of the Test Samples

 

Element Content () Element Content ()
Cu 0.16 CaF2 7.52
Pb 1.45 SiO2 44.2
Zn 3.25 Al2O3 9.01
As 0.47 MgO 0.34
S 10.16 CaO 5.82
TFe 9.67 Mn 0.92
Sn 0.20 Cd 0.019
Ag (g/t) 128.32 Au (g/t) 0.20

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT105

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

  

Sources: Processing Test Report on the Comprehensive Recovery of Lead, Zinc, Silver, Tin and Sulphur for GC Lead-Zinc Mine, Hunan Research Institute for Nonferrous Metals, May 2009.

 

The main minerals of the ore include quartz, feldspar, chlorite, fluorite, kaolinite and mica, which are gangue minerals with no recovery value. Minerals with recovery value are sphalerite, galena, pyrite, pyrrhotite, chalcopyrite, bornite and cassiterite.

 

Table 13.2:Main Mineral Composition of the Test Samples

 

Mineral Content () Mineral Content ()
Sphalerite 4.8 Quartz (Contain a small amount of chalcedony) 30
Galena 1.6 Feldspar 8
Pyrite 13 Chlorite 12
Pyrrhotite 2.2 Kaolinite 5.5
Arsenopyrite 1 Sericite and Muscovite 6
Magnetite and Hematite 2 Hornblende 2
Chalcopyrite and Bornite 0.5 Silicate minerals such as tremolite, actinolite and garnet 1
Cassiterite 0.2 Calcite and Rhodochrosite 2.2
Fluorite 7.5 Others 0.5

Sources: Processing Test Report on the Comprehensive Recovery of Lead, Zinc, Silver, Tin and Sulphur for GC Lead-Zinc Mine, Hunan Research Institute for Nonferrous Metals, May 2009.

  

13.3.2  Occurrence State

 

Silver

Silver is the main valuable element in the ore, and its phase analysis results are shown in Table 13.3. Silver is relatively scattered, mainly in the form of silver sulphide such as argentite and acanthite, accounting for about 40.59%. Secondly, it occurs in pyrite, galena, sphalerite and other sulfides as submicroscopic natural silver particles or isomorphism state atomic state, accounting for about 32.65%. The silver that exists in the form of independent native silver minerals is also relatively high, accounting for approximately 23.39%. Additionally, approximately 2.19% of silver is hosted in gangue minerals, and about 1.18% of silver is hosted in cerargyrite.

Under the microscope, minerals such as native silver, argentite and acanthite are rare, and the embedding particle size is small, mostly below 0.04 mm. They are mainly embedded with galena and pyrite, mostly wrapped by galena, pyrite or embedded in galena, pyrite grains. Occasionally, native silver is embedded in quartz fissures or wrapped by quartz. Analysis results of monominerals show that independent silver minerals account for about 13% of the total silver. Silver in galena accounts for about 40% of the total silver, and silver in sphalerite accounts for about 14% of the total silver. Silver in other sulfides accounts for about 30% of the total silver, and silver in gangue minerals accounts for 3% of the total silver. Silver minerals are most closely related to galena, and silver has the widest distribution in galena, suggesting that most of the silver can be enriched in lead concentrate.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT106

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

 

Table 13.3:Phase Analysis Results of Silver

 

Silver Phase Content (g/t) Distribution (%) Remarks
Native Silver 30.24 23.39 Dissociated or exposed metallic silver
Silver Sulphide 52.47 40.59 Dissociated or exposed silver sulfide minerals such as argentite and acanthite

 

Silver in Sulfides

 

42.21

 

32.65

Including atomic silver in pyrite, pyrrhotite, galena, sphalerite, arsenopyrite, chalcopyrite, tetrahedrite and other sulfides, as well as native silver and silver sulfide enclosed in sulfides and not exposed.
Silver in Cerargyrite 1.53 1.18 The content of cerargyrite in the ore is minimal.
Silver in Other 2.83 2.19 Enveloped by gangue minerals, unexposed native silver, silver sulfide, silver in sulfides, etc.
Total 129.28 100.00  

Sources: Processing Test Report on the Comprehensive Recovery of Lead, Zinc, Silver, Tin and Sulphur for GC Lead-Zinc Mine, Hunan Research Institute for Nonferrous Metals, May 2009.

 

Tin

The phase analysis results for tin are presented in Table 13.4, with the disseminated grain size of cassiterite illustrated in Figure 13.1. Tin in the ore mainly occurs as the oxide mineral cassiterite, comprising 74.55% of the total tin content. This is followed by tin sulfide, which constitutes 13.64%. Tin in silicates and colloidal tin account for 6.36% and 5.45% respectively.

Cassiterite: Primarily occurs as irregularly dispersed granules within the ore. It is commonly situated between particles of quartz, sericite, chlorite, and hornblende. It is also frequently observed among particles of galena and pyrite, while its association with sphalerite is comparatively less pronounced. The embedding grain size of cassiterite is fine, typically less than 0.05mm, with a substantial proportion below 0.03mm. Stannite, is mainly located between particles of sphalerite, galena, pyrite, and chalcopyrite, among other sulfides. It is embedded as irregularly shaped granules with a grain size that is slightly coarser than that of cassiterite, mainly under 0.05mm
Tin sulfide: Mainly occurs as stannite.
Colloidal tin: Mainly occurs as varlamoffite, which is a fine-grained colloidal aggregate resembling earthy or ochreous textures. It is typically a mixture of fine-crystalline or cryptocrystalline tin dioxide hydrate with cryptocrystalline tin-bearing hydrous limonite and alumina, frequently adsorbed by other minerals such as limonite and clay minerals. Varlamoffite generally has such a fine particle size that its morphology is challenging to discern under a microscope.
Tin in silicates: This form of tin mainly manifests as ultrafine particles of cassiterite encapsulated within silicate minerals or quartz. Subsequently, it may occur as tin silicate or in an ionic state within the silicates.

 

Table 13.4:Phase Analysis of Tin

 

Chemical Phase of Tin Content (%) Distribution (%) Remarks
Tin in Cassiterite 0.164 74.55 The main tin phase
Tin in Tin Sulfide 0.030 13.64 Stannite

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT107

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

 

Chemical Phase of Tin Content (%) Distribution (%) Remarks
Tin in Silicate 0.014 6.36

Tin silicate and cassiterite in very fine particles

encased in silicate minerals or quartz

Tin in Colloidal Tin 0.012 5.45 Varlamoffite etc.
Total Tin 0.22 100.00  

Sources: Processing Test Report on the Comprehensive Recovery of Lead, Zinc, Silver, Tin, and Sulphur for GC Lead-Zinc Mine, Hunan Research Institute for Nonferrous Metals, May 2009

 

 

Lead

Lead mainly occurs in the form of the sulfide mineral galena, comprising 92.59% of the total, followed by carbonate mineral white lead, accounting for about 4.44%. Anglesite and plumbojarosite accounted for 1.48% each.

Some coarse galena particles exhibit hypidiomorphic granular texture, though they generally appear as allotriomorphic granular texture. These are commonly found in contact with sphalerite and pyrite, filling the spaces between pyrite grains, often accompanied by sphalerite and chalcopyrite, and exhibit minor metasomatism of the pyrite. The disseminated grain size of galena is depicted in Figure 13.1.

 

Zinc

Zinc mainly occurs as the sulfide mineral sphalerite, comprising approximately 94.17% of the total zinc content. This is followed by carbonate minerals such as smithsonite, which constitute about 2.32%. Zinc silicate accounted for approximately 2.24%, while franklinite and other zinc-bearing minerals account for around 1.27%.

 

Sphalerite mostly appears as allotriomorphic granular texture, with some occurring as hypidiomorphic granular texture. It is commonly found in contact with and intergrown with galena and pyrite, filling the spaces between pyrite grains along with galena and chalcopyrite, and exhibits minor metasomatism of pyrite. Some sphalerite is fine grained and coated with pyrite, meanwhile the chalcopyrite of emulsion texture also can be observed at some sphalerite internally. The disseminated grain size of sphalerite is shown in Figure 13.1.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT108

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

  

Figure 13.1: Disseminated Grain Size of Galena, Sphalerite and Cassiterite

 

 

 

Source: SRK, based on the data from Preliminary Design

 

Galena and sphalerite are primarily disseminated as medium to fine grains, mainly between 0.037 and 2 mm, with the grain size of galena being marginally larger than that of sphalerite. Cassiterite is disseminated as micro-fine grains, posing a challenge to its dissociation and recovery during the grinding process.

 

Other Elements

Copper ores in the GC deposit are primarily chalcopyrite, with a minor presence of bornite and occasional occurrences of tetrahedrite. The distribution of these ores is uneven, and the overall content is low. Exploring the feasibility of processing and concentrating copper into copper concentrate represents a significant area of research.

Arsenic minerals are mainly represented by arsenopyrite, which is considered a deleterious mineral within the ore. The arsenic content is subject to strict limitations across all concentrates.

Fluorine is mainly found in the form of fluorite, with minor occurrences within silicate minerals such as tourmaline and hornblende. In the GC deposit, fluorite is unevenly distributed and has a relatively low average content, rendering it without economic recovery value, and it is typically regarded as a gangue mineral.

Cadmium is typically presented in sphalerite through isomorphism or as inclusions of greenockite. In the zinc concentrate, cadmium is co-enriched with zinc, which is a valuable element in the concentrate.

Iron is primarily found in iron sulfide minerals such as pyrite and pyrrhotite, and to a lesser extent in magnetite and hematite, as well as in silicate minerals. These iron sulfide minerals are also the main source of sulphur, which is concentrated into sulphur concentrate during the mineral processing.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT109

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

  

Sulphur is primarily presented in pyrite, and secondarily in minerals such as sphalerite, pyrrhotite, galena, and arsenopyrite. In the mineral processing, aside from the lead and zinc concentrates, sulphur is concentrated as pyrite and pyrrhotite into pyrite concentrate, thereby forming sulphur concentrate.

 

13.4  Processing Test

 

13.4.1  Lead-Zinc-Sulphur Sequential Flotation Test

For ore samples less than 2mm in size, a sequential preferential flotation process for lead, zinc, and sulphur was employed. A series of condition tests were conducted, including those for grinding fineness, lead flotation reagent scheme, zinc flotation reagent scheme, and sulphur flotation reagent scheme. Based on these tests, the optimal conditions were selected for both open-circuit and closed- circuit process tests. The closed-circuit test process is depicted in Figure 13.2, with the results detailed in Table 13.5. The optimal grinding fineness was 80% passing 200 mesh (P80=75μm).

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT110

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

 

Figure 13.2:Lead-Zinc-Sulphur Flotation Closed-Circuit Test Flowsheet

 

 

Source: SRK, based on the Mineral Processing Test Report by Hunan Research Institute for Nonferrous Metals.

 

Table 13.5:Results of the Lead-Zinc-Sulphur Flotation Closed-Circuit Process Test

 

Product

Mass Pull

(%)

  Grade   Metal Recovery (%)  
Pb (%) Zn (%) S (%) Ag (g/t) Pb Zn S Ag
Pb Conc. 2.65 45.92 9.72   2,903.75 84.25 7.92   63.16
Zn Conc. 5.86 0.97 48.70   264.52 3.94 87.77   12.72
S Conc. 15.01 0.79 0.46 41.85 170.32 8.21 2.12 61.83 20.98
S Tail 76.48 0.068 0.093   5.00 3.60 2.19   3.14
Feed 100.00 1.44 3.25 10.16 121.84 100.00 100.00   100.00

Source: Processing Test Report on the Comprehensive Recovery of Lead, Zinc, Silver, Tin, and Sulphur for GC Lead Zinc Mine, Hunan Research Institute for Nonferrous Metals, May 2009

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT111

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

 

13.4.2   Copper-Lead Separation Exploratory Test

The lead concentrate obtained from the aforementioned closed-circuit test contained 3% copper. A copper-lead separation test was conducted using an open-circuit process with 'one roughing and one cleaning' to depress lead and float copper, producing quality-standard copper concentrate with an improved lead concentrate grade. The copper concentrate achieved a grade of 18.46% with a recovery rate of 67.56%; the lead concentrate grade was enhanced from 46.05% to 57.16%, with a recovery rate of 88.88%. The results indicate the feasibility of producing high-quality copper concentrate.

13.4.3   Tin Recovery Test

Exploratory tests were conducted on the sulphur tailings from the aforementioned closed-circuit test to recover tin, utilizing various processes and equipment for gravity separation. The results are as follows:

Flotation tests with different reagent schemes yielded a maximum concentrate grade of 0.36% and a tin recovery rate of 12.68%, which were unsatisfactory.
Unclassified shaking tables separation produced tin concentrate at a grade of 27.72% with a tin recovery rate of 32.64%.
Classified shaking tables separation, where tailings were classified by fineness into two categories: greater than 200 mesh (75μm) and less than 200 mesh, resulted in a tin concentrate grade of 28.34% and a tin recovery rate of 34.07%.
The rough concentrate obtained from pre-concentration with spiral chutes was further processed with classified shaking tables for cleaning operation, resulting in a tin concentrate grade of 41.28% and a tin recovery rate of 31.57%.
The rough concentrate, pre-concentrated by centrifugal concentrators, was then cleaned with unclassified shaking tables, resulting in a tin concentrate grade of 35.82% and a tin recovery rate of 21.49%.

The results of the tin recovery test indicate that the gravity separation is feasible, particularly the combination of spiral chutes and shaking tables, which can achieve higher concentrate grades and recovery rates.

The tin concentrate resulting from the gravity separation process contained sulphur in excess of 7%. Flotation for desulfurization was employed, and the tests showed that it was possible to reduce the sulphur content in the final tin concentrate to around 0.5%, while increasing the tin grade to over 50% and achieving an operational recovery rate of more than 84%. Particularly, the desulfurization flotation of the concentrate from the spiral chutes and shaking tables yielded a tin concentrate grade of 56.7% and a recovery rate of 93.8%. 

13.5  Ore Pre-Sorting Test

Beijing Honest completed the ore pre-sorting test in July 2020. ROM with particle size of 10~60mm is selected. X104 intelligent sorting system is used to scan the ROM to obtain its image. Through intelligent identification algorithm, different tailings discarding rates from low to high are set for pre- discarding of tailings. The test results are shown in Table 13.6.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT112

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Processing and Metallurgical Testing  
■  FINAL

 

The test results show that when the discarding rate of tailings is 41.84%, the grade of lead and zinc in the concentrate is 6.734%, and the grade of lead and zinc in tailings is 0.333%, which meets the requirements of tailings. The recovery rate of lead and zinc is more than 96%. The grade of silver in the concentrate is 114.12 g/t, and the grade of silver in the tailings is only 13.01 g/t. It shows that the pre-sorting results of X104 intelligent sorting system is satisfactory.

 

Table 13.6:Intelligent Pre-Sorting Test Results

 

        Grade Recovery Rate ()
Steps Product Weight (kg) Yield () Ag (g/t) Pb (%) Zn (%) Ag Pb Zn
Step 1 Concentrate 449.6 81.43 85.53 1.69 3.25 96.98 99.26 99.17
Tailings 102.5 18.57 11.67 0.06 0.12 3.02 0.74 0.83
Step 2 Concentrate 363.6 65.86 102.77 2.07 3.96 94.24 98.39 97.71
Tailings 188.5 34.14 12.12 0.07 0.18 5.76 1.61 2.29
Step 3 Concentrate 321.1 58.16 114.12 2.32 4.41 92.42 97.50 96.09
Tailings 231.0 41.84 13.01 0.08 0.25 7.58 2.50 3.91
Step 4 Concentrate 288.0 52.16 123.97 2.56 4.74 90.05 96.33 92.61
Tailings 264.1 47.84 14.95 0.11 0.41 9.95 3.67 7.39

13.6  Conclusions of Testing
The GC deposit has silver-lead-zinc polymetallic ore, and also contains a small amount of copper and tin for comprehensive recovery. Lead concentrate, zinc concentrate, and sulphur concentrate are produced sequentially by preferential flotation process. Silver and copper are mainly enriched in lead concentrate, and the test results are good. Lead preferential flotation -- zinc-sulphur mixed flotation and then zinc-sulphur separation flotation process is now adopted in the GC processing plant. It is proved to be feasible, and satisfactory recovery rates are achieved.
It is feasible to separate copper concentrate from lead concentrate, not only to obtain copper concentrate, but also to improve the grade of lead concentrate. At present, there is no in-depth technical study on copper recovery in the GC processing plant. SRK recommends that copper- lead separation flotation test be carried out on the lead concentrate produced in the GC processing plant, including lead concentrate regrinding and flotation test. It can reduce zinc content in the lead concentrate and improve the grade of lead concentrate while obtaining copper concentrate.
The results of experimental tin recovery from sulphur flotation tailings show that tin concentrate can be produced by gravity separation. Tin is recovered by classified gravity separation process, and qualified tin concentrate is produced, which is feasible.
The X-ray intelligent sorting machine is the preferred equipment for ore pre-sorting. It has been developed rapidly in recent years. Tests have shown that it is feasible to conduct pre-sorting to the ore crushed to a suitable particle size. Some partings and waste rocks can be discarded in advance. It is beneficial for processing of low-grade ore. XRT intelligent sorting system was installed in the GC processing plant in March 2023, replacing the previous hand-sorting.
There are many ore bodies in GC Mine, and the ore properties of different ore bodies vary slightly. The processing parameters and reagents should be adjusted to adapt to the changes in ore properties. SRK recommends that ore processing tests be carried out on ore from some representative ore bodies in order to guide the production of the plant.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT113

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

14  Mineral Resource Estimates
14.1  Introduction

The Mineral Resource estimation work was completed by Mr Yongwei Li, Resource Geologist of Silvercorp under the supervision of Guoliang Ma, who is the QP of Silvercorp. Mr Mark Wanless (Pr.Sci.Nat, FGSSA), and Ms Yanfang Zhao (MAusIMM), who are Principal Geologists from SRK have reviewed the database, estimation methodologies and models used to prepare the Mineral Resource estimate using Isatis.Neo. After some adjustment to the compositing, capping and search parameters, Mr Mark Wanless and Ms Yanfang Zhao were satisfied that they comply with reasonable industry practice.

The Qualified Person responsible for the Mineral Resources is Mr Mark Wanless, who is a full time employee of SRK Consulting (South Africa) Ltd. (SRK ZA) and Registered with the South African Council for Natural Scientific Professionals as Pr.Sci.Nat, 400178/05, Fellow of the Geological Society of South Africa, Member of the Geostatistical Association of South Africa. Mr Mark Wanless visited the project between the 23 and 26 of April 2024.

The estimates are based on drilling samples and underground samples information available up to 2024. With respect to drilling and underground sample information available for the March 2024 Mineral Resource estimates, SRK believes the current drilling and channel sampling information is sufficiently reliable to interpret with confidence the boundaries for GC deposits and that the assay data are sufficiently reliable to support Mineral Resource estimation.

The Mineral Resources have been estimated in accordance with generally accepted CIM Definition Standards and are reported in accordance with the Stock Exchange listing requirements. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resource will be converted into Mineral Reserves. Micromine™ software was used for data compilation, domain wire-framing and grade estimation.

This section describes the Mineral Resource estimation methodology and summarizes the key assumptions. The report author is not aware of any specific environmental liabilities on the property. GC Mine has all required permits to conduct the proposed work on the property. The report author is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform on-going work programs on the property.

14.2  Estimation Procedures

The Mineral Resource evaluation methodology involved the following procedures:

Database compilation and verification;
Geological interpretation for estimation domain;
Data preparation (compositing and capping) for statistical analysis;
Construction of the block model and grade interpolation;
Mining depletion;
Mineral Resource classification;

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT114

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Model validation;
Assessment of “reasonable prospects for eventual economic extraction” (“RPEEE”) and selection of appropriate cut-off grades (COG); and
Preparation of the Mineral Resource statement.

14.3  Database

The data used in the estimate consists of surface and underground diamond drillholes and channel samples. The underground channel samples are from tunnels, raises, and cross-cuts.

The data SRK received from GC Mine include a database (GC.mdb and Density Measurement in excel format), Wireframes (Ag-Pb-Zn veins, mined out area and write-off areas to be excluded from the Mineral Resource), composites in .dat format, QA/QC data, original GC Lab report from 2021 to 2023, original umpire checks report from ALS and SGS Laboratories from 2021 to 2023, block models for each veins in DM format, Topo file, etc.

As of March 2024 there were 3,582 drillholes (101,043 samples/ 482,605 m) and 56,090 underground samples in the database. Detailed information is as shown in

Table 14.1, and the drillhole and underground sample locations are shown in Figure 14.1.

 

Figure 14.1:Drillholes and Underground Sampling Location

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT115

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Table 14.1:Summary of Resource Database

 

Type Drillhole/Channel Number Length (m) Samples
Tunnel/Drift/Cross-cut samples 17,382 35,484 47,845
Level access samples 111 343 425
Trench samples 31 656 223
Raise samples 3,832 4,455 7,601
Drill holes 3,582 482,605 101,043
Sub-total 24,938 523,543 157,137

14.4  Domain Modelling

The wireframe models for 256 mineralized veins have been modelled and supplied by GC Mine to SRK, and were reviwed by SRK in the Beijing office and on the GC Mine site to ensure they were representative of the insitu mineralization as of March 2024.

The mineralized veins were modelled in Micromine software mainly based on the vein structure and lithology using a broad 80g/t AgEq cut-off for the resource domain boundary. A cross section of the mineralized veins is shown in Figure 14.2.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT116

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.2:Mineralized Veins Section

 

 

The GC deposit comprises 256 veins, including numerous small veins. The 10 biggest veins, on the basis of classified tonnes, are V10, V2E, V2N, V19A, V33, NV10, V4, V9_5B, V1A and V16 in sequence. The location of these is illustrated in Figure 14.3 as the red traces.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT117

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

  Figure 14.3: Plan View of Mineralized Veins Display at Level 0 m (Red: Biggest 10 Veins)

 

 

14.5  Specific Gravity

As there are no new density measurements from 2021 to 2023, the same density formula was assigned to the block model as per AMC’s previous calculations:

Within mineralization wireframes of GC deposit based on the multiple linear regression model using lead, zinc, and silver grades
DENSITY = 3.094919 + (0.040827 x Pb) + (0.034253 x Zn) + (0.000482 x Ag)
2.60 is assigned to barren rock.

14.6  Compositing

Assays were averaged into full-width composites across the individual veins. A 0.4m composite lengths and full width composites were tested and compared. The shrinkage stoping and resue stoping methods are employed on GC Mine, are non-selective across the width of the veins. Therefore, estimating variable grades across the thickness of the veins is not required for the mine planning, and a full width compositing strategy allows for the estimates to be length weighted, which is more appropriate for this style of mineralization. A full-width composite was deemed appropriate given the narrow geometry of the veins and lack of selectivity. The distribution of sample lengths is shown in Figure 14.4.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT118

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.4:Sampling Interval Histogram

 

 

Figure 14.5 shows the comparison between raw samples and the full width composites.

 

Figure 14.5:Scatter Plot of Ag Mean Grade

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT119

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.6:Scatter Plot of Pb Mean Grade

 

 

 

Figure 14.7:Scatter Plot of Zn Mean Grade

 

 

 

The full width composites statistics for the largest 10 veins are presented in Table 14.2.

 

Table 14.2:Composites (Declustered Length Weighted) Statistics of the Selected 10 Veins

 

Vein Field Name No of Points Maximum Mean Std Dev Coeff. of Variation
  Ag (g/t) 1,118 933.47 55.52 79.91 1.44
V10 Pb (%) 1,118 28.04 1.49 2.36 1.58
  Zn (%) 1,118 20.10 2.76 2.41 0.87
V2E Ag (g/t) 1,236 2,015.00 88.05 116.07 1.32

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT120

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Vein Field Name No of Points Maximum Mean Std Dev Coeff. of Variation
  Pb (%) 1,236 18.00 1.31 1.86 1.41
  Zn (%) 1,236 20.20 2.74 2.44 0.89
  Ag (g/t) 98 1,296.00 143.81 203.38 1.41
V2N Pb (%) 98 17.01 0.95 2.14 2.25
  Zn (%) 98 31.40 6.58 6.67 1.01
  Ag (g/t) 933 1,308.00 71.08 97.72 1.37
V19A Pb (%) 933 49.73 1.50 2.98 1.98
  Zn (%) 933 32.05 3.67 4.12 1.12
  Ag (g/t) 805 2,223.63 125.40 216.36 1.73
V33 Pb (%) 805 19.72 1.43 2.58 1.81
  Zn (%) 805 25.71 2.39 3.48 1.45
  Ag (g/t) 541 902.00 53.58 80.66 1.51
NV10 Pb (%) 541 21.92 1.22 2.30 1.88
  Zn (%) 541 27.58 2.73 2.99 1.09
  Ag (g/t) 28 416.43 70.42 108.68 1.54
V4 Pb (%) 28 5.50 0.61 1.07 1.77
  Zn (%) 28 5.99 0.81 1.40 1.74
  Ag (g/t) 442 359.00 68.85 58.58 0.85
V9_5B Pb (%) 442 23.12 2.16 2.91 1.35
  Zn (%) 442 15.57 3.24 2.25 0.69
  Ag (g/t) 302 656.00 58.38 86.86 1.49
V1A Pb (%) 302 19.41 1.95 3.03 1.55
  Zn (%) 302 17.48 2.43 2.78 1.14
  Ag (g/t) 888 2,382.00 131.73 235.33 1.79
V16 Pb (%) 888 14.62 0.87 1.58 1.82
  Zn (%) 888 27.43 2.53 3.24 1.28

 

14.7  Evaluation of Outliers

 

Assay capping for Ag, Pb and Zn was applied after compositing for the mineralized domains. The Probability plots and Capping Values for the largest 10 veins are presented in Figure 14.8 and Table 14.3. Capping values were selected for each vein and variable based on the visual assessment of the distribution and the outliers. No standardised value (such as at a specific percentile) was applied, but each was assessed individually to assess the most appropriate capping value. These were generally above but close to the two standard deviation value, where capping was deemed necessary.

 

Table 14.3:Statistics of Capping Data for the Selected 10 Veins

 

        Mean Grade
Veins Items Sample No. Capped Capping Value    
        Before Capping After Capping
  Ag (g/t)   No Cap 55.52 55.52
V10 Pb (%) 18 9.5 1.49 1.41
  Zn (%)   No Cap 2.76 2.76

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT121

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

        Mean Grade
Veins Items Sample No. Capped Capping Value    
        Before Capping After Capping
  Ag (g/t)   No Cap 88.05 88.05
V2E Pb (%)   No Cap 1.31 1.31
  Zn (%)   No Cap 2.74 2.74
  Ag (g/t)   No Cap 78.73 78.73
V2N Pb (%)   8.5 2.09 2.09
  Zn (%)   No Cap 3.59 3.59
  Ag (g/t)   No Cap 71.08 71.08
V19A Pb (%) 7 15 1.50 1.43
  Zn (%)   No Cap 3.67 3.67
  Ag (g/t) 10 950 100.98 97.61
V33 Pb (%) 8 13 0.98 0.97
  Zn (%)   No Cap 1.84 1.84
  Ag (g/t) 5 330 53.58 50.94
NV10 Pb (%) 9 9 1.22 1.12
  Zn (%)   No Cap 2.73 2.73
  Ag (g/t)   No Cap 94.10 94.10
V4 Pb (%) 1 5 0.52 0.51
  Zn (%) 1 5.8 0.56 0.55
  Ag (g/t)   No Cap 67.19 67.19
V9_5B Pb (%)   No Cap 1.83 1.83
  Zn (%)   No Cap 3.12 3.12
  Ag (g/t)   No Cap 55.24 55.24
V1A Pb (%) 1 17 1.18 1.18
  Zn (%)   No Cap 1.53 1.53
  Ag (g/t) 14 1000 131.73 124.44
V16 Pb (%) 9 7.5 0.87 0.82
  Zn (%)   No Cap 2.53 2.53

 

Figure 14.8:Probability Plots for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT122

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.8:Probability Plots for the Selected 10 Veins

 

 


 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT123

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.8:Probability Plots for the Selected 10 Veins

 

 

 

Sources: Silvercorp Metals Inc.

