x
|
Quarterly report pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
|
¨
|
Transition report pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
|
|
|
Delaware
|
94-3320693
|
(State or other jurisdiction of
incorporation or organization)
|
(IRS Employer
Identification No.)
|
Large accelerated filer
x
|
Accelerated filer
¨
|
|
|
Non-accelerated filer
¨
(Do not check if a smaller reporting company)
|
Smaller reporting company
¨
|
|
|
Page No.
|
|
|
|
|
|
|
Item 1.
|
|
|
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
Item 2.
|
||
|
|
|
Item 3.
|
||
|
|
|
Item 4.
|
||
|
|
|
|
|
|
|
|
|
Item 1.
|
||
|
|
|
Item 1A.
|
||
|
|
|
Item 2.
|
||
|
|
|
Item 3.
|
||
|
|
|
Item 4.
|
||
|
|
|
Item 5.
|
||
|
|
|
Item 6.
|
PART I.
|
FINANCIAL INFORMATION
|
ITEM 1.
|
FINANCIAL STATEMENTS
|
|
April 30,
2014 |
|
January 31,
2014 |
||||
|
(unaudited)
|
|
|
||||
Assets
|
|
|
|
||||
Current assets:
|
|
|
|
||||
Cash and cash equivalents
|
$
|
827,891
|
|
|
$
|
781,635
|
|
Short-term marketable securities
|
51,233
|
|
|
57,139
|
|
||
Accounts receivable, net
|
684,155
|
|
|
1,360,837
|
|
||
Deferred commissions
|
162,494
|
|
|
171,461
|
|
||
Prepaid expenses and other current assets
|
313,608
|
|
|
309,180
|
|
||
Total current assets
|
2,039,381
|
|
|
2,680,252
|
|
||
Marketable securities, noncurrent
|
650,764
|
|
|
482,243
|
|
||
Property and equipment, net
|
1,251,000
|
|
|
1,240,746
|
|
||
Deferred commissions, noncurrent
|
143,467
|
|
|
153,459
|
|
||
Capitalized software, net
|
455,819
|
|
|
481,917
|
|
||
Goodwill
|
3,500,823
|
|
|
3,500,823
|
|
||
Other assets, net
|
600,090
|
|
|
613,490
|
|
||
Total assets
|
$
|
8,641,344
|
|
|
$
|
9,152,930
|
|
Liabilities, temporary equity and stockholders’ equity
|
|
|
|
||||
Current liabilities:
|
|
|
|
||||
Accounts payable, accrued expenses and other liabilities
|
$
|
766,601
|
|
|
$
|
934,324
|
|
Deferred revenue
|
2,288,324
|
|
|
2,473,705
|
|
||
Convertible 0.75% senior notes, net
|
275,029
|
|
|
542,159
|
|
||
Term loan, current
|
30,000
|
|
|
30,000
|
|
||
Total current liabilities
|
3,359,954
|
|
|
3,980,188
|
|
||
Convertible 0.25% senior notes, net
|
1,052,815
|
|
|
1,046,930
|
|
||
Term loan, noncurrent
|
247,500
|
|
|
255,000
|
|
||
Deferred revenue, noncurrent
|
36,291
|
|
|
48,410
|
|
||
Other noncurrent liabilities
|
802,927
|
|
|
757,187
|
|
||
Total liabilities
|
5,499,487
|
|
|
6,087,715
|
|
||
Temporary equity
|
9,943
|
|
|
26,705
|
|
||
Stockholders’ equity:
|
|
|
|
||||
Common stock
|
614
|
|
|
610
|
|
||
Additional paid-in capital
|
3,556,070
|
|
|
3,363,377
|
|
||
Accumulated other comprehensive income
|
15,298
|
|
|
17,680
|
|
||
Accumulated deficit
|
(440,068
|
)
|
|
(343,157
|
)
|
||
Total stockholders’ equity
|
3,131,914
|
|
|
3,038,510
|
|
||
Total liabilities, temporary equity and stockholders’ equity
|
$
|
8,641,344
|
|
|
$
|
9,152,930
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Revenues:
|
|
|
|
|
||||
Subscription and support
|
$
|
1,147,306
|
|
|
$
|
842,221
|
|
|
Professional services and other
|
79,466
|
|
|
50,412
|
|
|
||
Total revenues
|
1,226,772
|
|
|
892,633
|
|
|
||
Cost of revenues (1)(2):
|
|
|
|
|
||||
Subscription and support
|
208,947
|
|
|
153,550
|
|
|
||
Professional services and other
|
83,358
|
|
|
55,444
|
|
|
||
Total cost of revenues
|
292,305
|
|
|
208,994
|
|
|
||
Gross profit
|
934,467
|
|
|
683,639
|
|
|
||
Operating expenses (1)(2):
|
|
|
|
|
||||
Research and development
|
188,358
|
|
|
131,939
|
|
|
||
Marketing and sales
|
639,355
|
|
|
466,490
|
|
|
||
General and administrative
|
162,095
|
|
|
129,750
|
|
|
||
Total operating expenses
|
989,808
|
|
|
728,179
|
|
|
||
Loss from operations
|
(55,341
|
)
|
|
(44,540
|
)
|
|
||
Investment income
|
1,778
|
|
|
3,354
|
|
|
||
Interest expense
|
(20,359
|
)
|
|
(11,883
|
)
|
|
||
Other expense (3)
|
(10,847
|
)
|
|
(874
|
)
|
|
||
Loss before provision for income taxes
|
(84,769
|
)
|
|
(53,943
|
)
|
|
||
Provision for income taxes
|
(12,142
|
)
|
|
(13,778
|
)
|
|
||
Net loss
|
$
|
(96,911
|
)
|
|
$
|
(67,721
|
)
|
|
Basic net loss per share
|
$
|
(0.16
|
)
|
|
$
|
(0.12
|
)
|
|
Diluted net loss per share
|
$
|
(0.16
|
)
|
|
$
|
(0.12
|
)
|
|
Shares used in computing basic net loss per share
|
612,512
|
|
|
588,385
|
|
|
||
Shares used in computing diluted net loss per share
|
612,512
|
|
|
588,385
|
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Cost of revenues
|
$
|
28,672
|
|
|
$
|
21,305
|
|
|
Marketing and sales
|
14,965
|
|
|
2,460
|
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Cost of revenues
|
$
|
11,810
|
|
|
$
|
10,678
|
|
|
Research and development
|
27,284
|
|
|
24,429
|
|
|
||
Marketing and sales
|
67,133
|
|
|
59,802
|
|
|
||
General and administrative
|
24,865
|
|
|
19,820
|
|
|
(3)
|
Amount includes approximately
$8.5 million
loss on conversions of our convertible
0.75%
senior notes due January 2015 recognized during the three months ended April 30, 2014.
|
|
Three Months Ended
April 30, |
|
||||||
|
2014
|
|
2013
|
|
||||
Net loss
|
$
|
(96,911
|
)
|
|
$
|
(67,721
|
)
|
|
Other comprehensive loss, before tax and net of reclassification adjustments:
|
|
|
|
|
||||
Foreign currency translation and other gains (losses)
|
3,115
|
|
|
(5,760
|
)
|
|
||
Unrealized gains (losses) on investments
|
(5,497
|
)
|
|
1,721
|
|
|
||
Other comprehensive loss, before tax
|
(2,382
|
)
|
|
(4,039
|
)
|
|
||
Tax effect
|
0
|
|
|
628
|
|
|
||
Other comprehensive loss, net of tax
|
(2,382
|
)
|
|
(3,411
|
)
|
|
||
Comprehensive loss
|
$
|
(99,293
|
)
|
|
$
|
(71,132
|
)
|
|
|
Three Months Ended
April 30, |
|
||||||
|
2014
|
|
2013
|
|
||||
Operating activities:
|
|
|
|
|
||||
Net loss
|
$
|
(96,911
|
)
|
|
$
|
(67,721
|
)
|
|
Adjustments to reconcile net loss to net cash provided by operating activities:
|
|
|
|
|
||||
Depreciation and amortization
|
110,808
|
|
|
62,297
|
|
|
||
Amortization of debt discount and transaction costs
|
11,791
|
|
|
9,670
|
|
|
||
Loss on conversions of convertible senior notes
|
8,529
|
|
|
0
|
|
|
||
Amortization of deferred commissions
|
59,855
|
|
|
45,667
|
|
|
||
Expenses related to employee stock plans
|
131,092
|
|
|
114,729
|
|
|
||
Excess tax benefits from employee stock plans
|
(9,041
|
)
|
|
(1,866
|
)
|
|
||
Changes in assets and liabilities, net of business combinations:
|
|
|
|
|
||||
Accounts receivable, net
|
676,682
|
|
|
369,889
|
|
|
||
Deferred commissions
|
(40,896
|
)
|
|
(17,483
|
)
|
|
||
Prepaid expenses, current assets and other assets
|
4,277
|
|
|
(6,350
|
)
|
|
||
Accounts payable, accrued expenses and other liabilities
|
(185,599
|
)
|
|
(95,808
|
)
|
|
||
Deferred revenue
|
(197,500
|
)
|
|
(129,835
|
)
|
|
||
Net cash provided by operating activities
|
473,087
|
|
|
283,189
|
|
|
||
Investing activities:
|
|
|
|
|
||||
Business combinations, net of cash acquired
|
0
|
|
|
(22,161
|
)
|
|
||
Nonrefundable deposit received for land
|
30,000
|
|
|
0
|
|
|
||
Strategic investments
|
(16,246
|
)
|
|
(5,116
|
)
|
|
||
Purchases of marketable securities
|
(250,536
|
)
|
|
(264,287
|
)
|
|
||
Sales of marketable securities
|
79,312
|
|
|
111,740
|
|
|
||
Maturities of marketable securities
|
7,198
|
|
|
14,558
|
|
|
||
Capital expenditures
|
(60,098
|
)
|
|
(54,010
|
)
|
|
||
Net cash used in investing activities
|
(210,370
|
)
|
|
(219,276
|
)
|
|
||
Financing activities:
|
|
|
|
|
||||
Proceeds from borrowings on convertible senior notes, net
|
0
|
|
|
1,132,750
|
|
|
||
Proceeds from issuance of warrants
|
0
|
|
|
84,800
|
|
|
||
Purchase of convertible note hedge
|
0
|
|
|
(153,800
|
)
|
|
||
Proceeds from employee stock plans
|
73,795
|
|
|
66,524
|
|
|
||
Excess tax benefits from employee stock plans
|
9,041
|
|
|
1,866
|
|
|
||
Payments on convertible senior notes
|
(283,892
|
)
|
|
0
|
|
|
||
Principal payments on capital lease obligations
|
(10,594
|
)
|
|
(8,499
|
)
|
|
||
Principal payments on term loan
|
(7,500
|
)
|
|
0
|
|
|
||
Net cash provided by (used in) financing activities
|
(219,150
|
)
|
|
1,123,641
|
|
|
||
Effect of exchange rate changes
|
2,689
|
|
|
(6,809
|
)
|
|
||
Net increase in cash and cash equivalents
|
46,256
|
|
|
1,180,745
|
|
|
||
Cash and cash equivalents, beginning of period
|
781,635
|
|
|
747,245
|
|
|
||
Cash and cash equivalents, end of period
|
$
|
827,891
|
|
|
$
|
1,927,990
|
|
|
Supplemental cash flow disclosure:
|
|
|
|
|
||||
Cash paid during the period for:
|
|
|
|
|
||||
Interest
|
$
|
8,667
|
|
|
$
|
642
|
|
|
Income taxes, net of tax refunds
|
$
|
9,994
|
|
|
$
|
17,283
|
|
|
Non-cash financing and investing activities:
|
|
|
|
|
||||
Fixed assets acquired under capital leases
|
$
|
5,886
|
|
|
$
|
6,557
|
|
|
Building in progress - leased facility acquired under financing obligation
|
$
|
12,760
|
|
|
$
|
0
|
|
|
•
|
the best estimate of selling price of the deliverables included in multiple deliverable revenue arrangements,
|
•
|
the fair value of assets acquired and liabilities assumed for business combinations,
|
•
|
the recognition, measurement and valuation of current and deferred income taxes,
|
•
|
the recognition and measurement of loss contingencies,
|
•
|
the fair value of the convertible notes,
|
•
|
the fair value of stock awards issued and related forfeiture rates,
|
•
|
the valuation of strategic investments and the determination of other-than-temporary impairments,
|
•
|
the estimate of real estate sublease rental rates and market conditions, and
|
•
|
the assessment of recoverability of long-lived assets (property and equipment, goodwill and identified intangibles).
|
|
Three Months Ended
April 30, |
|
||||||
|
2014
|
|
2013
|
|
||||
Americas
|
$
|
876,377
|
|
|
$
|
631,108
|
|
|
Europe
|
230,810
|
|
|
162,826
|
|
|
||
Asia Pacific
|
119,585
|
|
|
98,699
|
|
|
||
|
$
|
1,226,772
|
|
|
$
|
892,633
|
|
|
•
|
there is persuasive evidence of an arrangement;
|
•
|
the service has been or is being provided to the customer;
|
•
|
the collection of the fees is reasonably assured; and
|
•
|
the amount of fees to be paid by the customer is fixed or determinable.
|
Computer, equipment and software
|
3 to 9 years
|
Furniture and fixtures
|
5 years
|
Leasehold improvements
|
Shorter of the lease term or 10 years
|
Building improvements
|
Amortized over the estimated useful lives of the respective assets when they are ready for their intended use.
|
|
Three Months Ended
April 30, |
|
|
|||||||
Stock Options
|
2014
|
|
|
2013
|
|
|
||||
Volatility
|
37
|
|
%
|
|
43
|
|
%
|
|
||
Estimated life
|
3.5 years
|
|
|
|
3.7 years
|
|
|
|
||
Risk-free interest rate
|
1.20-1.39
|
|
%
|
|
0.52-0.59
|
|
%
|
|
||
Weighted-average fair value per share of grants
|
$
|
16.93
|
|
|
|
$
|
13.47
|
|
|
|
|
|
|
|
|
|
|
Investments classified as Marketable Securities
|
Amortized
Cost
|
|
Unrealized
Gains
|
|
Unrealized
Losses
|
|
Fair Value
|
||||||||
Corporate notes and obligations
|
$
|
417,693
|
|
|
$
|
1,510
|
|
|
$
|
(137
|
)
|
|
$
|
419,066
|
|
U.S. treasury securities
|
42,705
|
|
|
20
|
|
|
(3
|
)
|
|
42,722
|
|
||||
Mortgage backed obligations
|
35,811
|
|
|
238
|
|
|
(96
|
)
|
|
35,953
|
|
||||
Asset backed securities
|
70,401
|
|
|
74
|
|
|
(34
|
)
|
|
70,441
|
|
||||
Municipal securities
|
2,999
|
|
|
1
|
|
|
(3
|
)
|
|
2,997
|
|
||||
Foreign government obligations
|
24,495
|
|
|
205
|
|
|
0
|
|
|
24,700
|
|
||||
U.S. agency obligations
|
23,717
|
|
|
11
|
|
|
(17
|
)
|
|
23,711
|
|
||||
Covered bonds
|
81,573
|
|
|
836
|
|
|
(2
|
)
|
|
82,407
|
|
||||
Total marketable securities
|
$
|
699,394
|
|
|
$
|
2,895
|
|
|
$
|
(292
|
)
|
|
$
|
701,997
|
|
Investments classified as Marketable Securities
|
Amortized
Cost
|
|
Unrealized
Gains
|
|
Unrealized
Losses
|
|
Fair Value
|
||||||||
Corporate notes and obligations
|
$
|
340,706
|
|
|
$
|
1,314
|
|
|
$
|
(170
|
)
|
|
$
|
341,850
|
|
U.S. treasury securities
|
16,016
|
|
|
28
|
|
|
0
|
|
|
16,044
|
|
||||
Mortgage backed obligations
|
24,888
|
|
|
281
|
|
|
(93
|
)
|
|
25,076
|
|
||||
Asset backed securities
|
38,213
|
|
|
39
|
|
|
(35
|
)
|
|
38,217
|
|
||||
Municipal securities
|
2,000
|
|
|
1
|
|
|
(3
|
)
|
|
1,998
|
|
||||
Foreign government obligations
|
24,305
|
|
|
171
|
|
|
(2
|
)
|
|
24,474
|
|
||||
U.S. agency obligations
|
14,726
|
|
|
9
|
|
|
(10
|
)
|
|
14,725
|
|
||||
Covered bonds
|
76,282
|
|
|
717
|
|
|
(1
|
)
|
|
76,998
|
|
||||
Total marketable securities
|
$
|
537,136
|
|
|
$
|
2,560
|
|
|
$
|
(314
|
)
|
|
$
|
539,382
|
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Recorded as follows:
|
|
|
|
||||
Short-term (due in one year or less)
|
$
|
51,233
|
|
|
$
|
57,139
|
|
Long-term (due after one year)
|
650,764
|
|
|
482,243
|
|
||
|
$
|
701,997
|
|
|
$
|
539,382
|
|
|
Less than 12 Months
|
|
12 Months or Greater
|
|
Total
|
||||||||||||||||||
|
Fair Value
|
|
Unrealized
Losses
|
|
Fair Value
|
|
Unrealized
Losses
|
|
Fair Value
|
|
Unrealized
Losses
|
||||||||||||
Corporate notes and obligations
|
$
|
93,208
|
|
|
$
|
(137
|
)
|
|
$
|
0
|
|
|
$
|
0
|
|
|
$
|
93,208
|
|
|
$
|
(137
|
)
|
U.S. treasury securities
|
32,147
|
|
|
(3
|
)
|
|
0
|
|
|
0
|
|
|
32,147
|
|
|
(3
|
)
|
||||||
Mortgage backed obligations
|
16,451
|
|
|
(80
|
)
|
|
1,861
|
|
|
(16
|
)
|
|
18,312
|
|
|
(96
|
)
|
||||||
Asset backed securities
|
16,170
|
|
|
(31
|
)
|
|
1,676
|
|
|
(3
|
)
|
|
17,846
|
|
|
(34
|
)
|
||||||
Municipal securities
|
1,997
|
|
|
(3
|
)
|
|
0
|
|
|
0
|
|
|
1,997
|
|
|
(3
|
)
|
||||||
U.S. agency obligations
|
14,713
|
|
|
(17
|
)
|
|
0
|
|
|
0
|
|
|
14,713
|
|
|
(17
|
)
|
||||||
Covered bonds
|
2,070
|
|
|
(2
|
)
|
|
0
|
|
|
0
|
|
|
2,070
|
|
|
(2
|
)
|
||||||
|
$
|
176,756
|
|
|
$
|
(273
|
)
|
|
$
|
3,537
|
|
|
$
|
(19
|
)
|
|
$
|
180,293
|
|
|
$
|
(292
|
)
|
Description
|
Quoted Prices in
Active Markets
for Identical Assets
(Level 1)
|
|
Significant Other
Observable
Inputs
(Level 2)
|
|
Significant
Unobservable
Inputs
(Level 3)
|
|
Balances as of
April 30, 2014
|
||||||||
Cash equivalents (1):
|
|
|
|
|
|
|
|
||||||||
Time deposits
|
$
|
0
|
|
|
$
|
102,773
|
|
|
$
|
0
|
|
|
$
|
102,773
|
|
Money market mutual funds
|
237,395
|
|
|
0
|
|
|
0
|
|
|
237,395
|
|
||||
Marketable securities:
|
|
|
|
|
|
|
|
||||||||
Corporate notes and obligations
|
0
|
|
|
419,066
|
|
|
0
|
|
|
419,066
|
|
||||
U.S. treasury securities
|
0
|
|
|
42,722
|
|
|
0
|
|
|
42,722
|
|
||||
Mortgage backed obligations
|
0
|
|
|
35,953
|
|
|
0
|
|
|
35,953
|
|
||||
Asset backed securities
|
0
|
|
|
70,441
|
|
|
0
|
|
|
70,441
|
|
||||
Municipal securities
|
0
|
|
|
2,997
|
|
|
0
|
|
|
2,997
|
|
||||
Foreign government obligations
|
0
|
|
|
24,700
|
|
|
0
|
|
|
24,700
|
|
||||
U.S. agency obligations
|
0
|
|
|
23,711
|
|
|
0
|
|
|
23,711
|
|
||||
Covered bonds
|
0
|
|
|
82,407
|
|
|
0
|
|
|
82,407
|
|
||||
Foreign currency derivative contracts (2)
|
0
|
|
|
550
|
|
|
0
|
|
|
550
|
|
||||
Total Assets
|
$
|
237,395
|
|
|
$
|
805,320
|
|
|
$
|
0
|
|
|
$
|
1,042,715
|
|
Liabilities
|
|
|
|
|
|
|
|
||||||||
Foreign currency derivative contracts (3)
|
$
|
0
|
|
|
$
|
1,482
|
|
|
$
|
0
|
|
|
$
|
1,482
|
|
Total Liabilities
|
$
|
0
|
|
|
$
|
1,482
|
|
|
$
|
0
|
|
|
$
|
1,482
|
|
Description
|
Quoted Prices in
Active Markets
for Identical Assets
(Level 1)
|
|
Significant Other
Observable Inputs (Level 2)
|
|
Significant
Unobservable
Inputs
(Level 3)
|
|
Balances as of
January 31, 2014
|
||||||||
Cash equivalents (1):
|
|
|
|
|
|
|
|
||||||||
Time deposits
|
$
|
0
|
|
|
$
|
212,700
|
|
|
$
|
0
|
|
|
$
|
212,700
|
|
Money market mutual funds
|
87,898
|
|
|
0
|
|
|
0
|
|
|
87,898
|
|
||||
Marketable securities:
|
|
|
|
|
|
|
|
||||||||
Corporate notes and obligations
|
0
|
|
|
341,850
|
|
|
0
|
|
|
341,850
|
|
||||
U.S. treasury securities
|
0
|
|
|
16,044
|
|
|
0
|
|
|
16,044
|
|
||||
Mortgage backed obligations
|
0
|
|
|
25,076
|
|
|
0
|
|
|
25,076
|
|
||||
Asset backed securities
|
0
|
|
|
38,217
|
|
|
0
|
|
|
38,217
|
|
||||
Municipal securities
|
0
|
|
|
1,998
|
|
|
0
|
|
|
1,998
|
|
||||
Foreign government obligations
|
0
|
|
|
24,474
|
|
|
0
|
|
|
24,474
|
|
||||
U.S. agency obligations
|
0
|
|
|
14,725
|
|
|
0
|
|
|
14,725
|
|
||||
Covered bonds
|
0
|
|
|
76,998
|
|
|
0
|
|
|
76,998
|
|
||||
Foreign currency derivative contracts (2)
|
0
|
|
|
1,598
|
|
|
0
|
|
|
1,598
|
|
||||
Total Assets
|
$
|
87,898
|
|
|
$
|
753,680
|
|
|
$
|
0
|
|
|
$
|
841,578
|
|
Liabilities
|
|
|
|
|
|
|
|
||||||||
Foreign currency derivative contracts (3)
|
$
|
0
|
|
|
$
|
1,801
|
|
|
$
|
0
|
|
|
$
|
1,801
|
|
Total Liabilities
|
$
|
0
|
|
|
$
|
1,801
|
|
|
$
|
0
|
|
|
$
|
1,801
|
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Notional amount of foreign currency derivative contracts
|
$
|
460,640
|
|
|
$
|
563,060
|
|
Fair value of foreign currency derivative contracts
|
$
|
(932
|
)
|
|
$
|
(203
|
)
|
|
|
Fair Value of Derivative Instruments
|
||||||
|
|
As of
|
||||||
|
Balance Sheet Location
|
April 30, 2014
|
|
January 31, 2014
|
||||
Derivative Assets
|
|
|
|
|
||||
Derivatives not designated as hedging instruments:
|
|
|
|
|
||||
Foreign currency derivative contracts
|
Prepaid expenses and other current assets
|
$
|
550
|
|
|
$
|
1,598
|
|
Derivative Liabilities
|
|
|
|
|
||||
Derivatives not designated as hedging instruments:
|
|
|
|
|
||||
Foreign currency derivative contracts
|
Accounts payable, accrued expenses and other liabilities
|
$
|
1,482
|
|
|
$
|
1,801
|
|
|
|
|
|
|
|
|
Three Months Ended
April 30, |
|
||||||
|
2014
|
|
2013
|
|
||||
Interest income
|
$
|
1,764
|
|
|
$
|
3,397
|
|
|
Realized gains
|
117
|
|
|
638
|
|
|
||
Realized losses
|
(103
|
)
|
|
(681
|
)
|
|
||
Total investment income
|
$
|
1,778
|
|
|
$
|
3,354
|
|
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Land
|
$
|
248,263
|
|
|
$
|
248,263
|
|
Building improvements
|
49,572
|
|
|
49,572
|
|
||
Computers, equipment and software
|
961,675
|
|
|
931,171
|
|
||
Furniture and fixtures
|
65,021
|
|
|
58,956
|
|
||
Leasehold improvements
|
313,535
|
|
|
296,390
|
|
||
Building in progress—leased facility
|
52,931
|
|
|
40,171
|
|
||
|
1,690,997
|
|
|
1,624,523
|
|
||
Less accumulated depreciation and amortization
|
(439,997
|
)
|
|
(383,777
|
)
|
||
|
$
|
1,251,000
|
|
|
$
|
1,240,746
|
|
|
Par Value
|
|
Equity
Component Recorded at Issuance
|
|
Liability Component of Par Value as of
|
||||||||||
(In thousands)
|
April 30, 2014
|
|
January 31, 2014
|
||||||||||||
0.75% Convertible Senior Notes due January 15, 2015
|
$
|
284,972
|
|
|
$
|
125,530
|
|
(1)
|
$
|
275,029
|
|
|
$
|
542,159
|
|
0.25% Convertible Senior Notes due April 1, 2018
|
1,150,000
|
|
|
122,421
|
|
(2)
|
1,052,815
|
|
|
1,046,930
|
|
|
Conversion
Rate per $1,000
Par Value
|
|
Initial
Conversion
Price per
Share
|
|
Convertible Date
|
|||
0.75% Senior Notes
|
46.8588
|
|
|
$
|
21.34
|
|
|
October 15, 2014
|
0.25% Senior Notes
|
15.0512
|
|
|
$
|
66.44
|
|
|
January 1, 2018
|
•
|
during any fiscal quarter, if, for at least
20
trading days during the
30
consecutive trading day period ending on the last trading day of the immediately preceding fiscal quarter, the last reported sales price of the Company’s common stock for such trading day is greater than or equal to
130%
of the applicable conversion price on such trading day share of common stock on such last trading day;
|
•
|
in certain situations, when the trading price of the Notes is less than
98%
of the product of the sale price of the Company’s common stock and the conversion rate;
|
•
|
upon the occurrence of specified corporate transactions described under the Notes Indenture, such as a consolidation, merger or binding share exchange; or
|
•
|
at any time on or after the convertible dates noted above.
