00011084262021FYFALSE00000810232021FYFALSE00000227672021FYFALSEhttp://fasb.org/us-gaap/2021-01-31#OtherLiabilitiesCurrenthttp://fasb.org/us-gaap/2021-01-31#OtherLiabilitiesCurrenthttp://fasb.org/us-gaap/2021-01-31#OtherLiabilitiesCurrenthttp://fasb.org/us-gaap/2021-01-31#OtherLiabilitiesCurrenthttp://fasb.org/us-gaap/2021-01-31#OtherLiabilitiesCurrenthttp://fasb.org/us-gaap/2021-01-31#OtherLiabilitiesCurrenthttp://fasb.org/us-gaap/2021-01-31#DeferredCreditsAndOtherLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2021-01-31#DeferredCreditsAndOtherLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2021-01-31#DeferredCreditsAndOtherLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2021-01-31#DeferredCreditsAndOtherLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2021-01-31#DeferredCreditsAndOtherLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2021-01-31#DeferredCreditsAndOtherLiabilitiesNoncurrenthttp://fasb.org/us-gaap/2021-01-31#FairValueMeasuredAtNetAssetValuePerShareMemberhttp://fasb.org/us-gaap/2021-01-31#FairValueMeasuredAtNetAssetValuePerShareMemberhttp://fasb.org/us-gaap/2021-01-31#FairValueMeasuredAtNetAssetValuePerShareMemberhttp://fasb.org/us-gaap/2021-01-31#FairValueMeasuredAtNetAssetValuePerShareMemberhttp://fasb.org/us-gaap/2021-01-31#FairValueMeasuredAtNetAssetValuePerShareMemberhttp://fasb.org/us-gaap/2021-01-31#FairValueMeasuredAtNetAssetValuePerShareMember00011084262021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-3100011084262022-02-18xbrli:shares0001108426pnm:PublicServiceCompanyOfNewMexicoMember2022-02-180001108426pnm:TexasNewMexicoPowerCompanyMember2022-02-1800011084262021-06-30iso4217:USD00011084262020-01-012020-12-3100011084262019-01-012019-12-310001108426us-gaap:ElectricityMember2021-01-012021-12-310001108426us-gaap:ElectricityMember2020-01-012020-12-310001108426us-gaap:ElectricityMember2019-01-012019-12-310001108426us-gaap:ElectricityGenerationMember2021-01-012021-12-310001108426us-gaap:ElectricityGenerationMember2020-01-012020-12-310001108426us-gaap:ElectricityGenerationMember2019-01-012019-12-31iso4217:USDxbrli:shares00011084262020-12-3100011084262019-12-3100011084262018-12-3100011084262021-12-310001108426us-gaap:CommonStockMember2018-12-310001108426us-gaap:AccumulatedOtherComprehensiveIncomeMember2018-12-310001108426us-gaap:RetainedEarningsMember2018-12-310001108426us-gaap:ParentMember2018-12-310001108426us-gaap:NoncontrollingInterestMember2018-12-310001108426us-gaap:RetainedEarningsMember2019-01-012019-12-310001108426us-gaap:ParentMember2019-01-012019-12-310001108426us-gaap:NoncontrollingInterestMember2019-01-012019-12-310001108426us-gaap:AccumulatedOtherComprehensiveIncomeMember2019-01-012019-12-310001108426us-gaap:CommonStockMember2019-01-012019-12-310001108426us-gaap:CommonStockMember2019-12-310001108426us-gaap:AccumulatedOtherComprehensiveIncomeMember2019-12-310001108426us-gaap:RetainedEarningsMember2019-12-310001108426us-gaap:ParentMember2019-12-310001108426us-gaap:NoncontrollingInterestMember2019-12-310001108426us-gaap:RetainedEarningsMember2020-01-012020-12-310001108426us-gaap:ParentMember2020-01-012020-12-310001108426us-gaap:NoncontrollingInterestMember2020-01-012020-12-310001108426us-gaap:AccumulatedOtherComprehensiveIncomeMember2020-01-012020-12-310001108426us-gaap:CommonStockMember2020-01-012020-12-310001108426us-gaap:CommonStockMember2020-12-310001108426us-gaap:AccumulatedOtherComprehensiveIncomeMember2020-12-310001108426us-gaap:RetainedEarningsMember2020-12-310001108426us-gaap:ParentMember2020-12-310001108426us-gaap:NoncontrollingInterestMember2020-12-310001108426us-gaap:RetainedEarningsMember2021-01-012021-12-310001108426us-gaap:ParentMember2021-01-012021-12-310001108426us-gaap:NoncontrollingInterestMember2021-01-012021-12-310001108426us-gaap:AccumulatedOtherComprehensiveIncomeMember2021-01-012021-12-310001108426us-gaap:CommonStockMember2021-01-012021-12-310001108426us-gaap:CommonStockMember2021-12-310001108426us-gaap:AccumulatedOtherComprehensiveIncomeMember2021-12-310001108426us-gaap:RetainedEarningsMember2021-12-310001108426us-gaap:ParentMember2021-12-310001108426us-gaap:NoncontrollingInterestMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:ElectricityGenerationMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:ElectricityGenerationMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:ElectricityGenerationMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2018-12-310001108426us-gaap:RetainedEarningsMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426us-gaap:ParentMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426us-gaap:NoncontrollingInterestMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426us-gaap:RetainedEarningsMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:ParentMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:NoncontrollingInterestMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2019-01-012019-12-310001108426us-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2019-12-310001108426us-gaap:RetainedEarningsMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:ParentMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:NoncontrollingInterestMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:RetainedEarningsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:ParentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:NoncontrollingInterestMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2020-01-012020-12-310001108426us-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2020-12-310001108426us-gaap:RetainedEarningsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:ParentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:NoncontrollingInterestMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:RetainedEarningsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:ParentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:NoncontrollingInterestMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2021-01-012021-12-310001108426us-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2021-12-310001108426us-gaap:RetainedEarningsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:ParentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:NoncontrollingInterestMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2018-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:CommonStockMemberpnm:TexasNewMexicoPowerCompanyMember2018-12-310001108426us-gaap:AdditionalPaidInCapitalMemberpnm:TexasNewMexicoPowerCompanyMember2018-12-310001108426us-gaap:RetainedEarningsMemberpnm:TexasNewMexicoPowerCompanyMember2018-12-310001108426us-gaap:RetainedEarningsMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:AdditionalPaidInCapitalMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:CommonStockMemberpnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426us-gaap:AdditionalPaidInCapitalMemberpnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426us-gaap:RetainedEarningsMemberpnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426us-gaap:RetainedEarningsMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:AdditionalPaidInCapitalMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:CommonStockMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:AdditionalPaidInCapitalMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:RetainedEarningsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:RetainedEarningsMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:AdditionalPaidInCapitalMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:CommonStockMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:AdditionalPaidInCapitalMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:RetainedEarningsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:PnmrMember2021-12-31pnm:utility0001108426pnm:PnmrMember2020-12-310001108426us-gaap:ElectricityGenerationPlantNonNuclearMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-31xbrli:pure0001108426us-gaap:ElectricityGenerationPlantNonNuclearMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:ElectricityGenerationPlantNonNuclearMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:CommonIntangibleAndGeneralPlantMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:CommonIntangibleAndGeneralPlantMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426pnm:CommonIntangibleAndGeneralPlantMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:PublicUtilitiesInventoryCoalMember2021-12-310001108426us-gaap:PublicUtilitiesInventoryCoalMember2020-12-310001108426us-gaap:PublicUtilitiesInventoryCoalMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:PublicUtilitiesInventoryCoalMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:PublicUtilitiesInventoryCoalMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:PublicUtilitiesInventoryCoalMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PublicUtilitiesInventoryMaterialsAndSuppliesMember2021-12-310001108426pnm:PublicUtilitiesInventoryMaterialsAndSuppliesMember2020-12-310001108426pnm:PublicUtilitiesInventoryMaterialsAndSuppliesMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:PublicUtilitiesInventoryMaterialsAndSuppliesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:PublicUtilitiesInventoryMaterialsAndSuppliesMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:PublicUtilitiesInventoryMaterialsAndSuppliesMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-31pnm:segment0001108426pnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberus-gaap:CorporateAndOtherMember2021-01-012021-12-310001108426us-gaap:CorporateAndOtherMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:CorporateAndOtherMember2021-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberus-gaap:CorporateAndOtherMember2020-01-012020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:CorporateAndOtherMember2020-01-012020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:CorporateAndOtherMember2020-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberus-gaap:CorporateAndOtherMember2019-01-012019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:CorporateAndOtherMember2019-01-012019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426us-gaap:CorporateAndOtherMember2019-12-310001108426us-gaap:SalesRevenueNetMemberpnm:UnaffiliatedCustomerOfTexasNewMexicoPowerCompanyOneMemberus-gaap:CustomerConcentrationRiskMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:SalesRevenueNetMemberpnm:UnaffiliatedCustomerOfTexasNewMexicoPowerCompanyOneMemberus-gaap:CustomerConcentrationRiskMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:SalesRevenueNetMemberpnm:UnaffiliatedCustomerOfTexasNewMexicoPowerCompanyOneMemberus-gaap:CustomerConcentrationRiskMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMemberpnm:UnaffiliatedCustomerofTexasNewMexicoPowerCompanyThreeMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMemberpnm:UnaffiliatedCustomerofTexasNewMexicoPowerCompanyThreeMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMemberpnm:UnaffiliatedCustomerofTexasNewMexicoPowerCompanyThreeMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426pnm:UnaffiliatedCustomerOfTexasNewMexicoPowerCompanyTwoMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426pnm:UnaffiliatedCustomerOfTexasNewMexicoPowerCompanyTwoMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426pnm:UnaffiliatedCustomerOfTexasNewMexicoPowerCompanyTwoMemberus-gaap:SalesRevenueNetMemberus-gaap:CustomerConcentrationRiskMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2018-12-310001108426us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2019-01-012019-12-310001108426us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2019-12-310001108426us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2020-01-012020-12-310001108426us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2020-12-310001108426us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2021-01-012021-12-310001108426us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2018-01-01utr:MW00011084262019-01-010001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RetailElectricCommercialCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:RetailElectricCommercialCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricCommercialCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RetailElectricIndustrialCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:RetailElectricIndustrialCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricIndustrialCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMember2021-01-012021-12-310001108426pnm:ElectricTransmissionServiceMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:ElectricTransmissionServiceMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426pnm:ElectricTransmissionServiceMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:MiscellaneousRevenueFromContractsWithCustomersMember2021-01-012021-12-310001108426pnm:MiscellaneousRevenueFromContractsWithCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426pnm:MiscellaneousRevenueFromContractsWithCustomersMember2021-01-012021-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RetailElectricCommercialCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:RetailElectricCommercialCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricCommercialCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RetailElectricIndustrialCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:RetailElectricIndustrialCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricIndustrialCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMember2020-01-012020-12-310001108426pnm:ElectricTransmissionServiceMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426pnm:ElectricTransmissionServiceMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426pnm:ElectricTransmissionServiceMember2020-01-012020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:MiscellaneousRevenueFromContractsWithCustomersMember2020-01-012020-12-310001108426pnm:MiscellaneousRevenueFromContractsWithCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426pnm:MiscellaneousRevenueFromContractsWithCustomersMember2020-01-012020-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricResidentialCustomersMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RetailElectricCommercialCustomersMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:RetailElectricCommercialCustomersMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricCommercialCustomersMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RetailElectricIndustrialCustomersMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:RetailElectricIndustrialCustomersMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricIndustrialCustomersMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricPublicAuthorityCustomersMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:ElectricityMemberpnm:RetailElectricEconomyEnergyServiceCustomersMember2019-01-012019-12-310001108426pnm:ElectricTransmissionServiceMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:ElectricTransmissionServiceMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426pnm:ElectricTransmissionServiceMember2019-01-012019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:MiscellaneousRevenueFromContractsWithCustomersMember2019-01-012019-12-310001108426pnm:MiscellaneousRevenueFromContractsWithCustomersMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426pnm:MiscellaneousRevenueFromContractsWithCustomersMember2019-01-012019-12-310001108426pnm:PNMR2020ForwardEquitySalesAgreementMember2020-12-152020-12-150001108426pnm:PNMR2020ForwardEquitySalesAgreementMember2020-12-150001108426srt:AffiliatedEntityMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426srt:AffiliatedEntityMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426srt:AffiliatedEntityMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426srt:AffiliatedEntityMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426srt:AffiliatedEntityMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426srt:AffiliatedEntityMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:LineOfCreditMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:LineOfCreditMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:LineOfCreditMember2021-01-012021-12-310001108426pnm:PNMRandTNMPMember2021-12-310001108426pnm:PNMRAndPNMRDevelopmentMemberus-gaap:LineOfCreditMember2021-01-012021-12-310001108426pnm:PNMAndTNMPMemberus-gaap:LineOfCreditMember2021-01-012021-12-310001108426pnm:PnmrMemberus-gaap:LetterOfCreditMemberpnm:LetterOrCredit30MilJPMorganMember2018-01-010001108426pnm:PNMR2018TwoYearTermLoanMember2019-12-310001108426pnm:PNMR2018TwoYearTermLoanMember2018-12-212018-12-210001108426pnm:PNMR2020ForwardEquitySalesAgreementMember2020-01-070001108426us-gaap:OverAllotmentOptionMember2020-01-072020-01-070001108426us-gaap:OverAllotmentOptionMember2020-01-082020-01-080001108426pnm:PNMR2018SUNS3.25percentdueMarch2021Memberus-gaap:UnsecuredDebtMember2020-12-310001108426pnm:PNMR2020DelayedDrawTermLoanMember2021-03-090001108426pnm:PNMR2018SUNS3.25percentdueMarch2021Memberus-gaap:UnsecuredDebtMember2021-03-092021-03-090001108426us-gaap:MediumTermNotesMemberpnm:PNMRDevelopmentTermLoanMember2020-12-310001108426us-gaap:MediumTermNotesMemberpnm:PNMRDevelopmentTermLoanMember2020-11-250001108426us-gaap:MediumTermNotesMemberpnm:PNMRDevelopmentTermLoanMember2021-05-182021-05-180001108426us-gaap:MediumTermNotesMemberpnm:PNMR2019TermLoanMember2020-12-310001108426pnm:PNMR2019TermLoanMemberus-gaap:NotesPayableOtherPayablesMember2021-05-182021-05-180001108426pnm:PNMR2020TermLoanMember2020-12-210001108426pnm:PNMR2018TwoYearTermLoanMemberus-gaap:NotesPayableOtherPayablesMember2020-12-212020-12-210001108426pnm:PNMR2018TwoYearTermLoanMember2020-12-212020-12-210001108426pnm:PNMR2020DelayedDrawTermLoanMember2020-12-220001108426pnm:PNMR2020DelayedDrawTermLoanMember2020-12-222020-12-220001108426pnm:PnmrMemberpnm:PNMR2018TwoYearTermLoanMember2020-12-222020-12-220001108426pnm:PNMR2020DelayedDrawTermLoanMemberus-gaap:NotesPayableOtherPayablesMember2021-05-182021-05-180001108426us-gaap:RevolvingCreditFacilityMemberus-gaap:LineOfCreditMemberpnm:PNMR2021DelayedDrawTermLoanDueMay2023Member2021-05-182021-05-180001108426pnm:PNMR2020TermLoanMemberus-gaap:NotesPayableOtherPayablesMember2021-05-182021-05-180001108426us-gaap:RevolvingCreditFacilityMemberpnm:PNMRDevelopmentRevolvingCreditFacilityMemberus-gaap:LineOfCreditMember2021-05-182021-05-180001108426us-gaap:RevolvingCreditFacilityMemberpnm:PNMRRevolvingCreditFacilityMemberus-gaap:LineOfCreditMember2021-05-182021-05-180001108426us-gaap:RevolvingCreditFacilityMemberus-gaap:LineOfCreditMemberpnm:PNMR2021DelayedDrawTermLoanDueMay2023Member2021-12-022021-12-020001108426us-gaap:RevolvingCreditFacilityMemberus-gaap:LineOfCreditMemberpnm:PNMR2021DelayedDrawTermLoanDueMay2023Member2021-12-310001108426us-gaap:RevolvingCreditFacilityMemberus-gaap:LineOfCreditMemberpnm:PNMR2021DelayedDrawTermLoanDueMay2023Memberus-gaap:SubsequentEventMember2022-01-242022-01-240001108426pnm:PNM2017TermLoanAgreementMemberpnm:JPMorganChaseBankN.A.andU.S.BankNationalAssociationMemberus-gaap:NotesPayableToBanksMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-010001108426pnm:DepositRelatedToPotentialTransmissionInterconnectionsMemberpnm:PNMRDevelopmentMember2018-01-012018-12-310001108426pnm:DepositRelatedToPotentialTransmissionInterconnectionsMemberpnm:PNMRDevelopmentMember2019-01-012019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:PNM2019250MillionTermLoanMember2019-01-180001108426pnm:PNM201940MillionTermLoanMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-180001108426us-gaap:RevolvingCreditFacilityMemberpnm:PNMRevolvingCreditFacilityMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-182019-12-180001108426pnm:PNM2019TermLoanMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-06-182021-06-180001108426pnm:PNM2020250MillionTermLoanMemberus-gaap:MediumTermNotesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-04-150001108426pnm:PNM2019TermLoanMemberus-gaap:MediumTermNotesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-04-152020-04-150001108426pnm:PNM2020250MillionTermLoanMemberus-gaap:SeniorNotesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-04-302020-04-300001108426pnm:PNM2020250MillionTermLoanMemberus-gaap:MediumTermNotesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-212020-12-210001108426us-gaap:SeniorNotesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-04-300001108426us-gaap:SeniorNotesMemberpnm:SeniorUnsecuredNotes321SeriesADueApril2030Member2020-04-300001108426us-gaap:SeniorNotesMemberpnm:SeniorUnsecuredNotes357SeriesBDueApril2039Member2020-04-300001108426pnm:PNMRevolvingCreditFacilityMemberus-gaap:LineOfCreditMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-04-302020-04-300001108426pnm:PollutionControlRevenueBondsDueJuneTwentyTwentyMemberus-gaap:NotesPayableOtherPayablesMember2019-01-012019-12-31pnm:bond_series0001108426pnm:PollutionControlRevenueBondsDueJuneTwentyTwentyMemberus-gaap:NotesPayableOtherPayablesMember2019-12-310001108426pnm:PollutionControlRevenueBondsDueJuneTwentyFortyMemberus-gaap:NotesPayableOtherPayablesMember2019-01-012019-12-310001108426pnm:PollutionControlRevenueBondsDueJuneTwentyFortyMemberus-gaap:NotesPayableOtherPayablesMember2020-12-310001108426us-gaap:NotesPayableOtherPayablesMemberpnm:PollutionControlRevenueBondsDue2043Member2019-01-012019-12-310001108426pnm:PollutionControlRevenueBondsDue2043Series1Memberus-gaap:NotesPayableOtherPayablesMember2020-12-310001108426pnm:PollutionControlRevenueBondsDue2043Series2Memberus-gaap:NotesPayableOtherPayablesMember2020-12-310001108426pnm:PNM2021FixedRatePCRBsMemberus-gaap:NotesPayableOtherPayablesMember2021-10-010001108426pnm:PollutionControlRevenueBondsAt625PercentMemberpnm:MaricopaCountyArizonaPollutionControlCorporationMemberus-gaap:NotesPayableOtherPayablesMember2019-12-310001108426pnm:CityOfFarmingtonNewMexicoMemberpnm:PollutionControlRevenueBondsAt590PercentMemberus-gaap:NotesPayableOtherPayablesMember2019-12-310001108426pnm:CityOfFarmingtonNewMexicoMemberpnm:PollutionControlRevenueBondsAt625PercentMemberus-gaap:NotesPayableOtherPayablesMember2019-12-310001108426pnm:PollutionControlRevenueBondsAt625PercentMemberpnm:MaricopaCountyArizonaPollutionControlCorporationMemberus-gaap:NotesPayableOtherPayablesMember2020-01-010001108426pnm:PollutionControlRevenueBondsAt625PercentMemberpnm:MaricopaCountyArizonaPollutionControlCorporationMemberus-gaap:NotesPayableOtherPayablesMember2020-01-012020-01-010001108426pnm:CityOfFarmingtonNewMexicoMemberus-gaap:NotesPayableOtherPayablesMember2020-06-010001108426us-gaap:NotesPayableOtherPayablesMember2020-06-222020-06-220001108426pnm:PNM202175MillionTermLoanMemberus-gaap:NotesPayableToBanksMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-06-180001108426pnm:PNM201940MillionTermLoanMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-06-182021-06-180001108426pnm:PNM202175MillionTermLoanMemberus-gaap:NotesPayableToBanksMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:SeniorNotesMemberpnm:PNM2021NotePurchaseAgreementMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-07-140001108426us-gaap:SeniorNotesMemberpnm:PNM2021SUNsAt259PercentDueJuly152033Member2021-07-140001108426us-gaap:SeniorNotesMemberpnm:PNM2021SUNsAt314PercentDueJuly152041Member2021-07-140001108426pnm:PNMSUNsAt535PercentDueOctober12021Memberus-gaap:SeniorNotesMember2021-07-142021-07-140001108426pnm:PNMSUNsAt535PercentDueOctober12021Memberus-gaap:SeniorNotesMember2021-07-140001108426pnm:PNMSeptember2021NotePurchaseAgreementMemberus-gaap:SeniorNotesMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-09-230001108426pnm:TwoPointTwoNinePercentSeniorUnsecuredNotesDueDecember302031Memberus-gaap:SeniorNotesMember2021-12-020001108426us-gaap:SeniorNotesMemberpnm:TwoPointTwoNinePercentSeniorUnsecuredNotesDueJuly152033Member2021-09-230001108426us-gaap:SeniorNotesMemberpnm:TwoPointNineSevenSeniorUnsecuredNotesDueDecember302041Member2021-09-230001108426pnm:PollutionControlRevenueBondsDue2033Memberus-gaap:NotesPayableOtherPayablesMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:SecuredDebtMemberpnm:TNMPTermLoanAgreementMemberpnm:TexasNewMexicoPowerCompanyMember2018-07-250001108426pnm:TNMP2018TermLoanMember2018-12-170001108426us-gaap:MortgagesMemberpnm:TNMP2019BondPurchaseAgreementMemberpnm:TexasNewMexicoPowerCompanyMember2019-02-260001108426us-gaap:MortgagesMemberpnm:TNMP2019BondPurchaseAgreementMemberpnm:TexasNewMexicoPowerCompanyMember2019-03-290001108426pnm:FirstMortgageBondsDue2019Series2009Aat9point50percentMemberus-gaap:UnsecuredDebtMemberpnm:TexasNewMexicoPowerCompanyMember2019-04-012019-04-010001108426pnm:FirstMortgageBondsDue2019Series2009Aat9point50percentMemberus-gaap:UnsecuredDebtMemberpnm:TexasNewMexicoPowerCompanyMember2019-04-010001108426us-gaap:MortgagesMemberpnm:FirstMortgageBonds3.60PercentDue2029Memberpnm:TexasNewMexicoPowerCompanyMember2019-07-010001108426us-gaap:SecuredDebtMemberpnm:TNMP2020BondPurchaseAgreementMemberpnm:TexasNewMexicoPowerCompanyMember2020-04-240001108426us-gaap:SecuredDebtMemberpnm:TNMP2020BondPurchaseAgreementBondSeries1And2Memberpnm:TexasNewMexicoPowerCompanyMember2020-04-240001108426us-gaap:SecuredDebtMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:TNMP2020BondPurchaseAgreementBondSeries3And4Member2020-07-150001108426us-gaap:SecuredDebtMemberpnm:TNMP2021BondPurchaseAgreementMemberpnm:TexasNewMexicoPowerCompanyMember2021-07-140001108426us-gaap:SecuredDebtMemberpnm:TNMP2021BondPurchaseAgreementMemberpnm:TexasNewMexicoPowerCompanyMember2021-08-160001108426us-gaap:SecuredDebtMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:TNMPFirstMortgageBondsMember2021-12-310001108426us-gaap:SecuredDebtMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:TNMPFirstMortgageBondsMember2021-01-012021-12-310001108426us-gaap:InterestRateContractMember2017-12-31pnm:derivative0001108426pnm:VariableRateShortTermDebtMember2017-01-012017-12-310001108426pnm:InterestRateContractOneMemberpnm:VariableRateShortTermDebtMember2017-12-310001108426pnm:InterestRateContractTwoMemberpnm:VariableRateShortTermDebtMember2017-12-310001108426pnm:VariableRateShortTermDebtMemberpnm:InterestRateContractThreeMember2017-12-310001108426pnm:VariableRateShortTermDebtMember2017-12-310001108426us-gaap:FairValueInputsLevel2Memberus-gaap:CashFlowHedgingMember2020-01-012020-12-310001108426srt:MaximumMember2021-12-310001108426pnm:PNMAndTNMPMember2021-12-310001108426pnm:PNMAndTNMPMember2020-12-310001108426us-gaap:SubsequentEventMember2022-02-180001108426pnm:TexasNewMexicoPowerCompanyMemberus-gaap:SubsequentEventMember2022-02-180001108426pnm:PNMRDevelopmentMember2021-12-310001108426pnm:PNMRDevelopmentMember2020-12-310001108426pnm:PNMRDevelopmentMemberus-gaap:SubsequentEventMember2022-02-180001108426pnm:PnmrMemberus-gaap:SubsequentEventMember2022-02-180001108426pnm:PNMRRevolvingCreditFacilityMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:PNMRevolvingCreditFacilityMember2021-12-310001108426pnm:LocalLinesOfCreditMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:TNMPRevolvingCreditFacilityMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsDue2019Series2009Aat9point50percentMemberpnm:TNMPRevolvingCreditFacilityMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsDue2019Series2009Aat9point50percentMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:RevolvingCreditFacilityMember2021-12-31pnm:extension_option0001108426pnm:FirstMortgageBondsDue2019Series2009Aat9point50percentMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:RevolvingCreditFacilityMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:PNMRevolvingCreditFacilityMember2020-12-310001108426pnm:PNM2017NewMexicoCreditFacilityMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:PNM2017NewMexicoCreditFacilityMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:TNMPRevolvingCreditFacilityMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PNMRRevolvingCreditFacilityMember2020-12-310001108426pnm:PNMRDevelopmentRevolvingCreditFacilityMember2021-12-310001108426pnm:PNMRDevelopmentRevolvingCreditFacilityMember2020-12-310001108426pnm:JPMorganChaseBankN.A.Member2021-12-310001108426srt:ParentCompanyMemberpnm:PNMRRevolvingCreditFacilityMember2021-12-310001108426srt:ParentCompanyMemberpnm:PNMRevolvingCreditFacilityMember2021-12-310001108426srt:ParentCompanyMemberpnm:TNMPRevolvingCreditFacilityMember2021-12-310001108426pnm:PNMAndTNMPMemberpnm:PNMRDevelopmentRevolvingCreditFacilityMember2021-12-310001108426pnm:PNMRRevolvingCreditFacilityMemberus-gaap:SubsequentEventMember2022-02-180001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:PNMRevolvingCreditFacilityMemberus-gaap:SubsequentEventMember2022-02-180001108426pnm:TNMPRevolvingCreditFacilityMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:SubsequentEventMember2022-02-180001108426pnm:PNM2017NewMexicoCreditFacilityMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:SubsequentEventMember2022-02-180001108426us-gaap:RevolvingCreditFacilityMemberus-gaap:SubsequentEventMember2022-02-180001108426srt:ParentCompanyMemberus-gaap:SubsequentEventMember2022-02-180001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:SubsequentEventMember2022-02-180001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPcrbDue2033At1Point875PercentMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPcrbDue2033At1Point875PercentMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPcrbDue2033At2Point15PercentMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPcrbDue2033At2Point15PercentMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2040At2Point125PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2040At2Point125PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2042At2Point45PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2042At2Point45PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:SeniorUnsecuredNotesPCRBFloatingRateWeeklyModeMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:SeniorUnsecuredNotesPCRBFloatingRateWeeklyModeMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2026At0Point875PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2026At0Point875PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2022At1Point05PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2022At1Point05PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2022At1Point20PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2022At1Point20PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPCRBDue2023At1Point10PercentMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPCRBDue2023At1Point10PercentMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2024At1Point15PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:SeniorUnsecuredNotesPCRBDue2024At1Point15PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2020-12-310001108426pnm:SeniorUnsecuredNotesDue2021At5Point35PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SeniorUnsecuredNotesDue2021At5Point35PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2023at3point15percentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2023at3point15percentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2025at3point45percentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2025at3point45percentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2025At3Point85PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2025At3Point85PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:SeniorUnsecuredNotesDue2028At3Point68PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SeniorUnsecuredNotesDue2028At3Point68PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesDue2028At3Point78PercentMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesDue2028At3Point78PercentMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2033At3Point93PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2033At3Point93PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2038At4Point22PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2038At4Point22PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:SeniorUnsecuredNotesDue2048At4Point50PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SeniorUnsecuredNotesDue2048At4Point50PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2048At4Point60PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2048At4Point60PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesDue2030At3Point21PercentMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesDue2030At3Point21PercentMember2020-12-310001108426pnm:SeniorUnsecuredNotesDue2039At3Point57PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SeniorUnsecuredNotesDue2039At3Point57PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:SeniorUnsecuredNotesDue2033At2Point59PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426pnm:SeniorUnsecuredNotesDue2033At2Point59PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SeniorUnsecuredNotesDue2033At2Point59PercentMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesDue2041At3Point14PercentMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesDue2041At3Point14PercentMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesDue2041At3Point14PercentMember2020-12-310001108426pnm:SeniorUnsecuredNotesDue2031At2Point29PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2031At2Point29PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2031At2Point29PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:SeniorUnsecuredNotesDue2041At2Point97PercentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SeniorUnsecuredNotesPollutionControlRevenueBondsMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2041At2Point97PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:UnsecuredDebtMemberpnm:SeniorUnsecuredNotesDue2041At2Point97PercentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PNM201940MillionTermLoanMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:UnsecuredDebtMemberpnm:PNM201940MillionTermLoanMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:PNM202175MillionTermLoanMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:PNM202175MillionTermLoanMemberus-gaap:UnsecuredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:FirstMortgageBonds6Point95PercentDue2043Series2013AMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMemberpnm:FirstMortgageBonds6Point95PercentDue2043Series2013AMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBondsDue2024Series2014Aat4point03percentMemberMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBondsDue2024Series2014Aat4point03percentMemberMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds3Point53Percentdue2026Series2016AMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds3Point53Percentdue2026Series2016AMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBonds3.22PercentDue2027Memberpnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBonds3.22PercentDue2027Memberpnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBonds3.85PercentDue2028Memberpnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBonds3.85PercentDue2028Memberpnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds3.79PercentDue2034Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds3.79PercentDue2034Memberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds3.92PercentDue2039Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds3.92PercentDue2039Memberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds4.06PercentDue2044Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds4.06PercentDue2044Memberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds3.60PercentDue2029Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds3.60PercentDue2029Memberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds273PercentDue2030Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds273PercentDue2030Memberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBonds336PercentDueApril2050Memberpnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBonds336PercentDueApril2050Memberpnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBonds293PercentDue2035Memberpnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBonds293PercentDue2035Memberpnm:FirstMortgageBondsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds336PercentDueJuly2050Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds336PercentDueJuly2050Memberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds244PercentDueAugust2035Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FirstMortgageBondsMemberpnm:FirstMortgageBonds244PercentDueAugust2035Memberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PnmrMemberpnm:PNMR2021DelayedDrawTermLoanDueMay2023Member2021-12-310001108426pnm:PnmrMemberpnm:PNMR2021DelayedDrawTermLoanDueMay2023Member2020-12-310001108426pnm:PNMR2018SUNS3.25percentdueMarch2021Memberpnm:PnmrMember2021-12-310001108426pnm:PNMR2018SUNS3.25percentdueMarch2021Memberpnm:PnmrMember2020-12-310001108426pnm:PnmrMemberpnm:PNMRDevelopmentTermLoanMember2021-12-310001108426pnm:PnmrMemberpnm:PNMRDevelopmentTermLoanMember2020-12-310001108426pnm:PnmrMemberpnm:PNM2019TermLoanMember2021-12-310001108426pnm:PnmrMemberpnm:PNM2019TermLoanMember2020-12-310001108426pnm:PNMR2020TermLoanMemberpnm:PnmrMember2021-12-310001108426pnm:PNMR2020TermLoanMemberpnm:PnmrMember2020-12-310001108426pnm:PnmrMemberpnm:PNMR2020DelayedDrawTermLoanMember2021-12-310001108426pnm:PnmrMemberpnm:PNMR2020DelayedDrawTermLoanMember2020-12-310001108426pnm:PaloVerdeNuclearGeneratingStationUnits1And4Memberpnm:PublicServiceCompanyOfNewMexicoMember2015-01-15pnm:lease0001108426pnm:PaloVerdeNuclearGeneratingStationUnit2Memberpnm:PublicServiceCompanyOfNewMexicoMember2016-01-150001108426pnm:PaloVerdeNuclearGeneratingStationUnits1And4Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationUnit2Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:PaloVerdeNuclearGeneratingStationMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:NavajoNationMember2021-01-012021-12-310001108426us-gaap:EquipmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:EquipmentMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:EquipmentMember2021-12-310001108426pnm:CoolingTowersMember2021-01-012021-12-31pnm:power_purchase_agreement0001108426pnm:PortfolioOneMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:PortfolioThreeMember2021-01-012021-12-310001108426pnm:PortfolioTwoMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:TriStateMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:UnusualWeatherMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:NaturalGasCostMember2021-01-012021-03-310001108426pnm:UnusualWeatherMemberus-gaap:ElectricityPurchasedMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-03-310001108426us-gaap:CommodityContractMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:DesignatedAsHedgingInstrumentMember2021-12-310001108426us-gaap:CommodityContractMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:DesignatedAsHedgingInstrumentMember2020-12-310001108426us-gaap:CommodityContractMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:FuelAndPurchasedPowerAdjustmentClauseMemberus-gaap:DesignatedAsHedgingInstrumentMember2021-12-310001108426us-gaap:CommodityContractMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:FuelAndPurchasedPowerAdjustmentClauseMemberus-gaap:DesignatedAsHedgingInstrumentMember2020-12-310001108426us-gaap:CommodityContractMemberus-gaap:CostOfSalesMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:DesignatedAsHedgingInstrumentMember2021-01-012021-12-310001108426us-gaap:CommodityContractMemberus-gaap:CostOfSalesMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:DesignatedAsHedgingInstrumentMember2020-01-012020-12-310001108426us-gaap:CommodityContractMemberus-gaap:FairValueHedgingMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-31utr:MWh0001108426us-gaap:CommodityContractMemberus-gaap:FairValueHedgingMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:NuclearDecommissioningTrustMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:NuclearDecommissioningTrustMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:MineReclamationTrustMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:MineReclamationTrustMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:PnmrAndPnmMember2021-12-310001108426us-gaap:CashAndCashEquivalentsMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:CashAndCashEquivalentsMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426us-gaap:CashAndCashEquivalentsMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberus-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:PreferredStockMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:PreferredStockMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426us-gaap:PreferredStockMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:EquitySecuritiesOtherFundsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:EquitySecuritiesOtherFundsMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:EquitySecuritiesOtherFundsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:USTreasuryAndGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:USTreasuryAndGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:USTreasuryAndGovernmentMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:USTreasuryAndGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:ForeignGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:ForeignGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:ForeignGovernmentMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:ForeignGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MunicipalBondsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MunicipalBondsMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MunicipalBondsMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MunicipalBondsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherDebtSecuritiesMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:OtherDebtSecuritiesMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherDebtSecuritiesMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherDebtSecuritiesMember2021-01-012021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:CashAndCashEquivalentsMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:CashAndCashEquivalentsMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426us-gaap:CashAndCashEquivalentsMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberus-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommonStockMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:PreferredStockMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:PreferredStockMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426us-gaap:PreferredStockMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:PreferredStockMemberus-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:EquitySecuritiesOtherFundsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:EquitySecuritiesOtherFundsMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:EquitySecuritiesOtherFundsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:EquitySecuritiesOtherFundsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:USTreasuryAndGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:USTreasuryAndGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:USTreasuryAndGovernmentMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:USTreasuryAndGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:ForeignGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:ForeignGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:ForeignGovernmentMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:ForeignGovernmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MunicipalBondsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MunicipalBondsMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MunicipalBondsMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MunicipalBondsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherDebtSecuritiesMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:OtherDebtSecuritiesMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherDebtSecuritiesMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherDebtSecuritiesMember2020-01-012020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:FairValueMeasurementsRecurringMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426pnm:PnmrMemberus-gaap:CarryingReportedAmountFairValueDisclosureMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:CarryingReportedAmountFairValueDisclosureMember2021-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberus-gaap:CarryingReportedAmountFairValueDisclosureMember2021-12-310001108426pnm:PnmrMemberus-gaap:CarryingReportedAmountFairValueDisclosureMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:CarryingReportedAmountFairValueDisclosureMember2020-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberus-gaap:CarryingReportedAmountFairValueDisclosureMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:EquitySecuritiesMember2021-12-310001108426pnm:AlternativeInvestmentsMemberus-gaap:PensionPlansDefinedBenefitMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:DebtSecuritiesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:EquitySecuritiesMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:AlternativeInvestmentsMemberus-gaap:PensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:DebtSecuritiesMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426srt:MinimumMember2021-01-012021-12-310001108426srt:MaximumMember2021-01-012021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueDisclosureItemAmountsDomainus-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueDisclosureItemAmountsDomainus-gaap:FairValueInputsLevel12And3Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel1Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel2Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel12And3Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel12And3Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2021-12-310001108426us-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMember2021-12-310001108426us-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMember2021-12-310001108426us-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:FixedIncomeFundsMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:FixedIncomeFundsMember2021-12-310001108426us-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:FixedIncomeFundsMember2021-12-310001108426us-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-12-310001108426us-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-12-310001108426us-gaap:FairValueInputsLevel12And3Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:FairValueInputsLevel2Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:FairValueInputsLevel12And3Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:FixedIncomeFundsMember2021-12-310001108426us-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:FixedIncomeFundsMember2021-12-310001108426us-gaap:FairValueInputsLevel2Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:FixedIncomeFundsMember2021-12-310001108426us-gaap:FairValueInputsLevel12And3Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:FairValueInputsLevel2Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueDisclosureItemAmountsDomainus-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueDisclosureItemAmountsDomainus-gaap:FairValueInputsLevel12And3Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel1Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel2Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel12And3Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:FairValueInputsLevel12And3Memberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:TrustForBenefitOfEmployeesMember2020-12-310001108426us-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMember2020-12-310001108426us-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMember2020-12-310001108426us-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:FixedIncomeFundsMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:FixedIncomeFundsMember2020-12-310001108426us-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:FixedIncomeFundsMember2020-12-310001108426us-gaap:FairValueInputsLevel12And3Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2020-12-310001108426us-gaap:FairValueInputsLevel2Memberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2020-12-310001