 

14.8  Block Model and Grade Estimation

 

The separated Micromine (software) models with different block model origins, dimensions and rotations for each vein were generated by GC Mine in May 2024. The block size was set to 10 m × 10 m × 5 m (East × North × Elevation), and the sub bock size was set to 2 m × 2 m × 0. 5 m (East × North × Elevation). In order to orient the model to follow the general strike of the mineralization, a rotation was performed for each vein. A block model parameter summary is presented in Table 14.4 for the ten largest veins.

 

Table 14.4:Block Model Summary

 

Vein XMIN XMAX YMIN YMAX ZMIN ZMAX DIP AZIMUTH
V10 593970 594970 2535220 2536170 -540 200 61 241
V2E 593720 594110 2535490 2535990 -660 140 66 290
V2N 593400 593850 2535820 2536100 -670 50 69 165
V19A 594050 594980 2535240 2535760 -530 190 59 260
V33 594000 594550 2535120 2535490 -330 310 63 158
NV10 594070 594720 2535410 2536230 -600 270 68 235
V4 592620 593720 2536230 2536710 -430 190 76 198
V9_5B 593590 593990 2535350 2535580 -550 -50 71 182
V1A 593250 594020 2534980 2535630 -280 130 27 63
V16 593480 594020 2535320 2535600 -400 250 70 268

Sources: Silvercorp Metals Inc.

 

Ag, Pb and Zn grade interpolation was performed using inverse distance squared (ID2) weighting for different veins, and the vein true thickness of each composite is used as a weight. The three progressively more relaxed search criteria used for estimation are presented in Table 14.5. The search ellipsoids were aligned with the general mineralization orientation.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT124

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Table 14.5:Specific Search Parameters

 

Pass Search Distance (X, Y, Z) Minimum Composites Maximum Composites
1 30 6 12
2 55 4 20
3 200 5 30

 

14.9  Model Validation

 

Model validation is a common approach for determining whether grade estimation has performed as expected. An acceptable or preferred validation result does not necessarily imply that the model is correct or derived from the right estimation approach. It suggests only that the model is a reasonable representation of the resource data used and of the estimation method applied. Other issues such as the relationship between the model-selectivity assumptions and mining practices are equally important when determining the appropriateness of the Mineral Resource estimate.

 

Comparisons between the global mean for the composites and block models for each vein showed some material differences, which are a result of the heterogenous nature of the mineralization, and the clustering of information in high and low grade areas of veins. SRK investigated the estimates in these veins visually and through swath plots to determine if there are any materially biased estimates. In all instances reviewed, the local estimation matched the data well, and the observed differences in the mean values were clearly due to irregular distribution of the composites. The estimation parameters in Table 14.5 were designed to result in accurate local estimates where there is dense data, and more smoothed estimates where the data is widely spaced.

 

The swath plot validation approach was adopted to validate the models. Swath plots of Ag, Pb and Zn for the largest 10 veins (as well as a number of other veins which showed discrepancies between the mean of the data and the mean of the estimates) were created in three orthogonal directions and elevation in particular slice thicknesses in each direction to validate the resultant block models. The swath plots of the 10 largest veins are shown in Figure 14.9 to Figure 14.11. The block models and composites match reasonably well in all orthogonal directions. This comparison shows close agreement between the block model and composites in terms of overall distribution and the estimates match the trends of the data along strike and in the dip direction.

 

Figure 14.9:Swath Plot of Ag for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT125

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.9:Swath Plot of Ag for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT126

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.9:Swath Plot of Ag for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT127

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.9:Swath Plot of Ag for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT128

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.9:Swath Plot of Ag for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT129

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.9:Swath Plot of Ag for the Selected 10 Veins

 

 

 

Figure 14.10:Swath Plot of Pb for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT130

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.10:Swath Plot of Pb for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT131

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.10: Swath Plot of Pb for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT132

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.10: Swath Plot of Pb for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT133

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.10: Swath Plot of Pb for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT134

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.10: Swath Plot of Pb for the Selected 10 Veins

 

 
   

 

Figure 14.11: Swath Plot of Zn for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT135

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.11: Swath Plot of Zn for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT136

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.11: Swath Plot of Zn for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT137

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.11: Swath Plot of Zn for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT138

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.11: Swath Plot of Zn for the Selected 10 Veins

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT139

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.11: Swath Plot of Zn for the Selected 10 Veins

 

 
     

 

14.10  Mineral Resource Classification

 

Mineral Resource classification is typically a subjective concept, industry best practices suggest that Mineral Resource classification should consider both the confidence in the geological continuity of the mineralized structures, the quality and quantity of exploration data supporting the estimates and the geostatistical confidence in the tonnage and grade estimates. Appropriate classification criteria should aim at integrating both concepts to delineate regular areas at similar resource classification.

 

SRK consider the quality of the drill hole data to be good, with appropriate sample collection protocols, good core recovery, adequate database management, and analytical results which generally are demonstrated to be sufficiently accurate and precise through industry standard analytical procedures and a comprehensive QA/QC management system. The chip sampling data, share the same database management protocols, and confidence in the analytical results. As discussed above, there are some concerns relating to possible bias in the sample collection methods. While these data are collected on short-spaced intervals, their confidence is not as high as the drill core data. While no bias has been conclusively demonstrated, the sample collection is sub optimal, and is likely to introduce inaccuracy in the data. This is somewhat mitigated by the quantity and spacing of the data but can be improved.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT140

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

The genesis of the ore bodies is well understood, and the veins can be followed over tens to hundreds of meter distances along strike and down dip. The wireframe models show few anomalous artifacts and honour the composite data well.

Silvercorp considers the three search passes parameters (Table 14.5) as the primary discriminator for the Mineral Resource classification (Figure 14.12) under the QP’s advice, with the estimates in the first pass having confidence sufficient for Measured Mineral Resources, the second pass as Indicated Mineral Resources and the third for Inferred Mineral Resources. To avoid a spotted dog phenomenon Silvercorp smoothed the classification boundaries to remove isolated pockets of higher or lower classification, with due consideration of the continuity of the veins. This approach is consistent with that previously applied by AMC.

 

Figure 14.12:Resource Classification for the Selected 10 Veins

 

 
     

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT141

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.12:Resource Classification for the Selected 10 Veins

 

 
     
     

 

 

Measured

Indicated

Inferred  

Unclass

 

14.11  Mining Depletion

Mining depletion and write-offs were coded into the block models by Silvercorp, based on survey information on 30 June 2024. An example of depletion coding is displayed for the biggest 10 veins in Figure 14.13. Figure 14.14 shows a composite plan view of mined-out and written-off material.

 

Figure 14.13: Mining Depletion for the Selected 10 Veins
 
V10 V2E

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT142

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.13:Mining Depletion for the Selected 10 Veins

 

 
  V2N V19A
     
  V33 NV10
     
  V4 V9_5B

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT143

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.13:Mining Depletion for the Selected 10 Veins

 

 
  V1A V16
     

 

 

Unmined

Development

Mine out stope  

Write-off material

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT144

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Figure 14.14: Plan View of Mined-Out Stopes (Purple) and Written-Off Shapes (Yellow)

 

 

Sources: Silvercorp Metals Inc.

 

14.12  Mineral Resource Statement

 

CIM Definition Standards for Mineral Resources and Mineral Reserves (2014) defines a Mineral Resource as:

“A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction(“RPEEE”).

The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated, or interpreted from specific geological evidence and knowledge, including sampling. In order to meet this requirement, SRK considers that major portions of the GC Project are amenable for underground mining. The assumptions made to determine the cut-off for underground mining for the GC Mine are shown in Table 14.6.

 

Table 14.6:RPEEE Assumptions

 

Item Unit Parameter
LTP Silver Price USD/oz 28.00
LTP AVG Recovery Rate % 81.42
Payable Factor factor 0.69
Mining Costs USD/t ROM 32.07
Backfill Plant USD/t ROM 3.10
Processing Plant USD/t ROM 14.93

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT145

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Item Unit Parameter
Tailing USD/t ROM 0.44
Sales, G & A USD/t ROM 8.17
Reclamation USD/t ROM 0.36
Corporate Social Responsibility USD/t ROM 0.11
COG (AgEq) g/t 120

Notes:

 

1  The price refers to the long-term prediction published by Consensus Market Forecasts in April 2024

2  AgEq = Ag+44.83*Pb+40.02*Zn.

Within the current mining license area, as of 30 June 2024, the GC Mine, above a COG of 120g/t AgEq, there are 11.49 million tonnes (“Mt”) of Measured and Indicated Mineral Resources at an average grade of 84 g/t Ag, 1.18% Pb, 2.85% Zn; and 9.57 Mt of Inferred Mineral Resources at an average grade of 85 g/t Ag, 1.23% Pb, 2.44% Zn. Details of the estimated Mineral Resources are shown in Table 14.7.

 

Table 14.7:Mineral Resource Statement for GC Project, as of 30 June 2024

 

Resource Classification Tonnes       Contained Metal  
(Mt) Ag (g/t) Pb (%) Zn (%) Ag (koz) Pb(kt) Zn(kt)
Measured 5.87 88 1.3 3.11 16,542 76 183
Indicated 5.62 80 1.05 2.57 14,507 59 144
Measured+Indicated 11.49 84 1.18 2.85 31,049 136 327
Inferred 9.57 85 1.23 2.44 26,194 117 234

Notes:

 

1  Mineral Resource Statement as of 30 June 2024.

2  Source: Silvercorp Metals Inc, Verified by SRK

3  Mineral Resource are reported at a cut-off grade of 120 g/t AgEq.

4  The totals may not compute exactly due to rounding.

5  The veins within the depth less than 5m below surface are not included in the Mineral Resource

 

14.13  Grade Sensitivity Analysis

Mineral Resources are sensitive to the selection of COGs. To illustrate this sensitivity, ore quantities and grade estimates at different COGs are presented in Table 14.8 and Table 14.9. The reader is cautioned that the figures presented in this table should not be mistaken for a Mineral Resource Statement. The figures are only presented to show the sensitivity of the block model estimates to the selection of COG. Figure 14.15 and Figure 14.16 represent this sensitivity as grade-tonnage curves.

 

Table 14.8: Global Block Model Quantities and Grade Estimates for Measured and Indicated Category, GC Project at Various cut-off Grades.

 

Cut-off Grade Quantity Grade Grade Grade
AgEq (g/t) (Mt) Ag (g/t) Pb (%) Zn (%)
100 13.13 78 1.09 2.65
105 12.72 80 1.11 2.70
110 12.30 81 1.13 2.75
115 11.90 82 1.16 2.79
120 11.49 84 1.18 2.85

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT146

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

Cut-off Grade Quantity Grade Grade Grade
AgEq (g/t) (Mt) Ag (g/t) Pb (%) Zn (%)
125 11.12 85 1.20 2.89
130 10.76 87 1.22 2.94
135 10.40 88 1.25 2.99
140 10.06 90 1.27 3.03

Notes: The reader is cautioned that the figures in this table should not be misconstrued with a Mineral Resource Statement. The figures are only presented to show the sensitivity of the block model estimates to the selection of cut-off grade.

 

Figure 14.15: Grade-Tonnage Curve for Measured and Indicated Category, at Various Cut-off Grades

 

 

Table 14.9: Global Block Model Quantities and Grade Estimates for Inferred Category, GC Project at Various Cut-off Grades

 

Cut-off Grade Quantity Grade Grade Grade
AgEq (g/t) (Mt) Ag (g/t) Pb (%) Zn (%)
100 10.99 79 1.13 2.28
105 10.61 81 1.15 2.32
110 10.23 82 1.18 2.36
115 9.91 84 1.20 2.40
120 9.57 85 1.23 2.44
125 9.23 87 1.25 2.48
130 8.89 88 1.28 2.52
135 8.59 90 1.30 2.56
140 8.29 91 1.33 2.59

Notes: The reader is cautioned that the figures in this table should not be misconstrued with a Mineral Resource Statement. The figures are only presented to show the sensitivity of the block model estimates to the selection of cut-off grade.

 

Figure 14.16:Grade-Tonnage Curve for Inferred Category, at Various Cut-off Grades

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT147

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Resource Estimates  
■  FINAL

 

14.14  Previous Mineral Resource Estimate

AMC was requested by Silvercorp to complete a NI43-101 compliant Mineral Resource estimation for the GC project in July 2021.

The last Mineral Resource was reported above a 105g/t AgEq cut-off to reflect underground mining for the RPEEE criteria under the CIM Definition Standards. The results of the estimation are shown in the Table 14.10.

 

Table 14.10: Mineral Resources as of 31 December 2020 (at a cut-off of 105g/t AgEq)

 

 

Tonnes

(Mt)

      Contained Metal
Classification Ag (g/t) Pb (%) Zn (%) Ag (koz)

Pb (M

lbs)

Zn (M

lbs)

Measured 5.286 88 1.3 3.1 14,906 154 360
Indicated 4.747 75 1.1 2.5 11,457 111 259
Measured and Indicated 10.033 82 1.2 2.8 26,363 265 619
Inferred 8.441 87 1.0 2.4 23,562 195 442

Sources: 2021 AMC report

Notes:

 

1 CIM Definition standards (2014) were used for reporting the Mineral Resources.

2 Mineral Resource are reported at a cut-off grade of 105 g/t AgEg.

3 The equivalency formula is Ag g/t+50.46*Pb%+43.53*Zn% using prices of USD18.20/oz Ag, USD0.94/lb Pb, and USD1.08/lb Zn and estimated recoveries of 82.6% Ag, 89.5% Pb, and 87.3% Zn.

4 Sample results up to 31 December 2020.

5 Mineral Resources have been depleted to account for mining to 31 December 2020.

6 Veins factored to a minimum extraction width of 0.4 m.

7 Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

8 The numbers may not compute exactly due to rounding.

The major changes to the Mineral Resource between 2021 and 2024 include:

 

The addition of approximately 51,861 samples from 204,243.8 m of drilling and 16,387 channel samples,

 

A change in the estimation methodology to use full width composites rather than 0.4 m composites,

 

An increase in the reporting cut-off due to changes in the RPEEE assumptions.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT148

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Reserve Estimates  
■  FINAL

 

15  Mineral Reserve Estimates

 

15.1  Introduction

The CIM Definition Standards provide for a direct relationship between Indicated Mineral Resources and Probable Mineral Reserves and between Measured Mineral Resources and Proven Mineral Reserves. As shown in Figure 15.1 below.

 

Figure 15.1: Relationship Between Mineral Reserves and Mineral Resources

Sources: CIM Definition Standard 2014

The following statement has been extracted from the CIM Standards for reference:

“Mineral Reserves are those parts of Mineral Resources which, after the application of all mining factors, result in an estimated tonnage and grade which, in the opinion of the Qualified Person(s) making the estimates, is the basis of an economically viable project after taking account of all relevant processing, metallurgical, economic, market, legal, environment, socio-economic and government factors. Mineral Reserves and delivered to the treatment plant or equivalent facility. The term ‘Mineral Reserve’ need not necessarily signify that extraction facilities are in place or operative or that all governmental approvals have been received. It does signify that there are reasonable expectations of such approvals.”

“A Mineral Reserve is the economically mineable part of a measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at pre-feasibility or feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified.”

“The public disclosure of a Mineral Reserve must be demonstrated by a Pre-Feasibility Study or Feasibility Study.”

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT149

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Reserve Estimates  
■  FINAL

 

15.2  Summary of Technical Study and Operation

A preliminary engineering design named Mining and Dressing Project of Gaocheng Lead-Zinc Ore in Yun’an County, Guangdong Province, was conducted by Guangdong Metallurgical & Architectural Design Institute (“GDMAI”), in January 2011. 

The mine was constructed based on the design by GCMAI and operated since 2014. Though some practical modifications and updates to the mining system and/or processing plant have been implemented in the 10-years of operating, SRK opines the production practice could be equivalent to or exceed a pre-feasibility study.

 

15.3  Cut-off Grades

The Mineral Resources of GC Mine contain silver, lead, and zinc elements. The Equivalent Ag (“AgEq”) grade was used for COG to define the “Ore”.

The following formula is applied to estimate the economic COG of AgEq for the feed ore from underground extraction.

 

𝐴 =  𝐶𝑚 + 𝐶𝑝 + 𝐶𝑔 + 𝐶𝑐 + 𝐶𝑒  
𝑃 * 𝑅 * 𝐹  

 

Parameters that are applied for estimates of the COG are presented in Table 15.1. The preferred COG is the estimated value which is round up to the nearest 10. SRK is of the view that material above the COG could be defined as economically extractable under those specific conditions.

 

Table 15.1:    Estimates for COGs

 

Item Unit MRE Shrinkage/OCAF Resuing Description
Preferred AgEq g/t 120 150 200 Round up to nearest 10
A g/t 115 160 142 Estimated COG of AgEq
Cm USD/t ROM 32.1 25.0 45.0 Mining cash cost
Cp USD/t ROM 18.5 18.5 18.5 Plant cash cost, including processing, backfill plants and tailing treatment
Cg USD/t ROM 8.2 8.2 8.2 Sale, General & Administration cash cost
Cc USD/t ROM 0.5 0.5 0.5 Corporate social responsibility and reclamation
Se USD/t ROM - 4.6 4.6 Exploration sustaining
R % 81.4 81.4 81.4 Long-term average processing recovery rates for silver
P USD/oz 28.5 22.0 22.0 Long-term forecast silver price
F factor 0.69 0.69 0.69 Payable Factor

Sources: GC Mine, CMF and SRK

Notes:

 

1 OCAF – Overhand cut and fill

2 Costs are considerred on the last 3-year average, detailed in Section 21.2 of this Report

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT150

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Reserve Estimates  
■  FINAL

 

3Prices are souced from Consensus Market Forecast, detailed in Section 19. The long-term silver price for Reserve is 22.0 USD/oz. It is 28.5 USD/oz. for Resources Estimates.
41 oz=31.1035 g
51 USD=7.22 RMB
6Average processing recovery rate is based on the last 3 year operation record, which is detailed in Section 17 of this report.

 

The saleable products of the GC Project are lead concentrate and zinc concentrate. The elements within these concentrates are payable based on various factors, depending on both the specific elements and their respective grades. The payable factors for Ag, Pb, and Zn elements within each concentrate are estimated based on the Contracts and operations records, as presented in Table 15.2 below.

 

Table 15.2: Estimates for Payable Factors

 

Item Unit Ag in Lead Conc. Pb in Lead Conc. Ag in Zinc Conc. Zn in Lead Conc.
Long-term forecast price USD/oz for Ag, USD/t for Pb and Zn 22.0 2,050 22.0 2,650
Average element grade in Conc. g/t for Ag, % for Pb and Zn 1,608 43.2 282.3 43.2
Reference prices in RMB, incl. VAT RMB/g for Ag, RMB/t for Pb and Zn 5.8 16,725 5.8 21,620
Paid considered, in RMB, incl. VAT RMB/g for Ag, RMB/t for Pb and Zn 5.3 16,228 0.60 14,857
Net received in USD, excl. VAT USD/oz for Ag, USD/t for Pb and Zn 20.0 1,989 2.3 1,821
Payable Factors, Net received against LTP Factor 0.91 0.97 0.10 0.69
Ag percentage in each Conc. % 73% N/A 27% N/A
Weighted payable Factor Factor Ag:0.69 Pb: 0.97   Zn 0.68

 

Sources: GC Mine, CMF and SRK

 

Notes:

 

1Prices are souced from Consensus Market Forecast, detailed in Section 19. The long-term prices for Reserve are silver 22USD/oz.; lead 2,050 USD/t (0.93 USD/lb); zinc 2,650 USD/t (1.2 USD/lb)
2Average element grade in concenstrates is based on the last 3 year operation record, which is detailed in Section 17 of this report.
3Reference prices in RMB consider value added tax with the rate of 13%, and the currency exchange rate of 1 USD=7.22 RMB
4The paid considered is depending on the grade of elements and contracts items, which is detailed in Section 19 of this report.
5The Ag percentage in each concentrate is based on the proportion of last 3 years operation records.
6Conc. : concentrate.
7VAT : value added tax.
8Incl. and excl. stand for including and excluding, respectively.

 

The equivalent factor of Pb and Zn against Ag is estimated considering; prices, recovery rates, and payable factors differences. The estimates are presented in Table 15.3 below. It should be noted that the equivalent factors are not updated since 31 March 2024 estimation. SRK opines the prices changing for 3 months has minimum effect on the factors.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT151

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Reserve Estimates  
■  FINAL

 

Table 15.3:Estimates for Equivalent Factors of Pb and Zn to Ag

 

Item Unit Ag Pb Zn
Long-Term Forecast Price USD/oz for Ag, USD/t for Pb and Zn 21.5 2,000 2,550
Average Recovery Rate % 81.4 90.0 89.5
Weighted Payable Factor Factor 0.69 0.97 0.68
Unit Used in Resource Model Unit g/t % %
Unit Value USD/Unit 0.39 17.45 15.58
Eq Factor against Ag Factor 1 44.83 40.02

 

Sources: GC Mine, CMF and SRK

 

Notes:

 

1 Ag recovery rate conbines the rates in both lead and zinc Conc., which are 58.9% and 22.5%, respectively.

2 Eq stands for equivalent

 

15.4  Modifying Factor

 

15.4.1  Mine Design Scope

 

Mining to date has been conducted in two stages, and design the third stage, which are horizontally defined by mine sections and vertically by elevations:

 

Stage 1 access by decline down to -50 mRL

 

Stage 2 is -50 mRL down to -300 mRL and employs a surface shaft access, as well as the extension of the decline

 

Stage 3 is on engineering design, which mines the Mineral Resources occurred between - 300 mRL and -500 mRL. The access method is a planned extension the decline.

 

The mine is designed to cover the deposits from the +100mRL down to -500mRL within the mining permits.

 

15.4.2  Stopes Design

 

The mineable shape is designed and evaluated by the followings:

 

Designed mining stope outline manually against the Measure and Indicated (“MI”) Mineral Resources categories, based on the 50m vertical intervals and about 50m length of the shapes. 5m crown pillar and 5-6m rib pillars of every stope excluded in the design

 

Cut the mineral structures with the stope outlines into stope blocks as mineable stope

 

Boolean operation with the end of month survey of stope

 

Interrogating against grade model (block model) to get the critical parameters, such as Mineral Resource category, grades, thickness, etc.

 

Classify the stope into mining method base on the thickness (horizontal) then applying the modifying factors:

 

-Minimum Mining Width(“MMW”): 0.5m for resuing and 1.0m for shrinkage, therefore before planned dilution, 0.4m for resuing and 0.8m for shrinkage mineable shape is considered;

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT152

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Reserve Estimates  
■  FINAL

 

-Planned dilution: if the thickness is lower than those, planned dilution (zero grade) to the minimum mining width;
-Unplanned dilution: an equivalent linear overbreak/ slough (“ELOS”) with zero grade is applied to the mineable shape. Factored 0.05m on hanging wall and footwall each for resuing stope and 0.1 each wall for shrinkage stope;
-Further factored dilution of 2% (if more than 2m wide), 3% (between 2m and 1m) and 4% (less 1m wide), is also applied for shrinkage as broken ore drawing when mining is finished;
-Factored ore loss as 95% and 92% for resuing and shrinkage method, respectively;
-COG filter: assess the diluted mineable shape against COG to filter out sub-economic stopes;
-Visual and manual filter the stopes considering the practical conditions with local engineer for mine planning; and
-Summation of the eligible material in stopes as the potential Mineral Reserves then conduct mine planning and scheduling.

 

In general, the Mineral Reserve estimates are well supported and provide a reasonable basis for ongoing production mining at these narrow vein deposits. The mining methods employed are highly selective, and GC Mine has initiated activities to minimise dilution as key strategy.

 

It should be noted that only stopes for resuing and shrinkage methods are considered during the stope design, the overhand cut and fill method employed as the same as the parameters as shrinkage stope.

 

Based on the mine design, and Mineral Resource occurrence, the Measure and Indicated Mineral Resource with dilution and diluted AgEq grade within designed stopes on each vertical interval is presented as Figure 15.2.

 

Figure 15.2:Measured and Indicated Mineral Resources including Dilution Material per Vertical Interval

 

 

Sources: GC Mine, as of 31 March 2024, SRK summarized

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT153

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Reserve Estimates  
■  FINAL

 

15.4.3  Dilution and Loss Summary

 

As a result of the previously described stope design, the mining dilution and ore loss estimated stope by stope and is summarized in Table 15.4.

 

Table 15.4:Dilution and Loss Summary

 

Mining Method Average Stope Width (m) Dilution Rate Ore Loss Rate Reserve %
Resuing 0.9 17% 5% 33%
Shrinkage or OCAF 1.8 25% 8% 67%
Weighted Average 1.5 22.3% 7.0% 100%

 

Sources: GC Mine, SRK summarized

 

Notes:

 

1 OCAF - overhand cut and fill mining method

 

15.5  Mineral Reserve Estimates

 

The estimated Mineral Reserve, based on the Mineral Resource estimate and the application of Modifying Factors to the tonnes and contained equivalent silver (“AgEq”), is summarised in Table 15.5 and illustrated in waterfall charts shown in Figure 15.3 and Figure 15.4.

 

Table 15.5:Summary of Mineral Reserve Conversion Process

 

Description Tonne (kt) AgEq (g/t) AgEq Contained
(t)
MI+INF MRE @ COG 120g/t AgEq 21,066 244.8 5,158
MI MRE @ COG 120g/t AgEq 11,492 250.8 2,882
Stope Design Scope 7,727 256.0 1,978
MMW 6,086 261.8 1,593
COG 4,461 301.0 1,343
Allowance for Dilution 954 - -
Mining Ore Loss -381 243.6 93
Mine Inventory as of 31 March 2024 5,035 248.3 1,250
Mineral Reserve as of 30 June 2024 4,965 249.0 1,236

Sources: GC Mine, SRK summarized

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT154

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Reserve Estimates  
■  FINAL

 

Figure 15.3:Waterfall Chart of Mineral Reserve Conversion - Tonne

 

Sources: GC Mine, SRK summarized

 

  Figure 15.4: Waterfall Chart of Mineral Reserve Conversion - Contained Equivalent Silver

 

Sources: GC Mine, SRK summarized

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT155

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mineral Reserve Estimates  
■  FINAL

 

15.6  Mineral Reserve Statement

 

By applying the Modifying Factors, SRK reviewed the GC Mine Mineral Reserves estimate, in accordance with the CIM Definition Standards (2014) and NI 43-101 standard (Table 15.6). The economically mineable parts of the Measured and Indicated Mineral Resources categories within the designed stopes, including diluting materials and allowance for losses, were classified as Proven and Probable Mineral Reserves, respectively. The feed ore is estimated based on the reference point being the primary crusher or temporary stockpile at the crusher feed. Totally around 44% MI Mineral Resource converted into Mineral Reserve in tonnes, and about 43% contained metal converted when considering equivalent silver.