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Liability component :
|
|
|
|
||||
Principal:
|
|
|
|
||||
0.75% Senior Notes (1)
|
$
|
284,972
|
|
|
$
|
568,864
|
|
0.25% Senior Notes (1)
|
1,150,000
|
|
|
1,150,000
|
|
||
Less: debt discount, net
|
|
|
|
||||
0.75% Senior Notes (2)
|
(9,943
|
)
|
|
(26,705
|
)
|
||
0.25% Senior Notes (3)
|
(97,185
|
)
|
|
(103,070
|
)
|
||
Net carrying amount
|
$
|
1,327,844
|
|
|
$
|
1,589,089
|
|
(in thousands, except for shares)
|
Date
|
|
Purchase
|
|
Shares
|
|||
0.75% Note Hedges
|
January 2010
|
|
$
|
126,500
|
|
|
26,943,812
|
|
0.25% Note Hedges
|
March 2013
|
|
$
|
153,800
|
|
|
17,308,880
|
|
|
Date
|
|
Proceeds
(in thousands)
|
|
Shares
|
|
Strike
Price
|
|||||
0.75% Warrants
|
January 2010
|
|
$
|
59,300
|
|
|
26,943,812
|
|
|
$
|
29.88
|
|
0.25% Warrants
|
March 2013
|
|
$
|
84,800
|
|
|
17,308,880
|
|
|
$
|
90.40
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Contractual interest expense
|
$
|
2,903
|
|
|
$
|
1,415
|
|
|
Amortization of debt issuance costs
|
1,228
|
|
|
741
|
|
|
||
Amortization of debt discount
|
10,984
|
|
|
9,240
|
|
|
||
|
$
|
15,115
|
|
|
$
|
11,396
|
|
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Deferred income taxes, net
|
$
|
48,556
|
|
|
$
|
49,279
|
|
Prepaid income taxes
|
22,838
|
|
|
23,571
|
|
||
Customer contract asset
|
54,360
|
|
|
77,368
|
|
||
Prepaid expenses and other current assets
|
187,854
|
|
|
158,962
|
|
||
|
$
|
313,608
|
|
|
$
|
309,180
|
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Capitalized internal-use software development costs, net of accumulated amortization of $109,994 and $101,687, respectively
|
$
|
77,169
|
|
|
$
|
72,915
|
|
Acquired developed technology, net of accumulated amortization of $324,980 and $294,628, respectively
|
378,650
|
|
|
409,002
|
|
||
|
$
|
455,819
|
|
|
$
|
481,917
|
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Deferred income taxes, noncurrent, net
|
$
|
9,738
|
|
|
$
|
9,691
|
|
Long-term deposits
|
18,027
|
|
|
17,970
|
|
||
Purchased intangible assets, net of accumulated amortization of $81,557 and $66,399, respectively
|
400,962
|
|
|
416,119
|
|
||
Acquired intellectual property, net of accumulated amortization of $12,479 and $11,304, respectively
|
11,967
|
|
|
11,957
|
|
||
Strategic investments
|
102,439
|
|
|
92,489
|
|
||
Customer contract asset
|
10,989
|
|
|
18,182
|
|
||
Other
|
45,968
|
|
|
47,082
|
|
||
|
$
|
600,090
|
|
|
$
|
613,490
|
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Accounts payable
|
$
|
36,723
|
|
|
$
|
64,988
|
|
Accrued compensation
|
259,517
|
|
|
397,002
|
|
||
Accrued other liabilities
|
274,792
|
|
|
235,543
|
|
||
Accrued income and other taxes payable
|
123,292
|
|
|
153,026
|
|
||
Accrued professional costs
|
19,309
|
|
|
15,864
|
|
||
Customer liability, current
|
38,077
|
|
|
53,957
|
|
||
Accrued rent
|
14,891
|
|
|
13,944
|
|
||
|
$
|
766,601
|
|
|
$
|
934,324
|
|
|
As of
|
||||||
|
April 30,
2014 |
|
January 31,
2014 |
||||
Deferred income taxes and income taxes payable
|
$
|
106,420
|
|
|
$
|
108,760
|
|
Customer liability, noncurrent
|
8,897
|
|
|
13,953
|
|
||
Financing obligation, building in progress-leased facility
|
52,931
|
|
|
40,171
|
|
||
Long-term lease liabilities and other
|
634,679
|
|
|
594,303
|
|
||
|
$
|
802,927
|
|
|
$
|
757,187
|
|
|
|
|
Options Outstanding
|
||||||||||
|
Shares
Available for
Grant
|
|
Outstanding
Stock
Options
|
|
Weighted-
Average
Exercise Price
|
|
Aggregate
Intrinsic Value
(in thousands)
|
||||||
Balance as of January 31, 2014
|
55,852,536
|
|
|
28,604,045
|
|
|
$
|
34.26
|
|
|
|
||
Increase in shares authorized:
|
|
|
|
|
|
|
|
||||||
2013 Equity Incentive Plan
|
1,186,551
|
|
|
0
|
|
|
0.00
|
|
|
|
|||
Options granted under all plans
|
(536,057
|
)
|
|
536,057
|
|
|
58.31
|
|
|
|
|||
Restricted stock activity
|
(880,568
|
)
|
|
0
|
|
|
0.00
|
|
|
|
|||
Stock grants to board and advisory board members
|
(67,080
|
)
|
|
0
|
|
|
0.00
|
|
|
|
|||
Exercised
|
0
|
|
|
(1,785,330
|
)
|
|
21.69
|
|
|
|
|||
Plan shares expired
|
(775,831
|
)
|
|
0
|
|
|
0.00
|
|
|
|
|||
Cancelled
|
328,647
|
|
|
(328,647
|
)
|
|
26.01
|
|
|
|
|||
Balance as of April 30, 2014
|
55,108,198
|
|
|
27,026,125
|
|
|
35.67
|
|
|
$
|
440,360
|
|
|
Vested or expected to vest
|
|
|
25,550,631
|
|
|
$
|
35.21
|
|
|
$
|
427,122
|
|
|
Exercisable as of April 30, 2014
|
|
|
10,647,678
|
|
|
$
|
27.72
|
|
|
$
|
254,804
|
|
|
|
Options Outstanding
|
|
Options Exercisable
|
||||||||||||
Range of Exercise
Prices
|
|
Number
Outstanding
|
|
Weighted-
Average
Remaining
Contractual Life
(Years)
|
|
Weighted-
Average
Exercise
Price
|
|
Number of
Shares
|
|
Weighted-
Average
Exercise
Price
|
||||||
$0.26 to $22.12
|
|
3,921,342
|
|
|
3.0
|
|
$
|
12.61
|
|
|
3,045,518
|
|
|
$
|
12.53
|
|
$22.98 to $27.06
|
|
3,861,549
|
|
|
3.2
|
|
26.79
|
|
|
1,851,121
|
|
|
26.85
|
|
||
$27.56 to $35.07
|
|
1,638,794
|
|
|
3.7
|
|
31.42
|
|
|
588,732
|
|
|
31.80
|
|
||
$35.63
|
|
4,190,536
|
|
|
1.6
|
|
35.63
|
|
|
3,297,395
|
|
|
35.63
|
|
||
$35.87 to $39.09
|
|
6,122,454
|
|
|
3.4
|
|
38.05
|
|
|
1,817,970
|
|
|
38.01
|
|
||
$40.19 to $52.14
|
|
879,377
|
|
|
5.5
|
|
42.94
|
|
|
46,942
|
|
|
42.30
|
|
||
$52.30 to $63.66
|
|
6,412,073
|
|
|
6.6
|
|
52.97
|
|
|
0
|
|
|
0.00
|
|
||
|
|
27,026,125
|
|
|
3.9
|
|
$
|
35.67
|
|
|
10,647,678
|
|
|
$
|
27.72
|
|
|
Restricted Stock Outstanding
|
|||||||||
|
Outstanding
|
|
Weighted-
Average
Exercise Price
|
|
Aggregate
Intrinsic
Value
(in thousands)
|
|||||
Balance as of January 31, 2014
|
24,653,578
|
|
|
$
|
0.001
|
|
|
|
||
Granted
|
831,288
|
|
|
0.001
|
|
|
|
|||
Cancelled
|
(701,260
|
)
|
|
0.001
|
|
|
|
|||
Vested and converted to shares
|
(2,011,456
|
)
|
|
0.001
|
|
|
|
|||
Balance as of April 30, 2014
|
22,772,150
|
|
|
$
|
0.001
|
|
|
$
|
1,176,182
|
|
Expected to vest
|
19,426,360
|
|
|
|
|
$
|
1,003,371
|
|
Options outstanding
|
27,026,125
|
|
Restricted stock awards and units outstanding
|
22,772,150
|
|
Stock available for future grant:
|
|
|
2013 Equity Incentive Plan
|
54,825,805
|
|
2006 Inducement Equity Incentive Plan
|
282,393
|
|
2004 Employee Stock Purchase Plan
|
6,114,165
|
|
Convertible senior notes
|
30,662,326
|
|
Warrants
|
44,252,692
|
|
|
185,935,656
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Numerator:
|
|
|
|
|
||||
Net loss
|
$
|
(96,911
|
)
|
|
$
|
(67,721
|
)
|
|
Denominator:
|
|
|
|
|
||||
Weighted-average shares outstanding for basic loss per share
|
612,512
|
|
|
588,385
|
|
|
||
Effect of dilutive securities:
|
|
|
|
|
||||
Convertible senior notes
|
0
|
|
|
0
|
|
|
||
Employee stock awards
|
0
|
|
|
0
|
|
|
||
Warrants
|
0
|
|
|
0
|
|
|
||
Adjusted weighted-average shares outstanding and assumed conversions for diluted loss per share
|
612,512
|
|
|
588,385
|
|
|
|
Three Months Ended April 30,
|
|
||||
|
2014
|
|
2013
|
|
||
Stock awards
|
20,472
|
|
|
20,279
|
|
|
Convertible senior notes
|
30,662
|
|
|
44,248
|
|
|
Warrants
|
44,253
|
|
|
44,253
|
|
|
|
Capital
Leases
|
|
Operating
Leases
|
|
Financing Obligation, Building in Progress-Leased Facility(1)
|
||||||
Fiscal Period:
|
|
|
|
|
|
||||||
Remaining nine months of fiscal 2015
|
$
|
62,622
|
|
|
$
|
162,059
|
|
|
$
|
0
|
|
Fiscal 2016
|
74,140
|
|
|
207,371
|
|
|
1,777
|
|
|||
Fiscal 2017
|
75,803
|
|
|
175,335
|
|
|
16,877
|
|
|||
Fiscal 2018
|
83,843
|
|
|
142,830
|
|
|
21,107
|
|
|||
Fiscal 2019
|
99,908
|
|
|
150,971
|
|
|
21,551
|
|
|||
Thereafter
|
200,067
|
|
|
1,125,631
|
|
|
274,512
|
|
|||
Total minimum lease payments
|
596,383
|
|
|
$
|
1,964,197
|
|
|
$
|
335,824
|
|
|
Less: amount representing interest
|
(82,847
|
)
|
|
|
|
|
|||||
Present value of capital lease obligations
|
$
|
513,536
|
|
|
|
|
|
ITEM 2.
|
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
|
•
|
strengthening our market-leading solutions;
|
•
|
extending distribution into high-growth markets;
|
•
|
expanding relationships with our existing customer base;
|
•
|
pursuing new customers;
|
•
|
reducing our attrition rates;
|
•
|
building our business in top markets globally, which includes building partnerships that help add customers; and
|
•
|
encouraging the development of third-party applications on our cloud computing platforms.
|
Sales Cloud
|
$
|
576.6
|
|
|
Service Cloud
|
294.8
|
|
|
|
ExactTarget Marketing Cloud
|
111.0
|
|
|
|
Salesforce1 Platform and Other
|
164.9
|
|
|
|
Total
|
$
|
1,147.3
|
|
|
(in thousands)
|
April 30,
2014 |
|
|
|
|
|
|
||
Fiscal 2015
|
|
|
|
|
|
|
|
||
Accounts receivable, net
|
$
|
684,155
|
|
|
|
|
|
|
|
Deferred revenue, current and noncurrent
|
2,324,615
|
|
|
|
|
|
|
|
(in thousands)
|
April 30,
2013
|
|
July 31,
2013
|
|
October 31,
2013
|
|
January 31,
2014
|
||||||||
Fiscal 2014
|
|
|
|
|
|
|
|
||||||||
Accounts receivable, net
|
$
|
502,609
|
|
|
$
|
599,543
|
|
|
$
|
604,045
|
|
|
$
|
1,360,837
|
|
Deferred revenue, current and noncurrent
|
1,733,160
|
|
|
1,789,648
|
|
|
1,734,619
|
|
|
2,522,115
|
|
(in thousands)
|
April 30,
2012
|
|
July 31,
2012
|
|
October 31,
2012
|
|
January 31,
2013
|
||||||||
Fiscal 2013
|
|
|
|
|
|
|
|
||||||||
Accounts receivable, net
|
$
|
371,395
|
|
|
$
|
446,917
|
|
|
$
|
418,590
|
|
|
$
|
872,634
|
|
Deferred revenue, current and noncurrent
|
1,334,716
|
|
|
1,337,184
|
|
|
1,291,703
|
|
|
1,862,995
|
|
•
|
there is persuasive evidence of an arrangement;
|
•
|
the service has been or is being provided to the customer;
|
•
|
the collection of the fees is reasonably assured; and
|
•
|
the amount of fees to be paid by the customer is fixed or determinable.
|
•
|
future expected cash flows from subscription and support contracts, professional services contracts, other customer contracts and acquired developed technologies and patents;
|
•
|
the acquired company’s trade name, trademark and existing customer relationship, as well as assumptions about the period of time the acquired trade name and trademark will continue to be used in our offerings;
|
•
|
uncertain tax positions and tax related valuation allowances assumed; and
|
•
|
discount rates.
|
•
|
The estimated life for the stock options which is estimated based on an actual analysis of expected life. The estimated life for shares issued pursuant to our ESPP is based on the two purchase periods within the 12 month offering period;
|
•
|
The risk free interest rate which is based on the rate for a U.S. government security with the same estimated life at the time of the option grant and the stock purchase rights;
|
•
|
The future stock price volatility which is estimated considering both our observed option-implied volatilities and our historical volatility calculations. We believe this is the best estimate of the expected volatility over the expected life of our stock options and stock purchase rights; and
|
•
|
The probability of performance conditions, if any, that affect the vesting of certain awards being achieved. Expense is only recognized for those shares expected to vest.
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Revenues:
|
|
|
|
|
||||
Subscription and support
|
$
|
1,147,306
|
|
|
$
|
842,221
|
|
|
Professional services and other
|
79,466
|
|
|
50,412
|
|
|
||
Total revenues
|
1,226,772
|
|
|
892,633
|
|
|
||
Cost of revenues:
|
|
|
|
|
||||
Subscription and support
|
208,947
|
|
|
153,550
|
|
|
||
Professional services and other
|
83,358
|
|
|
55,444
|
|
|
||
Total cost of revenues
|
292,305
|
|
|
208,994
|
|
|
||
Gross profit
|
934,467
|
|
|
683,639
|
|
|
||
Operating expenses:
|
|
|
|
|
||||
Research and development
|
188,358
|
|
|
131,939
|
|
|
||
Marketing and sales
|
639,355
|
|
|
466,490
|
|
|
||
General and administrative
|
162,095
|
|
|
129,750
|
|
|
||
Total operating expenses
|
989,808
|
|
|
728,179
|
|
|
||
Loss from operations
|
(55,341
|
)
|
|
(44,540
|
)
|
|
||
Investment income
|
1,778
|
|
|
3,354
|
|
|
||
Interest expense
|
(20,359
|
)
|
|
(11,883
|
)
|
|
||
Other expense (1)
|
(10,847
|
)
|
|
(874
|
)
|
|
||
Loss before provision for income taxes
|
(84,769
|
)
|
|
(53,943
|
)
|
|
||
Provision for income taxes
|
(12,142
|
)
|
|
(13,778
|
)
|
|
||
Net loss
|
$
|
(96,911
|
)
|
|
$
|
(67,721
|
)
|
|
(1)
|
Amount includes approximately $8.5 million loss on conversions of our convertible 0.75% senior notes due January 2015 recognized during the three months ended April 30, 2014.