108426us-gaap:FairValueInputsLevel12And3Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:FairValueInputsLevel2Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberus-gaap:CashAndCashEquivalentsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:FairValueInputsLevel12And3Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:FixedIncomeFundsMember2020-12-310001108426us-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:FixedIncomeFundsMember2020-12-310001108426us-gaap:FairValueInputsLevel2Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMemberus-gaap:FixedIncomeFundsMember2020-12-310001108426us-gaap:FairValueInputsLevel12And3Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:FairValueInputsLevel1Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:FairValueInputsLevel2Memberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Memberus-gaap:CashAndCashEquivalentsMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel1Memberus-gaap:CashAndCashEquivalentsMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberus-gaap:CashAndCashEquivalentsMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Memberpnm:EquitySecuritiesCorporateStocksCommonMember2021-12-310001108426pnm:PnmrMemberpnm:EquitySecuritiesCorporateStocksCommonMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberpnm:EquitySecuritiesCorporateStocksCommonMember2021-12-310001108426pnm:PnmrMemberpnm:EquitySecuritiesCorporateStocksPreferredMemberus-gaap:FairValueInputsLevel12And3Member2021-12-310001108426pnm:PnmrMemberpnm:EquitySecuritiesCorporateStocksPreferredMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberpnm:EquitySecuritiesCorporateStocksPreferredMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Memberus-gaap:FixedIncomeFundsMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel1Memberus-gaap:FixedIncomeFundsMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberus-gaap:FixedIncomeFundsMember2021-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesUSGovernmentMemberus-gaap:FairValueInputsLevel12And3Member2021-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesUSGovernmentMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesUSGovernmentMemberus-gaap:FairValueInputsLevel2Member2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Memberpnm:FixedIncomeSecuritiesInternationalGovernmentMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel1Memberpnm:FixedIncomeSecuritiesInternationalGovernmentMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberpnm:FixedIncomeSecuritiesInternationalGovernmentMember2021-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesMunicipalsMemberus-gaap:FairValueInputsLevel12And3Member2021-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesMunicipalsMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesMunicipalsMemberus-gaap:FairValueInputsLevel2Member2021-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesOtherFundsMemberus-gaap:FairValueInputsLevel12And3Member2021-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesOtherFundsMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberpnm:FixedIncomeSecuritiesOtherFundsMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Member2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel1Member2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Member2021-12-310001108426pnm:PnmrMemberus-gaap:PrivateEquityFundsMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:PrivateEquityFundsMember2021-12-310001108426pnm:PnmrMemberus-gaap:HedgeFundsMember2021-12-310001108426pnm:PnmrMemberus-gaap:HedgeFundsMemberus-gaap:FairValueMeasuredAtNetAssetValuePerShareMember2021-12-310001108426pnm:PnmrMemberus-gaap:RealEstateMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:RealEstateMember2021-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Memberus-gaap:CashAndCashEquivalentsMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel1Memberus-gaap:CashAndCashEquivalentsMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberus-gaap:CashAndCashEquivalentsMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Memberpnm:EquitySecuritiesCorporateStocksCommonMember2020-12-310001108426pnm:PnmrMemberpnm:EquitySecuritiesCorporateStocksCommonMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberpnm:EquitySecuritiesCorporateStocksCommonMember2020-12-310001108426pnm:PnmrMemberpnm:EquitySecuritiesCorporateStocksPreferredMemberus-gaap:FairValueInputsLevel12And3Member2020-12-310001108426pnm:PnmrMemberpnm:EquitySecuritiesCorporateStocksPreferredMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberpnm:EquitySecuritiesCorporateStocksPreferredMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Memberus-gaap:FixedIncomeFundsMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel1Memberus-gaap:FixedIncomeFundsMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberus-gaap:FixedIncomeFundsMember2020-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesUSGovernmentMemberus-gaap:FairValueInputsLevel12And3Member2020-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesUSGovernmentMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesUSGovernmentMemberus-gaap:FairValueInputsLevel2Member2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Memberpnm:FixedIncomeSecuritiesInternationalGovernmentMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel1Memberpnm:FixedIncomeSecuritiesInternationalGovernmentMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberpnm:FixedIncomeSecuritiesInternationalGovernmentMember2020-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesMunicipalsMemberus-gaap:FairValueInputsLevel12And3Member2020-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesMunicipalsMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesMunicipalsMemberus-gaap:FairValueInputsLevel2Member2020-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesOtherFundsMemberus-gaap:FairValueInputsLevel12And3Member2020-12-310001108426pnm:PnmrMemberpnm:FixedIncomeSecuritiesOtherFundsMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Memberpnm:FixedIncomeSecuritiesOtherFundsMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel12And3Member2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel1Member2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueInputsLevel2Member2020-12-310001108426pnm:PnmrMemberus-gaap:PrivateEquityFundsMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:PrivateEquityFundsMember2020-12-310001108426pnm:PnmrMemberus-gaap:HedgeFundsMember2020-12-310001108426pnm:PnmrMemberus-gaap:HedgeFundsMemberus-gaap:FairValueMeasuredAtNetAssetValuePerShareMember2020-12-310001108426pnm:PnmrMemberus-gaap:RealEstateMember2020-12-310001108426pnm:PnmrMemberus-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:RealEstateMember2020-12-310001108426us-gaap:VariableInterestEntityPrimaryBeneficiaryMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:VariableInterestEntityPrimaryBeneficiaryMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:VariableInterestEntityPrimaryBeneficiaryMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:VariableInterestEntityPrimaryBeneficiaryMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:VariableInterestEntityPrimaryBeneficiaryMembersrt:MaximumMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:VariableInterestEntityPrimaryBeneficiaryMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:NMCapitalMemberpnm:CoalSupplyMemberpnm:SanJuanGeneratingStationMember2016-01-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:PensionPlansDefinedBenefitMember2021-01-012021-12-310001108426us-gaap:PensionPlansDefinedBenefitMemberus-gaap:ForeignPlanMemberus-gaap:EquitySecuritiesMember2021-12-310001108426us-gaap:PensionPlansDefinedBenefitMember2021-12-310001108426srt:MinimumMemberus-gaap:PensionPlansDefinedBenefitMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2019-12-310001108426us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2020-01-012020-12-310001108426us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-12-310001108426us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2019-01-012019-12-310001108426us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2018-01-012018-01-010001108426us-gaap:EquitySecuritiesMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-12-310001108426us-gaap:DebtSecuritiesMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-12-310001108426pnm:PNMAndTNMPMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2020-01-012020-12-310001108426pnm:PNMAndTNMPMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-01-012021-12-310001108426pnm:PNMAndTNMPMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2021-12-310001108426pnm:PNMAndTNMPMemberus-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2020-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:OtherPensionPlansDefinedBenefitMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:QualifiedPlanMember2021-01-012021-12-310001108426us-gaap:QualifiedPlanMember2020-01-012020-12-310001108426us-gaap:QualifiedPlanMember2019-01-012019-12-310001108426us-gaap:NonqualifiedPlanMember2021-01-012021-12-310001108426us-gaap:NonqualifiedPlanMember2020-01-012020-12-310001108426us-gaap:NonqualifiedPlanMember2019-01-012019-12-310001108426us-gaap:QualifiedPlanMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:QualifiedPlanMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:QualifiedPlanMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:NonqualifiedPlanMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:NonqualifiedPlanMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:NonqualifiedPlanMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:QualifiedPlanMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:QualifiedPlanMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:QualifiedPlanMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:NonqualifiedPlanMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:NonqualifiedPlanMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:NonqualifiedPlanMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426pnm:PerformanceEquityPlanMember2021-01-012021-12-310001108426pnm:PerformanceEquityPlanMemberpnm:NonemployeeMembersoftheBoardofDirectorsMember2021-01-012021-12-310001108426pnm:PerformanceEquityPlanMember2014-05-310001108426pnm:RestrictedStockAndPerformanceSharesMember2021-12-310001108426pnm:RestrictedStockAndPerformanceSharesMember2021-01-012021-12-310001108426pnm:PnmrMember2021-01-012021-12-310001108426pnm:PnmrMember2020-01-012020-12-310001108426pnm:PnmrMember2019-01-012019-12-310001108426pnm:RestrictedStockAndPerformanceSharesMember2020-01-012020-12-310001108426pnm:RestrictedStockAndPerformanceSharesMember2019-01-012019-12-310001108426pnm:MarketBasedSharesMember2021-01-012021-12-310001108426pnm:MarketBasedSharesMember2020-01-012020-12-310001108426pnm:MarketBasedSharesMember2019-01-012019-12-310001108426us-gaap:RestrictedStockMember2020-12-310001108426us-gaap:RestrictedStockMember2021-01-012021-12-310001108426us-gaap:RestrictedStockMember2021-12-310001108426srt:ManagementMemberus-gaap:PerformanceSharesMemberpnm:AchievedPerformanceTargetFor2018Through2020Member2021-12-310001108426pnm:AchievedPerformanceTargetFor20192021Membersrt:ManagementMemberus-gaap:PerformanceSharesMember2021-12-310001108426srt:ManagementMemberus-gaap:PerformanceSharesMember2020-12-310001108426srt:ManagementMemberus-gaap:PerformanceSharesMember2019-12-310001108426srt:ManagementMemberus-gaap:PerformanceSharesMember2021-01-012021-12-310001108426us-gaap:RestrictedStockMember2020-01-012020-12-310001108426us-gaap:RestrictedStockMember2019-01-012019-12-310001108426us-gaap:EmployeeStockOptionMember2021-01-012021-12-310001108426us-gaap:EmployeeStockOptionMember2020-01-012020-12-310001108426us-gaap:EmployeeStockOptionMember2019-01-012019-12-310001108426us-gaap:EmployeeStockOptionMember2019-12-310001108426pnm:FuelAndPurchasedPowerAdjustmentClauseMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:FuelAndPurchasedPowerAdjustmentClauseMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:FuelAndPurchasedPowerAdjustmentClauseMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FuelAndPurchasedPowerAdjustmentClauseMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:TransmissionCostRecoveryFactorMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:TransmissionCostRecoveryFactorMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:TransmissionCostRecoveryFactorMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:TransmissionCostRecoveryFactorMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:EnergyEfficiencyMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:EnergyEfficiencyMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:EnergyEfficiencyMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:EnergyEfficiencyMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:OtherRegulatoryAssetsCurrentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:OtherRegulatoryAssetsCurrentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:OtherRegulatoryAssetsCurrentMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:OtherRegulatoryAssetsCurrentMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:EnvironmentalRestorationCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:EnvironmentalRestorationCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:EnvironmentalRestorationCostsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:EnvironmentalRestorationCostsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:DeferredIncomeTaxChargesMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:DeferredIncomeTaxChargesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:DeferredIncomeTaxChargesMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:DeferredIncomeTaxChargesMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:LossOnReacquiredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:LossOnReacquiredDebtMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:LossOnReacquiredDebtMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:LossOnReacquiredDebtMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:PensionAndOtherPostretirementPlansCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:PensionAndOtherPostretirementPlansCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:PensionAndOtherPostretirementPlansCostsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:PensionAndOtherPostretirementPlansCostsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:SJGSUnits2and3Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SJGSUnits2and3Memberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:SJGSUnits2and3Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:SJGSUnits2and3Memberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:AdvancedMeteringInfrastructureCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:AdvancedMeteringInfrastructureCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:AdvancedMeteringInfrastructureCostsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:AdvancedMeteringInfrastructureCostsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:AdvancedMeterRetirementCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:AdvancedMeterRetirementCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:AdvancedMeterRetirementCostsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:AdvancedMeterRetirementCostsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:DeferredCostsUnderElectronicTransferAccountMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:DeferredCostsUnderElectronicTransferAccountMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:DeferredCostsUnderElectronicTransferAccountMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:DeferredCostsUnderElectronicTransferAccountMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:DeferredCOVID19CostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:DeferredCOVID19CostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:DeferredCOVID19CostsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:DeferredCOVID19CostsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:SanJuanGeneratingStationReplacementResourcesMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SanJuanGeneratingStationReplacementResourcesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:SanJuanGeneratingStationReplacementResourcesMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:SanJuanGeneratingStationReplacementResourcesMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:EIMMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:EIMMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:EIMMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:EIMMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:OtherRegulatoryAssetsNoncurrentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:OtherRegulatoryAssetsNoncurrentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:OtherRegulatoryAssetsNoncurrentMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:OtherRegulatoryAssetsNoncurrentMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:FuelAndPurchasedPowerAdjustmentClauseMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:FuelAndPurchasedPowerAdjustmentClauseMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:FuelAndPurchasedPowerAdjustmentClauseMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:FuelAndPurchasedPowerAdjustmentClauseMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:RenewableEnergyRiderMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:RenewableEnergyRiderMember2020-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberpnm:RenewableEnergyRiderMember2021-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberpnm:RenewableEnergyRiderMember2020-12-310001108426pnm:EnergyEfficiencyMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:EnergyEfficiencyMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:EnergyEfficiencyMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:EnergyEfficiencyMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:TransmissionCostRecoveryFactorMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:TransmissionCostRecoveryFactorMember2020-12-310001108426pnm:TransmissionCostRecoveryFactorMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:TransmissionCostRecoveryFactorMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:RemovalCostsMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:RemovalCostsMember2020-12-310001108426us-gaap:RemovalCostsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:RemovalCostsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:DeferredIncomeTaxChargesMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:DeferredIncomeTaxChargesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:DeferredIncomeTaxChargesMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:DeferredIncomeTaxChargesMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:AssetRetirementObligationCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:AssetRetirementObligationCostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:AssetRetirementObligationCostsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:AssetRetirementObligationCostsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:RenewableEnergyProgramMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:RenewableEnergyProgramMember2020-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberus-gaap:RenewableEnergyProgramMember2021-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberus-gaap:RenewableEnergyProgramMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:AcceleratedDepreciationSNCRsMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:AcceleratedDepreciationSNCRsMember2020-12-310001108426pnm:AcceleratedDepreciationSNCRsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:AcceleratedDepreciationSNCRsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:PensionAndOtherPostretirementPlansCostsMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:PensionAndOtherPostretirementPlansCostsMember2020-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberus-gaap:PensionAndOtherPostretirementPlansCostsMember2021-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberus-gaap:PensionAndOtherPostretirementPlansCostsMember2020-12-310001108426pnm:COVID19CostsSavingsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:COVID19CostsSavingsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:COVID19CostsSavingsMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:COVID19CostsSavingsMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:OtherRegulatoryAssetsLiabilitiesMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:OtherRegulatoryAssetsLiabilitiesMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:OtherRegulatoryAssetsLiabilitiesMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426us-gaap:OtherRegulatoryAssetsLiabilitiesMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426pnm:UndergroundMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:IncreaseinCoalMineDecommissioningLiabilityMember2020-01-012020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:AccountingStandardsUpdate201707Member2021-01-012021-12-310001108426pnm:JointProjectsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:JointProjectsMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426pnm:PnmrMemberpnm:JointProjectsMember2021-01-012021-12-310001108426pnm:SjgsCoalMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:FourCornersUnits4And5CoalMember2021-12-310001108426pnm:LunaGasMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SjgsUnits1And2Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:OtherUnrelatedEntities1Memberpnm:SjgsUnits1And2Member2021-12-310001108426pnm:SjgsCoalMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:Unit4Member2021-12-310001108426pnm:SjgsCoalMemberpnm:OtherUnrelatedEntities2Memberpnm:Unit4Member2021-12-310001108426pnm:SjgsCoalMemberpnm:Unit4Memberpnm:OtherUnrelatedEntities3Member2021-12-310001108426pnm:SjgsCoalMemberpnm:Unit4Memberpnm:OtherUnrelatedEntities4Member2021-12-310001108426pnm:SjgsCoalMemberpnm:OtherUnrelatedEntities5Memberpnm:Unit4Member2021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-31pnm:generating_unit0001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:FourCornersMember2021-01-012021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMember2021-01-012021-12-310001108426pnm:FourCornersMember2021-01-012021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:NuclearSpentFuelAndWasteDisposalMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:NuclearSpentFuelAndWasteDisposalMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:OtherDeferredCreditsMember2021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:NuclearSpentFuelAndWasteDisposalMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:OtherDeferredCreditsMember2020-12-310001108426pnm:EnergyTransitionActMemberpnm:RequiredPercentageby2025Memberpnm:ElectricGenerationPortfolioStandardMember2019-06-140001108426pnm:EnergyTransitionActMemberpnm:ElectricGenerationPortfolioStandardMemberpnm:RequiredPercentageby2030Member2019-06-140001108426pnm:EnergyTransitionActMemberpnm:ElectricGenerationPortfolioStandardMemberpnm:RequiredPercentageby2040Member2019-06-140001108426pnm:EnergyTransitionActMemberpnm:RequiredPercentageby2045Memberpnm:ElectricGenerationPortfolioStandardMember2019-06-140001108426pnm:CleanAirActRelatedToRegionalHazeMember1999-12-31pnm:state0001108426pnm:CleanAirActRelatedToRegionalHazeMember2021-12-31utr:T0001108426srt:MaximumMemberpnm:SanJuanGeneratingStationAndFourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-02-25pnm:parts_per_billion0001108426srt:MaximumMemberpnm:SanJuanGeneratingStationAndFourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMember2015-09-300001108426srt:MaximumMemberpnm:SanJuanGeneratingStationAndFourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMember2015-10-01pnm:option0001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:CoalSupplyMemberpnm:SanJuanGeneratingStationMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:CoalSupplyMemberpnm:SanJuanGeneratingStationMember2020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:CoalSupplyMemberpnm:SanJuanGeneratingStationMemberus-gaap:SubsequentEventMember2022-02-172022-02-17iso4217:USDutr:T0001108426pnm:NMCapitalMemberpnm:CoalSupplyMemberpnm:SanJuanGeneratingStationMember2021-12-310001108426pnm:CoalSupplyMemberpnm:FourCornersMember2021-01-012021-12-310001108426pnm:SurfaceMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:IncreaseinCoalMineDecommissioningLiabilityMember2020-12-012020-12-310001108426pnm:UndergroundMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:IncreaseinCoalMineDecommissioningLiabilityMember2020-12-012020-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:IncreaseinCoalMineDecommissioningLiabilityMember2019-01-012019-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:IncreaseinCoalMineDecommissioningLiabilityMemberpnm:FourCornersMember2020-01-012020-12-310001108426pnm:SurfaceMemberus-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2021-12-310001108426us-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:UndergroundMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2021-12-310001108426pnm:SurfaceMemberus-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:SurfaceMemberus-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:UndergroundMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:UndergroundMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:SanJuanGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:SanJuanGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:LossOnLongTermPurchaseCommitmentMemberpnm:SanJuanGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:SanJuanGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:MineReclamationTrustMember2021-12-310001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:MineReclamationTrustMember2021-01-012021-12-310001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:MineReclamationTrustMember2020-01-012020-12-310001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:MineReclamationTrustMember2019-01-012019-12-310001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:MineReclamationTrustMember2021-12-310001108426pnm:SanJuanGeneratingStationAndFourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:MineReclamationTrustMember2021-01-012021-12-310001108426pnm:SanJuanGeneratingStationMemberpnm:CoalFiredElectricityGeneratingFacilityDemolitionAndRemediationOrdinanceMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-11-092021-11-090001108426pnm:SanJuanGeneratingStationMemberpnm:CoalFiredElectricityGeneratingFacilityDemolitionAndRemediationOrdinanceMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMembersrt:MaximumMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:NuclearPlantMember2021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:NuclearPlantMemberpnm:CommercialProvidersMember2021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:IndustryWideRetrospectiveAssessmentProgramMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:NuclearPlantMember2021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:NuclearPlantMember2021-12-310001108426pnm:PaloVerdeNuclearGeneratingStationMemberpnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:NuclearPlantMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:NavajoNationAllotteeMattersMember2012-09-012012-09-30pnm:landowner0001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:NavajoNationAllotteeMattersMember2021-12-31pnm:Allotment_Parcel0001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:NavajoNationAllotteeMattersMember2015-01-220001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:NavajoNationAllotteeMattersMember2015-07-13utr:acre0001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:NavajoNationAllotteeMattersMember2015-12-010001108426pnm:A2015ElectricRateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2015-01-012015-12-310001108426pnm:NonFuelEnergyMemberpnm:A2015ElectricRateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2015-01-012015-12-310001108426pnm:PaloVerdeNuclearGeneratingStationUnit2LeasesMemberpnm:PublicServiceCompanyOfNewMexicoMember2016-01-310001108426pnm:PaloVerdeNuclearGeneratingStationUnit2Memberpnm:PublicServiceCompanyOfNewMexicoMember2016-08-310001108426pnm:A2015ElectricRateCaseMemberpnm:PaloVerdeNuclearGeneratingStationUnit2LeasesMemberpnm:PublicServiceCompanyOfNewMexicoMember2016-08-012016-08-310001108426pnm:PaloVerdeNuclearGeneratingStationUnit2LeasesMemberpnm:PublicServiceCompanyOfNewMexicoMember2016-08-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:PaloVerdeNuclearGeneratingStationUnit1LeasesextendedMember2016-08-310001108426pnm:A2015ElectricRateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2016-09-282016-09-280001108426pnm:A2015ElectricRateCaseMemberpnm:PaloVerdeNuclearGeneratingStationUnit2LeasesMemberpnm:PublicServiceCompanyOfNewMexicoMember2016-01-012016-01-310001108426pnm:PaloVerdeNuclearGeneratingStationUnit2LeasesMemberpnm:PublicServiceCompanyOfNewMexicoMember2016-09-300001108426pnm:PaloVerdeNuclearGeneratingStationUnit2Memberpnm:A2015ElectricRateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-05-160001108426pnm:PaloVerdeNuclearGeneratingStationUnit2Memberpnm:PublicServiceCompanyOfNewMexicoMember2019-05-160001108426pnm:NewMexico2015RateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:PaloVerdeNuclearGeneratingStationUnit2Memberpnm:NewMexico2015RateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:PaloVerdeNuclearGeneratingStationUnit2Memberpnm:NewMexico2015RateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426pnm:NewMexico2015RateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:LeaseholdsAndLeaseholdImprovementsMemberpnm:NewMexico2015RateCaseMemberpnm:PaloVerdeNuclearGeneratingStationUnits1And4Memberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426pnm:NMPRCMember2016-01-012016-12-310001108426pnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-01-102018-01-100001108426pnm:FourCornersMember2018-01-102018-01-100001108426pnm:FourCornersMember2018-01-1000011084262018-02-012018-02-010001108426pnm:RenewablePortfolioStandardMembersrt:MaximumMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:RenewablePortfolioStandardMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:RenewablePortfolioStandard2014Memberpnm:NewMexicoWindMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:RenewablePortfolioStandard2014Memberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RedMesaWindMember2021-01-012021-12-310001108426pnm:LaJoyaWindMemberpnm:RenewablePortfolioStandardMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:RenewablePortfolioStandardMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:LightningDockGeothermalMember2021-01-012021-12-310001108426pnm:LaJoyaWindMemberpnm:RenewablePortfolioStandardMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-06-032019-06-030001108426pnm:LaJoyaWindMemberpnm:RenewablePortfolioStandardMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-06-030001108426pnm:RenewableEnergyRiderMemberpnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-06-012020-06-010001108426pnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RenewableEnergyRiderSkyBlueEnergyProgramMember2020-06-012020-06-010001108426pnm:RenewableEnergyRiderMemberpnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-01-010001108426pnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RenewableEnergyRiderSkyBlueEnergyProgramMember2021-01-012021-01-010001108426pnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:RenewableEnergyRiderSkyBlueEnergyProgramMember2020-11-182020-11-180001108426pnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-06-012021-06-010001108426pnm:RenewableEnergyRiderMemberpnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426pnm:RenewableEnergyRiderMemberpnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426pnm:RenewableEnergyRiderMemberpnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:RenewableEnergyRiderMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426srt:MinimumMemberpnm:RenewablePortfolioStandardMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426pnm:A2017EnergyEfficiencyandLoadManagementProgramMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:DisincentivesIncentivesAddedMember2019-01-012019-12-310001108426pnm:A2017EnergyEfficiencyandLoadManagementProgramMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:DisincentivesIncentivesAddedMember2019-12-31utr:GWh0001108426pnm:EnergyEfficiencyandLoadManagementProgramProposed2018PortfolioMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:DisincentivesIncentivesAddedMember2019-12-310001108426pnm:A2020EnergyEfficiencyAnnualReportMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:DisincentivesAndIncentivesAddedMember2021-04-152021-04-150001108426pnm:A2020EnergyEfficiencyAnnualReportMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:DisincentivesAndIncentivesAddedMember2021-04-150001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:EnergyEfficiencyAndLoadManagementProgramMember2020-04-152020-04-150001108426srt:MinimumMemberpnm:RenewablePortfolioStandardMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-04-15utr:MMBTU0001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:EnergyEfficiencyAndLoadManagementProgramMember2020-04-15pnm:meter0001108426pnm:IntegratedResourcePlan2011Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:NMPRCMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:IntegratedResourcePlan2020Member2021-01-292021-01-290001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2019-07-012019-07-010001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2021-01-012021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2020-02-210001108426us-gaap:EmployeeSeveranceMemberpnm:SanJuanGeneratingStationMember2020-03-310001108426pnm:PublicServiceCompanyOfNewMexicoMemberus-gaap:EmployeeSeveranceMemberpnm:SanJuanGeneratingStationMember2020-03-310001108426us-gaap:OtherRestructuringMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2020-03-310001108426pnm:EconomicDevelopmentAndWorkforceTrainingCostsMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2020-03-310001108426pnm:OtherDeferredCreditsMemberpnm:SanJuanGeneratingStationMember2020-12-310001108426pnm:OtherDeferredCreditsMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2020-12-310001108426pnm:OtherDeferredCreditsMemberpnm:SanJuanGeneratingStationMember2021-12-310001108426pnm:OtherDeferredCreditsMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2021-12-310001108426pnm:PublicServiceCompanyOfNewMexicoMember2020-07-290001108426pnm:SanJuanGeneratingStationMember2020-09-280001108426pnm:ReplacementResourcePortfolioOneMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-11-130001108426pnm:ReplacementResourcePortfolioTwoMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-11-130001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-11-010001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-11-012020-11-010001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-11-012020-11-300001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-082021-01-080001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-080001108426pnm:FourCornersMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-280001108426pnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-04-020001108426pnm:PublicServiceCompanyOfNewMexicoMember2021-04-020001108426pnm:LeasedInterestTerminationOnJanuary152023Memberpnm:PublicServiceCompanyOfNewMexicoMember2021-04-020001108426pnm:LeasedInterestTerminationOnJanuary152023Memberpnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-04-020001108426pnm:LeasedInterestTerminationOnJanuary152024Memberpnm:NMPRCMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-04-020001108426pnm:ReplacementResourcePortfolioOneMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-04-020001108426pnm:ReplacementResourcePortfolioTwoMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-04-020001108426pnm:ReplacementResourcePortfolioThreeMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-04-0200011084262021-04-022021-04-020001108426pnm:EnergyImbalanceMarketMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426pnm:FacebookDataCenterMember2018-01-012018-12-310001108426pnm:CasaMesaWindMemberpnm:FacebookDataCenterMember2018-12-310001108426pnm:AvangridRenewablesLLCMemberpnm:FacebookDataCenterMember2018-12-310001108426pnm:FacebookDataCenterMemberpnm:Route66SolarEnergyCenterMember2018-12-310001108426pnm:FacebookDataCenterMemberpnm:NMRDMember2018-01-012018-12-310001108426pnm:FacebookDataCenterMemberpnm:NMRDMember2018-12-31pnm:Facility0001108426pnm:FacebookDataCenterMemberpnm:PNMRDevelopmentMember2018-12-310001108426pnm:FacebookDataCenterMember2021-02-080001108426pnm:FacebookDataCenterMember2021-06-230001108426pnm:FacebookDataCenterMember2021-07-280001108426pnm:FacebookDataCenterMember2021-10-010001108426pnm:PNMSolarDirectMember2019-05-310001108426pnm:PNMSolarDirectMember2019-05-312019-05-310001108426pnm:WesternSpiritLineMember2019-05-01pnm:kv0001108426pnm:WesternSpiritAndPatternWindAffiliattesMember2021-12-310001108426pnm:FormulaTransmissionRateCaseMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:COVID19Memberpnm:DeferredCOVID19CostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:COVID19Memberpnm:DeferredCOVID19CostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:COVID19Memberpnm:DeferredCOVID19CostsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426pnm:COVID19Memberpnm:COVID19CostsSavingsMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426pnm:COVID19Memberpnm:COVID19CostsSavingsMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426pnm:COVID19Member2021-02-032021-02-030001108426pnm:TransportationElectrificationProgramMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-180001108426pnm:PublicServiceCompanyOfNewMexicoMember2021-03-120001108426pnm:SanJuanGeneratingStationOwnersMemberpnm:InsuranceDeductibleMemberpnm:SanJuanGeneratingStationMember2021-06-300001108426pnm:InsuranceDeductibleMemberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2021-06-300001108426pnm:SanJuanGeneratingStationUnit1Memberpnm:PublicServiceCompanyOfNewMexicoMemberpnm:SanJuanGeneratingStationMember2021-06-300001108426pnm:A2018TNMPRateCaseMemberpnm:TexasNewMexicoPowerCompanyMember2018-05-302018-05-300001108426pnm:A2018TNMPRateCaseMemberpnm:TexasNewMexicoPowerCompanyMember2018-12-202018-12-200001108426pnm:TexasNewMexicoPowerCompanyMember2017-01-012017-12-310001108426pnm:A2018TNMPRateCaseMemberpnm:TexasNewMexicoPowerCompanyMember2018-01-012018-12-310001108426pnm:A2018TNMPRateCaseMemberpnm:TexasNewMexicoPowerCompanyMember2019-08-012019-08-310001108426pnm:A2018TNMPRateCaseMemberpnm:TexasNewMexicoPowerCompanyMember2019-10-012019-10-310001108426pnm:A2018TNMPRateCaseMemberpnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426pnm:TexasNewMexicoPowerCompanyMemberpnm:AdvancedMeterSystemDeploymentAndSurchargeRequestMember2011-07-012011-07-310001108426pnm:TexasNewMexicoPowerCompanyMemberpnm:AdvancedMeterSystemDeploymentAndSurchargeRequestMember2016-12-31pnm:advanced_meter0001108426pnm:TexasNewMexicoPowerCompanyMember2020-10-020001108426pnm:PUCTMemberpnm:TexasNewMexicoPowerCompanyMember2018-04-012018-12-310001108426pnm:EnergyEfficiencyMemberpnm:TexasNewMexicoPowerCompanyMember2019-03-012020-02-290001108426pnm:EnergyEfficiencyMemberpnm:TexasNewMexicoPowerCompanyMember2020-03-012021-02-280001108426pnm:EnergyEfficiencyMemberpnm:TexasNewMexicoPowerCompanyMember2021-03-012021-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2021-05-270001108426pnm:TexasNewMexicoPowerCompanyMember2021-07-280001108426pnm:TransmissionCostOfServiceRatesMemberpnm:TexasNewMexicoPowerCompanyMember2019-03-212019-03-210001108426pnm:TransmissionCostOfServiceRatesMemberpnm:TexasNewMexicoPowerCompanyMember2019-09-192019-09-190001108426pnm:TransmissionCostOfServiceRatesMemberpnm:TexasNewMexicoPowerCompanyMember2020-03-272020-03-270001108426pnm:TransmissionCostOfServiceRatesMemberpnm:TexasNewMexicoPowerCompanyMember2020-10-072020-10-070001108426pnm:TransmissionCostOfServiceRatesMemberpnm:TexasNewMexicoPowerCompanyMember2021-03-122021-03-120001108426pnm:TransmissionCostOfServiceRatesMemberpnm:TexasNewMexicoPowerCompanyMember2021-09-202021-09-200001108426pnm:TexasNewMexicoPowerCompanyMemberus-gaap:SubsequentEventMember2022-01-262022-01-260001108426pnm:TexasNewMexicoPowerCompanyMember2020-04-062020-04-060001108426pnm:TexasNewMexicoPowerCompanyMember2020-06-262020-06-260001108426pnm:TexasNewMexicoPowerCompanyMember2021-04-052021-04-050001108426pnm:TexasNewMexicoPowerCompanyMember2021-07-012021-07-010001108426pnm:TexasNewMexicoPowerCompanyMember2020-03-300001108426pnm:COVID19Memberpnm:TexasNewMexicoPowerCompanyMember2021-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2020-04-142020-04-140001108426pnm:NMPRCMember2017-01-012017-12-310001108426pnm:NMPRCMember2021-01-012021-03-310001108426pnm:PnmrMember2018-12-310001108426pnm:PnmrMember2019-12-310001108426us-gaap:InternalRevenueServiceIRSMember2021-12-310001108426pnm:TexasNewMexicoPowerCompanyMember2020-04-010001108426pnm:PnmrToPnmMemberpnm:ServiceBillingsMember2021-01-012021-12-310001108426pnm:PnmrToPnmMemberpnm:ServiceBillingsMember2020-01-012020-12-310001108426pnm:PnmrToPnmMemberpnm:ServiceBillingsMember2019-01-012019-12-310001108426pnm:ServiceBillingsMemberpnm:PnmrToTnmpMember2021-01-012021-12-310001108426pnm:ServiceBillingsMemberpnm:PnmrToTnmpMember2020-01-012020-12-310001108426pnm:ServiceBillingsMemberpnm:PnmrToTnmpMember2019-01-012019-12-310001108426pnm:ServiceBillingsMemberpnm:PnmToTnmpMember2021-01-012021-12-310001108426pnm:ServiceBillingsMemberpnm:PnmToTnmpMember2020-01-012020-12-310001108426pnm:ServiceBillingsMemberpnm:PnmToTnmpMember2019-01-012019-12-310001108426pnm:ServiceBillingsMemberpnm:TnmpToPnmrMember2021-01-012021-12-310001108426pnm:ServiceBillingsMemberpnm:TnmpToPnmrMember2020-01-012020-12-310001108426pnm:ServiceBillingsMemberpnm:TnmpToPnmrMember2019-01-012019-12-310001108426pnm:ServiceBillingsMemberpnm:TNMPtoPNMMember2021-01-012021-12-310001108426pnm:ServiceBillingsMemberpnm:TNMPtoPNMMember2020-01-012020-12-310001108426pnm:ServiceBillingsMemberpnm:TNMPtoPNMMember2019-01-012019-12-310001108426pnm:ServiceBillingsMemberpnm:PNMRToNMRDMember2021-01-012021-12-310001108426pnm:ServiceBillingsMemberpnm:PNMRToNMRDMember2020-01-012020-12-310001108426pnm:ServiceBillingsMemberpnm:PNMRToNMRDMember2019-01-012019-12-310001108426pnm:PNMfromNMRDMemberpnm:RenewableEnergyPurchasesMember2021-01-012021-12-310001108426pnm:PNMfromNMRDMemberpnm:RenewableEnergyPurchasesMember2020-01-012020-12-310001108426pnm:PNMfromNMRDMemberpnm:RenewableEnergyPurchasesMember2019-01-012019-12-310001108426pnm:InterconnectionBillingsMemberpnm:PNMToNMRDMember2021-01-012021-12-310001108426pnm:InterconnectionBillingsMemberpnm:PNMToNMRDMember2020-01-012020-12-310001108426pnm:InterconnectionBillingsMemberpnm:PNMToNMRDMember2019-01-012019-12-310001108426pnm:InterconnectionBillingsMemberpnm:PNMtoPNMRMember2021-01-012021-12-310001108426pnm:InterconnectionBillingsMemberpnm:PNMtoPNMRMember2020-01-012020-12-310001108426pnm:InterconnectionBillingsMemberpnm:PNMtoPNMRMember2019-01-012019-12-310001108426pnm:PnmrToPnmMemberpnm:InterconnectionBillingsMember2021-01-012021-12-310001108426pnm:PnmrToPnmMemberpnm:InterconnectionBillingsMember2020-01-012020-12-310001108426pnm:PnmrToPnmMemberpnm:InterconnectionBillingsMember2019-01-012019-12-310001108426pnm:InterconnectionBillingsMemberpnm:NMRDToPNMMember2021-01-012021-12-310001108426pnm:InterconnectionBillingsMemberpnm:NMRDToPNMMember2020-01-012020-12-310001108426pnm:InterconnectionBillingsMemberpnm:NMRDToPNMMember2019-01-012019-12-310001108426pnm:PnmrToPnmMemberpnm:InterestChargesMember2021-01-012021-12-310001108426pnm:PnmrToPnmMemberpnm:InterestChargesMember2020-01-012020-12-310001108426pnm:PnmrToPnmMemberpnm:InterestChargesMember2019-01-012019-12-310001108426pnm:InterestChargesMemberpnm:PNMtoPNMRMember2021-01-012021-12-310001108426pnm:InterestChargesMemberpnm:PNMtoPNMRMember2020-01-012020-12-310001108426pnm:InterestChargesMemberpnm:PNMtoPNMRMember2019-01-012019-12-310001108426pnm:InterestChargesMemberpnm:PnmrToTnmpMember2021-01-012021-12-310001108426pnm:InterestChargesMemberpnm:PnmrToTnmpMember2020-01-012020-12-310001108426pnm:InterestChargesMemberpnm:PnmrToTnmpMember2019-01-012019-12-310001108426pnm:PnmrToTnmpMemberpnm:IncomeTaxSharingPaymentsMember2021-01-012021-12-310001108426pnm:PnmrToTnmpMemberpnm:IncomeTaxSharingPaymentsMember2020-01-012020-12-310001108426pnm:PnmrToTnmpMemberpnm:IncomeTaxSharingPaymentsMember2019-01-012019-12-310001108426pnm:PnmrToPnmMemberpnm:IncomeTaxSharingPaymentsMember2021-01-012021-12-310001108426pnm:PnmrToPnmMemberpnm:IncomeTaxSharingPaymentsMember2020-01-012020-12-310001108426pnm:PnmrToPnmMemberpnm:IncomeTaxSharingPaymentsMember2019-01-012019-12-310001108426pnm:IncomeTaxSharingPaymentsMemberpnm:PNMtoPNMRMember2021-01-012021-12-310001108426pnm:IncomeTaxSharingPaymentsMemberpnm:PNMtoPNMRMember2020-01-012020-12-310001108426pnm:IncomeTaxSharingPaymentsMemberpnm:PNMtoPNMRMember2019-01-012019-12-310001108426pnm:TnmpToPnmrMemberpnm:IncomeTaxSharingPaymentsMember2021-01-012021-12-310001108426pnm:TnmpToPnmrMemberpnm:IncomeTaxSharingPaymentsMember2020-01-012020-12-310001108426pnm:TnmpToPnmrMemberpnm:IncomeTaxSharingPaymentsMember2019-01-012019-12-310001108426pnm:NMRDMemberpnm:PNMRDevelopmentMember2021-12-310001108426pnm:NMRDMember2021-12-310001108426pnm:CentralNewMexicoElectricCooperativeMemberpnm:NMRDMember2021-12-310001108426pnm:NMRDMemberpnm:PNMRDevelopmentMember2021-01-012021-12-310001108426pnm:NMRDMemberpnm:PNMRDevelopmentMember2020-01-012020-12-310001108426pnm:NMRDMemberpnm:PNMRDevelopmentMember2019-01-012019-12-310001108426pnm:PNMRDevelopmentMemberpnm:NMRDMember2021-02-012021-02-280001108426pnm:PNMRDevelopmentMemberpnm:NMRDMember2021-01-012021-12-310001108426pnm:NMRDMember2021-01-012021-12-310001108426pnm:NMRDMember2020-01-012020-12-310001108426pnm:NMRDMember2019-01-012019-12-310001108426pnm:NMRDMember2021-12-310001108426pnm:NMRDMember2020-12-310001108426pnm:MergerAgreementMembersrt:ScenarioForecastMember2022-12-310001108426pnm:PnmrMemberpnm:MergerAgreementMembersrt:ScenarioForecastMember2023-01-012023-03-310001108426pnm:AvangridMemberpnm:MergerAgreementMembersrt:ScenarioForecastMember2023-01-012023-03-310001108426pnm:MergerAgreementMembersrt:ScenarioForecastMember2023-01-012023-03-310001108426srt:ParentCompanyMember2021-01-012021-12-310001108426srt:ParentCompanyMember2020-01-012020-12-310001108426srt:ParentCompanyMember2019-01-012019-12-310001108426srt:ParentCompanyMember2020-12-310001108426srt:ParentCompanyMember2019-12-310001108426srt:ParentCompanyMember2018-12-310001108426srt:ParentCompanyMember2021-12-310001108426us-gaap:AllowanceForCreditLossMember2018-12-310001108426us-gaap:AllowanceForCreditLossMember2019-01-012019-12-310001108426us-gaap:AllowanceForCreditLossMember2019-12-310001108426us-gaap:AllowanceForCreditLossMember2020-01-012020-12-310001108426us-gaap:AllowanceForCreditLossMember2020-12-310001108426us-gaap:AllowanceForCreditLossMember2021-01-012021-12-310001108426us-gaap:AllowanceForCreditLossMember2021-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2018-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-01-012019-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2019-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-01-012020-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2020-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-01-012021-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:PublicServiceCompanyOfNewMexicoMember2021-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:TexasNewMexicoPowerCompanyMember2018-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:TexasNewMexicoPowerCompanyMember2019-01-012019-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:TexasNewMexicoPowerCompanyMember2019-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:TexasNewMexicoPowerCompanyMember2020-01-012020-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:TexasNewMexicoPowerCompanyMember2020-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:TexasNewMexicoPowerCompanyMember2021-01-012021-12-310001108426us-gaap:AllowanceForCreditLossMemberpnm:TexasNewMexicoPowerCompanyMember2021-12-31
Table of Contents