 

Table 15.6:Mineral Reserve Statement for GC Mine, as of 30 June 2024

 

Category Tonnes Ag Pb Zn Contained metal  
Unit (Mt) (g/t) (%) (%) Ag (koz) Pb(kt) Zn(kt)
Proven 2.73 81 1.26 2.95 7,142 34 81
Probable 2.23 81 1.15 2.71 5,791 26 61
2P Total 4.97 81 1.21 2.84 12,933 60 141

 

Sources: GC Mine, SRK summarized

 

Notes:

 

1 Any differences between totals and sum of components are due to rounding.

2150 g/t AgEq and 200 g/t AgEq COG was applied to Shrinkage (including overhand cut & fill) and resuing stopes, respectively.

3 The COG estimates are based on the forecast prices 22 USD/oz silver, 2,050 USD/t lead, and 2,650 USD/t zinc.

4 The Mineral Reserves are reported on a metric dry tonne basis.

5 The Mineral Reserves are reported at the reference point of ROM stockpile before crushing or directly crushing.

6 The Mineral Reserves are reported inclusive of Mineral Resources.

7 The Mineral Reserves are effective as of 30 June 2024.

 

15.7  Discussion on Potentially Impacts to Mineral Reserve Estimates

 

As in the case for most mining projects, the extent to which the estimate of Mineral Reserves may be affected by mining, metallurgical, infrastructure, permitting, market and other factors could vary from major gains to total losses of Mineral Reserves.

 

There are no known issues to the Qualified/ Competent Person of this section expected to materially affect the Mineral Reserve estimates.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT156

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

16  Mining Methods

 

16.1  Introduction

 

Mining to date has been conducted in two stages, and designing the third stage, which are horizontally defined by mine sections and vertically by elevations:

 

Stage 1 production employs conventional mobile, rubber-tired, diesel-powered equipment (development jumbo, loader, and truck) with surface declines access down to -50 mRL.

 

Stage 2 development from -50 mRL down to -300 mRL employs conventional tracked equipment (battery powered locomotives, rail cars, electric rocker shovels and pneumatic hand-held drills) via a surface shaft access, as well as the extension of the decline.

 

Stage 3 is on design, which mines the Mineral Resources occurred between -300 mRL and - 500 mRL, with access via the extension of the surface decline.

 

The is operated the combination of Stage 1 and Stage 2 via three production and one ventilation systems. The production level interval is 50 m between each level. These systems include:

 

The main decline production system includes one main decline from surface at 176 mRL to -300 mRL with a total length of 4,000 m.

 

The exploration decline production system is one exploration decline from surface at 110 mRL to -50 mRL with a total length of 1,500m. Furthermore, the exploration decline connects to the main decline at 0 mRL and -50 mRL.

 

The main shaft production system is one main shaft from surface 258 mRL to -370 mRL.

 

The ventilation system includes two ventilation shafts, which are:

 

Phase 1 ventilation shaft is return air raise from 114 mRL to -50 mRL;

 

Phase 2 ventilation shaft is return air raise from 122 mRL to -200 mRL;

 

The main decline, exploration decline, and main shaft are utilized as intake fresh air.

 

The mining method employed by the mine were traditional shrinkage and resuing stoping methods, previously 2021. Overhand cut and fill method has been introduced as the backfill plant finished construction and is operational.

 

The underground infrastructure, including water supplier and dewatering system, hoisting system, ventilation, power supply, compressed air supply, are constructed for the first two stages mine.

 

16.2  Operation and Product Rate

 

GC Mine has been commercial operated since Q2 2014.

 

GC Mine operates mainly using contractors for mine development, production, ore transportation, and exploration. GC Mine provides its own management, technical services, and supervisory staff to manage the mine operations.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT157

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

The design full product rate is approximately 330 ktpa. The mine operation is conducted 365 days of the year but mine production is currently scheduled on the basis of 330 days per year at an average of approximately 1,000 tpd. The operation record for the last 3 years are presented in Table 16.1.

 

Table 16.1:Operation Records from FY2020 to FY2025 Q1

 

Year Unit FY2022 FY2023 FY2024 FY2025 Q1
Ore Mined dry tonne 314,882 299,959 290,006 83,139
Moisture % 3.07 2.97 2.67 3.13
Processed dry tonne 318,042 299,597 290,050 83,745
Head Grades          
Ag g/t 75 75 69 64
Pb % 1.53 1.32 1.19 0.94
Zn % 3.19 2.75 2.64 2.38

Sources: GC Mine processing annually report

 

16.3  Geotechnical and Hydrogeology Considerations

 

The rock mass condition is categorized as Fair to Good and the AMC assessment anticipated that the vein and host rocks in the mine area would generally be competent, but with areas where local conditions require, additional local ground support installed. This has largely been confirmed in operations, with most areas deemed to require little or no support. Where Poor ground conditions have been encountered, ground support is provided, with a range of strategies available depending on the local conditions. This may be either rock bolts with or without mesh, shotcrete only, shotcrete with rock bolts, shotcrete with rock bolts and mesh, timber, or heavier steel support.

 

Based on the review of the available geotechnical data and high-level assessments undertaken, the geotechnical aspects of the mine design were generally reasonable for mining study purposes. However, given the limited nature of the data, the geotechnical knowledge at the Project prior to commencement of operations was not considered to be at the level of detail normally associated with a mining operation or feasibility study in Canada. That geotechnical knowledge has at the practical level, been significantly advanced since the commencement of operations. SRK has recommended that, as part of ongoing operations at the mine, geotechnical and ground support aspects should be continuously reviewed in a formal and recordable manner, bearing in mind previous recommendations, local and mine-wide operating experience in all rock types encountered, any advisable data collection, and looking to future mining development.

 

Specific hydrogeological investigations were not conducted. The mine design report presents discussion of hydrogeological conditions at GC Mine and states that hydrogeological exploration in the district is relatively inadequate. For AMC’s preliminary geotechnical assessments, minor water inflows (less than five litres per minute locally) were assumed. SRK notes that operating experience to date indicates that the assumption of minor water inflows is reasonable.

 

16.4  Mine Design

 

The mine design is based on the engineering work completed by the local official provincial design institute GMADI (April 2016). Refinements in areas such as profile dimensions, alignments, fleet

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT158

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

sizing, etc. have been made by GC Mine technical personnel on an as-needed basis during the Project construction and operations phases. Design aspects have been progressively advanced and refined as operations have progressed but without any major change in development requirements.

 

The mine is designed as an underground operation, developed a hybrid access system of declines and shafts, staged in 2 steps at the beginning, targeting the Mineral Resources above -300mRL. A third stage is on the progress of engineering design; however, the access method has been considered as decline access and the relayed air return raises. Figure 16.1 shows the mine design for GC Mine.

 

The mining stages are horizontally defined by mine sections and vertically by elevations:

 

Stage 1 production employs conventional mobile, rubber-tired, diesel-powered equipment (development jumbo, loader, and truck) with surface declines access down to -50 mRL.

 

Stage 2 development from -50 mRL down to -300 mRL employs conventional tracked equipment (battery powered locomotives, rail cars, electric rocker shovels and pneumatic hand-held drills) via a surface shaft access, as well as the extension of the decline.

 

Stage 3 is on designing, which mines the Mineral Resources occurred between -300 mRL and - 500 mRL.

 

Figure 16.1:Mine Design for GC Mine

 

 

Sources: GC Mine

 

16.4.1  Vertical Access

 

The mine access for men and materials, as well as the transportation of ore and waste, is provided by two declines (Exploration decline, Main decline ) and a shaft (Main Shaft). The secondary means of emergency egress is provided by the Phase1 and Phase 2 return airway shafts (RAR). Table 16.2 summarizes general details for each vertical access.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT159

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Table 16.2:Summary of General Details for Mine Access

 

Shaft Name Diameter (m) Collar Elevation (mRL) Bottom Elevation (mRL) Depth (m) Profile East Collar Coordinate North Collar Co- ordinate Collar Access
Main Decline Extend 4.2 x 3.8 176 -300 706 Rectangular 37,593,581 2,535,330 Surface
Exploration Decline 3.7 x 3.5 112 50 62 Rectangular 37,593,379 2,535,987 Surface
Stage 1 RAR 3.5 120 -50 170 Circular 37,593,954 2,535,692 Surface
Stage 2 RAR 3.5 122 -50 172 Circular 37,594,206 2,535,586 Adit
Main Shaft 6.0 248 -370 618 Circular 37,593,562 2,535,544 Surface

Sources: GC Mine

 

The Main decline provides access to the +100 mRL, +50 mRL, 0 mRL, -50 mRL, -100 mRL, -150 mRL, -200 mRL, -250 mRL and -300 mRL levels.

 

The Exploration decline provides access to the +100 mRL, +50 mRL, 0 mRL, and -50 mRL. The Main decline connects to the Exploration decline at 0 mRL and -50 mRL. The average gradient is 12% (1 in 8.3) with minimum radius of 20 m. The total decline access length is 2,358 m (excluding stockpiles).

 

The Main Shaft collar is located at +248 mRL elevation with a circular diameter is 6.0 m.

 

16.4.2  Horizontal Access

 

The level (horizontal) development/ drive is designed relative to the vein positions. The ore drive is developed primarily from the level access. Then development of the raises to the upper-level to control the vein, also well as the stope access. A third drive is developed, the footwall drive which is used as the transportation of ROM. The fourth part of the develop is the cross-cut from the foot wall drive to ore drive that is used for the extraction of ore from the stope. A typical level develop against mineralization veins is illustrates in Figure 16.2.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT160

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.2:Planning View of Development and Veins - 150m RL

 

Sources: GC Mine

 

16.4.3  Expansion Plan for the Third Stage

 

Stage 3 is the planned extension of the decline downwards as the main access. Relayed air return raises are planned for ventilation. Materials and ROM will be transported to Level -300mRL then hoisted to surface via main shaft. The main decline is also a standby material movement path.

 

16.5  Material Movement

 

The ROM material is mined/ drawn out of the stope or waste excavated from development headings and loaded into 0.7m3 rail cars by small scale rubber-tired load-haul-dump mobile machines (LHD) from either cross-cut draw points or development headings directly. The rail cars are moved by electric locomotives along the level drive (footwall drive) to the shaft, then hoisted two at a time in the shaft cage (2 deck) to surface. The material mined near decline system, underground trucks are loaded at the stope draw points equipped with vibration feeder at the bottom of the ore pass, which is fed from upper level by rail cars or LHD directly.

 

The Main Shaft has one ground mounted multi-rope friction winder (Koepe winder) (600 kW rating), and is used for hoisting men and material as well ore and waste, for areas below the -50 mRL. The shaft is also used for intake air, services access (ladder, cables, and pipes) and emergency egress.

 

The shaft hoisting capacity is estimated to be approximately 330 ktpa. The capacities are estimated based on 330 days per year, three shifts per day, and eight-hour shifts.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT161

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Waste that is cage hoisted in rail cars to surface is transferred to the rail waste dump tip head that is within 200 m of the Main Shaft. Figure 16.3 shows the Main Shaft headframe.

 

Figure 16.3: Underground Access and Level Drive of GC Mine

 

 

Sources: SRK site visit

 

16.6  Stoping Method

 

Shrinkage stoping, overhand cut and fill (OCAF) stoping, and resue stoping are the methods utilized in GC Mine. Shrinkage stoping and resue stoping were employed at the beginning of the mine's life. Overhand OCAF stoping has been employed since 2021. The ROM per each stoping method for the last 3 years is presented in Figure 16.3.

 

Table 16.3:ROM Percentage per Stoping Method

 

Year Unit FY2021 FY2022 FY2024 FY2025 Q1
Shrinkage % ROM 71% 77% 76% 70%
Resuing % ROM 29% 21% 16% 24%
OCAF % ROM 0% 3% 8% 6%

Sources: GC Mine

Notes: The final total might include some rounding inaccuracies.

 

16.6.1 Shrinkage Stoping

 

The method begins with establishing a sill drive along the vein to expose the vein at 2.4 m height. An access drive (conventionally a footwall drive) is also developed parallel to the vein at 2.4 m wide x 2.4 m high at a minimum stand-off distance of 6 m from the vein. Cross-cuts between the access and vein drives are developed at approximately 7.5 m strike spacing (actual spacing is dependent on the loader used, loader dimensions and the rib pillar thickness required for rib stability). The cross-

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT162

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

cuts act as draw points for the mucking of the stope ore. Travel way access raises, that are also used for services are established between the levels at each end of the stope block. Waste packs are built on each void side of the raise as stoping proceeds upwards. Each stoping block is normally 50 m strike length by 50 m height.

 

Miners use hand-held pneumatic drills (jackleg) to drill a 1.8 – 2.0 m stope lift that is drilled and blasted as inclined up-holes with a forward inclination of 75 – 85° (“half-uppers”). The typical drill pattern uses a drill burden of 0.6 – 0.8 m and spacing of 0.8 – 1.2 m, depending on vein thickness. Holes are charged with cartridge explosives and ignited with tape fuse. The powder factor is generally 0.4 – 0.5 kg/t. Stope blasting fills the void below with ore as the mining proceeds upwards. While mining upwards, only 30 – 35% of the stope ore may be removed until the entire stope is mined. At this point, all ore is removed from the stope, leaving the stoping void effectively empty. A crown pillar is maintained for the stope to provide regional stability and to minimize dilution from up-dip stopes. Ventilation, compressed air, and water are carried up the travel way raises to the stoping level. Loading of the ore from the draw points is by LHD into trucks (Stage 1) or electric rail over-throw loaders into rail cars (Stage 2).

 

As the backfill plant began operating in 2021, the mined out areas of shrinkage stopes in GC Mine are being backfilled in a predetermined schedule.

 

Figure 16.4 depicts the Shrinkage stoping method as used at GC Mine.

 

Figure 16.4: Typical Shrinkage Stope Layout

 

 

Sources: GC Mine

 

16.6.2  Resue Stoping

 

Vein and access development preparation is essentially the same as for shrinkage stoping except that an elevated sill drive (3 m on-dip height) is established along with draw points (generally limited

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT163

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

to two or three) to provide access to the raise positions (raises equipped with steel liners as mill holes).

 

Resue stoping veins are typically higher-grade and generally between 0.20 m (minimum extraction width 0.3 m) and 0.80 m width. Resue stoping involves separately blasting and mucking the high grade narrow vein and waste required to achieve a minimum stoping work width.

 

The mining crew consists of miners using hand-held pneumatic drills. Half-uppers lifts are drilled and blasted in essentially the same manner as for shrinkage stoping. After an ore lift is blasted and cleaned, the footwall is blasted and used to fill the void mined out. This process is repeated until the crown pillar is reached. The entire stope is left filled with waste from the cleaning of the footwall.

 

The blasted ore is transported by wheelbarrow and/ or hand shovelling to the steel-lined mill-hole. The steel pass is constructed in lift segments as the stope is mined upwards. The base of the steel pass is held in place with a timber set. The footwall waste is then cleaned to maintain a minimum mining width (typically 0.8 m for GC Mine) and to provide the working platform for the next stope lift. In contrast to shrinkage stoping, the mined-out stope is left filled with waste from the cleaning of the footwall necessary to maintain a minimum mining thickness and to provide a working platform.

 

The order of vein extraction and footwall cleaning is generally dependent on the condition of the vein hangingwall contact. Where the vein hangingwall contact is distinct and stable, the vein is extracted first; otherwise, the footwall waste is extracted first followed by vein.

 

Rubber mats and/ or old conveyor belting are placed on top of the levelled waste after each waste lift to minimize ore dilution with the waste (ore losses) and also to minimize over-cleaning of the waste (dilution). Cleaning of the ore consists of hand shovelling and hand carting to the steel pass which connects to the mill hole cross-cut. The rubber mats and/ or old conveyor belt are rolled up and removed for reuse prior to blasting the footwall and forming the next platform lift.

 

In-stope ore transporting may potentially be improved by using scraper winches with small hoes.

 

Figure 16.5 depicts the resue stoping method at GC Mine.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT164

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.5: Typical Resuing Stope Layout

 

 

Sources: GC Mine

 

16.6.3  Overhand Cut and Fill

 

OCAF mining is suitable for ore bodies with steep dips and vein thicknesses of 2 to 7 m. Key design factors for this method similar as shrinkage method.

 

Stopes are arranged along the strike of the ore body, with lengths of 80 and 100 m, widths corresponding to the ore body thickness, and heights of 50 m.

 

Each stope is a relatively independent mining unit, divided into lifts with heights of 1.8 to 2 m.

 

The lift is mined and cemented backfilled to a height of 1.8 to 2 m, matching the height of the open void. The final layer is backfilled to the roof.

 

There are two manways, which also serve for ventilation, are positioned on either side of the stope, with the ore pass located in the footwall level.

 

Ore is extracted using a scraper or loader. When a loader is used, footwall ramps and sub-levels are designed for personnel, materials, and equipment access.

 

Crown pillars and rib pillars are left intact, but no sill pillars are retained.

 

Figure 16.6 depicts the OCAF method at GC Mine, and Figure 16.7 below shows an operated OCAF stope.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT165

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.6: Typical OCAF Stope Layout

 

 

Sources: GC Mine

 

Figure 16.7: Operation of OCAF Stope

 

 

Sources: SRK site visit

 

16.6.4  Stope Management and Grade Control

 

The purpose of stope management is to implement stope operation procedures for dilution reduction via the Mining Quality Control Department. The department has a total of four technical staff,

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT166

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

including management, mine engineer, geologist, and technician. The mine engineer in the group is responsible for supervising the stope operation procedure, with stope inspection occurring at least once per day to check that mine contractors are following procedure guidelines. The geologist and geological technician are responsible for stope geological mapping and sampling, which occurs every 1.5 m of stope lift. The department also measures the mined area of a stope at the end of each month for mine contract payment and reconciliation purposes.

 

Key aspects of the stope inspection are as follows:

 

Ensuring that the back and floor of the stope are flat prior to drilling blasting holes

 

Checking to ensure the boundary of the mineralization and drillhole locations are correctly marked with red paint before drilling, as presented in Figure 16.8

 

Checking to ensure the length, orientation, direction, location, slope gradient, and number of blast holes drilled

 

Ensuring drillholes are inclined not less than 60 degree to the horizontal, are not longer than 2 m, and are drilled optimally relative to vein and excavation width to minimize dilution

 

In a resuing stope, checking if the stope floor is covered with rubber mat/ belting before blasting

 

In a resuing stope, checking to make sure that waste is sorted first and left in the stope before mucking ore to the mill holes after blasting; also ensuring that the floor and walls are cleaned with a broom to minimize ore losses before footwall slashing

 

After blasting, checking that the stope back is not more than 3.5 m high and the steel mill holes in a resue stope are properly covered with steel grid.

 

Regarding contract payments, a mine contractor is paid based on the quantity of ore mined. As it may be seen as an incentive for the contractor to maximize material removed from the stope, contractor payments are governed by a specific formula that calculates planned ore tonnes based on extraction to design and a planned dilution factor. During mine operations, each rail car or small tricycle load of ore is weighed at a weigh station outside the mine portals. If weighed ore tonnes are greater than planned ore tonnes from a given stoping area, the mine contractor is paid solely based on the planned tonnes. For shrinkage stopes, an adjustment for paid tonnes is required to be made, since a stope usually takes several months to complete and, generally, only blast swell is removed until the stope nears completion.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT167

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.8: Stoping Management and Blasting Holes

 

 

Sources: SRK site visit

 

16.7  Mine Services

 

16.7.1  Ventilation

 

Mine ventilation is practiced as set out by Chinese laws and regulations. Among key ventilation regulations are:

 

minimum ventilation volume per person (4 m3/ min/ person);

 

minimum ventilation velocity (typically 0.25 – 0.50 m/ sec dependent on location or activity); and

 

minimum diluting volume for diesel emissions (4 m3/ min/ kW).

 

The primary ventilation generally flows from west to east using the main levels interconnected by dedicated level vent raises (plus active stope accesses). The upper level(s) where stoping has been completed are used as return airways to separate the fresh and exhaust air. A series of air/ ventilation doors and sealed walls are utilized in the ventilation system. Inactive development headings and draw points are sealed to enhance the ventilation circuit by minimizing leakage.

 

Primary Ventilation

 

The ventilation volume is predominantly influenced by the minimum air velocity for the various development and production activities. No diesel equipment is required for Stage 2 stoping. The peak ventilation volume is estimated to be 220 m3/ sec inclusive of 30% air leakage. The total air quantity is 210 m3/ sec, with 100 m3/ sec from the decline and 110 m3/ sec from the shaft. The primary fan (FBCDZ-NO32) is powered by YBF-450-12P electrical motors (250 kW x 2, one for standby).

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT168

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

The fresh air intake airways are:

 

Main Shaft (6.0 m diameter located approximately at Mine Section 22) with air flow of 110 m3/ sec at the collar. The friction factor acknowledges hoisting equipment and fittings in the shaft. For hoisting intake airways, there is a regulatory requirement for air purification prior to a level receiving fresh air from the Main Shaft

 

Main decline (4.2 m x 3.6 m located approximately at Mine Section 26) with 50 m3/ sec at the portal

 

Exploration decline (3.7 m x 3.45 m located approximately at Mine Section 28) with 50 m3/ sec at the portal.

 

The return air exhaust airways are:

 

Stage 2 Ventilation Shaft (3.5 m diameter located approximately at Mine Section 52). The fan duty point is 140 m3/ sec at 2,070 Pa (total pressure). The friction factor assumes the shaft is furnished with a ladderway. The exhaust fan configuration is axial (250 kW/ 380 V) mounted horizontally with a fan diffuser for silencing.

 

The development on the inlet side is configured to enable emergency egress

 

The Stage 2 Ventilation Shaft is developed internally from within a short drift with the fan installation also established within the drift development.

 

The key airway regulation requirements are:

 

Vehicle access doors (airlock system) placed in the decline level accesses for the +100 mRL, +50 mRL, 0 mRL, -100 mRL, -150 mRL, -200 mRL and -250 mRL levels

 

Two regulators on the -100 mRL level and one on the -50 mRL level to force air to the lower level working areas

 

The Stage 1 Vent Shaft is sealed at the collar and is used as an internal exhaust

 

All rock passes are assumed to be filled with rock for leakage purposes

 

All stope and inter-level ventilation raises include ladderway resistances

 

Two mine air-conditioners at the connection with the decline and main shaft in -300 mRL to cool the fresh air from the upper level.

 

Secondary Ventilation

 

The secondary ventilation consists of auxiliary fans for ventilating development faces, infrastructure chambers, loading and tipping areas and stope faces.

 

Development faces are ventilated using domestically manufactured fans (5.5 kW/ 380 V). A combination of forced and exhaust ventilation is applied for long blind-heading distances as required.

 

Stopes are force-ventilated using domestically manufactured fans (4 kW/ 380 V) via the access timber cribbed travel way. The stope air returns to the upper level via a second access travel way at 50 m strike spacing.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT169

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

16.7.2  Water Supply

 

Water consumption underground is primarily for drilling and dust suppression. Water supply and carried via pipelines along the drives, is sourced from the nearby sump(s) of recycle uses for underground works.

 

Personnel carry drinking water as required to remote workplaces in water containers.

 

16.7.3  Dewatering

 

Underground water is discharged to surface using conventional centrifugal pumps via pipelines installed in the decline, and Main Shaft. Underground water pumped to surface in two stages, and is collected in ponds at the decline portal or Main Shaft for sediment settling prior to being pumped to the process plant water treatment station.

 

At the Stage 1 pump station (-300 mRL), three pumps (Model MD155-67×5, capacity 155 m3/h) are installed, as shown in Figure 16.9. Water from -300 mRL pump station is discharged through two steel pipelines installed in the shaft to the Stage 2 pump station. The effective water storage volume of the inner and outer sumps totals 2,000 m3 at -300 mRL.

 

At the Stage 2 pump station (-50 mRL), three pumps (Model MD280-43×8, capacity 280 m3/h) are installed. Water from -50 mRL pump station is discharged through two steel pipelines installed in the decline to the surface. The effective water storage volume of the inner and outer sumps totals 2,450 m3 at -50 mRL.

 

As indicated, three pumps are installed in each pump chamber. Under normal water inflow conditions one unit is running, one unit is under maintenance, and the other is on standby. Under maximum water inflow conditions, two pumps will be running. Underground pumps are specified for clean water discharge, so each pump station has its own twin compartment sediment settling arrangement. The capacity of these is equivalent to six to eight hours of normal water inflow condition (Safety Regulations on Metal and Nonmetal Mining Operation – National Standard GB16423-2006).

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT170

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.9:Pump and Power Stations at - 300mRL

 

 

Sources: SRK site visit

 

16.7.4  Power Supply

 

Power is provided from a 110 kV substation near Gaocun town, about 6 km from the mine site, which is fed from the Guangdong Province electrical grid system.

 

High voltage supply is 10 kV to the surface sub-stations. The mine has standby diesel generator power for essential mine facilities (pump stations, shaft operations, primary ventilation fans).

 

Underground sub-stations are located on each level. Level development utilizing electric mining equipment (drills) has incorporated additional sub-stations along the level to manage voltage drop from the sub-station.

 

Low voltage supply from the underground sub-stations is 415 V (drills), 380 V (pumps and fans), and 220 – 250 V (lighting and rail operation).

 

There are two 1,500 kW diesel power generators on standby.

 

16.7.5  Compressed Air

 

Compressed air is primarily used for drilling, i.e. hand-held ‘jackleg’ drilling in the stopes and conventional development faces. There is some minor use for shotcreting, and blasthole cleaning, as necessary.

 

Compressed air is reticulated to all levels and to the emergency refuge stations.

 

Compressors (electrically powered two-stage piston compressors) are located adjacent to the decline portal (3 x 20 m3/ min, 0.8 Mpa, 110 kW, and one 40 m3/ min, 0.8 Mpa, 250 kW) and Main

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT172

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Shaft brace area (7 x 40 m3/ min, 0.8 Mpa, 250 kW). Compressed air is reticulated using steel and plastic piping for air distribution via the Main Shaft.

 

16.7.6  Communications

 

Mine surface communications are available by landline and mobile phone services.

 

Telephones are the base means of communicating with underground. Phones are located adjacent to the decline level accesses (Stage 1 set-up) and adjacent to the Main Shaft level accesses.

 

The WiFi signal covers the capital development on each level, the air doors at the connection between the shaft area and decline area, and drift which has filling pipelines of GC Mine. This is used to remote control and monitoring the hoisting, air doors, and power switching situation.

 

16.7.7  Explosive Magazine

 

Underground explosive magazines are located adjacent to each level return air shaft and are limited to one day of required bulk explosives and three days of required blasting ancillaries.

 

16.7.8  Maintenance Workshop

 

The mining contractor have their own mobile equipment workshop for repairs and servicing located adjacent to the decline portal. There are also underground drill service bays established close to the working areas in redundant stockpile areas to minimize tramming delays, as shown in Figure 16.10 below.

 

Mobile equipment repairs (trucks, loaders, etc.), other equipment breakdowns and equipment major services are conducted in the mining contractor’s surface workshop with minor services conducted in redundant stockpile areas underground.

 

Minor equipment (such as jacklegs, secondary fans, development pumps, etc.) are also serviced in the mining contractor’s surface workshop.

 

The electric locomotive and rail cars are serviced and repaired in a service rail siding located adjacent to the Main Shaft.

 

Other fixed and mobile equipment (primary pumps, surface electric locomotive, rail cars, vehicles, etc.) are serviced in surface workshop located adjacent to the Main Shaft. This is fully equipped with overhead crane, welding, electrical, hydraulic, lathe services, etc.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT173

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.10: Surface and Underground Workshops

 

 

Sources: SRK site visit

 

16.8  Mine Equipment and Machinery

 

All mobile equipment and some minor fixed equipment are provided by the mining contractor.