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Cost of revenues
|
$
|
28,672
|
|
|
$
|
21,305
|
|
|
Marketing and sales
|
14,965
|
|
|
2,460
|
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Cost of revenues
|
$
|
11,810
|
|
|
$
|
10,678
|
|
|
Research and development
|
27,284
|
|
|
24,429
|
|
|
||
Marketing and sales
|
67,133
|
|
|
59,802
|
|
|
||
General and administrative
|
24,865
|
|
|
19,820
|
|
|
|
Three Months Ended April 30,
|
|
||||
|
2014
|
|
2013
|
|
||
Amortization of purchased intangibles:
|
|
|
|
|
||
Cost of revenues
|
2
|
%
|
|
2
|
%
|
|
Marketing and sales
|
1
|
|
|
0
|
|
|
|
Three Months Ended April 30,
|
|
||||
|
2014
|
|
2013
|
|
||
Stock-based awards:
|
|
|
|
|
||
Cost of revenues
|
1
|
%
|
|
1
|
%
|
|
Research and development
|
2
|
|
|
3
|
|
|
Marketing and sales
|
5
|
|
|
7
|
|
|
General and administrative
|
2
|
|
|
2
|
|
|
|
Three Months Ended April 30,
|
|
||||
|
2014
|
|
2013
|
|
||
Revenues by geography:
|
|
|
|
|
||
Americas
|
71
|
%
|
|
71
|
%
|
|
Europe
|
19
|
|
|
18
|
|
|
Asia Pacific
|
10
|
|
|
11
|
|
|
|
100
|
%
|
|
100
|
%
|
|
|
Three Months Ended
April 30, 2014 compared to Three Months Ended April 30, 2013 |
|
Three Months Ended
April 30, 2013 compared to Three Months Ended April 30, 2012 |
||
Revenue constant currency growth rates
(as compared to the comparable prior periods)
|
|
|
|
||
Americas
|
39
|
%
|
|
30
|
%
|
Europe
|
35
|
%
|
|
38
|
%
|
Asia Pacific
|
26
|
%
|
|
17
|
%
|
Total growth
|
37
|
%
|
|
30
|
%
|
|
Three Months Ended April 30,
|
|
Variance
|
|||||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
|
Percent
|
|||||||
Subscription and support
|
$
|
1,147,306
|
|
|
$
|
842,221
|
|
|
$
|
305,085
|
|
|
36
|
%
|
Professional services and other
|
79,466
|
|
|
50,412
|
|
|
29,054
|
|
|
58
|
%
|
|||
Total revenues
|
$
|
1,226,772
|
|
|
$
|
892,633
|
|
|
$
|
334,139
|
|
|
37
|
%
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
Subscription and support
|
$
|
208,947
|
|
|
$
|
153,550
|
|
|
$
|
55,397
|
|
Professional services and other
|
83,358
|
|
|
55,444
|
|
|
27,914
|
|
|||
Total cost of revenues
|
$
|
292,305
|
|
|
$
|
208,994
|
|
|
$
|
83,311
|
|
Percent of total revenues
|
24
|
%
|
|
23
|
%
|
|
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
Research and development
|
$
|
188,358
|
|
|
$
|
131,939
|
|
|
$
|
56,419
|
|
Percent of total revenues
|
16
|
%
|
|
15
|
%
|
|
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
Marketing and sales
|
$
|
639,355
|
|
|
$
|
466,490
|
|
|
$
|
172,865
|
|
Percent of total revenues
|
52
|
%
|
|
52
|
%
|
|
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
General and administrative
|
$
|
162,095
|
|
|
$
|
129,750
|
|
|
$
|
32,345
|
|
Percent of total revenues
|
13
|
%
|
|
15
|
%
|
|
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
Loss from operations
|
$
|
(55,341
|
)
|
|
$
|
(44,540
|
)
|
|
$
|
(10,801
|
)
|
Percent of total revenues
|
(5
|
)%
|
|
(5
|
)%
|
|
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
Investment income
|
$
|
1,778
|
|
|
$
|
3,354
|
|
|
$
|
(1,576
|
)
|
Percent of total revenues
|
0
|
%
|
|
0
|
%
|
|
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
Interest expense
|
$
|
(20,359
|
)
|
|
$
|
(11,883
|
)
|
|
$
|
(8,476
|
)
|
Percent of total revenues
|
(1
|
)%
|
|
(1
|
)%
|
|
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
Other expense
|
$
|
(10,847
|
)
|
|
$
|
(874
|
)
|
|
$
|
(9,973
|
)
|
Percent of total revenues
|
(1
|
)%
|
|
0
|
%
|
|
|
|
Three Months Ended April 30,
|
|
Variance
|
||||||||
(in thousands)
|
2014
|
|
2013
|
|
Dollars
|
||||||
Provision for income taxes
|
$
|
(12,142
|
)
|
|
$
|
(13,778
|
)
|
|
$
|
1,636
|
|
Effective tax rate
|
(14
|
)%
|
|
(26
|
)%
|
|
|
|
Capital
Leases |
|
Operating
Leases |
|
Financing Obligation, Building in Progress-Leased Facility
|
||||||
Fiscal Period:
|
|
|
|
|
|
||||||
Remaining nine months of fiscal 2015
|
$
|
62,622
|
|
|
$
|
162,059
|
|
|
$
|
0
|
|
Fiscal 2016
|
74,140
|
|
|
207,371
|
|
|
1,777
|
|
|||
Fiscal 2017
|
75,803
|
|
|
175,335
|
|
|
16,877
|
|
|||
Fiscal 2018
|
83,843
|
|
|
142,830
|
|
|
21,107
|
|
|||
Fiscal 2019
|
99,908
|
|
|
150,971
|
|
|
21,551
|
|
|||
Thereafter
|
200,067
|
|
|
1,125,631
|
|
|
274,512
|
|
|||
Total minimum lease payments
|
596,383
|
|
|
$
|
1,964,197
|
|
|
$
|
335,824
|
|
|
Less: amount representing interest
|
(82,847
|
)
|
|
|
|
|
|||||
Present value of capital lease obligations
|
$
|
513,536
|
|
|
|
|
|
•
|
Stock-Based Expenses
. The Company’s compensation strategy includes the use of stock-based compensation to attract and retain employees and executives. It is principally aimed at aligning their interests with those of our stockholders and at long-term employee retention, rather than to motivate or reward operational performance for any particular period. Thus, stock-based compensation expense varies for reasons that are generally unrelated to operational decisions and performance in any particular period.
|
•
|
Amortization of Purchased Intangibles.
The Company views amortization of acquisition-related intangible assets, such as the amortization of the cost associated with an acquired company’s research and development efforts, trade names, customer lists and customer relationships, as items arising from pre-acquisition activities determined at the time of an acquisition. While it is continually viewed for impairment, amortization of the cost of purchased intangibles is a static expense, one that is not typically affected by operations during any particular period.
|
•
|
Amortization of Debt Discount.
Under GAAP, certain convertible debt instruments that may be settled in cash (or other assets) on conversion are required to be separately accounted for as liability (debt) and equity (conversion option) components of the instrument in a manner that reflects the issuer’s non-convertible debt borrowing rate. Accordingly, for GAAP purposes we are required to recognize imputed interest expense on the Company’s $575 million of convertible senior notes that were issued in a private placement in January 2010 and the Company’s $1.15 billion of convertible senior notes that were issued in a private placement in March 2013. The imputed interest rates were approximately 5.9% for the notes issued in January 2010 and approximately 2.5% for the notes issued in March 2013, while the coupon interest rates were 0.75% and 0.25%, respectively. The difference between the imputed interest expense and the coupon interest expense, net of the interest amount capitalized, is excluded from management’s assessment of the Company’s operating performance because management believes that this non-cash expense is not indicative of ongoing operating performance. Management believes that the exclusion of the non-cash interest expense provides investors an enhanced view of the Company’s operational performance.
|
•
|
Gains/Losses on Conversions of Debt.
Upon settlement of the Company’s convertible senior notes, we attribute the fair value of the consideration transferred to the liability and equity components of the convertible senior notes. The difference between the fair value of consideration attributed to the liability component and the carrying value of the liability as of settlement date is recorded as a non-cash gain or loss on the statement of operations. Management believes that the exclusion of the non-cash gain/loss provides investors an enhanced view of the company’s operational performance.
|
•
|
Income Tax Effects and Adjustments
. During fiscal 2014, the Company’s non-GAAP tax provision excludes the tax effects of expense items described above and certain tax items not directly related to the current fiscal year’s ordinary operating results. Examples of such tax items include, but are not limited to, changes in the valuation allowance related to deferred tax assets, certain acquisition-related costs and unusual or infrequently occurring items. Management believes the exclusion of these income tax adjustments provides investors with useful supplemental information about the Company’s operational performance. During fiscal 2015, the Company intends to compute and provide a fixed long-term projected non-GAAP tax rate. When projecting this long-term rate, the Company excluded the income tax effects of the non-cash items described above. Additionally, the Company evaluated its current long-term projections, current tax structure and other factors such as the Company’s existing tax positions in various jurisdictions and key legislations in major jurisdictions where the company operates. The Company intends to re-evaluate this long-term rate only on an annual basis. This long-term non-GAAP tax rate eliminates the effects of non-recurring and period specific items which can vary in size and frequency, and will provide better consistency within the interim reporting periods. Examples of the non-recurring and period specific items include but are not limited to changes in the valuation allowance related to deferred tax assets, effects resulting from acquisitions, and unusual or infrequently occurring items. This long-term rate could be subject to change for a variety of reasons, for example, significant structural changes in the geographic earnings mix including acquisition activity, or fundamental tax law changes in major jurisdictions where the company operates.
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Non-GAAP gross profit
|
|
|
|
|
||||
GAAP gross profit
|
$
|
934,467
|
|
|
$
|
683,639
|
|
|
Plus:
|
|
|
|
|
||||
Amortization of purchased intangibles
|
28,672
|
|
|
21,305
|
|
|
||
Stock-based expenses
|
11,810
|
|
|
10,678
|
|
|
||
Non-GAAP gross profit
|
$
|
974,949
|
|
|
$
|
715,622
|
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Non-GAAP operating profit
|
|
|
|
|
||||
GAAP loss from operations
|
$
|
(55,341
|
)
|
|
$
|
(44,540
|
)
|
|
Plus:
|
|
|
|
|
||||
Amortization of purchased intangibles
|
43,637
|
|
|
23,765
|
|
|
||
Stock-based expenses
|
131,092
|
|
|
114,729
|
|
|
||
Non-GAAP operating profit
|
$
|
119,388
|
|
|
$
|
93,954
|
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Non-GAAP net income
|
|
|
|
|
||||
GAAP net loss
|
$
|
(96,911
|
)
|
|
$
|
(67,721
|
)
|
|
Plus:
|
|
|
|
|
||||
Amortization of purchased intangibles
|
43,637
|
|
|
23,765
|
|
|
||
Stock-based expenses
|
131,092
|
|
|
114,729
|
|
|
||
Amortization of debt discount, net
|
10,984
|
|
|
9,240
|
|
|
||
Loss on conversion of debt
|
8,529
|
|
|
0
|
|
|
||
Less:
|
|
|
|
|
||||
Income tax effects and adjustments of Non-GAAP items
|
(27,815
|
)
|
|
(19,049
|
)
|
|
||
Non-GAAP net income
|
$
|
69,516
|
|
|
$
|
60,964
|
|
|
|
Three Months Ended April 30,
|
|
||||||
|
2014
|
|
2013
|
|
||||
Non-GAAP diluted earnings per share
|
|
|
|
|
||||
GAAP diluted loss per share
|
$
|
(0.16
|
)
|
|
$
|
(0.12
|
)
|
|
Plus:
|
|
|
|
|
||||
Amortization of purchased intangibles
|
0.07
|
|
|
0.04
|
|
|
||
Stock-based expenses
|
0.20
|
|
|
0.19
|
|
|
||
Amortization of debt discount, net
|
0.02
|
|
|
0.01
|
|
|
||
Loss on conversion of debt
|
0.01
|
|
|
0.00
|
|
|
||
Less:
|
|
|
|
|
||||
Income tax effects and adjustments of Non-GAAP items
|
(0.03
|
)
|
|
(0.02
|
)
|
|
||
Non-GAAP diluted earnings per share
|
$
|
0.11
|
|
|
$
|
0.10
|
|
|
Shares used in computing diluted net income per share
|
648,000
|
|
|
622,677
|
|
|
|
Three Months Ended April 30,
|
|
||||
Supplemental Diluted Sharecount Information (in thousands):
|
2014
|
|
2013
|
|
||
Weighted-average shares outstanding for GAAP basic earnings per share
|
612,512
|
|
|
588,385
|
|
|
Effect of dilutive securities:
|
|
|
|
|
||
Convertible senior notes
|
8,495
|
|
|
13,563
|
|
|
Warrants associated with the convertible senior note hedges
|
13,220
|
|
|
8,214
|
|
|
Employee stock awards
|
13,773
|
|
|
12,515
|
|
|
Adjusted weighted-average shares outstanding and assumed conversions for Non-GAAP diluted earnings per share
|
648,000
|
|
|
622,677
|
|
|
ITEM 3.
|
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
|
ITEM 4.
|
CONTROLS AND PROCEDURES
|
ITEM 1.
|
LEGAL PROCEEDINGS
|
ITEM 1A.
|
RISK FACTORS
|
•
|
risk of entering new markets in which we have little or no experience or where competitors may have stronger market positions;
|
•
|
potential write-offs of acquired assets or investments, and potential financial and credit risks associated with acquired customers;
|
•
|
potential loss of key employees;
|
•
|
inability to generate sufficient revenue to offset acquisition or investment costs;
|
•
|
the inability to maintain relationships with customers and partners of the acquired business;
|
•
|
the difficulty of transitioning the acquired technology onto our existing platforms and maintaining the security standards consistent with our other services for such technology;
|
•
|
potential unknown liabilities associated with the acquired businesses;
|
•
|
unanticipated expenses related to acquired technology and its integration into existing technology;
|
•
|
negative impact to our results of operations because of the depreciation and amortization of amounts related to acquired intangible assets, fixed assets and deferred compensation, and the loss of acquired deferred revenue and unbilled deferred revenue;
|
•
|
delays in customer purchases due to uncertainty related to any acquisition;
|
•
|
the need to implement controls, procedures and policies at the acquired company;
|
•
|
challenges caused by distance, language and cultural differences;
|
•
|
in the case of foreign acquisitions, the challenges associated with integrating operations across different cultures and languages and any currency and regulatory risks associated with specific countries; and
|
•
|
the tax effects of any such acquisitions.
|
•
|
our ability to retain and increase sales to existing customers, attract new customers and satisfy our customers’ requirements;
|
•
|
the attrition rates for our service;
|
•
|
the amount and timing of operating costs and capital expenditures related to the operations and expansion of our business;
|
•
|
changes in deferred revenue and unbilled deferred revenue balances, which are not reflected in the balance sheet, due to seasonality, the compounding effects of renewals, invoice duration, invoice timing and new business linearity;
|
•
|
the number of new employees;
|
•
|
changes in our pricing policies and terms of contracts, whether initiated by us or as a result of competition;
|
•
|
the cost, timing and management effort for the introduction of new features to our service;
|
•
|
the costs associated with acquiring new businesses and technologies and the follow-on costs of integration and consolidating the results of acquired businesses;
|
•
|
the rate of expansion and productivity of our sales force;
|
•
|
the length of the sales cycle for our service;
|
•
|
new product and service introductions by our competitors;
|
•
|
our success in selling our service to large enterprises;
|
•
|
variations in the revenue mix of editions of our service;
|
•
|
technical difficulties or interruptions in our service;
|
•
|
expenses related to our real estate, our office leases and our data center capacity and expansion;
|
•
|
changes in foreign currency exchange rates;
|
•
|
changes in interest rates and our mix of investments, which would impact our return on our investments in cash and marketable securities;
|
•
|
conditions, particularly sudden changes, in the financial markets have and may continue to impact the value of and access to our investment portfolio;
|
•
|
changes in the effective tax rates due to changes in the mix of earnings and losses in countries with differing statutory tax rates, certain non-deductible expenses, changes in the valuation of deferred tax assets and liabilities and our ability to utilize them, changes in federal, state or international tax laws including fundamental changes to tax laws applicable to corporate multinationals that may be considered by the United States and many countries in the European Union, changes in accounting principles, changes in judgment from the evaluation of new information that results in a recognition, derecognition or change in measurement of a tax position taken in a prior period, results of tax examinations by the Internal Revenue Service, state and foreign taxing authorities, as well as changes in excess tax benefits related to exercises and vesting of stock-based compensation;
|
•
|
changes to non-income taxes due to changes in federal, state or international tax laws; changes in taxing jurisdictions’ administrative interpretations, decisions, policies, and positions; results of tax examinations, settlements or judicial decisions; changes in accounting principles; changes to the business operations, including acquisitions, as well as the evaluation of new information that results in a change to a tax position taken in a prior period;
|
•
|
our ability to realize benefits from strategic partnerships;
|
•
|
expenses related to significant, unusual or discrete events which are recorded in the period in which the events occur;
|
•
|
general economic conditions that may adversely affect either our customers’ ability or willingness to purchase additional subscriptions or upgrade their service, or delay a prospective customers’ purchasing decision, or reduce the value of new subscription contracts, or affect attrition rates;
|
•
|
timing of additional investments in our enterprise cloud computing application and platform services and in our consulting service;
|
•
|
regulatory compliance costs;
|
•
|
the timing of customer payments and payment defaults by customers;
|
•
|
extraordinary expenses such as litigation or other dispute-related settlement payments;
|
•
|
the impact of new accounting pronouncements;
|
•
|
equity issuances, including as consideration in acquisitions or due to the conversion of our outstanding convertible notes at the election of the note holders;
|
•
|
the timing of stock awards to employees and the related adverse financial statement impact of having to expense those stock awards on a straight-line basis over their vesting schedules;
|
•
|
the timing of commission, bonus, and other compensation payments to employees; and
|
•
|
the timing of payroll and other withholding tax expenses which is triggered by the payment of bonuses and when employees exercise their vested stock awards.
|
•
|
enterprise software application vendors;
|
•
|
cloud computing application service providers;
|
•
|
software companies that provide their product or service free of charge, and only charge a premium for advanced features and functionality;
|
•
|
traditional platform development environment companies; and
|
•
|
cloud computing development platform companies.
|
•
|
localization of our service, including translation into foreign languages and associated expenses;
|
•
|
laws and business practices favoring local competitors;
|
•
|
compliance with multiple, conflicting and changing governmental laws and regulations, including employment, tax, privacy, anti-corruption, import/export, antitrust, data protection and industry-specific laws and regulations, including rules related to compliance by our third-party resellers;
|
•
|
pressure on the creditworthiness of sovereign nations, particularly in Europe, where we have customers and a balance of our cash, cash equivalents, and marketable securities. Liquidity issues or political actions by sovereign nations could result in decreased values of these balances;
|
•
|
regional data privacy laws and other regulatory requirements that apply to outsourced service providers and to the transmission of our customers’ data across international borders;
|
•
|
treatment of revenue from international sources and changes to tax codes, including being subject to foreign tax laws and being liable for paying withholding income or other taxes in foreign jurisdictions;
|
•
|
foreign currency fluctuations and controls;
|
•
|
different pricing environments;
|
•
|
difficulties in staffing and managing foreign operations;
|
•
|
different or lesser protection of our intellectual property;
|
•
|
longer accounts receivable payment cycles and other collection difficulties;
|
•
|
natural disasters, acts of war, terrorism, pandemics or security breaches; and
|
•
|
regional economic and political conditions.
|
•
|
it may impair our ability to obtain additional financing in the future for working capital, capital expenditures, acquisitions, general corporate or other purposes;
|
•
|
an increased portion of our cash flows from operations may have to be dedicated towards repaying the principal beginning in 2015 or earlier if necessary;
|
•
|
it may make us more vulnerable to downturns in our business, our industry or the economy in general; and
|
•
|
limitations within the term loan covenants may restrict our ability to incur additional indebtedness, grant liens, merge or consolidate, dispose of assets, make investments, make acquisitions, enter into transactions with affiliates, pay dividends or make distributions, repurchase stock and enter into restrictive agreements, as defined in the credit agreement.
|
•
|
variations in our operating results, earnings per share, cash flows from operating activities, deferred revenue and other financial metrics and non-financial metrics, and how those results compare to analyst expectations;
|
•
|
forward-looking guidance to industry and financial analysts related to future revenue and earnings per share;
|
•
|
changes in the estimates of our operating results or changes in recommendations by securities analysts that elect to follow our common stock;
|
•
|
announcements of technological innovations, new services or service enhancements, strategic alliances or significant agreements by us or by our competitors;
|
•
|
announcements by us or by our competitors of mergers or other strategic acquisitions, or rumors of such transactions involving us or our competitors;
|
•
|
announcements of customer additions and customer cancellations or delays in customer purchases;
|
•
|
recruitment or departure of key personnel;
|
•
|
disruptions in our service due to computer hardware, software, network or data center problems;
|
•
|
the economy as a whole, market conditions in our industry and the industries of our customers;
|
•
|
trading activity by a limited number of stockholders who together beneficially own a majority of our outstanding common stock;
|
•
|
the issuance of shares of common stock by us, whether in connection with an acquisition, a capital raising transaction or upon conversion of some or all of our outstanding convertible senior notes;
|
•
|
issuance of debt or other convertible securities; and
|
•
|
any other factors discussed herein.
|
•
|
permit the board of directors to establish the number of directors;
|
•
|
provide that directors may only be removed “for cause” and only with the approval of 66 2/3 percent of our stockholders;
|
•
|
require super-majority voting to amend some provisions in our amended and restated certificate of incorporation and bylaws;
|
•
|
authorize the issuance of “blank check” preferred stock that our board could use to implement a stockholder rights plan (also known as a “poison pill”);
|
•
|
eliminate the ability of our stockholders to call special meetings of stockholders;
|
•
|
prohibit stockholder action by written consent, which requires all stockholder actions to be taken at a meeting of our stockholders;
|
•
|
provide that the board of directors is expressly authorized to make, alter or repeal our bylaws; and
|
•
|
establish advance notice requirements for nominations for election to our board or for proposing matters that can be acted upon by stockholders at annual stockholder meetings.
|
ITEM 2.
|
UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
|
ITEM 3.
|
DEFAULTS UPON SENIOR SECURITIES
|
ITEM 4.
|
MINE SAFETY DISCLOSURES
|
ITEM 5.
|
OTHER INFORMATION
|
ITEM 6.
|
EXHIBITS
|
Exhibit
No.
|
|
Exhibit Description
|
|
Provided
Herewith
|
|
Incorporated by Reference
|
|||||||
Form
|
|
SEC File No.
|
|
Exhibit
|
|
Filing Date
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.1
|
|
Amended and Restated Certificate of Incorporation of salesforce.com, inc.
|
|
|
|
8-K
|
|
001-32224
|
|
3.1
|
|
|
06/11/2013
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.2
|
|
Amended and Restated Bylaws of salesforce.com, inc.
|
|
|
|
8-K
|
|
001-32224
|
|
3.2
|
|
|
06/11/2013
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10.1*
|
|
Form of Change of Control as entered into with Joe Allanson, Keith Block, Alex Dayon, Scott Dorsey, Steve Fisher, Parker Harris, George Hu, Maria Martinez, Burke Norton and Graham Smith
|
|
|
|
10-K
|
|
001-32224
|
|
10.14
|
|
|
03/09/2009
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10.2
|
|
Office Lease dated as of April 10, 2014 by and between salesforce.com, inc. and Transbay Tower LLC
|
|
X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10.3*
|
|
Transition Services Agreement dated February 27, 2014 by and between salesforce.com and Graham Smith
|
|
X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
31.1
|
|
Certification of Chief Executive Officer pursuant to Exchange Act Rule 13a-14(a) or 15(d)-14(a), as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
|
|
X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
31.2
|
|
Certification of Chief Financial Officer pursuant to Exchange Act Rule 13a-14(a) or 15(d)-14(a), as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
|
|
X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
32.1
|
|
Certification of Chief Executive Officer and Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
|
|
X
|
|
|
|
|
|
|
|
|
Exhibit
No.