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-K
(Mark One)
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 2021
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from _________ to _________
Name of Registrant, State of Incorporation, Address Of Principal Executive Offices, Telephone Number, Commission File No., IRS Employer Identification No.
PNM Resources, Inc.
(A New Mexico Corporation)
414 Silver Ave. SW
Albuquerque, New Mexico 87102-3289
Telephone Number - (505) 241-2700
Commission File No. - 001-32462
IRS Employer Identification No. - 85-0468296

Public Service Company of New Mexico
(A New Mexico Corporation)
414 Silver Ave. SW
Albuquerque, New Mexico 87102-3289
Telephone Number - (505) 241-2700
Commission File No. - 001-06986
IRS Employer Identification No. - 85-0019030

Texas-New Mexico Power Company
(A Texas Corporation)
577 N. Garden Ridge Blvd.
Lewisville, Texas 75067
Telephone Number - (972) 420-4189
Commission File No. - 002-97230
IRS Employer Identification No. - 75-0204070

Securities registered pursuant to Section 12(b) of the Act:
Registrant
Title of each class
Trading Symbol(s)
Name of each exchange on which registered
PNM Resources, Inc.
Common Stock, no par value
PNM
New York Stock Exchange

Securities registered pursuant to Section 12(g) of the Act:
Registrant
Title of each class
Public Service Company of New Mexico
1965 Series, 4.58% Cumulative Preferred Stock
($100 stated value without sinking fund)

Indicate by check mark whether each registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
PNM Resources, Inc. (“PNMR”)
Yes
No
Public Service Company of New Mexico (“PNM”)
Yes
No
Texas-New Mexico Power Company (“TNMP”)
Yes
No

Indicate by check mark if each registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
PNMR
Yes
No
PNM
Yes
No
TNMP
Yes
No


Table of Contents

Indicate by check mark whether each registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports) and (2) has been subject to such filing requirements for the past 90 days.
PNMR
Yes
No
PNM
Yes
No
TNMP
Yes
No
(NOTE: As a voluntary filer, not subject to the filing requirements, TNMP filed all reports under Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months.)

Indicate by check mark whether each registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
PNMR
Yes
No
PNM
Yes
No
TNMP
Yes
No
Indicate by check mark whether each registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer
Accelerated
filer
Non-accelerated
filer
Smaller reporting company
Emerging growth company
PNMR
Large accelerated
filer

Accelerated
filer
Non-accelerated filer
Smaller reporting company
Emerging growth company
PNM
Large accelerated
filer
Accelerated
filer
Non-accelerated filer
Smaller reporting company
Emerging growth company
TNMP
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. £

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.
PNMR
Yes
No
PNM
Yes
No
TNMP
Yes
No

Indicate by check mark whether the registrants are a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes   No

As of February 18, 2022, shares of common stock outstanding were:
 
PNMR85,834,874 
PNM39,117,799 
TNMP6,358 

On June 30, 2021, the aggregate market value of the voting common stock held by non-affiliates of PNMR as computed by reference to the New York Stock Exchange composite transaction closing price of $48.77 per share reported by The Wall Street Journal, was $4,186,166,805. PNM and TNMP have no common stock held by non-affiliates.

PNM AND TNMP MEET THE CONDITIONS SET FORTH IN GENERAL INSTRUCTIONS (I) (1) (a) AND (b) OF FORM 10-K AND ARE THEREFORE FILING THIS FORM WITH THE REDUCED DISCLOSURE FORMAT PURSUANT TO GENERAL INSTRUCTION (I) (2).

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the following document are incorporated by reference into Part III of this report:

Proxy Statement to be filed by PNMR with the SEC pursuant to Regulation 14A relating to the annual meeting of shareholders of PNMR to be held on May 10, 2022.

This combined Form 10-K is separately filed by PNMR, PNM, and TNMP.  Information contained herein relating to any individual registrant is filed by such registrant on its own behalf.  Each registrant makes no representation as to information relating to the other registrants.  When this Form 10-K is incorporated by reference into any filing with the SEC made by PNMR, PNM, or TNMP, as a registrant, the portions of this Form 10-K that relate to each other registrant are not incorporated by reference therein.
ii

Table of Contents

PNM RESOURCES, INC. AND SUBSIDIARIES
PUBLIC SERVICE COMPANY OF NEW MEXICO AND SUBSIDIARIES
TEXAS-NEW MEXICO POWER COMPANY AND SUBSIDIARIES

INDEX 
   Page
 
PART I
ITEM 1. BUSINESS
A - 1
A - 1
A - 2
OPERATIONS AND REGULATION
A - 3
REGULATED OPERATIONS
A - 3
A - 5
A - 6
A - 6
A - 9
A - 10
A - 10
A - 10
A - 11
A - 13
ITEM 1A. RISK FACTORS
A - 13
ITEM 1B. UNRESOLVED STAFF COMMENTS
A - 25
ITEM 2. PROPERTIES
A - 25
ITEM 3. LEGAL PROCEEDINGS
A - 25
ITEM 4. MINE SAFETY DISCLOSURES
A - 25
A - 26
PART II
ITEM 5. MARKET FOR PNMR’S COMMON EQUITY, RELATED STOCKHOLDER 
 MATTERS, AND ISSUER PURCHASES OF EQUITY SECURITIES
A - 26
ITEM 6. [RESERVED]
A - 26
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
A - 27
ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURE ABOUT MARKET RISK
A - 60
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
B - 1
ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING
C - 1
AND FINANCIAL DISCLOSURE
ITEM 9A. CONTROLS AND PROCEDURES
C - 1
ITEM 9B. OTHER INFORMATION
C - 2
ITEM 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
C - 2
PART III
ITEM 10. DIRECTORS, EXECUTIVE OFFICERS, AND CORPORATE GOVERNANCE
C - 2
ITEM 11. EXECUTIVE COMPENSATION
C - 2
ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND
MANAGEMENT AND RELATED STOCKHOLDER MATTERS
C - 2
ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS AND DIRECTOR
INDEPENDENCE
C - 2
ITEM 14. PRINCIPAL ACCOUNTING FEES AND SERVICES
C - 2
PART IV
ITEM 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES
D - 1
ITEM 16. FORM 10-K SUMMARY
D - 11
E - 1
 
iii

Table of Contents

GLOSSARY
Definitions:  
ABCWUAAlbuquerque Bernalillo County Water Utility Authority
ABO  Accumulated Benefit Obligation
ACE RuleAffordable Clean Energy Rule
AEP OnSite PartnersAEP OnSite Partners, LLC, a subsidiary of American Electric Power, Inc.
Afton  Afton Generating Station
AFUDCAllowance for Funds Used During Construction
ALJ  Administrative Law Judge
AMIAdvanced Metering Infrastructure
AMSAdvanced Meter System
Anaheim
City of Anaheim, California
AOCI  Accumulated Other Comprehensive Income
APBO  Accumulated Postretirement Benefit Obligation
APS  Arizona Public Service Company, the operator and a co-owner of PVNGS and Four Corners
ARO  Asset Retirement Obligation
ARPAlternative Revenue Program
AvangridAvangrid, Inc., a New York corporation
BART  Best Available Retrofit Technology
BDTBalanced Draft Technology
Board  Board of Directors of PNMR
BSERBest system of emission reduction technology
BTU  British Thermal Unit
CAAClean Air Act
CAISOCalifornia Independent System Operator
Carbon Pollution StandardsCarbon Pollution Standards established by the EPA on August 3, 2015
Casa Mesa WindCasa Mesa Wind Energy Center
CCAECoalition for Clean Affordable Energy
CCNCertificate of Convenience and Necessity
CCRCoal Combustion Residuals
CFIUSCommittee on Foreign Investment in the United States
CFRECitizens for Fair Rates and the Environment
CIACContributions in Aid of Construction
CO2
  Carbon Dioxide
COVID-19Novel coronavirus global pandemic
CSACoal Supply Agreement
CTC  Competition Transition Charge
DC CircuitUnited States Court of Appeals for the District of Columbia Circuit
DCOSTNMP’s applications for a distribution cost recovery factor
DOE  United States Department of Energy
Effective TimeThe time the Merger is consummated
EIM  Western Energy Imbalance Market developed and operated by CAISO
ELGEffluent Limitation Guidelines
End DateThe date at which the Merger Agreement may be terminated if the Effective Time has not yet occurred; January 20, 2022, subsequently extended to April 20, 2023.
Energy Transition ChargeRate rider established to collect non-bypassable customer charges for repayment of the Securitized Bonds
EPA  United States Environmental Protection Agency
EPE  El Paso Electric Company
ERCOT  Electric Reliability Council of Texas
ESGEnvironmental, Social, and Governance principles
ETAThe New Mexico Energy Transition Act
EUEAThe New Mexico Efficient Use of Energy Act
Exchange ActSecurities Exchange Act of 1934
FarmingtonThe City of Farmington, New Mexico
FASB  Financial Accounting Standards Board
FAST ActSEC’s modernization and simplification of Regulation S-K
FCCFederal Communications Commission
iv

Table of Contents

FERC  Federal Energy Regulatory Commission
Four Corners  Four Corners Power Plant
Four Corners Abandonment ApplicationPNM’s January 8, 2021 application for approval for the abandonment of Four Corners and issuance of a securitized financing order
Four Corners CSAFour Corners’ coal supply contract with NTEC
Four Corners Purchase and Sale AgreementPNM’s pending sale of its 13% ownership interest in Four Corners to NTEC
FPPAC  Fuel and Purchased Power Adjustment Clause
FTCFederal Trade Commission
FTYFuture Test Year
GAAP  Generally Accepted Accounting Principles in the United States of America
GHG  Greenhouse Gas Emissions
GWh  Gigawatt hours
HSRHart-Scott Rodino Antitrust Improvement Act of 1976
IBEW  International Brotherhood of Electrical Workers
IberdrolaIberdrola, S.A., a corporation organized under the laws of the Kingdom of Spain, and 81.5% owner of Avangrid
INDCIntended Nationally Determined Contribution
IRCInternal Revenue Code
IRPIntegrated Resource Plan
IRS  Internal Revenue Service
ISFSIIndependent Spent Fuel Storage Installation
Joint ApplicantsPNM, PNMR, Merger Sub, Avangrid and Iberdrola, S.A.
kVKilovolt
KW  Kilowatt
KWh
  Kilowatt Hour
La Joya Wind ILa Joya Wind Facility generating 166 MW of output that became operational in February 2021
La Joya Wind IILa Joya Wind Facility generating 140 MW of output that became operational in June 2021
La Luz  La Luz Generating Station
Leased InterestLeased capacity in PVNGS Unit 1 and Unit 2
LeewardLeeward Renewable Energy Development, LLC
LIBOR  London Interbank Offered Rate
Lightning Dock Geothermal
Lightning Dock geothermal power facility, also known as the Dale Burgett Geothermal Plant
Lordsburg  Lordsburg Generating Station
Los AlamosThe Incorporated County of Los Alamos, New Mexico
Luna  Luna Energy Facility
MD&A  Management’s Discussion and Analysis of Financial Condition and Results of Operations
MergerThe merger of Merger Sub with and into PNMR pursuant to the Merger Agreement, with PNMR surviving the Merger as a direct, wholly-owned subsidiary of Avangrid
Merger AgreementThe Agreement and Plan of Merger, dated October 20, 2020, between PNMR, Avangrid and Merger Sub, as amended by the amendment to the Merger Agreement dated January 3, 2022
Merger SubNM Green Holdings, Inc., a New Mexico corporation and wholly-owned subsidiary of Avangrid which will merge with and into PNMR at the effective time of the Merger (defined below)
MetaMeta Platform, Inc., formerly known as Facebook Inc.
MMBTU  Million BTUs
Moody’s  Moody’s Investor Services, Inc.
MW  
Megawatt
MWh  Megawatt Hour
NAAQSNational Ambient Air Quality Standards
NDT  Nuclear Decommissioning Trusts for PVNGS
NEENew Energy Economy
NERC  
North American Electric Reliability Corporation
New Mexico Wind
New Mexico Wind Energy Center
NM 2015 Rate CaseRequest for a General Increase in Electric Rates Filed by PNM on August 27, 2015
NM 2016 Rate CaseRequest for a General Increase in Electric Rates Filed by PNM on December 7, 2016
NM AREANew Mexico Affordable Reliable Energy Alliance, formerly New Mexico Industrial Energy Consumers Inc.
v

Table of Contents

NM CapitalNM Capital Utility Corporation, an unregulated wholly-owned subsidiary of PNMR, now known as
New Mexico PPA Corporation
NM District CourtUnited States District Court for the District of New Mexico
NM Supreme Court
New Mexico Supreme Court
NMAG  New Mexico Attorney General
NMED  New Mexico Environment Department
NMMMD
The Mining and Minerals Division of the New Mexico Energy, Minerals and Natural Resources Department
NMPRC  New Mexico Public Regulation Commission
NMRD
NM Renewable Development, LLC, owned 50% each by PNMR Development and AEP OnSite Partners, LLC
NOx  Nitrogen Oxides
NOPRNotice of Proposed Rulemaking
NPDESNational Pollutant Discharge Elimination System
NRC  United States Nuclear Regulatory Commission
NTEC  Navajo Transitional Energy Company, LLC, an entity owned by the Navajo Nation
OATTOpen Access Transmission Tariff
OCI  Other Comprehensive Income
OPEB
  Other Post-Employment Benefits
OSM
United States Office of Surface Mining Reclamation and Enforcement
Paris AgreementA legally binding international treaty on climate change adopted on December 12, 2015
Pattern WindPattern New Mexico Wind, LLC, an affiliate of Western Spirit and Pattern Development
PBO
  Projected Benefit Obligation
PCRBs
  Pollution Control Revenue Bonds
PMParticulate Matter
PNM
  Public Service Company of New Mexico and Subsidiaries
PNM 2017 New Mexico Credit Facility
PNM’s $40.0 Million Unsecured Revolving Credit Facility
PNM 2017 Term Loan
PNM’s $200.0 Million Unsecured Term Loan
PNM 2019 $40.0 Million Term Loan
PNM’s $40.0 Million Unsecured Term Loan
PNM 2019 $250.0 Million Term Loan
PNM’s $250.0 Million Unsecured Term Loan
PNM 2020 Fixed Rate PCRBsPNM's $302.5 million PCRBs remarketed on July 22, 2020
PNM 2020 Note Purchase AgreementPNM's Agreement for the sale of PNM 2020 SUNs
PNM 2020 SUNsPNM's $200.0 million Senior Unsecured Notes issued on April 30, 2020
PNM 2020 Term LoanPNM’s $250.0 million Unsecured Term Loan issued on April 15, 2020, of which $100.0 million was repaid on April 30, 2020
PNM 2021 Fixed Rate PCRBsPNM’s $100.3 million PCRBs remarketed on October 1, 2021
PNM 2021 Note Purchase AgreementPNM’s Agreement for the sale of PNM’s 2021 SUNs
PNM 2021 SUNsPNM’s $160.0 Million Senior Unsecured Notes issued on July 14, 2021
PNM 2021 Term LoanPNM’s $75.0 Million 18-month Unsecured Term Loan that matures on December 18, 2022
PNM Floating Rate PCRBsPNM's $100.3 million PCRBs remarketed on July 1, 2020
PNM Revolving Credit Facility
PNM’s $400.0 Million Unsecured Revolving Credit Facility
PNM September 2021 Note Purchase AgreementPNM’s Agreement for the sale of PNM’s September 2021 SUNs
PNM September 2021 SUNsPNM’s $150.0 Million Senior Unsecured Notes issued on December 2, 2021
PNMR
  PNM Resources, Inc. and Subsidiaries
PNMR 2018 SUNS
PNMR’s $300.0 Million Senior Unsecured Notes issued on March 9, 2018
PNMR 2018 Two-Year Term Loan
PNMR’s $50.0 Million Two-Year Unsecured Term Loan
vi

Table of Contents

PNMR 2019 Term Loan
PNMR’s $150.0 Million Unsecured Term Loan
PNMR 2020 Forward Equity Sale Agreements
PNMR’s Block Equity Sale of 6.2 million Shares of PNMR Common Stock with Forward Sales Agreement
PNMR 2020 Term LoanPNMR’s $150.0 million Unsecured Term Loan that matures on January 31, 2022
PNMR 2020 Delayed-Draw Term LoanPNMR’s $300.0 million Unsecured Delayed-Draw Term Loan that matures on January 31, 2022
PNMR 2021 Delayed-Draw Term LoanPNMR’s $1.0 Billion Unsecured Delayed-Draw Term Loan that matures on May 18, 2023
PNMR Development
PNMR Development and Management Company, an unregulated wholly-owned subsidiary of PNMR
PNMR Development Revolving Credit Facility
PNMR Development’s $40.0 million Unsecured Revolving Credit Facility
PNMR Development Term Loan
PNMR Development’s $65.0 Million Unsecured Term Loan that matures on January 31, 2022
PNMR Revolving Credit Facility
PNMR’s $300.0 Million Unsecured Revolving Credit Facility
PPA  Power Purchase Agreement
PSD  Prevention of Significant Deterioration
PUCT  Public Utility Commission of Texas
PV  Photovoltaic
PVNGS  Palo Verde Nuclear Generating Station
PVNGS Leased Interest Abandonment ApplicationApplication with the NMPRC requesting approval for the decertification and abandonment of 114MW of leased PVNGS capacity
RCT  Reasonable Cost Threshold
REANew Mexico’s Renewable Energy Act of 2004
RECsRenewable Energy Certificates
Red Mesa WindRed Mesa Wind Energy Center
REP  Retail Electricity Provider
RFPRequest For Proposal
Rio BravoRio Bravo Generating Station, formerly known as Delta
RMC  Risk Management Committee
ROEReturn on Equity
RPS  Renewable Energy Portfolio Standard
S&P  Standard and Poor’s Ratings Services
SCE  Southern California Edison Company
SCPPA  Southern California Public Power Authority
SEC  United States Securities and Exchange Commission
Securitized BondsEnergy transition bonds
SIP  State Implementation Plan
SJCC  San Juan Coal Company
SJGS
  San Juan Generating Station
SJGS Abandonment Application
PNM’s July 1, 2019 consolidated application seeking NMPRC approval to retire PNM’s share of SJGS in 2022, for related replacement generating resources, and for the issuance of securitized bonds under the ETA
SJGS CSA
San Juan Generating Station Coal Supply Agreement
SO2
  Sulfur Dioxide
SRP  Salt River Project
SUNsSenior Unsecured Notes
Tax ActFederal tax reform legislation enacted on December 22, 2017, commonly referred to as the Tax Cuts and Jobs Act
TCEQ  Texas Commission on Environmental Quality
TCOSTransmission Cost of Service
TECA  Texas Electric Choice Act
Tenth CircuitUnited States Court of Appeals for the Tenth Circuit
TEPTransportation Electrification Program
vii

Table of Contents

TNMP  Texas-New Mexico Power Company and Subsidiaries
TNMP 2018 Rate Case
TNMP’s General Rate Case Application Filed May 30, 2018
TNMP 2018 Term Loan
TNMP’s $35.0 Million Unsecured Term Loan
TNMP 2019 Bonds
TNMP’s First Mortgage Bonds to be issued under the TNMP 2019 Bond Purchase Agreement
TNMP 2019 Bond Purchase Agreement
TNMP’s Agreement to Issue an Aggregate of $305.0 Million in First Mortgage Bonds in 2019
TNMP 2020 BondsTNMP’s First Mortgage Bonds issued on April 24, 2020 under the TNMP 2020 Bond Purchase Agreement
TNMP 2020 Bond Purchase AgreementTNMP’s Agreement for the sale of TNMP’s 2020 First Mortgage Bonds
TNMP 2021 BondsTNMP’s First Mortgage Bonds to be issued under the TNMP 2021 Bond Purchase Agreement
TNMP 2021 Bond Purchase AgreementTNMP’s Agreement for the sale of TNMP’s 2021 First Mortgage Bonds
TNMP FMBsTNMP’s aggregate $750.0 Million of outstanding 2014 to 2020 First Mortgage Bonds
TNMP Revolving Credit Facility
  TNMP’s $75.0 Million Secured Revolving Credit Facility
TNP  TNP Enterprises, Inc. and Subsidiaries
Tri-State  Tri-State Generation and Transmission Association, Inc.
TSAsTransmission Service Agreements
Tucson  Tucson Electric Power Company
UAMPS  Utah Associated Municipal Power Systems
U.S.The Unites States of America
US Supreme CourtUnited States Supreme Court
Valencia  Valencia Energy Facility
VIEVariable Interest Entity
WACC  Weighted Average Cost of Capital
Western Spirit Line An approximately 150-mile 345-kV transmission line that PNM purchased in December 2021
WestmorelandWestmoreland Coal Company
WFB LOC FacilityLetter of credit arrangements with Wells Fargo Bank, N.A., entered into in August 2020
WRAWestern Resource Advocates
WSJWestmoreland San Juan, LLC, an indirect wholly-owned subsidiary of Westmoreland
WSJ LLCWestmoreland San Juan, LLC, a subsidiary of Westmoreland Mining Holdings, LLC, and current owner of SJCC
WSPP  Western Systems Power Pool
viii

Table of Contents

PART I
 
ITEM 1.BUSINESS

THE COMPANY
Overview
PNMR is an investor-owned holding company with two regulated utilities providing electricity and electric services in New Mexico and Texas. PNMR’s electric utilities are PNM and TNMP. PNMR is focused on achieving three key financial objectives:
Earning authorized returns on regulated businesses
Delivering at or above industry-average earnings and dividend growth
Maintaining investment grade credit ratings

In conjunction with these objectives, PNM and TNMP are dedicated to:

Maintaining strong employee safety, plant performance, and system reliability
Delivering a superior customer experience
Demonstrating environmental stewardship in business operations, including transitioning to an emissions-free generating portfolio by 2040
Supporting the communities in their service territories

PNMR’s success in accomplishing its financial objectives is highly dependent on two key factors: fair and timely regulatory treatment for its utilities and the utilities’ strong operating performance. The Company has multiple strategies in place to achieve favorable regulatory treatment, all of which have as their foundation a focus on the basics: safety, operational excellence, and customer satisfaction, while engaging stakeholders to build productive relationships. The Company believes that maintaining strong and modern electric infrastructure is critical to ensuring reliability and supporting economic growth. PNM and TNMP strive to balance service affordability with infrastructure investment to maintain a high level of electric reliability and to deliver a safe and superior customer experience.