 

GC Mine’s fixed equipment is predominantly domestically manufactured and locally sourced (Guangdong Province). The equipment manufacturers are well known, and their equipment is commonly used for Chinese mining operations. Table 16.4 summarizes the contractor’s equipment. Table 16.5 summarizes the GC mine equipment.

 

Table 16.4:Mining Contractor Typical Key Equipment Summary

 

Contractor Equipment Units Manufacturer Model Capacity
Single boom jumbo 1 Atlas Copco BoomerK41 3700mm rod
Single boom jumbo 1 Atlas Copco BoomerK111 4100 mm rod
Load haul dump truck 20 Shandong Derui Mining Machinery WJ-1 1 m3
Load haul dump truck 2 Guangxi Liugong Machinery CLG833 3 m3
Raise boring 2 Hunan Jinyue Machinery Equipment JY-AT1500 φ1000-1500
Truck 12 Fujian Longyan Shifeng Construction Machinery LHF30 18 t
Personnel carrier 2 Anhui Tongguan Machinery JY-5YR-16 16 persons
Shotcreter 2 Hunan Changde Shotcrete Machinery Factory HPZ-6 6 m3/hr
Electric loader 15 Nanchang Hengye Mining Z-30 0.3 m3
Auxiliary stoping & development fan 60 Zib Ventilation Machine Plant JK56-No4 0.1~3.4 m3/hr
Truck 15 Suizhou Shenwei Mining Machinery UO-5 3T
Jackleg 120 Tianshui pneumatic machinery YT-28

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT174

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Sources: GC Mine

 

Table 16.5:GC Mine’s Fixed Equipment Summary

 

Equipment Stage Units Manufacturer Model Capacity
Multi-rope friction hoister 2 1 Luoyang Zhongzhong Automation Engineering JKMD-2.8*4PI 1,200 t/day – ore+waste
Primary fan 1 1 Zibo Fan Factory

DK62-12-No30/2 ×

200KW

34748790m³/min
Primary fan 2 1 Yanjing Equipment Manufacturing

FBCDZ-12-NO32/2 ×

250KW

300010800m³/min
Waste and service cage 2 1 Xuzou Coal Mine Safety Equipment 4# lengthen cage  
Multiple stage centrifugal pump - -50 mRL 1 3 Chongqing Xiquan Pump Industry MD280-43*8

Q=280 m3/h, 344 m

head

Multiple stage centrifugal pump - -300 mRL 2 3 Chongqing Xiquan Pump Industry MD155-67*5 Q=155 m3/hr, 335 m head
Air compressor – decline 1 1 Shanghai Kangkeer Compressor KG-150A 20 m3/min at 0.8 Mpa
  1 1 Q-tech Air System Technology Ltd. QGD250-8.5 42 m3/min at 0.8 Mpa
  1 1 Engineering The Future Ltd. BK132-8T 22 m3/min at 0.8 Mpa
  1 1 Engineering The Future Ltd. BK110-8T 20 m3/min at 0.8 Mpa
Air compressor main shaft 2 3 Engineering The Future Ltd. JN270-8-

43.12 m3/min at

0.8 Mpa

  2 2 Guangdong Hande Precision Machinery Co. Ltd. HJ-350A 42 m3/min at 0.8 Mpa
  2 1 Q-tech Air System Technology Ltd. QGD250A-8.5 42 m3/min at 0.8 Mpa
  2 1 Q-tech Air System Technology Ltd. QGD250AC

43.3 m3/min at

0.8 Mpa

Voltage transformer - decline 1&2 1 Zhuhai Nanfang Hualitong Special Transformer Co., Ltd. S11-1250KVA 0.4/10KV  
  1&2 1 Zhuhai Nanfang Hualitong Special Transformer Co., Ltd. S11-3150Kva  
Voltage transformer - Stage2 Ventilation shaft 1&2 1 Zhuhai Nanfang Hualitong Special Transformer Co., Ltd. S11-800kVA  
Voltage transformer - -150mRL 1&2 1 Zhejiang Fujie Electric Co., Ltd. KSG11-500/10  
Voltage transformer - -150mRL 1&2 1 Zhejiang Fujie Electric Co., Ltd. KSG-1000/10-0.4  
  1&2 1 Zhejiang Fujie Electric Co., Ltd. KSG-500/10-0.4  
Voltage transformer - -300mRL 1&2 1 Zhejiang Fujie Electric Co., Ltd. KSG-1000/10-0.4  
  1&2 1 Zhejiang Fujie Electric Co., Ltd. KSG-500/10-0.4  
Electric generator - Stage2 Ventilation shaft 1&2 2 Guangzhou Yinge Power Technology Co., Ltd. MTAA11-G3 250KVA
Electric generator - Shaft 1&2 1 Guangzhou Yinge Power Technology Co., Ltd. QSK60-G4 1500KVA
Electric locomotive 2 24 Hunan Xiangtan Qiankun Mining Equipment Co., Ltd. CKY2.5-6GB 75m3/h
Rail car 2 136 Luanchuan County Sanli Engineering Co., Ltd. YFC-0.81 0.75 m3
Mine air-condition 2 2 Shenzhen Del Refrigeration Equipment Co., Ltd. ILG320DV (20°) 10000-12000m³/h
Ceramic plunger pump 2 2 Xianyang Keyu Machinery Manufacturing Co., Ltd. YB300 45m³/h

 

Sources: GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT175

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

16.9  Mine Safety

 

Mine safety is practiced as set out by Chinese health and safety laws and regulations.

 

There is an Occupational Health and Safety (“OHS”) department for the GC Mine, staffed with three mine safety trainer officers and seven technicians.

 

The mine and mining contractors are tasked with providing appropriate Personal Protective Equipment (“PPE”) to their own staff. The PPE available includes protective clothes, hard hats, safety steel toe capped boots, work gloves, face masks, back armour, respiratory protective apparatus (self- rescuers), headband lamp and ear plugs.

 

The OHS department provides safety training, enforces the OHS policies and procedures, makes recommendations on mine safety issues, and carries out daily inspections of the underground workings and explosive usages.

 

Safety committees are headed by the General Manager and made up of the Deputy General Manager, Mine Superintendent, Safety Department Supervisor, and representatives of the mining contractor. The committees are coordinated by the GC Mine Safety Department. The mine management and the safety officers are required to have valid mine safety training certificates issued by the Provincial Bureau of Safe Production and Inspection.

 

16.9.1  Fire Prevention

 

Water for fire protection is provided via the Main Shaft with 200 t surge capacity. Primary reticulation and secondary reticulation are by 108 mm and 89 mm nominal bore pipes respectively, which are installed and maintained in accordance with national safety standards (Safety Regulations on Metal and Non-metal Mining Operation – National standard GB16423-2006).

 

Fire extinguishers are provided and maintained in accordance with regulations and good practice at the electrical installations, pump stations, service workshops, and locomotive garage and wherever a fire hazard is identified to exist.

 

Visible fire signs and fire safety notices are posted in appropriate areas.

 

A suitable number of fire extinguishers are provided and maintained at each stationary diesel motor and transformer substation. In addition, the main fan air flow can be reversed within 10 minutes.

 

Every light duty vehicle carries at least one fire extinguisher of adequate size and proper type.

 

All heavy-duty mobile mine equipment; loaders, trucks, drills, charge-up machines, etc. are equipped with on-board fire suppression systems.

 

A mine-wide warning system is installed at the main mine intake airway entries to alert underground workers to the event of an emergency. This consists of audible alarms, ventilation status lights, and stench gas.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT176

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

16.9.2  Mine Rescue

 

Fully trained and equipped mine rescue teams are site-based with team members provided by the mining contractor and always maintained on-site. The mine rescue teams are trained for surface and underground emergencies.

 

A mine rescue Emergency Response Plan has been developed and is kept up to date.

 

A mine rescue room is provided in the surface mine offices adjacent to the Main Shaft.

 

An emergency clinic is maintained on-site and manned by a physician 24 hrs per day. GC Mine also has a contract established with the Yunfu General Hospital to provide emergency services and ambulance extraction to the hospital.

 

At the beginning of 2023, GC Mine had signed a contract with the ShaoGuan Mine Rescue Team.

 

16.9.3  Emergency Egress

 

Egress to surface is available via all ventilation shafts, Exploration decline, Main decline, and Main Shaft.

 

The Main Shaft and ventilation shafts are equipped with staged ladderways incorporating general mine services and partitioned from other shaft activities; they are provided with appropriate ventilation profile clearance and established in accordance with good practices.

 

Lateral egresses are appropriately signposted and maintained for walking access.

 

16.9.4  Mine Refuge Stations

 

A permanent refuge station is located at -300 mRL in the bottom of the Main Shaft, as shown in Figure 16.11.

 

Static and/ or mobile refuge stations are established on each mine level with the exception of the

+100 mRL, which is not a production level.

 

The static refuge stations or mobile refuge chambers are established in accordance with good practices with independent air supply (compressed bottled oxygen), communications, first aid, etc., and are of appropriate capacity to cater for the personnel numbers in the active mine areas.

 

For the +50 mRL, 0 mRL, and -50 mRL levels, mobile mine refuge chambers are located in close proximity to the active development and production stopes in redundant stockpile areas.

 

For the remaining levels from -100 mRL to -300 mRL, static mine refuge stations are located adjacent to the Main Shaft.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT177

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.11: Permanent Refuge Station at -300mRL

 

 

Sources: SRK site visit

 

16.10  Mine Personnel

 

GC Mine operates the mine using mining contractors for development, production, as well as the operation and maintenance of GC Mines fixed equipment. GC Mine provides their own management, technical services, and supervision staff. The mine is operated on a continuous roster for 365 days per year working three eight-hour shifts per day.

 

Figure 16.12 summarizes the GC Mine employee numbers from year 2011 to 2023. These numbers exclude geological drilling, external consultants, and advisor. The mining contractor average yearly employee numbers are approximately 280 for all years.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT178

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.12: GC Mine Employees over Years

 

 

Sources: GC Mine

 

16.11  Life of Mine (“LOM”) Plan

 

The GC Mine has operated since 2014 Q4 and achieved peak capacity in 2021, which is approximately 313 ktpa. The mine has been designed as 1,000 tpd and operates 330 day/ year for the first 2 stages. The third stage is proposed to utilise the current shaft capacity, however addition capacity is also available via decline.

 

Annual ore production is projected to rise from the current level of around 313 kt to 342kt in FY2025 and then steady to 363 kt by FY2026 for the remainder of its envisaged mine life. The key reason of production ramp up is associated with the third stage development and more stopes employing mobile equipment. The key target of the mine plan is to achieve the planned grade, mining more efficiently and lower the cost base.

 

The mine schedule is directed towards achieving the grade target as provided by mine management. The progress of mine sequencing and scheduling has been designed to facilitate this target and is as following:

 

Stope by stope planning considering the currently mining activities and grades target;

 

Design the ore drive as grade control or production exploration development as necessary;

 

Factored stope preparation development, such as level drive, cross-cut, raises based on the stope geometry parameters;

 

Design and schedule the mine layout development, such as decline, lower level ore drive (exploration drive) for long-term consideration; and

 

Sum up the scheduling result and optimization.

 

The productivity applied to mine schedule is summarised as followings:

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT179

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Resuing stope: maximum 600t/ month, the typical planned productivity is 300-500t/ month

 

Shrinkage stope: 1,200t/ m including the broken ore mucking period, the typical planned productivity is about 1,000t/ m;

 

OCAF stope: using as same as shrinkage stopes’ parameters.

 

Decline: 100m/ month with jumbo drilling

 

Level drive or ore drive: 50m/ month with LHD cleaning

 

Raises: all consider 50m/ month as jackleg drilling, though three raise boring machine are available on site. The boring time for a 50m raise is about 15 days.

 

The mine scheduled on monthly basis for the first year, and quarterly for the second year, the annually for the rest of mine life. The schedule summarized in Table 16.6 below and Figure 16.13 and Figure 16.14 below.

 

Table 16.6:Summary of LOM Schedule

 

Fiscal
Year
ROM AgEq Ag Pb Zn Capital
Dev
Exploration
Dev
Stope Prep
Dev
Total Dev
Unit kt g/t g/t % % m m m m
FY2025
Q2-Q4
257 238 71 1.12 3.02 5,774 2,580 8,168 16,522
FY2026 363 256 77 1.23 3.08 11,584 1,595 5,887 19,067
FY2027 362 251 83 1.35 2.69 4,954 4,513 9,713 19,180
FY2028 362 251 85 1.10 2.91 3,511 3,794 10,760 18,066
FY2029 362 253 90 1.10 2.84 1,649 4,498 11,506 17,653
FY2030 362 252 81 1.08 3.06 100 5,463 11,442 17,006
FY2031 363 248 87 1.16 2.72 - 4,461 9,534 13,995
FY2032 362 249 81 1.27 2.77 - 5,563 8,800 14,364
FY2033 362 248 77 1.17 2.94 - 3,281 9,112 12,394
FY2034 363 247 89 1.13 2.68 - 2,563 5,282 7,844
FY2035 363 249 81 1.39 2.62 - 1,794 5,364 7,158
FY2036 363 246 82 1.42 2.52 - 1,562 5,066 6,629
FY2037 362 248 81 1.19 2.86 - 1,461 3,950 5,412
FY2038 359 236 65 1.15 2.99 - - 1,294 1,294

LOM

total

4,965 248 81 1.21 2.83 27,572 43,128 105,878 176,584

Source: GC Mine, summarized by SRK

Notes:

 

1 Fiscal year is from 1st April to 31st March of the next year. FY2025 is from 1 April of 2024 to 31 March of 2025;

2 ROM stands for run of mine, which includes dilution and ore loss.

3 Dev stands for drive development

4 Stope Prep stands for stope preparation development

5 Inferred Mineral Resources are not included.

6 ROM is considered feed the processing plant directly or rehandled from the temporary stockpile. Therefore, the processing plan is the same as mine schedule.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT180

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

Figure 16.13: ROM Schedule over LOM

 

Source: GC Mine, summarized by SRK

 

Figure 16.14: Development Schedule over LOM

 

Source: GC Mine, summarized by SRK

 

The capacity since FY 2026 (about 362-363ktpa) is over the mining permit capacity which is 330ktpa. SRK opines that there is potentially a risk of GC Mine being fined by the Regulator for over production. However, that would not be material risk for the mining activities as 10% plus the permitting could be

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT181

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Mining Methods  
■  FINAL

 

managed by shutting down or ramping down during the raining season or the month of Spring Festival.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT182

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

17  Recovery Method
     
17.1  Introduction

 

GDMAI completed the Preliminary Design of Mining and Processing of GC Lead-Zinc Mine in Yun’an District, Guangdong Province in April 2011. The GC processing plant has a designed processing capacity of 528,000 tpa (1,600 tpd), and is built on a steep hillside next to the main shaft. It makes full use of the terrain to make the slurry flow (gravity flow) by itself and saves pumping costs. The GC processing plant has one crushing production line, two identical grinding and floatation production lines, one production line for tin recovery from tailings, four concentrate dewatering lines, one tailings dewatering line, and one TSF for dry tailings. The GC processing plant was completed and put into operation in 2014. Depending on the mining supply quantity, a flexible operation system is adopted for the crushing production line. One or two grinding and floatation production lines will run. The actual annual ore processing volume is between 260kt and 630kt. In March 2023, an X-ray intelligent sorting line (XRT intelligent sorting) was built to replace the previous hand-sorting operation. At present, the pre-sorting system is still in the process of adjustment/ optimisation. Figure 17.1 is the photo of the GC processing plant.

 

Figure 17.1: Photo of GC Processing Plant

 

Sources: SRK site visit in April 2024

 

17.2  Production Process

 

The production process of GC processing plant is shown in Figure 17.2. It includes crushing-screening, XRT intelligent sorting, grinding-classification, lead preferential flotation, zinc-sulphur mixed flotation and zinc-sulphur separation flotation, tin recovery by gravity separation, concentrate

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT183

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

thickening-filtering, tailings thickening-filtering, tailings piling and discharging, etc. The main workshops can be seen in Figure 17.3. A brief description of the process flowsheet is as follows:

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT184

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

Figure 17.2: Production Process Flowsheet of GC Processing Plant

 

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT185

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

Sources: SRK site visit in April 2024

 

Figure 17.3: Main Production Workshop Photos of GC Processing Plant

 

Sources: SRK site visit in April 2024

 

Crushing and Screening

 

The plant adopts a two-stage closed-circuit crushing process, with the ROM feed size of no more than 350mm and the product size of less than 15mm (-15mm).

 

The crushing circuit consists of a ROM bin from which the ore is drawn by a vibrating feeder into the primary jaw crusher. The jaw crusher product is screened on a double deck vibrating screen, with the -15 mm fines being conveyed forwards to the fine ore bin while the +60 mm material feeds the secondary cone crusher via a buffer storage bin to maintain choke feeding of the crusher. The 15–60 mm material is transported into the XRT intelligent sorting system by belt conveyor. Currently, the feed size class of the pre-sorting system is still in the process of optimization.

 

Intelligent Ore Sorting

 

XRT intelligent sorting system was built and put into trial production in March 2023, being expected to replace the previous hand-sorting operation to improve the throughput and reduce the cost of the plant.

 

The screening intermediate products (15–60 mm) enter into two stage vibrating screens (ZK2142) in the XRT intelligent sorting system by belt conveyor for two-stage washings. The pulp produced by washing is pumped to the grinding system through the pipeline while the oversize product (clean ore) is distributed to the XRT intelligent sorting machine for waste rock discarding. The waste rock is conveyed to a waste rock silo for sale, and the concentrate returns to the buffer ore bin of the secondary cone crusher.

 

Grinding and Classification

 

The grinding process adopts a two-stage closed circuit, equipped with grate ball mill + spiral classifier and overflow ball mill + hydrocyclone group, with a final overflow fineness of 80% passing 75 µm (P80=75μm) and a concentration of 35% to 38%.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT186

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

The grinding circuit is configured in two parallel series, each with a capacity of 800 tpd, for reasons of flexibility and easy maintenance.

 

Flotation

 

Following on the grinding circuit, the flotation circuit is similarly configured in two parallel series. The overflow (O/F) of the hydrocyclone group flows to the lead rougher conditioning tank mixing with flotation reagents, and then to the lead rougher flotation cells. The lead flotation circuit is ‘one roughing + two scavengings+ three cleanings’, to obtain lead concentrate. The lead tailings then flow to the zinc-sulphur mixed flotation process, with the circuit of ‘one roughing + two scavengings + one cleaning’, to produce the tailings and zinc-sulphur mix concentrate. The mix concentrate then enters the zinc-sulphur separation flotation process, with the structure of ‘one roughing + two scavengings + three cleanings’, to produce the zinc concentrate and sulphur concentrate simultaneously.

 

Concentrate Dewatering

 

The lead, zinc, and pyrite concentrate all use a two-stage dewatering process, with one stage of dewatering using a thickener and a discharge concentration of 40% to 50%, the second stage of dewatering using a ceramic filter, with a final concentrate moisture content of 10% to 12%. After dewatering, the concentrate is bagged and loaded by front-end loader into trucks for transport to the smelter customers.

 

Tailings Handling

 

The tailings are firstly pumped to a deep cone thickener for concentration, and the underflow is switched through the valve into the press filtration system or into the backfill system. The thickener underflow concentration can reach more than 72%.

 

The tailings deposition method is dry stacking. The filtered tailings are conveyed to the TSF via conveyor belts and then spread by bulldozer on a bench-by-bench basis.

 

17.3  Processing Equipment

 

The processing facilities of GC processing plant include one crushing system and one newly built X- ray intelligent sorting system, two grinding and flotation production lines, dewatering lines for lead, zinc and sulphur concentrates, tailings dewatering and dry tailings piling facility, and tin recovery from flotation tailings by gravity separation. The main processing equipment is shown in Table 17.1.

 

Table 17.1: Main Processing Equipment of GC Processing Plant

 

No. Item Type Power (kW) Quantity
1 1# Head Tank (Return Water) Ф15000×6000   1
2 2# Head Tank (Raw Water) Ф13000×6000   1
3 ROM Bin (Coarse Crushing) 135m3   1
4 Vibrating Feeder XZGZ-2500×1100×250 3 1
5 Jaw Crusher PE600×900 75 1
6 Middling Bin (Fine Crushing) 24.8m3   1
7 Vibrating Feeder GZG903 0.75×2 1
8 Cone Crusher PYH-3Z 220+5.5+4 1
9 Double-deck Heavy-duty Type
Circular Vibrating Screen
2YKR2460H 45 1
10 Vibrating Screen (Washing) ZKB2240 15×2 2

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT187

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

No. Item Type Power (kW) Quantity
11 Electric Vibrating Feeder GKG903 1.5×2 1
12 X-ray Intelligent Sorting Machine KK104-24-M 22 1
13 Screw Air Compressor RUO-Y110-8 110 1
14 Waste Rock Bin Ф8000×11500   1
15 Fine Ore Bin (Ball Mill) 718m3   2
16 Disk Feeder DK-1000 1.5 8
17 Grate Ball Mill MQG2700×3000 400 2
18 Overflow Ball Mill MQY2700×3000 400 2
19 High Weir Single Spiral Classifier FG-24 18.5 2
20 Polyurethane Hydrocyclone Group FX-250GJ×8   2
21 Slurry Pump (Cyclone Group) 6×4E-WXR 75 4
22 Air Agitation Flotation Machine XCF-10 30 16
23 Air Agitation Flotation Machine KYF-10 22 38
24 Mechanical Agitation Flotation Machine BF-2.8 5.5 24
25 Lifting Agitation Tank XBT-2500 22 4
26 Lifting Agitation Tank XBJ-10 4 2
27 Agitation Tank RJ-25 11 6
28 Agitation Tank RJ-20 7.5 2
29 Centrifugal Blower C360-1.25 220 3
30 Polyurethane Hydrocyclone Group FX-250GJ-15×6   1
31 Slurry Pump (Cyclone) 80SPH 75 2
32 Reciprocated Swing Belt Sluice 6-10500 1.1 2
33 Suspended Swing Belt Sluice 2800×5000   11
34 6-S Type Fine Sand Shaking Table 6-S1825*4520 1.1 12
35 6-S Type Fine Tailings Shaking Table 6-S1825*4520 1.1 25
36 Desulphurization Flotation Machine 4A5A   12
37 Central Drive Thickener TXZ-9 4 1
38 Central Drive Thickener NXZ-15 5.5 1
39 Central Drive Thickener NXZ-20 5.5 1
40 Ceramic Disc Vacuum Filter HTG-12 2.2 1
41 Ceramic Disc Vacuum Filter HTG-20/5 2.2 1
42 Ceramic Disc Vacuum Filter HTG-45/5 2.2 2

Sources: GC Mine Processing Equipment Summary Table

 

17.4  Production Records

 

The production records of the GC processing plant in recent years are shown in Table 17.2. The lead concentrate has a grade of about 45% Pb, and the recovery rate of lead is about 90%. It contains about 1,500g/t silver, with a recovery rate of about 60%. It also has a zinc content of about 6%. The zinc concentrate has a zinc grade of about 44%, a zinc recovery rate of about 89%, a silver content of about 290g/t, and a silver recovery rate of about 23%. The sulphur grade of sulphur concentrate is about 45%, and the sulphur recovery rate is about 49%.

 

XRT intelligent sorting system was completed and put into trial operation in March 2023. It has been proved that it can replace hand-sorting. At present, it is still in the process of continuous optimization to increase the tailings discarding rate and reduce the grade of waste rock.

 

The copper content in the lead concentrate reaches 2% ~ 3%, and it is possible to produce copper concentrate by flotation from the lead concentrate. Given that the lead concentrate also contains

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT188

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

around 6% zinc, SRK proposes to carry out regrinding-flotation test on lead concentrate to reduce the zinc content and obtain copper concentrate. Reducing the zinc content of lead concentrate may improve the recovery of zinc from the zinc concentrate.

 

Table 17.2: Production Records of GC Processing Plant

 

Item Unit FY2022 FY2023 FY2024 FY2025 Q1
Ore Tonnes for Pre-sorting t     317,986 93,920
Ore Grade for Pre-sorting Pb %     1.10 0.86
  Zn %     2.44 2.17
  Ag g/t     64 59
Tonnes of Pre-sorting Waste t     27,937 10,176
Grade of Pre-sorting Waste Pb %     0.15 0.14
  Zn %     0.42 0.43
  Ag g/t     9 12
Discarding Rate of Pre-sorting %     8.79 10.83
Metal Loss of Pre-sorting Waste Pb %     1.18 1.77
  Zn %     1.50 2.15
  Ag %     1.28 2.26
Ore tonnes for Grinding and Flotation t 318,042 299,597 290,050 83,745
Head Grade for Grinding Pb % 1.53 1.32 1.19 0.94
  Zn % 3.19 2.75 2.64 2.38
  Ag g/t 75 75 69 64
Output of Lead Concentrate t 9,655 7,797 7,076 1,710
Grade of Lead Concentrate Pb % 44.86 45.46 44.24 41.65
  Zn % 6.13 5.80 5.34 5.28
  Ag g/t 1437 1728 1686 1914
Yield of Lead Concentrate (to grinding feed) % 3.04 2.60 2.44 2.04
Recovery of Lead Concentrate (to grinding feed) Pb % 89.20 89.83 90.54 90.18
  Zn % 5.83 5.50 4.94 4.54
  Ag % 58.39 59.81 59.63 60.87
Output of Zinc Concentrate t 20,028 16,726 15,656 4,267
Grade of Zinc Concentrate Zn % 45.40 44.24 43.96 42.15
  Ag g/t 301 297 285 293
Yield of Zinc Concentrate (to grinding feed) % 6.30 5.58 5.40 5.10
Recovery of Zinc Concentrate (to grinding feed) Zn % 89.61 89.93 90.00 90.38
  Ag % 25.39 22.04 22.34 23.26

Sources: GC Mine

 

17.5  Consumptions and Services

 

17.5.1  Reagent and Material Consumptions

 

The reagent and material consumptions for processing in the recent years are shown in Table 17.3, where the data in the table represent the consumptions under normal production conditions. SRK is informed by the GC processing plant manager that the crushing system typically operates at night

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT189

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

during low electricity price period to save crushing costs, with a price difference of about double between peak and valley electricity prices.

 

Table 17.3: Reagent and Material Consumptions in GC Processing Plant

 

Reagents Unit FY2022 FY2023 FY2024 FY2025 Q1
ZnSO4 kg/t 1.09 1.05 1.03 1.24
W-1 g/t 99 93 86.35 92.41
Na2SO3 g/t 117 122 114.64 163.23
BK903 g/t 2.83 5.2 5.64 0.71
ADD g/t 2.5 0.7 0.78 1.89
SN-9 g/t 69 40 27.44 4.13
CuSO4 g/t 193 168 161.4 124.79
8230 g/t 3 6 4.88 1.18
SNX g/t 118 106 103.46 124.75
Sodium Humate g/t 265 265 262.27 192.74
Na2CO3 g/t 42 23 17.61 15.34
2# Oil g/t 24 25 26.53 27.03
H2SO4 g/t 633 488 406.8 173.38
Lime kg/t 2.1 1.57 1.56 1.42
SHMP g/t   17.77 41.43 0
Steel Balls kg/t 1.29 1.27 1.24 1.26
Electricity kWh/t 50.35 52.84 54.77 50.23

Sources: GC Mine.