|
|
Exhibit Description
|
|
Provided
Herewith
|
|
Incorporated by Reference
|
||||||
|
|
|
Form
|
|
SEC File No.
|
|
Exhibit
|
|
Filing Date
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
101.INS†
|
|
XBRL Instance Document
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
101.SCH†
|
|
XBRL Taxonomy Extension Schema Document
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
101.CAL†
|
|
XBRL Taxonomy Extension Calculation Linkbase Document
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
101.DEF†
|
|
XBRL Extension Definition
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
101.LAB†
|
|
XBRL Taxonomy Extension Label Linkbase Document
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
101.PRE†
|
|
XBRL Taxonomy Extension Presentation Linkbase Document
|
|
|
|
|
|
|
|
|
|
|
*
|
Indicates a management contract or compensatory plan or arrangement
|
|
|
†
|
The financial information contained in these XBRL documents is unaudited and these are not the official publicly filed financial statements of salesforce.com, inc. The purpose of submitting these XBRL documents is to test the related format and technology, and, as a result, investors should continue to rely on the official filed version of the furnished documents and not rely on this information in making investment decisions. In accordance with Rule 402 of Regulation S-T, the information in these exhibits shall not be deemed to be “filed” for purposes of Section 18 of the Exchange Act, or otherwise subject to the liability of that section, and shall not be incorporated by reference into any registration statement or other document filed under the Securities Act, or the Exchange Act, except as shall be expressly set forth by specific reference in such filing.
|
|
salesforce.com, inc.
|
May 29, 2014
|
/s/ G
RAHAM
S
MITH
|
|
Graham Smith
|
|
Chief Financial Officer
|
|
salesforce.com, inc.
|
May 29, 2014
|
/s/ J
OE
A
LLANSON
|
|
Joe Allanson
|
|
Senior Vice President, Chief Accountant and Controller
(Principal Accounting Officer)
|
TERMS OF LEASE
|
DESCRIPTION
|
1. Effective Date:
|
April 10, 2014.
|
2. Premises:
|
|
2.1 Building:
|
That certain sixty-one (61) story office building (the "
Building
") to be located at 415 Mission Street, San Francisco, California, to be known as "Salesforce Tower" (subject to Tenant's rights under
Article 23
to change the name of the Project (as defined below)), which Building shall contain 1,420,081 rentable square feet ("
RSF
") of office and retail space.
|
2.2 Premises:
|
713,727 RSF of space consisting of (i) the portions of the Building depicted on
Exhibit A-1
to this Lease, which is comprised of certain office space on the floors of the Building specified below (the "
Office Space
"), (ii) the portions of the Building depicted on
Exhibit A-2A
to this Lease, which is comprised of certain retail space in the ground floor lobby of the Building (the "
Retail Space
"), and (iii) the portions of the Building depicted on
Exhibit A-2B
to this Lease, which is comprised of certain space on the P-1 level of the Parking Structure (as defined below) (the "
P-1 Space
").
On a Phase-by-Phase basis, the RSF of each portion of the Premises is as follows:
Phase 1 Premises: 134,568 RSF
Phase 2 Premises: 149,544 RSF
Phase 3 Premises: 175,996 RSF
Phase 4 Premises: 152,262 RSF
Phase 5 Premises: 101,357 RSF
|
|
|
|
2
|
3.1.1 Phase 1 Premises and Phase 2 Premises (collectively, "
Tranche 1
"):
|
Approximately fifteen (15) years and six (6) months from the "Phase 1 Lease Commencement Date" (as that term is defined in
Section 3.2.1
of this Summary below), except that if Tenant commences to conduct its business in the "Phase 1 Premises" (as that term is defined in
Section 3.2
of this Summary below) prior to April 1, 2017, then the Tranche 1 Lease Expiration date shall nonetheless end on September 30, 2032.
|
3.1.2 Phase 3 Premises, Phase 4 Premises and Phase 5 Premises (collectively, "
Tranche 2
"):
|
Approximately thirteen (13) years from the "Phase 3 Lease Commencement Date" (as that term is defined in
Section 3.2.3
of this Summary below), except that if Tenant commences to conduct its business in the "Phase 3 Premises" (as that term is defined in
Section 3.2
of this Summary below) prior to February 1, 2018, then the first Phase 1 Lease Year shall nonetheless end on January 31, 2031.
|
3.2 Lease Commencement Date:
|
Landlord shall construct the "Base, Shell and Core," as that term is defined in
Section 1.1
of
Exhibit B
, attached hereto, and deliver the same to Tenant on a phased basis, with the first phase ("
Phase 1
") consisting of the delivery of the P-1 Space the Retail Space, floors 3 ‑ 7, and floor 61 (the "
Phase 1 Premises
") to Tenant, the second phase ("
Phase 2
") consisting of the delivery of floors 8 – 13 (the "
Phase 2 Premises
") to Tenant, the third phase ("
Phase 3
") consisting of the delivery of floors 14 – 20 (the "
Phase 3 Premises
") to Tenant, the fourth phase ("
Phase 4
") consisting of the delivery of floors 21 – 26 (the "
Phase 4 Premises
") to Tenant, and the fifth phase ("
Phase 5
") consisting of the delivery of floors 27 – 30 (the "
Phase 5 Premises
") to Tenant. The term "
Phase
" as used in this Lease shall mean Phase 1, Phase 2, Phase 3, Phase 4 or Phase 5, as applicable.
|
|
3
|
3.2.1 Phase 1 Lease Commencement Date:
|
The lease commencement date for the Phase 1 Premises (the "
Phase 1 Lease Commencement Date
") shall be the later of (i) the "Final Condition Date," as that term is defined in
Exhibit B
, attached hereto and (ii) the earlier of (A) the date upon which Tenant first commences to conduct business in the Phase 1 Premises, and (B) April 1, 2017; provided that if Tenant commences to conduct its business in the Phase 1 Premises prior to April 1, 2017, then for purposes of calculating increases in Base Rent and the applicable Lease Expiration date only, the Phase 1 Lease Commencement Date shall be deemed to have occurred on April 1, 2017, and Base Rent for the Phase 1 Premises for the period beginning with the date Tenant commences to conduct its business in the Phase 1 Premises and ending upon March 31, 2018 shall be at the initial Base Rent set forth on
Exhibit A-3
attached hereto. The phrase "commences to conduct business" (and other phrases of similar import) shall not include use of the applicable portion of the Premises by Tenant for the storage, construction, staging or the construction or installation of Improvements by Tenant pursuant to
Exhibit B
of this Lease.
|
3.2.2 Phase 2 Lease Commencement Date:
|
The lease commencement date for the Phase 2 Premises (the "
Phase 2 Lease Commencement Date
") shall be the later of (i) the Final Condition Date and (ii) the earlier of (A) the date upon which Tenant first commences to conduct business in the Phase 2 Premises and (B) October 1, 2017; provided that if Tenant commences to conduct its business in the Phase 2 Premises prior to October 1, 2017, then for purposes of calculating increases in Base Rent only, the Phase 2 Lease Commencement Date shall be deemed to have occurred on October 1, 2017, and Base Rent for the Phase 2 Premises for the period beginning with the date Tenant commences to conduct its business in the Phase 2 Premises and ending upon September 30, 2018 shall be at the initial Base Rent set forth on
Exhibit A-3
attached hereto.
|
|
4
|
3.2.3 Phase 3 Lease Commencement Date:
|
The lease commencement date for the Phase 3 Premises (the "
Phase 3 Lease Commencement Date
") shall be the later of (i) the Final Condition Date and (ii) the earlier of (A) the date upon which Tenant first commences to conduct business in the Phase 3 Premises and (B) February 1, 2018; provided that if Tenant commences to conduct its business in the Phase 3 Premises prior to February 1, 2018, then for purposes of calculating increases in Base Rent and the applicable Lease Expiration date only, the Phase 3 Lease Commencement Date shall be deemed to have occurred on February 1, 2018, and Base Rent for the Phase 3 Premises for the period beginning with the date Tenant commences to conduct its business in the Phase 3 Premises and ending upon January 31, 2019 shall be at the initial Base Rent set forth on
Exhibit A-3
attached hereto.
|
3.2.3 Phase 4 Lease Commencement Date:
|
The lease commencement date for the Phase 4 Premises (the "
Phase 4 Lease Commencement Date
") shall be the later of (i) the Final Condition Date and (ii) the earlier of (A) the date upon which Tenant first commences to conduct business in the Phase 4 Premises and (B) June 1, 2018; provided that if Tenant commences to conduct its business in the Phase 4 Premises prior to June 1, 2018, then for purposes of calculating increases in Base Rent only, the Phase 4 Lease Commencement Date shall be deemed to have occurred on June 1, 2018, and Base Rent for the Phase 4 Premises for the period beginning with the date Tenant commences to conduct its business in the Phase 4 Premises and ending upon May 31, 2019 shall be at the initial Base Rent set forth on
Exhibit A-3
attached hereto.
|
3.2.5 Phase 5 Lease Commencement Date:
|
The lease commencement date for the Phase 5 Premises (the "
Phase 5 Lease Commencement Date
") shall be the later of (i) the Final Condition Date and (ii) the earlier of (A) the date upon which Tenant first commences to conduct business in the Phase 5 Premises and (B) October 1, 2018; provided that if Tenant commences to conduct its business in the Phase 5 Premises prior to October 1, 2018, then for purposes of calculating increases in Base Rent only, the Phase 5 Lease Commencement Date shall be deemed to have occurred on October 1, 2018, and Base Rent for the Phase 5 Premises for the period beginning with the date Tenant commences to conduct its business in the Phase 5 Premises and ending upon September 30, 2019 shall be at the initial Base Rent set forth on
Exhibit A-3
attached hereto.
|
|
5
|
|
With respect to Phase 1, Phase 2, Phase 3, Phase 4, and Phase 5 all references in this Lease to "
Lease Commencement Date
" shall mean and refer to the "Phase 1 Lease Commencement Date," the "Phase 2 Lease Commencement Date," the "Phase 3 Lease Commencement Date," the "Phase 4 Lease Commencement Date," or the "Phase 5 Lease Commencement Date," as applicable.
|
3.3 Lease Expiration Date:
|
The Lease Expiration Date shall occur independently with respect to each portion of the Premises as follows:
|
3.3.1 Tranche 1:
|
The Lease Expiration Date with respect to Tranche 1 (i.e., the Phase 1 Premises and the Phase 2 Premises) shall be the last day of the one hundred eighty-sixth (186
th
) full calendar month of the Lease Term from the Phase 1 Lease Commencement Date.
|
3.3.2 Tranche 2:
|
The Lease Expiration Date with respect to Tranche 2 (i.e., the Phase 3 Premises, the Phase 4 Premises, and the Phase 5 Premises) shall be the last day of the one hundred fifty-sixth (156
th
) full calendar month of the Lease Term from the Phase 3 Lease Commencement Date.
With respect to Tranche 1 and Tranche 2 all references in this Lease to "
Tranche
" shall mean and refer to "Tranche 1" or "Tranche 2," as applicable.
|
3.4 Option Term(s):
|
One (1) seven (7)-year option to renew as to each Tranche followed by one (1) five (5)-year option to renew as to each Tranche, as more particularly set forth in
Section 2.2
of this Lease.
|
4. Base Rent (
Article 3
):
|
See
Exhibit A-3
, attached hereto.
|
5. Intentionally Omitted:
|
|
6. Tenant's Share
(
Article 4
):
|
With respect to Phase 1 Premises
: 9.4761%.
With respect to Phase 2 Premises
: 10.5307%.
With respect to Phase 3 Premises
: 12.3934%.
With respect to Phase 4 Premises
: 10.7221%.
With respect to Phase 5 Premises
: 7.1374%.
|
|
6
|
7. Permitted Use
(
Article 5
):
|
Tenant shall use (i) the Office Space for general office use and any other incidental use permitted by applicable "Law," as that term is defined in
Section 5.2
of the Lease, including without limitation, (a) for an executive briefing center, (b) cafeteria, auditorium, showers, and private restrooms and, (c) subject to the limitations set forth in this Lease, Child Care Facility (as defined in
Section 5.3
below) and a Wellness Center (as defined in
Section 5.5
below) (the "
Permitted Office Use
"), (ii) the Retail Space for (A) sales of Tenant's merchandise, (B) events, (C) elevator access, and (D) demonstration displays, exhibit displays, visual and media displays and other displays of products promoting Tenant, its business and its charitable foundation (uses (A) through (D), being referred to herein as the "
Specified Retail Uses
") and general retail use (the Specified Retail Uses together with general retail use being referred to herein as the "
Permitted Retail Use
"), and (iii) the P-1 Space for loading, unloading, receiving and handling, consistent with a first class office building (collectively, the "
Permitted Use
"). Items (a) through (c) above and the Specified Retail Uses are deemed to be consistent with a first class office building.
|
8. Letter of Credit
(
Article 21
):
|
$24,450,800.00, as increased and decreased pursuant to
Article 21
.
|
9. Parking Passes
(
Article 28
):
|
An amount equal to Tenant's Share of the total number of parking passes to be issued for the Building underground parking structure (the "
Parking Structure
").
|
10. Address of Tenant
(
Section 29.18
):
|
salesforce.com, inc.
The Landmark@One Market, 3rd Floor San Francisco, CA 94105 Attention: General Counsel |
|
with copies to
:
salesforce.com, inc.
The Landmark@One Market, Third Floor San Francisco, CA 94105 Attention: Vice President of Real Estate |
|
7
|
|
and
Paul Hastings LLP
55 2nd Street, 24th Floor San Francisco, CA 94105 Attention: Stephen I. Berkman |
11. Address of Landlord
(
Section 29.18
):
|
Boston Properties Limited Partnership
Four Embarcadero Center
Lobby Level, Suite One
San Francisco, California 94111
Attention: Mr. Bob Pester
and
Boston Properties, Inc.
Prudential Center Tower
800 Boylston Street, Suite 1900
Boston, Massachusetts 02199
Attention: General Counsel
and
Boston Properties Limited Partnership
Four Embarcadero Center
Lobby Level, Suite One
San Francisco, California 94111
Attention: Regional Counsel
and
Hines Interests Limited Partnership
101 California Street, Suite 1000
San Francisco, California 94111-5894
Attention: Mr. Paul Paradis
and
Allen Matkins Leck Gamble Mallory & Natsis LLP
1901 Avenue of the Stars, Suite 1800
Los Angeles, California 90067
Attention: Anton N. Natsis, Esq.
|
|
8
|
12. Broker(s)
(
Section 29.24
):
Representing Tenant
:
Cushman & Wakefield
425 Market Street Suite 2300 San Francisco, CA 94105 Attention: Mr. Dan Harvey |
Representing Landlord
:
CBRE, Inc.
101 California Street, 44th Floor San Francisco, CA 94111 Attention: John A. Cecconi
and
Cushman & Wakefield
One Maritime Plaza Suite 900 San Francisco, CA 94111 Attention: Mr. Mark McGranahan |
13. Improvement Allowance
(
Section 2
of
Exhibit B
):
|
An amount equal to $70.00 per RSF of the Premises for a total of $49,960,890.00.
|
14. Payment Address and Wiring Instructions for Payment of Rent (
Article 3
):
|
To Be Provided by Landlord Prior To The Phase 1 Lease Commencement Date
|
|
9
|
|
10
|
|
11
|
|
12
|
|
13
|
|
14
|
|
15
|
|
16
|
|
17
|
|
18
|
|
19
|
|
20
|
|
21
|
|
22
|
|
23
|
|
24
|
|
25
|
|
26
|
|
27
|
|
28
|
|
29
|
|
30
|
|
31
|
|
32
|
|
33
|
|
34
|
|
35
|
|
36
|
|
37
|
|
38
|
|
39
|
|
40
|
|
41
|
|
42
|
|
43
|
|
44
|
|
45
|
|
46
|
|
47
|
|
48
|
|
49
|
|
50
|
|
51
|
|
52
|
|
53
|
|
54
|
|
55
|
|
56
|
|
57
|
|
58
|
|
59
|
|
60
|
|
61
|
|
62
|
|
63
|
|
64
|
|
65
|
|
66
|
|
67
|
|
68
|
|
69
|
|
70
|
|
71
|
|
72
|
|
73
|
|
74
|
|
75
|
|
76
|
|
77
|
|
78
|
|
79
|
|
80
|
|
81
|
|
82
|
|
83
|
Reduction Date
|
**L-C Amount (No Right of First Offer Space)
|
Sixth (6
th
) Anniversary of the Phase 1 Lease Commencement Date
|
$13,203,432.00, which amount equals fifty-four percent (54%) of the Original L-C Amount
|
Eighth (8
th
) Anniversary of the Phase 1 Lease Commencement Date
|
$6,846,224.00, which amount equals twenty-eight percent (28%) of the Original L-C Amount*
|
|
84
|
|
85
|
|
86
|
|
87
|
|
88
|
|
89
|
|
90
|
|
91
|
|
92
|
|
93
|
|
94
|
|
95
|
|
96
|
|
97
|
|
98
|
|
99
|
|
100
|
|
101
|
|
102
|
|
103
|
|
104
|
|
105
|
|
106
|
|
107
|
|
108
|
|
109
|
|
110
|
|
111
|
|
112
|
|
113
|
|
114
|
|
115
|
|
116
|
|
117
|
|
118
|
|
119
|
|
120
|
"LANDLORD":
TRANSBAY TOWER LLC,
a Delaware Limited Liability Company,
By: Transbay Tower Holdings LLC,
a Delaware limited liability company, its Manager
By: BXP TB Development LLC,
a Delaware limited liability company, its Managing Member
By: Boston Properties Limited Partnership,
a Delaware limited partnership, its Manager
By: Boston Properties, Inc.,
a Delaware corporation, its General Partner
By:
/s/ Mortimer B. Zukerman
_______
Name: Mortimer B. Zuckerman Title: Chairman
"TENANT":
salesforce.com, inc.,
a Delaware corporation
By:
/s/ Burke F. Norton
Name: Burke F. Norton Its: EVP, Chief Legal Officer |
|
121
|
|
122
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-1
-1-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
2
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
3
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
4
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
5
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
6
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
7
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
8
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
9
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
10
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
11
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
12
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
13
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
14
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
15
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
16
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
17
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
18
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
19
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
20
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
21
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
22
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
23
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
24
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
25
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
26
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
27
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
28
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
29
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-2A
-1-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-2B
-1-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
Period During Lease Term* |
Annual Base Rent
|
Monthly Installment of Base Rent |
Annual
Rental Rate per Rentable Square Foot* |
||||||
Phase 1 Lease Year 1
|
|
$273,726.00
|
|
|
$22,810.50
|
|
|
$74.00
|
|
Phase 1 Lease Year 2
|
|
$277,425.00
|
|
|
$23,118.75
|
|
|
$75.00
|
|
Phase 1 Lease Year 3
|
|
$281,124.00
|
|
|
$23,427.00
|
|
|
$76.00
|
|
Phase 1 Lease Year 4
|
|
$284,823.00
|
|
|
$23,735.25
|
|
|
$77.00
|
|
Phase 1 Lease Year 5
|
|
$288,522.00
|
|
|
$24,043.50
|
|
|
$78.00
|
|
Phase 1 Lease Year 6
|
|
$292,221.00
|
|
|
$24,351.75
|
|
|
$79.00
|
|
Phase 1 Lease Year 7
|
|
$295,920.00
|
|
|
$24,660.00
|
|
|
$80.00
|
|
Phase 1 Lease Year 8
|
|
$299,619.00
|
|
|
$24,968.25
|
|
|
$81.00
|
|
Phase 1 Lease Year 9
|
|
$303,318.00
|
|
|
$25,276.50
|
|
|
$82.00
|
|
Phase 1 Lease Year 10
|
|
$307,017.00
|
|
|
$25,584.75
|
|
|
$83.00
|
|
Phase 1 Lease Year 11
|
|
$310,716.00
|
|
|
$25,893.00
|
|
|
$84.00
|
|
Phase 1 Lease Year 12
|
|
$314,415.00
|
|
|
$26,201.25
|
|
|
$85.00
|
|
Phase 1 Lease Year 13
|
|
$318,114.00
|
|
|
$26,509.50
|
|
|
$86.00
|
|
Phase 1 Lease Year 14
|
|
$321,813.00
|
|
|
$26,817.75
|
|
|
$87.00
|
|
Phase 1 Lease Year 15
|
|
$325,512.00
|
|
|
$27,126.00
|
|
|
$88.00
|
|
Phase 1 Lease Year 16
|
|
$329,211.00
|
|
|
$27,434.25
|
|
|
$89.00
|
|
*For purposes of this schedule "
Phase 1 Lease Year
" shall mean each consecutive twelve (12) month period during the Lease Term; provided, however, that the first Phase 1 Lease Year shall commence on the Phase 1 Lease Commencement Date and end on the last day of the month in which the first anniversary of the Phase 1 Lease Commencement Date occurs (except that if Tenant commences to conduct its business in the Phase 1 Premises prior to April 1, 2017, then the first Phase 1 Lease Year shall end March 31, 2018) and the second and each succeeding Phase 1 Lease Year shall commence on the first day of the next calendar month; and further provided that the last Phase 1 Lease Year shall end on the Lease Expiration Date with respect to the Phase 1 Premises.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
Period During Lease Term* |
Annual Base Rent
|
Monthly Installment of Base Rent |
Annual
Rental Rate per Rentable Square Foot* |
||||||
Phase 2 Lease Year 1
|
|
$6,579,936.00
|
|
|
$548,328.00
|
|
|
$44.00
|
|
Phase 2 Lease Year 2
|
|
$6,729,480.00
|
|
|
$560,790.00
|
|
|
$45.00
|
|
Phase 2 Lease Year 3
|
|
$6,879,024.00
|
|
|
$573,252.00
|
|
|
$46.00
|
|
Phase 2 Lease Year 4
|
|
$7,028,568.00
|
|
|
$585,714.00
|
|
|
$47.00
|
|
Phase 2 Lease Year 5
|
|
$7,178,112.00
|
|
|
$598,176.00
|
|
|
$48.00
|
|
Phase 2 Lease Year 6
|
|
$7,327,656.00
|
|
|
$610,638.00
|
|
|
$49.00
|
|
Phase 2 Lease Year 7
|
|
$7,477,200.00
|
|
|
$623,100.00
|
|
|
$50.00
|
|
Phase 2 Lease Year 8
|
|
$7,626,744.00
|
|
|
$635,562.00
|
|
|
$51.00
|
|
Phase 2 Lease Year 9
|
|
$7,776,288.00
|
|
|
$648,024.00
|
|
|
$52.00
|
|
Phase 2 Lease Year 10
|
|
$7,925,832.00
|
|
|
$660,486.00
|
|
|
$53.00
|
|
Phase 2 Lease Year 11
|
|
$8,075,376.00
|
|
|
$672,948.00
|
|
|
$54.00
|
|
Phase 2 Lease Year 12
|
|
$8,224,920.00
|
|
|
$685,410.00
|
|
|
$55.00
|
|
Phase 2 Lease Year 13
|
|
$8,374,464.00
|
|
|
$697,872.00
|
|
|
$56.00
|
|
Phase 2 Lease Year 14
|
|
$8,524,008.00
|
|
|
$710,334.00
|
|
|
$57.00
|
|
Phase 2 Lease Year 15
|
|
$8,673,552.00
|
|
|
$722,796.00
|
|
|
$58.00
|
|
Phase 2 Lease Year 16
|
|
$8,823,096.00
|
|
|
$735,258.00
|
|
|
$59.00
|
|
*For purposes of this schedule "
Phase 2 Lease Year
" shall mean each consecutive twelve (12) month period during the Lease Term; provided, however, that the first Phase 2 Lease Year shall commence on the Phase 2 Lease Commencement Date and end on the last day of the month in which the first anniversary of the Phase 2 Lease Commencement Date occurs (except that if Tenant commences to conduct its business in the Phase 2 Premises prior to October 1, 2017, then the first Phase 2 Lease Year shall end September 30, 2018)and the second and each succeeding Phase 2 Lease Year shall commence on the first day of the next calendar month; and further provided that the last Phase 2 Lease Year shall end on the Lease Expiration Date with respect to the Phase 2 Premises
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
Period During Lease Term* |
Annual Base Rent
|
Monthly Installment of Base Rent |
Annual
Rental Rate per Rentable Square Foot* |
||||||
Phase 5 Lease Year 1
|
|
$1,522,620.00
|
|
|
$126,885.00
|
|
|
$60.00
|
|
Phase 5 Lease Year 2
|
|
$1,547,997.00
|
|
|
$128,999.75
|
|
|
$61.00
|
|
Phase 5 Lease Year 3
|
|
$1,573,374.00
|
|
|
$131,114.50
|
|
|
$62.00
|
|
Phase 5 Lease Year 4
|
|
$1,598,751.00
|
|
|
$133,229.25
|
|
|
$63.00
|
|
Phase 5 Lease Year 5
|
|
$1,624,128.00
|
|
|
$135,344.00
|
|
|
$64.00
|
|
Phase 5 Lease Year 6
|
|
$1,649,505.00
|
|
|
$137,458.75
|
|
|
$65.00
|
|
Phase 5 Lease Year 7
|
|
$1,674,882.00
|
|
|
$139,573.50
|
|
|
$66.00
|
|
Phase 5 Lease Year 8
|
|
$1,700,259.00
|
|
|
$141,688.25
|
|
|
$67.00
|
|
Phase 5 Lease Year 9
|
|
$1,725,636.00
|
|
|
$143,803.00
|
|
|
$68.00
|
|
Phase 5 Lease Year 10
|
|
$1,751,013.00
|
|
|
$145,917.75
|
|
|
$69.00
|
|
Phase 5 Lease Year 11
|
|
$1,776,390.00
|
|
|
$148,032.50
|
|
|
$70.00
|
|
Phase 5 Lease Year 12
|
|
$1,801,767.00
|
|
|
$150,147.25
|
|
|
$71.00
|
|
Phase 5 Lease Year 13
|
|
$1,827,144.00
|
|
|
$152,262.00
|
|
|
$72.00
|
|
*For purposes of this schedule "
Phase 5 Lease Year
" shall mean each consecutive twelve (12) month period during the Lease Term; provided, however, that the first Phase 5 Lease Year shall commence on the Phase 5 Lease Commencement Date and end on the last day of the month in which the first anniversary of the Phase 5 Lease Commencement Date occurs (except that if Tenant commences to conduct its business in the Phase 5 Premises prior to October 1, 2018, then the first Phase 5 Lease Year shall end September 30, 2019) and the second and each succeeding Phase 5 Lease Year shall commence on the first day of the next calendar month; and further provided that the last Phase 5 Lease Year shall end on the Lease Expiration Date with respect to the Phase 5 Premises.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
Period During Lease Term* |
Annual Base Rent
|
Monthly Installment of Base Rent* |
Annual
Rental Rate per Rentable Square Foot* |
||||||
Phase 5 Lease Year 1
|
|
$5,014,680.00
|
|
|
$417,890.00
|
|
|
$66.00
|
|
Phase 5 Lease Year 2
|
|
$5,090,660.00
|
|
|
$424,221.67
|
|
|
$67.00
|
|
Phase 5 Lease Year 3
|
|
$5,166,640.00
|
|
|
$430,553.33
|
|
|
$68.00
|
|
Phase 5 Lease Year 4
|
|
$5,242,620.00
|
|
|
$436,885.00
|
|
|
$69.00
|
|
Phase 5 Lease Year 5
|
|
$5,318,600.00
|
|
|
$443,216.67
|
|
|
$70.00
|
|
Phase 5 Lease Year 6
|
|
$5,394,580.00
|
|
|
$449,548.33
|
|
|
$71.00
|
|
Phase 5 Lease Year 7
|
|
$5,470,560.00
|
|
|
$455,880.00
|
|
|
$72.00
|
|
Phase 5 Lease Year 8
|
|
$5,546,540.00
|
|
|
$462,211.67
|
|
|
$73.00
|
|
Phase 5 Lease Year 9
|
|
$5,622,520.00
|
|
|
$468,543.33
|
|
|
$74.00
|
|
Phase 5 Lease Year 10
|
|
$5,698,500.00
|
|
|
$474,875.00
|
|
|
$75.00
|
|
Phase 5 Lease Year 11
|
|
$5,774,480.00
|
|
|
$481,206.67
|
|
|
$76.00
|
|
