Item 1. Financial Statements
EQUITRANS MIDSTREAM CORPORATION
Statements of Consolidated Comprehensive Income (Unaudited) | | | | | | | | | | | | | | | |
| | | Three Months Ended March 31, |
| | | | | 2024 | | 2023 |
| | | | | (Thousands, except per share amounts) |
Operating revenues | | | | | $ | 364,274 | | | $ | 376,337 | |
Operating expenses: | | | | | | | |
Operating and maintenance | | | | | 45,228 | | | 42,862 | |
Selling, general and administrative | | | | | 44,329 | | | 32,622 | |
Transaction costs | | | | | 5,684 | | | — | |
Depreciation | | | | | 71,672 | | | 69,404 | |
Amortization of intangible assets | | | | | 16,205 | | | 16,205 | |
| | | | | | | |
| | | | | | | |
Total operating expenses | | | | | 183,118 | | | 161,093 | |
Operating income | | | | | 181,156 | | | 215,244 | |
Equity income (a) | | | | | 73,005 | | | 122 | |
| | | | | | | |
Other (expense) income, net | | | | | (3,976) | | | (8,102) | |
| | | | | | | |
Net interest expense | | | | | (118,896) | | | (104,957) | |
Income before income taxes | | | | | 131,289 | | | 102,307 | |
Income tax expense (benefit) | | | | | 19,400 | | | (3,784) | |
Net income | | | | | 111,889 | | | 106,091 | |
Net income attributable to noncontrolling interest | | | | | 2,890 | | | 4,409 | |
Net income attributable to Equitrans Midstream | | | | | 108,999 | | | 101,682 | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
Preferred dividends | | | | | 14,628 | | | 14,628 | |
Net income attributable to Equitrans Midstream common shareholders | | | | | $ | 94,371 | | | $ | 87,054 | |
| | | | | | | |
Earnings per share of common stock attributable to Equitrans Midstream common shareholders - basic | | | | | $ | 0.22 | | | $ | 0.20 | |
| | | | | | | |
| | | | | | | |
Earnings per share of common stock attributable to Equitrans Midstream common shareholders - diluted | | | | | $ | 0.21 | | | $ | 0.20 | |
| | | | | | | |
Weighted average common shares outstanding - basic | | | | | 434,497 | | | 433,707 | |
Weighted average common shares outstanding - diluted | | | | | 440,561 | | | 434,254 | |
| | | | | | | |
Statement of comprehensive income: | | | | | | | |
Net income | | | | | $ | 111,889 | | | $ | 106,091 | |
Other comprehensive income, net of tax: | | | | | | | |
Pension and other post-retirement benefits liability adjustment, net of tax expense of $6 and $7 | | | | | 20 | | | 22 | |
Other comprehensive income | | | | | 20 | | | 22 | |
Comprehensive income | | | | | 111,909 | | | 106,113 | |
Less: Comprehensive income attributable to noncontrolling interest | | | | | 2,890 | | | 4,409 | |
Less: Comprehensive income attributable to preferred dividends | | | | | 14,628 | | | 14,628 | |
Comprehensive income attributable to Equitrans Midstream common shareholders | | | | | $ | 94,391 | | | $ | 87,076 | |
| | | | | | | |
Dividends declared per common share | | | | | $ | 0.15 | | | $ | 0.15 | |
(a)Represents equity income from Mountain Valley Pipeline, LLC (the MVP Joint Venture). See Note 5.
The accompanying notes are an integral part of these consolidated financial statements.
EQUITRANS MIDSTREAM CORPORATION
Statements of Consolidated Cash Flows (Unaudited)
| | | | | | | | | | | |
| Three Months Ended March 31, |
| 2024 | | 2023 |
| (Thousands) |
Cash flows from operating activities: | | | |
Net income | $ | 111,889 | | | $ | 106,091 | |
Adjustments to reconcile net income to net cash provided by operating activities: | | | |
Depreciation | 71,672 | | | 69,404 | |
Amortization of intangible assets | 16,205 | | | 16,205 | |
| | | |
Deferred income tax expense (benefit) | 17,160 | | | (5,260) | |
| | | |
Equity income (a) | (73,005) | | | (122) | |
Other expense (income), net | 4,234 | | | 8,288 | |
| | | |
Non-cash long-term compensation expense | 4,904 | | | 3,468 | |
Changes in other assets and liabilities: | | | |
Accounts receivable | 24,019 | | | 44,422 | |
| | | |
Accounts payable | (8,545) | | | (18,419) | |
Accrued interest | (39,130) | | | (43,597) | |
Deferred revenue | 60,965 | | | 76,317 | |
Other assets and other liabilities | (12,877) | | | (32,077) | |
Net cash provided by operating activities | 177,491 | | | 224,720 | |
Cash flows from investing activities: | | | |
Capital expenditures | (84,944) | | | (75,640) | |
Capital contributions to the MVP Joint Venture | (422,985) | | | (34,513) | |
| | | |
Principal payments received on the Preferred Interest (defined in Note 7) | 1,529 | | | 1,429 | |
| | | |
Net cash used in investing activities | (506,400) | | | (108,724) | |
Cash flows from financing activities: | | | |
Proceeds from revolving credit facility borrowings | 280,000 | | | 137,500 | |
Payments on revolving credit facility borrowings | (660,000) | | | (180,000) | |
Proceeds from the issuance of long-term debt | 600,000 | | | — | |
| | | |
Debt discounts, debt issuance costs and credit facility arrangement fees | (10,206) | | | — | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
Dividends paid to common shareholders | (65,050) | | | (64,964) | |
Dividends paid to holders of Equitrans Midstream Preferred Shares | (14,628) | | | (14,628) | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
Distributions paid to noncontrolling interest | (8,000) | | | (8,000) | |
Other items | (797) | | | (1,306) | |
Net cash provided by (used in) financing activities | 121,319 | | | (131,398) | |
| | | |
Net change in cash and cash equivalents | (207,590) | | | (15,402) | |
Cash and cash equivalents at beginning of period | 258,877 | | | 67,898 | |
Cash and cash equivalents at end of period | $ | 51,287 | | | $ | 52,496 | |
| | | |
Cash paid during the period for: | | | |
Interest, net of amount capitalized | $ | 156,092 | | | $ | 146,828 | |
Income taxes, net | $ | 2,049 | | | $ | — | |
| | | |
| | | |
| | | |
(a)Represents equity income from the MVP Joint Venture. See Note 5.
The accompanying notes are an integral part of these consolidated financial statements.
EQUITRANS MIDSTREAM CORPORATION
Consolidated Balance Sheets (Unaudited)
| | | | | | | | | | | |
| March 31, 2024 | | December 31, 2023 |
| (Thousands) |
ASSETS | |
Current assets: | | | |
Cash and cash equivalents | $ | 51,287 | | | $ | 258,877 | |
| | | |
Accounts receivable (net of allowance for credit losses of $7,752 and $6,429 as of March 31, 2024 and December 31, 2023, respectively) | 242,017 | | | 258,264 | |
| | | |
| | | |
| | | |
Other current assets | 68,693 | | | 78,356 | |
Total current assets | 361,997 | | | 595,497 | |
| | | |
Property, plant and equipment | 9,831,728 | | | 9,745,298 | |
Less: accumulated depreciation | (1,823,590) | | | (1,752,914) | |
Net property, plant and equipment | 8,008,138 | | | 7,992,384 | |
| | | |
Investment in unconsolidated entity (a) | 2,194,117 | | | 1,832,282 | |
Goodwill | 486,698 | | | 486,698 | |
Net intangible assets | 505,928 | | | 522,133 | |
| | | |
| | | |
| | | |
| | | |
Other assets | 291,963 | | | 280,432 | |
Total assets | $ | 11,848,841 | | | $ | 11,709,426 | |
| | | |
LIABILITIES, MEZZANINE EQUITY AND SHAREHOLDERS' EQUITY | | | |
Current liabilities: | | | |
Current portion of long-term debt | $ | 299,846 | | | $ | 299,731 | |
| | | |
Accounts payable | 51,872 | | | 60,884 | |
| | | |
Capital contributions payable to the MVP Joint Venture | 46,835 | | | 181,051 | |
Accrued interest | 95,200 | | | 134,330 | |
Accrued liabilities | 82,457 | | | 106,870 | |
Total current liabilities | 576,210 | | | 782,866 | |
| | | |
Long-term liabilities: | | | |
Revolving credit facility borrowings | 850,000 | | | 1,230,000 | |
Long-term debt | 6,640,152 | | | 6,046,709 | |
| | | |
| | | |
Contract liability | 1,358,238 | | | 1,296,039 | |
| | | |
Deferred income taxes | 26,254 | | | 4,718 | |
Regulatory and other long-term liabilities | 181,820 | | | 160,977 | |
Total liabilities | 9,632,674 | | | 9,521,309 | |
| | | |
| | | |
Mezzanine equity: | | | |
Equitrans Midstream Preferred Shares, 30,018 shares issued and outstanding as of March 31, 2024 and December 31, 2023 | 681,842 | | | 681,842 | |
| | | |
Shareholders' equity: | | | |
| | | |
Common stock, no par value, 433,661 and 433,505 shares issued and outstanding as of March 31, 2024 and December 31, 2023, respectively | 3,982,574 | | | 3,977,149 | |
Retained deficit | (2,904,491) | | | (2,932,206) | |
Accumulated other comprehensive loss | (1,252) | | | (1,272) | |
Total common shareholders' equity | 1,076,831 | | | 1,043,671 | |
Noncontrolling interest | 457,494 | | | 462,604 | |
Total shareholders' equity | 1,534,325 | | | 1,506,275 | |
Total liabilities, mezzanine equity and shareholders' equity | $ | 11,848,841 | | | $ | 11,709,426 | |
(a)Represents investment in the MVP Joint Venture. See Note 5.
The accompanying notes are an integral part of these consolidated financial statements.
EQUITRANS MIDSTREAM CORPORATION
Statements of Consolidated Shareholders' Equity and Mezzanine Equity (Unaudited)
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | Mezzanine |
| | | | | | | | | | | | | | | Equity |
| | | | | | | | | Accumulated | | | | | | Equitrans |
| | | Common Stock | | | | Other | | | | | | Midstream |
| | | Shares | | No | | Retained | | Comprehensive | | Noncontrolling | | Total | | Preferred |
| | | Outstanding | | Par Value | | Deficit | | Loss | | Interest | | Equity | | Shares |
| | | (Thousands, except per share amounts) | | |
Balance at January 1, 2023 | | | 432,781 | | | $ | 3,974,127 | | | $ | (3,053,590) | | | $ | (1,332) | | | $ | 479,399 | | | $ | 1,398,604 | | | $ | 681,842 | |
Other comprehensive income (net of tax): | | | | | | | | | | | | | | | |
Net income | | | — | | | — | | | 87,054 | | | — | | | 4,409 | | | 91,463 | | | 14,628 | |
Pension and other post-retirement benefits liability adjustment, net of tax expense of $7 | | | — | | | — | | | — | | | 22 | | | — | | | 22 | | | — | |
Dividends on common shares ($0.15 per share) | | | — | | | — | | | (65,121) | | | — | | | — | | | (65,121) | | | — | |
Share-based compensation plans, net | | | 402 | | | 3,050 | | | — | | | — | | | — | | | 3,050 | | | — | |
Distributions paid to noncontrolling interest in Eureka Midstream Holdings, LLC | | | — | | | — | | | — | | | — | | | (8,000) | | | (8,000) | | | — | |
Dividends paid to holders of Equitrans Midstream Preferred Shares ($0.4873 per share) | | | — | | | — | | | — | | | — | | | — | | | — | | | (14,628) | |
Balance at March 31, 2023 | | | 433,183 | | | $ | 3,977,177 | | | $ | (3,031,657) | | | $ | (1,310) | | | $ | 475,808 | | | $ | 1,420,018 | | | $ | 681,842 | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | Mezzanine |
| | | | | | | | | | | | | Equity |
| | | | | | | Accumulated | | | | | | Equitrans |
| Common Stock | | | | Other | | | | | | Midstream |
| Shares | | No | | Retained | | Comprehensive | | Noncontrolling | | Total | | Preferred |
| Outstanding | | Par Value | | Deficit | | Loss | | Interest | | Equity | | Shares |
| (Thousands, except per share amounts) |
Balance at January 1, 2024 | 433,505 | | | $ | 3,977,149 | | | $ | (2,932,206) | | | $ | (1,272) | | | $ | 462,604 | | | $ | 1,506,275 | | | $ | 681,842 | |
Other comprehensive income (net of tax): | | | | | | | | | | | | | |
Net income | — | | | — | | | 94,371 | | | — | | | 2,890 | | | 97,261 | | | 14,628 | |
Pension and other post-retirement benefits liability adjustment, net of tax expense of $6 | — | | | — | | | — | | | 20 | | | — | | | 20 | | | — | |
Dividends on common shares ($0.15 per share) | — | | | — | | | (66,656) | | | — | | | — | | | (66,656) | | | — | |
Share-based compensation plans, net | 156 | | | 5,425 | | | — | | | — | | | — | | | 5,425 | | | — | |
Distributions paid to noncontrolling interest in Eureka Midstream Holdings, LLC | — | | | — | | | — | | | — | | | (8,000) | | | (8,000) | | | — | |
Dividends paid to holders of Equitrans Midstream Preferred Shares ($0.4873 per share) | — | | | — | | | — | | | — | | | — | | | — | | | (14,628) | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
Balance at March 31, 2024 | 433,661 | | | $ | 3,982,574 | | | $ | (2,904,491) | | | $ | (1,252) | | | $ | 457,494 | | | $ | 1,534,325 | | | $ | 681,842 | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
| | | | | | | | | | | | | |
The accompanying notes are an integral part of these consolidated financial statements.