 

17.5.2  Water Supply

 

The water consumption is about 5m3 per tonne of ore, which mainly comes from mineral processing return water and mine water. The mine water is pumped and discharged to the wastewater processing station for coagulation and sedimentation treatment, and then pumped to the TSF reclaiming basin, where it is further precipitated and clarified together with the return water from the GC processing plant, and then pumped to the return water head tank of the GC processing plant.

 

New water comes from the Hashui River, and a large-diameter water intake well is built by the riverside. Water is pumped to the nearby transfer pump station, from where it is pumped to the raw water processing facility on the top of the mine, and after purification, it flows to the clean water head tank at the GC processing plant, mainly used for the preparation of mineral processing reagents, pulp pump sealing and ground flushing. (Figure 17.4)

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT190

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

Figure 17.4: New Water Intake, Pumping and Purification Processing Facilities

 

 

Sources: SRK site visit in April 2024

 

17.5.3  Laboratory

 

The GC Mine has built a high-standard laboratory, GC Lab, equipped with X-ray fluorescence spectrophotometer, ICP-OES Aivo550, atomic absorption spectrophotometer, infrared carbon and sulfur analyser, fire assay analysis room, volumetric analysis room (including balance room, Au-Ag- Cu analysis room, Pb-Zn-Sn analysis room), responsible for the preparation and laboratory analysis of the production samples of the GC processing plant and mining exploration/ ore definition samples. There is also a mineral processing laboratory to conduct tests when the processing index is abnormal, to timely guide the adjustment of the operation parameters for the GC processing plant. Figure 17.5 shows some photos of the GC Lab.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT191

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recovery Method  
■  FINAL

 

Figure 17.5: Photos of the GC Laboratory

 

Sources: SRK site visit in April 2024

 

17.5.4  Machine Maintenance

 

The GC maintenance workshop is equipped with appropriate equipment to meet daily maintenance requirements. The workshop facilities are equipped with craneage, welding, and basic machine-shop capabilities.

 

More extensive maintenance and major overhaul needs can be outsourced, with appropriate contractors or equipment suppliers.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT192

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Project Infrastructure  
■  FINAL

 

18  Project Infrastructure

 

18.1  Introduction

 

GC Mine has been commercial operated since Q2 2014. Both the surface and underground infrastructure has been established. Some of the infrastructures are presented in Figure 18.1.

 

Figure 18.1:Part of Facilities of GC Mine

 

 

Sources: SRK site visit

 

18.2  Tailings Storage Facility

 

18.2.1  Overview

 

The GC TSF is a dry-stacking tailings dam, located in a valley on the south side of the GC processing plant, 200m away from the GC processing plant in a straight line, as shown in Figure 18-2. Between the processing plant and the TSF are the tailings dewatering station and the underground mine paste plant. The tailings from the GC processing plant are pumped to the deep cone thickener for thickening, after which they are primarily used for the underground paste filling needs, and the remaining tailings are pressed and filtrated in the tailings press filter plant, and the filter cake is transported to the TSF by the belt conveyor, which will be levelled and compacted by bulldozers and excavators. The total designed dam height of the TSF is 99.5m (elevation of 233m), and the total storage capacity is 2,989,300 m3. As of April 2024, the tailings stacking height is 63m (elevation of 196.3m) with the tailings stacking stock of about 1,180,000 m3 (39% of capacity), and the remaining storage capacity is 1,809,300 m3 corresponding to a tailings stacking volume of 3,160 kt according to a tailings stacking specific gravity of 1.75t/ m3.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT193

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Project Infrastructure  
■  FINAL

 

The GC TSF is a third-class dam with a number of displacement monitoring facilities and phreatic line monitoring systems installed to monitor the safety of the dam body and obtained the latest “Safety Production Permit” on 31 August 2023, valid until 30 August 2026.

 

Figure 18-2: Photos of Tailings Storage Facility

 

 

Sources: SRK site visit

 

18.2.2  Tailings Dam and Tailings Discharge

 

The tailings dam is composed of the initial dam and the tailings stacking dam. The initial dam is 21.5m high, the stacking dam is 78.0m high, and the total dam height is 99.5m. The initial dam is rolled rockfill dam, with the dam crest elevation of 155.0m, the dam base elevation of 133.5m, the dam height of 21.5m, the dam crest width of 5.0m and the dam crest axis length of 60.0m.

 

The tailings stacking dam adopts the upstream damming method, and the final crest elevation is 233.0m. After thickened and press filtered, tailings are transported to the TSF by the belt conveyor, levelled and compacted by bulldozers and excavators from the front of the TSF to the tail, and a gradient of 1% to 10% is formed slightly toward the tail of the TSF, so that the rainwater on the surface of the TSF is collected at the tail of the TSF and discharged outside of the TSF through the

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT194

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Project Infrastructure  
■  FINAL

 

drainage system under the dam. The tailings’ stacking dam is divided into sub-dams every 5m higher, and each sub-dam is equipped with a 2.5m wide berm with longitudinal and transverse drainage ditches of cement laid stone masonry constructed inside the berms. Dam face drainage ditches and dam abutment ditches are constructed at all the berms and dam abutments to divert and drainage the slope water catchment. The designed total height of the stacking dam is 78.0m. A total of 8 sub- dams have been built and the 9th sub-dam is currently being built. The outer slope of the stacking dam is covered with soil and planted with turf for slope protection. During the site visit, SRK noticed that the slopes of all the completed sub-dams have been planted with grass and restored to green.

 

After tailings are stacked to the designed final stacking dam crest elevation of 233.0m, in order to make the beach surface as a whole “high at the tail and low in front of the dam” and eliminate the possibility of beach water ponding and overtopping, a beach surface with a slope of 1.5% is formed at the tail towards the dam body. Finally, the beach surface is covered with 30 to 50cm clay, planted with grass and restored to green, and TSF surface drainage ditches are built to divert and drainage the beach water catchment.

 

18.2.3  Flood Control and Drainage System and Return Water System

 

In addition to the above-mentioned slope and abutment drainage ditches, permanent flood interception ditches have been built on the slopes on both sides of the TSF to intercept the upstream slope rainwater from entering the TSF. The catchment area of the TSF below the flood interception ditches is 0.23km2. The rainwater on the dam slope is diverted to the reclaiming basin through the slope drainage ditches, and the rainwater on the TSF surface collected at the tail of the TSF is discharged to the reclaiming basin through the drainage system in the TSF. The drainage system in the TSF is completely constructed in accordance with the wet discharge TSF, which is composed of the drainage chute at the tail of the TSF and the drainage culvert at the bottom. The drainage chute and culvert are all constructed of reinforced concrete structures and rectangular sections with the sectional dimensions (width × height) of 1.5 × 1.8m and 0.5 × 1.05m, respectively.

 

The tailings seepage water is discharged to the reclaiming basin by the drainage chute, the drainage culvert and the seepage drainage zone under the TSF. The seepage drainage zone is made of woven bagged gravel and stacked next to the drainage chute and the drainage culvert on both sides to form blind ditches with a trapezoidal section.

 

The reclaiming basin is located downstream of the initial dam, and there is a retaining dam 100m away the initial dam, forming a reclaiming basin with a total capacity of about 40,000 m3, which also serves as a sedimentation and clarification sump. The retaining dam is an impermeable rolling earth- rock dam, with the dam crest elevation of 135.5m, the dam base elevation of 113.2m, the dam height of 22.3m, the dam length of about 71m, and the dam crest width of 5m. A spillway is built on each side of the abutments to prevent flood water from overflowing dam during extreme weather events and ensure the safety of the retaining dam. The section size of the spillway is 2.0 × 2.9m. A return water pump house is built in the reclaiming basin, which is connected to the left bank by a trestle, and the reclaimed water in the basin is pumped to the return water head tank of the GC processing plant for the use of mineral processing production.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT195

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Project Infrastructure  
■  FINAL

 

18.3  Waste Rock Dump

 

The +215 mRL waste rock dump (“WRD”) is located a short distance to the east of the mine portal. SRK were advised that the immediate capacity of the order of 275,000 m3 (~558 kt). Previous site observations and review of surface plans referenced that there appeared to be room for a downstream extension of the waste dump location and/ or ability to increase the waste dump height to approximately +300 mRL to accommodate all waste produced over the LOM.

 

However, waste rock produced to date has largely been used for construction purposes transported off-site by local companies, minimum of charge, again to be used for construction activities. The WRD areas on site are thus empty. The removal of waste rock from site is anticipated to continue for the foreseeable future. The waste rock sale contracts are reviewed on annual basis. SRK has reviewed the available contract which will expire at the end of October 2024. The sale price is RMB5.3/ t (including 13% VAT) of waste rock. SRK also noted as stated by the management of GC Mine, the waste rook is free when the aggregate market is low.

 

18.4  Backfill Plant

 

The backfill plant is designed for cemented full tailings, with a system capacity of 60 – 80 m3/hr, or around 300 m3/day assuming seven hours operation. The envisaged concentration of the backfill is around 69 - 72% solids, at a density of approximately 1.9 t/m3. The capacity of the plant at the projected utilization is more than sufficient to supply underground backfill requirements at the LOM mining rates. The process of the backfill plant is presented in Figure 18.3.

 

Figure 18.3:Flowsheet of Backfill Plant

 

 

 

Sources: GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT196

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Project Infrastructure  
■  FINAL

 

The backfilling system is mainly composed of the sub-systems of tailings delivery, tailings thickening, tailings mixing, water addition, backfill control, cement supply, pipeline conveying, water supply, and power supply.

 

The full tailings with a mass concentration of 10 - 12% produced by the process plant are pumped into the deep cone thickener in order to thicken to the range of 66 - 68% solids. The concentrated tailings are conveyed to the mixing system by gravity from the bottom of the thickener.

 

The bulk cement is stored in a steel silo from where it is delivered to the mixer. The concentrated tailings are mixed with water and cement in the mixer to prepare a backfilling slurry, which is then pumped underground via a backfill raise or raises and pipelines, to be delivered to various underground shrinkage stope voids and OCAF stope as required.

 

Tailings feed to the backfill plant can come directly from the mill or from the dry stack tailings area.

 

GC Mine notes that underground tailings backfill has obvious advantages, including reduction of the surface storage footprint and thus being more environmentally friendly, facilitation of in situ ore pillar removal and thus maximizing ore production, enhancing mine support with associated safety benefits, and improvement of the ventilation circuit through elimination of potential short-circuiting.

 

The construction of the backfill plant was completed, and tested on 24 December 2019. After surface and underground full-process backfilling tests and adjustment, the system began operating on 15 July 2020. The operation record of the backfill plant is shown in Table 18.1.

 

Table 18.1: Operation Record of Backfill Plant

 

Year Backfill Volume Backfill Material The Percentage of Tailing in Backfill
Unit t %
FY2020 43,900 53,997 19.90%
FY2021 79,050 97,231 34.20%
FY2022 99,531 122,423 49.30%
FY2023 101,118 124,375 53.90%
FY2024 104,011 127,933 53.81%
FY2025 Q1 28,128 34,598 48.82%

Sources: GC Mine

 

18.5  Power Supply

 

There is a 110 kV substation near Gaocun Township, about 6 km from the mining area. This is fed from the Guangdong Province electrical grid system. GC Mine uses this substation as the main source of power for the mine.

 

There are two overhead power lines for the 6 km route. Two 15.0 MW diesel generators are designated for emergency backup to the man-hoist, underground ventilation system, water pumping and essential services in the plant.

 

A new 10 kV substation was built in the mining area to provide power service for the operations area as a whole. The power supply and distribution in the process plant, mining area, administrative and living areas are configured based on needs.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT197

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Project Infrastructure  
■  FINAL

 

18.6  Access Road

 

Access to the GC Mine from Guangzhou is via 178 km of four-lane express highway to Yunfu, then 48 km of paved road to the GC Mine site. A railway connection including high speed rail from Guangzhou to Yunfu is also available.

 

There are 15 road segments assigned to this Project, some are site and others general access roads. There are no issues of large equipment and/ or ore concentrates transportation.

 

18.7  Water Supply

 

The source of water for the mine is from local creeks and gullies that flow into the Hashui Creek. The flows typically vary from about 11,000 m3/day (dry season) to 69,000 m3/day (wet season), with the wet season being from April to September inclusive. The annual average rainfall varies in the range of 1,400 – 1,734 mm. The water quality and quantity from the local creeks is sufficient to meet the GC Mine requirements, which are of the order of 2,000 m3/day.

 

Water is drawn from the Datian reservoir and pumped to an elevated hilltop water tank (at approximately 343 mRL) for water treatment filtration and surge capacity storage. The treated water is then gravity fed to the mine site and processing plant (at approximately 248 mRL).

 

The key specifications of the water supply system are:

Datian reservoir water tank with 100 m3 of settling capacity and 200 m3 clean water capacity.
Hilltop water tank with 300 m3 storage, and water filtration capability via two filtration units.

 

Water consumption underground is primarily for drilling and dust suppression.

 

Potable water is provided underground adjacent to the Main Shaft with water quality conforming to regulatory requirements. Personnel carry drinking water as required to remote workplaces in water containers.

 

18.8  Sewage Treatment

 

A sewage treatment station is located at the mine site for processing of mine camp sewage.

 

18.9  Water Treatment Facility

 

There is a water treatment facility at GC Mine to treat the water that is not recycled, before the water is released to the environment, to comply with standing regulations.

 

18.10  Site Communication

 

A dispatching system is used for production dispatching at the mine. A 200-gate digital programmed control dispatching exchange is deployed at the dispatching room of the office building under production management personnel. To facilitate external communication, 10 pairs of trunk lines are used. The internet and cell phone signal are well established on site by service providers.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT198

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Project Infrastructure  
■  FINAL

 

18.11  Dams and Tunnels

 

GC Mine has built an approximately 1 km long diversion tunnel with two dams on the Hashui Creek to relocate the course of this river beyond the projected subsidence zone of influence.

 

18.12  Surface Maintenance Workshop

 

The surface maintenance facilities include a workshop building area of 756.5 m2, in which the following auxiliary services are provided:

Tyre processing, maintenance, and servicing
Welding
Electrical
Hydraulic
Tools, parts, and material warehouse

 

The workshop is mainly responsible for maintenance of large-scale production equipment, vehicle repair, processing and repair of components, and the processing of emergency parts. One LD 10 t electric single-beam crane, one BC6063B shaping machine, one CD6240A saddle bed lathe, one Z3040 × 16/I radial drilling machine, and one bench drilling machine are located in the workshop, as well as alternating current arc welding, rectification arc welding, snag grinding machine, cut-off machine, electric drying oven, mobile air compressor, etc. Maintenance facilities such as tool rack, working platform, gas cutting device, etc. are also provided, along with a dynamic balancing machine, tire picking machine, tire mending machine, battery charger, and vehicle repair/ inspection pit.

 

Mechanical maintenance facilities also include equipment and spare parts store, dump oil depot, reserve electric locomotives, and tramcars maintenance workshop and stockpile yard.

 

The mining contractor has their own mobile equipment workshop for repairs and servicing adjacent to the decline portal. There are underground drill service bays established in redundant stockpile areas to minimize tramming delays for the slower moving drills.

 

Mobile equipment repairs (trucks, loaders, etc.), other equipment breakdowns and equipment major services are conducted in the mining contractor’s surface workshop with minor services conducted in the redundant stockpile areas. Minor equipment (such as jacklegs, secondary fans, development pumps, etc.) are also serviced in the mining contractor’s surface workshop.

 

Electric locomotives and rail cars are serviced and repaired in a service rail siding located adjacent to the Main Shaft.

 

Other fixed and mobile plant (primary pumps, surface electric locomotive, rail cars, vehicles, etc.) are serviced in GC Mine surface workshop located adjacent to the Main Shaft.

 

18.13  Explosive Magazine

 

The explosives magazine is located in the valley to the south-east of the GC Mine. It is permitted to hold two of 5t of bulk explosives magazines and 20,000 detonators, representing approximately 15

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT199

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Project Infrastructure  
■  FINAL

 

days and 30 days of supply, respectively. Security services are used, and detonators are scanned on release from the magazine for security audit purposes.

 

18.14  Fuel Farm

 

Diesel fuel is required for the mobile mine equipment, some small trucks, and surface vehicles. The surface fuel tank and pumping station set-up allows for refuelling of both light vehicles and heavy duty mining equipment.

 

A properly constructed containment for storage of fuel is located in the vicinity of the diesel generators and fuel dispensing facilities. The storage facility is located down-wind from the mine air intake fans and a reasonable distance from buildings, camp, and mine portal (referencing local occupational health and safety regulations and fire-fighting requirement). The lined containment area is constructed such that spills are confined and can readily be cleaned, so that the need for extensive and costly remediation work can be avoided during site closure.

 

No fuel is allowed to be stored underground. Trucks and loaders are re-fuelled at the surface fuel farm and dispensing facility.

 

18.15  Camp and Building

 

The mine office complex to the east of the warehouse comprises the administration and engineering buildings, which provide working space for management, supervision, geology, engineering, and other operations support staff.

 

Administrative, Living, and Welfare Facilities are composed of administrative office building, hostel, canteen, washroom, and residential building, as well as dining and entertainment facilities.

 

18.16  Security and Gate House

 

A security/ gatehouse is located on the site access road. The access road off a local village road has a manual gate with signage indicating that vehicles and persons are now entering the private Property.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT200

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Market Studies and Contracts  
■  FINAL

 

19  Market Studies and Contracts

 

19.1  Commodity Prices

 

Neither GC Mine, nor SRK has conducted a market study in relation to silver, lead and zinc concentrates which will be produced by GC Mine. Silver, lead and zinc are freely traded commodities on the world market for which there is a steady demand from numerous buyers.

 

Figure 19.1 below represent independent analyst, Consensus Market Forecasts (“CMF”) for the silver, lead, and zinc outlooks (in real USD), which was issued in June 2024. The commodity price forecasts are considered by SRK to reflect a reasonable outlook for the future.

 

Figure 19.1:Outlook for Silver, Lead and Zinc Prices by CMF

 

 

Sources: CMF, released on 17 June, 2024

 

Table 19.1 Below summarized the long-term prices quoted for Mineral Resources and Mineral Reserves estimation purposes.

 

Table 19.1: Long-Term Commodities Prices Applied to Estimates

 

Commodity Units SPOT Analysts LTP-High LTP-Low Mineral Reserves Mineral Resources
Silver (USD/oz) 29.24 8 28.48 16.50 22.00 28.50
Lead (USD/t) 2,105 8 2,160 1,650 2,050 2,650
  (USc/lb) 95 8 98 75 93 121
Zinc (USD/t) 2,757 9 2,806 2,160 2,650 3,450
  (USc/lb) 125 9 127 98 120 156

Sources: CMF, released on 17 June, 2024

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT201

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Market Studies and Contracts  
■  FINAL

 

19.2  Concentrate Marketing

 

It is understood that the GC mine concentrates are marketed to existing smelter customers in China and appropriate terms have been negotiated for FY2025. Totally 7 contracts with 3 smelters on zinc concentrates and 5 lead concentrates are available for reviewing. All contracts have freight and related expenses to be paid by the customers.

 

SRK has summarized the payable metals in concentrate prices based on the discount method which is notarized in the sale contracts. The prices mentioned in the contracts are all in RMB and including (“Incl.”) 13% VAT. The discount method mentioned in the contracts is summary as below:

 

Silver metal in lead concentrate. The payable factor is depending on the silver grade in the concentrate.
Payable 92%, Ag grade 2,500 g/t
Payable 91.5%, Ag grade 2,000 g/t
Payable 91%, Ag grade 1,500 g/t
Payable 90.5%, Ag grade 1,000 g/t
Payable 88%, Ag grade 800 g/t
Lead metal in lead concentrate. The basic grade is Pb 50%. The abatement of price is RMB 360/t metal contained in concentrate. The penalty on grade floating are as follows:
Fix abatement RMB 360 /t metal in concentrate, Pb grade 50 %
RMB 360 /t + (50%-Grade) x 100x RMB 20, 40%Pb grade 50 %
RMB 560 /t + (40%-Grade) x 100x 50 RMB, 35%Pb grade 40 %
RMB 810 /t + (35%-Grade) x 100x 100 RMB, 30%Pb grade 35 %
Zinc metal in zinc concentrate. The penalty is based on not only Zn grade, but also the metal prices.
If the zinc metal price is no more than 15,000 RMB/t incl. VAT
Fix abatement 5,300 RMB/t metal in concentrate, Zn grade = 50 %
RMB 5,300 /t - (Grade-50%) x 100x 20 RMB, Zn grade 50%
RMB 5,300 /t + (50%-Grade) x 100x 20 RMB, 45%Zn grade 50 %
RMB 5,400 /t + (45%-Grade) x 100x 50 RMB, 40%Zn grade 45 %
RMB 5,650 /t + (40%-Grade) x 100x 100 RMB, 35%Zn grade 40 %
If the zinc metal price is more than RMB 15,000 /t incl. VAT, additional 20% of the premium against the based price is applied together with the penalties applied as the price is lower than RMB 15,000 /t.
Silver metal in zinc concentrate. The payable factor is depending on the silver grade in the concentrate.
RMB 0.8 per gram, Ag grade 400 g/t

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT202

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Market Studies and Contracts  
■  FINAL

 

RMB 0.7 per gram, Ag grade 300 g/t
RMB 0.6 per gram, Ag grade 150 g/t
Not pay, Ag grade 150 g/t

 

It is also understood that an acceptable arsenic level in base metal concentrates, without penalty, for Chinese smelters is of the order of 1.0% and notes that the GC Mine lead and zinc concentrates are acceptable to those smelters. Should the arsenic level ever be higher than 1.0% in zinc concentrates, the payable Zn content would be discounted by 0.5% Zn for every 1% As above the 1.0% As level.

 

It is also understood that there are some other measures on valuable elements in concentrates other than silver, lead, and zinc, such as copper or gold. However, there is no available data from the Mineral Resource estimates and not material to the operation performance.

 

19.3  Operational Contracts

 

SRK reviewed the available mining and development contract with professional services provider dated 13 December 2022, which will expire in 2025. The items and budget support the costing records and forecasting for Opex.

 

The waste rock from the development which is transported to the temporary waste rock dump located near the portals of shaft, main decline and exploration decline, are available to sell. The sale price is RMB5.3 per tonne waste including 13% VAT. The freight and related expenses to be paid by the customer.

 

The waste from the ore sorting system is also sold at a sale price of RMB 12 per tonne incl. 13% VAT. The freight and related expenses to be paid by the customer.

 

The domestic garbage disposal is contracted out to local provider. Totally about RMB 302,820 per annual including 3% VAT.

 

The environmental impact monitoring service is contracted out to professional service providers, on waste, surface underground and TSF water, waste gas, soil, and noise. The contract budget about RMB 74,000 per annual including 6% VAT for the service.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT203

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Environmental Studies, Permitting, and Social or Community Impact  
■  FINAL

 

20  Environmental Studies, Permitting, and Social or Community Impact

 

20.1  Review Objective

 

The objective of this review is to identify and/ or verify the existing and potential Environmental, Permitting, and Social or Community liabilities and risks, and assess any associated proposed remediation measures for the GC Mine.

 

20.2  Review Process, Scope, and Standards

The process for verifying the environmental permitting and licensing compliance and operational conformance for the GC Mine comprised a review and inspection of the projects’ environmental management performance against:

Chinese national environmental regulatory requirements; and
World Bank/ International Finance Corporation (IFC) environmental standards and guidelines, and internationally recognised environmental management practices.

The methodology applied for this environmental review of the project consisted of a combination of documentation review, site visit and interviews with company technical representatives.

 

20.3  Permitting

According to the requirements of relevant laws and regulations of China, a series of environmental protection related licences and permits should be obtained during the operation of mines, such as safety production permit, water use permit and site discharge permit.

 

20.3.1  Safety Production Permit

The safety production permits for the GC Mine are presented in Table 20.1.

 

Table 20.1:Details of the Safety Production Permits for the GC Mine

 

Areas GC Mine
Safety Production Permit No. [2023] Wb012 II2
Issued To Guangdong Found Mining Ltd. (GC Mine)
Issued By Guangdong Province Emergency Management Bureau
Licensed Activity Lead-zinc-silver Mine Underground Mining
Issue Date 31 August 2023
Expiry Date 30 August 2026
Areas GC Mine TSF
Safety Production Permit No. [2023] Wc013 II2
Issued To Guangdong Found Mining Ltd. (GC Mine TSF)
Issued By Guangdong Province Emergency Management Bureau
Licenced Activity TSF Operation

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT204

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Environmental Studies, Permitting, and Social or Community Impact  
■  FINAL

  

Issue Date 31 August 2023
Expiry Date 30 August 2026

SRK considers that the above safety production permits cover the entire mine site and TSF of the GC Mine.

 

20.3.2  Water Use Permit

The water use permit for the GC Mine is presented in Table 20.2.

 

Table 20.2:Details of the Water Use Permit for the GC Mine

 

Water Use Permit No. D445303S2022-0007
Issued To Guangdong Found Mining Ltd.
Issued By Yunfu City Yun’an District Agriculture, Rural and Water Resources Bureau
Issue Date 15 March 2022
Expiry Date 14 March 2027
Water Supply Source Surface water
Water Use Allocation 200,000m3/year

 
 20.3.3  Site Discharge Permit

 

According to relevant laws and regulations, enterprises, institutions, and other producers and operators whose production and emissions of pollutants are small and have minimal impact on the environment are not required to apply for pollutant discharge permits, but they should fill out pollutant discharge registration forms. GC Mine has registered the discharge of fixed pollution sources on 19 May 2023. The registration number is 91445300680642284X002Y. Registration is valid until 18 May 2028. The permissible discharge of waste includes dust and treated mine dewatering water.

 

20.4  Status of Environmental Approvals

The basis of environmental policy in China is contained in the 2018 Constitution of the PRC. Pursuant to Article 26 of the Constitution, the state protects and improves the environment in which people live and the ecological environment. It prevents and controls pollution and other public hazards. The state organizes and encourages afforestation and the protection of forests.

The following are other Chinese laws that provide environmental legislative support to the Minerals Resources Law of the PRC (2019) and the Environmental Protection Law of the PRC (2014):

Environmental Impact Assessment (EIA) Law (2018)
Law on Prevention & Control of Atmospheric Pollution (2018)
Law on Prevention & Control of Noise Pollution (2021)
Law on Prevention & Control of Water Pollution (2017)
Law on Prevention & Control Environmental Pollution by Solid Waste (2020)
Forestry Law (2021)
Water Law (2016)

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT205

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Environmental Studies, Permitting, and Social or Community Impact  
■  FINAL

 

Land Administration Law (2019)
Protection of Wildlife Law (2023)
Regulations on the Administration of Construction Project Environmental Protection (2017).

In accordance with Chinese legislation the Project will be subjected to a comprehensive EIA to assess the environmental impacts of the proposed development on the human and natural environment prior to the commencement of construction, mining and processing operations. The company provided SRK with the EIA report and approval for the project, with specific details outlined in Table 20.3.

 

Table 20.3: Details of the EIA Report and Approval for the GC Mine

 

Project Produced By Production Date Approved By Approval Date
Gaocheng Pb-Zn Mine Development Project (0.33Mtpa) Guangdong Heli Engineering Survey Institute

 

March, 2010

Guangdong Province Environmental Protection
Bureau

June 13,

2010

Furthermore, a water and soil conservation plan (“WSCP”) is required for a project constructed in the area where is prone to water and soil erosion. The company provided SRK with the WSCP report and approval for the project, with specific details outlined in Table 20.4.

 

Table 20.4: Details of the WSCP Report and Approval for the GC Mine

 

Project Produced By Production Date Approved By Approval Date
Gaocheng Pb-Zn Mine Development Project (0.33Mtpa)

China Water Resources Pearl River Planning, Surveying & Designing Co., Ltd.