Phase 5 Lease Year 12
|
|
$5,850,460.00
|
|
|
$487,538.33
|
|
|
$77.00
|
|
Phase 5 Lease Year 13
|
|
$5,926,440.00
|
|
|
$493,870.00
|
|
|
$78.00
|
|
*For purposes of this schedule "
Phase 5 Lease Year
" shall mean each consecutive twelve (12) month period during the Lease Term; provided, however, that the first Phase 5 Lease Year shall commence on the Phase 5 Lease Commencement Date and end on the last day of the month in which the first anniversary of the Phase 5 Lease Commencement Date occurs (except that if Tenant commences to conduct its business in the Phase 5 Premises prior to October 1, 2018, then the first Phase 5 Lease Year shall end September 30, 2019)and the second and each succeeding Phase 5 Lease Year shall commence on the first day of the next calendar month; and further provided that the last Phase 5 Lease Year shall end on the Lease Expiration Date with respect to the Phase 5 Premises.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
Period During Lease Term |
Annual Base Rent
|
Monthly Installment of Base Rent* |
Annual
Rental Rate per Rentable Square Foot* |
Phase 1 Lease Year 1
|
$1,564,740.00
|
$130,395.00
|
$90.00
|
Phase 1 Lease Year 2
|
$1,582,126.00
|
$131,843.83
|
$91.00
|
Phase 1 Lease Year 3
|
$1,599,512.00
|
$133,292.67
|
$92.00
|
Phase 1 Lease Year 4
|
$1,616,898.00
|
$134,741.50
|
$93.00
|
Phase 1 Lease Year 5
|
$1,634,284.00
|
$136,190.33
|
$94.00
|
Phase 1 Lease Year 6
|
$1,651,670.00
|
$137,639.17
|
$95.00
|
Phase 1 Lease Year 7
|
$1,669,056.00
|
$139,088.00
|
$96.00
|
Phase 1 Lease Year 8
|
$1,686,442.00
|
$140,536.83
|
$97.00
|
Phase 1 Lease Year 9
|
$1,703,828.00
|
$141,985.67
|
$98.00
|
Phase 1 Lease Year 10
|
$1,721,214.00
|
$143,434.50
|
$99.00
|
Phase 1 Lease Year 11
|
$1,738,600.00
|
$144,883.33
|
$100.00
|
Phase 1 Lease Year 12
|
$1,755,986.00
|
$146,332.17
|
$101.00
|
Phase 1 Lease Year 13
|
$1,773,372.00
|
$147,781.00
|
$102.00
|
Phase 1 Lease Year 14
|
$1,790,758.00
|
$149,229.83
|
$103.00
|
Phase 1 Lease Year 15
|
$1,808,144.00
|
$150,678.67
|
$104.00
|
Phase 1 Lease Year 16
|
$1,825,530.00
|
$152,127.50
|
$105.00
|
*For purposes of this schedule "
Phase 1 Lease Year
" shall mean each consecutive twelve (12) month period during the Lease Term; provided, however, that the first Phase 1 Lease Year shall commence on the Phase 1 Lease Commencement Date and end on the last day of the month in which the first anniversary of the Phase 1 Lease Commencement Date occurs (except that if Tenant commences to conduct its business in the Phase 1 Premises prior to April 1, 2017, then the first Phase 1 Lease Year shall end March 31, 2018) and the second and each succeeding Phase 1 Lease Year shall commence on the first day of the next calendar month; and further provided that the last Phase 1 Lease Year shall end on the Lease Expiration Date with respect to the Phase 1 Premises.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-3
-10-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-4
-1-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-5
-1-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
Floor
|
RSF
|
2
|
2,313
*
|
31
|
25,028
|
32
|
24,967
|
33
|
25,145
|
34
|
25,490
|
35
|
25,373
|
36
|
25,389
|
37
|
25,576
|
38
|
25,447
|
39
|
25,293
|
40
|
25,127
|
41
|
24,945
|
42
|
24,743
|
43
|
24,528
|
44
|
24,293
|
45
|
24,041
|
*Note, the RSF of the Building specified in
Section 2.1
of the Summary does not include the RSF of the second (2
nd
) floor of the Building. Therefore, if Tenant or any other tenant of the Building leases all or any portion of the second (2
nd
) floor, the Building RSF shall be increased to include such RSF, and Tenant's Shares shall be adjusted accordingly to account for the additional RSF.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-6
-1-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-7
-1-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT A-8
-1-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT B
-21-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
Division Number
|
Pages
|
Section
|
Title
|
Date Issued
|
Issue Name
|
DIVISION 1
|
91
|
|
General Conditions
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
GENERAL
|
2
|
01 10 00
|
Summary
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
REQUIREMENTS
|
1
|
01 11 10
|
Definitions
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
2
|
01 21 00
|
Allowances
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
1
|
01 22 00
|
Unit Prices
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
2
|
01 23 00
|
Alternates
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
2
|
01 25 10
|
Substitution Request Form
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
01 31 00
|
Project Management and Coordination
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
01 33 00
|
Submittal Procedures
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
01 40 00
|
Quality Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
14
|
01 42 00
|
References
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
01 45 00
|
Structural Testing, Inspection, and Quality Assurance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
8
|
01 50 00
|
Temporary Facilities and Controls
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
01 51 00
|
Environmental Procedures
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
1
|
01 52 00
|
Emergency Response
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
01 60 00
|
Product Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
01 73 00
|
Execution
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
01 73 16
|
Construction Tolerance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
01 74 19
|
Construction Waste Management and Disposal
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
01 77 00
|
Closeout Procedures
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
01 79 00
|
Demonstration and Training
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
11
|
01 81 13
|
Sustainable Design Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
01 91 13
|
General Commissioning Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 3
|
5
|
03 10 00
|
Concrete Forming and Accessories
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
CONCRETE
|
4
|
03 20 00
|
Concrete Reinforcing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
12
|
03 30 00
|
Cast-in-Place Concrete
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
8
|
03 33 12
|
Landscape Cast-in-Place Concrete
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
03 37 13
|
Shotcrete
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 4
|
11
|
04 22 00
|
Concrete Unit Masonry
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
MASONRY
|
14
|
04 42 00
|
Exterior Stone Cladding
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 5
|
10
|
05 12 00
|
Structural Steel Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
METALS
|
6
|
05 31 00
|
Steel Decking
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
05 40 00
|
Cold-Formed Metal Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
10
|
05 50 00
|
Metal Fabrications
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
05 51 13
|
Metal Stairs
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
05 52 13
|
Pipe Railings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
05 53 13
|
Bar Gratings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
05 60 00
|
Site Metal Fabrications
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
05 63 00
|
Stainless Steel Column Cladding
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
8
|
05 70 00
|
Decorative Metal
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
05 73 00
|
Decorative Metal Railings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
DIVISION 6
|
5
|
06 06 60
|
Specialty Resin Panels
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
WOOD,
|
6
|
06 10 00
|
Rough Carpentry
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
PLASTICS, AND
|
3
|
06 16 00
|
Sheathing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
COMPOSITES
|
7
|
06 41 16
|
Plastic-Laminate-Faced Architectural Cabinets
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
|
|
|
|
|
||
|
|
|
|
|
|
||
DIVISION 7
|
4
|
07 12 00
|
Liquid Elastomeric Waterproofing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
THERMAL AND
|
9
|
07 13 26
|
Below Grade Sheet Waterproofing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
MOISTURE
PROTECTION
|
8
|
07 14 13
|
Hot Fluid-Applied Rubberized Asphalt Waterproofing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
07 14 16
|
Cold Fluid-Applied Waterproofing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
07 16 10
|
Cementitious Waterproofing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
Deleted
|
7
|
07 18 00
|
Traffic Coatings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
4
|
07 19 19
|
Silicone Elastomeric Coating
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
3
|
07 19 23
|
Site Repellents
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
07 21 00
|
Thermal Insulation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
07 27 26
|
Fluid-Applied Membrane Air Barriers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
07 42 13.13
|
Formed Metal Wall Panels
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
7
|
07 42 13.14
|
Ribbed Metal Wall Panels
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
07 42 13.53
|
Metal Soffit Panels
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
11
|
07 52 16
|
Styrene-Butadiene-Styrene (SBS) Modified Bituminous Membrane Roofing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
10
|
07 62 00
|
Sheet Metal Flashing and Trim
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
2
|
07 67 00
|
Elastomeric Flashing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
7
|
07 72 00
|
Roof Accessories
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
07 81 00
|
Applied Fireproofing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
07 84 13
|
Penetration Firestopping
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
07 84 46
|
Fire-Resistive Joint Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
10
|
07 92 00
|
Joint Sealants
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
3
|
07 92 14
|
Site Sealants
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
4
|
07 95 00
|
Expansion Control
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
|
|
|
|
|
||
|
|
|
|
|
|
||
DIVISION 8
|
8
|
08 11 13
|
Hollow Metal Doors and Frames
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
OPENINGS
|
8
|
08 11 14
|
Custom Stainless Steel Doors and Frames
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
7
|
08 14 16
|
Flush Wood Doors
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
08 31 13
|
Access Doors and Frames
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
08 33 23
|
Overhead Coiling Doors
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
08 33 26
|
Overhead Coiling Grilles
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
10
|
08 41 13
|
Aluminum-Framed Entrances and Storefronts
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
08 41 26
|
All-Glass Entrances and Storefronts
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
7
|
08 42 33
|
Revolving Door Entrances
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
Deleted
|
9
|
08 43 00
|
Formed Stainless Steel Doors and Entrances
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
26
|
08 44 13
|
Glazed Aluminum Curtain Walls
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
51
|
08 71 00
|
Door Hardware
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
17
|
08 80 00
|
Glazing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
4
|
08 83 00
|
Mirrors
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
08 91 19
|
Fixed Louvers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
|
|
|
|
|
||
|
|
|
|
|
|
||
DIVISION 9
|
2
|
09 00 00
|
Mock-Up Rooms and Assemblies
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
FINISHES
|
6
|
09 21 16.23
|
Gypsum Board Shaft Wall Assemblies
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
|
6
|
09 22 16
|
Non-Structural Metal Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
09 24 00
|
Portland Cement Plastering
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
09 29 00
|
Gypsum Board
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
9
|
09 30 00
|
Tiling
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
09 51 13
|
Acoustical Panel Ceilings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
09 54 50
|
Metal Panel Ceilings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
09 54 60
|
Seamless Sound Absorptive Acoustical Finish System
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
10
|
09 63 40
|
Stone Flooring
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
09 65 13
|
Resilient Base and Accessories
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
09 65 19
|
Resilient Tile Flooring
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
09 68 13
|
Tile Carpeting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
11
|
09 69 00
|
Access Flooring
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
4
|
09 72 00
|
Wall Coverings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
9
|
09 75 13
|
Interior Stone Paneling
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
4
|
09 80 00
|
High-Performance Architectural Coatings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
09 91 13
|
Exterior Painting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
09 91 23
|
Interior Painting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
4
|
09 91 40
|
Concrete Sealer
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
|
|
|
|
|
||
|
|
|
|
|
|
||
DIVISION 10
|
5
|
10 14 00
|
Signage
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
SPECIALTIES
|
215
|
10 14 01
|
Signage Message Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
1
|
10 14 02
|
Signage Color Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
10 14 03
|
Signage Materials Notes
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
3
|
10 14 43
|
Photoluminescent Egress Path Markings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
4
|
10 21 13
|
Toilet Compartments
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
10 22 13
|
Wire Mesh Partitions
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
4
|
10 28 00
|
Toilet and Bath Accessories
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
10 44 00
|
Fire Protection Specialties
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
5
|
10 50 00
|
Metal Lockers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
6
|
10 55 00
|
Postal Specialties
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
|
|
|
|
|
||
|
|
|
|
|
|
||
DIVISION 11
|
9
|
11 12 46
|
Electric Retractable Bollards
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
EQUIPMENT
|
2
|
11 16 50
|
Dock Bumpers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
12
|
11 24 00
|
Exterior Building Maintenance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
8
|
11 24 01
|
Window Cleaners’ Suspended Access Platform
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
|
|
|
|
|
||
|
|
|
|
|
|
||
DIVISION 12
|
6
|
12 36 40
|
Stone Countertops
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
FURNISHINGS
|
3
|
12 93 00
|
Site Furniture
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
3
|
12 93 10
|
Lighting Pylon
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
|
|
|
|
|
|
||
|
|
|
|
|
|
||
DIVISION 14
|
26
|
14 21 00
|
Electric Elevators
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
CONVEYING
|
8
|
14 21 10
|
Elevator Cars and Entrances
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
||
SYSTEMS
|
|
|
|
|
|
||
|
|
|
|
|
|
||
|
|
|
|
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
DIVISION 21
|
20
|
21 00 10
|
General Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
FIRE
|
5
|
21 00 20
|
Fire Suppression Scope of Work
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
SUPPRESSION
|
1
|
21 05 07
|
Design Conditions
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
21 05 13
|
Motor Requirements for Fire Suppression Equipment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
21 05 48
|
Vibration and Seismic Controls for Fire Suppression Piping and Equipment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
21 05 50
|
Access Doors and Color-Coded Identification in General Construction
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
21 05 93
|
Testing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
Deleted
|
4
|
21 07 00
|
Fire Suppression System Insulation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
21 11 00
|
Connections to Utilities
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
12
|
21 12 00
|
Fire Suppression Standpipe Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
12
|
21 13 00
|
Fire Suppression Sprinkler Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
21 30 00
|
Fire Pumps and Controllers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
21 41 00
|
Fire Suppression Water Storage Tank
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 22
|
20
|
22 00 10
|
General Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
PLUMBING
|
5
|
22 00 20
|
Plumbing Scope of Work
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
22 00 30
|
Connections to Utilities
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
1
|
22 05 07
|
Design Conditions
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
22 05 13
|
Motor Requirements for Plumbing Equipment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
22 05 48
|
Vibration Isolation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
22 05 50
|
Access Doors and Color-Coded Identification in General Construction
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
22 05 93
|
Testing, Balancing, and Adjusting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
22 07 00
|
Thermal Insulation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
12
|
22 10 00
|
Domestic Water Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
12
|
22 11 30
|
Recycled Water Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
22 12 00
|
Potable Water Storage Tanks
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
22 13 00
|
Sewage and Drainage System
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
22 13 26
|
Facility Fuel Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
22 21 23
|
Pumps
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
22 30 00
|
Plumbing Equipment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
22 40 00
|
Clean-outs, Drains, and Plumbing Fixtures
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
22 63 13
|
Natural Gas Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 23
|
20
|
23 00 10
|
General Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
HEATING,
|
10
|
23 00 20
|
HVAC Scope of Work
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
VENTILATING,
|
2
|
23 05 07
|
Design Conditions
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
AND AIR-
|
9
|
23 05 13
|
Motor Requirements for HVAC Equipment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
CONDITIONING
|
7
|
23 05 30
|
Miscellaneous Equipment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
(HVAC)
|
9
|
23 05 48
|
Vibration Isolation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
23 05 50
|
Access Doors and Color Coded Identification in General Construction
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
23 05 93
|
Testing, Balancing, and Adjusting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
8
|
23 07 00
|
Thermal Insulation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
|
10
|
23 08 00
|
Mechanical Systems Commissioning Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
2
|
23 08 31
|
CA Title 24 Energy Standards HVAC Acceptance Testing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
17
|
23 21 13
|
Pipes, Valves, Fittings, and Accessories
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
23 21 23
|
Pumps
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
8
|
23 25 00
|
Water Treatment Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
14
|
23 31 00
|
Ductwork and Sheet Metal
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
23 33 19
|
Sound Absorbing Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
10
|
23 34 00
|
Exhaust and Ventilating Fans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
11
|
23 36 00
|
Air Terminal Units
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
11
|
23 37 00
|
Air Distribution Equipment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
23 40 00
|
Air Filtering
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
23 41 00
|
Tanks and Vessels
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
23 52 16
|
Condensing Boilers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
23 57 19
|
Liquid-to-Liquid Heat Exchangers for HVAC
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
11
|
23 64 16
|
Centrifugal Water Chilling Units
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
23 65 13
|
Factory Assembled Cooling Towers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
9
|
23 73 23
|
Custom Factory-Built Air Handling Units
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
11
|
23 73 63
|
Custom Factory-Built Tri-Path Multi-Zone Air Handling Units
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
23 81 21
|
Computer Room DX Air Cooled Air Handling Units
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
23 81 25
|
Computer Room Chilled Water Air Handling Units
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
23 82 19
|
Factory-Built Fan Coil Units
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
8
|
23 83 05
|
Radiant Hydronic Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 25
|
5
|
25 01 00
|
BMCS Scope of Work
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
BUILDING
|
19
|
25 05 00
|
BMCS General Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
MANAGEMENT
|
6
|
25 06 00
|
BMCS Documentation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
AND CONTROL
|
7
|
25 07 00
|
BMCS Testing and Inspections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
SYSTEM
|
7
|
25 08 00
|
BMCS Commissioning Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
25 11 00
|
BMCS Networks and Workstations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
12
|
25 14 00
|
BMCS Controllers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
13
|
25 15 00
|
BMCS Software
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
25 16 00
|
BMCS Software Interfaces
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
25 30 10
|
BMCS Field Devices – Electrical
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
10
|
25 30 20
|
BMCS Field Devices - Air
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
25 30 30
|
BMCS Field Devices – Water
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
25 35 19
|
BMCS Valves
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
25 35 23
|
BMCS Dampers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
126
|
25 80 00
|
BMCS Schedules, Diagrams, and Sequences
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 26
|
20
|
26 00 10
|
General Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
ELECTRICAL
|
6
|
26 00 20
|
Scope of Work
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
2
|
26 05 11
|
Electrical Service
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
26 05 19
|
Electrical Conductors - 600 Volts
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
26 05 23
|
Motor and Control Wiring Systems
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
26 05 26
|
Grounding and Bonding
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
26 05 33
|
Raceways and Boxes
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
26 05 43
|
Underground Ducts and Raceways
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
|
5
|
32 14 40
|
Sand-Set Stone Paving
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
1
|
32 16 13
|
Concrete Curbs and Gutters
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
32 17 13
|
Parking Accessories
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
32 17 23
|
Pavement Markings
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
32 34 10
|
Geosynthetic Fill
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
32 84 00
|
Planting Irrigation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
32 91 13
|
Planting Soil Preparation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
3
|
32 91 30
|
Planting Area Finish Grading
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
6
|
32 92 10
|
Contract Growing and Maintenance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
5
|
32 93 00
|
Planting Materials
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
12
|
32 94 53
|
Modular Suspended Pavement System
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 33
|
1
|
33 05 13
|
Manhole Grade Adjustment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
UTILITIES
|
1
|
33 05 16
|
Utility Structures
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
1
|
33 10 00
|
Water Utilities
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
1
|
33 30 00
|
Sanitary Sewer Utilities
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
4
|
33 41 19
|
Landscape Drainage
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
|
|
|
|
|
|
DIVISION 34
|
6
|
34 14 13
|
Aerial Tramway
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
TRANSPORTATION
|
9
|
34 14 14
|
Aerial Tramway Ropeway Equipment
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
14
|
34 14 15
|
Aerial Tramway Electrical
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
7
|
34 14 16
|
Aerial Tramway Maintenance Requirements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
ISSUE NO
|
SHEET NO.