EQUITRANS MIDSTREAM CORPORATION
Notes to Consolidated Financial Statements (Unaudited)
1. Financial Statements
Nature of Business. The Company's operating subsidiaries provide midstream services to the Company's customers in Pennsylvania, West Virginia and Ohio through three primary assets: the gathering system, which includes predominantly dry gas gathering systems of high-pressure gathering lines; the transmission system, which includes FERC-regulated interstate pipelines and storage systems; and the water network, which primarily consists of water pipelines and other facilities that support well completion activities and produced water handling activities.
Basis of Presentation. References in these financial statements to Equitrans Midstream or the Company refer collectively to Equitrans Midstream Corporation and its consolidated subsidiaries for all periods presented, unless otherwise indicated.
The accompanying unaudited consolidated financial statements have been prepared in accordance with generally accepted accounting principles in the United States (GAAP) for interim financial information and with the requirements of Form 10-Q and Article 10 of Regulation S-X. Accordingly, they do not include all of the information and footnotes required by GAAP for complete financial statements. In the opinion of management, these unaudited consolidated financial statements include all adjustments (consisting of only normal, recurring adjustments, unless otherwise disclosed in this Quarterly Report on Form 10-Q) necessary for a fair presentation of the financial position of the Company as of March 31, 2024, the results of its operations, cash flows and equity for the three months ended March 31, 2024 and 2023. The consolidated balance sheet at December 31, 2023 has been derived from the audited financial statements at that date, but does not include all of the information and notes required by GAAP for complete financial statements. This Quarterly Report on Form 10-Q should be read in conjunction with the Company's Annual Report on Form 10-K for the year ended December 31, 2023, which includes all disclosures required by GAAP.
Due to, among other things, the seasonal nature of the Company's utility customer contracts, as well as producers’ well completion activities and varying needs for fresh and produced water (which are primarily driven by horizontal lateral lengths and the number of completion stages per well), the interim statements for the three months ended March 31, 2024 are not necessarily indicative of the results that may be expected for the year ending December 31, 2024.
For further information, refer to the Company's consolidated financial statements and related notes in the Company's Annual Report on Form 10-K for the year ended December 31, 2023, as well as Part I, "Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations" contained herein.
Recently Issued Accounting Standards.
In November 2023, the FASB issued ASU 2023-07, Segment Reporting (Topic 280): Improvements to Reportable Segment Disclosures, which provides improvements to reportable segment disclosures and is intended to enhance the disclosures regarding significant segment expenses. The guidance is applicable to all public entities that are required to report segment information in accordance with Topic 280 and is to be applied retrospectively to all prior periods presented in the financial statements. The Company is currently evaluating the potential impact of adopting this standard on its financial statements and related disclosures.
In December 2023, the FASB issued ASU 2023-09, Income Taxes: Improvements to Income Tax Disclosures, which provides improvements to income tax disclosures and is intended to benefit investors by providing more detailed income tax disclosures that would be useful in making capital allocation decisions. The guidance is applicable to all public entities required to report income taxes in accordance with ASC 740 and should be applied prospectively, but retrospective application is permitted. The standard requires disaggregated information about a reporting entity’s effective tax rate reconciliation, information on income taxes paid, and various other disclosure changes. The Company is currently evaluating the potential impact of adopting this standard on its financial statements and related disclosures.
2. Proposed EQT Transaction
Proposed EQT Transaction. On March 10, 2024, the Company, EQT Corporation (Parent), Humpty Merger Sub Inc., an indirect wholly owned subsidiary of Parent (Merger Sub), and Humpty Merger Sub LLC, an indirect wholly owned subsidiary of Parent (LLC Sub), entered into an Agreement and Plan of Merger (the Merger Agreement), pursuant to which, among other things, Merger Sub will merge with and into the Company (the First Merger), with the Company surviving the First Merger as an indirect wholly owned subsidiary of Parent (the First Step Surviving Corporation) and, as the second step in a single integrated transaction, the First Step Surviving Corporation will merge with and into LLC Sub (the Second Merger and,
together with the First Merger, the Mergers), with LLC Sub surviving the Second Merger as an indirect wholly owned subsidiary of Parent (the transactions contemplated by the Merger Agreement, the EQT Transaction).
Under the terms of the Merger Agreement, and subject to the satisfaction or waiver of certain conditions therein, at the effective time of the First Merger (the Effective Time), (i) each share of common stock, no par value per share, of Equitrans Midstream Corporation (Equitrans Midstream common stock) issued and outstanding immediately prior to the Effective Time (excluding any excluded shares) will be converted automatically at the Effective Time into the right to receive 0.3504 (the Exchange Ratio) fully-paid and nonassessable shares of common stock of Parent, no par value per share (EQT Shares) and (ii) each Equitrans Midstream Corporation Series A Perpetual Convertible Preferred Share, no par value (Equitrans Midstream Preferred Share), issued and outstanding immediately prior to the Effective Time will be treated in accordance with Section 8 of the Company’s Second Amended and Restated Articles of Incorporation and the procedures set forth in Section 2.5 of the Merger Agreement.
The EQT Transaction is expected to close during the fourth quarter of 2024. The completion of the First Merger is subject to the satisfaction or waiver of certain closing conditions, including, among others: (i) approval of the Merger Agreement and the Mergers by holders of a majority of the outstanding shares of Equitrans Midstream common stock and Equitrans Midstream Preferred Shares, with such Equitrans Midstream Preferred Shares treated as Equitrans Midstream common stock on an as-converted basis, voting together as a single class, (ii) approval of the issuance of EQT Shares in connection with the Mergers by a majority of votes cast at a special meeting of holders of EQT Shares, (iii) expiration or termination of (a) all waiting periods under the Hart-Scott-Rodino Antitrust Improvements Act of 1976, as amended (the HSR Act) and (b) any commitment to, or agreement with, any governmental entity to delay the consummation of, or not to consummate the transactions contemplated by the Merger Agreement, and (iv) the MVP Joint Venture receiving authorization of the Federal Energy Regulatory Commission (FERC) to place the Mountain Valley Pipeline (MVP) in-service.
The Merger Agreement contains representations and warranties from the parties, and each party has agreed to certain covenants, including, among others, covenants relating to (i) the conduct of business during the interim period between the execution of the Merger Agreement and the Effective Time and (ii) the obligation to use reasonable best efforts to cause the Mergers to be consummated.
Upon termination of the Merger Agreement under certain circumstances, the Company will be obligated to pay Parent a termination fee equal to $191 million. Upon termination of the Merger Agreement under certain circumstances, Parent will be obligated to pay the Company (i) a termination fee equal to $545 million or (ii) a special termination fee equal to $176 million.
The Company recorded approximately $5.7 million in expenses related to the EQT Transaction during the three months ended March 31, 2024 primarily related to advisor, legal and other transaction-related fees, which are included in transaction costs in the statements of consolidated comprehensive income.
3. Financial Information by Business Segment
The Company reports its operations in three segments that reflect its three lines of business of Gathering, Transmission and Water, which reflects the manner in which management evaluates the business for making operating decisions and assessing performance.
| | | | | | | | | | | | | | | |
| | | Three Months Ended March 31, |
| | | | | 2024 | | 2023 |
| | | | | (Thousands) |
Revenues from customers: | | | | | | | |
Gathering (a) | | | | | $ | 224,640 | | | $ | 210,752 | |
Transmission (a) | | | | | 116,894 | | | 138,906 | |
Water | | | | | 22,740 | | | 26,679 | |
Total operating revenues | | | | | $ | 364,274 | | | $ | 376,337 | |
Operating income: | | | | | | | |
Gathering | | | | | $ | 105,059 | | | $ | 104,294 | |
Transmission | | | | | 77,082 | | | 98,922 | |
Water | | | | | 4,988 | | | 12,373 | |
Headquarters (b) | | | | | (5,973) | | | (345) | |
Total operating income | | | | | $ | 181,156 | | | $ | 215,244 | |
| | | | | | | |
Reconciliation of operating income to net income: | | | | | | | |
Equity income (c) | | | | | $ | 73,005 | | | $ | 122 | |
| | | | | | | |
Other (expense) income, net (d) | | | | | (3,976) | | | (8,102) | |
| | | | | | | |
Net interest expense | | | | | (118,896) | | | (104,957) | |
Income tax expense (benefit) | | | | | 19,400 | | | (3,784) | |
Net income | | | | | $ | 111,889 | | | $ | 106,091 | |
(a)For the three months ended March 31, 2023, volumetric-based fee revenues associated with Gathering and Transmission included one-time contract buyouts by a customer for approximately $5.0 million and $23.8 million, respectively.
(b)Includes transaction costs and other certain unallocated corporate expenses.
(c)Equity income is included in the Transmission segment.
(d)Includes unrealized loss on derivative instruments recorded in the Gathering segment.
| | | | | | | | | | | |
| March 31, 2024 | | December 31, 2023 |
| (Thousands) |
Segment assets: | | | |
Gathering | $ | 7,573,577 | | | $ | 7,612,820 | |
Transmission (a) | 3,731,064 | | | 3,369,718 | |
Water | 245,270 | | | 217,225 | |
Total operating segments | 11,549,911 | | | 11,199,763 | |
Headquarters, including cash | 298,930 | | | 509,663 | |
Total assets | $ | 11,848,841 | | | $ | 11,709,426 | |
(a)The equity method investment in the MVP Joint Venture is included in the Transmission segment.
| | | | | | | | | | | | | | | |
| | | Three Months Ended March 31, |
| | | | | 2024 | | 2023 |
| | | | | (Thousands) |
Depreciation: | | | | | | | |
Gathering | | | | | $ | 50,152 | | | $ | 49,349 | |
Transmission | | | | | 14,383 | | | 13,888 | |
Water | | | | | 7,034 | | | 5,863 | |
Headquarters | | | | | 103 | | | 304 | |
Total | | | | | $ | 71,672 | | | $ | 69,404 | |
Capital expenditures: | | | | | | | |
Gathering (a) | | | | | $ | 54,256 | | | $ | 59,713 | |
Transmission (b) | | | | | 17,704 | | | 9,189 | |
Water | | | | | 10,047 | | | 11,076 | |
| | | | | | | |
Total (c) | | | | | $ | 82,007 | | | $ | 79,978 | |
(a)Includes capital expenditures related to the noncontrolling interest in Eureka Midstream Holdings, LLC (Eureka Midstream) of approximately $5.0 million and $3.2 million for the three months ended March 31, 2024 and 2023, respectively.
(b)Transmission capital expenditures do not include aggregate capital contributions made to the MVP Joint Venture of approximately $423.0 million and $34.5 million for the three months ended March 31, 2024 and 2023, respectively.
(c)The Company accrues capital expenditures when the work has been completed but the associated bills have not yet been paid. Accrued capital expenditures are excluded from the statements of consolidated cash flows until they are paid. The net impact of non-cash capital expenditures, including the effect of accrued capital expenditures, transfers to/from inventory as assets are completed/assigned to a project and capitalized share-based compensation costs, was $2.9 million and $(4.3) million for the three months ended March 31, 2024 and 2023, respectively.
4. Revenue from Contracts with Customers
For the three months ended March 31, 2024 and 2023, substantially all revenues recognized on the Company's statements of consolidated comprehensive income were from contracts with customers. As of March 31, 2024 and December 31, 2023, all receivables recorded on the Company's consolidated balance sheets represented performance obligations that have been satisfied and for which an unconditional right to consideration exists.
Summary of disaggregated revenues. The tables below provide disaggregated revenue information by business segment.