February, 2009 Guangdong Province Water Bureau

March 25,

2009

SRK reviewed above EIA report and approval and concluded that the EIA basically cover the main production facilities including mine site, GC processing plant and TSF. SRK considers that the GC Mine prepared the EIA report in accordance with relevant Chinese legal requirements and obtained corresponding government approval.

 

20.5  Environmental and Social Aspects

 

20.5.1  Flora and Fauna

According to the baseline study of EIA report, the vegetation in this area belongs to the South Asian tropical monsoon rainforest, also known as evergreen monsoon rainforest and monsoon evergreen broad-leaved forest. Due to the strong interference and destruction of human activities, only some zonal vegetation exists near the TSF in this area, such as Ficus of the mulberry family. Most of plants are secondary vegetation and artificial vegetation. No large wild mammals were seen during the survey, and small passerine birds were occasionally seen in this area. There are no endangered animals and plants in the GC Mine’s area. The landform and topography in the project’s area may be changed by mining, waste rock and tailings dumping, haul roads, office buildings and dormitories, and other facilities. The WSCP report anticipates that the disturbed land area due to project development will be 28.7 hm2. The development of the project may also result in impacts to or loss

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT206

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Environmental Studies, Permitting, and Social or Community Impact  
■  FINAL

 

of flora and fauna habitat. If effective measures are not taken to manage and rehabilitate the disturbed areas, the surrounding land can become polluted and the land utilization function will be changed, causing an increase in land desertification, water loss and soil erosion. The EIA concludes that the river diversion will not cause significant impacts on the habitats of terrestrial wildlife or lead to species extinction. The impacts on terrestrial wildlife are considered temporary. However, the river diversion will alter the original habitat of aquatic organisms, particularly impacting benthic organisms to a greater extent. According to the preliminary investigation of the EIA report, there are no rare or endangered plants or animals in the mining area, TSF, or surrounding areas. Additionally, there are no natural reserves or forest parks in the vicinity.

 

20.5.2  Water Management

 

The region is located in a subtropical warm and humid area with abundant rainfall, characterized by well-developed surface water systems, mainly consisting of gullies and tributaries, with the largest river being the Shenbu River. The Shenbu River flows through the northeastern periphery of the mining area. All surface water sources in the region drain into the Shenbu River. Additionally, within the mining area, the Hashui River flows into the Shenbu River from the southwestern corner of the mining area.

 

The drinking water source for the project is mountain spring water. Before use, the spring water undergoes filtration through sand, activated carbon, and reverse osmosis. The treated mountain spring water is also provided to nearby villagers for their use. For daily domestic water needs, water is sourced from the Hashui River and treated before use. Underground mining production water and supplementary fresh water for the GC processing plant comes from treated dewatering water. SRK suggests that GC Mine adopts a sustainable water supply management strategy aimed at minimizing its effects on natural ecosystems, preventing aquifer depletion, and mitigating impacts on water users. Simultaneously, the company should engage in consultation with essential stakeholders, such as governments and potentially affected communities, to comprehend and address any conflicts arising from water demand, community reliance on water resources, and existing local conservation regulations.

 

The potential negative impacts of the GC Mine to surface water and ground water are due to the indiscriminate discharge of untreated production and domestic wastewater. In addition, the mining activities may lead to the change of the groundwater table. The main wastewater pollution sources of the project include dewatering water, processing wastewater, tailings and waste rock leachate, hazardous waste leachate, wastewater from maintenance workshop, industrial site rainwater, domestic sewage, etc. The EIA report states that mine dewatering may cause groundwater table to drop and have negative impacts on agricultural and domestic water sources. The EIA approval requires all the processing wastewater for the GC Mine should be collected and reused for production.

 

During the site visit, it was observed that the project development had led to the diversion of the Hashui River, which was accomplished through the use of culverts. SRK also observed that there was a dewatering water treatment plant constructed at the GC Mine to process the mine water. Lime, PAC (Polyaluminum chloride), and PAM (Polyacrylamide) are used to treat the mine water. After treatment, some of the mine water is reused to supplement fresh water for underground mining operations and GC processing plant production, while the remaining portion, meeting the Class III standard of the "Surface Water Environmental Quality Standards" (GB3838-2002), is discharged. All processing wastewater is internally recycled and not discharged externally. Domestic sewage is

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT207

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Environmental Studies, Permitting, and Social or Community Impact  
■  FINAL

  

centrally collected, undergoes biochemical treatment, and is reused for landscaping within the GC processing plant area without external discharge. The treatment methods for mine water, processing wastewater and domestic sewage for the project are generally consistent with the requirements outlined in the project's EIA approval.

 

According to the monitoring reports provided by the GC Mine, the project conducts comprehensive environmental monitoring every quarter, which includes water quality monitoring. Additionally, surface water and groundwater monitoring are conducted once each year, separately during the first and second halves of the year. Sampling locations for surface water include the discharge point of mine water as well as upstream and downstream points of the Hashui River from the discharge outlet. Monitoring parameters include ammonia nitrogen, copper, cadmium, arsenic, iron, manganese, etc. SRK reviewed the surface water monitoring reports provided by the company for the year 2023, which indicated that the water quality monitoring results were within the relevant standard ranges. However, the groundwater monitoring conducted in May 2023 revealed that the manganese levels in two groundwater monitoring wells and one domestic water well exceeded the relevant standard limits.

 

SRK recommends that water quality monitoring be undertaken upstream and downstream of the project area (including the TSF), and also any site water discharges. SRK also suggests enhancing some water pollution control measures to reduce the risk, such as surface hardening, second containment facility and accident pool, are recommended to mitigate the water pollution risks.

 

20.5.3  Waste Rock and Tailings Management

The project does not have a permanent WRD, but there is a temporary WRD where generated waste rock is temporarily stored and subsequently sold externally. SRK sighted a waste rock sales contract valid until 31 October 2024. Most of the tailings are backfilled in the mined-out area and the remaining tailings are discharged into the TSF through dry stacking. No geochemical characterisation of waste rocks or acid rock drainage (ARD) assessment has been sighted as part of this review. During the site visit, SRK did not observe clear evidence of ARD. The EIA report states that toxicity leaching tests has been conducted on the tailings from the GC Mine. The tailings for the GC Mine are not hazardous waste with leaching toxicity and belong to general industrial solid waste (Class I).

 

20.5.4  Noise and Dust Emissions

The dust emission sources for the GC Mine are mainly from loading and unloading, waste rock dumping, ore stockpile, crashing, screening and movement of vehicles and mobile equipment. Dust management measures for the mine site and GC processing plant proposed in the EIA reports mainly comprise wet drilling, water sprinkling, using dust collector, etc. During the site visit, SRK observed that the dust collector was used for ore crushing process.

The main sources of noise emissions for the GC Mine are from the operation of the mining and GC processing plant operation (drilling, blasting, loading, haulage, crushers, ball mills, pumps and other processing equipment) and movement of vehicles/ mobile equipment. The EIA reports states that low noise equipment, foundation vibration reduction and workshop sealing are to be adopted as noise prevention measures.

No significant noise and dust emissions were observed during the site visit. SRK reviewed the quarterly noise and exhaust monitoring reports provided by the company for 2023. The reports

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT208

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Environmental Studies, Permitting, and Social or Community Impact  
■  FINAL

  

indicate that the particulate emissions from the crushing and screening workshop, the fugitive emissions at the mine boundary, and the noise levels at the mine boundary all comply with the relevant standards.

 

20.5.5  Hazardous Substances Management

Hazardous materials have the characteristics of corrosive, reactive, explosive, toxic, flammable and potentially biologically infectious, which pose a potential risk to human and/ or environmental health. The hazardous materials will be generated mainly by the project’s construction, mining, and processing operations and include hydrocarbons (i.e. fuels, waste oils, and lubricants) and oil containers, batteries, medical waste, etc. The leaks, spills or other types of accidental releases of hazardous materials may have negative impact on soils, surface water, and groundwater resources.

The main hazardous materials for the GC Mine operations will comprise the storage and handling of processing reagents, waste oil, waste oil drum, etc. There is an explosive magazine which was generally well managed. During the site visit, SRK noted that the processing reagents are stored on a cement surface. SRK recommends that the collected waste oil, oil drums and reagents be stored with secondary containment which is in line with the recognised international industry management practices.

 

20.5.6  Occupational Health and Safety

A well developed and comprehensive safety management system comprises site inductions, site policies, safe work procedures, training, risk/hazard management (including signage), use of personal protective equipment (“PPE”), emergency response process, incident/ accident reporting, an onsite first aid/ medical centre, designated safety responsibilities for site personnel, regular safety meetings and a work permit/ tagging system. SRK reviewed the company's safety production management system, occupational disease prevention and control plan, safety production work plan, and emergency response plan for the GC Mine, and concluded that the development of these plans complies with relevant Chinese requirements.

GC Mine has provided SRK with a historical OHS records. No fatal accidents have occurred in the past three years. SRK recommends the company conduct safety record and develop incident analysis reports for the possible injuries in future. The proposed reports analysed the cause of injuries and identified measures to prevent a recurrence, which are in line with international recognized OHS accident monitoring practice.

 

20.5.7  Mine Closure and Rehabilitation

 

The Chinese national requirements for mine closure are covered under Article 21 of the Mineral Resources Law of PRC (2023), the Rules for Implementation of the Mineral Resources Law of the PRC, the Mine Site Geological Environment Protection Regulations (2019), and the Land Rehabilitation Regulation (2011) issued by the State Council. In summary, these legislative requirements cover the need to conduct land rehabilitation, to prepare a geological environmental protection and reclamation plan, and to submit it for assessment and approval. In addition, a mine geological environment treatment and restoration fund account should be established by the GC Mine. SRK has sighted the geological environmental protection and reclamation plan for the GC Mine which was produced in July 2021.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT209

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Environmental Studies, Permitting, and Social or Community Impact  
■  FINAL

  

The total cost of geological environmental protection and reclamation for the GC Mine is RMB7,754,300 which comprise geological environmental protection of RMB2,087,200 and land reclamation of RMB5,667,100 respectively. The company informed SRK that the full amount has been deposited, and withdrawals will be made based on annual reclamation and mine closure conditions, subject to approval and acceptance by relevant departments. By the end of 2021, the project had invested over USD 10.5 million (RMB 76 million) in remediation funds and restored an area of 16 hectares.

 

20.5.8  Social Considerations

 

The GC Mine is located approximately 15 km southwest of Yun'an County, Guangdong Province. Administratively, it falls under the jurisdiction of Gaocun Town, Yun'an County, Yunfu City. Villages within the mining area boundary include Gaocheng Village and You Village, among others. The project area consists mostly of secondary forest land, with a few hillsides cleared for farmland.

 

The GC Mine does not encompass any nature reserves, scenic spots, or cultural relics. The general project area does not include any cultural minority groups. The broader Yun’an County is predominantly made up of Han Chinese. According to the relevant Chinese environmental legislation, public participation should be involved within the environmental impact assessment. The results of public participation for the GC Mine shows that 95.4% of the respondents supported the construction of the project. Public comments mainly focused on drinking water, water security for agricultural irrigation and the impact of project drainage on agricultural production.

 

The company actively engages in various social welfare and charity activities, including community development, assistance to vulnerable groups, educational support, and donations to foundations. Additionally, the company provides diverse employment opportunities for local residents of working age. SRK recommends that the company continuously improve its public participation and grievance mechanisms to ensure ongoing community engagement. This ensures the company receive and address specific concerns raised by affected persons or members of host communities in a timely fashion.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT210

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

 

21  Capital and Operating Costs

This section summarizes the Capex and Opex.

GC Mine has been in operation since 2014 at designed nominal capacity of 330ktpa feed ore, and all necessary infrastructure for the operation is in place. The mine is designed as an underground operation developed by a hybrid access of declines and shaft, staged in 2 steps at the beginning, targeting the Mineral Resources above -300mRL. A third stage is in the engineering design phase; however, the access method has been considered as decline access and the relayed air return raises. The associated Capex for the depth extension development is estimated by the GC Mine. The other sustainable Capex such as mine closure, facilities updates and/ or capital maintenance are also estimated.

GC Mine has a relative stable operation which addresses the Opex forecasting via their historic performance records.

All the Capex and Opex are estimated in RMB by the mine management. A static exchange rate of USD 1.00: RMB7.22 is referenced.

 

21.1  Capital Cost

 

21.1.1  Summary

 

The Capex for GC Mine over LOM includes mine capitalized development, processing updates, infrastructure updates and mine closure and reclamation. The summary of LOM Capex is presented in Table 21.1.

 

Table 21.1:Summary of LOM Capex for GC Mine

 

Item Unit LOM Total
Exploration Drillings USD Million 34.6
Mine Capex Development USD Million 23.6
Processing Updates USD Million 2.4
Infrastructure Updates USD Million 0.2
Mine Closure & Reclamation USD Million 1.8
Total USD Million 62.5

Sources: GC Mine, summarized by SRK

Notes: Any differences between totals and sum of components are due to rounding

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT216

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

 

 Figure 21.1: Capex Investment Plan over LOM

 

 

Sources: GC Mine, summarized by SRK

 

21.1.2  Exploration Drilling

Exploration drilling helps to define the extent and grade of the deposit/ veins for resource definition, for expanse the LOM for the currently schedule. The total exploration drilling Capex of the last 3 years, which has increased for the years FY 2022 to FY 2024 from USD2 million to USD2.1 million. The forecasted exploration Capex are based on the weighted average unit Capex rate to mined feed resulting a similar trend of the past years. Table 21.2 provides the estimates, which is USD6.96/t mined on average.

 

Table 21.2: Exploration Drilling Capex over Last 3 Years

 

Item Unit Average FY2022 FY2023 FY2024
Exploration Drillings Capex USD Million 2.3 2.5 2.2 2.1
Drilling Meters m 68,986 66,699 65,399 74,859
ROM t 301,616 314,882 299,959 290,006
Exploration Capex Rate USD/t ROM 7.52 6.35 7.33 7.24

Sources: Management's Discussion and Analysis ("MDA") from Silvercorp and Operating Cost data from GC Mine

Notes: FY2023 & FY2024 data soured from MDA, FY2022 data sourced from GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT217

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

 

21.1.3   Capitalized Development

Capitalized development includes the decline expansion/ deepening that is from the currently Level -300mRL down to -500mRL; and the level drive, air return raise, UG exploration drilling chamber, and exploration drives, which serve the mine more than 1 year. The stope preparation drives are classed as Opex.

The decline development is currently undergoing detail design engineering, targeting the Mineral Resources from -350 mRL to -500 mRL. The mine schedule outlines the planned development meters annually, with unit costs derived from development contracts. Figure 21.2 illustrates the projected capitalized development costs over the LOM.

 

Figure 21.2:Capitalized Development over the LOM

 

Sources: GC Mine, summarized by SRK

 

21.1.4  Processing and Infrastructure Updates

The processing Capex updates include the following items, and the details is presented in Table 21.3 below:

Coarse waste rejection: The implementation of automation to improve waste management and processing efficiency, with an estimated cost of USD761,773 scheduled in FY2026
Automation: Aiming to integrate advanced automation equipment, such as various components and electrical instruments, into the processing line to enhance operational efficiency, with an estimated cost of USD110,803 in FY2026
Tin Ore Process Optimization: Optimizing the processing infrastructure and some equipment for the tin ore gravity separation circuit, with an estimated cost of USD41,551 in FY2026
Detection Automation: The installation of automatic concentration density detection equipment in the grinding and floating circuit, with an estimated cost of USD207,756 for FY2027

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT218

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

  

Dense Media Separation: The purchasing of equipment for enhancing ore separation processes. It is planned for FY2028 and FY2029, with an estimated cost of USD1,246,537
Stockyard Rain Shelter: This infrastructure improvement is to protect stockpiled materials from weather-related impacts and is planned to be constructed in FY2026 at a cost of USD152,355.

 

Table 21.3:Processing and Infrastructure Updates Capex

 

Item Unit LOM Total FY2025 FY2026 FY2027 FY2028 FY2029 FY2030
Processing                
Coarse waste rejection USD k 761.8 - 761.8 - - - -
Automation USD k 110.8 - - 110.8 - - -
Tin ore process optimization USD k 41.6 - - 41.6 - - -
Detection automation USD k 207.8 - - - 207.8 - -
Dense media separation USD k 1,246.5 - - - - 623.3 623.3
Infrastructure     - - - - - -
Stockyard rain shelter USD k 152.4 - 152.4 - - - -

Sources: GC Mine, summarized by SRK

 

21.1.5  Closure & Reclamation Capex

The closure costs are categorized into reclamation engineering costs, general reclamation expenses, and sustainable mine construction, and detailed in Table 21.4.

Reclamation Engineering Cost: Includes reclamation engineering costs associated with outsourcing and construction
Reclamation Expense: General expenses related to material, consulting, and reviewing for reclamation
Sustainable Mine Construction: Costs associated with sustainable mine construction, appearing in 2023.

 

Table 21.4:Closure & Reclamation Capex over Last 3 Years

 

Item Unit Average FY2022 FY2023 FY2024
Reclamation Engineering USD k 40.0 37.1 58.3 24.5
Reclamation Expense USD k 44.1 17.5 32.9 82.0
Sustainable Mine Construction USD k 6.9 - - 20.7
Mine Closure & Reclamation Total USD k 91.0 54.6 91.3 127.2
Mine ROM t 301,616 314,882 299,959 290,006
Closure Capex Rate USD/t ROM 0.30 0.17 0.30 0.44

Sources: GC Mine, summarized by SRK

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT219

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

 

21.2  Operating Costs

 

21.2.1  Summary

 

The Opex is categorized into mining, processing, backfill, tailings and filtration, S&GA, and corporate social responsibility costs (“CSR”). The Opex is forecasted from the historical operation/ production records of the past 3 years. The unit Opex goes up slightly due to the variation of ROM tonnages over the past 3 years. The forecasted Opex is USD58.3 per tonne. Table 21.5 presented the summary of unit costs per last 3 year and the weighted average parameters. Figure 21.3 illustrates the distribution of each cost center of the Opex. The mining cost is the major part of the Opex.

 

Table 21.5:Summary of Opex Historical & Forecasted for GC Mine

 

Item Unit FY2022 FY2023 FY2024 Weighted Average as Forecasted  
Mining USD/t ROM 26.5 31.9 36.6 31.7  
Plant USD/t Feed 13.2 15.6 16.3 15.0  
Backfill USD/t ROM 3.2 3.1 2.9 3.1  
Tailings filtration USD/t Feed 0.4 0.5 0.3 0.4  
S&GA USD/t Feed 7.0 8.2 8.9 8.0  
CSR USD/t Feed 0.2 0.1 0.1 0.1  
Total Cash Unit Cost USD/t 50.5 59.4 65.0 58.3  
Mine ROM kt 315 300 290    
Plant Feed kt 318 300 290    

Sources: GC Mine, summarized by SRK

Notes: Mining and backfill costs are united by mine ROM and the others are united by plant feed.

 

Figure 21.3:Pie Chat of Percentage for GC Mine Opex

 

Sources: GC Mine, summarized by SRK

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT220

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

  

Figure 21.4 shows the total Opex from FY2022 to FY2024. It can be seen that annual costs consistently increase from USD16 million to USD18.8 million over these periods, driven primarily by the slightly reduction of the ROM processed.

 

Figure 21.4:Opex for Historical Three-Year (in USD k)

 

Sources: GC Mine, summarized by SRK

 

21.2.2  Mining

The mining Opex is categorized into contractors for mining and development, materials, labour, power, maintenance, and safety management.

Mining Contractor

Costs for contractors of stoping operation are based on annual contracts with agreed unit mining costs. Costs vary for the three mining methods; shrinkage, OCAF, and resuing, depending on mining width (thickness) and mining depth (Table 21.6). The contract stipulates that GC Mine supplies the materials.

 

Table 21.6:Detailed Opex from Mining Contracts

 

Item Thickness Unit Decline at -100m
Level and above
Shaft at -100m Level
and below
      Cost Cost
Shrinkage d3.0m USD/t 8.75 8.96
Shrinkage 3>d≧1.5m USD/t 10.62 10.94

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT221

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

 

Item Thickness Unit Decline at -100m
Level and above
Shaft at -100m Level
and below
      Cost Cost
Shrinkage d<1.5m USD/t 14.32 14.68
Resuing d0.5m USD/t 36.15 37.26
Resuing 0.5<d0.8m USD/t 33.52 34.21
Resuing 0.8m<d USD/t 31.99 32.55
OCAF (Gangue)   USD/t 13.07 -
OCAF Thickness<1.8m USD/t 19.39 -
OCAF Thickness1.8m USD/t 13.85 -
OCAF (Tailings) Thickness<1.8m USD/t - 19.39
OCAF (Tailings) Thickness1.8m USD/t - 13.85

Source: GC Mine

Development Contractor

The Opex for contractors involved in mine development, such as developing ore passes, raises, drifts, and cross-cuts, are also based on annual contracts with agreed unit development costs (Table 21.7).

 

Table 21.7:Detailed Opex from Development Contracts (in USD/m)

 

Item Section Width
(m)
Section Height
(m)
Decline at -100m
Level and above
Shaft at -100m Level
and below
      Cost  Cost
Raise 1.2 1.2 134.20 132.89
Raise 1.5 2 243.17 256.08
Raise 1.5 1.8 185.15 200.68
Raise 1.8 1.8 204.00 218.84
Raise 2 2 235.82 251.79
Raise φ1.2   373.96 373.96
Raise φ1.4 or φ1.5   401.66 401.66
Ore Pass 1.4 1.4 150.17 149.14
Ore Pass 1.5 1.5 160.40 161.52
Ore Pass 1.6 1.6 169.06 168.64
Ore Pass Access 1.2 1.8 161.77 161.91
Ore Pass Access 1.4 1.8 175.48 174.93
Sublevel 1.4 1.8 166.90 167.59

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT222

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

 

Item Section Width
(m)
Section Height
(m)
Decline at -100m Level
and above
Shaft at -100m Level
and below
      Cost Cost
Sublevel 1.6 1.8 191.41 179.50
Drive 2 2 184.65 182.51
Drive 2 2.2 188.55 190.94
Drive 2 2.4 196.39 196.18
Drive 2.2 2.4 202.29 201.45
Drive 2.4 2.4 216.19 215.19
Drive 2.6 2.6 238.16 236.09
Drive 2.8 2.8 256.84 264.57
Drive 2.5 2.5 225.07 225.07
Drive 2.5 2.7 236.15 236.15
Decline 4.2 3.75 562.33 -
Bay in Decline 4.2 3.45 512.89 -

Source: GC Mine

Material

This includes accessories, wire and cable, steel, wood, lubricating oil, and explosive/ blasting materials.

Labour

This category includes salaries and bonuses, insurance, welfare fees, and subsidies.

Water and Power

This includes water and electricity consumption during mining operations.

Maintenance and others

This includes general maintenance and miscellaneous costs.

Safety Management

This includes PPE, safety training, supplies and the monitoring.

Table 21.8 below provides the unit mining cost breakdown over past 3 years and the weighted average of them.

 

Table 21.8:Breakdown of Mining Opex (in USD/t ROM)

 

Cost Centre FY2022 FY2023 FY2024 Weighted Average
Mining Contractor 12.86 11.87 15.21 13.31
Development Contractor 4.89 6.56 9.19 6.88

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT223

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

 

Cost Centre FY2022 FY2023 FY2024 Weighted Average
Material 3.55 5.82 4.02 4.47
Labour 1.99 1.97 2.65 2.20
Power 1.22 1.49 2.47 1.73
Maintenance & Others 0.14 0.17 1.20 0.50
Safety Management 1.90 4.00 1.83 2.58
Mining Total 26.55 31.89 36.57 31.67

Sources: GC Mine, summarized by SRK

 

 

21.2.3  Backfill Costs

The backfill Opex is categorized into materials, labour, power, maintenance, and safety management. Material is the major part which includes cement, backfilling pipes, wires and cables, accessories, lubricant oil, and tools. The breakdown of backfill cost is presented in Table 21.9.

 

Table 21.9:Breakdown of Backfill Opex (in USD/t ROM)

 

Cost Centre FY2022 FY2023 FY2024 Weighted Average
Material 1.79 1.60 1.56 1.65
Labour 1.21 1.34 1.23 1.26
Power 0.06 0.07 0.07 0.07
Maintenance & Other 0.04 0.07 -0.00 0.03
Safety Management 0.10 0.01 0.01 0.04
Backfill Total 3.19 3.09 2.87 3.05

Sources: GC Mine, summarized by SRK

 

 

21.2.4  Processing

The processing Opex is categorized into consumables, labour, power, maintenance, safety management, and outsourced manufacturing. The consumables and the labour are the major parts of processing cost.

Consumables

This includes steel balls, reagents, steel, wires and cables, equipment accessories, lubricant oil, tools, and equipment spare parts.

Labor

This includes salaries and bonuses, insurance, welfare fees, and subsidies.

Water and Power

Costs include water and electricity consumption for processing operations.

Maintenance & Other

This includes general maintenance and other miscellaneous costs.

Safety Management

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT224

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

  

This includes PPE, safety training and supplies.

Outsourced Manufacturing

 

This cost, which starts appearing in 2023, covers outsourced processing manufacturing activities.

 

The breakdown of processing Opex is presented in Table 21.10.

 

Table 21.10:Breakdown of Processing Opex (in USD/t Feed)

 

Cost Centre FY2022 FY2023 FY2024 Weighted Average
Consumables 5.55 6.65 5.83 6.01
Labour 3.82 4.44 4.72 4.32
Power 3.30 3.90 4.57 3.92
Maintenance & Other 0.44 0.54 0.52 0.50
Safety Management 0.12 0.07 0.08 0.09
Outsourced Manufacturing - - 0.59 0.20

Sources: GC Mine, summarized by SRK

 

 

21.2.5  Tailings Filtration

The tailings filtration Opex is divided into categories: material, labour, power, maintenance, other, and safety management. The breakdown of tailings filtration activity is shown in Table 21.11, in which power and material are the largest expenditure components.

 

Table 21.11:Breakdown of Taillings Filtration Opex (in USD/t Feed)

 

Cost Center FY2022 FY2023 FY2024 Weighted Average
Material 0.14 0.07 0.07 0.09
Labour 0.06 0.07 0.07 0.07
Power 0.15 0.12 0.09 0.12
Maintenance & Other 0.03 0.01 0.02 0.02
Safety Management 0.02 0.21 0.02 0.08
Tailings Filtration Total 0.39 0.48 0.27 0.38

Sources: GC Mine, summarized by SRK

 

 

21.2.6  Selling, General and Administrative

The S&GA Opex is categorized into selling, laboratory, administration, environment, reclamation, insurance, power, service charges, travel and office expenses, and others. The breakdown of S&GA activity is shown in Table 21.12, in which admin cost is the largest expenditure components.

Selling: Opex includes salaries and bonuses, insurance, welfare fees, and subsidies for selling personal and office expenses, which appear in 2022 and 2023.
Laboratory: Opex for laboratory activities began in 2022, including expense for crushing, grinding, flotation, and gravity-separation metallurgical testing.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT225

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Capital and Operating Costs  
■  FINAL

  

Admin: Administrative Opex, including salaries, bonuses, insurance, and welfare fees for management personnel.
Environment: Opex related to environmental management and compliance.
Reclamation: Opex for reclamation management.
Insurance: Opex for disability security fund.
Power: Opex for water and electricity consumption.
Service Charge: Service charges related to consulting for consulting, review, and legal matters.
Travel and Office Expenses: Opex of travel expense, business entertainment expenses, and office-related expenses.
Others: Miscellaneous Opex.