Both PNM and TNMP seek cost recovery for their investments through general rate cases, periodic cost of service filings, and various rate riders. PNM filed a general rate case with the NMPRC in December 2016 and the NMPRC issued a rate order in that case in January 2018. TNMP filed a general rate case in May 2018 and the PUCT issued an order in that case in December 2018. Additional information about rate filings is provided in Operations and Regulation below and in Note 17.

PNMR’s common stock trades on the New York Stock Exchange under the symbol PNM. PNMR was incorporated in the State of New Mexico in 2000.

Other Information

These filings for PNMR, PNM, and TNMP include disclosures for each entity. For discussion purposes, this report uses the term “Company” when discussing matters of common applicability to PNMR, PNM, and TNMP. Discussions regarding only PNMR, PNM, or TNMP are so indicated. A reference to “MD&A” in this report refers to Part II, Item 7. – Management’s Discussion and Analysis of Financial Condition and Results of Operations. A reference to a “Note” refers to the accompanying Notes to Consolidated Financial Statements.

Financial information relating to amounts of revenue, net earnings, and total assets of reportable segments is contained in MD&A and Note 2.

Merger

On October 20, 2020, PNMR, Avangrid and Merger Sub entered into the Merger Agreement pursuant to which Merger Sub will merge with and into PNMR, with PNMR surviving the Merger as a wholly-owned subsidiary of Avangrid. The proposed Merger has been unanimously approved by the Boards of Directors of PNMR, Avangrid and Merger Sub and approved by PNMR shareholders at the Special Meeting of Shareholders held on February 12, 2021.

Pursuant to the Merger Agreement, each issued and outstanding share of the common stock of PNMR (other than (i) the issued shares of PNMR common stock that are owned by Avangrid, Merger Sub, PNMR or any wholly-owned subsidiary of Avangrid or PNMR, which will be automatically cancelled at the Effective Time and (ii) shares of PNMR common stock outstanding immediately prior to the Effective Time and held by a holder who has not voted in favor of, or consented in writing to, the Merger who is entitled to, and who has demanded, payment for fair value of such shares) at the Effective Time will be converted into the right to receive $50.30 in cash.

A - 1

Table of Contents

The Merger Agreement provided that it may be terminated if the Effective Time shall not have occurred by the End Date; however, either PNMR or Avangrid could extend the End Date to April 20, 2022 if all conditions to closing have been satisfied other than the obtaining of all required regulatory approvals. On December 8, 2021, the NMPRC issued an order rejecting the stipulation agreement relating to the Merger and the approval of the Merger from the NMPRC has not yet been obtained.

In light of the NMPRC December 8, 2021 ruling, on January 3, 2022, PNMR, Avangrid and Merger Sub entered into an Amendment to the Merger Agreement pursuant to which PNMR and Avangrid each agreed to extend the End Date to April 20, 2023. The parties acknowledge in the Amendment that the required regulatory approval from the NMPRC has not been obtained and that the parties have reasonably determined that such outstanding approval will not be obtained by April 20, 2022. As amended, the Merger Agreement may be terminated by each of PNMR and Avangrid under certain circumstances, including if the Merger is not consummated by April 20, 2023.

With respect to the NMPRC proceedings, on April 20, 2021, the Joint Applicants, the NMAG, WRA, the International Brotherhood of Electrical Workers Local 611, Dine, Nava Education Project, the San Juan Citizens Alliance and To Nizhoni Ani, had entered into a stipulation and agreement in the Joint Application for approval of Merger pending before the NMPRC. Subsequently, CCAE, Onward Energy Holdings LLC, Walmart Inc., Interwest Energy Alliance, M-S-R Power and the Incorporated County of Los Alamos joined an amended stipulation. An evidentiary hearing was held from August 11 - 19, 2021. On November 1, 2021, a Certification of Stipulation was issued by the hearing examiner, which recommended against approval of the amended stipulation. On December 8, 2021, the NMPRC issued an order adopting the Certification of Stipulation, rejecting the amended stipulation reached by the parties. On January 3, 2022, PNMR and Avangrid filed a notice of appeal with the NM Supreme Court. On February 2, 2022, PNMR and Avangrid filed a statement of issues outlining the argument for appeal.

With respect to other regulatory proceedings related to the Merger, in January 20, 2021, the FTC notified PNMR and Avangrid that early termination of the waiting period under the HSR Act in connection with the Merger was granted. In February 2021, CFIUS completed its review of the Merger and concluded that there are no unresolved national security concerns with respect to the Merger. In March 2021, PNMR and Avangrid received FCC approval of the transfer of operating licenses related to the Merger. In April 2021, FERC issued an order authorizing the Merger. In May 2021, the PUCT issued an order authorizing the Merger and the NRC approved the Merger. As a result of the delay in closing of the Merger due to the need to obtain NMPRC approval, PNMR and Avangrid are required to make a new filing under the HSR Act and request extensions of the previous granted approvals from the FCC and NRC. On February 9, 2022, the request for extension was filed with the NRC. On February 24, 2022, the requests for a 180-day extension were granted by the FCC. No additional filings will be required with CFIUS, FERC or the PUCT.

Consummation of the Merger remains subject to the satisfaction or waiver of certain customary closing conditions, including, without limitation, the absence of any material adverse effect on PNMR, the receipt of required regulatory approvals, and the agreements relating to the divestiture of Four Corners being in full force and effect and all applicable regulatory filings associated therewith being made. The agreement relating to the divestiture of Four Corners has been entered into and is in full force and effect and related filings have been made with the NMPRC.

WEBSITES
The PNMR website, www.pnmresources.com, is an important source of Company information. New or updated information for public access is routinely posted.  PNMR encourages analysts, investors, and other interested parties to register on the website to automatically receive Company information by e-mail. This information includes news releases, notices of webcasts, and filings with the SEC. Participants will not receive information that was not requested and can unsubscribe at any time.
Our corporate websites are:

PNMR: www.pnmresources.com
PNM: www.pnm.com
TNMP: www.tnmp.com

PNMR’s corporate website (www.pnmresources.com) includes a dedicated section providing key environmental and other sustainability information related to PNM’s and TNMP’s operations and other information that collectively demonstrates the Company’s commitment to ESG principles. This information highlights plans for PNM to be coal-free by 2024 (subject to regulatory approval) and to have an emissions-free generating portfolio by 2040.

The contents of these websites are not a part of this Form 10-K. The SEC filings of PNMR, PNM, and TNMP, including annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act, are accessible free of charge on the PNMR website as soon as reasonably practicable after they are filed with, or furnished to, the SEC. Reports filed with the SEC are available on its website, www.sec.gov. These reports are also available in print upon request from PNMR free of charge.

A - 2

Table of Contents

Also available on the Company’s website at https://www.pnmresources.com/esg-commitment/governance.aspx and in print upon request from any shareholder are PNMR’s:

Corporate Governance Principles
Code of Ethics (Do the Right Thing Principles of Business Conduct)
Charters of the Audit and Ethics Committee, Nominating and Governance Committee, Compensation and Human Resources Committee, and Finance Committee
Restated Articles of Incorporation and Bylaws

The Company will post amendments to or waivers from its code of ethics (to the extent applicable to the Company’s executive officers and directors) on its website.

OPERATIONS AND REGULATION

Regulated Operations

Electric power demand is generally seasonal. Power consumption in both New Mexico and Texas peaks during the hot summer months with revenues traditionally peaking during that period. The seasonality of demand for electricity in turn impacts the timing of plant maintenance and operating expense throughout the year. As a result, the quarterly operating results of PNMR and its operating subsidiaries vary throughout the year. In addition, unusually mild or extreme weather patterns may cause the overall operating results of the Company to fluctuate.

PNM
Operational Information

PNM is an electric utility that provides electric generation, transmission, and distribution service to its rate-regulated customers. PNM was incorporated in the State of New Mexico in 1917. PNM’s retail electric service territory covers a large area of north-central New Mexico, including the cities of Albuquerque, Rio Rancho, and Santa Fe, and certain areas of southern New Mexico. Service to retail electric customers is subject to the jurisdiction of the NMPRC. The largest retail electric customer served by PNM accounted for 3.1% of its revenues for the year ended December 31, 2021. Other services provided by PNM include wholesale transmission services to third parties. Regulation encompasses the utility’s electric rates, service, accounting, issuances of securities, construction of major new generation, abandonment of existing generation, types of generation resources, transmission and distribution facilities, and other matters. See Notes 16 and 17 for additional information on rate cases and other regulatory matters.

Weather-normalized retail electric KWh sales increased by 0.3% in 2021 and decreased by 0.8% in 2020. The system peak demands for retail and firm-requirements customers were as follows:

System Peak Demands
202120202019
(Megawatts)
Summer1,968 1,974 1,937 
Winter1,518 1,460 1,440 
PNM holds long-term, non-exclusive franchise agreements for its electric retail operations, with varying expiration dates. These franchise agreements allow the utility to access public rights-of-way for placement of its electric facilities. Franchise agreements have expired in some areas PNM serves. Because PNM remains obligated under New Mexico state law to provide service to customers in these areas, the expirations should not have a material adverse impact. The Albuquerque, Rio Rancho, and Santa Fe metropolitan areas accounted for 41.2%, 7.2%, and 5.7% of PNM’s 2021 revenues and no other franchise area represents more than 5%. PNM also earns revenues from its electric retail operations in its service areas that do not require franchise agreements.

PNM owns 3,426 miles of electric transmission lines that interconnect with other utilities in New Mexico, Arizona, Colorado, Texas, and Utah. New Mexico ranks third in the Nation for energy potential from solar power according to the Nebraska Department of Energy & Energy Sun Index and ranks third in the Nation for land-based wind capacity according to the U.S. Office of Energy Efficiency and Renewable Energy. PNM owns transmission capacity in an area of eastern New Mexico with large wind generation potential and in recent years there has been substantial interest by developers of wind generation to interconnect to PNM’s transmission system in this area. PNM invested approximately $285 million for the expansion of PNM’s transmission system reflecting the purchase of the Western Spirit Line to provide additional service to transmit power from these generation resources to customers in New Mexico and California.

PNM began participating in the EIM on April 1, 2021 which generated $12.5 million of cost savings to customers for the year. The NMPRC granted PNM authority to seek recovery of costs associated with joining the EIM in a future general rate
A - 3

Table of Contents

case and to pass the benefits of participating in EIM to customers through the FPPAC. See Note 17. PNM also engages in activities to optimize its existing jurisdictional assets and long-term power agreements through spot market, hour-ahead, day-ahead, week-ahead, and other sales of excess generation not required to fulfill retail load and contractual commitments. These activities are credited to customers through PNM’s FPPAC.

Regulatory Activities

NMPRC Regulated Retail Rate Proceedings

The rates PNM charges retail customers are subject to traditional rate regulation by the NMPRC. In December 2016, PNM filed the NM 2016 Rate Case with the NMPRC. After extensive settlement negotiations and public proceedings, the NMPRC issued a Revised Order Partially Adopting Certification of Stipulation dated January 17, 2018. The key terms of that order include an increase in base non-fuel revenues of $10.3 million, which includes a reduction to reflect the impact of the decrease in the federal corporate income tax rate and updates to PNM’s cost of debt (aggregating an estimated $47.6 million annually), a ROE of 9.575%, a requirement to return to customers over a three-year period the benefit of the reduction in the New Mexico corporate income tax rate, a disallowance of PNM’s ability to collect an equity return on certain investments aggregating $148.1 million at Four Corners, and a requirement to consider the prudency of PNM’s decision to continue its participation in Four Corners in PNM’s next general rate case filing. In accordance with the NMPRC’s final order, PNM implemented 50% of the approved rate increase for service rendered beginning February 1, 2018 and the rest of the increase for service rendered on January 1, 2019.

PNM has a NMPRC-approved rate rider to collect costs for renewable energy procurements that are not otherwise being collected in rates. If PNM’s earned return on jurisdictional equity in a calendar year, adjusted for weather and other items not representative of normal operation, exceeds the NMPRC-approved rate by 0.5%, the rider provides that PNM would refund the excess to customers during the following year. PNM did not exceed the limitation in 2020 and does not expect to exceed the limitation in 2021. The NMPRC has also approved riders designed to allow PNM to bill and collect substantially all of fuel and purchased power costs and costs of approved energy efficiency initiatives.

FERC Regulated Wholesale Transmission

Rates charged to wholesale electric transmission customers, other than customers on the Western Spirit Line described below, are based on a formula rate mechanism pursuant to which rates for wholesale transmission service are calculated annually in accordance with an approved formula. The formula includes updating cost of service components, including investment in plant and operating expenses, based on information contained in PNM’s annual financial report filed with FERC, as well as including projected transmission capital projects to be placed into service in the following year. The projections included are subject to true-up in the formula rate for the following year. Certain items, including changes to return on equity and depreciation rates, require a separate filing to be made with FERC before being included in the formula rate.

In May 2019, PNM filed an application with FERC requesting approval to purchase and provide transmission service on the Western Spirit Line. All necessary approvals were obtained. In December 2021, PNM completed the purchase of the Western Spirit Line and service under related transmission agreements was initiated using an incremental rate that is separate from the formula rate mechanism described above. See Note 17.

The Energy Transition Act (“ETA”)

The ETA became effective on June 14, 2019. As discussed below, the ETA amends the REA and requires utilities operating in New Mexico to provide 100% zero-carbon energy by 2045. The ETA also provides for a transition from fossil-fueled generating resources to renewable and other carbon-free resources by allowing utilities to issue to qualified investors securitized bonds, or “energy transition bonds,” related to the retirement of certain coal-fired generating facilities. Proceeds from the energy transition bonds must be used to provide utility service to customers and for other costs as defined by the ETA. On January 29, 2020, the NM Supreme Court issued a ruling requiring the NMPRC apply the ETA to all aspects of PNM’s SJGS Abandonment Application. On April 1, 2020, the NMPRC unanimously approved the hearing examiners’ recommended decisions regarding the abandonment of SJGS and the related securitized financing under the ETA. On May 8, 2020, CFRE and NEE filed a joint statement of issues with the NM Supreme Court which asserts that the NMPRC improperly applied the ETA and that the ETA violates the New Mexico Constitution. On January 10, 2021, the NM Supreme Court issued its decision rejecting CFRE’s and NEE’s constitutional challenges to the ETA and affirmed the NMPRC final order.

On January 8, 2021, PNM filed the Four Corners Abandonment Application, which seeks NMPRC approval to exit PNM’s 13% share of Four Corners as of December 31, 2024, and issuance of approximately $300 million of energy transition bonds as provided by the ETA. As ordered by the hearing examiner in the case, PNM filed an amended application and testimony on March 15, 2021. The amended application provided additional information to support PNM's request, provided background on the NMPRC's consideration of the prudence of PNM's investment in Four Corners in the NM 2016 Rate Case and explained how the proposed sale and abandonment provides a net public benefit. On December 15, 2021, the NMPRC issued a final order denying approval of the Four Corners Abandonment Application and the corresponding request for issuance
A - 4

Table of Contents

of securitized financing. On December 22, 2021, PNM filed a Notice of Appeal with the NM Supreme Court of the NMPRC decision to deny the application.

PNM expects the ETA will have a significant impact on PNM’s future generation portfolio, including PNM’s planned retirements of SJGS in 2022 and the Four Corners exit in 2024. PNM cannot predict the full impact of the ETA or the outcome of its pending and potential future generating resource abandonment and replacement resource filings with the NMPRC. See additional discussion of the ETA and PNM’s SJGS and Four Corners Abandonment Applications in Notes 16 and 17.

Renewable Energy

The REA was enacted to encourage the development of renewable energy in New Mexico. The ETA amended the REA and requires utilities operating in New Mexico to have renewable portfolios equal to 20% by 2020, 40% by 2025, 50% by 2030, 80% by 2040, and 100% zero-carbon energy by 2045. The REA provides for streamlined proceedings for approval of utilities’ renewable energy procurement plans, provides utilities recovery of costs incurred consistent with approved procurement plans, and sets a RCT for the procurement of renewable resources to prevent excessive costs being added to rates. PNM files required renewable energy plans with the NMPRC annually and makes procurements consistent with the plans approved by the NMPRC. See Note 17.

TNMP

Operational Information

TNMP is a regulated utility operating and incorporated in the State of Texas. TNMP’s predecessor was organized in 1925. TNMP provides transmission and distribution services in Texas under the provisions of TECA and the Texas Public Utility Regulatory Act. TNMP is subject to traditional cost-of-service regulation with respect to rates and service under the jurisdiction of the PUCT and certain municipalities. TNMP’s transmission and distribution activities are solely within ERCOT, which is the independent system operator responsible for maintaining reliable operations for the bulk electric power supply system in most of Texas. Therefore, TNMP is not subject to traditional rate regulation by FERC. TNMP serves a market of small to medium sized communities, most of which have populations of less than 50,000. TNMP is the exclusive provider of transmission and distribution services in most areas it serves.

TNMP’s service territory consists of three non-contiguous areas. One portion of this territory extends from Lewisville, which is approximately 10 miles north of the Dallas-Fort Worth International Airport, eastward to municipalities near the Red River, and to communities north, west, and south of Fort Worth. The second portion of its service territory includes the area along the Texas Gulf Coast between Houston and Galveston, and the third portion includes areas of far west Texas between Midland and El Paso.

TNMP provides transmission and distribution services at regulated rates to various REPs that, in turn, provide retail electric service to consumers within TNMP’s service area. See Notes 16 and 17 for additional information on rate cases and other regulatory matters.

In mid-February 2021, Texas experienced a severe winter storm delivering the coldest temperatures in 100 years for many parts of the state. As a result, the ERCOT market was not able to deliver sufficient generation load to the grid resulting in significant, statewide outages as ERCOT directed transmission operators to curtail thousands of firm load megawatts. TNMP complied with ERCOT directives to curtail the delivery of electricity in its service territory and did not experience significant outages on its system outside of the ERCOT directed curtailments. For additional information on the Texas winter storm, see Note 16.

For its volumetric load consumers billed on KWh usage, TNMP experienced a decrease in weather normalized retail KWh sales of 0.8% in 2021 and an increase of 2.9% in 2020. For its weather normalized demand-based load, excluding retail transmission consumers, TNMP experienced an increase of 1.8% in 2021 and a decrease of 1.3% in 2020. As of December 31, 2021, 110 active REPs receive transmission and distribution services from TNMP. In 2021, the three largest REPs accounted for 23%, 19%, and 10% of TNMP’s operating revenues. No other consumer accounted for more than 10% of revenues.

TNMP holds long-term, non-exclusive franchise agreements for its electric transmission and distribution services. These agreements have varying expiration dates and some have expired. TNMP intends to negotiate and execute new or amended franchise agreements with municipalities where the agreements have expired or will be expiring. Since TNMP is the exclusive provider of transmission and distribution services in most areas that it serves, the need to renew or renegotiate franchise agreements should not have a material adverse impact. TNMP also earns revenues from service provided to facilities in its service area that lie outside the territorial jurisdiction of the municipalities with which TNMP has franchise agreements.

Regulatory Activities

The rates TNMP charges customers are subject to traditional rate regulation by the PUCT. On January 1, 2019, TNMP
A - 5

Table of Contents

implemented a PUCT order in TNMP’s 2018 Rate Case to increase annual base rates by $10.0 million based on a ROE of 9.65%, a cost of debt of 6.44%, and a capital structure comprised of 55% debt and 45% equity. The increase reflects the reduction in the federal corporate income tax rate to 21%. Under the approved settlement stipulation TNMP was granted authority to update depreciation rates and refund the regulatory liability related to federal tax reform to customers.

The PUCT has approved mechanisms that allow TNMP to recover capital invested in transmission and distribution projects without having to file a general rate case. The PUCT approved interim adjustments to TNMP’s transmission rates of $7.8 million in March 2020, $2.0 million in October 2020, $14.1 million in March 2021, and $6.3 million in September 2021. On January 26, 2022 TNMP filed an application to further update its transmission rates, which would increase revenues by $14.2 million annually. The application is pending before the PUCT. The PUCT approved interim adjustments to TNMP’s distribution revenue requirement of $14.7 million in August 2020 and $13.5 million in September 2021. The PUCT also approved rate riders that allow TNMP to recover amounts related to energy efficiency and third-party transmission costs.


Corporate and Other

The Corporate and Other segment includes PNMR holding company activities, primarily related to corporate level debt and the activities of PNMR Services Company. PNMR Services Company provides corporate services through shared services agreements to PNMR and all of PNMR’s business units, including PNM and TNMP. These services are charged and billed at cost on a monthly basis to the business units. The activities of PNMR Development, NM Capital, and NMRD are also included in Corporate and Other.
SOURCES OF POWER
PNM
Generation Capacity

As of December 31, 2021, the total net generation capacity of facilities owned or leased by PNM was 2,168 MW. PNM also obtains power under long-term PPAs for the power produced by Valencia, New Mexico Wind, Red Mesa Wind, Casa Mesa Wind, La Joya Wind I and II, the Lightning Dock Geothermal facility, and the NMRD-owned solar facilities.

PNM’s capacity in electric generating facilities, which are owned, leased, or under PPAs, in commercial operation as of December 31, 2021 is:
GenerationPercent of
CapacityGeneration
TypeNameLocation(MW)Capacity
CoalSJGSWaterflow, New Mexico562 18.0 %
CoalFour CornersFruitland, New Mexico200 6.4 %
    Coal-fired resources762 24.4 %
GasReeves StationAlbuquerque, New Mexico146 4.6 %
GasAfton (combined cycle)La Mesa, New Mexico235 7.5 %
GasLordsburgLordsburg, New Mexico85 2.7 %
GasLuna (combined cycle)Deming, New Mexico190 6.1 %
Gas/Oil
Rio Bravo
Albuquerque, New Mexico149 4.8 %
GasValenciaBelen, New Mexico155 5.0 %
GasLa Luz Belen, New Mexico41 1.3 %
Gas-fired resources
1,001 32.0 %
NuclearPVNGSWintersburg, Arizona402 12.9 %
SolarPNM-owned solarTwenty-four sites in New Mexico158 5.1 %
SolarNMRD-owned solarLos Lunas, New Mexico130 4.2 %
WindNew Mexico Wind House, New Mexico200 6.4 %
WindRed Mesa WindSeboyeta, New Mexico102 3.3 %
WindCasa Mesa WindHouse, New Mexico50 1.6 %
WindLa Joya Wind ITorrance, New Mexico166 5.3 %
WindLa Joya Wind IITorrance, New Mexico140 4.5 %
GeothermalLightning Dock GeothermalLordsburg, New Mexico11 0.3 %
Renewable resources
957 30.7 %
3,122 100.0 %

The NMPRC has approved plans for PNM to procure energy and RECs from additional solar-PV renewable resources totaling 1,440 MW to serve retail customers and a data center located in PNM’s service territory, including the portfolio to
A - 6

Table of Contents

replace the planned retirement of SJGS for solar PPAs of 650 MW combined with 300 MW of battery storage agreements. The PVNGS Leased Interest Abandonment Application approved by the NMPRC includes solar PPAs of 450 MW combined with 290 MW of battery storage agreements. The majority of these renewable resources are key means for PNM to meet the RPS and related regulations that require PNM to achieve prescribed levels of energy sales from renewable sources, including those set by the recently enacted ETA, without exceeding cost requirements. If adjusted for these plans, the table above would reflect the percentage of generation capacity from fossil-fueled resources of 26.5%, from nuclear resources of 6.4%, and from renewable and battery storage resources of 67.1%. In addition, PNM also has a customer distributed solar generation program that represented 201.2 MW at December 31, 2021.

Fossil‑Fueled Plants

SJGS is operated by PNM and, until December 2017, consisted of four units. SJGS Units 2 and 3 were retired in December 2017 and the ownership interests in SJGS Unit 4 were restructured. PNM has received NMPRC approval to retire its remaining ownership in SJGS in 2022. See Note 17.

The table below presents the rated capacities and ownership interests of each participant in each unit of SJGS at December 31, 2021:
Unit 1Unit 4
Capacity (MW)340 507 
PNM (1)
50.000 %77.297 %
Tucson50.000 — 
Farmington— 8.475 
Los Alamos— 7.200 
UAMPS— 7.028 
Total100.000 %100.000 %
(1) Includes a 12.8% interest held in SJGS Unit 4 as a merchant plant.

Four Corners Units 4 and 5 are 13% owned by PNM. These units are jointly owned with APS, SRP, Tucson, and NTEC, and are operated by APS. The Four Corners plant site is located on land within the Navajo Nation and is subject to an easement from the federal government. APS, on behalf of the Four Corners participants, negotiated amendments to extend the owners’ right to operate the plant on the site to July 2041. In June 2021, APS and the owners of Four Corners entered into agreements to operate Four Corners seasonally beginning in Fall 2023, subject to the necessary approvals. Under seasonal operations, a single unit will remain online year-round, subject to market conditions as well as planned maintenance outages and unplanned outages. In addition, the other unit will be operational throughout the summer season when customer demand is the highest. PNM filed the Four Corners Abandonment Application, which seeks NMPRC approval to exit PNM’s 13% share of Four Corners as of December 31, 2024. See Note 17.

PNM owns 100% of Reeves, Afton, Rio Bravo, Lordsburg, and La Luz and one-third of Luna. The remaining interests in Luna are owned equally by Tucson and Samchully Power & Utilities 1, LLC. PNM is also entitled to the entire output of Valencia under a PPA. Reeves, Lordsburg, Rio Bravo, La Luz, and Valencia are used primarily for peaking power and transmission support. As discussed in Note 10, Valencia is a variable interest entity and is consolidated by PNM.

Nuclear Plant

PNM is participating in the three units of PVNGS with APS (the operating agent), SRP, EPE, SCE, SCPPA, and the Department of Water and Power of the City of Los Angeles. PNM is entitled to 10.2%, including portions that are leased to PNM, of the power and energy generated by PVNGS. Currently, PNM has ownership interests of 2.3% in Unit 1, 9.4% in Unit 2, and 10.2% in Unit 3 and has leasehold interests of 7.9% in Unit 1 and 0.8% in Unit 2. The lease payments for the leased portions of PVNGS are recovered through retail rates approved by the NMPRC.

On April 5, 2021, PNM and SRP entered into an Asset Purchase and Sale Agreement, pursuant to which PNM agreed to sell to SRP certain PNM-owned assets and nuclear fuel necessary to the ongoing operation and maintenance of leased capacity in PVNGS Unit 1 and Unit 2, which SRP has agreed to acquire from the lessors upon termination of the existing leases. The proposed transaction between PNM and SRP received all necessary approvals, including NRC approval for the transfer of the associated possessory licenses to SRP at the end of the term of each of the respective leases. See Notes 16 and 17 for information on other PVNGS matters including the PVNGS Leased Interest Abandonment Application and Note 8 for additional information concerning the PVNGS leases.

Renewables

At December 31, 2021, PNM owns 158 MW of solar facilities in commercial operation. In addition, PNM purchases renewable power under long-term PPAs to serve New Mexico retail customers, including a data center located in PNM’s service territory. At December 31, 2021, renewable energy procured under these agreements from wind, solar-PV, and
A - 7

Table of Contents

geothermal facilities aggregated to 658 MW, 130 MW, and 11 MW. These agreements currently have expiration dates beginning in January 2035 and extending through June 2045. The NMPRC has approved PNM’s request to enter into additional PPAs for renewable energy for an additional 1,440 MW of energy from solar-PV facilities combined with 640 MW of battery storage agreements with an anticipated 100 MW expected to come online in 2022. The entire portfolio of replacement resources approved by the NMPRC in PNM’s SJGS Abandonment Application includes replacement of SJGS capacity with the procurement of 650 MW of solar PPAs combined with 300 MW of battery storage agreements. The PVNGS Leased Interest Abandonment Application approved by the NMPRC for replacement of 114 MW of PVNGS capacity and to ensure system reliability and load needs are met includes procurement of 450 MW of solar PPAs combined with 290 MW of battery storage agreements. In addition, the NMPRC issued an order that will allow PNM to service a data center for an additional 190 MW of solar PPA combined with 50 MW of battery storage and a 50 MW solar PPA expected to be operational in 2023. See Note 17.

A summary of purchased power, excluding Valencia, is as follows:
 Year Ended December 31,
 20212020
Purchased under long-term PPAs
MWh3,107,696 2,207,238 
Cost per MWh$33.95 $34.00 
Other purchased power
Total MWh (1)
2,510,263 318,061 
Cost per MWh$45.97 $51.18 
(1) Increase in 2021 primarily resulted from PNM’s participation in the EIM. See Note 4 and Note 17.

Plant Operating Statistics

Equivalent availability of PNM’s major base-load generating stations was:
PlantOperator20212020
SJGSPNM74.2%73.3%
Four CornersAPS66.1%63.9%
PVNGSAPS91.7%89.5%
Joint Projects

SJGS, PVNGS, Four Corners, and Luna are joint projects each owned or leased by several different entities. Some participants in the joint projects are investor-owned entities, while others are privately, municipally, or co-operatively owned. Furthermore, participants in SJGS have varying percentage interests in different generating units within the project. On January 31, 2016 an agreement to restructure the ownership in SJGS became effective. The restructuring agreement provided for certain participants in SJGS to exit ownership at December 31, 2017, by which time SJGS Units 2 and 3 were required to be permanently shut down. On April 1, 2020, the NMPRC approved the abandonment of PNM’s remaining interest in SJGS on June 30, 2022. On February 17 2022, PNM filed a request with the NMPRC to extend operation of SJGS Unit 4 until September 30, 2022. The filing provided that PNM had obtained agreement from the SJGS owners to extend operation of Unit 4, but was unable to secure the extended operation of Unit 1. See Note 17 for additional information about PNM’s SJGS Abandonment Application.

The primary operating or participation agreements for the other joint projects expire July 2041 for Four Corners, December 2046 for Luna, and November 2047 for PVNGS. As described above, Four Corners is located on land within the Navajo Nation and is subject to an easement from the federal government. On January 8, 2021, PNM filed the Four Corners Abandonment Application, which seeks NMPRC approval to exit PNM’s 13% share of Four Corners as of December 31, 2024. See Note 17 for additional information about PNM’s Four Corners Abandonment Application. Portions of PNM’s interests in PVNGS Units 1 and 2 are held under leases. See Nuclear Plant above and Note 8 regarding PNM’s actions related to these leases.

It is possible that other participants in the joint projects have circumstances and objectives that have changed from those existing at the time of becoming participants. The status of these joint projects is further complicated by the uncertainty surrounding the form of potential legislation and/or regulation of GHG, other air emissions, and CCRs, as well as the impacts of the costs of compliance and operational viability of all or certain units within the joint projects. It is unclear how these factors will enter into discussions and negotiations concerning the status of the joint projects as the expiration of basic operational agreements approaches. PNM can provide no assurance that its participation in the joint projects will continue in the manner that currently exists.

TNMP

TNMP provides only transmission and distribution services and does not sell power.
A - 8

Table of Contents

FUEL
PNM
The percentages (on the basis of KWh) of PNM’s generation of electricity, including Valencia, fueled by coal, nuclear fuel, and gas and oil, and the average costs to PNM of those fuels per MMBTU were as follows:
 CoalNuclearGas and Oil
 Percent of
Generation
Average
Cost
Percent of
Generation
Average
Cost
Percent of
Generation
Average
Cost
202144.3 %$3.02 34.8 %$0.68 16.8 %$6.02 
202043.6 %$3.04 34.7 %$0.70 17.6 %$1.63 

In both 2021 and 2020, 4.1% of PNM’s generation was from utility-owned solar, which has no fuel cost. The generation mix for 2022, including power procured under long-term PPAs, is expected to be 25.7% coal, 33.2% nuclear, 18.3% gas and oil, and 22.8% from renewable resources, including solar, wind, and geothermal. Due to locally available natural gas and oil supplies, the utilization of locally available coal deposits, and the generally adequate supply of nuclear fuel, PNM believes that adequate sources of fuel are available for its generating stations into the foreseeable future. See Sources of Power – PNM – PPAs for information concerning the cost of purchased power. PNM recovers substantially all of its fuel and purchased power costs through the FPPAC.