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| | Three Months Ended March 31, 2024 |
| | Gathering | | Transmission | | Water | | Total |
| | (Thousands) |
Firm reservation fee revenues (a) | | $ | 135,676 | | | $ | 100,323 | | | $ | 9,375 | | | $ | 245,374 | |
Volumetric-based fee revenues | | 88,964 | | | 16,571 | | | 13,365 | | | 118,900 | |
| | | | | | | | |
Total operating revenues | | $ | 224,640 | | | $ | 116,894 | | | $ | 22,740 | | | $ | 364,274 | |
| | | | | | | | |
| | Three Months Ended March 31, 2023 |
| | Gathering | | Transmission | | Water | | Total |
| | (Thousands) |
Firm reservation fee revenues (a) | | $ | 140,071 | | | $ | 101,722 | | | $ | 9,375 | | | $ | 251,168 | |
Volumetric-based fee revenues (b) | | 70,681 | | | 37,184 | | | 17,304 | | | 125,169 | |
| | | | | | | | |
Total operating revenues | | $ | 210,752 | | | $ | 138,906 | | | $ | 26,679 | | | $ | 376,337 | |
| | | | | | | | |
| | |
| | | | | | | | |
| | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | |
| | | | | | | | |
| | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
(a) Firm reservation fee revenues associated with Gathering included MVC unbilled revenues of approximately $5.9 million and $3.3 million for the three months ended March 31, 2024 and 2023, respectively.
(b) For the three months ended March 31, 2023, volumetric-based fee revenues associated with Gathering and Transmission included one-time contract buyouts by a customer for approximately $5.0 million and $23.8 million, respectively.
Contract assets. The Company's contract assets related to the Company's future MVC deficiency payments are generally expected to be collected within the next twelve months and are primarily included in other current assets in the Company's consolidated balance sheets until such time as the MVC deficiency payments are invoiced to the customer.
The following table presents changes in the Company's contract assets balance: | | | | | | | | | | | | | |
| | | |
| Three Months Ended March 31, | | |
| 2024 | | 2023 | | |
| (Thousands) | | |
Balance as of beginning of period | $ | 11,123 | | | $ | 27,493 | | | |
Revenue recognized in excess of amounts invoiced (a) | 5,903 | | | 3,262 | | | |
Minimum volume commitments invoiced (b) | (7,833) | | | (23,558) | | | |
Amortization (c) | (165) | | | (165) | | | |
Balance as of end of period | $ | 9,028 | | | $ | 7,032 | | | |
| | | | | |
(a)Primarily includes revenues associated with MVCs that are included in revenues within the Gathering and Water segments.
(b)Unbilled revenues are transferred to accounts receivable once the Company has an unconditional right to consideration from the customer.
(c)Amortization of capitalized contract costs paid to customers over the expected life of the agreement.
Contract liabilities. The Company's contract liabilities consist of deferred revenue primarily associated with the EQT Global GGA. Contract liabilities are classified as current or non-current according to when such amounts are expected to be recognized.
The following table presents changes in the Company's contract liability balances:
| | | | | | | | | | | | | |
| | | |
| | | Three Months Ended March 31, |
| | | 2024 | | 2023 |
| | | (Thousands) |
Balance as of beginning of period | | | $ | 1,301,100 | | | $ | 973,087 | |
Amounts recorded during the period (a) | | | 62,456 | | | 81,930 | |
Change in estimated variable consideration (b) | | | — | | | (3,392) | |
Amounts transferred during the period (c) | | | (1,491) | | | (2,221) | |
| | | | | |
Balance as of end of period | | | $ | 1,362,065 | | | $ | 1,049,404 | |
| | | | | |
(a)Includes deferred billed revenue during the three months ended March 31, 2024 and 2023 primarily associated with the EQT Global GGA.
(b)For the three months ended March 31, 2023, the change in estimated variable consideration represents the decrease in total deferred revenue due to changes in MVP timing assumptions.
(c)Deferred revenues are recognized as revenue upon satisfaction of the Company's performance obligation to the customer.
Summary of remaining performance obligations. The following table summarizes the estimated transaction price allocated to the Company's remaining performance obligations under all contracts with firm reservation fees, MVCs and/or ARCs as of March 31, 2024 that the Company will invoice or transfer from contract liabilities and recognize in future periods.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | 2024(a) | | 2025 | | 2026 | | 2027 | | 2028 | | Thereafter | | Total |
| (Thousands) |
Gathering firm reservation fees | | $ | 128,764 | | | $ | 176,822 | | | $ | 167,220 | | | $ | 160,435 | | | $ | 156,743 | | | $ | 1,553,481 | | | $ | 2,343,465 | |
Gathering revenues supported by MVCs | | 333,494 | | | 458,745 | | | 490,982 | | | 488,944 | | | 486,306 | | | 2,690,099 | | | 4,948,570 | |
Transmission firm reservation fees | | 291,127 | | | 400,381 | | | 400,511 | | | 399,762 | | | 397,081 | | | 2,771,121 | | | 4,659,983 | |
Water revenues supported by ARCs/MVCs | | 36,331 | | | 48,441 | | | 45,159 | | | 44,065 | | | 45,706 | | | 120,938 | | | 340,640 | |
Total (b) | | $ | 789,716 | | | $ | 1,084,389 | | | $ | 1,103,872 | | | $ | 1,093,206 | | | $ | 1,085,836 | | | $ | 7,135,639 | | | $ | 12,292,658 | |
(a) April 1, 2024 through December 31, 2024.
(b) Includes assumptions regarding timing for placing certain projects in-service. Such assumptions may not be realized and delays in the in-service dates for projects have substantially altered, and any future additional delays may further substantially alter, the remaining performance obligations for certain contracts with firm reservation fees, MVCs and/or ARCs. The MVP Joint Venture is accounted for as an equity method investment and those amounts are not included in the table above.
Based on total projected contractual revenues, including projected contractual revenues from future capacity expected from expansion projects that are not yet fully constructed or not yet fully in-service for which the Company has executed firm contracts, the Company's firm gathering contracts and firm transmission and storage contracts had weighted average remaining terms of approximately 13 years and 11 years, respectively, as of March 31, 2024.
5. Investment in Unconsolidated Entity
The MVP Joint Venture. The Company has an equity method investment in the MVP Joint Venture. The MVP Joint Venture is constructing the Mountain Valley Pipeline and is developing the MVP Southgate project, each discussed in more detail below. The Company maintains separate ownership interests in and is expected to operate the two MVP Joint Venture projects.
Mountain Valley Pipeline. The MVP Joint Venture is constructing the Mountain Valley Pipeline (MVP), a 303-mile natural gas interstate pipeline that is designed to span from northern West Virginia to southern Virginia. The Company will operate the MVP and owned a 48.9% interest in the MVP project as of March 31, 2024.
In April 2024, the MVP Joint Venture filed its in-service authorization request for the MVP project with the FERC. As of the filing of this Quarterly Report on Form 10-Q, the MVP Joint Venture has continued to make substantial progress on completing the MVP and construction, together with commissioning activity and certain pre-MVP in-service restoration on the MVP is ongoing. The Company expects to complete construction and final commissioning of the pipeline on or about May 31, 2024 and is targeting a total project cost of approximately $7.85 billion (including contingency and excluding allowance for funds used during construction (AFUDC)).
MVP and MVP-related long-term firm capacity will begin on the first day of the month immediately following the date MVP receives FERC authorization to commence service and is able to provide the applicable service level (with certain MVC step ups and more significant gathering MVC fee declines under the EQT Global GGA commencing effective the first day of the calendar quarter in which the MVP long-term firm capacity obligations commence). The targeted completion timing, and accordingly the commencement of MVP and MVP-related long-term firm capacity contractual obligations, as well as the estimated total project cost, are subject to many ongoing factors. If construction and final commissioning were to be completed on or about May 31, 2024 and the project completed at a total project cost of approximately $7.85 billion (including contingency and excluding AFUDC), the Company expects its equity ownership in the MVP project would progressively increase from approximately 48.9% to approximately 49.2%.
The MVP Joint Venture is a variable interest entity because it has insufficient equity to finance its activities during the construction stage of the project. The Company is not the primary beneficiary of the MVP Joint Venture because the Company does not have the power to direct the activities that most significantly affect the MVP Joint Venture's economic performance. Certain business decisions, such as decisions to make distributions of cash, require a greater than 66 2/3% ownership interest approval, and no one member owns more than a 66 2/3% interest. Upon completion of the MVP project, the Company expects the MVP Joint Venture to no longer be a variable interest entity because it will have sufficient equity to finance its activities, including accessing capital markets and returning a portion of invested capital to its owners.
In March 2024, the MVP Joint Venture issued a capital call notice for the funding of the MVP project to MVP Holdco, LLC (MVP Holdco), a wholly owned subsidiary of the Company, for $46.8 million, which was paid in April 2024. The capital contributions payable and the corresponding increase to the investment balance are reflected on the consolidated balance sheet as of March 31, 2024.
Pursuant to the MVP Joint Venture's limited liability company agreement, MVP Holdco is obligated to provide performance assurances in respect of the MVP project, which may take the form of a guarantee from EQM (provided that EQM's debt is rated as investment grade in accordance with the requirements of the MVP Joint Venture's limited liability company agreement), a letter of credit or cash collateral, in favor of the MVP Joint Venture to provide assurance as to the funding of MVP Holdco's proportionate share of the construction budget for the MVP project. As of March 31, 2024, the letter of credit with respect to the MVP project was in the amount of approximately $104.7 million. The letter of credit with respect to the MVP project is expected to be further reduced as the Company contributes capital to fund MVP Holdco's remaining proportionate share of the construction budget, subject to a minimum-required level to be maintained through in-service of the MVP project.
The Company's ownership interest in the MVP Joint Venture related to the MVP project is significant for the three months ended March 31, 2024 as defined by the SEC's Regulation S-X Rule 1-02(w). Accordingly, as required by Regulation S-X Rule
3-09, the following tables summarize the condensed financial statements of the MVP Joint Venture in relation to the MVP project.
Condensed Balance Sheets
| | | | | | | | | | | |
| March 31, 2024 | | December 31, 2023 |
| (Unaudited) | | |
| (Thousands) |
Current assets | $ | 228,562 | | | $ | 349,417 | |
Non-current assets | 9,099,814 | | | 8,480,539 | |
Total assets | $ | 9,328,376 | | | $ | 8,829,956 | |
| | | |
Current liabilities | $ | 238,888 | | | $ | 371,508 | |
| | | |
Equity | 9,089,488 | | | 8,458,448 | |
Total liabilities and equity | $ | 9,328,376 | | | $ | 8,829,956 | |
Condensed Statements of Operations
| | | | | | | | | | | | | | | |
| | | Three Months Ended March 31, |
| | | | | 2024 | | 2023 |
| | | | | (Unaudited) |
| | | | | (Thousands) |
Operating (expense) income | | | | | $ | (34) | | | $ | — | |
Other income | | | | | 3,270 | | | 257 | |
AFUDC - debt | | | | | 43,960 | | | — | |
AFUDC - equity | | | | | 102,579 | | | — | |
Net income | | | | | $ | 149,775 | | | $ | 257 | |
MVP Southgate Project. In April 2018, the MVP Joint Venture announced the MVP Southgate project (MVP Southgate) as a contemplated interstate pipeline that was approved by the United States FERC and designed to extend approximately 75 miles from the MVP in Pittsylvania County, Virginia to new delivery points in Rockingham and Alamance Counties, North Carolina using 24-inch and 16-inch diameter pipe.
In late December 2023, following completion of its negotiations with each of Public Service Company of North Carolina, Inc. (PSNC) and Duke Energy Carolinas, LLC (Duke), the MVP Joint Venture entered into precedent agreements with each of PSNC and Duke. The precedent agreements contemplate an amended project (in lieu of the original project) and, among other things, describe certain conditions precedent to the parties' respective obligations regarding MVP Southgate. The amended project would extend approximately 31 miles from the terminus of the MVP in Pittsylvania County, Virginia to planned new delivery points in Rockingham County, North Carolina using 30-inch diameter pipe.
The Company is expected to operate the MVP Southgate pipeline and owned a 47.2% interest in the MVP Southgate project as of March 31, 2024. The targeted completion timing for the project is June 2028.
Pursuant to the MVP Joint Venture's limited liability company agreement, MVP Holdco is obligated to provide performance assurances in respect of MVP Southgate, which performance assurances may take the form of a guarantee from EQM (provided that EQM's debt is rated as investment grade in accordance with the requirements of the MVP Joint Venture's limited liability company agreement), a letter of credit or cash collateral. On April 6, 2023, EQM’s $14.2 million letter of credit with respect to the MVP Southgate project was terminated, following the determination to temporarily defer partners’ obligations to post performance assurances with respect to the MVP Southgate project, which may be reinstated upon further developments. Upon the FERC’s initial release to begin construction of the MVP Southgate project, the Company will be obligated to deliver an allowable form of performance assurance in an amount equal to 33% of MVP Holdco’s proportionate share of the remaining capital obligations under the applicable construction budget.