 

Table 21.12:Breakdown of S&GA Opex (in USD/t Feed)

 

Cost Centre FY2022 FY2023 FY2024 Weighted Average
Selling - 0.03 0.11 0.04
Laboratory - 0.23 0.24 0.16
Admin 4.35 5.14 4.93 4.81
Environment 0.17 0.20 0.16 0.17
Reclamation 0.07 0.14 0.14 0.12
Insurance 0.03 0.04 0.14 0.07
Power 0.19 0.25 0.32 0.25
Service Charge 0.99 1.05 1.50 1.18
Travel and Office Expenses 0.75 0.84 1.14 0.91
Others 0.49 0.25 0.19 0.31
S&GA Total 7.03 8.17 8.86 8.02

Sources: GC Mine, summarized by SRK

 

 

21.2.7  Corporate Social Responsibility Opex

CSR Opex is associated with initiatives aimed at benefiting the local community and ensuring responsible mining practices, such as charity association, donations, and foundation. The average of past 3 years is USD39 thousand per year, and the unit cost is about USD0.13/t plant feed.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT226

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

22  Economic Analysis

The economic analysis presented in this section is based only on the results of the technical review provided above and some key assumptions. It is provided for technical evaluation and Mineral Reserve estimation purposes only.

The economic analysis of the was conducted using conventional Discounted Cash Flow (“DCF”) techniques. It is important to note that the purpose of this analysis is solely to demonstrate the economic viability of the Project. The derived NPVs do not indicate the fair market values or the profitability of the Project. The estimated cash flows and NPVs were presented on an after-tax basis, and financing costs were not considered.

The Net Present Value (“NPV”) was determined from the project's cash flow using an 8% discount rate as the base case. Since the Project is ongoing, there is no Internal Rate of Return (“IRR”) or payback period due to the absence of initial Capex. Additionally, a sensitivity analysis was performed to examine the effects of changes in Capex, Opex, and pricing.

 

22.1  Principal Assumptions

The cash flow estimate includes only the revenue, costs, taxes, and other factors directly associated with GC Mine. The assumptions are as follows:

The ROM and finial products of GC Mine, which are lead and zinc concentrates, are based on the LOM schedule.
The local currency for GC Mine is RMB, while USD are used for technical-economic analysis. The exchange rate is set statically at USD1 = RMB7.22, based on the reference value at the effective date.
Annual gross revenue is calculated by applying the forecasted metal prices and payable metal percentages from contracts to the annual recovered metal for each operating year.
SRK does not consider future inflation nor currency and cost fluctuations; the cost remains constant over the LOM.
Financing is assumed to be on a 100% equity basis; no debt or related financing costs have been included in the technical-economic analysis.
Corporate obligations and financing costs are not considered.
Exploration Capex, which is aimed at discovering additional Mineral Resources that are outside the Mineral Reserves estimates, is not considered during this analysis.
No salvage value has been included in the technical-economic analysis.
Working capital will be fully recovered at the end of LOM.
The reference date or effective date is 30 June 2024.
22.1.1  LOM Physical

The mine production and key technical inputs parameters are described in the previous section. The summary of the key physical assumptions is presented in Table 22.1.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT227

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

Table 22.1: LOM Physical Inputs for Economic-Analysis
Item Unit LOM Total or Average
Physical    
Mineral Reserve kt 4,965
Ag Grade g/t 80.9
Pb Grade % 1.21
Zn Grade % 2.83
Capacity (average over LOM) ktpa 355
Working Day d/a 330
Life of Mine a 14
Pb Concentrate    
Ag Recovery Rate % 59.3
Pb Recovery Rate % 89.9
Ag Grade in Conc. g/t 1,998.4
Pb Grade in Conc. % 44.9
Zn Concentrate    
Ag Recovery Rate % 23.3
Zn Recovery Rate % 89.8
Ag Grade in Conc. g/t 330.1
Zn Grade in Conc. % 44.5

Sources: LOM Physical Inputs for Economic Analysis

22.1.2  Pricing Assumptions

Table 22.2 shows the prices for Silver, Lead, and Zinc. These commodity prices are dynamic and are derived from CMF, published by Consensus Economics Inc., to which SRK subscribes annually.

 

Table 22.2: Pricing Assumptions for Economic Analysis

 

Commodity Units 2024 2025 2026 2027 2028 2029 LTP
Silver USD/oz 29.3 29.3 27.0 27.3 25.8 22.0 22.0
Lead USD/t 2,150 2,050 2,000 2,050 2,050 2,050 2,050
USc/lb 98 93 91 93 93 93 93
Zinc USD/t 2,750 2,600 2,550 2,550 2,500 2,650 2,650
USc/lb 125 118 116 116 113 120 120

Source: CMF, 17 June 2024

 

22.1.3  Payment Scales

All sales contracts are valid for one year, with key elements subject to change based on market conditions during monthly supplemental agreement negotiations. SRK has summarized these details in Table 22.3 and Table 22.4.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT228

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

Table 22.3: Pb Concentrate Payment Scales
% Pb Deduction (RMB/t Pb) Ag (g/t) % Payable
Pb ≥ 50 200.0 Ag ≥ 2500 92.00
40 ≤ Pb < 50 200+20×(50−Pb) Ag ≥ 2000 91.50
35 ≤ Pb < 40 400+50×(40−Pb) Ag ≥ 1500 91.00
30 ≤ Pb < 35 650+100×(35−Pb Ag ≥ 1000 90.50
Pb < 30 Negotiable Ag ≥ 800 88.00

Source: Sales Contract

 

Table 22.4: Zn Concentrate Payment Scales
% Zn Deduction RMB/t Zn Price ≤
RMB 15,000/t
Deduction RMB/t Zn Price >
RMB 15,000/t
Ag (g/t) Payable
RMB/g Ag
Zn > 50 5,250-20×(Zn-50) 5,250 + (Price – 15,000)×20% – 20×(50-Zn) Ag ≥ 400 1.00
Zn = 50 5,250 5,250 − 0.2×(Price−15,000) 300 ≤ Ag
< 400
0.70
45 ≤ Zn < 50 5,250+20×(50-Zn) 5,250 + (Price – 15,000)×20% + 20×(50-Zn) 150 ≤ Ag < 300 0.60
40 ≤ Zn < 45 5,350+50×(45-Zn) 5,350 + (Price – 15,000)×20% + 50×(45-Zn) Ag < 150 -
35 ≤ Zn < 40 5,600+100×(40-Zn) 5,600 + (Price – 15,000)×20% + 100×(40-Zn)    

Source: Sales Contract

SRK used the forecasted prices, an exchange rate of USD7.22/RMB, and a VAT of 13% to estimate the net payable factors to metal prices in USD basis, as shown below:

Silver in Lead Conc. :
91.5% when Ag grade 2,000 g/t
91.0% when Ag grade 1,500 g/t
Lead in Lead Conc. :98%
Silver in Zinc Conc. :
12.4% when Ag grade 300 g/t
10.6% when Ag grade 150 g/t
Zinc in Zinc Conc. :68.6%
22.1.4  Tax and Royalties

The tax, government charges and royalties for GC Mine are mainly corporate income tax, resource tax, which is in term of royalties, and value added tax (“VAT”). The small scales tax such as stamp duty, are included in S&GA costs.

Corporate Income Tax (“CIT”)

The standard corporate tax rate in China is 25% of taxable income. However, Silvercorp has informed SRK that, as a Hi-New Tech enterprise, the subsidiary entities operating the GC Mine benefit from a reduced enterprise income tax rate of 15% for a three-year term, which is renewable.

Resource Tax (Royalties)

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT229

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

3% of the net sales from lead (Pb) and zinc (Zn) mineral products
2% of the net sales from silver (Ag) mineral products
No resource tax for gold (Au) and copper (Cu), as they are considered by-products
Value Added Tax

In China, industrial minerals prices include a VAT, which is 13% of sales, excluding revenue from gold (Au) if any. The company is allowed to deduct the VAT paid for the production costs. The final VAT payable will be the basis for paying other surtaxes and fees. SRK used the following simplified formulas to calculate the VAT payable:

VAT received = total sales revenue/(1+13%) × 13%;
VAT paid = VAT received × 20%; and
VAT payable = VAT received – VAT paid.
Surtax/Surcharge
City construction fee: 7% of VAT Payable
Education surtax: 5% of VAT Payable
22.1.5  Depreciation

The capital and sustaining expenditures, including development costs, have been depreciated on a unit production basis over the LOM. The assumed depreciation follows the straight-line method over a period of 10 years.

22.1.6  Working Capital

Working capital is the capital needed to fund operations before revenue is received from the finished product. It was calculated as 30% of the operating cost for the initial year. Over the project's life, the working capital nets to zero.

22.2  DCF Projection

The key economic results from the technical-economic model are shown in Table 22.5.

 

Table 22.5: LOM Profit, Loss & Cash Flow Forecasting
Item Unit LOM Total Annually Average over LOM
Revenue (incl. VAT) USD k 515,263 36,805
Opex USD k -290,830 -20,774
Royalties, Charges & VAT Payable USD k -66,801 -4,772
EBITDA USD k 157,633 11,259
Depreciation USD k -26,511 -1,894
EBIT USD k 131,122 9,366
Income Tax USD k -19,668 -1,405
Net Profit USD k 111,453 7,961

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT230

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

Item Unit LOM Total Annually Average over LOM
Add back Depreciation USD k 26,511 1,894
Less Sustaining Capex (Excl. Exploration) USD k -27,884 -1,992
Free Cash Flow USD k 110,081 7,863

The projection for Project operation shows a positive economic prospect. At a discount rate of 8%, the NPV of the Project is USD 63.1 million. The sensitivity of NPV against discount rate is presented in Figure 22.2. The annual cash flows are presented graphically in Figure 22.1 and in tabular form in Table 22.6.

Figure 22.1: Cash Flow Profile

 

Figure 22.2: GC Mine NPV versus Discount Rate

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT231

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT232

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

Table 22.6: LOM Production and Cash Flow Forecast

 

Year Period Units LoM FY2025 Q2-Q4
1
FY 2026
2
FY 2027
3
FY 2028
4
FY 2029
5
FY 2030
6
FY 2031
7
FY 2032
8
FY 2033
9
FY 2034
10
FY 2035
11
FY 2036
12
FY 2037
13
FY 2038
14
Revenues                                
                                 
Price                                
Pb price US$/t     2,150   2,050   2,000   2,050   2,050   2,050   2,050   2,050   2,050   2,050   2,050   2,050   2,050   2,050
Zn price US$/t   2,750 2,600 2,550 2,550 2,500 2,650 2,650 2,650 2,650 2,650 2,650 2,650 2,650 2,650
Ag price US$/g   0.94 0.94 0.87 0.88 0.83 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71
                                 
Payable Price                                
Pb price US$/t     2,110   2,012   1,963   2,012   2,012   2,012   2,012   2,012   2,012   2,012   2,012   2,012   2,012   2,012
Ag in Pb price US$/g   0.86 0.86 0.79 0.80 0.76 0.65 0.65 0.64 0.64 0.65 0.64 0.64 0.6472 0.64
Zn price US$/t   1,886 1,783 1,749 1,749 1,715 1,818 1,818 1,818 1,818 1,818 1,818 1,818 1,818 1,818
Ag in Zn price US$/g   0.10 0.10 0.11 0.11 0.10 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.08
                                 
Revenue                                
Pb Revenue (VAT) US$M 109 6.16 8.07 8.63 7.20 7.20 7.07 7.61 8.31 7.66 7.41 9.11 9.31 7.79 7.47
Ag in Pb Revenue (VAT) US$M 168 10.44 14.18 14.08 14.63 14.64 11.25 12.11 11.19 10.64 12.39 11.20 11.35 11.25 8.91
Zn Revenue (VAT) US$M 229 14.84 17.91 15.32 16.56 15.85 18.10 16.12 16.38 17.39 15.88 15.51 14.93 16.91 17.55
Ag in Zn Revenue (VAT) US$M 9 0.48 0.65 0.75 0.78 0.78 0.60 0.64 0.60 0.57 0.66 0.60 0.61 0.60 0.41
                                 
Total Revenue US$M 515 31.92 40.81 38.79 39.16 38.47 37.02 36.49 36.49 36.25 36.34 36.42 36.20 36.55 34.34
                                 
Depreciation                                
                                 
Depreciation US$M 27 0.30 0.94 1.29 1.57 1.83 2.05 2.17 2.33 2.41 2.49 2.23 2.27 2.31 2.31
                                 
Royalties and Government Charges                                
                                 
VAT received US$M 59 3.67 4.70 4.46 4.51 4.43 4.26 4.20 4.20 4.17 4.18 4.19 4.16 4.21 3.95
VAT paid US$M 12 0.73 0.94 0.89 0.90 0.89 0.85 0.84 0.84 0.83 0.84 0.84 0.83 0.84 0.79
VAT payable US$M 47 2.94 3.76 3.57 3.60 3.54 3.41 3.36 3.36 3.34 3.34 3.35 3.33 3.36 3.16
                                 
Surtax/Surcharge US$M 6 0.35 0.45 0.43 0.43 0.42 0.41 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.38
                                 
Royalties                                
Ag Royalties US$M 4 0.22 0.30 0.30 0.31 0.31 0.24 0.26 0.24 0.22 0.26 0.24 0.24 0.24 0.19
Pb Royalties US$M 3 0.18 0.24 0.26 0.22 0.22 0.21 0.23 0.25 0.23 0.22 0.27 0.28 0.23 0.22
Zn Royalties US$M 7 0.45 0.54 0.46 0.50 0.48 0.54 0.48 0.49 0.52 0.48 0.47 0.45 0.51 0.53
                                 
Royalties and Charges US$M 67 4.14 5.28 5.01 5.06 4.97 4.81 4.73 4.74 4.71 4.71 4.73 4.70 4.75 4.48
                                 
Taxation                                
                                 
Revenue US$M 515 31.92 40.81 38.79 39.16 38.47 37.02 36.49 36.49 36.25 36.34 36.42 36.20 36.55 34.34
Opex US$M 291 16.02 20.81 22.04 22.31 22.61 22.42 21.91 21.60 21.78 20.43 20.55 20.38 20.00 17.99
Royalties and Government Charges US$M 67 4.14 5.28 5.01 5.06 4.97 4.81 4.73 4.74 4.71 4.71 4.73 4.70 4.75 4.48
Depreciation US$M 27 0.30 0.94 1.29 1.57 1.83 2.05 2.17 2.33 2.41 2.49 2.23 2.27 2.31 2.31
                                 
Tax US$M 20 1.72 2.07 1.57 1.53 1.36 1.16 1.15 1.17 1.10 1.31 1.34 1.33 1.43 1.43
                                 
Income Statement                                
                                 
Revenue US$M 515 31.92 40.81 38.79 39.16 38.47 37.02 36.49 36.49 36.25 36.34 36.42 36.20 36.55 34.34
Opex US$M 291 16.02 20.81 22.04 22.31 22.61 22.42 21.91 21.60 21.78 20.43 20.55 20.38 20.00 17.99
Royalties and Charges US$M 67 4.14 5.28 5.01 5.06 4.97 4.81 4.73 4.74 4.71 4.71 4.73 4.70 4.75 4.48
EBITDA US$M 158 11.76 14.72 11.74 11.80 10.90 9.79 9.86 10.15 9.76 11.21 11.14 11.12 11.81 11.87
Depreciation US$M 27 0.30 0.94 1.29 1.57 1.83 2.05 2.17 2.33 2.41 2.49 2.23 2.27 2.31 2.31
EBIT US$M 131 11.46 13.78 10.45 10.23 9.06 7.74 7.68 7.83 7.35 8.72 8.91 8.85 9.50 9.57
Tax US$M 20 1.72 2.07 1.57 1.53 1.36 1.16 1.15 1.17 1.10 1.31 1.34 1.33 1.43 1.43
                                 
Net Income US$M 111 9.74 11.71 8.88 8.69 7.70 6.58 6.53 6.65 6.25 7.41 7.58 7.53 8.08 8.13
                                 
Cash Flow                                
                                 
Cash IN US$M 515 31.92 40.81 38.79 39.16 38.47 37.02 36.49 36.49 36.25 36.34 36.42 36.20 36.55 34.34
Cash OUT US$M 405 25.01 34.65 32.23 31.82 31.72 30.72 29.11 29.16 28.59 27.31 27.21 26.95 26.67 24.03
Free Cash Flow US$M 110 6.91 6.16 6.55 7.34 6.75 6.30 7.38 7.32 7.66 9.03 9.21 9.25 9.88 10.31
Cumulative Cash Flow US$M   6.91 13.07 19.62 26.96 33.72 40.02 47.41 54.73 62.39 71.42 80.64 89.89 99.77 110.08

 

     
22.3  Sensitivity Analysis

SRK conducted a single-factor sensitivity analysis for the GC Mine to determine which factors significantly impact its economics when considered independently. The analysis focused on metal prices, Capex, and Opex, each tested within a ±30% range. The results showed that the Project is most sensitive to changes in metal prices and least sensitive to variations in Capex. Results of the sensitivity tests are presented in Table 22.7 and Figure 22.3.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT233

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

Table 22.7:Sensitivity Analysis Result (@8% Discount Rate)

 

 

Price Opex Capex
Variance      
  NPV @ 8% Annual Discount Rate (USD Million)
30% 132.0 18.3 57.9
25% 120.5 25.7 58.8
20% 109.0 33.2 59.6
15% 97.5 40.7 60.5
10% 86.1 48.1 61.3
5% 74.6 55.6 62.2
0% 63.1 63.1 63.1
-5% 51.6 70.5 63.9
-10% 40.1 78.0 64.8
-15% 28.6 85.5 65.7
-20% 17.1 93.0 66.5
-25% 5.5 100.4 67.4
-30% -6.7 107.9 68.3

 

 

Figure 22.3: Sensitivity Spider Chart (8% Discount Rate)

 

It can be seen that the changes in prices have the greatest impact on the GC Mine’s NPV, while Opex and Capex have smaller effects.

To clarify the effects of prices on the GC Mine’s NPV, SRK estimated that the break-even price (NPV=0, at 8% discount rate) is around a change of -27.3% from the base scenario prices used in the model, i.e. if the price drops to about 72.7% of the forecasting price, the GC Mine NPV will become negative.

Another sensitivity of the GC Mine against exploration Capex was also assessed. When considering this Capex on the existing Mineral Reserve mine plan, the Project is still positive as that the NPV is USD 44.4 Million at 8% discount rate.

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT234

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Economic Analysis  
■  FINAL

 

A third sensitivity of the Project against CIT rate was also evaluated. In case where the tax reduction benefit is not renewed after 3 years, the tax rate will be at the standard 25% of taxable income. The Project is still positive as that the NPV is USD 58.1 Million at 8% discount rate.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT235

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Adjacent Properties  
■  FINAL

 

23  Adjacent Properties

The GC Mine is located within the Daganshan mineralization field featuring tungsten (W), tin (Sn), gold (Au), silver (Ag), lead (Pb), and zinc (Zn) mineralization. The field is characterized by five “nested” zonations. From the centre outward, the mineralization zones are W (+Sn, Mo, and Bi), Sn, Sn-Pb- Zn, Ag-Pb-Zn, and Au (the gold zone is not shown in Figure 23.1). The following are a list of deposits that have been discovered and mined within the field:

Dajinshan Tungsten Deposit. The deposit is located in the centre of the Daganshan field.
Jiuquling Tin Deposit. The deposit is a quartz vein type and surrounds the tungsten mineralization zone. It is reported that the Jiuquling deposit has been developed and is in production, however detailed information such as grade, deposit size, tonnage, metal recovery, etc. are not available at this time.
Jianshan Tin-Lead-Zinc-Silver Deposit. The deposit is located in the tin-lead-zinc mineralization zone. It is a sedimentary type of deposit.
Yunfu Pyrite Deposit. The Yunfu pyrite mine is an open pit mine located 4.5 km north-west of the city of Yunfu. Mine production began in 1988.

Figure 23.1 illustrates the general geological understanding of properties adjacent to the GC Mine. SRK is not aware of any immediate adjacent properties that would directly affect the interpretation or evaluation of the mineralization and anomalies found on the GC Project property.

 

Figure 23.1: Zonation of Mineralization in the Daganshan Mineralization Field

 

Sources: GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT236

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Other Relevant Data and Information  
■  FINAL

 

24  Other Relevant Data and Information

 

There is no additional information or explanation required to make the Technical Report understandable and not misleading.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT237

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Interpretation and Conclusions  
■  FINAL

 

25  Interpretation and Conclusions

 

25.1  Geology

 

The GC Mine is located at the intersection between the Wuchuan-Sihui Deep Fault zone and Daganshan Arc-ring structural zone. It is situated in the south-west part of the Daganshan uplift. Structures developed in the area are mainly the NWW-EW striking Gaocheng Fault zone, the NE striking Baimei Fault zone, and the Songgui Fault zone.

 

Mineralization at GC Mine is primarily hosted within a WNW-ENE trending, 4.8 km long and 2 km wide fault zone. This zone encompasses numerous veins, with the more common WNW veins generally striking between 90° and 150° and dipping between 55° to sub-vertical. The average thickness of the WNW-ENE veins is about 0.8 m. There are also east-west striking veins that typically strike 50° to 130° and dip between 65° and sub-vertical to the SE and SSW. The average thickness is around 0.8 m.

 

The dominant sulphide mineral is pyrite, and other constituents are a few percent of sphalerite, galena, pyrrhotite, arsenopyrite, magnetite, and less than one percent of chalcopyrite and cassiterite. Gangue minerals include chlorite, quartz, fluorite, feldspar, mica, and hornblende, with a small or trace amount of kaolinite, tremolite, actinolite, chalcedony, garnet, zoisite, apatite, and tourmaline.

 

Alteration minerals associated with the GC Mine vein systems include quartz, sericite, pyrite, and chlorite, together with clay minerals and limonite. Silicification commonly occurs near the centre of the veins. Chlorite and sericite occur near and slightly beyond the vein margins.

 

The poly-metallic mineralization of the GC deposit belongs to the mesothermal vein infill style of deposit.

 

25.2  Data verification

 

SRK conducted the site inspections to the GC Mine from 23 to 26 April in 2024, undertook a site inspection of the project area, visited the drill core store/ core tray storage, site sample preparation lab and reviewed the mineralization, tunnel sampling procedure during the underground visit to understand the company’s protocols and procedures related to exploration management, and took the data entry check and assay validation.

 

The data verification shows reasonable analytical accuracy and precision. The QP considers the GC Mine Mineral Resource database acceptable for Mineral Resource estimation.

 

25.3  Mineral Resource Estimation

 

The Mineral Resource estimation work was completed by Mr Yongwei Li, Resource Geologist of Silvercorp under the supervision of Guoliang Ma, who is the QP of Silvercorp. Mr Mark Wanless, Principal Geologist of SRK ZA (Pr.Sci.Nat, FGSSA) and Ms Yanfang Zhao, Principal Geologist of SRK (MAusIMM) have reviewed the database, estimation methodologies and models used to prepare the Mineral Resource estimate using Isatis.Neo software. After some adjustment to the compositing, capping and search parameters, Mr Mark Wanless and Ms Yanfang Zhao are satisfied that they comply with reasonable industry practice and the guidelines of the CIM Code.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT238

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Interpretation and Conclusions  
■  FINAL

 

The estimates are based on drilling samples and underground samples information available up to 2024. With respect to drilling and underground sample information available for the March 2024 Mineral Resource estimates, SRK believes the current drilling and channel sampling information is sufficiently reliable to interpret with confidence the boundaries for GC deposits and that the assay data is sufficiently reliable to support Mineral Resource estimation.

 

25.4  Mining Method

 

The mine is designed as an underground operation developed by a hybrid access of declines and shaft, initially in 2 stages, targeting the Mineral Resources above -300mRL. A third stage is currently being designed, with the access method being considered as decline access and the relayed air return raises.

Stage 1 production employs conventional mobile, rubber-tired, diesel-powered equipment (development jumbo, loader, and truck) with surface declines access down to -50 mRL.
Stage 2 development from -50 mRL down to -300 mRL employs conventional tracked equipment (battery powered locomotives, rail cars, electric rocker shovels and pneumatic hand-held drills) via a surface shaft access, as well as the extension of the decline.
Stage 3 is being designed, which will mine the Mineral Resources occurring between -300 mRL and -500 mRL.

 

The mining method employed by GC Mine were traditional shrinkage and resuing stoping methods, previously to 2021. OCAF method has been introduced as the backfill plant was commissioned.

 

The ROM material is mined/ drawn from the stope or waste excavated from development heading and loaded into 0.7m3 rail cars by LHD from either cross-cut draw points or development headings directly. The rail cars are moved by electric locomotives along the level drive (footwall drive) to the shaft, then hoisted two at a time in the shaft cage (2 deck) to surface. The material mined near decline system, underground trucks are loaded at the stope draw point equipped with vibration feeder at the bottom of the ore pass, which is fed from upper level by rail cars or LHD directly.

 

The underground infrastructure, including water supplier and dewatering system, hoisting system, ventilation, power supply, compressed air supply, and so on are well constructed for the first 2 stages of mining.

 

GC Mine operates mainly using contractors for mine development, production, ore transportation, and exploration. GC Mine provides its own management, technical services, and supervisory staff to manage the mine operations.

 

All mobile equipment and some minor fixed equipment are provided by the mining contractor.

 

The mine is operating at industrial good practice and with a reasonable perspective feasible extraction of the eligible Mineral Resources.

 

25.5  Recovery Method

 

The production process and operating parameters of the GC processing plant are suitable for the ore properties of the GC Mine. The historical performance shows that the targets of producing

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT239

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Interpretation and Conclusions  
■  FINAL

 

commercial lead concentrate and zinc concentrate have been achieved, and the recovery rates of silver, lead and zinc have also reached the design value.

 

The new intelligent pre-sorting system built in 2023 replaces the hand-sorting and is still in the process of continuous optimization. Intelligent pre-sorting can improve the head grade for grinding, which is conducive to the processing utilization of low-grade ore.

 

The crushing system operates during the electricity price valley period (low cost electricity), which is conducive to reducing crushing costs. The grinding and floating system is two identical independent series, and the processing capacity of a single series is 900 to 950 tpd, which can fully reach the designed processing capacity of 1,600 tpd. The two grinding and floating circuits has the flexibly to adapt to changes in mining ore supply.

 

The GC processing plant is built on a steep hillside, which can make full use of gravity to convey ore pulp, and the ROM bin is located near the main shaft, making the material conveying/ transportation costs at a low level. The layout of the GC processing plant is reasonable with good management, and the ancillary facilities are adequate.

 

The lead concentrate contains 2% to 3% of copper and about 6% of zinc, it is recommended to carry out flotation test for the lead concentrate to separate copper and reduce zinc, including re-grinding flotation test, in order to produce copper concentrate, improve the grade of lead concentrate and increase the recovery rate of zinc.

 

25.6  Environmental Studies, Permitting, and Social or Community Impact

 

The GC Mine has obtained the main environmental protection-related permits required for operation, including the safety production permit, water use permit, and site discharge permit. An EIA report for GC Mine was prepared by Guangdong Heli Engineering Survey Institute in March, 2020. Guangdong Province Environmental Protection Bureau issued aforementioned EIA approval on 13 June 2010. The EIA report basically cover the main production facilities including mine site, processing plant and TSF.

 

25.7  Capital and Operating Costs

 

Records of Capex and Opex have been provided to SRK for review.