Coal

SJGS and Four Corners are coal-fired generating plants that obtain their coal requirements from mines near the plants. The coal supply contract for SJGS, was set to expire on June 30, 2022, but was extended, subject to FERC acceptance of the SJGS participation agreement, through September 30, 2022 with an amendment to the coal supply agreement executed on February 17, 2022. Coal supply has not been arranged for periods after the existing contract expires. Substantially all of PNM’s coal costs are passed on to PNM’s customers under the FPPAC. PNM believes there is adequate availability of coal resources to continue to operate SJGS through September 30, 2022.

In December 2013, a coal supply arrangement for Four Corners that runs through July 6, 2031 was executed. Since that time, certain amendments have been made to the contract including amendments to reduce annual take-or-pay minimums and to change the annual contract period to end in May rather than in July of each year. The contract provides for pricing adjustments over its term based on economic indices. In connection with the proposed exit of Four Corners, PNM would make payments totaling $75.0 million to NTEC for relief from its obligations under the coal supply agreement for Four Corners after December 31, 2024.

See Note 16 for additional information about PNM’s coal supply arrangements. See Note 17 for additional information about PNM’s SJGS Abandonment Application, PNM’s Four Corners Abandonment Application, and the 2020 IRP, which all focus on a carbon-free electricity portfolio by 2040 that would eliminate coal at the end of 2024.
Natural Gas
The natural gas used as fuel for the electric generating plants is procured on the open market and delivered by third-party transportation providers. The supply of natural gas can be subject to disruptions due to extreme weather events and/or pipeline or facility outages. PNM has contracted for firm gas transmission capacity to minimize the potential for disruptions due to extreme weather events. Certain of PNM’s natural gas plants are generally used as peaking resources that are highly relied upon during seasonally high load periods and/or during periods of extreme weather, which also may be the times natural gas has the highest demand from other users. Substantially all of PNM’s natural gas costs are recovered through the FPPAC.
Nuclear Fuel and Waste

PNM is one of several participants in PVNGS. The PVNGS participants are continually identifying their future nuclear fuel resource needs and negotiating arrangements to fill those needs. The PVNGS participants have contracted for 100% of PVNGS’s requirements for uranium concentrates through 2025 and 55% through 2028. Additional needed supplies are covered through existing inventories or spot market transactions. For conversion services, 100% are contracted through 2025 and 70% through 2030. Additional needed conversion services are covered through existing inventories or spot market transactions. For enrichment services 90% is contracted through 2022 and 80% through 2026. For fuel assembly fabrication 100% is contracted through 2027.
The Nuclear Waste Policy Act of 1982 required the DOE to begin to accept, transport, and dispose of spent nuclear fuel and high-level waste generated by the nation’s nuclear power plants by 1998. The DOE’s obligations are reflected in a contract with each nuclear power plant. The DOE failed to begin accepting spent nuclear fuel by 1998. APS (on behalf of itself and the other PVNGS participants) pursued legal actions for which settlements were reached. See Note 16 for information concerning these actions.
A - 9

Table of Contents

The DOE had planned to meet its disposal obligations by designing, licensing, constructing, and operating a permanent geologic repository at Yucca Mountain, Nevada. In March 2010, the DOE filed a motion to dismiss with prejudice its Yucca Mountain construction authorization application that was pending before the NRC. Several legal proceedings followed challenging DOE’s withdrawal of its Yucca Mountain construction authorization application. None of these lawsuits have been conclusively decided. However, the DC Circuit ordered the NRC to resume its review of the application. The results of the NRC’s review publications do not signal whether or when the NRC might authorize construction of the repository.

All spent nuclear fuel from PVNGS is being stored on-site. PVNGS has sufficient capacity at its on-site ISFSI to store all of the nuclear fuel that will be irradiated during the initial operating license periods, which end in December 2027. Additionally, PVNGS has sufficient capacity at its on-site ISFSI to store a portion of the fuel that will be irradiated during the extended license periods, which end in November 2047. If uncertainties regarding the United States government’s obligation to accept and store spent fuel are not favorably resolved, the PVNGS participants will evaluate alternative storage solutions. These may obviate the need to expand the ISFSI to accommodate all of the fuel that will be irradiated during the extended license periods.

ENVIRONMENTAL MATTERS

Electric utilities are subject to stringent laws and regulations for protection of the environment by local, state, federal, and tribal authorities. In addition, PVNGS is subject to the jurisdiction of the NRC, which has the authority to issue permits and licenses and to regulate nuclear facilities in order to protect the health and safety of the public from radioactive hazards and to conduct environmental reviews. The liabilities under these laws and regulations can be material. In some instances, liabilities may be imposed without regard to fault, or may be imposed for past acts, whether or not such acts were lawful at the time they occurred. See MD&A – Other Issues Facing the Company – Climate Change Issues for information on GHG. In addition, Note 16 contains information related to the following matters, incorporated in this item by reference:

PVNGS Decommissioning Funding
Nuclear Spent Fuel and Waste Disposal
The Energy Transition Act
Environmental Matters under the caption “The Clean Air Act”
Cooling Water Intake Structures
Effluent Limitation Guidelines
Santa Fe Generating Station
Environmental Matters under the caption “Coal Combustion Residuals Waste Disposal”

COMPETITION

Regulated utilities are generally not subject to competition from other utilities in areas that are under the jurisdiction of state regulatory commissions. In New Mexico, PNM does not have direct competition for services provided to its retail electric customers. In Texas, TNMP is not currently in any direct retail competition with any other regulated electric utility. However, PNM and TNMP are subject to customer conservation and energy efficiency activities, as well as initiatives to utilize alternative energy sources, including self-generation, or otherwise bypass the PNM and TNMP systems.

PNM is subject to varying degrees of competition in certain territories adjacent to or within the areas it serves. This competition comes from other utilities in its region as well as rural electric cooperatives and municipal utilities.  PNM is involved in the generation and sale of electricity into the wholesale market to serve its New Mexico retail customers.  PNM is subject to competition from regional utilities and merchant power suppliers with similar opportunities to generate and sell energy at market-based prices and larger trading entities that do not own or operate generating assets.

HUMAN CAPITAL RESOURCES

PNM Resources depends on over 1,600 dedicated employees to deliver outstanding customer service and transform into an emissions-free generation future.

Culture

Our diverse and inclusive workforce make the Company successful through our core values of safety, caring, and integrity. Our culture fosters behavior and mindset to sustain shared purpose, transparency and collaboration creating both individual and organizational accountability for achieving key results. Aligned with the core value of safety, we embarked on an in-depth safety survey and actionable plan focused on further integrating safety into our culture. In addition, we incorporate mental and physical well-being into our culture through a robust employee wellness program.

Talent Management and Total Rewards

We seek to attract and retain a highly skilled workforce by offering competitive compensation and benefits as well as opportunities for career advancement. Total compensation packages are reviewed regularly to ensure competitiveness within
A - 10

Table of Contents

the industry and consistency with performance levels. We are committed to a leadership development program, which ensures our leaders’ success and provides diverse learning plans for all employees.

Diversity and Inclusion

Our core values also drive a culture committed to diversity and inclusion. Our diverse workforce enables the Company to provide exceptional value to our customers and stakeholders. Our 1,646 employees include 39% represented by a bargaining unit, 26% women, 52% minorities, 14% identified as disabled, and 8% veterans. To enhance diversity, we take a multi-tiered approach, including unconscious bias training in our leadership development program, incorporating diversity into our hiring process and undertaking targeted recruitment with organizations supporting diverse candidates. Compensation equity is reviewed three times per year and we perform a robust annual succession planning process, including an evaluation of our programs for diversity and inclusion.

Governance

The Board agrees that human capital management is an important component of PNM Resources’ continued growth and success, and is essential for its ability to attract, retain and develop talented and skilled employees. Management regularly reports to the Compensation Committee of the Board on human capital management topics, including corporate culture, diversity and inclusion, employee development and compensation and benefits. The Compensation Committee has oversight of talent retention and development and succession planning, and the Board provides input on important decisions in each of these areas.
Employees
The following table sets forth the number of employees of PNMR, PNM, and TNMP as of December 31, 2021:
PNMRPNMTNMP
Corporate (1)
401 — — 
PNM877 877 — 
TNMP368 — 368 
   Total1,646 877 368 
(1) Represents employees of PNMR Services Company.

As of December 31, 2021, PNM had 444 employees in its power plant and operations areas that are currently covered by a collective bargaining agreement with the IBEW Local 611 that is in effect through April 30, 2023. As of December 31, 2021, TNMP had 193 employees represented by IBEW Local 66 covered by a collective bargaining agreement that is in effect through August 31, 2024. The wages and benefits for PNM and TNMP employees who are members of the IBEW are typically included in the rates charged to electric customers and consumers, subject to approval of the NMPRC and PUCT.

DISCLOSURE REGARDING FORWARD LOOKING STATEMENTS

Statements made in this filing that relate to future events or PNMR’s, PNM’s, or TNMP’s expectations, projections, estimates, intentions, goals, targets, and strategies are made pursuant to the Private Securities Litigation Reform Act of 1995. Readers are cautioned that all forward-looking statements are based upon current expectations and estimates and apply only as of the date of this report. PNMR, PNM, and TNMP assume no obligation to update this information.
Because actual results may differ materially from those expressed or implied by these forward-looking statements, PNMR, PNM, and TNMP caution readers not to place undue reliance on these statements. PNMR’s, PNM’s, and TNMP’s business, financial condition, cash flows, and operating results are influenced by many factors, which are often beyond their control, that can cause actual results to differ from those expressed or implied by the forward-looking statements. These factors, which are neither presented in order of importance nor weighted, include:

The expected timing and likelihood of completion of the pending Merger, including the timing, receipt and terms and conditions of any required governmental and regulatory approvals of the pending Merger that could reduce anticipated benefits or cause the parties to abandon the transaction
The occurrence of any event, change or other circumstances that could give rise to the termination of the Merger Agreement
The risk that the parties may not be able to satisfy the conditions to the proposed Merger in a timely manner or at all
The risk that the proposed Merger could have an adverse effect on the ability of PNMR to retain and hire key personnel and maintain relationships with its customers and suppliers, and on its operating results and businesses generally
The ability of PNM and TNMP to recover costs and earn allowed returns in regulated jurisdictions, including the prudence of PNM’s undepreciated investments in Four Corners and recovery of PNM’s investments and other costs associated with that plant, and the impact on service levels for PNM customers if the ultimate outcomes do not provide
A - 11

Table of Contents

for the recovery of costs and operating and capital expenditures, as well as other impacts of federal or state regulatory and judicial actions
The ability of the Company to successfully forecast and manage its operating and capital expenditures, including aligning expenditures with the revenue levels resulting from the ultimate outcomes of regulatory proceedings, or resulting from potential mid-term or long-term impacts related to COVID-19
Uncertainty relating to PNM’s decision to return the currently leased generating capacity in PVNGS Units 1 and 2 at the expiration of their lease terms in 2023 and 2024, including future regulatory outcomes relating to the ratemaking treatment
Uncertainty surrounding the status of PNM’s participation in jointly-owned generation projects, including the changes in PNM’s generation entitlement share for PVNGS following termination of the leases in 2023 and 2024, the proposed exit from Four Corners and the exit and abandonment of SJGS
Uncertainty regarding the requirements and related costs of decommissioning power plants and reclamation of coal mines supplying certain power plants, as well as the ability to recover those costs from customers, including the potential impacts of current and future regulatory proceedings
The impacts on the electricity usage of customers and consumers due to performance of state, regional, and national economies, energy efficiency measures, weather, seasonality, alternative sources of power, advances in technology, the impacts of COVID-19 on customer usage, other changes in supply and demand
Uncertainty related to the potential for regulatory orders, legislation or rulemakings that provide for municipalization of utility assets or public ownership of utility assets, including generation resources, or which would delay or otherwise impact the procurement of necessary resources in a timely manner
The Company’s ability to access the financial markets in order to provide financing to repay or refinance debt as it comes due, as well as for ongoing operations and construction expenditures, including disruptions in the capital or credit markets, actions by ratings agencies, and fluctuations in interest rates, including any negative impacts that could result from the ultimate outcomes of regulatory proceedings, from the economic impacts of COVID-19 or from the entry into the Merger Agreement
The risks associated with completion of generation, transmission, distribution, and other projects, including uncertainty related to regulatory approvals and cost recovery, and the ability of counterparties to meet their obligations under certain arrangements (including approved PPAs related to replacement resources for facilities to be retired or for which the leases will terminate), and supply chain or other outside support services that may be disrupted by the impacts of COVID-19
The potential unavailability of cash from PNMR’s subsidiaries due to regulatory, statutory, or contractual restrictions or subsidiary earnings or cash flows
The performance of generating units, transmission systems, and distribution systems, which could be negatively affected by operational issues, fuel quality and supply chain issues (disruptions), unplanned outages, extreme weather conditions, wildfires, terrorism, cybersecurity breaches, and other catastrophic events, including the impacts of COVID-19, as well as the costs the Company may incur to repair its facilities and/or the liabilities the Company may incur to third parties in connection with such issues
State and federal regulation or legislation relating to environmental matters and renewable energy requirements, the resultant costs of compliance, and other impacts on the operations and economic viability of PNM’s generating plants
State and federal regulatory, legislative, executive, and judicial decisions and actions on ratemaking, and taxes, including guidance related to the Tax Act, and other matters
Risks related to climate change, including potential financial risks resulting from climate change litigation and legislative and regulatory efforts to limit GHG, including the impacts of the ETA
Employee workforce factors, including cost control efforts and issues arising out of collective bargaining agreements and labor negotiations with union employees
Variability of prices and volatility and liquidity in the wholesale power and natural gas markets
Changes in price and availability of fuel and water supplies, including the ability of the mines supplying coal to PNM’s coal-fired generating units and the companies involved in supplying nuclear fuel to provide adequate quantities of fuel
Regulatory, financial, and operational risks inherent in the operation of nuclear facilities, including spent fuel disposal uncertainties
The impacts of decreases in the values of marketable securities maintained in trusts to provide for decommissioning, reclamation, pension benefits, and other postretirement benefits, including potential increased volatility resulting from international developments and the impacts of COVID-19
Uncertainty surrounding counterparty performance and credit risk, including the ability of counterparties to supply fuel and perform reclamation activities and impacts to financial support provided to facilitate the coal supply at SJGS
The effectiveness of risk management regarding commodity transactions and counterparty risk
The outcome of legal proceedings, including the extent of insurance coverage
Changes in applicable accounting principles or policies

For information about the risks associated with the use of derivative financial instruments see Part II, Item 7A. “Quantitative and Qualitative Disclosures About Market Risk.”

A - 12

Table of Contents

SECURITIES ACT DISCLAIMER

Certain securities described in this report have not been registered under the Securities Act of 1933, as amended, or any state securities laws and may not be reoffered or sold in the United States absent registration or an applicable exemption from the registration requirements of the Securities Act of 1933 and applicable state securities laws. This Form 10-K does not constitute an offer to sell or the solicitation of an offer to buy any securities. 

ITEM 1A.    RISK FACTORS
 
The business and financial results of PNMR, PNM, and TNMP are subject to a number of risks and uncertainties, many of which are beyond their control, including those set forth below and in MD&A, Note 16, and Note 17. For other factors that may cause actual results to differ materially from those indicated in any forward-looking statement contained in this report, see Disclosure Regarding Forward Looking Statements in Item 1. Business. TNMP provides transmission and distribution services to REPs that provide electric service to consumers in TNMP’s service territories. References to customers in the risk factors discussed below also encompass the customers of these REPs who are the ultimate consumers of electricity transmitted and distributed through TNMP’s facilities.
Regulatory Risks
The profitability of PNMR’s utilities depends on being able to recover their costs through regulated rates and earn a fair return on invested capital, including investments in its generating plants. Without timely cost recovery, including recovery of undepreciated investments and other costs associated with abandoning generation facilities, and the opportunity to earn a fair return on capital investments, PNMR’s liquidity and results of operations could be negatively impacted. Further, PNM and TNMP are in a period of significant capital expenditures. While increased capital investments and other costs are placing upward pressure on rates charged to customers, energy efficiency initiatives and other factors are placing downward pressure on customer usage. The combination of these matters could adversely affect the Company’s results of operations and cash flows.
The rates PNM charges its customers are regulated by the NMPRC and FERC. TNMP is regulated by the PUCT. The Company is in a period requiring significant capital investment and is projecting total construction expenditures for the years 2022-2026 to be $4.2 billion. See Note 14. PNM and TNMP anticipate a trend toward increasing costs, for which they will have to seek regulatory recovery. These costs include or are related to costs of asset construction for generation, transmission, and distribution systems necessary to provide electric service, as well as the cost to remove and retire existing assets, environmental compliance expenditures, regulatory mandates to acquire power from renewable resources, regulation related to nuclear safety, increased costs related to cybersecurity, increased interest costs to finance capital investments, and depreciation.
 
At the same time costs are increasing, there are factors placing downward pressure on the demand for power, thereby reducing customer usage. These factors include changing customer behaviors, including increased emphasis on energy efficiency measures and utilization of alternative sources of power, rate design that is not driven by economics, which could influence customer behavior, unfavorable economic conditions, reduced new sources of demand, and unpredictable weather patterns.

The combination of costs increasing relatively rapidly and the technologies and behaviors that are reducing energy consumption places upward pressure on the per unit prices that must be charged to recover costs. This upward pressure on unit prices could result in additional efforts by customers to reduce consumption through alternative measures. Without timely cost recovery and the authorization to earn a reasonable return on invested capital, the Company’s liquidity and results of operations could be negatively impacted.
On January 8, 2021, PNM filed the Four Corners Abandonment Application, which seeks NMPRC approval to exit PNM’s 13% share of Four Corners as of December 31, 2024, and issuance of approximately $300 million of energy transition bonds as provided by the ETA. On December 15, 2021, the NMPRC issued a final order denying approval of the Four Corners Abandonment Application and the corresponding request for issuance of securitized financing. On December 22, 2021, PNM filed a Notice of Appeal with the NM Supreme Court of the NMPRC decision to deny the application. PNM’s Statement of Issues was filed with the NM Supreme Court on January 21, 2022. See additional discussion of the ETA and PNM’s Four Corners Abandonment Application in Notes 16 and 17.

On January 29, 2021 PNM filed its 2020 IRP addressing the 20-year planning period, from 2020 through 2040. The plan focuses on a carbon-free electricity portfolio by 2040 that would eliminate coal at the end of 2024. This includes replacing the power from San Juan with a mix of approved carbon-free resources and the plan to exit Four Corners at the end of 2024. The plan highlights the need for additional investments in a diverse set of resources, including renewables to supply carbon-free power, energy storage to balance supply and demand, and efficiency and other demand-side resources to mitigate load growth. See additional discussion regarding PNM’s 2020 IRP filing in Note 17.

A - 13

Table of Contents

On June 11, 2020, PNM provided notices to the lessors and the NMPRC that PNM will return the leased assets under both its PVNGS Unit 1 and Unit 2 leases upon expiration of the leases in January 2023 and 2024. PNM issued an RFP for replacement power resources on June 25, 2020. On April 2, 2021, PNM filed an application with the NMPRC requesting approval for the decertification and abandonment of 114 MW of leased PVNGS capacity, sale and transfer of related assets, and approval to procure new resources (“PVNGS Leased Interest Abandonment Application”). On April 21, 2021, the NMPRC issued an order stating that issues reserved to a separate proceeding in the NM 2015 Rate Case regarding the decision to permanently disallow recovery of certain future decommissioning costs related to PVNGS Units 1 and 2 shall be addressed in this case and PNM shall file testimony addressing the issue. On July 28, 2021, the hearing examiner issued a recommended decision recommending dismissal of PNM's requests for approval to abandon and decertify the Leased Interest; dismissal of PNM's request for approval to sell and transfer the related assets; and dismissal of PNM's request to create regulatory assets for the associated remaining undepreciated investments, but does not preclude PNM seeking recovery of the costs in a general rate case in which the test year period includes the time period in which PNM incurs such costs. The hearing examiner's recommended decision further provides that PNM's request for replacement and system reliability resources and the decision to permanently disallow recovery of certain future decommissioning costs related to PVNGS Units 1 and 2 should remain within the scope of this case.

On August 25, 2021, the NMPRC issued an order granting portions of the July 28, 2021 recommended decision related to dismissal of PNM's request for approval to abandon and decertify the Leased Interest and dismissal of PNM's request for approval to sell and transfer the related assets. In addition, the order bifurcated the issue of approval for the two PPAs and three battery storage agreements into a separate docket so it may proceed expeditiously. On February 16, 2022, the NMPRC approved the two PPAs and three battery storage agreements. See additional discussion of PNM’s PVNGS Leased Interest Abandonment Application in Notes 17.

An adverse decision regarding PNM’s ability to recover certain PVNGS decommissioning costs and recovery of undepreciated investments at PVNGS and Four Corners, could negatively impact PNM’s financial position, results of operations, and cash flows. Likewise, if the NMPRC does not authorize appropriate recovery of any undepreciated generating resources at the time those resources cease to be used to provide service to New Mexico ratepayers, including required future investments, and does not authorize recovery of the costs of obtaining power to replace those resources, PNM’s financial position, results of operations, and cash flows could be negatively impacted.
The inability to operate generation resources prior to their planned retirement dates, or the NMPRC’s denial, modification or delay of PNM’s applications for replacement resources, would require PNM to obtain power from other sources in order to serve the needs of its customers. There can be no assurance the NMPRC will allow PNM to recover undepreciated investments in retired facilities through rates charged to customers, that adequate sources of replacement power would be available, that adequate transmission capabilities would be available to bring that power into PNM’s service territory, or whether the cost of obtaining those resources would be economical. Any such events would negatively impact PNM’s financial position, results of operations, and cash flows unless the NMPRC authorized the collection from customers of any un-recovered costs related to the retired facilities, as well as costs of obtaining replacement power.

It is also possible that unsatisfactory outcomes of these matters, the financial impact of climate change regulation or legislation, other environmental regulations, the result of litigation, the adequacy and timeliness of cost recovery mechanisms, and other business considerations, could jeopardize the economic viability of certain generating facilities or the ability or willingness of individual participants to continue their participation through the periods currently contemplated in the agreements governing those facilities.

PNM currently recovers the cost of fuel for its generation facilities through its FPPAC. A coal supply contract for SJGS, was set to expire on June 30, 2022, but was extended, subject to FERC acceptance of the amended SJGS participation agreement, through September 30, 2022 with an amendment to the coal supply agreement on February 17, 2022. In December 2013, a new fifteen-year coal supply contract for Four Corners beginning in July 2016 was executed. In connection with its exit from Four Corners discussed, and subject to ultimate approval of its Four Corners Abandonment Application with a successful appeal of its initial denial discussed in Note 17, PNM will be relieved of its obligations under the coal supply agreement after December 31, 2024. The contracts provide for pricing adjustments over their terms based on economic indices. Although PNM believes substantially all costs under coal supply arrangements would continue to be recovered through the FPPAC, there can be no assurance that full recovery will continue to be allowed.

PNMR has counterparty credit risk in connection with financial support that was provided to facilitate the coal supply arrangement for SJGS. Adverse developments from these factors could have a negative impact on the business, financial condition, results of operations, and cash flows of PNM and PNMR.

PNMR has an arrangement with a bank under which the bank has issued $30.3 million of letters of credit in favor of sureties in order for the sureties to post reclamation bonds that are required under the miner’s operating permit. The Company’s financial position, results of operations, and cash flows could be negatively impacted if the current mine operator were to default on its obligations to reclaim the San Juan mine and PNMR is required to perform under the letter of credit support agreement.
A - 14

Table of Contents


PNMR’s utilities are subject to numerous comprehensive federal, state, tribal, and local environmental laws and regulations, including those related to climate change, which may impose significant compliance costs and may significantly limit or affect their operations and financial results.

Compliance with federal, state, tribal, and local environmental laws and regulations, including those addressing climate change, air quality, CCRs, discharges of wastewater originating from fly ash and bottom ash handling facilities, cooling water, effluent, and other matters, may result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emission control obligations. These costs could include remediation, containment, civil liability, and monitoring expenses. The Company cannot predict how it would be affected if existing environmental laws and regulations were to be repealed, revised, or reinterpreted, or if new environmental laws or regulations were to be adopted. See Note 16 and the Climate Change Issues subsection of the Other Issues Facing the Company section of MD&A.

EPA’s Clean Power Plan, the U.S. participation in the Paris Agreement, and federal GHG reduction measures setting emission guidelines have recently been subject to repeal and removal and remain in a state of uncertainty. Therefore, PNMR is dealing with an uncertain regulatory and policy environment. Under the Biden Administration, EPA and other federal agencies will seek to expand climate change regulations and work to aggressively reduce GHG emissions. Many state agencies, environmental advocacy groups, and other organizations will continue to focus on decarbonization with enhanced attention on GHG from fossil-fueled generation facilities. See discussion above and Note 17, regarding PNM’s abandonment applications and the ETA. PNM currently depends on fossil-fueled generation for a significant portion of its electricity. As discussed under Climate Change Issues, this type of generation could be subject to future EPA or state regulations requiring GHG reductions. The anticipated expansion of federal and state regulations could result in additional operating restrictions on facilities and increased generation and compliance costs.

CCRs from the operation of SJGS are currently being used in the reclamation of a surface coal mine. These CCRs consist of fly ash, bottom ash, and gypsum. Any new regulation that would affect the reclamation process, including any future decision regarding classification of CCRs as hazardous waste, could significantly increase the costs of the disposal of CCRs and the costs of mine reclamation. In addition, PNM would incur additional costs to the extent the rule requires the closure or modification of CCR units at Four Corners or the construction of new CCR units beyond those already anticipated or requires corrective action to address releases from CCR disposal units at the site. See Note 16.

A regulatory body may identify a site requiring environmental cleanup, including cleanup related to catastrophic events such as hurricanes or wildfires, and designate PNM or TNMP as a responsible party. There is also uncertainty in quantifying exposure under environmental laws that impose joint and several liability on all potentially responsible parties. Failure to comply with environmental laws and regulations, even if such non-compliance is caused by factors beyond PNM’s or TNMP’s control, may result in the assessment of civil or criminal penalties and fines.

BART determinations have been made for both SJGS and Four Corners under the program to address regional haze in the “four corners” area. Those determinations require facilities to reduce the levels of visibility-impairing emissions, including NOx. Significant capital expenditures have been made at SJGS and at Four Corners for the installation of control technology, resulting in operating cost increases. The final guidance document for how states are to address the second implementation period (“2nd Planning Period”) of the Regional Haze rule was issued on August 20, 2019. In accordance with that guidance and EPA’s revised regional haze rule, states must submit Regional Haze SIPs by July 2021. NMED is currently preparing its next regional haze SIP and has notified PNM that it will not be required to submit a regional haze four-factor analysis for SJGS since PNM will retire its share of SJGS in 2022. The agency may ask for some documentation of PNM’s plans as the state moves closer to filing their SIP and setting the schedule for hearings on regional haze.

If PNM fails to timely obtain, maintain or comply with any required environmental regulatory approval, operations at affected facilities could be suspended or could subject PNM to additional expenses and potential penalties. Failure to comply with applicable environmental laws and regulations also could result in civil liability arising out of government enforcement actions or private claims. In addition, PNMR and its operating subsidiaries may underestimate the costs of environmental compliance, liabilities, and litigation due to the uncertainty inherent in these matters. Although there is uncertainty about the timing and form of the implementation of EPA’s regulations regarding climate change, CCRs, power plant emissions, changes to the ambient air quality standards, and other environmental issues, the promulgation and implementation of such regulations could have a material impact on operations. The Company is unable to estimate these costs due to the many uncertainties associated with, among other things, the nature and extent of future regulations and changes in existing regulations, including the changes in regulatory policy under the Biden Administration. Timely regulatory recovery of costs associated with any environmental-related regulations would be needed to maintain a strong financial and operational profile. The above factors could adversely affect the Company’s business, financial position, results of operations, and liquidity.


A - 15

Table of Contents

PNMR, PNM, and TNMP are subject to complex government regulation unrelated to the environment, which may have a negative impact on their businesses, financial position and results of operations.
To operate their businesses, PNMR, PNM, and TNMP are required to have numerous permits and approvals from a variety of regulatory agencies. Regulatory bodies with jurisdiction over the utilities include the NMPRC, NMED, PUCT, TCEQ, ERCOT, FERC, NRC, EPA, and NERC. Oversight by these agencies covers many aspects of the Company’s utility operations including, but not limited to: location, construction, and operation of facilities; the purchase of power under long-term contracts; conditions of service; the issuance of securities; and rates charged to customers. FERC has issued a number of rules pertaining to preventing undue discrimination in transmission services and electric reliability standards. The significant level of regulation imposes restrictions on the operations of the Company and causes the incurrence of substantial compliance costs. PNMR and its subsidiaries are unable to predict the impact on their business and operating results from future actions of any agency regulating the Company. Changes in existing regulations or the adoption of new ones could result in additional expenses and/or changes in business operations. Failure to comply with any applicable rules, regulations or decisions may lead to customer refunds, fines, penalties, and other payments, which could materially and adversely affect the results of operations and financial condition of PNMR and its subsidiaries. 

Operational Risks
Customer electricity usage could be reduced by increases in prices charged and other factors.  This could result in underutilization of PNM’s generating capacity, as well as underutilization of the capacities of PNM’s and TNMP’s transmission and distribution systems.  Should this occur, operating and capital costs might not be fully recovered, and financial performance could be negatively impacted.

A number of factors influence customers’ electricity usage.  These factors include but are not limited to rates charged by PNM and TNMP, rates charged by REPs utilizing TNMP’s facilities to deliver power, energy efficiency initiatives, unusual weather patterns, availability and cost of alternative sources of power, and national, regional, or local economic conditions.

These factors and others may prompt customers to institute additional energy efficiency measures or take other actions that would result in lower energy consumption. If customers bypass or underutilize PNM’s and TNMP’s facilities through self-generation, renewable, or other energy resources, technological change, or other measures, revenues would be negatively impacted.

PNM’s and TNMP’s service territories include several military bases and federally funded national laboratories, as well as large industrial customers that have significant direct and indirect impacts on the local economies where they operate.  The Company does not directly provide service to any of the military bases or national laboratories but does provide service to large industrial customers. The Company’s business could be hurt from the impacts on the local economies associated with these customer groups as well as directly from the large industrial customers for a number of reasons including federally-mandated base closures, significant curtailment of the activities at the bases or national laboratories, and closure of industrial facilities or significant curtailment of their activities.
 
Another factor that could negatively impact the Company is that proposals are periodically advanced in various localities to municipalize, or otherwise take over PNM’s facilities, which PNM believes would require state legislative or other legal action to implement, or to establish new municipal utilities in areas currently served by PNM.  If any such initiative is successful, the result could be a material reduction in the usage of the facilities, a reduction in rate base, and reduced earnings.

Should any of the above factors result in facilities being underutilized, the Company’s financial position, results of operations, and cash flows could be significantly impacted.

Advances in technology could make electric generating facilities less competitive.

Research and development activities are ongoing for new technologies that produce power or reduce power consumption. These technologies include renewable energy, customer-oriented generation, energy storage, and energy efficiency. PNM generates power at central station power plants to achieve economies of scale and produce power at a cost that is competitive with rates established through the regulatory process. There are distributed generation technologies that produce power, including fuel cells, microturbines, wind turbines, and solar cells, which have become increasingly cost competitive. These advances in technology have reduced the costs of these alternative methods of producing power to a level that is competitive with that of central station power production. In addition, advances made in the capabilities of energy storage have further decreased power production and peak usage through the dispatch of more battery systems. These technological advances have resulted in demand reduction that negatively impact revenue and/or result in underutilized assets that have been built to serve peak usage. In addition, certain federal, state, or local requirements that regulated utilities such as PNM are required to follow could result in third parties being able to provide electricity from similar generation technologies to consumers at prices lower than PNM is able to offer. As these technologies become more cost competitive or can be used by third-parties to supply power at lower prices than PNM is able to offer, PNM’s energy sales and/or regulated returns could be eroded, and the value of its generating facilities could be reduced. Advances in technology could also change the channels
A - 16

Table of Contents

through which electric customers purchase or use power, which could reduce the Company’s sales and revenues or increase expenses. These advances can also create more uncertainty in load shapes and forecasts, which could have implications for generation and system planning.

Costs of decommissioning, remediation, and restoration of nuclear and fossil-fueled power plants, as well as reclamation of related coal mines, could exceed the estimates of PNMR and PNM as well as the amounts PNM recovers from its ratepayers, which could negatively impact results of operations and liquidity.

PNM has interests in a nuclear power plant, two coal-fired power plants, and several natural gas-fired power plants and is obligated to pay its share of the costs to decommission these facilities. PNM is also obligated to pay for its share of the costs of reclamation of the mines that supply coal to the coal-fired power plants. Likewise, other owners or participants are responsible for their shares of the decommissioning and reclamation obligations and it is important to PNM that those parties fulfill their obligations. Rates charged by PNM to its customers, as approved by the NMPRC, include a provision for recovery of certain costs of decommissioning, remediation, reclamation, and restoration. The NMPRC has established a cap on the amount of costs for the final reclamation of the surface coal mines that may be recovered from customers. PNM records estimated liabilities for its share of the legal obligations for decommissioning and reclamation. These estimates include many assumptions about future events and are inherently imprecise. In the event the costs to decommission the facilities or to reclaim the mines serving the plants exceed current estimates, or if amounts are not approved for recovery by the NMPRC, results of operations could be negatively impacted.