|
SHEET TITLE
|
DATE ISSUED
|
ISSUE NAME
|
8
|
A00.00
|
Cover Sheet
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
6
|
C0.00
|
Title Sheet
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C0.10
|
Note Sheet
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C1.00
|
Existing Conditions Plan (West)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C1.10
|
Existing Conditions Plan (East)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C2.00
|
Demolition Plan (West)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C2.10
|
Demolition Plan (East)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C2.20
|
Demolition Plan Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C3.00
|
Horizontal Control Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C3.10
|
Horizontal Control Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C4.00
|
Grading Plan (West)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C4.10
|
Grading Plan (East)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C5.00
|
Utility Plan (West)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C5.10
|
Utility Plan (East)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C5.20
|
Utility Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C6.00
|
Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
C6.10
|
Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
C6.20
|
Longitudinal Sidewalk Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C7.00
|
Erosion Control Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C7.10
|
Erosion Control Notes and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C8.00
|
Civil Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C8.10
|
Civil Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C8.20
|
Civil Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C8.30
|
Civil Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C8.40
|
Civil Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C8.50
|
Civil Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
C8.60
|
Civil Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
6
|
SL1
|
Street Lighting Title Sheet
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
SL2
|
Street Lighting Site Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
1
|
L00.00
|
Drawing Index and Notes
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L00.01
|
Drawing Index and Notes
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L00.02
|
Drawing Index and Notes
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L01.01
|
Ground Level Zone 1 Area Site Plan (ID Plan)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L01.02
|
Ground Level Zone 2 Site Plan (ID Plan)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L01.03
|
Fifth Level Zone 3 Area Site Plan (ID Plan)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L02.01
|
Ground Level Zone 1 Construction Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L02.02
|
Ground Level Zone 2 Construction Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L02.03
|
Fifth Level Zone 3 Construction Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L03.01
|
Ground Level Zone 1 Layout Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L03.02
|
Ground Level Zone 2 Layout Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L03.03
|
Fifth Level Zone 3 Layout Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L03.04
|
Layout & Construction Plan Enlargements
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L04.01
|
Ground Level Zone 1 Subslab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L04.02
|
Ground Level Zone 2 Subslab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L05.01
|
Ground Level Zone 1 Grading & Drainage Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L05.02
|
Ground Level Zone 2 Grading and Drainage Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L05.03
|
Fifth Level Zone 3 Grading and Drainage Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L06.02
|
Ground Level Zone 2 Piping Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L06.03
|
Fifth Level Zone 3 Piping Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L07.02
|
Ground Level Zone 2 Lightweight Fill Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L08.02
|
Ground Level Zone 2 Soil Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L08.03
|
Fifth Level Zone 3 Soil Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L09.01
|
Ground Level Zone 1 Irrigation Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L09.02
|
Ground Level Zone 2 Irrigation Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L09.03
|
Fifth Level Zone 3 Irrigation Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L09.04
|
Irrigation Notes and Legend
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L09.05
|
Irrigation Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L10.02
|
Ground Level Zone 2 Planting Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L10.03
|
Fifth Level Zone 3 Planting Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.10
|
Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.11
|
Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.12
|
Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.13
|
Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.20
|
Granite Paving Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.21
|
Granite Paving Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.22
|
Granite Paving Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.23
|
Granite Paving Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.40
|
Site Metals Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.41
|
Site Metals Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.42
|
Site Metal Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.50
|
Stainless Steel Planter Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.80
|
Site Furnishings Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.81
|
Site Furnishings Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.90
|
Lighting Pylon Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
L11.91
|
Lighting Pylon Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
6
|
A01.01
|
Code Analysis
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
9
|
A01.02
|
General Information
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A01.03
|
Conditions of Approval
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
4
|
A01.04
|
Mission Square Easement Agreement
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
A01.05
|
Mission Square Easement Agreement
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
A01.06
|
Mission Square Easement Agreement
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A01.07
|
LEED Checklist
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
A01.08
|
Pedestrian Bridge AB 005
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A01.09
|
Rescue Air AB 005
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A01.10
|
Fire Water Calculations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A01.11
|
Cladding Pressure Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A01.12
|
Cladding Pressure Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A01.13
|
Fire Safety Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A01.14
|
Fire Safety Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A01.15
|
Horizontal Fin Pressure Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A12.01
|
Smoke Control Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A12.02
|
Smoke Control Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A12.03
|
Smoke Control Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A12.04
|
Smoke Control Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A12.05
|
Smoke Control Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A12.06
|
Smoke Control Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A12.07
|
Smoke Control Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.01
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.02
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.03
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.04
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.05
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.06
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.07
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.08
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.09
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.10
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.11
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.12
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.13
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.14
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.15
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.16
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.17
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.18
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.19
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A13.20
|
Egress and Rating Diagrams
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A14.21
|
Building Energy Analysis ENV-1C
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A14.22
|
Building Energy Analysis ENV-1C
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
8
|
A20.01
|
Site Plan Level 1
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A20.05
|
Site Plan Level 5
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A20.10
|
Gondola Lift Plan and Profile
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A21.01
|
Enlarged Site Plans Gondola
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A21.02
|
Enlarged Site Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A21.03
|
Enlarged Garage Entry Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A21.05
|
Pedestrian Bridge Plan and Underside RCP
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A21.06
|
Pedestrian Bridge Canopy Plan and RCP
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A21.10
|
Pedestrian Bridge Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A22.01
|
Gondola Lift Plan and Profile
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A22.10
|
Site Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A22.11
|
Site Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
5
|
A30.58
|
Level 58 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
5
|
A30.59
|
Level 59 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
5
|
A30.60
|
Level 60 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
5
|
A30.61
|
Level 61 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
5
|
A30.62
|
Level 62 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
5
|
A30.63
|
Level 63 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A30.64
|
Penthouse Roof Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A30.65
|
Maintenance Walkway 1
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A30.66
|
Maintenance Walkway 2
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A30.67
|
Maintenance Walkway 3
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A30.68
|
Maintenance Walkway 4
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A30.69
|
Composite Roof Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.P3
|
Level P3 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.P2
|
Level P2 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.P1
|
Level P1 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.01
|
Level 01 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.02
|
Level 02 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.03
|
Level 03 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.04
|
Level 04 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.05
|
Level 05 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.06
|
Level 06-14 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.15
|
Level 15 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.16
|
Level 16 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.17
|
Level 17 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.18
|
Level 18 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.19
|
Level 19-30 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.31
|
Level 31 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.32
|
Level 32 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.33
|
Level 33 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.34
|
Level 34 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.35
|
Level 35 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.36
|
Level 36 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.37
|
Level 37-46 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.47
|
Level 47 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.48
|
Level 48 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.49
|
Level 49 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.50
|
Level 50 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.51
|
Level 51-56 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.57
|
Level 57-60 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.61
|
Level 61 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.62
|
Level 62 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.63
|
Level 63 Enlarged Core Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A31.71
|
Level P1 Stair Transfer and Garage Exhaust Transfer
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.72
|
Enlarged Electrical Vault Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.73
|
Enlarged Switchgear Room Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.74
|
Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A31.75
|
Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A32.P1
|
Level P1 Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A32.01
|
Level 1 Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A32.02
|
Level 2 Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A32.03
|
Level 3 Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A32.05
|
Level 5 Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.P3
|
Level P3 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
3
|
A33.P2
|
Level P2 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.P1
|
Level P1 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.01
|
Level 01 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.02
|
Level 02 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.03
|
Level 03 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.04
|
Level 04 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.05
|
Level 05 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.06
|
Level 06 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.07
|
Level 07-14 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.15
|
Level 15 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.16
|
Level 16 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.17
|
Level 17 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.18
|
Level 18-26 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.27
|
Level 27 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.28
|
Level 28 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.29
|
Level 29 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.30
|
Level 30 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.31
|
Level 31 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.32
|
Level 32 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.33
|
Level 33 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.34
|
Level 34 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.35
|
Level 35 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.36
|
Level 36 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.37
|
Level 37 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.38
|
Level 38 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.39
|
Level 39 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.40
|
Level 40 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.41
|
Level 41 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.42
|
Level 42 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.43
|
Level 43 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.44
|
Level 44 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.45
|
Level 45 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.46
|
Level 46 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.47
|
Level 47 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.48
|
Level 48 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.49
|
Level 49 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.50
|
Level 50 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.51
|
Level 51 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.52
|
Level 52 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.53
|
Level 53 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.54
|
Level 54 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.55
|
Level 55 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.56
|
Level 56 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.57
|
Level 57 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.58
|
Level 58 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.59
|
Level 59 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.60
|
Level 60 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.61
|
Level 61 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.62
|
Level 62 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.63
|
Level 63 Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
A33.64
|
Penthouse Roof Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A33.68
|
Composite Slab Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A34.01
|
Enlarged Lobby and Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
A34.02
|
Enlarged Public Lobby and Reflective Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A34.03
|
Enlarged Elevator Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A34.04
|
Enlarged Elevator Lobby Reflected Ceiling Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A34.05
|
Enlarged Elevator Lobby and Reflected Ceiling Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A34.06
|
Enlarged Garage Elev. and Lobby Ref. Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A34.07
|
Enlarged Garage Elevator Lobby
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A34.08
|
Mail Room Plan, Elevations and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.01
|
Enlarged Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.02
|
Enlarged Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.03
|
Enlarged Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.04
|
Enlarged Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.05
|
Enlarged Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.06
|
Enlarged Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.07
|
Enlarged Toilet Rooms
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.08
|
Enlarged Toilet Room Finish Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.09
|
Enlarged Toilet Room Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.10
|
Enlarged Toilet Rooms & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A35.11
|
Enlarged Locker Rooms & Showers
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A35.12
|
Enlarged Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A35.13
|
Enlarged Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A35.14
|
Alternate Toilet Room & Reflected Ceiling Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A36.01
|
Multi-Tenant Corridor and Lobby Plan, RCP and Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A36.02
|
Multi-Tenant Corridor and Lobby Plan, RCP and Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A36.03
|
Multi-Tenant Corridor and Lobby Plan, RCP and Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A36.04
|
Multi-Tenant Corridor and Lobby Plan, RCP and Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A36.05
|
Multi-Tenant Corridor and Lobby Plan, RCP and Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A36.06
|
Multi-Tenant Corridor and Lobby Plan, RCP and Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A36.11
|
Multi-Tenant Elevator Lobby Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A36.12
|
Multi-Tenant Elevator Lobby Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A36.21
|
Multi-Tenant Corridor and Elevator
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A36.22
|
Multi-Tenant Column Cover Details and Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
A40.01
|
Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
A40.02
|
Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.11
|
Enlarged Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.12
|
Enlarged Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.13
|
Enlarged Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.14
|
Enlarged Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.15
|
Enlarged Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.16
|
Enlarged Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.17
|
Enlarged Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.18
|
Enlarged Building Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.19
|
Enlarged Building Corner Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A40.20
|
Enlarged Building Corner Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.21
|
Enlarged Tower Top Typical Curtain Wall Elevation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.22
|
Enlarged Tower Top Core Elevation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.23
|
Enlarged Tower Top Core Elevation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.24
|
Enlarged Tower Top Core Elevation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.25
|
Enlarged Tower Top Core Elevation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.31
|
Generator Exhaust Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.32
|
Enlarged Details Generator Exhaust
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A40.33
|
Plan Details Column Enclosure L6-26
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A40.34
|
Plan Details Column Enclosure L27-44
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A40.35
|
Plan Details Column Enclosure L60
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
A40.41
|
Garage Entry Elevations North and South
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A40.42
|
Garage Entry Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
A50.01
|
Tower Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.11
|
Garage Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.12
|
Garage Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.13
|
Garage Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.14
|
Garage Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.15
|
Garage Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.16
|
Garage Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A50.17
|
Garage Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.21
|
Electrical Vault Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.25
|
Penthouse Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A50.26
|
Penthouse Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.01
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.02
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.03
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.04
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.05
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.06
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.07
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.08
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.09
|
Foundation Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A52.10
|
Garage Exhaust Transfer Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A53.01
|
Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A53.02
|
Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A53.03
|
Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A53.04
|
Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A53.05
|
Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A53.06
|
Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A53.07
|
Section Detail Gondola
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.10
|
Slab Edge Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.11
|
Slab Edge Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.12
|
Slab Edge Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.13
|
Slab Edge Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.14
|
Enlarged Slab Edge Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.15
|
Enlarged Slab Edge Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.16
|
Enlarged Slab Edge Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.21
|
Enlarged Penthouse Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A54.22
|
Enlarged Penthouse Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A55.01
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.02
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.03
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.04
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.05
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.06
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.07
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.08
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.09
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.10
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.11
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A55.12
|
Enlarged Curtain Wall Shade RCP L6-26
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A55.14
|
Enlarged Curtain Wall Shade Radiused RCP Corner
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.15
|
Enlarged Curtain Wall Shade RCP L1-5
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
A55.16
|
Enlarged Curtain Wall Shade RCP L6-26
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.18
|
Enlarged Curtain Wall Shade
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.25
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.26
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.31
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.32
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.33
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.34
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.35
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.36
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.37
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.38
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.39
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.40
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.41
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.42
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.43
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.44
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.45
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.46
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.47
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.48
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.49
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.50
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.51
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.52
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.53
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.54
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.55
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.56
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A55.57
|
Enlarged Curtain Plan, Elevation & Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A55.61
|
Curtain Wall Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A55.62
|
Curtain Wall Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A55.63
|
Curtain Wall Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.01
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.02
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.03
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.04
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.05
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.06
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.07
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.08
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.09
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.10
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.11
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.12
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.13
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.14
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.15
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.16
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.17
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.18
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.19
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
A56.20
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.21
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.22
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A56.23
|
Curtain Wall Geometry Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A60.01
|
Curtain Wall Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A60.51
|
Curtain Wall Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A60.52
|
Curtain Wall Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A60.53
|
Curtain Wall Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A60.71
|
Curtain Wall Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A60.72
|
Curtain Wall Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A60.73
|
Curtain Wall Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A60.74
|
Curtain Wall Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A60.75
|
Curtain Wall Section Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
DELETED
|
A60.79
|
Curtain Wall Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.01
|
Enlarged Stair Plans Stair 1
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.02
|
Enlarged Stair Plans Stair 1 & 2
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.03
|
Enlarged Stair Plans Stair 2 & 3
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.04
|
Enlarged Stair Plans Stair 3 & 4 & 5
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.11
|
Enlarged Stair Sections Stair 1 & 2
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.12
|
Enlarged Stair Sections Stair 1 & 2
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.13
|
Enlarged Stair Sections Stair 1, 2 & 3
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.14
|
Enlarged Stair Sections Stair 3 & 4
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.15
|
Stair Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.16
|
Stair Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.17
|
Maintenance Ladder
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.21
|
Elevator Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.22
|
Elevator Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.23
|
Elevator Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.24
|
Elevator Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.25
|
Elevator Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.31
|
Elevator Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.32
|
Elevator Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.33
|
Elevator Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.34
|
Elevator Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.35
|
Elevator Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.41
|
Cab Plans & Elevations PE 1-28
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.42
|
Cab Plans & Elevations PE 29-30
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.43
|
Cab Plans & Elevations GE 1-2
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A70.44
|
Cab Plans & Elevations SE 1-2
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A80.01
|
Partition Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A80.02
|
Partition Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A80.11
|
Finish Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A80.21
|
Door Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A80.22
|
Door Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A80.23
|
Door Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A80.24
|
Door Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A80.25
|
Perforated Metal Door Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A90.21
|
Mechanical Supply / Return Chase Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A90.22
|
Mechanical Supply / Return Chase Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A90.31
|
Column Enclosure Plan
|
10 FEB 2014
|
Issued for Bid Addendum #2
|
2
|
A90.41
|
Raised Access Floor Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.01
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.02
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
A91.03
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.04
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.05
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.06
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.07
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.08
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.09
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.10
|
Lobby Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.11
|
Interior Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.12
|
Interior Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.13
|
Interior Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.14
|
Interior Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.15
|
Interior Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.16
|
Interior Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.17
|
Interior Plan Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.18
|
Hanging System Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A91.19
|
Lobby Interior Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A91.20
|
Lobby Interior Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A91.21
|
Interior Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A92.01
|
Toilet Room Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A92.02
|
Toilet Room Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
A92.03
|
Toilet Room Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A92.11
|
Toilet Room Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A92.12
|
Toilet Room and Shower Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A95.01
|
Bicycle Storage
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
A95.02
|
Garage Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
4
|
S0.01
|
Abbreviations, Legends, and Drawing List
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S0.02
|
Symbols and Reinforcing Bar Tables
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S0.03
|
General Notes
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S0.04
|
General Notes
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
S0.11
|
Structural Design Criteria
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
S0.12
|
Structural Design Criteria
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
S0.13
|
Structural Design Criteria
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
6
|
S0.14
|
Structural Design Criteria
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
4
|
S1.01
|
Load Maps
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S1.02
|
Load Maps
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S1.03
|
Load Maps
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
7
|
S2.00
|
Load Bearing Element Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P3
|
Foundation Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P3B
|
Foundation Mat Bottom Reinforcing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P3S
|
Foundation Mat Shear Reinforcing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P3T
|
Foundation Mat Top Reinforcing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P2
|
Level P2 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P2B
|
Level P2 Bottom Reinforcing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P2T
|
Level P2 Top Reinforcing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P1
|
Level P1 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.P1B
|
Level P1 Bottom Reinforcing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
4
|
S2.P1T
|
Level P1 Top Reinforcing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.01
|
Level 1 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.02
|
Level 2 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.03
|
Level 3 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.04
|
Level 4 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.05
|
Level 5 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.06
|
Levels 6-14 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.15
|
Level 15 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.16
|
Level 16 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.17
|
Level 17 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.18
|
Levels 18-24 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.25
|
Level 25 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.26
|
Level 26 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.27
|
Level 27 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.28
|
Level 28 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.29
|
Level 29 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.30
|
Level 30 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.31
|
Level 31 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.32
|
Level 32 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.33
|
Level 33 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.34
|
Level 34 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.35
|
Level 35 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.36
|
Level 36 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.37
|
Level 37 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.38
|
Level 38 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.39
|
Level 39 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.40
|
Level 40 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.41
|
Level 41 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.42
|
Level 42 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.43
|
Level 43 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.44
|
Level 44 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.45
|
Level 45 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.46
|
Level 46 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.47
|
Level 47 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.48
|
Level 48 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.49
|
Level 49 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.50
|
Level 50 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.51
|
Level 51 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.52
|
Level 52 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.53
|
Level 53 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.54
|
Level 54 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.55
|
Level 55 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.56
|
Level 56 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.57
|
Level 57 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.58
|
Level 58 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.59
|
Level 59 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.60
|
Level 60 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.61
|
Level 61 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.62
|
Level 62 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.63
|
Level 63 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.64
|
Level 64 Framing Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S2.70
|
Partial Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
4
|
S3.01
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S3.01S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.02
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S3.02S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.03
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.04
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.04S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.05