6. Debt
Amended EQM Credit Facility. On February 15, 2024 (the Fifth Amendment Date), EQM entered into an amendment (the Fifth Amendment) to the Third Amended and Restated Credit Agreement, dated as of October 31, 2018 (as amended, supplemented or otherwise modified, the Amended EQM Credit Facility), among EQM, as borrower, Wells Fargo Bank, National Association, as the administrative agent, swing line lender and an L/C issuer, the lenders party thereto from time to time and any other persons party thereto from time to time. The Fifth Amendment, among other things, amended the financial covenant, such that the Consolidated Leverage Ratio (as defined in the Amended EQM Credit Facility) (i) as of March 31, 2024, could not exceed 6.00 to 1.00, (ii) as of June 30, 2024, cannot exceed 6.25 to 1.00, (iii) as of September 30, 2024, cannot exceed 5.85 to 1.00 and (iv) as of the end of each fiscal quarter thereafter, cannot exceed 5.50 to 1.00. EQM has or, as applicable, will have aggregate commitments available under the Amended EQM Credit Facility of approximately $1.55 billion prior to April 30, 2025, and approximately $1.45 billion on and after April 30, 2025 and prior to April 30, 2026. For the avoidance of doubt, any reference to the Amended EQM Credit Facility as of any particular date shall mean the Amended EQM Credit Facility as in effect on such date.
As of March 31, 2024, EQM had $520 million of borrowings and approximately $105.8 million of letters of credit outstanding under the Amended EQM Credit Facility. Taking into account the maximum Consolidated Leverage Ratio applicable under the Amended EQM Credit Facility that, as of March 31, 2024, could not exceed 6.00 to 1.00, EQM had the ability to borrow approximately $0.2 billion under the Amended EQM Credit Facility as of March 31, 2024. As of December 31, 2023, EQM had $915 million of borrowings and approximately $105.8 million of letters of credit outstanding under the Amended EQM Credit Facility.
During the three months ended March 31, 2024 and 2023, the maximum outstanding borrowings at any time were approximately $1,055 million and $315 million, respectively, the average daily balances were approximately $834 million and $262 million, respectively, and the weighted average annual interest rates were approximately 8.3% and 7.5%, respectively. For the three months ended March 31, 2024 and 2023, commitment fees of $0.7 million and $2.1 million, respectively, were paid to maintain credit availability under the Amended EQM Credit Facility. As of March 31, 2024, no term loans were outstanding under the Amended EQM Credit Facility.
The Amended EQM Facility contains negative covenants that, among other things, limit restricted payments, the incurrence of debt, dispositions, mergers and other fundamental changes, and transactions with affiliates, in each case and as applicable, subject to certain specified exceptions. In addition, the Amended EQM Credit Facility contains certain specified events of default such as insolvency, nonpayment of scheduled principal or interest obligations, change of control and cross-default related to the acceleration or default of certain other financial obligations.
Eureka Credit Facility. Eureka has a $400 million senior secured revolving credit facility with Sumitomo Mitsui Banking Corporation, as administrative agent, the lenders party thereto from time to time and any other persons party thereto from time to time (the 2021 Eureka Credit Facility) that matures in November 2025.
As of March 31, 2024, and December 31, 2023, Eureka had $330 million and $315 million, respectively, of borrowings outstanding under the 2021 Eureka Credit Facility. For the three months ended March 31, 2024 and 2023, the maximum amount of outstanding borrowings under the 2021 Eureka Credit Facility at any time were approximately $330 million and $303 million, respectively, the average daily balances were approximately $323 million and $299 million, respectively, and Eureka incurred interest at weighted average annual interest rates of approximately 8.3% and 7.1%, respectively. For the three months ended March 31, 2024 and 2023, commitment fees of $0.1 million and $0.1 million, respectively, were paid to maintain credit availability under the 2021 Eureka Credit Facility.
The 2021 Eureka Credit Facility contains negative covenants that, among other things, limit restricted payments, the incurrence of debt, dispositions, mergers and other fundamental changes, and transactions with affiliates, in each case and as applicable, subject to certain specified exceptions. In addition, the 2021 Eureka Credit Facility contains certain specified events of default such as insolvency, nonpayment of scheduled principal or interest obligations, loss and failure to replace certain material contracts, change of control and cross-default related to the acceleration or default of certain other financial obligations.
2024 Senior Notes. On February 26, 2024, EQM completed a private offering of $600 million in aggregate principal amount of new 6.375% senior notes due 2029 (the 2024 Senior Notes) and received net proceeds from the offering of approximately $590.6 million inclusive of a discount of approximately $7.5 million and debt issuance costs of approximately $1.9 million. EQM used the net proceeds from the 2024 Senior Notes offering to repay certain outstanding indebtedness, including borrowings under the Amended EQM Credit Facility, and for general partnership purposes.
The 2024 Senior Notes were issued under and are governed by an indenture, dated February 26, 2024 (the 2024 Indenture), between EQM and U.S. Bank Trust Company, National Association, as trustee (the Trustee). The 2024 Indenture contains
covenants that limit EQM’s ability to, among other things, incur certain liens securing indebtedness, engage in certain sale and leaseback transactions, and enter into certain consolidations, mergers, conveyances, transfers or leases of all or substantially all of EQM’s assets. The 2024 Senior Notes will mature on April 1, 2029 and interest on the 2024 Senior Notes is payable semi-annually in arrears on April 1 and October 1 of each year, commencing on October 1, 2024.
The 2024 Senior Notes are unsecured and rank equally in right of payment with all of EQM’s existing and future senior indebtedness. The 2024 Senior Notes are senior in right of payment to any of EQM’s future indebtedness that are, by their terms, expressly subordinated in right of payment to the 2024 Senior Notes. The 2024 Senior Notes are effectively subordinated to EQM’s future secured indebtedness, if any, to the extent of the value of the assets securing such indebtedness, and structurally subordinated to all existing and future obligations, including trade payables, of EQM’s subsidiaries, other than any subsidiaries that may guarantee the Notes in the future.
EQM may, at its option, redeem some or all of the 2024 Senior Notes, in whole or in part, at any time prior to their maturity at the applicable redemption price as set forth in the Indenture.
Upon the occurrence of a Change of Control Triggering Event (as defined in the 2024 Indenture), EQM may be required to offer to purchase the 2024 Senior Notes at a purchase price equal to 101% of the aggregate principal amount of the 2024 Senior Notes repurchased, plus accrued and unpaid interest, if any, on the 2024 Senior Notes repurchased, to, but excluding, the date of settlement, subject to the right of holders of record on the relevant record date to receive interest due on an interest payment date that is on or prior to the date of settlement.
The 2024 Indenture contains certain events of default (each an Event of Default), including the following: (1) default in the payment of interest on such 2024 Senior Notes when due that continues for 30 days; (2) default in the payment of principal of or premium, if any, on any such 2024 Senior Notes when due, whether at its stated maturity, upon redemption or otherwise; (3) failure by EQM or any subsidiary guarantor, if any, to comply for 90 days with the other agreements with respect to such 2024 Senior Notes contained in the 2024 Indenture after written notice by the Trustee or by the holders of at least 25% in principal amount of the outstanding 2024 Senior Notes; (4) certain events of bankruptcy, insolvency or reorganization of EQM or any subsidiary guarantor, if any, that is one of EQM’s Significant Subsidiaries (as defined in the 2024 Indenture); and (5) if such 2024 Senior Notes are guaranteed by a subsidiary guarantor that is one of EQM’s Significant Subsidiaries, (a) the guarantee of that subsidiary guarantor ceases to be in full force and effect, except as otherwise provided in the 2024 Indenture; (b) the guarantee of that subsidiary guarantor is declared null and void in a judicial proceeding; or (c) such subsidiary guarantor denies or disaffirms its obligations under the 2024 Indenture or its guarantee.
If an Event of Default occurs and is continuing, the Trustee or the holders of at least 25% in aggregate principal amount of the outstanding 2024 Senior Notes may declare the principal of and all accrued and unpaid interest on such 2024 Senior Notes to be immediately due and payable. If an Event of Default relating to certain events of bankruptcy, insolvency or reorganization occurs, the principal of and interest on the 2024 Senior Notes will become immediately due and payable without any action on the part of the Trustee or any holders of the 2024 Senior Notes.
As of March 31, 2024, EQM and Eureka were in compliance with all debt provisions and covenants.
7. Fair Value Measurements
Assets Measured at Fair Value on a Recurring Basis. The Company records derivative instruments at fair value on a gross basis in its consolidated balance sheets. The EQT Global GGA provides for potential cash bonus payments payable by EQT to the Company during the period beginning on the first day of the calendar quarter in which the MVP long-term firm capacity obligations commence through the calendar quarter ending December 31, 2024 (the Henry Hub cash bonus payment provision). The potential cash bonus payments are conditioned upon the quarterly average of certain Henry Hub natural gas prices exceeding certain price thresholds. The Henry Hub cash bonus payment provision is accounted for as a derivative instrument and recorded at its estimated fair value using a Monte Carlo simulation model. Significant inputs used in the fair value measurement include NYMEX Henry Hub natural gas futures prices as of the date of valuation, probability-weighted assumptions regarding MVP project completion, risk-free interest rates based on U.S. Treasury rates, expected volatility of NYMEX Henry Hub natural gas futures prices and an estimated credit spread of EQT. The probability-weighted assumptions regarding MVP project completion utilizing internally developed methodologies, and the expected volatility of NYMEX Henry Hub natural gas futures prices, used in the valuation methodology represent significant unobservable inputs causing the Henry Hub cash bonus payment provision to be designated as a Level 3 fair value measurement. An expected average volatility of approximately 45.0% was utilized in the valuation model, which is based on market-quoted volatilities of relevant NYMEX Henry Hub natural gas forward prices.
As of March 31, 2024 and December 31, 2023, the fair values of the Henry Hub cash bonus payment provision were $19.8 million and $24.5 million, respectively, which were recorded in other current assets on the Company's consolidated balance
sheets. During the three months ended March 31, 2024 and 2023, the Company recognized losses of $4.7 million and $8.5 million, respectively, representing the change in estimated fair value of the derivative instrument during the respective periods and are recorded in other (expense) income, net in the Company's statements of consolidated comprehensive income.
Other Financial Instruments. The carrying values of cash and cash equivalents, accounts receivable and accounts payable approximate fair value due to the short maturity of the instruments. The carrying values of borrowings under the Amended EQM Credit Facility and the 2021 Eureka Credit Facility approximate fair value as the interest rates are based on prevailing market rates. As EQM's borrowings under its senior notes are not actively traded, their fair values are estimated using an income approach model that applies a discount rate based on prevailing market rates for debt with similar remaining time-to-maturity and credit risk; as such, their fair values are Level 2 fair value measurements. As of March 31, 2024 and December 31, 2023, the estimated fair values of EQM's senior notes were approximately $6,901.2 million and $6,334.3 million, respectively, and the carrying values of EQM's senior notes were approximately $6,940.0 million and $6,346.4 million, respectively. The fair value of the preferred interest that the Company has in EQT Energy Supply, LLC (EES), a subsidiary of EQT (the Preferred Interest) is a Level 3 fair value measurement and is estimated using an income approach model that applies a market-based discount rate. As of March 31, 2024, and December 31, 2023, the estimated fair values of the Preferred Interest were approximately $88.2 million and $90.7 million, respectively, and the carrying values of the Preferred Interest were approximately $87.0 million and $88.5 million, respectively.
8. Earnings Per Share
The Company excluded 30,018 (in thousands) of weighted average anti-dilutive securities related to the Equitrans Midstream Preferred Shares from the computation of diluted weighted average common shares outstanding for the three months ended March 31, 2024. The Company excluded 30,136 (in thousands) of weighted average anti-dilutive securities related to the Equitrans Midstream Preferred Shares and stock-based compensation awards from the computation of diluted weighted average common shares outstanding for the three months ended March 31, 2023.
The Company grants Equitrans Midstream phantom units to non-employee directors that will be paid in Equitrans Midstream common stock upon the director's termination of service from the Company's Board of Directors. As there are no remaining service, performance or market conditions related to these awards, 840 and 603 (in thousands) Equitrans Midstream phantom units were included in the computation of basic and diluted weighted average common shares outstanding for the three months ended March 31, 2024 and 2023, respectively.
9. Income Taxes
The Company's effective tax rate was 14.8% for the three months ended March 31, 2024 compared to (3.7)% for the three months ended March 31, 2023. The Company calculates the provision for income taxes for interim periods by applying an estimate of the annual effective tax rate for the full fiscal year to "ordinary" income or loss (income (loss) before income taxes excluding unusual or infrequently occurring items) for the periods. The effective tax rate was higher for the three months ended March 31, 2024 compared to the three months ended March 31, 2023 primarily due to the impact of changes in the valuation allowance that limit tax benefits for the Company's federal and state deferred tax assets and the impact of projected AFUDC - equity from the MVP project.
For the three months ended March 31, 2024, the Company believes that it is more likely than not that a portion of the benefit from the deferred tax assets related to interest disallowance carryforward under Internal Revenue Code Section 163(j) will not be realized and accordingly, the Company maintains a valuation allowance. For the three months ended March 31, 2024, the Company recorded approximately $10.4 million in income tax benefit related to changes in valuation allowances because of increases in federal and state deferred tax liabilities that are expected to be realized against net operating losses and a portion of the interest disallowance carryforward. As of March 31, 2024 and December 31, 2023, the valuation allowances related to federal and state deferred tax assets were approximately $46.4 million and $56.8 million, respectively.