The costs of decommissioning any nuclear power plant are substantial. PNM is responsible for all decommissioning obligations related to its entire interest in PVNGS, including portions under lease both during and after termination of the leases. PNM maintains trust funds designed to provide adequate financial resources for decommissioning PVNGS and for reclamation of the coal mines serving SJGS and Four Corners at the end of their expected lives. However, if the PVNGS units are decommissioned before their planned date or the coal mines are shut down sooner than expected, these funds may prove to be insufficient.

The financial performance of PNMR, PNM, and TNMP may be adversely affected if power plants and transmission and distribution systems do not operate reliably and efficiently.
The Company’s financial performance depends on the successful operation of PNM’s generation assets, as well as the transmission and distribution systems of PNM and TNMP. PNM’s recent abandonment applications for SJGS and Four Corners will increase PNM’s dependency on other generation resources, including renewable resources, gas-fired facilities, and PVNGS, and will reduce PNM’s flexibility in managing those resources. Unscheduled or longer than expected maintenance outages, breakdown or failure of equipment or processes due to aging infrastructure, temporary or permanent shutdowns to achieve environmental compliance, other performance problems with the generation assets, severe weather conditions, accidents and other catastrophic events, acts of war or terrorism, cybersecurity attacks, wildfires, disruptions in the supply, quality, and delivery of fuel and water supplies, and other factors could result in PNM’s load requirements being larger than available system generation capacity. Unplanned outages of generating units and extensions of scheduled outages occur from time to time and are an inherent risk of the Company’s business. If these were to occur, PNM would be required to purchase electricity in either the wholesale market or spot market at the then-current market price. There can be no assurance that sufficient electricity would be available at reasonable prices, or available at all. The failure of transmission or distribution facilities may also affect PNM’s and TNMP’s ability to deliver power. These potential generation, distribution, and transmission problems, and any service interruptions related to them, could result in lost revenues and additional costs.

PNMR, PNM, and TNMP are subject to information security breaches and risks of unauthorized access to their information and operational technology systems as well as physical threats to assets.
The Company faces the risk of physical and cybersecurity attacks, both threatened and actual, against generation facilities, transmission and distribution infrastructure, information technology systems, and network infrastructure, which could negatively impact the ability of the Company to generate, transport, and deliver power, or otherwise operate facilities in the most efficient manner or at all.

The utility industry in which the Company operates is a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure, some of which are deemed to be critical infrastructure under NERC guidelines. Certain of the Company’s systems are interconnected with external networks. In the regular course of business, the utilities handle a range of sensitive security and customer information. PNM and TNMP are subject to the rules of various agencies and the laws of various states, concerning safeguarding and maintaining the confidentiality of this information. Cyber-attacks regularly occur, and generally are unsuccessful. Those few events that are successful do not generally result in significant or consequential business impacts. However, despite steps the Company may take to detect, mitigate and/or eliminate threats and respond to security incidents, the techniques used by those who wish to obtain unauthorized access, and possibly disable or sabotage systems and/or abscond with information and data, change frequently and the Company may not be able to protect against all such actions.

A - 17

Table of Contents

In the event that a capable adversary attacks the Company’s computer and operating systems, despite the best efforts of the Company, the generation, transmission, or distribution of electrical services could be degraded or disrupted, customer information, business records, or other sensitive data could be lost, destroyed, or released outside of the Company’s control. Further, the Company’s use of technologies manufactured by third parties may be subject to espionage activities, and cyber-attack of the third party resulting in losses outside of the control of the company. Although the Company has implemented security measures to identify, prevent, detect, respond to, and recover from cyber and physical security events and supply chain disruptions, critical infrastructure, including information and operational technology systems, are vulnerable to disability, failures, or unauthorized access, which could occur as a result of malicious compromise, employee error, and/or employee misconduct or supply compromise.  A successful physical or cybersecurity attack or other similar failure of the systems could impact the reliability of PNM’s generation and PNM’s and TNMP’s transmission and distribution systems, including the possible unauthorized shutdown of facilities. Such an event could lead to disruptions of business operations, including the Company’s ability to generate, transport, and deliver power to serve customers, to bill customers, and to process other financial information. A breach of the Company’s information systems could also lead to the loss and destruction of confidential and proprietary data, personally identifiable information, trade secrets, intellectual property and supplier data, and could disrupt business operations which could harm the Company’s reputation and financial results, as well as potential increased regulatory oversight, litigation, fines, and other remedial action. The costs incurred to investigate and remediate a physical or cybersecurity attack could be significant. A significant physical or cybersecurity attack on the Company’s critical infrastructure could have an adverse impact on the operations, reputation and financial condition of PNMR, PNM, and TNMP.
There are inherent risks in the ownership and operation of nuclear facilities.
PNM has a 10.2% undivided interest in PVNGS, including interests in Units 1 and 2 held under leases. PVNGS represents 12.9% of PNM’s total generating capacity as of December 31, 2021. PVNGS is subject to environmental, health, and financial risks including but not limited to the ability to obtain adequate supplies of nuclear fuel and water, the ability to dispose of spent nuclear fuel, decommissioning of the plant (see above), securing the facilities against possible terrorist attacks, and unscheduled outages due to equipment failures.
 
The NRC has broad authority under federal law to impose licensing and safety-related requirements for the operation of nuclear generation facilities. Events at nuclear facilities of other operators or which impact the industry generally may lead the NRC to impose additional requirements and regulations on all nuclear generation facilities, including PVNGS. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit and to promulgate new regulations that could require significant capital expenditures and/or increase operating costs.
In the event of noncompliance with its requirements, the NRC has the authority to impose a progressively increasing inspection regime that could ultimately result in the shutdown of a unit, civil penalties, or both, depending upon the NRC’s assessment of the severity of the situation, until compliance is achieved. Increased costs resulting from penalties, a heightened level of scrutiny, and/or implementation of plans to achieve compliance with NRC requirements could adversely affect the financial condition, results of operations, and cash flows of PNMR and PNM. Although PNM has no reason to anticipate a serious nuclear incident at PVNGS, if an incident did occur, it could materially and adversely affect PNM’s results of operations and financial condition. 
PNM has external insurance coverage to minimize its financial exposure to some risks. However, it is possible that liabilities associated with nuclear operations could exceed the amount of insurance coverage. See Note 16.

Peak demand for power could exceed forecasted supply capacity, resulting in increased costs for purchasing capacity in the market or building additional generation facilities and/or battery storage facilities.

PNM is obligated to supply power to retail customers. As PNM continues to complete the significant transition in generation resources necessary to achieve 100% carbon emission-free generation by 2040, there are certain potential deliverability and cost risks associated with this transition. These risks are in three main areas, including 1) risk of completion of replacement resources prior to planned generation unit retirements, 2) increasing levels of renewable generation presenting risks of uncertainty and variability that will be further compounded as neighboring systems transition towards increasing levels of renewable resources, and 3) risks for mitigating possible resource volatility through a shrinking energy market.

At peak times, power demand could exceed PNM’s forecasted available generation capacity, particularly if PNM’s power plants are not performing as anticipated and additional resources are not approved as PNM transitions its system to carbon emission-free generation and battery storage. Availability of this technology may create additional strain on the system by adding these additional resources without adequate storage. Additionally, further advances in the technology of renewable resources may need to occur in order to ensure that these resources meet carbon emission-free standards. Competitive market forces or adverse regulatory actions may require PNM to purchase capacity and energy from the market or build additional resources to meet customers’ energy needs in an expedited manner. If that occurs, PNM may see opposition to recovery of these additional costs and could experience a lag between when costs are incurred and when regulators permit recovery in customers’ rates. These situations could have negative impacts on results of operations and cash flows.
A - 18

Table of Contents


Throughout 2021 and continuing into 2022, PNM provided notices of delays and status updates to the NMPRC for the approved SJGS replacement resource projects. All four project developers have notified PNM that completion of the projects will be delayed and no longer available for most, if any of the 2022 summer peak load period. PNM's existing resources, including available reserves, may be insufficient for 2022 summer peak load reliability considering these delays. PNM has entered into agreements to purchase power from third parties to minimize potential impacts to customers during the 2022 summer peak load period. PNM likely faces the same concerns in the summer of 2023 as a result of delays in the NMPRC approval of replacement resources for the PVNGS leased capacity that expire in January 2023. Prolonged regulatory approval of replacement resources for PVNGS leased capacity, continued delays in replacement resources for SJGS, availability of resources and increased costs for purchasing capacity may negatively impact the results of operations and cash flows. See Note 17.

On May 26, 2021, the NMPRC opened a docket initiating a rulemaking in order to streamline IRP proceedings and allow NMPRC oversight of utility resource procurement practices. On June 7, 2021 the NMPRC issued an Order providing a proposed rule governing IRP and Procurement practices. The proposed rule establishes the NMPRC approval process for the IRP and requirements for the utility to proceed with a Request for Proposal (RFP) for any required resources, which would also be subject to NMPRC and stakeholder oversight and NMPRC approval. The process would require the utility to make available to any stakeholder its modeling and data in order to allow independent alternative analysis of resources, and also provides for the NMPRC to assign an Independent Evaluator at its discretion. PNM and other parties provided comments indicating that the NMPRC lacks authority to impose many of the proposed requirement for both IRP and utility resource procurement practices. The proposed oversight of the procurement process is likely to prevent a utility’s timely acquisition of necessary resources and may inhibit competitive procurement.

Difficulties in obtaining permits and rights-of-way could negatively impact PNM’s results of operations.

PNM’s ability to execute planned operational activities and projects may be inhibited by difficulties in obtaining permits and rights-of-way and other delays. Many of PNM’s transmission and distribution lines cross federal, state, and tribal lands. The Company can experience significant delays in obtaining approvals for new infrastructure, as well as renewals of existing rights-of-way and access for critical maintenance, including vegetation management on these lands. The environmental regulations governing siting and permitting on federal, state, and tribal lands are complex, involve multiple agencies, and include a public process. Any of these risk factors could result in higher costs, delays, or the inability to complete planned projects.

General Economic and Weather Risks
The outbreak of COVID-19 and its impact on business and economic conditions could negatively affect the Company's business, results of operations, financial condition, cash flows, and the trading value of PNMR's common stock and the Company's debt securities.

The scale and scope of the ongoing COVID-19 outbreak, the resulting global pandemic, and the impact on the economy and financial markets could adversely affect the Company’s business, results of operations, financial condition, cash flows, and access to the capital markets. The Company provides critical electric services and has implemented business continuity and emergency response plans to continue to provide these services to its customers and to support the Company’s operations. The Company is also working to ensure the health and safety of its employees is not compromised. These measures include precautions with regard to employee and facility hygiene, travel limitations, allowing certain employees to continue to work remotely whenever possible, and protocols for required work within customer premises to protect our employees, customers and the public. We are also working with our suppliers to understand and mitigate the potential impacts to our supply chain and have taken steps to ensure the integrity of our information systems.

However, there is no assurance that the continued spread of COVID-19 and efforts to contain the virus will not adversely impact our business, results of operations, financial condition, cash flows, ability to access the capital markets, and the trading value of the Company's common stock and debt securities. The continued spread of COVID-19 and related efforts to contain the virus could adversely impact the Company by:

reducing usage and/or demand for electricity by our customers in New Mexico and Texas;
reducing the availability and productivity of our employees;
increasing costs as a result of our emergency measures, including costs to ensure the safety of our employees, security of our information systems and delayed payments from our customers and uncollectable accounts;
causing delays and disruptions in the availability of and timely delivery of materials and components used in our operations;
causing delays and disruptions in the supply chain resulting in disruptions in the commercial operation dates of certain projects;
A - 19

Table of Contents

causing a deterioration in the credit quality of our counterparties, including power purchase agreement providers, contractors or retail customers, that could result in credit losses;
causing impairments of goodwill or long-lived assets and adversely impacting the Company’s ability to develop, construct and operate facilities;
impacting the Company’s ability to meet the requirements of the covenants in our existing credit facilities, including covenants regarding debt to capitalization;
causing a deterioration in our financial metrics or the business environment that impacts our credit ratings;
decreasing the value of our investment securities held in trusts for pension and other postretirement benefits, and for nuclear decommissioning and coal mine reclamation, which could lead to increased funding requirements;
impacting our liquidity position and cost of and ability to access funds from financial institutions and capital markets;
receiving unfavorable regulatory treatment in recovery of bad debt expense incurred during the Governor of New Mexico’s emergency executive order; and
causing other unpredictable events.

General economic conditions of the nation and/or specific areas can affect the Company’s customers and suppliers. Economic recession or downturn may result in decreased consumption by customers and increased bad debt expense, and could also negatively impact suppliers, all of which could negatively affect the Company.

Economic activity in the service territories of PNMR subsidiaries is a key factor in their performance. Decreased economic activity can lead to declines in energy consumption, which could adversely affect future revenues, earnings, and growth.  Higher unemployment rates, both in the Company’s service territories and nationwide, could result in commercial customers ceasing operations and lower levels of income for residential customers. These customers might then be unable to pay their bills on time, which could increase bad debt expense and negatively impact results of operations and cash flows. Economic conditions also impact the supply and/or cost of commodities and materials needed to construct or acquire utility assets or make necessary repairs.
The operating results of PNMR and its operating subsidiaries are seasonal and are affected by weather conditions, including regional drought.
Electric generation, transmission, and distribution are generally seasonal businesses that vary with the demand for power. With power consumption typically peaking during the hot summer months, revenues traditionally peak during that period. As a result, quarterly operating results of PNMR and its operating subsidiaries vary throughout the year. In addition, PNMR and its operating subsidiaries have historically had lower revenues resulting in lower earnings when weather conditions are milder. Unusually mild weather in the future could reduce the revenues, net earnings, and cash flows of the Company.
Drought conditions in New Mexico, especially in the “four corners” region, where SJGS and Four Corners are located, may affect the water supply for PNM’s generating plants.  If inadequate precipitation occurs in the watershed that supplies that region, PNM may have to decrease generation at these plants. This would require PNM to purchase power to serve customers and/or reduce the ability to sell excess power on the wholesale market and reduce revenues. Drought conditions or actions taken by the court system, regulators, or legislators could limit PNM’s supply of water, which would adversely impact PNM’s business. Although SJGS and Four Corners participate in voluntary shortage sharing agreements with tribes and other water users in the “four corners” region, PNM cannot be certain these contracts will be enforceable in the event of a major drought or that it will be able to renew these contracts in the future.
TNMP’s service areas are exposed to extreme weather, including high winds, drought, flooding, ice storms, and periodic hurricanes. Extreme weather conditions, particularly high winds and severe thunderstorms, also occur periodically in PNM’s service areas. These severe weather events can physically damage facilities owned by TNMP and PNM. Any such occurrence both disrupts the ability to deliver energy and increases costs. Extreme weather can also reduce customers’ usage and demand for energy or could result in the Company incurring obligations to third parties related to such events. These factors could negatively impact results of operations and cash flows.
As discussed in Note 16, in February 2021, Texas experienced a severe winter storm delivering the coldest temperatures in 100 years for many parts of the state. ERCOT declared its highest state of emergency, an Emergency Energy Alert Level 3 (EEA3), due to exceptionally high electric demand exceeding supply amid the arctic temperatures. Ultimately, the ERCOT market was not able to deliver sufficient generation load to the grid resulting in significant, statewide outages as ERCOT directed transmission operators to curtail thousands of firm load megawatts. In response to the severe winter weather, the Governor of Texas issued a Declaration of a State of Disaster for all counties in Texas. Additionally, to assist in the recovery from the emergency conditions, the PUCT issued an order that placed a temporary moratorium on customer disconnections due to non-payment for transmission and distribution utilities that ended in June 2021. Consequently, the duration of the severe winter storm and high energy costs posed a financial hardship to REPs in the ERCOT region. The Texas Attorney General issued civil investigation demands to ERCOT and 11 power companies in Texas related to power outages, emergency plans, energy pricing and other factors associated with the severe weather storm. While TNMP has regulatory authorization to defer bad debt expense from REPs to a regulatory asset and seek recovery in a future general rate case, it intends to fully cooperate with all regulatory directives and inquiries made by the PUCT, the Texas Attorney General, and any other regulatory agencies. Various market participants, including TNMP, have been named as defendants in lawsuits relating to the February 2021 winter
A - 20

Table of Contents

weather power outages. As a transmission and distribution utility operating during that weather event, TNMP could be named in additional suits.
The impact of wildfires could negatively affect PNM’s and TNMP’s results of operations.

PNM and TNMP have large networks of electric transmission and distribution facilities. Weather conditions in the U.S. Southwest region and Texas vary and could contribute to wildfires in or near PNM’s and TNMP’s service territories. PNM and TNMP take proactive steps to mitigate wildfire risk. However, wildfire risk is always present and PNM and TNMP could be held liable for damages incurred as a result of wildfires caused, or allegedly caused, by their transmission and distribution systems. In addition, wildfires could cause damage to PNM’s and TNMP’s assets that could result in loss of service to customers or make it difficult to supply power in sufficient quantities to meet customer needs. These events could have negative impacts on the Company’s financial position, results of operations, and cash flows.
Risks Relating to the Proposed Merger with Avangrid

There is no assurance when or if the proposed Merger will be completed.

Completion of the proposed Merger is subject to the satisfaction or waiver of a number of conditions as set forth in the Merger Agreement, including regulatory approval and other customary closing conditions. There can be no assurance that the conditions to completion of the proposed Merger will be satisfied or waived or that other events will not intervene to delay or result in the failure to close the proposed Merger. In particular, as discussed in more detail below, the NMPRC issued a negative ruling on the merger in December 2021 and in January 2022 PNMR filed a notice of appeal with the New Mexico Supreme Court. At this time PNMR and Avangrid amended the Merger Agreement to extend the End Date to April 20, 2023. It is not possible at this time to predict if or when the merger will receive the required approval from the NMPRC.

In addition, each of Avangrid and PNMR may unilaterally terminate the Merger Agreement under certain circumstances, and Avangrid and PNMR may agree at any time to terminate the Merger Agreement, even though PNMR shareholders have already approved the Merger Agreement.

Avangrid and PNMR may be unable to obtain the regulatory approvals required to complete the proposed Merger.

In addition to other conditions set forth in the Merger Agreement, completion of the proposed Merger is conditioned upon the receipt of various state and U.S. federal regulatory approvals, including, but not limited to, approval by NMPRC, PUCT, FERC, NRC and the FCC. Avangrid and PNMR have made various filings and submissions and will pursue all required consents, orders and approvals in accordance with the Merger Agreement. In March 2021, PNMR and Avangrid received FCC approval of the transfer of operating licenses related to the Merger. In April 2021, FERC issued an order authorizing the Merger. In May 2021 the PUCT issued an order authorizing the Merger and the NRC approved the Merger. On December 8, 2021 the NMPRC issued an order rejecting the amended stipulation reached by the parties, see Note 17. On January 3, 2022, PNMR and Avangrid filed a notice of appeal with the NM Supreme Court, and PNM filed its Statement of Issues with the NM Supreme Court on February 2, 2022. In light of the NMPRC December 8, 2021 ruling, on January 3, 2022, PNMR, Avangrid and Merger Sub entered into an Amendment to the Merger Agreement pursuant to which PNMR and Avangrid each agreed to extend the End Date to April 20, 2023. As a result of the delay in closing the Merger due to the need to obtain NMPRC approval, PNMR and Avangrid will be required to make a new filing under the HSR Act and requested extensions of the previously granted approvals from the FCC and NRC. No additional filings will be required with CFIUS, FERC or the PUCT. These consents, orders and approvals may impose requirements, limitations or costs or place restrictions, and if such consents, orders and approvals require an extended period of time to be obtained, such extended period of time could increase the chance that an event occurs that constitutes a material adverse effect with respect to PNMR and thereby may allow Avangrid not to complete the proposed Merger. Such extended period of time also may increase the chance that other adverse effects with respect to PNMR could occur, such as the loss of key personnel. Further, no assurance can be given that the required consents, orders and approvals will be obtained or that the required conditions to closing will be satisfied.

The announcement and pendency of the proposed Merger, during which PNMR is subject to certain operating restrictions, could have an adverse effect on PNMR’s businesses, results of operations, financial condition or cash flows and our ability to access the capital markets.

The announcement and pendency of the proposed Merger could disrupt PNMR’s businesses, and uncertainty about the effect of the Merger may have an adverse effect on PNMR. These uncertainties could disrupt the business of PNMR and cause suppliers, vendors, partners and others that deal with PNMR to defer entering into contracts with PNMR or making other decisions concerning PNMR or seek to change or cancel existing business relationships with PNMR. In addition, PNMR’s employees may experience uncertainty regarding their roles after the Merger. For example, employees may depart either before the completion of the Merger because of such uncertainty and issues relating to the difficulty of coordination or a desire not to remain following the Merger; and the pendency of the Merger may adversely affect PNMR’s ability to retain, recruit and motivate key personnel. Additionally, the Merger requires PNMR to obtain Avangrid’s consent prior to taking certain specified actions while the Merger is pending. These restrictions may prevent PNMR from pursuing otherwise attractive business
A - 21

Table of Contents

opportunities or other capital structure alternatives and making other changes to its business or executing certain of its business strategies prior to the completion of the Merger. Further, the Merger may impact our ability to access the capital markets and could give rise to potential liabilities, including as a result of future shareholder lawsuits relating to the Merger. Any of these matters could adversely affect the businesses of, or harm the results of operations, financial condition or cash flows of PNMR.

PNMR will incur substantial transaction fees and costs in connection with the proposed Merger.

PNMR has incurred and expects to incur additional material non-recurring expenses in connection with the proposed Merger and completion of the transactions contemplated by the Merger Agreement. Further, even if the proposed Merger is not completed, PNMR will need to continue to pay certain costs relating to the proposed Merger incurred prior to the date the proposed Merger was abandoned, such as legal, accounting, financial advisory, filing and printing fees.

The termination of the Merger Agreement could negatively impact PNMR.

If the Merger is not completed for any reason, the ongoing businesses of PNMR may be adversely affected and, without realizing any of the anticipated benefits of having completed the Merger, PNMR would be subject to a number of risks, including the following:

PNMR may experience negative reactions from the financial markets, including a decline of its stock price (which may reflect a market assumption that the Merger will be completed);
PNMR may experience negative reactions from its customers, regulators and employees;
PNMR may be required to pay certain costs relating to the Merger, whether or not the Merger is completed; and
Matters relating to the Merger will have required substantial commitments of time and resources by PNMR management, which would otherwise have been devoted to day-to-day operations and other opportunities that may have been beneficial to PNMR as an independent company.

If the Merger Agreement is terminated and the Board seeks another merger, business combination or other transaction, PNMR shareholders cannot be certain that PNMR will be able to find a party willing to offer equivalent or more attractive consideration than the consideration PNMR shareholders would receive in the Merger.

The Merger Agreement contains provisions that prevent a potential alternative acquirer that might be willing to pay more to acquire PNMR.

The Merger Agreement contains customary “no shop” provisions which state that we will not solicit or facilitate proposals regarding a merger or similar transaction with another party while the Merger Agreement is in effect. In January 2022, the End Date in the Merger Agreement was extended to April 20, 2023. These provisions prevent a potential third-party acquirer from considering or proposing an alternative acquisition, even if it were prepared to pay consideration with a higher value than that proposed to be paid in the Merger.
Financial Risks
PNMR may be unable to meet its ongoing and future financial obligations and to pay dividends on its common stock if its subsidiaries are unable to pay dividends or distributions to PNMR.
PNMR is a holding company and has no operations of its own. PNMR’s ability to meet its financial obligations and to pay dividends on its common stock primarily depends on the net earnings and cash flows of PNM and TNMP and their capacity to pay upstream dividends or distributions. Prior to providing funds to PNMR, PNM and TNMP have financial and regulatory obligations that must be satisfied, including among others, debt service and, in the case of PNM, preferred stock dividends.
The NMPRC has placed certain restrictions on the ability of PNM to pay dividends to PNMR, including that PNM cannot pay dividends that cause its debt rating to fall below investment grade. The NMPRC has also restricted PNM from paying dividends in any year, as determined on a rolling four-quarter basis, in excess of net earnings without prior NMPRC approval. PNM is permitted to pay dividends to PNMR from prior equity contributions made by PNMR. Additionally, PNMR’s financing agreements generally include a covenant to maintain a debt-to-capitalization ratio that does not exceed 70%, and PNM and TNMP’s financing arrangements generally include a covenant to maintain debt-to-capitalization ratios that do not exceed 65%. PNM also has various financial covenants that limit the transfer of assets, through dividends or other means and the Federal Power Act imposes certain restrictions on dividends paid by public utilities, including that dividends cannot be paid from paid-in capital.
Further, the ability of PNMR to declare dividends depends upon the extent to which cash flows will support dividends, the Company’s financial circumstances and performance, economic conditions in the U.S. and in the Company’s service areas, future growth plans and the related capital requirements, and other business considerations. Declaration of dividends may also be affected by decisions of the NMPRC, FERC, and PUCT in various regulatory cases currently pending or that may be docketed in the future, including the outcome of appeals of those decisions, conditions imposed by the NMPRC, PUCT, or Federal Power Act, and the effect of federal regulatory decisions and legislative acts.
A - 22

Table of Contents

Disruption in the credit and capital markets may impact the Company’s strategy and ability to raise capital.
As discussed in MD&A – Liquidity and Capital Resources, PNMR and its subsidiaries rely on access to both short-term and longer-term capital markets as sources of liquidity for any capital requirements not satisfied by cash flow from operations. In general, the Company relies on its short-term credit facilities as the initial source to finance construction expenditures. This results in increased borrowings under the facilities over time. The Company is currently projecting total construction expenditures for the years 2022-2026 to be $4.2 billion. If PNMR or its operating subsidiaries are not able to access capital at competitive rates, or at all, PNMR’s ability to finance capital requirements and implement its strategy will be limited. Disruptions in the credit markets, which could negatively impact the Company’s access to capital, could be caused by an economic recession, declines in the health of the banking sector generally or the failure of specific banks who are parties to the Company’s credit facilities, deterioration in the overall health of the utility industry, the bankruptcy of an unrelated energy company, war, terrorist attacks, cybersecurity attacks, or threatened attacks.
 
If the Company’s cash flow and credit and capital resources are insufficient to fund capital expenditure plans, the Company may be forced to delay important capital investments, sell assets, seek additional equity or debt capital, or restructure debt. In addition, insufficient cash flows and capital resources may result in reductions of credit ratings. This could negatively impact the Company’s ability to incur additional indebtedness on acceptable terms and would result in an increase in the interest rates applicable under the Company’s credit facilities. The Company’s cash flow and capital resources may be insufficient to pay interest and principal on debt in the future. If that should occur, the Company’s capital raising or debt restructuring measures may be unsuccessful or inadequate to meet scheduled debt service obligations. This could cause the Company to default on its obligations and further impair liquidity.
Reduction in credit ratings or changing rating agency requirements could materially and adversely affect the Company’s growth, strategy, business, financial position, results of operations, and liquidity.
PNMR, PNM, and TNMP cannot be sure that any of their current credit ratings will remain in effect for any given period of time or that a rating will not be put under review for a downgrade, lowered, or withdrawn entirely by a rating agency. As discussed in MD&A - Liquidity and Capital Resources, all of PNMR, PNM, and TNMP debt ratings are investments grade. Downgrades or changing requirements could result in increased borrowing costs due to higher interest rates on current borrowings or future financings, a smaller potential pool of investors, and decreased funding sources. Such conditions also could require the provision of additional support in the form of letters of credit and cash or other collateral to various counterparties.

Declines in values of marketable securities held in trust funds for pension and other postretirement benefits and in the NDT and coal mine reclamation trusts could result in sustained increases in costs and funding requirements for those obligations, which may affect operational results.

The pension plans’ targeted asset allocation is 50% liability matching fixed and 50% return generating income, which includes alternative income. The Company uses a strategy, known as Liability Driven Investing, which seeks to select investments that match the liabilities of the pension plans. The OPEB plans generally use the same pension fixed income and equity investment managers and utilize the same overall investment strategy as the pension plans, except there is no allocation to alternative investments and the OPEB plans have a target asset allocation of 30% equities and 70% fixed income.

The NDT investment portfolio maintains a target of 80% fixed income and 20% equity securities. The current asset allocation exposes the NDT investment portfolio to market and macroeconomic factors. Declines in market values could result in increased funding of the trusts, the recognition of losses as impairments for the NDT and coal mine reclamation trusts, and additional expense for the benefit plans. In addition, a change in GAAP required that all changes in the fair value of equity securities recorded on the Company’s balance sheet be reflected in earnings, which results in increased volatility in earnings.

Impairments of goodwill and long-lived assets of PNMR, PNM, and TNMP could adversely affect the Company’s business, financial position, liquidity, and results of operations.
The Company annually evaluates recorded goodwill for impairment. See Note 1 and the Critical Accounting Policies and Estimates section of MD&A. Long-lived assets are also assessed whenever indicators of impairment exist. Factors that affect the long-term value of these assets, including treatment by regulators in ratemaking proceedings, as well as other economic and market conditions, could result in impairments. Significant impairments could adversely affect the Company’s business, financial position, liquidity, and results of operations.

PNM’s PVNGS leases describe certain events, including “Events of Loss” and “Deemed Loss Events”, the occurrence of which could require PNM to take ownership of the underlying assets and pay the lessors for the assets.
The “Events of Loss” generally relate to casualties, accidents, and other events at PVNGS, including the occurrence of specified nuclear events, which would severely adversely affect the ability of the operating agent, APS, to operate, and the ability of PNM to earn a return on its interests in PVNGS.  The “Deemed Loss Events” consist primarily of legal and regulatory
A - 23

Table of Contents

changes (such as issuance by the NRC of specified violation orders, changes in law making the sale and leaseback transactions illegal, or changes in law making the lessors liable for nuclear decommissioning obligations). PNM believes that the probability of such “Events of Loss” or “Deemed Loss Events” occurring is remote for the following reasons: (1) to a large extent, prevention of “Events of Loss” and some “Deemed Loss Events” is within the control of the PVNGS participants through the general PVNGS operational and safety oversight process; and (2) other “Deemed Loss Events” would involve a significant change in current law and policy. PNM is unaware of any proposals pending or being considered for introduction in Congress, or in any state legislative or regulatory body that, if adopted, would cause any of those events. Furthermore, the NRC places restrictions on the ownership of nuclear generating facilities. These restrictions could limit the transfer of ownership of the assets underlying all or a portion of its current leased interests in PVNGS. PNM and SRP entered into an Asset Purchase and Sale Agreement, pursuant to which PNM agreed to sell to SRP certain PNM-owned assets and nuclear fuel necessary to the ongoing operation and maintenance of leased capacity in PVNGS Unit 1 and Unit 2, which SRP has agreed to acquire from the lessors upon termination of the existing leases. The proposed transaction between PNM and SRP has been approved by the NRC for the transfer of the associated possessory licenses at the end of the term of each of the respective leases. If the proposed transaction is not consummated, PNM may be required to retain all or a portion of its currently leased capacity in PVNGS or be exposed to other claims for damages by the lessors. See Note 8. If these events were to occur, there is no assurance PNM would be provided cost recovery from customers.

The impacts and implementation of U.S. tax reform legislation may negatively impact PNMR’s, PNM’s, and TNMP’s businesses, financial position, results of operations, and cash flows.

On December 22, 2017, comprehensive changes in U.S. federal income taxes were enacted through legislation commonly known as the Tax Cuts and Jobs Act (the “Tax Act”). Among other things, the Tax Act reduced the federal corporate income tax rate from 35% to 21% effective January 1, 2018, eliminated federal bonus depreciation for utilities, and limited interest deductibility for non-utility business activities and the deductibility of certain officer compensation. During 2018, the IRS issued additional guidance related to certain officer compensation and proposed regulations on interest deductibility that provided a 10% “de minimis” exception allowing entities with predominantly regulated activities to fully deduct interest expenses. In addition, the IRS issued proposed regulations interpreting Tax Act amendments to depreciation provisions of the IRC that allowed the Company to claim a bonus depreciation deduction on certain construction projects placed in service subsequent to the third quarter of 2017.

The Company believes that the impacts of the Tax Act will not significantly impact the future earnings of regulated activities due to the ratemaking process. However, cash flows will be reduced in the near term due to less cash being received from customer billings as the benefits of the reduced corporate income tax are passed on to ratepayers, but without a corresponding reduction in income taxes paid due to the Company having a net operating loss carryforward for income taxes purposes. In addition, the income tax benefit of net losses for the unregulated activities of PNMR will be negatively impacted by the reduced rate.

It is possible that the Biden administration and Congress will make changes to provisions of the Tax Act or other tax laws. In addition, further changes to U.S. Treasury regulations, IRS interpretations of the current provisions of the Tax Act, and actions by the NMPRC, PUCT, and FERC could cause the Company’s expectations of the impacts of the Tax Act to change. Any such changes could adversely affect the Company’s financial position, results of operations, and cash flows.

Governance Risks
Provisions of PNMR’s organizational documents, as well as several other statutory and regulatory factors, will limit another party’s ability to acquire PNMR and could deprive PNMR’s shareholders of the opportunity to receive a takeover premium for shares of PNMR’s common stock.
PNMR’s restated articles of incorporation and by-laws include a number of provisions that may have the effect of discouraging persons from acquiring large blocks of PNMR’s common stock or delaying or preventing a change in control of PNMR. The material provisions that may have such an effect include:
Authorization for the Board to issue PNMR’s preferred stock in series and to fix rights and preferences of the series (including, among other things, voting rights and preferences with respect to dividends and other matters)
Advance notice procedures with respect to any proposal other than those adopted or recommended by the Board
Provisions specifying that only a majority of the Board, the chairman of the Board, the chief executive officer, or holders of at least one-tenth of all of PNMR’s shares entitled to vote may call a special meeting of shareholders
 
Under the New Mexico Public Utility Act, NMPRC approval is required for certain transactions that may result in PNMR’s change in control or exercise of control, including ownership of 10% or more of PNMR’s voting stock. PUCT approval is required for changes to the ownership of TNMP or its parent and certain other transactions relating to TNMP. Certain acquisitions of PNMR’s outstanding voting securities also require FERC approval.