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S3.05S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.06
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.07
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.07S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.08
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.08S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.09
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.09S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.10
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S3.10S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.11
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S3.11S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.12
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.12S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.13
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.13S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.14
|
Shear Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.14S
|
Shear Wall Elevations - Sleeve Penetrations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.21
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.22
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.23
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.24
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.25
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.26
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.27
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.28
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.29
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.30
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.31
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.32
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.33
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.34
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.35
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.36
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.37
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.38
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.39
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.40
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.41
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.42
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.43
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.44
|
Shear Wall Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.47
|
Coupling Beam Details and Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.48
|
Typical Steel Coupling Beam Details and Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.49
|
Typical Shear Wall Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
4
|
S3.51
|
Basement Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.52
|
Basement Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.53
|
Basement Wall Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.61
|
Tower Top Feature Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.62
|
Tower Top Feature Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.63
|
Tower Top Feature Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.64
|
Tower Top Feature Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S3.65
|
Tower Top Feature Partial Plans and Elevations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S3.71
|
Plaza Elevator Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S3.72
|
Screenwall Framing
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
7
|
S4.01
|
Load Bearing Element Schedule and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.02
|
Typical Foundation and Column Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S4.03
|
Typical Concrete Slab Details and Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.04
|
Typ Concrete Beam & One-Way Slab Details & Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S4.05
|
Typical Concrete Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.19
|
Sloped Steel Column Geometry
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S4.20
|
Steel Column Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.21
|
Typical Steel Column Details and Schedule
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.22
|
Typical Steel Beam Connections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.23
|
Typical Steel Beam Connections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.24
|
Typical Steel Beam Connections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.25
|
Typical Steel Details and Window Washing Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S4.26
|
Typical Steel Deck Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S4.31
|
Typical CMU Wall Details and Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
4
|
S5.01
|
Concrete Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S5.02
|
Concrete Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S5.03
|
Concrete Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S5.11
|
Concrete Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
3
|
S6.01
|
Steel Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S6.51
|
Top Feature Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S6.52
|
Top Feature Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S6.53
|
Top Feature Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
4
|
S6.54
|
Top Feature Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S6.55
|
Top Feature Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S6.56
|
Top Feature Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
3
|
S6.57
|
Top Feature Sections and Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
2
|
M0.01
|
Mechanical Legend and Abbreviations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.02
|
Title 24 Compliance Forms
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.03
|
Title 24 Compliance Forms
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.04
|
Title 24 Compliance Forms
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.05
|
Title 24 Compliance Forms
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.06
|
Title 24 Compliance Forms
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.07
|
Title 24 Compliance Forms
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.08
|
Title 24 Compliance Forms
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.09
|
Mechanical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M0.10
|
Mechanical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
M0.11
|
Mechanical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.P3
|
Mechanical Parking Level 3 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.P2
|
Mechanical Parking Level 2 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.P1
|
Mechanical Parking Level 1 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.01
|
Mechanical Level 1 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.02
|
Mechanical Level 2 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.03
|
Mechanical Level 3 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.04
|
Mechanical Level 4 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.05
|
Mechanical Level 5 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.06
|
Mechanical Typical Plan – Levels 6-16
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.17
|
Mechanical Level 17 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.18
|
Mechanical Level 18 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.19
|
Mechanical Typical Plan – Levels 19-30
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.31
|
Mechanical Level 31 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.32
|
Mechanical Level 32 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.33
|
Mechanical Level 33 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.34
|
Mechanical Level 34 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.35
|
Mechanical Level 35 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.36
|
Mechanical Level 36 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.37
|
Mechanical Typical Plan – Levels 37-48
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.49
|
Mechanical Level 49 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.50
|
Mechanical Level 50 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.51
|
Mechanical Level 51 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.52
|
Mechanical Typical Plan – Levels 52-54
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.55
|
Mechanical Typical Plan – Levels 55-58
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.59
|
Mechanical Typical Plan – Levels 59-60
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.61
|
Mechanical Level 61 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.61A
|
Mechanical Level 61 Alternate Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.62
|
Mechanical Level 62 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.63
|
Mechanical Level 63 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M2.64
|
Mechanical Level 64 Roof Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.01
|
Mechanical Boiler Plant Enlarged Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.02
|
Mechanical Chiller Plant Enlarged Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.03
|
Mechanical Generator Plan & Louver Summary
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.04
|
Typical Mechanical Room Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.05
|
Typical Mechanical Room Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.06
|
Mechanical Garage Exhaust Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.07
|
Mechanical Radiant Floor Layout
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.08
|
Mechanical Restroom Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.09
|
Mechanical Cooling Tower Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.10
|
Mechanical Multi-Tenant Corridor– Levels 4, 6-14
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M3.11
|
Mechanical Multi-Tenant Corridor Plan – Levels 50-61
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M4.01
|
Mechanical Air Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M4.02
|
Mechanical Air Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M4.03
|
Mechanical Air Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M4.04
|
Mechanical Water Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M4.05
|
Mechanical Water Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M4.06
|
Mechanical Water Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M4.07
|
Mechanical Chilled Water Plant Flow Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M4.08
|
Mechanical Heating Plant Flow Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M6.01
|
Mechanical Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M6.02
|
Mechanical Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
M6.03
|
Mechanical Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
M6.04
|
Mechanical Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
2
|
E0.01
|
Electrical Legends and Abbreviations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.02
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.03
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.04
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.05
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.06
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.07
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.08
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.09
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.10
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.11
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.12
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.13
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.14
|
Electrical Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.15
|
Electrical Title 24 Compliance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.16
|
Electrical Title 24 Compliance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.17
|
Electrical Title 24 Compliance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.18
|
Electrical Title 24 Compliance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.19
|
Electrical Title 24 Compliance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E0.20
|
Electrical Title 24 Compliance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
E0.21
|
Electrical Title 24 Compliance
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.P3
|
Electrical Parking Level 3 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.P2
|
Electrical Parking Level 2 Plan - Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.P1
|
Electrical Parking Level 1 Plan - Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.00
|
Electrical Site Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.01
|
Electrical Level 1 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.02
|
Electrical Level 2 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.03
|
Electrical Level 3 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.04
|
Electrical Level 4 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.05
|
Electrical Level 5 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.06
|
Electrical Typical Plan - Levels 6-14 - Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.15
|
Electrical Level 15 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.16
|
Electrical Level 16 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.17
|
Electrical Level 17 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.18
|
Electrical Typical Plan - Levels 18-30– Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.31
|
Electrical Level 31 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.32
|
Electrical Level 32 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.33
|
Electrical Level 33 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.34
|
Electrical Level 34 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.35
|
Electrical Level 35 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.36
|
Electrical Level 36 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.37
|
Electrical Typical Plan - Levels 37-46
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.47
|
Electrical Level 47 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.48
|
Electrical Level 48 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.49
|
Electrical Level 49 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.50
|
Electrical Level 50 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.51
|
Electrical Typical Plan - Levels 51-60 – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.61
|
Electrical Level 61 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
E2.62
|
Electrical Level 62 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.63
|
Electrical Level 63 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.64
|
Electrical Level 64 Plan – Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.65
|
Electrical Maintenance Walkway 1 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.66
|
Electrical Maintenance Walkway 2 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.67
|
Electrical Maintenance Walkway 3 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E2.68
|
Electrical Maintenance Walkway 4 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.P3
|
Electrical Parking Level 3 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.P2
|
Electrical Parking Level 2 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.P1
|
Electrical Parking Level 1 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.01
|
Electrical Level 1 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.02
|
Electrical Level 2 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.03
|
Electrical Level 3 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.04
|
Electrical Level 4 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.05
|
Electrical Level 5 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.06
|
Electrical Typical Plan - Levels 6-14 – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.15
|
Electrical Level 15 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.16
|
Electrical Level 16 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.17
|
Electrical Level 17 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.18
|
Electrical Typical Plan - Levels 18-30 - Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.31
|
Electrical Level 31 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.32
|
Electrical Level 32 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.33
|
Electrical Level 33 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.34
|
Electrical Level 34 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.35
|
Electrical Level 35 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.36
|
Electrical Level 36 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.37
|
Electrical Typical Plan - Levels 37-46 – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.47
|
Electrical Level 47 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.48
|
Electrical Level 48 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.49
|
Electrical Level 49 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.50
|
Electrical Level 50 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.51
|
Electrical Typical Plan - Levels 51-60 – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.61
|
Electrical Level 61 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.62
|
Electrical Level 62 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.63
|
Electrical Level 63 Plan – Lighting
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.70
|
Electrical Catwalk Lighting Section
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E3.71
|
Electrical Tower Top Lighting Elevation
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.01
|
Electrical Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.02
|
Electrical Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.03
|
Electrical Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.04
|
Electrical Enlarged PG&E Vaults
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.05
|
Electrical Enlarged PG&E Vaults
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.06
|
Electrical Multi-Tenant Corridor – Levels 4, 6-14
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.07
|
Electrical Multi-Tenant Corridor Plan – Levels 15-30
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.08
|
Electrical Multi-Tenant Corridor Plan – Levels 31-34
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.09
|
Electrical Multi-Tenant Corridor Plan – Levels 35-46
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.10
|
Electrical Multi-Tenant Corridor – Levels 47-49
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E4.11
|
Electrical Multi-Tenant Corridor Plan – Levels 50-61
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.01
|
Electrical Riser Diagram #1 - Normal Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.02
|
Electrical Riser Diagram #2 - Normal Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.03
|
Electrical Riser Diagram #3 - Normal Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.04
|
Electrical Riser Diagram #4 - Normal Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.11
|
Electrical Riser Diagram #1 - Emergency Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
E5.12
|
Electrical Riser Diagram #2 - Emergency Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.13
|
Electrical Riser Diagram #3 - Emergency Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.14
|
Electrical Riser Diagram #4 - Emergency Power
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.21
|
Electrical Fire Alarm Riser Diagram #1
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.22
|
Electrical Fire Alarm Riser Diagram #2
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.23
|
Electrical Fire Alarm Riser Diagram #3
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.24
|
Electrical Fire Alarm Riser Diagram #4
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.25
|
Firefighter’s Override Panel (1 of 3)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.26
|
Firefighter’s Override Panel (2 of 3)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.27
|
Firefighter’s Override Panel (3 of 3)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.30
|
Electrical Telecommunications/Grounding Riser
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E5.40
|
Electrical Metering System Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E6.01
|
Electrical Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
E6.02
|
Electrical Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
2
|
P0.01
|
Plumbing & Fire Protection Legend and Abbreviations
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P0.02
|
Plumbing & Fire Protection Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P0.03
|
Plumbing & Fire Protection Schedules
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.P3U
|
Plumbing & Fire Protection Parking Level 3 Underground
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.P3
|
Plumbing & Fire Protection Parking Level 3 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.P2
|
Plumbing & Fire Protection Parking Level 2 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.P1
|
Plumbing & Fire Protection Parking Level 1 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.01
|
Plumbing & Fire Protection Level 1 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.02
|
Plumbing & Fire Protection Level 2 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.03
|
Plumbing & Fire Protection Level 3 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.04
|
Plumbing & Fire Protection Level 4 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.05
|
Plumbing & Fire Protection Level 5 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.06
|
Plumbing & Fire Protection Level 6 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.07
|
Plumbing & Fire Protection Level 7 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.08
|
Plumbing & Fire Protection Typical Plan – Levels 8-11
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.12
|
Plumbing & Fire Protection Level 12 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.13
|
Plumbing & Fire Protection Level 13 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.14
|
Plumbing & Fire Protection Level 14 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.15
|
Plumbing & Fire Protection Level 15 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.16
|
Plumbing & Fire Protection Typical Plan – Levels 16-19
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.20
|
Plumbing & Fire Protection Level 20 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.21
|
Plumbing & Fire Protection Level 21 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.22
|
Plumbing & Fire Protection Level 22 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.23
|
Plumbing & Fire Protection Levels 23 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.24
|
Plumbing & Fire Protection Levels 24 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.25
|
Plumbing & Fire Protection Levels 25 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.26
|
Plumbing & Fire Protection Levels 26 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.27
|
Plumbing & Fire Protection Level 27 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.28
|
Plumbing & Fire Protection Level 28 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.29
|
Plumbing & Fire Protection Level 29 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.30
|
Plumbing & Fire Protection Level 30 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.31
|
Plumbing & Fire Protection Level 31 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.32
|
Plumbing & Fire Protection Level 32 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.33
|
Plumbing & Fire Protection Level 33 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.34
|
Plumbing & Fire Protection Level 34 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
2
|
P2.35
|
Plumbing & Fire Protection Level 35 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.36
|
Plumbing & Fire Protection Level 36 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.37
|
Plumbing & Fire Protection Level 37 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.38
|
Plumbing & Fire Protection Level 38 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.39
|
Plumbing & Fire Protection Level 39 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.40
|
Plumbing & Fire Protection Typical Plan – Levels 40-43
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.44
|
Plumbing & Fire Protection Level 44 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.45
|
Plumbing & Fire Protection Level 45 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.46
|
Plumbing & Fire Protection Level 46 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.47
|
Plumbing & Fire Protection Level 47 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.48
|
Plumbing & Fire Protection Level 48 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.49
|
Plumbing & Fire Protection Level 49 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.50
|
Plumbing & Fire Protection Level 50 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.51
|
Plumbing & Fire Protection Level 51 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.52
|
Plumbing & Fire Protection Level 52 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.53
|
Plumbing & Fire Protection level 53 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.54
|
Plumbing & Fire Protection Level 54 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.55
|
Plumbing & Fire Protection Level 55 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.56
|
Plumbing & Fire Protection Levels 56 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.57
|
Plumbing & Fire Protection Level 57 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.58
|
Plumbing & Fire Protection level 58 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.59
|
Plumbing & Fire Protection Level 59 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.60
|
Plumbing & Fire Protection Level 60 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.61
|
Plumbing & Fire Protection Level 61 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.62
|
Plumbing & Fire Protection Level 62 Plan
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.63
|
Plumbing & Fire Protection Level 63 Roof
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P2.64
|
Plumbing & Fire Protection Roof Level 64
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
P2.68
|
Plumbing & Fire Protection Maintenance Walkway 4
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P3.01
|
Plumbing & Fire Protection Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P3.02
|
Plumbing & Fire Protection Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P3.03
|
Plumbing & Fire Protection Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P3.04
|
Plumbing & Fire Protection Enlarged Plans
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.01A
|
Plumbing Domestic Water & Recycled Water Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.01B
|
Plumbing Domestic Water & Recycled Water Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.02A
|
Fire Protection Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.02B
|
Fire Protection Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.03
|
Plumbing Storm Drain Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.04A
|
Plumbing Sanitary and Vent Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.04B
|
Plumbing Sanitary and Vent Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.04C
|
Plumbing Grey Waste Water Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.05
|
Fuel Oil Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P4.06
|
Plumbing Natural Gas Riser Diagram
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P5.01
|
Plumbing & Fire Protection Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P5.02
|
Plumbing & Fire Protection Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P5.03
|
Plumbing & Fire Protection Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P5.04
|
Plumbing & Fire Protection Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
P5.05
|
Plumbing & Fire Protection Details
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
2
|
SE2.01
|
Security Plan Site
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
SE3.P3
|
Security Plan Floor P3
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
|
|
|
|
|
2
|
WW1.00
|
Façade Maintenance Composite Roof Plan: (B.M.U.) Platform, Storage Layout
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
WW1.01
|
Façade Maintenance Section (B.M.U.) at Tower
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
WW1.02
|
Façade Maintenance “Transferable” Stabilization
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
WW1.03
|
Façade Maintenance “Transferable” and Workstation Anchor Detail
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
WW1.04
|
Façade Maintenance (Aerial Work Platform)
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
WW1.05
|
Façade Maintenance Partial Plan: Platform / Façade Anchor Layout
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
WW2.00
|
(B.M.U.) Service Platform Access Layout
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
1
|
WW2.01
|
Unscheduled Maintenance Tieback Anchor Layout/Sections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
2
|
TRM-001
|
Park-Plaza Gondola Plan / Profile
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
TRM-002
|
Plaza-Park Gondola Lower Terminal Arrangement Plan/Profile
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
TRM-003
|
Park-Plaza Gondola Upper Terminal Arrangement Plan/Profile
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
TRM-004
|
Plaza-Park Gondola Lower Terminal Structural and Connections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
TRM-005
|
Plaza-Park Gondola Upper Terminal Structural and Connections
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
2
|
TRM-006
|
Plaza-Park Gondola Drive Machine Arrangement
|
10 Feb 2014
|
Issued for Bid Addendum #2
|
|
|
|
|
|
|
GR20.1
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR3O.P3
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR3O.P2
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR3O.P1
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.01
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.02
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.03
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
CR30.04
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.05
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.06
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.15
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.16
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.17
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.18
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.19
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.27
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.28
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.29
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.30
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.31
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.32
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.33
|
Sign Locations
|
10 Feb 2014
|
Progress
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
|
GR30.34
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.35
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.36
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.37
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.38
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.39
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.40
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.41
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.42
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.43
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.44
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.45
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.46
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.47
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.48
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.49
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.50
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.51
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.52
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.53
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.54
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.55
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.56
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.57
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.58
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.59
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.60
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.61
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.62
|
Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR30.63
|
Level 63 Plan Sign Locations
|
10 Feb 2014
|
Progress
|
|
GR100
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR101
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR200
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR201
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR202
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR300
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR301
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR302
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR303
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR400
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR401
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR402
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
GR403
|
Signage & Graphics Elevations and Details
|
10 Feb 2014
|
Progress
|
|
|
|
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1
-26-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1A
-1-
|
|
•
|
Main air supply duct from the perimeter to the Fan Rooms (two main ducts on each floor)
|
◦
|
Reference drawing number: M2.19
|
•
|
Main Relief air duct at perimeter (2 locations)
|
•
|
Duct from the Fan rooms stubbed out to the TI space
|
o
|
Reference drawing number: M2.19
|
•
|
Raised access floor in all core areas
|
o
|
For raised floor detail reference drawing number: A90.41
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1B
-1-
|
|
•
|
The following scope at the Elevator Lobbies (Finishes at Tenants discretion): Finish tape & paint walls, flooring, ceilings, lighting, code required evacuation signage, painting of elevator doors & frames.
|
•
|
Drywall cladding and finishes at columns and tenant side of core walls (Finishes at Tenants discretion).
|
•
|
Furnish & Install the Raised Access Floor System (floor cleaning and sealing of concrete & Associated perimeter details)
|
•
|
Furnish & Install Window Shades at the perimeter windows
|
•
|
MEP Upgrades
|
◦
|
Fire Sprinkler System:
Modify sprinkler system as required by TI Construction
|
◦
|
Plumbing:
All distribution outside of the core plumbing system
|
◦
|
HVAC:
HVAC ductwork on the floor from the point of connection at the main air handlers to distribution or intake points. The exception is the core restrooms supply and exhaust which will be installed as part of the core and shell scope. Tenant shall also be responsible for the following:
|
▪
|
Perimeter Duct & Cooling System
|
▪
|
DDC controls
|
◦
|
Electrical:
Tenant is responsible for electrical distribution from Electrical Panel on floor sized for 6 watts per usable square foot capacity. Additional 2 Watts per usable square foot capacity available in bus riser.
|
•
|
Extension of Life Safety system as required by scope of tenant improvements
|
•
|
Extending copper & fiber service from basement level MPOE to floor (Multiple sleeves in floor of telecom closets on each floor provided in core & shell) and all distribution from the Telecom closets
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 1C
-1-
|
|
1.
|
Structural steel with spray applied fireproofing (where such spray is required).
|
2.
|
Unfinished interior core and shaft construction.
|
3.
|
Temporary, non-occupancy fire sprinkler risers and distribution.
|
4.
|
Tenant sleeves at electrical/data closets.
|
5.
|
Plumbing rough-in (no loops outside of core).
|
6.
|
Building exit stairs.
|
7.
|
Floors in broom-swept condition.
|
8.
|
Temporary or permanent power to support construction activities related to the Improvements.
|
9.
|
Freight elevator or hoist.
|
10.
|
Roof installed on the Building.
|
11.
|
Water tight Building façade with the potential exception for small areas to coordinate the construction hoist.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SECTION 1D
-1-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE 2
-1-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
Controls:
|
TBD
|
Controls:
|
TBD
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
◦
|
General MEP Notes for tenant materials including, but not limited to, those materials not yet selected and those identified as TBD:
|
1.
|
Tenant interface to building systems shall match building system manufacturer’s brand and spec requirements.
|
2.
|
All materials used in the building shall be appropriately rated for both commercial heavy duty applications as well as the intensity of the connection into the building system.
|
3.
|
BMCS; Building management control system, or generically, the building automation system components shall be of the same brand, type and specification UOL as the building core system installed and shall all be native BACnet compliant.
|
4.
|
Plumbing materials under pressure such as piping fittings and valves that connect to a core building system shall be rated for commercial heavy duty applications and at 2x the working pressure at the point of connection.
|
5.
|
Fire Alarm shall match the building installed UL Listing of the fire alarm system and be of the appropriate brand, type and specification identified under the UL Listing of that system.
|
6.
|
Firestop systems and devices shall comply with ASTM E 814 (UL 1479), NEC 300-21, and NEC 800-52 (b) and shall follow a “UL Classified” system.
|
Type:
|
Solid-core, plain-sliced, wood veneer finish, species to be determined:
|
Size:
|
1-3/4” thick x 3’0” wide x 8’10 1/2”
|
LEED note:
|
Wood to be FSC certified and free of urea and formaldehyde
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
Type:
|
Minimum ½” thick clear tempered glass, with brushed stainless steel top and bottom rails
|
Size:
|
3’0” wide x 8’10 1/2” high
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
Studs:
|
Cold-Rolled, Corrosion-Resistant Zinc Coated Steel Sheet Gauge as required to span height; ASTM, C645 Non-load bearing with punched webs; width as required to span height; spacing as required
|
Height:
|
Floor to underside of finished ceiling, if ceiling is installed. Floor to underside of slab, if no ceiling is installed.
|
Studs:
|
Cold-Rolled, Corrosion-Resistant Zinc Coat Steel Sheet Gauge as required to span height; ASTM, C645 Non-load bearing with punched webs; with as required to span height; spacing as required
|
Studs:
|
Cold-Rolled, Corrosion-Resistant Zinc Coat Steel Sheet Gauge as required to span height; ASTM, C645 Non-load bearing with punched webs; width as required to span height; spacing as required
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
Studs:
|
Cold-Rolled, Corrosion-Resistant Zinc Coat Steel Sheet Gauge as required to span height; ASTM, C645 Non-load bearing with punched webs width as required to span height; spacing as required
|
095113
|
Ceilings
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
Manufacturer:
|
To be determined. Basis of design: Benjamin Moore, PPG Architectural Finishes, Sherwin-Williams, or approved equal
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
Controls:
|
TBD
|
Controls:
|
TBD
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
◦
|
Landlord will focus on the visibility of furniture and furnishing layout from the exterior of the building and from common areas. Backing will be required for furniture that abuts perimeter glass walls.