EQUITRANS MIDSTREAM CORPORATION
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations
You should read the following discussion and analysis of financial condition and results of operations in conjunction with the consolidated financial statements, and the notes thereto, included elsewhere in this report.
Cautionary Statements
Disclosures in this Quarterly Report on Form 10-Q contain certain forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended (the Exchange Act), and Section 27A of the Securities Act of 1933, as amended (the Securities Act). Statements that do not relate strictly to historical or current facts are forward-looking and usually identified by the use of words such as “aim,” “anticipate,” “approximate,” “aspire,” “assume,” “believe,” “budget,” “cause,” “continue,” “could,” “depend,” develop,” “design,” “estimate,” “expect,” “focused,” “forecast,” “goal,” “guidance,” “impact,” “implement,” “increase,” “intend,” “lead,” “maintain,” “may,” “might,” “objective,” “opportunity,” “outlook,” “plan,” “position,” “possible,” “potential,” “predict,” “project,” “pursue,” “reduce,” “remain,” “result,” “scheduled,” “seek,” “should,” “strategy,” “strive,” “target,” “view,” “will,” or “would” and other similar words. The absence of such words or expressions does not necessarily mean the statements are not forward-looking. Without limiting the generality of the foregoing, forward-looking statements contained in this Quarterly Report on Form 10-Q include the matters discussed in the section captioned "Outlook" in Part I, "Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations," and the expectations of plans, strategies, objectives, and growth and anticipated financial and operational performance of Equitrans Midstream Corporation (together with its subsidiaries, Equitrans Midstream or the Company), including the following and/or statements with respect thereto, as applicable:
•statements regarding (i) the proposed EQT Transaction, including the ability to consummate the Mergers in the expected time frame or at all, including due to the inability to obtain all approvals necessary or the failure of closing conditions and (ii) anticipated or perceived benefits of the proposed EQT Transaction, including any synergies;
•guidance and any changes in such guidance in respect of the Company’s gathering, transmission and storage and water services revenue and volume, including the anticipated effects associated with the EQT Global GGA;
•projected revenue (including from firm reservation fees) and volumes, gathering rates, deferred revenues, expenses and contract liabilities, and the effects on liquidity, leverage, projected revenue, deferred revenue and contract liabilities associated with the EQT Global GGA and the MVP project (including changes in timing for such project);
•the ultimate gathering MVC fee relief, and timing thereof, provided to EQT under the EQT Global GGA and related agreements, and timing of commencement of step ups in MVC thereunder;
•the Company's ability to de-lever and timing and means thereof;
•the ultimate financial, business, reputational and/or operational impacts resulting, directly or indirectly, from the Rager Mountain natural gas storage field incident;
•the weighted average contract life of gathering, transmission and storage contracts;
•infrastructure programs (including the targeted or ultimate timing, cost, capacity and sources of funding with respect to gathering, transmission and storage and water projects);
•the cost to construct or restore right-of-way for, capacity of, shippers for, timing and durability of regulatory approvals and concluding litigation, final design (including project scope, expansions, extensions or refinements and capital related thereto), ability and timing to contract additional capacity on, mitigate emissions from, targeted in-service dates of, and completion (including potential timing of such completion) of current, planned or in-service projects or assets, in each case as applicable;
•the effect of the Fiscal Responsibility Act of 2023 on the MVP Joint Venture's ability to complete the MVP project;
•the ability to construct, complete and place in service the MVP project;
•the targeted timing and cost of completing, the MVP project (and risks related thereto);
•the targeted total MVP project cost and schedule, including the timing for contractual obligations to commence, and the ability to continue construction, potential receipt of in-service authorization, and the realizability of the perceived benefits of the MVP project;
•view as to having finalized the scope of the MVP Southgate and the ability to permit, construct, complete and place in service the MVP Southgate;
•the targeted total project cost and timing for completing (and ability to complete) MVP Southgate, including the satisfaction, if any, of conditions precedent with respect to the relevant precedent agreements, timing for forecasted capital expenditures related thereto, and the realizability of the perceived benefits of the amended project, design, scope and provisions included in the relevant precedent agreements, and any potential extensions of the terms of the precedent agreements;
•the MVP Joint Venture's ability to execute any additional agreements for firm capacity for the MVP Southgate;
•the realizability of all or any portion of the Henry Hub cash bonus payment under the EQT Global GGA;
•the potential for future bipartisan support for, and the potential timing for, additional federal energy infrastructure permitting reform legislation to be enacted;
•the ultimate terms, partner relationships and structure of the MVP Joint Venture and ownership interests therein;
•the impact of changes in assumptions and estimates relating to the potential completion and full in-service timing of the MVP project (as well as changes in such timing) on, among other things, the fair value of the Henry Hub cash bonus payment provision of the EQT Global GGA, gathering rates, the amount of gathering MVC fee relief and the estimated transaction price allocated to the Company's remaining performance obligations under certain contracts with firm reservation fees and MVCs;
•the Company's ability to identify and complete opportunities to optimize its existing asset base and/or expansion projects in the Company's operating areas and in areas that would provide access to new markets;
•the Company's ability to bring, and targeted timing for bringing, in-service extensions and expansions of its mixed-use water system, and realize benefits therefrom in accordance with its strategy for its water services business segment;
• the Company's ability to identify and complete acquisitions and other strategic transactions, including joint ventures, effectively integrate transactions into the Company's operations, and achieve synergies, system optionality, accretion and other benefits associated with transactions, including through increased scale;
• the potential for the MVP project, EQM's leverage, the EQT Transaction, customer credit ratings changes, defaults, acquisitions, dispositions and financings to impact EQM's credit ratings and the potential scope of any such impacts;
• the effect and outcome of contractual disputes, litigation and other proceedings, including regulatory investigations and proceedings;
• the potential effects of any consolidation of or effected by upstream gas producers, including acquisitions of midstream assets, whether in or outside of the Appalachian Basin;
• the potential for, timing, amount and effect of future issuances or repurchases of the Company's securities;
• the effects of conversion, if at all, of the Equitrans Midstream Preferred Shares (as defined herein) or timing for any redemption thereof;
• the effects of seasonality;
• expected cash flows, cash flow profile (and support therefor from certain contract structures) and MVCs, including those associated with the EQT Global GGA, and the potential impacts thereon of the commission and in-service timing (or absence thereof) and cost of the MVP project;
• projected capital contributions and capital and operating expenditures (which may be adjusted by management of the combined company should the EQT Transaction close), including the amount and timing of reimbursable capital expenditures, capital budget and sources of funds for capital expenditures;
• the Company's ability to recoup replacement and related costs;
• future dividend amounts, timing and rates;
• statements regarding macroeconomic factors' effects on the Company's business, including future commodity prices, the impact of MVP in-service on commodity prices or natural gas volumes in the Appalachian Basin, and takeaway capacity constraints in the Appalachian Basin;
• beliefs regarding future decisions of customers in respect of production growth, curtailing natural gas production, timing of turning wells in line, rig and completion activity and related impacts on the Company's business, and the effect, if any, on such future decisions should the MVP be brought in-service, as well as the potential for increased volumes to flow to the Company's gathering and transmission system to supply the MVP following in-service;
• the Company's liquidity and financing position and requirements, including sources, availability and sufficiency;
• statements regarding future interest rates and/or reference rates and the potential impacts thereof;
• the ability of the Company's subsidiaries (some of which are not wholly owned) to service debt under, and comply with the covenants contained in, their respective credit agreements;
• the MVP Joint Venture's ability to raise project-level debt, and the anticipated proceeds that the Company expects to receive therefrom;
• expectations regarding natural gas and water volumes in the Company's areas of operations;
• the Company's ability to achieve anticipated benefits associated with the execution of commercial agreements;
• the Company's ability to position itself for a lower carbon economy, achieve, and create value from, its environmental, social and governance (ESG) and sustainability initiatives, targets and aspirations (including targets and aspirations set forth in its climate policy) and respond, and impacts of responding, to increasing stakeholder scrutiny in these areas;
• the effectiveness of the Company's information technology and operational technology systems and practices to detect and defend against evolving cyberattacks on United States critical infrastructure;
• the effects and associated cost of compliance with existing or new government regulations including any quantification of potential impacts of regulatory matters related to climate change on the Company; and
• future tax rates, status and position.
The forward-looking statements included in this Quarterly Report on Form 10-Q involve risks and uncertainties that could cause actual results to differ materially from projected results. Accordingly, investors should not place undue reliance on forward-looking statements as a prediction of actual results. The Company has based these forward-looking statements on management's current expectations and assumptions about future events. While the Company considers these expectations and assumptions to be reasonable, they are inherently subject to significant business, economic, competitive, regulatory, judicial, construction and other risks and uncertainties, many of which are difficult to predict and are beyond the Company's control, including, as it pertains to the MVP project and its total cost and timing, risks and uncertainties such as the physical construction and restoration conditions, including steep slopes and any further unexpected geological impediments, equipment issues, weather which could affect forward construction and restoration, including the amount and severity of pipeline slips, testing, commissioning, continued crew availability, ability to meet workforce draw down plans, productivity ultimately realized, assumptions related to, and the realizability of, bids provided or to be provided and/or claims which could be made by or against contractors, including relating to materials or subcontractors, project opposition, and the receipt of any necessary approvals, including in-service authorization. Further, the commencement of MVP and MVP-related long-term firm capacity contractual obligations, and certain MVC step ups, more significant gathering MVC fee declines and potential Henry Hub cash bonus payments under the EQT Global GGA, are dependent on MVP authorization from the FERC and ability to commence service and also the terms of the applicable contracts governing the timing of such commencement, which generally provide that such firm capacity obligations commence on the first day of the month immediately following the date MVP is authorized and able to provide the applicable service level and in the case of the EQT Global GGA begin on the first day of the calendar quarter in which such MVP long-term firm capacity obligations commence. The risks and uncertainties that may affect the operations, performance and results of the Company's business and forward-looking statements include, but are not limited to, those set forth under Part I, "Item 1A. Risk Factors" in the Company's Annual Report on Form 10-K for the year ended December 31, 2023, as updated by this Quarterly Report on Form 10-Q, as applicable.
Any forward-looking statement speaks only as of the date on which such statement is made and the Company does not intend to correct or update any forward-looking statement, unless required by securities law, whether as a result of new information, future events or otherwise. As forward-looking statements involve significant risks and uncertainties, caution should be exercised against placing undue reliance on such statements. All such statements are expressly qualified by this cautionary statement.
Executive Overview
Net income attributable to Equitrans Midstream common shareholders was $94.4 million, $0.21 per diluted share, for the three months ended March 31, 2024 compared to $87.1 million, $0.20 per diluted share, for the three months ended March 31, 2023. The increase resulted primarily from higher equity income, partially offset by higher income tax expense, higher operating expenses, higher net interest expense and lower operating revenues.
On March 10, 2024, we entered into a definitive agreement to be acquired by EQT. The Company recorded approximately $5.7 million in expenses related to the EQT Transaction during the three months ended March 31, 2024 primarily related to advisor, legal and other transaction-related fees. See also “Proposed Acquisition by EQT Corporation” under “Outlook” below and “We are expected to incur significant transaction costs in connection with the EQT Transaction, which may be in excess of those anticipated by us.” included in Part II, “Item 1A. Risk Factors” of this Quarterly Report on Form 10-Q.
Business Segment Results
Operating segments are revenue-producing components of an enterprise for which separate financial information is produced internally and is subject to evaluation by the chief operating decision maker in deciding how to allocate resources. Headquarters costs consist primarily of transaction costs and other certain unallocated corporate expenses, as applicable. Net interest expense, loss on extinguishment of debt, components of other (expense) income, net and income tax expense (benefit) are managed on a consolidated basis. The Company has presented each segment's operating income, other (expense) income, net, equity income, impairment of equity method investment and various operational measures, as applicable, in the following sections. Management believes that the presentation of this information is useful to management and investors regarding the financial condition, results of operations and trends and uncertainties of its segments. The Company has reconciled each segment's operating income to the Company's consolidated operating income and net income in Note 3.