A - 24

Table of Contents

ITEM 1B. UNRESOLVED STAFF COMMENTS
None.

ITEM 2.PROPERTIES

PNMR

The significant properties owned by PNMR include those owned by PNM and TNMP and are disclosed below.

PNM

See Sources of Power in Part I, Item. 1 Business above for information on PNM’s owned and leased capacity in electric generating stations. As of December 31, 2021, PNM owned, or jointly owned, 3,426 miles of electric transmission lines, 5,751 miles of distribution overhead lines, 5,765 miles of underground distribution lines (excluding street lighting), and 250 substations. PNM’s electric transmission and distribution lines are generally located within easements and rights-of-way on public, private, and Native American lands. PNM owns and leases interests in PVNGS Units 1 and 2 and related property, communication, office and other equipment, office space, vehicles, and real estate. PNM also owns service and office facilities throughout its service territory. See Note 8 for additional information concerning leases.

TNMP

TNMP’s facilities consist primarily of transmission and distribution facilities located in its service areas. TNMP also owns and leases vehicles, service facilities, and office locations throughout its service territory. As of December 31, 2021, TNMP owned 983 miles of overhead electric transmission lines, 7,297 miles of overhead distribution lines, 1,408 miles of underground distribution lines, and 113 substations. Substantially all of TNMP’s property is pledged to secure its first mortgage bonds. See Note 7.

ITEM 3.LEGAL PROCEEDINGS

See Note 16 and Note 17 for information related to the following matters for PNMR, PNM, and TNMP, incorporated in this item by reference.

Note 16

Cooling Water Intake Structures
•    Santa Fe Generating Station
•    San Juan River Adjudication
•    Navajo Nation Allottee Matters

Note 17

PNMR– Merger Regulatory Proceedings
PNM – 2020 Decoupling
PNM – 2020 Integrated Resource Plans
PNM – SJGS Abandonment Application
PNM – Four Corners Abandonment Application
PNM – PVNGS Leased Interest Abandonment Application
PNM – FERC Compliance
TNMP – Transmission Cost of Service Rates

ITEM 4.MINE SAFETY DISCLOSURES

Not Applicable.

A - 25

Table of Contents

SUPPLEMENTAL ITEM – INFORMATION ABOUT EXECUTIVE OFFICERS OF PNM RESOURCES, INC.
All officers are elected annually by the Board of PNMR. Executive officers, their ages as of February 18, 2022 and offices held with PNMR for the past five years are as follows:
NameAgeOfficeInitial Effective Date
P. K. Collawn63
Chairman, President, and Chief Executive Officer
January 2012
J. D. Tarry51
Senior Vice President and Chief Financial Officer
January 2020
 
Vice President, Controller and Treasurer
September 2018
Vice President, Finance and Controller
February 2017
Vice President, Corporate Controller, and Chief Information Officer
April 2015
C. N. Eldred
68
Executive Vice President, Corporate Development and Finance
January 2020
Executive Vice President and Chief Financial Officer
July 2007
P. V. Apodaca70
Senior Vice President, General Counsel, and Secretary
January 2010
R. N. Darnell64Senior Vice President, Public PolicyJanuary 2012
C. M. Olson64
Senior Vice President, Utility Operations
February 2018
Vice President, Utility Operations
December 2016

PART II
 
ITEM 5.MARKET FOR PNMR’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS, AND ISSUER PURCHASES OF EQUITY SECURITIES

PNMR’s common stock is traded on the New York Stock Exchange under the symbol “PNM”.
Dividends on PNMR’s common stock are declared by its Board. The timing of the declaration of dividends is dependent on the timing of meetings and other actions of the Board. This has historically resulted in dividends considered to be attributable to the second quarter of each year being declared through actions of the Board during the third quarter of the year. The Board declared dividends on common stock considered to be for the second quarter of $0.3275 per share in July 2021 and $0.3075 per share in July 2020. The Board declared dividends on common stock considered to be for the third quarter of $0.3275 per share in September 2021 and $0.3075 per share in September 2020. In February 2022, the Board increased the quarterly dividend from $0.3275 to $0.3475 per share and in December 2020 the Board increased the quarterly dividend from $0.3075 to $0.3275 per share. PNMR targets a long-term dividend payout ratio of 55% of ongoing earnings, which is a non-GAAP financial measure, that excludes from GAAP earnings certain non-recurring, infrequent, and other items that are not indicative of fundamental changes in the earnings capacity of the Company’s operations. PNMR uses ongoing earnings to evaluate the operations of the Company and to establish goals, including those used for certain aspects of incentive compensation, for management and employees.
On February 18, 2022, there were 7,513 holders of record of PNMR’s common stock. All of the outstanding common stock of PNM and TNMP is held by PNMR.

As discussed in Note 7, in January 2020, PNMR completed an equity offering of approximately 6.2 million shares of common stock. In lieu of issuing equity at the time of the offering, PNMR entered into forward sale agreements with certain forward counterparties. On December 15, 2020 PNMR physically settled all shares under the PNMR 2020 Forward Equity Sale Agreements by issuing 6.2 million shares to the forward purchasers at a price of $45.805 per share, aggregating net proceeds of $283.1 million.

All of PNM’s and TNMP’s common stock is owned by PNMR and is not listed for trading on any stock exchange. See Note 6 for a discussion on limitations on the payments of dividends and the payment of future dividends, as well as dividends paid by PNM and TNMP.

See Part III, Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters.

Preferred Stock

As of December 31, 2021, PNM has 115,293 shares of cumulative preferred stock outstanding. PNM is not aware of any active trading market for its cumulative preferred stock. Quarterly cash dividends were paid on PNM’s outstanding cumulative preferred stock at the stated rates during 2021 and 2020. PNMR and TNMP do not have any preferred stock outstanding.

Sales of Unregistered Securities

None.

ITEM 6.    [RESERVED]
A - 26

Table of Contents


ITEM 7.MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations for PNMR is presented on a combined basis, including certain information applicable to PNM and TNMP. This report uses the term “Company” when discussing matters of common applicability to PNMR, PNM, and TNMP. The MD&A for PNM and TNMP is presented as permitted by Form 10-K General Instruction I (2) as amended by the FAST Act. For additional information related to the earliest of the two years presented please refer to the Company’s 2020 Annual Report on Form 10-K. A reference to a “Note” in this Item 7 refers to the accompanying Notes to Consolidated Financial Statements included in Part II, Item 8, unless otherwise specified. Certain of the tables below may not appear visually accurate due to rounding.

MD&A FOR PNMR
EXECUTIVE SUMMARY
Overview and Strategy
    
PNMR is a holding company with two regulated utilities serving approximately 806,000 residential, commercial, and industrial customers and end-users of electricity in New Mexico and Texas. PNMR’s electric utilities are PNM and TNMP. PNMR strives to create a clean and bright energy future for customers, communities, and shareholders. PNMR’s strategy and decision-making are focused on safely providing reliable, affordable, and environmentally responsible power built on a foundation of Environmental, Social and Governance (ESG) principles.

Recent Developments

Merger

On October 20, 2020, PNMR, Avangrid and Merger Sub entered into the Merger Agreement pursuant to which Merger Sub will merge with and into PNMR, with PNMR surviving the Merger as a wholly-owned subsidiary of Avangrid. The proposed Merger has been unanimously approved by the Boards of Directors of PNMR, Avangrid and Merger Sub and approved by PNMR shareholders at the Special Meeting of Shareholders held on February 12, 2021.

Pursuant to the Merger Agreement, each issued and outstanding share of the common stock of PNMR (other than (i) the issued shares of PNMR common stock that are owned by Avangrid, Merger Sub, PNMR or any wholly-owned subsidiary of Avangrid or PNMR, which will be automatically cancelled at the Effective Time and (ii) shares of PNMR common stock outstanding immediately prior to the Effective Time and held by a holder who has not voted in favor of, or consented in writing to, the Merger who is entitled to, and who has demanded, payment for fair value of such shares) at the Effective Time will be converted into the right to receive $50.30 in cash.

The Merger Agreement provided that it may be terminated if the Effective Time shall not have occurred by the End Date; however, either PNMR or Avangrid could extend the End Date to April 20, 2022 if all conditions to closing have been satisfied other than the obtaining of all required regulatory approvals. On December 8, 2021, the NMPRC issued an order rejecting the stipulation agreement relating to the Merger and the approval of the Merger from the NMPRC has not yet been obtained.

In light of the NMPRC ruling, on January 3, 2022, PNMR, Avangrid and Merger Sub entered into an Amendment to the Merger Agreement pursuant to which PNMR and Avangrid each agreed to extend the End Date to April 20, 2023. The parties acknowledge in the Amendment that the required regulatory approval from the NMPRC has not been obtained and that the parties have reasonably determined that such outstanding approval will not be obtained by April 20, 2022. As amended, the Merger Agreement may be terminated by each of PNMR and Avangrid under certain circumstances, including if the Merger is not consummated by April 20, 2023.

With respect to the NMPRC proceedings, on April 20, 2021, the Joint Applicants, the NMAG, WRA, the International Brotherhood of Electrical Workers Local 611, Dine, Nava Education Project, the San Juan Citizens Alliance and To Nizhoni Ani, had entered into a stipulation and agreement in the Joint Application for approval of Merger pending before the NMPRC. Subsequently, CCAE, Onward Energy Holdings LLC, Walmart Inc., Interwest Energy Alliance, M-S-R Power and the Incorporated County of Los Alamos joined an amended stipulation. An evidentiary hearing was held in August 2021. On November 1, 2021, a Certification of Stipulation was issued by the hearing examiner, which recommended against approval of the amended stipulation. On December 8, 2021, the NMPRC issued an order adopting the Certification of Stipulation, rejecting the amended stipulation reached by the parties. On January 3, 2022, PNMR and Avangrid filed a notice of appeal with the NM Supreme Court. On February 2, 2022, PNMR and Avangrid filed a statement of issues outlining the argument for appeal.

With respect to other regulatory proceedings related to the Merger, in January 2021, the FTC notified PNMR and Avangrid that early termination of the waiting period under the HSR Act in connection with the Merger was granted. In February 2021, CFIUS completed its review of the Merger and concluded that there are no unresolved national security concerns with respect to the Merger. In March 2021, PNMR and Avangrid received FCC approval of the transfer of operating
A - 27

Table of Contents

licenses related to the Merger. In April 2021, FERC issued an order authorizing the Merger. In May 2021, the PUCT issued an order authorizing the Merger, and the NRC approved the Merger. As a result of the delay in closing of the Merger due to the need to obtain NMPRC approval, PNMR and Avangrid are required to make a new filing under the HSR Act and request extensions of approvals previously received from the FCC and NRC. On February 9, 2022, the request for extension was filed with the NRC. On February 24, 2022, the requests for a 180-day extension were granted by the FCC. No additional filings will be required with CFIUS, FERC or the PUCT.

Consummation of the Merger remains subject to the satisfaction or waiver of certain customary closing conditions, including, without limitation, the absence of any material adverse effect on PNMR, the receipt of required regulatory approval from the NMPRC, and the agreements relating to the divestiture of Four Corners being in full force and effect and all applicable regulatory filings associated therewith being made. The agreement relating to the divestiture of Four Corners has been entered into and is in full force and effect and related filings have been made with the NMPRC.

EIM

On April 1, 2021, PNM joined and began participating in the EIM. The EIM is a real-time wholesale energy trading market operated by the CAISO that enables participating electric utilities to buy and sell energy. The EIM aggregates the variability of electricity generation and load for multiple balancing authority areas and utility jurisdictions. In addition, the EIM facilitates greater integration of renewable resources through the aggregation of flexible resources by capturing diversity benefits from the expanding geographic footprint and the expanded potential uses for those resources. PNM completed a cost-benefit analysis, which indicated participation in the EIM would provide substantial benefits to retail customers. In 2018, PNM filed an application with the NMPRC requesting, among other things, to recover initial capital investments and authorization to establish a regulatory asset to recover other expenses that would be incurred in order to join the EIM. The NMPRC approved the establishment of a regulatory asset but deferred certain rate making issues, including but not limited to issues related to implementation and ongoing EIM costs and savings, the prudence and reasonableness of costs to be included in the regulatory asset, and the period over which costs would be charged to customers until PNM’s next general rate case filing. PNM has already experienced $12.5 million of costs savings to customers through participation in the EIM. See Note 17.

Texas Winter Storm

In mid-February 2021, Texas experienced a severe winter storm delivering the coldest temperatures in 100 years for many parts of the state. As a result, the ERCOT market was not able to deliver sufficient generation load to the grid resulting in significant, statewide outages as ERCOT directed transmission operators to curtail thousands of firm load megawatts. TNMP complied with ERCOT directives to curtail the delivery of electricity in its service territory and did not experience significant outages on its system outside of the ERCOT directed curtailments. TNMP has deferred bad debt expense from defaulting REPs to a regulatory asset totaling $0.8 million at December 31, 2021, and will seek recovery in a general rate case. At this time, the Company does not expect significant financial impacts related to this event. For additional information on the Texas winter storm, see Note 16.

Financial and Business Objectives
PNMR is focused on achieving three key financial objectives:

Earning authorized returns on regulated businesses
Delivering at or above industry-average earnings and dividend growth
Maintaining investment grade credit ratings

In conjunction with these objectives, PNM and TNMP are dedicated to:

Maintaining strong employee safety, plant performance, and system reliability
Delivering a superior customer experience
Demonstrating environmental stewardship in business operations, including transitioning to an emissions-free generating portfolio by 2040
Supporting the communities in their service territories

Earning Authorized Returns on Regulated Businesses

PNMR’s success in accomplishing its financial objectives is highly dependent on two key factors: fair and timely regulatory treatment for its utilities and the utilities’ strong operating performance. The Company has multiple strategies to achieve favorable regulatory treatment, all of which have as their foundation a focus on the basics: safety, operational excellence, and customer satisfaction, while engaging stakeholders to build productive relationships. Both PNM and TNMP seek cost recovery for their investments through general rate cases, periodic cost of service filings, and various rate riders.

Fair and timely rate treatment from regulators is crucial to PNM and TNMP in earning their allowed returns and critical for PNMR to achieve its financial objectives. PNMR believes that earning allowed returns is viewed positively by credit rating
A - 28

Table of Contents

agencies and that improvements in the Company’s ratings could lower costs to utility customers. Additional information about rate filings is provided in Note 17.

State Regulation

The rates PNM and TNMP charge customers are subject to traditional rate regulation by the NMPRC, FERC, and the PUCT.

New Mexico 2016 Rate Case – In January 2018, the NMPRC approved a settlement agreement that authorized PNM to implement an increase in base non-fuel rates of $10.3 million, which included a reduction to reflect the impact of the decrease in the federal corporate income tax rate and updates to PNM’s cost of debt (aggregating $47.6 million annually). This order was on PNM’s application for a general increase in retail electric rates filed in December 2016 (the “NM 2016 Rate Case”). The key terms of the order include:

A ROE of 9.575%
A requirement to return to customers over a three-year period the benefit of the reduction in the New Mexico corporate income tax rate to the extent attributable to PNM’s retail operations (Note 18)
A disallowance of PNM’s ability to collect an equity return on certain investments aggregating $148.1 million at Four Corners, but allowing recovery of a debt-only return
An agreement to not implement non-fuel base rate changes, other than changes related to PNM’s rate riders, with an effective date prior to January 1, 2020
A requirement to consider the prudency of PNM’s decision to continue its participation in Four Corners in PNM’s next general rate case filing

PNM implemented 50% of the approved increase for service rendered beginning February 1, 2018 and implemented the rest of the increase for service rendered beginning January 1, 2019.

On December 29, 2020, Sierra Club filed a motion to re-open the NM 2016 Rate Case. The motion requests that the NMPRC re-open the NM 2016 Rate Case for the limited purpose of conducting a prudence review of certain Four Corners capital expenditures that the NMPRC deferred in its order approving the settlement agreement. Alternatively, Sierra Club requested that the deferred prudence review be conducted, and given weight as appropriate, in the Four Corners Abandonment Application. On February 10, 2021, the NMPRC rejected Sierra Club’s motion to re-open the NM 2016 Rate Case and stated that issues on whether the terms of the ETA provide an opportunity for consideration of prudence for Four Corners undepreciated investments included in a financing order or what effects the rates approved in the NM 2016 Rate Case may have on determining energy transition cost should be considered in the Four Corners Abandonment Application. For additional information on the Four Corners Abandonment Application see Note 17.

2020 Decoupling Petition – On May 28, 2020, PNM filed a petition for approval of a rate adjustment mechanism that would decouple the rates of its residential and small power rate classes. Decoupling is a rate design principle that severs the link between the recovery of fixed costs of the utility through volumetric charges. If approved, customer bills would not be impacted until January 1, 2022. On October 2, 2020, PNM requested an order to vacate the public hearing and stay the proceeding until the NMPRC decides whether to entertain a petition to issue a declaratory order resolving the issues raised in the motions to dismiss. On October 7, 2020, the hearing examiner approved PNM's request to stay the proceeding and vacate the public hearing and on October 30, 2020 PNM filed a petition for declaratory order asking the NMPRC to issue an order finding that full revenue decoupling is authorized by the EUEA. On March 17, 2021, the NMPRC issued an order granting PNM's petition for declaratory order which commences a proceeding to address petitions. Oral arguments were made on July 15, 2021. On January 14, 2022, the hearing examiner issued a recommended decision recommending the NMPRC find that the EUEA does not mandate the NMPRC to authorize or approve a full decoupling mechanism, defining full decoupling as limited to energy efficiency and load management measures and programs. The recommended decision also states that a utility may request approval of a rate adjustment mechanism to remove regulatory disincentives to energy efficiency and load management measures and programs through a stand-alone petition, as part of the utility’s triennial energy efficiency application or a general rate case and that PNM is not otherwise precluded from petitioning for a rate adjustment mechanism prior to its next general rate case. Finally, the recommended decision stated that the EUEA does not permit the NMPRC to reduce a utility’s ROE based on approval of a disincentive removal mechanism founded on removing regulatory disincentives to energy efficiency and load management measures and programs. The recommended decision does not specifically prohibit a downward adjustment to a utility’s capital structure, based on approval of a disincentive removal mechanism. See Note 17. PNM cannot predict the outcome of this matter.

PVNGS Leased Interest Abandonment Application On April 2, 2021, PNM filed the PVNGS Leased Interest Abandonment Application. In the application, PNM requested NMPRC authorization to decertify and abandon its Leased Interest and to create regulatory assets for the associated remaining undepreciated investments with consideration of cost recovery of the undepreciated investments in a future rate case. PNM also sought NMPRC approval to sell and transfer the PNM-owned assets and nuclear fuel supply associated with the Leased Interest to SRP, which will be acquiring the Leased Interest from the lessors upon termination of the existing leases. In addition, PNM sought NMPRC approval for a 150 MW
A - 29

Table of Contents

solar PPA combined with a 40 MW battery storage agreement and a stand-alone 100 MW battery storage agreement to replace the Leased Interest. To ensure system reliability and load needs are met in 2023, when a majority of the leases expire, PNM also requested NMPRC approval for a 300 MW solar PPA combined with a 150 MW battery storage agreement. On August 25, 2021, the NMPRC issued an order confirming PNM requires no further NMPRC authority to abandon the PVNGS Leased Interest and to sell and transfer the PNM-owned assets and nuclear fuel supply associated with the Leased Interest to SRP. The order bifurcated the issue of approval of the two PPAs and three battery storage agreements into a separate docket so it may proceed expeditiously and deferred a ruling on the other issues. On February 16, 2022, the NMPRC approved the two PPAs and three battery storage agreements. For additional information on PNM's Leased Interest and the associated abandonment application see Note 16 and Note 17.

Advanced Metering Currently, TNMP has approximately 262,000 advanced meters across its service territory. Beginning in 2019, the majority of costs associated with TNMP’s AMS program are being recovered through base rates. On July 14, 2021, TNMP filed a request with the PUCT to consider and approve its final reconciliation of the costs spent on the deployment of AMS from April 1, 2018 through December 31, 2018 of $9.0 million and approve appropriate carrying charges until full collection. On September 13, 2021, the PUCT Staff filed a recommendation for approval of TNMP's application for substantially all costs. On October 2, 2020, TNMP filed an application with the PUCT for authorization to implement necessary technological upgrades of approximately $46 million to its AMS program by November 2022. On January 14, 2021, the PUCT approved TNMP’s application. TNMP will seek recovery of the investment associated with the upgrade in a future general rate proceeding or DCOS filing.

In February 2016, PNM filed an application with the NMPRC requesting approval of a project to replace its existing customer metering equipment with Advanced Metering Infrastructure (“AMI”), which was denied. As ordered by the NMPRC, PNM’s 2020 filing for energy efficiency programs to be offered in 2021, 2022, and 2023 included a proposal for an AMI pilot project, although PNM did not recommend the proposal due to the limited benefits that are cost-effective under a pilot structure. On September 17, 2020, the hearing examiner in the energy efficiency case issued a recommended decision recommending that PNM's proposed 2021 energy efficiency and load management program be approved, with the exception of the proposed AMI pilot program. On October 28, 2020, the NMPRC approved the recommended decision.

Rate Riders and Interim Rate Relief The PUCT has approved mechanisms that allow TNMP to recover capital invested in transmission and distribution projects without having to file a general rate case. The PUCT also approved rate riders that allow TNMP to recover amounts related to energy efficiency and third-party transmission costs. The NMPRC has approved PNM recovering fuel costs through the FPPAC, as well as rate riders for renewable energy, energy efficiency, and the TEP. These mechanisms allow for more timely recovery of investments.

FERC Regulation

Rates PNM charges wholesale transmission customers are subject to traditional rate regulation by FERC. Rates charged to wholesale electric transmission customers, other than customers on the Western Spirit Line described below, are based on a formula rate mechanism pursuant to which rates for wholesale transmission service are calculated annually in accordance with an approved formula. The formula includes updating cost of service components, including investment in plant and operating expenses, based on information contained in PNM’s annual financial report filed with FERC, as well as including projected transmission capital projects to be placed into service in the following year. The projections included are subject to true-up. Certain items, including changes to return on equity and depreciation rates, require a separate filing to be made with FERC before being included in the formula rate.

In May 2019, PNM filed an application with FERC requesting approval to purchase and provide transmission service on the Western Spirit Line. All necessary approvals were obtained. In December 2021, PNM completed the purchase of the Western Spirit Line and service under related transmission agreements was initiated using an incremental rate that is separate from the formula rate mechanism described above. See Note 17.

On March 12, 2021, PNM filed four unexecuted TSAs with FERC totaling 145 MW with Leeward. The unexecuted TSAs provide long-term firm, point-to-point transmission service on PNM’s transmission system. The unexecuted TSAs are based on the pro-forma transmission service agreements with certain non-conforming provisions under Attachment A of PNM’s OATT and include PNM’s OATT rate. PNM filed the unexecuted TSAs at the request of Leeward because the parties were unable to reach an agreement on the terms and conditions for transmission service. On May 11, 2021, FERC issued an order accepting PNM's four unexecuted TSAs based on PNM's proposed pricing scheme included in its OATT rate. On June 10, 2021, Pattern Wind and Leeward both filed a request for rehearing of the FERC Order. On September 10, 2021, Leeward filed a petition in the United States District Court for the District of Columbia for review of FERC's order accepting PNM's four unexecuted TSAs. On November 15, 2021, FERC issued an order denying the rehearing. On December 3, 2021, Leeward filed an Unopposed Motion for Voluntary Dismissal with the United States District Court for the District of Columbia of its petition for review. PNM is unable to predict the outcome of this matter. See Note 17.
Delivering At or Above Industry-Average Earnings and Dividend Growth
PNMR’s financial objective to deliver at or above industry-average earnings and dividend growth enables investors to
A - 30

Table of Contents

realize the value of their investment in the Company’s business. Earnings growth is based on ongoing earnings, which is a non-GAAP financial measure that excludes from GAAP earnings certain non-recurring, infrequent, and other items that are not indicative of fundamental changes in the earnings capacity of the Company’s operations. PNMR uses ongoing earnings to evaluate the operations of the Company and to establish goals, including those used for certain aspects of incentive compensation, for management and employees.

PNMR targets a dividend payout ratio in the 50% to 60% range of its ongoing earnings. PNMR expects to provide at or above industry-average dividend growth in the near-term. The Board will continue to evaluate the dividend on an annual basis, considering sustainability and growth, capital planning, and industry standards.

Under the terms of the Merger Agreement, PNMR has agreed not to declare, set aside, make or pay any dividend or other distribution, payable in cash, stock, property or otherwise, with respect to any of its equity securities, or make any other actual, constructive or deemed distribution in respect of any equity securities (except (i) PNMR may continue the declaration and payment of planned regular quarterly cash dividends on PNMR common stock for each quarterly period ended after the date of the Merger Agreement, which for any fiscal quarter in 2022 shall not exceed $0.3475, with usual record and payment dates in accordance with past dividend practice, and (ii) for any cash dividend or cash distribution by a wholly-owned subsidiary of PNMR to PNMR or another wholly-owned subsidiary of PNMR).

The Board approved the following increases in the indicated annual common stock dividend:
Approval DatePercent Increase
December 20206.5 %
February 20226.1 %

Maintaining Investment Grade Credit Ratings

The Company is committed to maintaining investment grade credit ratings in order to reduce the cost of debt financing and to help ensure access to credit markets, when required. On February 10, 2022, Moody’s downgraded TNMP’s issuer rating from A3 to Baa1 and changed the outlook from negative to stable. See the subheading Liquidity included in the full discussion of Liquidity and Capital Resources below for the specific credit ratings for PNMR, PNM, and TNMP. All of the credit ratings issued by both Moody’s and S&P on the Company’s debt continue to be investment grade.

Business Focus

To achieve its business objectives, focus is directed in key areas: Safe, Reliable and Affordable Power; Utility Plant and Strategic Investments; Environmentally Responsible Power; and Customer, Stakeholders, and Community Engagement. The Company works closely with its stakeholders to ensure that resource plans and infrastructure investments benefit from robust public dialogue and balance the diverse needs of our communities. Equally important is the focus of PNMR’s utilities on customer satisfaction and community engagement.

Safe, Reliable, and Affordable Power

Safety is the first priority of our business and a core value of the Company. PNMR utilizes a Safety Management System to provide clear direction, objectives and targets for managing safety performance and minimizing risks and empowers employees to “Be the Reason Everyone Goes Home Safe”.

PNMR measures reliability and benchmark performance of PNM and TNMP against other utilities using industry-standard metrics, including System Average Interruption Duration Index (“SAIDI”) and System Average Interruption Frequency Index (“SAIFI”). PNM's and TNMP's investment plans include projects designed to support reliability and reduce the amount of time customers are without power.

PNMR and its utilities are aware of the important roles they play in enhancing economic vitality in their service territories. Management believes that maintaining strong and modern electric infrastructure is critical to ensuring reliability and supporting economic growth. When contemplating expanding or relocating their operations, businesses consider energy affordability and reliability to be important factors. PNM and TNMP strive to balance service affordability with infrastructure investment to maintain a high level of electric reliability and to deliver a safe and superior customer experience. Investing in PNM’s and TNMP’s infrastructure is critical to ensuring reliability and meeting future energy needs. Both utilities have long-established records of providing customers with safe and reliable electric service.

The Company continues to closely monitor developments and has taken and continues to take steps to mitigate the potential risks related to the COVID-19 pandemic. The Company has assessed and updated its existing business continuity plans in response to the impacts of the pandemic through crisis team meetings and working with other utilities and operators. It has identified its critical workforce, staged backups and limited access to control rooms and critical assets. The Company has worked to protect the safety of its employees using a number of measures, including minimizing exposure to other employees
A - 31

Table of Contents

and the public and supporting flexible arrangements for all applicable job functions. The Company is also working with its suppliers to manage the impacts to its supply chain and remains focused on the integrity of its information systems and other technology systems used to run its business. However, the Company cannot predict the extent or duration of the ongoing COVID-19 pandemic, its effects on the global, national or local economy, or on the Company's financial position, results of operations, and cash flows. The Company will continue to monitor developments related to COVID-19 and will remain focused on protecting the health and safety of its customers, employees, contractors, and other stakeholders, and on its objective to provide safe, reliable, affordable and environmentally responsible power. As discussed in Note 17, both PNM and TNMP suspended disconnecting certain customers for past due bills, waived late fees during the pandemic, and have been provided regulatory mechanisms to recover these and other costs resulting from COVID-19. See additional discussion below regarding the Company's customer, community, and stakeholder engagement in response to COVID-19 and in Item 1A. Risk Factors.

Utility Plant and Strategic Investments

Utility Plant Investments – During the 2020 and 2021 periods, PNM and TNMP together invested $1.6 billion in utility plant, including substations, power plants, nuclear fuel, and transmission and distribution systems. New Mexico’s clean energy future depends on a reliable, resilient, secure grid to deliver an evolving mix of energy resources to customers. PNM has launched a capital initiative, which emphasizes new investments in its transmission and distribution infrastructure with three primary objectives: delivering clean energy, enhancing customer satisfaction and increasing grid resilience. Projects are aimed at advancing the infrastructure beyond its original architecture to a more flexible and redundant system accommodating growing amounts of intermittent and distributed generation resources and integrating evolving technologies that provide long-term customer value. See the subheading Capital Requirements included in the full discussion of Liquidity and Capital Resources below for additional discussion of the Company’s projected capital requirements.

Strategic Investments – In 2017, PNMR Development and AEP OnSite Partners created NMRD to pursue the acquisition, development, and ownership of renewable energy generation projects, primarily in the state of New Mexico. Abundant renewable resources, large tracts of affordable land, and strong government and community support make New Mexico a favorable location for renewable generation. New Mexico ranks third in the Nation for energy potential from solar power according to the Nebraska Department of Energy & Energy Sun Index and ranks third in the Nation for land-based wind capacity according to the U.S. Office of Energy Efficiency and Renewable Energy. PNMR Development and AEP OnSite Partners each have a 50% ownership interest in NMRD. Through NMRD, PNMR anticipates being able to provide additional renewable generation solutions to customers within and surrounding its regulated jurisdictions through partnering with a subsidiary of one of the United States’ largest electric utilities. As of December 31, 2021, NMRD’s renewable energy capacity in operation was 135.1 MW, which includes 130 MW of solar-PV facilities to supply energy to the Meta data center located within PNM’s service territory, 1.9 MW to supply energy to Columbus Electric Cooperative located in southwest New Mexico, 2.0 MW to supply energy to the Central New Mexico Electric Cooperative, and 1.2 MW of solar-PV facilities to supply energy to the City of Rio Rancho, New Mexico. In addition, PNM’s February 8, 2021 application with the NMPRC for approval to service the Meta data center includes construction of a 50 MW solar facility owned by NMRD, which is expected to be operational in 2023. See Note 17. NMRD actively explores opportunities for additional renewable projects, including large-scale projects to serve future data centers and other customer needs.

Integrated Resource Plan

NMPRC rules require that investor-owned utilities file an IRP every three years. The IRP is required to cover a 20-year planning period and contain an action plan covering the first four years of that period.

NMPRC rules required PNM to file its 2020 IRP in July 2020. In April 2020, the NMPRC approved PNM ‘s request to extend the deadline to file its 2020 IRP until six months after the NMPRC issues a final order approving replacement resources in PNM’s SJGS Abandonment Application. On January 29, 2021, PNM filed its 2020 IRP. The plan focuses on a carbon-free electricity portfolio by 2040 that would eliminate coal at the end of 2024. This includes replacing the power from San Juan with a mix of approved carbon-free resources and the plan to exit Four Corners at the end of 2024. The plan highlights the need for additional investments in a diverse set of resources, including renewables to supply carbon-free power, energy storage to balance supply and demand, and efficiency and other demand-side resources to mitigate load growth. See additional discussion regarding PNM’s 2020 IRP filing in Note 17.
Environmentally Responsible Power
PNMR has a long-standing record of environmental stewardship. PNM’s environmental focus is in three key areas:

Developing strategies to provide reliable and affordable power while transitioning to a 100% emissions-free generating portfolio by 2040
Preparing PNM’s system to meet New Mexico’s increasing renewable energy requirements as cost-effectively as possible
Increasing energy efficiency participation

PNMR’s corporate website (www.pnmresources.com) includes a dedicated section providing key environmental and other sustainability information related to PNM’s and TNMP’s operations and other information that collectively demonstrates
A - 32

Table of Contents

the Company’s commitment to ESG principles. This information highlights plans for PNM to be coal-free by 2024 (subject to regulatory approval) and to achieve an emissions-free generating portfolio by 2040.

In February 2022 PNM named its first Chief Environmental Officer. The Chief Environmental Officer will be responsible for developing and implementing the Company’s business strategy and positions on environmental and sustainability policy issues and will be charged with establishing organization-wide policies, strategies, goals, objectives and programs that advance sustainability and ensure compliance with regulations. The role will serve as the Company’s primary contact with various regulatory and stakeholder agencies on environmental matters. In addition, the role will lead environmental justice work, incorporating impacts to tribal, worker and affected communities and advance ESG reporting.

On September 21, 2020, PNM announced an agreement to partner with Sandia National Laboratories in research and development projects focused on energy resiliency, clean energy, and national security. The partnership demonstrates PNMR's commitment to ESG principles and its support of projects that further its emissions-free generation goals and plans for a reliable, resilient, and secure grid to deliver New Mexico's clean energy future.