|
◦
|
Perimeter partition layout shall be aligned with curtain-wall mullions.
|
◦
|
General MEP Notes for tenant materials including, but not limited to, those materials not yet selected and those identified as TBD:
|
7.
|
Tenant interface to building systems shall match building system manufacturer’s brand and spec requirements.
|
8.
|
All materials used in the building shall be appropriately rated for both commercial heavy duty applications as well as the intensity of the connection into the building system. For example,
|
9.
|
HVAC materials shall follow SMACNA requirements and be appropriate for the type of HVAC system installed at the core of the building.
|
10.
|
BMCS; Building management control system, or generically, the building automation system components shall be of the same brand, type and specification UOL as the building core system installed and shall all be native BACnet compliant.
|
11.
|
Plumbing materials under pressure such as piping fittings and valves that connect to a core building system shall be rated for commercial heavy duty applications and at 2x the working pressure at the point of connection.
|
12.
|
Fire Sprinkler system shall all be UL listed for fire sprinkler applications as well as all Federal, State and Local requirements.
|
13.
|
Fire Alarm shall match the building installed UL Listing of the fire alarm system and be of the appropriate brand, type and specification identified under the UL Listing of that system.
|
14.
|
Electrical materials that will connect to the building systems, they shall carry the appropriate ratings for voltage, amperage and AIC interrupting ratings and shall match the building system brand, type and classification installed in the core system.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
15.
|
Electrical receptacles, outlets and switches shall carry a nominal 20 AMP minimum rating regardless of manufacturer.
|
•
|
Note: Floor coring not typical or generally needed with raised floor system. The following apply to potential exception as approved by building management.
|
◦
|
For individual and distributed single openings spaced at 4’oc or more or groups of 4 penetrations only (3.5” diam max ea.), no structural review required.
|
◦
|
Space groups at 3x diameter minimum between each opening and a minimum of 8’oc between groups.
|
◦
|
Groups of 5 or more are individual penetrations patterned at less than 4’oc will require specific review. Contact Building Management if this layout condition exists.
|
◦
|
Prior to coring, check layout from underside of deck with existing steel framing. No steel shall be cut.
|
◦
|
Place penetrations in shallow portion of deck whenever possible.
|
◦
|
Avoid placing penetration in continuous lines adjacent and parallel to supports (steel beams) or submit for review.
|
◦
|
Avoid placing penetration at perimeter of building that could affect both chord reinforcement and curtain wall embeds.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
◦
|
Obtain and pay for all required fees, permits, testing, and inspections
|
◦
|
Firestop systems and devices shall comply with ASTM E 814 (UL 1479), NEC 300-21, and NEC 800-52 (b) and shall follow a “UL Classified” system.
|
◦
|
The Subcontractors shall provide all necessary seismic bracing to support horizontal pipe, ductwork, conduit, cable, wiring, fixtures, and equipment.
|
◦
|
All piping, ductwork, conduit, equipment, and fixtures shall be coordinated in a manner to allow for adequate code required clearances from existing core improvements. In addition, all mechanical piping and ductwork shall maintain an 8” clear zone above the ceiling. No item such as pipe, duct, etc., shall be in contact with any electrical equipment.
|
◦
|
Subcontractor/Contractor must guarantee all work and materials for one (1) year from the date of filing a Notice of Completion.
|
◦
|
Pressure test each system of piping and ductwork in accordance with applicable codes and recognized industry standards.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
TI Material & Equipment
|
Base Building Specification Section
|
|
|
Ductwork
|
23 31 00 – Ductwork and Sheet Metal
|
Piping
|
23 21 13 – Pipes, Valves, Fittings, & Accessories
|
Hydrostatic Testing
|
23 05 93- Section 3.3 D
|
VAV Fan Powered Terminal Units
|
23 36 00- Air Terminal Units
|
Grills, Registers, and Diffusers
|
23 37 00– Air Distribution Equipment
|
Mechanical Insulation
|
23 07 00- Thermal Insulation
|
Offices – cooling inside design condition
|
23 05 07 – Design Conditions
|
Offices – heating inside design condition
|
23 05 07 – Design Conditions
|
Testing & Balancing
|
23 05 93 – Testing, Balancing, & Adjusting
|
TI Material & Equipment
|
Base Building Specification Section
|
|
|
Sanitary Waste/Vent Piping
|
221300 – Sewage and Drainage Systems
|
Water Piping
|
221130- Recycled Water Systems
22 10 00- Domestic Water Systems
|
Floor drains, Plumbing Fixtures
|
224000- Clean-outs, Drains, & Plumbing Fixtures
|
Pipe Insulation
|
220700 – Thermal Insulation
|
|
|
TI Material & Equipment
|
Base Building Specification Section
|
|
|
Sprinkler Piping
|
211300- Fire Suppression Sprinkler Systems
|
Design/Build Drawings & Calculation Requirements
|
211300- Fire Suppression Sprinkler Systems
|
Hangers & Supports
|
211300- Fire Suppression Sprinkler Systems
|
Pipe joints/fittings
|
211300 – Fire Suppression Sprinkler Systems
|
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
TI Material & Equipment
|
Base Building Specification Section
|
|
|
Cutting and Patching existing construction
|
01731 – Cutting and Patching
|
Installation of building standard 2x4 fluorescent light fixtures (Refer to tenant building standards for specific light fixture)
|
26 51 13– Light Fixtures and Lamps
|
Electrical Wire/Conductors
|
26 05 19– Electrical Conductors – 600 Volts
|
Installation of wall plug receptacles (Refer to tenant building standards for specifics on the receptacle)
|
26 27 26– Wiring Devices
|
Electrical Conduit
|
26 05 33– Raceways and Boxes
|
Conduit hangers and supports
|
26 05 33– Raceways and boxes.
|
Wall telephone/Data Outlets
|
26 05 33– Raceways and Boxes
|
|
|
Outlet, Junction, and Pull Boxes
|
260533– Raceways and Boxes
|
|
|
Grounding
|
26 05 26–Grounding and Bonding &
26 70 00–Telecomunication System
|
Motor Wiring
|
26 05 23– Motor and control wiring systems
|
TI Material & Equipment
|
Base Building Specification Section
|
|
|
Fire Alarm Control Panel Information
|
28 31 30- Fire Detection, Alarm and Communication (FDAC) Systems
|
Fire Alarm Devices
|
28 31 30– Fire Detection, Alarm and Communication (FDAC) Systems
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
TI Material & Equipment
|
Base Building Specification Section
|
|
|
Temperature sensors
|
25 30 20 – BMCS Field Devices
|
Relative humidity sensors
|
23 30 20 – BMCS Field Devices
|
Control relays
|
25 30 10 – BMCS Field Devices
|
Pressure sensors
|
23 30 20 – BMCS Field Devices
|
Carbon dioxide sensors
|
23 30 20 – BMCS Field Devices
|
DDC controllers
|
25 14 00 – BMCS Controllers
|
Damper actuators
|
25 35 23- BMCS Dampers
|
Valve controls
|
25 35 19- BMCS Valves
|
Electrical requirements
|
25 05 00- BMCS General Requirements
|
Software Interface
|
25 16 00- BMCS Software Interface
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
SCHEDULE
3
-15-
|
|
Re:
|
Office Lease dated ____________, 20__ (the "
Lease
"), by and between ____________________, a _____________________ ("
Landlord
"), and _______________________, a _______________________ ("
Tenant
"), for certain premises being more particularly described in the Lease (the "
Premises
"), located in that certain building located at 415 Mission Street, San Francisco, California (the "
Building
").
|
1.
|
The Lease Commencement Date for [the Phase 1 Premises] [the Phase 2 Premises] [the Phase 3 Premises] [the Phase 4 Premises] [the Phase 5 Premises] is ______________ (the "Applicable Lease Commencement Date").
|
2.
|
The Lease Expiration Date for [the Phase 1 Premises] [the Phase 2 Premises] [the Phase 3 Premises] [the Phase 4 Premises] [the Phase 5 Premises] is _____________________.
|
3.
|
Base Rent with respect to [the Phase 1 Premises] [the Phase 2 Premises] [the Phase 3 Premises] [the Phase 4 Premises] [the Phase 5 Premises] commenced on the Applicable Lease Commencement Date in the amount of ________________.
|
4.
|
If the Applicable Lease Commencement Date is other than the first day of the month, the first billing will contain a pro rata adjustment. Each billing thereafter shall be for the full amount of the monthly installment as provided for in the Lease.
|
5.
|
Capitalized terms used herein that are defined in the Lease shall have the same meaning when used herein.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
|
"
Landlord
":
,
a
By:
Name:
Its:
|
Agreed to and Accepted
as of ____________, 20__.
"
Tenant
":
,
a
By:
Name:
Its:
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT F
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT F
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT F
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT F
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
Phase of the Premises
|
Lease Commencement Date
|
Phase 1
|
|
Phase 2
|
|
Phase 3
|
|
Phase 4
|
|
Phase 5
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
Phase of the Premises
|
Lease Expiration Date
|
Phase 1
|
|
Phase 2
|
|
Phase 3
|
|
Phase 4
|
|
Phase 5
|
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT F
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
|
"Tenant":
,
a
By:
Name:
Its:
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT F
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
•
|
Empty and clean (when necessary) all waste, mixed recycling, and composting receptacles (where applicable) and remove contents to the designated area.
|
•
|
Dust or wipe clean with micro-fiber cloths and dusting sleeves all horizontal surfaces, desks, chairs, files, telephones, picture frames, etc so as to cover the floor 1x/week.
Do not
rearrange materials on surfaces.
|
•
|
Spot clean all conference and partition glass including lobby glass for fingerprints and smudges. Partition glass cleaning will be handled outside this contract as a tenant billable work order.
|
•
|
Dust windowsills/railings.
|
•
|
HEPA vacuum all carpet areas
every other night
. Carpet-sweep high traffic area's nightly. (Do not pull vacuum cords around corners.) Broom-sweep all area rugs. Edges should be either swept or vacuumed with appropriate HEPA edge cleaning tool, as required.
|
•
|
Remove all finger marks and smudges from all vertical surfaces taking care not to mar material finishes.
|
•
|
Dust mop and spot clean all tiled areas.
|
•
|
Damp wash and wipe dry all plastic or Formica desk tops in common areas.
|
A.
|
Services performed as necessary or in the frequency stated:
|
•
|
Wash waste receptacles. To be done if liquids might have leaked into the receptacle through the plastic liner or in other areas, as required. Plastic liners are only used in areas with wet trash – not less than
bi-monthly
.
|
•
|
Damp mop floors where spillage occurred or dirt tracked in.
|
•
|
Machine buff VCT flooring every
2 months
.
|
•
|
Strip/scrub VCT and recoat using green seal strippers and floor finishes, as necessary – not less than
quarterly
.
|
•
|
Spot clean carpet areas per request. Major carpet cleaning will be handled outside this contract as a tenant billable work order.
|
•
|
Dust light fixtures – no less than
annually
. (Where reachable)
|
•
|
Vacuum/dust all perimeter slot diffusers on a
quarterly
basis.
|
•
|
Clean all air vent grills – not less than
quarterly
.
|
•
|
Wash windowsills/railings – not less than
monthly
.
|
•
|
Dust fire extinguishers/fire extinguisher cabinets – not less than
monthly
.
|
•
|
Dust all doors and spot clean as necessary.
|
•
|
Interior perimeter windows washed
annually
.
|
A.
|
Services performed nightly:
|
•
|
Empty and clean (when necessary) all waste receptacles and remove paper towel/tissue to be composted, and rubbish to be trashed to the designated area.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
•
|
Wash and disinfect all basins, urinals and bowls using nonabrasive green seal cleaners to remove stains and clean undersides of rim on urinals and bowls. Wash both sides of toilet seats.
|
•
|
Clean all mirrors, bright work and enamel surfaces with green seal cleaning products.
|
•
|
Spot clean all partitions, tile walls, doors, door handle area and outside surfaces of all dispensers and receptacles. Damp wipe all lavatory tops and remove water spots from wall surfaces next to dispensers/receptacles. Spot clean around light fixtures.
|
•
|
Clean flushometers, piping and other metal.
|
•
|
Fill toilet tissue, paper towels (minimum 95% recycled paper), soap, and sanitary napkin dispensers. Do not place any extra supplies on top of dispenser or counter top.
|
•
|
Sweep, micro-fiber wet mop, and thoroughly rinse floor. Clean all corners and edges to prevent dirt buildup. Do not leave standing water on the floor.
|
•
|
Floor drains are sanitized and flushed every other week with water.
|
•
|
Refrigerator & microwave cleaning
|
•
|
Green Encapsulation carpet cleaning
|
•
|
Shower cleaning
|
•
|
Dish washing service
|
•
|
Day & weekend matron/kitchen service
|
•
|
Extra trash and recycling service
|
•
|
Partition glass cleaning
|
•
|
Special detail cleaning
|
•
|
Maintenance program for all non-building standard floors and finishes such as marble, hardwood, granite, travertine, porcelain, etc.
|
•
|
Janitorial for this property instituted the
UNGER
restroom micro-fiber program and uses Green Seal/Ecologo USGBC approved chemicals. (1/2008)
|
•
|
Implemented a color coded micro-fiber mop, cloth, and dusting sleeve program to avoid cross contamination and improve our diversion rate through the use of washable/reusable cleaning materials. (6/2007)
|
•
|
Vacuuming and edge vacuuming is performed using carpet and rug institute approved HEPA filtration vacuums.
|
•
|
Our recycling, composting, and waste management program utilizes a double barrel caddy system, with color coded barrels (grey & blue) and liners (brown for waste, clear for recycling, & green for compostables). Full, tied off liners are placed outside the service elevator for the refuse janitor to pick up and sort before they are compacted/composted. These measures help to insure that during disposal we are able to maximize our diversion rate to comply with San Francisco's 2010 mandate for commercial building's to have a 75% diversion rate.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT F
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT G
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT G
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT G
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT G
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT H-1
-3-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT H-1
-3-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT H-2
-3-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT H-2
-3-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT H-2
-3-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT H-3
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT H-3
-2-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
1.
|
DRAFT DRAWN AT SIGHT ON DEUTSCHE BANK AG, NEW YORK BRANCH, FOR THE AMOUNT OF THE DRAWING
MARKED “DRAWN UNDER DEUTSCHE BANK AG, NEW YORK BRANCH LETTER OF CREDIT NO. 839BGC1400___”.
|
2.
|
A DATED STATEMENT, SIGNED BY AUTHORIZED REPRESENTATIVE OF TRANSBAY TOWER LLC (SIGNED AS SUCH) STATING: “(I) THAT BENEFICIARY IS OTHERWISE ALLOWED TO DRAW DOWN ON THE LETTER OF CREDIT PURSUANT TO THE TERMS OF THAT CERTAIN OFFICE LEASE BY AND BETWEEN BENEFICIARY AND APPLICANT DATED _______________, AS AMENDED (COLLECTIVELY, THE “LEASE”), (II) THAT BENEFICIARY IS ENTITLED TO DRAW DOWN THE FULL AMOUNT OF LETTER OF CREDIT NO. 839BGC1400___ AS THE RESULT OF THE FILING OF A VOLUNTARY PETITION UNDER THE U.S. BANKRUPTCY CODE OR A STATE BANKRUPTCY CODE BY THE TENANT UNDER THE LEASE, WHICH FILING HAS NOT BEEN DISMISSED AT THE
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
-4-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT J
-6-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
1.
|
Defined Terms
. Initially capitalized terms used but not defined herein shall have the meanings set forth in the Lease.
|
2.
|
Term
. The Lease Term shall be approximately fifteen (15) years and six (6) months, as set forth in the Lease, commencing on the Phase 1 Lease Commencement Date. Subject to the terms and conditions set forth in the Lease, Tenant has two (2) consecutive options to extend the Lease Term, the first for seven (7) years and the second for five (5) years.
|
3.
|
Lease Incorporation; Purpose of Memorandum
. This Memorandum is subject to all conditions, terms and provisions of the Lease, which agreement is hereby adopted and made a part hereof by reference to the same, in the same manner as if all the provisions thereof were set forth herein in full. This Memorandum has been executed for the purpose of recordation in order to give notice of all of the terms, provisions and conditions of the Lease, and is not intended, and shall not be construed, to define, limit, or modify the Lease. This Memorandum is not a complete summary of the Lease, nor shall any provisions of this Memorandum be used in interpreting the provisions of the Lease.
|
4.
|
Conflict
. In the event of a conflict between the terms of the Lease and this Memorandum, the Lease shall prevail. Reference should be made to the Lease for a more detailed description of all matters contained in this Memorandum.
|
5.
|
Additional Documents
. Upon any termination of the Lease, Landlord and Tenant agree to execute and deliver such documents as are reasonably required and are reasonable approved by the parties to terminate and release this Memorandum of record.
|
6.
|
Counterparts
. This Memorandum may be executed in as many counterparts as may be deemed necessary and convenient, and by the different parties hereto on separate counterparts, each of which, when so executed, shall be deemed an original, but all such counterparts shall constitute one and the same instrument.
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT J
-6-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
By:
|
Transbay Tower Holdings LLC,
|
By:
|
BXP TB Development LLC,
|
By:
|
Boston Properties Limited Partnership,
|
By:
|
Boston Properties, Inc.,
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT J
-6-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT J
-6-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT J
-6-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT J
-6-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
EXHIBIT J
-6-
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
ARTICLE 1
|
PREMISES, BUILDING, PROJECT, AND COMMON AREAS 10
|
ARTICLE 2
|
LEASE TERM; OPTION TERM(S) 19
|
ARTICLE 3
|
BASE RENT 24
|
ARTICLE 4
|
ADDITIONAL RENT 25
|
ARTICLE 5
|
USE OF PREMISES 38
|
ARTICLE 6
|
SERVICES AND UTILITIES 42
|
ARTICLE 7
|
REPAIRS 47
|
ARTICLE 8
|
ADDITIONS AND ALTERATIONS 47
|
ARTICLE 9
|
COVENANT AGAINST LIENS 51
|
ARTICLE 10
|
INDEMNIFICATION AND INSURANCE 51
|
ARTICLE 11
|
DAMAGE AND DESTRUCTION 57
|
ARTICLE 12
|
NONWAIVER 59
|
ARTICLE 13
|
CONDEMNATION 60
|
ARTICLE 14
|
ASSIGNMENT AND SUBLETTING 61
|
ARTICLE 15
|
SURRENDER OF PREMISES; OWNERSHIP AND REMOVAL OF TRADE FIXTURES 68
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
1
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
ARTICLE 16
|
HOLDING OVER 68
|
ARTICLE 17
|
ESTOPPEL CERTIFICATES; FINANCIAL INFORMATION 69
|
ARTICLE 18
|
SUBORDINATION 71
|
ARTICLE 19
|
DEFAULTS; REMEDIES 73
|
ARTICLE 20
|
COVENANT OF QUIET ENJOYMENT 78
|
ARTICLE 21
|
LETTER OF CREDIT 78
|
ARTICLE 22
|
INTENTIONALLY OMITTED 86
|
ARTICLE 23
|
SIGNS 86
|
ARTICLE 24
|
COMPLIANCE WITH LAW 98
|
ARTICLE 25
|
LATE CHARGES 99
|
ARTICLE 26
|
LANDLORD'S RIGHT TO CURE DEFAULT; PAYMENTS BY TENANT 99
|
ARTICLE 27
|
ENTRY BY LANDLORD 100
|
ARTICLE 28
|
TENANT PARKING 101
|
ARTICLE 29
|
MISCELLANEOUS PROVISIONS 102
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
2
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
3
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
4
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
5
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
6
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
7
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
8
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
9
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
10
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
11
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
12
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
13
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
14
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
15
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
16
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
17
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
18
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
720213.12/WLA
372738-00005/4-9-14/mem/ejw
|
19
|
Salesforce Tower
415 MISSION STREET
[salesforce.com, Inc.]
|
|
|
GRAHAM SMITH, an individual
|
|
|
|
Dated:
February 27
, 2014
|
|
/s/ Graham Smith
|
|
|
Graham Smith
|
|
|
|
|
|
SALESFORCE.COM, INC.
|
|
|
|
Dated:
February 27
, 2014
|
By
|
/s/ Burke Norton
|
|
|
Burke Norton
|
|
|
Chief Legal Officer
|
1.
|
I have reviewed this report on Form 10-Q of salesforce.com, inc.;
|
2.
|
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
|
3.
|
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
|
4.
|
The registrant's other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
|
a)
|
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
|
b)
|
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
|
c)
|
Evaluated the effectiveness of the registrant's disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
|
d)
|
Disclosed in this report any change in the registrant's internal control over financial reporting that occurred during the registrant's most recent fiscal quarter that has materially affected, or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and
|
5.
|
The registrant's other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant's auditors and the audit committee of the registrant's board of directors (or persons performing the equivalent functions):
|
a)
|
All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant's ability to record, process, summarize and report financial information; and
|
b)
|
Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant's internal controls over financial reporting.
|
May 29, 2014
|
/s/ M
ARC
B
ENIOFF
|
|
Marc Benioff
|
|
Chairman of the Board of Directors and Chief
Executive Officer
|
1.
|
I have reviewed this report on Form 10-Q of salesforce.com, inc.;
|
2.
|
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
|
3.
|
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
|
4.
|
The registrant's other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
|
a)
|
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
|
b)
|
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
|
c)
|
Evaluated the effectiveness of the registrant's disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
|
d)
|
Disclosed in this report any change in the registrant's internal control over financial reporting that occurred during the registrant's most recent fiscal quarter that has materially affected, or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and
|
5.
|
The registrant's other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant's auditors and the audit committee of the registrant's board of directors (or persons performing the equivalent functions):
|
a)
|
All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant's ability to record, process, summarize and report financial information; and
|
b)
|
Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant's internal controls over financial reporting.
|
May 29, 2014
|
/s/ G
RAHAM
S
MITH
|
|
Graham Smith
|
|
Chief Financial Officer
|
May 29, 2014
|
/s/ M
ARC
B
ENIOFF
|
|
Marc Benioff
|
|
Chairman of the Board of Directors and
Chief Executive Officer
|
May 29, 2014
|
/s/ G
RAHAM
S
MITH
|
|
Graham Smith
|
|
Chief Financial Officer
|