Gathering Results of Operations
| | | | | | | | | | | | | | | | | | | | | | | |
| | | Three Months Ended March 31, |
| | | | | | | 2024 | | 2023 | | % Change |
| | | | | | | (Thousands, except per day amounts) |
FINANCIAL DATA | | | | | | | |
Firm reservation fee revenues (a) | | | | | | | $ | 135,676 | | | $ | 140,071 | | | (3.1) | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
Volumetric-based fee revenues (b) | | | | | | | 88,964 | | | 70,681 | | | 25.9 | |
Total operating revenues | | | | | | | 224,640 | | | 210,752 | | | 6.6 | |
Operating expenses: | | | | | | | | | | | |
Operating and maintenance | | | | | | | 24,760 | | | 21,396 | | | 15.7 | |
Selling, general and administrative | | | | | | | 28,464 | | | 19,508 | | | 45.9 | |
| | | | | | | | | | | |
Depreciation | | | | | | | 50,152 | | | 49,349 | | | 1.6 | |
Amortization of intangible assets | | | | | | | 16,205 | | | 16,205 | | | — | |
| | | | | | | | | | | |
Total operating expenses | | | | | | | 119,581 | | | 106,458 | | | 12.3 | |
Operating income | | | | | | | $ | 105,059 | | | $ | 104,294 | | | 0.7 | |
| | | | | | | | | | | |
Other (expense) income, net (c) | | | | | | | $ | (4,672) | | | $ | (8,494) | | | (45.0) | |
| | | | | | | | | | | |
OPERATIONAL DATA | | | | | | | | | | | |
Gathered volumes (BBtu per day) | | | | | | | | | | | |
Firm capacity (d) | | | | | | | 4,777 | | | 5,292 | | | (9.7) | |
Volumetric-based services | | | | | | | 2,603 | | | 2,088 | | | 24.7 | |
Total gathered volumes | | | | | | | 7,380 | | | 7,380 | | | — | |
| | | | | | | | | | | |
Capital expenditures (e) | | | | | | | $ | 54,256 | | | $ | 59,713 | | | (9.1) | |
(a)For the three months ended March 31, 2024 and 2023, firm reservation fee revenues included approximately $5.9 million and $3.3 million, respectively, of MVC unbilled revenues.
(b)For the three months ended March 31, 2023, volumetric-based fee revenues included a one-time contract buyout by a customer for approximately $5.0 million.
(c)Other (expense) income, net includes the unrealized loss on derivative instruments associated with the Henry Hub cash bonus payment provision. See Note 7 for further information on the Henry Hub cash bonus payment provision.
(d)Includes volumes up to the contractual MVC under agreements structured with MVCs. Volumes in excess of the contractual MVC are reported under volumetric-based services.
(e)Includes approximately $5.0 million and $3.2 million of capital expenditures related to the noncontrolling interest in Eureka Midstream for the three months ended March 31, 2024 and 2023, respectively.
Three Months Ended March 31, 2024 Compared to Three Months Ended March 31, 2023
Gathering operating revenues increased by $13.9 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023. Volumetric-based fee revenues increased by $18.3 million primarily due to higher gathered volumes that previously were subject to MVC revenues. Firm reservation fee revenues decreased by $4.4 million primarily due to the aforementioned change in volumes caused by the expiration of MVCs under a certain customer contract, partially offset by new customer agreements and higher effective rates. Although not a primary factor affecting first quarter gathering results of operations, first quarter 2024 gathered volumes and revenue were impacted by the negative effect of the approximately one Bcf per day of gross production curtailments announced in March 2024 by EQT, as a substantial portion of such curtailments were realized on the Company's systems beginning in late February 2024.
Gathering operating expenses increased by $13.1 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023. Selling, general and administrative expenses increased by $9.0 million primarily due to an increase in litigation reserves and higher personnel costs. Operating and maintenance expenses increased by $3.4 million primarily due to higher personnel costs.
See "EQT Global GGA" below in the Quarterly Report on Form 10-Q and Part I, “Item 1. Business” in the Company's Annual Report on Form 10-K for the year ended December 31, 2023 for discussion of the EQT Global GGA, and the transactions related thereto, including periodic gathering MVC fee declines and, additionally, discussion that in connection with MVP full in-service the EQT Global GGA provides for more significant potential gathering MVC fee declines in certain contract years. Firm reservation fee revenues under the Company’s Hammerhead gathering agreement with EQT are expected to contribute to an increase in the Company’s firm reservation fee revenues following achievement of the Hammerhead pipeline full commercial in-service in conjunction with full MVP in-service. However, the percentage of the Company's operating revenues that are generated by firm reservation fees may vary year to year depending on various factors, including customer volumes and the rates realizable under the Company’s contracts, including the EQT Global GGA. See also "Cautionary Statements," and "Commodity Price Risk" in Part I, "Item 3. Quantitative and Qualitative Disclosures About Market Risk" of this Quarterly Report on Form 10-Q for additional information on factors that could affect the Company's operating revenues, including the Company's expectation that EQT will continue to curtail production on the Company's systems through May 2024 and that EQT and/or other producers could curtail production further in 2024.
Transmission Results of Operations | | | | | | | | | | | | | | | | | | | | | | | |
| | | Three Months Ended March 31, |
| | | | | | | 2024 | | 2023 | | % Change |
| | | | | | | (Thousands, except per day amounts) |
FINANCIAL DATA | | | | | | | |
Firm reservation fee revenues | | | | | | | $ | 100,323 | | | $ | 101,722 | | | (1.4) | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
Volumetric-based fee revenues (a) | | | | | | | 16,571 | | | 37,184 | | | (55.4) | |
Total operating revenues | | | | | | | 116,894 | | | 138,906 | | | (15.8) | |
Operating expenses: | | | | | | | | | | | |
Operating and maintenance | | | | | | | 11,753 | | | 14,390 | | | (18.3) | |
Selling, general and administrative | | | | | | | 13,676 | | | 11,706 | | | 16.8 | |
Depreciation | | | | | | | 14,383 | | | 13,888 | | | 3.6 | |
Total operating expenses | | | | | | | 39,812 | | | 39,984 | | | (0.4) | |
Operating income | | | | | | | $ | 77,082 | | | $ | 98,922 | | | (22.1) | |
| | | | | | | | | | | |
Equity income | | | | | | | $ | 73,005 | | | $ | 122 | | | 59,740.2 | |
| | | | | | | | | | | |
| | | | | | | | | | | |
OPERATIONAL DATA | | | | | | | | | | | |
Transmission pipeline throughput (BBtu per day) | | | | | | | | | | | |
Firm capacity (b) | | | | | | | 3,370 | | | 3,345 | | | 0.7 | |
Interruptible capacity | | | | | | | 49 | | | 3 | | | 1,533.3 | |
Total transmission pipeline throughput | | | | | | | 3,419 | | | 3,348 | | | 2.1 | |
| | | | | | | | | | | |
Average contracted firm transmission reservation commitments (BBtu per day) | | | | | | | 4,157 | | | 4,239 | | | (1.9) | |
| | | | | | | | | | | |
Capital expenditures (c) | | | | | | | $ | 17,704 | | | $ | 9,189 | | | 92.7 | |
(a)For the three months ended March 31, 2023, volumetric-based fee revenues included a one-time contract buyout by a customer for approximately $23.8 million.
(b)Firm capacity includes volumes associated with firm capacity contracts including volumes in excess of firm capacity.
(c)Transmission capital expenditures do not include aggregate capital contributions made to the MVP Joint Venture of approximately $423.0 million and $34.5 million for the three months ended March 31, 2024 and 2023, respectively.
Three Months Ended March 31, 2024 Compared to Three Months Ended March 31, 2023
Transmission operating revenues decreased by $22.0 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023 primarily as a result of a one-time contract buyout by a customer of approximately $23.8 million incurred during the three months ended March 31, 2023, partially offset by increased throughput volumes.
Operating expenses decreased by $0.2 million for the three months ended March 31, 2024, compared to the three months ended March 31, 2023. Operating and maintenance expense decreased $2.6 million primarily due to expenses associated with the Rager Mountain natural gas storage field incident incurred in the first quarter of 2023, partially offset by higher personnel costs and higher property taxes. Selling, general and administrative expenses increased by $2.0 million primarily due to higher personnel costs and higher professional service fees, partially offset by lower bad debt expense.
See Part II, "Item 1. Legal Proceedings" of this Quarterly Report on Form 10-Q for information regarding the Rager Mountain natural gas storage incident. See also, "We have incurred and expect to incur costs and expenses as a result of or arising in relation to the Rager Mountain natural gas storage field incident in November 2022, which has included and may include potential additional regulatory penalties or other sanctions, which could, depending on their scope and timing, materially adversely affect our business, financial condition, results of operations, liquidity and ability to pay dividends to our shareholders." included in Part I, "Item 1A. Risk Factors" in the Company's Annual Report on Form 10-K for the year ended December 31, 2023.
Equity income increased by $72.9 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023 due to the increase in the MVP Joint Venture's AFUDC on the MVP project resulting from the continuance of growth construction activities in 2024. Following MVP full in-service, the Company's equity income will be primarily derived from 20-year firm reservation contracts for the MVP project.
Water Results of Operations
| | | | | | | | | | | | | | | | | | | | | | | |
| | | Three Months Ended March 31, |
| | | | | | | 2024 | | 2023 | | % Change |
| | | | | | | (Thousands, except MMgal amounts) |
FINANCIAL DATA | | | | | | | |
Firm reservation fee revenues | | | | | | | $ | 9,375 | | | $ | 9,375 | | | — | |
Volumetric-based fee revenues | | | | | | | 13,365 | | | 17,304 | | | (22.8) | |
Total operating revenues | | | | | | | 22,740 | | | 26,679 | | | (14.8) | |
Operating expenses: | | | | | | | | | | | |
Operating and maintenance | | | | | | | 8,693 | | | 7,045 | | | 23.4 | |
Selling, general and administrative | | | | | | | 2,025 | | | 1,398 | | | 44.8 | |
Depreciation | | | | | | | 7,034 | | | 5,863 | | | 20.0 | |
| | | | | | | | | | | |
Total operating expenses | | | | | | | 17,752 | | | 14,306 | | | 24.1 | |
Operating income | | | | | | | $ | 4,988 | | | $ | 12,373 | | | (59.7) | |
| | | | | | | | | | | |
OPERATIONAL DATA | | | | | | | | | | | |
Water services volumes (MMgal) | | | | | | | | | | | |
Firm capacity (a) | | | | | | | 127 | | | 108 | | | 17.6 | |
Volumetric-based services | | | | | | | 282 | | | 351 | | | (19.7) | |
Total water volumes | | | | | | | 409 | | | 459 | | | (10.9) | |
| | | | | | | | | | | |
Capital expenditures | | | | | | | $ | 10,047 | | | $ | 11,076 | | | (9.3) | |
(a) Includes volumes up to the contractual MVC under agreements structured with MVCs or ARCs, as applicable. Volumes in excess of the contractual MVC are reported under volumetric-based services.
Three Months Ended March 31, 2024 Compared to Three Months Ended March 31, 2023
Water operating revenues decreased by $3.9 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023 as a result of decreased volumetric-based fee revenues primarily due to lower volumes and lower average rates.
Water operating expenses increased by $3.4 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023. Operating and maintenance expense increased $1.6 million due to higher mixed-use water storage expenses related to a storage facility placed in-service during 2023 and higher purchased water costs as a result of increased activity. Depreciation expense increased $1.2 million due to additional assets placed in-service.
The Company’s volumetric-based water services are directly associated with producers’ well completion activities and fresh and produced water needs (which are primarily driven by horizontal lateral lengths and the number of completion stages per well). Therefore, the Water volumetric operating results traditionally fluctuate from year-to-year in response to producers’ well completion activities.
Other Income Statement Items
Other (Expense) Income, Net
Other (expense) income, net decreased by $4.1 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023. The decrease was primarily due to a $4.7 million unrealized loss on derivative instruments during the three months ended March 31, 2024, as compared to a $8.5 million unrealized loss on derivative instruments during the three months ended March 31, 2023, primarily due to changes in NYMEX Henry Hub natural gas futures prices and
probability-weighted assumptions regarding MVP project completion associated with the Henry Hub cash bonus payment provision.
See also Note 7 for a discussion of factors affecting the estimated fair value of the derivative asset attributable to the Henry Hub cash bonus payment provision that is recognized in other (expense) income, net on the Company's statements of consolidated comprehensive income.
Net Interest Expense
Net interest expense increased by $13.9 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023 primarily due to increased borrowings and interest rates under the revolving credit facilities and interest on the 2024 Senior Notes issued in February 2024, partially offset by the redemption of the 4.75% senior notes due 2023 (the 2023 Notes) effected in June 2023 and increased interest income.
See Note 6 for a discussion of certain of the Company's outstanding debt.
Income Tax Expense (Benefit)
See Note 9 for an explanation of the changes in income tax expense for the three months ended March 31, 2024 compared to the three months ended March 31, 2023.
Net Income Attributable to Noncontrolling Interest
Net income attributable to noncontrolling interest decreased by $1.5 million for the three months ended March 31, 2024 compared to the three months ended March 31, 2023, primarily as a result of lower net income on Eureka Midstream.
Capital Expenditures
See "Investing Activities" and "Capital Requirements" under "Capital Resources and Liquidity" for a discussion of capital expenditures and capital contributions.
Outlook
Proposed Acquisition by EQT Corporation. On March 10, 2024, the Company, Parent, Merger Sub and LLC Sub entered into the Merger Agreement, pursuant to which, among other things, Merger Sub and the Company will consummate the First Merger, with the Company surviving the First Merger as the First Step Surviving Corporation and, as the second step in a single integrated transaction, the First Step Surviving Corporation and LLC Sub will consummate the Second Merger, with LLC Sub surviving the Second Merger as an indirect wholly owned subsidiary of Parent.