The Energy Transition Act (“ETA”)

On June 14, 2019, Senate Bill 489, known as the ETA, became effective. The ETA amends the REA and requires utilities operating in New Mexico to have renewable portfolios equal to 20% by 2020, 40% by 2025, 50% by 2030, 80% by 2040, and 100% zero-carbon energy by 2045. The ETA also amends sections of the REA to allow for the recovery of undepreciated investments and decommissioning costs related to qualifying EGUs that the NMPRC has required be removed from retail jurisdictional rates, provided replacement resources to be included in retail rates have lower or zero-carbon emissions. The ETA provides for a transition from fossil-fueled generating resources to renewable and other carbon-free resources by allowing utilities to issue securitized bonds, or “energy transition bonds,” related to the retirement of certain coal-fired generating facilities to qualified investors. PNM expects the ETA will have a significant impact on PNM’s future generation portfolio, including PNM’s planned retirement of SJGS in 2022 and the planned Four Corners exit in 2024. PNM cannot predict the full impact of the ETA on potential future generating resource abandonment and replacement filings with the NMPRC.

SJGS Abandonment Application – On July 1, 2019, PNM filed a Consolidated Application for the Abandonment and Replacement of SJGS and Related Securitized Financing Pursuant to the ETA (the “SJGS Abandonment Application”). The SJGS Abandonment Application sought NMPRC approval to retire PNM’s share of SJGS in mid-2022, and for approval of replacement resources and the issuance of approximately $361 million of Securitized Bonds as provided by the ETA. The application included several replacement resource scenarios including PNM’s recommended replacement scenario, which is consistent with PNM’s goal of having a 100% emissions-free generating portfolio by 2040 and would have provided cost savings to customers while preserving system reliability.

The NMPRC issued an order requiring the SJGS Abandonment Application be considered in two proceedings: one addressing SJGS abandonment and related financing and the other addressing replacement resources but did not definitively indicate if the abandonment and financing proceedings would be evaluated under the requirements of the ETA. After several requests for clarification and legal challenges, in January 2020, the NM Supreme Court ruled the NMPRC is required to apply the ETA to all aspects of PNM’s SJGS Abandonment Application, and that any previous NMPRC orders inconsistent with their ruling should be vacated.

In February 2020, the hearing examiners issued two recommended decisions recommending approval of PNM’s proposed abandonment of SJGS, subject to approval of the separate replacement resources proceeding, and approval of PNM’s proposed financing order to issue Securitized Bonds.  The hearing examiners recommended, among other things, that PNM be authorized to abandon SJGS by June 30, 2022, to issue Securitized Bonds of up to $361 million, and to establish the Energy Transition Charge. The hearing examiners recommended an interim rate rider adjustment upon the start date of the Energy Transition Charge to provide immediate credits to customers for the full value of PNM’s revenue requirement related to SJGS until those reductions are reflected in base rates. In addition, the hearing examiners recommended PNM be granted authority to establish regulatory assets to recover costs that PNM will pay prior to the issuance of the Securitized Bonds, including costs associated with the bond issuances as well as for severances, job training, and economic development funds. On April 1, 2020, the NMPRC unanimously approved the hearing examiners' recommended decisions regarding the abandonment of SJGS and the Securitized Bonds. On April 10, 2020, CFRE and NEE filed a notice of appeal with the NM Supreme Court of the NMPRC’s approval of PNM’s request to issue securitized financing under the ETA. On January 10, 2022, the NM Supreme Court issued its decision rejecting CFRE’s and NEE’s constitutional challenges to the ETA and affirmed the NMPRC final order.

On June 24, 2020, the hearing examiners issued a second recommended decision on PNM's request for approval of replacement resources that addressed the entire portfolio of replacement resources. On July 29, 2020 the NMPRC issued an order approving resource selection criteria identified in the ETA that include PPA's for 650 MW of solar and 300 MW of battery storage. Throughout 2021 and continuing into 2022, PNM provided notices of delays and status updates to the NMPRC for the approved SJGS replacement resource projects, which coupled with the abandonment of SJGS Units 1 and 4 present a risk that PNM will have insufficient operational resources to meet the 2022 summer peak to reliably serve its customers. PNM
A - 33

Table of Contents

entered into three agreements to purchase power from third parties in the second half of 2021 to minimize potential impacts to customers and on February 17, 2022, PNM provided a notice and request with the NMPRC that PNM had obtained agreement from the SJGS owners and WSJ LLC to extend operation of Unit 4 until September 30, 2022. SJGS Unit 4 will provide 327 MW of capacity and improve PNM’s projected system reserve margin to meet the 2022 summer peak. On February 23, 2022, the NMPRC issued an order finding that PNM did not require NMPRC approval to extend operation of SJGS Unit 4 for an additional three-month period. On February 25, 2022, the amended SJGS participation agreement was filed with FERC. See additional discussion of the ETA and PNM’s San Juan Abandonment Application in Notes 16 and 17.

Four Corners Abandonment Application - On January 8, 2021, PNM filed the Four Corners Abandonment Application, which seeks NMPRC approval to exit PNM’s 13% share of Four Corners as of December 31, 2024, and issuance of approximately $300 million of energy transition bonds as provided by the ETA. As ordered by the hearing examiner in the case, PNM filed an amended application and testimony on March 15, 2021. The amended application provided additional information to support PNM's request, provided background on the NMPRC's consideration of the prudence of PNM's investment in Four Corners in the NM 2016 Rate Case and explained how the proposed sale and abandonment provides a net public benefit. On December 15, 2021, the NMPRC issued a final order denying approval of the Four Corners Abandonment Application and the corresponding request for issuance of securitized financing. On December 22, 2021, PNM filed a Notice of Appeal with the NM Supreme Court of the NMPRC decision to deny the application. See additional discussion of the ETA and PNM’s Four Corners Abandonment Application in Notes 16 and 17.

PNM enhanced its plan to exit Four Corners and emphasized its ESG strategy to reduce carbon emissions on March 12, 2021 with an announcement for additional plans for seasonal operations at Four Corners beginning in the fall of 2023, subject to the necessary approvals. The solution for seasonal operations ensures the plant will be available to serve each owners' customer needs during times of peak energy use while minimizing operations during periods of low demand. This approach results in an estimated annual 20 to 25 percent reduction in carbon emissions at the plant and retains jobs and royalty payments for the Navajo Nation.

The Community Solar Act

On June 18, 2021, Senate Bill 84, known as the Community Solar Act, became effective. The Community Solar Act establishes a program that allows for the development of community solar facilities and provides customers of a qualifying utility with the option of accessing solar energy produced by a community solar facility in accordance with the Community Solar Act. The NMPRC is charged with administering the Community Solar Act program, establishing a total maximum capacity of 200 MW community solar facilities (applicable until November 2024) and allocating proportionally to the New Mexico electric investor-owned utilities and participating cooperatives. As required under the Community Solar Act, the NMPRC opened a docket on May 12, 2021 to adopt rules to establish a community solar program no later than April 1, 2022. See Note 17.

Electric Vehicles

PNMR is building upon its ESG goal of 100% emissions-free generation by 2040 with plans for additional emissions reductions through the electrification of its vehicle fleet. Growing the number of electric vehicles within the Company's fleet will benefit the environment and lower fuel costs furthering the commitment to ESG principles. Under the commitment, existing fleet vehicles will be replaced as they are retired with an increasing percentage of electric vehicles. The new goals call for 25% of all light duty fleet purchases to be electric by 2025 and 50% to be electric by 2030.

To demonstrate PNMR’s commitment to increase the electrification of vehicles in its service territory, PNM filed a TEP with the NMPRC on December 18, 2020. The TEP supports customer adoption of electric vehicles by focusing on addressing the barriers to electric vehicle adoption and encourage use. PNM’s proposed program budget will be dedicated to low and moderate income customers by providing rebates to both residential and non-residential customers towards the purchase of chargers and/or behind-the-meter infrastructure. On November 10, 2021, the NMPRC issued a final order approving PNM’s TEP program. See Note 17.

In December 2021, PNM announced that it will be joining the National Electric Highway Coalition, which plans to build fast-charging ports along major U.S. travel corridors. The coalition, with approximately 50 investor-owned electric companies is committed to providing electric vehicle (EV) fast charging ports that will allow the public to drive EVs with confidence throughout the country’s major roadways by the end of 2023.

Other Environmental Matters

Four Corners may be required to comply with environmental rules that affect coal-fired generating units, including regional haze rules and the ETA. On June 19, 2019, EPA repealed the Clean Power Plan, promulgated the ACE Rule, and revised the implementing regulations for all emission guidelines issued under the CAA Section 111(d). On January 19, 2021, the DC Circuit issued an opinion vacating and remanding the ACE Rule, holding that it was based on a misconstruction of Section 111(d) of the Clean Air Act, but stayed its mandate for vacatur of the repeal of the Clean Power Plan to ensure that the now-outdated rule would not become effective. The U.S. Supreme Court granted four petitions for certiorari seeking review of
A - 34

Table of Contents

the DC Circuit’s decision, and oral arguments in the case were held on February 28, 2022. A decision is expected in June 2022. In addition, on January 27, 2021, President Biden signed an executive order requiring a review of environmental regulations issued under the Trump Administration, which will include a review of the ACE rule.

Renewable Energy
PNM’s renewable procurement strategy includes utility-owned solar capacity, as well as solar, wind, and geothermal energy purchased under PPAs. As of December 31, 2021, PNM has 158 MW of utility-owned solar capacity in operation. In addition, PNM purchases power from a customer-owned distributed solar generation program that had an installed capacity of 201.2 MW at December 31, 2021. PNM also owns the 500 KW PNM Prosperity Energy Storage Project. The project was one of the first combinations of battery storage and solar-PV energy in the nation and involved extensive research and development of advanced grid concepts. The facility also was the nation’s first solar storage facility fully integrated into a utility’s power grid. PNM also purchases the output from New Mexico Wind, a 200 MW wind facility, and the output of Red Mesa Wind, an existing 102 MW wind energy center. PNM’s 2020 renewable energy procurement plan was approved by the NMPRC in January 2020 and includes a PPA to procure 140 MW of renewable energy and RECs from La Joya Wind II that became operational in June 2021. The NMPRC approved the portfolio to replace the planned retirement of SJGS resulting in PNM executing solar PPAs of 650 MW combined with 300 MW of battery storage agreements. In addition, the PVNGS Leased Interest Abandonment Application approved by the NMPRC includes solar PPAs of 450 MW combined with 290 MW of battery storage agreements. The majority of these renewable resources are key means for PNM to meet the RPS and related regulations that require PNM to achieve prescribed levels of energy sales from renewable sources, including those set by the recently enacted ETA, without exceeding cost requirements.
As discussed in Strategic Investments above, PNM is currently purchasing the output of 130 MW of solar capacity from NMRD that is used to serve the Meta data center which includes two 25-year PPAs to purchase renewable energy and RECs from an aggregate of approximately 100 MW of capacity from two solar-PV facilities constructed by NMRD to supply power to Meta, Inc. The first 50 MW of these facilities began commercial operations in November 2019 and the second 50 MW facility began commercial operations in July 2020. Additionally, PNM has entered into three separate 25-year PPAs to purchase renewable energy and RECs to be used by PNM to supply additional renewable power to the Meta data center. These PPAs include the purchase of power and RECs from a 50 MW wind project, which was placed in commercial operation in November 2018, a 166 MW wind project which became operational in February 2021, and a 50 MW solar-PV project to be operational in 2022. In addition, the NMPRC issued an order that will allow PNM to service the Meta data center for an additional 190 MW of solar PPA combined with 50 MW of battery storage and a 50 MW solar PPA expected to be operational in 2023. See Note 17.
In March 2020, the NMPRC approved the PNM Solar Direct program under which qualified governmental and large commercial customers could participate in a voluntary renewable energy procurement program. The costs of the program would be recovered directly from subscribing customers through a rate rider, including the costs to procure renewable energy from 50 MW of solar-PV facilities under a 15-year PPA. These facilities are expected to be placed in commercial operation in 2022.
PNM will continue to procure renewable resources while balancing the impact to customers’ electricity costs in order to meet New Mexico’s escalating RPS and carbon-free resource requirements.
Energy Efficiency
    
Energy efficiency plays a significant role in helping to keep customers’ electricity costs low while meeting their energy needs and is one of the Company’s approaches to supporting environmentally responsible power. PNM’s and TNMP’s energy efficiency and load management portfolios continue to achieve robust results. In 2021, incremental energy saved as a result of new participation in PNM’s portfolio of energy efficiency programs is estimated to be approximately 95 GWh. This is equivalent to the annual consumption of approximately 11,245 homes in PNM’s service territory. PNM’s load management and annual energy efficiency programs also help lower peak demand requirements. As discussed above, in April 2020, PNM filed an application for energy efficiency and load management programs to be offered in 2021, 2022, and 2023. On September 17, 2020, the hearing examiner in the case issued a recommended decision recommending that PNM's proposed 2021 energy efficiency and load management program be approved, with the exception of the proposed AMI pilot program. On October 28, 2020, the NMPRC issued an order adopting the recommended decision in its entirety. In 2021, TNMP’s incremental energy saved as a result of new participation in TNMP’s energy efficiency programs is estimated to be approximately 19 GWh. This is equivalent to the annual consumption of approximately 2,469 homes in TNMP’s service territory. TNMP’s High-Performance Homes residential new construction energy efficiency program was honored for the sixth year in a row by ENERGY STAR. This recognition includes the program’s fourth straight Partner of the Year Sustained Excellence Award. For information on PNM's and TNMP's energy efficiency filing with the NMPRC and PUCT see Note 17.

Water Conservation and Solid Waste Reduction

PNM continues its efforts to reduce the amount of fresh water used to make electricity (about 35% more efficient than in 2007).  Continued growth in PNM’s fleet of solar and wind energy sources, energy efficiency programs, and innovative uses
A - 35

Table of Contents

of gray water and air-cooling technology have contributed to this reduction.  Water usage has continued to decline as PNM has substituted less fresh-water-intensive generation resources to replace SJGS Units 2 and 3 starting in 2018, as water consumption at that plant has been reduced by approximately 50%.  As the Company moves forward with its mission to achieve 100% carbon‐free generation by 2040, it expects that more significant water savings will be gained. PNM has set a goal to reduce freshwater use 80% by 2035 and 90% by 2040 from 2005 levels. Focusing on responsible stewardship of New Mexico’s scarce water resources improves PNM’s water-resilience in the face of persistent drought and ever-increasing demands for water to spur the growth of New Mexico’s economy.

In addition to the above areas of focus, the Company is working to reduce the amount of solid waste going to landfills through increased recycling and reduction of waste. In 2021, 18 of the Company’s 23 facilities met the solid waste diversion goal of a 65% diversion rate. The Company expects to continue to do well in this area in the future.

Customer, Stakeholder, and Community Engagement

Another key element of the Company’s commitment to ESG principles is fostering relationships with its customers, stakeholders, and communities. The Company strives to deliver a superior customer experience. Through outreach, collaboration, and various community-oriented programs, the Company has demonstrated a commitment to building productive relationships with stakeholders, including customers, community partners, regulators, intervenors, legislators, and shareholders. In December 2021, PNM Resources was named for the second consecutive year to Newsweek’s list of America’s Most Responsible Companies highlighting companies in areas of ESG. PNM continues to focus its efforts to enhance the customer experience through customer service improvements, including enhanced customer service engagement options, strategic customer outreach, and improved communications. These efforts are supported by market research to understand the varying needs of customers, identifying and establishing valued services and programs, and proactively communicating and engaging with customers. As a result, PNM continues to experience steady performance in customer satisfaction in both the J.D. Power Electric Utility Residential Customer Satisfaction StudySM and its own proprietary relationship surveys. In the 2021 fourth quarter J.D. Power overall customer satisfaction results PNM outperformed the West Midsize industry average by one point.

The Company has leveraged a number of communications channels and strategic content to better serve and engage its many stakeholders. PNM’s website www.pnm.com, provides the details of major regulatory filings, including general rate requests, as well as the background on PNM’s efforts to maintain reliability, keep prices affordable, and protect the environment. The Company’s website is also a resource for information about PNM’s operations and community outreach efforts, including plans for building a sustainable energy future for New Mexico and to transition to an emissions-free generating portfolio by 2040. PNM has also leveraged social media in communications with customers on various topics such as education, outage alerts, safety, customer service, and PNM’s community partnerships in philanthropic projects. As discussed above, PNMR’s corporate website, www.pnmresources.com, includes a dedicated section providing additional information regarding the Company’s commitment to ESG principles and other sustainability efforts.

With reliability being the primary role of a transmission and distribution service provider in Texas’ deregulated market, TNMP continues to focus on keeping end-users updated about interruptions and to encourage consumer preparation when severe weather is forecasted. In the third quarter of 2021, TNMP provided a 30-person team in support of another utility that experienced significant damage to their transmission and distribution system as a result of Hurricane Ida. TNMP has been honored by the Edison Electric Institute four times since 2012 for its assistance to out-of-state utilities affected by hurricanes. TNMP has also been honored twice for hurricane response in its own territory.

Local relationships and one-on-one communications remain two of the most valuable ways both PNM and TNMP connect with their stakeholders. Both companies maintain long-standing relationships with governmental representatives and key electricity consumers to ensure that these stakeholders are updated on Company investments and initiatives. Key electricity consumers also have dedicated Company contacts that support their important service needs.

Another demonstration of the Company’s commitment to ESG principles is the Company’s tradition of supporting the communities it serves in New Mexico and Texas. This support extends beyond corporate giving and financial donations from the PNM Resources Foundation to also include collaborations on community projects, customer low-income assistance programs, and employee volunteerism. In response to COVID-19, additional efforts were made in each of these areas and exhibit the Company’s core value of caring for its customers and communities.

During the three years ending December 31, 2021, corporate giving contributed $10.4 million to civic, educational, environmental, low income, and economic development organizations. PNMR recognizes its responsibility to support programs and organizations that enrich the quality of life across its service territories and seeks opportunities to further demonstrate its commitment in these areas as needs arise. In response to COVID-19 community needs, PNMR donated to an Emergency Action Fund in partnership with key local agencies to benefit approximately ninety nonprofits and small businesses facing challenges due to lack of technology, shifting service needs, and cancelled fundraising events. Additionally, employee teams have supported first responders and other front-line workers through the delivery of food and other supplies often procured from local businesses struggling during stay-at-home orders. PNM also donated to the Pueblo Relief Fund and delivered personal protective supplies to pueblo areas and tribal nations throughout New Mexico. While its service territory does not include the Navajo Nation, PNM’s operations include generating facilities and employees in this region that has been
A - 36

Table of Contents

disproportionately affected by the pandemic. In response, employee teams focused efforts to this region and also provided available supplies of personal protective equipment. PNM has also collaborated with the Navajo Tribal Utility Authority Wireless (“NTUAW”) to set up wireless “hot spots” throughout the Navajo Nation in areas without internet access to assist first responders and support continued education opportunities amidst school closures. These actions supplement PNM’s continued support for the Navajo Nation. The PNM Navajo Nation Workforce Training Scholarship Program provides support for Navajo tribal members and encourages the pursuit of education and training in existing and emerging jobs in the communities in which they live. In 2019, PNM invested an additional $500,000 into this scholarship program to further assist in the development and education of the Navajo Nation workforce. PNM has invested in paid summer college engineering internship programs for American Indian students available in the greater Albuquerque area and established the PNM Pueblo Education Scholarship Endowment to invest in higher education for Native American Pueblo Indian students. PNM also continues to partner in the Light up Navajo project, piloted in 2019 and modeled after mutual aid to connect homes without electricity to the power grid. In a more active role in 2021, PNM also partnered with key local organizations to initiate funding for programs focused on diversity, equity and inclusion.

Another important outreach program is tailored for low-income customers and includes the PNM Good Neighbor Fund to provide customer assistance with their electric utility bills. COVID-19 has increased the needs of these customers along with customers who may not otherwise need to seek assistance. In addition to the suspension of residential customer disconnection from April 2020 through August 2021 and the expansion of customer payment plans, PNM responded with increased communications through media outlets and customer outreach to connect customers with nonprofit community service providers offering financial assistance, food, clothing, medical programs, and services for seniors. As a result of these communication efforts, 4,147 families in need received emergency assistance through the PNM Good Neighbor Fund during 2021. Additionally, PNM has worked closely with the New Mexico Department of Finance and Administration to implement strategies ensuring customers receive rent benefits, including utility bill assistance, from the Emergency Rental Assistance Program (“ERAP”). As a result of these efforts, the ERAP has paid over $6 million in customer arrears since the launch of the program in March 2021.

Additionally, as a part of corporate giving, on October 1, 2020, PNM introduced $2.0 million in funding for new COVID Customer Relief Programs to support income-qualified residential customers and small business customers who have been impacted by the financial challenges created by COVID-19 and have past due electric bills. Qualified customers that pay a portion of their past-due balance can receive assistance toward their remaining balance.

Volunteerism is also an important facet of employee culture, keeping our communities safer, stronger, smarter and more vibrant. In 2021, new programs were launched to provide employees with COVID-safe projects through virtual, hybrid, and limited group gatherings. Employees and nonprofits remained resilient, creative, and innovative and responded to community need and selflessly gave their time and talents to organizations throughout New Mexico and Texas completing 8,741 volunteer hours with nonprofits and other community organizations. Volunteers also participate in a company-wide annual Day of Service at nonprofits across New Mexico and Texas along with participation on a variety of nonprofit boards and independent volunteer activities throughout the year. In addition, the Company facilitated employee and customer Earth Day cleanups across PNM’s service territory resulting in over 2,200 gallons of trash collected.

In addition to the extensive engagement both PNM and TNMP have with nonprofit organizations in their communities, the PNM Resources Foundation provides nearly $1.6 million in grant funding each year across New Mexico and Texas. These grants help nonprofits innovate or sustain programs to grow and develop business, develop and implement environmental programs, and provide educational opportunities. Beginning in 2020, the PNM Resources Foundation is funding grants with a three-year focus on decreasing homelessness, increasing access to affordable housing, reducing carbon emissions, and increasing community safety with an emphasis on COVID-19 programs. As part of this emphasis, $0.5 million is awarded annually to nonprofits in New Mexico and Texas to assist with work being done on the front lines of the pandemic for community safety, with a focus on helping senior citizens and people currently experiencing homelessness during the shelter-in-place directives. The PNM Resources Foundation continued to expand its matching donation program to offer 2-to-1 matching on employee donations made to social justice nonprofits and increased the annual amount of matching donations available to each of its employees. PNM Resources Foundation awarded $0.3 million of additional grants to non-profits supporting TNMP communities following the winter storm in February 2021.

Economic Factors
    
PNM – In 2021, PNM experienced a decrease in weather normalized residential load of 0.9%, more than offset by an increase in weather normalized commercial load of 4.4% compared to 2020, signaling a return to pre-COVID-19 levels. PNM did not experience significant impacts to its other customer classes.

TNMP – In 2021, TNMP experienced a decrease in volumetric weather normalized retail load of 0.8% compared to 2020. Weather normalized demand-based load, excluding retail transmission consumers, increased 1.8% in 2021 compared to 2020. The shift back to lower volumetric weather normalized retail load and higher weather normalized demand-based commercial and industrial load reflects a return to pre-COVID-19 trends.

A - 37

Table of Contents

Although the Company has experienced signs of recovery from state restrictions related to COVID-19, it is unable to determine the duration or final impacts from COVID-19 as discussed in more detail in Item 1A Risk Factors. The Company has not experienced, nor does it expect significant negative impacts to customer usage at PNM and TNMP resulting from the economic impacts of COVID-19. However, if current economic conditions worsen, the Company may be required to implement additional measures such as reducing or delaying operating and maintenance expenses and planned capital expenditures.

Results of Operations

Net earnings attributable to PNMR were $195.8 million, or $2.27 per diluted share in the year ended December 31, 2021 compared to $172.8 million, or $2.15 per diluted share in 2020. Among other things, earnings in 2021 benefited from higher weather normalized retail load at PNM, higher demand-based load at TNMP, higher transmission rates at PNM and TNMP, higher distribution rates at TNMP, lower surface mine reclamation expense and lower accretion expense at PNM, lower interest expense at PNM and Corporate and Other, higher equity AFUDC at PNM, and lower costs related to the Merger at Corporate and Other. These increases were partially offset by milder weather conditions at PNM and TNMP, lower volumetric load at TNMP, increased operational and maintenance expense, including higher plant maintenance and administrative costs at PNM, higher employee related, outside service and vegetation management expense at PNM and TNMP, increased depreciation and property taxes at PNM and TNMP due to increased plant in service, higher interest charges at TNMP, and decreased performance on PNM's NDT and coal mine reclamation investment securities. Diluted earnings per share increased in 2021 due to higher net earnings, partially offset by the dilutive impact of additional shares issued under the PNMR 2020 Forward Equity Sale Agreements on December 15, 2020. Additional information on factors impacting results of operations for each segment is discussed below under Results of Operations.

Liquidity and Capital Resources

PNMR and PNM have revolving credit facilities with capacities of $300.0 million and $400.0 million that currently expire in October 2023. Both facilities provide for short-term borrowings and letters of credit and can be extended through October 2024, subject to approval by a majority of the lenders. In addition, PNM has a $40.0 million revolving credit facility with banks having a significant presence in New Mexico that expires in December 2022, and TNMP has a $75.0 million revolving credit facility, which expires in September 2022 and contains two one-year extension options, subject to approval by a majority of the lenders. Total availability for PNMR on a consolidated basis was $799.8 million at February 18, 2022. The Company utilizes these credit facilities and cash flows from operations to provide funds for both construction and operational expenditures. PNMR also has intercompany loan agreements with each of its subsidiaries.

PNMR projects that its consolidated capital requirements, consisting of construction expenditures and dividends, will total $4.8 billion for 2022-2026. These construction expenditures include expenditures for PNM’s capital initiative that includes investments in transmission and distribution infrastructure to deliver clean energy, enhance customer satisfaction, and increase grid resilience.

To fund capital spending requirements to meet growth that balances earnings goals, credit metrics and liquidity needs, the Company has entered into a number of other financing arrangements in 2021. For further discussion on these financing arrangements see Liquidity and Capital Resources discussion below as well as Note 7.

After considering the effects of these financings and the Company’s short-term liquidity position as of February 18, 2022, the Company has consolidated maturities of long-term and short-term debt aggregating $194.7 million in the period from January 1, 2022 through February 28, 2023. In addition to internal cash generation, the Company anticipates that it will be necessary to obtain additional long-term financing in the form of debt refinancing, new debt issuances, and/or new equity in order to fund its capital requirements during the 2022-2026 period. The Company currently believes that its internal cash generation, existing credit arrangements, and access to public and private capital markets will provide sufficient resources to meet the Company’s capital requirements for at least the next twelve months. As of December 31, 2021 and February 18, 2022, the Company was in compliance with its debt covenants.
RESULTS OF OPERATIONS

The following discussion and analysis should be read in conjunction with the Consolidated Financial Statements and Notes thereto. Trends and contingencies of a material nature are discussed to the extent known. Also, refer to Disclosure Regarding Forward Looking Statements in Part I, Item 1 and to Risk Factors in Part I, Item 1A.


A - 38


A summary of net earnings attributable to PNMR is as follows:
Year Ended December 31,Change
202120202021/2020
(In millions, except per share amounts)
Net earnings attributable to PNMR$195.8 $172.8 $23.0 
Average diluted common and common equivalent shares
86.1 80.3 5.8 
Net earnings attributable to PNMR per diluted share
$2.27 $2.15 $0.12 

The components of the changes in net earnings attributable to PNMR by segment are:
Change
2021/2020
(In millions)
PNM$10.0 
TNMP5.3 
Corporate and Other7.7 
  Net change$23.0 

Information regarding the factors impacting PNMR’s operating results by segment are set forth below.

Segment Information

The following discussion is based on the segment methodology that PNMR’s management uses for making operating decisions and assessing performance of its various business activities. See Note 2 for more information on PNMR’s operating segments.
PNM

PNM defines utility margin as electric operating revenues less cost of energy, which consists primarily of fuel and purchase power costs. PNM believes that utility margin provides a more meaningful basis for evaluating operations than electric operating revenues since substantially all fuel and purchase power costs are offset in revenues as those costs are passed through to customers under PNM’s FPPAC. Utility margin is not a financial measure required to be presented under GAAP and is considered a non-GAAP measure.

The following table summarizes the operating results for PNM:
 Year Ended December 31,Change
 202120202021/2020
 (In millions)
Electric operating revenues$1,362.0 $1,139.8 $222.2 
Cost of energy531.8 345.2 186.6 
Utility margin830.2 794.7 35.5 
Operating expenses438.4 414.4 24.0 
Depreciation and amortization170.4 165.3 5.1 
Operating income221.5 214.9 6.6 
Other income (deductions)28.4 31.6 (3.2)
Interest charges(51.4)(64.6)13.2 
Segment earnings before income taxes198.6 181.9 16.7 
Income (taxes)(27.0)(21.9)(5.1)
Valencia non-controlling interest(15.5)(14.0)(1.5)
Preferred stock dividend requirements(0.5)(0.5)— 
Segment earnings$155.5 $145.5 $10.0 
A - 39



The following table shows GWh sales, including the impacts of weather, by customer class and average number of customers:
 Year Ended December 31,Percent Change
 202120202021/2020
 (Gigawatt hours, except customers)
Residential3,339.5 3,438.4 (2.9)%
Commercial3,500.4 3,404.6 2.8 
Industrial1,592.3 1,412.6 12.7 
Public authority226.1 245.4 (7.9)
Economy service (1)
504.7 444.9 13.4 
Other sales for resale (2)
5,447.9 2,556.2 113.1 
14,610.9 11,502.1 27.0 %
Average retail customer (thousands)540.0 535.2 0.9 %
(1)PNM purchases energy for a large customer on the customer’s behalf and delivers the energy to the customer’s location through PNM’s transmission system. PNM charges the customer for the cost of the energy as a direct pass through to the customer with only a minor impact in utility margin resulting from providing ancillary services.
(2)Increase in other sales for resale is the result of participation in the EIM beginning in April 2021. See Note 4 and Note 17.

Operating results2021 compared to 2020

The following table summarizes the significant changes to utility margin:
Year Ended December 31, 2021
Change
Utility margin:
(In millions)
Retail customer usage/load – Weather normalized retail KWh sales increased 4.4%, for commercial customers, partially offset by decreased sales to residential customers of 0.9%
$6.1 
Weather – Slightly milder than normal weather in 2021 compared to significantly warmer weather in 2020; cooling degree days were 11.0% lower and heating degree days were 9.7% lower in 2021
(10.3)
Leap Year – Decrease in revenue due to additional day in 2020
(1.8)
Transmission Increase primarily due to higher revenue under formula transmission rates, the addition of new customers, and higher volumes
26.8 
Rate riders Includes renewable energy, fuel clause, and energy efficiency riders which are partially offset in operating expense
8.6 
Coal mine reclamation – Lower expense on surface mine reclamation in 2021 and the 2020 remeasurement of PNM’s obligation for Four Corners and SJGS coal mine reclamation (Note 16)
5.5 
Other
0.6 
Net Change
$35.5 


A - 40


The following tables summarize the primary drivers for operating expenses, depreciation and amortization, other income (deductions), interest charges, and income taxes:
Year Ended December 31, 2021
Change
Operating expenses:
(In millions)
Higher plant maintenance and administrative costs at SJGS, Four Corners and gas-fired plants, partially offset by lower costs at PVNGS$4.8 
Higher property taxes due to increases in utility plant in service, partially offset by favorable settlement of property values0.7 
Higher employee related, outside services, and vegetation management expenses12.5 
Higher energy efficiency and renewable rider expenses offset in utility margin4.8 
2021 non-retail credit loss 1.0 
2021 regulatory disallowance and restructuring costs, primarily resulting from the PVNGS Leased Interest Abandonment Application1.2 
2020 remeasurement of coal mine reclamation costs associated with ownership restructuring of SJGS and Four Corners (Note 16)(1.1)
Other0.1 
Net Change
$24.0 
Depreciation and amortization:
Increased utility plant in service$6.8 
Lower accretion expense for PVNGS plant decommissioning AROs resulting from 2020 study(2.0)
Other0.3 
Net Change$5.1 
Other income (deductions):
Decreased performance on investment securities in the NDT and coal mine reclamation trusts$(4.8)
Higher equity AFUDC2.9 
Higher trust expenses partially offset by higher interest income related to investment securities in the NDT and coal mine reclamation trusts(1.0)
2020 donation to the COVID Customer Relief Program2.0 
2021 donations including establishment of the PNM Pueblo Education Scholarship Endowment
(3.0)
Other0.7 
Net Change$(3.2)
Interest charges:
Issuance of $200.0 million of SUNs in April 2020$(2.3)
Refinancing of $160.0 million of SUNs in July 20211.8 
Issuance of $150.0 million of SUNs in December 2021(0.3)
Lower interest on term loans4.6 
Lower interest on remarketed PCRBs8.2 
Higher debt AFUDC including amounts resulting from 2020 FERC audit0.4 
Other0.8 
Net Change$13.2 
Income (taxes) benefits:
Higher segment earnings before income taxes$(3.9)
Lower non-deductible compensation1.2 
Lower amortization of state excess deferred income taxes (Note 18)(6.2)
Lower amortization of state net operating loss regulatory asset 1.4 
Other2.4 
Net Change$(5.1)
A - 41


TNMP

TNMP defines utility margin as electric operating revenues less cost of energy, which consists of costs charged by third-party transmission providers. TNMP believes that utility margin provides a more meaningful basis for evaluating operations than electric operating revenues since all third-party transmission costs are passed on to customers through a transmission cost recovery factor. Utility margin is not a financial measure required to be presented under GAAP and is considered a non-GAAP measure.

The following table summarizes the operating results for TNMP:
 Year Ended December 31,Change
 202120202021/2020
 (In millions)
Electric operating revenues$417.9 $383.2 $34.7 
Cost of energy113.1 102.1 11.0 
Utility margin304.8 281.1 23.7 
Operating expenses114.2 104.9 9.3