 

The associated Capex for deepen development are estimated by GC Mine. The other sustainable Capex such as mine closure, facilities updates and/ or capital maintenance are also estimated. The Capex is forecasted as about USD 62.5 million including USD 34.6 million exploration drillings over LOM.

 

GC Mine has a relative stable operation which addresses the Opex forecasting via their historical production records. The Opex is forecasted from the historical operation records of the past 3 years, which is USD58.3 per tonne.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT240

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Interpretation and Conclusions  
■  FINAL

  

25.8   Economic Analysis

 

The NPVs at a discount rate of 8% are about USD 63.1 million These positive NPVs provide an indication that it is economically viable for the GC Mine to report Mineral Reserves.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT241

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recommendations  
■  FINAL

 

26  Recommendations

 

26.1  Geology

 

As reviewed by SRK from the geology, exploration, data management and Mineral Resource estimation, the QP recommendations for the GC Mine are indicated below:

 

Regarding the sample database and QA/QC samples, SRK recommends ensuring that all records, including drillhole and channel samples, are assigned a consistent year between the collar and assay files. This will help reduce reporting discrepancies
Additional bulk density measurements should be conducted on representative samples with varying base metal and pyrite content
Bulk density measurements should also be taken from samples of the surrounding waste material
Most umpire (check) samples show slightly bias results compared to the original samples in the higher end of the assay range. This phenomenon has occurred in both the ALS and GC Lab, which are the primary laboratories. It is recommended that it be assessed whether the storage of samples leads to this situation, which may be related to swelling and caking during oxidation
During the site underground channel sampling observations, only the larger blocks on the plastic sheet were taken, all the fines were discarded, and the sampling was biased against the hanging wall and footwall units, with a larger proportion of the mineralization zone (Figure 6.2) chipped. Although SRK recognises that channel sampling is challenging due to the variable hardness of the rock units and uneven surface for sampling, SRK recommends that the chip sampling can be improved using a diamond saw to cut a channel for the chipping, which will also reduce the volume of sample and allow the full sample of coarse and fine material to be collected
The umpire samples from 2021 to 2023 were observed to have some swelling and caking, especially in the samples for 2021 and 2022, which may result in mass change or oxidation, which may affect the results.

 

26.2  Mining

 

Based on the site visit and review of available technical information, and Mineral Reserve estimates, the QP recommendations for the GC Mine are indicated below: 

Conducting technical studies on long-hole stoping method for the relative wider veins, and recording the test stope data, for the improvement of mining efficiency and cost reduction
Conducting reconciliation on not only Mineral Resources versus Processed Feed, but also on the mineral flows, from Mineral Resource model, grade control results, mining, then processing
Conducting reconciliation on exploration investment versus Mineral Resource updates to demonstrate the Capex efficiency
Considering utilising commercial mine planning software for mine scheduling, more efficient for modifying
As part of ongoing operations at the mine, geotechnical and ground support aspects should be continuously reviewed in a formal and recordable manner, bearing in mind previous.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT242

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Recommendations  
■  FINAL

  

recommendations, local and mine-wide operating experience in all rock types encountered, any advisable data collection, and looking to future mining development.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT243

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
References  
■  FINAL

 

27  References

 

NI 43-101 Technical Report Update on the Gaocheng Ag-Zn-Pb Project in Guangdong Province, People’s Republic of China, AMC Mining Consultants (Canada) Ltd. October 2021;
Processing Test Report on the Comprehensive Recovery of Lead, Zinc, Silver, Tin and Sulphur for GC Lead-Zinc Mine, Hunan Research Institute for Nonferrous Metals, May 2009.
Preliminary Design of Mining and Processing of GC Lead-Zinc Mine in Yun’an District, Guangdong Province, Guangdong Metallurgical & Architectural Design Institute, April 2011.
GC LOM 43-101(20240613).xlsm, GC Mine
Management’s Discussion and Analysis for the year ended March 31, 2024, Silvercorp
Production records, from FY 2020 to 2024, in xlsx format, GC Mine
20240718_GC_Reserves_30June, in xlsx format, GC Mine
20240712_GC Mine 0630 Addition data, in xlsx format, GC Mine

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT244

Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China
Closure  
■  FINAL

 

Closure

 

This report, Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China, was prepared by

 

 

 

 

 

 

 

Original signed by Mark Wanless of SRK Consulting

   
   
Mark Wanless  
Principal Geologist  

 

 

 

 

 

 

 

 

 

Original signed by Falong Hu of SRK Consulting China Ltd

   
   

Falong Hu, FAusIMM

Principal Consultant (Mining)

 

 

and reviewed by

 

 

 

 

 

 

Original signed by Alexander Thin of SRK Consulting China Ltd

   
   

Alexander Thin, FAusIMM

Principal Consultant (Mining)

 

 

 

 

 

 

 

All data used as source material plus the text, tables, figures, and attachments of this document have been reviewed and prepared in accordance with generally accepted professional engineering and environmental practices.

 

  
SRK CONSULTING CHINA LTD.    20 JULY 2024  ■  EFFECTIVE DATE: 30 JUNE 2024  ■  MW, FH/YZ, LN, NX, TC, HH/AT245

 

 

 

 

 

 

  
  
Appendix AMining Permit

 

 

 

The copy of the Mining Permit

 

 

 

 

 

 

 

 

 

  
  
Appendix BBusiness License

 

 

 

The copy of the Business License

 

 

 

 

 

 

 

 

 

  
  
Appendix CHigh-Tech Enterprise Certificate

 

 

 

The copy of the High-Tech Enterprise Certificate

 

 

 

 

 

 

 

 

 

  
  
Appendix DWater Use Permit

 

 

 

The copy of the Water Use Permit

 

 

 

 

 

 

 

 

 

  
  
Appendix ESafety Production Permits

 

 

 

The copy of the Safety Production Permit – UG Mine

 

 

 

 

 

 

The copy of the Safety Production Permit – TSF

 

 

 

 

 

To accompany the report entitled Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, People’s Republic of China (“GC Project”), which was effective on 30 June 2024, and prepared for Guangdong Found Mining Co., Ltd.

 

I, Falong Hu, FAusIMM, PMP, do hereby certify that: 

1) I am a Principal Mining Engineer, associate Practice Leader with the firm of SRK Consulting China Ltd. (“SRK CN”) with an office at: B1301 COFCO Plaza, 8 Jianguomennei Dajie, Beijing, the People’s Republic of China (“PRC” or “China”).
2) I graduated with a bachelor’s degree in mining engineering from Central South University, China (B.Eng.) in 2009, a Master of Business Administration from China University of Geoscience Beijing, China (MBA) in 2015.
3) I am a fellow of the Australasian Institute of Mining and Metallurgy (“FAusIMM”), (#313608), and in a good standing. I am a register Project Management Professional (“PMP”).
4) I have practiced my profession as a Mining Engineer for a total 16 years since my graduation.
5)My relevant work experience includes:

Review and reporting on mining method and Mineral Reserve Estimates for operations and projects around the world for due diligence and regulatory requirements.
Technical studies (Scoping/PEA, PFS, FS) project work on both underground and open pit projects, in Africa, Asia and Australia.
Operational experience in operations as mine planer and technical service, in China.
Participation and author of several NI 43-101 Technical Report.
Authored/co-authored several technical reports for IPO listing or transactions in the Stock Exchange of Hong Kong Limited.

6) I personally did visit the subject property to the Technical Report on April 23 to 26, 2024.
7) I have read the definition of Qualified Person set out in National Instrument 43-101 and certify that by virtue of my education, affiliation to a professional association, and past relevant work experience, I fulfilled the requirements to be a Qualified Person for the purposes of National Instrument 43-101 and this technical report has been prepared in compliance with National Instrument 43-101 and Form 43-101F1.
8) I, as a Qualified Person, am independent of the issuer as defined in Section 1.5 of National Instrument 43-101.
9) I am an author and chief compiler of this technical report and have supervised the independent verification completed by SRK and the preparation of Section 2 to 5, 15, 16, 18 except for 18.2, 19, 23 and the relevant portions of Section 1, 24 to 27 of this technical report. I accept professional responsibility for those sections I co-authored.
10) I have had prior involvement with GC Project that is the subject of the Technical Report, in that I assisted the independent valuer with SRK Australia to review the mining method, with respect to an independent technical valuation service, in 2023.
11) I have read National Instrument 43-101 and confirm that this technical report has been prepared in compliance therewith.
12) That, as of the effective date of the Technical Report and the date this certificate, to the best of my knowledge, information and belief, this technical report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
 

Effective Date: 30 June 2024

Signing Date: 13 September 2024

 

 

 

"Falong Hu"

 

Falong Hu, FAusIMM, PMP

Principal Consultant (Mining)

Associate Practice Leader, Management of MPE

 

 

 

 

To accompany the report entitled Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, People’s Republic of China (“GC Project”), which was effective on 30 June 2024, and prepared for Guangdong Found Mining Co., Ltd.

 

I, Mark Wanless, FGSSA, Pr.Sci.Nat, do hereby certify that:

1) I am a Principal Geologist with the firm SRK Consulting (South Africa) (Pty) Ltd. (SRK ZA) with an office at SRK House, 265 Oxford Road, Illovo, Johannesburg 2196, South Africa.
2) I am a graduate of the University of Cape Town with a BSc (Hons) in Geology in 1995. I have practised my profession continuously since 1996.
3) I am registered as a Geologist with the South African Council for Natural Scientific Professionals (Registration No 400178/05). I am a Fellow of the Geological Society of South African and a Member of the Geostatistical Association of South Africa and a Member of the South African Institute of Mining and Metallurgy.
4) I have practiced my profession as a Geologist for a total 28 years since my graduation.

5)

My relevant work experience includes:

Review and reporting on geological modelling and Mineral Resource estimates for operations and projects around the world for due diligence and regulatory requirements.
Technical studies (Scoping/PEA, PFS, FS) and project work on polymetallic precious and base metal deposits in Southern Africa, Asia, South America, and Australia.

Operational experience on Gold mines in South Africa as a Geologist and Mine Planner.

Participation and author of several NI 43-101 Technical Report.
Authored/co-authored several technical reports for IPO listing or transactions on Stock Exchanges including the TSX, ASX, LSE, JSEs and HKSE.

6) I personally did visit the subject property to the Technical Report on April 23 to 26, 2024.
7) I have read the definition of Qualified Person set out in National Instrument 43-101 and certify that by virtue of my education, affiliation to a professional association, and past relevant work experience, I fulfilled the requirements to be a Qualified Person for the purposes of National Instrument 43-101 and this technical report has been prepared in compliance with National Instrument 43-101 and Form 43-101F1.
8) I, as a Qualified Person, am independent of the issuer as defined in Section 1.5 of National Instrument 43- 101.
9) I am a co-author of this technical report and responsible for Sections 7 to 12 and 14 of this report as they pertain to GC Mine, and accept professional responsibility for these sections of this technical report.
10) I have had no prior involvement with GC Project that is the subject of the Technical Report.
11) I have read National Instrument 43-101 and confirm that this technical report has been prepared in compliance therewith.
12) That, as of the effective date of the Technical Report and the date this certificate, to the best of my knowledge, information and belief, this technical report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
 

Effective Date: 30 June 2024

Signing Date: 13 September 2024

 

 

 

"Mark Wanless"

 

Mark Wanless, FGSSA, Pr.Sci.Nat

Principal Consultant (Geology) 

 

 

 

 

To accompany the report entitled Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, People’s Republic of China (“GC Project”), which was effective on 30 June 2024, and prepared for Guangdong Found Mining Co., Ltd.

 

I, Yanfang Zhao, MAusIMM, do hereby certify that:

1) I am a principal geological engineer with the firm of SRK Consulting China Ltd. (“SRK CN”) with an office at: B1301 COFCO Plaza, 8 Jianguomennei Dajie, Beijing, the People’s Republic of China (“PRC” or “China”).
2) I graduated with a master’s degree in mineral prospecting and exploration from China University of Geosciences (Beijing), China (M.Eng.) in 2009, a bachelor’s degree in resources environment from Shandong University of Science and Technology, 2006.
3) I am a member of the Australasian Institute of Mining and Metallurgy (“MAusIMM”), (#315027), and in a good standing.
4) I have practiced my profession as a geological engineer for a total 15 years since my graduation.

5)

My relevant work experience includes:

Review and reporting on geological modelling and Mineral Resource estimates for operations and projects around the world for due diligence and regulatory requirements.
Experience in mining company as a Geologist, in China.
Participation and author of several NI 43-101 Technical Report.
Authored/co-authored several technical reports for IPO listing or transactions in the Stock Exchange of Hong Kong Limited.

6) I personally did visit the subject property to the Technical Report on April 23 to 26, 2024.
7) I am independent of the issuer as defined in Section 1.5 of National Instrument 43-101.
8) I am an author of this technical report and prepare of for Sections 7 to 12 and 14 for QP review.
9) I have had prior involvement with GC Project that is the subject of the Technical Report, in that I assisted the independent valuer with SRK Australia to review the geology and resource estimation method and procedure, with respect to an independent technical valuation service, in 2023.
10) I have read National Instrument 43-101 and confirm that this technical report has been prepared in compliance therewith.
11) That, as of the effective date of the Technical Report and the date this certificate, to the best of my knowledge, information and belief, this technical report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
 

Effective Date: 30 June 2024

Signing Date: 13 September 2024

 

 

 

"Yanfang Zhao"

Yanfang Zhao, MAusIMM

Principal Consultant (Geology)

 

 

 

 

To accompany the report entitled Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, People’s Republic of China (“GC Project”), which was effective on 30 June 2024, and prepared for Guangdong Found Mining Co., Ltd.

 

I, Tzuhsuan Chuang, MAusIMM, do hereby certify that:

1) I am a Senior Mining Engineer with the firm of SRK Consulting China Ltd. (“SRK CN”) with an office at: B1301 COFCO Plaza, 8 Jianguomennei Dajie, Beijing, the People’s Republic of China (“PRC” or “China”).
2) I graduated with a master’s degree in mining engineering from Colorado School of Mines, USA (M.Sc) in 2016.
3) I am a member of the Australasian Institute of Mining and Metallurgy (“MAusIMM”), (#3088857), and in a good standing.
4) I have practiced my profession as a Mining Engineer for a total 7 years since my graduation.

5)

My relevant work experience includes:

Review and reporting on Capex, Opex, technical-economic evaluation for projects around the world for regulatory requirements.
Technical studies (Scoping/PEA, PFS, FS) project work on both underground and open pit projects, in Africa and Asia.
Operational experience on gold mine in Colombia as a Mine Planner.
Participation and author of several NI 43-101 Technical Report.
Authored/co-authored several technical reports for IPO listing or transactions in the Stock Exchange of Hong Kong Limited.

6) I personally did not visit the subject property to the Technical Report.
7) I am independent of the issuer as defined in Section 1.5 of National Instrument 43-101.
8) I am a co-author of this technical report and have supervised the independent verification completed by SRK and the preparation of Section 21 and 22 of this technical report for QP review. I accept professional responsibility for those sections I co-authored.
9) I have had no prior involvement with GC Project that is the subject of the Technical Report.
10) I have read National Instrument 43-101 and confirm that this technical report has been prepared in compliance therewith.
11) That, as of the effective date of the Technical Report and the date this certificate, to the best of my knowledge, information and belief, this technical report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
 

Effective Date: 30 June 2024

Signing Date: 13 September 2024

 

 

 

"Tzuhsuan Chuang"

 

Tzuhsuan Chuang, MAusIMM

Senior Consultant (Mining)

 

 

 

 

To accompany the report entitled Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, People’s Republic of China (“GC Project”), which was effective on 30 June 2024, and prepared for Guangdong Found Mining Co., Ltd.

 

I, Lanliang Niu, MAusIMM, do hereby certify that:

1) I am a Principal Mineral Processing Engineer, worked for SRK Consulting China Ltd. (“SRK CN”) with an office at: B1301 COFCO Plaza, 8 Jianguomennei Dajie, Beijing, the People’s Republic of China (“PRC” or “China”).
2) I graduated with a bachelor’s degree in mineral processing from Beijing University of Iron and Steel Technology in 1987.
3) I am a member of the Australasian Institute of Mining and Metallurgy (“MAusIMM”), (#313608), and a member of China Association of Mineral Resources Appraisers (“CAMRA”).
4) I have practiced my profession as a Mineral Processing Engineer for a total of 37 years since my graduation and have worked at SRK CN for 17 years as a Mineral Processing Consultant.
5) I worked in two mineral research institutes from 1987 to 2005, while also working in three gold mines from 1987 to 1994. I worked in a rare earth mine from 2005 to 2007. Since late 2007, I have been with SRK CN, gaining experience in over 200 mining projects.
6) I personally did visit the subject property to the Technical Report on April 23 to 26, 2024.
7) I am independent of the issuer as defined in Section 1.5 of National Instrument 43-101.
8) I am a co-author of this technical report and have supervised the independent verification completed by SRK and the preparation of Section 13 and 17 of this technical report for QP review. I accept professional responsibility for those sections I co-authored.
9) I have had no prior involvement with GC Project that is the subject of the Technical Report.
10) I have read National Instrument 43-101 and confirm that this technical report has been prepared in compliance therewith.
11) That, as of the effective date of the Technical Report and the date this certificate, to the best of my knowledge, information and belief, this technical report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
 

Effective Date: 30 June 2024

Signing Date: 13 September 2024

 

 

 

"Lanliang Niu"

 

Lanliang Niu, MAusIMM

Principal Consultant (Mineral Processing)

 

 

 

 

To accompany the report entitled Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, People’s Republic of China (“GC Project”), which was effective on 30 June 2024, and prepared for Guangdong Found Mining Co., Ltd.,

 

I, Nan Xue, MAusIMM, do hereby certify that:

1) I am a Principal Environmental Scientist of SRK Consulting China Ltd. (“SRK CN”) with an office at: B1301 COFCO Plaza, 8 Jianguomennei Dajie, Beijing, the People’s Republic of China (“PRC” or “China”).
2) I graduated with a Master’s degree in environmental science from Nankai University, China (M.Sc) in 2007.
3) I am a member of the Australasian Institute of Mining and Metallurgy (“MAusIMM”), (#314731).
4) I have practiced my profession as an Environmental Scientist for a total 17 years since my graduation.

5)

My relevant work experience includes:

Engineering analysis, pollution source calculation and impact predictions for environmental impact assessment report.
Environmental technical studies (Scoping/PEA, PFS, FS) project work on mining projects.
Conduct environmental due diligence in accordance with equator principles, International Finance Corporation environmental and social performance standards and other international standards.
Participation in a number of NI 43-101 Technical Reports for IPO listing or transactions in the Stock Exchange of Hong Kong Limited.

6) I personally did not visit the subject property to the Technical Report.
7) I am independent of the issuer as defined in Section 1.5 of National Instrument 43-101.
8) I am a co-author of this technical report and have supervised the independent verification completed by SRK and the preparation of Section 20 of this technical report for QP review. I accept professional responsibility for those sections I co-authored.
9) I have had prior involvement with GC Project that is the subject of the Technical Report, in that I assisted the independent valuer with SRK Australia to review the geology and resource estimation method and procedure, with respect to an independent technical valuation service, in 2023.
10) I have read National Instrument 43-101 and confirm that this technical report has been prepared in compliance therewith.
11) That, as of the effective date of the Technical Report and the date this certificate, to the best of my knowledge, information and belief, this technical report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
 

Effective Date: 30 June 2024

Signing Date: 13 September 2014

 

 

 

"Nan Xue"

 

Nan Xue, MAusIMM

Principal Consultant (ESG)

 

 

 

 


Exhibit 99.2

 
SRK Consulting China Ltd
B1301 COFCO Plaza
No.8 Jianguomennei Dajie
Dongcheng District
Beijing, China 100005
T: +86 10 6511 1000
F: +86 10 8512 0385
E: china@srk.com
www.srk.com

13 September 2024

Toronto Stock Exchange
British Columbia Securities Commission
Alberta Securities Commission
Saskatchewan Financial Services Commission
Manitoba Securities Commission
Ontario Securities Commission
Autorite des marches financiers
New Brunswick Securities Commission
Nova Scotia Securities Commission
Securities Commission of Newfoundland and Labrador
Superintendent of Securities, Prince Edward Island

Dear Sirs/Mesdames,

CONSENT of QUALIFIED PERSON

I, Lanliang Niu, consent to the public filing of the technical report titled “Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China”, effective date June 30, 2024 (the “Technical Report”) by Silvercorp Metals Inc. (“Silvercorp”).

I also consent to any extracts from or a summary of the Technical Report in the August 27, 2024, news release of Silvercorp (the “News Release”).

I certify that I have read the News Release being filed by Silvercorp and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible.

Yours faithfully

Original signed by
Lanliang Niu, MAusIMM

Qualified Person Signature
Principal Consultant (Processing)

Local Offices: Group Offices:
Beijing Africa
Nanchang Asia
Kunming Australia
  Europe
  North America
  South America

 




Exhibit 99.3


SRK Consulting China Ltd
B1301 COFCO Plaza
No.8 Jianguomennei Dajie
Dongcheng District
Beijing, China 100005
 
T: +86 10 6511 1000
F: +86 10 8512 0385
E: china@srk.com
 
www.srk.com

13 September 2024

Toronto Stock Exchange
British Columbia Securities Commission
Alberta Securities Commission
Saskatchewan Financial Services Commission
Manitoba Securities Commission
Ontario Securities Commission
Autorite des marches financiers
New Brunswick Securities Commission
Nova Scotia Securities Commission
Securities Commission of Newfoundland and Labrador
Superintendent of Securities, Prince Edward Island

Dear Sirs/Mesdames,

CONSENT of QUALIFIED PERSON

I, Nan Xue, consent to the public filing of the technical report titled “Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China”, effective date June 30, 2024 (the “Technical Report”) by Silvercorp Metals Inc. (“Silvercorp”).

I also consent to any extracts from or a summary of the Technical Report in the August 27, 2024, news release of Silvercorp (the “News Release”).

I certify that I have read the News Release being filed by Silvercorp and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible.

Yours faithfully

Original signed by
Nan Xue, MAusIMM

Qualified Person Signature
Principal Consultant (Environmental)

Local Offices: Group Offices:
Beijing Africa
Nanchang Asia
Kunming Australia
  Europe
  North America
  South America

 




Exhibit 99.4

 
SRK Consulting China Ltd
B1301 COFCO Plaza
No.8 Jianguomennei Dajie
Dongcheng District
Beijing, China 100005
 
T: +86 10 6511 1000
F: +86 10 8512 0385
E: china@srk.com
 
www.srk.com

13 September 2024

Toronto Stock Exchange
British Columbia Securities Commission
Alberta Securities Commission
Saskatchewan Financial Services Commission
Manitoba Securities Commission
Ontario Securities Commission
Autorite des marches financiers
New Brunswick Securities Commission
Nova Scotia Securities Commission
Securities Commission of Newfoundland and Labrador
Superintendent of Securities, Prince Edward Island

Dear Sirs/Mesdames,

CONSENT of QUALIFIED PERSON

I, Tzuhsuan Chuang, consent to the public filing of the technical report titled “Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China”, effective date June 30, 2024 (the “Technical Report”) by Silvercorp Metals Inc. (“Silvercorp”).

I also consent to any extracts from or a summary of the Technical Report in the August 27, 2024, news release of Silvercorp (the “News Release”).

I certify that I have read the News Release being filed by Silvercorp and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible.

Yours faithfully

Original signed by
Tzuhsuan Chuang, MAusIMM

Qualified Person Signature
Senior Consultant (Mining)

Local Offices: Group Offices:
Beijing Africa
Nanchang Asia
Kunming Australia
  Europe
  North America
  South America

 




Exhibit 99.5


SRK Consulting China Ltd
B1301 COFCO Plaza
No.8 Jianguomennei Dajie
Dongcheng District
Beijing, China 100005
 
T: +86 10 6511 1000
F: +86 10 8512 0385
E: china@srk.com
 
www.srk.com

13 September 2024

Toronto Stock Exchange
British Columbia Securities Commission
Alberta Securities Commission
Saskatchewan Financial Services Commission
Manitoba Securities Commission
Ontario Securities Commission
Autorite des marches financiers
New Brunswick Securities Commission
Nova Scotia Securities Commission
Securities Commission of Newfoundland and Labrador
Superintendent of Securities, Prince Edward Island

Dear Sirs/Mesdames,

CONSENT of QUALIFIED PERSON

I, Yanfang Zhao, consent to the public filing of the technical report titled “Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China”, effective date June 30, 2024 (the “Technical Report”) by Silvercorp Metals Inc. (“Silvercorp”).

I also consent to any extracts from or a summary of the Technical Report in the August 27, 2024, news release of Silvercorp (the “News Release”).

I certify that I have read the News Release being filed by Silvercorp and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible.

Yours faithfully

Original signed by
Yanfang Zhao, MAusIMM

Qualified Person Signature
Principal Consultant (Geology)

Local Offices: Group Offices:
Beijing Africa
Nanchang Asia
Kunming Australia
  Europe
  North America
  South America

 




Exhibit 99.6


SRK Consulting China Ltd
B1301 COFCO Plaza
No.8 Jianguomennei Dajie
Dongcheng District
Beijing, China 100005
 
T: +86 10 6511 1000
F: +86 10 8512 0385
E: china@srk.com
 
www.srk.com

13 September 2024

Toronto Stock Exchange
British Columbia Securities Commission
Alberta Securities Commission
Saskatchewan Financial Services Commission
Manitoba Securities Commission
Ontario Securities Commission
Autorite des marches financiers
New Brunswick Securities Commission
Nova Scotia Securities Commission
Securities Commission of Newfoundland and Labrador
Superintendent of Securities, Prince Edward Island

Dear Sirs/Mesdames,

CONSENT of QUALIFIED PERSON

I, Falong Hu, consent to the public filing of the technical report titled “Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China”, effective date June 30, 2024 (the “Technical Report”) by Silvercorp Metals Inc. (“Silvercorp”).

I also consent to any extracts from or a summary of the Technical Report in the August 27, 2024, news release of Silvercorp (the “News Release”).

I certify that I have read the News Release being filed by Silvercorp and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible.

Yours faithfully

Original signed by
Falong Hu, FAusIMM, PMP

Qualified Person Signature
|Principal Consultant (Mining)

Local Offices: Group Offices:
Beijing Africa
Nanchang Asia
Kunming Australia
  Europe
  North America
  South America

 




Exhibit 99.7


SRK Consulting China Ltd
B1301 COFCO Plaza
No.8 Jianguomennei Dajie
Dongcheng District
Beijing, China 100005
 
T: +86 10 6511 1000
F: +86 10 8512 0385
E: china@srk.com
 
www.srk.com

13 September 2024

Toronto Stock Exchange

British Columbia Securities Commission
Alberta Securities Commission
Saskatchewan Financial Services Commission
Manitoba Securities Commission
Ontario Securities Commission
Autorite des marches financiers
New Brunswick Securities Commission
Nova Scotia Securities Commission
Securities Commission of Newfoundland and Labrador
Superintendent of Securities, Prince Edward Island

Dear Sirs/Mesdames,

CONSENT of QUALIFIED PERSON

I, Mark Wanless, consent to the public filing of the technical report titled “Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China”, effective date June 30, 2024 (the “Technical Report”) by Silvercorp Metals Inc. (“Silvercorp”).

I also consent to any extracts from or a summary of the Technical Report in the August 27, 2024, news release of Silvercorp (the “News Release”).

I certify that I have read the News Release being filed by Silvercorp and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible.

Yours faithfully

Original signed by
Mark Wanless, Pr.Sci,Nat, FGSSA

Qualified Person Signature
Principal Consultant (Geology)