Under the terms of the Merger Agreement, and subject to the satisfaction or waiver of certain conditions therein, at the Effective Time, (i) each share of Equitrans Midstream common stock issued and outstanding immediately prior to the Effective Time (excluding any excluded shares) will be converted automatically at the Effective Time into the right to receive that number of EQT Shares equal to the Exchange Ratio and (ii) each Equitrans Midstream Preferred Share issued and outstanding immediately prior to the Effective Time will be treated in accordance with Section 8 of the Company’s Second Amended and Restated Articles of Incorporation and the procedures set forth in Section 2.5 of the Merger Agreement.
The EQT Transaction is expected to close during the fourth quarter of 2024. The completion of the First Merger is subject to the satisfaction or waiver of certain closing conditions, including, among others: (i) approval of the Merger Agreement and the Mergers by holders of a majority of the outstanding shares of Equitrans Midstream common stock and Equitrans Midstream Preferred Shares, with such Equitrans Midstream Preferred Shares treated as Equitrans Midstream common stock on an as-converted basis, voting together as a single class, (ii) approval of the issuance of EQT Shares in connection with the Mergers by a majority of votes cast at a special meeting of holders of EQT Shares, (iii) expiration or termination of (a) all waiting periods under the HSR Act and (b) any commitment to, or agreement with, any governmental entity to delay the consummation of, or not to consummate the transactions contemplated by the Merger Agreement, and (iv) the MVP Joint Venture receiving authorization of the FERC to place the MVP in-service.
The Merger Agreement contains representations and warranties from the parties, and each party has agreed to certain covenants, including, among others, covenants relating to (i) the conduct of business during the interim period between the execution of the Merger Agreement and the Effective Time and (ii) the obligation to use reasonable best efforts to cause the Mergers to be consummated.
Upon termination of the Merger Agreement under certain circumstances, the Company will be obligated to pay Parent a termination fee equal to $191 million. Upon termination of the Merger Agreement under certain circumstances, Parent will be obligated to pay the Company (i) a termination fee equal to $545 million or (ii) a special termination fee equal to $176 million.
The above description of the Merger Agreement and the transactions contemplated thereby, including certain referenced terms, is a summary of certain principal terms and conditions contained in the Merger Agreement, a copy of which is attached as Exhibit 2.1 to the Company’s Current Report on Form 8-K, filed March 11, 2024.
See Note 2 to the consolidated financial statements for additional information. Also, see the risk factors and other cautionary statements, specifically, Risks Related to the EQT Transaction under the heading “Risk Factors” in Item 1A of this Quarterly Report on Form 10-Q.
Standalone Strategy. Until the First Merger occurs (or in the event that the Merger Agreement is terminated), the Company will continue its standalone strategy of pursuing organic growth projects, including completing and placing in-service the MVP, focusing on identifying opportunities to use its existing assets to deepen and grow its customer relationships at optimized levels of capital spending and taking into account the Company’s leverage, and continuing to prudently invest resources in its sustainability-oriented initiatives. The Company’s standalone strategy also reflects its continued focus on achieving a strong balance sheet and de-levering, and given the Company’s size, operating footprint and other factors considering inorganic opportunities, such as to extend the Company’s operations into the southeast United States and new, key demand markets, such as the Gulf of Mexico LNG export market.
The Company expects that the MVP, together with the Hammerhead pipeline and Equitrans, L.P. Expansion Project (EEP), will primarily drive the near-term organic growth of the Company's business, as discussed in further detail below. In particular, the Company believes that the MVP, among other benefits, will allow for greater natural gas production in the southwestern Appalachian Basin (and/or result in increased volumes flowing to the Company's gathering and transmission system given the Company's belief in the system's current unique positioning to provide the supply path to MVP).
•Mountain Valley Pipeline. The MVP is a 303-mile, 42-inch diameter natural gas interstate pipeline with a targeted capacity of 2.0 Bcf per day that is designed to span from the Company's existing transmission and storage system in Wetzel County, West Virginia to Pittsylvania County, Virginia, which will provide access to the growing southeast demand markets once it is placed in-service. As of March 31, 2024, the Company owned an approximate 48.9% interest in the MVP project, and once placed into service, the Company will also operate the MVP. The MVP Joint Venture has secured a total of 2.0 Bcf per day of firm capacity commitments at 20-year terms. Additional shippers have expressed interest in the MVP project and the MVP Joint Venture is evaluating an expansion opportunity that could add approximately 0.5 Bcf per day of capacity through the installation of incremental compression.
As of April 28, 2024, the MVP Joint Venture has made substantial progress on the MVP project including, among other things, completing:
•approximately 303 miles of pipeline installed (less than 1 mile remaining to install);
•all waterbody and wetland crossing work;
•the hydrotesting of approximately 269 miles (approximately 35 miles remain to be tested, inclusive of interconnect piping);
•the purging and packing of the pipeline through to the second compressor station (total of approximately 77 miles);
•the commissioning of two of three MVP compressor stations; and
•restoration of a substantial portion of the pipeline right-of-way, with the majority of remaining pipeline restoration to occur following MVP in-service.
Remaining forward construction includes the tying in of a completed bore to the adjacent installed pipeline, completing the installation of pipe on a steep slope, and the tying together of the final pipeline segments after completing testing and commissioning activities.
In April 2024, the MVP Joint Venture filed its in-service authorization request for the MVP project with the FERC. Construction, together with commissioning activity and certain pre-MVP in-service restoration, is ongoing as of the date of this Quarterly Report on Form 10-Q and the Company expects to complete construction and final
commissioning of the pipeline on or about May 31, 2024. The majority of the remaining restoration is to occur following MVP in-service.
MVP and MVP-related long-term firm capacity will begin on the first day of the month immediately following the date MVP receives FERC authorization to commence service and is able to provide the applicable service level (with certain MVC step ups and more significant gathering MVC fee declines under the EQT Global GGA commencing effective the first day of the calendar quarter in which the MVP long-term firm capacity obligations commence). Should MVP be authorized and able to provide service, however its long-term firm capacity obligations are not yet effective due to timing, MVP would be available for interruptible or short-term firm service until long-term firm capacity obligations commence.
While the MVP project has made substantial progress toward completion, total estimated project cost was adversely affected by a number of factors, including that the pace of forward construction and workforce draw down realized through April 28, 2024 were slower than anticipated resulting in additional labor, equipment and support costs in April and May 2024. Project costs were affected by challenges with physical construction conditions, certain equipment and other issues experienced in now-completed boring operations, unexpected challenges experienced with certain pipeline cleaning procedures, and weather. Additionally, the Company updated its assumptions regarding completing certain restoration efforts, including associated scope, permit-related activities, and labor, as well as taking into account refreshed bids from contractors. Given these and certain other factors which may have potential impacts on completing the project, such as weather in the pre- or post-MVP in-service periods, the Company is targeting a total project cost of approximately $7.85 billion (including contingency and excluding allowance for funds used during construction (AFUDC)).
As the MVP Joint Venture continues to diligently work towards responsibly completing the MVP project and restoring the pipeline right of way, it continues to prioritize the safety of its workforce, communities, and assets, and the project's compliance with applicable environmental standards and regulations.
The targeted completion timing, and accordingly the commencement of MVP and MVP-related long-term firm capacity contractual obligations, as well as the estimated total project cost, are subject to many ongoing factors, including those outlined in the "Cautionary Statements" section of this Quarterly Report on Form 10-Q.
Through March 31, 2024, the Company had funded approximately $3.8 billion to the MVP Joint Venture for the MVP project. Given the Company's expectation to complete construction and final commissioning of the pipeline on or about May 31, 2024 and its estimate of total project cost of approximately $7.85 billion (including contingency and excluding AFUDC), the Company expects it would make total capital contributions to the MVP Joint Venture in 2024 of approximately $700 million, and expects that it would incur a total of approximately $4.1 billion over the project's construction and restoration, inclusive of approximately $255 million in excess of the Company's ownership interest, and anticipates its equity ownership in the MVP project would progressively increase from approximately 48.9% to approximately 49.2%.
•Wellhead Gathering Expansion Projects and Hammerhead Pipeline. During the three months ended March 31, 2024, the Company invested approximately $54.3 million in gathering projects (inclusive of capital expenditures related to the noncontrolling interest in Eureka Midstream). For 2024, the Company expects to invest approximately $235 million to $285 million in gathering projects (inclusive of expected capital expenditures of approximately $15 million related to the noncontrolling interest in Eureka Midstream). The primary projects include infrastructure expansion and optimization in core development areas in the Marcellus and Utica Shales in southwestern Pennsylvania, southeastern Ohio and northern West Virginia for EQT, Range Resources Corporation (Range Resources) and other producers. The Company has seen and expects that it will continue to see the benefits of return-to-pad drilling and system integrations in 2024, and estimates gathering capital expenditures required to maintain flat gathered volumes in a given year would be between approximately $200 million and $250 million for 2024.
The Hammerhead pipeline is a 1.6 Bcf per day gathering header pipeline that is primarily designed to connect natural gas produced in Pennsylvania and West Virginia to the MVP, Texas Eastern Transmission and Eastern Gas Transmission, is supported by a 20-year term, 1.2 Bcf per day, firm capacity commitment from EQT, and cost approximately $540 million. The Company expects EQT's Hammerhead pipeline long-term firm capacity commitments to commence in conjunction with full MVP in-service (specifically on the first day of the month immediately following the date MVP receives FERC authorization to commence service and is able to provide the applicable service level) and the Company is focused on obtaining additional firm capacity commitments and/or additional interruptible volumes for the Hammerhead pipeline. During the first quarter of 2024, the Company provided firm and interruptible gathered volumes on Hammerhead of approximately $6.0 million. The Company expects
interruptible volumes from the Company's Hammerhead Gathering agreement with EQT to continue up to the full commercial in-service date of the Hammerhead pipeline when EQT's firm commitments will commence.
The Company also has an agreement with a producer customer to install approximately 32,000 horsepower booster compression to existing facilities. The project is backed by a long-term firm commitment and was placed in-service in late February 2024.
•Transmission Projects. During the three months ended March 31, 2024, the Company invested approximately $17.7 million in transmission projects. For 2024, the Company expects to invest approximately $70 million to $80 million in transmission projects, including approximately $40 million for the Company's Ohio Valley Connector expansion project (OVCX). The Company expects OVCX will increase deliverability on the Company's existing Ohio Valley Connector pipeline (OVC) by approximately 350 MMcf per day, create new receipt and delivery transportation paths, and enhance long-term reliability. The project is primarily supported by new long-term firm capacity commitments of 330 MMcf per day, as well as an extension of approximately 1.0 Bcf per day of existing contracted mainline capacity for EQT. OVCX is designed to meet growing demand in key markets in the mid-continent and gulf coast through existing interconnects with long-haul pipelines in Clarington, Ohio. On January 20, 2023, the FERC issued the Final Environmental Impact Statement for the project. On June 15, 2023, the FERC issued the Certificate of Public Convenience and Necessity for OVCX. On July 31, 2023, the FERC issued the Notice to Proceed and the Company commenced construction during the third quarter of 2023. OVCX began providing interim service to shippers on April 1, 2024, and the Company expects full in-service to occur on May 1, 2024. The Company expects to invest a total of approximately $160 million in the project, with the majority of the total investment for the project expected to be completed in 2024. The OVCX project, as well as the Company's successful open season in 2023 for the available transmission capacity that was subject of the one-time transmission customer's contract buyout during the first quarter of 2023, is consistent with the Company's ongoing efforts to optimize existing assets and achieve capital efficiency.
The Company's EEP project is designed to provide north-to-south capacity on the mainline Equitrans, L.P. system, including primarily for deliveries to the MVP. A portion of the EEP commenced operations with interruptible service in the third quarter of 2019. The EEP provides capacity of approximately 600 MMcf per day and offers access to several markets through interconnects with Texas Eastern Transmission, Eastern Gas Transmission and Columbia Gas Transmission. The Company expects the 20-year term firm transportation agreements for 550 MMcf per day of capacity to commence in connection with MVP full in-service (specifically on the first day of the month immediately following both EEP and MVP receiving FERC authorization to commence service and are able to provide the applicable service levels).
•MVP Southgate Project. In December 2023, the MVP Joint Venture announced an amended MVP Southgate project in lieu of the original project. The amended project would extend approximately 31 miles from the terminus of the MVP in Pittsylvania County, Virginia to planned new delivery points in Rockingham County, North Carolina using 30-inch diameter pipe. The MVP Joint Venture has entered into precedent agreements with each of Public Service Company of North Carolina, Inc. and Duke Energy Carolinas, LLC, which precedent agreements contemplate the amended project and, among other things, describe certain conditions precedent to the parties' respective obligations regarding MVP Southgate. The Company is expected to operate the MVP Southgate project and owned a 47.2% interest in the MVP Southgate project as of March 31, 2024. The MVP Joint Venture completed an open season for the MVP Southgate project in February 2024, and believes it has substantially finalized the project scope as described above. The targeted completion timing for the project is June 2028.
The FERC previously conditioned its authorization on MVP Southgate being built and made available for service by June 18, 2023. On June 15, 2023, the MVP Joint Venture filed a request with the FERC for an extension of time to June 18, 2026, to complete MVP Southgate, which the FERC granted on December 19, 2023. Project opponents filed a request for rehearing of the FERC's December 19, 2023 order. On February 20, 2024, the FERC denied the rehearing request, and on April 25, 2024, the FERC issued an additional order addressing the arguments raised on rehearing. On April 22, 2024, project opponents filed a petition with the U.S. Court of Appeals for the D.C. Circuit challenging the FERC's December 19, 2023 order. The MVP Joint Venture is evaluating the permitting and regulatory roadmap for the project, including requesting an updated completion due date.
•Water Operations. During the three months ended March 31, 2024, the Company invested approximately $10.0 million in its water infrastructure, primarily to continue to construct the initial mixed-use water system buildout. During 2023, the Company completed the majority of the main trunkline pipelines on the mixed water system, including a pipeline that connects its two mixed water storage facilities. In May 2023, the Company executed a 10-year agreement backed by a minimum volume commitment with a producer customer to provide fresh and mixed-use
water delivery service and during the first quarter of 2024, the Company completed and placed into service a permanent mixed water pipeline extending from its mixed-use water system to such producer customer. For 2024, the Company expects to invest approximately $25 million to $35 million in its water operations, primarily related to the continued construction of its mixed-use water system buildout.
See further discussion of capital expenditures in the "Capital Requirements" section below.
EQT Global GGA. On February 26, 2020, the Company entered into a Gas Gathering and Compression Agreement (as subsequently amended, the EQT Global GGA) with EQT and certain affiliates of EQT for the provision by the Company of certain gas gathering services to EQT. Certain MVC step ups, more significant gathering MVC fee declines, and potential Henry Hub cash bonus payments under the EQT Global GGA are to commence beginning on the first day of the calendar quarter in which MVP long-term firm capacity obligations become effective. As MVP long-term firm capacity obligations are to begin on the first day of the month immediately following the date MVP receives FERC authorization to commence service and is able to provide the applicable service level, the MVC step ups, fee declines, and Henry Hub payments under the EQT Global GGA may take effect retroactively to the beginning of a calendar quarter or at the beginning of the following quarter.
Capital Resources and Liquidity
The Company's liquidity requirements are to finance its operations, its capital expenditures, potential acquisitions and other strategic transactions and capital contributions to joint ventures, including the MVP Joint Venture, to pay cash dividends and distributions, when declared and to satisfy any indebtedness obligations. Additionally, the Company or its affiliates may, at any time and from time to time, seek to retire or purchase outstanding debt through cash purchases and/or exchanges for equity or debt, in open-market purchases, privately negotiated transactions or otherwise. Such repurchases or exchanges, if any, will be upon such terms and at such prices as the Company may determine, and will depend on prevailing market conditions, the Company's other liquidity requirements, contractual restrictions and other factors and the amounts involved may be material. The Company's ability to meet these liquidity requirements depends on the Company's cash flow from operations, the continued ability of the Company to borrow under its subsidiaries' credit facilities and the Company's ability to raise capital in banking and capital markets. We believe that our cash on hand, future cash generated from operations and future cash received from potential distributions from the MVP Joint Venture, together with available borrowing capacity under our subsidiaries' credit facilities and our access to banking and capital markets, will provide adequate resources to fund our short-term and long-term capital, operating and financing needs. However, cash flow, available borrowing capacity and capital raising activities may be affected by prevailing economic conditions in the natural gas industry and other financial and business factors, including factors discussed in Part I, “Item 1A. Risk Factors” in the Company's Annual Report on Form 10-K for the year ended December 31, 2023 (for example, see “If we, our subsidiaries or our joint ventures are unable to obtain needed capital or financing on satisfactory terms, our ability to execute our business strategy and pay dividends to our shareholders may be diminished. Additionally, financing transactions may increase our financial leverage or could cause dilution to our shareholders.”) and factors discussed in Part II, “Item 1A. Risk Factors” in this Quarterly Report on Form 10-Q, some of which are beyond the Company's control. The Company's available sources of liquidity include cash from operations, cash on hand, borrowings under its subsidiaries' revolving credit facilities, issuances of additional debt and issuances of additional equity securities. Taking into account the maximum Consolidated Leverage Ratio applicable under the Amended EQM Credit Facility that, as of March 31, 2024, could not exceed 6.00 to 1.00, EQM had the ability to borrow approximately $0.2 billion under the Amended EQM Credit Facility as of March 31, 2024. See Note 6 to the consolidated financial statements for further information regarding the Amended EQM Credit Facility. See also "Our subsidiaries’ significant indebtedness, and any future indebtedness, as well as the restrictions under our subsidiaries’ debt agreements, could adversely affect our operating flexibility, business, financial condition, results of operations, liquidity and ability to pay dividends to our shareholders." included in Part I, "Item 1A. Risk Factors" of the Company's Annual Report on Form 10-K for the year ended December 31, 2023.
See “Security Ratings” below for a discussion of EQM’s credit ratings during 2024. Based on EQM's credit rating levels, EQM has delivered credit support to the MVP Joint Venture in the form of a letter of credit, which is for MVP project, and was in the amount of approximately $104.7 million as of March 31, 2024. The letter of credit with respect to the MVP project is expected to be further reduced as the Company contributes capital to fund MVP Holdco's remaining proportionate share of the construction budget, subject to a minimum-required level to be maintained through in-service of the MVP project. See "A further downgrade of EQM’s credit ratings could impact our liquidity, access to capital, and costs of doing business." included in Part I, "Item 1A. Risk Factors" in the Company’s Annual Report on Form 10-K for the year ended December 31, 2023.
The following table is a summary of the cash flows by activity for the three months ended March 31, 2024 and 2023, respectively.
| | | | | | | | | | | | | |
| Three Months Ended March 31, |
| 2024 | | 2023 | | |
| (Thousands) |
Cash flows | | | | | |
Net cash provided by operating activities | $ | 177,491 | | | $ | 224,720 | | | |
Net cash used in investing activities | (506,400) | | | (108,724) | | | |
Net cash provided by (used in) financing activities | 121,319 | | | (131,398) | | | |
Net decrease in cash and cash equivalents | $ | (207,590) | | | $ | (15,402) | | | |
Operating Activities
Net cash flows provided by operating activities decreased approximately $47.2 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023. The decrease was primarily due to the timing of working capital payments and receipts.
Investing Activities
Net cash flows used in investing activities increased by approximately $397.7 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023. The increase was primarily due to an increase in capital contributions to the MVP Joint Venture. See “Capital Requirements” below for a discussion of forecasted 2024 capital expenditures and capital contributions to the MVP Joint Venture.
Financing Activities
Net cash flows provided by (used in) financing activities increased by $252.7 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023. For the three months ended March 31, 2024, the primary sources of financing cash flows were proceeds from the issuance of the 2024 Senior Notes and borrowings under the revolving credit facilities, while the primary uses of financing cash flows were repayments on borrowings under the revolving credit facilities, the payments of dividends to shareholders and distributions paid to noncontrolling interest. For the three months ended March 31, 2023, the primary uses of financing cash flows were repayments on borrowings under the revolving credit facilities, the payments of dividends to shareholders and distributions paid to noncontrolling interest, while the primary source of financing cash flows was borrowings under the revolving credit facilities.
Capital Requirements
The gathering, transmission and storage and water services businesses are capital intensive, requiring significant investment to develop new facilities and to maintain and upgrade existing operations.
Capital expenditures in 2024 are expected to be approximately $330 million to $400 million (including approximately $15 million attributable to the noncontrolling interest in Eureka Midstream). Given the Company's expectation to complete construction and final commissioning of the pipeline on or about May 31, 2024 and its estimate of total project cost of approximately $7.85 billion (including contingency and excluding AFUDC), the Company expects to make total capital contributions to the MVP Joint Venture in 2024 of approximately $700 million. Capital contributions payable to the MVP Joint Venture are accrued upon the issuance of a capital call by the MVP Joint Venture. The Company's short-term and long-term capital investments may vary significantly from period to period based on the available investment opportunities, the timing of the construction of the MVP and other projects, and maintenance needs. The Company expects to fund short-term and long-term capital expenditures and capital contributions primarily through cash on hand, cash generated from operations, available borrowings under its subsidiaries' credit facilities and its access to banking and capital markets.
Credit Facility Borrowings
See Note 6 for a discussion of the Amended EQM Credit Facility and the 2021 Eureka Credit Facility.
Security Ratings
The table below sets forth the credit ratings for EQM's debt instruments at March 31, 2024. | | | | | | | | | | | | | | | | | | | |
| | | EQM Senior Notes | | |
Rating Service | | | | | Rating | | Outlook | | | | |
Moody's | | | | | Ba3 | | N/A | | | | |
S&P | | | | | BB- | | N/A | | | | |
Fitch | | | | | BB | | N/A | | | | |
In light of the proposed EQT Transaction, on March 11, 2024, Moody's placed EQM's credit rating on Review for Upgrade and on March 12, 2024, S&P placed EQM’s credit rating on Credit Watch Developing. On February 21, 2024, Fitch removed the Rating Watch Positive and assigned a Stable Outlook for EQM as a result of the then-proposed 2024 Senior Notes offering and subsequently, on March 13, 2024, in light of the proposed EQT Transaction, Fitch placed EQM's credit rating on Rating Watch Positive. EQM's credit ratings are subject to revision or withdrawal at any time by the assigning rating organization, and each rating should be evaluated independently of any other rating. The Company cannot ensure that a rating will remain in effect for any given period of time or that a rating will not be lowered or withdrawn entirely by a credit rating agency if, in its judgment, circumstances so warrant. If any credit rating agency downgrades or withdraws EQM's ratings, including for reasons relating to the MVP project (such as delays affecting the MVP project or increases in such project’s targeted costs), EQM’s leverage or credit ratings of the Company's customers, the Company's access to the capital markets could become more challenging, borrowing costs will likely increase, the Company may, depending on contractual provisions in effect at such time, be required to provide additional credit assurances (the amount of which may be substantial) and the potential pool of investors and funding sources may decrease. In order to be considered investment grade, a company must be rated Baa3 or higher by Moody's, BBB- or higher by S&P, or BBB- or higher by Fitch. All of EQM's credit ratings are considered non-investment grade.
Commitments and Contingencies
From time to time, various legal and regulatory claims and proceedings are pending or threatened against the Company and its subsidiaries. While the amounts claimed may be substantial, the Company is unable to predict with certainty the ultimate outcome of such claims and proceedings. The Company accrues legal and other direct costs related to loss contingencies when incurred. The Company establishes reserves whenever it believes it to be appropriate for pending matters. Furthermore, after consultation with counsel and considering the availability, if any, of insurance, the Company believes, although no assurance can be given, that the ultimate outcome of any matter currently pending against it or any of its consolidated subsidiaries as of the filing of this Quarterly Report on Form 10-Q will not materially adversely affect its business, financial condition, results of operations, liquidity or ability to pay dividends to its shareholders.
See Part II, "Item 1. Legal Proceedings" of this Quarterly Report on Form 10-Q for discussion of litigation and regulatory proceedings, including related to the Rager Mountain natural gas storage field incident, and, further relating to that incident, "We have incurred and expect to continue to incur costs and expenses as a result of or arising in relation to the Rager Mountain natural gas storage field incident in November 2022, which has included and may include potential additional regulatory penalties or other sanctions, which could, depending on their scope and timing, materially adversely affect our business, financial condition, results of operations, liquidity and ability to pay dividends to our shareholders." under Part I, "Item 1A. Risk Factors" of the Company's Annual Report on Form 10-K for the year ended December 31, 2023.
See Note 14 to the consolidated financial statements included in the Company's Annual Report on Form 10-K for the year ended December 31, 2023 for further discussion of the Company's commitments and contingencies.
Dividends
On April 22, 2024, the Company's Board of Directors declared cash dividends for the first quarter of 2024 of $0.15 per common share and $0.4873 per Equitrans Midstream Preferred Share to shareholders of record at the close of business on May 7, 2024.
Critical Accounting Estimates
The Company's critical accounting policies are described in Part II, "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" contained in the Company's Annual Report on Form 10-K for the year ended December 31, 2023. Any new accounting policies or updates to existing accounting policies as a result of new accounting pronouncements have been included in the notes to the Company's consolidated financial statements in Part I, "Item 1. Financial Statements" of this Quarterly Report on Form 10-Q. Preparation of financial statements requires management to make estimates and assumptions that affect the reported amounts in the Company's consolidated financial statements and accompanying notes. The Company's critical accounting policies are considered critical due to the significant judgments and
estimates used in the preparation of the Company's consolidated financial statements and the material impact on the results of operations or financial condition. Actual results could differ from those judgments and estimates.